RecordWell Data

Plan Commission Meeting — Agenda packet

Village of Sister Bay · Door County · Plan Commission Meeting · meeting of Nov 10, 2026 · Agenda packets

Open the original document More from Village of Sister Bay

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Po sted On: 11/06/2026 PLAN COMMISSION MEETING AGENDA Tuesday, November 10, 2026 -- 5:30 P.M. Sister Bay-Liberty Grove Fire Station – 2258 Mill Rd., Sister Bay, WI – Large Meeting Room To access the meeting electronically, click: https://zoom.us/j/4439901723?pwd=yAVpi40M1OIqgNufcVUE8XWCUSkKaH.1&omn=9706363858 Meeting ID: 443 990 1723 Passcode: 304078 To connect by phone: 1-301-715-8592 - Meeting ID 443 990 1723# For additional meeting information visit: www.sisterbaywi.gov, click ‘Agendas and Minutes’ or watch the meeting video online. AGENDA 1. Call to Order & Roll Call 2. Approve of Agenda 3. Approve Meeting Minutes: a) October 30, 2026; Regular Meeting 4. Comments, Correspondence, and Concerns from the Public 5. Public Hearing, Discussion & Possible Action; Text Amendments; Chapter 66; a) Fee in Lieu of Parking b) Automotive Repair c) Accessory Dwelling Units d) Development Agreements 6. Discussion/Action Items: a) Plan Commission Review; Spa- Dorr Hotel Holdings, LLC- 2335 Mill Rd 7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee 8. Next Meeting • Regular Monthly Meeting; December 22, 2026, at 5:30 P.M.; Large Meeting Room, Sister Bay-Liberty Grove Fire Station 9. Adjournment Pub lic Notice For q uestions regarding the above a genda items or to review the related files contact Sarah Bertges, Administrative Assistant, at adminassist@sisterbaywi.gov. To submit letters in support or opposition of an agenda item that is not part of a public hearing, email adminassist@sisterbaywi.gov by 4:00 pm the day before the meeting; letters regarding a public hearing must be received by 4:00 pm the Thursday before the hearing. It is possible that members of, or quorum of, other governmental bodies may attend the meeting to gather information; no action will be taken by any governmental body other than the body specifically referred to above. Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through sign language interpreters or other auxiliary aid or accommodation at no cost to the individual. Due to the difficulty in finding interpreters, requests should be made as far in advance as possible, preferably a minimum of 48 hours. For additional information or to request this service, contact the Village Administration Office at 920.854.4118 or in writing to: Village Administration Building, 2383 Maple Dr., PO Box 769, Sister Bay, WI 54234. Copies of reports and other supporting documentation are typically available online and can also be viewed at the Village Administration Office 8 am – 4 pm Monday through Thursday, except holidays. The Village of Sister Bay is an Equal Opportunity Provider & Employer 1 VILLAGE OF SISTER BAY 1 PLAN COMMISSION MEETING MINUTES 2 FRIDAY, OCTOBER 30, 2026 3 UNAPPROVED 4 5 1. Call to Order & Roll Call 6 Chairperson Nate Bell called the Plan Commission meeting to order on Friday , October 30, 2026, at 7 9:00 A.M. and roll call was taken. 8 9 Present: Commission members Nate Bell, Jerry Ahrens, Skip Heidler, and Brigid White. 10 11 Staff Member(s): Administrative Assistant Sarah Bertges. 12 13 Others: Warren Zaug, Chris Schmeltz. VIA ZOOM: Louise Howson 14 15 2. Approve of Agenda 16 Motion to approve the agenda as presented was made by Bell and second by Heidler. Motion carried 17 – all ayes. 18 19 3. Approve Meeting Minutes 20 a. September 22, 2026; Regular Meeting 21 Two corrections were offered. 22 Motion to approve the September 22, 2026 minutes as amended was made by Heidler and second by 23 Ahrens. Motion carried – all ayes. 24 25 4. Comments, Correspondence, and Concerns from the Public 26 Bell reported receiving one email, and the sender confirmed he wanted it included in the packet. 