RecordWell Data

Joint Highway & Facilities and Finance Committees Agenda Packet (PDF)

Door County · Door County · meeting of Jul 22, 2026 · Agenda packets

Open the original document More from Door County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

In compliance with the Americans with Disabilities Act, any person needing assistance to participate in this meeting, should contact the Office of the County Clerk at (920)746 2200. Notification 72 hours prior to a meeting will enable the County to make reasonable arrangements to ensure accessibility to that meeting. Notice of Public Meeting Wednesday, July 22, 2026 8:30 a.m. JOINT HIGHWAY & FACILITIES AND FINANCE COMMITTEES Door County Government Center County Board Room (C101), 1st Floor 421 Nebraska St, Sturgeon Bay, WI Oversight for: Door County Highway & Cherryland Airport, Facilities & Parks, Historical Museum A AGENDA  Call Meeting to Order  Establish a Quorum ~ Roll Call  Adopt Agenda / Properly Noticed  Correspondence  Public Comment  New Business (Review / Action) ▪ Door County Museum & Archives Project Bids Received - Review, Accept, Recommend Award ▪ Resolution 2026-___ Museum and Archives Project-Phase III Funding, Contract, Awards, Construction Authorization  Adjourn Deviation from Order Shown May Occur This meeting will be conducted by teleconference or video conference. Members of the public may join the meeting remotely or in-person. To attend the meeting via computer: Please click the link below to join: https://us02web.zoom.us/j/8398124027 2?pwd=BtAEbFY481DjFdacN7gCuGo BbfdCj0.1 Webinar/Meeting: 839 8124 0272 Passcode: 525307 Or by Phone: Dial: 1-312-626-6799 Page 1 of 69 County of Door FACILITIES & PARKS DEPARTMENT County Government Center 421 Nebraska Street Sturgeon Bay, WI 54235 Wayne Spritka Facilities & Parks Director (920) 746-7130 wspritka@co.door.wi.us MEMORANDUM TO: Chairman, Highway & Facilities Committee Chairman, Finance Committee FR: Wayne J. Spritka Director, Facilities & Parks SUBJECT: MUSEUM & ARCHIVES FACILITY PROJECT-Construction Bid Results and Project Budget Update DATE: 7-17-26 Re: Resolution 2025-97- Museum & Archive Facility Project The Facilities & Parks Department, in consultation with Immel Construction, serving as the Construction Manager (CM), and Integrity Engineering, serving as the Architectural and Engineering (A&E) firm, has completed Phases I and II of the Museum & Archives Facility Project, including design development and the competitive bidding process. Background At its regular meeting on May 12, 2026, the Highway & Facilities Committee reviewed the Construction Manager's control estimate of $2,869,470 for the construction phase of the project. Following review of the estimate and project scope, the Committee authorized the project to proceed to public bidding. Bid Results Competitive bids were received and reviewed in accordance with project requirements. The apparent low responsive bid for construction totals $2,926,480. This represents an increase of $57,010 (approximately 2%) over the May 2026 control estimate. According to Immel Construction, the primary factor contributing to the increase is the recent escalation in the cost of structural steel and other metal building materials. Despite this increase, the final bid remains well within industry expectations and reflects a competitive bidding environment. Project Budget Resolution 2025-97 – Museum & Archives Facility Project authorized the use of up to $2,685,000 from the County's Capital Improvement Program (CIP) Project Fund, which has an available balance of $5,042,851. That authorization was based on the Phase I Evaluation and Feasibility Study completed on October 31, 2025. Page 2 of 69 Following completion of bidding and refinement of the remaining project costs, staff has prepared an updated project budget. The current total estimated project cost is $3,300,000, which includes: • Construction contract • Architectural and engineering services • Construction contingency • Sturgeon Bay Utilities construction and connection fees • Furniture, fixtures, and equipment (FF&E) The attached budget provides a comprehensive forecast of anticipated expenditures through project completion. Recommendation Attached for your review are: • Draft Resolution awarding the construction contract and updating project funding; • Construction bid tabulation and supporting bid documents; and • Updated project budget reflecting the anticipated costs through project completion. The project team believes the bid results represent a favorable outcome in today's construction market. Approval of the attached resolution will allow the County to proceed with construction while maintaining a realistic budget that reflects current market conditions and the remaining project requirements. Attached: 7-17-26 Door County Museum & Archives Project Bid 2026-___Draft Resolution-Blank 7-17-26 Reset Project Budget Summary Page 3 of 69 July 17, 2026 Wayne Spritka Door County Facilities and Parks 421 Nebraska St. Sturgeon Bay, WI Wayne, On July 16, 2026, Immel Construction received bids for the Door County Museum Archives & Storage project in Sturgeon Bay, WI. Bids were based on drawings and specifications prepared by Integrity Engineering & Design, LLC and bidding Addendum No. 1. The total construction cost for the project. $2,926,480.00 Base Bid $2,702,960.00 Alternate No. 1: Museum Concrete Ramp & ADA Toilet Rooms $186,626.00 Alternate No. 2: Foundation Wall Sealing $12,759.00 Alternate No. 3: Performance and Payment bond for subcontracts $24,135.00 larger than $100,000 Bid prices for the individual bid packages are listed below: A. Division 03 – Concrete Reinforcing Materials (Furnish only) See Bid Tab B. Division 04 – Masonry $ 117,000.00 C. Division 05 – Steel Framing, Joists & Decking (Furnish only) $ 20,000.00 D. Division 05 – Steel Erection $ 27,600.00 E. Division 06 – Rough Carpentry (F urnish only) $ 10,877.00 F. Division 06 – Architectural Woodwork (Furnish only) $ 10,110.00 G. Division 07 – Metal and Wall Panels $ 134,186.00 H. Division 07 – Roofing, Metal & Trim, Accessories $ 340,527.00 I. Division 07 – Joint Sealants See Bid Tab J. Division 08 – Doors, Frames, & Hardware (furnish only) $ 36,749.00 K. Division 08 – Aluminum Framed Storef ronts, Sunshades, Glazing $ 168,736.00 L. Division 08 – Overhead Sectional Doors $ 3,242.86 M. Division 09 – Gypsum Board $ 202,689.00 N. Division 09 – Tile $ 16,738.00 O. Division 09 – Acoustical Ceilings $ 16,550.00 P. Division 09 – Resilient Floor and Carpet $ 24,504.00 Q. Division 09 – Painting $ 53,600.00 R. Division 09 – High Performance Coatings $ 12,500.00 S. Division 10 – Specialties (Furnish only) $ 17,051.00 T. Division 21 -- Fire Suppression $ 85,640.00 U. Division 22 – Plumbing $ 189,185.00 Page 4 of 69 V. Division 23 -- Heating, Ventilating, A nd Air-Conditioning (HVAC) $ 424,000.00 W. Division 26 – Electrical $ 278,500.00 X. Division 31 – Earthwork $ 6,545.00 Y. Division 32 – Landscaping $ 500.00 Z. Division 28 – Cleaning $ 4,880.00 AA. Division 02 – Selective Demolition $ 125,210.00 BB. Division 03 – Exterior Site Concrete $ 3,801.00 CC. Division 03 – Concrete (Building) $ 28,025.00 DD. Division 06 – General Trades $ 65,373.00 A spreadsheet summarizing subcontractor bids is attached for your reference. Construction activities are tentatively scheduled to commence on or around August 24, 2026, pending all necessary state and local permit approvals. Thank you for allowing Immel Construction the opportunity to provide this bid for your upcoming project. If you have any questions, please do not hesitate to contact our office. Sincerely, Paul Martzke, AIA LEED AP President Howard Immel, Inc. Page 5 of 69 Trade Contractor Bid Amount Notes Bid Package A – Concrete Reinforcing Material (furnish only) Was included with the concrete packages Bid Package B – Masonry Berglund Construction Company 117,000.00$ American Masonry Inc. (dba. American 133,650.00$ Advanced Restoration 139,456.00 $ Pahlow 139,800.00 $ Bid Package C – Metals (furnish only) 20,000.00$ No bids received - Allowance Bid Package D – Steel Erection SPE 27,600.00 $ Bid Package E – Rough Carpentry (furnish only) Immel 10,877.00 $ Bid Package F – Architectural Woodwork (furnish only) Showcase Commercial Interiors 10,110.00$ Lange Bros 18,658.77 $ Consolidated Construction 22,049.00 $ Incorrectly included installation Bid Package G – Metal Wall Panels Corcoran 134,186.00 $ Bid Package H – Roofing Quality Roofing 340,527.00 $ CustomCraft Roofing 378,889.30 $ Crafts Inc 475,430.00 $ PHD Roof Doctor's Inc 505,900.00 $ Nations Roof North 603,350.00 $ Northern Metal & Roofing 653,660.00 $ Bid Package I – Joint Sealants Included in individual bid packages Bid Package J – Doors, Frames, and Hardware (furnish only) Block Iron 36,749.00 $ TriCity Glass & Door 39,396.00 $ LaForce 40,062.00 $ HJ Martin 42,521.00 $ Bid Package K – Aluminum Framed Entrances and Storefronts, Glass/Glazing HJ Martin 168,736.00 $ Corcoran 189,785.00 $ Omni Glass & Paint 99,835.00 $ Incomplete did not bid the sunshades Bid Package L – Sectional Doors Fox Valley Overhead Door 3,242.86 $ Overhead Door Company of Appleton 4,512.00$ Central Door Solutions 4,645.00 $ Page 6 of 69 Trade Contractor Bid Amount Notes Bid Package M – Gypsum Board Systems Verhalen 202,689.00 $ Mission 243,288.00 $ Bid Package N – Tile Gegare 16,738.00 $ 250 donation amount Bid Package O – Acoustical Ceilings Appleton Acoustical 16,550.00 $ VerHalen 17,271.00 $ ALC 19,815.00 $ Bid Package P – Resilient Flooring and Carpet Gegare 24,504.00 $ 250 donation amount Bid Package Q – Painting Thomas Painting 53,600.00 $ Davis Painting 73,833.00 $ Bid Package R – High Performance Coatings Thomas Painting 12,500.00 $ Alternate Bid 2 Bid Package S – Specialties (furnish only) LaForce 17,051.00 $ BMSI 21,893.29 $ Best Specialties 9,200.00 $ Missing corner Guards Pye-Barker 890.00 $ Fire Extinguishers Only Bid Package T – Fire Protection Complete Fire Solutions 85,640.00 $ Fireline Sprinkler 91,059.00 $ Fire Protection Specialists LLC 99,150.00$ Blair Fire Protection 104,430.00 $ Bid Package U – Plumbing Hurckman 189,185.00 $ Turriff 232,597.00$ Bid Package V – HVAC AMA 424,000.00 $ $5,000 donation amount MTI 449,018.00 $ $5,518 donation amount Hurckman 458,900.00 $ Bid Package W – Electrical Quality Electric LLC 278,500.00 $ Eland 339,085.00 $ $6,500 donation amount NEI 346,925.00 $ Van Den Heuvel Electric (An HMI Comp 466,000.00$ Vlies 495,869.00 $ Bid Package X – Earthwork Ostrenga 6,545.00 $ Bid Package Y – Landscaping Allowance 500.00 $ No Bids Received Page 7 of 69 Trade Contractor Bid Amount Notes Bid Package Z – Final Cleaning Jack's Maintenance 4,880.00 $ Castle Cleaners 4,975.00 $ Bid Package AA – Selective Demolition Immel Construction 125,210.00 $ Bid Package BB – Exterior Site Concrete Immel Construction 3,801.00 $ Bid Package CC – Concrete (Building) Immel Construction 28,025.00 $ Bid Package DD – General Trades Immel Construction 65,373.00 $ Page 8 of 69 Door County Museum & Archives CONTROL ESTIMATE NO. 2 May 8, 2026 Page 9 of 69 May 8, 2026 CONTROL ESTIMATE #2 Wayne Spritka Door County Facilities and Parks 421 Nebraska St. Sturgeon Bay, WI Wayne, Immel Construction is pleased to provide the following preliminary budget control estimate for the Door County Museum Archives & Storage project in Sturgeon Bay, WI. The preliminary budget estimate to complete this work is a combined cost of $2,869,470, broken down as follows: 1. Door County Museum Archives & Storage Space – $1,882,233 2. Commercial Space Renovation for Tenant Use – $809,219 3. Existing Museum ADA Upgrades – $178,018 Our estimate is based on the schematic design package by Integrity Engineering & Design, LLC dated 04-21-26. Attached is a divisional breakdown of the estimate. Please note that at this time these are estimates based on the preliminary plans developed to date. As we move forward as a team and are able to make decisions that further describe your project, the cost will also become better defined. Once final plans and specifications are developed, the work can be competitively bid out to subcontractors and suppliers, which will provide you with a more exact cost of construction. If you have any questions, please do not hesitate to contact our office. Sincerely, Paul Martzke, AIA LEED AP President Howard Immel, Inc. Page 10 of 69 May 8, 2026 PROJECT: Door County Museum BID DATE BID DATE BID DA TE BID DATE BID DATE BID DATECITY, STATE: Sturgeon Bay, WI3-Apr-26 5-May-26 3-A pr-26 5-May-26 3-Apr-26 5-May-26ARCHITECT: Integrity DesignSales Tax Sales TaxLIQUIDATED DAMAGES: None5.50% 5.50%ADDENDUM # NoneBID TOTA LS 1,896,588$ 1,882,233$ 828,644$ 809,219$ 185,000$ 178,018$ CSI CODEDESCRIPTION SUBCONTRACTOR / SUPPLIER CONTROL ESTIMATE #1 CONTROL ESTIMATE CONTROL ESTIMATE #1 CONTROL ESTIMATE #2 CONTROL ESTIMATE #1 CONTROL ESTIMA TE #2 Museum Museum Commercial Space Commercial Space Museum ADA Upgrades Museum ADA Upgrades Testing AllowanceImmel5,000$ 5,000$ DEMO TOTAL 66,588$ 66,588$ 47,897$ 47,897$ 21,047$ 12,100$ DIVISION 3 CONCRETE TOTAL 8,494$ 8,494$ -$ -$ 7,594$ 51,000$ DIVISION 4 MASONRY TOTAL 44,500$ 44,500$ 28,800$ 28,800$ -$ -$ DIVISION 5 STEEL TOTAL 19,200$ 19,200$ -$ -$ -$ 7,200$ DIVISION 6 CARPENTRY TOTAL 23,814$ 23,275$ 13,400$ 9,800$ 10,761$ 1,000$ DIVISION 7 TOTAL 478,047$ 483,047$ -$ -$ 15,700$ 1,500$ DIVISION 8 TOTAL 141,753$ 127,945$ 28,106$ 32,666$ 9,132$ 4,980$ DIVISION 9 TOTAL 234,382$ 230,384$ 169,686$ 150,777$ 18,370$ 9,104$ DIVISION 10 TOTAL 12,185$ 12,185$ 11,400$ 11,400$ 2,337$ 1,600$ DIVISION 31 TOTAL -$ -$ -$ -$ 8,200$ 10,000$ DIVISION 32 TOTAL -$ -$ -$ -$ 5,378$ 2,920$ DIVISION 33 TOTAL -$ -$ -$ -$ -$ -$ MEP TOTAL 562,950$ 562,950$ 471,650$ 471,650$ 37,900$ 28,500$ 21 00 00 Fire SuppressionBadger32,500$ 32,500$ 32,500$ 32,500$ 22 00 00 PlumbingBeno37,000$ 37,000$ 37,000$ 37,000$ 21,100$ 18,000$ 23 00 00 HVACAMA201,650$ 201,650$ 190,750$ 190,750$ 8,200$ 5,000$ 26 00 00 ElectricalVos291,800$ 291,800$ 211,400$ 211,400$ 8,600$ 5,500$ RECAP SHEET TOTALS1,596,913$ 1,583,568$ 770,939$ 752,990$ 136,419$ 129,904$ PROCUREMENT & CONTRACTING REQUIREMENTS 1,200$ 1,200$ 1,200$ 1,200$ 300$ 300$ 00 31 46 PERMITS1,200$ 1,200$ 1,200$ 1,200$ 300$ 300$ 00 62 16 GENERAL LIABILITY INSURANCEN-$ -$ -$ -$ 00 73 16BUILDERS RISK INSURANCE - BUILDING TYPE IIA, IIB, IA or IBN-$ -$ -$ -$ -$ -$ 00 73 16BUILDERS RISK INSURANCE - BUILDING TYPE IIIA, IIIB or IVN-$ -$ -$ -$ -$ -$ 00 73 16BUILDERS RISK INSURANCE - BUILDING TYPE VA or VBN-$ -$ -$ -$ -$ -$ GENERAL REQUIREMENTS 165,088$ 165,088$ -$ -$ 35,889$ 35,889$ Subtotal 1,763,201$ 1,749,856$ 772,139$ 754,190$ 172,608$ 166,093$ OTHER PROJECT COSTS 114,609$ 113,741$ 50,189$ 49,023$ 11,219$ 10,796$ 00 70 00 CM FEE1.50%26,449$ 26,248$ 11,582$ 11,313$ 2,589$ 2,491$ 01 21 16 ESTIMATING CONTINGENCY5.00%88,160$ 87,493$ 38,607$ 37,710$ 8,630$ 8,305$ 01 21 16 CONSTRUCTION CONTINGENCY0.00%-$ -$ -$ -$ -$ -$ Subtotal 1,877,810$ 1,863,597$ 822,328$ 803,213$ 183,827$ 176,889$ YBOND 18,778$ 18,636$ 6,316$ 6,006$ 1,173$ 1,129$ NEXTENDED PROJECT WARRANTY -$ -$ -$ -$ -$ -$ Wkly FeePRELIMINARY BUDGET1,896,588$ 1,882,233$ 828,644$ 809,219$ 185,000$ 178,018$ Page 11 of 69 CONTACT Paul Martzke, AIA, LEED AP President paulma@immelconstruction.com (920) 406-0137 1820 Radisson Street Green Bay, WI 54302 920.468.8208 www.immelconstruction.com Page 12 of 69 ROLL CALL Board Members Aye Nay Exc. Dist. 1 D. Englebert Dist. 2 T. Thayse Dist. 3 J. Tlachac Dist. 4 N. Robillard Dist. 5 J. Miller Dist. 6 K. Fisher Dist. 7 C. Morkin Dist. 8 C. Jeanquart Dist. 9 R. Shaw Dist. 10 A. Heim Peter Dist. 11 H. Bacon Dist. 12 N. Norton Dist. 13 D. Vogel Dist. 14 H. Zettel Dist. 15 E. Gauger Dist. 16 T. Cain-Bieri Dist. 17 D. Smith Dist. 18 V. Hancock Dist. 19 P. Pluff Dist. 20 W. Kalms Dist. 21 N. Goss BOARD ACTION Vote Required: Majority Vote of a Quorum Motion to Approve Adopted 1st Defeated 2nd Yes: No: Exc: Reviewed by: , Corp. Counsel Reviewed by: , Administrator FISCAL IMPACT: The total 2026 CIP budget for this project is $4,959,851. Funding in the amount of $3,300,00 has been allocated in the Capital Projects Funds for the Museum & Archives project. STW Certification: I, Jill M. Lau , Clerk of Door County, hereby certify that the above is a true and correct copy of a resolution that was adopted on the 28th day of July , 20 26 by the Door County Board of Supervisors. Jill M. Lau County Clerk, Door County Resolution No. 2026-___ MUSEUM AND ARCHIVES PROJECT-PHASE III FUNDING, CONTRACT AWARDS, CONSTRUCTION AUTHORIZATION TO THE DOOR COUNTY BOARD OF SUPERVISORS: WHEREAS, the County of Door is considering (1) upgrading the Door County 1 Historical Museum and (2) renovating the former Younkers building at 56 N. 4th Avenue, 2 Sturgeon Bay, for a proposed new museum archives facility, meeting, and tenant space 3 (the “Project”); and 4 5 WHEREAS, Phase I (schematic design and design development) and Phase II 6 (construction documents and competitive bidding) of the Project were authorized to 7 proceed by Resolution No. 2025-97 (adopted 12-16-25); and 8 9 WHEREAS, the Highway & Facilities Committee, at its May 13, 2026 meeting, 10 approved the Project design and authorized moving forwarding with soliciting bids; and 11 12 WHEREAS, competitive bidding has been conducted, responsive bids were timely 13 received and reviewed, bid results have been documented, and the lowest responsible 14 bidders have been identified, with construction costs of $2,926,480; and 15 16 WHEREAS, the bid construction cost s of $2,926,480 exceed the construction 17 manager’s (Immel Construction) May, 2026 control estimate of $2, 869,470 by $57, 010 18 (approximately 2%); and 19 20 WHEREAS, total Project costs , including c onstruction costs and other associated 21 expenses such as architectural and engineering services , furniture, fixtures, and 22 equipment, utilities, and contingency, are anticipated not to exceed $3,300,000; and 23 24 WHEREAS, $4,959,851 has been budgeted for the Project; and 25 26 WHEREAS, at a joint meeting held on July 22, 2026, t he Highway & Facilities 27 Committee and the Finance Committee recommended awarding contracts to the lowest 28 responsible bidders, consistent with Immel Construction’s July 17, 2026 summary letter 29 report (attached hereto and incorporated herein by reference), and further recommended 30 authorizing up to $3,300,000 from the CIP Fund (Account # 401.51.7190.69901.00035) 31 to complete Phase III (construction) of the Project. 