Utility Advisory Board Agenda and Packet
City of River Falls · St. Croix County · meeting of Nov 16, 2026 · Agenda packets
Open the original document More from City of River Falls
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF RIVER FALLS WISCONSIN
UTILITY ADVISORY BOARD AGENDA
CITY HALL – COUNCIL CHAMBERS
NOVEMBER 16, 2026
The public may view/listen to the meeting by:
• Viewing the City’s YouTube Channel: https://www.youtube.com/user/cityofriverfalls
Call Meeting to Order: 6:30 p.m.
Pledge of Allegiance
Roll Call
Approval of Minutes: September 21, 2026
ACTION MAY BE TAKEN ON ANY OF THE FOLLOWING ITEMS
PUBLIC COMMENT, PETITIONS, REQUESTS AND COMMUNICATIONS:
1. Public Comment
NEW BUSINESS:
2. Resolution Recommending the Purchase of Materials for Highview Meadows/Royal
Oaks Electric Distribution Replacements and Upgrades
3. Resolution Recommending Approval of New Electric Parallel Generation Schedule
(PGS) Rate
REPORTS:
4. Capacity Management Operation Maintenance (CMOM) Sanitary Sewer Collection
System Report
5. Finance Report
6. Utility Dashboards
7. Monthly Utility Report
8. Utility Director’s Report
ADJOURNMENT:
Council members may be in attendance for informational purposes only.
No official Council action will be taken.
NOTE: Any person who has a qualifying disability as defined by the Americans with Disabilities Act that requires the
meeting or materials to be in an accessible location or format, may contact City Clerk Amy White at (715) 426-3408
or in person at 222 Lewis Street, for accommodations. Requests for accommodations should be made at least three
(3) business days in advance of the meeting. Every effort will be made to arrange accommodations.
Posted at City Hall: 11/05/2026; Published: The Pierce County Journal: 11/12/2026
1
CITY OF RIVER FALLS
UTILITY ADVISORY BOARD
MEETING MINUTES
SEPTEMBER 21, 2026
The meeting was called to order by Utility Advisory Board (UAB) Chair Chris Lick at 6:30 p.m.
The pledge of allegiance was said.
Utility Advisory Board Present: Amber Bjork, Joel Donna, Lance Hovland, Mark Klecker,
Chris Lick, Tim Thum, and Rose Walker
Council Present: Mayor Alison Page
Staff Present: Utility Director Kevin Westhuis; Electric Operations Superintendent Wayne
Siverling; WPPI Energy Services Manager Jenna Willi; Executive Assistant Lanae Nelson; IT
Manager Chris Feyereisen; and IT Specialist Lead Jon Smits
Approval of Minutes:
Meeting Minutes: 08-17-2026
MSC Klecker/Walker approved minutes. Unanimous.
NEW BUSINESS:
Resolution 2026 – 10 Recommending Approval of WPPI Energy Amendment No. 3 to the Long
Term Power Supply Contract for Participating Members
WPPI Energy President & CEO Mike Peters presented Amendment No. 3 to the Long-Term
Power Supply Contract. The proposed amendment would extend the contract term from
December 31, 2055, through December 31, 2073, allowing WPPI Energy to support long-term
financing for future generation and transmission investments.
Peters reviewed WPPI Energy’s member-owned structure, power supply resources, projected
capacity needs, and the benefits of the long-term contract, including cost stability, reliability, and
shared resource planning. He noted that 27 of the 51 member utilities had completed the
approval process.
The Board discussed the proposed amendment and its financial and operational benefits to
River Falls and the other WPPI Energy members. Peters introduced WPPI Energy Services
Manager Jenna Willi, who was in attendance.
MSC Thum/Walker moved to approve the resolution. Motion passed unanimously.
REPORTS:
IT Security Informational Update
IT Manager Chris Feyereisen provided an update on City cybersecurity practices and security
measures for critical utility infrastructure. Programmable logic controllers systems have been
isolated from the internet, with multi-factor authentication implemented throughout the
infrastructure. No current security concerns were reported.
Finance Report
Westhuis reviewed the monthly financial reports and reported that revenues exceeded
expenses in the Electric, Water, Wastewater, and Stormwater utility funds.
2
Utility Dashboards
Westhuis reviewed utility performance dashboards.
Monthly Report
Utility reports for August 2026 were included in the meeting packet.
Utility Director’s Report
Westhuis reported that a 72-hour continuous performance test began at the Wastewater
Treatment Facility’s Biosolids Dryer.
The Mound Reservoir has been cleaned and returned to service. The Sycamore Water Tower is
being drained for its required five-year DNR inspection.
Electric Operations Superintendent Wayne Siverling reported that the North Substation has
returned to service following a minor SF6 gas leak. Repairs are planned to extend the
equipment’s service life.
Siverling also reported that the East Division Street to High View Meadows electrical project is
nearing completion. A planned four-to-six-hour outage may be required during the final
equipment switchover.
ADJOURNMENT:
MSC Bjork/Thum to adjourn. Motion caried unanimously. UAB Chair Lick adjourned the
meeting at 7:52 p.m.
Respectfully submitted, Executive Assistant Lanae Nelson
3
#2
MEMORANDUM
TO: Utility Advisory Board
FROM: Wayne Siverling, Electric Operations Superintendent
DATE: November 16, 2026
TITLE: RESOLUTION RECOMMENDING THE PURCHASE OF MATERIALS FOR
HIGHVIEW MEADOWS/ROYAL OAKS ELECTRIC DISTRIBUTION
REPLACEMENTS AND UPGRADES
_____________________________________________________________________
RECOMMENDED ACTION
Recommend that the Utility Advisory Board (UAB) adopt a resolution advising the City Council to
authorize the purchase of 12,000 feet of 750 MCM underground primary cable from Stuart C. Irby
Co. in the amount of $162,576. The cable will be placed into inve ntory for use in the Highview
Meadows/Royal Oaks area for the E lectric Distribution Replacements and Upgrades Capital
Improvement Plan (CIP) projec t, which is scheduled for construction in 2027 .
BACKGROUND
The 2027 Capital Improvement Plan (CIP) includes electric distribution system replacements and
upgrades in the Highview Meadows/Royal Oaks area, located on the east side of River Falls
beyond the hospital (see attached map).
The City of River Falls and River Falls
Municipal Utilities (RFMU) have identified a
need to extend larger electrical infrastructure
east of town, beginning near the eastbound
Highway 35/65 bypass off -ramp and
continuing to the pedestrian tunnel. The project
will include approximately 4,000 feet of new
infrastructure and will improve electric system
reliability and capacity for customers in this
growing service area.
To support this project, the Electric Utility will
require approximately 12,000 feet of 750 MCM
underground primary cable. The cable will be
purchased in advance and added to inventory
for use on the Highview Meadows/Royal Oaks
Highview Meadows / Royal Oaks Area Map
Green Line: Proposed underground utility cable conduit route.
Red Lines: Existing underground utility infrastructure (conduit,
equipment, underground cable, etc.).
4
Memorandum to Utility Advisory Board
November 16, 2026
Page 2
area for the project and future system needs.
DISCUSSION
RFMU Electric Utility staff solicited quotes for the purchase of 750 MCM underground primary
cable required for the Highview Meadows/Royal Oaks Electric Distribution Replacements and
Upgrades project. This purchase is part of the City's broader effort to secure long-lead materials
in advance of the planned 2027 construction schedule.
Staff recommends approval of a purchase order with Stuart C. Irby Co. of Burnsville, Minnesota,
for the procurement of 12,000 feet of 750 MCM underground primary cable. The anticipated
delivery timeframe is the Spring of 2027.
In addition to the quote received from Stuart C. Irby Co., staff obtained pricing through the WPPI
Energy Joint Purchasing Program. Both vendors provided identical pricing.
Given the equivalent pricing, staff recommends Stuart C. Irby Co. based on its established
business relationship with RFMU and experience supplying underground distribution materials.
FINANCIAL CONSIDERATIONS
The Highview Meadows/Royal Oaks area project is included in the 2027 Capital Improvement
Plan and is funded through the Electric Utility Fund.
Vendor Delivery Timeframe Total Quote
Stuart C. Irby, Co. 2027 Spring Delivery $162,576
WPPI Energy Joint Purchasing 2027 Delivery Timeframe $162,576
Sources
Amount Uses Amount
Electric Utility Fund $162,576 750 MCM Underground Primary Cable
(Stuart C. Irby, Co.) $162,576
Total Sources $162,576 Total Uses $162,576
Figures 1 & 2: 750 MCM Underground Primary cable at Public Works
5
Memorandum to Utility Advisory Board
November 16, 2026
Page 3
The quote submitted by Stuart C. Irby Co. totals $162,576, or approximately $13.55 per linear
foot, and is within the project's available budget.
The 2027 CIP includes $400,000 for this portion of the project. The quoted amount covers the
supply of 750 MCM underground primary cable and is subject to applicable metal escalation
adjustments related to fluctuations in aluminum and copper markets.
The project will utilize existing inventory for components including switchgear, primary pedestals,
terminators, and primary elbows. Replacement of inventory items used for the project will result
in additional material costs that will be incorporated into the overall project budget. Installation is
anticipated to be completed using directional boring methods.
Payment for the cable will be made upon delivery to the River Falls Municipal Utilities project site.
CONCLUSION
Staff recommends that the Utility Advisory Board adopt a resolution recommending that the City
Council authorize the City Administrator to approve the purchase of 12,000 feet of 750 MCM
underground primary cable from Stuart C. Irby Co. in the amount of $16 2,576 for the Highview
Meadows/Royal Oaks Electric Distribution Replacements and Upgrades project.
Enc:
Stuart C. Irby, Co. Quote
6
,
QUOTE DATE ORDER NUMBER
<$
4,$
PAGE NO.
$
4
,,,
CUSTOMER NUMBER CUSTOMER ORDER NUMBER JOB/RELEASE NUMBER OUTSIDE SALESPERSON
<<<$
<,4,,4$
INSIDE SALESPERSON REQD DATE FRGHT ALLWD SHIP VIA
<<<<$
,4,,44<,$
ORDER QTY SHIP QTY LINE DESCRIPTION Prc/UOM Ext Amt
<<<<<$
444<<$
<$
4
Quotation
STUART C IRBY BR673 BURNSVILLE
12501 DUPONT AVE SOUTH
BURNSVILLE MN 55337
763-588-0545
10/28/26 S014762233
REMIT TO:
STUART C IRBY CO
POST OFFICE BOX 741001
ATLANTA GA 30384-1001 1
SOLD TO: SHIP TO:
RIVER FALLS MUNICIPAL UTILITIES RIVER FALLS MUNICIPAL UTILITIES
222 LEWIS STREET SUITE 228 950 BENSON STREET
RIVER FALLS, WI 54022-2190 RIVER FALLS, WI 54022
715-425-0906
ORDERED BY: Wayne Siverling
115643 750MCM Quote Michael J Uphoff
CHAD W LAFOR 10/28/26 Yes BW BEST-WAY
12000FT 1 OKON 162-23-3096 750MCM-61X AL F/S 13548.000M 162576.00
220M EPR 15KV 16X10 1500
(+/-)
-----------------------------------
SHIP ON 8 X 1500FT REELS +/-5%
-----------------------------------
PRICING SUBJECT TO METALS
ESCALATION @ CU=6.50 & AL=2.50
-----------------------------------
LEAD TIME: FEB/MARCH 2027
-----------------------------------
Your # 2-14-350-5750
** Reprint ** Reprint ** Reprint **
Subtotal 162576.00
S&H CHGS 0.00
Sales Tax
TOTAL 162576.00
* This is a quotation *
Prices firm for acceptance within 30 days with the exception of commodity prices which are
subject to change daily. Quotation is void if changed. Complete quote must be used unless
authorized in writing.
All transactions are subject to and exclusively governed by our Terms and Conditions of Sale,which are incorporated herein and available at: https://www.irbyutilities.com/terms.
Additional or conflicting terms are rejected, void, and of no force or effect.
