Packet
Village of Cottage Grove · Dane County · meeting of Nov 16, 2026 · Agenda packets
Open the original document More from Village of Cottage Grove
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, November 16, 2026
6:30 p.m.
This meeting will take place as a virtual meeting via Zoom. Please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/85680297073?
pwd=LkoSLKwLPu51uP7135cHmOzVaH4gqa.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 856 8029 7073# When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
11-2-26 VB MINUTES.PDF
10-26-26 VB BUDGET WORKSHOP MINUTES.PDF
11-4-26 JT. VB - TOWN MINUTES (1).PDF
Consider The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
Public Hearing: A Public Hearing To Hear Interested Citizens On The 2027 Proposed
Budget For The Village Of Cottage Grove.
2027 VILLAGE BOARD PRELIMINARY BUDGET - PUBLIC HEARING NOV
16.PDF
2026-20 RESOLUTION TO APPROVE 2027 BUDGET LEVY.PDF
COTTAGE GROVE MSB PROPOSAL REVISED.PDF
Discuss Resolution 2026-20; A Resolution Adopting The 2027 Budget And Authorizing
The Clerk To Levy Taxes.
Consider Resolution 2026-20; A Resolution Adopting The 2027 Budget And
Authorizing The Clerk To Levy Taxes.
Unfinished Business
Discuss Requirement That All Standing Village Board, Committee, And Commission
Meetings To Be Held At Village Hall And Include A Hybrid Participation Option.
(Presented By President Kelm -Nelson)
MEMO_ADDITION TO COMMITTEE EXPECTIONS IN HANDBOOK_CKN 11-
16-26.PDF
Consider Requirement That All Standing Village Board, Committee, And
Commission Meetings To Be Held At Village Hall And Include A Hybrid Participation
Option.
Discuss Rules Governing Teleconferences And Virtual Attendance At Meetings.
(Presented By Village President)
RULES GOVERNING TELECONFERENCES AND VIRTUAL ATTENDANCE
AT MEETINGS (02-16-2026) CKN 11-16-26.PDF
Consider Rules Governing Teleconferences And Virtual Attendance At Meetings.
Discuss Potential Zoning Changes Related To Residential Infill. (Presented By Planning
Director)
CG_ZONORD-HOUSINGINFILL_2026-11-10.PDF
Discuss Potential Zoning Changes Related To Creating A Corridor Overlay. (Presented
By Planning Director)
CG_ZONORD-CORRIDOROVERLAY_2026-11-10.PDF
Discuss Policies Prohibiting Village Elected Officials And Staff From Executing Non -
Disclosure Agreements.(Presented By Village Attorney)
NON-DISCLOSURE AGREEMENT RESTRICTIONS.PDF
Consider Policies Prohibiting Village Elected Officials And Staff From Executing
Non-Disclosure Agreements.
Reports From Village Boards, Commissions & Committees
Emergency Management Committee
Discuss Emergency Action Plan. (Presented By Assistant Administrator/HR
Manager)
MEMO - DRAFT EMERGENCY ACTION PLAN.PDF
29 CFR 1910.38 EMERGENCY ACTION PLANS.PDF
SPS 332.15.PDF
DRAFT EMERGENCY ACTION PLAN.PDF
Consider Emergency Action Plan.
Utility Commission
11-11-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
11-11-26 PW AGENDA.PDF
Discuss Recommendation Of Approval Of The Purchase And Installation Of Four In-
Vehicle Radios For The Public Works Fleet.
ADDITIONAL FLEET RADIOS MEMO.PDF
Consider Recommendation Of Approval Of The Purchase And Installation Of Four
In-Vehicle Radios For The Public Works Fleet.
