1.0 Agenda and Packet
City of Oconto Falls · Oconto County · meeting of Nov 6, 2026 · Agenda packets
Open the original document More from City of Oconto Falls
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
1
City of Oconto Falls Finance Committee Thursday October 22,2026
CITY OF OCONTO FALLS
FINANCE COMMITTEE MEETING
Council Chambers – Municipal Building
500 N. Chestnut Avenue
Oconto Falls, WI 54154
Thursday October 22, 2026 – 5:00 PM
MINUTES
Chairman Mayor Braun called the meeting to order at 5:00 PM.
Roll Call:
Present: Jeff McDonald, Marty Coopman, Derek Konop, Kevin Rusch
Also Present: Mayor Clint Braun, Administrator Peter Wills, Deputy Treasurer Scott Schoen,
Library Director Rachel Pascoe, Fire Chief Tim Magnin, Ashley Bahrke,
Michelle Tester, Utility Manager Beth Rank, Street Superintendent Wally Remic
Absent: Devin Wirtz
DISCUSSION AND POSSIBLE RECOMMENDATION / ACTION ON ANY OR ALL OF
THE FOLLOWING:
1. Elect Finance Committee Chair
Committee Member Rusch nominated Alderman Coopman to be the Chair of the
Committee.
MOTION: Rusch/ McDonald
Motion to elect Coopman as Finance Committee Chair.
Voice Vote: All present voting aye - MOTION CARRIED
2. 2027 General Fund Budget
A. 2027 General Fund Budget
i. City Municipal Levy Limit for Property Taxes
City Administrator Wills explained municipal levy limit is a state law that limits
how much a city can increase the total amount of property taxes it collects each
year, based upon the City’s net new construction for the previous year. It is
intended to restrict increases in the City's property tax levy, even when the City's
expenses are rising. The 2026 Municipal Levy Limit Worksheet from the
Wisconsin Department of Revenue was reviewed. The worksheet outlines the
City’s allowable property tax levy for 2026 and identifies adjustments based on
statutory levy limits, unused levy amounts, and other applicable factors. The
City’s payable allowable levy for 2026 is calculated at $1,185,080, including a
$186 adjustment for unused levy carryforward from the previous year. Principle
and interest payments for existing debt begore the budget is approved is then
2
City of Oconto Falls Finance Committee Thursday October 22,2026
added for the total tax levy for 2026 taxes, that will be used to fund the 2027
general fund budget.
NO ACTION TAKEN
ii. 2027 Garbage & Recycling Annual Assessment Fee
Cost of garbage and recycling contract costs increased for 2027, additionally the
contract includes 5% fuel surcharge when diesel is above $4.00 per gallon.
MOTION: Rusch/Coopman
Motion to recommend to Common Council garbage annual assessment increase
to $146.70 per pickup and recycling annual assessment increase to $88.85 per
pickup.
Voice Vote: All present voting aye - MOTION CARRIED
iii. 2027 Tax Increment Finance (TIF) Budget
There is a number of potential housing developments that will seek Tax Increment
Finance (TIF) support for potential development. The direct support for the
projects is expected to be Paygo funding, in which the developer will invest in the
project and then the City would reimburse for a portion of agreed costs over the
life of the TIF. The new tax increment generated from the project would be used
to repay the developers cost of Infrastructure of Water, storm sewer, and utilities
installation costs for the projects. Prior to the developments commencing the TIF
will need to support engineering and professional services costs for the projects.
The 2027 TIF budget includes $35,000 in TIF project expenses, the TIF is
expected to generate only $5,065 in Revenue , the difference will need to come
from general fund until the development projects generate increment to cover the
TIF shortfall. The increased increment of tax revenue from this project will stay
within the TIF district for the life of the TIF to help fund current and future
projects. NO ACTION TAKEN
iv. 2027 Library Request
The Oconto Falls Community Library presented its proposed 2027 budget,
reflecting a 10% reduction in the City of Oconto Falls' appropriation. The City's
contribution will decrease from $90,500 in 2026 to $81,450 in 2027, a reduction
of $9,050.
MOTION: Rusch/ McDonald
Motion to recommend to Common Council $81,450 for budget of the Oconto
Falls Library.
Voice Vote: All present voting aye - MOTION CARRIED
3
City of Oconto Falls Finance Committee Thursday October 22,2026
v. 2027-2028 Capital Project Request
a. Police Squad Car
The need for a new Police Department squad car was brought up during
Finance meeting. Committee requested Administrator get quote on loan
terms with first payments due in 2028 for police squad for next Finance
Meeting.
NO ACTION TAKEN
b. 2005 Fire Truck Refurbishment
Fire Chief Magnin presented an estimate from Red Power Diesel Service,
Inc. provided an estimate for repairs and upgrades to the 2005 Fire Engine.
