RecordWell Data

Board of Public Works — Agenda Packet

City of Stevens Point · Portage County · Board of Public Works · meeting of Jul 14, 2025 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING July 14, 2025 - 6:15 PM (or immediately following previously scheduled meeting) Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 831 9742 4142 | Passcode: 926754 By Computer: https://us02web.zoom.us/j/83197424142?pwd=elK8p94j8zDeqsbUwx4s3tT3nFCVaK.1 By Phone: +1-312-626-6799 (US Chicago) (A quorum of the City Council may attend this meeting) AGENDA Roll Call Informational 1. Director's Report a. Division and Church Streets Reconstruction Project. Discussion and Possible Action 2. To award the Pavement Maintenance Project #25-104 to Fahrner Asphalt Sealers of Wisconsin in an amount not to exceed $195,988.75. 3. To approve the Relocation Order and Right of Way Plat to extend the Business 51 Reconstruction Project limits from Franklin Street to Briggs Street. Adjourn Meeting Rider Any person who has special needs while attending this meeting or needing agenda materials for this meeting should contact the City Clerk as soon as possible to ensure a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569, TDD # 346-1556 or by mail at 1515 Strongs Ave., Stevens Point, WI 54481. Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City Clerk for inspection during normal business hours from 7:30 a.m. to 4:00p.m. Page 1 of 13 s t e v e n s p o i n t . c o m July 9, 2025 DIRECTOR OF PUBLIC WORKS REPORT Scott Beduhn 1. Engineering Division • Country Club Drive: o Construction is anticipated to begin in August and be complete in the early fall. o The City has a streetlight and control cabinet in conflict with the proposed improvement that will be relocated before construction. • Division and Church Streets Reconstruction Project: o AECOM continues working to complete final designs for the North Segment (North Point Drive to Fourth Avenue) and the far South Segment (South City Limits to Michigan Avenue), which are both at an approximate 80 percent design stage. ▪ Real estate acquisition for both projects is underway. ▪ WPS is preparing for the relocation of overhead utilities throughout the North Segment, which should occur later this year. o During the review of the 60 percent design plans, there were concerns over utility conflicts related to the Moses Creek crossing of Division Street, which is located just north of Franklin Street. After much discussion between staff, AECOM, and Gremmer, it was agreed that the best overall approach to address the concerns was to extend the work south to Briggs Street, which will eliminate the concerns as the proposed utilities can tie into existing utilities. ▪ AECOM has submitted a change order for the additional work related to the extension of the project with is being presented at this month’s Finance Committee meeting for approval. ▪ A new Relocation Order and Right of Way Plat is also being presented this month to both Plan Commission and Board of Public Works for consideration. • 2024 Street Improvement Project (Northside): o All remaining work is anticipated to be complete by the middle of July. o In addition, the contractor is addressing warranty issues on the work completed last year. • 2025 Street Improvement Project (Washington Ave): o The contractor currently has three utility crews on the project is moving along very quickly. As a result, road building on Washington between Grant and Second should begin very soon. • 2025 Street Improvement Project (Madison/Monroe): o The contractor began construction the week of June 16, 2025 and is currently utilities on Monroe