Board of Public Works — Agenda Packet
City of Stevens Point · Portage County · Board of Public Works · meeting of Jul 14, 2025 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal requirement for our open meetings.
We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all
of the time.
CITY OF STEVENS POINT
BOARD OF PUBLIC WORKS MEETING
July 14, 2025 - 6:15 PM
(or immediately following previously scheduled meeting)
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 831 9742 4142 | Passcode: 926754
By Computer: https://us02web.zoom.us/j/83197424142?pwd=elK8p94j8zDeqsbUwx4s3tT3nFCVaK.1
By Phone: +1-312-626-6799 (US Chicago)
(A quorum of the City Council may attend this meeting)
AGENDA
Roll Call
Informational
1. Director's Report
a. Division and Church Streets Reconstruction Project.
Discussion and Possible Action
2. To award the Pavement Maintenance Project #25-104 to Fahrner Asphalt
Sealers of Wisconsin in an amount not to exceed $195,988.75.
3. To approve the Relocation Order and Right of Way Plat to extend the
Business 51 Reconstruction Project limits from Franklin Street to Briggs
Street.
Adjourn
Meeting Rider
Any person who has special needs while attending this meeting or needing agenda materials for this meeting should
contact the City Clerk as soon as possible to ensure a reasonable accommodation can be made. The City Clerk can
be reached by telephone at (715) 346-1569, TDD # 346-1556 or by mail at 1515 Strongs Ave., Stevens Point, WI
54481.
Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City
Clerk for inspection during normal business hours from 7:30 a.m. to 4:00p.m.
Page 1 of 13
s t e v e n s p o i n t . c o m
July 9, 2025
DIRECTOR OF PUBLIC WORKS REPORT
Scott Beduhn
1. Engineering Division
• Country Club Drive:
o Construction is anticipated to begin in August and be complete in the early fall.
o The City has a streetlight and control cabinet in conflict with the proposed improvement
that will be relocated before construction.
• Division and Church Streets Reconstruction Project:
o AECOM continues working to complete final designs for the North Segment (North Point
Drive to Fourth Avenue) and the far South Segment (South City Limits to Michigan Avenue),
which are both at an approximate 80 percent design stage.
▪ Real estate acquisition for both projects is underway.
▪ WPS is preparing for the relocation of overhead utilities throughout the North Segment,
which should occur later this year.
o During the review of the 60 percent design plans, there were concerns over utility conflicts
related to the Moses Creek crossing of Division Street, which is located just north of Franklin
Street. After much discussion between staff, AECOM, and Gremmer, it was agreed that
the best overall approach to address the concerns was to extend the work south to Briggs
Street, which will eliminate the concerns as the proposed utilities can tie into existing
utilities.
▪ AECOM has submitted a change order for the additional work related to the extension
of the project with is being presented at this month’s Finance Committee meeting for
approval.
▪ A new Relocation Order and Right of Way Plat is also being presented this month to
both Plan Commission and Board of Public Works for consideration.
• 2024 Street Improvement Project (Northside):
o All remaining work is anticipated to be complete by the middle of July.
o In addition, the contractor is addressing warranty issues on the work completed last year.
• 2025 Street Improvement Project (Washington Ave):
o The contractor currently has three utility crews on the project is moving along very quickly.
As a result, road building on Washington between Grant and Second should begin very
soon.
• 2025 Street Improvement Project (Madison/Monroe):
o The contractor began construction the week of June 16, 2025 and is currently utilities on
Monroe Street.
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 2 of 13
s t e v e n s p o i n t . c o m
• East Park Commerce Center Badger Avenue Extension:
o Due to materials and electrical service installation delays, the lighting system is not yet
operable. All the other work is complete.
▪ The remaining materials have recently been delivered, and the contractor is
coordinating the electrical service installation with WPS.
• Forest Creek Subdivision:
o Nothing new to report
• Curb Gutter and Sidewalk Repair Project:
o Nothing new to report.
• Fall Paving Project:
o Staff is evaluating funding availability and exploring options for a fall paving project.
▪ Currently staff is looking at several potential corridors, however most of the focus has
been on Green Avenue.
• Pavement Maintenance Project:
o Bids for the annual pavement maintenance project were received on July 8th. The
apparent low bidder was Farhner Asphalt Sealers out of Plover, WI. Staff’s
recommendation for contract award is included in this month’s Board of Public Works
meeting packet.