The proposed work includes upgrading the electrical and lighting systems
to meet new NFPA standards, installing a new pressure governor,
rebuilding valves and front inlet plumbing, and making necessary paint
repairs. Additional work includes replacing the corroded rear tailboard
support, installing a new fuel tank, replacing the water tank frame,
completing frame repairs and undercoating, and replacing all air tanks and
valves. The estimated cost for parts and labor is $162,270.00. Committee
requested Administrator get quote on lending terms with payments starting
in 2028 for 2005 Fire Truck Refurbishment for next Finance Meeting. NO
ACTION TAKEN
c. LRIP Road Project-Wisconsin Ave
The City of Oconto Falls was awarded funding through the 2026-27 Municipal Street
Improvement Supplemental Program (MSIS) for the Wisconsin Street project. The
project was one of 30 selected for funding statewide. The estimated eligible project
cost is $1,387,803.50, with WisDOT providing reimbursement of up to $693,901.75.
The City will be responsible for the remaining project costs. Committee requested
Administrator get quote on lending terms with payments starting in 2028 for 2027
LRIP Road Project-Wisconsin Ave design and grant management for next Finance
Meeting
NO ACTION TAKEN
vi. 2027-2028 Borrowing for Capital Requests
Council discussed potential capital improvement projects for 2027-2028 and
various borrowing options available to fund the anticipated requests. Discussion
included possible financing methods, the allocation of funds, and considerations
for determining how the projects would be funded. No final decisions were made
at this time. Committee requested Administrator get quote on lending terms with
payments starting in 2028 for 2027 capital projects, to be reviewed at next
Finance Committee Meeting.
NO ACTION TAKEN
4
City of Oconto Falls Finance Committee Thursday October 22,2026
B. Set 2027 General Fund Budget Public Hearing
MOTION: McDonald /Rusch
Motion to set public hearing for 2027 General Fund Budget public hearing on
November 30th 2026 at 5:00pm.
Voice Vote: All present voting aye - MOTION CARRIED
Having no further business, Chairman Coopman declared the meeting adjourned at 7:28PM.
City Administrator Peter Wills
A quorum of the Common Council was in attendance.
Peshtigo National Bank 2027 Loan Payment Version 1
Loan Terms & Payments for 2027 Capital Project Requests Final numbers would depend on
exact timing of closing but this should be very close to what you need for discussion and
planning purposes:
1. Street Project
$120,000 Financed
4.95% Fixed
10 year term
20 year amortization
1st payment due 12/1/2027
Payment amount: $9,765 due annually
2. Fire Truck
$165,000 Financed
4.95% Fixed
10 year term
10 year amortization
1st payment due 12/1/2027
Payment amount: $21,650 due annually
3. Squad Car
$70,000 Financed
4.95% Fixed
5 year term
5 year amortization
1st payment due 12/1/2027
Payment amount: $16,375 due annually
Let me know if you need anything else. We should be able to turn this around fairly quickly after
you get approval on your end.
Thanks,
Peshtigo National Bank
Loan Terms & Payments for 2027 Capital Project Requests
Final numbers would depend on exact timing of closing but this should be very close to
what you need for discussion and planning purposes:
1. Street Project
$120,000 Financed
4.95% Fixed
10 year term
20 year amortization
1st payment due 2/15/2028
Payment amount: $9,765 due annually
2. Fire Truck
$165,000 Financed
4.95% Fixed
10 year term
10 year amortization
1st payment due 2/15/2028
Payment amount: $21,650 due annually
3. Squad Car
$70,000 Financed
4.95% Fixed
5 year term
5 year amortization
1st payment due 2/15/2028
Payment amount: $16,375 due annually
Let me know if you need anything else. We should be able to turn this around fairly quickly
after you get approval on your end.
Thanks,
Managing Wisconsin’s trust assets for public education
Sarah Godlewski, Secretary of State
John Leiber, State Treasurer
Joshua L. Kaul, Attorney General
101 E. Wilson Street
2nd Floor
PO Box 8943
Madison, WI 53708-8943
(608) 266-1370 INFORMATION
(608) 266-0034 LOANS
(608) 267-2787 FAX
bcpl.wisconsin.gov
Tia Nelson, Executive Secretary
Rev. 09/23/2026
Fact Sheet - General Obligation Loans
Eligible Borrowers: Wisconsin towns, villages, cities, counties, school districts, technical college districts, public inland lake
protection and rehabilitation districts, town sanitary districts, metropolitan sewerage districts,
metropolitan sewerage systems, joint sewerage systems, consortiums, cooperative educational service
agencies (CESAs), federated public library systems, and drainage districts.
Loan Process: Simple and transparent, with funds available 30-45 days from initial application request.
Loan Security: Loans become a general obligation of the borrower and require the borrower to levy a tax sufficient to
make annual principal and interest payments when due.
Loan Purpose: Loans of 10 years or less may be made to facilitate the performance of any power or duty of the
borrowing municipality, including operations and maintenance. Loans greater than 10 years are
restricted to the financing or refinancing of public purpose projects including “the acquisition, leasing,
planning, design, construction, development, extension, enlargement, renovation, rebuilding, repair or
improvement of land, waters, property, highways, buildings, equipment, or facilities”, or any purpose
otherwise allowed by law.
