Resource Planning Committee Agenda Packet (PDF)
Door County · Door County · meeting of Apr 16, 2026 · Agenda packets
Open the original document More from Door County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Notice in compliance with the Americans with Disabilities Act: 1) Any person needing assistance to participate in this meeting should contact the Office of the
County Clerk at (920) 746-2200. Notification 72 hours prior to a meeting will enable the County to make reasonable arrangements to ensure accessibility to this
meeting. 2) Door County is committed to making its electronic and information technology (e.g., website and contents) accessible for all persons. If you
encounter difficulty accessing the posted materials for this meeting, located on-line at https://www.co.door.wi.gov/AgendaCenter under the committee name, or
have trouble accessing the virtual meeting, please call (920) 746-2323, or send a FAX to (920) 746-2387, or send an e-mail to Lriemer@co.door.wi.gov so that
we may determine how to best assist you.
AGENDA
1. Call business meeting to order.
2. Establish a quorum: roll call.
3. Adopt agenda/properly noticed.
4. Approve minutes for April 2, 2026, meeting.
5. Correspondence.
6. Public comment: Information may be received from members of the public, except
information related to a pending hearing (e.g., zoning amendment or conditional use
permit). Extensive discussion and all action must be deferred until and unless specific
notice of the subject matter is included on the agenda.
7. Zoning hearing: Liberty Grove; Ella Baltus, on behalf of OHCE LLC; conditional use permit
to establish a “Bulk Storage of Fuel Products” land use within parcel number 018-01-
02312824A2 off of CTH ZZ; Light Industrial (LI).
8. Matters to be placed on a future agenda or referred to a committee, official, or employee.
9. Next meeting dates:
• May 7, 2026: Business meeting
• May 21, 2026: ?
• June 4, 2026: ?
• June 18, 2026: ?
10. Adjourn.
Deviation from order shown may occur.
Notice of Public Meeting
Thursday, April 16, 2026
Business meeting at approx. 3:15 p.m.
after public hearing starting at 3:00 p.m.
DOOR COUNTY
RESOURCE PLANNING
COMMITTEE
Door County Government Center
Chambers Room
(C102, 1st floor)
421 Nebraska Street
Sturgeon Bay, WI 54235
Oversight for Land Use Services Department
Anyone wishing to speak must attend
in person.
Members of the public who wish to
simply monitor/observe the meeting may
attend in person or do so remotely by
using the link below, or via the Zoom
smartphone app, or by calling (312) 626-
6799.
Link:
https://us02web.zoom.us/j/8349190820
7?pwd=ACbAPae8vDLWQPCOtQFoy9
hvZpYTkA.1
Webinar ID: 834 9190 8207
Passcode: 368065
Zoom Webinar ID: 894 1468 1074
Passcode: 113675
1
1
These minutes have not been reviewed by the oversight committee and are subject to approval or revision
at the next regular committee meeting.
MINUTES OF MEETING
DOOR COUNTY RESOURCE PLANNING COMMITTEE
April 2, 2026
1. Call business meeting to order.
Chair Zettel called a business meeting to order at 3:46 p.m. in the Door County Government Center
Chambers Room (C102, 1st floor), 421 Nebraska Street, Sturgeon Bay, Wisconsin.
2. Establish a quorum: roll call.
Present: RPC Members Staff
Hugh Zettel Karyn Behling
Ken Fisher Tess Trybull
Bob Bultman Tara McKeefry
Claire Morkin
David Enigl (excused)
3. Adopt agenda/properly noticed.
After confirmation of proper notice and posting procedures, there was a motion by Fisher, seconded
by Bultman, to adopt the agenda as presented. Motion carried unanimously.
4. Approve minutes for February 5, 2026 meeting.
Motion by Bultman, seconded by Morkin, to approve the minutes as presented. Motion carried
unanimously.
5. Correspondence.
None.
6. Public comment: Information may be received from members of the public, except
information related to a pending hearing (e.g., zoning amendment or conditional use permit).
Extensive discussion and all action must be deferred until and unless specific notice of the
subject matter is included on the agenda.