Street. City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 2 of 13 s t e v e n s p o i n t . c o m • East Park Commerce Center Badger Avenue Extension: o Due to materials and electrical service installation delays, the lighting system is not yet operable. All the other work is complete. ▪ The remaining materials have recently been delivered, and the contractor is coordinating the electrical service installation with WPS. • Forest Creek Subdivision: o Nothing new to report • Curb Gutter and Sidewalk Repair Project: o Nothing new to report. • Fall Paving Project: o Staff is evaluating funding availability and exploring options for a fall paving project. ▪ Currently staff is looking at several potential corridors, however most of the focus has been on Green Avenue. • Pavement Maintenance Project: o Bids for the annual pavement maintenance project were received on July 8th. The apparent low bidder was Farhner Asphalt Sealers out of Plover, WI. Staff’s recommendation for contract award is included in this month’s Board of Public Works meeting packet. • Downtown Concrete Joint Repair Project: o Staff is working on the limits for a concrete joint repair project in the downtown area. The last joint repair project was done in 2018. • West River Drive: o Using the public input received at the second PIM, AECOM is currently preparing a final technical memo of the traffic evaluation • West Zinda Bridge: o The work is complete, and the bridge has been reopened to traffic. • Michigan Avenue Underpass: o The City’s consultant is preparing a scope of work for the project's next phases. o With road funding outside of Business 51, staff is working to complete the underdrain and pavement repairs in 2026. • Hoover Road Intersection Signalizations: o All preliminary work before the delivery of the signal equipment, including the installation of buried conduits and signal bases, is complete. ▪ The anticipated delivery timeframe for the signal equipment remains mid-August at which time the contractor will return to finish the installation. ▪ It is anticipated that the new signals will be functional around the middle of September. • Park Street Railroad Crossing Closure investigation: o Staff is beginning to evaluate truck route options and potential roadway improvements for the possible rail crossing closure. o After completing some preliminary engineering, staff anticipates holding a public informational meeting this summer. Page 3 of 13 s t e v e n s p o i n t . c o m • SS4A Grant – Demonstration Activities (DAs): o The SS4A stakeholder members (Demonstration Activities subcommittee) have identified three Demonstration Activities to be completed within the City of Stevens as part of the SS4A grant. The three activities include: ▪ Temporary curb extensions at the intersection of Fourth Avenue and Isadore Street. ▪ Buffered bike lanes along Water Street between Riverview Avenue and Kwik Trip. ▪ Buffered bike lanes along Michigan Avenue between Patch Street and Dixon Street. o These DAs will remain in place during the summer months and will be removed this fall. ▪ Public Works staff will be installing delineators to create the temporary curb extensions and buffered bike lanes and will also be conducting both pre- and post-installation data collection. • Additional Miscellaneous Projects: o Engineering Staff continues working on proposed 2026 and 2027 roadway projects, including gathering survey data, researching right of way, and preparing bidding documents. o Engineering staff have been working with university staff on several fronts to improve the University environment. These include: ▪ Discussions in conjunction with Community