Economic
Development Lending: BCPL is a major source of funding for economic development projects including pass -through loans or
grants made for private development, funding development incentives, TID infrastructure loans, land
acquisition and development of business parks, and similar projects. Upon request, BCPL is able to
provide critical flexibility in the repayment schedule if and when expected revenues are delayed.
Payments: Annual payments are due March 15 each year and are exempt from State of Wisconsin municipal levy
limit calculations. Loans funded between September 1 and March 14 do not have a required payment
the following March 15. BCPL can provide custom amortization schedules to coordinate payments with
future budgeted items. Upon request, we can allow a few years of interest -only payments to provide
sufficient time for the project to generate expected revenues.
Prepayment: Prepayments are allowed without penalty between January 1 and August 31 each year , upon 30 days
prior written notice. This flexibility can be extremely valuable for our customers when compared to the
rigid payment structure required after selling bonds. Tired of waiting for a call date? Call BCPL!
Terms: 2-year to 20-year fixed rate loans.
Current Rates: Loan Term 2 years 6.25%
3-5 years 6.25%
6-10 years 6.50%
11-20 years 7.00%
Rate Lock: Market-based interest rates are locked for 60 days following BCPL receipt of the loan application request
form. If the completed application is received by BCPL within 60 days, the rate lock remains in place
through final loan approval, the 4-month draw period, and the full term of the loan.
Fees: No application fees, origination fees or prepayment fees. No fees period!
Best Part: 100% of interest earned by BCPL is distributed to provide the sole state aid for public school library
media and resources. This payment effectively reduces local real estate taxes by providing schools with
another source of funding. See our website for the annual contribution BCPL made to your local school
district. You might be surprised!
Premier Community Bank
Loan Terms for 2027 Capital Project Requests
We can certainly provide the funding this year with 1st payments due in February 2028 and
then annual payments from there. For all of the loans, we would be at about 6%. It's crazy,
but the Muni market is the highest I've seen it in quite some time. We can probably drop
the rate by .25% if the City could/would open deposit accounts here at Premier.
Thank you!!