None
7. Zoning hearing: Skyler Witalison, on behalf of Jill M. Hockers, proposes to expand an
existing campground located at 10663 County Highway ZZ. There are currently 96 camp
sites; 40 additional sites are being proposed. Expansion of a campground may be authorized
by the issuance of a conditional use permit in the Heartland-10 zoning district. Liberty
Grove.
Motion by Fisher, seconded by Morkin, that:
1. The applicant has demonstrated by substantial evidence that the application and all
conditions and requirements relating to the proposed conditional use are or will be satisfied.
2. There was no substantial evidence to support the opposite conclusion.
3. A conditional use permit valid for twelve months is hereby granted, subject to the following
conditions and requirements:
2
MINUTES OF MEETING
RESOURCE PLANNING COMMITTEE
April 2, 2026
2
a) The project(s) shall comply with all applicable local, state, and federal building codes
and ordinances, including obtaining all required approvals and permits prior to beginning
construction.
b) Any outdoor lighting erected in conjunction with this use shall utilize fixtures whose lens,
hood, or combination thereof allow no direct beams to be seen from off the property or
cast skyward, and the lighting elements of which shall not be visible from adjacent
properties.
c) The parking area landscaping plan in compliance with section 7.03 of the Door County
Comprehensive Zoning Ordinance, submitted on February 2nd, 2026 shall be
implemented prior to the occupancy of the proposed sites.
d) Vegetative screening, as detailed in Door County Comprehensive Zoning Ordinance
section 3.10(4), landscape buffer tree requirements, is required. Any new vegetation
required to supplement existing vegetation shall be installed prior to occupancy of the
proposed sites.
e) The campground expansion shall contain no more than 40 campsites, for a total number
of 136 sites. Any additional sites will require approval from the Door County Land Use
Services Department.
f) A 10:00 p.m. curfew shall be required and all fires shall be extinguished by 12:00 a.m.
g) There shall be no exterior amplified sound from 10 p.m. to 7:00 a.m.
h) The green dashed line representing an access way on the site plan shall be 12’ wide to
allow emergency vehicles through.
i) A site map shall be displayed in plain view at the main building.
j) Signage shall be posted to clearly define the campground boundaries.
k) The entire project shall be completed by May 30, 2028.
Motion carried unanimously.
8. Consider resolution regarding Town of Union’s town zoning ordinance map amendment;
rezone 1 parcel (0260027262334) from General Agricultural (GA) to Rural Residential (RR);
Union.
Motion by Fisher, seconded by Bultman, to recommend to county board to approve the town zoning
ordinance map amendment.
9. New Business:
a. Staffing Update
b. Review and Discussion of Shipping Container Town Surveys
Behling provided a background on how the department regulates shipping containers
and briefly provided an array of responses from towns. The RPC asked the department
to proceed with a proposed text amendment for shipping containers to be used as
accessory structures.
c. Review and Discussion of Camping Town Surveys
Behling provided a background on how the department regulates camping and briefly
provided an array of responses from towns. The RPC asked the department to proceed
with a proposed text amendment to allow camping to a greater extent.
3
MINUTES OF MEETING
RESOURCE PLANNING COMMITTEE
April 2, 2026
3
d. Refund Policy
The RPC briefly discussed the proposed refund policy. The consensus was to approve
the policy as presented.
e. General Agricultural District-discussion on use allowances
The RPC decided to table the discussion due to the possibility of new members.
f. Discussion of a possible text amendment for Data Centers
Following discussion, the RPC asked for a moratorium to be drafted and for more
information about data centers to be provided, such as a definition and infrastructure
requirements.
10. Matters to be placed on a future agenda or referred to a committee, official, or employee.
A discussion about data centers and uses in agricultural districts.