32 33 NOW, THEREFORE, BE IT RESOLVED, that the Door County Board of Supervisors 34 hereby approve s the expenditure of up to $ 3,300,000 from the CIP Fund (Account 35 #401.51.7190.69901.00035) to complete Phase III of the Project; and 36 37 BE IT FURTHER RESOLVED, that contracts are awarded to the lowest responsible 38 bidders, consistent with Immel Construction’s July 17, 2026 summary letter report, and 39 authorization is granted to proceed with construction. 40 SUBMITTED BY: HIGHWAY & FACILITIES COMMITTEE & FINANCE COMMITTEE Walter Kalms Highway & Facilities Committee Chair Jeff Miller Finance Committee Chair Todd Thayse David Englebert Jeff Miller Dave Smith Ken Fisher Collin Jeanquart Elizabeth Gauger Theresa Cain-Smith Nancy Robillard Dale Vogel Jason Tlachac Hugh Zettel Page 13 of 69 Date Description Capital Improvement Funding Totals SOURCES OF FUNDS 11/15/2023 RES-2025-97 Museum & Archives Project $0.00 $2,685,000.00 $0.00 $2,685,000.00 7/1/2026 Focus on Energy Rebate $0.00 $2,903.00 $0.00 $0.00 $2,903.00 $0.00 $0.00 $0.00 $612,097.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Funds Available $0.00 $2,903.00 $2,685,000.00 $0.00 $3,300,000.00 USES OF FUNDS 2026 Gannett $0.00 $0.00 $0.00 $0.00 -$252.77 A&E Integrity Engneering $0.00 $0.00 $0.00 -$9,980.00 -$79,840.00 CM- Immel Construction-Phase I -$25,000.00 -$25,000.00 City of Sturgeon Bay $0.00 -$350.00 $0.00 $0.00 $0.00 $0.00 Subtotal - Paid in 2026 $0.00 $0.00 $0.00 -$34,980.00 -$105,442.77 Remaining Estimates 2026 A&E Integrity Engneering -$19,960.00 FFE Estimate -$72,002.00 Construction Bid (includes cm fee and gen cond) -$2,926,480.00 Sturgeon Bay Utilities Estimate -$19,000.00 Contingency 5% of bid -$146,324.00 $0.00 $0.00 $0.00 Subtotal for 2023 $0.00 $0.00 $0.00 $0.00 -$3,183,766.00 Total Expenses $0.00 -$105,442.77 Total Spent - 2026 $105,442.77 Total Funds Available $3,300,000.00 Total Spent - 2027 Total Expenses & Estimated -$3,289,208.77 Total Spent to Date $105,442.77 Total Funds Remaining $10,791.23 **note** Above allocations do not include roof replacement over the Pioneer Fire Station. Project budget will be tracked closely. If funds are avaible roof section will be replaced based on the most recent 7-14-26 inspection. If no excess then the roof will be budgeted for 2029. RESET-PROJECTED Museum & Archives Project Budget PLANNED FUNDS AVAILABLE AND EXPENSES PAID THRU 7-17-26 December 2025 Project RESET Page 14 of 69 SCALE: 1" = 1'-0"DETAILROOM NAME/NUMBERELEVATIONSYMBOLS LEGENDDETAIL IDENTIFICATIONREVISIONPLAN DETAIL REFERENCE FIRE PROTECTION SYSTEMS CONSTRUCTION CLASSIFICATION:DESIGN LOADS: PER IBC 2021, CHAPTER 16OCCUPANCY: BUILDING SIZE: SPOT ELEVATIONEXISTING SPOTELEVATION PROFESSIONAL STAMP DESIGN TEAMPROJECT LOCATIONSITE LOCATION MAP MATERIAL LEGEND SHEET INDEXPROJECT DATABUILDING CODE: IBC 2021(WITH WISCONSIN AMENDMENTS) QUICK SPEC SHEET GENERAL CONDITIONS:SITE MAP BUILDING DESIGN BUILDING SECTION REFERENCE DOOR COUNTY MUSEUM ARCHIVESPROPOSED ALTERATIONS FOR:STURGEON BAY, WI 54235SHEETSHEET NAME FAX (800) 388-3860(800) 242-8511WEBSITE: www.diggershotline.com CALL 3 WORK DAYSBEFORE YOU DIGDIGGERSHOTLINE RICELAKE 11 TOMAHRAPIDS 13FALLSPARK WISCONSIN RHINELANDER8 141 STEVENS POINT ASHLAND2 53EAU CLAIRELA CROSSE WAUSAU SUPERIOR OSHKOSHFOND DU LACMANITOWOCSHEBOYGAN KENOSHARACINE APPLETONGREEN BAY41 43 94909090 43 949494 51 MADISONMILWAUKEE151 1236 MONTELLO23MAUSTONPORT WASHINGTONNORTH FREEDOMRIPONSHAWANO IF YOU HAVE ANY QUESTIONS OR COMMENTS ABOUT THE CONTENT OR PRESENTATION OF MATERIAL ON THIS PLAN, PLEASE CALL (920) 469-9288OUR SERVICE IS UNMATCHED AND OUR INTEGRITY IS IMPECCABLE.PROCESS AND MAKE BUILDING CONSTRUCTION MORE ENJOYABLE.ENGINEERING. OUR PLANS MOVE SMOOTHLY THROUGH THE STATE REVIEWWE PROVIDE HIGH QUALITY ARCHITECTURAL DESIGN AND STRUCTURALINTEGRITY MISSION STATEMENTNTEGRITENGINEERING DESIGN, LLC2637 Tulip Lane Green Bay, WI 54313Phone: (920) 469-9288 Fax: (920) 469-6809E-mail: Info@IntegrityEngineering.bizY T1.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES Page 15 of 69 ·· DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES T1.1 Page 16 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES LS1.0 Page 17 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES D1.0 Page 18 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES D1.1 Page 19 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A1.0 Page 20 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A1.1 Page 21 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A1.2 Page 22 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A1.3 Page 23 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A1.4 Page 24 of 69 THE HARBORCENTER DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A2.0 Page 25 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A2.1 Page 26 of 69 ··· DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A3.0 Page 27 of 69 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A3.1 Page 28 of 69 WINDOW DIAGRAMS·· FRAME DIAGRAMS DOOR DIAGRAMS ·· DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A4.0 Page 29 of 69 JAMB HEAD JAMB HEAD JAMB HEAD JAMB HEAD HEAD JAMB HEAD JAMB SILL HEAD JAMB HEAD JAMB JAMB HEAD HEAD JAMB DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ARCHIVES A4.1 Page 30 of 69 A A A A A A XXX A XXX XXX XXX XXX ROOM MECH./JAN. 109 TENANT FUTURE 116 WORK AREA EXIBIT FAB 102 GENERAL STORAGE WAREHOUSE/ 101 OFFICE 108 ROOM I.T. 110VESTIBULE 112 CORRIDOR 105 CORRIDOR 107 CORRIDOR 111 TOILET MENS 114 TOILET WOMENS 115 ROOM CONFERENCE 106 ROOM CONF/BREAK 113 WAREHOUSE MULTI-USE 103 WAREHOUSE COLLECTIONS 104 TENANT FUTURE 118 CORRIDOR 117 1 2 3 4 5 6 7 8 9 A B C D E F G EXISTING 6" WATER SERVICE2 EXISTING 6" DOUBLE CHECK BACKFLOW PREVENTER (VERTICAL) 2 REPLACE EXISTING FDC w/NEW. COORDINATE STYLE w/LOCAL AUTHORITIES & PROVIDE PLACARD ON THE EXTERIOR OF THE BUILDING, NEXT TO THE FDC, STATING THE SYSTEM DESIGN PRESSURE. 4 EXISTING TEST CONNECTION 2 PROVIDE 6" TEE FOR 2" DOMESTIC WATER CONNECTION 3 NEW DRY VALVE3 F I R E P R O T E C T I O N S Y S T E M S L E G E N D INDICATES NEW WET FIRE PROTECTION SPRINKLER ORDINARY HAZARD1 SERVED FROM EXISTING SYSTEM MAIN/RISER. INDICATES NEW DRY FIRE PROTECTION SPRINKLER SYSTEM SERVED FROM NEW SYSTEM MAIN DRY VALVE. INDICATES NEW WET FIRE PROTECTION SPRINKLER LIGHT HAZARD SERVED FROM EXISTING SYSTEM MAIN/RISER. F I R E P R O T E C T I O N N O T E S 1. THE ENTIRE BUILDING SHALL BE PROVIDED WITH A FIRE PROTECTION SPRINKLER SYSTEM. THE SYSTEM SHALL MEET ALL FEDERAL, STATE, AND LOCAL CODES AND ORDINANCES. THE SYSTEM SHALL BE DESIGNED TO MEET THE LATEST EDITION OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES AND FACTORY MUTUAL (FM) APPROVAL GUIDELINES. DESIGN CRITERIA LISTED ON THESE DRAWINGS AND INCLUDED IN ASSOCIATED SPECIFICATIONS ARE CONSIDERED MINIMUM ACCEPTABLE REQUIREMENTS. 2. EXISTING AREAS HAVE AN AUTOMATIC SPRINKLER SYSTEM PRESENTLY INSTALLED. REMOVE PIPING, SUPPORTS, AND ALL OTHER ASSOCIATED ITEMS THAT INTERFERE WITH NEW GENERAL, ELECTRICAL AND MECHANICAL INSTALLATIONS AND REINSTALL SYSTEM FOR PROPER COVERAGE OF NEW LAYOUT. 3. INSPECTOR TEST CONNECTIONS AND LOW POINT DRAINS SHALL BE INSTALLED AS PER NFPA REQUIREMENTS AND PROVIDED WHERE REQUIRED. TERMINATION HEIGHT SHALL BE NO HIGHER THAN 48'' ABOVE FINISHED FLOOR. 4. SPRINKLER MAIN AND BRANCH PIPING SHALL BE INSTALLED AS HIGH AS POSSIBLE TO PROVIDE MAXIMUM USABLE HEIGHT FOR THE OCCUPANTS AND OWNER. COORDINATE ROUTING WITH PLUMBING, HVAC, AND ELECTRICAL CONTRACTORS. PRECEDENCE IN INSTALLING EQUIPMENT, PIPING, DUCTWORK, AND CONDUIT WILL BE AS DETERMINED BY THE ENGINEER AND GENERAL CONTRACTOR. NO CONTRACTOR HAS EXCLUSIVE RIGHT OF WAY IN INSTALLING HIS WORK. 5. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR GRID LAYOUT. SPRINKLER HEAD LOCATIONS SHALL BE COORDIATED WITH ELECTRICAL LIGHTING AND HVAC GRILL LOCATIONS AND LOCATED IN THE CENTER OF THE CEILING TILE. 6. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SIZING OF ALL PIPING, EQUIPMENT, AND ACCESSORIES. CONTRACTOR SHALL PROVIDE HYDRAULIC CALCULATIONS TO PROVE THE ADEQUACY AND PROPER SIZING OF THE PIPING NETWORK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MODIFY PIPE SIZING TO MEET SYSTEM REQUIREMENTS. REFER TO FIRE PROTECTION SPRINKLER WORK SPECIFICATION SECTION 21 00 00 FOR ADDITIONAL SYSTEM REQUIREMENTS AND INFORMATION. K E Y O F N O T E S INDICATES A CONNECTION TO EXISTING PIPING. CONTRACTOR IS TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO REMAIN. REMOVE AND SEAL ALL RELATED PIPING AND HANGERS BACK TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO BE REMOVED. FIELD VERIFY LOCATION, SIZE & ELEVATION OF EXIST. PIPING BEFORE NEW FIXTURE OR PIPING. CONNECT TO EXISTING PIPING, AND REMODEL EXISTING FIXTURE OR PIPING TO BE REMOVED. FURNISH AND INSTALL PROCEEDING WITH NEW CONSTRUCTION. STACK, MAIN OR RISER. PIPING AS REQUIRED. 1 2 3 4 © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATEREVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION FP-1 LGD JUNE 15, 2026 FIRE PROTECTION SHEET INDEX SHEET DESCRIPTION FP-1 FIRST FLOOR PLAN FP-2 DETAILS SCALE: 1/8" = 1'-0"1 FIRST FLOOR PLAN - FIRE PROTECTION TRUE NORTH PLAN NORTH Page 31 of 69 INFORMATION PERTAINING TO EXISTING PROJECT CONDITIONS, SUCH AS PRESENT LOCATIONS OF CIVIL, ARCHITECTURAL AND STRUCTURAL BUILDING COMPONENTS, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL EQUIPMENT, PIPING, DUCT WORK, ROUGH -INS, AND OTHER MISCELLANEOUS CONSTRUCTION, APPEARS ON THE DRAWINGS. WHILE SUCH INFORMATION HAS BEEN BASED ON AVAILABLE RECORDS AND COLLECTED WITH REASONABLE CARE, THE ARCHITECT AND ENGINEER DO NOT ASSUME ANY EXPRESSED OR IMPLIED GUARANTEE THAT CONDITIONS SO INDICATED ARE SHOWN ENTIRELY COMPLETE, CORRECT AND REPRESENTATIVE OF THOSE ACTUALLY EXISTING. ALL CONTRACTORS SHALL SATISFY THEMSELVES AS TO ALL EXISTING JOB CONDITIONS PRIOR TO BIDDING, AND VERIFY ALL DIMENSIONS AT THE SITE. E x i s t i n g P r o j e c t C o n d i t i o n s N o t e © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION FP-2 LGD JUNE 15, 2026 NOT TO SCALE 1 PIPE PENETRATIONS AT NON-RATED WALL DETAIL NOT TO SCALE 2 PIPE PENETRATIONS AT RATED WALL DETAIL NOT TO SCALE 3 FIRE PROTECTION RISER DETAIL 2 2 3 4 Page 32 of 69 For Sheets P -1 to P -7 Only. 1 2 3 4 5 6 7 8 9 A B C D E F G EXISTING SS 1 EXISTING WC, LAV & FD 1 EXISTING WC, LAV & URI 1 EXISTING DOMESTIC WATER HEATER (ON MEZZ.) 1 EXISTING EWC 1 EXISTING HB 4 ABANDON EXISTING DOMESTIC WATER SERVICE 1 EXISTING DOMESTIC WATER (BELOW STAIR) 1 EXISTING CW 1 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 1 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING ROOF DRAIN 5 EXISTING 10" STORM SEWER 2 EXISTING 10" COND DN 2 EXISTING HB 4 EXISTING HB 1 EXISTING 6" WATER SERVICE 2 EXISTING CATCH BASIN 2 EXISTING CATCH BASIN 2 EXISTING COND DISCHARGE TO GRADE 1 EXISTING CONNECTIONS FOR (2) WASHER's 1 EXISTING VTR 1 EXISTING VTR 1 APPROX. LOCATION OF EXISTING SANITARY SEWER EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 10" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 K E Y O F N O T E S ADJUST EXISTING ROOF DRAINS IN CONJUNCTION WITH NEW ROOF PORTION OF PROJECT, COORDINATE WITH ROOFING CONTRACTOR. REPLACE ALL EXISTING ROOF DRAINS, CONNECT NEW ROOF DRAINS TO EXISTING PIPING. INDICATES A CONNECTION TO EXISTING PIPING. CONTRACTOR IS TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO REMAIN. REMOVE AND SEAL ALL RELATED PIPING AND HANGERS BACK TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO BE REMOVED. FIELD VERIFY LOCATION, SIZE & ELEVATION OF EXIST. PIPING BEFORE NEW FIXTURE OR PIPING. CONNECT TO EXISTING PIPING, AND REMODEL EXISTING FIXTURE OR PIPING TO BE REMOVED. FURNISH AND INSTALL PROCEEDING WITH NEW CONSTRUCTION. STACK, MAIN OR RISER. PIPING AS REQUIRED. 1 2 3 4 5 INFORMATION PERTAINING TO EXISTING PROJECT CONDITIONS, SUCH AS PRESENT LOCATIONS OF CIVIL, ARCHITECTURAL AND STRUCTURAL BUILDING COMPONENTS, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL EQUIPMENT, PIPING, DUCT WORK, ROUGH -INS, AND OTHER MISCELLANEOUS CONSTRUCTION, APPEARS ON THE DRAWINGS. WHILE SUCH INFORMATION HAS BEEN BASED ON AVAILABLE RECORDS AND COLLECTED WITH REASONABLE CARE, THE ARCHITECT AND ENGINEER DO NOT ASSUME ANY EXPRESSED OR IMPLIED GUARANTEE THAT CONDITIONS SO INDICATED ARE SHOWN ENTIRELY COMPLETE, CORRECT AND REPRESENTATIVE OF THOSE ACTUALLY EXISTING. ALL CONTRACTORS SHALL SATISFY THEMSELVES AS TO ALL EXISTING JOB CONDITIONS PRIOR TO BIDDING, AND VERIFY ALL DIMENSIONS AT THE SITE. E x i s t i n g P r o j e c t C o n d i t i o n s N o t e © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-1 LGD JUNE 15, 2026 PLUMBING SHEET INDEX SHEET DESCRIPTION P-1 FIRST FLOOR DEMOLITION PLAN P-2 BELOW GRADE PLAN P-3 FIRST FLOOR PLAN P-4 ROOF PLAN P-5 SUPPLY, WASTE & VENT ISOMETRICS P-6 STORM / CLEARWATER ISOMETRIC P-7 SCHEDULES & DETAILS SCALE: 1/8" = 1'-0" 1 FIRST FLOOR DEMOLITION PLAN - PLUMBING TRUE NORTH PLAN NORTH Page 33 of 69 A A A A A A XXX A XXX XXX XXX XXX ROOM MECH./JAN. 109 TENANT FUTURE 116 WORK AREA EXIBIT FAB 102 GENERAL STORAGE WAREHOUSE/ 101 OFFICE 108 ROOM I.T. 110 VESTIBULE 112 CORRIDOR 105 CORRIDOR 107 CORRIDOR 111 TOILET MENS 114 TOILET WOMENS 115 ROOM CONFERENCE 106 ROOM CONF/BREAK 113 WAREHOUSE MULTI-USE 103 WAREHOUSE COLLECTIONS 104 TENANT FUTURE 118 CORRIDOR 117 1 2 3 4 5 6 7 8 9 A B C D E F G SAWCUT & PATCH EXISTING FLOOR CONNECT TO EXISTING SAN NEW FCO ABANDON EXISTING SAN PLUMBER TO TELEVISE & RECORD EXACT LOCATION, SIZE & DEPTH OF EXISTING SANITARY DRAIN FROM EXISTING TOILET ROOMS TO STREET. DOCUMENT & SEND RESULTS TO PLUMBING DESIGNER FOR REVIEW PRIOR TO STARTING NEW WORK. 3 SAWCUT & PATCH EXISTING FLOOR SAWCUT & PATCH EXISTING FLOOR 4" SAN CAPPED CONN. FOR FUTURE I.E. : 97' - 6" 4" SAN CAPPED CONN. FOR FUTURE FCO FCO FCO 3" SAN 1/8" / 12" 4" SAN 1/8" / 12" 4" SAN 1/8" / 12" 4" SAN 1/8" / 12" CONNECT TO EXISTING SAN 3 2" W UP 3" W UP FCO 1-1/2" V UP 3" W UP 3" W UP 4" UP TO WCO 3" W UP 3" V UP 2" W UP 1-1/2" W UP FCO I.E. : 96' - 2" I.E. : 96' - 8" I.E. : 97' - 0" I.E. : 98' - 1" I.E. : 97' - 5" I.E. : 98' - 4" Arch: 100' -0" EL. @ FIN. FLOOR ABOVE EXISTING 6" WATER SERVICE 2 EXISTING 10" STORM SEWER 2 EXISTING 10" COND UP 2 EXISTING CATCH BASIN 2 EXISTING CATCH BASIN 2 I.E. : 97' - 5" K E Y O F N O T E S ADJUST EXISTING ROOF DRAINS IN CONJUNCTION WITH NEW ROOF PORTION OF PROJECT, COORDINATE WITH ROOFING CONTRACTOR. REPLACE ALL EXISTING ROOF DRAINS, CONNECT NEW ROOF DRAINS TO EXISTING PIPING. INDICATES A CONNECTION TO EXISTING PIPING. CONTRACTOR IS TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO REMAIN. REMOVE AND SEAL ALL RELATED PIPING AND HANGERS BACK TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO BE REMOVED. FIELD VERIFY LOCATION, SIZE & ELEVATION OF EXIST. PIPING BEFORE NEW FIXTURE OR PIPING. CONNECT TO EXISTING PIPING, AND REMODEL EXISTING FIXTURE OR PIPING TO BE REMOVED. FURNISH AND INSTALL PROCEEDING WITH NEW CONSTRUCTION. STACK, MAIN OR RISER. PIPING AS REQUIRED. 