Carrie Hill | AVP-Commercial & Ag Lender
745 US Hwy 32 Pulaski WI 54162
Phone: (920) 822-4736 ext. 2003
E-mail: chill@premiercommunity.com
State Trust Fund Loan Calculator Sample Data
Loan Amount:$70,000.00
Number of Payments: 4
Interest Rate: 6.25%
Yearly Payment: $20,592.21
Final Payment: $20,592.24
Total All Payments:$82,368.87
Total Principal Paid:$70,000.00
Total Interest Paid:$12,368.87
Sample Amortization Table
PaymentPayment Date Yearly
Payment Principal Interest Total Interest Balance
1 3/14/2028 $20,592.21 $15,210.36 $5,381.85 $5,381.85 $54,789.64
2 3/14/2029 $20,592.21 $17,167.86 $3,424.35 $8,806.20 $37,621.78
3 3/14/2030 $20,592.21 $18,240.85 $2,351.36 $11,157.56 $19,380.93
4 3/14/2031 $20,592.24 $19,380.93 $1,211.31 $12,368.87 $0.00
Total: $82,368.87 $70,000.00 $12,368.87
State Trust Fund Loan Calculator Sample Data
Loan Amount:$165,000.00
Number of Payments: 9
Interest Rate: 6.5%
Yearly Payment: $25,139.86
Final Payment: $25,139.91
Total All Payments:$226,258.77
Total Principal Paid:$165,000.00
Total Interest Paid:$61,258.77
Sample Amortization Table
PaymentPayment Date Yearly
Payment Principal Interest Total Interest Balance
1 3/14/2028 $25,139.86 $11,946.64 $13,193.22 $13,193.22 $153,053.36
2 3/14/2029 $25,139.86 $15,191.39 $9,948.47 $23,141.69 $137,861.97
3 3/14/2030 $25,139.86 $16,178.83 $8,961.03 $32,102.72 $121,683.15
4 3/14/2031 $25,139.86 $17,230.45 $7,909.40 $40,012.12 $104,452.69
5 3/14/2032 $25,139.86 $18,331.83 $6,808.03 $46,820.15 $86,120.86
6 3/14/2033 $25,139.86 $19,542.00 $5,597.86 $52,418.00 $66,578.86
7 3/14/2034 $25,139.86 $20,812.23 $4,327.63 $56,745.63 $45,766.63
8 3/14/2035 $25,139.86 $22,165.03 $2,974.83 $59,720.46 $23,601.61
9 3/14/2036 $25,139.91 $23,601.61 $1,538.31 $61,258.77 $0.00
Total: $226,258.77 $165,000.00 $61,258.77
Wisconsin Street Reconstruction - Utility and Roadway 10/27/2026
ITEM ITEM ESTIMATED UNIT TOTAL
NO. DESCRIPTION QUANTITY UNITS PRICE PRICE
General Improvements
1 Mobilization 1 LS 77,000.00 $ 77,000.00 $ 39,908.30 $ 12,309.77 $ 11,103.54 $ 13,678.38 $
2 Unclassified Excavation 7,000 CY 20.00 $ 140,000.00 $ 140,000.00 $
3 Clearing and Grubbing 1 LS 7,500.00 $ 7,500.00 $ 3,887.17 $ 1,199.00 $ 1,081.51 $ 1,332.31 $
4 Saw Cut Asphalt 430 LF 3.00 $ 1,290.00 $ 1,290.00 $
5 Saw Cut Concrete 150 LF 4.00 $ 600.00 $ 600.00 $
6 Topsoil Placement and Grading 3,600 SY 8.00 $ 28,800.00 $ 28,800.00 $
7 Seed, Fertilize, and Hydro Mulch 3,600 SY 3.00 $ 10,800.00 $ 10,800.00 $
8 Erosion and Sedimentation Controls 1 LS 10,000.00 $ 10,000.00 $ 5,182.90 $ 1,598.67 $ 1,442.02 $ 1,776.41 $
9 Traffic Control 1 LS 10,000.00 $ 10,000.00 $ 5,182.90 $ 1,598.67 $ 1,442.02 $ 1,776.41 $
10 Dewatering
1 LS 5,000.00$ 5,000.00$ 3,750.00$ 1,250.00$
General Improvements Subtotal: Item(s) #1 thru #10 290,990.00 $
Roadway Improvements
11 Concrete Curb and Gutter, Type D, 30-Inch 3,100 LF 18.00 $ 55,800.00 $ 55,800.00 $
12 Asphalt Driveway, 3-Inch 170 SY 60.00 $ 10,200.00 $ 10,200.00 $
13 Dense Graded Base, 1 1/4-Inch 4,450 TON 18.00 $ 80,100.00 $ 80,100.00 $
14 Breaker Run 2,850 TON 18.00 $ 51,300.00 $ 51,300.00 $
15 Asphaltic Binder, 2 1/4-Inch 900 TON 100.00 $ 90,000.00 $ 90,000.00 $
16 Asphaltic Surface, 1 3/4-Inch 700 TON 100.00 $ 70,000.00 $ 70,000.00 $
17 Concrete Driveway, 6-Inch 1,150 SF 10.00 $ 11,500.00 $ 11,500.00 $
18 Concrete Sidewalk, 4-Inch 13,900 SF 10.00 $ 139,000.00 $ 139,000.00 $
19 Concrete Sidewalk, 6-Inch 1,600 SF 10.00 $ 16,000.00 $ 16,000.00 $
20 Detectable Warning Field 120 SF 50.00 $ 6,000.00 $ 6,000.00 $
21 Geotextile Fabric, Type SAS 8,500 SY 3.00 $ 25,500.00 $ 25,500.00 $
22 Excavation Below Subgrade (EBS) 700 CY 45.00 $ 31,500.00 $ 31,500.00 $
23 Pavement Markings, Waterborne, White, 4-Inch 400 LF 7.50 $ 3,000.00 $ 3,000.00 $
24 Pavement Markings, Waterborne, White, 18-Inch
80 LF 35.00$ 2,800.00$ 2,800.00$
Roadway Improvements Subtotal: Item(s) #11 thru #24 592,700.00 $
Storm Sewer Improvements
25 Street Inlet, 2 FT. x 3 FT. 16 EA 3,250.00 $ 52,000.00 $ 52,000.00 $
