RecordWell Data

Utility Committee Meeting — Agenda Packet

City of New Berlin · Waukesha County · Utility Committee · meeting of Nov 10, 2026 · Agenda packets

Open the original document More from City of New Berlin

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Utility Committee Meeting Agenda November 10, 2026 - 4:45 PM Council Chambers 3805 S. Casper Drive Published: 11/05/2026 AGENDA 1. CALL TO ORDER 2. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE 3. APPROVAL OF MINUTES A. September 22, 2026 Meeting Minutes 4. NEW BUSINESS A. UT 14-26 Discussion and possible action on the proposed 2027 Water Utility Operating Budget. B. UT 15-26 Discussion and possible action on the proposed 2027 Water Utility CIP Budget. Information included in the 2027 Water Utility Operating Budget. C. UT 16-26 Discussion and possible action on the proposed 2027 Wastewater Utility Operating Budget. D. UT 17-26 Discussion and possible action on the proposed 2027 Wastewater Utility CIP Budget. Information included in the 2027 Wastewater Utility Operating Budget. 5. CLOSED SESSION A. The matters to be discussed in closed session are as enumerated in Wisconsin Statutes Section 19.85(1)(e): Deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. More specifically: B. Review of bids, engineer's recommendation and analysis for the Cleveland and Valley View Liftstation Generator Project. 6. RECONVENE TO OPEN SESSION A. Discussion and possible action to accept or reject the bid of presumptive low bidder. B. Discussion and possible action to award the bid for the construction of the Cleveland and Valley View Liftstation Generator Project to the lowest responsive, responsible bidder. 7. UPDATES 8. ADJOURN Additional Information Page 1 of 52 • The agenda packet, including supplemental information related to agenda items, is available online at www.NewBerlinWI.gov. Once finalized by the governing body, approved meeting minutes will also be posted online. • Agenda items may be taken out of order at the governing body's discretion. • Members, and possibly a quorum, of other municipal governmental bodies may attend this meeting to gather information. However, no action will be taken by any governmental body other than the one referenced in this notice. • Accommodations will be provided under the Americans with Disabilities Act (ADA) to meet the needs of individuals with disabilities. If you require assistance or appropriate aids and services, please contact the Office of the City Clerk at (262) 786-8610 with reasonable notice. Page 2 of 52 Utility Committee MEETING MINUTES September 22, 2026 - 4:45 PM Council Chambers 3805 S. Casper Drive MINUTES 1. CALL TO ORDER Alderman Harenda called the meeting to order at 4:47 PM 2. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE Assistant Deputy City Clerk Sarah Holtz took the roll call as follows: Present: Alderperson Hopkins, Alderperson Harenda, Commissioner Nissen Jr., Commissioner Anderson, Alderperson Kroupa Staff Present: City Attorney Mark Blum, Accounting Supervisor John Sughroue, Assistant Deputy City Clerk Sarah Holtz The Assistant Deputy City Clerk confirmed that a quorum was present and that the meeting was properly posted in compliance with open meetings law. 3. APPROVAL OF MINUTES A. 06/23/2026 Meeting Minutes MOTION: Motion to Approve Motion by: Alderperson Kroupa Second by: Alderperson Hopkins VOTE: Motion Passed 5-0 4. NEW BUSINESS None 5. OLD BUSINESS Page 3 of 52 None 6. CLOSED SESSION MOTION: Motion to Enter Closed Session at 4:48 PM Motion by: Alderperson Hopkins Second by: Commissioner Anderson VOTE: Motion Passed 5-0 A. The matters to be discussed in closed session are as enumerated in Wisconsin Statutes Section 19.85(1)(e): Deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. More Specifically: B. MD7/AT&T poposal for amendment of lease agreement for AT&T Calhoun Tower #1 C. MD7/AT&T proposal for amendment of lease agreement for AT&T Sunnyslope Tower #2 7. RECONVENE TO OPEN SESSION MOTION: Motion to Return to open session at 4:54 PM Motion by: Commissioner Nissen Jr. Second by: Commissioner Anderson VOTE: Motion Passed 5-0 A. Discussion and possible action regarding MD7/AT&T proposal for amendment of lease agreement for AT&T Calhoun Tower #1. No action was taken. B. Discussion and possible action regarding MD7/AT&T proposal for amendment of lease agreement for AT&T Sunnyslope Tower #2. No action was taken. 8. UPDATES Page 4 of 52 None 9. ADJOURN MOTION: Motion to Adjourn at 4:55 PM Motion by: Alderperson Kroupa Second by: Alderperson Hopkins VOTE: Motion Passed 5-0 Respectfully Submitted, Sarah Holtz, Assistant Deputy City Clerk Page 5 of 52 CITY OF NEW BERLIN PROPOSED BUDGET YEAR 2027 WATER UTILITY Page 6 of 52 New Berlin Water Utility 2027 Budget TABLE OF CONTENTS 1 Budget Assumptions 3 Budget Summary 4 2027 Proposed Budget 8 Payroll 10 Budget Detail Description 16 Four-Year Budget Analysis 17 2027 Capital Budget 18 Ten-Year Capital Budget 19 Capital Budget Detail Description Page 7 of 52 Page 1 WATER BUDGET ASSUMPTIONS Revenues: The Water Utility is not currently projecting a water rate increase for 2027. However, Milwaukee Water Works (MWW) is undergoing a conventional rate case that may affect the Utility’s cost of purchased water. Based on the most recent available estimate, MWW rates may increase by approximately 7%. If implemented, the Water Utility could use a Purchased Water Adjustment to pass through the increased wholesale cost. This would result in an estimated customer rate increase of approximately 1.5% to 1.75%. Because the timing and final outcome of the MWW rate case remain uncertain, no purchased-water- related rate increase is included in the 2027 budget. The Utility is projecting a typical year of water usage, with approximately 815 million gallons expected to be sold. All other utility revenues are expected to remain relatively flat in 2027. Expenses: Operating Purchased Water: Like said above MWW petitioned the Public Service Commission for a Conventional Rate Case. It is expected that these rates should go into effect sometime during 2027. The Water Utility is budgeting for a typical volume of water purchased, approximately 926 million gallons. Labor: As experienced operators retire and new hires come on board, the Utility Department is focused on training employees across both Wastewater and Water operations. Additionally, the Department implemented a new time and attendance system a couple of years ago, which now provides a more accurate reflection of how operators are allocating their time. As a result of these two factors, the approach to budgeting labor has been updated in this year’s budget. Based on an analysis of the past five years of hourly data, it has been determined that operators spend approximately 57.4% of their time supporting Water operations and 42.6% supporting Wastewater operations. Applying this allocation, along with staffing assigned to other Utility functions, results in 10.4 full-time equivalent (FTE) positions budgeted to the Water Utility and 8.0 FTE positions budgeted to the Wastewater Utility. The Utility Department is aligning with the City’s self-insured health insurance model, which was implemented in 2026. Based on the most recent information available, health insurance premiums are projected to increase by 12.0% compared with 2026. Additionally, the Wisconsin Retirement System (WRS) contribution rate has increased slightly for 2027, rising to 7.25% from 7.20% in 2026. Supply Pumping – Power (91000623-56130) and Gas & Oil (91004933-54190): Due to rate increases from WE Energies and significant increases in gas prices, the budgeted expenses for electricity and gas & oil have been increased accordingly. Maintenance of Structure & Improvements – Contracted Services (91004651-52030): In 2027 the Utility will be contracting with a company to do maintenance on all the generators at the pumphouses. We expect this to cost us about $12,500. Distribution Reservoirs & Standpipes – Contracted Services (91002672-52030): Every five years the Utility is required clean and inspect the