7
** Reprint ** Reprint ** Reprint **
,
QUOTE DATE ORDER NUMBER
<$
4,$
PAGE NO.
$
4
,,,
CUSTOMER NUMBER CUSTOMER ORDER NUMBER JOB/RELEASE NUMBER OUTSIDE SALESPERSON
<<<$
<,4,,4$
INSIDE SALESPERSON REQD DATE FRGHT ALLWD SHIP VIA
<<<<$
4444$
Quotation
STUART C IRBY BR673 BURNSVILLE
12501 DUPONT AVE SOUTH
BURNSVILLE MN 55337
763-588-0545
10/28/26 S014762233
REMIT TO:
STUART C IRBY CO
POST OFFICE BOX 741001
ATLANTA GA 30384-1001 2
SOLD TO: SHIP TO:
RIVER FALLS MUNICIPAL UTILITIES RIVER FALLS MUNICIPAL UTILITIES
222 LEWIS STREET SUITE 228 950 BENSON STREET
RIVER FALLS, WI 54022-2190 RIVER FALLS, WI 54022
715-425-0906
ORDERED BY: Wayne Siverling
115643 750MCM Quote Michael J Uphoff
CHAD W LAFOR 10/28/26 Yes BW BEST-WAY
Terms and Conditions of Sale for Quotes
A. Seller assumes no responsibility whatsoever for any interpretation of bid documents, plans, or specifications provided to Seller (i.e., customer
shall be solely responsible for ensuring interpretation of such documents, plans and/or specifications and for conformity and appropriateness of all
goods and services ordered in comparison to same).
B. Prices are subject to change at any time prior to shipment unless otherwise agreed in writing signed by an authorized Seller representative.
C. Pricing and estimated delivery dates are based solely on the quantities and specific products and/or scope of services identified in this quote.
Seller may refuse, terminate, or change pricing, estimated dates, and other terms of its offer if customer requests changes or deviations from the
original quote. Unless an authorized Seller representative accepts customer
s proposed deviations in an explicit signed agreement modifying this
quotation, any such proposed deviations are automatically rejected, void, and of no force or effect.
D. Quotation does not include special mounting or installation hardware, equipment options, accessories, samples, spares, or mock-up equipment unless
otherwise noted.
E. Seller is not responsible for the design of the project or any goods supplied.
F. Seller reserves the right to increase the pricing quoted herein to account for force majeure events, the imposition of new or increased tariffs,
shipping costs, import/export fees, duties, customs, or taxes, currency fluctuations, or increases in commodity or market pricing.
G. Pre-shipment of anchor bolts is plus freight.
H. Where applicable, fabrication and shipment of goods can only be made after Seller receives the following: (i) purchase order conforming to this
Quotation, (ii) customer
s verification and approval of technical information, (iii) approved Submittal Drawings, and (iv) credit approval.
I. Lead times are strictly estimates. Seller is not responsible for ship dates beyond estimated dates unless Seller s President or VP Finance
otherwise explicitly agrees in a signed writing as part of this Quotation and then only to the extent so agreed.
J. All orders are FCA Shipping Point, prepaid and billed, unless otherwise noted in quote.
K. Logistic solutions, storage, handling, kitting, expedited or special delivery, testing, including, but not limited to, infrared scanning and NETA
testing, spares, start-up, installation, commissioning, arc flash studies, and other services are excluded unless otherwise specified in this quote.
Please contact your Seller representative for additional information on any such services if desired.
L. This quotation and all related transactions are also subject to the applicable manufacturer
s published warranties, including all applicable
disclaimers, exclusions, and limitations.
M. This quotation constitutes Seller
s confidential information, and customer shall not share or distribute this quotation to third parties other than
to the extent reasonably necessary to process the transactions contemplated herein with Seller.
N. Unless otherwise expressly agreed in a separate writing signed by Seller
s President or VP Finance, Seller does not agree and is not subject to any
contractual flow-down or pass-through terms from customer, including, but not limited to, DFARs, FARs, Prime Contracts, Minority Business
requirements, Buy America Act, etc.
8
RESOLUTION NO. 2026-XX
RESOLUTION RECOMMENDING THE PURCHASE OF MATERIALS FOR HIGHVIEW
MEADOWS/ROYAL OAKS ELECTRIC DISTRIBUTION REPLACEMENTS AND UPGRADES
WHEREAS, the City of River Falls and River Falls Municipal Electric Utility have identified a
Capital Improvement Project (CIP) scheduled for 2027 involving electrical distribution system
replacements and upgrades in the Highview Meadows/Royal Oaks area, including the
installation of 750 MCM primary underground cable; and
WHEREAS, it is in the best interest of the Electric Utility to proactively procure the required
materials in advance to ensure availability, mitigate future cost increases, and maintain project
schedules; and
WHEREAS, two quotations were received for the purchase of 750 MCM primary underground
cable; and
WHEREAS, Stuart C. Irby Co. submitted a quotation for the purchase and delivery of 12,000
feet of 750 MCM primary underground cable to be placed into inventory for future use; and
WHEREAS, the 2027 CIP includes funding in the amount of $400,000 for projects requiring
these electrical materials; and
WHEREAS, the lowest responsible quote received was from Stuart C. Irby Co. in the amount of
$162,576; and
WHEREAS, Utility staff have reviewed the proposal, determined it to be acceptable, and
recommend the purchase based on current and anticipated material needs; and
NOW, THEREFORE, BE IT RESOLVED, that the Utility Advisory Board recommends that the
River Falls Common Council authorize the City Administrator to approve the purchase from
Stuart C. Irby Co. for the delivery of 12,000 feet of 750 MCM primary underground cable, to be
placed into inventory for use in the 2027 Highview Meadows/Royal Oaks Electric Distribution
Replacement and Upgrade Project, in an amount not to exceed $162,576.
Dated this 16th day of November 2026.
__________________________
Chris Lick, Board Chair
ATTEST:
________________________________
Amy White, City Clerk
9
#3
MEMORANDUM
TO: Utility Advisory Board
FROM: Jenna Willi, WPPI Energy Services Manager
DATE: November 16, 2026
TITLE: RESOLUTION RECOMMENDING APPROVAL OF NEW ELECTRIC PARALLEL
GENERATION SCHEDULE (PGS) RATE
_____________________________________________________________________
RECOMMENDED ACTION
Recommend approval of the new Parallel Generation Schedule (Pgs) rate schedule for River
Falls Municipal Utilities (RFMU) customers and authorize inclusion in WPPI Energy's group filing
with the Public Service Commission (PSC) of Wisconsin.
BACKGROUND
The Public Service Commission (PSC) of Wisconsin recently approved a new Parallel
Generation Service (Pgs) rate option for municipal electric utilities. Adoption of this rate would
allow RFMU to compensate customers for excess electricity generation at the applicable
seasonal avoided-cost rate rather than the retail or wholesale energy rate.
This approach is consistent with long-standing practices used by many investor-owned and
cooperative utilities throughout Wisconsin.
Under the current structure, excess customer generation may be credited at the retail rate. The
retail rate reflects not only energy costs but also the costs associated with maintaining and
operating the electric distribution system. While customer -owned generation can offset energy
purchases, customers with parallel generation continue to rely on the utility's distribution
infrastructure for both receiving and exporting energy. As a result, distribution system costs
remain largely unchanged regardless of t he amount of excess generation produced.
The proposed rate more closely aligns customer compensation with the utility's actual avoided
energy costs. This approach promotes equitable cost recovery and helps reduce the potential for
shifting distribution system costs to customers who do not have pa rallel generation systems.
Additionally, the proposed rate encourages customers to size generation systems to meet their
own energy needs rather than oversizing systems primarily to generate revenue through excess
energy sales.
10
Memorandum to Utility Advisory Board
November 16, 2026
Page 2
RATE IMPACTS
Pgs-1 Rate Schedule
(Systems Smaller Than 20 kW)
Existing (Legacy) Customers
• Continue to be net-metered on a monthly basis.
• Applies to systems interconnected prior to the effective date of the revised rate
schedule.
• Customers will continue receiving the retail rate credit for excess generation for ten (10)
years following implementation of the new rate.
• Grandfathered status transfers only with the original ownership; ownership changes will
result in the system being treated as non-legacy.
New (Non-Legacy) Customers
• Continue to be net-metered on a monthly basis.
• Applies to systems interconnected after the effective date of the revised rate schedule.
• Excess generation will be credited at WPPI Energy's avoided-cost rate rather than
RFMU's retail rate.
• This creates a direct pass-through structure whereby RFMU purchases excess
generation from the customer and WPPI Energy purchases that energy from RFMU at
the same avoided-cost rate.
• The change reduces financial losses associated with purchasing excess generation
above its market value and reduces incentives to oversize systems.
• WPPI Energy will update avoided-cost rates annually and provide required PSC
reporting and tariff administration on behalf of participating members.
Pgs-2 Rate Schedule
(Systems 20 kW and Larger)
• All customers, including existing customers, will transition to the revised rate upon its
effective date.
• Net metering will continue on an hourly basis.
• Excess generation will be credited at WPPI Energy's avoided-cost rate.
• Excess generation transactions will continue to operate as a direct pass-through
between the customer, RFMU, and WPPI Energy.
FINANCIAL CONSDERATIONS
The primary cost associated with adopting the new Pgs rate schedule is the PSC filing fee.
WPPI Energy is coordinating a group filing on behalf of multiple member utilities, which is
expected to reduce filing costs for participating communities, including River Falls.
The proposed rate structure is expected to improve cost recovery, reduce potential cost shifting
between customer classes, and better align excess generation compensation with actual
avoided energy costs.
CONCLUSION
Staff recommends that the Utility Advisory Board recommend City Council approval of a resolution
11
Memorandum to Utility Advisory Board
November 16, 2026
Page 3
authorizing River Falls Municipal Utilities to participate in WPPI Energy's group filing with the
Public Service Commission of Wisconsin for adoption of the new Parallel Generation S chedule
(Pgs) rate schedule.
The proposed rate structure promotes equitable cost recovery, aligns compensation for excess
generation with actual avoided costs, and helps ensure that electric distribution system costs are
shared fairly among all utility customers.
12
RESOLUTION NO. 2026-XX
RESOLUTION RECOMMENDING APPROVAL OF NEW ELECTRIC PARALLEL
GENERATION SCHEDULE (PGS) RATE
WHEREAS, the Public Service Commission of Wisconsin has approved a revised Parallel
Generation Schedule (Pgs) rate for municipal electric utilities; and
WHEREAS, the revised Pgs rate schedule allows excess generation from qualifying customer-
owned generation systems to be credited at the applicable avoided-cost rate rather than the
retail electric rate; and
WHEREAS, the revised rate structure more accurately reflects the utility's avoided energy costs,
promotes equitable cost recovery, and reduces the potential for distribution system costs to be
shifted to customers without parallel generation systems; and
WHEREAS, adoption of the revised Pgs rate is consistent with practices currently used by many
Wisconsin electric utilities; and
WHEREAS, WPPI Energy is coordinating a group filing with the Public Service Commission of
Wisconsin on behalf of participating member utilities, which will reduce administrative costs
associated with filing the revised tariff;
NOW, THEREFORE, BE IT RESOLVED, that the Utility Advisory Board recommends that the
River Falls Common Council authorize WPPI Energy to proceed with the group filing application
for the adoption of the revised Parallel Generation Schedule (Pgs) rate for River Falls Municipal
Utilities, subject to approval by the Public Service Commission of Wisconsin.
Dated 16th day of November, 2026.
Chris Lick, Board Chair
ATTEST:
Amy White, City Clerk
13
#4
MEMORANDUM
TO: Utility Advisory Board
FROM: Bradley Vick, Water/Wastewater Superintendent
DATE: November 16, 2026
TITLE: 2026 CAPACITY MANAGEMENT OPERATION MAINTENANCE (CMOM)
SANITARY SEWER COLLECTION SYSTEM REPORT
BACKGROUND
The Wisconsin Department of Natural Resources (WDNR) requires municipal wastewater
collection system owners to develop and implement a Capacity, Management, Operation, and
Maintenance (CMOM) program in accordance with Wisconsin Administrative Code NR 210.2 3.