1 2 3 4 5 © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-2 LGD JUNE 15, 2026 SCALE: 1/8" = 1'-0" 1 BELOW GRADE PLAN - PLUMBING TRUE NORTH PLAN NORTH Page 34 of 69 A A A A A A XXX A XXX XXX XXX XXX ROOM MECH./JAN. 109 TENANT FUTURE 116 WORK AREA EXIBIT FAB 102 GENERAL STORAGE WAREHOUSE/ 101 OFFICE 108 ROOM I.T. 110 VESTIBULE 112 CORRIDOR 105 CORRIDOR 107 CORRIDOR 111 TOILET MENS 114 TOILET WOMENS 115 ROOM CONFERENCE 106 ROOM CONF/BREAK 113 WAREHOUSE MULTI-USE 103 WAREHOUSE COLLECTIONS 104 TENANT FUTURE 118 CORRIDOR 117 1 2 3 4 5 6 7 8 9 A B C D E F G Arch: 100' -0" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 4" ST 1/8" / 12" 4" ST 1/8" / 12" 4 HB -1 4 EXISTING 6" WATER SERVICE 2 6" ST 1/8" / 12" 10" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" CONNECT TO EXISTING 6" COND CONNECT TO EXISTING 6" COND 6" COND UP TO DR -1 6" COND UP TO DR -1 CONNECT TO EXISTING 10" STORM 3 5 5 CONNECT TO EXISTING 6" COND CONNECT TO EXISTING 6" COND 5 5 CONNECT TO EXISTING 6" COND 5 CONNECT TO EXISTING 6" COND 5 CONNECT TO EXISTING 6" COND 5 CONNECT TO EXISTING 6" COND 5 CONNECT TO EXISTING 8" STORM 3 CAP EXISTING 6" STORM 3 HB -1 (2) L -1 (2) L -1 EWC -1 DR -2 DR -2 WC -2 WC -1 U-1 WC -2 (2) WC -1 DR -3 DR -4 SS -1 EXISTING 10" COND DN 2 3" VTR CO FCO FCO FCO 2" VTR SS -2 WATER SOFTENING EQUIPMENT WS -1 & BRINE TANK WATER HEATING EQUIPMENT WH -1, ET -1 & CP -1 ON SHELF MIN. 7'-0" ABOVE SS S S S S S S CONNECT TO EXISTING 3/4" CW 3 NEW 2" DOMESTIC WATER FROM EXISTING 6" WATER SERVICE (FP CONTRACTOR TO PROVIDE TEE) 3 NEW 1" DOMESTIC WATER METER w/VALVED BY -PASS 4" COND UP TO DR -1 4" CO 4" COND UP TO DR -1 6" COND UP TO DR -1 6" CO 3" V DN FCO 1-1/2" V DN FCO FCO HB -1 EXISTING CATCH BASIN 2 EXISTING CATCH BASIN 2 2" CAPPED CONNECT FOR FUTURE USE EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 10" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 EXISTING 6" STORM 2 TYPICAL FIXTURE CONNECTIONS WATER CLOSET ( WC -1 & 2 ) = 3" W & 3/4" CWS URINAL ( U-1) = 2" W, 1 -1/2" V & 1 -1/4" CWS LAVATORY ( L-1) = 2" W - 1-1/2" V, 1/2" HW & 1/2" CWS SERVICE SINK ( SS -1) = 3" W, 3/4" HW & 3/4" CWS UTILITY SINK ( SS -2) = 2" W, 1 -1/2" V, 3/4" HW & 3/4" CWS ELECTRIC WATER COOLER ( EWC -1) = 1 -1/2" W, 1 -1/2" V & 1/2" CWS HOSE BIBB ( HB -1) = 3/4" CW K E Y O F N O T E S ADJUST EXISTING ROOF DRAINS IN CONJUNCTION WITH NEW ROOF PORTION OF PROJECT, COORDINATE WITH ROOFING CONTRACTOR. REPLACE ALL EXISTING ROOF DRAINS, CONNECT NEW ROOF DRAINS TO EXISTING PIPING. INDICATES A CONNECTION TO EXISTING PIPING. CONTRACTOR IS TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO REMAIN. REMOVE AND SEAL ALL RELATED PIPING AND HANGERS BACK TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO BE REMOVED. FIELD VERIFY LOCATION, SIZE & ELEVATION OF EXIST. PIPING BEFORE NEW FIXTURE OR PIPING. CONNECT TO EXISTING PIPING, AND REMODEL EXISTING FIXTURE OR PIPING TO BE REMOVED. FURNISH AND INSTALL PROCEEDING WITH NEW CONSTRUCTION. STACK, MAIN OR RISER. PIPING AS REQUIRED. 1 2 3 4 5 © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-3 LGD JUNE 15, 2026 SCALE: 1/8" = 1'-0" 1 FIRST FLOOR PLAN - PLUMBING TRUE NORTH PLAN NORTH Page 35 of 69 1 2 3 4 5 6 7 8 9 A B C D E F G 1,600 SQ. FT. 62 GPM 1,610 SQ. FT. 62 GPM 2,164 SQ. FT. 83 GPM 2,151 SQ. FT. 83 GPM 1,571 SQ. FT. 61 GPM 2,045 SQ. FT. 79 GPM 2,455 SQ. FT. 95 GPM 1,718 SQ. FT. 66 GPM 2,264 SQ. FT. 87 GPM 1,701 SQ. FT. 66 GPM 838 SQ. FT. 33 GPM 736 SQ. FT. 29 GPM 6" - DR -1 5 6" - DR -1 5 6" - DR -1 6" - DR -1 3" VT 3" VT 6" - DR -15 1,571 SQ. FT. 61 GPM 6" - DR -15 6" - DR -1 5 4" - DR -15 4" - DR -15 6" - DR -15 6" - DR -15 6" - DR -1 5 6" - DR -15 K E Y O F N O T E S ADJUST EXISTING ROOF DRAINS IN CONJUNCTION WITH NEW ROOF PORTION OF PROJECT, COORDINATE WITH ROOFING CONTRACTOR. REPLACE ALL EXISTING ROOF DRAINS, CONNECT NEW ROOF DRAINS TO EXISTING PIPING. INDICATES A CONNECTION TO EXISTING PIPING. CONTRACTOR IS TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO REMAIN. REMOVE AND SEAL ALL RELATED PIPING AND HANGERS BACK TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO BE REMOVED. FIELD VERIFY LOCATION, SIZE & ELEVATION OF EXIST. PIPING BEFORE NEW FIXTURE OR PIPING. CONNECT TO EXISTING PIPING, AND REMODEL EXISTING FIXTURE OR PIPING TO BE REMOVED. FURNISH AND INSTALL PROCEEDING WITH NEW CONSTRUCTION. STACK, MAIN OR RISER. PIPING AS REQUIRED. 1 2 3 4 5 36" © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-4 LGD JUNE 15, 2026 SCALE: 1/8" = 1'-0" 1 ROOF PLAN - PLUMBING TRUE NORTH PLAN NORTH NOT TO SCALE 2 PIPE PENETRATION AT ROOF DETAIL NOT TO SCALE 3 ROOF DRAIN DETAIL Page 36 of 69 3" VTR CO FCO FCO FCO FCO 2" VTR 4" SAN CAPPED CONN. FOR FUTURE 4" SAN CAPPED CONN. FOR FUTURE CONNECT TO EXISTING SAN 3 CONNECT TO EXISTING SAN NEW FCO ABANDON EXISTING SAN 3 UTILITY SINK SS HD FD FCO FD FD (3) WC's (2) LAVs EWC (2) LAVs (2) WC's URI CO 4" SAN 1/8" / 12" 4" SAN 1/8" / 12" 3" SAN 1/8" / 12" 4" SAN 1/8" / 12" 4" SAN 1/8" / 12" 4" SAN 5/32" / 12" 4" 4" 4" 4" 4" 3" 3" 3" 3" 3" 4" 3" 3" 4" 2" 1 1/2" 2" 2" 1 1/2" 1 1/2" 1 1/2" 2" 3" 1 1/2" 1 1/2" 1 1/2" 4" 4" 2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 4" 1 1/2" 1 1/2" 3" 3" 3" 3" 3" 20 DFU 20 DFU 40 DFU 43 DFU 43 DFU + 40 DFU FUTURE 10 DFU 53 DFU + 40 DFU FUTURE 13 DFU S S S S S S S UTILITY SINK SS (3) WC's (2) LAVs EWC (2) LAVs (2) WC's URI HB HB NEW 1" DOMESTIC WATER METER w/VALVED BY -PASS SEE DETAIL 3/P -5 CONNECT TO EXISTING 3/4" CW 3 TO WATER HEATING EQUIPMENT SEE DETAIL 5/P -5 TO WATER SOFTENING EQUIPMENT w/VALVED BY -PASS SEE DETAIL 4/P -5 3/4" 3/4" 3/4" 2" 2" 2" 2" 3/4" 2" 2" 2" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 2" 3/4" 3/4" 1" 1" 3/4" 1" 1" 1 1/2" 1 1/2" 1 1/2" 1 1/2" 3/4" 3/4" 2" CAPPED CONNECTION FOR FUTURE USE 3/4" 3/4" 1 1/2" 3/4" 3/4" 1 1/2" 3/4" 3/4" 3/4" 3/4" 1 1/2" 1 1/2" 1" 3/4" 3/4" 3/4" 3/4" 1 1/4" 1 1/2" 3/4" 1 1/4" 3/4" 1/2" 1/2" 3/4" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" H=2 CWS=2 H=4 CWS=19.5 H=6 CS=27.5 TO EXISTING HB C=35.5 C=39.5 COLD (SOFT) 1" 1" 1" 1" 1" 1" © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-5 LGD JUNE 15, 2026 NOT TO SCALE 1 WASTE & VENT DIAGRAM NOT TO SCALE 2 SUPPLY RISER DIAGRAM 109 102 115 114 116 103 NOT TO SCALE 4 WATER SOFTENER DETAIL 109 102 115 114 103 101 NOT TO SCALE 5 WATER HEATING EQUIPMENT NOT TO SCALE 3 DOMESTIC WATER METER DETAIL Page 37 of 69 EXISTING 10" COND DN 2 CONNECT TO EXISTING 10" STORM 3 6" RD 6" RD 6" RD 6" RD 1,600 SQ. FT. 62 GPM 1,610 SQ. FT. 62 GPM 5 5 2,164 SQ. FT. 83 GPM 2,151 SQ. FT. 83 GPM 5 5 6" RD 6" RD 1,571 SQ. FT. 61 GPM 5 1,571 SQ. FT. 61 GPM 5 6" RD 5 2,045 SQ. FT. 79 GPM 6" RD 5 2,455 SQ. FT. 95 GPM 6" RD 5 1,718 SQ. FT. 66 GPM 6" RD 5 6" RD 5 4" RD 4" RD 5 5 838 SQ. FT. 33 GPM 736 SQ. FT. 29 GPM 1,701 SQ. FT. 66 GPM 2,264 SQ. FT. 87 GPM CAP EXISTING 6" STORM 3 CONNECT TO EXISTING 8" STORM 3 CO CO 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 6" ST 1/8" / 12" 4" ST 1/8" / 12" 4" ST 1/8" / 12" EXISTING 10" STORM SEWER 2 128 GPM 376 GPM 867 GPM © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-6 LGD JUNE 15, 2026 NOT TO SCALE 1 STORM/CLEARWATER DIAGRAM Page 38 of 69 K E Y O F P L U M B I N G S Y M B O L S SYMBOLS ABBR. DESCRIPTION STM.S. STORM SEWER OR DRAIN SAN.S. SANITARY SEWER OR DRAIN D.T. DRAIN TILE A.W. ACID WASTE PIPING G.W. GREASY WASTE PIPING CL.W. CLEARWATER WASTE PIPING W. SANITARY WASTE PIPING V. VENT PIPING CL.V. CLEARWATER VENT AV. ACID VENT PIPING CW. COLD WATER PIPING CW.S. SOFTENED COLD WATER PIPING HW. HOT WATER PIPING CR. HOT WATER CIRCULATING RETURN PIPING G. GAS PIPING A. COMPRESSED AIR PIPING BL.V. BALL VALVE BF.V. BUTTERFLY VALVE PRV PRESSURE REGULATING VALVE CK.V. CHECK VALVE B.V. BALANCING VALVE CO/FCO CLEANOUT or FLUSH CLEANOUT (AS NOTED) DTR. DRAIN TILE RECEIVER WITH TRAP AND CLEANOUT DTCO DRAIN TILE CLEANOUT C.C. / P.C. CAPPED CONNECTION or PLUGGED CONNECTION H.B. HOSE BIBB R.D. ROOF DRAIN F.D. FLOOR DRAIN H.D. HUB DRAIN EL. FLOOR AND/OR GRADE ELEVATION I.E. INVERT ELEVATION (ARCHITECTURAL DATUM) I.E. INVERT ELEVATION (ENGINEERING DATUM) B.O. FURNISHED BY-OTHERS (PLB. ROUGH-IN & CONN.) ROOM NUMBERS V.T.R. VENT THROUGH ROOF A.F. ABOVE FLOOR W.S. WASTE STACK V.S. VENT STACK DT AW CL CL AV S G A CO FCO DT DT I.E.: 0'-0'' I.E.: 0.0' A123 V.T. VENT TERMINAL UN. UNION OR DIELECTRIC UNION SAWCUT APPRX. AREA OF EXISTING FLOOR TO BE REMOVED W.H.A. WATER HAMMER (SHOCK) ARRESTOR P.G. PRESSURE GAUGE THERM. THERMOMETER F.S. FLOOR SINK COND. CONDUCTOR PIPING GW RM. N.P. NON-POTABLE WATER NP © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ARCHIVES STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 56 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-7 LGD JUNE 15, 2026 NOT TO SCALE 1 PIPE PENETRATIONS AT NON-RATED WALL DETAIL NOT TO SCALE 2 PIPE PENETRATIONS AT RATED WALL DETAIL NOT TO SCALE 3 TYPICAL PIPE SUPPORT DETAILS Page 39 of 69 25. ALL WORK SHALL CONFORM TO STATE AND LOCAL CODES WHETHER OR NOT SPECIFICALLY SHOWN ON THE PLANS.26. ANY VARIATION FROM THESE PLANS AND/OR SPECIFICATIONS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE HVAC DESIGNER, SHALL RELIEVE THE DESIGNER OF ANY RESPONSIBILITY FOR THE SATISFACTORY OPERATION OF THE ENTIRE HVAC SYSTEM.27. THE HVAC CONTRACTOR SHALL PROVIDE FOUR (4) SETS OF OPERATIONS AND MAINTENANCE MANUALS FOR ANY MAJOR HVAC EQUIPMENT PROVIDED. MANUALS ARE TO BE KEPT ON FILE BY THE OWER, AS WELL AS NEAR THE EQUIPMENT FURNISHED. 34. THE HVAC CONTRACTOR OR RECOGNIZED BALANCING CONTRACTOR SHALL BE RESPONSIBLE FOR BALANCING THE ENTIRE SYSTEM SO THAT THE SUPPLY AIR, RETURN AIR, EXHAUST AIR, AND FRESH AIR ARE WITHIN +/- 10% OF THE AIR QUANTITIES SHOWN ON THE PLAN. THE HVAC CONTRACTOR SHALL FURNISH THE HVAC DESIGNER WITH AN ELECTRONIC VERSION OF THE BALANCING REPORT IN PDF FORMAT, AS WELL AS (4) HARD COPIES THAT SHALL BE RETAINED AT THE PROJECT SITE AND AVAILABLE FOR INSPECTION UPON REQUEST. THE AIR SYSTEMS SHALL BE BALANCED IN SUCH A MANNER AS TO MINIMIZE LOSSES FROM DAMPER THROTTLING BY ADJUSTING FAN SPEED, AND ADJUSTING PROVIDED MANUAL VOLUME DAMPERS IN THE BRANCH DUCT TO EACH GRILL IN ORDER TO MEET AIR FLOW CONDITIONS. BALANCING PROCEDURES SHALL BE ACCEPTABLE TO THE DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES (DSPS), AND THE IMC. THE HVAC CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY VOLUME, CONTROL, AND BACK-DRAFT DAMPERS REQUIRED FOR INSTALLATION AND BALANCING. 28. ALL GAS PIPING SHALL BE BLACK IRON SCHEDULE 40 WITH GAS-COCK AND DIRT LEG AT EACH APPLIANCE. 31. GAS PIPING SHALL CONFORM TO ALL STATE AND LOCAL CODES, AS WELL AS THE NATIONAL FUEL GAS CODE RECOMMENDATIONS.32. THE HVAC CONTRACTOR SHALL FURNISH AND INSTALL SCHEDULE 40 STEEL GAS PIPING AND FITTINGS. THE HVAC CONTRACTOR SHALL INSTALL ALL NECESSARY VALVES, FITTINGS, REGULATORS, AND SAFETY AND OPERATING DEVICES. THE HVAC CONTRACTOR SHALL PROVIDE AND INSTALL AN APPROVED GAS SHUT-OFF VALVE.33. ALL GAS PIPING INSTALLATIONS SHALL COMPLY WITH NFPA 54, AS WELL AS THE MOST CURRENT NATIONAL FUEL GAS CODE. ALTERNATE 'EQUAL' MANUFACTURERS WILL BE CONSIDERED FOR ALL EQUIPMENT AS SCHEDULED IF ALLCAPACITIES, AIR FLOWS, PRESSURE DROPS, EFFICIENCIES, WARRANTIES, AND OVERALL EQUIPMENT QUALITY OFCONSTRUCTION CAN BE DEMONSTRATED. IF ALTERNATE MANUFACTURERS ARE BEING PROPOSED PLEASE LISTWHAT IS BEING OFFERED AS AN ALTERNATE AS WELL AS THE DEDUCT TO THE OWNER IF ACCEPTING THEALTERNATE. 30. ALL GAS PIPING SHALL BE RUN STRAIGHT AND TRUE AND BE INSTALLED IN A QUALITY WORKMANLIKE FASHION.PROVIDE GAS REGULATORS AT EACH APPLIANCE. VENT ALL REGULATORS TO OUTSIDE AS NECESSARY.29. 14. 24. EQUIPMENT NOTES:1. EQUIPMENT SHALL BE ENCLOSED, SUSPENDED, OR GUARDED AS SHOWN ON THE PLANS. EQUIPMENT LOCATIONS SHALL COMPLY WITH ANY/ALL MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS AS WELL AS ALL STATE AND LOCAL CODES WHETHER OR NOT INDICATED ON THE PLANS.2. ALL CLEARANCES AROUND EQUIPMENT SHALL COMPLY WITH MANUFACTURER'S RECOMMEND- TIONS AND STATE AND LOCAL CODES WHETHER OR NOT INDICATED ON THE PLANS. CLEARANCES SHALL ALLOW EASE OF ACCESS AND MAINTENANCE FOR ALL EQUIPMENT AS INSTALLED.3. THERMOSTATS AND ROOM CONDITIONING DEVICES SHALL BE MOUNTED A MAXIMUM OF 4' ABOVE THE FLOOR IN ORDER TO COMPLY WITH "AMERICANS WITH DISABILITIES ACT."4. SMOKE DETECTORS SHALL BE INSTALLED AS PER IMC CODE 606.2.1 THROUGH 606.2.3. EXCEPTION: SMOKE DETECTORS SHALL NOT BE REQUIRED WHERE AIR DISTRIBUTION SYSTEMS ARE INCAPABLE OF SPREADING SMOKE BEYOND THE ENCLOSING WALLS, FLOORS AND CEILINGS OF THE ROOM OR SPACE IN WHICH THE SMOKE IS GENERATED.5. SMOKE DETECTORS SHALL BE INSTALLED IN RETURN AIR SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000 CFM, IN THE RETURN AIR DUCT OR PLENUM UPSTREAM OF ANY FILTERS, EXHAUST AIR CONNECTIONS, OUTDOOR AIR CONNECTIONS, OR DECONTAMINATION EQUIPMENT AND APPLIANCES. EXCEPTION: SMOKE DETECTORS ARE NOT REQUIRED IN THE RETURN AIR SYSTEM WHERE THE SPACE SERVED BY THE AIR DISTRIBUTION SYTEM IS PROTECTED BY A SYSTEM OF AREA SMOKE DETECTORS IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. THE AREA SMOKE DETECTOR SYSTEM SHALL COMPLY WITH THE IMC SECTION 606.4. 5. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY/ALL LINE VOLTAGE WIRING (115 VOLT OR HIGHER). THE TEMPERATURE CONTROL CONTRACTOR SHALL FURNISH AND INSTALL ANY/ALL 24 VOLT CONTROL WIRING.3.2.1.CONTRACTOR SHALL PROVIDE COMPLETE CONTRACTING SERVICES INCLUDING HEATING, VENTILATING ANDAIR-CONDITIONING WORK, AND CONTROL WORK.ALL WORK SHALL BE GUARANTIED FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE OF COMPLETION.THE MANUFACTURER'S REPRESENTATIVE MUST PROVIDE THE START-UP FOR ALL EQUIPMENT.HEATING CONTRACTOR SHALL MOUNT ALL ELECTRIC HEATING UNITS.ALL STARTERS AND DISCONNECTS FOR HEATING EQUIPMENT SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICALCONTRACTOR. ALL 3-PHASE STARTERS SHALL BE MAG. CONTACT OR VFD AS SCHEDULED.VERIFY LOCATION OF ALL THERMOSTATS.PROVIDE FLEXIBLE CONNECTORS BETWEEN ALL MOTORIZED EQUIPMENT AND ITS ASSOCIATED DUCTWORK SYSTEM.DO NOT FABRICATE DUCTWORK WITHOUT FIELD CHECKING CLEARANCES.ALL DUCTWORK SHALL BE PRIME FIRST QUALITY GALVANIZED STEEL SHEETS. GAUGES OF METAL, SUPPORT SPACING,ETC. SHALL CONFORM TO THE LATEST EDITION OF ASHRAE AND SMACNA CONSTRUCTION STANDARDS FORDUCTWORK. ALL SUPPLY, RETURN, AND EXHAUST DUCTWORK SHALL BE CONSTRUCTED TO THE 2" PRESSURECLASSIFICATION TABLE. ALL DUCTWORK SHALL UTILIZE A TDC OR DUCT-MATE CONNECTION SYSTEM.ALL ROUND DUCTWORK SHALL BE SPIRAL DUCT.ALL DUCTS CALLED OUT AS BEING ACOUSTICALLY LINED SHALL USE 1" LINER.ALL DUCT SIZES LISTED ARE ACTUAL SHEET METAL DIMENSIONS. FOR EXAMPLE; IF A DUCT IS NOTED AS BEING24/18-LINED THAN THE ACTUAL SHEET METAL DIMENSION IS 24/18 AND THE INTERIOR "FREE AREA" OF THE DUCT IS22/16.ALL MANUAL VOLUME DAMPERS SHALL BE MULTI-BLADE CONTROL DAMPERS (WHERE DUCT SIZES ALLOW).SEAL ALL DAMPER FRAMES AND DUCTWORK.ALL SUPPLY DUCT TAKE-OFFS SHALL BE 45 DEGREE OR WITH CONICAL TEE.ALL 24x24 CEILING DIFFUSERS SHALL BE PLAQUE TYPE. ALL EXHAUST GRILLES OR CEILING RETURN GRILLES SHALL BE12"x12" OR 24"x24" EGG-CRATES AS SHOWN.FLEX DUCT SHALL NOT EXCEED 5'-0" IN LENGTH.COORDINATE ALL ROOF OR WALL OPENINGS WITH GENERAL CONTRACTOR AND ROOFING CONTRACTOR.HVAC CONTRACTOR SHALL INSTALL NEW ROOF CURBS AS SOON AS POSSIBLE AND PROVIDE TEMPORARY CAP TOPREVENT DAMAGE TO BUILDING.THE ENGINEER IS NOT RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION OR THE SAFETY OF THE JOBSITE, AND THAT THESE RESPONSIBILITIES ARE INTENDED AND REMAIN SOLELY THOSE OF THE CONTRACTOR.SYSTEM HEATING LOADS WERE DETERMINED USING DESIGN DAY CONDITIONS OF -15 DEGREE DB OUTSIDE AIR AND 70DEGREE DB INTERIOR.SYSTEM COOLING LOADS WERE DETERMINED BY USING DESIGN DAY CONDITIONS OF 90/74 DB/WB AND A DISCHARGEAIR TEMPERATURE OF 55/54 DB/WB WITH THE SOLE PURPOSE OF MAINTAINING INDOOR COMFORT AIR CONDITIONS OF74 DEGREES ON A 90 DEGREE DAY. 4.6.7.8.9.10.11.12.13. INCLUDE SMOKE DETECTORS AND/OR RELAY,AND ACCESS PANELS TO DETECTORS. JOIST SPACE INSULATE CURB CAVITYWITH FIBERGLASS BATTINSULATION.PER DETAIL.TO CONDENSATE TRAPCONDENSATE CONNECTION, FLASHINGROOF DECK THERMOSTAT WIRING, VERIFYSENSOR LOCATION WITH POWER WIRING UP THROUGHBASE OF UNIT, CONNECTS TOBREAKER/DISCONNECT ON RTUCASE.FLOOR PLANS. SUPPLY AND RETURNAIR CONNECTIONS. SIZINGPER SHOP DWG.STRUCTURAL ROOF CURB,ROOF PENETRATION AND AIR INTAKEOUTSIDE E.C. TO WIRE. INTERLOCK WITH SUPPLYFAN. UPON SENSING SMOKE FAN SHALLSHUT-DOWN AND AN AUDIBLE AND VISUAL ALARM SHALL BE TRIGGERED.INTERLOCKING WITH THE BUILDINGSFIRE ALARM SYSTEM SHALL SATISFYTHIS REQUIREMENT.NO SCALE SUPPORT FLEX AS REQUIREDTO PREVENT SAGGING.FLEXIBLE AIR DUCT. MAXIMUMLENGTH 5'-0" WITH ONE (1)90° ELBOW. CEILING DIFFUSEREXPOSED GRID CEILINGSYSTEM WITH LAY-INACOUSTICAL TILE. SHEET METAL ELBOW.R=1.0 x DUCT DIA. QUADRANT LOCKBRANCH DUCT SPIN-IN FITTING NOTE: PROVIDE NYLON BANDS FOR CONNECTING FLEXIBLEAIR DUCT TO DIFFUSER AND BRANCH DUCT.SPLICES IN FLEXIBLE AIR DUCT WILL NOT BE ACCEPTED.SCALE: NONE MANUAL VOLUMEDAMPER"R" 15.16.17.18.19.20.21.22.23. Kaukauna, Wisconsin 54130W556 Wrightstown Rd.Phone: 920-268-6404email: allhvacdesign@gmail.com DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES Page 40 of 69 GGGGG GG REMOVE EXISTINGVENT IN ITS ENTIRETY. REMOVE EXISTINGUNIT HEATER ANDALL ASSOCIATEDVENTING.REMOVE EXISTINGUNIT HEATER ANDALL ASSOCIATEDVENTING. REMOVE EXISTINGEXHAUST FAN ANDALL ASSOCIATED DUCTWORK, POWERAND CONTROL WIRING,AND ROOF CURBREMOVE EXISTINGEXHAUST FAN ANDALL ASSOCIATED DUCTWORK, CONTROLWIRING, AND ROOFCURB GEXISTING GAS REMOVE EXISTINGVENT IN ITS ENTIRETY.REMOVE EXISTINGUNIT HEATER ANDALL ASSOCIATEDVENTING. REMOVE EXISTINGVENT IN ITS ENTIRETY. REMOVE EXISTINGEXHAUST FAN ANDALL ASSOCIATED DUCTWORK, POWERAND CONTROL WIRING,AND ROOF CURB REMOVE EXISTINGPACKAGED ROOFTOP UNIT AND ALL ASSOCIATED DUCTWORK, POWER/CONTROLWIRING, AND ROOF CURB REMOVED EXISTING GASPIPING BACK TO LOCATIONOF NEW LINE TO BE RUNTO NEW RTU-1....SEE NEW PLAN REMOVE EXISTINGPACKAGED ROOFTOP UNIT AND ALL ASSOCIATED DUCTWORK, CONTROL WIRING,AND ROOF CURB.POWER AND GAS SHALLREMAIN, TO BE RE-USEDFOR NEW RTU-2 REMOVE EXISTINGPACKAGED ROOFTOP UNIT AND ALL ASSOCIATED DUCTWORK, CONTROL WIRING,AND ROOF CURB.POWER AND GAS SHALLREMAIN, TO BE RE-USEDFOR NEW RTU-3 REMOVE EXISTINGPACKAGED ROOFTOP UNIT AND ALL ASSOCIATED DUCTWORK, CONTROL WIRING,AND ROOF CURB.POWER AND GAS SHALLREMAIN, TO BE RE-USEDFOR NEW RTU-4 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES SCALE: 1/8" = 1'-0"H.V.A.C. DEMOLITION PLAN Page 41 of 69 125CFM 150CFM 100CFM 10"Ø24x24C.T.G. 250 CFM12x12 C.E.G. ERV-1ON ROOF 300CFM 300CFM 225CFM T EWH-24 KW RTU-27-1/2 TON RTU-17-1/2 TON 225CFM 250 CFM12x12 C.E.G.175CFM 175CFM 250CFM 150CFM 10"Ø12/12 EXH. DUCT 12/12 FRESH AIR EWH-34 KW 100CFM200CFMMVD T T 28/16LINED MVD2800 CFM28/16LINED 8"Ø LINED36/1814"ØMVD24x24 C.R.G.950 CFM TEMPERATURE CONTROLPANEL(S) AND DIGITALPROGRAMMABLE TIME-CLOCK(S) ON WALL BEHIND DOOR. T NOTE: DEMOLITION OF EXISTINGROOF TOP UNIT SHALL BE COMPLETEDOWN TO EXISTING ROOF DECK.A NEW 14" ROOF CURB SHALL BE PROVIDED OVER THE EXISTING ROOFOPENINGS. MODIFY EXISTING OPENINGSAS NECESSARY WITHIN THE CONFINES OF THE NEW CURB. NOTE: DEMOLITION OF EXISTINGROOF TOP UNIT SHALL BE COMPLETEDOWN TO EXISTING ROOF DECK.A NEW 14" ROOF CURB SHALL BE PROVIDED OVER THE EXISTING ROOFOPENINGS. MODIFY EXISTING OPENINGSAS NECESSARY WITHIN THE CONFINES OF THE NEW CURB. 6"Ø VAV-3A1050 CFMVAV-3B350 CFM18/14-LINED 12"ØMVD10"Ø10"Ø 8"Ø 8"ØMVD MVDMVD8"Ø8"Ø10"Ø 8"ØMVD MVDMVDMVD WRAP FRESH AIRDUCT WITH 4.2" OFFOIL-FACED INSULATION MVD8"Ø 8"Ø 16"Ø W/ MVD OFFBOTTOM OF R.A.MAIN TO 24x24 C.R.G.1000 CFM MVD MVD OPEN ENDED36/16-LINED 6"Ø 6"Ø 6"Ø MVD2900 CFM 12/10-LINEDTRANSFER DUCTOPENENDED12x12C.T.G. 8"Ø 8"ØMVD 14/14-LINED MVD 150 CFM12x12 C.E.G.EXTEND 3/4" GASFROM EXISTING TONEW ROOFTOP UNIT GEXISTING GAS S CO2 SENSOR...OPERATE PERNOTE 3 ON RTUSCHEDULEOPEN ENDED36/16-LINED 28/12LINED36x10 FLANGEDOPENING.24x14 FLANGEDOPENING. 