RecordWell Data

Utility Advisory Board Agenda and Packet

City of River Falls · Pierce County · meeting of Nov 16, 2026 · Agenda packets

Open the original document More from City of River Falls

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF RIVER FALLS WISCONSIN UTILITY ADVISORY BOARD AGENDA CITY HALL – COUNCIL CHAMBERS NOVEMBER 16, 2026 The public may view/listen to the meeting by: • Viewing the City’s YouTube Channel: https://www.youtube.com/user/cityofriverfalls Call Meeting to Order: 6:30 p.m. Pledge of Allegiance Roll Call Approval of Minutes: September 21, 2026 ACTION MAY BE TAKEN ON ANY OF THE FOLLOWING ITEMS PUBLIC COMMENT, PETITIONS, REQUESTS AND COMMUNICATIONS: 1. Public Comment NEW BUSINESS: 2. Resolution Recommending the Purchase of Materials for Highview Meadows/Royal Oaks Electric Distribution Replacements and Upgrades 3. Resolution Recommending Approval of New Electric Parallel Generation Schedule (PGS) Rate REPORTS: 4. Capacity Management Operation Maintenance (CMOM) Sanitary Sewer Collection System Report 5. Finance Report 6. Utility Dashboards 7. Monthly Utility Report 8. Utility Director’s Report ADJOURNMENT: Council members may be in attendance for informational purposes only. No official Council action will be taken. NOTE: Any person who has a qualifying disability as defined by the Americans with Disabilities Act that requires the meeting or materials to be in an accessible location or format, may contact City Clerk Amy White at (715) 426-3408 or in person at 222 Lewis Street, for accommodations. Requests for accommodations should be made at least three (3) business days in advance of the meeting. Every effort will be made to arrange accommodations. Posted at City Hall: 11/05/2026; Published: The Pierce County Journal: 11/12/2026 1 CITY OF RIVER FALLS UTILITY ADVISORY BOARD MEETING MINUTES SEPTEMBER 21, 2026 The meeting was called to order by Utility Advisory Board (UAB) Chair Chris Lick at 6:30 p.m. The pledge of allegiance was said. Utility Advisory Board Present: Amber Bjork, Joel Donna, Lance Hovland, Mark Klecker, Chris Lick, Tim Thum, and Rose Walker Council Present: Mayor Alison Page Staff Present: Utility Director Kevin Westhuis; Electric Operations Superintendent Wayne Siverling; WPPI Energy Services Manager Jenna Willi; Executive Assistant Lanae Nelson; IT Manager Chris Feyereisen; and IT Specialist Lead Jon Smits Approval of Minutes: Meeting Minutes: 08-17-2026 MSC Klecker/Walker approved minutes. Unanimous. NEW BUSINESS: Resolution 2026 – 10 Recommending Approval of WPPI Energy Amendment No. 3 to the Long Term Power Supply Contract for Participating Members WPPI Energy President & CEO Mike Peters presented Amendment No. 3 to the Long-Term Power Supply Contract. The proposed amendment would extend the contract term from December 31, 2055, through December 31, 2073, allowing WPPI Energy to support long-term financing for future generation and transmission investments. Peters reviewed WPPI Energy’s member-owned structure, power supply resources, projected capacity needs, and the benefits of the long-term contract, including cost stability, reliability, and shared resource planning. He noted that 27 of the 51 member utilities had completed the approval process. The Board discussed the proposed amendment and its financial and operational benefits to River Falls and the other WPPI Energy members. Peters introduced WPPI Energy Services Manager Jenna Willi, who was in attendance. MSC Thum/Walker moved to approve the resolution. Motion passed unanimously. REPORTS: IT Security Informational Update IT Manager Chris Feyereisen provided an update on City cybersecurity practices and security measures for critical utility infrastructure. Programmable logic controllers systems have been isolated from the internet, with multi-factor authentication implemented throughout the infrastructure. No current security concerns were reported. Finance Report Westhuis reviewed the monthly financial reports and reported that revenues exceeded expenses in the Electric, Water, Wastewater, and Stormwater utility funds. 2 Utility Dashboards Westhuis reviewed utility performance dashboards. Monthly Report Utility reports for August 2026 were included in the meeting packet. Utility Director’s Report Westhuis reported that a 72-hour continuous performance test began at the Wastewater Treatment Facility’s Biosolids Dryer. The Mound Reservoir has been cleaned and returned to service. The Sycamore Water Tower is being drained for its required five-year DNR inspection. Electric Operations Superintendent Wayne Siverling reported that the North Substation has returned to service following a minor SF6 gas leak. Repairs are planned to extend the equipment’s service life. Siverling also reported that the East Division Street to High View Meadows electrical project is nearing completion. A planned four-to-six-hour outage may be required during the final equipment switchover. ADJOURNMENT: MSC Bjork/Thum to adjourn. Motion caried unanimously. UAB Chair Lick adjourned the meeting at 7:52 p.m. Respectfully submitted, Executive Assistant Lanae Nelson 3 #2 MEMORANDUM TO: Utility Advisory Board FROM: Wayne Siverling, Electric Operations Superintendent DATE: November 16, 2026 TITLE: RESOLUTION RECOMMENDING THE PURCHASE OF MATERIALS FOR HIGHVIEW MEADOWS/ROYAL OAKS ELECTRIC DISTRIBUTION REPLACEMENTS AND UPGRADES _____________________________________________________________________ RECOMMENDED ACTION Recommend that the Utility Advisory Board (UAB) adopt a resolution advising the City Council to authorize the purchase of 12,000 feet of 750 MCM underground primary cable from Stuart C. Irby Co. in the amount of $162,576. The cable will be placed into inve ntory for use in the Highview Meadows/Royal Oaks area for the E lectric Distribution Replacements and Upgrades Capital Improvement Plan (CIP) projec t, which is scheduled for construction in 2027 . BACKGROUND The 2027 Capital Improvement Plan (CIP) includes electric distribution system replacements and upgrades in the Highview Meadows/Royal Oaks area, located on the east side of River Falls beyond the hospital (see attached map). The City of River Falls and River Falls Municipal Utilities (RFMU) have identified a need to extend larger electrical infrastructure east of town, beginning near the eastbound Highway 35/65 bypass off -ramp and continuing to the pedestrian tunnel. The project will include approximately 4,000 feet of new infrastructure and will improve electric system reliability and capacity for customers in this growing service area. To support this project, the Electric Utility will require approximately 12,000 feet of 750 MCM underground primary cable. The cable will be purchased in advance and added to inventory for use on the Highview Meadows/Royal Oaks Highview Meadows / Royal Oaks Area Map Green Line: Proposed underground utility cable conduit route. Red Lines: Existing underground utility infrastructure (conduit, equipment, underground cable, etc.). 4 Memorandum to Utility Advisory Board November 16, 2026 Page 2 area for the project and future system needs. DISCUSSION RFMU Electric Utility staff solicited quotes for the purchase of 750 MCM underground primary cable required for the Highview Meadows/Royal Oaks Electric Distribution Replacements and Upgrades project. This purchase is part of the City's broader effort to secure long-lead materials in advance of the planned 2027 construction schedule. Staff recommends approval of a purchase order with Stuart C. Irby Co. of Burnsville, Minnesota, for the procurement of 12,000 feet of 750 MCM underground primary cable. The anticipated delivery timeframe is the Spring of 2027. In addition to the quote received from Stuart C. Irby Co., staff obtained pricing through the WPPI Energy Joint Purchasing Program. Both vendors provided identical pricing. Given the equivalent pricing, staff recommends Stuart C. Irby Co. based on its established business relationship with RFMU and experience supplying underground distribution materials. FINANCIAL CONSIDERATIONS The Highview Meadows/Royal Oaks area project is included in the 2027 Capital Improvement Plan and is funded through the Electric Utility Fund. Vendor Delivery Timeframe Total Quote Stuart C. Irby, Co. 2027 Spring Delivery $162,576 WPPI Energy Joint Purchasing 2027 Delivery Timeframe $162,576 Sources Amount Uses Amount Electric Utility Fund $162,576 750 MCM Underground Primary Cable (Stuart C. Irby, Co.) $162,576 Total Sources $162,576 Total Uses $162,576 Figures 1 & 2: 750 MCM Underground Primary cable at Public Works 5 Memorandum to Utility Advisory Board November 16, 2026 Page 3 The quote submitted by Stuart C. Irby Co. totals $162,576, or approximately $13.55 per linear foot, and is within the project's available budget. The 2027 CIP includes $400,000 for this portion of the project. The quoted amount covers the supply of 750 MCM underground primary cable and is subject to applicable metal escalation adjustments related to fluctuations in aluminum and copper markets. The project will utilize existing inventory for components including switchgear, primary pedestals, terminators, and primary elbows. Replacement of inventory items used for the project will result in additional material costs that will be incorporated into the overall project budget. Installation is anticipated to be completed using directional boring methods. Payment for the cable will be made upon delivery to the River Falls Municipal Utilities project site. CONCLUSION Staff recommends that the Utility Advisory Board adopt a resolution recommending that the City Council authorize the City Administrator to approve the purchase of 12,000 feet of 750 MCM underground primary cable from Stuart C. Irby Co. in the amount of $16 2,576 for the Highview Meadows/Royal Oaks Electric Distribution Replacements and Upgrades project. Enc: Stuart C. Irby, Co. Quote 6 ,  QUOTE DATE  ORDER NUMBER  <$          4,$   PAGE NO.   $                4 ,,,  CUSTOMER NUMBER  CUSTOMER ORDER NUMBER  JOB/RELEASE NUMBER  OUTSIDE SALESPERSON  <<<$                <,4,,4$  INSIDE SALESPERSON   REQD DATE  FRGHT ALLWD  SHIP VIA  <<<<$                   ,4,,44<,$  ORDER QTY  SHIP QTY  LINE  DESCRIPTION  Prc/UOM  Ext Amt  <<<<<$                                                                                                                                                                                                                                                                                                                                                                                                                                            444<<$                <$          4 Quotation STUART C IRBY BR673 BURNSVILLE 12501 DUPONT AVE SOUTH BURNSVILLE MN 55337 763-588-0545 10/28/26 S014762233 REMIT TO: STUART C IRBY CO POST OFFICE BOX 741001 ATLANTA GA 30384-1001 1 SOLD TO: SHIP TO: RIVER FALLS MUNICIPAL UTILITIES RIVER FALLS MUNICIPAL UTILITIES 222 LEWIS STREET SUITE 228 950 BENSON STREET RIVER FALLS, WI 54022-2190 RIVER FALLS, WI 54022 715-425-0906 ORDERED BY: Wayne Siverling 115643 750MCM Quote Michael J Uphoff CHAD W LAFOR 10/28/26 Yes BW BEST-WAY 12000FT 1 OKON 162-23-3096 750MCM-61X AL F/S 13548.000M 162576.00 220M EPR 15KV 16X10 1500  (+/-) ----------------------------------- SHIP ON 8 X 1500FT REELS +/-5% ----------------------------------- PRICING SUBJECT TO METALS ESCALATION @ CU=6.50 & AL=2.50 ----------------------------------- LEAD TIME: FEB/MARCH 2027 ----------------------------------- Your # 2-14-350-5750 ** Reprint ** Reprint ** Reprint ** Subtotal 162576.00 S&H CHGS 0.00 Sales Tax TOTAL 162576.00 * This is a quotation * Prices firm for acceptance within 30 days with the exception of commodity prices which are subject to change daily. Quotation is void if changed. Complete quote must be used unless authorized in writing. All transactions are subject to and exclusively governed by our Terms and Conditions of Sale,which are incorporated herein and available at: https://www.irbyutilities.com/terms. Additional or conflicting terms are rejected, void, and of no force or effect. 7 ** Reprint ** Reprint ** Reprint ** ,  QUOTE DATE  ORDER NUMBER  <$          4,$   PAGE NO.   $                4 ,,,  CUSTOMER NUMBER  CUSTOMER ORDER NUMBER  JOB/RELEASE NUMBER  OUTSIDE SALESPERSON  <<<$                <,4,,4$  INSIDE SALESPERSON   REQD DATE  FRGHT ALLWD  SHIP VIA  <<<<$                   4444$                                                                                                                                            Quotation STUART C IRBY BR673 BURNSVILLE 12501 DUPONT AVE SOUTH BURNSVILLE MN 55337 763-588-0545 10/28/26 S014762233 REMIT TO: STUART C IRBY CO POST OFFICE BOX 741001 ATLANTA GA 30384-1001 2 SOLD TO: SHIP TO: RIVER FALLS MUNICIPAL UTILITIES RIVER FALLS MUNICIPAL UTILITIES 222 LEWIS STREET SUITE 228 950 BENSON STREET RIVER FALLS, WI 54022-2190 RIVER FALLS, WI 54022 715-425-0906 ORDERED BY: Wayne Siverling 115643 750MCM Quote Michael J Uphoff CHAD W LAFOR 10/28/26 Yes BW BEST-WAY Terms and Conditions of Sale for Quotes A. Seller assumes no responsibility whatsoever for any interpretation of bid documents, plans, or specifications provided to Seller (i.e., customer shall be solely responsible for ensuring interpretation of such documents, plans and/or specifications and for conformity and appropriateness of all goods and services ordered in comparison to same). B. Prices are subject to change at any time prior to shipment unless otherwise agreed in writing signed by an authorized Seller representative. C. Pricing and estimated delivery dates are based solely on the quantities and specific products and/or scope of services identified in this quote. Seller may refuse, terminate, or change pricing, estimated dates, and other terms of its offer if customer requests changes or deviations from the original quote. Unless an authorized Seller representative accepts customer  s proposed deviations in an explicit signed agreement modifying this quotation, any such proposed deviations are automatically rejected, void, and of no force or effect. D. Quotation does not include special mounting or installation hardware, equipment options, accessories, samples, spares, or mock-up equipment unless otherwise noted. E. Seller is not responsible for the design of the project or any goods supplied. F. Seller reserves the right to increase the pricing quoted herein to account for force majeure events, the imposition of new or increased tariffs, shipping costs, import/export fees, duties, customs, or taxes, currency fluctuations, or increases in commodity or market pricing. G. Pre-shipment of anchor bolts is plus freight. H. Where applicable, fabrication and shipment of goods can only be made after Seller receives the following: (i) purchase order conforming to this Quotation, (ii) customer  s verification and approval of technical information, (iii) approved Submittal Drawings, and (iv) credit approval. I. Lead times are strictly estimates. Seller is not responsible for ship dates beyond estimated dates unless Seller  s President or VP Finance otherwise explicitly agrees in a signed writing as part of this Quotation and then only to the extent so agreed. J. All orders are FCA Shipping Point, prepaid and billed, unless otherwise noted in quote. K. Logistic solutions, storage, handling, kitting, expedited or special delivery, testing, including, but not limited to, infrared scanning and NETA testing, spares, start-up, installation, commissioning, arc flash studies, and other services are excluded unless otherwise specified in this quote. Please contact your Seller representative for additional information on any such services if desired. L. This quotation and all related transactions are also subject to the applicable manufacturer  s published warranties, including all applicable disclaimers, exclusions, and limitations. M. This quotation constitutes Seller  s confidential information, and customer shall not share or distribute this quotation to third parties other than to the extent reasonably necessary to process the transactions contemplated herein with Seller. N. Unless otherwise expressly agreed in a separate writing signed by Seller  s President or VP Finance, Seller does not agree and is not subject to any contractual flow-down or pass-through terms from customer, including, but not limited to, DFARs, FARs, Prime Contracts, Minority Business requirements, Buy America Act, etc. 8 RESOLUTION NO. 2026-XX RESOLUTION RECOMMENDING THE PURCHASE OF MATERIALS FOR HIGHVIEW MEADOWS/ROYAL OAKS ELECTRIC DISTRIBUTION REPLACEMENTS AND UPGRADES WHEREAS, the City of River Falls and River Falls Municipal Electric Utility have identified a Capital Improvement Project (CIP) scheduled for 2027 involving electrical distribution system replacements and upgrades in the Highview Meadows/Royal Oaks area, including the installation of 750 MCM primary underground cable; and WHEREAS, it is in the best interest of the Electric Utility to proactively procure the required materials in advance to ensure availability, mitigate future cost increases, and maintain project schedules; and WHEREAS, two quotations were received for the purchase of 750 MCM primary underground cable; and WHEREAS, Stuart C. Irby Co. submitted a quotation for the purchase and delivery of 12,000 feet of 750 MCM primary underground cable to be placed into inventory for future use; and WHEREAS, the 2027 CIP includes funding in the amount of $400,000 for projects requiring these electrical materials; and WHEREAS, the lowest responsible quote received was from Stuart C. Irby Co. in the amount of $162,576; and WHEREAS, Utility staff have reviewed the proposal, determined it to be acceptable, and recommend the purchase based on current and anticipated material needs; and NOW, THEREFORE, BE IT RESOLVED, that the Utility Advisory Board recommends that the River Falls Common Council authorize the City Administrator to approve the purchase from Stuart C. Irby Co. for the delivery of 12,000 feet of 750 MCM primary underground cable, to be placed into inventory for use in the 2027 Highview Meadows/Royal Oaks Electric Distribution Replacement and Upgrade Project, in an amount not to exceed $162,576. Dated this 16th day of November 2026. __________________________ Chris Lick, Board Chair ATTEST: ________________________________ Amy White, City Clerk 9 #3 MEMORANDUM TO: Utility Advisory Board FROM: Jenna Willi, WPPI Energy Services Manager DATE: November 16, 2026 TITLE: RESOLUTION RECOMMENDING APPROVAL OF NEW ELECTRIC PARALLEL GENERATION SCHEDULE (PGS) RATE _____________________________________________________________________ RECOMMENDED ACTION Recommend approval of the new Parallel Generation Schedule (Pgs) rate schedule for River Falls Municipal Utilities (RFMU) customers and authorize inclusion in WPPI Energy's group filing with the Public Service Commission (PSC) of Wisconsin. BACKGROUND The Public Service Commission (PSC) of Wisconsin recently approved a new Parallel Generation Service (Pgs) rate option for municipal electric utilities. Adoption of this rate would allow RFMU to compensate customers for excess electricity generation at the applicable seasonal avoided-cost rate rather than the retail or wholesale energy rate. This approach is consistent with long-standing practices used by many investor-owned and cooperative utilities throughout Wisconsin. Under the current structure, excess customer generation may be credited at the retail rate. The retail rate reflects not only energy costs but also the costs associated with maintaining and operating the electric distribution system. While customer -owned generation can offset energy purchases, customers with parallel generation continue to rely on the utility's distribution infrastructure for both receiving and exporting energy. As a result, distribution system costs remain largely unchanged regardless of t he amount of excess generation produced. The proposed rate more closely aligns customer compensation with the utility's actual avoided energy costs. This approach promotes equitable cost recovery and helps reduce the potential for shifting distribution system costs to customers who do not have pa rallel generation systems. Additionally, the proposed rate encourages customers to size generation systems to meet their own energy needs rather than oversizing systems primarily to generate revenue through excess energy sales. 10 Memorandum to Utility Advisory Board November 16, 2026 Page 2 RATE IMPACTS Pgs-1 Rate Schedule (Systems Smaller Than 20 kW) Existing (Legacy) Customers • Continue to be net-metered on a monthly basis. • Applies to systems interconnected prior to the effective date of the revised rate schedule. • Customers will continue receiving the retail rate credit for excess generation for ten (10) years following implementation of the new rate. • Grandfathered status transfers only with the original ownership; ownership changes will result in the system being treated as non-legacy. New (Non-Legacy) Customers • Continue to be net-metered on a monthly basis. • Applies to systems interconnected after the effective date of the revised rate schedule. • Excess generation will be credited at WPPI Energy's avoided-cost rate rather than RFMU's retail rate. • This creates a direct pass-through structure whereby RFMU purchases excess generation from the customer and WPPI Energy purchases that energy from RFMU at the same avoided-cost rate. • The change reduces financial losses associated with purchasing excess generation above its market value and reduces incentives to oversize systems. • WPPI Energy will update avoided-cost rates annually and provide required PSC reporting and tariff administration on behalf of participating members. Pgs-2 Rate Schedule (Systems 20 kW and Larger) • All customers, including existing customers, will transition to the revised rate upon its effective date. • Net metering will continue on an hourly basis. • Excess generation will be credited at WPPI Energy's avoided-cost rate. • Excess generation transactions will continue to operate as a direct pass-through between the customer, RFMU, and WPPI Energy. FINANCIAL CONSDERATIONS The primary cost associated with adopting the new Pgs rate schedule is the PSC filing fee. WPPI Energy is coordinating a group filing on behalf of multiple member utilities, which is expected to reduce filing costs for participating communities, including River Falls. The proposed rate structure is expected to improve cost recovery, reduce potential cost shifting between customer classes, and better align excess generation compensation with actual avoided energy costs. CONCLUSION Staff recommends that the Utility Advisory Board recommend City Council approval of a resolution 11 Memorandum to Utility Advisory Board November 16, 2026 Page 3 authorizing River Falls Municipal Utilities to participate in WPPI Energy's group filing with the Public Service Commission of Wisconsin for adoption of the new Parallel Generation S chedule (Pgs) rate schedule. The proposed rate structure promotes equitable cost recovery, aligns compensation for excess generation with actual avoided costs, and helps ensure that electric distribution system costs are shared fairly among all utility customers. 12 RESOLUTION NO. 2026-XX RESOLUTION RECOMMENDING APPROVAL OF NEW ELECTRIC PARALLEL GENERATION SCHEDULE (PGS) RATE WHEREAS, the Public Service Commission of Wisconsin has approved a revised Parallel Generation Schedule (Pgs) rate for municipal electric utilities; and WHEREAS, the revised Pgs rate schedule allows excess generation from qualifying customer- owned generation systems to be credited at the applicable avoided-cost rate rather than the retail electric rate; and WHEREAS, the revised rate structure more accurately reflects the utility's avoided energy costs, promotes equitable cost recovery, and reduces the potential for distribution system costs to be shifted to customers without parallel generation systems; and WHEREAS, adoption of the revised Pgs rate is consistent with practices currently used by many Wisconsin electric utilities; and WHEREAS, WPPI Energy is coordinating a group filing with the Public Service Commission of Wisconsin on behalf of participating member utilities, which will reduce administrative costs associated with filing the revised tariff; NOW, THEREFORE, BE IT RESOLVED, that the Utility Advisory Board recommends that the River Falls Common Council authorize WPPI Energy to proceed with the group filing application for the adoption of the revised Parallel Generation Schedule (Pgs) rate for River Falls Municipal Utilities, subject to approval by the Public Service Commission of Wisconsin. Dated 16th day of November, 2026. Chris Lick, Board Chair ATTEST: Amy White, City Clerk 13 #4 MEMORANDUM TO: Utility Advisory Board FROM: Bradley Vick, Water/Wastewater Superintendent DATE: November 16, 2026 TITLE: 2026 CAPACITY MANAGEMENT OPERATION MAINTENANCE (CMOM) SANITARY SEWER COLLECTION SYSTEM REPORT BACKGROUND The Wisconsin Department of Natural Resources (WDNR) requires municipal wastewater collection system owners to develop and implement a Capacity, Management, Operation, and Maintenance (CMOM) program in accordance with Wisconsin Administrative Code NR 210.2 3. The River Falls Municipal Utilities Wastewater Department's 2026 CMOM Report is included in this agenda packet. The CMOM program is designed to ensure the City's sanitary sewer collection system is properly managed, operated, and maintained. Program objectives include maintaining adequate system capacity, reducing infiltration and inflow (I/I), preventing sanitary s ewer backups and overflows, and protecting public health and the environment. The program establishes procedures for routine inspections, system cleaning, preventive maintenance, emergency response, asset management, and long-term capital improvement planning. Implementation of the CMOM program helps identify existing and potential infrastructure deficiencies, prioritize system improvements, maintain regulatory compliance, and support the long-term reliability of the City's wastewater collection system. DISCUSSION The 2026 CMOM Report documents the City's ongoing efforts to manage, operate, and maintain its sanitary sewer collection system in accordance with WDNR requirements. The report outlines current maintenance practices, infrastructure assessments, inspection activities, and improvement planning efforts aimed at maintaining system performance and reliability. Continued implementation of the CMOM program allows the City to evaluate system conditions, identify deficiencies, prioritize maintenance and capital projects, and address capacity concerns before they result in service disruptions. The program also supports proactive asset management and long -term planning for the sanitary sewer system. 