The River Falls Municipal Utilities Wastewater Department's 2026 CMOM Report is included in
this agenda packet.
The CMOM program is designed to ensure the City's sanitary sewer collection system is properly
managed, operated, and maintained. Program objectives include maintaining adequate system
capacity, reducing infiltration and inflow (I/I), preventing sanitary s ewer backups and overflows,
and protecting public health and the environment. The program establishes procedures for routine
inspections, system cleaning, preventive maintenance, emergency response, asset
management, and long-term capital improvement planning.
Implementation of the CMOM program helps identify existing and potential infrastructure
deficiencies, prioritize system improvements, maintain regulatory compliance, and support the
long-term reliability of the City's wastewater collection system.
DISCUSSION
The 2026 CMOM Report documents the City's ongoing efforts to manage, operate, and maintain
its sanitary sewer collection system in accordance with WDNR requirements. The report outlines
current maintenance practices, infrastructure assessments, inspection activities, and
improvement planning efforts aimed at maintaining system performance and reliability.
Continued implementation of the CMOM program allows the City to evaluate system conditions,
identify deficiencies, prioritize maintenance and capital projects, and address capacity concerns
before they result in service disruptions. The program also supports proactive asset management
and long -term planning for the sanitary sewer system.
14
Memorandum to Utility Advisory Board
November 16, 2026
Page 2
CONCLUSION
The City's continued implementation of the CMOM program is essential to maintaining a reliable,
efficient, and sustainable sanitary sewer collection system. Through ongoing evaluation,
preventive maintenance, infrastructure assessment, and capital improvem ent planning, the City
can effectively address current system needs while preparing for future demands.
Maintaining an effective CMOM program reduces the risk of sanitary sewer backups and
overflows, helps protect public health and the environment, and ensures compliance with
applicable WDNR regulations. Staff recommends acceptance of the 2026 CMOM Report and
continued implementation of the City's CMOM program.
15
City of River Falls
Capacity Management Operation Maintenance
Sanitary Sewer Collection System
16
INTRODUCTION
The Capacity Management Operation Maintenance (CMOM) document is a requirement of the Wisconsin
Pollution Discharge Elimination Permit issued by the Wisconsin Department of Natural Resources to the
City of River Falls. The goal of the CMOM program is to promote awareness of the sanitary sewer
collection system and identify issues before they become a problem.
The City of River Falls collection system consists of approximately 61 miles of gravity sanitary sewer main
and 3 lift stations with accompanying force main. The collection system continues to expand as new areas
around the City develop.
The document is meant to be a reference for the operation of the sanitary sewer collection system. The
Wisconsin Department of Natural Resources few has set up a 10-step program to cover all aspects of the
collection system.
The 10 parts of the CMOM program are:
1. Set you Goals.
2. Know your organization.
3. Understand your legal authority.
4. Operation & maintenance.
5. Design and performance standards.
6. Emergency overflow response plan.
7. Capacity assurance review.
8. Self-audit.
9. Special studies.
10. Compliance maintenance annual report.
The following pages provide an overview of each step and the information required to fulfill the CMOM
requirements.
ORGANIZATION
1. Ownership and Governing Body Description –
The City of River Falls is a Municipal Corporation with authority vested in the City Council and the Mayor,
who is the Chief Executive Officer (CEO) of the City. River Falls, like many other cities under the Home-
Rule Charter of Wisconsin, has the power to govern itself regarding local matters except where the State
has specifically prohibited that power.
The Mayor has the authority to perform executive responsibilities by monitoring the Administrator and
various departments of the City government. As the City’s policy leader, the Mayor also holds veto power
over Council actions. Along with the City Administrator, the Mayor represents the City with media relations,
meetings and presentations to other governmental units. The Mayor is also responsible for appointing
positions on certain boards, commissions, and committees within the City.
The Mayor and City Council are the governing body for the City of River Falls. The Common Council Bylaws
regulate the business and of the City Council by clarifying or summarizing City ordinances and policies or
guiding the City Council in municipal matters. Except as otherwise provided by law, the City Council shall
have the management and control of the city property, finances, highways, streets, utilities, and the public
service. The Council may act for the government and good order of the city, for its commercial benefit, and
for the health, safety, welfare, and convenience of the public. The Council consists of seven alderpersons,
one member from each of the City’s four aldermanic districts, three at large, and the mayor. At Large
alderpersons represent all districts.
The City Administrator serves as the Chief Appointed Official (CAO) of the City. In order to provide a more
efficient and effective government, the CAO is responsible for the direction and coordination of City
employees and reports directly to the Mayor and City Council. The City Administrator provides assistance
to the Mayor and City Council regarding policies and future planning, manages labor negotiations and
17
employee relations, provides overall management and direction of City departments and is the public
information officer for the City. In addition, the City Administrator is the Executive Director of the River
Falls Economic Development Corporation and works with area economic development organizations to
bring industries to the city.
2. Organizational Chart –
A flow chart is attached that shows the structure of the utility management.
3. Personnel and Position Descriptions –
Complete and updated job descriptions for all positions in the utility are kept by the Human Resources
Department.
4. Internal Communication Procedures –
All employees are issued a cell phone by the City that is used for communication purposes. In emergency
or call-out situations employees are generally notified in two ways. Customers call the utility number to
report an emergency. During normal business hours the customer service desk is staffed, and they will call
personnel to respond. After normal business hours the individual on-call team member is notified by Always
Answer (a contract virtual receptionist services call facility). If Always Answer Customer Service
Representative does not receive a response from the on-call personnel, the protocol for the representative
is to continue down the on-call list until a response is received from a team member. This procedure is
used for events such as basement backups or citizens reporting sanitary sewer overflows.
The Utility uses a Supervisory Control and Data Acquisition (SCADA) system. SCADA is the use of many
electronic monitoring nodes that are offsite and allow for access to critical utility system information. This
information can be accessed remotely through computers and smart phones by our utility personnel to help
identify and trouble shoot key electric, water and wastewater system functions. Our SCADA system
monitors the lift stations. The system will call out an operator in the event of a pump failure, high wet well
or electrical outage. The callout system works the same. The first call is to the operator on on-call standby
team member, if there is no response the calls will continue down the on-call phone list until a response is
received.
During normal maintenance activities operators communicate with their cell phones. The utility also has
portable two-way digital radios if cell reception is lost.
5. Public Information –
Informational utility materials are available on the City and Utility websites, social media channels, utility
billing inserts, mailings, and door hanger tags. The utility maintains a website and regularly post information
for customers. Monthly bills are sent by mail or electronically, depending on the customer’s preference.
Billing inserts may be included to provide additional information. Communication with individual customers
occurs when issues arise that require specific instructions.
18
Collection System and WWTP On-Call List
Name Title Work Phone Cell Area
Tim Rixmann Lead/Operator 715-426-3468 715-222-4494 WWTP/Collection
Joe Curran Operator 715-426-3468 715-441-6343 Collection
Todd Decker Operator 715-426-3468 715-821-2236 Collection
David Paynotta Operator 715-426-3468 715-821-9773 Collection
Josh Penovich Operator/Lab 715-426-3468 715-222-7090 WWTP
Bradley Vick Superintendent 715-426-3428 715-821-0201 Collection/WWTP
Bill Swenson Operator in
Charge (OIC)
715-426-3531 715-821-2788 WWTP
Josh Penovich Lab/Operator 715-426-3468 715-222-7090 WWTP
Kevin Westhuis Utility Director 715-426-3442 970-691-4040 Emergency
Coordination
Thomas Polkoski Operator 715-426-3468 715-821-6307 Collection
Dean Seemuth Operator 715-426-3428 715-209-0403 Collection
Brent Wiersma Operator 715-426-3428 715-821-9271 Collection
Todd Nickleski City Engineer 715-426-3409 Engineering
19
20
GOALS
The short- and long-term goals of the CMOM are established to ensure proper operation of the sanitary sewer
collection system. They are geared to three main areas of focus. These areas include preventing basement
backups, preventing sanitary sewer overflows and preventing hydraulic overloading at the wastewater treatment
facility.
Goals for the coming year (2026)
• Clean 25% of the collection system.
• Purchase a jetter/vacuum truck in the Capital Improvement Plan (CIP) funding 2030.
• Use a budget of $187,250 budget to slip-line old clay tile sewer.
• Use $160,000 in the CIP budget monies to rebuild failing manholes.
Long term goals
• Continue the program to slip line failing sewers and rebuild manholes. Line all clay pipe by 2040.
• Correct the problem areas of the interceptor main from North Main St. to the Wastewater Treatment Facility
(WWTF)
In addition to the three main areas of focus the program will have other benefits. It will help improve system
reliability, improve operator safety and help improve response to emergency situations.
LEGAL AUTHORITY
Legal authority is essential in maintaining an effective WWTF collection system. The ability
to establish service charges adequately cover the cost of maintaining the collection system and providing for future
replacement is necessary. Being able to enforce what types of wastes along with the volumes and strengths is
key. It is important that we have the ability to plan and implement replacement work and new construction to
connect future development. We need the capability for enforcement of illicit discharges and violations of the
sewer use ordinance.
1. Sewer Use Ordinance –
The ordinance should be a living, breathing document that is reviewed and update regularly.
2. Pretreatment Programs –
Currently the City does not have any industrial permits in force. The sewer use ordinance provides the
means to formulate a program or agreement.
3. Fat, Oil and Grease Control –
Chapter 13.12.050 provides for the requirement for businesses to install grease interceptors. It also
requires the facility to keep records of maintenance which may be reviewed by the City.
4. Illicit Discharges by Commercial and Industrial Users –
Control manholes are required at commercial/industrial applications. These manholes provide a sampling
location as well as an area to facilitate observation of the discharge. Connections to the sanitary system
require a permit and are inspected prior to being placed in service.
5. Private Property Clear Water –
Chapter 13.12.050 Section A prohibits discharge of clear water into the sanitary system.
6. Private Lateral Inspection –
Chapter 13.04.030 gives City employees the authority to enter private property to enforce any provision of
Chapter 13. Chapter 13.12.50 addresses surface and groundwater into private laterals.
7. Service and Management Agreements –
The City has the authority to enter into agreements and contract for services. The City currently has an
agreement with the City of New Richmond for emergency use of their jetter/vacuum unit.
8. Enforcement Action –
Chapter 13.12.060 establishes fines for violation of Chapter 13 of the Municipal Code. The offender is
also liable for damage to the WWTF and receiving river. In the event the offender does not pay for
damages they will be subject to imprisonment.
21
SEWER USE ORDINANCE
Chapter 13.12 - SEWER SERVICE SYSTEM*
Sections:
13.12.010 - Definitions.
Unless the context specifically indicates otherwise, the meaning of terms used in this chapter shall be as follows:
"BOD" (denoting biochemical oxygen demand) means the quantity of oxygen utilized in the biochemical oxidation of organic
matter under standard laboratory procedure in five days at twenty (20) degrees G. expressed in milligrams per liter.
"Building drain" means that part of the lowest horizontal piping of a drainage system which receives the discharge from
soil, waste and other drainage pipes inside the walls of the building and conveys it to the building sewer, beginning two fee t
outside the outside face of the building wall.
"Building sewer" means the extension from the building drain to the public sewer or other place of disposal.
"City" means the city of River Falls, Wisconsin, or the city council of said city.
"Combined sewer" means a sewer receiving both surface runoff and sewage.
"Garbage" means solid wastes from the domestic and commercial preparation, cooking and dispensing of food, and from the
handling, storage and sale of produce.
"Individual sewage disposal system" means a sewage disposal system, other than a public or community system, which
receives sewage from an individual establishment. Unless otherwise indicated the word "system" as it appears in this chapter
means "individual sewage disposal system".
"Industrial wastes" means the liquid wastes from industrial manufacturing processes, trade or business as distinct from sanit ary
sewage.