24x14 FLANGEDOPENING.24x14 FLANGEDOPENING. RTU-1 RTU-2 12"Ø18/14-LINED 12/12 18/18-LINED TO24x24 C.R.G...BALANCE TO 1400 CFM MVDCAP DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES SCALE: 1/4" = 1'-0"PARTIAL H.V.A.C. FLOOR PLAN Page 42 of 69 RTU-410 TON 400CFM 125CFMT 325CFM 250CFM10"Ø24x24C.T.G.24x24 FURNACE NO. 1W/ MATCHING4 TON CONDENSINGUNIT ON EQUIP. PAD DUCTLESS MINI-SPLIT NO. 1 200CFM RTU-37-1/2 TON T T T T T EWH-24 KW EWH-14 KW TUH-2 TUH-1 PAINT BOOTH(BY OWNER) 20"ØVAV-4B2200 CFM 14"ØVAV-4A1000 CFM VAV-4C800 CFM14"Ø FUTURE 48" 32/20LINED 18x12 DOUBLEDEFLECTION SUPPLYGRILLE...800 CFMCUT 14"Ø OPENING INROOF DECK AND COVERWITH 18x18x14 HIGH CURBOVER OPENING. FLASH, CAP,AND SEAL WATER/AIR TIGHTFOR FUTURE 12"Ø VENT FROMFUTURE 48" PAINT BOOTH. 20x6 DOUBLEDEFLECTION SUPPLYREGISTER...550 CFM 20x6 DOUBLEDEFLECTION SUPPLYREGISTER...450 CFM TRANSITION FROM14"Ø TO 16/14 LINEDIN DROP. 20x6 DOUBLEDEFLECTION SUPPLYREGISTER...550 CFM 12x4 DOUBLEDEFLECTION SUPPLYREGISTER...200 CFM20x6 DOUBLEDEFLECTION SUPPLYREGISTER...475 CFM 36x6 DOUBLEDEFLECTION SUPPLYREGISTER...975 CFM 18"Ø 24x24 C.T.G. COMPLETEWITH BACKDRAFT DAMPERTO PREVENT AIR FROMFLOWING FROM THE FABAREA TO THE COLLECTIONSWAREHOUSE. 24x24 C.T.G.OFF BOTTOM OF LINED 24/24TRANSFER DUCT. EXTEND CONDENSATE TO HUBDRAIN IN JANITOR ROOM. FURNACE 150CFM MVD10"Ø 5"Ø DRYER TYPEWALL VENT 200CFM200CFM 200CFM200CFM LINED36/18 8"Ø 18/16-LINED SSPEED SWITCH FOR(4) CIRC FANS ONWALL AT 44" A.F.F.TO BOTTOM OF ROUGH-IN BOX. 32/20LINED(3) 24x24C.R.G. 30x30 TRANSFERGRILLE HIGH ONEACH SIDE OF WALL 20"Ø 16/14-LINED AT 10 FT A.F.F. 22/22LINED T REF-1400 CFM 10/10 NEAR STRUCTUREAT UNDERSIDE OF ROOF.18x18 C.E.G.400 CFM 14x10 TRANSFERGRILLE LOW ON EACHSIDE OF WALL. S ROOM PRESSURE SENSORTO CONTROL RTU-4 O.A. DAMPERPOSITION OVER-RIDE. IF THIS ROOM'S PRESSURE GOES NEGATIVERELATIVE TO THE WAREHOUSE SPACESTHEN OUTDOOR AIR DAMPER SHALLMODULATE TO MAINTAIN RELATIVENEUTRAL BUILDING PRESSURE.GGGGG GG NOTE: DEMOLITION OF EXISTINGROOF TOP UNIT SHALL BE COMPLETEDOWN TO EXISTING ROOF DECK.A NEW 14" ROOF CURB SHALL BE PROVIDED OVER THE EXISTING ROOFOPENINGS. MODIFY EXISTING OPENINGSAS NECESSARY WITHIN THE CONFINES OF THE NEW CURB. NOTE: DEMOLITION OF EXISTINGROOF TOP UNIT SHALL BE COMPLETEDOWN TO EXISTING ROOF DECK.A NEW 14" ROOF CURB SHALL BE PROVIDED OVER THE EXISTING ROOFOPENINGS. MODIFY EXISTING OPENINGSAS NECESSARY WITHIN THE CONFINES OF THE NEW CURB. 10"Ø10"ØMVD6"Ø 12/12-LINEDVAV-3A1050 CFM VAV-3C1600 CFM VAV-3B350 CFM 28/14LINED20/16-LINED 8"Ø8"Ø20/14-LINED14/14-LINED MVDMVD MVDMVD MVDMVD 8"Ø8"Ø 8"Ø8"Ø NOTE: DEMOLITION OF EXISTINGROOF EXHAUST FAN SHALL BE COMPLETEDOWN TO EXISTING ROOF DECK.A NEW 24" ROOF CURB SHALL BE PROVIDED OVER THE EXISTING ROOFOPENING. MODIFY EXISTING OPENINGAS NECESSARY WITHIN THE CONFINES OF THE NEW CURB. 14/14-LINED 6"Ø UP THRU PIPE PORTAL. TERMINATE WITH RAIN CAP AT42" ABOVE ROOF SURFACE.WRAP INTERIOR PORTION OF6"Ø DUCT WITH 4.2" OF FOIL-FACED INSULATION. MVD8"Ø 10"Ø24/14LINED COMBINATION VENT/INTAKETHRU EXISTING ROOF PENETRATION. PROVIDENEW FLASHING/SEALINGAIR/WATER TIGHT. VENTTO TERMINATE WITH RAINCAP 36" ABOVE ROOFPENETRATION. 1/2" GAS TOUNIT HTR UH-2125 MBHUH-1125 MBH CEF-1100 CFM 20/14LINED20/14LINED8"Ø 14/14-LINED ON ROOF. MOUNT AIR COOLED CONDENSING 8"Ø18/14-LINED MVD 18/14LINED GG LEAVE 1/2" VALVEDAND CAPPED GASFOR PLUMBER 1/2" GAS3/4" GASTO FURNACE EXISTING GASMETER (2 LB)VERIFY. PROVIDE MVD IN DROP ANDBALANCE TO 75 CFM 1" GAS 1" GAS CONNECT NEW 1" GASTO EXISTING AND EXTENDAS SHOWN. 1" GAS CIRC FANNO. 1 CIRC FANNO. 2 CIRC FANNO. 3 CIRC FANNO. 4 COMBINATION VENT/INTAKEUP THRU ROOF. TERMINATEWITH RAIN CAP 42" ABOVEROOF SURFACE. SCO2 SENSOR...OPERATE PERNOTE 3 ON RTUSCHEDULEMVD 20/14-LINED 28/14LINED 8"Ø8"ØMVDMVD14/14-LINED200CFM 200CFM 200CFM 12"Ø 18/18-LINED TO24x24 C.R.G...BALANCE TO 1400 CFM MVD DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES SCALE: 1/4" = 1'-0"PARTIAL H.V.A.C. FLOOR PLAN Page 43 of 69 400CFM CFM FURNACE NO. 1W/ MATCHING4 TON CONDENSINGUNIT ON EQUIP. PAD DUCTLESS MINI-SPLIT NO. 1 TUH-1 TUH-4UH-3 PAINT BOOTH(BY OWNER) CIRC FANNO. 5 CIRC FANNO. 6 CIRC FANNO. 7 CIRC FANNO. 8 FUTURE 48"CUT 14"Ø OPENING INROOF DECK AND COVERWITH 18x18x14 HIGH CURBOVER OPENING. FLASH, CAP,AND SEAL WATER/AIR TIGHTFOR FUTURE 12"Ø VENT FROMFUTURE 48" PAINT BOOTH. EXTEND CONDENSATE TO HUBDRAIN IN JANITOR ROOM. FURNACEMVD10"Ø 5"Ø DRYER TYPEWALL VENT 18/16-LINED SSPEED SWITCH FOR(4) CIRC FANS ONWALL AT 44" A.F.F.TO BOTTOM OF ROUGH-IN BOX. 14x10 TRANSFERGRILLE LOW ON EACHSIDE OF WALL. GGGG GGG MVD8"Ø COMBINATION VENT/INTAKETHRU EXISTING ROOF PENETRATION. PROVIDENEW FLASHING/SEALINGAIR/WATER TIGHT. VENTTO TERMINATE WITH RAINCAP 36" ABOVE ROOFPENETRATION. EXTEND EXISTINGGAS TO NEW UNITHEATER LOCATION.1/2" 1/2" CONNECT NEW1/2" GAS TOEXISTING. 125 MBH UH-3125 MBHUH-4125 MBH CEF-1100 CFM ON ROOF. MOUNT AIR COOLED CONDENSINGUNIT ON EQUIP PAD ON ROOF. 8"Ø18/14-LINED GG1/2" GAS3/4" GASTO FURNACE EXISTING GASMETER (2 LB)VERIFY.1" GAS COMBINATION VENT/INTAKE OUT SIDEWALL WITH RAIN CAP 42" ABOVEROOF SURFACE. DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES SCALE: 1/4" = 1'-0"PARTIAL H.V.A.C. FLOOR PLAN Page 44 of 69 ERV-1F.L.A.TAGUNITMAKE-UP AIRFILTERSCFM SPEEDSUPPLY FAN MOTORVOLT/PHEXHAUST AIRCFMFILTERSEXHAUST FAN MOTORF.L.A. UNITEFF.CONSTRUCTIONMODELMANUFACTURERE.S.P. E.S.P. NOTES:1. UNIT SHALL BE COMPLETE WITH MERV 8 FILTERS, FIELD WIRED 3.7 KW ELECTRIC PRE-HEAT COIL, MOTORIZED ISOLATION DAMPERS, MAG. CONTACT MOTOR STARTERS, AND FUSED DISCONNECTS. 650MERV 8AMPS240/1ONE650 65.1%OXYGEN 8A18OUSTATIC PLATE, HEAT0.75"MERV 8& HUMIDITY TRANSFER0.75" SPEEDVOLT/PHONE UNIT ELECTRICALMCAMOCP29.730 TAG WHDEWH-1BTU/HRUNITLOCATIONWATTSRECESSED DIMENSIONVOLTSPH.MFRMODELCONNECTDIS-THERMOSTATSSHOWH-400813,6524000 208YESDIGITAL14-3/818-1/44 BERKO1CORRIDOR MODELNO. 3. UNIT COMPLETE WITH EC BLOWER MOTOR, LINE SET, EVAPORATOR DEFROST CONTROL, AND PROGRAMMABLE T'STAT WITH WEB ACCESS. SERVICENO.UNITOUTSIDETOTALTYPECFMEXT. S.P.AIR CFMSUPPLY FANOUTDOOR CONDENSING UNIT LATEATWBDBWBDB(DEG.)TEMP.MBHTONSCOOLINGAMB.MODELNO.S.E.E.R.VOLTPH MBHINPUTFUELTYPEMBHCONTROLOUTPUTSTEPSAFUEFURNACEMANUF. NOTES: 1. VERIFY ALL VOLTAGE AVAILABILITIES WITH E.C. BEFORE ORDERING ANY EQUIPMENT. VOLTPH 2. MATCHING CASED COOLING COIL SHALL ALSO BE FURNISHED. COIL SHALL BE AN "A" TYPE ARRANGEMENT. IF MORE THAN ONE SIZE IS OFFERED FOR EACH MATCHING FURNACE THE SIZE THAT MOST CLOSELEY MATCHES THE FURNACE DISCHARGE SHALL BE USED. MCAMOCP MCAMOCP 4. ORDER UNIT WITH SIDE RETURN AIR SET-UP, AND COMPLETE WITH 2" CARTRIDGE FILTER RACK.5. ALL REQUIRED MOTOR STARTERS AND DISCONNECTS FURNISHED AND INSTALLED BY E.C. NOTE: WALL HEATERS SHALL BE LOCATED 8" ABOVE FINISHED FLOOR. 2.8 AMPS208/12.8 3. H.C. SHALL FURNISH AND INSTALL THE TIME CLOCK. DM92SN1005CNA*1OFFICE /ARRANG.VERT.1550750.65"55.467.080.056.395445.5DC3SEN4810A*13.4 1208-23025.640NAT292%112016.725GAS DAIKIN10092.1TOILETS MANUFACTURERMODELTAGUNITSERVICECFMS.P.IN H2ORPMMOTORAMPSVOLTSPH.SPEEDB.D.DPRINLETGRILLESPEEDCONTROLWALLJACKBRICKVENTARRANGEMENTCEILINGINLINE DISCONNECTCEF-1MECH 109X 100 GREENHECKYESNOYESNOYESONE120110100.190.25 SPA-125YES MODELMANUFACTURERCURBROOFTYPEDPR.SPEEDPH.VOLTSH.P.MOTORDRIVEFANRPMFANINCHDIA.FANTYPET.S.P.CFMSERVICENO.UNIT DPR.SIZEROOF OPENINGCONNECTDIS-REF-1EXHIBIT WORK4000.55BI91550DIRECT1/101201VGYESB.D.10x1013.5x13.524"GREENHECKVG-090NOTE: FAN SHALL BE CONTROLLED VIA DIGITAL PROGRAMMABLE TIMER LOCATED BEHIND THE DOOR IN MECH ROOM 109. NOTE 1: UNIT COMPLETE WITH STAND-ALONE CONTROLLER, BAROMETRIC RELIEF, POWERED CONVENIENCE OUTLET, HINGED ACCESS DOORS, FULL ECONOMIZER CONTROL, R.A. SMOKE DETECTOR, R.A. CO2 DETECTOR (IN R.A. MAIN FOR RTU-1,2, & 4, AND IN EACH CONFERENCE ROOM), HAIL GUARD, AND 14" ROOF CURB.NOTE 2: R.A. SMOKE DETECTOR CONTROL: E.C. SHALL INTERLOCK THE DETECTOR WITH THE UNITS' SUPPLY AIR FAN. UPON ACTIVATION DETECTOR SHALL TURN SUPPLY FAN "OFF" AND TRIGGER A VISUAL AND AUDIBLE ALARM PLACED IN A LOCATION OF MOST OCCUPANCY.NOTE 3: R.A. CO2 SENSOR: UPON SENSING LEVELS GREATER THAN 1200 PPM THE O.A. DAMPER SHALL MODULATE OPEN BEYOND ITS' LISTED MINIMUM POSITION (100% CLOSED) UNTIL LEVELS DROP BELOW 1200 PPM. O.A. DAMPER SHALL THEN RETURN TO ITS' MINIMUM LISTED POSITION. 1125102.5198012014"ØUNITNO.INPUTMBHOUTPUTMBHCFMELECTRICAL CIRCUITVOLTPH.FLUESIZEMANUFACTURERMODELNO.INTAKESIZE4"ØMODINEHDS-125 NOTE: UNITS COMPLETE WITH REMOTE T'STAT AND COMBINATION VENT/INTAKE TERMINATION KITS 2 NOTE: ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C. NOTE 4: ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C. OVERALL UNIT ELECTRICAL CHARACTERISTICSFUSE SIZEDUAL-ELEMENTRECOMMENDEDMAX.MIN.FUSEAMPACITYCIRCUITMINIMUMPHVOLT NO.MODELMANUF.CURBROOFAREAMEDIAHEATINGBURNEROUTPUTMBHINPUTMBHTYPEFUELHPFANSCOND.TONSMBHTEMP.AMB.WBDBWBDBLATEATSPEEDSPH.VOLTH.P.MOTORE.S.P.AIR CFMOUTSIDECFMTOTALTYPESERVICENO.UNIT BY-PASSHOT GASCOOLINGSUPPLY FAN FILTERSTYPEMERV(DEG.)E.E.R.DRIVE QTY. (FT.) RTU-4 EXCHANGERHEAT RNA-010AAON314"NAT.GAS.350283.5YES9.5113.695 11 2"PLEATED8.898 6080805554 208STAINLESSSTEEL400-2200DIRECT 80675 VFD2083ARRANG.DOWNFLOW4000 MODELNO.REMARKSRECOMMENDEDDUAL-ELEMENTPHMINIMUMCIRCUITVOLTCONDENSING UNITSTONSSEERMBHCLNG AMPACITYFUSE SIZENO.MODELMBHCOOLINGSPEEDSHEATINGINDOOR UNITMOTORCFM 2. MFR. TO FURNISH REMOTE CONTROL DEVICE. MOUNT DEVICE ON WALL IN ROOM AS SHOWN.1. COST MUST INCLUDE PRICE TO RUN CONDENSATE TO HUB DRAIN (COORDINATE WITH PLUMBING CONTRACTOR), AND REFRIGERANT PIPING TO AND FROM THESE UNITS. VOLTPH.M.C.A.QTYUNITSERVICE CLNGHSPFMBH 5. ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C. AMPNO.UNITSERVICEDIA.MANUF.MODELMOTORVOLTSPH.1 12011.256" 56001BERKO NOTE: ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C.NOTE: UNITS COMPLETE WITH ALL HANGING HARDWARE AND CONTROLS. 4. CONDENSING UNIT COMPLETE WITH WIND BAFFLE. 11.7 8:1 2 34 345 1,2,3,4,5111.0208/23020.8112.04N/A1208/2301.04251I.T. 110 N/A 28PKA-A12LA12.0 PUY-A12NKA7 (SEE NOTE) BREAKERSEE NOTE125102.5198012014"Ø4"ØHDS-125125102.5198012014"Ø4"ØHDS-125125102.5198012014"Ø4"ØHDS-125 MULTI-USEWAREHOUSE 103 BAROMETRIC YES RELIEF NOTE: GROUP FANS ON SINGLE CONTROLLER PER ROOM CONTAINING CIRC FANS. 3. VERIFY ALL VOLTAGE AVAILABILITY BEFORE ORDERING ANY EQUIPMENT. 120156" 56001BERKOMULTI-USEWAREHOUSE 103120156" 56001BERKOCOLLECTIONSWAREHOUSE 104120156" 56001BERKOCOLLECTIONSWAREHOUSE 104120156" 56001BERKOGENERAL USE /STORAGE 1016 120156" 56001BERKOGENERAL USE /STORAGE 1017 120156" 56001BERKOGENERAL USE /STORAGE 1018 120156" 56001BERKOGENERAL USE /STORAGE 101 1.21.21.21.21.21.21.2 105EWH-2 SSHOWH-400813,6524000 208YESDIGITAL14-3/818-1/44 BERKO1VESTIBULE112 HOT DAWGMODINEHOT DAWGMODINEHOT DAWGMODINEHOT DAWG NOTE: ALL UNIT HEATERS CAN BE GROUPED ON A SINGLE 15 AMP CIRCUIT. SEE NOTESEE NOTESEE NOTE AREA 102FAN SHALL BE PROGRAMMED TO OPERATE CONTINUOUSLY DURING ALL BUILDING'S OCCUPIED HOURS. 2. UNIT SHALL BE CONTROLLED VIA DIGITAL PROGRAMMABLE TIMER LOCATED BEHIND THE DOOR IN MECH ROOM 109.UNIT SHALL BE PROGRAMMED TO OPERATE CONTINUOUSLY DURING ALL BUILDING'S OCCUPIED HOURS. NOTE: ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C.NOTE: H.C. SHALL FURNISH AND INSTALL THE TIME CLOCK. 4. THE ELECTRIC PRE-HEATER SHALL BE SET TO KEEP OUTSIDE AIR ENTERING THE UNIT TO 5°F OR ABOVE. NOTE: FAN SHALL BE CONTROLLED VIA DIGITAL PROGRAMMABLE TIMER LOCATED BEHIND THE DOOR IN MECH ROOM 109.FAN SHALL BE PROGRAMMED TO OPERATE CONTINUOUSLY DURING ALL BUILDING'S OCCUPIED HOURS.NOTE: ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C.NOTE: H.C. SHALL FURNISH AND INSTALL THE TIME CLOCK. EWH-3 SSHOWH-400813,6524000 208YESDIGITAL14-3/818-1/44 BERKO1VESTIBULE119 RTU-3 DHG0903WM00283CDAIKIN314"NAT.GAS.180145.8YES7.59095 21 2"PLEATED5.568 42.350505554 208ALUMINIZEDSTEEL275-RTU1.0"DIRECT 80673-1/2VFD2083ARRANG.DOWNFLOW3000 12.5 2:1(650-ERV)YESROOMSCONFERECE1.0"RTU-2 DHG0903WM00283CDAIKIN314"NAT.GAS.180145.8YES7.59095 21 2"PLEATED5.568 42.350505554 208ALUMINIZEDSTEEL1.0"DIRECT 80673-1/2ONE2083ARRANG.DOWNFLOW3000 12.5 2:1YESRTU-1 DHG0903WM00283CDAIKIN314"NAT.GAS.180145.8YES7.59095 21 2"PLEATED5.568 42.350505554 208ALUMINIZEDSTEEL1.0"DIRECT 80673-1/2ONE2083ARRANG.DOWNFLOW3000 12.5 2:1YESTENANT 118FUTURETENANT 116FUTURESTORAGEMUSEUM 150150 NOTE: H.C. SHALL FURNISH THE CONTROLLERS AND TURN OVER TO E.C. FOR INSTALLATION. UNITNO. OUTLETSIZE BYBYBYCONTROLPRESSUREDEPENDENT ORINDEPENDENTTYPEFURNISHEDTRANSFORMERINSTALLEDCONTROLMANUF.MODEL 4C 3C CFMMINIMUM 4A INLETSIZE 4B 3A3B1050 INDEP. ENVIRO-TECSDR-1012.75x11.25T.C.C.T.C.C.T.C.C.40010"Ø3502006"Ø T'STATCFMMAXIMUM 80025010"Ø220020016"Ø160060012"Ø10005010"ØINDEP. ENVIRO-TECSDR-068.75x8.75T.C.C.T.C.C.T.C.C.T'STATINDEP. ENVIRO-TECSDR-1214.75x13.75T.C.C.T.C.C.T.C.C.T'STATINDEP. ENVIRO-TECSDR-1012.75x11.25T.C.C.T.C.C.T.C.C.T'STATINDEP. ENVIRO-TECSDR-1622.75x16.25T.C.C.T.C.C.T.C.C.T'STATINDEP. ENVIRO-TECSDR-1012.75x11.25T.C.C.T.C.C.T.C.C.T'STAT DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES Page 45 of 69 E0.1MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 ELECTRICAL SHEET INDEX26-013 E1.1E0.1ELECTRICAL DEMOLITION FLOOR PLANELECTRICAL LIGHTING FLOOR PLAN 1.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ALL ELECTRICAL SYSTEM COMPONENTS IN OR ONTHIS BUILDING UNLESS NOTED OTHERWISE ON THIS PLAN.2.PROVIDE A NEW BLANK PLATE OVER ANY EXISTING BOXES WHERE WALLS ARE REMAINING AND DEVICE REMOVED.3.COORDINATE WITH OTHER TRADES AND INCLUDE ALL ELECTRICAL DEMOLITION WORK REQUIRED BY THOSE TRADESTO COMPLETE THE DEMOLITION.4.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ALL LOW VOLTAGE ELECTRICAL SYSTEMCOMPONENTS AND EQUIPMENT (PAGING / SOUNDS / FIRE ALARM / DATA / VOICE / DOOR ACCESS CONTROL / SECURITYSYSTEMS) INCLUDING SYSTEM CABLING, CONDUIT, DEVICES, ETC. IN OR ON THIS BUILDING UNLESS NOTEDOTHERWISE ON THIS PLAN.5.NOT ALL ELECTRICAL EQUIPMENT, TO BE REMOVED, IS SHOWN ON THIS PLAN. IT IS THE INTENT OF THIS PLAN TOREMOVE ALL ELECTRICAL UNLESS SPECIFICALLY NOTED ON THIS PLAN.6.DEMOLITION PLAN IS BASED ON CASUAL ON-SITE OBSERVATION AS EXISTING ELECTRICAL DRAWINGS ARE NOTAVAILABLE FOR THIS BUILDING. IT SHALL BE UNDERSTOOD THAT IT IS NOT INCLUSIVE OF ALL WORK NECESSARY.CONTRACTOR IS RESPONSIBLE FOR ACCOMPLISHING ALL DEMOLITION WORK REQUIRED BY THE CONTRACTDOCUMENTS AND NECESSARY TO ACCOMMODATE SATISFACTORY COMPLETION OF THE PROJECT.7.UNLESS NOTED OTHERWISE, CONTRACTOR SHALL REMOVE AND TAKE POSSESSION OF MATERIALS, EQUIPMENT, ANDDEVICES DEPICTED ON DRAWINGS, AND AS REQUIRED FOR PROJECT’S INTENDED RESULT. REMOVE CIRCUITING TOIT’S SOURCE OR TO REMAINING EQUIPMENT ON A COMMON CIRCUIT. PROVIDE MODIFICATIONS AS NECESSARY TOMAINTAIN POWER TO REMAINING DOWNSTREAM EQUIPMENT.8.DO NOT SALVAGE ANY ELECTRICAL EQUIPMENT OR COMPONENTS FOR REUSE, UNLESS NOTED OTHERWISE.9.BUILDING WILL RECEIVE A NEW ELECTRICAL SERVICE. COORDINATE WITH THE LOCAL UTILITY COMPANY - STURGEONBAY UTILITIES ON REMOVAL OF THE EXISTING OVERHEAD ELECTRICAL SERVICE. ELECTRICAL CONTRACTOR TODISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ALL OWNER OWNED ELECTRICAL SERVICEEQUIPMENT / MATERIALS.10.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR EXISTING ELECTRICAL SERVICE GROUNDING SYSTEM.11.COORDINATE TIMING AND PHASING OF ELECTRICAL SERVICE REMOVAL / POWER OUTAGE WITH THE GENERALCONTRACTOR. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL SERVICE AND OR TEMP POWER FORTHE PROJECT DURING THE CONSTRUCTION PHASE.12.LIGHTING DEMOLITION: ONLY EXTERIOR LIGHTING FIXTURES ARE SHOWN ON THE DEMOLITION FLOOR PLAN. ALLEXISTING LIGHT FIXTURES, INTERIOR AND EXTERIOR, AND TO BE DISCONNECT, REMOVE, TAKEN POSSESSION OF, ANDSITE CLEARED. INCLUDING ALL LIGHT SWITCHES, CIRCUITS, CONDUIT, WIRE, TIMECLOCKS, SENSORS, CONTROLS,ETC.13.EXISTING BUILDING DOES NOT HAVE A FIRE ALARM SYSTEM INSTALLED. BUILDING IS SPRINKLERED. DISCONNECT,REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ALL SPRINKLER SYSTEM MONITORING AND OR DUCT DETECTORWIRING / MONITORING.14.ANY ELECTRICAL DEVICES RECESSED IN ANY EXISTING COLUMN OR WALL THAT IS TO REMAIN ARE TO BE REMOVED,INCLUDING DEVICE, PLATE, AND CONDUCTORS BACK TO POINT OF ORIGIN. PLACE A NEW BLANK PLATE OVEREXISTING EMPTY BOX. GENERAL NOTES - ELECTRICAL DEMOLITIONPLAN NOTES - SHEET E0.1DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ALL ELECTRICAL SYSTEM COMPONENTS(ELECTRICAL SERVICE, FEEDERS, CONDUIT, WIRE / CABLE, FITTINGS, CABLING, JUNCTION BOXES, PANELS, LIGHTFIXTURES, DEVICES, CIRCUITS, LOW VOLTAGE SYSTEM EQUIPMENT, HVAC ELECTRICAL CIRCUITS, DISCONNECTS,ETC.) IN OR ON THIS BUILDING UNLESS NOTED OTHERWISE ON THIS PLAN.EXISTING OWNER (PRIVATELY OWNED) FIBER OPTICAL CABLE FROM ADJACENT DOOR COUNTY MUSEUM BUILDINGTO EXISTING MDF RACK IN THIS BUILDING. DISCONNECT, REMOVE, AND TAKE POSSESSION OF AND SITE CLEAR.