14 Memorandum to Utility Advisory Board November 16, 2026 Page 2 CONCLUSION The City's continued implementation of the CMOM program is essential to maintaining a reliable, efficient, and sustainable sanitary sewer collection system. Through ongoing evaluation, preventive maintenance, infrastructure assessment, and capital improvem ent planning, the City can effectively address current system needs while preparing for future demands. Maintaining an effective CMOM program reduces the risk of sanitary sewer backups and overflows, helps protect public health and the environment, and ensures compliance with applicable WDNR regulations. Staff recommends acceptance of the 2026 CMOM Report and continued implementation of the City's CMOM program. 15 City of River Falls Capacity Management Operation Maintenance Sanitary Sewer Collection System 16 INTRODUCTION The Capacity Management Operation Maintenance (CMOM) document is a requirement of the Wisconsin Pollution Discharge Elimination Permit issued by the Wisconsin Department of Natural Resources to the City of River Falls. The goal of the CMOM program is to promote awareness of the sanitary sewer collection system and identify issues before they become a problem. The City of River Falls collection system consists of approximately 61 miles of gravity sanitary sewer main and 3 lift stations with accompanying force main. The collection system continues to expand as new areas around the City develop. The document is meant to be a reference for the operation of the sanitary sewer collection system. The Wisconsin Department of Natural Resources few has set up a 10-step program to cover all aspects of the collection system. The 10 parts of the CMOM program are: 1. Set you Goals. 2. Know your organization. 3. Understand your legal authority. 4. Operation & maintenance. 5. Design and performance standards. 6. Emergency overflow response plan. 7. Capacity assurance review. 8. Self-audit. 9. Special studies. 10. Compliance maintenance annual report. The following pages provide an overview of each step and the information required to fulfill the CMOM requirements. ORGANIZATION 1. Ownership and Governing Body Description – The City of River Falls is a Municipal Corporation with authority vested in the City Council and the Mayor, who is the Chief Executive Officer (CEO) of the City. River Falls, like many other cities under the Home- Rule Charter of Wisconsin, has the power to govern itself regarding local matters except where the State has specifically prohibited that power. The Mayor has the authority to perform executive responsibilities by monitoring the Administrator and various departments of the City government. As the City’s policy leader, the Mayor also holds veto power over Council actions. Along with the City Administrator, the Mayor represents the City with media relations, meetings and presentations to other governmental units. The Mayor is also responsible for appointing positions on certain boards, commissions, and committees within the City. The Mayor and City Council are the governing body for the City of River Falls. The Common Council Bylaws regulate the business and of the City Council by clarifying or summarizing City ordinances and policies or guiding the City Council in municipal matters. Except as otherwise provided by law, the City Council shall have the management and control of the city property, finances, highways, streets, utilities, and the public service. The Council may act for the government and good order of the city, for its commercial benefit, and for the health, safety, welfare, and convenience of the public. The Council consists of seven alderpersons, one member from each of the City’s four aldermanic districts, three at large, and the mayor. At Large alderpersons represent all districts. The City Administrator serves as the Chief Appointed Official (CAO) of the City. In order to provide a more efficient and effective government, the CAO is responsible for the direction and coordination of City employees and reports directly to the Mayor and City Council. The City Administrator provides assistance to the Mayor and City Council regarding policies and future planning, manages labor negotiations and 17 employee relations, provides overall management and direction of City departments and is the public information officer for the City. In addition, the City Administrator is the Executive Director of the River Falls Economic Development Corporation and works with area economic development organizations to bring industries to the city. 2. Organizational Chart – A flow chart is attached that shows the structure of the utility management. 3. Personnel and Position Descriptions – Complete and updated job descriptions for all positions in the utility are kept by the Human Resources Department. 4. Internal Communication Procedures – All employees are issued a cell phone by the City that is used for communication purposes. In emergency or call-out situations employees are generally notified in two ways. Customers call the utility number to report an emergency. During normal business hours the customer service desk is staffed, and they will call personnel to respond. After normal business hours the individual on-call team member is notified by Always Answer (a contract virtual receptionist services call facility). If Always Answer Customer Service Representative does not receive a response from the on-call personnel, the protocol for the representative is to continue down the on-call list until a response is received from a team member. This procedure is used for events such as basement backups or citizens reporting sanitary sewer overflows. The Utility uses a Supervisory Control and Data Acquisition (SCADA) system. SCADA is the use of many electronic monitoring nodes that are offsite and allow for access to critical utility system information. This information can be accessed remotely through computers and smart phones by our utility personnel to help identify and trouble shoot key electric, water and wastewater system functions. Our SCADA system monitors the lift stations. The system will call out an operator in the event of a pump failure, high wet well or electrical outage. The callout system works the same. The first call is to the operator on on-call standby team member, if there is no response the calls will continue down the on-call phone list until a response is received. During normal maintenance activities operators communicate with their cell phones. The utility also has portable two-way digital radios if cell reception is lost. 5. Public Information – Informational utility materials are available on the City and Utility websites, social media channels, utility billing inserts, mailings, and door hanger tags. The utility maintains a website and regularly post information for customers. Monthly bills are sent by mail or electronically, depending on the customer’s preference. Billing inserts may be included to provide additional information. Communication with individual customers occurs when issues arise that require specific instructions. 18 Collection System and WWTP On-Call List Name Title Work Phone Cell Area Tim Rixmann Lead/Operator 715-426-3468 715-222-4494 WWTP/Collection Joe Curran Operator 715-426-3468 715-441-6343 Collection Todd Decker Operator 715-426-3468 715-821-2236 Collection David Paynotta Operator 715-426-3468 715-821-9773 Collection Josh Penovich Operator/Lab 715-426-3468 715-222-7090 WWTP Bradley Vick Superintendent 715-426-3428 715-821-0201 Collection/WWTP Bill Swenson Operator in Charge (OIC) 715-426-3531 715-821-2788 WWTP Josh Penovich Lab/Operator 715-426-3468 715-222-7090 WWTP Kevin Westhuis Utility Director 715-426-3442 970-691-4040 Emergency Coordination Thomas Polkoski Operator 715-426-3468 715-821-6307 Collection Dean Seemuth Operator 715-426-3428 715-209-0403 Collection Brent Wiersma Operator 715-426-3428 715-821-9271 Collection Todd Nickleski City Engineer 715-426-3409 Engineering 19 20 GOALS The short- and long-term goals of the CMOM are established to ensure proper operation of the sanitary sewer collection system. They are geared to three main areas of focus. These areas include preventing basement backups, preventing sanitary sewer overflows and preventing hydraulic overloading at the wastewater treatment facility. Goals for the coming year (2026) • Clean 25% of the collection system. • Purchase a jetter/vacuum truck in the Capital Improvement Plan (CIP) funding 2030. • Use a budget of $187,250 budget to slip-line old clay tile sewer. • Use $160,000 in the CIP budget monies to rebuild failing manholes. Long term goals • Continue the program to slip line failing sewers and rebuild manholes. Line all clay pipe by 2040. • Correct the problem areas of the interceptor main from North Main St. to the Wastewater Treatment Facility (WWTF) In addition to the three main areas of focus the program will have other benefits. It will help improve system reliability, improve operator safety and help improve response to emergency situations. LEGAL AUTHORITY Legal authority is essential in maintaining an effective WWTF collection system. The ability to establish service charges adequately cover the cost of maintaining the collection system and providing for future replacement is necessary. Being able to enforce what types of wastes along with the volumes and strengths is key. It is important that we have the ability to plan and implement replacement work and new construction to connect future development. We need the capability for enforcement of illicit discharges and violations of the sewer use ordinance. 1. Sewer Use Ordinance – The ordinance should be a living, breathing document that is reviewed and update regularly. 2. Pretreatment Programs – Currently the City does not have any industrial permits in force. The sewer use ordinance provides the means to formulate a program or agreement. 3. Fat, Oil and Grease Control – Chapter 13.12.050 provides for the requirement for businesses to install grease interceptors. It also requires the facility to keep records of maintenance which may be reviewed by the City. 4. Illicit Discharges by Commercial and Industrial Users – Control manholes are required at commercial/industrial applications. These manholes provide a sampling location as well as an area to facilitate observation of the discharge. Connections to the sanitary system require a permit and are inspected prior to being placed in service. 5. Private Property Clear Water – Chapter 13.12.050 Section A prohibits discharge of clear water into the sanitary system. 6. Private Lateral Inspection – Chapter 13.04.030 gives City employees the authority to enter private property to enforce any provision of Chapter 13. Chapter 13.12.50 addresses surface and groundwater into private laterals. 7. Service and Management Agreements – The City has the authority to enter into agreements and contract for services. The City currently has an agreement with the City of New Richmond for emergency use of their jetter/vacuum unit. 8. Enforcement Action – Chapter 13.12.060 establishes fines for violation of Chapter 13 of the Municipal Code. The offender is also liable for damage to the WWTF and receiving river. In the event the offender does not pay for damages they will be subject to imprisonment. 21 SEWER USE ORDINANCE Chapter 13.12 - SEWER SERVICE SYSTEM* Sections: 13.12.010 - Definitions. Unless the context specifically indicates otherwise, the meaning of terms used in this chapter shall be as follows: "BOD" (denoting biochemical oxygen demand) means the quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure in five days at twenty (20) degrees G. expressed in milligrams per liter. "Building drain" means that part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste and other drainage pipes inside the walls of the building and conveys it to the building sewer, beginning two fee t outside the outside face of the building wall. "Building sewer" means the extension from the building drain to the public sewer or other place of disposal. "City" means the city of River Falls, Wisconsin, or the city council of said city. "Combined sewer" means a sewer receiving both surface runoff and sewage. "Garbage" means solid wastes from the domestic and commercial preparation, cooking and dispensing of food, and from the handling, storage and sale of produce. "Individual sewage disposal system" means a sewage disposal system, other than a public or community system, which receives sewage from an individual establishment. Unless otherwise indicated the word "system" as it appears in this chapter means "individual sewage disposal system". "Industrial wastes" means the liquid wastes from industrial manufacturing processes, trade or business as distinct from sanit ary sewage. "Person" means any individual, firm, company, society, association, corporation or group. "pH" means the logarithm of the reciprocal of the weight of hydrogen ions in grams per liter of solution. "Public sewer" means a sewer in which all owners of abutting properties have equal rights, and is controlled by public author ity. "Public Utilities Commission" means the utility commission acting for and in behalf of the city. "Sanitary sewer" means a sewer which carries sewage and to which storm, surface and groundwaters are not intentionally admitted. "Sewage" means a combination of the water-carried wastes from residences, business buildings, institutions and industrial establishments, together with such ground, surface and stormwaters as may be present. "Usual" or "normal" sewage shall be sewage that does not exceed two hundred