"Person" means any individual, firm, company, society, association, corporation or group.
"pH" means the logarithm of the reciprocal of the weight of hydrogen ions in grams per liter of solution.
"Public sewer" means a sewer in which all owners of abutting properties have equal rights, and is controlled by public author ity.
"Public Utilities Commission" means the utility commission acting for and in behalf of the city.
"Sanitary sewer" means a sewer which carries sewage and to which storm, surface and groundwaters are not intentionally
admitted.
"Sewage" means a combination of the water-carried wastes from residences, business buildings, institutions and industrial
establishments, together with such ground, surface and stormwaters as may be present. "Usual" or "normal" sewage shall be
sewage that does not exceed two hundred fifty mg/liter of five day BOD and/or two hundred fifty (250) mg/liter of five day
suspended solids and does not contain the substances prohibited in Section 13.12.050(B).
"Sewage treatment plant" means any arrangement of devices and structures used for treating sewage.
"Sewage works" means all facilities for collecting, pumping, treating and disposing of sewage.
"Sewer" means a pipe or conduit for carrying sewage.
"Sewer service charge" is a service charge levied on users of the wastewater collection and treatment facilities for payments of
depreciation and debt service expenses, as well as operation, maintenance and replacement costs (O, M & R) of such
facilities. (User charge, which covers O, M & R costs, is part of the Sewer Service Charge.)
"Suspended solids" means solids that either float on the surface of, or are in suspension in water, sewage or other liquids a nd
which are removable by laboratory filtering.
"Shall" is mandatory; "may" is permissive.
"Slug" means any discharge of water, sewage or industrial waste which in concentration of any given constituent or in quantit y
of flow exceeds for any period of duration longer than fifteen (15) minutes more than three times the average twenty -four (24)
22
hour concentration of flows during normal operation.
"Storm drain" (sometimes termed "storm sewer") means a sewer which carries storm and surface waters and drainage, but
excludes sewage and industrial wastes, other than unpolluted cooling water.
"User charge" is a charge levied on users of the waste-water collection and treatment facilities as part of the sewer service
charge for payment of O, M & R costs of such facilities.
"Utility administrator" means the administrator of the city, Wisconsin Municipal Utilities, or his or her authorized represen tative.
"Watercourse" means a channel in which a flow of water occurs, either continuously or intermittently.
"Wisconsin Pollutant Discharge Elimination System (WPDES) Permit" is a document issued by the Wisconsin Department of
Natural Resources, which establishes effluent limitations and monitoring requirements for the municipal wastewater treatment
facility. WPDES Permit No. WI-0029394-2 and modifications thereof pertain to the wastewater treatment facility in the city
operated by the River Falls Public Utility Commission.
(Prior code § 13.06(1))
13.12.020 - Use of public sewers required.
A. No person shall place, deposit, or permit to be deposited in any unsanitary manner on public or private property within
the city or in any area under the jurisdiction of the city, any human excrement, garbage or other objectionable waste.
B. Except as herein provided, no person shall construct or maintain any privy, privy vault, septic tank, cesspool, or other
facility intended or used for the disposal of sewage.
C. When property abuts upon any public street or alley along which sanitary sewer mains have been constructed, the
owner of any dwelling or commercial establishment on the property shall install suitable toilet facilities therein and
connect them with the sanitary sewer in accordance with the provisions of this title within ninety (90) days after the date
of mailing or delivering official notice to do so. The notice shall be given to the owner or occupant in writing by the city
clerk on order of the council.
D. Whenever any owner or occupant fails to comply with such written notice, the council shall by resolution direct that a
toilet be installed and connection made with the sewer system and that the cost of the installation be paid in the first
instance out of the general fund and then assessed against the property benefited.
E. After the installation and connection have been completed pursuant to council resolution, the clerk shall serve a
written notice of the assessment upon the owner or his or her representative directing him to pay the assessment to the
treasurer within ten (10) days after the service of the notice. If the assessment is not paid within ten (10) days, the clerk
shall certify the amount to the county auditor for collection in the sane manner as other special assessments. The
council may by resolution spread the assessment over a five-year period.
(Prior code § 13.06(2))
13.12.030 - Private sewage disposal.
The latest edition of the Wisconsin Plumbing Code (Chs. COMM 51-57, Wis. Adm. Code) as established by the Wisconsin
Department of Health and Social Services is adopted by reference and made a part of this chapter as if fully set forth herein .
Before publication of this code of ordinances, the clerk shall mark at least one copy of this Wisconsin Department of Health
and Social Services code as an official copy and file it in his office for use and examination.
(Amended during Supplement #1; prior code § 13.06(3))
13.12.040 - Building sewers and connections.
A. No unauthorized person shall uncover, make any connections with or opening into, use, alter, or disturb any public
sewer or appurtenance thereof without first obtaining a written permit from the city utility department.
B. There shall be two classes of building sewer permits:
1. For residential and commercial service;
2. For service to establishments producing industrial wastes;
3. In either case, the owner or his or her agent shall make application on a special form furnished by the city. The
permit application shall be supplemented by any plans, specifications, or other information considered pertinent in
the judgment of the city building inspector. A permit and inspection fee shall be paid to the city at the time the
application is filed, such fee to be an amount as currently on file in the city's sewerage rate schedule.
C. All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner.
The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the
installation of the building sewer.
D. A separate and independent building sewer shall be provided for every building; except where one building stands at
the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through
an
adjoining alley, court, yard, or driveway, the building sewer from the front building may be extended to the rear building
and the whole considered as one building sewer.
E. Old building sewers may be used in connection with new buildings only when they are found, on examination by the
23
city utility department to meet all requirements of this title.
F. The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating,
placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and
plumbing code or other applicable rules and regulations of the city. In the absence of code provision or in amplification
thereof, the materials and procedures set forth in appropriate specification of the A.S.T.M. and Standard Specifications
for
Water and Sewer Construction in Wisconsin.
G. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all
buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by
such
building drain shall be lifted by an approved means and discharged to the building sewer.
H. No person shall make connection of roof downspouts, exterior foundation drains, areaway drains, or other sources of
surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a
public sanitary sewer.
I. The connection of the building sewer into the public sewer shall conform to the requirements of the building and
plumbing code or other applicable rules and regulations of the city, or the procedures set forth in appropriate
specifications of the A.S.T.M. and the Standard Specifications for Water and Sewer Construction in Wisconsin. All such
connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be
approved by the city utility department before installation.
J. The applicant for the building sewer permit shall notify the city utility department when the building sewer is ready for
inspection and connection to the public sewer. The connection shall be made under the supervision of the city utility
department.
K. All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect
the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall
be restored in a manner satisfactory to the city.
(Prior code § 13.07)
13.12.050 - Sewer system general regulations.
A. Discharge of Surface Water. No person shall discharge or cause to be discharged any storm water, surface water,
groundwater, cooling water, or unpolluted industrial process waters into any sanitary sewer. No rain spout or other form
of surface drainage and no foundation drainage shall be connected with any sanitary sewer.
B. Nonacceptable Wastes. No person shall discharge or permit to be discharged into any public sewer any of the
following wastes:
1. Any liquid or vapor having a temperature in excess of one hundred eighty (180) degrees Fahrenheit, which
shall be discharged into the sewer for a period of over ten (10) minutes;
2. Any water or water having a five-day biological oxygen demand exceeding one thousand (1,000) parts per
million by weight as averaged during any twelve (12) month period;
3. Any gasoline, benzene, naptha, fuel oil, lubrication oil, or other flammable or explosive liquid, solid or
gas;
4. Any garbage that has not been properly shredded;
5. Any ashes, cinders, sand, mud, straw, shavings, meta, glass, rags, feathers, tar, plastics, wood, manure, grit,
brick, cement, onyx, carbide, or other matter that may interfere with the proper operation of the sewers or
sewage treatment plant;
6. Any water or waste having a pH lower than 5.5 or higher than 9.5 or having any other corrosive property
capable of causing damage or hazard to structures, equipment or personnel of the sewage works;
7. Any water or waste containing a toxic or poisonous substance in sufficient quantities to constitute a hazard to
humans or animals, injure or interfere with a sewage treatment, or create any hazard in the receiving waters of
the sewage treatment plant;
8. Any noxious or malodorous gas or substance capable of creating a public nuisance;
9. Any waters or wastes containing strong acid iron pickling wastes, or concentrated plating solutions whether
neutralized or not;
10. Any waters or wastes containing iron, chromium, copper, zinc and similar objectionable or toxic substances;
or wastes exerting an excessive chlorine requirement, to such degree that any such material received in the
composite sewage at the sewage treatment works exceeds the limits established by the city utilities department
for such materials;
24
11. Materials which exert or cause unusual BOD, chemical oxygen demand, or chlorine requirements in such
quantities as to constitute a significant load on the sewage treatment works, and unusual volume of flow or
concentration of wastes constituting "slugs" as defined herein;
12. Waters or wastes containing substances which are not amenable to treatment or reduction by the sewage
treatment processes employed, or are amenable to treatment only to such degree that the sewage treatment
plant effluent cannot meet the requirements of other agencies having jurisdiction over discharge to the receiving
waters;
13. Any toxic inconsistent with the requirements of the Clean Water Act of 1977;
14. The city shall comply with all the requirements of WPDES Permit No. WI -0029394-2 and all modifications
thereof. No discharge shall be allowed into the sanitary sewerage system that is in violation of the requirements
of the WPDES permit and the modifications thereof.
C. Control of Industrial Wastes.
1. If any waters or wastes are discharged, or are proposed to be discharged to the public sewers, which waters
contain the substances or possess the characteristics enumerated in subsection B of this section, and which in
the judgment of the city may have a deleterious effect upon the sewage works, processes, equipment, or
receiving waters, or which otherwise create a hazard to life or constitute a public nuisance, the city shall:
a. Reject the wastes;
b. Require pretreatment to an acceptable condition for discharge to the public sewers;
c. Require control over the quantities and rates of discharge; and/or
d. Require payment to cover the added cost of handling and treating the wastes not covered by existing
taxes or sewer charge under the provisions of subsection F of this section.
2. Pretreatment Equipment. If pretreatment or equalization of waste flows is permitted, the design and
installation of the plants and equipment shall be subject to the review and approval of the city utilities
department, and subject to the requirements of all applicable codes, ordinances and laws. Where preliminary
treatment or flow-equalizing facilities are provided for any waters or wastes, they shall be maintained
continuously in satisfactory and effective operation by the owner at his or her expense.
3. Report Required. Within three months after February 24, 1981, each person who discharges industrial wastes
to a public sewer shall prepare and file with the city a report that shall include pertinent data relating to the
quantity and characteristics of the waste discharged to the wastewater works. The following forms or the
information needed to complete them will be accepted:
a. Annual NR 101, Effluent Reporting Form;
b. Form 3400-28, Industrial Waste Contribution to Municipal System.
4. New Connection Report. Each person desiring to make a new connection to a public sewer for the purpose of
discharging industrial waste shall prepare and file with the city a report that shall include actual or predicted data
relating to the quantity and characteristics of the waste to be discharged. This discharge shall comply with the
requirements of WPDES Permit No. WI-0029394-2.
5. Request for Extension. When it can be demonstrated that circumstances exist which would create an
unreasonable burden on the person to comply with the time schedule imposed above, a request for extension of
time may be presented to the city for consideration.
D. Control Manhole Required. When required by the city utilities department the owner of any property serviced by a
building sewer carrying industrial wastes shall install a suitable control manhole together with such necessary meters
and other appurtenances in the building sewer to facilitate observation, sampling and measurement of the wastes. Such
manhole, when required, shall be accessibly and safely located, and shall be constructed in accordance with plans
approved by the city. The manhole and/or other sampling equipment shall be installed by the owner at his or her
expense and shall be maintained by him or her so as to be safe and accessible at all times.