underground reservoirs and water towers. Every ten years we are required to drain the water towers. This was done in 2026. Therefore, we have decreased this line item by $20,000. Page 8 of 52 Page 2 Taxes – Tax Equivalent: Tax Equivalent, or sometimes referred to as a “payment in lieu of tax”, is a cost of providing utility service and is an expense that must be recorded as required by the PSC. Non Operating Expenses: Amortization Exp – Milwaukee Water: The Water Utility paid $1,500,000 for the right to purchase water from the City of Milwaukee in 2009. The Water Utility is amortizing $75,000 over the life of the contract, which was 20 years. After 2027 there will be one remaining on the contract. The contract with MWW will automatically renew. Expenses: Interest Clean Water Fund Loan: In 2015 the Water Utility applied for Clean Water Fund Loans to pay for the Water Reliability Project, in 2017 162 nd Street Watermain Replacement project, and in 2018 Greenridge Watermain Placement project. We received the funding for the Reliability project in 2017, 162nd Street project in 2018, and Greenridge project in 2020. The Utility has budgeted $37,756 in interest expense from these three loans. These loans will be paid in full in the year 2039. Advance from Wastewater: In 2022 the Water Utility borrowed $5,500,000 from the Wastewater Utility to fund the Moorland Road Relining project. The amount of interest budgeted to pay to the Wastewater Utility is $141,000. The advance will be paid in full in 2042. Capital funding: The total 2027 capital budget is $939,000. Major projects include:  Pumphouse #7 Emergency Generator — $350,000: Inst allation of a standby generator to provide reliable backup power for the booster pumps serving the surrounding neighborhood. See page 26 for additional details.  Rogers Pumphouse #3 Variable Frequency Drive — $100,000: Installation of a variable frequency drive to improve pump operation and system control. See page 22 for additional details.  Forest View Pumphouse Demolition: Demolition of the decommissioned Forest View reservoir site, which no longer serves an operational purpose. See page 24 for additional details. See page 17 for the full 2027 capital funding budget, page 18 for the ten-year capital funding projection. Page 9 of 52 03-Nov-26 2027 PROPOSED BUDGET 2024 2025 2026 2026 2026 EST. 2027 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL BUDGET OPERATING REVENUES 6,499,621 6,778,621 7,040,709 3,218,312 6,919,236 7,038,841 OPERATING EXPENSES OPERATIONS & MAINTENANCE 3,097,426 3,319,405 3,563,850 1,580,113 3,426,287 3,665,379 DEPRECIATION 1,558,592 1,490,549 1,600,000 790,000 1,600,000 1,550,000 TAX EQUIVALENT-TO CITY 708,217 731,022 745,000 372,500 745,000 774,000 TOTAL OPERATING EXPENSE 5,364,235 5,540,976 5,908,850 2,742,613 5,771,287 5,989,379 NET OPERATING INCOME (LOSS) 1,135,386 1,237,645 1,131,859 475,699 1,147,949 1,049,462 NON-OPERATING EXPENSES INTEREST ON DEBT 214,476 196,434 188,271 94,136 188,271 178,756 LITIGATION SETTLEMENT - - - - - - LOSS ON DISPOSAL - - - - - - AMORTIZATION 75,000 75,000 75,000 37,500 75,000 75,000 TOTAL NON-OPERATING EXPENSE 289,476 271,434 263,271 131,636 263,271 253,756 NON-OPERATING REVENUES AMORITZATION OF BOND PREMIUM 10,530 - - - - - INTEREST INCOME 449,582 405,983 400,000 191,040 380,000 380,000 GRANTS - - - - - - TOTAL NON-OPERATING REVENUE 460,112 405,983 400,000 191,040 380,000 380,000 Net Income Before Capital Contributions 1,306,022 1,372,194 1,268,588 535,104 1,264,678 1,175,706 Capital Contributions 41,736 - - - - - CHANGE in NET ASSETS 1,347,758 1,372,194 1,268,588 535,104 1,264,678 1,175,706 Net Assets - Beginning of Year 47,048,597 48,396,355 49,768,549 49,768,549 51,033,227 Net Assets - End of Year 48,396,355 49,768,549 51,037,137 51,033,227 52,208,934 NEW BERLIN WATER UTILITY Page 3 Page 10 of 52 03-Nov-26 2024 2025 2026 2026 2026 EST. 2027 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ________ ________ ________ ________ ________ ________ OPERATING REVENUES: 91000000 46000 UNMETERED SALES 2,705 2,820 8,000 714 3,000 3,000 91000000 46110 METERED SALES - RESIDENTIAL 2,737,118 2,823,173 2,979,740 1,293,939 3,012,439 2,995,134 91000000 46120 METERED SALES - COMMERCIAL 1,019,160 1,031,202 1,105,051 505,330 1,028,678 1,112,524 91000000 46125 METERED SALES - MULTIFAMILY 662,944 686,040 743,114 342,224 684,524 745,338 91000000 46130 METERED SALES - INDUSTRIAL 425,520 452,652 417,283 215,421 406,629 418,583 91000000 46140 METERED SALES - PUBLIC 59,731 58,126 54,039 23,440 52,765 52,875 91000000 46181 PRIVATE FIRE PROTECTION 169,296 169,254 186,048 85,062 170,124 170,208 91000000 46182 PUBLIC FIRE PROTECTION 964,674 1,050,934 1,050,934 525,467 1,050,934 1,050,934 91000000 46200 FORFEITED DISCOUNTS 34,660 57,962 38,000 11,315 53,000 46,000 91000000 46300 STAND-BY SERVICE 10,024 9,848 10,000 4,872 9,744 10,000 91000000 46301 MISC. SERVICE REVENUES 3,311 5,184 7,500 3,146 6,400 6,400 91000000 46301 METER CHARGE TO SEWER 200,883 212,401 225,000 110,416 225,000 220,000 91100000 48010 RENTS (TOWER/BUILDINGS) 188,595 198,025 195,000 96,966 195,000 186,845 91000000 46011 ADMIN CHARGE TO STORMWATER 21,000 21,000 21,000 - 21,000 21,000 --------------- --------------- --------------- --------------- --------------- --------------- SUBTOTAL-OPERATING REVENUES 6,499,621 6,778,621 7,040,709 3,218,312 6,919,236 7,038,841 NONOPERATING REVENUES: 91100000 47000 INTEREST INCOME 432,600 395,820 400,000 191,040 380,000 380,000 91100000 47001 UNREALIZED GAIN/LOSS ON INVESTM E 16,541 2,780 - - - - 91100000 47002 REALIZED GAIN/LOSS ON INVESTMEN T 441 7,383 - - - - 91000000 49502 AMORTIZATION OF BOND PREMIUM 10,530 - - - - - 91300000 43400 IMPACT FEES - - - - - - 91300000 42400 CAPITAL CONTRIBUTION 41,736 - - - - - --------------- --------------- --------------- --------------- --------------- --------------- SUBTOTAL-NONOPERATING REVENU 501,848 405,983 400,000 191,040 380,000 380,000 __________ __________ __________ __________ __________ __________ TOTAL REVENUES 7,001,469 7,184,604 7,440,709 3,409,352 7,299,236 7,418,841 CITY OF NEW BERLIN WATER UTILITY 2027 PROPOSED BUDGET Page 4 Page 11 of 52 1852126.965 2024 2025 2026 2026 2026 EST. 2027 121,167 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ________ ________ ________ ________ ________ ________ OPERATING EXPENSES: 91000602 53021 PURCHASED WATER 1,558,875 1,530,142 1,668,293 768,809 1,703,000 1,730,960 91000623 56130 POWER PURCHASED 98,619 107,360 137,025 66,421 132,842 155,000 91000624 50010 OPERATIONS - LABOR 23,963 16,863 32,095 861 1,722 20,419 91000624 52030 OPERATIONS - CONTRACTED 13,943 15,597 25,000 32,982 45,000 40,000 91000624 54110 OPERATIONS - SUPPLIES - - 1,000 - 500 1,000 91000631 50010 STRUC & IMPROV PUMPHSE LABOR 19,193 18,096 25,013 4,641 9,282 19,582 91000631 52030 STRUC & IMPROV PUMPHSE CONTRA C 92,177 133,914 42,000 1,350 15,000 40,000 91000631 54110 STRUC & IMPROV PUMPHSE SUPPLIE S 3,162 2,448 3,000 98 3,000 3,000 91000633 50010 PUMPING PLANT - LABOR 22,489 32,951 18,987 10,972 21,944 26,363 91000633 52030 PUMPING PLANT - CONTRACTED 1,998 - 12,000 - 4,000 9,000 91000633 54110 PUMPING PLANT - SUPPLIES 10 - 3,000 121 1,000 2,500 91001642 50010 WATER SAMPLES - LABOR 8,051 9,040 10,790 3,367 6,734 9,469 91001642 52030 WATER SAMPLES - TESTING 13,197 13,602 16,000 5,812 15,000 16,000 91001642 54110 WATER SAMPLES - SUPPLIES 327 808 500 1,501 2,000 2,000 91004651 50010 STRUC & IMPROV - LABOR 4,097 14,847 16,292 5,415 10,830 12,603 91004651 52030 STRUC & IMPROV - CONTRACTED 9,405 11,445 13,000 8,544 14,000 22,000 91004651 54110 STRUC & IMPROV - SUPPLIES 812 2,825 5,000 3,842 5,000 5,000 91001652 54110 WATER TREATMENT - SUPPLIES - 307 400 - 400 400 91002663 50010 METER REPLACEMENT - LABOR 38,402 52,023 60,264 31,925 63,850 58,688 91002663 52030 METER REPLACEMENT - CONTRACTE D - 2,266 1,500 25 1,500 2,000 91002663 54110 METER REPLACEMENT - SUPPLIES 6,262 2,988 6,800 5,752 7,000 7,500 91002664 50010 CUST INSTALL - LABOR 8,933 22,811 14,011 14,652 29,304 20,533 91002664 52030 CUST INSTALL - CONTRACTED - - 200 - - 200 91002664 54110 CUST INSTALL - SUPPLIES 6,546 - 2,500 1,749 2,500 2,500 91002672 50010 DIST RESERVOIRS - LABOR 193 3,003 2,869 236 472 1,788 91002672 52030 DIST RESERVOIRS - CONTRACTED 19,987 4,911 44,000 19,383 30,000 24,000 91002672 54110 DIST RESERVOIRS - SUPPLIES 936 2,799 1,500 234 1,500 1,500 91002673 50010 TRANS & DIST - LABOR 88,233 115,596 112,151 39,851 79,702 108,241 91002673 52030 TRANS & DIST - CONTRACTED 11,795 71,732 45,000 14,093 40,000 45,000 91002673 54110 TRANS & DIST - SUPPLIES 13,620 32,124 40,000 6,315 30,000 35,000 91002674 50010 FIRE MAINS - LABOR 741 361 597 291 582 624 91002675 50010 SERVICES - LABOR 91,282 37,919 79,596 15,677 31,354 65,696 91002675 52030 SERVICES - CONTRACTED 422 - 10,000 786 2,500 10,000 91002675 54110 SERVICES - SUPPLIES 595 1,107 9,000 931 4,000 9,000 CITY OF NEW BERLIN WATER UTILITY 2027 PROPOSED BUDGET Page 5 Page 12 of 52 2024 2025 2026 2026 2026 EST. 2027 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ________ ________ ________ ________ ________ ________ 91002676 50010 METER TESTING - LABOR 11,942 15,608 15,987 5,712 11,424 15,035 91002676 52030 METER TESTING - CONTRACTED 5,266 5,616 8,500 - 8,500 8,500 91002676 54110 METER TESTING - SUPPLIES 332 1,648 1,500 - 2,000 1,500 91002677 50010 HYDRANTS - LABOR 35,976 48,563 53,477 10,903 21,806 43,720 91002677 52030 HYDRANTS - CONTRACTED 29,739 12,309 22,000 - 15,000 22,000 91002677 54110 HYDRANTS - SUPPLIES 9,712 19,431 30,000 6,308 25,000 30,000 91003902 50010 METER READING - LABOR 4,463 5,396 4,851 1,437 2,874 4,810 91003902 52030 METER READING - CONTRACTED 2,726 4,364 25,000 14,618 25,000 18,000 91003902 54110 METER READING - SUPPLIES 500 - 100 180 300 100 91003903 52030 ACCT & COLLECT - CONTRACTED 20,625 20,625 25,000 10,312 20,625 25,000 91003903 54110 ACCT & COLLECT - SUPPLIES 13,746 14,669 16,000 7,495 15,000 16,000 91003904 56190 UNCOLLECTIBLE ACCOUNTS 527 92 1,000 - 1,000 1,000 91004920 50010 ADMIN & GENERAL - LABOR 240,142 287,467 221,315 179,764 359,528 271,454 91004920 51030 HEALTH INSURANCE 176,465 183,747 187,850 96,380 192,760 207,936 91004920 51065 VISION DENTAL INSURANCE 3,558 3,824 4,946 2,226 4,452 5,031 91004920 51070 LIFE INSURANCE 1,340 1,269 1,530 1,393 2,786 1,541 91004921 54110 CONSERVATION - SUPPLIES - - 100 - - 100 91004921 54112 CONSERVATION - TOILET REBATE PR O - - 300 - 100 300 91004921 54120 OFFICE SUPPLIES & EXPENSE 23,276 18,865 35,000 5,033 25,000 25,000 91004923 56200 OUTSIDE SERVICE-ACCOUNTING 18,167 17,704 18,500 12,798 18,500 18,500 91004923 56210 OUTSIDE SERVICE-LEGAL 9,312 9,312 13,000 4,656 9,312 13,000 91004923 56220 OUTSIDE SERVICE-ENGINEERING - - 15,000 - 5,000 15,000 91004923 56250 OUTSIDE SERVICE-CROSS CONNECT 33,290 33,984 33,984 11,328 33,984 36,000 91004923 56250 OUTSIDE SERVICE-GIS 7,500 7,500 7,500 3,750 7,500 7,500 91004924 56050 PROPERTY INSURANCE 33,340 24,715 34,000 16,833 32,000 32,000 91004925 50010 SAFETY/TRAINING - LABOR 5,775 6,325 4,807 5,741 11,482 7,766 91004925 52030 TRAINING SERVICES - - - - - - 91004925 54110 SAFETY/TRAINING - SUPPLIES 3,596 5,455 5,000 402 4,000 5,000 91004925 54300 CONFERENCE/SEMINAR/MEETING 1,008 3,421 4,800 1,153 4,800 5,800 91004926 50080 VACATION 68,052 69,049 67,206 23,475 46,950 68,733 91004926 50090 SICK LEAVE 13,826 22,466 24,520 6,827 13,654 20,371 91004926 50100 HOLIDAYS - - 685 - - 187 91004926 50110 OTHER LABOR - 92 708 114 228 281 91004926 51010 RETIREMENT 40,001 64,819 56,453 26,431 52,862 59,385 91004926 51060 LONG TERM DISABILITY 738 580 632 165 330 629 91004926 52070 DRUG TESTING - - 700 - 700 700 91004927 56020 WORKMAN'S COMP. 18,317 11,417 22,000 11,250 21,000 22,000 91004927 56080 INSURANCE CLAIMS - 27,447 - - - - CITY OF NEW BERLIN WATER UTILITY 2027 PROPOSED BUDGET Page 6 Page 13 of 52 2024 2025 2026 2026 2026 EST. 2027 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ________ ________ ________ ________ ________ ________ 91004932 52030 GENERAL PLANT - CONTRACTED 1,227 8,436 9,000 2,754 9,000 9,000 91004932 54110 GENERAL PLANT - SUPPLIES 5,566 4,743 5,500 1,379 6,000 5,500 91004933 50010 TRANSP EXP - LABOR 13,048 12,968 17,835 3,974 7,948 14,170 91004933 54020 TRANSP EXP - CONTRACTED 5,959 7,791 12,000 3,548 6,000 12,000 91004933 54110 TRANSP EXP - SUPPLIES 581 340 1,700 97 500 1,700 91004933 54190 TRANSP EXP - GAS,OIL,TIRES 16,395 18,760 22,000 9,359 22,000 30,000 91004933 56030 TRANSP EXP - INSURANCE 3,640 2,497 5,500 - 5,500 5,500 91010000 58010 DEPRECIATION 1,455,842 1,411,247 1,500,000 740,000 1,500,000 1,450,000 91010000 58030 DEPRECIATION - TRANSPORTATION 102,750 79,302 100,000 50,000 100,000 100,000 91020049 56240 REGULATORY COMMISSION EXP. 7,051 7,751 7,000 - 7,000 7,400 91024926 51020 TAXES-FICA & MEDICARE 52,437 48,455 59,981 25,682 51,364 62,664 91250060 56230 TAXES-TAX EQUIVALENT 708,217 731,022 745,000 372,500 745,000 774,000 ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- SUBTOTAL-OPERATING EXPENSES 5,364,235 5,540,976 5,908,850 2,742,613 5,771,287 5,989,379 NONOPERATING EXPENSES: 91130050 57010 INTEREST ON LONG-TERM DEBT 9,063 - - - - - 91130050 57010 INTEREST ON ADVANCE FROM SEWE R 159,538 153,375 147,600 73,800 147,600 141,000 91130050 57010 INTEREST ON CLEAN WATER FUND L O 45,875 43,059 40,671 20,336 40,671 37,756 91140050 58041 AMORTIZATION OF MILWAUKEE WATER 75,000 75,000 75,000 37,500 75,000 75,000 -------------- -------------- -------------- -------------- -------------- -------------- SUBTOTAL-NONOPERATING EXPENS 289,476 271,434 263,271 131,636 263,271 253,756 __________ __________ __________ __________ __________ __________ TOTAL EXPENSES 5,653,711 5,812,410 6,172,121 2,874,249 6,034,558 6,243,135 CHANGE IN NET ASSETS 1,347,758 1,372,194 1,268,588 535,104 1,264,678 1,175,706 - CITY OF NEW BERLIN WATER UTILITY 2027 PROPOSED BUDGET Page 7 Page 14 of 52 2024 2025 2026 2026 2026 EST. 2027 DESCRIPTION ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ________ ________ ________ ________ ________ ________ OPERATIONS - LABOR 23,963 16,863 32,095 861 1,722 20,419 STRUC & IMPROV PUMPHSE LABOR 19,193 18,096 25,013 4,641 9,282 19,582 PUMPING PLANT - LABOR 22,489 32,951 18,987 10,972 21,944 26,363 WATER SAMPLES - LABOR 8,051 9,040 10,790 3,367 6,734 9,469 STRUC & IMPROV - LABOR 4,097 14,847 16,292 5,415 10,830 12,603 WATER TREATMENT - LABOR - - - - - - METER REPLACEMENT - LABOR 38,402 52,023 60,264 31,925 63,850 58,688 CUST INSTALL - LABOR 8,933 22,811 14,011 14,652 29,304 20,533 DIST RESERVOIRS - LABOR 193 3,003 2,869 236 472 1,788 TRANS & DIST - LABOR 88,233 115,596 112,151 39,851 79,702 108,241 FIRE MAINS - LABOR 741 361 597 291 582 624 SERVICES - LABOR 91,282 37,919 79,596 15,677 31,354 65,696 METER TESTING - LABOR 11,942 15,608 15,987 5,712 11,424 15,035 HYDRANTS - LABOR 35,976 48,563 53,477 10,903 21,806 43,720 METER READING - LABOR 4,463 5,396 4,851 1,437 2,874 4,810 ACCT & COLLECT - LABOR - - - - - - SAFETY/TRAINING - LABOR 5,775 6,325 4,807 5,741 11,482 7,766 VACATION 68,052 69,049 67,206 23,475 46,950 68,733 SICK LEAVE 13,826 22,466 24,520 6,827 13,654 20,371 HOLIDAYS - - 685 - - 187 OTHER LABOR - 92 708 114 228 281 TRANSP EXP - LABOR 13,048 12,968 17,835 3,974 7,948 14,170 ADMIN & GENERAL - LABOR 240,142 287,467 221,315 179,764 359,528 271,454 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 698,801 791,444 784,056 365,835 731,670 790,533 Full-time 689,657 771,452 746,430 347,719 695,044 717,364 Over-time 922 3,261 3,000 803 2,000 3,000 City Charge 8,222 16,731 34,626 17,313 34,626 70,169 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 698,801 791,444 784,056 365,835 731,670 790,533 CITY OF NEW BERLIN WATER UTILITY 2027 PROPOSED BUDGET Page 8 Page 15 of 52 2024 2025 2026 2027 BUDGET BUDGET BUDGET BUDGET ________ ________ ________ ________ Director of DPW 0.00 0.00 0.10 0.10 Deputy Director of DPW 0.00 0.00 0.10 0.10 Manager 0.50 0.50 0.00 0.00 Supervisor 0.50 0.50 0.50 0.50 Lead Operator 2.00 2.00 2.00 2.00 Control System Tech/Operator 0.50 0.50 0.50 0.50 Operator 5.30 5.30 5.70 5.70 Operator-in-training 0.00 0.00 0.00 0.00 Accounting Supervisor 0.50 0.50 0.50 0.50 Accounting Coordinator 0.50 0.50 0.50 0.50 Office Coordinator 0.50 0.50 0.50 0.50 -------- -------- -------- -------- 10.30 10.30 10.40 10.40 CITY OF NEW BERLIN WATER UTILITY 2027 PROPOSED BUDGET Page 9 Page 16 of 52 2025 to 2026 2024 to 2025 2026 to 2027 A B C D B-A C-B D-C Average 2024 2025 2026 2027 Percent of $ % % % Annual ACTUAL ACTUAL ESTIMATED PROPOSED Total Expense Difference Difference Difference Difference Increase 1) OPERATING REVENUES 6,499,621 6,778,621 6,919,236 7,038,841 119,605 4.3% 2.1% 1.7% 2.7% 2) Depreciation (1,558,592) (1,490,549) (1,600,000) (1,550,000) 24.8% (50,000) -4.4% 7.3% -3.1% 0.0% 3) Tax equivalent (708,217) (731,022) (745,000) (774,000) 12.4% 29,000 3.2% 1.9% 3.9% 3.0% 4) Purchased Water (1,558,875) (1,530,142) (1,703,000) (1,730,960) 27.7% 27,960 -1.8% 11.3% 1.6% 3.7% 5) All other operating expenses (1,538,551) (1,789,263) (1,723,287) (1,934,419) 31.0% 211,132 16.3% -3.7% 12.3% 8.3% 6) TOTAL OPERATING EXPENSES (5,364,235) (5,540,976) (5,771,287) (5,989,379) (218,092) 3.3% 4.2% 3.8% 3.7% 7) Operating Income (Loss) 1,135,386 1,237,645 1,147,949 1,049,462 (98,487) 8) **Non operating Revenue 501,848 405,983 380,000 380,000 - -19.1% -6.4% 0.0% -8.5% 9) Non operating Expense (289,476) (271,434) (263,271) (253,756) 4.1% (9,515) -6.2% -3.0% -3.6% -4.3% CHANGE IN NET ASSETS 1,347,758 1,372,194 1,264,678 1,175,706 (88,972) ** Includes contributed interest revenue, capital including impact fees & developer contributed infrastructure. D-C NEW BERLIN WATER UTILITY BUDGET ANALYSIS Page 16 Page 17 of 52 Priority Description Cost Funding Source 1 Meters 75,000 Working Capital 2 Utility Building Boiler Replacement 22,000 Working Capital 3 SCADA - Security 75,000 Working Capital 4 Pumphouse #3 VFD Upgrade 100,000 Working Capital 5 Hydrant and Valve Replacement Program 50,000 Working Capital 6 Demoliton - Forest View Pumphouse 105,000 Working Capital 7 Leak Detection Equipment 40,000 Working Capital 8 Pumphouse #7 - Generator 350,000 Working Capital 9 Vehicle Replacement 112,500 Working Capital 10 IT Equipment Replacement 9,500 Working Capital TOTAL 939,000 $ Funding Sources: Working Capital 939,000 Borrowed Capital - 939,000$ NEW BERLIN WATER UTILITY 2027 CAPITAL BUDGET Page 17 Page 18 of 52 Project 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 TOTA L - - - - - - - Meters 75,000 335,000 335,000 335,000 335,000 335,000 350,000 350,000 350,000 350,000 3,150,000 Utility Building Boiler Replacement 22,000 22,000 SCADA - Network Replacement 100,000 100,000 200,000 SCADA - Security 75,000 75,000 150,000 Pumphouse #3 VFD Upgrade 100,000 100,000 Hydrant and Valve Replacement 50,000 50,000 50,000 50,000 50,000 55,000 55,000 55,000 55,000 55,000 525,000 Demoliton - Forest View Pumphouse 105,000 105,000 Leak Detection Equipment 40,000 40,000 Pumphouse #7 - Generator 350,000 350,000 Pumphouse Repairs 100,000 100,000 Tower Rehab/Painting 1,800,000 1,800,000 Rogers/Pickford Watermain 1,670,000 1,670,000 Vehicle Replacement 112,500 50,000 50,000 60,000 120,000 392,500 Hydro Excavator / Sewer Combo Truck 500,000 500,000 IT Equipment Replacement 9,500 9,500 9,500 14,000 12,500 9,500 9,500 9,500 9,500 14,000 107,000 TOTAL 939,000 2,114,500 544,500 999,000 457,500 519,500 2,289,500 514,500 414,500 419,000 9,211,500 Note: Dependent on City CIP Projects NEW BERLIN WATER UTILITY TEN-YEAR CAPITAL IMPROVEMENT PROGRAM 2027 - 2036 Page 18 Page 19 of 52 Page 19 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Meters Department Priority # 1 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 75,000 $ 335,000 $ 335,000 $ 335,000 $ 335,000 Construction Engineering & Administration Total $ 75,000 $ 335,000 $ 335,000 $ 335,000 $ 335,000 Project Scope and Description: Purchase water meters per PSC and DNR requirements to replace meters. Location: Per PSC rules and regulations water meter change out schedules differ depending on the size of the meter 5/8”, ¼”, or 1” meters, which are used for residential and small businesses, shall be replaced every fifteen to twenty (15-20) years. Small commercial meters, 1-1/2” and 2”, have to be replaced every four years. Large commercial meters, 3” or larger, have to be replaced every two (2) years. Analysis of Need: We are not ordering any residential meters in 2027. We will be purchasing our normal allotment of commercial meters. Alternatives: None Ongoing Operating Costs: Page 20 of 52 Page 20 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Water Project Title: Generator – Utility Building Boiler Replacement Department Priority # 2 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 22,000 Construction Engineering & Administration Total $ 22,000 Project Scope and Description: Replacing the two boilers in the Utility Building Location: Utility Building Analysis of Need: The HVAC system installed during construction of the Utility Building has experienced frequent failures and has required significant ongoing maintenance. In addition to increasing repair costs, continued reliability issues create an operational and employee health and safety risk if heating is lost during winter conditions. Alternatives: Continue incurring high maintenance costs to keep the existing boilers operational, while accepting the risk of a heating failure during cold winter months. Ongoing Operating Costs: None Page 21 of 52 Page 21 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Water Project Title: SCADA – Security Upgrade Department Priority # 3 Item 2026 2027 2028 2029 2030 Land Acquisition Equipment $ 68,000 Construction Engineering & Administration $ 7,000 Total $ 75,000 Project Scope and Description: Replacing the cameras servers at Utility locations. Location: Seven of the Water Utility SCADA locations Analysis of Need: The servers supporting security cameras at the Utility properties are beyond their useful life and should be replaced. These servers typically have an expected service life of approximately 6 to 7 years. Alternatives: None, current equipment will be obsolete Ongoing Operating Costs: None Page 22 of 52 Page 22 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Pumphouse #3 VFD Upgrade Department Priority # 4 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 90,000 Construction Engineering & Administration $ 10,000 Total $ 100,000 Project Scope and Description: Variable Frequency Drive (VFD) electrical panel upgrade Location: Pumphouse #3 – Rogers Drive Pumphouse Analysis of Need: This project will replace the soft start electrical panel with a Variable Frequency Drive (VFD) electrical panel. The service pumps are oversized and pull water from the reservoirs too quickly. With the current system we cannot fully control how much water we are putting in the system. This leads to pressure surges and drain backs. The VFD will allow us to fine tune the rate we are pushing water into the system. Alternatives: Keep the soft start system, putting extra strain on the system. Ongoing Operating Costs: Page 23 of 52 Page 23 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Hydrant and Valve Replacement Program Department Priority # 5 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 Construction Engineering & Administration Total $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 Project Scope and Description: Hydrant and Valve Replacement Program Location: City Wide Analysis of Need: Maintaining an inventory of replacement hydrants and valves allows the Utility to respond promptly when infrastructure fails. Replacement hydrants are kept on hand for situations where an existing hydrant is no longer repairable and must be replaced. Similarly, maintaining valve inventory enables the Utility to repair failed valves immediately rather than allowing a leak to continue while waiting for replacement materials to arrive. Alternatives: Ongoing Operating Costs: Page 24 of 52 Page 24 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Demolition – Forest View Pumphouse Department Priority # 6 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment Construction $ 105,000 Engineering & Administration Total $ 105,000 Project Scope and Description: Demolition of the unused pumphouse Location: Forest View Pumphouse Analysis of