RecordWell Data

Packet

Village of Cross Plains · Dane County · meeting of Nov 10, 2026 · Agenda packets

Open the original document More from Village of Cross Plains

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Packet 11.10.2026 - ZBA PACKET.DOCX.PDF Agenda 11.10.2026 - ZBA AGENDA.DOCX 1. Documents: 1.I. Documents: 1 Zoning Board of Appeals Regular Meeting Notice and Agenda Village Hall 2417 Brewery Road Cross Plains, WI 53528 (608) 798-3241 Tuesday, November 10, 2026 5:00 pm The Village of Cross Plains will provide opportunities for the public to participate virtually or by calling in. Please take note that the meeting will continue even if technical problems occur. The log in information is as follows: Zoom Meeting Link: https://us02web.zoom.us/j/2456624318?omn=89327584141 Conference telephone line: +1 312 626 6799 Meeting ID: 245 662 4318 I. Call to Order II. Roll Call III. Pledge of Allegiance IV. Public Comment – This is an opportunity for anyone to address the Zoning Board of Appeals on any issue. Please observe the time limit of 3 minutes. While the Zoning Board of Appeals encourages input from residents, it may not discuss or act on any issue that is not duly noticed on the agenda. Please see the Public Comment instructions at the end of this agenda. V. General Business – Regular Meeting 1. Public Hearing for a petition from Zuern Building Products & Design Center for an area variance from Section 85.25(a)(1) of the Village of Cross Plains Municipal Code of Ordinances to allow redevelopment with reduced fill and dryland access around the buildings at 1918 and 19 23 Market Street, Cross Plains, WI. 2. Discussion and Possible Action on the petition from Zuern Building Products & Design Center for an area variance from Section 85.25(a)(1) of the Village of Cross Plains Municipal Code of Ordinances to allow redevelopment with reduced fill and dryland access around the buildings at 1918 and 1923 Market Street, Cross Plains, WI. 2 3. Public Hearing for a petition from David Wirth, for an area variance from sections 84.29(g) of the Village of Cross Plains Municipal Code of Ordinances to allow a shed with a reduced setback into the rear yard at 7012 Laufenberg Blvd, Cross Plains, WI. 4. Discussion and Possible Action on the petition from David Wirth, for an area variance from sections 84.29(g) of the Village of Cross Plains Municipal Code of Ordinances to allow a shed with a reduced setback into the rear yard at 7012 Laufenberg Blvd, Cross Plains, WI. VI. Adjournment This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above stated meeting to gather information. No action will be taken by any governmental body at the above stated meeting other than the governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to accommodate the n eeds of disabled individuals. For additional information or to request this service, contact the Village Hall at (608) 798 -3241 or bobbi@cross-plains.wi.us. PUBLIC COMMENT INSTRUCTIONS WRITTEN: Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either on or not on the agenda to be included in the meeting packet, by emailing cpersson@cross- plains.wi.us or in writing to Village Board, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will be distributed at the meeting. IN-PERSON: Public comment forms are available at the Board Room entrance. Please fill out and hand to staff prior to start of meeting. Comments are limited to three-minutes per person and must be delivered at the designated microphone for recording purposes. Accommodations can be provided for those unable to access the microphone. VIRTUAL: When public comments are allowed, attendees on Zoom wishing to participate should click “raise hand” if on video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those wishing to provide oral comments remotely must have their full name displayed within the Zoom application and must state address of residence. *As permitted by the Wisconsin open meetings law and while not required, the Zoning Board of Appeals has chosen to allow public comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Zoning Board of Appeals may not engage in discussion or take action during this period but may consider deferring the subject to a later meeting with notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on certain specified matters where the public can comment. The meeting chairperso n will identify rules for providing comments. Other items on the agenda which are not listed for public hearing do not require the Board to allow public comment, however the meeting chairperson can at their own discretion allow limited public comments. VILLAGE OF CROSS PLAINS Zoning Board of Appeals – Public Hearing Notice Notice is hereby given that a public hearing will be held at Village Hall, located at 2417 Brewery Road, Cross Plains, WI 53528 at 5:00 pm or at the earliest extent possible, on November 10, 2026 before the Zoning Board of Appeals, regarding the following items(s): 1. A petition from Zuern Building Products & Design Center for an area variance from Section 85.25(a)(1) of the Village of Cross Plains Municipal Code of Ordinances to allow redevelopment with reduced fill and dryland access around the buildings at 1918 and 1923 Market Street, Cross Plains, WI. 2. A petition from David Wirth , for an area variance from sections 84. 29(g) of the Village of Cross Plains Municipal Code of Ordinances to allow a shed with a reduced setback into the rear yard at 7012 Laufenberg Blvd, Cross Plains, WI. All persons interested may make arrangements to review the petition or ask further questions by contacting Interim Village Administrator , Tony Ruesga , at (608) 798 -4100 extension 1 12 or TRuesga@crossplainspolicewi.com. All persons interested are invited to attend the public hearings and be heard. Interested parties are encouraged to participate in-person or via Zoom. You may join the meeting at Village Hall or by going to https://us02web.zoom.us/j/83455718979 or by calling 1-312-626-6799 and entering the meeting ID; 834 5571 8979. Dated this 29 th day of October 2026. Carly Persson Village Administrator 070704199210 D & R RIPP LLC 5904 PRAIRIE LN PALATINE IL 60067 070703244921 NONN LIVING TR, JAMES & JUDITH 7813 COUNTY HIGHWAY K CROSS PLAINS WI 53528 070703245001 KALSCHEUR IMPLEMENT CO INC 1113 MAIN ST CROSS PLAINS WI 53528 070703245011 ZANDER 51 LLC 901 DEMING WAY STE 102 MADISON WI 53717 070703245332 CROSS PLAINS, VILLAGE OF 2417 BREWERY RD CROSS PLAINS WI 53528-9499 070703245127 CLIFFORD ZANDER 6091 FORD DR MAZOMANIE WI 53560 070703245234 NONN LIVING TR, JAMES & JUDITH 7813 COUNTY HIGHWAY K CROSS PLAINS WI 53528 070703245741 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 070703245841 Current Owner 100 N FAIRCHILD ST MADISON WI 53703 070703291014 WI DNR PO BOX 7921 MADISON WI 53701-7921 070703291710 WI DOT 2101 WRIGHT ST MADISON WI 53704 070703292353 CROSS PLAINS, VILLAGE OF 2417 BREWERY RD CROSS PLAINS WI 53528-9499 070703292657 WI DNR PO BOX 7921 MADISON WI 53701-7921 070704160741 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 070704196401 WI DOT 2101 WRIGHT ST MADISON WI 53704 070704199604 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 