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ELECTRICAL MAIN DISTRIBUTION PANEL / FEEDER.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ELECTRICAL BRANCH PANEL / FEEDER.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR EXTERIOR WALL MOUNTED FLOOD LIGHT.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR EXTERIOR SOFFIT MOUNTED FLOOD LIGHT.EXISTING OWNER FIBER OPTIC CABLE ENTRANCE POINT INTO BUILDING.EXISTING OVERHEAD DOOR IS TO REMAIN. SITE CLEAR ELECTRICAL LINE VOLTAGE CIRCUIT, DISCONNECT FORMOTOR. REFEED FROM NEW PANEL A1 - SEE SHEET E2.1 AND MOTOR SCHEDULE.DISCONNECT, REMOVE, AND TURN OVER TO THE OWNER EXISTING MDF RACK AND EQUIPMENT WITHIN.DISCONNECT EXISTING 12 STRAND MULTI MODE FIBER CABLE AND SITE CLEAR. SEE SHEET E2.1 AND DETAIL 1/E3.1FOR INFORMATION ON NEW FIBER CABLING.EXISTING RECEPTACLES ON OUTSIDE WALL ARE FED UP FROM CONCRETE FLOOR. DISCONNECT, REMOVE, ANDTAKE POSSESSION OF DEVICE AND CONDUCTORS. CUT CONDUIT FLUSH WITH FLOOR AND CAP - TYP.EXISTING FIBER OPTIC CABLE IS ALREADY DETACHED FROM EXISTING DOOR COUNTY MUSEUM BUILDING ANDCURRENTLY COILED ON GRADE AT UTILITY POLE - SITE CLEAR.DISCONNECT, REMOVE, AND SITE CLEAR ALL DEVICES ON EXISTING COLUMN. PROVIDE BLANK PLATE OVEREXISTING BOX.DISCONNECT, REMOVE, AND SITE CLEAR ALL DEVICES ON EXISTING WALL THAT IS SCHEDULED TO REMAIN.PROVIDE BLANK PLATE OVER EXISTING BOX.DISCONNECT, REMOVE, AND SITE CLEAR ALL CONDUIT AND POWER TO EXTERIOR "YOUNKERS" BUILDING SIGN.DISCONNECT, REMOVE, AND SITE CLEAR ALL EXISTING SPRINKLER SYSTEM MONITORING / ALARM EQUIPMENT /DEVICES.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR ALL PHONE EQUIPMENT / LOW VOLTAGE. 1234657 1 EX PANEL MDPEX PANEL A EX PANEL B EX PANEL C EX PANEL D EX PANEL G EX UTILITY POLE 1 1 1 11 1 1 1 1 111 1 1 1 1 11 EX MDFRACK 2 EX SUB PANELEX SUB PANEL344 4 4 4 4 4 1 1 1 RTU 1 2 6 EX ELEC METER 2 ATTACHED AT UTILITY POLE 5 55555 5 OVERHEAD FIBER CABLING TOMUSEUM BUILDING(OWNER OWNED) 6 6 6 6 7 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES 3 ETR OHD-1 88 9 9 EX CKT: A-12120V / 20A ETR 1E4.1 1E4.1 1E4.1 1E4.1 1E4.1 4 5 E1.2LIGHT FIXTURE SCHEDULE, LIGHTING CONTROLS SCHEDULE, AND DETAILSE2.1ELECTRICAL POWER AND SYSTEMS FLOOR PLANE3.1DETAILSE3.2DETAILSE4.1ELECTRICAL ONE-LINE DIAGRAM AND DETAILSE4.2PANELBOARD SCHEDULES AND SPC SCHEDULEE4.3MOTOR SCHEDULE, ELECTRICAL SYMBOLS LIST, AND EXISTING SITE PHOTOS 10 10 10 10 10 10 EX UTILITY POLE2 11 11 EX SUB PANEL4 SEC / SPK SYSTEM15 PHONE EQUIPMENT16 12 121212 121212 12 12 10 10 13 13 13 13 10 13 13 13 1013 14 141313 13 13 13 13 NESW FLOOR PLAN - DEMOLITIONSCALE: 18"=1'-0" TSTSFS 15 15 RTU RTU RTU OVERHEAD ELECTRICALSERVICE TO THEDOOR COUNTYMUSEUM BUILDINGUNDERGROUND ELECTRICALSERVICE TO THE DOOR COUNTYMUSEUM BUILDING EXISTING POLE MOUNTEDCT / METER SOCKET1E4.1SEE 1E4.1SEE OVERHEAD ELECTRICALSERVICE TO THEYOUNKERS BUILDING(RENOVATION BUILDING) EXISTING DOOR COUNTY MUSEUM BUILDING EX RETAINING WALLEX PARKING LOT AREA SOFT SCAPE AREA WATER HTR 5 16 Page 46 of 69 E1.1MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 PLAN NOTES - SHEET E1.1MOUNT LIGHT FIXTURE ABOVE CT/METER CABINET AT UTILITY TRANSFORMER / SERVICE ENTRANCELOCATION.LIGHT FIXTURE TO HAVE INTEGRAL MOTION SENSOR.ROOM IS OPEN TO EXPOSED STRUCTURE - NO FINISHED CEILING.WALL MOUNT LED NIGHT LIGHT STRIP FIXTURESURFACE MOUNT LIGHT FIXTURE TO DRYWALL CEILING. CEILING IS RATED - SEE ARCHITECTURAL PLANS.PROVIDE WALL "L" BRACKET FOR MOUNTING STRIP LIGHTS OVER TOP OF OWNER PROVIDED COUNTER.1'-0" FROM WALL TO EDGE OF LIGHT FIXTURE.FUTURE TENANT SPACE - PENDANT MOUNT STRIP LIGHTS WITHIN SPACE. VERIFY WITH THE OWNER TOINSTALL PRIOR TO ROUGH-IN.CIRCUIT LIGHT FIXTURE TO ABOVE COUNTER 120V RECEPTACLE CIRCUIT.SEE LIGHTING CONTROLS SCHEDULE ON SHEET E1.2 - TYPICAL ALL SWITCHES AND SENSORS.SEE DIGITAL DIMMING / CONTROL DETAIL 1/E1.2 - TYPICAL.EXTERIOR LIGHTING CIRCUIT TO BE ROUTED THRU TIME CLOCK SYSTEM - SEE DETAIL 5/E1.2.LOCATE NEW WALL PACK LIGHT FIXTURE IN SAME LOCATION AS DEMOLISHED WALL PACK LIGHT FIXTURE.LIGHT FIXTURE MOUNTED ABOVE DOOR UNDER STAIRWELL IN STORAGE AREA.(2) REMOTE EMERGENCY EGRESS LIGHTING HEADS POWERED VIA EXIT LIGHT HIGH CAPACITY BATTERY.MOUNT 1'-0" ABOVE EXIT DOOR.WALL MOUNTED GOOSE NECK LIGHTS TO HIGHLIGHT BUILDING SIGN. PRIOR TO ROUGH-IN VERIFY EXACTSIGN DIMENSIONS AND HEIGHT. ADJUST LIGHT LOCATIONS BASED UPON FINDINGS. 1 1.REFERENCE ARCHITECTURAL SHEETS FOR APPLICABLE INTERIOR ELEVATIONS, SECTIONS, REFLECTEDCEILNG PLANS AND MISC. BUILDING INFORMATION REQUIRED TO COMPLETE THE ELECTRICALINSTALLATIONS.2.ROUTE UN-SWITCHED CIRCUIT TO ALL FIXTURES WITH EMERGENCY BALLASTS IN ADDITION TO ANYSWITCHED CIRCUITS INDICATED. IF NO SWITCHED CIRCUIT IS INDICATED, CONNECT TO NEAREST LIGHTINGCIRCUIT, AHEAD OF ALL SWITCHING.3.FIXTURES SHOWN WITH A DARKENED TRIANGLE, SHALL INCLUDE INTEGRAL EMERGENCY BATTERY.PROVIDE DEDICATED HOT CONDUCTOR TO LIGHT FIXTURES WITH EMERGENCY BATTERY.4.ALL RECESSED FIXTURES WHICH PENETRATE THE BUILDING ENVELOPE (FROM A HEATED SPACE TO A NONHEATED SPACE) SHALL BE PROPERLY SEALED OR BOXED OUT TO ELIMINATE AIR PASSING THROUGH TOANOTHER SPACE. THIS DOES NOT CHANGE THE REQUIREMENT TO MAINTAIN THE PROPER INSULATIONRATING AS CALLED OUT IN THE CONTRACT DOCUMENTS.5.CONNECT EXIT SIGN TO LOCAL LIGHTING CIRCUIT UTILIZING #12 AWG CONDUCTORS - TYPICAL.6.COORDINATE LOCATION OF ALL NIGHTLIGHTS WITH OWNER PRIOR TO ROUGH-IN. ROUTE ALL NIGHT LIGHTSAHEAD OF SWITCHING.7.PROVIDE CLEAR ADHESIVE LABEL WITH BLACK TYPE STATING LIGHT SWITCH CIRCUIT NUMBER ONFACEPLATE OF DEVICE. VERIFY WITH THE CONSTRUCTION MANAGER FOR HEIGHT DESIRED BY THE OWNER.8.PAINT JUNCTION BOX COVERS PER SPECIFICATIONS SECTION 26 05 33. GENERAL NOTES - LIGHTING23456 8910 W1 W3 W3 W214'-0" E114 E1 14 E114 E114 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES T2T2T2 T2 T2 T2E T1ET1 T1ET1T1E E2 OSDTL 33 3 3 WSD WSD WSD 12 2 T1 NL4 T3T36 6 NL 4E1.2TYPICAL 4E1.2TYPICAL 4 5 5 5 5 5 5 7 T3688 8 TCPANEL A2 A3A3EA3 A3A3A3 A3EA3EA3 A3A3A3 A3A3EA3 E2 E2 H2H2 H2EH2 H2 H2H2 H2E H1E H2H2 H2H2 H2 H2 H2 H2 H2EH2E H2EH2E E2 H1 H1 H1 H1E H1E H1 H1 H1 H1E H1E H1 H1E H1 H1 H1 H1 H1E H1E H1 H1 H1E WSD WSD A1E A1E A1E A1A1E A1EA1 A1 A1E A1 A1E A1E NL 34 NL NL NL A1ENL OSPC OSPC OSPC E2 NL E2 OSPC E2 T1NL4 APPROX. LOCATIONOF EXISTINGTALL SHELVING TOREMAIN APPROX. LOCATIONOF EXISTINGTALL SHELVING TOREMAIN A1ENL A3 A3 A3A3 A3A3 WMD-1 OSDTSA3E A3 WA WA R6A1EA1OSDTR WSDOSDTL OSDTL T1 WSD C1 C1 C1 C1 R6A1OSDTRA1E A3 A3 A3 A3 A3 A3 A3 A3 A3 ZONE 4WMD-1ZONE 3WMD-1 ZONE 2WMD-1ZONE 1WMD-1 OSDTL OSPC 910 910 910 9 910 9 10 910 E2 E2E2 ZONE 1WMD-2 /WMD-3 WMD-2 WMD-3ZONE 2WMD-2WMD-3ZONE 3WMD-2WMD-3 ZONE 4WMD-2WMD-3 4E1.2TYPICAL4E1.2TYPICAL 3E1.2 3E1.22E1.2 A3-8VIA TC-1CHANNEL 1CONT. C-111 11 A3-10VIA TC-2CHANNEL 2CONT. C-211 C 5E1.2 1213 13 14 910 91010 10 10 T1ET1 T1ET1T1 T1E T1T1ET1T1E A1-2 A1-4 9 9 10 9 9 9 99 3 3 3 3 3 A2-22 A2-20 PANELA3 A3-2 T1 A3-4 T2-3 A3-6 PANEL T2 PANEL MDPPANEL A1 C A3-12VIA TC-1CHANNEL 311 TC-1,C-1,C-2 B118'-0" B118'-0" 15 15 NESW FLOOR PLAN - LIGHTINGSCALE: 18"=1'-0" NEW BUILDINGSIGNAGE 12 12 12 W1212 W1212 W1212 PANEL T1 3 3 3 3 T1T1ET1-3 E2 E2 E2 A1 A1 A1 A1ENL3 A1E E2 E2 7 37 WSD A1 A1 Page 47 of 69 E1.2MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 WMD-1 LIGHTING CONTROLS SCHEDULE NLIGHT NPODMA 4P DX TAGDESCRIPTIONMANUFACTURER MODEL / CAT #.WAAUTOMATIC WALL SWITCH - NO DIMMINGSENSOR SWITCHWSXA SERIES LISTED DEVICES ARE BASIS OF DESIGN - EQUALS ARE ACCEPTABLE.DIGITAL DIMMING / CONTROL / SWITCH / SENSOR - SEE DETAIL 1/E1.2PROVIDE ALL POWER PACK / RELAYS / ROOM CONTROLLERS / ACCESSORIES AND MOUNTING HARDWARE AS REQUIRED.WHEN THE SENSOR IS SHOWN IN A ROOM WITH WALL SWITCHES, THE SENSOR SHALL ACT AS AN OVERRIDE TO THE ROOM LIGHTING.PROVIDE CLEAR ADHESIVE LABEL WITH BLACK TYPE STATING LIGHT SWITCH CONTROL ON FACEPLATE.WALL PLATE COLORS TO MATCH RECEPTACLE PLATE COLORS - ARCHITECT TO SELECT FINAL PLATE / DEVICE COLOR.OCCUPANCY SENSORS MUST MEET IECC 2021 C405.2.1.1. REQUIREMENT FOR MANUAL ON OR AUTO ON TO MAX 50%. 1.2.3.4.5.6.7.GENERAL NOTES:DEVICE MUST BE APPROPRIATE FOR INSTALLED ENVIRONMENT - PLENUM RATED OR APPROPRIATELY INSTALLED FOR A PLENUM (WHENAPPLICABLE)PROVIDE AND INSTALL ALL ROOM CONTROLLERS AND PLENUM RATED LOW VOLTAGE CABLING PER MANUFACTURERS SPECIFICATIONS.PROVIDE POWER PACK(S) AND TRANSFORMER(S) AS REQUIRED. CONNECT ALL SENSORS AHEAD OF ALL SWITCHES WITHIN THE ROOM/SPACE TOPROVIDE AUTOMATIC OFF; ADJUST TIME, SENSITIVITY, AND AIMING OF EACH SENSOR TO THE OWNER'S SATISFACTION.MULTIPLE SENSORS IN A COMMON SPACE SHALL BE WIRED IN PARALLEL SO THAT ALL SENSORS INTERCOMMUNICATE AND WORK IN TANDEM TOCONTROL LIGHTING. PROVIDE A WIREGUARD OVER SENSORS SHOWN WITH A "WG" DESIGNATION. WIREGUARDS SHALL BE AS RECOMMENDED BYTHE SENSOR MANUFACTURER SO AS NOT TO INTERFERE WITH SENSOR OPERATION.OCCUPANCY SENSORS MUST MEET IECC 2021 C405.2.1.1. REQUIREMENT FOR MANUAL ON OR AUTO ON TO MAX 50%. WSDMANUAL WALL SWITCH - WITH DIMMINGNLIGHTNPODMA DX OSH1HIGH BAY OCCUPANCY SENSOR HB300W-HBL3WWATTSTOPPEROSDTLDIGITAL DUAL TECH 360 DEGREE - LARGE NLIGHTNCM PDT 10 RJB NOTES: OSDTSDIGITAL DUAL TECH 360 DEGREE - SMALL NCM PDT 9 RJBNLIGHT MANUAL WALL SWITCH - WITH DIMMINGSEE DETAIL 2/E1.2 DIGITALXX XX MOUNTING CEILINGCEILINGSTRUCTURE WALLWALLWALLCOLORMATCH DEVICESMATCH DEVICESMATCH DEVICES WHITEWHITEWHITE NOTES1,3,4,61,2,3,4,61,2,3,4,5 1,2,3,4,6,71,2,3,4,6,71,3,4,6,7 TIMECLOCK - 4 CHANNELET70415CR INTERMATICWALLN/A1 CLIGHTING CONTRACTORELEC HELDSQUARE DWALLN/A1 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES LINE VOLTAGE LINE VOLTAGE DIGITAL MOTION SENSOR CONTROL WIRING ON/OFF/DIMMINGROOMCONTROLLER CLASS 2 0-10 VOLT 0-10 VOLTLED DRIVER0-10 VOLTLED DRIVER LOW-VOLTAGE CABLES**CABLES ASRECOMMENDED BYMANUFACTURER(TYPICAL). DIGITALDIMMINGSWITCH DIGITAL LIGHTING CONTROL / SENSOR / DIMMING WIRING DETAIL1E1.2NO SCALE BUTTON 1DIMMINGZONE 1WORK STATIONNON DAYLIGHTAREA OUTLET BOX WITH TWIST-LOCKRECEPTACLE.UNISTRUT. ATTACH TOSTRUCTURE. AIRCRAFT CABLE SUPPORT ONBOTH ENDS (END VIEW SHOWN).HOOK WITH SAFETY LATCH. LED HIGH-BAY FIXTURE. FIXTURE CORD WITHTWIST-LOCK PLUG. 3/8" MIN. EYEBOLT SECURED TOUNISTRUT USING SPRING NUT ANDNO-TWIST SQUARE WASHER. MOUNT BOTTOM OF LIGHT FIXTURESEVEN WITH BOTTOM OF STEELJOISTS (WHERE APPLICABLE). LED HIGH BAY MOUNTING DETAIL4E1.2NO SCALE OSPCPIR 180 - CORRIDORCX-100-1WATTSTOPPERWALLWHITE1,3,4,6,7 OSDTRDT-300WATTSTOPPERWALLWHITE1,3,4,6,7 DUAL TECH 360 DEGREE - SMALL BUTTON 3DIMMINGZONE 3WORK STATIONCODE DAYLIGHTAREA BUTTON 2DIMMINGZONE 2MAIN ROOMNON DAYLIGHTAREABUTTON 4DIMMINGZONE 4MAIN ROOMCODE DAYLIGHTAREA 43LINE VOLTAGE SWITCH - SEE SPECWALLMATCH DEVICESSEE SPECSEE SPEC4 BUTTON 1DIMMINGZONE 1NORTHLIGHTINGBUTTON 3DIMMINGZONE 3AISLE #1 BUTTON 2DIMMINGZONE 2SOUTH ANDWEST LIGHTINGBUTTON 4DIMMINGZONE 4AISLE #2 WALL SWITCH ELEVATION -WMD-2 AND WMD-3 - ROOM 1013E1.2NO SCALE WALL SWITCH ELEVATION -WMD-1 - ROOM 1082E1.2NO SCALE WMD-2NLIGHT NPODMA 4P DXMANUAL WALL SWITCHEX - WITH DIMMINGSEE DETAIL 3/E1.2XWALLMATCH DEVICES1,2,3,4,5 WMD-3 TIMECLOCK LIGHTING CONTROL DETAIL - TC-15E1.2NO SCALE ELECTRONIC 4 CHANNEL TIMECLOCK INTERMATIC MODEL ET70415CR - TIME CLOCK TC-1TIMERPOWERCHANNEL 1CHANNEL 2CHANNEL 3CHANNEL 4 XXXXXXXXXXXXXX 1234567891011121314 120V - CIRCUIT A3-14NH MOMENTARY SWITCH SHALL BE PROGRAMMED TO CONTROLALL CHANNEL(S) OR AS DIRECTED BY THE OWNER.MC-1 CONTACTOR C-2COILCIRCUITA3-10 4 POLE - 20 AMPELECTRICALLY HELDSQ-D LIGHTINGCONTACTOR -NEMA 1 ENCLOSURE SPAREEXTERIORBUILDINGSIGN LIGHTS(TYPE B1)CKT: A3-12FUTURE CONTACTOR C-1COILCIRCUITA3-8 4 POLE - 20 AMPELECTRICALLY HELDSQ-D LIGHTINGCONTACTOR -NEMA 1 ENCLOSURE CANOPY AND WALL PACKS(SOUTH ELEV)SPAREFUTURE TC-1C-1, C-2 EXTERIOROWNERSIGN LIGHTCKT: A3-9 TC WALL PACKS(WEST ELEV) DETAIL NOTESCHANNEL 1:ENERGIZE CONTACTOR C-1 FROMDUSK TO 10 PMCHANNEL 2:ENERGIZE CONTACTOR C-2 FROMDUSK TO DAWNCHANNEL 3:VERIFY WITH THE OWNER FORTHIS TIME SETTINGCHANNEL 4:VERIFY WITH THE OWNER FORTHIS TIME SETTINGCHANNEL 3 AND 4 LOADS MAY BEPLACED ON EITHER CONTACTORC-1 OR C-2 IF APPROPRIATE PEROWNER REQUIREMENTS.SPAREFUTURESPAREFUTURESPAREFUTURESPAREFUTURE Page 48 of 69 E2.1MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 GENERAL NOTES - POWER AND SYSTEMS1.REVIEW THE ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING AND FIRE PROTECTION SHEETS FORFURTHER WORK AND FOR ADDITIONAL DETAIL, SUCH AS MOUNTING HEIGHTS AND DIMENSIONS.2.REVIEW FURNITURE LAYOUTS, PROVIDED BY THE OWNER. DO NOT ROUGH IN ANY ELECTRICALEQUIPMENT WITHOUT FIRST COORDINATING WITH THE LATEST SET OF FURNITURE PLANS, ASPROVIDED BY THE OWNER.3.SEE SPECIFICATIONS FOR FIRE STOPPING FOR ALL RATED WALLS.4.PROVIDE ARCFLASH PROTECTION EQUIPMENT IN AREAS WHERE CODE REQUIRES ARC FLASHPROTECTION.5.ALL RECEPTACLES INSTALLED BELOW 66" ABOVE THE FLOOR AND IN ALL SPACES ACCESSIBLE TOTHE PUBLIC SHALL BE TAMPER RESISTANT TYPE. THIS INCLUDES, BUT IS NOT LIMITED TO: EXTERIOR DEVICES, STAIRWELLS, CORRIDORS, RESTROOMS, STORAGE ROOMS, OPEN AREAS, OFFICESACCESSIBLE TO OPEN AREAS, ETC. 6.PROVIDE POWER TO MISC. PLUMBING AND HVAC CONTROL PANELS AS REQUIRED BY THE PLUMBINGAND HVAC SCOPE OF WORK. REFERENCE PLUMBING AND HVAC PLANS.7.ROUTE DETECTIBLE YELLOW UNDERGROUND WARNING TAPE WITH ALL UNDERGROUND CONDUITRUNS. WARNING TAPE SHALL BE TYPE ID.8.PROVIDE BUILDING STUDIES, ARCFLASH CALCULATIONS, SHORT CIRCUIT STUDIES, FOR THEELECTRICAL DISTRIBUTION SYSTEM, INCLUDING PANELS AND MOTORS ASSOCIATED WITH THEPANELS. INCLUDE THE COSTS OF THIS SERVICE AND LABEL INSTALLATION IN THE BID. STUDIES TO BECOMPLETED PRIOR TO SHOP DRAWING SUBMITTAL AND APPROVAL.9.DETERMINE FINAL ROUTING OF BRANCH CIRCUITING AND FEEDERS, UPSIZE TO MEET MIN. VOLTAGEDROP STANDARDS / REQUIREMENTS.10.PROVIDE CLEAR ADHESIVE LABEL WITH BLACK TYPE STATING RECEPTACLE CIRCUIT NUMBER ONFACEPLATE OF ALL 120V DEVICES. VERIFY WITH THE CONSTRUCTION MANAGER FONT HEIGHTDESIRED BY THE OWNER.11.PAINT JUNCTION BOX COVERS PER SPECIFICATIONS SECTION 26 05 33. PLAN NOTES - SHEET E2.1DOOR REQUIRES DOOR ACCESS CONTROL SYSTEM - SEE DETAIL 9/E3.1 AND 1/E3.1.CEILING MOUNTED CORD REEL - SEE SEE SPC SCHEDULE.SPRINKLER SYSTEM RISER LOCATION - PROVIDE AND INSTALL NEW TAMPER AND FLOW SWITCHES AT THEEXISTING SPRINKLER RISER. CONNECT TO THE NEW SPRINKLER SYSTEM MONITORING PANEL. TEST PER NFPA-72 BY THE ELECTRICAL CONTRACTOR. COORDINATE WITH JASON BAUDUIN OF BAY ELECTRONICS(920-559-6066) FOR INSTALL OF MOXA BOX FOR COUNTY MONITORING THRU COUNTY DISPATCH.WIRELESS ACCESS POINT - FINAL LOCATION DIRECTED BY THE OWNER. COIL 10'-0" ADDITIONAL CABLE /SERVICE LOOP AT THIS LOCATION. OWNER TO PROVIDE AND INSTALL WAP - SEE DETAIL 7/E3.1.FUTURE ELECTRIC VEHICLE CHARGING LOCATION. ROUTE FEEDER TO AN EXTERIOR JUNCTION BOX MOUNTEDON WALL AND LABEL BOX - SEE SPC SCHEDULE FOR DETAILS. FINAL LOCATION DIRECTION IS BY THE OWNER.LOW VOLTAGE SERVICE CONDUITS - SEE DETAIL 1/E3.1.FOR ADDITIONAL WORK IN THIS ROOM SEE ENLARGED PLAN THIS SHEET.EXISTING OVERHEAD DOOR IS TO REMAIN AND TO BE REFEED FROM PANEL A1 - EXISTING PUSHBUTTONCONTROL TO REMAIN. REWIRE MOTOR WITH NEW LINE VOLTAGE POWER CIRCUIT AND A NEW DISCONNECT.SEE MOTOR SCHEDULE FOR MORE INFORMATION.TV MONITOR LOCATION - VERIFY FINAL LOCATION PRIOR TO INSTALL. PROVIDE AND INSTALL 4 GANG RECESSEDWALL MEDIA BOX - PASS AND SEYMOUR EFSB4 OR EQUAL FLUSH IN WALL. 4 GANG BOX TO INCLUDE (1) DATAOUTLET WITH (2) CAT6, (1) 20A RECEPTACLE, AND (2) BLANK SINGLE GANG WITH 1 1/4"C ROUTED / STUBBED TOABOVE ACCESSIBLE CEILING AND BUSHED. ROUTE CAT 6 DATA CABLING TO MDF. DATA CABLING TO BEROUTED IN 3/4" CONDUIT STUBBED TO ABOVE ACCESSIBLE CEILING OF ROOM AND BUSHED - SEE DETAIL 2/E3.2.SURFACE MOUNT ALL WIRING DEVICES ON EXISTING WALLS WITHIN THIS ROOM - EMT CONDUIT.WALL MOUNTED GROUNDING BUS - SEE DETAILS 1/E3.1, 2/E3.1, AND 3/E3.1.BLANK BOX - TYPICAL - SEE DETAIL 8/E3.2.VERIFY FINAL MOUNTING HEIGHT OF RECEPTACLE FOR ELECTRIC WATER COOLER WITH THE PLUMBINGCONTRACTOR. VERIFY IF UNIT PURCHASED REQUIRES (1) DUPLEX, (1) DOUBLE DUPLEX, OR (2) INDIVIDUALDUPLEX RECEPTACLES FOR 2 SEPARATE UNITS.SECURITY CAMERA LOCATION. CAMERA IS PROVIDED AND INSTALLED BY THE OWNER. ROUTE A CAT 6SECURITY CAMERA CABLE TO MDF IN IT ROOM 110 - SEE DETAIL 1/E3.1 FOR ADDITIONAL INFORMATION.IN-GRADE HANDHOLE / PULL BOX FOR LOW VOLTAGE COMMUNICATIONS SERVICES AT PROPERLY LINE ORDIRECTED BY LOW VOLTAGE UTILITY AND OWNER - SEE DETAIL 3/E3.2.ROUTE NEW FIBER OPTIC CABLE IN INNER FIBER DUCT AT INSIDE OF OUTSIDE WALL AT APPROXIMATELY 17'-0"ABOVE FINISHED FLOOR IN J-HOOK WIRE MANAGEMENT.TVSS / SURGE SUPPRESSION UNIT (SPD) - SEE DETAIL 3/E3.1.OWNER INSTALLED WORK BENCH - VERIFY FINAL LOCATION AND COUNTER TOP HEIGHT. MOUNTEDRECEPTACLES A MIN 4" ABOVE TOP OF COUNTER.EXTERIOR SIGN CIRCUIT TO BE ROUTED THRU TIME CLOCK SYSTEM - SEE DETAIL 5/E1.2.MAIN DISTRIBUTION FRAME (MDF) RACK. ROUTE ALL CAT 6 NETWORK AND SECURITY CABLES WITHIN THISBUILDING TO MDF - SEE 1/E3.1.12 INDOOR / OUTDOOR MULTI MODE FIBER CABLE FROM EXISTING DOOR COUNTY MUSEUM BUILDING BASEMENTTO NEW BUILDING MDF RACK / IT ROOM 110. ROUTE IN 1 1/4" HDPE AT THE EXTERIOR BELOW GRADE AND IN1-1/4" METALLIC ARMOUR INNER DUCT AT INSIDE OF THE BUILDING - TOTAL OVERALL LENGTH - APPROXIMATELY400' - SITE VERIFY FINAL DISTANCE FOR BIDDING. TERMINATE ON BOTH ENDS AND TEST - SEE DETAIL 1/E3.1. 