Plan Commission
11-11-2026 PLAN COMMISSION AGENDA.PDF
Discuss Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
CG_VAR_PC_DIPPINDOG-CUP_2026-11-12.PDF
CG_DIPPINDOG-CUP_2026-11-05.PDF
ALESCH_CUPRESPONSE_2026-10-27.PDF
Consider Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
Reports From Village Officers
Village President
i. Discuss appointment of Trustee Stoa to Plan Commission. (replacing Trustee
Murphy)
ii. Consider appointment of Trustee Stoa to Plan Commission.
iii. Discuss appointment of Trustee Villavicencio to Law Enforcement Committee.
(replacing Trustee Stoa)
iv. Consider appointment of Trustee Villavicencio to Law Enforcement Committee.
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 11.16.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 11.13.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible
that members of and possibly a quorum of members of other governmental bodies may attend the
above stated meeting to gather information; no action will be taken by any governmental body at
the above-stated meeting other than the governmental body specifically referred to above in this
notice.
Upcoming meetings:
11/18- Library Board
11/19- DGEMS
11/23- Natvig Landfill
11/23 Jt. Fire
11/24-LEC
1.
2.
3.
4.
5.
Documents:
a.
6.
Documents:
a.
a.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
c.
Documents:
d.
Documents:
e.
Documents:
e.i.
8.
a.
a.i.
Documents:
a.i.1.
b.
Documents:
c.
Documents:
c.i.
Documents:
c.i.1.
d.
Documents:
d.i.
Documents:
d.i.1.
9.
a.
b.
c.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, November 16, 2026
6:30 p.m.
This meeting will take place as a virtual meeting via Zoom. Please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/85680297073?
pwd=LkoSLKwLPu51uP7135cHmOzVaH4gqa.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 856 8029 7073# When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
11-2-26 VB MINUTES.PDF
10-26-26 VB BUDGET WORKSHOP MINUTES.PDF
11-4-26 JT. VB - TOWN MINUTES (1).PDF
Consider The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
Public Hearing: A Public Hearing To Hear Interested Citizens On The 2027 Proposed
Budget For The Village Of Cottage Grove.
2027 VILLAGE BOARD PRELIMINARY BUDGET - PUBLIC HEARING NOV
16.PDF
2026-20 RESOLUTION TO APPROVE 2027 BUDGET LEVY.PDF
COTTAGE GROVE MSB PROPOSAL REVISED.PDF
Discuss Resolution 2026-20; A Resolution Adopting The 2027 Budget And Authorizing
The Clerk To Levy Taxes.
Consider Resolution 2026-20; A Resolution Adopting The 2027 Budget And
Authorizing The Clerk To Levy Taxes.
Unfinished Business
Discuss Requirement That All Standing Village Board, Committee, And Commission
Meetings To Be Held At Village Hall And Include A Hybrid Participation Option.
(Presented By President Kelm -Nelson)
MEMO_ADDITION TO COMMITTEE EXPECTIONS IN HANDBOOK_CKN 11-
16-26.PDF
Consider Requirement That All Standing Village Board, Committee, And
Commission Meetings To Be Held At Village Hall And Include A Hybrid Participation
Option.
Discuss Rules Governing Teleconferences And Virtual Attendance At Meetings.
(Presented By Village President)
RULES GOVERNING TELECONFERENCES AND VIRTUAL ATTENDANCE
AT MEETINGS (02-16-2026) CKN 11-16-26.PDF
Consider Rules Governing Teleconferences And Virtual Attendance At Meetings.
Discuss Potential Zoning Changes Related To Residential Infill. (Presented By Planning
Director)
CG_ZONORD-HOUSINGINFILL_2026-11-10.PDF
Discuss Potential Zoning Changes Related To Creating A Corridor Overlay. (Presented
By Planning Director)
CG_ZONORD-CORRIDOROVERLAY_2026-11-10.PDF
Discuss Policies Prohibiting Village Elected Officials And Staff From Executing Non -
Disclosure Agreements.(Presented By Village Attorney)
NON-DISCLOSURE AGREEMENT RESTRICTIONS.PDF
Consider Policies Prohibiting Village Elected Officials And Staff From Executing
Non-Disclosure Agreements.