26 Storm Manhole, 4 FT. I.D. 5 EA 4,000.00 $ 20,000.00 $ 20,000.00 $
27 Storm Sewer, HDPE, 12-Inch 160 LF 60.00 $ 9,600.00 $ 9,600.00 $
28 Storm Sewer, HDPE, 18-Inch 1,600 LF 65.00 $ 104,000.00 $ 104,000.00 $
29 Storm Sewer, PVC, 6-Inch 900 LF 50.00 $ 45,000.00 $ 45,000.00 $
30 Connect to Existing Storm 1 EA 700.00 $ 700.00 $ 700.00 $
31 Inserta Tee, 6 IN.
25 EA 300.00$ 7,500.00$ 7,500.00$
Storm Sewer Improvements Subtotal: Item(s) #25 thru #31 238,800.00 $
Street Storm Sewer Sanitary Sewer Water main
Wisconsin St Engineer Estimate
Sanitary Sewer Improvements
32 Sanitary Sewer Manhole, 4 FT. Dia. 7 EA 5,500.00 $ 38,500.00 $ 38,500.00 $
33 Sanitary Cap, 8-Inch 1 EA 300.00 $ 300.00 $ 300.00 $
34 Sanitary Sewer, PVC, 8-Inch 1,620 LF 65.00 $ 105,300.00 $ 105,300.00 $
35 Sanitary Sewer Lateral, PVC, 6-Inch 660 LF 80.00 $ 52,800.00 $ 52,800.00 $
36 Wye, 8 x 6-Inch 20 EA 150.00 $ 3,000.00 $ 3,000.00 $
37 Connect to Existing Sanitary Lateral 20 EA 500.00 $ 10,000.00 $ 10,000.00 $
38 Connect to Existing Sanitary Sewer 4 EA 1,000.00 $ 4,000.00 $ 4,000.00 $
39 Abandon Existing Sanitary Sewer
1 LS 1,500.00$ 1,500.00$ 1,500.00$
Sanitary Sewer Improvements Subtotal: Item(s) #32 thru #39 215,400.00 $
Water Main Improvements
40 Water Main, PVC, 6-Inch 200 LF 70.00 $ 14,000.00 $ 14,000.00 $
41 Water Main, PVC, 8-Inch 1,620 LF 75.00 $ 121,500.00 $ 121,500.00 $
42 Gate Valve & Box, 6-Inch 3 EA 2,250.00 $ 6,750.00 $ 6,750.00 $
43 Gate Valve & Box, 8-Inch 7 EA 2,900.00 $ 20,300.00 $ 20,300.00 $
44 Reducer, 8 x 6-Inch 1 EA 500.00 $ 500.00 $ 500.00 $
45 Reducer, 8 x 4-Inch 2 EA 500.00 $ 1,000.00 $ 1,000.00 $
46 Tee, 8-Inch 1 EA 800.00 $ 800.00 $ 800.00 $
47 Tee, 8 x 6-Inch 1 EA 700.00 $ 700.00 $ 700.00 $
48 Cross, 8-Inch 1 EA 1,200.00 $ 1,200.00 $ 1,200.00 $
49 Plug, 8-Inch 1 EA 300.00 $ 300.00 $ 300.00 $
50 Hydrant 3 EA 6,000.00 $ 18,000.00 $ 18,000.00 $
51 45 Bend, 8-Inch 2 EA 500.00 $ 1,000.00 $ 1,000.00 $
52 Water Service, HDPE, 1-Inch 660 LF 65.00 $ 42,900.00 $ 42,900.00 $
53 Tap, Saddle, Corporation, Curb Stop & Box, 1-Inch 20 EA 800.00 $ 16,000.00 $ 16,000.00 $
54 Connect to Existing Water Service 20 EA 250.00 $ 5,000.00 $ 5,000.00 $
55 Connect to Existing Water Main 4 EA 2,500.00 $ 10,000.00 $ 10,000.00 $
56 Insulation, 2-Inch 480 SF 5.00 $ 2,400.00 $ 2,400.00 $
57 Abandon Existing Water Main
1 LS 3,000.00$ 3,000.00$ 3,000.00$
Water Main Improvements Subtotal: Item(s) #40 thru #57 265,350.00 $
Estimated Construction Cost per Utility 1,603,240.00 $ 828,351.27 $ 255,506.12 $ 234,219.09 $ 285,163.52 $
Contingency (15%) 240,500.00 $ 124,300.00 $ 38,300.00 $ 35,100.00 $ 42,800.00 $
Design Engineering (10%) 184,400.00 $ 95,278.56 $ 29,384.76 $ 26,935.71 $ 32,800.98 $
Construction Engineering (10%) 184,400.00 $ 95,278.56 $ 29,384.76 $ 26,935.71 $ 32,800.98 $
Total Project Cost 2,212,540.00 $ 1,143,208.39 $ 352,575.63 $ 323,190.50 $ 393,565.48 $
Wisconsin St Engineer Estimate
From: Dan Rammer
To: Peter Wills
Cc: Steve Herman; Jason Valentine; Beth Rank; Street Sup
Subject: RE: MSA 2026-2027 Projects
Date: Thursday, September 3, 2026 3:21:41 PM
Attachments: image001.png
image002.png
image003.png
Peter,
1. Engineering (design and construction) - $368,800 (combo lump sum design and T&E
construction). Assume 50/50 split of design and construction
2. LRIP management - $2,000 (could be added to engineering contract)
3. CDBG breakdown below:
a. Income Survey - $5,000 T&E
b. Grant Application – $15,000 Lump Sum
c. Grant Administration - $46,000 (if awarded) Lump Sum
4. If possible, I prefer to complete the topographic survey prior to snow falling
(October/November would be ideal) but would have to coordinate with the income survey
results. I don’t want to get too far ahead on design/survey if the income surveys are trending
toward the project not being eligible for funding. Design would follow and need to be
completed by the end of April 2027 for CDBG grant application.
Let me know if you have any other questions or need more info.