12345789 6 101112131415PANEL MDP NEW UTILITYTRANSFORMER CSC CSC CSC CSC CSC CSCCSC 16 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES WAPC WAPC USB4D 4D4D A2-9PLOTTER 2 USB WL-11A2-10A2-8A2-6A2-4A2-2 PANEL A2GFIGFI GFIGFIGFI A2-16 A2-12GFI 44" 44"44" 44" 44" 44"44"44" 44" 44" 44"44"18 18 44" 44"44" 44" 44"GF1/WP 44"44"GF1/WP 44" 44" 44" 44" 44"GF1/WP GFIA2-14 GFIA1-1 44" GFIA1-3 GFIA1-5 44" ETR OHD-158 FL-12 RE1 DCD RE1DCD 4 4 4 5 COMMUNICATIONS SERVICESPROVIDER (LOW VOLTAGE)H 6 ROUTED BELOWGRADE ROUTE ATROOF STRUCTURE 44" 44" 44" 44" 44" 44"44" 10 10 10 44" 44" 44" 44" C 44" MDF14 14 14 14 1414 14 15PB#1 J 16 CR-14 2C5 2C72C6 11TGB11MGBTV17 NEW CT CABINETAND METER / METERSOCKET ETR 2E4.1 2E4.1 2E4.1 TL TL TLTL 1E3.2 1E3.2 1E3.21E3.2 44" ROUTED BELOWGRADE TO DOOR COUNTYMUSEUM BUILDINGBASEMENT IN HDPECONDUIT - MIN 30" 21 44" UNISTRUT MOUNT PANELSON THE EXTERIOR WALL3/4"x4'x8' FIRE TREATEDPLYWOOD - PAINTED WHITE J 19 EXTERIOROWNER SIGN 44" RTU-11 RTU-22 RTU-33 RTU-44 CF-17CF-28 CF-39CF-410 UH-415 A2-11 A2-13 PLAN NOTES - SHEET E2.1PROVIDE FIBER OPTIC PULL BOX AT BUILDING ENTRANCE - ROUTE IN 2" CONDUITFROM PULL BOX UP TO ROOF STRUCTURAL STEEL AND BUSH. PROVIDE 10'-0"SERVICE LOOP AT PULL BOX AND AT ROOF STRUCTURAL STEEL. ROUTE IN INNERDUCT AND J-HOOK WIRE MANAGEMENT AT STRUCTURAL STEEL TO MDF / IT ROOM 110.FLUSH MOUNT CEILING RECEPTACLE IN 2X2 ACOUSTICAL TILE CEILING - FUTUREPROJECTOR. VERIFY DESIRED LOCATION WITH THE OWNER PRIOR TO ROUGH-IN.PLACE RATED BOX AT APPROXIMATELY 10'-0" ABOVE FINISHED GRADE. TRANSITIONTO RIGID STEEL CONDUIT ABOVE GRADE AND UP EXTERIOR WALL. PAINT CONDUIT ONEXTERIOR WALL TO MATCH EXTERIOR WALL.IN-GRADE HANDHOLE / PULL BOX FOR FIBER OPTIC CABLE - SEE DETAIL 3/E3.2. 2223 GFI 24 GF1/WP GF1/WP 3RF T2-38,40,423RF T2-36 GF1/WP3RF A3-38,40,423RF PANEL A1 GFIA2-18 A2-38,40,42 A2-36 RTU AT ROOF RTU ATROOF RTU AT ROOF CSC USB4D WAPC 2DA3-3PRINTER 2DA3-1PRINTERRE1DCD RE1DCD 4 GFIEWCGFIEWC13A3-25 A3-5A3-7 44" A3-16A3-32 PANEL A3 RTU AT ROOF USB4D 44" 44" 20 GFIGFIA3-23 A3-21 44" WAPC4 4DUSBM2D9 4DUSBM2D9 4DUSBM2D9 USB44"GFIGFIGFI A3-17MIC.A3-15COFFEEA3-19REF.A3-13 WAP 12 12 12 21 25 H25PB#2 75'-0"EXISTING IT EQ INBASEMENT OFEXISTING MUSEUMBUILDING NEMA 12 J-BOXAT 10'-0" AFG24 EXISTING DOOR COUNTY MUSEUM BUILDING RETAINING WALLPARKING LOT AREA SOFT SCAPE AREANESW FLOOR PLAN - POWER AND SYSTEMSSCALE: 18"=1'-0" UH-314 UH-112UH-213 11EWH-3 8EWH-1 12EWH-2 1718192021NESW ENLARGED ROOMS 109 / 112 - POWER AND SYSTEMSSCALE: 1/4"=1'-0" PANEL A3TCCC TC-1,C-1,C-22E4.1 7 7 3/4" TREATEDFIRE RATEDPLYWOOD ONWALLS BY OTHERS 44"GFI44"A3-20 AC-2(ROOF)18 AC-1(ROOF)16CEF-16 F-117 ERV-111 MDF (ROOF)3RFA3-81,83 MIN SPLIT -INDOOR WALLUNIT - WIRE TOAC-1 (ON ROOF) GF1/WP F F 3R 3R 3EV-1 CR-2 CR-4CR-3 J44" A3-11 A3-22 A3-24CC1D A3-26 T2-2 A3-9VIA TC-1CHANNEL 4 A3-30 A3-28 44" MDP-2,4,6F WAPC4 APPROX. LOCATIONOF EXISTINGTALL SHELVING TOREMAIN APPROX. LOCATIONOF EXISTINGTALL SHELVING TOREMAIN REDDC NEW CT CABINETAND METER / METERSOCKET2E4.1 SP 12'-0" WAP12'-0" TSTSFS3 3/4"x4'x4' FIRE TREATEDPLYWOOD - PAINTED WHITEF 1621 NEW UTILITY SERVICEFEEDER NEW UTILITY SERVICEFEEDER NEW PRIMARY UTILITY SERVICEFEEDER A1-8 SPRINKLER SYSTEMMONITORING CONTROLPANELSSMP 4 10WH-1CP-119 9WS-1 FWP 2E4.1 PANEL T22E4.1 PANEL T12E4.1 T1-36 T1-38,40,42 VERIFY PANELLOCATION WITHOWNER PRIORTO THE START OFCONSTRUCTION VERIFY PANELLOCATION WITHOWNER PRIORTO THE START OFCONSTRUCTION T1-2 REF-120 GFI44" 44" 44"DDC PANELS DF(RETURNAIR) DF(RETURNAIR) DF(RETURNAIR) DF(RETURNAIR) 4E3.2 4E3.2 4E3.2 4E3.2 2D GFI 23 22 A3-1844" JJA1-10 44" CF-521 CF-622 SPCF-723 CF-824 SPFINAL LOCATIONBY DIV 23 FINAL LOCATIONBY DIV 23 H H HH H H H H 3"C PATHWAY SLEEVESABOVE FINISHEDCEILING3"C PATHWAY SLEEVESABOVE FINISHEDCEILING SEE SHEET E1.0 OF2ND BIDDING PROJECTFOR REFERENCE TOTHIS AREA Page 49 of 69 E3.1MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 3E3.1NO SCALEGROUNDING BAR MGB AND TGB WALL ANCHORSUITABLE FOR WALLCONSTRUCTION(TYP.) RED STANDOFFINSULATOR,POLEYSTER/FIBERGLASS3/8" MOUNTING BOLTSTAINLESS STEELMOUNTING BRACKET, 1"OFFSET2"1/4"SECTION "A-A"FRONT ELEVATION TYPICAL GROUND CONNECTIONFOR EQUIPMENT. 2-HOLECOMPRESSION LUG BOLTS, WIRE,ETC. BOLT TO PLATE - SEE2/E3.1. 1/4" X 4" X 20" COPPER GROUND BUS - MGB A A BUILDING GROUNDING ELECTRODE SYSTEM DETAIL ELECTRICAL SERVICEEQUIPMENT / DISC.MAIN BONDINGJUMPER NEC250.28GROUND BUS GROUND ROD TELECOMMUNICATIONS EQUIPMENT GROUND BUS(TGB - SEE DETAIL 3/E3.1) BUILDING EXTERIORWALL OR FLOORSLAB 2E3.1NO SCALE MDF AND ALL IDF RACK ENCLOSURES BUILDING GROUND BUS MGB - SEE DETAIL 3/E3.1 GROUND ELECTRODECONDUCTOR NEC 250.66 BONDING JUMPERMETAL PIPING SYSTEMSNEC 250.104 (B)BONDING JUMPER #4 AWGCOPPER - NEC 250.66 (A) TGB MGB #6 AWG COPPER INSULATED BONDINGJUMPER3/0 AWG COPPER INSULATED GROUND CONDUCTOR- BOND TO SERVICE GROUNDING METAL PIPING SYSTEMSTELECOMMUNICATIONS DETAIL1E3.1NO SCALE 1/4" X 4" X 12" COPPER GROUND BUS - TGB UTILITY TRANSFORMERTRANSFORMER GROUND BUS GENERATOR GROUND BUS COPPER GROUNDINGCONDUCTOR - NEC 250 #4/0 AWG COPPER GROUNDING CONDUCTOR -BOND THE GENERATOR NEUTRAL TO THEGROUND BUS AT THE GENERATOR. #4 AWG COPPER BONDING JUMPERNEC 250.66 (A) MBONDING JUMPER #6AWG COPPER -NEC 250.66 (A) #4/0 AWG COPPER GROUNDELECTRODE CONDUCTOR NEC250.66 WATER METER PROVIDE 10' VERTICALCABLE SERVICE LOOP INVERTICAL WIREMANAGEMENT AT MDFRACK.RECESSED - 3/4"C. FROMDEVICE TO ABOVE NEARESTACCESSIBLE CEILING ANDBUSH.SEE ACCESSIBLE FINISHEDCEILINGMDF RACK XX PAIR COPPERBACKBONE CABLE -VERIFY PAIRSREQUIRED. CONDUITS BY THE ELECTRICALCONTRACTOR FOR COMMUNICATIONSYSTEM SERVICES (LOW VOLTAGE) COMMUNICATIONSSYSTEMS SERVICESCABLES - BY PROVIDER(S).WALL MOUNTED 110PUNCH BLOCK SC SEE WAPC TGB1011121314151617181920212223242526 123456789 IT ROOM 110FINISHED FLOOR NOTES:WALL PLATE COLOR: SEE SPEC AND VERIFY WITH THE OWNER AND ARCHITECT PRIOR TOPURCHASE TO MATCH RECEPTACLE AND SWITCH PLATES.FINAL CABLE COUNT AT EACH DEVICE / EQUIPMENT TO BE VERIFIED WITH THE OWNER PRIOR TOROUGH-IN.FINAL EQUIPMENT LOCATION TO BE VERIFIED WITH THE OWNER PRIOR TO ROUGH-IN.MOUNT WALL DEVICES ADJACENT TO POWER RECEPTACLE IF PRESENT.VERIFY FINAL WAP AND SECURITY CAMERA LOCATIONS WITH THE OWNER PRIOR TO ROUGH-IN.ALL CABLING TO BE PLENUM RATED.DATA / VOICE COMMUNICATIONS: PROVIDE AND INSTALL A COMPLETE SYSTEM - DEVICE / BOX /PLATE / MUD RING / CABLING / WIRE MANAGEMENT / CONDUIT PATHWAY / TERM / TESTING. INSTALLALL CAT 6 AND CAT 6A DATA / VOICE / WAP CABLING FROM EACH OUTLET AND SECURITY CAMERA TOMDF / MODULAR PATCH PANEL.PROVIDE AND INSTALL PATCH CORDS.PROVIDE AND INSTALL ALL ABOVE CEILING WIRE MANAGEMENT AND SERVICE LOOPS.PROVIDE AND INSTALL ALL LABELING.PROVIDE AND INSTALL GROUNDING SYSTEM.PROVIDE AND INSTALL (1) 48 PORT AND (1) 24 PORT CAT 6 MODULAR PATCH PANELS.PROVIDE AND INSTALL SPD (SURGE PROTECTION DEVICE) PLUG STRIPS.PROVIDE AND INSTALL COMMUNICATIONS UTILITY SERVICE CONDUIT PATHWAYS, 110 BLOCKS, ANDCROSS CONNECT.PROVIDE AND INSTALL ALL 110 PUNCH BLOCKS, COOPER BACKBONE CABLES AND CROSS CONNECT.PROVIDE AND INSTALL FLOOR MOUNTED RU45 MDF RACK - VERIFY FINAL RACK SIZE WITH OWNERAND OWNER PROVIDED EQUIPMENT PRIOR TO SHOP DRAWING SUBMITTAL.PROVIDE AND INSTALL RACK MOUNTED UPS.SECURITY CAMERAS ARE PROVIDED AND INSTALLED BY THE OWNER. PROVIDE AND INSTALL CABLE,CONDUIT PATHWAYS, AND BOXES.DOOR ACCESS CONTROL SYSTEM IS PROVIDED AND INSTALLED BY THE OWNER. PROVIDE ANDINSTALL CABLE, CONDUIT PATHWAYS, AND BOXES. CABLE SUPPORT HOOK INSTALLATION FACEPLATE (TYP)CONDUIT UNLESSNOTED OTHERWISE.PLASTIC BUSHINGHORIZONTAL CABLING1-GANG BOX COVER WINDOW FOR IDLABEL PULL STRING BLANKS IN UNUSEDPORTS W/ (2)CONNECTOR PORTS -EXAMPLE SHOWN (MUD RING)OUTLET BOX4-11/16" SQUARE x2-1/8" DEEP4-PORT SHOWN 4'-0" O.C. MAX.6" J-HOOK COMMUNICATIONS ANDCABLE SAG SHALL NOTEXCEED 6" J-HOOK CLIP OTHER LOW-VOLTAGE CABLE COMMUNICATIONS EQUIPMENT OUTLET CONDUIT TOACCESSIBLE CEILING 4E3.1NO SCALE 6E3.1NO SCALE DETAIL 1/E3.1 SCHEDULE WAPWIRELESS ACCESS POINT2D3D GROUND ROD SCSECURITY CAMERA DATA / VOICEDATA / VOICE 24" SEE3E3.12E3.1 DETAIL NOTES·MUST ACHIEVE LESS THAN 10 OHMS OR AS NOTED SPECIFICATIONS SECTION 26 05 26 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.·ROUTE GROUND CONDUCTORS IN PVC CONDUIT.·PROVIDE ALL CONDUIT SLEEVES THRU WALLS / FLOORS.·PROVIDE ALL FIRE STOPPING AND SEALING.·ALL GROUND CONDUCTORS ON THIS DIAGRAM SHALL BE COPPER.·ALL GROUNDING CONDUCTORS SIZES SHALL CONFORMS TO THE GUIDELINES SET BY THE NEC.·INSTALL PER NEC 250. BUILDING STEELSHALL BE BONDEDTO GROUND BUSIN ELECTRICALROOM.#3/0 AWG COPPER GROUNDINGCONDUCTOR 3/4" X 10'-0" COPPERWELDGROUND ROD. SEE FLOORPLANS AND SPECIFICATIONSECTION 26 05 26. PANELBOARD(S) GROUND BUS TINNED COPPER PLATE BUILDING STEEL#3/0 AWG COPPER TO BUILDING STEEL COLUMN OR FROST FOOTING,RE: STRUCTURAL FLOOR SLAB PROVIDE10'-0" SERVICE LOOP UP ATSTRUCTURE OR ABOVE FINISHEDCEILING - TYP ALL CAT CABLING 6E3.1 (2) CAT 6 FROM OUTLET TO IT ROOM 110(3) CAT 6 FROM OUTLET TO IT ROOM 110(2) CAT 6A FROM OUTLET TO IT ROOM 110(1) CAT 6 FROM CAMERA LOCATION TO IT ROOM 110 CABLES INSTALLED / LOCATIONTO LOCATION DCDOOR ACCESS CONTROLBY OWNERS DOOR SUB CONTRACTORWWALL PHONE(1) CAT 6 FROM OUTLET TO IT ROOM 110 JACKETCOLORDEVICETYPEDEVICESYMBOL GREENPURPLE BLUE / WHITEBLUE / WHITE YELLOWWHITE NOT APPLICABLE TO THISPROJECT NOT APPLICABLE TO THISPROJECTNOT APPLICABLE TO THISPROJECT PANELBOARD MDP NEUTRAL BUS COMMUNICATIONSCABLES BYCONTRACTOR. WIRELESS ACCESS POINT7E3.1NO SCALE DOOR ACCESS CONTROL DETAIL PROVIDE AND INSTALL 1/2"CONDUIT FOR DOOR POSITIONSWITCH. 9E3.1NO SCALE VERIFY ALL DOOR TYPESAND THEIR REQUIREMENTS.E 4" SQUARE BOX ABOVE ACCESSIBLECEILING,OR AS DIRECTED BY OWNERSDOOR ACCESS CONTROLSUB-CONTRACTOR. PROVIDE ANY LINEVOLTAGE POWER REQUIREMENTS.1/2" CONDUIT PATHWAYS ELECTRIC STRIKE IN DOOR FRAME.COORDINATE TYPE REQUIRED WITH THEGENERAL CONTRACTOR. DETAIL NOTES:OWNERS DOOR SUBCONTRACTOR ISDOOR GUARD SECURITY - LARRYMADSEN (920)-559-0424. OWNERS DOORSUB WILL PROVIDE AND INSTALL ALLDOOR ACCESS CONTROL EQUIPMENTINCLUDING CAT 6 WIRING TO MDF / DOOREQUIPMENT / IT ROOM 110.PROVIDE AND INSTALL CONDUIT / BOXES/ 120V POWER REQUIRED.COORDINATE ALL WORK WITH THE DOORACCESS CONTROL SUB-CONTRACTORFOR THE ELECTRICAL CONTRACTORPRIOR TO ROUGH-IN. VERIFY ALLCONDUIT AND BOX SIZES AS WELL ASCONDUIT ROUTING.VERIFY WITH OWNERS DOOR ACCESSCONTROL SUB CONTRACTOR WALL ORMULLION MOUNTED CARD READER.WALL MOUNTED: 4" SQUARE BOX WITHSINGLE GANG DEVICE RING FOR CARDREADER. 44"PROVIDE AND INSTALLBLANK BOX OUTLET /JUNCTION BOX PROVIDE 3/4" C. TOABOVE ACCESSIBLECEILING AND BUSH. BLANK BOX DEVICE DETAIL8E3.1NO SCALE PLAN SYMBOL DC R D J DETAIL NOTESTELECOMMUNICATIONSCONTRACTOR SHALL BOND ALLMETAL RACKS, ENCLOSURES,CABLE RUNWAY, AND OTHERMETALIC ELEMENTS IN THE MAINEQUIPMENT ANDTELECOMMUNICATIONS ROOMSTO GROUND BUS WITH #6 AWGCOPPER. RECEPTACLE / SWITCH WIRING DETAIL5E3.1NO SCALE GROUND RING -20'-0" MIN -#2 AWG COPPERNEC 250.66 (C ) RACK MOUNTED 110-BLOCKSNETWORK ELECTRONICSSHELFCABLE MANAGEMENTNETWORK ELECTRONICSCABLE MANAGEMENT SECURITYCABLE MANAGEMENT48 PORT PATCH PANELCABLE MANAGEMENTSPD PLUG STRIPGROUND BUS BARUPS UNIT 272829303132 C SEE7E3.1 4E3.1 DETAIL NOTESCONDUIT SHALL BE CONTINUOUS FROMOUTLET BOX TO ACCESSIBLE CEILINGSPACE OR AS INDICATED ON DRAWINGS.PROVIDE PULL STRING IN ALL CONDUITS. xD PLAN SYMBOL 44" CROSS CONNECTWIRING PLAN SYMBOL PLAN SYMBOLOWNER TO PROVIDEAND INSTALL CAMERA UNITPLAN SYMBOL NEW PRIVATELY OWNED 12 STRANDMULTI MODE FIBER OPTIC CABLEFROM EXISTING DOOR COUNTMUSEUM BUILDING BASEMENT - SEESHEET E2.1. 10'-0" SERVICE LOOP ATBOTH ENDS A3-32 TO MGB TO HANDHOLE AT PROPERTY LINEOR LOCATION DIRECTION BY THEOWNERS TELECOMMUNICATIONSCONTRACTOR - SEE SHEET E2.1. TO STEEL 24 PORT PATCH PANEL ACCESSIBLE FINISHED CEILING DETAIL NOTES:GENERIC HOOK SHOWN.INTENDED HOOK ORIENTATION IS AS SHOWN.DO NOT INSTALL UPSIDE DOWN ORSIDEWAYS. SELECT ANCHORING MEANS PERLOCATION REQUIREMENTS. DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES DETAIL NOTESSEE DETAIL 9/E3.1 FOR DOOR ACCESS CONTROLCABLING / ADDITIONAL INFORMATION.SECURITY CAMERAS ARE PROVIDED ANDINSTALLED BY THE OWNER. 1/2"C. FROM CAMERA LOCATION TOABOVE NEAREST ACCESSIBLE CEILING(OR IN EXPOSED SPACE UP TO STEELSTRUCTURE) AND BUSH. FREE AIRROUTING ABOVE ACCESSIBLE CEILINGAND UP AT STRUCTURE IN OPENSPACES. 3/4"C. FROM DOOR CONTROLLER TO ABOVENEAREST ACCESSIBLE CEILING, OR MIN 12"ABOVE CONTROLLER, OR IF IN OPEN SPACESUP TO STRUCTURAL STEEL AND BUSH. FREEAIR ROUTING ABOVE ACCESSIBLE CEILINGAND UP AT STRUCTURE IN OPEN SPACES (INWIRE MANAGEMENT). CAT 6 CABLE IS PROVIDEDAND INSTALLEDBY THE OWNERS DOORSUBCONTRACTOR - CONDUIT GNØ JUNCTION BOXSELF TAPPING GREENGROUNDINGSCREW-#10-32X3/8"(TYPICAL)TAPPED HOLE IN BOXCIRCUIT MARKER ONPHASE CONDUCTORPER SPECIFICATIONSWIRE NUT (TYPICAL) DETAIL NOTESPROVIDE A SEPARATE NEUTRAL FOR EACH CIRCUIT.WIRING DEVICES SHALL NOT BE USED FORSPLICING. USE A PIGTAIL TO CONNECT EACH DEVICEAS SHOWN.GREEN GROUND CONDUCTOR SHALL BECONTINUOUS SO THAT REMOVAL OF DEVICE WILLNOT INTERFERE WITH GROUND CONTINUITY. 4DDATA / VOICE(4) CAT 6 FROM OUTLET TO IT ROOM 110BLUE / WHITE ROOMSFINISHED FLOOR FINISHED FLOOR ACCESSIBLE FINISHEDCEILING R DETAIL NOTESCOIL 10'-0" SERVICE LOOP AT WAP. 48 PORT PATCH PANEL IN CONDUIT PATHWAY A1, A2, A3, T1, T2 1DDATA / VOICE(1) CAT 6 FROM OUTLET TO IT ROOM 110BLUE / WHITE CC = CEILING MOUNTED DEVICE 3334353637381 RU SPACE1 RU SPACE1 RU SPACE394041424344 1 RU SPACE1 RU SPACE1 RU SPACE1 RU SPACE1 RU SPACE1 RU SPACE451 RU SPACE x 1 RU SPACE1 RU SPACE1 RU SPACE1 RU SPACE1 RU SPACE1 RU SPACE 1 RU SPACE1 RU SPACE1 RU SPACE Page 50 of 69 E3.2 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES CORD REEL MOUNTING1E3.2NO SCALE PLAN SYMBOL 7 169 FRONT 4TOP2" TRADE SIZE KO3/4" TRADE SIZE KOCONCENTRIC 3/4" AND1 1/4" TRADE SIZE KO 11 3 9 RIGHT SIDE130BOTTOMISO 4 GANG RECESSED MEDIA BOX2E3.2NO SCALE IN GRADE PULL / HAND BOX PB#1 AND #23E3.2NO SCALE SECTION A-ACOVER ORCOVER SHALL BE PLACEDAS TO RECESS INTOVAULT TO PREVENTLATERAL MOVEMENT.ISOMETRIC VIEWPLAN VIEW 24"30"34 X 2" LIFTING SLOT (2X)12" -13 UNC HEX HEAD BOLTWITH WASHER (TOTAL 4)24" A ATERMINATE ALL CONDUITSWITH TERMINATION KITS(INCIDENTAL TO CONDUITS) NOTES:PULL BOX SHALL HAVE AN OPEN BASE.COVER SHALL BE DETACHABLE AND SHALL LOCK.PULL BOXES SHALL BE OF ONE-PIECE CONSTRUCTION.PLACEMENT OF PULL BOXES SHALL BE LOCATED PER PLANS, ADJUSTED FORACTUAL SITE CONDITIONS.PULL BOX SHALL BE USED IN GRASS, GRAVEL, OR NON-VEHICULAR TRAFFICSIDEWALK AREAS, UNLESS NOTED OTHERWISE. CONDUITS AS SHOWNON PLANS ELECTRICALCOMMUNICATIONS RETRACTABLE 45' - 12/3 SJO CORDWITH GROUND CONDUCTOR BALL / CABLE STOP 120V / 20 AMP PLUG - NEMA 5-20PON A GFI BREAKER / DEDICATEDCIRCUIT WHITE CORD REEL - SEE SPC SCHEDULE5'-0" SJO CORD, 12/3 W/ TWIST LOCKPLUG HEAD 120V / 20 AMP TWIST LOCK (TL)RECEPTACLE MOUNTED ATSTRUCTURAL STEELSTRUCTURAL MOUNTINGPLATE BY OTHERSACOUSTIC CEILING TILE 4 HOLE MOUNTING CORDREEL MOUNTING BASE MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 IN INSTALLATIONS WHERE TWO OR MORE RTUS ARE INSTALLED TOGETHER, MOUNT REMOTE TEST STATION ON NEAREST WALL THAT PROVIDES ACCESS. NOTES MOUNT ALL TEST SWITCHES IN ONE AREA.2.1.NOTES:REMOTE TESTWIRING DIAGRAM SEE DUCT SMOKERETURNAIRLOCATION DIAGRAMCONTROL PANELDDCDETECTORDUCT SUPPLYAIRRTU INDICATING RTU NUMBER.PROVIDE NAMEPLATE MULTIPLE DETECTOR LOCATIONS.OTHER INDICATORS FORINDICATORLIGHTRTU NUMBERINDICATINGNAMEPLATEWIRING IN CONDUITDETECTORDUCT DETECTOR REMOTETEST SWITCH SEE NOTE #3 3.DUCT SMOKE DETECTORS SHALL BE INSTALLED IN RETURN AIR SYSTEMS WITH ACAPACITY GREATER THAN 2,000 CFM, IN THE RETURN AIR DUCT OR PLENUMUPSTREAM OF ANY FILTERS, EXHAUST AIR CONNECTIONS, OUTDOOR AIRCONNECTIONS, OR DECONTAMINATION EQUIPMENT AND APPLIANCES.WHERE RETURN AIR RISERS SERVE TWO OR MORE STORIES AND ARE PART OF ARETURN AIR SYSTEM HAVING A CAPACITY GREATER THAN 15,000 CFM, DUCTSMOKE DETECTORS SHALL BE INSTALLED AT EACH STORY. SUCH DUCT SMOKEDETECTORS SHALL BE LOCATED UPSTREAM OF THE CONNECTION BETWEEN THERETURN AIR RISER AND ANY AIR DUCTS OR PLENUMS.FOR HIGH RISE BUILDINGS, IN ADDITION TO THE DUCT SMOKE DETECTOR IN THEMAIN RETURN AIR DUCT, PROVIDE A DUCT SMOKE DETECTOR IN THE EXHAUST AIRPLENUM OF EACH A/C SYSTEM HAVING A CAPACITY GREATER THAN 2,000 CFM.4. AIREXHAUST 5. AND NOTE #4WIRE INTO HVAC CONTROL PANEL OR STARTER TO SHUT DOWN FAN IN6.THE ACTUATION OF A DUCT SMOKE DETECTOR SHALL ACTIVATE A VISIBLEAND AUDIBLE SUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED LOCATION (>2,000 CFM) CM CM RTS/I RTS/I THE EVENT SMOKE IS DETECTED. PROVIDE OVERRIDE SWITCH (KEYED SWITCH ORSTART PUSH-BUTTON STATION IN LOCKED ENCLOSURE) ADJACENT TO FACP TORESTART THE HVAC UNIT. PROVIDE WRITTEN STATEMENT TO DFD CONSTR. REP.THAT THE SYSTEM WAS TESTED AND OPERATES CORRECTLY. ROOF TOP UNIT FAN SHUT DOWN4E3.2NO SCALE DF DF CCR-XXTL Page 51 of 69 E4.1MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 NO SCALE:NEW ELECTRICAL ONE-LINE RISER DIAGRAM - 2026 PANEL MDP120/208V3∅,4W600AMCB - 600/3NEMA 1PANEL A1120/208V3∅,4W100AMLONEMA 142 SPACE ROOM 116 EXTERIOR GRADE NO SCALE:EXISTING ONE-LINE RISER DIAGRAMEX GROUNDING - SITE CLEAR EX PANEL A120/208V3∅,4W225A MLO SECONDARY OVERHEAD UTILITY SERVICE FEEDERSITE CLEARED BY UTILITY COMPANY ETR UTILITY POLE EX PANEL MDP120/208V3∅,4W600A600/3 MCB200/3200/3SPACE100/370/330/330/3 METR PANELB120/208V3∅,4WCOLUMNTYPEPANEL 200/3200/370/370/330/330/3 200/3EX PANEL120/208V3∅,4WEX PANEL120/208V3∅,4W ETR PANELC120/208V3∅,4WCOLUMNTYPEPANEL ETR PANELD120/208V3∅,4WCOLUMNTYPEPANEL ETR PANELG120/208V3∅,4WCOLUMNTYPEPANEL SURGE SUPPRESSION CONNECTION3E4.1NO SCALE 12 3 4 X DETAIL NOTESPROVIDE 60 AMP 3 PHASE CURRENT LIMITING BREAKER IN MAIN SERVICE PANELMAIN SERVICE PANEL OR DISTRIBUTION PANEL - SEE 2/E4.1.4#6, 1#10 GND IN 1" CONDUIT.CONDUIT AND FEEDER DISTANCE NOT TO EXCEED 5 FEET.SURGE SUPPRESSION UNIT.ADJUST SIZE OF CIRCUIT BREAKER, CONDUCTORS, AND CONDUIT ASNECESSARY TO ADHERE TO SPD MANUFACTURER'S RECOMMENDATIONS. 