Reports From Village Boards, Commissions & Committees
Emergency Management Committee
Discuss Emergency Action Plan. (Presented By Assistant Administrator/HR
Manager)
MEMO - DRAFT EMERGENCY ACTION PLAN.PDF
29 CFR 1910.38 EMERGENCY ACTION PLANS.PDF
SPS 332.15.PDF
DRAFT EMERGENCY ACTION PLAN.PDF
Consider Emergency Action Plan.
Utility Commission
11-11-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
11-11-26 PW AGENDA.PDF
Discuss Recommendation Of Approval Of The Purchase And Installation Of Four In-
Vehicle Radios For The Public Works Fleet.
ADDITIONAL FLEET RADIOS MEMO.PDF
Consider Recommendation Of Approval Of The Purchase And Installation Of Four
In-Vehicle Radios For The Public Works Fleet.
Plan Commission
11-11-2026 PLAN COMMISSION AGENDA.PDF
Discuss Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
CG_VAR_PC_DIPPINDOG-CUP_2026-11-12.PDF
CG_DIPPINDOG-CUP_2026-11-05.PDF
ALESCH_CUPRESPONSE_2026-10-27.PDF
Consider Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
Reports From Village Officers
Village President
i. Discuss appointment of Trustee Stoa to Plan Commission. (replacing Trustee
Murphy)
ii. Consider appointment of Trustee Stoa to Plan Commission.
iii. Discuss appointment of Trustee Villavicencio to Law Enforcement Committee.
(replacing Trustee Stoa)
iv. Consider appointment of Trustee Villavicencio to Law Enforcement Committee.
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 11.16.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 11.13.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible
that members of and possibly a quorum of members of other governmental bodies may attend the
above stated meeting to gather information; no action will be taken by any governmental body at
the above-stated meeting other than the governmental body specifically referred to above in this
notice.
Upcoming meetings:
11/18- Library Board
11/19- DGEMS
11/23- Natvig Landfill
11/23 Jt. Fire
11/24-LEC
1.
2.
3.
4.
5.
Documents:
a.
6.
Documents:
a.
a.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
c.
Documents:
d.
Documents:
e.
Documents:
e.i.
8.
a.
a.i.
Documents:
a.i.1.
b.
Documents:
c.
Documents:
c.i.
Documents:
c.i.1.
d.
Documents:
d.i.
Documents:
d.i.1.
9.
a.
b.
c.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, November 16, 2026
6:30 p.m.
This meeting will take place as a virtual meeting via Zoom. Please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/85680297073?
pwd=LkoSLKwLPu51uP7135cHmOzVaH4gqa.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 856 8029 7073# When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
11-2-26 VB MINUTES.PDF
10-26-26 VB BUDGET WORKSHOP MINUTES.PDF
11-4-26 JT. VB - TOWN MINUTES (1).PDF
Consider The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
Public Hearing: A Public Hearing To Hear Interested Citizens On The 2027 Proposed
Budget For The Village Of Cottage Grove.
2027 VILLAGE BOARD PRELIMINARY BUDGET - PUBLIC HEARING NOV
16.PDF
2026-20 RESOLUTION TO APPROVE 2027 BUDGET LEVY.PDF
COTTAGE GROVE MSB PROPOSAL REVISED.PDF
Discuss Resolution 2026-20; A Resolution Adopting The 2027 Budget And Authorizing
The Clerk To Levy Taxes.
Consider Resolution 2026-20; A Resolution Adopting The 2027 Budget And
Authorizing The Clerk To Levy Taxes.
Unfinished Business
Discuss Requirement That All Standing Village Board, Committee, And Commission
Meetings To Be Held At Village Hall And Include A Hybrid Participation Option.
(Presented By President Kelm -Nelson)
MEMO_ADDITION TO COMMITTEE EXPECTIONS IN HANDBOOK_CKN 11-
16-26.PDF
Consider Requirement That All Standing Village Board, Committee, And
Commission Meetings To Be Held At Village Hall And Include A Hybrid Participation
Option.