fifty mg/liter of five day BOD and/or two hundred fifty (250) mg/liter of five day suspended solids and does not contain the substances prohibited in Section 13.12.050(B). "Sewage treatment plant" means any arrangement of devices and structures used for treating sewage. "Sewage works" means all facilities for collecting, pumping, treating and disposing of sewage. "Sewer" means a pipe or conduit for carrying sewage. "Sewer service charge" is a service charge levied on users of the wastewater collection and treatment facilities for payments of depreciation and debt service expenses, as well as operation, maintenance and replacement costs (O, M & R) of such facilities. (User charge, which covers O, M & R costs, is part of the Sewer Service Charge.) "Suspended solids" means solids that either float on the surface of, or are in suspension in water, sewage or other liquids a nd which are removable by laboratory filtering. "Shall" is mandatory; "may" is permissive. "Slug" means any discharge of water, sewage or industrial waste which in concentration of any given constituent or in quantit y of flow exceeds for any period of duration longer than fifteen (15) minutes more than three times the average twenty -four (24) 22 hour concentration of flows during normal operation. "Storm drain" (sometimes termed "storm sewer") means a sewer which carries storm and surface waters and drainage, but excludes sewage and industrial wastes, other than unpolluted cooling water. "User charge" is a charge levied on users of the waste-water collection and treatment facilities as part of the sewer service charge for payment of O, M & R costs of such facilities. "Utility administrator" means the administrator of the city, Wisconsin Municipal Utilities, or his or her authorized represen tative. "Watercourse" means a channel in which a flow of water occurs, either continuously or intermittently. "Wisconsin Pollutant Discharge Elimination System (WPDES) Permit" is a document issued by the Wisconsin Department of Natural Resources, which establishes effluent limitations and monitoring requirements for the municipal wastewater treatment facility. WPDES Permit No. WI-0029394-2 and modifications thereof pertain to the wastewater treatment facility in the city operated by the River Falls Public Utility Commission. (Prior code § 13.06(1)) 13.12.020 - Use of public sewers required. A. No person shall place, deposit, or permit to be deposited in any unsanitary manner on public or private property within the city or in any area under the jurisdiction of the city, any human excrement, garbage or other objectionable waste. B. Except as herein provided, no person shall construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of sewage. C. When property abuts upon any public street or alley along which sanitary sewer mains have been constructed, the owner of any dwelling or commercial establishment on the property shall install suitable toilet facilities therein and connect them with the sanitary sewer in accordance with the provisions of this title within ninety (90) days after the date of mailing or delivering official notice to do so. The notice shall be given to the owner or occupant in writing by the city clerk on order of the council. D. Whenever any owner or occupant fails to comply with such written notice, the council shall by resolution direct that a toilet be installed and connection made with the sewer system and that the cost of the installation be paid in the first instance out of the general fund and then assessed against the property benefited. E. After the installation and connection have been completed pursuant to council resolution, the clerk shall serve a written notice of the assessment upon the owner or his or her representative directing him to pay the assessment to the treasurer within ten (10) days after the service of the notice. If the assessment is not paid within ten (10) days, the clerk shall certify the amount to the county auditor for collection in the sane manner as other special assessments. The council may by resolution spread the assessment over a five-year period. (Prior code § 13.06(2)) 13.12.030 - Private sewage disposal. The latest edition of the Wisconsin Plumbing Code (Chs. COMM 51-57, Wis. Adm. Code) as established by the Wisconsin Department of Health and Social Services is adopted by reference and made a part of this chapter as if fully set forth herein . Before publication of this code of ordinances, the clerk shall mark at least one copy of this Wisconsin Department of Health and Social Services code as an official copy and file it in his office for use and examination. (Amended during Supplement #1; prior code § 13.06(3)) 13.12.040 - Building sewers and connections. A. No unauthorized person shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the city utility department. B. There shall be two classes of building sewer permits: 1. For residential and commercial service; 2. For service to establishments producing industrial wastes; 3. In either case, the owner or his or her agent shall make application on a special form furnished by the city. The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgment of the city building inspector. A permit and inspection fee shall be paid to the city at the time the application is filed, such fee to be an amount as currently on file in the city's sewerage rate schedule. C. All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer. D. A separate and independent building sewer shall be provided for every building; except where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard, or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer. E. Old building sewers may be used in connection with new buildings only when they are found, on examination by the 23 city utility department to meet all requirements of this title. F. The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city. In the absence of code provision or in amplification thereof, the materials and procedures set forth in appropriate specification of the A.S.T.M. and Standard Specifications for Water and Sewer Construction in Wisconsin. G. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer. H. No person shall make connection of roof downspouts, exterior foundation drains, areaway drains, or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. I. The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city, or the procedures set forth in appropriate specifications of the A.S.T.M. and the Standard Specifications for Water and Sewer Construction in Wisconsin. All such connections shall be made gastight and watertight. Any deviation from the prescribed procedures and materials must be approved by the city utility department before installation. J. The applicant for the building sewer permit shall notify the city utility department when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the city utility department. K. All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city. (Prior code § 13.07) 13.12.050 - Sewer system general regulations. A. Discharge of Surface Water. No person shall discharge or cause to be discharged any storm water, surface water, groundwater, cooling water, or unpolluted industrial process waters into any sanitary sewer. No rain spout or other form of surface drainage and no foundation drainage shall be connected with any sanitary sewer. B. Nonacceptable Wastes. No person shall discharge or permit to be discharged into any public sewer any of the following wastes: 1. Any liquid or vapor having a temperature in excess of one hundred eighty (180) degrees Fahrenheit, which shall be discharged into the sewer for a period of over ten (10) minutes; 2. Any water or water having a five-day biological oxygen demand exceeding one thousand (1,000) parts per million by weight as averaged during any twelve (12) month period; 3. Any gasoline, benzene, naptha, fuel oil, lubrication oil, or other flammable or explosive liquid, solid or gas; 4. Any garbage that has not been properly shredded; 5. Any ashes, cinders, sand, mud, straw, shavings, meta, glass, rags, feathers, tar, plastics, wood, manure, grit, brick, cement, onyx, carbide, or other matter that may interfere with the proper operation of the sewers or sewage treatment plant; 6. Any water or waste having a pH lower than 5.5 or higher than 9.5 or having any other corrosive property capable of causing damage or hazard to structures, equipment or personnel of the sewage works; 7. Any water or waste containing a toxic or poisonous substance in sufficient quantities to constitute a hazard to humans or animals, injure or interfere with a sewage treatment, or create any hazard in the receiving waters of the sewage treatment plant; 8. Any noxious or malodorous gas or substance capable of creating a public nuisance; 9. Any waters or wastes containing strong acid iron pickling wastes, or concentrated plating solutions whether neutralized or not; 10. Any waters or wastes containing iron, chromium, copper, zinc and similar objectionable or toxic substances; or wastes exerting an excessive chlorine requirement, to such degree that any such material received in the composite sewage at the sewage treatment works exceeds the limits established by the city utilities department for such materials; 24 11. Materials which exert or cause unusual BOD, chemical oxygen demand, or chlorine requirements in such quantities as to constitute a significant load on the sewage treatment works, and unusual volume of flow or concentration of wastes constituting "slugs" as defined herein; 12. Waters or wastes containing substances which are not amenable to treatment or reduction by the sewage treatment processes employed, or are amenable to treatment only to such degree that the sewage treatment plant effluent cannot meet the requirements of other agencies having jurisdiction over discharge to the receiving waters; 13. Any toxic inconsistent with the requirements of the Clean Water Act of 1977; 14. The city shall comply with all the requirements of WPDES Permit No. WI -0029394-2 and all modifications thereof. No discharge shall be allowed into the sanitary sewerage system that is in violation of the requirements of the WPDES permit and the modifications thereof. C. Control of Industrial Wastes. 1. If any waters or wastes are discharged, or are proposed to be discharged to the public sewers, which waters contain the substances or possess the characteristics enumerated in subsection B of this section, and which in the judgment of the city may have a deleterious effect upon the sewage works, processes, equipment, or receiving waters, or which otherwise create a hazard to life or constitute a public nuisance, the city shall: a. Reject the wastes; b. Require pretreatment to an acceptable condition for discharge to the public sewers; c. Require control over the quantities and rates of discharge; and/or d. Require payment to cover the added cost of handling and treating the wastes not covered by existing taxes or sewer charge under the provisions of subsection F of this section. 2. Pretreatment Equipment. If pretreatment or equalization of waste flows is permitted, the design and installation of the plants and equipment shall be subject to the review and approval of the city utilities department, and subject to the requirements of all applicable codes, ordinances and laws. Where preliminary treatment or flow-equalizing facilities are provided for any waters or wastes, they shall be maintained continuously in satisfactory and effective operation by the owner at his or her expense. 3. Report Required. Within three months after February 24, 1981, each person who discharges industrial wastes to a public sewer shall prepare and file with the city a report that shall include pertinent data relating to the quantity and characteristics of the waste discharged to the wastewater works. The following forms or the information needed to complete them will be accepted: a. Annual NR 101, Effluent Reporting Form; b. Form 3400-28, Industrial Waste Contribution to Municipal System. 4. New Connection Report. Each person desiring to make a new connection to a public sewer for the purpose of discharging industrial waste shall prepare and file with the city a report that shall include actual or predicted data relating to the quantity and characteristics of the waste to be discharged. This discharge shall comply with the requirements of WPDES Permit No. WI-0029394-2. 5. Request for Extension. When it can be demonstrated that circumstances exist which would create an unreasonable burden on the person to comply with the time schedule imposed above, a request for extension of time may be presented to the city for consideration. D. Control Manhole Required. When required by the city utilities department the owner of any property serviced by a building sewer carrying industrial wastes shall install a suitable control manhole together with such necessary meters and other appurtenances in the building sewer to facilitate observation, sampling and measurement of the wastes. Such manhole, when required, shall be accessibly and safely located, and shall be constructed in accordance with plans approved by the city. The manhole and/or other sampling equipment shall be installed by the owner at his or her expense and shall be maintained by him or her so as to be safe and accessible at all times. E. Measurement Procedures. All measurements, tests and analyses of the characteristics of waters and wastes to which reference is made in this title shall be determined in accordance with the latest edition of "Standard Methods for the Examination of Water and Wastewater" published by the American Public Health Association, and shall be determined at the control manhole provided, or upon suitable samples taken at the control manhole. F. Special Cases. 