Thanks,
Dan
From: Peter Wills <pwills@cityofocontofalls.wi.gov>
Sent: Wednesday, September 2, 2026 11:33 AM
To: Dan Rammer <drammer@msa-ps.com>
Cc: Steve Herman <sherman@msa-ps.com>; Jason Valentine <jvalentine@ofmu.org>; Beth Rank
<brank@ofmu.org>; Street Sup <wremic@cityofocontofalls.wi.gov>
Subject: Re: MSA 2026-2027 Projects
Dan,
Looking at estimates Capital Budgeting to review City year to schedule design and
construction
1. The attached Engineering estimate for design & engineering $368,800.00.
2. Can you provide a quote for CDBG
a. CDBG Application, including survey gathering & Grant Management
b. Wi DOT LRIP management costs
3. Time needed for design & engineering for Wisconsin Street including infrastructure
Peter Wills
City Administrator
City of Oconto Falls
500 N. Chestnut/PO Box 70
Oconto Falls, WI 54154
920-846-4505
pwills@cityofocontofalls.wi.gov
From: Dan Rammer <drammer@msa-ps.com>
Sent: Wednesday, September 2, 2026 11:22 AM
To: Peter Wills <pwills@cityofocontofalls.wi.gov>
Cc: Steve Herman <sherman@msa-ps.com>; Jason Valentine <jvalentine@ofmu.org>; Beth Rank
<brank@ofmu.org>; Street Sup <wremic@cityofocontofalls.wi.gov>
Subject: RE: MSA 2026-2027 Projects
Peter,
Yes, you can have CDBG and LRIP funding on the same project. Could even add in DNR (safe
drinking water or clean water fund) just need to be careful with reimbursements. For CDBG we
would still have to verify it is eligible based on an income survey.
Thanks,
Dan
From: Peter Wills <pwills@cityofocontofalls.wi.gov
>
Sent: Wednesday, September 2, 2026 8:23 AM
To: Dan Rammer <drammer@msa-ps.com>; Beth Rank <brank@ofmu.org>
Cc: Jason Valentine <jvalentine@ofmu.org>; Street Sup <wremic@cityofocontofalls.wi.gov>; Steve
Herman <sherman@msa-ps.com>
Subject: MSA 2026-2027 Projects
Dan,
Is CDBG Funding eligible to be stacked with LRIP funding. The City has been approved
for $600k in LRIP funding, looking to use for Wisconsin Street.
Peter Wills
City Administrator
City of Oconto Falls
500 N. Chestnut/PO Box 70
Oconto Falls, WI 54154
920-846-4505
pwills@cityofocontofalls.wi.gov
From: Dan Rammer <drammer@msa-ps.com>
Sent: Tuesday, September 1, 2026 12:07 PM
To: Peter Wills <pwills@cityofocontofalls.wi.gov>; Beth Rank <brank@ofmu.org>
Cc: Jason Valentine <jvalentine@ofmu.org>; Street Sup <wremic@cityofocontofalls.wi.gov>; Steve
Herman <sherman@msa-ps.com>
Subject: RE: 2026-2027 Projects
Just following up on this to see if there has been any additional thoughts about a potential
future project?
Reach out with any thoughts or questions!
Thanks,
Dan
From: Dan Rammer
Sent: Friday, August 21, 2026 9:29 AM
To: 'Peter Wills' <pwills@cityofocontofalls.wi.gov
>; Beth Rank <brank@ofmu.org>
Cc: 'Jason Valentine' <jvalentine@ofmu.org>; 'Street Sup' <wremic@cityofocontofalls.wi.gov>; Steve
Herman <sherman@msa-ps.com>
Subject: RE: 2026-2027 Projects
Good morning Peter and Beth,
I wanted to reach out regarding some previous discussions regarding potential future projects
as we start rolling into budget season. If the City would like to pursue CDBG funding, similar to
Columbia St project, now is the time to start the discussion. CDBG applications are due May
15, 2027 which will require income surveys and engineered plans and specs. Income surveys
are best to complete now and get verified with DOA to ensure the project eligibility.
A couple projects that have been previously identified and provided estimates for are below,
with estimates attached. This was about a year ago so I know priorities can change. The ideal
project is typically around $1.5 million. If it is a $1.5m project, the City would be eligible for
$1m in grant funds and then would be responsible for $500k match. Not sure if you have had
any internal discussions as far as project priorities but I would be happy to sit down and
discuss if you are interested.
Reach out with any questions or if you want to sit down and discuss.
Dan Rammer, PE - WI | Team Leader - Public Works
MSA Professional Services, Inc.
100% Employee Owned
2901 E Enterprise Ave, Suite 500
Appleton, WI 54913
+1 (920) 931-0095
From: Dan Rammer
Sent: Tuesday, October 28, 2025 4:34 PM
To: 'Peter Wills' <pwills@cityofocontofalls.wi.gov>; Street Sup <wremic@cityofocontofalls.wi.gov>
Cc: Jason Valentine <jvalentine@ofmu.org>; Ben Andrews <bandrews@msa-ps.com>
Subject: RE: 2026 Projects
Attached are the requested project estimates with a few comments below:
In general, we assumed replacement of existing water and sewer as is, storm sewer I was
unsure based on mapping but would recommend adding more if mapping is accurate. We also
assumed close to existing street widths, assuming there wouldn’t be significant widening or
narrowing of any roadway. If we need to adjust just let me know.