11. Next meeting dates:
• April 16, 2026: One hearing
• May 7, 2026: One hearing
• May 21, 2026: Possible hearing(s)
• June 4, 2026: One hearing
One hearing scheduled April 16th; no hearings scheduled following that. RPC asked for a business
meeting on May 7th to go over shipping containers and the draft moratorium. The RPC also asked
for an educational presentation / discussion for new members. Meeting schedule discussed as
noted
12. Adjourn.
Motion by Fisher, seconded by Morkin, to adjourn. Motion carried unanimously.
Meeting adjourned at 4:41 p.m.
Reported by,
Karyn Behling
Land Use Services Director
Tara McKeefry
Code Administrator
4
NOTICE OF PUBLIC HEARING BEFORE
THE DOOR COUNTY, WI RESOURCE PLANNING COMMITTEE
DOOR COUNTY GOVERNMENT CENTER
421 NEBRASKA ST.
STURGEON BAY, WI 54235
A public hearing and subsequent business meeting will be held by the Door County Resource Planning Committee (RPC)
on Thursday, April 16, 2026, in the Door County Government Center Chambers Room (C102, 1st Floor).
Applicants and others who wish to offer oral testimony must attend in person.
Members of the public who wish to simply monitor/observe the hearing and meeting may attend in person, or do so
remotely by computer using the link below, or via the Zoom smartphone app, or by calling (312) 626 -6799.
Link: https://us02web.zoom.us/j/83491908207?pwd=ACbAPae8vDLWQPCOtQFoy9hvZpYTkA.1
Zoom Webinar ID: 834 9190 8207
Passcode: 368065
The hearing will begin at 3:00 p.m. to give consideration to the application below for a Conditional Use Permit, as
specified in the Door County Comprehensive Zoning Ordinance.
LIBERTY GROVE
Ella Baltus, on behalf of OHCE LLC, proposes to establish a “Bulk Storage of Fuel Products” land use within parcel
number 018-01-02312824A2 off of CTH ZZ. Establishment of a “Bulk Storage of Fuel Products” land use requires a
Conditional Use Permit in the Light Industrial (LI) zoning district.
The purpose of a hearing is to allow parties to explain how their interests are affected, how the public is affected, and to
bring out any facts pertinent to the case related to public health, safety, convenience, and general welfare.
Written testimony will be accepted on 8 1/2" x 11" paper, or by email to LUSdepartment@co.door.wi.gov, and must be
received 48 hours prior to the day of the hearing. Anonymous correspondence will not be accepted. Letters are avai lable
for inspection upon request. Letters are entered into hearing records, but are not read aloud. Please note:
Correspondence or testimony submitted for town-level proceedings does NOT get forwarded to the county.
All application materials may be viewed on-line approximately four business days before the hearing at
https://www.co.door.wi.gov/AgendaCenter. Additional materials may be posted up until 4:30 p.m. the day before the
hearing.
The list of names to whom this notice was sent by regular mail is available upon request.
Hugh Zettel, Chairperson
Resource Planning Committee
c/o Land Use Services Dept.
Door County Gov’t. Center
421 Nebraska St.
Sturgeon Bay, WI 54235
Phone: (920) 746-2323
FAX: (920) 746-2387
Publication Dates: March 20th & March 27th, 2026
5
CONDITIONAL USE PERMIT WORKSHEET
Applicant Project
The Door County Resource Planning Committee (RPC) decision to approve, approve with conditions, or deny
a Conditional Use Permit (CUP) must be supported by substantial evidence. A CUP applicant has the burden
of proof. S/he must demonstrate, by substantial evidence, that the application and all requirements and
conditions established in the ordinance and by the RPC relating to the conditional use are or shall be satisfied.
If an applicant meets their burden of proof, then the RPC must grant the CUP.
If an applicant fails to meet their burden of proof, the CUP will be denied. The CUP may also be denied if
substantial evidence exists to support the opposite conclusion, i.e., that the conditions and requirements the
applicant must meet to obtain the conditional use permit are not or will not be satisfied.
Substantial evidence: Facts and information, other than merely personal preferences or speculation, directly
pertaining to the requirements and conditions an applicant must meet to obtain a conditional use permit and
that reasonable persons would accept in support of a conclusion.