27 Bell stated that the email was more appropriate for the public hearing on November 10. No 28 members of the public asked to speak. 29 30 5. Discussion/Action Items 31 32 a. Proposed Land Division/Certified Survey Map (CSM) for Zaug Enterprises LTD to Separate a 3-33 Acre Parcel from an Existing 16-Acre Parcel, Parcel#181005312832L 34 Bell informed the Commission that the CSM had already been approved on October 22 because of 35 the 90-day statutory review period. That period began when the CSM was submitted on July 24. Bell 36 stated that the deadline was missed and that the Village attorney confirmed this the previous week. 37 Bell stated a planning and zoning consultant had been engaged and was expected to attend the next 38 meeting. Bell noted that the applicant was not in a rush and that the zoning implications could still 39 be discussed. 40 Warren Zaug, representing Zaug Enterprises, explained that the 16-acre parcel is the site of the 41 Country House Resort. The 3 acres to be separated are not used by the resort, which uses the 42 remaining 13 acres. Zaug Enterprises is the limited partnership that owns the land, and Country 43 House Inc. is the operating company. The separation is for business planning purposes. There are no 44 immediate plans for the 3 acres, and the owner intends to keep the existing B-1 General Business 45 zoning. The parcel has no structures, about 300 feet of width, and shore frontage on a steep bluff. 46 Access is via an easement across property already owned by the applicant to Sunny Court, a public 47 road. The portion of Sunny Court on the west side of the parcel is private. Sewer, water, and a fire 48 hydrant are located near the nearby resort-used houses. 49 Commissioners noted that the parcel lies within both bluff and woodland overlay districts, which will 50 require attention in any future development. Commissioners also noted that B-1 development is 51 2 October 30, 2026 Plan Commission Meeting- Unapproved 2 expected to abut a public road. Bell stated that the Village could in the future elect to make the 1 access a public road to satisfy that requirement. Bell added that the trigger would likely be 2 development, depending on the intensity of use and emergency services access. Commissioners 3 found nothing in the code requiring a waiting period between land division and rezoning, and agreed 4 the two matters are independent. The minimum acreage requirements of the district were met. 5 Bell noted that the Commission could approve the CSM but could not deny it, and the item was 6 acted on as a formality. 7 Motion to approve the proposed land division and CSM for Zaug Enterprises LTD was made by Heidler 8 and second by Ahrens. Motion carried – all ayes. 9 10 b. Proposed Spa - Dorr Hotel Holdings, LLC - 2335 Mill Rd 11 Bell noted that the item was a continuation of the March 31 preliminary review, and that the 12 Planned Unit Development (PUD) documents had been sent to the Commission the previous 13 afternoon after a commissioner observed that the project is within a PUD. 14 Chris Schmeltz, representing the applicant, stated that the original single-story design did not fit the 15 surrounding area. The building was redesigned as a larger two-story structure. The applicant 16 proposed increasing maximum patron capacity from 20 to 40, which would raise the parking 17 requirement from 5 to 10 spaces. The applicant had also requested the 3-space credit for the district 18 and 7 additional shared spaces. He emphasized that the spa would be open to the public and not 19 restricted to hotel guests. 20 Building description. Schmeltz described the facility as a thermal spa circuit containing a hot mineral 21 pool, a cool pool, and a cold plunge. It would include two saunas, with capacities of about 20 and 8 22 to 10, and a 2-hour session model. The upper level would house the spa, and the lower level would 23 hold four treatment rooms and mechanical, laundry, boiler, and filter space. The primary entrance 24 would be from the Dorr Hotel parking lot side. The 40-person figure was described as a ceiling to 25 avoid returning later for an increase, and the applicant did not expect to reach it routinely. 