Discuss Rules Governing Teleconferences And Virtual Attendance At Meetings.
(Presented By Village President)
RULES GOVERNING TELECONFERENCES AND VIRTUAL ATTENDANCE
AT MEETINGS (02-16-2026) CKN 11-16-26.PDF
Consider Rules Governing Teleconferences And Virtual Attendance At Meetings.
Discuss Potential Zoning Changes Related To Residential Infill. (Presented By Planning
Director)
CG_ZONORD-HOUSINGINFILL_2026-11-10.PDF
Discuss Potential Zoning Changes Related To Creating A Corridor Overlay. (Presented
By Planning Director)
CG_ZONORD-CORRIDOROVERLAY_2026-11-10.PDF
Discuss Policies Prohibiting Village Elected Officials And Staff From Executing Non -
Disclosure Agreements.(Presented By Village Attorney)
NON-DISCLOSURE AGREEMENT RESTRICTIONS.PDF
Consider Policies Prohibiting Village Elected Officials And Staff From Executing
Non-Disclosure Agreements.
Reports From Village Boards, Commissions & Committees
Emergency Management Committee
Discuss Emergency Action Plan. (Presented By Assistant Administrator/HR
Manager)
MEMO - DRAFT EMERGENCY ACTION PLAN.PDF
29 CFR 1910.38 EMERGENCY ACTION PLANS.PDF
SPS 332.15.PDF
DRAFT EMERGENCY ACTION PLAN.PDF
Consider Emergency Action Plan.
Utility Commission
11-11-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
11-11-26 PW AGENDA.PDF
Discuss Recommendation Of Approval Of The Purchase And Installation Of Four In-
Vehicle Radios For The Public Works Fleet.
ADDITIONAL FLEET RADIOS MEMO.PDF
Consider Recommendation Of Approval Of The Purchase And Installation Of Four
In-Vehicle Radios For The Public Works Fleet.
Plan Commission
11-11-2026 PLAN COMMISSION AGENDA.PDF
Discuss Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
CG_VAR_PC_DIPPINDOG-CUP_2026-11-12.PDF
CG_DIPPINDOG-CUP_2026-11-05.PDF
ALESCH_CUPRESPONSE_2026-10-27.PDF
Consider Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
Reports From Village Officers
Village President
i. Discuss appointment of Trustee Stoa to Plan Commission. (replacing Trustee
Murphy)
ii. Consider appointment of Trustee Stoa to Plan Commission.
iii. Discuss appointment of Trustee Villavicencio to Law Enforcement Committee.
(replacing Trustee Stoa)
iv. Consider appointment of Trustee Villavicencio to Law Enforcement Committee.
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 11.16.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 11.13.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible
that members of and possibly a quorum of members of other governmental bodies may attend the
above stated meeting to gather information; no action will be taken by any governmental body at
the above-stated meeting other than the governmental body specifically referred to above in this
notice.
Upcoming meetings:
11/18- Library Board
11/19- DGEMS
11/23- Natvig Landfill
11/23 Jt. Fire
11/24-LEC
1.
2.
3.
4.
5.
Documents:
a.
6.
Documents:
a.
a.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
c.
Documents:
d.
Documents:
e.
Documents:
e.i.
8.
a.
a.i.
Documents:
a.i.1.
b.
Documents:
c.
Documents:
c.i.
Documents:
c.i.1.
d.
Documents:
d.i.
Documents:
d.i.1.
9.
a.
b.
c.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
VILLAGE OF COTTAGE GROVE
NOTICE OF PUBLIC MEETING
Village Board of Trustees
Monday, November 16, 2026
6:30 p.m.
This meeting will take place as a virtual meeting via Zoom. Please join the meeting from your
computer, tablet or smartphone by visiting https://us06web.zoom.us/j/85680297073?
pwd=LkoSLKwLPu51uP7135cHmOzVaH4gqa.1. You can also participate via phone by dialing 1
312 626 6799 and use Meeting ID 856 8029 7073# When asked for your Participant ID, just press
#, when asked for the Passcode enter 221.You may also choose to participate by providing public
comment prior to the meeting via email to Village Clerk Lisa
Kalata: lkalata@villageofcottagegrove.gov . If this is a teleconference, virtual or hybrid meeting,
please review the Village of Cottage Grove’s policy.