12345 PANEL MDPTVSS / SURGESUPPRESSIONUNIT (SPD)#6 GND DETAIL 1/E4.1 AND 2/E4.1 NOTES:SEE PANEL SCHEDULES FOR ADDITIONAL INFORMATION, INCLUDING BRANCH CIRCUIT BREAKERS.TVSS / SURGE SUPPRESSION DEVICE - SEE DETAIL 3/E4.1.PROVIDE PANEL PLAQUE - SEE DETAIL 4/E4.1.PROVIDE PANEL PLAQUE - SEE DETAIL 5/E4.1PROVIDE AND INSTALL UTILITY METER BASE AND CT CABINET PER STURGEON BAY UTILITIES (SBU).PROVIDE AND INSTALL ELECTRICAL SERVICE GROUNDING SYSTEM PER THE N.E.C. 250. SEE BUILDINGGROUNDING DETAIL 2/E3.1 FOR ADDITIONAL GROUNDING REQUIREMENTS.PROVIDE AND INSTALL NEW PANELBOARD.COORDINATE BUILDING ELECTRICAL SERVICE WITH STURGEON BAY UTILITIES. INCLUDING REMOVAL OFEXISTING ELECTRICAL SERVICE TO THE BUILDING, NEW PAD MOUNTED TRANSFORMER, CONCRETE PAD,METERING / CT CABINET, ETC. PROVIDE COMPLETE INSTALLATION PER THEIR REQUIREMENTS, N.E.C., STATEOF WISCONSIN, N.F.P.A., AND LOCAL CODES.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR EXISTING PANEL / FEEDER.COORDINATE THE PHASING OF POWER OUTAGE AND SWITCHOVER FOR THIS SERVICE WITH THE OWNERAND STURGEON BAY UTILITIES.EXISTING OWNER (PRIVATELY OWNED) FIBER OPTICAL CABLE FROM ADJACENT DOOR COUNTY MUSEUMBUILDING TO EXISTING MDF RACK IN THIS BUILDING. DISCONNECT, REMOVE, TAKE POSSESSION OF ANDSITE CLEAR.DISCONNECT, REMOVE, AND SITE CLEAR EXISTING ELECTRICAL SERVICE, OWNER OWNED ELECTRICALEQUIPMENT, PANELS, CONDUIT, WIRE, ETC. COORDINATE TIMING AND PHASING WITH STURGEON BAYUTILITIES, THE OWNER, AND GENERAL CONTRACTOR.VERIFY WITH STURGEON BAY UTILITIES SECONDARY TRANSFORMER FEEDER REQUIREMENTS AND PROVIDEA COMPLETE INSTALLATION PER THEIR REQUIREMENTS, N.E.C., N.F.P.A., AND LOCAL CODES.VERIFY WITH THE UTILITY AVAILABLE FAULT CURRENT AND FINAL LOCATION OF UTILITY TRANSFORMER /ELECTRICAL SERVICE FEEDER LENGTH.COORDINATE CONCRETE PAD REQUIREMENTS WITH THE GENERAL CONTRACTOR AND THE LOCAL POWERUTILITY COMPANY.INSTALL AND TERMINATE SERVICE FEEDER CONDUCTORS PER WI ADMIN CODE 316.230.FEEDER LISTED AS COPPER, IT IS ACCEPTABLE TO UTILIZE ALUMINUM CONDUCTORS ON THIS FEEDER - SIZEALUMINUM CONDUCTORS TO THE APPROPRIATE AMPERAGE REQUIRED. 123 DOOR COUNTY MUSEUMBUILDINGYEAR: 2026ELECTRICAL SERVICE:600 AMP120/208 VOLT3 PHASE / 4 WIRE 10" 10" ENGRAVED NAMEPLATE - PANEL MDP4E4.1NO SCALE INSTALLING ELECTRICALCONTRACTOR HERE "X"XDETAIL NOTESINSTALL THIS ENGRAVED NAMEPLATE AT PANEL MDP.WHITE BACKGROUND - BLACK LETTERS.PLACE INSTALLING ELECTRICAL CONTRACTORSNAME IN THIS LOCATION.STATE PER ELECTRICAL SERVICE CHARACTERISTICS.PROJECT PER TITLEBLOCK. 12 1 2 3 34 4 45678910111213 6 CONDUIT PENETRATION THRU CONCRETE6E4.1NO SCALE 660/3TS PLAN SYMBOL5 WEATHER HEAD AND FEEDERTO EX PANEL MDP SITE CLEAREDBY THE ELECTRICAL CONTRACTORUTILITY AND CUSTOMER ELECTRICAL SERVICETRANSITION POINT 9999 TVSS / SURGESUPPRESSIONUNIT (SPD)TV60/3 2 13 225/3 NEW PAD MOUNTEDUTILITY TRANSFORMER NEW CONCRETE PAD 8 NEW PRIMARY BYUTILITY15 13 AVAILABLE FAULT CURRENT (AFC)POINT #1 - 37,896A.PER SBU - ELECTRICAL UTILITY. 600/3 4#3,1#8G-1 1/4"C EXTERIOR MCT CABINETMETERSOCKET5 PER STURGEONBAY UTILITIES - VERIFY ALL FEEDER SIZES BASED ON COPPER CONDUCTORS - ALUMINUM FEEDERS FOR BRANCH PANELS ARE ACCEPTABLE.SEE PLAN NOTE #18 THIS SHEET.FEEDERS:PROVIDE BUILDING STUDIES AS PART OF THIS PROJECT - SEE SPECIFICATIONS SECTION 26 05 72 AND 26 05 74.NO ELECTRICAL EQUIPMENT SHALL BE ORDERED OR SHOP DRAWINGS CREATED PRIOR TO COMPLETION ANDRESOLUTION OF THE BUILDING STUDIES.PERFORM ARC FLASH CALCULATIONS AND SHORT CIRCUIT CALCULATIONS FOR NEW WORK: ELECTRICAL PANELS /EQUIPMENT / MOTORS / DISCONNECTS / ETC. INSTALL ARC FLASH LABELS PER N.E.C. FOR NEW ALL PANELS,STARTERS, DISCONNECTS, VFD'S, AND CONTROL PANELS AS PART OF THIS PROJECT. BUILDING STUDIES:PROVIDE TEMP. POWER FOR THIS PROJECT - SEE SPECIFICATIONS SECTION 26 50 00.PROJECT TEMP POWER: SITE CLEAR EXISTING ELECTRICAL SERVICE GROUNDING SYSTEM AND PROVIDE NEW SERVICE GROUNDINGSYSTEMS.ALL GROUNDING IS TO BE DONE PER THE SPECIFICATIONS, DETAILS, AND IN ACCORDANCE WITH NEC 250REQUIREMENTS.GROUNDING: 1476 12 11 EXTERIOR EXTERIOR PANEL A3120/208V3∅,4W225AMLONEMA 184 SPACE147225/31503 2 PARALLEL SETS OF:4#350KCMIL, 1#2/0G-4"CAND (1) SPARE EMPTY 4"C. PROVIDE AND INSTALLCONDUIT PATHWAY AND(1) SPARE CONDUIT. 14 14 15 ROOM 102ROOM 109 2E4.1 1E4.1 16 16 EXTERIORBUILDINGWALL MCB - ELECTRICALSERVICE DISCONNECT 4#4/0,1#4G-2 1/2"C 9 99 9 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES PANEL A2120/208V3∅,4W225AMLONEMA 142 SPACE41 ROOM 101 100/37 PANEL T1120/208V3∅,4W150AMCB - 150ANEMA 142 SPACE147 4#3/0,1#6G-2"C PANEL "XX"120/208 VOLT - 3P/4WSOURCED FROM - "MDP" ENGRAVED NAMEPLATE -BRANCH PANEL5E4.1NO SCALE XDETAIL NOTESINSTALL THIS ENGRAVED NAMEPLATE AT ALL BRANCHPANELS - WHITE BACKGROUND - BLACK LETTERS.STATE ELECTRICAL CHARACTERISTICS.PANEL NAME VARIES.12 12 10" 4" 17 ETR PANEL120/208V3∅,4W 9 TO EXISTING MDF EX UTILITY POLE ANDPOLE SITE CLEARED BYTHE UTILITY COMPANY 11 M EX UTILITY POLE ANDPOLE MOUNTEDTRANSFORMERSWILL BE SITE CLEAREDBY THE UTILITYCOMPANYEX WEATHER HEADFOR ELECTRICALSERVICE TO EXISTINGTO REMAIN DOORCOUNTY MUSEUMBUILDING. EX ELEC. METERFOR ELECTRICALSERVICE TO EXISTINGTO REMAIN DOORCOUNTY MUSEUMBUILDING. SALVAGE EXISTINGFEEDER INTO EXISTINGTO REMAIN DOORCOUNTY MUSEUMBUILDING FORRECONNECT TO NEWELECTRICAL SERVICE /CT / METER CABINETSEE 2/E4.1 M CT CABINETMETERSOCKETCT CABINETMETERSOCKET5 PER STURGEONBAY UTILITIES - VERIFY EX EXTERIORBUILDING WALLDOOR COUNTYMUSEUM BLDG.EX EXTERIORBUILDING WALLEX YOUNKERS BLDG.(RENOVATION BLDG.) SALVAGEEXISTING ANDRECONNECTTO NEW CT CAB /METER SOCKET 17 13PROVIDE AND INSTALLCONDUIT PATHWAY AND(1) SPARE CONDUIT. 3 3 MGB2E3.1MAIN GROUNDING BAR3E3.1 7 10 PANEL T2120/208V3∅,4W150AMCB - 150ANEMA 142 SPACE147 4#3/0,1#6G-2"C17 1503 ROOM 118 VERIFY PANELLOCATION WITHOWNER PRIORTO THE START OFCONSTRUCTIONVERIFY PANELLOCATION WITHOWNER PRIORTO THE START OFCONSTRUCTION 1717 17EXTERIOR GRADE Page 52 of 69 E4.2MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES Page 53 of 69 E4.3MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 ELECTRICAL SYMBOLSDUPLEX RECEPTACLE - MTD: 24" AFF TO TOP OF BOX OR GENERAL SYMBOL NOTES:LIGHT FIXTURES: SEE LIGHT FIXTURE SCHEDULE.LIGHT FIXTURES: HALF SHADED LIGHT FIXTURES ARE INTENDED FOR EMERGENCY EGRESS LIGHTING.MOTOR CONNECTIONS: SEE MOTOR SCHEDULE.SPECIAL OUTLET CONNECTIONS: SEE SPC SCHEDULE.PANELBOARDS: SEE INDIVIDUAL PANELS SCHEDULES.MEDIA BOXES - SEE PLANS FOR DEVICES REQUIRED AT EACH LOCATION. VERIFY MONITOR HEIGHT AND LOCATION.WHERE SYMBOL INDICATES INSTALLATION ABOVE A COUNTER, INSTALL RECEPTACLE 4" ABOVE COUNTER BACKSPLASH ORCOUNTER (IF BACKSPLASH IS NOT PRESENT). IF COUNTER DOES NOT EXIST, INSTALL AT 44" AFF, UNLESS NOTEDOTHERWISE. COORDINATE WITH CASEWORK DETAILS PRIOR TO ROUGH-IN.RECEPTACLE SUBSCRIPTS:GFIGROUND FAULT INTERRUPTINGWPWEATHER RESISTANTTLTWIST LOCK TYPECCEILING MOUNTEDUSBUSB CHARGER DEVICE - (2) TYPE A AND (2) TYPE CHHOSPITAL GRADEXX" NOTED SPECIFIC MOUNTING HEIGHT OF DEVICESWITCH / LIGHTS SUBSCRIPTS:33 WAY SWITCH44 WAY SWITCHWxDIGITAL SWITCHES - SEE LIGHTING CONTROLS SCHEDULE AND DETAILS ON SHEET E1.2.NLNIGHT LIGHTTELECOMMUNICATION / SECURITY EQUIPMENT OUTLETS SUBSCRIPTS - SEE DETAIL 1/E3.1 AND 9/E3.1:CMOUNTED IN CEILING.WAPWIRELESS ACCESS POINT.xDDATA EQUIPMENT OUTLET W/ "x" NUMBER OF CABLES.SCSECURITY CAMERA LOCATION - CAT 6DCDOOR ACCESS CONTROLMDFMAIN DISTRIBUTION FRAMEGENERAL NOTES:ETR: EQUIPMENT / DEVICES / MATERIAL LISTED "ETR" IS EXISTING TO REMAIN.ER: EQUIPMENT / DEVICES / MATERIAL LISTED "ER" IS EXISTING RELOCATED.NL: NIGHT LIGHT FIXTURE 24/7 ENERGIZED.DASHED EQUIPMENT / MATERIALS / DEVICES / LIGHTS / MOTORS / ETC. TO BE DEMOLISHED.PROVIDE CLEAR ADHESIVE LABEL ON FACEPLATE OF ALL DEVICES.ALL NEW DATA / VOICE OUTLETS - HOME RUN CABLING TO IT ROOM 110, TERMINATE AND TEST. XX FVFFC XX" = SPECIFIC NOTED MOUNTED HEIGHTDUPLEX RECEPTACLE - MTD: 4" ABOVE CASEWORKBACKSPLASHDOUBLE DUPLEX RECEPTACLE - MTD: 24" AFF TO TOP OFBOX OR XX" = SPECIFIC NOTED MOUNTED HEIGHTDUPLEX RECEPTACLE - MTD: 4" ABOVE CASEWORKBACKSPLASHUSB RECEPTACLE - MTD: 24" AFF TO TOP OF BOX ORXX" = SPECIFIC NOTED MOUNTED HEIGHTUSB RECEPTACLE - MTD: 4" ABOVE CASEWORKBACKSPLASH MOTOR CONNECTIONPANELBOARD - SURFACE MOUNTEDSPECIAL OUTLET CONNECTION FUSED (FSSW) AND NON-FUSED (NFSSW) SAFETY SWITCHESVARIABLE FREQ DRIVE (VFD) WITH INTEGRALFUSED SAFETY SWITCH ELECTRICAL SHEET REVISION CLOUD IDENTIFICATION # TEMPERATURE CONTROL PANEL WITHTRANSFORMER / DISC. SWITCH COMBINATION STARTER / FUSED DISCONNECTSWITCH - COMBO LINE CONTINUATION BREAK TELECOMMUNICATIONS EQUIPMENT OUTLET - SEE SCHEDULEMTD: MATCH ADJACENT 120V RECEPTACLE, OR NOTED HEIGHT ELECTRICAL SHEET PLAN NOTE SYMBOL LED LIGHT FIXTURE - PENDANT - HIGHBAY TYPEWITH INTEGRAL OCCUPANCY SENSOR. NORMAL AND EMLIGHTING BRANCH CIRCUITING - UNSWITCHEDLIGHTING / POWER BRANCH CIRCUITINGLIGHT SWITCH - SEE DETAIL 1/E1.2MTD: 48" AFF TO TOP OF BOX LED LIGHT FIXTURE - RECESSED - LINEAR TYPENORM AND EM LIGHTING OCCUPANCY SENSOR LED EXIT SIGN - UNIVERSAL MOUNTINGLED EXTERIOR WALL MOUNTED LIGHT FIXTURE JJUNCTION BOXMMEDIA BOX - RECESSED WITH DEVICES AT WALL MONITORS LED LIGHT FIXTURE - RECESSED - 2' X 2' TROFFER TYPENORMAL OR EM LED LIGHT FIXTURE - PENDANT - LINEAR TYPENORM AND EMLED LIGHT FIXTURE - SURFACE - LINEAR STRIP TYPENORM AND EM DOOR ACCESS CONTROL - CARD READERRDOOR ACCESS CONTROL - ELECTRIC STRIKE LOCATIONEDOOR ACCESS CONTROL - DOOR POSITION SWITCHD CONDUIT STUBWALL MOUNTED GROUNDING BAR RECESSED DEVICE BLANK BOX - MTD: 24" AFF. TO TOP OF BOX TVTVSS SURGE SUPPRESSION DEVICE TCTIME CLOCKCLIGHTING CONTRACTOR ELECTRICAL SERVICE CT CAB / ELETRICAL METER 1.2.3.4.5.6.7.8. 9. 10. OVERHEAD DOOR LOCAL PUSHBUTTON CONTROL SSMP - SPRINKLER SYSTEM MONITORING UNITHEXTERIOR IN GRADE PULL BOX / HAND HOLE. CSECURITY CAMERA LOCATION PAD MOUNT UTILITY TRANSFORMERUTILITY POLE W/ POLE MOUNTED UTILITY TRANSFORMERS DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ARCHIVES 1 EXISTING ELECTRICAL SERVICE EQUIPMENT2 EXISTING COLUMN MOUNTED BRANCH PANEL 3 EXISTING FIBER OPTIC CABLE ENTERING BUILDING 4 EXISTING ELECTRICAL UTILITY SERVICE ENTRANCE 5 EXISTING WEATHER HEAD AND FIBER ENTRANCE 6 EXISTING WEATHER HEAD AND FIBER ENTRANCE LED EXTERIOR EGRESS LAMP HEADS (2) VIA EXIT LIGHT BATTERY XEXELECTRICAL DETAIL REFERENCESPRINKLER SYSTEM MANUAL PULL STATION - WALLMTD: 44" AFF TO TOP OF BOXFSPRINKLER SYSTEM - TAMPER SWITCHSPRINKLER SYSTEM - FLOW SWITCHTSFSXEXISTING CONDITIONS - SITE PHOTO REFERENCE LED LIGHT FIXTURE - RECESSED - ROUND DOWNLIGHT SPRINKLER SYSTEM EXTERIOR NOTIFICATION DEVICEMTD: 96" AFG TO TOP OF BOX - WP (WEATHER PROOF)FFIRE ALARM DUCT DETECTOR - DUCTWORK / RTU FAN SHUT DOWNDF Page 54 of 69 SCALE: 1" = 1'-0"DETAILROOM NAME/NUMBERELEVATIONSYMBOLS LEGENDDETAIL IDENTIFICATIONREVISIONPLAN DETAIL REFERENCE FIRE PROTECTION SYSTEMS CONSTRUCTION CLASSIFICATION:DESIGN LOADS: PER IBC 2021, CHAPTER 16OCCUPANCY: BUILDING SIZE: SPOT ELEVATIONEXISTING SPOTELEVATION PROFESSIONAL STAMP DESIGN TEAMPROJECT LOCATIONSITE LOCATION MAP MATERIAL LEGEND SHEET INDEXPROJECT DATABUILDING CODE: IBC 2021(WITH WISCONSIN AMENDMENTS)GENERAL CONDITIONS:SITE MAP BUILDING DESIGN BUILDING SECTION REFERENCE DOOR COUNTY MUSEUM ALTERATIONSPROPOSED ALTERATIONS FOR:STURGEON BAY, WI 54235SHEETSHEET NAME FAX (800) 388-3860(800) 242-8511WEBSITE: www.diggershotline.com CALL 3 WORK DAYSBEFORE YOU DIGDIGGERSHOTLINE RICELAKE 11 TOMAHRAPIDS 13FALLSPARK WISCONSIN RHINELANDER8 141 STEVENS POINT ASHLAND2 53EAU CLAIRELA CROSSE WAUSAU SUPERIOR OSHKOSHFOND DU LACMANITOWOCSHEBOYGAN KENOSHARACINE APPLETONGREEN BAY41 43 94909090 43 949494 51 MADISONMILWAUKEE151 1236 MONTELLO23MAUSTONPORT WASHINGTONNORTH FREEDOMRIPONSHAWANO IF YOU HAVE ANY QUESTIONS OR COMMENTS ABOUT THE CONTENT OR PRESENTATION OF MATERIAL ON THIS PLAN, PLEASE CALL (920) 469-9288OUR SERVICE IS UNMATCHED AND OUR INTEGRITY IS IMPECCABLE.PROCESS AND MAKE BUILDING CONSTRUCTION MORE ENJOYABLE.ENGINEERING. OUR PLANS MOVE SMOOTHLY THROUGH THE STATE REVIEWWE PROVIDE HIGH QUALITY ARCHITECTURAL DESIGN AND STRUCTURALINTEGRITY MISSION STATEMENTNTEGRITENGINEERING DESIGN, LLC2637 Tulip Lane Green Bay, WI 54313Phone: (920) 469-9288 Fax: (920) 469-6809E-mail: Info@IntegrityEngineering.bizY T1.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ALTERATIONS Page 55 of 69 ·· T1.1DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 56 of 69 LS1.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 57 of 69 D1.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 58 of 69 TOP OF FOUNDATION WALL KEYS1.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 59 of 69 A1.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 60 of 69 A1.1DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 61 of 69 A2.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 62 of 69 FRAME DIAGRAMS DOOR DIAGRAMS JAMB HEAD A4.0DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY ISS8ED )2RC2NS7R8C7I2NMUSEUM ALTERATIONS Page 63 of 69 BATHROOM EXISTING 106 BATHROOM EXISTING 107 ADA ENTRY EXISTING 105 BATHROOM 106 BATHROOM 107 ENTRY NEW ADA 105 VAULT EXISTING X OFFICE EXISTING 108 LOBBY EXISTING 101 THEATER EXISTING 102 CONTROL EXISTING 103 STAIR 'A' EXISTING 104 EXTERIOR PATIO EXISTING 109 BATHROOM 106 BATHROOM 107 ENTRY NEW ADA 105 VAULT EXISTING X OFFICE EXISTING 108 LOBBY EXISTING 101 THEATER EXISTING 102 CONTROL EXISTING 103 STAIR 'A' EXISTING 104 EXTERIOR PATIO EXISTING 109 K E Y O F P L U M B I N G S Y M B O L S SYMBOLS ABBR. DESCRIPTION STM.S. STORM SEWER OR DRAIN SAN.S. SANITARY SEWER OR DRAIN D.T. DRAIN TILE A.W. ACID WASTE PIPING G.W. GREASY WASTE PIPING CL.W. CLEARWATER WASTE PIPING W. SANITARY WASTE PIPING V. VENT PIPING CL.V. CLEARWATER VENT AV. ACID VENT PIPING CW. COLD WATER PIPING CW.S. SOFTENED COLD WATER PIPING HW. HOT WATER PIPING CR. HOT WATER CIRCULATING RETURN PIPING G. GAS PIPING A. COMPRESSED AIR PIPING BL.V. BALL VALVE BF.V. BUTTERFLY VALVE PRV PRESSURE REGULATING VALVE CK.V. CHECK VALVE B.V. BALANCING VALVE CO/FCO CLEANOUT or FLUSH CLEANOUT (AS NOTED) DTR. DRAIN TILE RECEIVER WITH TRAP AND CLEANOUT DTCO DRAIN TILE CLEANOUT C.C. / P.C. CAPPED CONNECTION or PLUGGED CONNECTION H.B. HOSE BIBB R.D. ROOF DRAIN F.D. FLOOR DRAIN H.D. HUB DRAIN EL. FLOOR AND/OR GRADE ELEVATION I.E. INVERT ELEVATION (ARCHITECTURAL DATUM) I.E. INVERT ELEVATION (ENGINEERING DATUM) B.O. FURNISHED BY-OTHERS (PLB. ROUGH-IN & CONN.) ROOM NUMBERS V.T.R. VENT THROUGH ROOF A.F. ABOVE FLOOR W.S. WASTE STACK V.S. VENT STACK DT AW CL CL AV S G A CO FCO DT DT I.E.: 0'-0'' I.E.: 0.0' A123 V.T. VENT TERMINAL UN. UNION OR DIELECTRIC UNION SAWCUT APPRX. AREA OF EXISTING FLOOR TO BE REMOVED W.H.A. WATER HAMMER (SHOCK) ARRESTOR P.G. PRESSURE GAUGE THERM. THERMOMETER F.S. FLOOR SINK COND. CONDUCTOR PIPING GW RM. N.P. NON-POTABLE WATER NP For Sheets P -1 to P -2 Only. EXISTING WC EXISTING LAV 1 1 EXISTING WC 1 EXISTING LAV 1 EXISTING DF 1 3" W UP 2" W UP 2" W UP 3" W UP CONNECT TO EXISTING SAN 3 CONNECT NEW 1/2" HW & 3/4" CW TO EXISTING 3 2" W DN 2" W DN CONNECT 1 -1/2" V TO EXISTING 3 L-1 WC -1 L-1 WC -1 K E Y O F N O T E S INDICATES A CONNECTION TO EXISTING PIPING. CONTRACTOR IS TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO REMAIN. REMOVE AND SEAL ALL RELATED PIPING AND HANGERS BACK TO INDICATES EXISTING FIXTURE, EQUIPMENT, OR PIPING TO BE REMOVED. FIELD VERIFY LOCATION, SIZE & ELEVATION OF EXIST. PIPING BEFORE PROCEEDING WITH NEW CONSTRUCTION. STACK, MAIN OR RISER. 