26 Commissioners noted that group events, such as bridal parties, could approach capacity and might 27 require a liquor license. 28 Parking. Commissioners discussed the following points. 29 ● The classification used in March was business recreational at 1 space per 4 patrons. A salon and 30 spa classification would require 1.5 spaces per customer. Commissioners generally agreed to 31 continue the 1-per-4 standard. 32 ● Concerns were raised that the 3-space credit applies per parcel and may not be reusable by an 33 adjoining use on the same property. It was also noted that the Dorr Hotel's allotted spaces 34 should not be counted as available shared spaces, and that nearby public parking cannot be 35 credited, although the Commission may take its existence into consideration. 36 ● It was stated that the 3-space credit applies to the individual lot and not to the PUD as a whole. 37 Other commissioners argued that the PUD must be treated consistently, so that credits and 38 green space are either applied on a PUD basis or on a per-lot basis. The question of the 3-space 39 credit was referred for further review. 40 ● Bike racks could offset 2 to 3 spaces, particularly for employees. 41 ● The applicant estimated 4 to 6 employees, and most of the applicant's staff walk to work from 42 employee housing. 43 ● Commissioners discussed the share of patrons who would be hotel guests. Estimates ranged 44 from one-half to two-thirds, and no figure was adopted. 45 ● Commissioners agreed on a baseline of 15 spaces (10 for patrons and 5 for employees). Potential 46 reductions would be applied afterward: 3 for the B-3 credit, if allowed, and 2 for bike racks, 47 which would yield about 10 spaces. 48 ● A commissioner questioned whether the Commission was being consistent, citing a nearby 49 business that was paying a fee in lieu of parking for a small patio expansion. Bell responded with 50 the history of the downtown parking moratorium that encouraged the original development. 51 3 October 30, 2026 Plan Commission Meeting- Unapproved 3 Bell noted that the current code now requires full parking for new projects. Commissioners 1 noted the PUD makes this project different from a stand-alone project. 2 ● Bell stated that fee in lieu of parking at this location would be acceptable, as existing public 3 parking can be maintained. Commissioners noted that a public hearing was forthcoming on 4 stabilizing the fee in lieu amount and designating its purpose, and that the Village supports a 5 shuttle bus. Commissioners expressed interest in reviewing the parking code within the year. 6 Bell stated that the code would likely be revisited but would not commit to a timeline. 7 ● Schmeltz stated the applicant would prefer to avoid an ongoing fee in lieu and proposed using 8 the Claflin Lane lot, about 450 feet away, for employee parking. The lot is owned by Mill Road 9 Holdings LLC and serves the workforce housing. Commissioners indicated they would be open to 10 reviewing a written proposal. The Commission noted that limiting patrons to hotel guests, which 11 Schmeltz described as a fallback, would reduce the requirement but conflicts with the 12 community purpose of the spa. 13 ● Blank walls: Commissioners asked for articulation on the wall facing CHOP, along the Mill Road 14 side, and at the northwest corner. The code requires breaks in long walls through windows, 15 material changes, or wall offsets. Schmeltz indicated the applicant would add details. 16 ● Setbacks: Schmeltz stated that the PUD allows a 0-foot setback but the applicant is not 17 requesting one, and a 6-foot setback is planned from Mill Road. Commissioners stated that the 18 Mill Road frontage is the front yard. The code allows chimneys to project 2 feet into side yards, 19 but not front yards. The front entry canopy and pillars also intrude into the 6-foot setback. 