Need: This site is a decommissioned reservoir that no longer serves an operational purpose for the Utility. Demolition would eliminate ongoing costs for heating, electricity, security, and grounds maintenance. Alternatives: Keep the building and keep paying operational costs of the building Ongoing Operating Costs: Page 25 of 52 Page 25 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Leak Detection Equipment Department Priority # 7 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 40,000 Construction Engineering & Administration Total $ 40,000 Project Scope and Description: Leak Detection Equipment Location: City Wide Analysis of Need: For small leaks and leak-survey work, the Utility currently relies on contracted leak-correlation services. This can result in delays of several days and may require exploratory excavations to locate a leak. Purchasing leak-correlation equipment would allow Utility staff to identify leak locations promptly, reduce dependence on outside contractors, minimize unnecessary excavation, and support faster repairs. Alternatives: Ongoing Operating Costs: Page 26 of 52 Page 26 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Pumphouse #7 - Generator Department Priority # 8 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 350,000 Construction Engineering & Administration Total $ 350,000 Project Scope and Description: Location: Pumphouse #7 – 16650 W. National Ave Analysis of Need: The emergency generator at this station experienced a critical failure several years ago and was not replaced. During a power outage, staff must transport and connect a portable generator to restore operations. This station operates the booster pumps needed to maintain water pressure in the surrounding neighborhood. The approximate one-hour delay in restoring pressure negatively affects residents and could also hinder firefighting operations. Alternatives: Ongoing Operating Costs: Page 27 of 52 Page 27 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - WATER Project Title: Vehicle Replacement Department Priority # 9 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $112,500 $50,000 $50,000 $60,000 Construction Engineering & Administration Total $112,500 $50,000 $50,000 $60,000 Project Scope and Description: Location: City Wide Analysis of Need: UT-173 – Work Truck: This 14-year-old vehicle has exceeded its planned service life. It has been used extensively for snowplowing and is beginning to show significant rust. The auxiliary fuel tank also requires frequent leak repairs, creating an ongoing safety concern. UT-133 – Work Van: This vehicle is primarily used for SCADA field operations and meter reading. It was purchased with an upgraded electronics package that has experienced frequent failures. Troubleshooting and repairing these issues is time-consuming and has resulted in operational delays. Alternatives: Ongoing Operating Costs: Page 28 of 52 Page 28 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Water Project Title: iPad Replacement/Computer Replacement Department Priority # 10 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 9,500 $ 9,500 $ 9,500 $ 14,000 $ 12,500 Construction Engineering & Administration Total $ 9,500 $ 9,500 $ 9,500 $ 14,000 $ 12,500 Project Scope and Description: Computer Replacement Location: City Wide Analysis of Need: Per the City’s IT Department, 2027 is a year where we will need to replace two network switches for the camera network, and the SCADA network. These items have a six-to-seven-year cycle. Alternatives: High maintenance cost for repairs. Ongoing Operating Costs: None Page 29 of 52 CITY OF NEW BERLIN PROPOSED BUDGET YEAR 2027 WASTEWATER UTILITY Page 30 of 52 New Berlin Wastewater Utility 2027 Budget TABLE OF CONTENTS 1 Budget Assumptions 3 Budget Summary 4 2027 Proposed Budget 7 Payroll 8 Budget Detail Description 10 Four-Year Budget Analysis 11 MMSD Capital Charges 2023 – 2032 12 History of MMSD Capital Charges to New Berlin 13 2027 Capital Budget 14 Ten-Year Capital Budget Projection 15 Capital Budget Detail Description Page 31 of 52 Page 1 WASTEWATER BUDGET ASSUMPTIONS Milwaukee Metropolitan Sewage District (MMSD) projects a $601,982 increase, representing a 14.7% increase compared to the 2026 capital charge. The MMSD disposal charge is also projected to increase by $122,939, a 4.0% increase, in comparison to the 2026 estimated totals. Combined these charges comprise 73.3% of the total Wastewater budget. Because MMSD establishes these charges and the City has limited ability to influence them, changes in MMSD rates have a significant effect on the Wastewater Utility budget and the rates needed to support utility operations. Revenues: The Wastewater Utility is not proposing a rate change in 2027. The rates are controlled by local ordinance and need only Utility Committee and Common Council approval to be adjusted. Expenses: MMSD Capital: Based on MMSD’s latest estimate, the budget includes a $601,982 increase in the capital charge, representing a 14.7% increase over the 2026 estimated total. The capital charge is calculated by multiplying the MMSD tax rate by the equalized value of New Berlin properties within the district boundaries. The charge is also adjusted to reflect capital improvements and other work completed within our watershed basin. For perspective, New Berlin’s MMSD capital charge reached approximately $6.4 million in 2018. Page 12 of the budget document provides a historical summary of capital charges dating back to 1999. MMSD Operating: According to MMSD’s Controller/Treasurer, the disposal charge is expected to increase by $122,939, a 4.0% increase, from 2026’s estimated total. No increase is currently anticipated in Muskego Utility’s operating disposal charge. Labor: As experienced operators retire and new hires come on board, the Utility Department is focused on training employees across both Wastewater and Water operations. Additionally, the Department implemented a new time and attendance system a couple of years ago, which now provides a more accurate reflection of how operators are allocating their time. As a result of these two factors, the approach to budgeting labor has been updated in this year’s budget. Based on an analysis of the past five years of hourly data, it has been determined that operators spend approximately 57.4% of their time supporting Water operations and 42.6% supporting Wastewater operations. Applying this allocation, along with staffing assigned to other Utility functions, results in 10.4 full-time equivalent (FTE) positions budgeted to the Water Utility and 8.0 FTE positions budgeted to the Wastewater Utility. The Utility Department is aligning with the City’s self-insured health insurance model, which was implemented in 2026. Based on the most recent information available, health insurance premiums are projected to increase by 12.0% compared with 2026. Additionally, the Wisconsin Retirement System (WRS) contribution rate has increased slightly for 2027, rising to 7.25% from 7.20% in 2026. Pumping – Power and Fuel (81001021-56130) and Gas & Oil (81001028-54190): Due to rate increases from WE Energies and significant increases in gas prices, the budgeted expenses for electricity and gas and oil have been increased accordingly. Page 32 of 52 Page 2 Inflow & Infiltration (I&I) Expenses (81001131-52030 Collection System-Contracted): A total of $600,000 is budgeted for inflow and infiltration (I&I) work, monitoring, and other public property maintenance. The Utility’s objective is to complete a major repair project every other year. For 2027, the budget includes $400,000 for a targeted sewer relining project in areas that continue to have clay sewer lines. The remaining $200,000 is budgeted for other maintenance activities, including I&I monitoring and related repairs. Capital Projects: The total Wastewater Utility capital budget is $927,000. This includes $500,000 for the Regal Manor Force Main replacement project. The existing force main leaving Regal Manor Liftstation has bends and connections that restrict flow and affect system performance. Additional