• Downtown Concrete Joint Repair Project:
o Staff is working on the limits for a concrete joint repair project in the downtown area. The
last joint repair project was done in 2018.
• West River Drive:
o Using the public input received at the second PIM, AECOM is currently preparing a final
technical memo of the traffic evaluation
• West Zinda Bridge:
o The work is complete, and the bridge has been reopened to traffic.
• Michigan Avenue Underpass:
o The City’s consultant is preparing a scope of work for the project's next phases.
o With road funding outside of Business 51, staff is working to complete the underdrain and
pavement repairs in 2026.
• Hoover Road Intersection Signalizations:
o All preliminary work before the delivery of the signal equipment, including the installation of
buried conduits and signal bases, is complete.
▪ The anticipated delivery timeframe for the signal equipment remains mid-August at
which time the contractor will return to finish the installation.
▪ It is anticipated that the new signals will be functional around the middle of September.
• Park Street Railroad Crossing Closure investigation:
o Staff is beginning to evaluate truck route options and potential roadway improvements for
the possible rail crossing closure.
o After completing some preliminary engineering, staff anticipates holding a public
informational meeting this summer.
Page 3 of 13
s t e v e n s p o i n t . c o m
• SS4A Grant – Demonstration Activities (DAs):
o The SS4A stakeholder members (Demonstration Activities subcommittee) have identified
three Demonstration Activities to be completed within the City of Stevens as part of the
SS4A grant. The three activities include:
▪ Temporary curb extensions at the intersection of Fourth Avenue and Isadore Street.
▪ Buffered bike lanes along Water Street between Riverview Avenue and Kwik Trip.
▪ Buffered bike lanes along Michigan Avenue between Patch Street and Dixon Street.
o These DAs will remain in place during the summer months and will be removed this fall.
▪ Public Works staff will be installing delineators to create the temporary curb extensions
and buffered bike lanes and will also be conducting both pre- and post-installation
data collection.
• Additional Miscellaneous Projects:
o Engineering Staff continues working on proposed 2026 and 2027 roadway projects,
including gathering survey data, researching right of way, and preparing bidding
documents.
o Engineering staff have been working with university staff on several fronts to improve the
University environment. These include:
▪ Discussions in conjunction with Community Development on the future of the old
Maytag lot.
▪ Discussions regarding the reconstruction of Fourth Avenue through campus, which is
tentatively scheduled for reconstruction in 2027.
o Staff continue to work with the Utility Department on various water, sanitary, stormwater,
and fiber projects.
o Staff continue to work with the Community Development Department on various projects.
These projects include:
▪ Shopko redevelopment
▪ Convent redevelopment
2. Streets Division- June
• Continued Operations:
o Garbage and Recycling
o Street Sign Compliance and replacement
o Street Light Maintenance
o Street Patching/Trumbull
o Drop off Site Operations
• Staffing:
o We are happy to report that the streets department is fully staffed.
• Summer Maintenance crews:
o Patching/Trumbull: The Trumbull crew has completed W. Clark Street and is now working
at the south end of Church Street. They will continue north along Church and Division
Streets.
o Concrete: Several hot days resulted in multiple concrete blowouts throughout the city.
The concrete crew was pulled away from other work to address these. They have since
returned to work along West Clark Street, continuing with utility patches and other
repairs as needed.
Page 4 of 13
s t e v e n s p o i n t . c o m
o Paint: The paint crew is approximately 90% complete with yellow pavement markings
(excluding long-line striping). Crosswalks in the vicinity of Seramur Park have also been
completed.
o Sweeping: The first full citywide sweep was completed at the end of May. As of this
report, approximately 40% of the second round of sweeping has been completed. This
percentage does not include spot sweeping done after Trumbull and patching
operations, which are completed following work in those areas.
o Crack Fill: The crack fill crew is about 45% complete with the 2025 crack fill program.
• Equipment maintenance/garage :
o There were two notable incidents involving city vehicles, both with no fault attributed to
city staff. One vehicle was T-boned, and another was close to a lightning strike, resulting
in electrical issues. Fleet staff are also actively working on preparations for the 2026 fleet
budget.
Respectfully submitted,
Superintendent Johnson
Page 5 of 13
s t e v e n s p o i n t . c o m
July 9, 2025
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Contract Award Recommendation
2025 Pavement Maintenance
Project 25-104
Bids for the annual Pavement Maintenance Project were received on July 8, 2025. Two bids
were received for this project. The bids are summarized in the attached bid tabulation.