20 Commissioners voiced general support for the chimney as an architectural feature, and agreed 21 to seek an approach that conforms to the code, such as a canopy that does not exceed the 22 setback. A site plan showing setbacks on all sides, including the CHOP side, which must remain 23 navigable for deliveries and snow management, was requested. 24 ● Green space: The PUD calls for central green space to be shared across the PUD and publicly 25 accessible. Lots 13 and 14 were combined by CSM into Lot 1. Commissioners asked for a full 26 green-space calculation for the whole PUD, including how much is already encumbered by 27 CHOP. The 10 percent requirement for green space applies. 28 ● Loading: The shared on-street loading zone serving CHOP was noted as a prior practice that the 29 code does not otherwise allow, and it will continue as grandfathered. 30 ● Color and lighting: Commissioners noted that the code calls for variation between adjacent 31 buildings and does not require matching colors. Schmeltz explained that the dark color was 32 inspired by Scandinavian waterfront architecture. A commissioner noted that the exterior 33 lighting specification of "2700 lumens" should be 2700 K, the color temperature. The lighting 34 plan is to be approved before the occupancy permit. 35 ● Commissioners cautioned that AI-generated renderings may be inaccurate, and that a landscape 36 plan is required to soften the building. 37 Direction to applicant. The Commission took no formal action. Bell stated that the building 38 design was headed in the right direction and that remaining items were primarily 39 documentation. Bell stated that if documents are submitted the week of November 2, the 40 building details could be placed on the November 10 agenda, but parking would take longer to 41 resolve. Schmeltz was told he could contact Village staff, who would direct him to the 42 consultant. 43 Action items: 44 ● The applicant to provide a green-space calculation for the entire PUD and a site plan showing 45 setbacks on all sides. 46 ● The applicant to provide a landscape plan, a lighting plan, and drainage plans for review with the 47 Village engineer. 48 ● The applicant to submit articulation details for blank walls. 49 ● The applicant to submit a proposal for employee parking at the Claflin Lane lot. 50 4 October 30, 2026 Plan Commission Meeting- Unapproved 4 ● The applicant to provide a parking calculation that includes bike rack credits and estimates of 1 hotel guest use. 2 ● The applicant to provide historical PUD documents and subsequent amendments dating from 3 2017. 4 ● Village staff to determine whether the B-3 3-space credit applies to the individual lot or the PUD, 5 and to compile all PUD amendments. 6 ● The Commission to review the parking code in the coming year. 7 8 6. Zoning Permit Log 9 Bell reported that the permit log had not been fully reviewed and that a backlog of items had been 10 identified. The consultant would work with staff to address the backlog, and the Village Clerk would 11 review the administrator's email for outstanding items. Bell stated that the permit log would be 12 revisited after the backlog was resolved. No commissioners raised items of concern. 13 14 7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee 15 Commissioners asked whether any notice beyond the required public notices was planned for the 16 November 10 public hearing. Bell directed staff to place a newspaper advertisement. Bell agreed to 17 contact the local press about running a story on the hearing. 