070704199210 D & R RIPP LLC 5904 PRAIRIE LN PALATINE IL 60067 070703245001 KALSCHEUR IMPLEMENT CO INC 1113 MAIN ST CROSS PLAINS WI 53528 070703245741 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 070703245841 Current Owner 100 N FAIRCHILD ST MADISON WI 53703 070703291710 WI DOT 2101 WRIGHT ST MADISON WI 53704 070704160741 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 070704195457 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 070704195859 CROSS PLAINS, VILLAGE OF 2417 BREWERY RD CROSS PLAINS WI 53528-9499 070704196401 WI DOT 2101 WRIGHT ST MADISON WI 53704 070704199604 PRAIRIE HILL PARTNERS LLC 820 ENTERPRISE DR SLINGER WI 53086 080735322641 TIMON D ZANDER 7013 LAUFENBERG BLVD CROSS PLAINS WI 53528 080735322901 GREGORY VALASKEY 7016 LAUFENBERG BLVD CROSS PLAINS WI 53528 080735323011 ELIZABETH FUHRMAN 7014 LAUFENBERG BLVD CROSS PLAINS WI 53528 080735323121 WIRTH LIVING TR, DAVID M & JULIE A 7012 LAUFENBERG BLVD CROSS PLAINS WI 53528 080735326751 CROSS PLAINS, VILLAGE OF 2417 BREWERY RD CROSS PLAINS WI 53528-9499 080735323231 PATRICK J LUND 7010 LAUFENBERG BLVD CROSS PLAINS WI 53528 080735323341 PATRICK DUGAN BERTOLINO 7008 LAUFENBERG BLVD CROSS PLAINS WI 53528 080735326501 CROSS PLAINS, VILLAGE OF 2417 BREWERY RD CROSS PLAINS WI 53528-9499 SS SS SS SS SS SS SS SS SS SS SS CC CH861.1861.5 861.6 861.9 863.3862.3 A/C A/C SIGN SAN SAN SAN GRT C GV GVGVMH GVT WVSWVGUYGUY WVS MH WVM WVM WV G G G G G G G G GG GG G G G GE E E E E E E E E E EE E FO E EE E E OH OHG G G G G OH OH OH OH OH OH G TTT T T T T T T T T W W W W FO FO FO FOT T T T T T FO FO FOSAN SAN SAN SAN SAN SAN SS SS SS SS SS SS SS SS SS SS W W W W T T T T T T T T T T CO CO COCO CO GVGVFOFOFO T T T T T T T T T T SS SS SS FOFOFOFOFOFOFOFO E E E E E E E E E E EE E G G G G G G G G G G G G 860861862862861 862 860 862 863862 859861862863862862862863 860861862 862 861860 862 861860859858 860861861862862861861 862 864863863863861862863863862 862859 864863862861 MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE:X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - GDP.DWGC001 REVIEW DRAWING -NOT FORCONSTRUCTION GRAPHIC SCALE 1 IN:40 FT80400 FEET DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECT NUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 MARKET STREETWESTERN SITE INFORMATION:PARCEL TAX ID: 070704160741TOTAL SITE AREA: 92,018 SF (2.11 AC)TOTAL DISTURBED AREA: 92,018 SF (2.11 AC)EXISTING PERVIOUS (AREA):845 SF (0.02 AC)EXISTING IMPERVIOUS (AREA): 91,173 SF (2.09 AC)EXISTING IMPERVIOUS AREA (PERCENT): 99.1%PROPOSED LANDSCAPE SURFACE RATIO (AREA): 10,278 SF (0.24 AC)PROPOSED LANDSCAPE SURFACE RATIO (PERCENT): 11.2%PROPOSED IMPERVIOUS (AREA):81,740 SF (1.88 AC)PROPOSED IMPERVIOUS AREA (PERCENT):88.8%LOT COVERAGE (PERCENT):37.6%PARKING:REGULAR PARKING STALLS: 27 STALLSADA ACCESSIBLE STALLS: 1 STALLS TOTAL PARKING STALLS:28 STALLS FEMA LEGEND:ZONE AE - REGULATORY FLOODWAYZONE AE - WITH BFEZONE X - 0.2% ANNUAL CHANCE FLOOD HAZARD EASTERN SITE INFORMATION:PARCEL TAX ID: 070703245741TOTAL SITE AREA: 66,115 SF (1.52 AC)TOTAL DISTURBED AREA: 66,115 SF (1.52 AC)EXISTING PERVIOUS (AREA):13,098 SF (0.30 AC)EXISTING IMPERVIOUS (AREA): 53,017 SF (1.22 AC)EXISTING IMPERVIOUS AREA (PERCENT): 80.2%PROPOSED LANDSCAPE SURFACE RATIO (AREA): 11,527 SF (0.27 AC)PROPOSED LANDSCAPE SURFACE RATIO (PERCENT):17.43%PROPOSED IMPERVIOUS (AREA):54,588 SF (1.25 AC)PROPOSED IMPERVIOUS AREA (PERCENT):82.6%LOT COVERAGE (PERCENT):31.7%PARKING: REGULAR PARKING STALLS18 STALLSADA ACCESSIBLE PARKING STALLS1 STALLTOTAL PARKING STALLS:19 STALLS PROPOSEDBUILDINGADDITIONFFE: 863.6EXISTINGBUILDINGFFE: 862.6 EXISTINGBUILDINGFFE: 862.6PROPOSEDBUILDINGFFE: 862.6 PROPOSEDBUILDINGFFE: 862.6 PROPOSEDBUILDINGFFE: 864.3 250049 9/18/2026 ZUERN BUILDINGPRODUCTS GENERALDEVELOPMENT PLAN 1923 MARKET STCROSS PLAINSWI53528 MJRDAD XXFEMA CROSS SECTION CO CO COCO CO CO CO COCO CO A/C SIGN SAN SAN SAN GRT C GV GVGVMH GVT WVSWVGUYGUY WVS MH WVM WVM G G G G G G G G G G G G G G G G G G G G G G GG G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E G E E E EW OHG G G G G G G G G G OH OH OH OH OH OH OH OH OH OH OH OH WG G G TT TT TT T T T T T T T T T T T T T T T T W W W W W W W W FO FO FO FO FO FO FO FO FOT T T T T T T T T T T T T T FO FO FO FO FO FO FO SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHOH W W W W W W T T T T T T T T T T T T T T T T T T T SAMH RIM 860.74 SAMH RIM 862.87N-18" PVC: 849.37S-18" PVC: 849.17 SAMH RIM 862.36N-18" PVC: 848.86S-24" PVC: 848.86 INL RIM 861.64NE-18" RCCP:856.64S-21" RCCP: 856.89W-27" RCCP: 856.29 INL RIM 859.98W-12" RCCP: 856.58INL RIM 859.88N-27" RCCP:855.28S-27" RCCP: 855.03W-12" RCCP: 856.48 INL RIM 861.80E-6" PVC: 860.35 RCCP B /12INIE 858.45 RCCP /12INIE 857.96 WV: 861.79 WVM: 860.80 WVS: 860.66 WVM: 862.42 WVS: 861.70 RCCP/12INIE 858.69 IP IP IPIPIPIP GVGVFOFOFOFO FOFOFOFO T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SSSS FOFOFOFO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G S76°55'05"E 466.61' S1°15'14"W 198.10' N76°55'05"W 486.92' N12°59'36"E 118.32' N76° 25' 05"W20.00'N12°59'36"E 75.40' 7 STALLS@ 9'x18' 8 STALLS@ 9'x18' 36.00'63.00'12 STALLS@ 9'x18'24.00'25.00' 24.00'25.00'8.00'6.00' 6.00'R4.0'R4.0' R4.0' R4.0' R4.0' R4.0'R10.0' 20.00'19.00' 30.00' 5.00'SIDE YARDPAVEMENT SETBACK 5.00'SIDE YARDPAVEMENT SETBACK 10.00'FRONT YARDPAVEMENT SETBACK 25.00'BUILDING SETBACK X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - WEST_CIVIL.DWG 250049 9/18/2026 C100 REVIEW DRAWING -NOT FORCONSTRUCTION ZUERN BUILDINGPRODUCTS SITE PLAN 1923 MARKET ST CROSS PLAINSWI53528 MJRDAD DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECTNUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 SITE PLAN LEGEND: REPAIR/REPLACE GRAVEL SECTIONIN KIND DUE TO SITE DISTURBANCE 1C500HMA PAVEMENTCONCRETE SIDEWALK, TYPE PER PLAN 2C500THICKENED EDGE SIDEWALK4C500STANDARD PARKING STALL (TYP)6C500ADA PARKING STALLS1C501DRIVEWAY ENTRANCE 2C501BIOFILTRATION MEDIA CROSS SECTION 2C503ADA DETECTABLE WARNING FIELDS 1C501DRIVEWAY ENTRANCE PROPOSEDBUILDINGADDITIONEXISTINGBUILDING EXISTINGBUILDING GRAPHIC SCALE 1 IN:20 FT40200 FEET PROPERTY LINE (TYP) 2C500THICKENED EDGE SIDEWALK MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE: MARKET STREETPROPOSEDSTORAGEBUILDING PROPOSEDSTORAGEBUILDING REPAIR/REPLACE GRAVEL SECTIONIN KIND DUE TO SITE DISTURBANCE REPAIR/REPLACE GRAVEL SECTIONIN KIND DUE TO SITE DISTURBANCE PROPOSED FENCE 0.5-FT OFFSET FROM PROPERTY LINE PROPOSED BREAKAWAY FENCE WITHIN FLOODWAY0.5-FT OFFSET FROM PROPERTY LINE TRASH & RECYCLING RECEPTICALS(2) 8-YARD DUMPSTERS PROPOSED BREAKAWAY FENCE &GATE WITHIN FLOODWAY PROPOSED FENCE & GATE 3'x3' CONDENSING UNIT WESTERN SITE INFORMATION:PARCEL TAX ID: 070704160741TOTAL SITE AREA: 92,018 SF (2.11 AC)TOTAL DISTURBED AREA: 92,018 SF (2.11 AC)EXISTING PERVIOUS (AREA):845 SF (0.02 AC)EXISTING IMPERVIOUS (AREA): 91,173 SF (2.09 AC)EXISTING IMPERVIOUS AREA (PERCENT): 99.1%PROPOSED LANDSCAPE SURFACE RATIO (AREA): 10,278 SF (0.24 AC)PROPOSED LANDSCAPE SURFACE RATIO (PERCENT): 11.2%PROPOSED IMPERVIOUS (AREA):81,740 SF (1.88 AC)PROPOSED IMPERVIOUS AREA (PERCENT):88.8%LOT COVERAGE (PERCENT):37.6%PARKING:REGULAR PARKING STALLS: 27 STALLSADA