1. No statement contained in this article shall be construed as preventing any special agreement or arrangement between the city and any industrial concern whereby an industrial waste of unusual strength or character may be accepted by the city for treatment, subject to payment therefor, by the industrial concern. 2. Whenever it is determined that any lot, parcel of land, building or premises is discharging industrial wastes of unusual volume, concentration or character, or of greatly variable volume, the utilities administrator shall recommend the adoption of a special rate for such class of users, taking into consideration the volume, biochemical-oxygen-demand value, and suspended solids content of the industrial wastes, and the nature of the use made of the sewer system, but industrial sewer service rates will not be changed or adopted as original rates except by resolution of the city utility commission. G. Grease and Sand Interceptors. Grease, oil and sand interceptors shall be provided when the city determines they are necessary for the proper handling of liquid wastes containing floatable grease in excessive amounts, as specified in subsection F of this section or any flammable wastes, sand or other harmful ingredients. Such interceptors shall not be required for private living quarters or dwelling units. All interceptors shall be of a type and capacity approved by the city and shall be located as to be readily and easily accessible for cleaning and inspection. In the maintaining of these interceptors, the owner of these interceptors shall be responsible for the proper removal and disposal by appropriate 25 means of the captured material and shall maintain records of the dates and means of disposal which shall be subject to review by the city. Disposal of the collected materials performed by the owners personnel or agent must be in accordance with currently acceptable Department of Natural Resource practice. H. New Connections. New connections to the city's sanitary sewer system will be allowed only if there is available capacity in all the downstream wastewater collection and treatment facilities. (Prior code § 13.08) 13.12.060 - Violations—Penalties. A. Any person found to be violating any provision of this chapter (except Section 13.12.040(A)) shall be served by the city with written notice stating the nature of the violation and providing a reasonable time limit for the satisfactory correction thereof. The offender shall, within the period of time stated in such notice, permanently cease all violations. B. Any person who shall continue any violation beyond the time limit provided for in subsection A of this section, or any person violating Section 13.12.040(A) shall upon conviction thereof be subject to a forfeiture of not less than one hundred dollars ($l00), nor more than five hundred dollars ($500) per offense, together with the costs of prosecution and shall be liable for any expenses resulting from damage to the treatment plant or receiving river, and in the event such forfeiture and costs are not paid, to imprisonment. Each day in which any such violation shall continue shall be deemed a separate offense. (Prior code § 13.10 (part)) Operation & Maintenance Maintenance is an essential part of a properly functioning collection system. Cleaning and clearing the sanitary sewer system of obstructions is essential to preventing basement backups and sanitary sewer overflows. Targeting maintenance activities to areas with the greatest concern is essential to using the maintenance budget in the most effective way. Sewer line televising and manhole inspections are two effective ways to achieve this. Record keeping for sewer backups can help target areas that need more attention. Listed below is maintenance activities performed by the utility to help ensure proper operation of the collection system. 1. Cleaning – Currently the City contracts out the cleaning of the sanitary sewer lines. The entire system is scheduled to be cleaned once every four years or approximately 25% of the system per year. Some problem areas with flat or improperly pitched pipes require more frequent cleaning. 2. Root Removal – Problem areas for root penetration into the sanitary pipe have been identified. Approximately 15% of the system has roots that require attention. Depending on the severity these areas may need to have a root saw run through yearly. 3. Flow Monitoring – Flow monitoring has been performed sporadically in the collection system. 4. Sewer Line Televising – Televising the sanitary system is an effective tool for determining areas of pipe that need to be repaired. It can also help to identify areas of surcharging by looking at flow lines on the pipe. The utility is currently inspecting about 3% of the collection system per year. Older areas of the system are being targeted. Televising is also an effective tool for locating sanitary sewer service connections at the main. The City also budget in 2027 $125,000 in CIP monies for replacement of equipment in 2027. 5. Manhole Inspections/Air Release – Inspections are performed on 10 – 15% of the manholes per year. Things to look for is any infiltration into the manhole, excessive solids accumulation, condition of inverts and bench, condition of walls especially brick manholes and the condition of the casting. Inspection of all force main air relief will be conducted quarterly. 6. Manhole Rehabilitation – Presently we have a $160,000 CIP budget for rehabbing existing manholes. Projects include rebuilding manhole benches, lining brick manholes, grouting to eliminate inflow and placement of chimney seals. 7. Mainline Rehabilitation - $187,250 CIP monies for 2027 for lining sewer and replacement of pipes that are too damaged to line. A grading system has been established to make sure the pipe requiring the most attention is put at the top of the list. 8. Private Sewer Inspections – Private sewer connections are inspected at the sewer main when main line televising is performed. During meter change outs and building inspections sewer services are checked for clear water discharge such as sump pump connections. 26 9. Private I/I Removal - If a sump pump or roof drain is connected to the sanitary sewer the City has the authority to have the clear water discharge disconnected. The City has not established a program for lateral inspection remediation. 10. Lift Station Operations & Maintenance (O&M) – Lift stations are constantly monitored through a SCADA system. Callout procedures are in place for pump failure and high wet well alarms. Lift station maintenance is performed monthly or more frequently if the need arises. Maintenance manuals are kept for all of the lift stations. 11. All O&M Manuals – All O&Mfor the WWTF are located in the storage room off of the lab, Lift Station manuals are located in the Superintendents office. 12. WWTF Continuous Operation with Limited Downtime - The continuous operation of the WWTF with limited downtime can not be stressed enough, to reduce downtime the following list of objectives shall be followed and updated as needed moving forward. They are as follows. a. Create a list of critical parts needed to facilitate repairs that may occur at anytime of the day or week that are special order or have long lead times when ordered. b. Perform an audit of spare parts once a year and update and order any parts that are needed c. The fore mentioned parts list and descriptions of Critical equipment shall be in the plants Maintenance SOP. 27 River Falls Sanitary Main Dashboard 2025 28 29 Sanitary Sewer Inspection Form Policy Date: July 29, 2015 RF_MH_ID: Inspected By: Inspection Date: Give each a box a +, --, or N/A designator to determine condition of each component, then assign a 1-5 rating for each of the 5 components. Summate at bottom, find final grade. Pavement Cracks Fractures Casting Offset Height variance Score Casting /5 Adjustable casting? ______ Open pick holes? _____ Internal gasket? ____ Cracks Fractures Softening of mortar Score Rings /5 Can you see internal wire structure? _____ Is the entire ring gone? _______ Cracks Fractures Softening of mortar Infiltration Score Riser/Chimney /5 What is this section made of? _______________ Cracks Fractures Softening of mortar Presence & condition of steps Score Base x2 multiplier ___________/10 What is this section made of? Bricks ____ Blocks _____ Precast _____ Is there a dropped line? If so: External ____ Internal ____ Any laterals coming in? Direction _____ Private/Public _____ Cracks Fractures Trough condition Doghouse condition Debris Total Floor /5 Is there anything on the floor that shouldn’t be there? ______ Comments: Total Score: ___/30 1 – Excellent Condition 2 – Acceptable condition for the coming years 3 – Needs to be addressed within 3-5 years 4 – Risk of collapse or failure imminent 5 – Collapsed Inspection Rating Key 6-10 points: 1 11-15 points: 2 16-20 points: 3 21-25 points: 4 26-30 points: 5 Urgency Scale (Circle One) None – no urgency Low – address next 3-5 years High – address this year Entry Required? _______ 30 Sanitary Sewer Statistics The predominant materials that make up the gravity collection system are clay tile and PVC pipe. Most new construction is PVC pipe. Polyethylene is used in boring applications and ductile is used when extra strength is required. Clay tile was the material of choice in installations into the late 1970’s. Most of the issues with pipe in the collection system involve clay tile. Improper installation techniques and root protrusion into the joints are the main issues. The city has stepped up efforts to line the failing clay tile sewers. In 2025 approximately 3,500 feet of clay pipe was lined. The City also has approximately 12,000 feet of force main. Force main transmits the sewage from the lift stations to the gravity sewer. The force main ranges from 4” – 8” in diameter and consist of cast iron, ductile iron and plastic pipe. Plastic is the predominant material compromising 83% of the force main. The older areas of the system were set up to transport all the sewage by gravity. The force mains are comparatively new as they were put in when the system expanded from its original boundaries. Two of the lift stations have the potential for removal along with the accompanying force mains. The Kinnickinnic and Woodridge lift stations have the potential to run to the existing gravity sewer system without pumping. Design and Performance Standards Design and performance standards ensure work done on the collection system is performed properly according to state and local standards. A variety of sources are used to ensure work is completed in accordance with these standards. 1. State Plumbing Code – SPS 382 is followed for all industrial, commercial and residential plumbing installation. State approved plans for industrial and commercial buildings must be submitted before any permits are issued. 2. Wisconsin Department of Natural Resources Code – As required by code plans are submitted to the WDNR for approval. 3. Local Municipal Code – The city maintains a variety of specifications on design and maintenance of the sanitary system. 1. Specifications for cleaning and televising. 2. Specifications for lining. 3. Specifications for construction of collection systems. 4. Specifications for manhole rehabilitation. Collection system design work is contracted out to private engineering firms under the guidance of the City of River Falls engineering department. Private firms do the design and submit the application for approval to the WDNR. 121,872 87,596 21,708 13,867 80,766 66,725 89,560 120,323 25,136 11,425 13,329 6,080 9,830 17,855 26,310 17,600 20,169 19,042 7,617 379 1,575 1,116 1,096 2018 2019 2020 2021 2022 2023 2024 2025 COLLECTION SYSTEM MAINTENANCE Cleaning Televising Root Removal 31 Inspection of collection system construction is performed by contracted services and city personnel. To facilitate the use of best practices a preconstruction meeting will be held. The design engineer, city staff and the project foreman for the contractor doing the work shall attend the meeting. The meeting shall cover special provisions, precautions, expectations and any other information pertinent to the project. A meeting prior to certain construction operations involving the project foreman for the contractor, contracted employees performing the work, on-site inspector and city staff will be held. The operations involve but are not limited to, sanitary sewer bypass, sewer reconstruction and any work being done immediately adjacent to active sanitary sewer infrastructure. The meeting will cover scope of work involved; contractors plan to complete the work, proper means and methods for performing the work and contingency plans in case of emergency. Following installation, the sewer lines are pressure tested and televised. Upon completion, notes are added to the plan set and record drawings are prepared. Commercial and industrial facilities must submit plans and specifications for private laterals to the city for approval. The applications are reviewed by the engineering department and utility personnel before building permits are issued. City staff inspects the installation. Residential laterals are covered by state plumbing code and city code. Personnel from engineering and the utility inspect the installation and prepare record drawings. Additions to the collection system, lateral installations, televising reports and sewers that have been lined are put into the cities ARC View mapping system. Emergency Overflow Response Plan 1. Alarm System and Routine Testing – The utility operates 3 lift stations all with audible, visual and telemetered alarm systems. The audible and visual alarms at the lift stations are checked monthly. The telemetered system or SCADA control also gives pump run times to catch pumping issues before they become a problem. The SCADA system is checked daily. If the SCADA system registers an alarm it dials out to the operator on standby. It continues down the list of personnel until someone is contacted. A 2019 upgrade of the SCADA systems planned to provide redundant level sensing systems. 