18 19 8. Next Meeting 20 The next regular monthly meeting was scheduled for November 10, 2026, at 5:30 P.M. in the Large 21 Meeting Room at the Sister Bay-Liberty Grove Fire Station. The commission also confirmed that the 22 November public hearing will be scheduled in conjunction with a regular Plan meeting on Tuesday, 23 November 10, 2026, at 5:30 P.M. 24 25 9. Adjournment 26 Motion to adjourn at 10:08 AM. 27 Motion by Heidler second by Ahrens. Motion carried -all ayes. 28 29 Respectfully submitted by Sarah Bertges, Administrative Assistant 30 5 Page 1 STAFF REPORT Date: November 10, 2026 To: Plan Commission Re: Comments, Correspondence, and Concerns from the Public 6 7 8 9 Page 1 STAFF REPORT Date: November 10, 2026 To: Plan Commission Re: Public Hearing Public Hearing, Discussion & Possible Action; Text Amendments; Chapter 66; a) Fee in Lieu of Parking b) Automotive Repair c) Accessory Dwelling Units d) Development Agreements 10 PLAN COMMISSION/VILLAGE BOARD NOTICE OF PUBLIC HEARING PLEASE TAKE NOTICE that the Village of Sister Bay Plan Commission will hold a public hearing on Tuesday, November 10, 2026, at 5:30 p.m. at the Sister Bay-Liberty Grove Fire Station, 2258 Mill Road, Sister Bay, Wisconsin, to receive public comment regarding proposed amendments to the Village of Sister Bay Zoning Code. The proposed amendments include: Automotive Body and Mechanical Repair: Amendments concerning automotive body and mechanical repair uses, including classification as a conditional use in the B-1 District and standards relating to noise, fumes and ventilation, outdoor vehicle storage, and screening. Fee-in-Lieu of Parking: Amendments to the Village's fee-in-lieu of parking provisions, including applicability within the B-2 and B-3 Districts and revisions to the method used to calculate the fee. Accessory Dwelling Units (ADUs): Amendments establishing and regulating accessory dwelling units, including where ADUs may be permitted and provisions relating to attached and detached ADUs, size, height, parking, and architectural compatibility. Development Agreements: Amendment changing the period for execution of a development agreement following Village Board approval from six months to 45 days. The Plan Commission may consider the proposed amendments following the public hearing and make a recommendation to the Village Board. Written comments for the Plan Commission public hearing must be received by 4:00 p.m. on Thursday, November 5, 2026. The Village Board is anticipated to consider the proposed amendments at its meeting on Tuesday, November 17, 2026. Written comments intended for consideration by the Village Board should be submitted to the Village Clerk by Friday, November 13, 2026. All correspondence submitted by the deadlines will be entered into the record. Late submissions or anonymous correspondence will be disregarded. Correspondence can be mailed to P.O. Box 769, Sister Bay, WI 54234; faxed to (920) 854- 9637; deposited in the drop box at the Administration Office at 2383 Maple Drive, Sister Bay; or e- mailed to clerk@sisterbaywi.gov. Copies of the proposed amendments are available for review at the Village Administration Office, 2383 Maple Drive, Sister Bay, Wisconsin, during regular business hours and on the Village's website. All interested persons are invited to attend the public hearing and be heard. Julie Thyssen, Village Clerk Village of Sister Bay Publish: October 23 and October 30, 2026 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Page 1 STAFF REPORT Date: November 10, 2026 To: Plan Commission Re: Plan Commission Review- Spa 37 Village of Sister Bay Standard Zoning Permit Application Village of Sister Bay 2383 MAPLE DRIVE /g0 SISTER BAY, WI 54234 PHONE 920 8544118 /g0 FAX 920 8549637 EMAIL INFOSISTERBAYWI.GOV WEB SITE WWW.SISTERBAYWI.GOV Is the applicant the property owner? Yes No First name Chris Last name Schmeltz Applicant Address PO Box 142, Ephraim, WI 54211 Applicant Phone 773 7506376 Contractor Name Jaco Management, LLC Contractor Address PO Box 142, Ephraim, WI 54211 Contractor Phone 773 7506376 38 Contractor Email jacomanagement1@gmail.com Parcel Identification Number PIN 181530009A Street Address of Property in Sister Bay 2335 Mill Road Is this property connected to public water? Yes No Is this