ACCESSIBLE STALLS: 1 STALLS TOTAL PARKING STALLS:28 STALLS 2C501BIOFILTRATION MEDIA CROSS SECTION OUTDOOR STORAGEOUTDOOR STORAGE OUTDOOR STORAGE OUTDOOR STORAGE A/C A/C SIGN IP IP IP IPIP IPIP GVGVFOFOFOFO FOFOFOFOFOFOFOFO FO E E EG G G 5 STALLS@9'x18' 13 STALLS@9'x18'37.50'25.00'9.00' 6.00' 24.00' 50.00'12.00' 75.00'26.00' 25.00' 42.00'R4.0'R4.0'R4.0'R4.0' R4.0' R30.0' R30.0' 28.18' 10.00'FRONT YARDPAVEMENT SETBACK25.00'BUILDING SETBACK 5.00'SIDE YARDPAVEMENT SETBACK 5.00'SIDE YARDPAVEMENT SETBACK N1°15'14"E 208.07' S76°55'05"E 211.69' S13°04'55"W 11.00'S76°55'05"E 272.95' S13°00'45"W 16.50' S56°46'25"W 138.33' N89°18'41"W 354.72' X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - EAST_CIVIL.DWG 250049 9/18/2026 C101 REVIEW DRAWING -NOT FORCONSTRUCTION ZUERN BUILDINGPRODUCTS SITE PLAN 1923 MARKET ST CROSS PLAINSWI53528, DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECTNUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 GRAPHIC SCALE 1 IN:20 FT40200 FEET SITE PLAN LEGEND: PROPOSEDBUILDING MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE: 1C500HMA PAVEMENTCONCRETE SIDEWALK, TYPE PER PLAN 1C501DRIVEWAY ENTRANCE 1C501DRIVEWAY ENTRANCE6C500ADA PARKING STALLS2C500THICKENED EDGE SIDEWALK2C503ADA DETECTABLE WARNING FIELDS 4C500STANDARD PARKING STALL (TYP) PROPERTY LINE (TYP) MJRDAD MARKET STREETINTERNAL RAMPREFER TO C301 & ARCHITECTURAL PLANS 4 STEPS/RISERSLOADING DOCKRETAINING WALL 3'x3' CONDENSER UNITPROPOSED FENCE 0.5-FT OFFSET FROM PROPERTY LINE PROPOSED BREAKAWAY FENCE WITHIN FLOODWAY0.5-FT OFFSET FROM PROPERTY LINE TRASH & RECYCLING RECEPTICALS(2) 8-YARD DUMPSTERSPROPOSED BREAKAWAY FENCE &GATE WITHIN FLOODWAY PROPOSED FENCE & GATE EASTERN SITE INFORMATION:PARCEL TAX ID: 070703245741TOTAL SITE AREA: 66,115 SF (1.52 AC)TOTAL DISTURBED AREA: 66,115 SF (1.52 AC)EXISTING PERVIOUS (AREA):13,098 SF (0.30 AC)EXISTING IMPERVIOUS (AREA): 53,017 SF (1.22 AC)EXISTING IMPERVIOUS AREA (PERCENT): 80.2%PROPOSED LANDSCAPE SURFACE RATIO (AREA): 11,527 SF (0.27 AC)PROPOSED LANDSCAPE SURFACE RATIO (PERCENT):17.43%PROPOSED IMPERVIOUS (AREA):54,588 SF (1.25 AC)PROPOSED IMPERVIOUS AREA (PERCENT):82.6%LOT COVERAGE (PERCENT):31.7%PARKING: REGULAR PARKING STALLS18 STALLSADA ACCESSIBLE PARKING STALLS1 STALLTOTAL PARKING STALLS:19 STALLS OUTDOOR STORAGE OUTDOOR STORAGE CO CO COCO CO CO CO COCO CO A/C SIGN SAN SAN SAN GRT C GV GVGVMH GVT WVSWVGUYGUY WVS MH WVM WVM G G G G G G G G G G G G G G G G G G G G G G GG G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E G E E E EW OHG G G G G G G G G G OH OH OH OH OH OH OH OH OH OH OH OH WG G G TT TT TT T T T T T T T T T T T T T T T T W W W W W W W W FO FO FO FO FO FO FO FO FOT T T T T T T T T T T T T T FO FO FO FO FO FO FO SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHOH W W W W W W T T T T T T T T T T T T T T T T T T T SAMH RIM 860.74 SAMH RIM 862.87N-18" PVC: 849.37S-18" PVC: 849.17 SAMH RIM 862.36N-18" PVC: 848.86S-24" PVC: 848.86 INL RIM 861.64NE-18" RCCP:856.64S-21" RCCP: 856.89W-27" RCCP: 856.29 INL RIM 859.98W-12" RCCP: 856.58INL RIM 859.88N-27" RCCP:855.28S-27" RCCP: 855.03W-12" RCCP: 856.48 INL RIM 861.80E-6" PVC: 860.35 RCCP B /12INIE 858.45 RCCP /12INIE 857.96 WV: 861.79 WVM: 860.80 WVS: 860.66 WVM: 862.42 WVS: 861.70 RCCP/12INIE 858.69 IP IP IPIPIPIP GVGVFOFOFOFO FOFOFOFO T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SSSS FOFOFOFO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - WEST_CIVIL.DWG 250049 9/18/2026 C110 REVIEW DRAWING -NOT FORCONSTRUCTION ZUERN BUILDINGPRODUCTS FIRE ACCESS PLAN 1923 MARKET ST CROSS PLAINSWI53528 MJRDAD DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECT NUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 PROPOSEDBUILDINGADDITIONEXISTINGBUILDING EXISTINGBUILDING GRAPHIC SCALE 1 IN:20 FT40200 FEET PROPERTY LINE (TYP) MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE: MARKET STREET PROPOSEDSTORAGEBUILDING PROPOSEDSTORAGEBUILDING BUILDING PERIMETER: 352-LF26' WIDE AERIAL APPARATUS FIRE LANE:88-LF PROVIDED20' WIDE FIRE ACCESS LANE250' MAX HOSE LAY FROM 20-FIRE ACCESS LANE500' MAX HOSE LAY FROM HYDRANT TO FAR ENDOF AERIAL APPARATUS LANE FIRE ACCESS DATA: EXISTING HYDRANT EXISTING HYDRANTAPPROX. 100-FT SOUTH OF SITE 47-FT LONG AERIALAPPARATUS FIRE TRUCKTURNING MOVEMENTS A/C A/C SIGN IP IP IP IPIP IPIP GVGVFOFOFOFO FOFOFOFOFOFOFOFO FO E E EG G G N1°15'14"E 208.07' S76°55'05"E 211.69' S13°04'55"W 11.00'S76°55'05"E 272.95' S13°00'45"W 16.50' S56°46'25"W 138.33' N89°18'41"W 354.72' X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - EAST_CIVIL.DWG 250049 9/18/2026 C111 REVIEW DRAWING -NOT FORCONSTRUCTION ZUERN BUILDINGPRODUCTS FIRE ACCESS PLAN 1923 MARKET ST CROSS PLAINSWI53528, DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECT NUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 GRAPHIC SCALE 1 IN:20 FT40200 FEET PROPOSEDBUILDING MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE: PROPERTY LINE (TYP) MJRDAD BUILDING PERIMETER: 747-LF26' WIDE AERIAL APPARATUS FIRE LANE:118-LF PROVIDED20' WIDE FIRE ACCESS LANE250' MAX HOSE LAY FROM 20-FIRE ACCESS LANE500' MAX HOSE LAY FROM HYDRANT TO FAR ENDOF AERIAL APPARATUS LANE FIRE ACCESS DATA: EXISTING HYDRANT EXISTING HYDRANTAPPROX. 100-FT SOUTH OF SITE 47-FT LONG AERIALAPPARATUS FIRE TRUCKTURNING MOVEMENTSMARKET STREET 861 860 860 861861 862862 862 861 862 862 860 860860860 CO CO COCO CO CC CH861.1861.5 861.6 861.9 863.3862.3 A/C SIGN SAN SAN SAN GRT C GV GVGVMH GVT WVSWVGUYGUY WVS MH WVM WVM G G G G G G G G G G G G G G G G G G G G G G GG G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E G E E E EW OHG G G G G G G G G G OH OH OH OH OH OH OH OH OH OH OH OH WG G G TT TT TT T T T T T T T T T T T T T T T T W W W W W W W W FO FO FO FO FO FO FO FO FOT T T T T T T T T T T T T T FO FO FO FO FO FO FO SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHOH W W W W W W T T T T T T T T T T T T T T T T T T T IP IP IPIPIPIP GVGVFOFOFOFO FOFOFOFO T T T T T T T T T T T T T T T T T T T SS SS SS SS SS SSSS FOFOFOFO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G 862.17862.44862.53861.33861.24860.97860.67861.81862.57862.54863.10MATCH862.68MATCH 860.45MATCH860.46MATCH860.62861.10859.25859.04859.05859.04859.04860.20859.73859.73859.90860.41860.50 862.60862.60 859.32 860 862 859.99 861862 861 859858 860 861 862 861861 862 862 861 858859 860861.26 862.59861.73862.57862.59 862.16 862.50 861.51 859.89861.15861.92 861.45 861.67861.58 861.43 862.09 860.32 861.28 MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE:X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - WEST - GRD.DWG 250049 9/18/2026 C300 REVIEW DRAWING -NOT FORCONSTRUCTION ZUERN BUILDINGPRODUCTS GRADING & UTILITYPLAN CROSS PLAINS, WI1923 MARKET ST DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECT NUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 EXISTING MINOR CONTOUR(1' INTERVAL)EXISTING MAJOR CONTOUR(5' INTERVAL)PROPOSED MINOR CONTOUR(1' INTERVAL)PROPOSED MAJOR CONTOUR(5' INTERVAL) ############ GRADING PLAN LEGEND: SLOPE INTERCEPTSS PROPOSED STORM SEWER. SIZE & MATERIAL PER PLANPROPOSED UNDERDRAIN CLEANOUTPROPOSED 6-INCH PERFORATED UNDERDRAIN PIPECO GRAPHIC SCALE 1 IN:20 FT40200 FEET FEMA LEGEND:ZONE AE - REGULATORY FLOODWAYZONE