E. Measurement Procedures. All measurements, tests and analyses of the characteristics of waters and wastes to which
reference is made in this title shall be determined in accordance with the latest edition of "Standard Methods for the
Examination of Water and Wastewater" published by the American Public Health Association, and shall be determined
at the control manhole provided, or upon suitable samples taken at the control manhole.
F. Special Cases.
1. No statement contained in this article shall be construed as preventing any special agreement or arrangement
between the city and any industrial concern whereby an industrial waste of unusual strength or character may
be
accepted by the city for treatment, subject to payment therefor, by the industrial concern.
2. Whenever it is determined that any lot, parcel of land, building or premises is discharging industrial wastes of
unusual volume, concentration or character, or of greatly variable volume, the utilities administrator shall
recommend the adoption of a special rate for such class of users, taking into consideration the volume,
biochemical-oxygen-demand value, and suspended solids content of the industrial wastes, and the nature of the
use made of the sewer system, but industrial sewer service rates will not be changed or adopted as original
rates except by resolution of the city utility commission.
G. Grease and Sand Interceptors. Grease, oil and sand interceptors shall be provided when the city determines they are
necessary for the proper handling of liquid wastes containing floatable grease in excessive amounts, as specified in
subsection F of this section or any flammable wastes, sand or other harmful ingredients. Such interceptors shall not be
required for private living quarters or dwelling units. All interceptors shall be of a type and capacity approved by the city
and shall be located as to be readily and easily accessible for cleaning and inspection. In the maintaining of these
interceptors, the owner of these interceptors shall be responsible for the proper removal and disposal by appropriate
25
means of the captured material and shall maintain records of the dates and means of disposal which shall be subject to
review by the city. Disposal of the collected materials performed by the owners personnel or agent must be in
accordance with currently acceptable Department of Natural Resource practice.
H. New Connections. New connections to the city's sanitary sewer system will be allowed only if there is available
capacity in all the downstream wastewater collection and treatment facilities.
(Prior code § 13.08)
13.12.060 - Violations—Penalties.
A. Any person found to be violating any provision of this chapter (except Section 13.12.040(A)) shall be served by the city
with written notice stating the nature of the violation and providing a reasonable time limit for the satisfactory correction
thereof. The offender shall, within the period of time stated in such notice, permanently cease all violations.
B. Any person who shall continue any violation beyond the time limit provided for in subsection A of this section, or any
person violating Section 13.12.040(A) shall upon conviction thereof be subject to a forfeiture of not less than one hundred
dollars ($l00), nor more than five hundred dollars ($500) per offense, together with the costs of prosecution and shall be
liable for any expenses resulting from damage to the treatment plant or receiving river, and in the event such forfeiture and
costs are not paid, to imprisonment. Each day in which any such violation shall continue shall be deemed a separate
offense.
(Prior code § 13.10 (part))
Operation & Maintenance
Maintenance is an essential part of a properly functioning collection system. Cleaning and clearing the sanitary
sewer system of obstructions is essential to preventing basement backups and sanitary sewer overflows. Targeting
maintenance activities to areas with the greatest concern is essential to using the maintenance budget in the most
effective way. Sewer line televising and manhole inspections are two effective ways to achieve this. Record keeping
for sewer backups can help target areas that need more attention.
Listed below is maintenance activities performed by the utility to help ensure proper operation of the collection
system.
1. Cleaning –
Currently the City contracts out the cleaning of the sanitary sewer lines. The entire system is scheduled to be
cleaned once every four years or approximately 25% of the system per year. Some problem areas with flat
or improperly pitched pipes require more frequent cleaning.
2. Root Removal –
Problem areas for root penetration into the sanitary pipe have been identified. Approximately 15% of the
system has roots that require attention. Depending on the severity these areas may need to have a root saw
run through yearly.
3. Flow Monitoring –
Flow monitoring has been performed sporadically in the collection system.
4. Sewer Line Televising –
Televising the sanitary system is an effective tool for determining areas of pipe that need to be repaired. It
can also help to identify areas of surcharging by looking at flow lines on the pipe. The utility is currently
inspecting about 3% of the collection system per year. Older areas of the system are being targeted.
Televising is also an effective tool for locating sanitary sewer service connections at the main. The City also
budget in 2027 $125,000 in CIP monies for replacement of equipment in 2027.
5. Manhole Inspections/Air Release –
Inspections are performed on 10 – 15% of the manholes per year. Things to look for is any infiltration into the
manhole, excessive solids accumulation, condition of inverts and bench, condition of walls especially brick
manholes and the condition of the casting. Inspection of all force main air relief will be conducted quarterly.
6. Manhole Rehabilitation –
Presently we have a $160,000 CIP budget for rehabbing existing manholes. Projects include rebuilding
manhole benches, lining brick manholes, grouting to eliminate inflow and placement of chimney seals.
7. Mainline Rehabilitation -
$187,250 CIP monies for 2027 for lining sewer and replacement of pipes that are too damaged to line. A
grading system has been established to make sure the pipe requiring the most attention is put at the top of
the list.
8. Private Sewer Inspections –
Private sewer connections are inspected at the sewer main when main line televising is performed. During
meter change outs and building inspections sewer services are checked for clear water discharge such as
sump pump connections.
26
9. Private I/I Removal -
If a sump pump or roof drain is connected to the sanitary sewer the City has the authority to have the clear
water discharge disconnected. The City has not established a program for lateral inspection remediation.
10. Lift Station Operations & Maintenance (O&M) –
Lift stations are constantly monitored through a SCADA system. Callout procedures are in place for pump
failure and high wet well alarms. Lift station maintenance is performed monthly or more frequently if the need
arises. Maintenance manuals are kept for all of the lift stations.
11. All O&M Manuals –
All O&Mfor the WWTF are located in the storage room off of the lab, Lift Station manuals are located in the
Superintendents office.
12. WWTF Continuous Operation with Limited Downtime -
The continuous operation of the WWTF with limited downtime can not be stressed enough, to reduce
downtime the following list of objectives shall be followed and updated as needed moving forward. They are
as follows.
a. Create a list of critical parts needed to facilitate repairs that may occur at anytime of the day or
week that are special order or have long lead times when ordered.
b. Perform an audit of spare parts once a year and update and order any parts that are needed
c. The fore mentioned parts list and descriptions of Critical equipment shall be in the plants
Maintenance SOP.
27
River Falls Sanitary Main Dashboard 2025
28
29
Sanitary Sewer Inspection Form
Policy Date: July 29, 2015
RF_MH_ID:
Inspected By: Inspection Date:
Give each a box a +, --, or N/A designator
to determine condition of each component, then
assign a 1-5 rating for each of the 5 components.
Summate at bottom, find final grade.
Pavement Cracks Fractures Casting Offset Height variance Score
Casting
/5
Adjustable casting? ______ Open pick holes? _____ Internal
gasket? ____
Cracks Fractures Softening of mortar Score
Rings
/5
Can you see internal wire structure? _____ Is the entire ring gone? _______
Cracks Fractures Softening of mortar Infiltration Score
Riser/Chimney
/5
What is this section made of? _______________
Cracks Fractures Softening of
mortar
Presence &
condition of steps
Score
Base
x2 multiplier
___________/10
What is this section made of? Bricks ____ Blocks _____ Precast _____
Is there a dropped line? If so: External ____ Internal ____
Any laterals coming in? Direction _____ Private/Public _____
Cracks Fractures Trough
condition
Doghouse
condition
Debris Total
Floor
/5
Is there anything on the floor that shouldn’t be there? ______
Comments: Total Score: ___/30
1 – Excellent Condition
2 – Acceptable condition for the coming years
3 – Needs to be addressed within 3-5 years
4 – Risk of collapse or failure imminent
5 – Collapsed
Inspection Rating Key
6-10 points: 1
11-15 points: 2
16-20 points: 3
21-25 points: 4
26-30 points: 5
Urgency Scale (Circle One)
None – no urgency
Low – address next 3-5
years
High – address this year
Entry Required? _______
30
Sanitary Sewer Statistics
The predominant materials that make up the gravity collection system are clay tile and PVC pipe. Most new
construction is PVC pipe. Polyethylene is used in boring applications and ductile is used when extra strength is
required.
Clay tile was the material of choice in installations into the late 1970’s. Most of the issues with pipe in the collection
system involve clay tile. Improper installation techniques and root protrusion into the joints are the main issues.
The city has stepped up efforts to line the failing clay tile sewers. In 2025 approximately 3,500 feet of clay pipe was
lined.
The City also has approximately 12,000 feet of force main. Force main transmits the sewage from the lift stations to
the gravity sewer. The force main ranges from 4” – 8” in diameter and consist of cast iron, ductile iron and plastic
pipe. Plastic is the predominant material compromising 83% of the force main. The older areas of the system were
set up to transport all the sewage by gravity. The force mains are comparatively new as they were put in when the
system expanded from its original boundaries.
Two of the lift stations have the potential for removal along with the accompanying force mains. The Kinnickinnic
and Woodridge lift stations have the potential to run to the existing gravity sewer system without pumping.
Design and Performance Standards
Design and performance standards ensure work done on the collection system is performed properly according to
state and local standards. A variety of sources are used to ensure work is completed in accordance with these
standards.
1. State Plumbing Code –
SPS 382 is followed for all industrial, commercial and residential plumbing installation. State approved plans
for industrial and commercial buildings must be submitted before any permits are issued.
2. Wisconsin Department of Natural Resources Code –
As required by code plans are submitted to the WDNR for approval.
3. Local Municipal Code –
The city maintains a variety of specifications on design and maintenance of the sanitary system.
1. Specifications for cleaning and televising.
2. Specifications for lining.
3. Specifications for construction of collection systems.
4. Specifications for manhole rehabilitation.
Collection system design work is contracted out to private engineering firms under the guidance of the City of River
Falls engineering department. Private firms do the design and submit the application for approval to the WDNR.
121,872
87,596
21,708
13,867
80,766
66,725
89,560
120,323
25,136
11,425
13,329
6,080
9,830
17,855
26,310
17,600
20,169
19,042
7,617
379
1,575
1,116
1,096
2018 2019 2020 2021 2022 2023 2024 2025
COLLECTION SYSTEM MAINTENANCE
Cleaning Televising Root Removal
31
Inspection of collection system construction is performed by contracted services and city personnel.
To facilitate the use of best practices a preconstruction meeting will be held. The design engineer, city staff and the
project foreman for the contractor doing the work shall attend the meeting. The meeting shall cover special
provisions, precautions, expectations and any other information pertinent to the project. A meeting prior to certain
construction operations involving the project foreman for the contractor, contracted employees performing the work,
on-site inspector and city staff will be held. The operations involve but are not limited to, sanitary sewer bypass,
sewer reconstruction and any work being done immediately adjacent to active sanitary sewer infrastructure. The
meeting will cover scope of work involved; contractors plan to complete the work, proper means and methods for
performing the work and contingency plans in case of emergency.
Following installation, the sewer lines are pressure tested and televised. Upon completion, notes are added to the
plan set and record drawings are prepared.
Commercial and industrial facilities must submit plans and specifications for private laterals to the city for approval.
The applications are reviewed by the engineering department and utility personnel before building permits are
issued. City staff inspects the installation.
Residential laterals are covered by state plumbing code and city code. Personnel from engineering and the utility
inspect the installation and prepare record drawings.
Additions to the collection system, lateral installations, televising reports and sewers that have been lined are put
into the cities ARC View mapping system.
Emergency Overflow Response Plan
1. Alarm System and Routine Testing –
The utility operates 3 lift stations all with audible, visual and telemetered alarm systems. The audible and
visual alarms at the lift stations are checked monthly. The telemetered system or SCADA control also gives
pump run times to catch pumping issues before they become a problem. The SCADA system is checked
daily. If the SCADA system registers an alarm it dials out to the operator on standby. It continues down the
list of personnel until someone is contacted. A 2019 upgrade of the SCADA systems planned to provide
redundant level sensing systems.