To aid in the review of and decision-making regarding the proposed conditional use project, the Resource
Planning Committee shall evaluate the following specific criteria as applicable, but shall not be limited
thereto:
Decision-Making Criteria Has the
applicant met
their burden of
proof?
(Yes / No / N/A)
Has convincing
opposing
substantial
evidence been
provided?
(Yes / No / N/A)
Are there conditions which should or
can be attached, whether to: a) insure
ordinance compliance, b) address the
lack of substantial evidence, and/or c)
address convincing and substantial
opposing evidence?
1) Whether the proposed
project will adversely affect
property values in the area.
2) Whether the proposed use
is similar to other uses in the
area.
3) Whether the proposed
project is consistent with the
Door County Comprehensive
and Farmland Preservation
Plan or any officially adopted
town plan.
4) Provision of an approved
sanitary waste disposal
system.
5) Provision for a potable
water supply.
6) Provisions for solid waste
disposal.
7) Whether the proposed use
creates noise, odor, or dust.
8) Provision of safe vehicular
and pedestrian access.
9) Whether the proposed
project adversely impacts
neighborhood traffic flow and
congestion.
6
10) Adequacy of emergency
services and their ability to
service the site.
11) Provision for proper
surface water drainage.
12) Whether proposed
buildings contribute to visual
harmony with existing
buildings in the neighborhood,
particularly as related to scale
and design.
13) Whether the proposed
project creates excessive
exterior lighting glare or
spillover onto neighboring
properties.
14) Whether the proposed
project leads to a major
change in the natural
character of the area through
the removal of natural
vegetation or alteration of the
topography.
15) Whether, and in what
amount and form, financial
assurance is necessary to
meet the objectives of this
ordinance.
16) Whether, and to what
extent, site-specific conditions
should be imposed to mitigate
potentially problematic
impacts of the use.
For example: Access restrictions?
Parking? Hours of operation? Hours
open to public? Screening? Increased
setbacks? Restrictions on signs?
17) The impact of the
proposed project on public
health, public safety, or the
general welfare of the County.
For example: Compliance with local,
state, and federal codes, laws, orders,
ordinances, and rules?
Other topics? (The RPC may
consider topics in addition to
the above.)
The Resource Planning Committee shall establish a completion date for the proposed project:
The Resource Planning Committee may impose conditions regarding the permit’s duration, transfer, or renewal.
7
County of Door
LAND USE SERVICES DEPARTMENT
County Government Center
421 Nebraska Street
Sturgeon Bay, WI 54235
Page 1 of 2
STAFF REPORT
Conditional Use Permit Application
Applicant Information
Property Owner: OHCE LLC
Applicant: Ella Baltus of Gas Distribution Systems Inc
Parcel Identification Number & Address: 018-01-02312824A2
Zoning District: Light Industrial (LI)
Petition request, including sections of zoning ordinance requiring permit:
Ella Baltus on behalf of OHCE LLC requests a Conditional Use Permit to establish a “Bulk Storage of Fuel Products” land
use within parcel number 018-01-02312824A2. Establishment of a Bulk Storage of Fuel Products use in the Light
Industrial (LI) zoning district requires a Conditional Use Permit.
Sections 2.05(3)(a), & 11.04, Door County Comprehensive Zoning Ordinance.
Description of Subject Property and Surrounding Area
• Lot Area, Width & Depth: 1.41 acres; Approx. 245 ft. wide & 250 ft. deep
• Road Frontage & Access: 245 ft. of road frontage along County Highway ZZ; Access to the subject parcel is via
Private Road Easement (Doc# 882754).
• Traffic patterns/road usage: Traffic/road usage on County Highway ZZ is light to moderate (depending on season)
due to County Highway ZZ being one of the main East-West thoroughfares across the peninsula.
• Existing uses/structures: Vacant/Agriculture
• Water and sanitation: Subject parcel will not have water or sanitation service
• Significant topography or vegetation: No significant topography or vegetation; Subject parcel is currently bordered
by mature trees located on neighboring parcels adjacent to the North, West and South. There are no mapped
wetlands on the subject property.