information is provided on page 16. The budget also includes $180,000 for new flow monitors that are currently 19 years old. Replacement is necessary because the cables used by the current models are being discontinued, and we may no longer be able to receive the data. Additional information is provided on page 19. Page 13 summarizes the 2027 capital funding budget, and page 14 presents 10-year capital funding projection. Page 33 of 52 02-Nov-26 2024 2025 2026 2026 2026 EST. 2027 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL BUDGET OPERATING REVENUES 11,069,903 10,950,958 11,050,375 5,367,514 11,023,861 11,067,000 OPERATING EXPENSES: OPERATIONS & MAINTENANCE 9,750,143 10,433,208 9,955,704 6,569,015 9,262,911 10,195,396 DEPRECIATION 951,598 978,925 955,000 475,833 971,666 990,000 TOTAL OPERATING EXPENSE 10,701,741 11,412,133 10,910,704 7,044,848 10,234,577 11,185,396 NET OPERATING INCOME (LOSS) 368,162 (461,175) 139,671 (1,677,334) 789,284 (118,396) NON-OPERATING EXPENSES MMSD PRIVATE PROPERTY I/I GRANT 61,174 473,056 - 1,051 150,000 - NON-OPERATING REVENUES INTEREST INCOME 797,666 825,300 650,000 415,169 800,000 750,000 OTHER - - - - - - GRANTS 65,091 462,428 - - 150,000 - TOTAL NON-OPERATING REVENUE 862,757 1,287,728 650,000 415,169 950,000 750,000 Net Income Before Capital Contributions 1,169,745 353,497 789,671 (1,263,216) 1,589,284 631,604 Capital Contributions - - - - - - CHANGE in NET ASSETS 1,169,745 353,497 789,671 (1,263,216) 1,589,284 631,604 69,232,726 70,402,471 70,755,968 70,755,968 72,345,252 NET ASSETS END of YEAR 70,402,471 70,755,968 71,545,639 72,345,252 72,976,856 NEW BERLIN WASTEWATER UTILITY 2027 PROPOSED BUDGET Page 3 Page 34 of 52 2024 2025 2026 2026 2026 EST. 2027 800 - WASTEWATER - REVENUES ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ____________________________________ _________ _________ _________ _________ _________ _________ OPERATING REVENUES: 81000000 46000 UNMETERED - RESIDENTIAL 251,417 252,375 255,000 126,069 252,069 252,000 81000000 46001 UNMETERED - COMMERCIAL 23,418 22,664 24,000 11,795 24,080 24,000 81000000 46110 RESIDENTIAL 6,272,709 6,245,476 6,310,000 3,077,911 6,278,211 6,295,000 81000000 46120 COMMERCIAL 2,008,322 1,942,885 2,010,500 972,114 2,017,505 2,010,500 81000000 46130 INDUSTRIAL 457,529 473,127 457,250 217,638 458,868 460,000 81000000 46140 PUBLIC 75,399 70,854 75,000 31,798 71,918 75,000 81000000 46150 RESIDENTIAL-METRO 1,086,603 1,087,197 1,080,000 543,877 1,084,237 1,085,000 81000000 46160 COMMERCIAL-METRO 449,444 422,914 445,000 213,887 442,344 445,000 81000000 46170 INDUSTRIAL-METRO 306,962 318,527 268,125 135,860 271,281 300,000 81000000 46180 PUBLIC-METRO 13,962 13,059 13,500 5,804 13,350 13,500 81000000 46200 FORFEITED DISCOUNTS 109,660 25,523 105,000 28,639 103,000 100,000 81000000 46301 MISC OPERATING REVENUES 14,478 76,357 7,000 2,122 7,000 7,000 -------------- -------------- -------------- -------------- -------------- -------------- SUBTOTAL-OPERATING REVENUES 11,069,903 10,950,958 11,050,375 5,367,514 11,023,861 11,067,000 NONOPERATING REVENUES: 81000000 41020 GRANTS - LOCAL 65,091 462,428 - - 150,000 - 81100000 47000 INTEREST INCOME 732,088 812,861 650,000 415,169 800,000 750,000 81100000 47001 UNREALIZED GAIN/LOSS ON INVESTMEN T 65,578 12,439 - - - - 81300000 42400 CAPITAL CONTRIBUTION - - - - - - ------------ ------------ ------------ ------------ ------------ ------------ SUBTOTAL-NONOPERATING REVENUES 862,757 1,287,728 650,000 415,169 950,000 750,000 _________ _________ _________ _________ _________ _________ TOTAL REVENUES 11,932,660 12,238,686 11,700,375 5,782,683 11,973,861 11,817,000 NEW BERLIN WASTEWATER UTILITY 2027 PROPOSED BUDGET Page 4 Page 35 of 52 2024 2025 2026 2026 2026 EST. 2027 800 - WASTEWATER - EXPENSES ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ____________________________________ _________ _________ _________ _________ _________ _________ OPERATING EXPENSES: 81001020 56150 DISPOSAL - LINNIE LAC 62,552 61,659 65,000 30,228 60,456 65,000 81001020 56150 DISPOSAL - MMSD 2,824,976 3,005,463 3,106,961 1,548,231 3,077,231 3,200,170 81001020 56160 MMSD CAPITAL CHARGES 5,516,556 5,741,481 4,167,167 4,185,450 4,185,450 4,769,149 81001021 56130 PUMPING POWER & FUEL 61,143 50,865 65,000 34,004 65,000 75,000 81001026 56140 CHEMICALS - - 1,000 - - 1,000 81001028 50010 TRANSP EXP - LABOR 9,988 10,291 13,753 7,658 15,316 16,304 81001028 54020 TRANSP EXP - REPAIRS 15,976 36,541 20,000 9,644 20,000 20,000 81001028 54110 TRANSP EXP - SUPPLIES 2,753 4,241 4,000 96 4,000 5,000 81001028 54190 TRANSP EXP - GAS & OIL 16,299 19,674 18,000 11,153 24,000 26,000 81001028 56030 TRANSP EXP - INSURANCE 5,089 3,618 5,000 - 4,500 5,000 81001131 50010 COLLECT SYS - LABOR 128,194 198,605 224,070 73,803 147,606 217,299 81001131 52030 COLLECT SYS - MAINTENANCE/RELINING 158,818 222,960 1,100,000 85,187 500,000 600,000 81001131 52033 COLLECT SYS - FLOW MONITORING 43,559 52,938 58,000 37,173 55,000 58,000 81001131 54110 COLLECT SYS - SUPPLIES 504 14,134 25,000 3,811 15,000 25,000 81001132 50010 COLLECT SYS PUMP - LABOR 48,735 41,982 79,278 11,385 22,770 51,982 81001132 52030 COLLECT SYS PUMP - CONTRACTED 52,485 38,202 60,000 49,321 65,000 65,000 81001132 54110 COLLECT SYS PUMP - SUPPLIES 1,856 3,811 5,000 3,405 5,000 5,000 81001134 50010 MAINT GEN PLANT - LABOR 13,663 17,970 18,995 12,203 24,406 25,668 81001134 52030 MAINT GEN PLANT - CONTRACTED 21,347 24,745 22,000 15,241 25,000 25,000 81001134 54110 MAINT GEN PLANT - SUPPLIES 3,094 3,617 4,000 7,195 10,000 4,000 81001235 56170 MAINTENANCE OF METERS 200,883 212,400 225,000 110,417 220,834 225,000 81001240 52030 ACCT & COLL - CONTRACTED 20,625 20,625 22,000 10,313 20,000 22,000 81001240 54110 ACCT & COLL - SUPPLIES 15,621 16,669 15,000 8,517 15,000 15,000 81001350 50010 ADMIN & GENERAL LABOR 216,834 279,065 162,247 146,671 293,342 187,790 81001350 51030 HEALTH INSURANCE 99,851 117,638 137,714 61,605 123,210 154,070 81001350 51065 VISION DENTAL INSURANCE 2,211 3,094 3,625 1,761 3,522 3,727 81001350 51070 LIFE INSURANCE 833 924 1,122 1,017 2,034 1,141 81001351 54120 OFFICE SUPPLIES & EXPENSE 18,716 14,074 22,500 5,023 15,000 22,500 NEW BERLIN WASTEWATER UTILITY 2027 PROPOSED BUDGET Page 5 Page 36 of 52 2024 2025 2026 2026 2026 EST. 2027 800 - WASTEWATER - CONT. ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED ____________________________________ _________ _________ _________ _________ _________ _________ 81001352 56200 OUTSIDE SERVICES - ACCOUNTING 18,167 17,706 20,000 12,797 20,000 20,000 81001352 56210 OUTSIDE SERVICES - LEGAL 9,312 9,312 13,000 4,656 9,312 13,000 81001352 56220 OUTSIDE SERVICES - ENGINEERING - - 60,000 - 15,000 40,000 81001352 56250 OUTSIDE SERVICES - GIS 7,500 7,500 7,500 3,750 7,500 7,500 81001353 56020 WORKER'S COMP INSURANCE 12,725 14,737 15,000 7,500 15,000 15,000 81001353 56050 PROPERTY & LIABILITY INS 17,229 16,593 18,000 8,917 17,834 18,000 81001354 50080 VACATIONS 42,140 54,255 60,109 14,795 59,590 71,448 81001354 50090 SICK LEAVE 8,405 8,397 12,982 5,043 10,086 12,316 81001354 50100 HOLIDAYS - - - - - - 81001354 50110 OTHER LABOR 122 - 59 - - 56 81001354 51010 RETIREMENT 31,914 36,774 41,386 19,152 43,304 44,001 81001354 51020 SOCIAL SECURITY/MEDICARE 32,511 34,894 43,972 19,253 38,506 46,431 81001354 51060 DISABILITY INSURANCE 444 427 463 154 308 466 81001354 52070 DRUG TESTING - - 700 - - 700 81001355 50010 SAFETY/TRAINING LABOR 2,104 2,136 3,301 1,022 2,044 2,878 81001355 52030 SAFETY/TRAINING CONTRACTED 726 453 1,500 229 750 1,500 81001355 54110 SAFETY/TRAINING SUPPLIES 3,470 8,437 4,000 403 2,500 8,000 81001355 54112 REBATE PROGRAM - - 300 - - 300 81001355 54300 CONFERENCE/SEMINAR/MEETING 213 4,301 2,000 832 2,500 3,000 81010000 58010 DEPRECIATION 951,598 978,925 955,000 475,833 971,666 990,000 -------------- -------------- -------------- -------------- -------------- -------------- SUBTOTAL-OPERATING EXPENSES 10,701,741 11,412,133 10,910,704 7,044,848 10,234,577 11,185,396 NONOPERATING EXPENSES: 81001131 52050 COLLECT SYS - GRANT PROJECTS 61,174 473,056 - 1,051 150,000 - ----------- ----------- ----------- ----------- ----------- ----------- SUBTOTAL-NONOPERATING EXPENSES 61,174 473,056 - 1,051 150,000 - __________ __________ __________ __________ __________ __________ TOTAL EXPENSES 10,762,915 11,885,189 10,910,704 7,045,899 10,384,577 11,185,396 Change in Net Assets 1,169,745 353,497 789,671 (1,263,216) 1,589,284 631,604 NEW BERLIN WASTEWATER UTILITY 2027 PROPOSED BUDGET Page 6 Page 37 of 52 2024 2025 2026 2026 2026 EST. 2027 ACTUAL ACTUAL BUDGET 6 MONTHS TOTAL PROPOSED _________ _________ _________ _________ _________ _________ TRANSP EXP - LABOR 9,988 10,291 13,753 7,658 15,316 16,304 COLLECT SYS - LABOR 128,194 198,605 224,070 73,803 147,606 217,299 COLLECT SYS PUMP - LABOR 48,735 41,982 79,278 11,385 22,770 51,982 MAINT GEN PLANT - LABOR 13,663 17,970 18,995 12,203 24,406 25,668 ACCT & COLL - LABOR - - - - - - VACATIONS 42,140 54,255 60,109 14,795 59,590 71,448 SICK LEAVE 8,405 8,397 12,982 5,043 10,086 12,316 HOLIDAYS - - - - - - OTHER LABOR 122 - 59 - - 56 SAFETY/TRAINING LABOR 2,104 2,136 3,301 1,022 2,044 2,878 ADMIN & GENERAL LABOR 216,834 279,065 162,247 146,671 293,342 187,790 ----------- ----------- ----------- ----------- ----------- ----------- 470,185 612,701 574,794 272,580 575,160 585,741 Full-time 458,724 604,115 599,773 255,028 537,660 540,983 Over-time 982 364 5,800 239 2,500 5,800 City Charge 10,479 8,222 34,626 17,313 35,000 38,958 ----------- ----------- ----------- ----------- ----------- ----------- 470,185 612,701 640,199 272,580 575,160 585,741 2024 2025 2026 2027 BUDGET BUDGET BUDGET PROPOSED Director of DPW 0.00 0.00 0.10 0.10 Deputy Director of DPW 0.00 0.00 0.10 0.10 Manager 0.50 0.50 0.00 0.00 Supervisor 0.50 0.50 0.50 0.50 Lead Operator 1.00 1.00 1.00 1.00 Control System Tech/Operator 0.50 0.50 0.50 0.50 Operator 4.70 4.70 4.30 4.30 Accounting Supervisor 0.50 0.50 0.50 0.50 Accounting Coordinator 0.50 0.50 0.50 0.50 Office Coordinator 0.50 0.50 0.50 0.50 ------- ------- ------- ------- 8.70 8.70 8.00 8.00 NEW BERLIN WASTEWATER UTILITY 2027 PROPOSED BUDGET Page 7 Page 38 of 52 Account Description 2025 Budget 2026 Budget Difference 81001020.56150 Disposal- Linnie Lac (Muskego Area) 65,000 65,000 - 81001020.56150 Disposal- MMSD Quaterly treatment user charges 3,106,961 3,200,170 93,209 81001020.56160 MMSD Capital charges 4,167,167 4,769,149 601,982 81001021.56130 Pumping- Power & fuel: Electric & fuel to run lift stations 65,000 75,000 10,000 81001026.56140 Chemicals: Lift station wet wells 1,000 1,000 - Account Description 2025 Budget 2026 Budget Difference 81001028.50010 Labor 13,753 16,304 2,551 81001028.54020 Contracted Services 20,000 20,000 - 81001028.54110 Supplies 4,000 5,000 1,000 81001028.54190 Gas, oil, tires, etc. 18,000 26,000 8,000 81001028.56030 Insurance 5,000 5,000 - Account Description 2025 Budget 2026 Budget Difference 81001131.50010 Labor 224,070 217,299 (6,771) 81001131.52030 Contracted Services - Maint., relining, manhole grouting 1,100,000 600,000 (500,000) 81001131.52033 Flow monitoring 58,000 58,000 - 81001131.54110 Supplies 25,000 25,000 - Account Description 2025 Budget 2026 Budget Difference 81001132.50010 Labor 79,278 51,982 (27,296) 81001132.52030 Contracted Services 60,000 65,000 5,000 81001132.54110 Supplies 5,000 5,000 - Account Description 2025 Budget 2026 Budget Difference 81001134.50010 Labor 18,995 25,668 6,673 81001134.52030 Contracted Services 22,000 25,000 3,000 81001134.54110 Supplies 4,000 4,000 - Meter Expense Account Description 2025 Budget 2026 Budget Difference 81001235.56170 Maintenance of meters: Sewer share (1/2) of Water Utility costs per PSC rules 225,000 225,000 - Account Description 2025 Budget 2026 Budget Difference 81001240.52030 Contracted Services 22,000 22,000 - 81001240.54110 Supplies 15,000 15,000 - Pumping System Liftstations, Supervisory Control & SCADA, elevator inspections & auxiliary generator General Plant (non-lift station) Shop & Utility storage building operation and shared expenses for office are at Well #7 CUSTOMER ACCOUNTING & COLLECTION EXPENSES Customer Accounting & Collecting Collection System Sewer mains, laterals, manholes, force mains Wastewater Budget 2027 Proposed OPERATION EXPENSES Disposal and Capital Charges Transportation Expenses MAINTENANCE EXPENSES Page 8 Page 39 of 52 Account Description 2025 Budget 2026 Budget Difference 81001350.50010 Administrative & General- Labor 162,247 187,790 25,543 81001350.51030 Health Insurance 137,714 154,070 16,356 81001350.51065 Vision/Dental Insurance 3,625 3,727 102 81001350.51070 Life Insurance 1,122 1,141 19 81001351.54120 Office Supplies & Expenses 22,500 22,500 - Account Description 2025 Budget 2026 Budget Difference 81001352.56200 Accounting: City Finance Dept charge & Audit Fees 20,000 20,000 - 81001352.56210 Legal: Percentage share (4%) of City Attorney base costs 13,000 13,000 - 81001352.56220 Engineering: City Engineering charges & technical services 60,000 40,000 (20,000) 81001352.56250 Other: GIS services 7,500 7,500 - Account Description 2025 Budget 2026 Budget Difference 81001353.56020 Workman's Comp Insurance 15,000 15,000 - 81001354.50080 Vacation wages 60,109 71,448 11,339 81001354.50090 Sick leave wages & Workers Comp wages 12,982 12,316 (666) 81001354.50100 Holiday wages - - - 81001354.50110 Other Labor 59 56 (3) 81001354.51010 Wisconsin Retirement System Payments 41,386 44,001 2,615 81001354.51020 Social Security 43,972 46,431 2,459 81001354.51060 Disability Insurance 463 466 3 81001354.52070 Drug Testing 700 700 - Account Description 2025 Budget 2026 Budget Difference 81001353.56050 Property & Liability Insurance 18,000 18,000 - 81001355.50010 Labor 3,301 2,878 (423) 81001355.52030 Contracted Services 1,500 1,500 - 81001355.54110 Supplies 4,000 8,000 4,000 81001355.54112 Rebate program 300 300 - 81001355.54300 Training and Workshops 2,000 3,000 1,000 Account Description 2025 Budget 2026 Budget Difference 81010000.58010 Depreciation 955,000 990,000 35,000 Account Description 2025 Budget 2026 Budget Difference 81001132.52050 Grant Projects - - - Total 10,910,704 11,185,396 274,692 Miscellaneous Expenses Non-Operating Expenses ADMINISTRATIVE, EMPLOYEE BENEFITS & GENERAL EXPENSES Adminstrative and Health Benefits Wastewater Budget 2027 Proposed Outside Services Employee Benefits Safety & Training Page 9 Page 40 of 52 2025 to 2026 2024 to 2025 2026 to 2027 A B C D B-A C-B D-C Average 2024 2025 2026 EST. 2027 Percent o f $% % % Annual ACTUAL ACTUAL TOTAL PROPOSED Total Expense Difference Difference Difference Difference Increase a) OPERATING REVENUES 11,069,903 10,950,958 11,023,861 11,067,000 43,139 -1.1% 0.7% 0.4% 0.0% LESS: b) MMSD Disposal (2,824,976) (3,005,463) (3,077,231) (3,200,170) 28.6% 122,939 6.4% 2.4% 4.0% 4.3% c) MMSD Capital (5,516,556) (5,741,481) (4,185,450) (4,769,149) 42.6% 583,699 4.1% -27.1% 13.9% -3.0% d) Taxes (32,511) (34,894) (38,506) (46,431) 0.4% 7,925 7.3% 10.4% 20.6% 12.8% e) Depreciation (951,598) (978,925) (971,666) (990,000) 8.9% 18,334 2.9% -0.7% 1.9% 1.3% Total non-controllable (9,325,641) (9,760,763) (8,272,853) (9,005,750) 80.5% 732,897 4.7% -15.2% 8.9% -0.6% f) Controllable Contribution 1,744,262 1,190,195 2,751,008 2,061,250 (689,758) Partially controlled cost g) Collect system - contracted (158,818) (222,960) (500,000) (600,000) Flow Monitoring (43,559) (52,938) (55,000) (58,000) h) All other expense s (1,234,897) (1,848,528) (1,556,724) (1,521,646) 13.6% (35,078) 49.7% -15.8% -2.3% 10.6% Operating Income (loss) 306,988 (934,231) 639,284 (118,396) (757,680) i) Nonoperating revenue 862,757 1,287,728 950,000 750,000 (200,000) k) Change in Net Asset s 1,169,745 353,497 1,589,284 631,604 (957,680) NEW BERLIN SEWER UTILITY PRELIMINARY BUDGET ANALYSIS D-C (103,000) 36.3% 101.2% 18.6% 52.0%5.8% Page 10 Page 41 of 52 $0.912 $0.854 $0.886 $0.619 $0.658 $0.601 $0.649 $0.721 $0.786 $0.810 $0.451 $0.430 $0.351 $0.614 $0.518 $0.632 $0.620 $0.586 $0.559 $0.562 $- $0.200 $0.400 $0.600 $0.800 $1.000 $1.200 $1.400 $1.600 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 New Berlin Capital Rate per $1,000 of Equalized Value from 2023 Through 2032 Billed Rate Rate Credit BudgetBilled Estimated Page 