2. Emergency Equipment –
A complete list of all emergency equipment can be found in the emergency response plan. In addition to city
owned equipment the utility has partnerships with contractors that have additional equipment not in the city
inventory. United Rentals (651) 294-2380 and United Rental Pump Solutions (952) 562-1555 have portable
generation and pumping equipment. A complete list of equipment can be found at UnitedRental.com.
3. Emergency Procedures –
The City is currently reviewing its emergency preparedness plans for the wastewater treatment plant and the
collection system. The types of emergencies vary from basement backups to lift station failures. It is
important that procedures exist to minimize the effects of collection system failures. The plan prioritizes
actions to take in order to respond to situations effectively.
Emergency situations can be brought on by a variety of factors. Natural disasters, power outages and equipment
failure are all potential problems. Many of the same procedures apply for varied causes.
Sewer Overflow Emergency Response Plan
Purpose
The City of River Falls owns and operates a collection system that consists of lift stations, gravity flow sewer mains
and pressure force mains. These facilities are well maintained and normally would not result in sanitary sewage
overflows (SSO). The possibility does exist those unforeseen accidents, equipment failures, plugged lines, major
weather events and other situations could result in sewer overflows or spills. The focus of this plan is to minimize
the effects of an overflow when they do occur. This will help reduce public health hazards, prevent property
damage and limit environmental impacts.
32
DNR Notification
Within 24 hours the Wisconsin Department of Natural Resources needs to be notified a sanitary sewer overflow
took place. The district engineer should be notified by phone or email. The current district engineer is Adebowale
Adesanwo at 715-492-4047 or email at adebowale.adesanwo@wisconsin.gov. Identify the volume and location of
the spill and if any waterway is affected. Within 5 days, fill out the required paperwork and submit to the WDNR.
Public Notification
Depending on the location and degree of the spill the level of public notification can vary. Small spills that can be
contained should be cordoned off and controlled by personnel or signs posted telling the public to avoid the area
until it is cleaned up. Direct notification of those affected should take place. These would generally be confined to
small areas or areas where there is little or no public use. If it is determined the overflow made it to a body of water
the level of public notification increases. The minimum level of notification would be sending a notice to a local
paper. Public notice should take place as defined by the Wisconsin DNR “by common sense for the common
good”. The utility director will determine the level of notification based on the situation. A list of media contacts is
attached. In addition to outside media the utility also maintains a website and has a Facebook page for contacting
community members. City Hall and the River Falls Public Library have public notice boards for posting. The public
notification should include site of the spill, any water bodies that may be affected and what steps the public can
take to minimize their risk. The method of publication needs to be documented on the SSO form for the WDNR.
Notification Procedure
Notifications of potential SSO events from the public go to the customer service department at the utilities. After
hour calls are routed to a 24 hr.-receptionist service. In either event an operator is contacted to respond to the
SSO.
Internal Notification Procedure
When it is determined a SSO has occurred the individual investigating the overflow should contact the wastewater
superintendent. In the event the wastewater superintendent does not respond one of the lead operators should be
contacted. The wastewater superintendent or responding lead operator will be responsible for notifying the utility
director.
Remediation Procedure
When a collection system supervisor receives notification of a possible SSO they will gather as much information
as possible, formulate a plan of action and determine what staffing and equipment is needed to respond to the
overflow. The following sections cover potential events that may cause an SSO as well as actions that should be
taken in the event of an overflow.
Traffic and Crowd Control
When responding to an SSO event staff will need to assess the situation and prevent the public from encountering
the overflow.
1. Use traffic control, barricades and warning tape.
2. Wear proper high visibility clothing approved for night work.
Mainline Blockage
1. Determine location of blockage by checking downstream manholes to look for backed up sewage.
2. Secure the area using barricades, warning tape and traffic control.
3. Work to contain the overflow.
4. If the blockage can be removed quickly this is the most effective means of stopping the overflow.
5. If necessary, use the Vac Truck to pump out the manhole or use a bypass pump to pump to the next
manhole downstream of the blockage.
6. Geo logs can be used to contain the spill area.
7. Use the Vac Truck to remove the blockage. Go in the manhole directly downstream of the blockage. Use a
cleaning nozzle with a front jet made for removing blockages.
a. Once the blockage has been removed vacuum up as much of the overflow as possible using the Vac
Truck. Use any other methods available to recover as much of the sewage as possible.
8. Once the cleanup has been completed document any property damage and take photographs.
9. Notify any customers affected by the SSO that the situation has been resolved. Refer questions of liability or
payment to the utility director.
33
10. Before leaving the area re-check manholes along the affected area to make sure the situation has been fully
resolved.
Force Main Failure
1. Isolate the leaking force main. The pump station feeding the force main will need to be shut down and
arrangements made to pump the wet well of the lift station. Use the city owned Vac Truck and contact
contract pumpers if necessary. A list of manholes to discharge by each lift station is attached.
2. In situations where a long-term shutdown is required contact American Pump. They maintain 24-hour service
for pumping equipment. The contact information is enclosed.
3. The same method for notification and cleanup for main line blockage should be used.
Pump station failure
1. The City maintains SCADA alarm notification at all lift stations. An alert will be sent for high water level,
power failure and loss of communication. The operators also monitor the pump runtimes daily to detect any
pump issues such as ragging or excessive runtimes.
2. In the event of a power outage the city has one mobile power generation units for providing backup power.
Instructions for operation and connection are located on each generator. When a power outage is reported to
an operator, they need to decide on how long the outage will be and monitor the wet well at the effect lift
station.
3. In the event of a pump failure the same procedure would be used to pump the wet well as in a force main
failure. The emergency pumping would continue until the lift station pumps are fixed.
Training
All new employees spend a minimum of 3 months working at the WWTF with experienced operators. They will
become proficient in the lab, and familiar with the operations of the WWTF. They also have three years to acquire
the relative DNR certifications.
4. Mutual Aid Agreements –
The City does not have any written mutual aid agreements. The city does have a working agreement with the
City of New Richmond and Hudson to provide emergency service with their jetter/vacuum truck for sewer
blockages in the event our truck is not operational. The city also has access to several contractors that
provide varied services. Here is a list of equipment that the City always has available.
Equipment
Description Make Department Location
Sewer
Combination
Truck
2007 Vactor Sewer WWTP
4” Trash Pump AMI Sewer WWTP
Sewer camera Aries Sewer WWTP
100kW
Generator
Cat Collection PW Garage
15 kW Generator Onan Collection PW Garage
Loader/Backhoe Volvo Shared PW Garage
Utility Vehicle John Deere Sewer WWTP
Utility Vehicle Polaris Sewer WWTP
80’ suction hose Sewer WWTP
Loader John Deere Streets PW Garage
4 chainsaws Stihl Streets PW Garage
2” Trash Pump Water PW Garage
Mini Excavator Cat Shared PW Garage
34
Trailer Vac Vac-tron Streets PW Garage
Trencher Ditch Witch Electric PW Garage
2” Dewatering
Pump
American Water PW Garage
Discharge hose
100 ft
Water PW Garage
3500 W
generator
Honda Water PW Garage
5. Communication Notification –
The Superintendent or Utility Director are responsible for notifying the WDNR. In their absence it is the
responsibility of the Lead Operator. Any public or media communication will be handled by the Utility Director
or City Administrator. In their absence the Superintendent will be responsible.
In an emergency the superintendent will direct the lead operators in action needing to be taken. The
superintendent with the assistance of the lead operators will direct and inform the operators on the course of
action to pursue. In the absence of the superintendent the lead operators will be responsible in pursuing a
plan of action under the direction of the utility director. It is important all personnel are prepared in the event
of an emergency. Time is crucial in preventing a major disaster and employees need to know the course of
action to take.
6. Lessons Learned -
Implementing a consistent and proactive preventive maintenance program can reduce the risk of sewer
backups, sanitary sewer overflows, and equipment failures. Establishing and maintaining a structured
preventive maintenance schedule for sewer mains, lift stations, and other critical wastewater collection
system assets will help improve system reliability, identify potential issues early, and support effective long-
term asset management.
Capacity Assurance Review
Capacity assurance helps to determine if the collection is adequate to support new connections. It also includes a
review of the current system to help identify trouble spots that need improvement or repair. Maintenance programs
can be geared to the areas with the greatest need.
1. Current and Up-to-Date Sewer Maps – The utility uses Arc-View mapping system. The system allows for
mapping of the entire collection system. The program allows for constant updating of the collection system
maps. Log sheets and maintenance date can be loaded into the system to make them easily accessible.
Video from collection system televising can be loaded to the corresponding area of the collection system and
is readily accessible with the Arc-View system.
2. Sewer System Plans and Specifications- Sanitary sewer system plans are prepared by registered engineers
and submitted to the WDNR for approval. Plans are prepared to WIDNR specifications. The city also
maintains specifications for various install and maintenance procedures dealing with the collection system.
3. Manholes – The collection system maps in Arc-View show manhole location and the individual number.
Quite a few of the manholes have GPS coordinates assigned to them, and more are being added all the time.
4. Lift Stations – Maintenance manuals are kept for the city’s five lift stations. The gallon per minute capacity of
the lift pumps is recorded along with wet well capacity.
Televising has detected deficiencies in the collection system. The annual slip lining and manhole rehabilitation
program are meant to address these. Areas that need frequent cleaning and root removal are identified and
addressed during the yearly maintenance cycle.
The Compliance Maintenance Annual Report attached to the end of the document identifies the categories of
concern.
35
SELF AUDIT CHECKLIST
DATE REPAIR/REPLACE/IMPROVEMENT INITIALS
36
Annual Self-Audit
The success of the CMOM program depends on auditing the program on a yearly basis. The successes and
failures need to be tracked to provide a path forward. The utility has for a number of years tracked maintenance
progress in the collection system. A record of feet of main cleaned and televised has been tracked on an annual
basis. Manhole rehabilitation and slip lining of sewer main have been documented as well.
The Compliance Maintenance Annual Report (CMAR) is a good resource for evaluating the CMOM program. The
attached collection system portion of the CMAR shows all the maintenance activity as well as problems that
occurred over the last year. Once the data has been entered into the CMAR a graph is generated making tracking
easy for various indicators of collection system performance. The CMAR will track indicators such as
influent/infiltration, sanitary sewer overflows, basement backups, equipment and pipe failure and complaints.
Annual maintenance activity is also documented in the CMAR.
The final step in the annual collection system audit is to measure progress achieving established goals. Yearly and
long-term goals have been established for ongoing maintenance and rehabilitation of the system.
The collection system audit will direct time and resources to areas of the collection system needing the greatest
attention. The idea is to balance resources over a number of years to minimize emergency repairs and have the
collection system perform to required standards.
Special Studies
In 2009 Ayres & Associates completed a study of the River Falls sanitary sewer system. The study was done to
evaluate current and future capacity of the collection system. Several projects were looked at to improve current
operation and prepare for future additions. The report recommended the city establish a budget of $100,000 per
year to line clay sewer pipe. The budget was implemented and has since grown to $160,000. The study also
identified problem areas along the north interceptor line. In 2016 the city retained TKDA engineering to do an in-
depth study of line that will eventually increase capacity to the north end of the system and eliminate a lift station.
Compliance Maintenance Annual Report
The Compliance Maintenance Annual Report (CMAR) began in 1987 as a way to help wastewater treatment plants
and collection system prevent degradation of the water quality and violations permitted effluent limits. It is a web-
based self-evaluation and grading system for domestic wastewater treatment and collection facilities.
The CMAR helps promote awareness and responsibility for wastewater collection and treatment needs and
maximizes the useful life of the facilities. The questions in the CMAR help operators focus their attention on the
most pressing needs for their system. Time and finances can be directed to areas where there is the greatest
need. It is meant to improve operation and maintenance and initiate formal planning and design for future needs.
The structure and grading system is designed to bring awareness and understanding to local governing officials
about wastewater capital and management needs. It also fosters communication between local government
officials, operators and the Wisconsin Department of Natural Resources (WDNR) to work cooperatively in assuring
the continued successful operation of the wastewater collection and treatment facilities. The governing body
reviews and passes a resolution approving the CMAR before it is submitted to the WDNR. A grade of C or lower
requires comment or an action plan by the system to address problems or deficiencies in the operation.