• Surrounding Area: All adjacent parcels are located in the Heartland-10 (HL-10) and Light Industrial (LI) zoning
districts (same as subject parcel). County Highway ZZ is adjacent to the east and the lot East of County Highway ZZ
contains a trade and contractor shop and commercial storage facility. Parcel adjacent to the south contains the
“Hockers Excavating Inc.” quarry. Parcel adjacent to the south and west contains the “CAMP Door County”
campground, an existing 96-site campground.
Background/History
• County Board approved a Map Amendment on 8/26/2025 to rezone approximately 20 acres of the parent parcel to
the Light Industrial (LI) zoning district.
• The subject parcel was created in 2026 via Certified Survey Map (Document #882762).
Landscape Buffer Requirements: A landscape buffer between the proposed building and principal buildings on adjoining
lots (per Section 3.10 of the County Comprehensive Zoning Ordinance) is not required due to the adjoining lots being in
the Light Industrial (LI) zoning district.
Off-Street Parking Requirements:
• A total of 2 parking spaces are required per the Land Use Services Department.
8
Page 2 of 2
• The applicant is proposing a 3600 square foot on-site parking location near the access driveway for the parcel
The proposed on-premise parking are in compliance with Chapter 7 of the County Comprehensive Zoning Ordinance.
Parking Area Landscaping Requirements:
Per Section 7.03(1) of the County Comprehensive Zoning Ordinance this land use does not require a parking area
landscaping plan since there will be less than 6 vehicles on-site at any given time.
The proposed development complies with all applicable requirements of the County Comprehensive Zoning Ordinance.
Zoning Considerations
• Purpose of the Light Industrial (LI) zoning district: “This district is intended to provide for manufacturing,
warehousing, and other light industrial operations. It is also intended that this district be used for the location of
trade or contractor establishments, commercial storage facilities, and similar businesses. Such uses should not be
detrimental to the surrounding area or to the county as a whole by reason of noise, dust, smoke, odor, traffic,
physical appearance, degradation of groundwater, or other nuisance factors. Such uses may be subject to
requirements which will reasonably ensure compatibility. This district can also be used for industrial or business
parks. Lot sizes of at least 60,000 square feet are required for new lots.”
• Does the use meet the zoning ordinance’s stated purpose and intent? The proposed Bulk Storage of Fuel Products
use may be permitted with a Conditional Use Permit. The proposed uses can presumably meet the zoning
ordinance’s stated purpose/intent and be compatible with the surrounding area with conditions of approval (see
suggested conditions below). See also the comprehensive plan considerations below.
• Specific requirements for proposed use and/or possible conditions that may be relevant.
1. The project(s) shall comply with all applicable local, state, and federal building codes and ordinances, including
obtaining all required approvals and permits prior to beginning construction.
2. Any outdoor lighting erected in conjunction with this use shall utilize fixtures whose lens, hood, or combination
thereof allow no direct beams to be seen from off the property or cast skyward, and the lighting elements of
which shall not be visible from adjacent properties.
3. The entire project shall be completed by _______, 20__.
Comprehensive Plan Considerations
County comprehensive plan land use map designation and description.
The subject parcel is designated as Industrial on the county’s future land use map, as described below and shown on the
attached map.
Industrial – Areas designated as “Industrial” are intended for uses such as fabrication, wholesaling, or long-term
storage of products and for extraction (mining) or transformation of materials.
The proposed Bulk Storage of Fuel Products is in line with the future land use designation of “industrial” as it will
be used to store large quantities of propane. This project would locate this land use near other industrial uses,
separate from dense residential or commercial areas. Lastly, this use is allowed in the LI zoning district via
conditional use permit and, presumably, any concerns can be addressed with conditions the Resource Planning
Committee deems appropriate.
• Relevant goals/policies/action items from comprehensive plan. None.
• Other relevant text from county comprehensive plan. None.