Development on the future of the old Maytag lot. ▪ Discussions regarding the reconstruction of Fourth Avenue through campus, which is tentatively scheduled for reconstruction in 2027. o Staff continue to work with the Utility Department on various water, sanitary, stormwater, and fiber projects. o Staff continue to work with the Community Development Department on various projects. These projects include: ▪ Shopko redevelopment ▪ Convent redevelopment 2. Streets Division- June • Continued Operations: o Garbage and Recycling o Street Sign Compliance and replacement o Street Light Maintenance o Street Patching/Trumbull o Drop off Site Operations • Staffing: o We are happy to report that the streets department is fully staffed. • Summer Maintenance crews: o Patching/Trumbull: The Trumbull crew has completed W. Clark Street and is now working at the south end of Church Street. They will continue north along Church and Division Streets. o Concrete: Several hot days resulted in multiple concrete blowouts throughout the city. The concrete crew was pulled away from other work to address these. They have since returned to work along West Clark Street, continuing with utility patches and other repairs as needed. Page 4 of 13 s t e v e n s p o i n t . c o m o Paint: The paint crew is approximately 90% complete with yellow pavement markings (excluding long-line striping). Crosswalks in the vicinity of Seramur Park have also been completed. o Sweeping: The first full citywide sweep was completed at the end of May. As of this report, approximately 40% of the second round of sweeping has been completed. This percentage does not include spot sweeping done after Trumbull and patching operations, which are completed following work in those areas. o Crack Fill: The crack fill crew is about 45% complete with the 2025 crack fill program. • Equipment maintenance/garage : o There were two notable incidents involving city vehicles, both with no fault attributed to city staff. One vehicle was T-boned, and another was close to a lightning strike, resulting in electrical issues. Fleet staff are also actively working on preparations for the 2026 fleet budget. Respectfully submitted, Superintendent Johnson Page 5 of 13 s t e v e n s p o i n t . c o m July 9, 2025 To: Board of Public Works From: Scott Beduhn, Director of Public Works Re: Contract Award Recommendation 2025 Pavement Maintenance Project 25-104 Bids for the annual Pavement Maintenance Project were received on July 8, 2025. Two bids were received for this project. The bids are summarized in the attached bid tabulation. The bids, submitted by Fahrner Asphalt Sealers, LLC out of Plover and Scott Construction, Inc out of Lake Delton, were both within the Engineer’s estimate for the work. The low bid was submitted by Fahrner Asphalt Sealers. The City has regularly worked with Fahrner on asphalt maintenance and repair issues and staff believes they are qualified and capable of performing the work. It is staff’s recommendation that the project be awarded to Fahrner Asphalt Sealers, LLC in an amount not to exceed $195,988.75, including a 15 percent contingency. If there are any questions, please do not hesitate to contact me. Thank you. Z:\90 - MEETINGS\2025 - MEETINGS\07 - July\Memo - Award Pavement Maintenance Project 25-104.doc City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 6 of 13 2025 Pavement Maintenance Project #25-104 Owner: City of Stevens Point 07/08/2025 10:00 AM CDT Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 1 SPV.0105.01 Supplemental Traffic Control LS 1 $4,500.00 $4,500.00 $1,500.00 $1,500.00 2 SPV.0105.02 Remove and Replace Pavement Markings LS 