Owners of treatment facilities and collection systems are required by Wisconsin Administrative Code Chapter NR
208 to electronically submit a CMAR on an annual basis. The next page shows the 2025 CMAR for the River Falls
collection system.
37
38
2026 Monthly Budget vs Actual Charts
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
Electric Fund 610 - 2026 Monthly Budget vs Actual
2026 - Monthly Budget
2026 - Monthly Revenue
2026 - Monthly Expense
*Does not include Capital Expeditures or Revenues
Report as of 10/29/26
*January and February 2026 WPPI Energy Expenses hit in March
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
2026
$17,434,500
$14,217,759
$11,696,591
Electric Fund 610 - 2026 Budget to Actual
Annual Budget
Total Revenue
Total Expense
Report as of 10/29/26*Does not include Capital Expeditures or Revenues
*March includes debt service payment
39
$-
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
Water Fund 620 - 2026 Monthly Budget vs Actual
2026 - Monthly Budget
2026 - Monthly Revenue
2026 - Monthly Expense
Report as of 10/29/26
*Does not include Capital Expeditures or Revenues
*April includes debt service payment
$-
$500,000.00
$1,000,000.00
$1,500,000.00
$2,000,000.00
$2,500,000.00
$3,000,000.00
$3,500,000.00
2026
$3,308,837.00
$3,030,307.81
$2,100,824.37
Water Fund 620 - 2026 Budget vs Actual
Annual Budget
Total Revenue
Total Expense
Report as of 10/29/26*Does not include Capital Expeditures or Revenues
40
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
Waste Water Fund 630 - 2026 Monthly Budget vs Actual
2026 - Monthly Budget
2026 - Monthly Revenue
2026 - Monthly Expense
Report as of10/29/26
*Does not include Capital Expeditures or Revenues
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
$4,000,000
2026
$3,756,000
$3,397,731
$2,807,866
Waste Water Fund 630 - 2026 Budget vs Actual
Annual Budget
Total Revenue
Total Expense
Report as of 10/29/26*Does not include Capital Expeditures or Revenues
*February and August include debt service payments
41
$-
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
$70,000
$80,000
Storm Water Fund 640 - 2026 Monthly Budget vs Actual
2026 - Monthly Budget
2026 - Monthly Revenue
2026 - Monthly Expense
Report as of 10/29/26*Does not include Capital Expeditures or Revenues
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
2026
$653,000
$548,177
$372,520
Storm Water Fund 640 - 2026 Budget vs Actual
Annual Budget
Total Revenue
Total Expense
Report as of 10/29/26*Does not include Capital Expeditures or Revenues
42
2026 Electric, Water, Wastewater, and Storm Sewer Unrestricted Fund Balance
43
Electric, Water, Wastewater, and Mann Valley Debt (Bonds)
Fund Name Name What for
Estimated
Payoff
Year
Principal
Payments
Made
Principal
Payments
Remaining
Principal Paid Remaining
Principal Total Debt Estimated
Interest
Electric Utility Fund Electric Revenue Bonds Series 2018B Power Plant Substation 2028 8 2 1,925,000$ 575,000$ 2,500,000.00$ 459,439.72$
Electric Utility Fund 2020 WPPI Energy for $500K 2020 WPPI Energy for $500K 2030 6 5 266,667$ 233,333$ 500,000.00$ -$
Water Utility Fund Water System Revenue Bonds 2011A Well House #6 and North Zone Booster Station 2031 14 5 1,420,000$ 705,000$ 2,125,000.00$ 944,046.70$
Water Utility Fund WI Water System Revenue Bond 2022D North Loop Water Extention, North Water Tower, & Re-Finance 2011A Bond 2042 4 16 645,000$ 4,200,000$ 4,845,000.00$ 2,331,245.18$
Waste Water Utility Fund Sewerage System Revenue Bonds 2016A WWTP Upgrades to Sludge Handling & Storage (DAFT Building) 2036 10 10 1,855,000$ 2,655,000$ 4,510,000.00$ 1,463,472.50$
Waste Water Utility Fund General Obligation Sewerage Bonds 2022C North Interceptor Sewer Extension and North Loop Project 2042 3 17 492,000$ 3,735,100$ 4,227,100.00$ 2,043,689.58$
Waste Water Utility Fund General Obligation Sewerage Bonds 2023A Biosolids Facility 2043 1 17 195,000$ 8,470,000$ 8,665,000.00$ 5,371,572.51$
Mann Valley Fund General Obligation Corporate Purpose Bonds 2023A Mann Valley Sewer, Electric, & Streets 2043 3 17 970,000$ 8,780,000$ 9,750,000.00$ 5,174,994.09$
Mann Valley Fund WI Water System Revenue Bond 2023D Mann Valley Capital Water Extension Costs 2028 0 1 - $ 4,933,000$ 4,933,000.00$ 1,147,039.98$
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
2020 WPPI
Energy for
$500K
Power Plant
Substation
Mann Valley
Capital
Water
Extension
Costs
Mann Valley
Sewer,
Electric, &
Streets
Biosolids
Facility
North
Interceptor
Sewer
Extension
and North
Loop
Project
WWTP
Upgrades to
Sludge
Handling &
Storage
(DAFT
Building)
North Loop
Water
Extention,
North Water
Tower, & Re-
Finance
2011A Bond
Well House
#6 and
North Zone
Booster
Station
Electric Utility Fund Mann Valley Fund Waste Water Utility Fund Water Utility Fund
Bond Repayment Financials
Sum of Principal Paid
Sum of Remaining Principal
Sum of Estimated Interest
44
0
2
4
6
8
10
12
14
16
18
2020 WPPI
Energy for
$500K
Power Plant
Substation
Mann Valley
Capital
Water
Extension
Costs
Mann Valley
Sewer,
Electric, &
Streets
Biosolids
Facility
North
Interceptor
Sewer
Extension
and North
Loop
Project
WWTP
Upgrades to
Sludge
Handling &
Storage
(DAFT
Building)
North Loop
Water
Extention,
North
Water
Tower, &
Re-Finance
2011A
Bond
Well House
#6 and
North Zone
Booster
Station
Electric Utility Fund Mann Valley Fund Waste Water Utility Fund Water Utility Fund
Principal Payments Made vs Remaining
Sum of Principal Payments Made
Sum of Principal Payments Remaining
45
Capital Expense Tracking
Fund Capital Project Name Previous Years Spend Budget January February March April May June July August September Total Spent
610 Transformers 275,000$ 28,225 $ - $ - $ - $ - $ 4,000 $ - $ 43,214$ 19,953 $ 95,392 $
610 Fault Indicator 12,500$ 11,207 $ - $ - $ - $ - $ - $ - $ - $ - $ 11,207 $
610 Inventory Mater -$ 14,344 $ 166,320$ - $ - $ 2,784 $ 14,201$ 60,050 $ - $ 36,911 $ 294,610 $
610 Stores & Minor -$ 6,605 $ 7,821 $ - $ - $ - $ 1,245 $ 2,400 $ 951$ 2,236 $ 21,257 $
610 Work Orders -$ - $ 7,150 $ - $ - $ 928$ - $ - $ - $ - $ 8,078 $
610 Vehicle - Elect Worktruck Replacement 55,000$ - $ - $ - $ - $ - $ - $ - $ 47,316 $ - $ 47,316 $
610 Vehicle - Digger Truck Replacement -$ - $ 466,481$ - $ - $ - $ - $ 12,886 $ - $ - $ 479,367 $
610 Electric Capital -$ - $ 6,815 $ - $ - $ - $ - $ - $ - $ - $ 6,815 $
610 Public Works Building Improvements 50,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Highview #1 400,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Street Lights @ Whitetail Ridge Corp Park 314,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Distrubution System Improvements 210,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Electric Underground Cable Replacement 160,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 New Subdivision Street Lights 118,000$ - $ - $ - $ - $ - $ - $ - $ 6,865 $ - $ 6,865 $
610 Overhead to Underground Wire Conversion 100,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 MiniExcavator 100,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Electric Meters 80,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Electric Services 67,500$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Battery Replacement North Substation 60,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Convert Arterial Streets to Underground 25,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Restore Lite 11,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Gatekeepers for AMI Infrastructure 10,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Phase Trakker 9,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
610 Replace Garage Doors at Power Plant 6,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
620 Water - CIP -$ - $ - $ - $ 1,415 $ 1,371 $ - $ - $ 119$ 7,198 $ 10,102 $
620 Advanced Metering Infrastructure (AMI) 136,756$ 5,293 $ 30,445 $ - $ - $ - $ - $ 30,445 $ - $ - $ 66,182 $
620 Meters 74,900$ 32,305 $ 4,806 $ - $ - $ - $ - $ 36,975 $ - $ - $ 74,085 $
620 Fire Hydrant Replacement 32,100$ - $ - $ - $ - $ - $ - $ - $ - $ 5,600 $ 5,600 $
620 Replace Lead Goosenecks 16,800$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
620 Sycamore Tower Inspection 8,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
620 Mound Reservior Inspection 8,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
620 Vehicles - Water -$ - $ - $ - $ - $ - $ - $ 12,886 $ 12,886 $
620 W. Locust St Design Services 17,369$ -$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
630 Waste Water CIP -$ - $ - $ - $ - $ 125,575 $ - $ - $ 2,309 $ - $ 127,884 $
630 BioSolids Facility 7,848,245$ 876,755$ - $ 44,542 $ - $ - $ 5,283 $ - $ 12,084$ - $ - $ 61,909 $
630 Lametti Interceptor 221,680$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
630 Sanitary Sewer Pipe Lineing 187,250$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
630 Manhole Rehab 100,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
630 Collection System Replacements 78,400$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
630 Vehicles - Sewer -$ - $ - $ - $ - $ - $ - $ 12,886 $ - $ - $ 12,886 $
630 W. Locust St Design Services 5,572$ -$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
640 Hoffman Park Basin Study 183,500$ -$ - $ (4,829) $ - $ - $ - $ - $ - $ - $ - $ (4,829)$
640 Collins Outfall 25,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
640 Hoffman/Greenwood Stormwater Infrastructure 388,500$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $
1,337,612 $
46
Electric KWh and Revenue Reports
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
14,000,000
15,000,000
16,000,000
17,000,000
January February March April May June July August September October November December
KWh Purchased By Month and Year
2024
2025
2026
$700,000
$900,000
$1,100,000
$1,300,000
$1,500,000
$1,700,000
$1,900,000
$2,100,000
$2,300,000
January February March April May June July August September October November December
Electric Revenues by Month and Year
2024
2025
2026
47
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
2024 Cost of Power vs. Revenue
2024 - Purchased Power
2024 - Electric Revenues
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
2025 Cost of Power vs. Revenue
2025 - Purchased Power
2025 - Electric Revenues
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
January February March April May June July August September
2026 Cost of Power vs. Revenue
2026 - Purchased Power
2026 - Electric Revenues
48
RFMU EFFICIENCY
PROGRAMS UPDATE
UTILITY PROGRAM PARTICIPATION 202 6 REPORT
TOTAL INCENTIVES GIVEN AS OF NOVEMBER 1, 2026
Program # of Customers
Participating
Total
Incentives
Business Programs
(Focus on Energy Match)
2 $873
Residential Efficiency
Program (Focus on Energy
Match)
1 $1,000
Electrification of Landscape
Equipment
14 $1,568
Home Energy
Assessments/Improvements 14 $8,013
Solar Program 1 $1,000
Electric Vehicle Charging
Program 5 $4,240
Smart Thermostat/Central
Air Tune Up 7 $287
Tree Power 2 $125
TOTAL: 46 $17,106
49
FOCUS ON ENERGY /IRA PROGRAMS
INCENTIVES PAID – THROUGH OCTOBER 28 , 2026
FOCUS ON ENERGY - $283,847
IRA HOMES & HEAR PROGRAMS - $26,859
*HOMES and HEAR program assessments and incentives are reflect no kWh savings (due to assessment only or electrification). The Instant
Discount Program also includes heat pumps, which can reflect gas savings, but increased kWh use.