The bids, submitted by Fahrner Asphalt Sealers, LLC out of Plover and Scott Construction, Inc
out of Lake Delton, were both within the Engineer’s estimate for the work. The low bid was
submitted by Fahrner Asphalt Sealers. The City has regularly worked with Fahrner on asphalt
maintenance and repair issues and staff believes they are qualified and capable of
performing the work.
It is staff’s recommendation that the project be awarded to Fahrner Asphalt Sealers, LLC in an
amount not to exceed $195,988.75, including a 15 percent contingency.
If there are any questions, please do not hesitate to contact me.
Thank you.
Z:\90 - MEETINGS\2025 - MEETINGS\07 - July\Memo - Award Pavement Maintenance Project 25-104.doc
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 6 of 13
2025 Pavement Maintenance Project #25-104
Owner: City of Stevens Point
07/08/2025 10:00 AM CDT
Line
Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
1 SPV.0105.01 Supplemental Traffic Control LS 1 $4,500.00 $4,500.00 $1,500.00 $1,500.00
2 SPV.0105.02 Remove and Replace Pavement Markings LS 1 $26,850.00 $26,850.00 $28,190.00 $28,190.00
3 SPV.0180.01 Seal Coat SY 27,500 $2.25 $61,875.00 $2.18 $59,950.00
4 SPV.0108.02 Seal Coat Special (Fog Seal) SY 27,500 $0.44 $12,100.00 $0.51 $14,025.00
5 SPV.0108.03 Seal Coat Special (GSB-88) SY 62,000 $1.05 $65,100.00 $1.58 $97,960.00
Base Bid Total: $170,425.00 $201,625.00
Base bid with Contingency: $195,988.75 $231,868.75
Fahrner Asphalt Sealers Scott Construction
Page 7 of 13
s t e v e n s p o i n t . c o m
July 9, 2025
To: Board of Public Works
From: Scott Beduhn, Director of Public Works
Re: Relocation Order and Right of Way Plat
Briggs to Franklin
Business 51 Reconstruction Project
As was mentioned at last month’s Board of Public Works meeting, utility conflicts with the
Moses Creek pipeline (which crosses Division Street just north of Franklin Street) have
resulted in a change to the project limits. While the original north segment reconstruction
project intended to extend south through the intersection of Fourth Avenue (to
approximately Franklin Street), the new project limits will now extend south to Briggs Street,
where the proposed utilities can be connected to existing utilities.
As part of the change to project limits, additional real estate must be acquired to facilitate
the construction. As such AECOM has prepared the attached Relocation Order and Right
of Way Plat for the portion of Division Street from Franklin Street to Briggs Street.
The Relocation Order and Right of Way Plat were approved at the July 7, 2025 Plan
Commission meeting and are also being presented to the Board of Public Works for your
consideration. Staff respectfully requests approval of the Relocation Order and Right of
Way Plat, which will then allow us to proceed with real estate acquisition.
If there are any questions, please do not hesitate to contact me.
Thank you
Z:\90 - MEETINGS\2025 - MEETINGS\07 - July\Memo - Relocation Order and ROW Plat.docx
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481
Public Works
Engineering Department:
Phone: 715-346-1561
Fax: 715-346-1650
Streets Department:
Phone: 715-346-1537
Fax: 715-346-1687
Page 8 of 13
RELOCATION ORDER
lpa1708 08/2011 (Replaces LPA3006)
Project
60730575-21
Road name
Business 51 Urban Reconstruction
Briggs Street to Franklin Street
Highway
Business 51
(Division Street)
County
Portage
Right of way plat date
6/26/2025
Plat sheet number(s)
4.01 through 4.04
Previously approved Relocation Order date
Description of termini of project:
Beginning at a point on the reference line which is 513.30 feet South and 1332.81 feet West of the Northeast Corner
of Section 32, T24N, R8E and ending at a point 348.58 feet North and 1331.55 feet West of the Southeast Corner of
Section 29, T24N, R8E.
Beginning Coordinates: Y = 203663.304, X = 165488.334, Sta. 124+30.82
Ending Coordinates: Y = 204525.181, X =165489.591, Sta. 132+92.69
Wisconsin County Coordinate System (WCCS), Portage County - NAD83 (1997)
To properly establish, lay out, widen, enlarge, extend, construct, reconstruct, improve, or maintain a portion of the
highway designated above, it is necessary to relocate or change and acquire certain lands or interests in lands as
shown on the right of way plat for the above project.