property connected to public sewer? Yes No What are you looking for? Zoning Permit Conditional use permit Sign permit Building permit Applicant Email jacomanagement1@gmail.com If you are looking for site plan review, conditional use permit, or a sign permit, you need to CANCEL this form submission and use a different form. Type of Construction Single Family Home Commercial Fence Attached Garage Multi family Deck Detached Garage Shed Addition Describe below) Other Describe here) Select one Please Provide a Brief Description of Your Project a two story commercial building that fits into Lot 9 with an entrance from lot 1 onto the upper floor that allows for ADA compliance. The lower level will be used for back of house for the upper level and 910 sqft that could be used for a single entrance commercial. Lot Size Ft. 7658.01 Total Lot Area 4408 Sq. Ft. Building Length 52 Building Width 52 39 Building Footprint 2700 Sq. Ft. Number of Stories 2 Height Roof Peak) less than 35' Primary roof Estimated costs $250000 Type of Construction wood 40 Before ANY applications will be considered this Permit/Application form must be completed and the following documents must be submitted to the employees in the Village Administration Office. The only exception will be “Early Startˮ Permits) /g0 The Attached Wetland Acknowledgment must be completed and signed by the property owner. /g0 Site Plan, showing location of all existing and proposed structures with setback distances depicted on the plan. A recent or updated survey may be required after initial review by Staff. /g0 Architectural Plan, showing all 4 sides of the building, as it will be constructed. Renderings need to be in color and ACTUAL SAMPLES OF COLORS AND MATERIALS MUST BE SUBMITTED. /g0 Landscaping Plan, showing location of all plants, landscaping features, fences, or accessories. A plant species list should be attached and referenced on the plan. /g0 Parking Plan, showing location of all parking improvements, pavement markings and signs and the number of parking stalls which will be provided. /g0 Lighting Plan, showing location of all exterior lights. Copies of proposed fixtures should be attached, with a calculation of lumens of output from the fixtures. All plans must conform to the Villageʼs performance standards section of the Zoning Code regarding light trespass. Approval by the Plan Commission and/or staff does not constitute an engineering approval, and lights found to be in violation of the Village Code will be required to be removed or replaced at the ownerʼs expense regardless of any approvals received from the Village. /g0 Drainage Plan, lots in excess of 1 acre will need to meet State of Wisconsin standards, and require engineering approval. Lots less than 1 acre in size will be evaluated on a case by case basis by staff, and, if appropriate, approved by the Plan Commission. /g0 Floor Plans including a foundation plan /g0 Building Plans, showing the interior of the proposed structure. These plans include HVAC, plumbing, and electrical plans. /g0 For New Construction – A Complete W ater & Drainage Fixture Unit Listing Must Be Provided – A licensed plumber will need to evaluate your plans, and submit a complete W ater and Drainage Fixture Unit List, so that REU calculations can be made by the Utilities Director. Any and all impact fees must be paid and a final Utilities inspection conducted before a water meter will be installed. /g0 For Remodeling Projects – Before any permits will be issued a licensed plumber will need to evaluate your plans, and submit a complete W ater and Drainage Fixture Unit List so that REU calculations can be made by the Utilities Director. Any and all impact fees must be paid before any remodeling commences. /g0 Other plans as requested by Village Staff. Thank you for your anticipated cooperation. If you have any questions regarding impact fees please call the WWTP at 9208542246. If you have any questions regarding Building Permits