MINUTES
(TUESDAY) NOVEMBER 10, 2026 – 9:00 A.M.
PROPERTY & TECHNOLOGY COMMITTEE OF
OCONTO COUNTY BOARD OF SUPERVISORS
301 WASHINGTON STREET, COURTHOUSE BUILDING “A” ROOM #3041
OCONTO WI 54153
www.ocontocountywi.gov
(Draft minutes, not approved by Committee)
COMMITTEE PRESENT: Guy Gooding, John Wittkopf, Wesley Kobylarczyk, Rick Scheffen
COMMITTEE ABSENT: Brenda Carey-Mielke
OTHERS PRESENT: Richard Heath, County Administrator; Al Sleeter, County Board Chair; Melissa Schwaller, Information Technology Director; Scott Krueger, Facilities Manager; Kathy Goldschmidt, Chief Deputy County Clerk; Kim Pytleski, County Clerk; Mike Beyer.
Call to Order
Chair Gooding called the meeting to order at 9:00 a.m.
Statement of County Mission and Vision
Statement of County Mission and Vision were read by County Administrator, Richard Heath.
Approval of Agenda
Change of Sequence – None.
Removal of Items – None.
Motion by Kobylarczyk/Scheffen to approve the agenda as presented. The motion was voted on and carried.
Approval of Minutes of Previous Meeting
Motion by Wittkopf/Kobylarczyk to approve the Property & Technology minutes of October 13, 2026. The motion was voted on and carried.
Communications
Two Building Use Applications were received: one from Bay-Lake Regional Planning Commission for Conference Room #2119 on November 2, 2026, and one from Law Office of Aaron M. Krzewinski, S.C. for Conference Room #2120 on December 16, 2026. Treated as information.
Facilities Manager Report
Discuss Building C Parking Lot Area
Scott Krueger, Facilities Manager, reported Parking Lot C has been resealed and restriped.
Discuss Old Jail Tour and Possible Uses
Supervisor Gooding reported that the Sheriff expressed interest in using the second floor of the former jail for Regional Public Health. He noted that an architectural assessment conducted several years ago concluded that constructing a new facility would be more cost-effective than renovating the existing space.
On-Call Log
Krueger reported there were no on-calls in October.
Approve Resolution to Replace Water Heaters in the LEC
Following discussion, motion Kobylarczyk/Scheffen to approve the bid from Foremen Heating & Ventilating Inc., Green Bay, WI, 54307 in the amount of $94,891.00 to replace two water heaters in the LEC and forward to county board. The motion was voted on and carried.
Technology Service Report
Melissa Schwaller, Information Technology Director, updated the committee on the following topics.
Bug Tussel Update
Previously, Bug Tussel provided OTDR and fiber test results following splicing work at each remote site. These results were used to confirm fiber lengths and optical loss levels, ensuring the County could select the appropriate SFP modules for each connection.
Progress to date includes:
Replaced switches at NVI, Lena, Land Conservation, and Suring Highway with Cisco 9300 switches, including the appropriate licensing and SFP modules.
Ordered additional SFP modules.
Ordered fiber cables.
The next step is to meet with MNJ to review and coordinate network routing.
Courtroom Project Update
A meeting was held on Friday, November 6, with the Clerk of Courts, Circuit Court staff, and the judges to review ongoing courtroom technology issues. CTI outlined available options and advised that the Zoom-related issues experienced with the WolfVision system are affecting other clients as well.
The group agreed to reconfigure the courtroom setup so that Zoom operates independently of the WolfVision system. Zak from CTI will be onsite all day Thursday, November 12, to implement this change in the courtrooms and address other outstanding courtroom technology issues. An update will be provided to the committee next month, which is in the department’s budget.
Cisco VOIP Migration Update
Oconto County is planning to transition from its on-premises Cisco VoIP system to Cisco Webex Calling, a cloud-based calling platform. The project includes migration of approximately 300 Cisco IP phones, configuration of 10 locations. Heartland Business Systems will assist the technology services team with the migration. Webex Calling licensing is a five-year agreement billed annually at $22,112.50 per year, for a total contract cost of $110,562.50.
GovAI Implementation
Schwaller contacted several counties to learn how they are using AI tools; some are currently testing platforms before committing to a license. GovAI has offered Oconto County access beginning in December for $500.00. The platform can help staff save time drafting documents, summarizing information, and organizing content, with staff continuing to review all work for accuracy and confidentiality.
Audio/Streaming Project Update Regarding Audio/Visual in the County Board Room; Possible Action
Review Action taken at the October 13, 2026, Meeting
Kim Pytleski, County Clerk, provided update to the committee regarding additional information received from Camera Corner Connecting Point (CCCP), a Tusker Company following the October 13, 2026 meeting. The quote for $972.50 to reprogram the system to allow up to 15 microphones to be active simultaneously would not accomplish the desired result. Following discussion, motion by Kobylarczyk/Scheffen to suspend action on motion made October 13, 2026, pending additional quote requested to incorporate OpenMeetings Discussion Manager with current Audio/Visual System. The motion was voted on and carried.