To effect this change, pursuant to authority granted under Sections 83.07 and 83.08, Wisconsin Statutes, the City of
Stevens Point orders that:
1. The said road is laid out and established to the lines and widths as shown on the plat.
2. The required lands or interests in lands as shown on the plat shall be acquired by: City of Stevens Point
3. This order supersedes and amends any previous order issued by the: City of Stevens Point
Approved: Mike Wiza, Mayor Date
Attest: Susan Pagel, Clerk Date
Page 9 of 13
R/W PROJECT NUMBER
PLOT NAME : C:\USERS\DONALD.BUZA\AECOM\60730575 BUS51 NORTH SEGMENT - GENERAL\900_CAD_GIS\910_CAD\60730575\SHEETSPLAN\60730575-21-RP.DWGFILE NAME : 6/26/2025 10:52 AMPLOT DATE :PLOT BY :BUZA, DONALD
CITY OF STEVENS POINTDATE:Mike Wiza, Mayor)APPROVED FOR THE CITY OF STEVENS POINT
FEDERAL PROJECT NUMBERSHEETNUMBERTOTALSHEETSPLAT OF RIGHT OF WAY REQUIRED FOR
REVISION DATELAYOUTSCALE0TOTAL NET LENGTH OF CENTERLINE =
CONSTRUCTION PROJECT NUMBER
60730575-21
BUSINESS 51 URBAN RECONSTRUCTIONBRIGGS STREET - FRANKLIN STREET BUSINESS 51 / DIVISION STREETPORTAGE COUNTY
14
2 MI0.163 MI
THIS PLAT IS A GRAPHIC REPRESENTATION AND IS FORREFERENCE PURPOSES ONLY. DEEDS MUST BE CHECKED TODETERMINE PROPERTY BOUNDARIES AND ACCESS RIGHTS.
ACCESS RESTRICTED BY ACQUISITIONNO ACCESS (BY STATUTORY AUTHORITY)ACCESS RESTRICTED (BY PREVIOUS PROJECT OR CONTROL)
BRIDGEPARCEL NUMBERUTILITY NUMBER25 40
18923242625
#1-25
NW
TEMPORARY LIMITED EASEMENT AREA
LOT, TIE & OTHER MINOR LINESGEODETIC SURVEY MONUMENT
SECTIONCORNERSYMBOL
TO BE REMOVED
SECTIONCORNERMONUMENT
(TO BE SET)(SEE FOUND MONUMENT TABLE)
EXISTING CENTERLINE
CONVENTIONAL SYMBOLSSECTION LINEQUARTER LINESIXTEENTH LINENEW REFERENCE LINENEW R/W LINE
CORPORATE LIMITSNEW R/W (FEE OR HE)(HATCHING VARIES BY OWNER)
EXISTING R/W OR HE LINEPROPERTY LINE
R/W MONUMENTTR NON-MONUMENTED R/W POINTFOUND SURVEY MONUMENTIP
P.L.SIGNPERMITTEDSIGNSIGN SIGN
EASEMENT AREA (PERMANENT LIMITED OR RESTRICTED DEVELOPMENT)BUILDINGPARALLEL OFFSETSNO ACCESS (NEW HIGHWAY)
CULVERTB B
WGTOHETVFOSANSS
CONVENTIONAL UTILITY SYMBOLSWATERGASTELEPHONEOVERHEAD TRANSMISSION LINESELECTRICCABLE TELEVISIONFIBER OPTICSANITARY SEWERSTORM SEWERCOMBINED SEWERELECTRIC TOWERTRANSMISSION STRUCTURESSSS
ELECTRIC POLETELEPHONE POLEPEDESTAL (LABEL TYPE) (TV, TEL, ELEC, ETC.)COMPENSABLENON-COMPENSABLE
ACCESS RIGHTSARACRESACALUMINUMALUMAND OTHERSET ALBLOCKBLKCENTERLINEC/LCERTIFIED SURVEY MAPCSMCONCRETECONCCOUNTY TRUNK HIGHWAYCTHCORNERCORDOCUMENT NUMBERDOCEASEMENT EASEEXISTINGEXGAS VALVEGVGRID NORTHGNIDENTIFICATIONIDLEFTLTMONUMENTMONNATIONAL GEODETIC SURVEYNGSNUMBERNOOUTLOTOLPAGEPPOINT OF TANGENCYPTPOINT OF BEGINNINGPOBPOINT OF CURVATUREPCPOINT OF COMPOUND CURVEPCCPOINT OF INTERSECTIONPIPROPERTY LINEPL