2. Emergency Equipment – A complete list of all emergency equipment can be found in the emergency response plan. In addition to city owned equipment the utility has partnerships with contractors that have additional equipment not in the city inventory. United Rentals (651) 294-2380 and United Rental Pump Solutions (952) 562-1555 have portable generation and pumping equipment. A complete list of equipment can be found at UnitedRental.com. 3. Emergency Procedures – The City is currently reviewing its emergency preparedness plans for the wastewater treatment plant and the collection system. The types of emergencies vary from basement backups to lift station failures. It is important that procedures exist to minimize the effects of collection system failures. The plan prioritizes actions to take in order to respond to situations effectively. Emergency situations can be brought on by a variety of factors. Natural disasters, power outages and equipment failure are all potential problems. Many of the same procedures apply for varied causes. Sewer Overflow Emergency Response Plan Purpose The City of River Falls owns and operates a collection system that consists of lift stations, gravity flow sewer mains and pressure force mains. These facilities are well maintained and normally would not result in sanitary sewage overflows (SSO). The possibility does exist those unforeseen accidents, equipment failures, plugged lines, major weather events and other situations could result in sewer overflows or spills. The focus of this plan is to minimize the effects of an overflow when they do occur. This will help reduce public health hazards, prevent property damage and limit environmental impacts. 32 DNR Notification Within 24 hours the Wisconsin Department of Natural Resources needs to be notified a sanitary sewer overflow took place. The district engineer should be notified by phone or email. The current district engineer is Adebowale Adesanwo at 715-492-4047 or email at adebowale.adesanwo@wisconsin.gov. Identify the volume and location of the spill and if any waterway is affected. Within 5 days, fill out the required paperwork and submit to the WDNR. Public Notification Depending on the location and degree of the spill the level of public notification can vary. Small spills that can be contained should be cordoned off and controlled by personnel or signs posted telling the public to avoid the area until it is cleaned up. Direct notification of those affected should take place. These would generally be confined to small areas or areas where there is little or no public use. If it is determined the overflow made it to a body of water the level of public notification increases. The minimum level of notification would be sending a notice to a local paper. Public notice should take place as defined by the Wisconsin DNR “by common sense for the common good”. The utility director will determine the level of notification based on the situation. A list of media contacts is attached. In addition to outside media the utility also maintains a website and has a Facebook page for contacting community members. City Hall and the River Falls Public Library have public notice boards for posting. The public notification should include site of the spill, any water bodies that may be affected and what steps the public can take to minimize their risk. The method of publication needs to be documented on the SSO form for the WDNR. Notification Procedure Notifications of potential SSO events from the public go to the customer service department at the utilities. After hour calls are routed to a 24 hr.-receptionist service. In either event an operator is contacted to respond to the SSO. Internal Notification Procedure When it is determined a SSO has occurred the individual investigating the overflow should contact the wastewater superintendent. In the event the wastewater superintendent does not respond one of the lead operators should be contacted. The wastewater superintendent or responding lead operator will be responsible for notifying the utility director. Remediation Procedure When a collection system supervisor receives notification of a possible SSO they will gather as much information as possible, formulate a plan of action and determine what staffing and equipment is needed to respond to the overflow. The following sections cover potential events that may cause an SSO as well as actions that should be taken in the event of an overflow. Traffic and Crowd Control When responding to an SSO event staff will need to assess the situation and prevent the public from encountering the overflow. 1. Use traffic control, barricades and warning tape. 2. Wear proper high visibility clothing approved for night work. Mainline Blockage 1. Determine location of blockage by checking downstream manholes to look for backed up sewage. 2. Secure the area using barricades, warning tape and traffic control. 3. Work to contain the overflow. 4. If the blockage can be removed quickly this is the most effective means of stopping the overflow. 5. If necessary, use the Vac Truck to pump out the manhole or use a bypass pump to pump to the next manhole downstream of the blockage. 6. Geo logs can be used to contain the spill area. 7. Use the Vac Truck to remove the blockage. Go in the manhole directly downstream of the blockage. Use a cleaning nozzle with a front jet made for removing blockages. a. Once the blockage has been removed vacuum up as much of the overflow as possible using the Vac Truck. Use any other methods available to recover as much of the sewage as possible. 8. Once the cleanup has been completed document any property damage and take photographs. 9. Notify any customers affected by the SSO that the situation has been resolved. Refer questions of liability or payment to the utility director. 33 10. Before leaving the area re-check manholes along the affected area to make sure the situation has been fully resolved. Force Main Failure 1. Isolate the leaking force main. The pump station feeding the force main will need to be shut down and arrangements made to pump the wet well of the lift station. Use the city owned Vac Truck and contact contract pumpers if necessary. A list of manholes to discharge by each lift station is attached. 2. In situations where a long-term shutdown is required contact American Pump. They maintain 24-hour service for pumping equipment. The contact information is enclosed. 3. The same method for notification and cleanup for main line blockage should be used. Pump station failure 1. The City maintains SCADA alarm notification at all lift stations. An alert will be sent for high water level, power failure and loss of communication. The operators also monitor the pump runtimes daily to detect any pump issues such as ragging or excessive runtimes. 2. In the event of a power outage the city has one mobile power generation units for providing backup power. Instructions for operation and connection are located on each generator. When a power outage is reported to an operator, they need to decide on how long the outage will be and monitor the wet well at the effect lift station. 3. In the event of a pump failure the same procedure would be used to pump the wet well as in a force main failure. The emergency pumping would continue until the lift station pumps are fixed. Training All new employees spend a minimum of 3 months working at the WWTF with experienced operators. They will become proficient in the lab, and familiar with the operations of the WWTF. They also have three years to acquire the relative DNR certifications. 4. Mutual Aid Agreements – The City does not have any written mutual aid agreements. The city does have a working agreement with the City of New Richmond and Hudson to provide emergency service with their jetter/vacuum truck for sewer blockages in the event our truck is not operational. The city also has access to several contractors that provide varied services. Here is a list of equipment that the City always has available. Equipment Description Make Department Location Sewer Combination Truck 2007 Vactor Sewer WWTP 4” Trash Pump AMI Sewer WWTP Sewer camera Aries Sewer WWTP 100kW Generator Cat Collection PW Garage 15 kW Generator Onan Collection PW Garage Loader/Backhoe Volvo Shared PW Garage Utility Vehicle John Deere Sewer WWTP Utility Vehicle Polaris Sewer WWTP 80’ suction hose Sewer WWTP Loader John Deere Streets PW Garage 4 chainsaws Stihl Streets PW Garage 2” Trash Pump Water PW Garage Mini Excavator Cat Shared PW Garage 34 Trailer Vac Vac-tron Streets PW Garage Trencher Ditch Witch Electric PW Garage 2” Dewatering Pump American Water PW Garage Discharge hose 100 ft Water PW Garage 3500 W generator Honda Water PW Garage 5. Communication Notification – The Superintendent or Utility Director are responsible for notifying the WDNR. In their absence it is the responsibility of the Lead Operator. Any public or media communication will be handled by the Utility Director or City Administrator. In their absence the Superintendent will be responsible. In an emergency the superintendent will direct the lead operators in action needing to be taken. The superintendent with the assistance of the lead operators will direct and inform the operators on the course of action to pursue. In the absence of the superintendent the lead operators will be responsible in pursuing a plan of action under the direction of the utility director. It is important all personnel are prepared in the event of an emergency. Time is crucial in preventing a major disaster and employees need to know the course of action to take. 6. Lessons Learned - Implementing a consistent and proactive preventive maintenance program can reduce the risk of sewer backups, sanitary sewer overflows, and equipment failures. Establishing and maintaining a structured preventive maintenance schedule for sewer mains, lift stations, and other critical wastewater collection system assets will help improve system reliability, identify potential issues early, and support effective long- term asset management. Capacity Assurance Review Capacity assurance helps to determine if the collection is adequate to support new connections. It also includes a review of the current system to help identify trouble spots that need improvement or repair. Maintenance programs can be geared to the areas with the greatest need. 1. Current and Up-to-Date Sewer Maps – The utility uses Arc-View mapping system. The system allows for mapping of the entire collection system. The program allows for constant updating of the collection system maps. Log sheets and maintenance date can be loaded into the system to make them easily accessible. Video from collection system televising can be loaded to the corresponding area of the collection system and is readily accessible with the Arc-View system. 2. Sewer System Plans and Specifications- Sanitary sewer system plans are prepared by registered engineers and submitted to the WDNR for approval. Plans are prepared to WIDNR specifications. The city also maintains specifications for various install and maintenance procedures dealing with the collection system. 3. Manholes – The collection system maps in Arc-View show manhole location and the individual number. Quite a few of the manholes have GPS coordinates assigned to them, and more are being added all the time. 4. Lift Stations – Maintenance manuals are kept for the city’s five lift stations. The gallon per minute capacity of the lift pumps is recorded along with wet well capacity. Televising has detected deficiencies in the collection system. The annual slip lining and manhole rehabilitation program are meant to address these. Areas that need frequent cleaning and root removal are identified and addressed during the yearly maintenance cycle. The Compliance Maintenance Annual Report attached to the end of the document identifies the categories of concern. 