Review and Approve Incorporation of OpenMeetings Discussion Manager with Current Audio/Visual System
Pytleski reviewed a revised microphone upgrades and recording system quote received from Camera Corner Connecting Point (CCCP), a Tusker Company, after it was determined that the original proposal would not meet the functionality initially anticipated. The revised quote does not include integrating the OpenMeetings Discussion Manager with current Audio/Visual System. Pytleski stated that integrating the systems now while CCCP is on site for the reprogramming made the most sense. Following discussion, the committee recommends proceeding with the recommendations made in the revised quote of $3,660.00 and the committee also requested pricing to integrate the OpenMeetings Discussion Manager feature at this time rather than delaying implementation. A fully revised proposal, including the OpenMeetings Discussion Manager integration option, will be presented to the Property & Technology Committee on December 8, 2026, for consideration and approval.
10.3 Review and Approve Quote for Upgrades to Microphone and Recording System (Enc.)
Pytleski presented a quote for microphone upgrades and recording system. Oconto County is requesting programming modifications to its existing audiovisual system to support two distinct meeting workflows: Board Meetings and Committee Meetings. The project includes modifications to the existing DSP configuration, Crestron control and touch-panel programming, video-system HDCP settings, and recording-output layouts as described below. Treated as information and to be placed on the committee agenda for December 8, 2026.
Summary: The Board Meeting workflow will retain the system’s existing microphone mute controls and camera-follow functionality. The Committee Meeting workflow will provide automatic microphone operation using a gating automixer limited to three open microphones at one time, eliminating the need for users to manually manage microphone mute states. During Committee Meetings, microphone-based camera control will be disabled, and the cameras will remain on fixed wide shots. The project also addresses the reported HDCP content issue and provide additional layout options for the recording output.
System Description
The existing audiovisual system will be modified to provide two meeting startup modes from the Crestron touch panel:
Board Meeting
The existing Board Meeting operation will remain unchanged.
Users will continue to control individual microphone mute states from the Crestron touch panel.
Existing microphone-based camera control will remain active, allowing the cameras to focus on the applicable speaker based on microphone selection and mute status.
Committee Meeting
All in-room microphones will be available through an automatic gating mixer.
A maximum of three microphones will be permitted to gate open at one time.
Users will not be required to manually mute and unmute microphones.
Individual microphone mute will still function.
Microphone-based camera focus and aiming will be disabled.
Cameras will remain on fixed wide shots of the participants in the room.
Audio:
The existing DSP programming will be modified to incorporate an automatic gating mixer for the in-room microphones.
The gating automixer will be configured to allow a maximum of three open microphones at one time.
Board Meeting mode will retain the existing individual microphone mute functionality and microphone-based camera- control logic.
Committee Meeting mode will:
Place the in-room microphones into the automatic gating mixer.
Permit a maximum of three microphones to gate open simultaneously.
Eliminate the need for users to manually manage individual microphone mute states.
Disable individual microphone selection from the Crestron interface.
Existing program audio and loudspeaker functionality will remain unchanged except for modifications necessary to implement the described DSP programming.
Existing DSP and microphone models and quantities are TBD.
Controls:
The existing Crestron control processor and touch-panel programming will be modified.
The system startup interface will provide two meeting-mode selections:
-Board Meeting
-Committee Meeting
Selecting Board Meeting will initiate the existing operating workflow, including individual microphone mute controls and
microphone-based camera control.
Selecting Committee Meeting will:
Enable the automatic gating microphone workflow.
Allow a maximum of three microphones to gate open at one time.
Disable individual microphone mute and selection controls.
Disable microphone-based camera focus and aiming.
Place the cameras into their designated fixed wide shots.
The Crestron interface will also be modified to provide two recording-output layout options:
Large participant view with small content view.
Small participant view with large content view.
The layout selections will apply to the recording output.
HDCP and Recording Considerations:
Applicable video devices in the signal path will be configured with HDCP disabled or set to “No” where the existing equipment provides that configuration option.
HDCP behavior is dependent upon the user's source device, the content being presented, and the requirements of the connected equipment. The proposed configuration therefore does not guarantee compatibility with every source device or type of content.
Content requiring HDCP or other copyright/content-protection mechanisms is not intended to be captured by the recording system. Copyright-protected content shall not be recorded through the AV system.
Oconto County is responsible for ensuring that content presented and recorded through the system is permitted to be recorded and is not subject to applicable recording or content-protection restrictions.
Crestron processor and touch-panel models and applicable programming source files are TBD.
Exclusions: The following work is not included in our Scope of Work:
All conduit, high voltage, wiring panels, breakers, relays, boxes, receptacles, etc.
Concrete saw cutting and/or core drilling.
Fire wall, ceiling, roof and floor penetration.
Necessary gypsum board replacement and/or repair.
Necessary ceiling tile or T-bar modifications, replacements and/or repair.
All millwork (moldings, trim, cut outs, etc.).
Patching and Painting.
Permits (unless specifically provided for and identified within the contract).
Construction Considerations:
In order to accomplish the outlined goals of this project, the Customer will be responsible for contracting with an outside entity to make the necessary modifications to the space as directed by CCCP a Tusker Co. The costs associated with these modifications are not included in this proposal.
Review Prior Months Vendor Payments
Committee reviewed October vouchers.
Announcements/General Information – None.
Next Meeting Date
Next meeting date is set for Tuesday, December 8, 2026, at 9:00 a.m.
Adjournment
Chair Gooding adjourned the meeting at 10:00 a.m.
Kathy Goldschmidt, Recorder
Posted: 11/11/2026
Source: Oconto County website. First collected Nov 12, 2026.