9
Town Level Map
Calvin Lawrence, Dennis Weise, Nina Rihn
Lakes
Named Streams
Navigable Stream
County Trunk Highway
State Trunk Highway
Roads
County
Private
State
Town
Village
Core Areas
Municipality
Lake Michigan
3/10/2026
0 1 20.5 mi
0 1.5 30.75 km
1:84,256
10
Neighborhood Aerial Map
Address
Navigable Stream
County Trunk Highway
Roads
County
Private
Town
ROW
Easements
Easement
Parcel
3/10/2026
0 0.15 0.30.07 mi
0 0.25 0.50.13 km
1:14,559
11
Aerial - Close Up
Address
County Trunk Highway
Roads
County
ROW
Easements
Easement
Parcel
4/9/2026
0 0.03 0.050.01 mi
0 0.04 0.090.02 km
1:2,359
12
Zoning
Calvin Lawrence, Dennis Weise, Nina Rihn
Address
Wetland Class Areas
County Trunk Highway
Roads
County
Private
ROW
Easements
Easement
Comprehensive Zoning
Light Industrial
Heartland - 10
Heartland - 5
3/10/2026
0 0.09 0.170.04 mi
0 0.1 0.20.05 km
1:7,266
13
Future Land Use
Address
Navigable Stream
County Trunk Highway
Roads
County
Private
Town
ROW
Easements
Easement
Parcel
Future Use
Industrial
Rural Residential
Rural/Agricultural
3/10/2026
0 0.1 0.20.05 mi
0 0.2 0.40.1 km
1:12,109
14
15
16
CONDITIONAL USE PERMIT APPLICATION OVERVIEW AND
ON-SITE INSPECTION AUTHORIZATION
A "conditional use" is one that has been determined to be compatible in a particular area, not a
use that is always compatible at a specific site within that area. The use is subject to
requirements and conditions, and is only allowed under a conditional use permit (CUP) issued
by Door County. A conditional use permit is also required if an owner wishes to expand a non-
conforming use (i.e., a use previously legally established which would not be allowed under
current zoning regulations).
(1) (We)
Ful name(s): Gas Distribution Systems
Ella BaiTus-- president
Propose to:
Plale a 30,000 gallon propane storage
The existing use of structure or land in question is:
vacant 1and
AUTHORIZATION FOR INSPECTION:
I hereby authorize the Zoning Administrator to enter upon the premises for which this petition is made at
any reasonable time for all purposes of inspection related to this petition.
SIGNATURE OF APPLICANTIAGENT: lla
DATE: 01/05/210
17
APPLICATION FOR CONDITIONAL USE PERMIT - ADDENDUM
A conditional use permit applicant has the burden of proof. S/he must demonstrate that the application and all
requirements and conditions established by the Resource Planning Committee relating to the conditional use are or shall
be satisfied, all of which must be supported by substantial evidence. "Substantial evidence" means facts and information,
other than merely personal preferences or speculation, directly pertaining to the requirements and conditions an applicant
must meet to obtain a conditional use permit and that reasonable persons would accept in support of a conclusion.
If an applicant meets this burden of proof, the Resource Planning Committee will grant the conditional use permit. If an
applicant fails to meet this burden of proof, the conditional use permit application will be denied.
To aid in its review of the proposed project, the Committee will consider the Door County Comprehensive Zoning
Ordinance criteria set forth below. Answer all portions of all questions completely. State "not applicable," if appropriate,
offering an explanation as to why facts and information were not provided.
Please provide the Resource Planning Committee members substantial evidence regarding:
1) Whether the proposed project will adversely affect property values in the area.
It will have no impact, if anything it will help
mare heating costs more affordable by prorloing
more optHon
2) Whether the proposed use is similar to other uses in the area.
3)
The pupane propane Storage is not necessar
is uss intrusive on
thah the existing
Whether the proposed project is consistent with the Door County Comprehensive and Farmland Preservation Plan or
any officially adopted town plan.
The project falls within all required limits
4) Provision of an approved sanitary waste disposal system.
Public Sewer
NA
Private Onsite Wastewater Treatment System (POWTS)
Check One Check One
_ Existing Conventional Septic
_ New _ Other In-ground System
_ Holding Tank
5) Provision for a potable water supply.