11 Page 42 of 52 MMSD Capital Charges to New Berlin Year Capital City Charge Paid Charges Population Per Capita 1999 1,988,321 36,946 53.82 2000 2,113,022 37,411 56.48 2001 2,275,705 38,461 59.17 2002 3,326,803 38,652 86.07 2003 2,875,740 38,920 73.89 2004 3,441,054 38,804 88.68 2005 4,965,539 38,896 127.66 2006 4,714,179 38,969 120.97 2007 4,655,796 39,260 118.59 2008 5,092,177 39,460 129.05 2009 4,965,148 39,500 125.70 2010 4,888,961 39,300 124.40 2011 5,499,951 39,584 138.94 2012 5,790,700 39,594 146.25 2013 5,797,957 39,770 145.79 2014 5,796,579 39,915 145.22 2015 6,306,515 40,130 157.15 2016 6,282,111 40,310 155.84 2017 6,230,307 40,027 155.65 2018 6,455,635 40,137 160.84 2019 6,092,220 40,287 151.22 2020 5,461,920 40,437 135.07 2021 5,570,431 40,587 137.25 2022 5,525,040 40,451 136.59 2023 5,327,768 40,601 131.22 2024 5,516,556 40,450 136.38 2025 5,741,481 40,186 142.87 2026 4,167,167 40,044 104.06 2027 4,769,149 39,938 119.41 Average annual increase is 3.8% per year Note: Charge per capita includes the entire city, however the entire city is not included in the Sewer Utility. Page 12 Page 43 of 52 Priority Description Cost Funding Source 1 Utility Building Boiler Replacement 28,000 Working Capital 2 Regal Manor Force Main Project 500,000 Working Capital 3 SCADA - Security 75,000 Working Capital 4 SCADA - PLC Upgrade Westridge 22,000 Working Capital 5 Flow Monitors 180,000 Working Capital 6 Vehicle Replacements 112,500 Working Capital 7 PC Replacement 9,500 Working Capital TOTAL 927,000 Funding Sources: Working Capital 927,000 Impact Fees - 927,000 NEW BERLIN WASTEWATER UTILITY 2027 CAPITAL BUDGET Page 13 Page 44 of 52 NEW BERLIN WASTEWATER UTILITY TEN-YEAR CAPITAL IMPROVEMENT PROGRAM 2027 - 2036 Project 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 TOTAL - - - - - - - Utility Building Boiler Replacement 28,000 28,000 Regal Manor Force Main Project 500,000 500,000 SCADA - Network Replacement 100,000 100,000 200,000 SCADA - Security 75,000 75,000 150,000 SCADA - PLC Upgrade Westridge 22,000 22,000 Flow Monitors 180,000 25,000 25,000 230,000 Vehicle Replacement 112,500 50,000 50,000 60,000 120,000 392,500 Hydro Excavator / Sewer Combo Truck 500,000 500,000 IT Equipment Replacement 9,500 9,500 9,500 14,000 12,500 9,500 9,500 9,500 9,500 14,000 107,000 TOTAL 927,000 59,500 159,500 514,000 72,500 129,500 84,500 134,500 9,500 39,000 2,129,500 Note: Dependent on City CIP Projects Page 14 Page 45 of 52 Page 15 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: Generator – Utility Building Boiler Replacement Department Priority # 1 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 28,000 Construction Engineering & Administration Total $ 28,000 Project Scope and Description: Replacing the two boilers in the Utility Building Location: Utility Building Analysis of Need: The HVAC system installed during construction of the Utility Building has experienced frequent failures and has required significant ongoing maintenance. In addition to increasing repair costs, continued reliability issues create an operational and employee health and safety risk if heating is lost during winter conditions. Alternatives: Continue incurring high maintenance costs to keep the existing boilers operational, while accepting the risk of a heating failure during cold winter months. Ongoing Operating Costs: None Page 46 of 52 Page 16 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: Regal Manor Force Main Department Priority # 2 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 500,000 Construction Engineering & Administration Total $ 500,000 Project Scope and Description: Replace the Force Main leaving Regal Liftstation Location: Regal Manor Liftstation Analysis of Need: The force main leaving the Regal Manor Liftstation includes bends and connections that restrict flow, creating a bottleneck during heavy rain events. During significant rainfall or flooding, this constraint increases the risk of basement backups and sanitary sewer overflows. Alternatives: Ongoing Operating Costs: None Page 47 of 52 Page 17 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: SCADA – Security Upgrade Department Priority # 3 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 68,000 Construction Engineering & Administration $ 7,000 Total $ 75,000 Project Scope and Description: Replacing the cameras servers at Utility locations Location: Nine of the Wastewater Utility SCADA locations Analysis of Need: The servers supporting security cameras at the liftstations are beyond their useful life and should be replaced. These servers typically have an expected service life of approximately 6 to 7 years. Alternatives: None, current equipment will be obsolete Ongoing Operating Costs: None Page 48 of 52 Page 18 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: SCADA – PLC Upgrade Westridge Liftstation Department Priority # 4 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 20,000 Construction Engineering & Administration $ 2,000 Total $22,000 Project Scope and Description: Replacing the PLC at Westridge Liftstation Location: Westridge Liftstation Analysis of Need: The PanelView at the Westridge Liftstation was replaced in 2026. The remaining SCADA upgrade is replacement of the programmable logic controller (PLC), which serves as the system’s computer component. This is the final PLC replacement needed within the Wastewater system. Alternatives: Ongoing Operating Costs: None Page 49 of 52 Page 19 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: Flow Monitors Department Priority # 5 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 180,000 Construction Engineering & Administration Total $ 180,000 Project Scope and Description: Replace flow monitors that read the flow that occurs in the Wastewater systems Location: City Wide Analysis of Need: Flow monitors support the Utility’s work with R.A. Smith to identify areas of the sanitary sewer system affected by inflow and infiltration (I&I). The monitors scheduled for replacement are approximately 19 years old. The data-transfer cables used by the existing monitors have been discontinued, and the Utility has only one spare cable remaining. If that cable fails, staff would be unable to retrieve monitoring data, limiting the Utility’s ability to identify and prioritize I&I problem areas. Alternatives: Ongoing Operating Costs: None Page 50 of 52 Page 20 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: Vehicle Replacement Department Priority # 6 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $112,500 $50,000 $50,000 $60,000 Construction Engineering & Administration Total $112,500 $50,000 $50,000 $60,000 Project Scope and Description: Location: City Wide Analysis of Need: UT-173 – Work Truck: This 14-year-old vehicle has exceeded its planned service life. It has been used extensively for snowplowing and is beginning to show significant rust. The auxiliary fuel tank also requires frequent leak repairs, creating an ongoing safety concern. UT-133 – Work Van: This vehicle is primarily used for SCADA field operations and meter reading. It was purchased with an upgraded electronics package that has experienced frequent failures. Troubleshooting and repairing these issues is time-consuming and has resulted in operational delays. Alternatives: Ongoing Operating Costs: Page 51 of 52 Page 21 CITY OF NEW BERLIN CAPITAL PROJECT SUMMARY - Wastewater Project Title: IT Equipment Replacement Department Priority # 7 Item 2027 2028 2029 2030 2031 Land Acquisition Equipment $ 9,500 $ 9,500 $ 9,500 $ 14,000 $ 12,500 Construction Engineering & Administration Total $ 9,500 $ 9,500 $ 9,500 $ 14,000 $ 12,500 Project Scope and Description: IT Equipment Replacement Location: Utility Building and City Hall Analysis of Need: Per the City’s IT Department, 2027 is a year in which we will need to replace two network switches for the Camera network, and the SCADA network. These items have a six-to-seven-year cycle. Alternatives: High maintenance cost for repairs. Ongoing Operating Costs: None Page 52 of 52

Source: City of New Berlin website. First collected Nov 11, 2026.