please call the Building Inspector at 9204953232 41 PLEASE ATTACH THE SITE PLAN IN ATTACHMENTS BELOW. INSTRUCTIONS /g0 INDICATE north and ENTER the dimensions of the property. /g0 SKETCH the location of the well, septic system (tank/field) and all other buildings present on the property. /g0 SKETCH the location of the proposed project (include dimensions) and SHOW the shortest distance from the project to the: /g0 Well /g0 Adjacent Buildings /g0 Edge Of Lake/Stream/Wetland /g0 Easements /g0 Septic Tank & Drain Field /g0 Rear & Side Property Lines /g0 Center(line) of Road/Highway /g0 Right-of-W ay of Road/Highway NOTE When showing distances less than 300 feet, please measure and show distance to the “nearest footˮ (do not estimate). Distances over 300 feet, may be estimated. /g0 LABEL all abutting roads, highways, lakes, streams or wetlands. /g0 LABEL the “USEˮ of all buildings shown. /g0 SHOW the outside dimensions of all structures on the property. /g0 Mark driveway location and length and width on site plan. 42 43 44 Please upload all needed attachments 6673001t-existing-1788470962869.pdf danmeissnerdorrproject-sheet-a101 option-5-plan-1788470… Visit heygov.co/sisterbaywi.gov/fr_01m1mgegk6t0rb76bg4m710sf0 to view or download full files. According to 2009 Wisconsin Act 373, no permit may be issued until the property owner signs the statement below acknowledging that s/he received the following notice: You are responsible for complying with state and federal laws concerning construction near or on wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural Resources wetlands identification web page at http://dnr.wi.gov/wetlands/locating.html or contact the Department of Natural Resources service center. By signing this form, I acknowledge I have received this notice. Signature Signed electronically on 9/3/26, 447 PM Quick Reference Officialʼs Contact List: BENJAMIN ANDREWS – Zoning Administrator - EMail: administrator@sisterbaywi.gov / Tele: 9208544118 BRETT GUILETTE – Building Inspector - EMail: brettg.isllc@gmail.com / Tele: 9204953232 I, the undersigned, hereby apply for a Land Use Permit and certify that all the information both above and attached is true and correct to the best of my knowledge. I affirm that all work performed will be done in accordance with the Sister Bay Zoning Code and with all other applicable laws and regulations. I hereby authorize the Zoning Administrator to enter the above-described property for purposes of obtaining information pertinent to my application request and to conduct land use code inspections. 45 Signature Signed electronically on 9/3/26, 447 PM Payment PAID $500.00 SUBMITED ON 9/3/26 For Administration use only Plan Commission Review Approve Decline CONDITIONS OF APPROVAL Estimated Impact Fee Utilities Approval: Approved Declined Zoning Administrator Review 46 MILL ROAD W LAT SAN LAT ST LAT SAN LAT C 10' 14' 30' 5.5' PRELIMINARYNot for Construction 03/2026 6673001T ---- ---- ---- ---- 1EXISTING CONDTIONS PROPOSED DEVELOPMENT FOR DORR WELLNESS VILLAGE OF SISTER BAY DOOR COUNTY, WISCONSIN NORTH SCALE IN FEET 0' 10' 20' 47 GROUND LEVEL 0' - 0" GROUND LEVEL 0' - 0" HIGH LEVEL 8' - 0" HIGH LEVEL 8' - 0" 3 A101 8' - 6" 0" GROUND LEVEL 0' - 0" GROUND LEVEL 0' - 0" HIGH LEVEL 8' - 0" HIGH LEVEL 8' - 0" 2 A101 8' - 0"4' - 0" 8' - 6" 2 A101 3 A101 -1' - 1" 0' - 0" 0' - 0" 10' - 6"41' - 6" 52' - 0 1/16" 52' - 0" 19' - 0" 21' - 10" 10' - 6" 52' - 0" 34' - 6 1/16"17' - 5 15/16" 18' - 4"32' - 4" 8' - 6" 8' - 6" 4' - 0" 4' - 0" 4' - 0" 0' - 0" PRINT DATE: 2026 © E30 FACADES, INC. TEMPLATE VERSION: MODEL: TITLE BLOCK VERSION: SHEET NUMBER: PRELIM DATE 08/25/2026 SHEET TITLE: KEY PLAN SHEET INFORMATION PROJECT NUMBER 2329 Mill Rd, Sister Bay, WI 54234 SUBMITTAL DATES SPECIALTY ENGINEER DRAWN BY DAN MEISSNER - DORR PROJECT MASSING STUDY FOR: 513 W.COLLEGE AVE, SUITE 330 APPLETON, WI 54911 (920) 903-3160 PROJECT INFORMATION DAN MEISSNER 2329 Mill Rd Sister Bay, WI 54234 PROFESSIONAL