1 2 3 INFORMATION PERTAINING TO EXISTING PROJECT CONDITIONS, SUCH AS PRESENT LOCATIONS OF CIVIL, ARCHITECTURAL AND STRUCTURAL BUILDING COMPONENTS, MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL EQUIPMENT, PIPING, DUCT WORK, ROUGH -INS, AND OTHER MISCELLANEOUS CONSTRUCTION, APPEARS ON THE DRAWINGS. WHILE SUCH INFORMATION HAS BEEN BASED ON AVAILABLE RECORDS AND COLLECTED WITH REASONABLE CARE, THE ARCHITECT AND ENGINEER DO NOT ASSUME ANY EXPRESSED OR IMPLIED GUARANTEE THAT CONDITIONS SO INDICATED ARE SHOWN ENTIRELY COMPLETE, CORRECT AND REPRESENTATIVE OF THOSE ACTUALLY EXISTING. ALL CONTRACTORS SHALL SATISFY THEMSELVES AS TO ALL EXISTING JOB CONDITIONS PRIOR TO BIDDING, AND VERIFY ALL DIMENSIONS AT THE SITE. E x i s t i n g P r o j e c t C o n d i t i o n s N o t e TYPICAL FIXTURE CONNECTIONS WATER CLOSET ( WC -1) = 3" W & 3/4" CWS LAVATORY ( L-1) = 2" W - 1-1/2" V, 1/2" HW & 1/2" CW ALTERNATE BID: ADA TOILET ROOM RENOVATIONS © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ALTERATIONS STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 18 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-1 LGD JUNE 15, 2026 PLUMBING SHEET INDEX SHEET DESCRIPTION P-1 FLOOR PLANS P-2 SCHEDULES & DETAILS SCALE: 1/8" = 1'-0" 1 FIRST FLOOR DEMOLITION PLAN - PLUMBING TRUE NORTH PLAN NORTH SCALE: 1/8" = 1'-0" 2 BELOW FLOOR PLAN (IN BASEMENT) - PLUMBING SCALE: 1/8" = 1'-0" 3 FIRST FLOOR PLAN - PLUMBING TRUE NORTH PLAN NORTH TRUE NORTH PLAN NORTH Page 64 of 69 ALTERNATE BID: ADA TOILET ROOM RENOVATIONS © 2026 LUBENOW, GOBSTER, DOMINIAK & ASSOCIATES, INC. PROPOSED ALTERATIONS FOR: DOOR COUNTY MUSEUM ALTERATIONS STURGEON BAY, WI ISSUE NO. ISSUE DATE REVISIONS SHEET: E-mail: Info@IntegrityEngineering.biz Phone: (920) 469-9288 Fax: (920) 469-6809 2637 Tulip Lane Green Bay, WI 54313 © COPYRIGHT-INTEGRITY ENGINEERING & DESIGN, LLC DATE: DRAWN BY: JOB NUMBER: 25253 18 N. 4TH AVENUE ISSUED FOR CONSTRUCTION P-2 LGD JUNE 15, 2026 NOT TO SCALE 1 TYPICAL PIPE SUPPORT DETAILS NOT TO SCALE 2 PIPE PENETRATIONS AT NON-RATED WALL DETAIL NOT TO SCALE 3 PIPE PENETRATIONS AT RATED WALL DETAIL Page 65 of 69 REMOVE EXISTINGELECTRIC HEATERIN ITS ENTIRETY REMOVE AND REPLACEEXISTING EXHAUST FANS.SEE NEW FLOOR PLANFOR LOCATIONS. ELECTRIC COVEHEATER NO. 1AT 7'-3" A.F.F.ELECTRIC COVEHEATER NO. 2AT 7'-3" A.F.F. CEF-2...100 CFMRECONNECT TO EXISTING EXHAUST DUCT ABOVE CLG.CEF-1...100 CFMRECONNECT TO EXISTING EXHAUST DUCT ABOVE CLG.NOTE: GENERAL CONTRACTORSHALL UNDERCUT THE DOORTO EACH BATHROOM BY 1"TO ALLOW FOR AIR TRANSFERINTO BATHROOM FROM LOBBY.TT MANUFACTURERMODELTAGUNITSERVICECFMS.P.IN H2ORPMMOTORAMPSVOLTSPH.SPEEDB.D.DPRINLETGRILLESPEEDCONTROLWALLJACKBRICKVENTARRANGEMENTCEILINGINLINE DISCONNECTCEF-1BATHROOM X 100 GREENHECKYESNOYESNOYESONE120110100.190.25 SPA-125YES NOTE: E.C. SHALL INTERLOCK FAN WITH ROOM'S LIGHTING CONTROL AND PROVIDE A TIME-DELAY-RELAY OF 15 MINUTES AFTER ROOM'S LIGHTS TURN "OFF".NOTE: ALL STARTERS AND DISCONNECTS SHALL BE FURNISHED AND INSTALLED BY E.C. 106CEF-2BATHROOM X 100 GREENHECKYESNOYESNOYESONE120110100.190.25 SPA-125YES107 MODELMANUFACTURERPH.VOLTSDHCABINET SIZEBTU/HRWATTSLENGTHNO.UNIT1 47"6004-3/16"3" 1201BERKORCC6012C2048 NOTE: COMPLETE WITH REMOTE T'STAT AMPS52 47"6004-3/16"3" 1201BERKORCC6012C20485SERVICEBATHROOM 106BATHROOM 107 ALL WORK SHALL CONFORM TO STATE AND LOCAL CODES WHETHER OR NOT SPECIFICALLY SHOWN ON THE PLANS.ANY VARIATION FROM THESE PLANS AND/OR SPECIFICATIONS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE HVAC DESIGNER, SHALL RELIEVE THE DESIGNER OF ANY RESPONSIBILITY FOR THE SATISFACTORY OPERATION OF THE ENTIRE HVAC SYSTEM.THE HVAC CONTRACTOR OR RECOGNIZED BALANCING CONTRACTOR SHALL BE RESPONSIBLE FOR BALANCING THE ENTIRE SYSTEM SO THAT THE SUPPLY AIR, RETURN AIR, EXHAUST AIR, AND FRESH AIR ARE WITHIN +/- 10% OF THE AIR QUANTITIES SHOWN ON THE PLAN. THE HVAC CONTRACTOR SHALL FURNISH THE HVAC DESIGNER WITH AN ELECTRONIC VERSION OF THE BALANCING REPORT IN PDF FORMAT, AS WELL AS (4) HARD COPIES THAT SHALL BE RETAINED AT THE PROJECT SITE AND AVAILABLE FOR INSPECTION UPON REQUEST. THE AIR SYSTEMS SHALL BE BALANCED IN SUCH A MANNER AS TO MINIMIZE LOSSES FROM DAMPER THROTTLING BY ADJUSTING FAN SPEED, AND ADJUSTING PROVIDED MANUAL VOLUME DAMPERS IN THE BRANCH DUCT TO EACH GRILL IN ORDER TO MEET AIR FLOW CONDITIONS. BALANCING PROCEDURES SHALL BE ACCEPTABLE TO THE DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES (DSPS), AND THE IMC. THE HVAC CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY VOLUME, CONTROL, AND BACK-DRAFT DAMPERS REQUIRED FOR INSTALLATION AND BALANCING. ALTERNATE 'EQUAL' MANUFACTURERS WILL BE CONSIDERED FOR ALL EQUIPMENT AS SCHEDULED IF ALLCAPACITIES, AIR FLOWS, PRESSURE DROPS, EFFICIENCIES, WARRANTIES, AND OVERALL EQUIPMENT QUALITY OFCONSTRUCTION CAN BE DEMONSTRATED. IF ALTERNATE MANUFACTURERS ARE BEING PROPOSED PLEASE LISTWHAT IS BEING OFFERED AS AN ALTERNATE AS WELL AS THE DEDUCT TO THE OWNER IF ACCEPTING THEALTERNATE.14. EQUIPMENT NOTES:1. EQUIPMENT SHALL BE ENCLOSED, SUSPENDED, OR GUARDED AS SHOWN ON THE PLANS. EQUIPMENT LOCATIONS SHALL COMPLY WITH ANY/ALL MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS AS WELL AS ALL STATE AND LOCAL CODES WHETHER OR NOT INDICATED ON THE PLANS.2. ALL CLEARANCES AROUND EQUIPMENT SHALL COMPLY WITH MANUFACTURER'S RECOMMEND- TIONS AND STATE AND LOCAL CODES WHETHER OR NOT INDICATED ON THE PLANS. CLEARANCES SHALL ALLOW EASE OF ACCESS AND MAINTENANCE FOR ALL EQUIPMENT AS INSTALLED.4. SMOKE DETECTORS SHALL BE INSTALLED AS PER IMC CODE 606.2.1 THROUGH 606.2.3. EXCEPTION: SMOKE DETECTORS SHALL NOT BE REQUIRED WHERE AIR DISTRIBUTION SYSTEMS ARE INCAPABLE OF SPREADING SMOKE BEYOND THE ENCLOSING WALLS, FLOORS AND CEILINGS OF THE ROOM OR SPACE IN WHICH THE SMOKE IS GENERATED.5. SMOKE DETECTORS SHALL BE INSTALLED IN RETURN AIR SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000 CFM, IN THE RETURN AIR DUCT OR PLENUM UPSTREAM OF ANY FILTERS, EXHAUST AIR CONNECTIONS, OUTDOOR AIR CONNECTIONS, OR DECONTAMINATION EQUIPMENT AND APPLIANCES. EXCEPTION: SMOKE DETECTORS ARE NOT REQUIRED IN THE RETURN AIR SYSTEM WHERE THE SPACE SERVED BY THE AIR DISTRIBUTION SYTEM IS PROTECTED BY A SYSTEM OF AREA SMOKE DETECTORS IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. THE AREA SMOKE DETECTOR SYSTEM SHALL COMPLY WITH THE IMC SECTION 606.4. 5. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY/ALL LINE VOLTAGE WIRING (115 VOLT OR HIGHER). THE TEMPERATURE CONTROL CONTRACTOR SHALL FURNISH AND INSTALL ANY/ALL 24 VOLT CONTROL WIRING.3.2.1.CONTRACTOR SHALL PROVIDE COMPLETE CONTRACTING SERVICES INCLUDING HEATING, VENTILATING ANDAIR-CONDITIONING WORK, AND CONTROL WORK.ALL WORK SHALL BE GUARANTIED FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE OF COMPLETION.HEATING CONTRACTOR SHALL MOUNT ALL ELECTRIC HEATING UNITS.ALL STARTERS AND DISCONNECTS FOR HEATING EQUIPMENT SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICALCONTRACTOR.VERIFY LOCATION OF ALL THERMOSTATS. MOUNT THERMOSTATS A MAXIMUM OF 48" ABOVE THE FLOOR.PROVIDE FLEXIBLE CONNECTORS BETWEEN ALL MOTORIZED EQUIPMENT AND ITS ASSOCIATED DUCTWORK SYSTEM.DO NOT FABRICATE DUCTWORK WITHOUT FIELD CHECKING CLEARANCES.ALL DUCTWORK SHALL BE PRIME FIRST QUALITY GALVANIZED STEEL SHEETS. GAUGES OF METAL, SUPPORT SPACING,ETC. SHALL CONFORM TO THE LATEST EDITION OF ASHRAE AND SMACNA CONSTRUCTION STANDARDS FORDUCTWORK.ALL ROUND DUCTWORK SHALL BE SPIRAL DUCT.ALL MANUAL VOLUME DAMPERS SHALL BE MULTI-BLADE CONTROL DAMPERS (WHERE DUCT SIZES ALLOW).SEAL ALL DAMPER FRAMES AND DUCTWORK.THE ENGINEER IS NOT RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION OR THE SAFETY OF THE JOBSITE, AND THAT THESE RESPONSIBILITIES ARE INTENDED AND REMAIN SOLELY THOSE OF THE CONTRACTOR. 4.6.7.8.9.10.11.12.13. 15.16.17. Kaukauna, Wisconsin 54130W556 Wrightstown Rd.Phone: 920-268-6404email: allhvacdesign@gmail.comH1.0ADOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ALTERATIONS SCALE: 1/4" = 1'-0"H.V.A.C. DEMOLITION PLAN SCALE: 1/4" = 1'-0"H.V.A.C. FLOOR PLAN Page 66 of 69 E1.0MIDWEST DESIGN SOLUTIONS, LLCN7668 BODART CTSEYMOUR, WI 54165scott@mwdsolutions.com(920) 621-7874 DOOR COUNTYE-mail: Info@IntegrityEngineering.bizPhone: (920) 469-9288 Fax: (920) 469-68092637 Tulip Lane Green Bay, WI 54313ENGINEERING & DESIGN, LLCNTEGRITY "ISSUED FORCONSTRUCTION"MUSEUM ALTERATIONS NESW FLOOR PLAN - LIGHTING / POWER / SYSTEMS PLANSCALE: 18"=1'-0" SSMMW1 W1 S1GFIGFI NESW FLOOR PLAN - DEMOLITION PLANSCALE: 18"=1'-0" ELECTRICAL SHEET INDEX26-013 E1.0ELECTRICAL FLOOR PLANS / SCHEDULES / SYMBOLS LIST S S PLAN NOTES - SHEET E1.0DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR LIGHT FIXTURE - SALVAGE EXISTINGLIGHTING CIRCUIT FOR REUSE IN SAME ROOM.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SITE CLEAR RECEPTACLE - SALVAGE EXISTINGRECEPTACLE CIRCUIT FOR REUSE IN SAME ROOM.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SALVAGE FIRE ALARM STROBE NOTIFICATION DEVICE- SALVAGE FOR RELOCATION WITHIN SAME ROOM.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SALVAGE LIGHT SWITCHES - SALVAGE FORRELOCATION WITHIN SAME ROOM.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SALVAGE CIRCUIT TO ELECTRIC WALL HEATER FORREUSE FOR WITH NEW ELECTRIC WALL HEATERS.REINSTALL EXISTING SALVAGED FIRE ALARM STROBE UNIT WITHIN RESTROOM. RECONNECT TO EXISTINGFIRE ALARM SYSTEM AND TEST.INSTALL NEW GFI RECEPTACLE IN NEW WALL AT 24" A.F.F. - RECONNECT TO SALVAGED RECEPTACLECIRCUIT FROM WITHIN ROOM.INSTALL NEW LIGHT FIXTURE AT EXISTING WALL - MOUNT ABOVE NEW MIRROR. RECONNECT TOSALVAGED LIGHTING CIRCUIT FROM WITHIN ROOM. CONTROL VIA NEW WALL SWITCH / SENSOR DEVICE.PROVIDE SURFACE RACEWAY TO LIGHT FIXTURE IF EXISTING WALL CANNOT BE FISHED.INSTALL NEW LIGHT FIXTURE AT CEILING / SURFACE. RECONNECT TO SALVAGED LIGHTING CIRCUIT FROMSAME AREA. CONTROL VIA EXISTING SALVAGED CONTROL.REINSTALL SALVAGED LIGHT SWITCHES AND RECONNECT TO THE EXISTING LIGHTING THEY CONTROL.PROVIDE NEW 120V - 20 AMP CIRCUIT FROM BEST AVAILABLE SOURCE FOR POWER DOOR OPERATOR.WIRE OPERATOR TO PUSHBUTTON CONTROL.PROVIDE 120V CIRCUIT TO NEW ELECTRIC WALL HEATER - UTILIZE SALVAGED ELECTRIC WALL HEATERCIRCUIT - NEW WALL HEATERS ARE EACH 120V /1P - 600 WATTS.PROVIDE 120V CONNECTION TO NEW CEILING EXHAUST FAN - CIRCUIT TO EXISTING LIGHTING CIRCUIT.CONTROL / INTERLOCK WITH ROOM LIGHT SWITCH / MOTION SENSOR.DISCONNECT, REMOVE, TAKE POSSESSION OF, AND SALVAGE CIRCUIT FOR CEILING FAN. 123456 8 10 7 11 1.REFERENCE ARCHITECTURAL SHEETS FOR APPLICABLE INTERIOR ELEVATIONS, SECTIONS, REFLECTEDCEILNG PLANS AND MISC. BUILDING INFORMATION REQUIRED TO COMPLETE THE ELECTRICALINSTALLATIONS.2.PROVIDE CLEAR ADHESIVE LABEL WITH BLACK TYPE STATING LIGHT SWITCH CIRCUIT NUMBER ONFACEPLATE OF DEVICE. VERIFY WITH THE CONSTRUCTION MANAGER FOR HEIGHT DESIRED BY THE OWNER.3.PROVIDE A NEW BLANK PLATE OVER ANY EXISTING BOXES WHERE WALLS ARE REMAINING AND DEVICEREMOVED.4.COORDINATE WITH OTHER TRADES AND INCLUDE ALL ELECTRICAL DEMOLITION WORK REQUIRED BY THOSETRADES TO COMPLETE THE DEMOLITION.5.DEMOLITION PLAN IS BASED ON CASUAL ON-SITE OBSERVATION AS EXISTING ELECTRICAL DRAWINGS ARENOT AVAILABLE FOR THIS BUILDING. IT SHALL BE UNDERSTOOD THAT IT IS NOT INCLUSIVE OF ALL WORKNECESSARY. CONTRACTOR IS RESPONSIBLE FOR ACCOMPLISHING ALL DEMOLITION WORK REQUIRED BYTHE CONTRACT DOCUMENTS AND NECESSARY TO ACCOMMODATE SATISFACTORY COMPLETION OF THEPROJECT.6.UNLESS NOTED OTHERWISE, CONTRACTOR SHALL REMOVE AND TAKE POSSESSION OF MATERIALS,EQUIPMENT, AND DEVICES DEPICTED ON DRAWINGS, AND AS REQUIRED FOR PROJECT’S INTENDED RESULT.REMOVE CIRCUITING TO IT’S SOURCE OR TO REMAINING EQUIPMENT ON A COMMON CIRCUIT. PROVIDEMODIFICATIONS AS NECESSARY TO MAINTAIN POWER TO REMAINING DOWNSTREAM EQUIPMENT.7.COORDINATE TIMING AND PHASING OF ELECTRICAL SERVICE REMOVAL / POWER OUTAGE WITH THEGENERAL CONTRACTOR. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL SERVICE AND ORTEMP POWER FOR THE PROJECT DURING THE CONSTRUCTION PHASE.8.SEE SPECIFICATIONS FOR FIRE STOPPING FOR ALL RATED WALLS.9.PROVIDE ARCFLASH PROTECTION EQUIPMENT IN AREAS WHERE CODE REQUIRES ARC FLASH PROTECTION.10.ALL RECEPTACLES INSTALLED BELOW 66" ABOVE THE FLOOR AND IN ALL SPACES ACCESSIBLE TO THEPUBLIC SHALL BE TAMPER RESISTANT TYPE. THIS INCLUDES, BUT IS NOT LIMITED TO: EXTERIOR DEVICES,STAIRWELLS, CORRIDORS, RESTROOMS, STORAGE ROOMS, OPEN AREAS, OFFICES ACCESSIBLE TO OPENAREAS, ETC. 11.PROVIDE POWER TO MISC. PLUMBING AND HVAC CONTROL PANELS AS REQUIRED BY THE PLUMBING ANDHVAC SCOPE OF WORK. REFERENCE PLUMBING AND HVAC PLANS.12.PROVIDE CLEAR ADHESIVE LABEL WITH BLACK TYPE STATING RECEPTACLE CIRCUIT NUMBER ON FACEPLATEOF ALL 120V DEVICES. VERIFY WITH THE CONSTRUCTION MANAGER FONT HEIGHT DESIRED BY THE OWNER. GENERAL NOTES: 1 2 23 3 41 EWCCFCF 5 6 78 89 9 10 HANDICAP POWER DOOR OPERATOR11 12 1213 CF6CF13 13 ELECTRICAL SYMBOLSDUPLEX RECEPTACLE - MTD: 24" AFF TO TOP OF BOX OR GENERAL SYMBOL NOTES:LIGHT FIXTURES: SEE LIGHT FIXTURE SCHEDULE.RECEPTACLE SUBSCRIPTS:GFIGROUND FAULT INTERRUPTINGXX" NOTED SPECIFIC MOUNTING HEIGHT OF DEVICESWITCH / LIGHTS SUBSCRIPTS:MSINGLE POLE SWITCH WITH INTEGRAL MOTION SENSOR - INTERLOCK W/ROOM EXHAUST FANDASHED EQUIPMENT / MATERIALS / DEVICES / LIGHTS / MOTORS / ETC. TO BEDEMOLISHED.PROVIDE CLEAR ADHESIVE LABEL ON FACEPLATE OF ALL DEVICES. XX XX" = SPECIFIC NOTED MOUNTED HEIGHTMOTOR CONNECTIONPANELBOARD - RECESSED MOUNTEDSPECIAL OUTLET CONNECTION ELECTRICAL SHEET REVISION CLOUD IDENTIFICATION #ELECTRICAL SHEET PLAN NOTE SYMBOL LIGHTING BRANCH CIRCUITING - UNSWITCHEDLIGHTING / POWER BRANCH CIRCUITINGLIGHT SWITCH W/ INTEGRAL SENSOR - MTD: 48" AFF TO TOP OF BOX LED LIGHT FIXTURE - SURFACE / WALL - LINEAR STRIP TYPE 1.2.3.4.5. FIRE ALARM - STROBE NOTIFICATION DEVICES LED LIGHT FIXTURE - SURFACE / CLOSE TO CEILING - ROUND EXISTING PANEL M EXISTING PANEL 14 14 14 Page 67 of 69 CUSTOMER SIGNATURE FOR DESIGN APPROVAL: COLORS: 505 LAWRENCE DR, DE PERE, WI 54115 920.336.8900 CREATIVESIGNCOMPANY .COM REVISION LOG: INTL DATE DESCRIPTION P-1 PMS 295 C (CUSTOMER TO APPROVE) P-2 MP 46258SP TUCSON GOLD (CUSTOMER TO APPROVE) CLIENT: LOCATION: DRAWN BY: SALESPERSON: DATE: LEAD #: PAGE: DOOR COUNTY FACILITIES & PARKS 56 N 4TH AVE STURGEON BAY WI TIMOTHY P ALLIE K 06/24/26 6784 1 QUANTITY: FONT: MOUNTING: INSTRUCTION: SQ FT: 1 S/F NON-LIT SIGN TIMES FLUSH TO WALL W/ STUDS PRODUCE & INSTALL 37.5 SQ FT (APPROX. 143.5 MAX ALLOWED) WALL MOUNT FLAT PANEL CONCEPTUAL DRAWING ONLY CUSTOMER RESPONSIBILITIES All sizes and dimensions are illustrated for client conception of the project and are not to be understood as being exact size or exact scale. Renderings, including lighting effects, opacities, and coloration, are an approximation. Please review all drawing details closely, as Creative Sign will produce signs as approved drawing indicates. Some changes may occur based on production needs. While Creative Sign will make all efforts to correct any obvious spelling or grammatical errors, the customer is responsible for confirming that the above copy, including names and titles, appear as desired. Creative Sign will make every effort to closely match colors, including PMS, where specified. We cannot guarantee exact matches due to varying compatibility of surface materials and paints used. THIS DRAWING IS THE PROPERTY OF CREATIVE SIGN CO, INC. This is an original, unpublished drawing by Creative Sign Co, Inc. It is for your personal use, in conjunction with a project being planned for you by Creative Sign Co, Inc. It is not to be shown to anyone outside of your organization nor is it to be used, reproduced, copied or exhibited in any fashion. Use of this design or the salient elements of this design in any sign done by any other company, without the expressed written permission of Creative Sign Co, Inc., is forbidden by law and carries a civil forfeiture of up to 25% of the purchase price of the sign. CONTACT YOUR SIGN CONSULTANT TO PURCHASE THE RIGHTS TO THIS DESIGN.SIGNATURE DATE --- 00/00/0000 DESCRIPTION DETAIL VIEW SCALE: 1/2” = 1’ CONFIRM WA APPROVE COLORS WEST ELEVATION SCALE: 1/16” = 1’ 90" (7'-6") 60" (5'-0") 9 3/8" 4 1/4" BACKGROUND: 1” HDU, SMOOTH, P-1 FACES & RETURNS COPY , BORDER, ICON: 1.5” HDU, SMOOTH, P-2 FACES & RETURNS CROSS SECTION SCALE: 1/2” = 1’ WALL EQ EQ Page 68 of 69 CUSTOMER SIGNATURE FOR DESIGN APPROVAL: COLORS: 505 LAWRENCE DR, DE PERE, WI 54115 920.336.8900 CREATIVESIGNCOMPANY .COM REVISION LOG: INTL DATE DESCRIPTION V-1 ORACAL 751-010 WHITE VINYL CLIENT: LOCATION: DRAWN BY: SALESPERSON: DATE: LEAD #: PAGE: DOOR COUNTY FACILITIES & PARKS 56 N 4TH AVE STURGEON BAY WI TIMOTHY P ALLIE K 06/24/26 6784 2 VINYL GRAPHICS QUANTITY: FONT: INSTRUCTION: 1 GOTHAM PRODUCE & INSTALL CONCEPTUAL DRAWING ONLY CUSTOMER RESPONSIBILITIES All sizes and dimensions are illustrated for client conception of the project and are not to be understood as being exact size or exact scale. Renderings, including lighting effects, opacities, and coloration, are an approximation. Please review all drawing details closely, as Creative Sign will produce signs as approved drawing indicates. Some changes may occur based on production needs. While Creative Sign will make all efforts to correct any obvious spelling or grammatical errors, the customer is responsible for confirming that the above copy, including names and titles, appear as desired. Creative Sign will make every effort to closely match colors, including PMS, where specified. We cannot guarantee exact matches due to varying compatibility of surface materials and paints used. THIS DRAWING IS THE PROPERTY OF CREATIVE SIGN CO, INC. This is an original, unpublished drawing by Creative Sign Co, Inc. It is for your personal use, in conjunction with a project being planned for you by Creative Sign Co, Inc. It is not to be shown to anyone outside of your organization nor is it to be used, reproduced, copied or exhibited in any fashion. Use of this design or the salient elements of this design in any sign done by any other company, without the expressed written permission of Creative Sign Co, Inc., is forbidden by law and carries a civil forfeiture of up to 25% of the purchase price of the sign. CONTACT YOUR SIGN CONSULTANT TO PURCHASE THE RIGHTS TO THIS DESIGN.SIGNATURE DATE --- 00/00/0000 DESCRIPTION TENANTS & LOCATION PHOTO DETAIL VIEW SCALE: 1” = 1’ GLASS 27.5" (2'-3 1/2") PER AK 20.5" (1'-8 1/2") 16" (1'-4") 1 1/2" V-3, 1ST SURFACE DIGITAL PRINT ON OPAQUE VINYL W/ GLOSS LAM, APPLIED 1ST SURFACE (TENANTS TBD) Page 69 of 69

Source: Door County website. First collected Oct 10, 2026.