AE - WITH BFEZONE X - 0.2% ANNUAL CHANCE FLOOD HAZARD SLOPE INTERCEPT (TYP) CONNECT TO EXISTINGSTORM SEWERINV: 856.436-INCH PVC STORM SEWER74-LF @ S=0.5%BIORETENTION BASINTOP ELEV: 860.3BOT. ELEV: 859.3BOT. AREA = 536-SF MJRDAD PROPOSEDBUILDINGADDITIONFFE: 863.6EXISTINGBUILDINGFFE: 862.6 PROPERTY LINE (TYP) EXISTINGBUILDINGFFE: 862.6 PROPOSEDSTORAGEBUILDINGFFE: 862.6 PROPOSEDSTORAGEBUILDINGFFE: 862.6 6-INCH PERFORATED UNDERDRAIN60-LF @ S=0.5% BIORETENTION BASINTOP ELEV: 859.0BOT. ELEV: 858.0BOT. AREA = 763-SF2.5-FT WIDE, 0.5-FT DEEPROCK CRIBRUNOFF VOLUME: 174.2 CFVOLUME PROVIDED: 371.3 CF6-INCH PERFORATED UNDERDRAIN90-LF @ S=0.5%6-INCH PERFORATED UNDERDRAIN112-LF @ S=0.5%6-INCH PVC STORM SEWER42-LF @ S=0.5%CONNECT TO EXISTINGCURB INLETINV: 855.28 XXFEMA CROSS SECTION EMERGENCY OVERFLOW WEIRELEV: 860.2 EMERGENCY OVERFLOW WEIRELEV: 858.9 A/C A/C SIGN SAN SAN SAN GRT GV GVGVMH GVT WVSWVGUYGUY WVS WVM WV G G GG G G G G G G G G G E E E E FO FO E E E E G E E E E E E E W OH OH OH OHG G G G G G G G G G OH OH OH OH OH OH OH OH OH OH OH OH WG G G T T T T T T W W W W W W W W EFO FO FO FO FO FO FO FO FOT T T T T T T T T T T T T T FO FO FO FO FO FO FO SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OHOH W W W W W W W W W IP IP IP IPIP IPIP GVGVFOFOFOFO FOFOFOFOFOFOFOFO FO E E E EG G G CH 861.9 863.3862.3 862.83863.80863862 861860 860861 862 861.14 861.04 861.90861.68861.62861.89861.91861.97861.63 863.97 861.82861.62861.38861.43862.06862.14861.46861.58861.76861.46861.16 860.98 861.39861.47 861.81 861.63862.82 861.30 862.93862.91 863.24862.52 861.61861.88 863.80860.30860.30 862.88863.00 862.01861.94 861.80 861.68 SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 864.30 864.31864.31861.58861.717.8% 7.0% 1.5%1.5% 864.30 1RIM = 862.1130-INCH NYLOPLAST DRAIN BASININV (N) = 859.23INV (W) = 859.232RIM = 861.6930-INCH NYLOPLAST DRAIN BASININV (E) = 858.693APRON ENDWALLINV (W) = 858.50 MATT ROLLINS9/18/2026 PLOTTED BY:PLOT DATE:X:\PROJECTS\DANE\250049 ZUERN BUILDING PRODUCTS - CROSS PLAINS\DESIGN\C3D\SHEETS\250049 - EAST - GRD.DWG 250049 9/18/2026MJRDADC301 REVIEW DRAWING -NOT FORCONSTRUCTION ZUERN BUILDINGPRODUCTS GRADING & UTILITYPLAN CROSS PLAINS, WI1923 MARKET ST DATE ISSUED:DRAWN BY:REVIEWED BY:JT PROJECT NUMBER:SHEET NUMBER: PROJECT: PROJECT ADDRESS: SHEET TITLE: DESCRIPTION:DATE:NO.DRAFT/REVISIONS: GREEN BAY | MADISONMILWAUKEE | EAU CLAIREMADISON OFFICE281 W NETHERWOOD ROAD, SUITE 1OREGON, WI 53575 EXISTING MINOR CONTOUR(1' INTERVAL)EXISTING MAJOR CONTOUR(5' INTERVAL)PROPOSED MINOR CONTOUR(1' INTERVAL)PROPOSED MAJOR CONTOUR(5' INTERVAL) ############ GRADING PLAN LEGEND: SLOPE INTERCEPTPROPOSED NYLOPLAST DRAIN BASIN, SIZE PER PLANSSSS PROPOSED STORM SEWER. SIZE & MATERIAL PER PLAN GRAPHIC SCALE 1 IN:20 FT40200 FEET FEMA LEGEND:ZONE AE - REGULATORY FLOODWAYZONE AE - WITH BFEZONE X - 0.2% ANNUAL CHANCE FLOOD HAZARD PROPOSEDBUILDINGFFE: 864.3 XXFEMA CROSS SECTION TRENCH DRAIN423-LFC5042 TRENCH DRAIN25-LFC5042 ADS STORMTECH UNDERGROUND STORAGEREFER TO SUPPLEMENTAL ADS DETAILSHEETS, SHEET C505 PROPOSED APRON ENDWALL WH A401 07 A402 05 A401 05 A101A 1 EX. OFFICE EX. STORAGE CLOSET EX. RESTROOM EX. RESTROOM EX. SHOW ROOM EX. SHOW ROOM EX. RETAIL A402 07 19 A601 07 A601 05 A601 EXISTING ADDITION CONF. ROOM 101 53'-9" 56'-0" SHELVING SHELVING SHELVING SHELVING FURNANCE RESTROOM 103 UP UP UP MECHANICAL CLOSET 102 SHOWROOM 100 A301 3 A301 4 55'-6" 6 3/4" 38'-7 1/4" 12'-0" 1'-10" 12'-0" 4'-0" 52'-8 3/4" PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY KEYPLAN TRUE NORTH PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) ADD. EX. C:\Revit\LocalProjects\80051rvA-V2025 V3_ay_nsmith.rvt 9/18/2026 11:01:13 AM A101 80051 SHOWROOM & OFFICE - FIRST FLOOR PLAN JAD BMA NJS ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 /1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS NORTH SCALE: 3/16" = 1'-0" FIRST FLOOR PLAN - OVERALL ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP SUBMITTAL 09/17/2026 A401 07 A402 05 A401 05 A402 07 19 A601 07 A601 05 A601 OFFICE 212 CONFERENCE ROOM 208 OFFICE 207 OFFICE 206 CONFERENCE ROOM 205 STAIR ST001 OPEN CUBICLES 200 ROOF BELOW A102A 2 EXISTING ADDITION DN FUTURE FUTURE SALES COORDINATOR SALES COORDINATOR WINDOW SPECIALIST WINDOW SPECIALIST ADMIN ASSISTANT ADMIN ASSISTANT FUTURE OFFICE 204 RESTROOM 203 RESTROOM 201 CLOSET 202 OUTSIDE SALES OFFICE 209 OUTSIDE SALES OFFICE 210 OUTSIDE SALES OFFICE 211 PRINTER PLAN COUNTER 56'-0" 53'-9" PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY KEYPLAN TRUE NORTH PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) ADD. EX. C:\Revit\LocalProjects\80051rvA-V2025 V3_ay_nsmith.rvt 9/18/2026 11:01:16 AM A102 80051 SHOWROOM & OFFICE - SECOND FLOOR PLAN JAD BMA NJS ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 /1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS NORTH SCALE: 3/16" = 1'-0" SECOND FLOOR PLAN - OVERALL ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP SUBMITTAL 09/17/2026 190'-0" 99'-0" 12'-0" 76'-0" 56'-0" 134'-0" 99'-0" 26'-0" 50'-0" 12'-0" 289'-0" 289'-0" 15'-10" 6'-4" 33'-10" 29'-0" 20'-0" 2'-8"3'-4" 79'-0" 99'- 0" 3'-0" 8'-0" 4'-0" 8'-0" 3'-0" 1'-4" 3'-4" 45'-4" 1'-6" 8'-0" 85'-0" 20'-0" 2'-8"3'-4" 79'-0" 99'-0" 7'-2" 6'-4" 8'-11" 13'-1" 5'-0" 8'-9" 5'-0" 9'-0" 5'-0" 7'-9" A403 23 A403 07 A403 06 A403 08 WAREHOUSE 100 88'-0" 88'-0" PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80053rvA-V2025_ay_nsmith.rvt 9/18/2026 10:55:41 AM A103 80053 WAREHOUSE - FIRST FLOOR PLAN AYA AYA Author ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 / 1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS NORTH SCALE: 1/16" = 1'-0" WAREHOUSE - FIRST FLOOR PLAN ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP RESUBMITTAL 09/17/2026 EXISTING FIRST FLOOR 100' -0" TOP OF FOOTING 96' -6" SECOND FLOOR @ ADDITION 112' -9 7/8" TRUSS BEARING @ ADDITION 121' -11" TRUSS BEARING 111' -1 1/8" 19 A601 07 A601 ADDITION EXISTING SIGNAGE FIRST FLOOR @ ADDITION 101' -0" 01 05 08 06 11 14 10 12 13 04 17 EXISTING FIRST FLOOR 100' -0" SECOND FLOOR @ ADDITION 112' -9 7/8" TRUSS BEARING @ ADDITION 121' -11" TRUSS BEARING 111' -1 1/8" 19 A601 07 A601 ADDITION EXISTING FIRST FLOOR @ ADDITION 101' -0" 07 12 10 15 05 02 08 06 11 13 16 04 31'-5" PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80051rvA-V2025 V3_ay_nsmith.rvt 9/18/2026 11:01:19 AM A401 80051 SHOWROOM & OFFICE - EXTERIOR ELEVATIONS JAD BMA NJS ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 /1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS SCALE: 3/16" = 1'-0" A401 NORTH ELEVATION 07 SCALE: 3/16" = 1'-0" A401 SOUTH ELEVATION 05 ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP SUBMITTAL 09/17/2026 01 02 03 KEYNOTES: LP SMARTSIDE ENGINEERED WOOD PANEL & VERTICAL SIDIN G, COLOR: SNOWSCAPE WHITE LP SMARTSIDE ENGINEERED WOOD LAP SIDING, COLOR: CAVERN STEEL LP SMARTSIDE ENGINEERED WOOD SHAKE LAP SIDING, COLOR: CAVERN STEEL LP SMARTSIDE 3 1/2" X 5/4" ENGINEERED WOOD CORNER T RIM, COLOR: GRAY OR WHITE LP SMARTSIDE 5 1/2" X 5/4" ENGINEERED WOOD SMOOTH T RIM, COLOR: MATCH WALL COLOR LP SMARTSIDE FASCIA BOARD, COLOR: CELLULAR PVC COLUMN WRAP / TRIM PREFINISHED METAL GUTTER PREFINISHED METAL DOWNSPOUT