35 SELF AUDIT CHECKLIST DATE REPAIR/REPLACE/IMPROVEMENT INITIALS 36 Annual Self-Audit The success of the CMOM program depends on auditing the program on a yearly basis. The successes and failures need to be tracked to provide a path forward. The utility has for a number of years tracked maintenance progress in the collection system. A record of feet of main cleaned and televised has been tracked on an annual basis. Manhole rehabilitation and slip lining of sewer main have been documented as well. The Compliance Maintenance Annual Report (CMAR) is a good resource for evaluating the CMOM program. The attached collection system portion of the CMAR shows all the maintenance activity as well as problems that occurred over the last year. Once the data has been entered into the CMAR a graph is generated making tracking easy for various indicators of collection system performance. The CMAR will track indicators such as influent/infiltration, sanitary sewer overflows, basement backups, equipment and pipe failure and complaints. Annual maintenance activity is also documented in the CMAR. The final step in the annual collection system audit is to measure progress achieving established goals. Yearly and long-term goals have been established for ongoing maintenance and rehabilitation of the system. The collection system audit will direct time and resources to areas of the collection system needing the greatest attention. The idea is to balance resources over a number of years to minimize emergency repairs and have the collection system perform to required standards. Special Studies In 2009 Ayres & Associates completed a study of the River Falls sanitary sewer system. The study was done to evaluate current and future capacity of the collection system. Several projects were looked at to improve current operation and prepare for future additions. The report recommended the city establish a budget of $100,000 per year to line clay sewer pipe. The budget was implemented and has since grown to $160,000. The study also identified problem areas along the north interceptor line. In 2016 the city retained TKDA engineering to do an in- depth study of line that will eventually increase capacity to the north end of the system and eliminate a lift station. Compliance Maintenance Annual Report The Compliance Maintenance Annual Report (CMAR) began in 1987 as a way to help wastewater treatment plants and collection system prevent degradation of the water quality and violations permitted effluent limits. It is a web- based self-evaluation and grading system for domestic wastewater treatment and collection facilities. The CMAR helps promote awareness and responsibility for wastewater collection and treatment needs and maximizes the useful life of the facilities. The questions in the CMAR help operators focus their attention on the most pressing needs for their system. Time and finances can be directed to areas where there is the greatest need. It is meant to improve operation and maintenance and initiate formal planning and design for future needs. The structure and grading system is designed to bring awareness and understanding to local governing officials about wastewater capital and management needs. It also fosters communication between local government officials, operators and the Wisconsin Department of Natural Resources (WDNR) to work cooperatively in assuring the continued successful operation of the wastewater collection and treatment facilities. The governing body reviews and passes a resolution approving the CMAR before it is submitted to the WDNR. A grade of C or lower requires comment or an action plan by the system to address problems or deficiencies in the operation. Owners of treatment facilities and collection systems are required by Wisconsin Administrative Code Chapter NR 208 to electronically submit a CMAR on an annual basis. The next page shows the 2025 CMAR for the River Falls collection system. 37 38 2026 Monthly Budget vs Actual Charts $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 Electric Fund 610 - 2026 Monthly Budget vs Actual 2026 - Monthly Budget 2026 - Monthly Revenue 2026 - Monthly Expense *Does not include Capital Expeditures or Revenues Report as of 10/29/26 *January and February 2026 WPPI Energy Expenses hit in March $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 2026 $17,434,500 $14,217,759 $11,696,591 Electric Fund 610 - 2026 Budget to Actual Annual Budget Total Revenue Total Expense Report as of 10/29/26*Does not include Capital Expeditures or Revenues *March includes debt service payment 39 $- $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 $400,000 $450,000 $500,000 Water Fund 620 - 2026 Monthly Budget vs Actual 2026 - Monthly Budget 2026 - Monthly Revenue 2026 - Monthly Expense Report as of 10/29/26 *Does not include Capital Expeditures or Revenues *April includes debt service payment $- $500,000.00 $1,000,000.00 $1,500,000.00 $2,000,000.00 $2,500,000.00 $3,000,000.00 $3,500,000.00 2026 $3,308,837.00 $3,030,307.81 $2,100,824.37 Water Fund 620 - 2026 Budget vs Actual Annual Budget Total Revenue Total Expense Report as of 10/29/26*Does not include Capital Expeditures or Revenues 40 $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 Waste Water Fund 630 - 2026 Monthly Budget vs Actual 2026 - Monthly Budget 2026 - Monthly Revenue 2026 - Monthly Expense Report as of10/29/26 *Does not include Capital Expeditures or Revenues $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 2026 $3,756,000 $3,397,731 $2,807,866 Waste Water Fund 630 - 2026 Budget vs Actual Annual Budget Total Revenue Total Expense Report as of 10/29/26*Does not include Capital Expeditures or Revenues *February and August include debt service payments 41 $- $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000 $80,000 Storm Water Fund 640 - 2026 Monthly Budget vs Actual 2026 - Monthly Budget 2026 - Monthly Revenue 2026 - Monthly Expense Report as of 10/29/26*Does not include Capital Expeditures or Revenues $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 2026 $653,000 $548,177 $372,520 Storm Water Fund 640 - 2026 Budget vs Actual Annual Budget Total Revenue Total Expense Report as of 10/29/26*Does not include Capital Expeditures or Revenues 42 2026 Electric, Water, Wastewater, and Storm Sewer Unrestricted Fund Balance 43 Electric, Water, Wastewater, and Mann Valley Debt (Bonds) Fund Name Name What for Estimated Payoff Year Principal Payments Made Principal Payments Remaining Principal Paid Remaining Principal Total Debt Estimated Interest Electric Utility Fund Electric Revenue Bonds Series 2018B Power Plant Substation 2028 8 2 1,925,000$ 575,000$ 2,500,000.00$ 459,439.72$ Electric Utility Fund 2020 WPPI Energy for $500K 2020 WPPI Energy for $500K 2030 6 5 266,667$ 233,333$ 500,000.00$ -$ Water Utility Fund Water System Revenue Bonds 2011A Well House #6 and North Zone Booster Station 2031 14 5 1,420,000$ 705,000$ 2,125,000.00$ 944,046.70$ Water Utility Fund WI Water System Revenue Bond 2022D North Loop Water Extention, North Water Tower, & Re-Finance 2011A Bond 2042 4 16 645,000$ 4,200,000$ 4,845,000.00$ 2,331,245.18$ Waste Water Utility Fund Sewerage System Revenue Bonds 2016A WWTP Upgrades to Sludge Handling & Storage (DAFT Building) 2036 10 10 1,855,000$ 2,655,000$ 4,510,000.00$ 1,463,472.50$ Waste Water Utility Fund General Obligation Sewerage Bonds 2022C North Interceptor Sewer Extension and North Loop Project 2042 3 17 492,000$ 3,735,100$ 4,227,100.00$ 2,043,689.58$ Waste Water Utility Fund General Obligation Sewerage Bonds 2023A Biosolids Facility 2043 1 17 195,000$ 8,470,000$ 8,665,000.00$ 5,371,572.51$ Mann Valley Fund General Obligation Corporate Purpose Bonds 2023A Mann Valley Sewer, Electric, & Streets 2043 3 17 970,000$ 8,780,000$ 9,750,000.00$ 5,174,994.09$ Mann Valley Fund WI Water System Revenue Bond 2023D Mann Valley Capital Water Extension Costs 2028 0 1 - $ 4,933,000$ 4,933,000.00$ 1,147,039.98$ $- $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 $8,000,000 $9,000,000 2020 WPPI Energy for $500K Power Plant Substation Mann Valley Capital Water Extension Costs Mann Valley Sewer, Electric, & Streets Biosolids Facility North Interceptor Sewer Extension and North Loop Project WWTP Upgrades to Sludge Handling & Storage (DAFT Building) North Loop Water Extention, North Water Tower, & Re- Finance 2011A Bond Well House #6 and North Zone Booster Station Electric Utility Fund Mann Valley Fund Waste Water Utility Fund Water Utility Fund Bond Repayment Financials Sum of Principal Paid Sum of Remaining Principal Sum of Estimated Interest 44 0 2 4 6 8 10 12 14 16 18 2020 WPPI Energy for $500K Power Plant Substation Mann Valley Capital Water Extension Costs Mann Valley Sewer, Electric, & Streets Biosolids Facility North Interceptor Sewer Extension and North Loop Project WWTP Upgrades to Sludge Handling & Storage (DAFT Building) North Loop Water Extention, North Water Tower, & Re-Finance 2011A Bond Well House #6 and North Zone Booster Station Electric Utility Fund Mann Valley Fund Waste Water Utility Fund Water Utility Fund Principal Payments Made vs Remaining Sum of Principal Payments Made Sum of Principal Payments Remaining 45 Capital Expense Tracking Fund Capital Project Name Previous Years Spend Budget January February March April May June July August September Total Spent 610 Transformers 275,000$ 28,225 $ - $ - $ - $ - $ 4,000 $ - $ 43,214$ 19,953 $ 95,392 $ 610 Fault Indicator 12,500$ 11,207 $ - $ - $ - $ - $ - $ - $ - $ - $ 11,207 $ 610 Inventory Mater -$ 14,344 $ 166,320$ - $ - $ 2,784 $ 14,201$ 60,050 $ - $ 36,911 $ 294,610 $ 610 Stores & Minor -$ 6,605 $ 7,821 $ - $ - $ - $ 1,245 $ 2,400 $ 951$ 2,236 $ 21,257 $ 610 Work Orders -$ - $ 7,150 $ - $ - $ 928$ - $ - $ - $ - $ 8,078 $ 610 Vehicle - Elect Worktruck Replacement 55,000$ - $ - $ - $ - $ - $ - $ - $ 47,316 $ - $ 47,316 $ 610 Vehicle - Digger Truck Replacement -$ - $ 466,481$ - $ - $ - $ - $ 12,886 $ - $ - $ 479,367 $ 610 Electric Capital -$ - $ 6,815 $ - $ - $ - $ - $ - $ - $ - $ 6,815 $ 610 Public Works Building Improvements 50,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Highview #1 400,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Street Lights @ Whitetail Ridge Corp Park 314,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Distrubution System Improvements 210,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Electric Underground Cable Replacement 160,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 New Subdivision Street Lights 118,000$ - $ - $ - $ - $ - $ - $ - $ 6,865 $ - $ 6,865 $ 610 Overhead to Underground Wire Conversion 100,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 MiniExcavator 100,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Electric Meters 80,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Electric Services 67,500$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Battery Replacement North Substation 60,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Convert Arterial Streets to Underground 25,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Restore Lite 11,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Gatekeepers for AMI Infrastructure 10,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Phase Trakker 9,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 610 Replace Garage Doors at Power Plant 6,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 620 Water - CIP -$ - $ - $ - $ 1,415 $ 1,371 $ - $ - $ 119$ 7,198 $ 10,102 $ 620 Advanced Metering Infrastructure (AMI) 136,756$ 5,293 $ 30,445 $ - $ - $ - $ - $ 30,445 $ - $ - $ 66,182 $ 620 Meters 74,900$ 32,305 $ 4,806 $ - $ - $ - $ - $ 36,975 $ - $ - $ 74,085 $ 620 Fire Hydrant Replacement 32,100$ - $ - $ - $ - $ - $ - $ - $ - $ 5,600 $ 5,600 $ 620 Replace Lead Goosenecks 16,800$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 620 Sycamore Tower Inspection 8,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 620 Mound Reservior Inspection 8,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 620 Vehicles - Water -$ - $ - $ - $ - $ - $ - $ 12,886 $ 12,886 $ 620 W. Locust St Design Services 17,369$ -$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Waste Water CIP -$ - $ - $ - $ - $ 125,575 $ - $ - $ 2,309 $ - $ 127,884 $ 630 BioSolids Facility 7,848,245$ 876,755$ - $ 44,542 $ - $ - $ 5,283 $ - $ 12,084$ - $ - $ 61,909 $ 630 Lametti Interceptor 221,680$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Sanitary Sewer Pipe Lineing 187,250$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Manhole Rehab 100,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Collection System Replacements 78,400$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630 Vehicles - Sewer -$ - $ - $ - $ - $ - $ - $ 12,886 $ - $ - $ 12,886 $ 630 W. Locust St Design Services 5,572$ -$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 640 Hoffman Park Basin Study 183,500$ -$ - $ (4,829) $ - $ - $ - $ - $ - $ - $ - $ (4,829)$ 640 Collins Outfall 25,000$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 640 Hoffman/Greenwood Stormwater Infrastructure 388,500$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,337,612 $ 46 Electric KWh and Revenue Reports 8,000,000 9,000,000 10,000,000 11,000,000 12,000,000 13,000,000 14,000,000 15,000,000 16,000,000 17,000,000 January February March April May June July August September October November December KWh Purchased By Month and Year 2024 2025 2026 $700,000 $900,000 $1,100,000 $1,300,000 $1,500,000 $1,700,000 $1,900,000 $2,100,000 $2,300,000 January February March April May June July August September October November December Electric Revenues by Month and Year 2024 2025 2026 47 $- $500,000 $1,000,000 $1,500,000 $2,000,000 2024 Cost of Power vs. Revenue 2024 - Purchased Power 2024 - Electric Revenues $- $500,000 $1,000,000 $1,500,000 $2,000,000 2025 Cost of Power vs. Revenue 2025 - Purchased Power 2025 - Electric Revenues $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 January February March April May June July August September 2026 Cost of Power vs. Revenue 2026 - Purchased Power 2026 - Electric Revenues 48 RFMU EFFICIENCY PROGRAMS UPDATE UTILITY PROGRAM PARTICIPATION 202 6 REPORT TOTAL INCENTIVES GIVEN AS