RECORDED AS(100')REEL / IMAGER/IREFERENCE LINER/LREMAININGREMRESTRICTIVE DEVELOPMENTRDE EASEMENTRIGHTRTRIGHT OF WAYR/WSECTIONSECSEPTIC VENTSEPVSQUARE FEETSFSTATE TRUNK HIGHWAYSTHSTATIONSTATELEPHONE PEDESTALTPTRANSPORTATION PROJECT PLATTPPUNITED STATES HIGHWAYUSHVOLUMEV
CONVENTIONAL ABBREVIATIONS
CURVE DATA ABBREVIATIONS/DELTALONG CHORDLCHLONG CHORD BEARINGLCBRADIUSRDEGREE OF CURVEDDELTA ANGLELENGTH OF CURVELTANGENTTDIRECTION AHEADDADIRECTION BACKDB
POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COUNTY COORDINATE SYSTEM COORDINATES (WCCS), PORTAGEALL NEW RIGHT-OF-WAY AND PERMANENT EASEMENT MONUMENTS WILL BE TYPE 2 (TYPICALLY 34" X 24" IRONREBARS), UNLESS OTHERWISE NOTED, AND WILL BE PLACED PRIOR TO THE COMPLETION OF THE PROJECT.DIMENSIONING FOR THE NEW RIGHT-OF-WAY IS MEASURED ALONG AND PERPENDICULAR TO THE NEW REFERENCELINES.RIGHT-OF-WAY BOUNDARIES ARE DEFINED WITH COURSES OF THE PERIMETER OF THE HIGHWAY LANDS REFERENCEDTO THE U.S. PUBLIC LAND SURVEY SYSTEM OR OTHER "SURVEYS" OF PUBLIC RECORD.FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PLANNING UNIT OF THE CITY OF STEVENS POINT.PARCEL AND UTILITY IDENTIFICATION NUMBERS MAY NOT POINT TO ALL AREAS OF ACQUISITION, AS NOTED ONTHE DETAIL PAGES.INFORMATION FOR THE BASIS OF EXISTING HIGHWAY RIGHT-OF-WAY POINTS OF REFERENCE AND ACCESS CONTROLARE LISTED ON THE DETAIL PAGES.
NOTES:COUNTY, NAD83 (1997) IN US SURVEY FEET, AND IS ALSO THE CITY OF STEVENS POINT COORDINATE SYSTEM.VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS, AND GRID DISTANCES. GRID DISTANCES MAY BE USEDAS GROUND DISTANCES.
DONALD J. BUZA, PLS-2338
ORIGINAL PLAT PREPARED BY
DATE:SIGNATURE:6/26/2025
DIVISION STBUS 51
Page 10 of 13
WISDOT/CADDS SHEET 75GRID FACTOR N/A EHWY: BUSINESS 51 / DIVISION STREETCOUNTY: PORTAGECONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBER 60730575-21DATE 6/26/2025REVISION DATE 0SCALE, FEET PS&EPLOT NAME : 60730575-21-RP.DWGFILE NAME : 6/26/2025 10:25 AMPLOT DATE :PLOT BY :BUZA, DONALD
44
PLAT SHEETSHEET
GN
PLOT SCALE :______ _____LAYOUT NAME - 4.02 4.02
TR2928323324N8E
TR293224N8E
Page 11 of 13
R/L = N00°05'01"E
60'
60'
OHOHOHOHOH
OHOHOHOHOHOHOHOHOHOHOHOH
WV
GVSANSS
GVWVWV
SS
WV
HSE HSE
WV
HSEHSE
HSEHSE
HSE
C
SIGNSIGNSIGNSIGN
BLDG
WALL
WVSS
SSSAN
WV
WALL
CTEL
BLDG
BLDG
WV
HSE
HSEHSEHSE
SIGNSIGNC
HSE
HSE
WV
WV
UTUTWV
SIGNSIGN
SAN
SANW
W W
W
G G G G
G
SAN
SANSAN
SAN
SAN
W
WE
G
G G
G
W W W W W W W W W W W WSANSANSANSANSANSANSANSANSANSANSANSAN
G G G G G G G G G G GFO FO FO FO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FOFO