PREFINISHED METAL FASICA SHINGLED ROOF STANDING SEAM METAL ROOF MARVIN FIBERGLASS WINDOW MARVIN SLIDING DOOR INSULATED ENTRY DOOR INSULATED DOUBLE DOOR CANOPY SUPPORT BRACKETS EXTERIOR SIGNAGE PROVIDED BY OWNER 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 EXISTING FIRST FLOOR 100' -0" TOP OF FOOTING 96' -6" SECOND FLOOR @ ADDITION 112' -9 7/8" TRUSS BEARING @ ADDITION 121' -11" TRUSS BEARING 111' -1 1/8" 05 A601 FIRST FLOOR @ ADDITION 101' -0" 13 09 03 06 11 08 05 07 11 10 12 08 04 EXISTING FIRST FLOOR 100' -0" TOP OF FOOTING 96' -6" EXISTING TRUSS BEARING 118' -6" SECOND FLOOR @ ADDITION 112' -9 7/8" TRUSS BEARING @ ADDITION 121' -11" TRUSS BEARING 111' -1 1/8" 05 A601 SIGNAGE SIGNAGE FIRST FLOOR @ ADDITION 101' -0" 07 12 10 05 01 02 03 08 09 10 11 13 12 18 03 17 SCALE: 3/16" = 1'-0" A402 WEST ELEVATION 05 PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80051rvA-V2025 V3_ay_nsmith.rvt 9/18/2026 11:01:22 AM A402 80051 SHOWROOM & OFFICE - EXTERIOR ELEVATIONS JAD BMA NJS ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 /1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS SCALE: 3/16" = 1'-0" A402 EAST ELEVATION 07 ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP SUBMITTAL 09/17/2026 01 02 03 KEYNOTES: LP SMARTSIDE ENGINEERED WOOD PANEL & VERTICAL SIDIN G, COLOR: SNOWSCAPE WHITE LP SMARTSIDE ENGINEERED WOOD LAP SIDING, COLOR: CAVERN STEEL LP SMARTSIDE ENGINEERED WOOD SHAKE LAP SIDING, COLOR: CAVERN STEEL LP SMARTSIDE 3 1/2" X 5/4" ENGINEERED WOOD CORNER T RIM, COLOR: MATCH ADJACENT WALL COLOR LP SMARTSIDE 5 1/2" X 5/4" ENGINEERED WOOD SMOOTH T RIM, COLOR: MATCH WALL COLOR LP SMARTSIDE FASCIA BOARD, COLOR: CELLULAR PVC COLUMN WRAP / TRIM PREFINISHED METAL GUTTER PREFINISHED METAL DOWNSPOUT PREFINISHED METAL FASICA SHINGLED ROOF STANDING SEAM METAL ROOF MARVIN FIBERGLASS WINDOW MARVIN SLIDING DOOR INSULATED ENTRY DOOR INSULATED DOUBLE DOOR ALUMINUM CANOPY EXTERIOR SIGNAGE PROVIDED BY OWNER 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 FIRST FLOOR 100' -0" LOW EAVE HEIGHT 130' -0" TOP OF HIGH PARAPET 134' -0" TOP OF LOW PARAPET 132' -0" 03 06 10 10 13 FIRST FLOOR 100' -0" LOW EAVE HEIGHT 130' -0" TOP OF HIGH PARAPET 134' -0" TOP OF LOW PARAPET 132' -0" 10 10 10 10 09 08 13 02 06 34'-0" 07 01 05 04 14 13 14 FIRST FLOOR 100' -0" LOW EAVE HEIGHT 130' -0" TOP OF HIGH PARAPET 134' -0" TOP OF LOW PARAPET 132' -0" 02 07 01 05 10 10 10 10 10 10 08 09 13 03 11 12 FIRST FLOOR 100' -0" LOW EAVE HEIGHT 130' -0" TOP OF HIGH PARAPET 134' -0" TOP OF LOW PARAPET 132' -0" 02 08 01 05 10 09 11 12 08 10 04 07 14 PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80053rvA-V2025_ay_nsmith.rvt 9/18/2026 10:55:45 AM A403 80053 WAREHOSUE - EXTERIOR ELEVATIONS AYA AYA Author ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 / 1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS 01 02 03 KEYNOTES: VERTICAL AVP METAL WALL PANEL SYSTEM, COLOR: SNOW W HITE VERTICAL AVP METAL WALL PANEL SYSTEM, COLOR: CHARCO AL GRAY HORIZONTAL PBU METAL WALL PANEL SYSTEM, COLOR: DEEP GRAY PREFINISHED METAL GUTTER PREFINISHED METAL EAVE/RAKE TRIM PREFINISHED METAL PARAPET CAP GALVALUME METAL ROOF PANEL INSULATED SECTIONAL OVERHEAD DOOR INSULATED WALK DOOR, COLOR: FIXED ALUMINUM WINDOW, COLOR: CLEAR ANODIZED LOADING DOCK WITH BUMPERS, DOCK LEVELER AND SHELTER 42" HIGH, 1-1/2" DIAMETER GUARDRAIL WITH POWDER COAT, COLOR: TBD ALUMINUM CANOPY NEW STAIRS AND HANDRAIL SCALE: 1/16" = 1'-0" A403 WEST ELEVATION 23 SCALE: 1/16" = 1'-0" A403 SOUTH ELEVATION 07 SCALE: 1/16" = 1'-0" A403 NORTH ELEVATION 06 SCALE: 1/16" = 1'-0" A403 EAST ELEVATION 08 04 05 06 07 08 09 10 11 12 13 ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP RESUBMITTAL 09/17/2026 14 MATERIAL LEGEND LP SMARTSIDE PANEL & VERTICAL SIDING SNOWSCAPE WHITE LP SMARTSIDE SHAKE LAP SIDING CAVERN STEEL LP SMARTSIDE LAP SIDING CAVERN STEEL SHINGLED ROOF STANDING SEAM METAL ROOF BLACK ALUMINUM STOREFRONT CLEAR ANODIZED PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80053rvA-V2025_ay_nsmith.rvt 9/18/2026 10:55:46 AM A406 80053 SHOWROOM & OFFICE - RENDERINGS AYA AYA Author ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 / 1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP RESUBMITTAL 09/17/2026 NORTHEAST CORNER NORTH ENTRANCE MATERIAL LEGEND LP SMARTSIDE PANEL & VERTICAL SIDING SNOWSCAPE WHITE LP SMARTSIDE SHAKE LAP SIDING CAVERN STEEL LP SMARTSIDE LAP SIDING CAVERN STEEL SHINGLED ROOF STANDING SEAM METAL ROOF BLACK ALUMINUM STOREFRONT CLEAR ANODIZED PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80053rvA-V2025_ay_nsmith.rvt 9/18/2026 10:55:47 AM A407 80053 SHOWROOM & OFFICE - RENDERINGS AYA AYA Author ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 / 1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP RESUBMITTAL 09/17/2026 NORTHWEST CORNER SOUTHWEST CORNER MATERIAL LEGEND PREFINISHED METAL PARAPET CAP / ALUMINUM CANOPY BLACK ALUMINUM STOREFRONT CLEAR ANODIZED VERTICAL AVP METAL PANEL SYSTEM SNOW WHITE HORIZONTAL PBU METAL PANEL SYSTEM DEEP GRAY VERTICAL AVP METAL PANEL SYSTEM CHARCOAL GRAY PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80053rvA-V2025_ay_nsmith.rvt 9/18/2026 10:55:48 AM A408 80053 WAREHOUSE - RENDERINGS AYA AYA Author ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 / 1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP RESUBMITTAL 09/17/2026 SOUTHWEST CORNER SOUTH ELEVATION MATERIAL LEGEND PREFINISHED METAL PARAPET CAP / ALUMINUM CANOPY BLACK ALUMINUM STOREFRONT CLEAR ANODIZED VERTICAL AVP METAL PANEL SYSTEM SNOW WHITE HORIZONTAL PBU METAL PANEL SYSTEM DEEP GRAY VERTICAL AVP METAL PANEL SYSTEM CHARCOAL GRAY PROJECT NUMBER Due to electronic distribution, this drawing may not be printed to the scale indicated on the drawings. Do NOT use scale to determine dimensions or sizes. No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission. ANGUS - YOUNG ASSOCIATES, INC. Copyright © 2026 All Rights Reserved APPROVED BY REVIEWED BY DRAWN BY PRELIMINARY - NOT FOR CONSTRUCTION Janesville | Madison | Rockford Sheet Size: 24" x 36" (Arch D) C:\Revit\LocalProjects\80053rvA-V2025_ay_nsmith.rvt 9/18/2026 10:55:49 AM A409 80053 WAREHOUSE - RENDERINGS AYA AYA Author ZUERN BUILDING PRODUCTS - CROSS PLAINS MASTERPLAN 1922 / 1923 MARKET STREET CROSS PLAINS, WI 53528 ZUERN BUILDING PRODUCTS ISSUANCES / REVISIONS NO: DESCRIPTION: DATE: 1 VILLAGE GDP/ SIP SUBMITTAL 08/10/2026 2 REVISED VILLAGE GDP/ SIP RESUBMITTAL 09/17/2026 LOADING DOCK SOUTHEAST CORNER Page 1 of 7 To: Village of Cross Plains From: Sonja Kruesel, AICP, Village Planner, Vandewalle & Associates Date: October 5, 2026 Re: 1923 & 1918 Market St. Planned Development (GDP and SIP Review) Site Details: Summary: Zuern Building Products & Design Center is requesting approval of a General Development Plan (GDP) and Specific Implementation Plan (SIP) for improvements to its two existing properties located on opposite sides of Market Street. Both properties are current zoned LI (Light Industrial) and have historically operated together as part of Zuern’s building materials sales and storage operation. The Planned Development would establish a coordinated development plan for the two properties and provide flexibility from