Schools & Government
HEAR (Home Electrification and Appliance…
Trade Ally Solutions
Direct to Customer
Business & Industry
Instant Discount Program - Residential
Trade Ally Solutions - Renewable Rewards…
HOMES Assessment Incentives
Targeted Kits Program
$248,449$26,359
$15,145
$12,388
$6,444
$750
$600
$500
$70
INCENTIVES BY PROGRAM
Key Statistics
296 Customers Participating
433 kW Reduced
1,747,000 kWh Savings (First Year)
Schools & Government
Business & Industry
Direct to Customer
Trade Ally Solutions - Renewable
Rewards Residential
Trade Ally Solutions
Targeted Kits
1,629,889
67,853
22,300
16,860
9,986
24
ANNUAL KWH BY PROGRAM *
50
GREEN BLOCKS
PROGRAM DASHBOARD
BLOCKS PROGRAM PARTICIPATION
THROUGH SEPTEMBER 2026
BLOCKS SOLD AND PARTICIPATION IN 202 6
Key Statistics
1,238 Customers Participating
9,570,000 kWh of Green Energy Purchased
Month # of blocks
purchased
January 3,541
February 3,535
March 3,540
April 3,543
May 3,547
June 3,558
July 3,558
August 3,546
September 3,532
October
November
December
Average 3,544
2026 Renewable Energy Block
Participation
Month Monthly
Participation
January 18.2%
February 17.6%
March 17.7%
April 17.9%
May 17.6%
June 17.8%
July 17.8%
August 17.7%
September 17.6%
October 0.0%
November 0.0%
December 0.0%
2026 Renewable Energy Block
Participation (%)
Month # of customers
participating
January 1,277
February 1,234
March 1,246
April 1,258
May 1,240
June 1,249
July 1,249
August 1,245
September 1,238
October
November
December
Average 1,248
2026 Renewable Energy Block
Participation
51
R F M U
M o n t h l y R e p o r t
River Falls Municipal Utilities October 2026
52
Zachary Kuechenmeister,
Journeyman Lineworker Apprentice
Jeff Ploeger,
Journeyman Lineworker
Projects
Electric Distribution & Infrastructure Update
Completed Projects
Completed cable replacement project in the Golf View Drive neighborhood
Replaced station power batteries at the North Substation, improving system reliablity and backup power capabilities
Projects in Progress
Division Street Feeder Extension
All equipment has been installed
Cabel installation is complete
Remaining work includes system testing and coordination of service switchovers
Citywide Cable Replacement Program
Ongoing cable replacment work continues throughout the service territory to improvie reliablity and system
performance
New Development Support
Skycoat facility in the Sterling Ponds Corporate Park
Construction of the new industrial facility is nearing completion
Utility infrastructure support and related work continue as needed
Next Steps
Complete testing and switchovers for the Division Street Feeder Extension
Continue scheduled cable replacement projects throughout the community
Support final utility requirements associated with the completion of the Skycoat facility
E l e c t r i c
D e p a r t m e n t
River Falls Municipal Utilities October 2026 PG 01
Wayne Siverling,
Electric Operations
Superintendent
Dan Treichel,
Lead Journeyman
Lineworker
Tim Wiste,
Lead Journeyman
Lineworker
Pat Oja,
Journeyman Lineworker
Logan Snyder,
Journeyman Lineworker
Cody Kruger,
Journeyman Lineworker
Jeremy Holschuh,
Journeyman Lineworker
Virgil Johnson,
Electric Meter Technician
Chris White,
Electric Meter Technician
53
Projects:
Staffing & Training
Conducted bi-weekly Water/Wastewater staff meetings with Water/Wastewater
Water/Wastewater Superintendent Bradley attended the Wisconsin Wastewater Operators Association (WWOA)
Conference in Green Bay
Water/Wastewater Operators Josh and David completed Traffic Control Refresher Training
Staff completed annual Safety Manual Refresher Training
Operations & Maintenance
Removed the Oxidation Ditch mixer motor and initiated repair work
Completed preventive maintenance on generators at all wells and the wastewater treatment facility
Supported the Wisconsin Department of Natural Resources (WDNR) during required Whole Effluent Toxicity (WET)
testing and sampling activities
Replaced a pressure relief valve at a manhole location
P.J. Kortens completed troubleshooting and diagnostic work on utility equipment
After-Hours On-Call Activity
Responded to three customer emergency water shutoff requests related to private plumbing issues
Repaired a leaking hydrant by replacing internal components
Addressed a backup-mode issue at the Spring Creek wet well by adjusting float controls
Responded to a vehicle collision involving a fire hydrant on October 28; hydrant replacement is planned
Projects & Inspections
Conducted the bid opening and preconstruction meeting for the Cedar Street improvements and Lametti Interceptor
Project
Total Excavating & Grading was awarded the contract
Construction is expected to begin soon
Continued review and updates of River Falls Engineering Details and Specifications in preparation for the 2027
revision cycle
Continued meter change-out program, sewer televising activities, and service line potholing
Completed a walkthrough inspection of water and sewer utilities in the Wildflower Meadows development
Total Excavating & Grading continues to address remaining punch-list items
W a t e r / W a s t e w a t e r
D e p a r t m e n t
River Falls Municipal Utilities October 2026 PG 02
Tim Rixmann,
Lead Water / Wastewater
Operator
Joe Curran,
Water / Wastewater
Operator
Todd Decker,
Water / Wastewater
Operator
Bradley VIck,
Water / Wastewater
Superintendent
David Paynotta,
Water / Wastewater
Operator
Bill Swenson,
Wastewater
Operator
Josh Penovich,
Water / Wastewater
Operator
Brent Wiersma,
Water / Wastewater
Operator
Thomas Polkoski,
Water / Wastewater
Operator
Dean Seemuth,
Water / Wastewater
Operator
54
Projects:
Compliance & Reporting
Completed the annual review and update of the Capacity Management Operation Maintenance (CMOM) Sanitary
Sewer Collection System report as required by the WDNR
This review was also part of the corrective actions associated with the recent sanitary sewer overflow (SSO).
Submitted monthly regulatory reports:
Electronic Discharge Monitoring Report (eDMR) for wastewater operations
Electronic Monthly Operating Report (eMOR) for water operations
Distributed private well sampling notices
Received results from 3 of the 7 private wells located within city limits
Continued sewer cleaning and televising program
Completed approximately 94,000 feet of the annual 100,000-foot goal (94%)
Regulatory Reminder
Consumer notifications for properties served by lead, galvanized requiring replacement (GRR), or lead status
unknown (LSU) service lines must be delivered by December 31, 2026
Public Outreach & Engagement
Hosted a facility tour for residents who had expressed concerns regarding odors near the wastewater treatment
facility
Provided an overview of the new dryer process and conducted a guided tour of the facility
Upcoming & Ongoing Work
Achieve substantial completion of the Dryer Project
Install a new water shutoff valve on the west bank of the Kinnickinnic River near the River Glen Apartments
Continue meter replacements, sewer televising, and service line investigations
Monitor and support startup activities associated with recently completed infrastructure improvements
W a t e r / W a s t e w a t e r
D e p a r t m e n t
River Falls Municipal Utilities October 2026 PG 03
55
C u s t o m e r S e r v i c e
D e p a r t m e n t
River Falls Municipal Utilities October 2026 PG 04
Amy White,
City Clerk
Theresa Folak,
Customer Service
Representative
Brenda Rundle,
Customer Service
Representative
Wendy Tokheim,
Customer Service / Billing Clerk
Projects
Utility Billing & Collections
Customer Service initiated the utility disconnection process on October 8 by mailing disconnection notices:
133 residential customers
8 commercial customers
Notices were issued to accounts with past-due balances of $250 or more
To encourage payment and prevent service interruptions:
108 outbound reminder calls were made on October 14
48 text message reminders were sent on October 16 as a final notification before disconnection
Disconnection activity included:
12 utility disconnections on October 19
1 additional utility disconnection on October 20
2 more utility disconnections on October 26 for failure to comply with payment arrangement requirements
Customer Service worked proactively with customers to avoid service interruptions:
54 payment arrangements were in place on October 19, providing customers additional time to resolve past-due
balances
Customer Service & Utility Support
Customer Service coordinated 40 service requests for the Water Department, including:
New water meter deliveries
Water meter exchanges
Water shutoffs for repair work
Seasonal irrigation meter removals and winterization activities
Election Administration Support
In-person absentee voting began on October 20 and continued through the end of the month
Election-related activity increased customer traffic at City Hall by approximately 1,500 visitors, resulting in a significant
increase in resident interactions and customer service activity
Key Highlights
Conducted extensive customer outreach efforts to minimize utility disconnections
Established 54 payment arrangements to assist customers with delinquent accounts
Coordinated 40 water service-related requests in support of utility operations
Supported election activities and accommodated approximately 1,500 additional visitors during the absentee voting
period
Jackie Sahnow,
Customer Service
Billing Clerk
Cindy Campbell,
Customer Service Lead
56
Projects
Mapping & Asset Management
Completed mapping updates for 12 Advanced Metering Infrastructure (AMI) meter changes
Continued attaching sanitary sewer inspection videos and reports to the GIS mapping system to improve recordkeeping
and asset management
Collected GPS data and mapped the Paulson Boring Project, including boring utility routes serving the North Substation
for electric and fiber infrastructure
Collected GPS data and completed mapping updates for the Birch Street Boring Project
Collected GPS data and mapped the electric joint trench installation associated with the Skycoat development
Planning & Coordination
Participated in two plan review meetings focused on updates to Standard Specifications and Construction Details
Assisted the Water/Wastewater Superintendent with sanitary sewer data collection and analysis for the annual Capacity,
Management, Operations, and Maintenance (CMOM) report
Training & Professional Development
Attended IT OneDrive Training to enhance document management and collaboration capabilities
Completed Safety Manual Refresher Training to maintain compliance and reinforce workplace safety practices
Department Support
Provided utility locating assistance for the Buildings & Maintenance Department (B&M) to support ongoing projects and
field operations
Ongoing Priorities
Continuing GIS mapping updates for utility infrastructure projects
Expand integration of sanitary sewer inspection records into the mapping system
Support utility planning, asset management, and interdepartmental coordination efforts
Assist with utility locating and data management needs across departments
E n g i n e e r i n g T e c h
W o r k
River Falls Municipal Utilities October 2026 PG 05
Tamarra Jaworski,
Engineering Technician
& GIS Mapper
57
Projects
Incentive Programs and Green Blocks
Total RFMU Program participation
46 customers received $17,106 in incentives
Total River Falls Focus on Energy Participation
296 customers received $283,847 in incentives
Total IRA (Inflation Reduction Act) HOMES and HEAR participation
6 customers received $26,859 in rebates
Green Blocks Update
September had 3,532 blocks purchased by 1,238 customers
9,570,000 kWh of renewable energy purchased in 2026
River Falls Municipal Utilities receives national recognition as Smart Energy Provider
River Falls Municipal Utilities (RFMU) earned the Smart Energy Provider designation Oct. 26 during the American Public
Power Association’s (APPA) Customer Connections Conference
The utility was named one of 59 recipients of the designation in 2026
The Smart Energy Provider designation recognizes public power utilities for demonstrating leading practices in four
key disciplines: energy efficiency, distributed generation, sustainability programs and customer experience
The designation lasts three years
Nationwide, 118 public power utilities now hold the prestigious title
RFMU is one of the 28 WPPI member utilities that now hold the Smart Energy Provider designation
Upcoming Events of Interest
November 19 – WPPI Executive Committee Meeting
December 16 – WPPI Executive Committee Meeting
December 17 – WPPI Board of Directors Meeting
R F M U & W P P I E n e r g y
P r o g r a m s
River Falls Municipal Utilities October 2026 PG 06
Jenna Willi,
WPPI Energy
Service Manager
58