Paul Street (Chestnut to Hillside)
Water main currently does not exist between Milwaukee and Hillside. This was assumed
to be replaced as is.
Storm sewer currently does not exist along Paul St, however would recommend adding
some in. Would need to verify a connection/outfall location
Assumes sidewalk installation on one side of the road, similar to Columbia St (this
would be my recommendation but not a requirement)
Poplar Ave (Washington to Columbia)
Sanitary sewer runs from Wisconsin to south, mapping does not show anything along
Poplar from Columbia to South. I have some concerns how some of the houses between
Columbia and Cedar are served, long laterals?
Similar to sanitary sewer, no water main along Poplar from Columbia to Wisconsin St.
Assumed to be replaced as is
Existing mapping shows no storm sewer along Poplar. I would expect there to be
drainage issues, and assumed we need to install storm sewer
Assumes sidewalk installation on one side of the road, similar to Columbia St (this
would be my recommendation but not a requirement)
Wisconsin St (Chestnut to Farm)
Assumes sidewalk on both sides, same as existing
Storm map doesn’t show a whole lot existing, would recommend adding more storm
drainage
Water and sewer extend the entire length.
Let me know if you have questions or would like to discuss.
Thanks,
Dan
From: Peter Wills <pwills@cityofocontofalls.wi.gov
>
Sent: Friday, October 24, 2025 2:12 PM
To: Dan Rammer <drammer@msa-ps.com>; Street Sup <wremic@cityofocontofalls.wi.gov>
Cc: Jason Valentine <jvalentine@ofmu.org>; Ben Andrews <bandrews@msa-ps.com>
Subject: Re: 2026 Projects
Dan,
See response below in red
Are these water, sewer, storm and roadway reconstructions? yes
Is the city planning to put in the LRIP application yes and MSA just provide the estimates? yes
Also want to verify limits.
Wisconsin St – Chestnut Ave to Farm Road yes
Paul St – Chestnut Ave to Hillside Ave yes
Poplar Ave – Washington St to Columbia St yes
Peter Wills
City Administrator
City of Oconto Falls
500 N. Chestnut/PO Box 70
Oconto Falls, WI 54154
920-846-4505
pwills@cityofocontofalls.wi.gov
Please note my email has changed
From: Dan Rammer <drammer@msa-ps.com>
Sent: Friday, October 24, 2025 1:41 PM
To: Peter Wills <pwills@cityofocontofalls.wi.gov>; Street Sup <wremic@cityofocontofalls.wi.gov>
Cc: Jason Valentine <jvalentine@ofmu.org>; Ben Andrews <bandrews@msa-ps.com>
Subject: RE: 2026 Projects
Are these water, sewer, storm and roadway reconstructions? Is the city planning to put in the
LRIP application and MSA just provide the estimates?
Also want to verify limits.
Wisconsin St – Chestnut Ave to Farm Road
Paul St – Chestnut Ave to Hillside Ave
Poplar Ave – Washington St to Columbia St
Thanks,
Dan
From: Peter Wills <pwills@cityofocontofalls.wi.gov
>
Sent: Friday, October 24, 2025 1:24 PM
To: Street Sup <wremic@cityofocontofalls.wi.gov>; Dan Rammer <drammer@msa-ps.com>
Cc: Jason Valentine <jvalentine@ofmu.org>; Ben Andrews <bandrews@msa-ps.com>
Subject: Re: 2026 Projects
One update, looking to applying for two streets in LRIP, need quotes in order to apply.
Looking to do the projects in 2027 & 2028.
Peter Wills
City Administrator
City of Oconto Falls
500 N. Chestnut/PO Box 70
Oconto Falls, WI 54154
920-846-4505
pwills@cityofocontofalls.wi.gov
Please note my email has changed
From: Street Sup <wremic@cityofocontofalls.wi.gov>
Sent: Friday, October 24, 2025 12:33 PM
To: Dan Rammer <drammer@msa-ps.com>
Cc: Peter Wills <pwills@cityofocontofalls.wi.gov>; Jason Valentine <jvalentine@ofmu.org>; Ben
Andrews <bandrews@msa-ps.com>
Subject: Re: 2026 Projects
Hi Dan
After talking with Peter we want to look at designing and pricing for Paul Street, Poplar
and Wisconsin. Not sure what our current budget is for engineering, but could you let me
know an estimate before you begin.
We are looking to put 2 streets on the LRIP for next year and need to submit them by the
end of November.
Thanks
Wally
Sent from my iPhone
On Oct 23, 2025, at 1:47 PM, Dan Rammer <drammer@msa-ps.com> wrote:
Good afternoon guys.
Just wanted to reach out/ follow up on some of our discussions about 2026
projects. Is there something that we want to start taking a closer look at? I know
there were a couple street or storm water projects Wally and I had discussed.
If we want to move forward now is the time to start planning topo and design,
before the snow flies! That would allow us enough time to get design done by
spring time and get them bid out for 2026 construction.