certain underlying LI zoning standards necessary to accommodate redevelopment and reinvestment in the two sites. Both sites have relatively significant constraints associated with mapped Floodway and 100-Year Floodplain district. Both sites are located directly south of the Wisconsin and Southern Railroad corridor. According to the applicant, the proposed redevelopment would occur in three phases as follows: • Phase 1, West Parcel (1923 Market Street): Construction of a two-story addition to the existing showroom/office building. The first-floor addition would expand showroom space, West East Acres 2.1 1.5 Parcel No. 0707-041- 6074-1 0707-032- 4574-1 Address 1923 Market St 1918 Market St Zoning Light Industrial Light Industrial Proposed Use Office, Showroom, and Storage Structures Warehouse West Parcel: 1923 Market St. East Parcel: 1918 Market St. Page 2 of 7 and the second floor would provide additional office space. Improvements also include new customer and employee parking areas and landscaping. Timing: start October 2026. • Phase 2, East Parcel (1918 Market Street): Demolition of three existing buildings and construction of a new ~20,500 sf warehouse. The warehouse would increase indoor lumber and material storage. Improvements also include parking, loading docks, site circulation, and landscaping. • Phase 3, West Parcel (1923 Market Street): Replace an existing building near the northwest corner of the property with two open-sided storage structures of ~7,385 and ~9,167 sf. The structures would provide covered storage or materials currently stored outdoors. Comprehensive Plan: The Village’s Future Land Use map identifies the west parcel for Light Industrial and identifies the east parcel as Downtown Mixed Use. The proposed project would allow for the continued longstanding industrial/building materials use of both properties, along with continued base zoning of Light Industrial. No conflicts with the Comprehensive Plan are identified. Planned Development Zoning Approach: The applicant is requesting Planned Development (PD) zoning primarily to accommodate several site-specific departures from the underlying zoning standards. These primarily include a reduced building setback and pavement setback on the north side of the east parcel, increased accessory building heights on the west parcel, reduced landscape surface ratios on both parcels, and procedural flexibility to allow the General Development Plan (GDP) and Specific Implementation Plan (SIP) to be considered concurrently. The PD process includes four primary steps which progress from an initial concept through detailed site-specific approval: 1. Pre-application review with staff (completed) 2. Concept review by the Plan Commission (completed) 3. GDP review and public hearing (October 8, 2026) 4. SIP review and action (October 8, 2026) The Plan Commission’s actions are recommendations to the Village Board which has final approval authority. The Plan Commission should consider the requested modifications in the context of the overall redevelopment of the properties rather than simply as individual dimensional exceptions. The project represents substantial reinvestment in the existing industrial business. The improvements would replace or renovate several existing structures, consolidate portions of the outdoor storage operation into new enclosed or covered buildings, improve parking and access, clarify the record regarding existing nonconforming conditions, and introduce additional landscaping along the public- facing portions of both sites. The overall impervious space is also reduced in the proposed condition and the architectural appearance of all buildings is improved. While several of the requests are fairly substantial departures from the code requirements (such as the 12’ north side setback and reductions compared to the 30% required landscape surface ratio) Page 3 of 7 these flexibilities are proposed as part of a comprehensive reinvestment of two already highly constrained and already developed sites. Requested PD Flexibilities: Site or Zoning Issue West Parcel (1923 Market St.) East Parcel (1918 Market St.) Justification Side Yard Setback -- 12 feet vs. required 25-foot min Allow the warehouse to shift north, away from the regulatory floodplain Pavement Setback (North) -- 0 feet vs. required 5-foot min Accommodate circulation on the north side of the warehouse, including fire safety access, and truck movements to the loading docks at the rear of the building Accessory Building Height 26 feet and 31 feet vs. required 20- foot max -- Necessary to accommodate covered material storage and forklift access Landscape Surface Ratio ~11% proposed vs. required 30% min ~17% proposed vs. required 30% min Applicants indicate both contain more landscaped areas than exists today despite not meeting the minimum of 30% LSR. The west parcel is almost 100% impervious today (88% proposed) and the east parcel is about 80% impervious today (82% proposed). Parking 28 spaces proposed vs. 32 required -- Share parking between the two sites. While the west side is deficient by 4 spaces, the east side provides a surplus of 13 spaces that can be shared across the two properties. Building Separation Proposed 19 feet vs. required 50 The reduced building separation is between accessory storage buildings which are not intended to be occupied or fully enclosed. Floodplain Variances Relief sought for dryland contiguous access Must be approved by the ZBA. PD approval is conditioned upon ZBA approval. Fire Lane Variances 12-foot fire lane width proposed rather than typical 20 feet Must be approved by the Fire Chief. Reference is included in this staff report. Site Access, Circulation, and Parking: The proposal would modify and formalize access to both properties. On the west parcel, the number of existing driveway openings would be reduced from three to two. The east parcel would retain two access points, but the overall frontage in driveway Page 4 of 7 opening would be reduced in size. The applicant does not anticipate a significant change in daily traffic volumes associated with the redevelopment. Parking is proposed to function collectively between the two properties with the PD zoning serving as formal documentation of shared parking arrangements. The expanded showroom/office use on the west parcel requires 32 spaces per the zoning code. Instead of 32 spaces, the applicant is proposing 28 spaces, resulting in a deficiency of 4 spaces. The warehouse on the east parcel requires 4 parking spaces (one stall per employee on the maximum shift), and the applicant is proposing 19 parking spaces (the site plan shows 19 while the narrative states 20 – I am using the more restrictive 19), resulting in a surplus of 13 spaces. If the land uses were to change in the future, or if ownership of one of the parcels changed in the future, in a way that would modify the parking availability, amendment to the Planned Development may be necessary. Floodway and Floodplain Overlay Zoning: Floodplain considerations are an important component of the project and were one of the principal issues identified during concept review. Portions of the properties are