SEAL AJ 08/25/2026 5:13:55 PM C:\Users\Aldin\Documents\Dan_Meissner_Dorr_Project_Aldin.JusicHWUWF.rvt A101 OPTION 5 PLAN 260032601 NOT FOR CONSTRU CTI ON 260000000 1/8" = 1'-0"2 OPTION 3 - SECTION 1 1/8" = 1'-0"3 OPTION 3 - SECTION 2 1/8" = 1'-0"1 OPTION 3 PLAN 48 Proposed SPA Proposed Location: Address: 2335 Mill Rd, Sister Bay, WI Ownership: The Dorr Hotel Holdings, LLC Zoning: B-3 Downtown Business District Amended October 29, 2026 49 Location of proposed spa in Sister Bay, WI 50 51 52 Code review on parking shows: • 1 space loading requirement, available on Mill Rd • 1 space per 300sqft; 2,500sqft=8 spaces • 1 space per 4 patrons, max 20 patrons= 5 spaces • 3 space B- 3 district credit Adjustments, shared parking with The Dorr hotel, spa primarily used by Hotel patrons 53 Plan Committee preliminary review- March 31, 2026 2335 Mill Road, Sister Bay Amended-October 29, 2026 -November 10, 2026 The proposed use is a spa that would accommodate up to 20 patrons. Change to 40 patrons at max capacity, we do not expect to be at max very often if at all. The property is in the B-3 Downtown Business District with a spa as a permitted use. Code review on parking shows: • 1 space loading requirement, available on Mill Rd • 1 space per 300sqft; 2,500sqft=8 spaces • 1 space per 4 patrons, max 20 40 pa trons= 5 spaces 10 spaces (15 spaces with staffing) • 3 space B- 3 district credit- 2 space bike rack credit • 6 spaces shared parking, 4 spaces designated parking off site at 10627 Claflin Ln w orkforce housing parking lot for employees of the spa Asking the Plan Committee to review the availability of shared parking with The Dorr hotel in accordance with section 66.0404(1) (b) to meet the parking requirements. Parking is available within approximately 400 feet of the lot to satisfy the parking demand. Thank you in advance for this preliminary review. 54 55 56 DÖRR SPA · SCHEMATIC LANDSCAPE Landscape Planting Plan SITE 2335 Mill Road, Sister Bay, WI DATE November 6, 2026 STATUS Design intent only MILL ROAD ENTRY & PEDESTRIAN AMENITY CHIMNEY SPA BUILDING COURTYARD HOT POOL COLD ENTRY WALK E · NW CORNER BED A · MILL ROAD FRONTAGE BED C · SOUTHEAST BED D · REAR BED (SOUTH) ↓ THE DÖRR HOTEL N Planting Key Clump Birch Betula, multi-stem white bark · 8–10′ ht. B&B 4 Annabelle Hydrangea Hydrangea arborescens ‘Annabelle’ · #3 cont. · white blooms, to match Dörr Hotel frontage 6 Arborvitae Thuja occidentalis ‘Emerald Green’ · 5–6′ ht. · 3′ o.c. 2 Karl Foerster Feather Reed Grass Calamagrostis × acutiflora ‘Karl Foerster’ · #1 cont. · planted in clumps of three 48 Lavender Lavandula × intermedia (zone-5 hardy) · #1 cont. · 18″ o.c. 4 Mulched Planting Bed Shredded hardwood, 3″ depth · steel bed edging Hardscape — No Plantings West side and entry walk 0 5′ 10′ Approximate scale, traced from exterior lighting plan Planting Notes 1. Bed A: clump birch just east of the chimney, five staggered clumps of three Karl Foerster, and a second clump birch at the northeast corner. 2. Bed B: two Karl Foerster clumps alternating with two arborvitae. Bed C: clump birch at the top and centre, Karl Foerster clumps along the building, and Annabelle hydrangeas along the road edge. 3. Bed D (rear): Karl Foerster clumps of three, alternating between the building face and the lot line. Bed E: one Karl Foerster clump centred in the northwest corner bed beside the stair/service pad; the rest of the west side stays hardscape. 4. Quantities are schematic; landscape contractor to verify against a survey and coordinate with exterior lighting, downspouts and snow storage. 57 Building setbacks from lot line shown as a dashed line 58 MILL ROAD 9 7 4 11 3 5 10 13 6 8 12 14 Sister Bay Market Place 1 2 LOT 2 CSM 3371 BAYSHORE DRIVE aka STH '42' LOT 1 CSM 3371 11/2026 GREEN SPACE ---- ---- ---- ---- 1GREEN SPACE EXHIBITSISTER BAY MARKET PLACE VILLAGE OF SISTER BAY NORTH SCALE IN FEET 0' 20' 40' 59

Source: Village of Sister Bay website. First collected Nov 12, 2026.