Public Water Supply
(Liberty Grove Sanitary District #1 and Maplewood only)
NA
Well
Check One Check One
Existing _Private Well
New _Shared Well
18
CONDITIONAL USE PERMIT ADDENDUM - PAGE 2
6) Provisions for solid waste disposal.
_Commercial hauler
_ Private delivery to collection site
_ Other
NA
7) Whether the proposed use creates noise, odor, or dust.
Nose the only noise generoaded will be from the tricks
delivering Dropane Which is minimal.
Odor: Occasionally when a storage is filled there is
a temporany proerane smell axpending on conditions
Dust Should not generate any aust
8) Provision of safe vehicular and pedestrian access.
Vehicular Access
✗ Existing Driveway(e) to County 22
_ New Driveway(s) to
Pedestrian Access
_ Sidewalks
_ Path or Trail
N/A
_ No Pedestrian Traffic
(Road Name)
9) Whether the proposed project adversely impacts neighborhood traffic flow and congestion.
Existing traffic: _ High Levels _ Medium Levels Low Levels
The ingress and egress will be minimal. The truuk
noid come and go to the storage 3-5 Himes
a weer
19
10)
CONDITIONAL USE PERMIT ADDENDUM - PAGE 3
Adequacy of emergency services and their ability to service the site. PLEASE SEE SEPARATE PAGE.
11) Provision for proper surface water drainage.
_ Natural Infiltration (explain below)
_ Some Grading of the Site (explain below)
_ Engineered Stormwater and/or Erosion Control Plan (attach)
The site is alr
already flat and will not requine
any moaifilations
12) Whether proposed buildings contribute to visual harmony with existing buildings in the neighborhood, particularly as
related to scale and design.
The Sumounding sumo area is industrial. So the Storage
Will not go against Visuae n
narmony
13) Whether the proposed project creates excessive exterior lighting glare or spillover onto neighboring properties.
N/A
14) Whether the proposed project leads to a major change in the natural character of the area through the removal of
natural vegetation or alteration of the topography.
Natural Vegetation: ✗ No Removal
_ Some Removal
_ Significant Removal (provide Landscape Plan)
Topography: No Change
_ Some Change
_ Major Change (provide Grading Plan)
20
CONDITIONAL USE PERMIT ADDENDUM - PAGE 4
15) Whether, and in what amount and form, financial assurance is necessary to meet the objectives of this ordinance.
N/A
16) Whether, and to what extent, site-specific conditions should be imposed to mitigate potentially problematic impacts of
the use.
"None, we already operate a Storage in Sturgeon
Bay w/ no Issue
17) The impact of the proposed project on public health, public safety, or the general welfare of the County.
The only impaet woid be positive, in allowing peopиa
anotner n
nearing opton
The Resource Planning Committee will establish a completion date for the proposed project.
By what month and year wil the project be completed? September. 202le
The Resource Planning Committee is allowed to consider topics in addition to the above. Please provide information on
additional topics you think the Committee should or may consider in evaluating this project.
We are a well established family owneg business that
looks forward To sernung Northern Dpor County
Note that a conditional use permit will generally remain in effect as long as the conditions and requirements upon which the
permit was issued are followed. Subsequent owners of the property are generally allowed to continue the use, subject to
those conditions and requirements. An affidavit is to be recorded with the deed to provide successors in interest notice of the
conditional use permit and conditions and requirements.
The Resource Planning Committee may, however, impose conditions regarding the permit's duration, transfer, or renewal, in
addition to any other conditions pertaining to ordinance standards or the specific criteria listed above. For example, the
Committee may grant a limited term conditional use permit if a reasonable basis exists for such limitation. Any limited term
conditional use permit may be subject to renewal after a re-evaluation of the use via a hearing before the Resource Planning
Committee.
21
22
23
24
25
26
27
LETTER(S) IN FAVOR
CUP
TOWN OF LIBERTY GROVE
28
29
Source: Door County website. First collected Oct 10, 2026.