located within the mapped FEMA Zone AE floodplain and regulatory floodway. Floodways are generally more restricted as that is the area where floodwaters flow during inundation. If fill is placed in the floodway, a hydraulic study is required to show no increase in the flood elevation. The applicants stated that while improvements are planned such as modifications to driveway entrances, pavement, and parking areas, grading will remain at the existing elevation, and no new fill will be placed. Fencing within the floodway is proposed to be designed as breakaway fencing. Development is allowed in the floodplain if buildings are constructed to flood protection regulations. The finished floor of buildings must be located 2 feet above the base flood elevation. In addition, the floodplain ordinance requires that a 15-foot dryland area be provided around the entirety of the structure which would provide land access for safety response during a flood. The applicant is requesting approval to not provide a continuous halo of dryland access around the Page 5 of 7 building. They state that dryland access can be accommodate on the north, but on the south side of the sites, the elevated building generally abuts mapped floodway rather than dryland access. The applicant’s justification is that building entrances (which would be used during safety response) are not located on the south side of the building and would be accessible via appropriate dryland in their proposed locations. Floodplain compliance, while important to review during PD/Site Plan review at the Plan Commission level, is separate from the zoning flexibility authorized with a PD approval. To receive relief from the floodplain ordinance, the Zoning Board of Appeals must consider a variance. Any required floodplain permits, certifications, ZBA variance, or other building permits shall be obtained separately from the PD approval. A related condition of approval is included. Fire Lane Access: The proposed warehouse on the east parcel is located approximately 12 feet from the north property line. This area is also intended to provide fire access along the north side of the building. Typical fire access lane requires approximately 20 feet of unobstructed width, therefore the configuration proposed does not meet the typical requirements. The Fire Chief has reviewed and approved the proposed reduced width. This access is particularly important because the south side of the building is adjacent to the floodway and may not provide reliable emergency access during a flood event. As a condition of approval, the 12-foot-wide area between the north side of the warehouse and the north property line shall remain permanently clear and unobstructed for fire and emergency access. Lighting: Photometric plans have been submitted for both properties. Proposed lighting includes building- mounted fixtures and pole-mounted site lighting. The Lighting code requires no more than 0.50 foot candles as measured at the property line. The maximum fixture height for the LI district is 16 feet. A note on Sheet ES00 and ES01 states that fixtures will be mounted on a 20’ tall pole. The plans shall either be revised to a maximum pole height of 16 feet or the exceedance shall be discussed and potentially authorized by the Plan Commission as a Planned Development flexibility. Location of 12’ Fire Lane Proposed Page 6 of 7 Landscaping: The landscaping plans concentrate planting primarily along Market Street and in the proposed parking areas. Tables on Sheet C600 and C601 demonstrates that proposed planting complies with the required number of landscaping points on both sites. Building Architecture: Overall, the proposed materials generally coordinated a white, gray, and black color palette provide a cohesive architectural character across the redevelopment while allowing the showroom/office building has a more customer-oriented appearance. • The showroom and office addition (west parcel) uses LP SmartSide siding in a combination of white and dark gray colors. Roofing materials and black and clear-anodized aluminum storefront/windows are proposed. The mix of siding orientations and materials, windows, roof forms, and entrance features provide articulation and visual interest. • The new warehouse (east parcel) uses an industrial material palette consisting primarily of vertical metal wall panels in white and gray, with horizontal metal panels in dark gray. • The materials for the proposed storage structures are also more industrial in nature. Fencing and Outdoor Storage: Outdoor material storage would remain an important component of the Zuern operation following redevelopment, although the new warehouse and covered storage structures would allow additional materials to be stored indoors or under cover. The site plans identify designated outdoor storage areas and proposed perimeter fencing on both properties. Portions of the proposed fencing and gates located within the regulatory floodway are specifically identified as breakaway fencing. Recommendation: Staff recommends that the Plan Commission make the following motion. Motion to recommend approval to the Village Board of the General Development Plan (GDP) and Specific Implementation Plan (SIP) for Zuern Building Products at 1918 and 1923 Market Street, subject to the following Findings of Fact and Conditions of Approval: Findings of Fact 1. Three phases of construction are approved as part of the Planned Development as noted in this review memo and the submitted application. 2. Zoning flexibility is approved as listed below: a. Reduced side yard building and pavement setback (1918 Market St.) b. Increase accessory building height (1923 Market St.) c. Reduced Landscape Surface Ratio (1918 and 1923 Market St.) d. Reduced parking spaces at 1923 Market St. and shared parking arrangements between 1918 and 1923 Market St. e. Reduced accessory building separation (1923 Market St.) f. Increase in light pole fixture height (1918 and 1923 Market St.)  Lighting was not identified as a flexibility in the materials submitted. The Plan Commission shall either include as a flexibility of the PD or require compliance with the 16’ maximum. Page 7 of 7 3. Fire Access as proposed, including a reduced 12-foot width at 1918 Market St. is approved by the Fire Chief. Conditions of Approval 1. All outstanding Village fees shall be paid prior to issuance of building permits. 2. The 12-foot-wide area between the north side of the warehouse and the north property line shall remain permanently clear and unobstructed for fire and emergency access. No outdoor material storage, vehicle parking, equipment storage, or other obstructions shall be permitted within this area at any time. 3. Shared parking is approved as part of the GDP/SIP. If either property is subsequently sold or otherwise separated from common ownership or operation, continued compliance with applicable parking approvals is required. 