FO
FO FO FO FO FO FO FO FO FO
FO
FO
T
WV GV
WV
50'
50'
124+00125+00126+00127+00128+00129+00
763IP
805IP
50'
10'
5'
10'
10'10'
7'7'
5'
5'
10'
WISDOT/CADDS SHEET 75GRID FACTOR N/A EHWY: BUSINESS 51 / DIVISION STREETCOUNTY: PORTAGECONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBER 60730575-21DATE 6/26/2025REVISION DATE 0SCALE, FEET PS&EPLOT NAME : 60730575-21-RP.DWGFILE NAME : 6/26/2025 10:32 AMPLOT DATE :PLOT BY :BUZA, DONALD
44
PLAT SHEETSHEET
GN
PLOT SCALE :4020LAYOUT NAME - 4.03 4.03
TR293224N8EY = 204168.092X = 164172.310PER COUNTY RECORDS(NOT RECOVERED)
Y = 204172.921X = 165489.7011/16TH CORNERFOUND 1-1/4" IRON BAR
N89°47'24"E
1317.40'
TR2928323324N8E Y = 204176.606X = 166821.141FOUND BERNTSENSURVEY NAIL
BUSINESS 51 / DIVISION STREET
BRIGGS STREET
BRIGGS STREETBEGIN RELOCATIONORDER STA 124+30.82Y = 203663.304X = 165488.334
TLE FORSLOPES TLE FORSLOPES
TLE FORSLOPES TLE FORSLOPESTLE FORSLOPES
SCHEDULE OF LANDS & INTERESTS REQUIREDOWNER'S NAMES ARE SHOWN FOR REFERENCE PURPOSESONLY AND ARE SUBJECT TO CHANGE PRIOR TO THE TRANSFEROF LAND INTERESTS TO THE CITY OF STEVENS POINT.
(QUARTER COR. TO 1/16TH COR.)NW-NESEC. 32
NE-NESEC. 32
SW-SESEC. 29
SE-SESEC. 29
SLOPEINTERCEPTSSLOPEINTERCEPTS
SLOPEINTERCEPTS
SLOPEINTERCEPTS
SLOPEINTERCEPTS
SLOPEINTERCEPTS
PORTAGE STREET
Page 12 of 13
OH
OH
OH
OH
OHOHOHOHOHOHOHOH
TEL
WV
SANSSTELC
WV
FLAG
SANWV
WVSIGNSIGN
VLV
GV
VLV
VLVSIGNSIGN
C
GUY
WV
SAN
WV
W W W W
SAN
SANSAN
G GG G
SANSAN
G
W W W W W W W W
G
SANSANSANSANSANSANSAN
G G G G G G G GFO FO FOFO
FOFO
FO
FO
FOFO FO FO FO FO
GV
WV
SAN
SANR/L = N00°05'01"E130+00131+00132+00133+00
50'
60'
60'60'
820IP
821IP
10'
10' 10'10'
5' 5'
5'5'
5'
7'
5'
5'
WISDOT/CADDS SHEET 75GRID FACTOR N/A EHWY: BUSINESS 51 / DIVISION STREETCOUNTY: PORTAGECONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBER 60730575-21DATE 6/26/2025REVISION DATE 0SCALE, FEET PS&EPLOT NAME : 60730575-21-RP.DWGFILE NAME : 6/26/2025 10:36 AMPLOT DATE :PLOT BY :BUZA, DONALD
44
PLAT SHEETSHEET
GN
PLOT SCALE :4020LAYOUT NAME - 4.04 4.04
TR293224N8EY = 204168.092X = 164172.310PER COUNTY RECORDS(NOT RECOVERED)
Y = 204172.921X = 165489.7011/16TH CORNERFOUND 1-1/4" IRON BAR
N89°47'24"E
1317.40'
TR2928323324N8EY = 204176.606X = 166821.141FOUND BERNTSENSURVEY NAIL
BUSINESS 51 / DIVISION STREET
FRANKLIN STREET
FRANKLIN STREETEND RELOCATIONORDER STA 132+92.69Y = 204525.181X = 165489.591
TLE FORSLOPES TLE FORSLOPES
TLE FORSLOPES TLE FORSLOPES
TLE FORSLOPES
TLE FORSLOPESTLE FORSLOPES
TLE FORSLOPES
(QUARTER COR. TO 1/16TH COR.)SW-SESEC. 29
SE-SESEC. 29
SLOPEINTERCEPTSSLOPEINTERCEPTS
SLOPEINTERCEPTS SLOPEINTERCEPTS
Page 13 of 13