OF NOVEMBER 1, 2026 Program # of Customers Participating Total Incentives Business Programs (Focus on Energy Match) 2 $873 Residential Efficiency Program (Focus on Energy Match) 1 $1,000 Electrification of Landscape Equipment 14 $1,568 Home Energy Assessments/Improvements 14 $8,013 Solar Program 1 $1,000 Electric Vehicle Charging Program 5 $4,240 Smart Thermostat/Central Air Tune Up 7 $287 Tree Power 2 $125 TOTAL: 46 $17,106 49 FOCUS ON ENERGY /IRA PROGRAMS INCENTIVES PAID – THROUGH OCTOBER 28 , 2026 FOCUS ON ENERGY - $283,847 IRA HOMES & HEAR PROGRAMS - $26,859 *HOMES and HEAR program assessments and incentives are reflect no kWh savings (due to assessment only or electrification). The Instant Discount Program also includes heat pumps, which can reflect gas savings, but increased kWh use. Schools & Government HEAR (Home Electrification and Appliance… Trade Ally Solutions Direct to Customer Business & Industry Instant Discount Program - Residential Trade Ally Solutions - Renewable Rewards… HOMES Assessment Incentives Targeted Kits Program $248,449$26,359 $15,145 $12,388 $6,444 $750 $600 $500 $70 INCENTIVES BY PROGRAM Key Statistics 296 Customers Participating 433 kW Reduced 1,747,000 kWh Savings (First Year) Schools & Government Business & Industry Direct to Customer Trade Ally Solutions - Renewable Rewards Residential Trade Ally Solutions Targeted Kits 1,629,889 67,853 22,300 16,860 9,986 24 ANNUAL KWH BY PROGRAM * 50 GREEN BLOCKS PROGRAM DASHBOARD BLOCKS PROGRAM PARTICIPATION THROUGH SEPTEMBER 2026 BLOCKS SOLD AND PARTICIPATION IN 202 6 Key Statistics 1,238 Customers Participating 9,570,000 kWh of Green Energy Purchased Month # of blocks purchased January 3,541 February 3,535 March 3,540 April 3,543 May 3,547 June 3,558 July 3,558 August 3,546 September 3,532 October November December Average 3,544 2026 Renewable Energy Block Participation Month Monthly Participation January 18.2% February 17.6% March 17.7% April 17.9% May 17.6% June 17.8% July 17.8% August 17.7% September 17.6% October 0.0% November 0.0% December 0.0% 2026 Renewable Energy Block Participation (%) Month # of customers participating January 1,277 February 1,234 March 1,246 April 1,258 May 1,240 June 1,249 July 1,249 August 1,245 September 1,238 October November December Average 1,248 2026 Renewable Energy Block Participation 51 R F M U M o n t h l y R e p o r t River Falls Municipal Utilities October 2026 52 Zachary Kuechenmeister, Journeyman Lineworker Apprentice Jeff Ploeger, Journeyman Lineworker Projects Electric Distribution & Infrastructure Update Completed Projects Completed cable replacement project in the Golf View Drive neighborhood Replaced station power batteries at the North Substation, improving system reliablity and backup power capabilities Projects in Progress Division Street Feeder Extension All equipment has been installed Cabel installation is complete Remaining work includes system testing and coordination of service switchovers Citywide Cable Replacement Program Ongoing cable replacment work continues throughout the service territory to improvie reliablity and system performance New Development Support Skycoat facility in the Sterling Ponds Corporate Park Construction of the new industrial facility is nearing completion Utility infrastructure support and related work continue as needed Next Steps Complete testing and switchovers for the Division Street Feeder Extension Continue scheduled cable replacement projects throughout the community Support final utility requirements associated with the completion of the Skycoat facility E l e c t r i c D e p a r t m e n t River Falls Municipal Utilities October 2026 PG 01 Wayne Siverling, Electric Operations Superintendent Dan Treichel, Lead Journeyman Lineworker Tim Wiste, Lead Journeyman Lineworker Pat Oja, Journeyman Lineworker Logan Snyder, Journeyman Lineworker Cody Kruger, Journeyman Lineworker Jeremy Holschuh, Journeyman Lineworker Virgil Johnson, Electric Meter Technician Chris White, Electric Meter Technician 53 Projects: Staffing & Training Conducted bi-weekly Water/Wastewater staff meetings with Water/Wastewater Water/Wastewater Superintendent Bradley attended the Wisconsin Wastewater Operators Association (WWOA) Conference in Green Bay Water/Wastewater Operators Josh and David completed Traffic Control Refresher Training Staff completed annual Safety Manual Refresher Training Operations & Maintenance Removed the Oxidation Ditch mixer motor and initiated repair work Completed preventive maintenance on generators at all wells and the wastewater treatment facility Supported the Wisconsin Department of Natural Resources (WDNR) during required Whole Effluent Toxicity (WET) testing and sampling activities Replaced a pressure relief valve at a manhole location P.J. Kortens completed troubleshooting and diagnostic work on utility equipment After-Hours On-Call Activity Responded to three customer emergency water shutoff requests related to private plumbing issues Repaired a leaking hydrant by replacing internal components Addressed a backup-mode issue at the Spring Creek wet well by adjusting float controls Responded to a vehicle collision involving a fire hydrant on October 28; hydrant replacement is planned Projects & Inspections Conducted the bid opening and preconstruction meeting for the Cedar Street improvements and Lametti Interceptor Project Total Excavating & Grading was awarded the contract Construction is expected to begin soon Continued review and updates of River Falls Engineering Details and Specifications in preparation for the 2027 revision cycle Continued meter change-out program, sewer televising activities, and service line potholing Completed a walkthrough inspection of water and sewer utilities in the Wildflower Meadows development Total Excavating & Grading continues to address remaining punch-list items W a t e r / W a s t e w a t e r D e p a r t m e n t River Falls Municipal Utilities October 2026 PG 02 Tim Rixmann, Lead Water / Wastewater Operator Joe Curran, Water / Wastewater Operator Todd Decker, Water / Wastewater Operator Bradley VIck, Water / Wastewater Superintendent David Paynotta, Water / Wastewater Operator Bill Swenson, Wastewater Operator Josh Penovich, Water / Wastewater Operator Brent Wiersma, Water / Wastewater Operator Thomas Polkoski, Water / Wastewater Operator Dean Seemuth, Water / Wastewater Operator 54 Projects: Compliance & Reporting Completed the annual review and update of the Capacity Management Operation Maintenance (CMOM) Sanitary Sewer Collection System report as required by the WDNR This review was also part of the corrective actions associated with the recent sanitary sewer overflow (SSO). Submitted monthly regulatory reports: Electronic Discharge Monitoring Report (eDMR) for wastewater operations Electronic Monthly Operating Report (eMOR) for water operations Distributed private well sampling notices Received results from 3 of the 7 private wells located within city limits Continued sewer cleaning and televising program Completed approximately 94,000 feet of the annual 100,000-foot goal (94%) Regulatory Reminder Consumer notifications for properties served by lead, galvanized requiring replacement (GRR), or lead status unknown (LSU) service lines must be delivered by December 31, 2026 Public Outreach & Engagement Hosted a facility tour for residents who had expressed concerns regarding odors near the wastewater treatment facility Provided an overview of the new dryer process and conducted a guided tour of the facility Upcoming & Ongoing Work Achieve substantial completion of the Dryer Project Install a new water shutoff valve on the west bank of the Kinnickinnic River near the River Glen Apartments Continue meter replacements, sewer televising, and service line investigations Monitor and support startup activities associated with recently completed infrastructure improvements W a t e r / W a s t e w a t e r D e p a r t m e n t River Falls Municipal Utilities October 2026 PG 03 55 C u s t o m e r S e r v i c e D e p a r t m e n t River Falls Municipal Utilities October 2026 PG 04 Amy White, City Clerk Theresa Folak, Customer Service Representative Brenda Rundle, Customer Service Representative Wendy Tokheim, Customer Service / Billing Clerk Projects Utility Billing & Collections Customer Service initiated the utility disconnection process on October 8 by mailing disconnection notices: 133 residential customers 8 commercial customers Notices were issued to accounts with past-due balances of $250 or more To encourage payment and prevent service interruptions: 108 outbound reminder calls were made on October 14 48 text message reminders were sent on October 16 as a final notification before disconnection Disconnection activity included: 12 utility disconnections on October 19 1 additional utility disconnection on October 20 2 more utility disconnections on October 26 for failure to comply with payment arrangement requirements Customer Service worked proactively with customers to avoid service interruptions: 54 payment arrangements were in place on October 19, providing customers additional time to resolve past-due balances Customer Service & Utility Support Customer Service coordinated 40 service requests for the Water Department, including: New water meter deliveries Water meter exchanges Water shutoffs for repair work Seasonal irrigation meter removals and winterization activities Election Administration Support In-person absentee voting began on October 20 and continued through the end of the month Election-related activity increased customer traffic at City Hall by approximately 1,500 visitors, resulting in a significant increase in resident interactions and customer service activity Key Highlights Conducted extensive customer outreach efforts to minimize utility disconnections Established 54 payment arrangements to assist customers with delinquent accounts Coordinated 40 water service-related requests in support of utility operations Supported election activities and accommodated approximately 1,500 additional visitors during the absentee voting period Jackie Sahnow, Customer Service Billing Clerk Cindy Campbell, Customer Service Lead 56 Projects Mapping & Asset Management Completed mapping updates for 12 Advanced Metering Infrastructure (AMI) meter changes Continued attaching sanitary sewer inspection videos and reports to the GIS mapping system to improve recordkeeping and asset management Collected GPS data and mapped the Paulson Boring Project, including boring utility routes serving the North Substation for electric and fiber infrastructure Collected GPS data and completed mapping updates for the Birch Street Boring Project Collected GPS data and mapped the electric joint trench installation associated with the Skycoat development Planning & Coordination Participated in two plan review meetings focused on updates to Standard Specifications and Construction Details Assisted the Water/Wastewater Superintendent with sanitary sewer data collection and analysis for the annual Capacity, Management, Operations, and Maintenance (CMOM) report Training & Professional Development Attended IT OneDrive Training to enhance document management and collaboration capabilities Completed Safety Manual Refresher Training to maintain compliance and reinforce workplace safety practices Department Support Provided utility locating assistance for the Buildings & Maintenance Department (B&M) to support ongoing projects and field operations Ongoing Priorities Continuing GIS mapping updates for utility infrastructure projects Expand integration of sanitary sewer inspection records into the mapping system Support utility planning, asset management, and interdepartmental coordination efforts Assist with utility locating and data management needs across departments E n g i n e e r i n g T e c h W o r k River Falls Municipal Utilities October 2026 PG 05 Tamarra Jaworski, Engineering Technician & GIS Mapper 57 Projects Incentive Programs and Green Blocks Total RFMU Program participation 46 customers received $17,106 in incentives Total River Falls Focus on Energy Participation 296 customers received $283,847 in incentives Total IRA (Inflation Reduction Act) HOMES and HEAR participation 6 customers received $26,859 in rebates Green Blocks Update September had 3,532 blocks purchased by 1,238 customers 9,570,000 kWh of renewable energy purchased in 2026 River Falls Municipal Utilities receives national recognition as Smart Energy Provider River Falls Municipal Utilities (RFMU) earned the Smart Energy Provider designation Oct. 26 during the American Public Power Association’s (APPA) Customer Connections Conference The utility was named one of 59 recipients of the designation in 2026 The Smart Energy Provider designation recognizes public power utilities for demonstrating leading practices in four key disciplines: energy efficiency, distributed generation, sustainability programs and customer experience The designation lasts three years Nationwide, 118 public power utilities now hold the prestigious title RFMU is one of the 28 WPPI member utilities that now hold the Smart Energy Provider designation Upcoming Events of Interest November 19 – WPPI Executive Committee Meeting December 16 – WPPI Executive Committee Meeting December 17 – WPPI Board of Directors Meeting R F M U & W P P I E n e r g y P r o g r a m s River Falls Municipal Utilities October 2026 PG 06 Jenna Willi, WPPI Energy Service Manager 58

Source: City of River Falls website. First collected Nov 12, 2026.