1 $26,850.00 $26,850.00 $28,190.00 $28,190.00 3 SPV.0180.01 Seal Coat SY 27,500 $2.25 $61,875.00 $2.18 $59,950.00 4 SPV.0108.02 Seal Coat Special (Fog Seal) SY 27,500 $0.44 $12,100.00 $0.51 $14,025.00 5 SPV.0108.03 Seal Coat Special (GSB-88) SY 62,000 $1.05 $65,100.00 $1.58 $97,960.00 Base Bid Total: $170,425.00 $201,625.00 Base bid with Contingency: $195,988.75 $231,868.75 Fahrner Asphalt Sealers Scott Construction Page 7 of 13 s t e v e n s p o i n t . c o m July 9, 2025 To: Board of Public Works From: Scott Beduhn, Director of Public Works Re: Relocation Order and Right of Way Plat Briggs to Franklin Business 51 Reconstruction Project As was mentioned at last month’s Board of Public Works meeting, utility conflicts with the Moses Creek pipeline (which crosses Division Street just north of Franklin Street) have resulted in a change to the project limits. While the original north segment reconstruction project intended to extend south through the intersection of Fourth Avenue (to approximately Franklin Street), the new project limits will now extend south to Briggs Street, where the proposed utilities can be connected to existing utilities. As part of the change to project limits, additional real estate must be acquired to facilitate the construction. As such AECOM has prepared the attached Relocation Order and Right of Way Plat for the portion of Division Street from Franklin Street to Briggs Street. The Relocation Order and Right of Way Plat were approved at the July 7, 2025 Plan Commission meeting and are also being presented to the Board of Public Works for your consideration. Staff respectfully requests approval of the Relocation Order and Right of Way Plat, which will then allow us to proceed with real estate acquisition. If there are any questions, please do not hesitate to contact me. Thank you Z:\90 - MEETINGS\2025 - MEETINGS\07 - July\Memo - Relocation Order and ROW Plat.docx City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 8 of 13 RELOCATION ORDER lpa1708 08/2011 (Replaces LPA3006) Project 60730575-21 Road name Business 51 Urban Reconstruction Briggs Street to Franklin Street Highway Business 51 (Division Street) County Portage Right of way plat date 6/26/2025 Plat sheet number(s) 4.01 through 4.04 Previously approved Relocation Order date Description of termini of project: Beginning at a point on the reference line which is 513.30 feet South and 1332.81 feet West of the Northeast Corner of Section 32, T24N, R8E and ending at a point 348.58 feet North and 1331.55 feet West of the Southeast Corner of Section 29, T24N, R8E. Beginning Coordinates: Y = 203663.304, X = 165488.334, Sta. 124+30.82 Ending Coordinates: Y = 204525.181, X =165489.591, Sta. 132+92.69 Wisconsin County Coordinate System (WCCS), Portage County - NAD83 (1997) To properly establish, lay out, widen, enlarge, extend, construct, reconstruct, improve, or maintain a portion of the highway designated above, it is necessary to relocate or change and acquire certain lands or interests in lands as shown on the right of way plat for the above project. To effect this change, pursuant to authority granted under Sections 83.07 and 83.08, Wisconsin Statutes, the City of Stevens Point orders that: 1. The said road is laid out and established to the lines and widths as shown on the plat. 2. The required lands or interests in lands as shown on the plat shall be acquired by: City of Stevens Point 3. This order supersedes and amends any previous order issued by the: City of Stevens Point Approved: Mike Wiza, Mayor Date Attest: Susan Pagel, Clerk Date Page 9 of 13 R/W PROJECT NUMBER PLOT NAME : C:\USERS\DONALD.BUZA\AECOM\60730575 BUS51 NORTH