Let me know if you want to discuss or what you may have in mind.
Thanks,
<image001.png>
Dan Rammer, PE | Team Leader - Public Works
Licensed in WI
MSA Professional Services, Inc.
100% Employee Owned
2901 E Enterprise Ave, Suite 500
Appleton, WI 54913
+1 (920) 931-0095
<image002.png>
<image003.png>
<image004.jpg>
April 15, 2026
The Honorable Peter A Wills
City of Oconto Falls
PO Box 70
Oconto Falls, WI 54154-0070
Dear Peter A Wills,
Congratulations! This letter confirms funding for your local project on Wisconsin St from the 2026-27
Municipal Street Improvement Supplemental Program (MSIS) , which is a component of the Local
Roads Improvement Program (LRIP), a reimbursement program of the Wisconsin Department of
Transportation (WisDOT). This program assists local units of government in improving deteriorating
county highways, town roads, and municipal streets un der the authority of the local unit of government
by paying up to 90% of the total eligible project costs, with the balance of costs funded by the political
subdivision where the work is performed.
Your project was one of 30 MSIS projects selected for funding in the 2026-27 biennium. The total eligible
cost of the project is currently estimated to be $1,387,803.50 based on the application materials
submitted. WisDOT will reimburse the City of Oconto Falls for up to a limit of $693,901.75.
You will soon receive a signed State/Municipal Project Agreement (SMA) from WisDOT. It is important
that you not incur any project costs until receipt of your signed State Municipal Project Agreement
(SMA) from WisDOT. Additionally, please be aware of the new program requirement beginning this cycle
which is to provide advertising information to the department at least 7 days prior to advertising. More
information on how to provide this information is located in the LRIP Guidelines and Requirements a
nd
on the LRIP webpage.
I greatly appreciate your commitment to provide a quality transportation system that promotes public
safety and economic development. Our state and local partnership is imperative to the future of
Wisconsin’s transportation infrastructure. Congratulations on your project award, which is a key part of
this effort.
Sincerely,
Kristina Boardman, Secretary
Wisconsin Department of Transportation
Office of the Secretary
4822 Madison Yards Way, S903
Madison, WI 53705
Governor Tony Evers
Secretary Kristina Boardman
wisconsindot.gov
Telephone: (608) 266-1114
Email: sec.exec@dot.wi.gov
State Trust Fund Loan Calculator Sample Data
Loan Amount:$125,000.00
Number of Payments: 19
Interest Rate: 7%
Yearly Payment: $12,279.31
Final Payment: $12,279.49
Total All Payments:$233,307.15
Total Principal Paid:$125,000.00
Total Interest Paid:$108,307.15
Sample Amortization Table
PaymentPayment Date Yearly
Payment Principal Interest Total Interest Balance
1 3/14/2028 $12,279.31 $1,515.62 $10,763.70 $10,763.70 $123,484.38
2 3/14/2029 $12,279.31 $3,635.41 $8,643.91 $19,407.61 $119,848.98
3 3/14/2030 $12,279.31 $3,889.89 $8,389.43 $27,797.03 $115,959.09
4 3/14/2031 $12,279.31 $4,162.18 $8,117.14 $35,914.17 $111,796.91
5 3/14/2032 $12,279.31 $4,432.09 $7,847.22 $43,761.39 $107,364.82
6 3/14/2033 $12,279.31 $4,763.78 $7,515.54 $51,276.93 $102,601.05
7 3/14/2034 $12,279.31 $5,097.24 $7,182.07 $58,459.01 $97,503.81
8 3/14/2035 $12,279.31 $5,454.05 $6,825.27 $65,284.27 $92,049.76
9 3/14/2036 $12,279.31 $5,818.18 $6,461.14 $71,745.41 $86,231.58
10 3/14/2037 $12,279.31 $6,243.10 $6,036.21 $77,781.62 $79,988.48
11 3/14/2038 $12,279.31 $6,680.12 $5,599.19 $83,380.81 $73,308.36
12 3/14/2039 $12,279.31 $7,147.73 $5,131.58 $88,512.40 $66,160.63
13 3/14/2040 $12,279.31 $7,635.38 $4,643.93 $93,156.33 $58,525.24
14 3/14/2041 $12,279.31 $8,182.55 $4,096.77 $97,253.10 $50,342.70
15 3/14/2042 $12,279.31 $8,755.33 $3,523.99 $100,777.09 $41,587.37
16 3/14/2043 $12,279.31 $9,368.20 $2,911.12 $103,688.20 $32,219.17
17 3/14/2044 $12,279.31 $10,017.79 $2,261.52 $105,949.72 $22,201.38
18 3/14/2045 $12,279.31 $10,725.22 $1,554.10 $107,503.82 $11,476.16
19 3/14/2046 $12,279.49 $11,476.16 $803.33 $108,307.15 $0.00
Total: $233,307.15 $125,000.00 $108,307.15