4. Any required floodplain permits, certifications, ZBA variance, or other building permits shall be obtained separately from the PD approval. David Wirth 7012 Laufenberg Boulevard Cross Plains, WI 53528 October 8, 2026 Village of Cross Plains Zoning Board of Appeals 2417 Brewery Road Cross Plains, WI 53528 Request for Rear Yard Setback Variance Property at 7012 Laufenberg Boulevard Dear Members of the Zoning Board of Appeals: I respectfully request a variance to allow a proposed 10-foot by 12-foot backyard storage shed to be located approximately 4 feet from my rear lot line, rather than the 10-foot setback I have been advised is required. This would be a reduction of approximately 6 feet, subject to confirmation of the lot line and the applicable method of measuring the shed setback. I have already had a gravel base prepared for the shed. The base is approximately 4 feet from the rear lot line. I am requesting permission to use this location before proceeding with installation of the shed. The land immediately beyond my rear lot line consists of a field and stream corridor, with trees and natural vegetation. There is no neighboring home directly behind the proposed shed location. These surroundings are the primary reason for my request. Given the existing open space and vegetation, I believe the proposed location would have limited impact on neighboring privacy, views, and use of adjacent property. The enclosed four photographs show the prepared base, its placement in the backyard, and the surrounding vegetation. I ask the Board to consider these site conditions in evaluating whether the reduced rear setback can be approved. Using the existing base would also avoid the expense and additional ground disturbance of relocating it. I am willing to provide a site plan, verified lot-line measurements, and any additional information required for review. Please advise me of the application requirements, fees, and hearing process, including any separate requirements related to the nearby stream. I would welcome a site visit if helpful. Thank you for considering my request. Sincerely, David Wirth Enclosures: Four site photographs Site Photographs 7012 Laufenberg Boulevard • Rear yard Photo 1 Backyard overview with the prepared gravel base and surrounding trees Site Photographs 7012 Laufenberg Boulevard • Rear yard Photo 2 Prepared gravel base and vegetation beyond the proposed shed location Site Photographs 7012 Laufenberg Boulevard • Rear yard Photo 3 Alternate view of the base and surrounding backyard Site Photographs 7012 Laufenberg Boulevard • Rear yard Photo 4 Detail of the gravel base edge and adjacent ground 1 Zoning Board of Appeals Regular Meeting Notice and Agenda Village Hall 2417 Brewery Road Cross Plains, WI 53528 (608) 798-3241 Tuesday, November 10 , 20 2 6 5 :00 pm The Village of Cross Plains will provide opportunities for the public to participate virtually or by calling in. Please take note that the meeting will continue even if technical problems occur. The log in information is as follows: Zoom Meeting Link: https://us02web.zoom.us/j/2456624318?omn=89327584141 Conference telephone line: +1 312 626 6799 Meeting ID: 245 662 4318 I. Call to Order II. Roll Call III. Pledge of Allegiance IV. Public Comment – This is an opportunity for anyone to address the Zoning Board of Appeals on any issue. Please observe the time limit of 3 minutes. While the Zoning Board of Appeals encourages input from residents, it may not discuss or act on any issue that is not duly noticed on the agenda. Please see the Public Comment instructions at the end of this agenda. V. General Business – Regular Meeting 1. Public Hearing for a petition from Zuern Building Products & Design Center for an area variance from Section 85.25(a)(1) of the Village of Cross Plains Municipal Code of Ordinances to allow redevelopment with reduced fill and dryland access around the buildings at 1918 and 1923 Market Street, Cross Plains, WI. 2. Discussion and Possible Action on the petition from Zuern Building Products & Design Center for an area variance from Section 85.25(a)(1) of the Village of Cross Plains Municipal Code of Ordinances to allow redevelopment with reduced fill and dryland access around the buildings at 1918 and 1923 Market Street, Cross Plains, WI. 2 3. Public Hearing for a petition from David Wirth, for an area variance from sections 84.29(g) of the Village of Cross Plains Municipal Code of Ordinances to allow a shed with a reduced setback into the rear yard at 7012 Laufenberg Blvd, Cross Plains, WI. 4. Discussion and Possible Action on the petition from David Wirth, for an area variance from sections 84.29(g) of the Village of Cross Plains Municipal Code of Ordinances to allow a shed with a reduced setback into the rear yard at 7012 Laufenberg Blvd, Cross Plains, WI. VI. Adjournment This meeting notice constitutes an official meeting of the above referenced group and was posted in accordance with all applicable laws related Open Meetings Law. It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above stated meeting to gather information. No action will be taken by any governmental body at the above stated meeting other than the governmental body specifically referred to above in this notice. Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals. For additional information or to request this service, contact the Village Hall at (608) 798-3241 or bobbi@cross- plains.wi.us . PUBLIC COMMENT INSTRUCTIONS WRITTEN : Send written comments by 12:00 p.m. on the Friday before the date of the meeting on any matter, either on or not on the agenda to be included in the meeting packet, by emailing cpersson@cross- plains.wi.us or in writing to Village Board, 2417 Brewery Rd., Cross Plains, WI 53528. All written comments received after 12:00pm on Friday will be distributed at the meeting. IN-PERSON : Public comment forms are available at the Board Room entrance. Please fill out and hand to staff prior to start of meeting. Comments are limited to three-minutes per person and must be delivered at the designated microphone for recording purposes. Accommodations can be provided for those unable to access the microphone. VIRTUAL : When public comments are allowed, attendees on Zoom wishing to participate should click “ raise hand ” if on video or press *9 if on phone call. Attendees will be called on in the order in which hands are raised. Those wishing to provide oral comments remotely must have their full name displayed within the Zoom application and must state address of residence. *As permitted by the Wisconsin open meetings law and while not required, the Zoning Board of Appeals has chosen to allow public comments during their meetings. This is specifically listed on the agenda as PUBLIC COMMENT. The Zoning Board of Appeals may not engage in discussion or take action during this period but may consider deferring the subject to a later meeting with notice. State statute and/or Village Code require the Village Board to hold PUBLIC HEARINGS on certain specified matters where the public can comment. The meeting chairperson will identify rules for providing comments. Other items on the agenda which are not listed for public hearing do not require the Board to allow public comment, however the meeting chairperson can at their own discretion allow limited public comments.

Source: Village of Cross Plains website. First collected Nov 12, 2026.