SEGMENT - GENERAL\900_CAD_GIS\910_CAD\60730575\SHEETSPLAN\60730575-21-RP.DWGFILE NAME : 6/26/2025 10:52 AMPLOT DATE :PLOT BY :BUZA, DONALD CITY OF STEVENS POINTDATE:Mike Wiza, Mayor)APPROVED FOR THE CITY OF STEVENS POINT FEDERAL PROJECT NUMBERSHEETNUMBERTOTALSHEETSPLAT OF RIGHT OF WAY REQUIRED FOR REVISION DATELAYOUTSCALE0TOTAL NET LENGTH OF CENTERLINE = CONSTRUCTION PROJECT NUMBER 60730575-21 BUSINESS 51 URBAN RECONSTRUCTIONBRIGGS STREET - FRANKLIN STREET BUSINESS 51 / DIVISION STREETPORTAGE COUNTY 14 2 MI0.163 MI THIS PLAT IS A GRAPHIC REPRESENTATION AND IS FORREFERENCE PURPOSES ONLY. DEEDS MUST BE CHECKED TODETERMINE PROPERTY BOUNDARIES AND ACCESS RIGHTS. ACCESS RESTRICTED BY ACQUISITIONNO ACCESS (BY STATUTORY AUTHORITY)ACCESS RESTRICTED (BY PREVIOUS PROJECT OR CONTROL) BRIDGEPARCEL NUMBERUTILITY NUMBER25 40 18923242625 #1-25 NW TEMPORARY LIMITED EASEMENT AREA LOT, TIE & OTHER MINOR LINESGEODETIC SURVEY MONUMENT SECTIONCORNERSYMBOL TO BE REMOVED SECTIONCORNERMONUMENT (TO BE SET)(SEE FOUND MONUMENT TABLE) EXISTING CENTERLINE CONVENTIONAL SYMBOLSSECTION LINEQUARTER LINESIXTEENTH LINENEW REFERENCE LINENEW R/W LINE CORPORATE LIMITSNEW R/W (FEE OR HE)(HATCHING VARIES BY OWNER) EXISTING R/W OR HE LINEPROPERTY LINE R/W MONUMENTTR NON-MONUMENTED R/W POINTFOUND SURVEY MONUMENTIP P.L.SIGNPERMITTEDSIGNSIGN SIGN EASEMENT AREA (PERMANENT LIMITED OR RESTRICTED DEVELOPMENT)BUILDINGPARALLEL OFFSETSNO ACCESS (NEW HIGHWAY) CULVERTB B WGTOHETVFOSANSS CONVENTIONAL UTILITY SYMBOLSWATERGASTELEPHONEOVERHEAD TRANSMISSION LINESELECTRICCABLE TELEVISIONFIBER OPTICSANITARY SEWERSTORM SEWERCOMBINED SEWERELECTRIC TOWERTRANSMISSION STRUCTURESSSS ELECTRIC POLETELEPHONE POLEPEDESTAL (LABEL TYPE) (TV, TEL, ELEC, ETC.)COMPENSABLENON-COMPENSABLE ACCESS RIGHTSARACRESACALUMINUMALUMAND OTHERSET ALBLOCKBLKCENTERLINEC/LCERTIFIED SURVEY MAPCSMCONCRETECONCCOUNTY TRUNK HIGHWAYCTHCORNERCORDOCUMENT NUMBERDOCEASEMENT EASEEXISTINGEXGAS VALVEGVGRID NORTHGNIDENTIFICATIONIDLEFTLTMONUMENTMONNATIONAL GEODETIC SURVEYNGSNUMBERNOOUTLOTOLPAGEPPOINT OF TANGENCYPTPOINT OF BEGINNINGPOBPOINT OF CURVATUREPCPOINT OF COMPOUND CURVEPCCPOINT OF INTERSECTIONPIPROPERTY LINEPL RECORDED AS(100')REEL / IMAGER/IREFERENCE LINER/LREMAININGREMRESTRICTIVE DEVELOPMENTRDE EASEMENTRIGHTRTRIGHT OF WAYR/WSECTIONSECSEPTIC VENTSEPVSQUARE FEETSFSTATE TRUNK HIGHWAYSTHSTATIONSTATELEPHONE PEDESTALTPTRANSPORTATION PROJECT PLATTPPUNITED STATES HIGHWAYUSHVOLUMEV CONVENTIONAL ABBREVIATIONS CURVE DATA ABBREVIATIONS/DELTALONG CHORDLCHLONG CHORD BEARINGLCBRADIUSRDEGREE OF CURVEDDELTA ANGLELENGTH OF CURVELTANGENTTDIRECTION AHEADDADIRECTION BACKDB POSITIONS SHOWN ON THIS PLAT ARE WISCONSIN COUNTY COORDINATE SYSTEM COORDINATES (WCCS), PORTAGEALL NEW RIGHT-OF-WAY AND PERMANENT EASEMENT MONUMENTS WILL BE TYPE 2 (TYPICALLY 34" X 24" IRONREBARS), UNLESS OTHERWISE NOTED, AND WILL BE PLACED PRIOR TO THE COMPLETION OF THE PROJECT.DIMENSIONING FOR THE NEW RIGHT-OF-WAY IS MEASURED ALONG AND PERPENDICULAR TO THE NEW REFERENCELINES.RIGHT-OF-WAY BOUNDARIES ARE DEFINED WITH COURSES OF THE PERIMETER OF THE HIGHWAY LANDS REFERENCEDTO THE U.S. PUBLIC LAND SURVEY SYSTEM OR OTHER "SURVEYS" OF PUBLIC RECORD.FOR THE CURRENT ACCESS/DRIVEWAY INFORMATION, CONTACT THE PLANNING UNIT OF THE CITY OF STEVENS POINT.PARCEL AND UTILITY IDENTIFICATION NUMBERS MAY NOT POINT TO ALL AREAS OF ACQUISITION, AS NOTED ONTHE DETAIL PAGES.INFORMATION FOR THE BASIS OF EXISTING HIGHWAY RIGHT-OF-WAY POINTS OF REFERENCE AND ACCESS CONTROLARE LISTED ON THE DETAIL PAGES. NOTES:COUNTY, NAD83 (1997) IN US SURVEY FEET, AND IS ALSO THE CITY OF STEVENS POINT COORDINATE SYSTEM.VALUES SHOWN ARE GRID COORDINATES, GRID BEARINGS, AND GRID DISTANCES. GRID DISTANCES MAY BE USEDAS GROUND DISTANCES. DONALD J. BUZA, PLS-2338 ORIGINAL PLAT PREPARED BY DATE:SIGNATURE:6/26/2025 DIVISION STBUS 51 Page 10 of 13 WISDOT/CADDS SHEET 75GRID FACTOR N/A EHWY: BUSINESS 51 / DIVISION STREETCOUNTY: PORTAGECONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBER 60730575-21DATE 6/26/2025REVISION DATE 0SCALE, FEET PS&EPLOT NAME : 60730575-21-RP.DWGFILE NAME : 6/26/2025 10:25 AMPLOT DATE :PLOT BY :BUZA, DONALD 44 PLAT SHEETSHEET GN PLOT SCALE :______ _____LAYOUT NAME - 4.02 4.02 TR2928323324N8E TR293224N8E Page 11 of 13 R/L = N00°05'01"E 60' 60' OHOHOHOHOH OHOHOHOHOHOHOHOHOHOHOHOH WV GVSANSS GVWVWV SS WV HSE HSE WV HSEHSE HSEHSE HSE C SIGNSIGNSIGNSIGN BLDG WALL WVSS SSSAN WV WALL CTEL BLDG BLDG WV HSE HSEHSEHSE SIGNSIGNC HSE HSE WV WV UTUTWV SIGNSIGN SAN SANW W W W G G G G G SAN SANSAN SAN SAN W WE G G G G W W W W W W W W W W W WSANSANSANSANSANSANSANSANSANSANSANSAN G G G G G G G G G G GFO FO FO FO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FOFO FO FO FO FO FO FO FO FO FO FO FO FO T WV GV WV 50' 50' 124+00125+00126+00127+00128+00129+00 763IP 805IP 50' 10' 5' 10' 10'10' 7'7' 5' 5' 10' WISDOT/CADDS SHEET 75GRID FACTOR N/A EHWY: BUSINESS 51 / DIVISION STREETCOUNTY: PORTAGECONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBER 60730575-21DATE 6/26/2025REVISION DATE 0SCALE, FEET PS&EPLOT NAME : 60730575-21-RP.DWGFILE NAME : 6/26/2025 10:32 AMPLOT DATE :PLOT BY :BUZA, DONALD 44 PLAT SHEETSHEET GN PLOT SCALE :4020LAYOUT NAME - 4.03 4.03 TR293224N8EY = 204168.092X = 164172.310PER COUNTY RECORDS(NOT RECOVERED) Y = 204172.921X = 165489.7011/16TH CORNERFOUND 1-1/4" IRON BAR N89°47'24"E 1317.40' TR2928323324N8E Y = 204176.606X = 166821.141FOUND BERNTSENSURVEY NAIL BUSINESS 51 / DIVISION STREET BRIGGS STREET BRIGGS STREETBEGIN RELOCATIONORDER STA 124+30.82Y = 203663.304X = 165488.334 TLE FORSLOPES TLE FORSLOPES TLE FORSLOPES TLE FORSLOPESTLE FORSLOPES SCHEDULE OF LANDS & INTERESTS REQUIREDOWNER'S NAMES ARE SHOWN FOR REFERENCE PURPOSESONLY AND ARE SUBJECT TO CHANGE PRIOR TO THE TRANSFEROF LAND INTERESTS TO THE CITY OF STEVENS POINT. (QUARTER COR. TO 1/16TH COR.)NW-NESEC. 32 NE-NESEC. 32 SW-SESEC. 29 SE-SESEC. 29 SLOPEINTERCEPTSSLOPEINTERCEPTS SLOPEINTERCEPTS SLOPEINTERCEPTS SLOPEINTERCEPTS SLOPEINTERCEPTS PORTAGE STREET Page 12 of 13 OH OH OH OH OHOHOHOHOHOHOHOH TEL WV SANSSTELC WV FLAG SANWV WVSIGNSIGN VLV GV VLV VLVSIGNSIGN C GUY WV SAN WV W W W W SAN SANSAN G GG G SANSAN G W W W W W W W W G SANSANSANSANSANSANSAN G G G G G G G GFO FO FOFO FOFO FO FO FOFO FO FO FO FO GV WV SAN SANR/L = N00°05'01"E130+00131+00132+00133+00 50' 60' 60'60' 820IP 821IP 10' 10' 10'10' 5' 5' 5'5' 5' 7' 5' 5' WISDOT/CADDS SHEET 75GRID FACTOR N/A EHWY: BUSINESS 51 / DIVISION STREETCOUNTY: PORTAGECONSTRUCTION PROJECT NUMBERSTATE R/W PROJECT NUMBER 60730575-21DATE 6/26/2025REVISION DATE 0SCALE, FEET PS&EPLOT NAME : 60730575-21-RP.DWGFILE NAME : 6/26/2025 10:36 AMPLOT DATE :PLOT BY :BUZA, DONALD 44 PLAT SHEETSHEET GN PLOT SCALE :4020LAYOUT NAME - 4.04 4.04 TR293224N8EY = 204168.092X = 164172.310PER COUNTY RECORDS(NOT RECOVERED) Y = 204172.921X = 165489.7011/16TH CORNERFOUND 1-1/4" IRON BAR N89°47'24"E 1317.40' TR2928323324N8EY = 204176.606X = 166821.141FOUND BERNTSENSURVEY NAIL BUSINESS 51 / DIVISION STREET FRANKLIN STREET FRANKLIN STREETEND RELOCATIONORDER STA 132+92.69Y = 204525.181X = 165489.591 TLE FORSLOPES TLE FORSLOPES TLE FORSLOPES TLE FORSLOPES TLE FORSLOPES TLE FORSLOPESTLE FORSLOPES TLE FORSLOPES (QUARTER COR. TO 1/16TH COR.)SW-SESEC. 29 SE-SESEC. 29 SLOPEINTERCEPTSSLOPEINTERCEPTS SLOPEINTERCEPTS SLOPEINTERCEPTS Page 13 of 13

Source: City of Stevens Point website. First collected Nov 13, 2026.