Call To Order
Determination Of Quorum And That The Agenda Was Properly Posted.
Pledge Of Allegiance
PUBLIC APPEARANCES-Public's Opportunity To Speak
Discuss The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
11-2-26 VB MINUTES.PDF
10-26-26 VB BUDGET WORKSHOP MINUTES.PDF
11-4-26 JT. VB - TOWN MINUTES (1).PDF
Consider The Minutes Of The Village Board Meeting On November 2, 2026, Budget
Workshop On October 26, 2026 And Joint Village/Town Meeting On November 4, 2026.
Public Hearing: A Public Hearing To Hear Interested Citizens On The 2027 Proposed
Budget For The Village Of Cottage Grove.
2027 VILLAGE BOARD PRELIMINARY BUDGET - PUBLIC HEARING NOV
16.PDF
2026-20 RESOLUTION TO APPROVE 2027 BUDGET LEVY.PDF
COTTAGE GROVE MSB PROPOSAL REVISED.PDF
Discuss Resolution 2026-20; A Resolution Adopting The 2027 Budget And Authorizing
The Clerk To Levy Taxes.
Consider Resolution 2026-20; A Resolution Adopting The 2027 Budget And
Authorizing The Clerk To Levy Taxes.
Unfinished Business
Discuss Requirement That All Standing Village Board, Committee, And Commission
Meetings To Be Held At Village Hall And Include A Hybrid Participation Option.
(Presented By President Kelm -Nelson)
MEMO_ADDITION TO COMMITTEE EXPECTIONS IN HANDBOOK_CKN 11-
16-26.PDF
Consider Requirement That All Standing Village Board, Committee, And
Commission Meetings To Be Held At Village Hall And Include A Hybrid Participation
Option.
Discuss Rules Governing Teleconferences And Virtual Attendance At Meetings.
(Presented By Village President)
RULES GOVERNING TELECONFERENCES AND VIRTUAL ATTENDANCE
AT MEETINGS (02-16-2026) CKN 11-16-26.PDF
Consider Rules Governing Teleconferences And Virtual Attendance At Meetings.
Discuss Potential Zoning Changes Related To Residential Infill. (Presented By Planning
Director)
CG_ZONORD-HOUSINGINFILL_2026-11-10.PDF
Discuss Potential Zoning Changes Related To Creating A Corridor Overlay. (Presented
By Planning Director)
CG_ZONORD-CORRIDOROVERLAY_2026-11-10.PDF
Discuss Policies Prohibiting Village Elected Officials And Staff From Executing Non -
Disclosure Agreements.(Presented By Village Attorney)
NON-DISCLOSURE AGREEMENT RESTRICTIONS.PDF
Consider Policies Prohibiting Village Elected Officials And Staff From Executing
Non-Disclosure Agreements.
Reports From Village Boards, Commissions & Committees
Emergency Management Committee
Discuss Emergency Action Plan. (Presented By Assistant Administrator/HR
Manager)
MEMO - DRAFT EMERGENCY ACTION PLAN.PDF
29 CFR 1910.38 EMERGENCY ACTION PLANS.PDF
SPS 332.15.PDF
DRAFT EMERGENCY ACTION PLAN.PDF
Consider Emergency Action Plan.
Utility Commission
11-11-26 UTILITY AGENDA.PDF
Public Works, Properties And Sustainability Committee
11-11-26 PW AGENDA.PDF
Discuss Recommendation Of Approval Of The Purchase And Installation Of Four In-
Vehicle Radios For The Public Works Fleet.
ADDITIONAL FLEET RADIOS MEMO.PDF
Consider Recommendation Of Approval Of The Purchase And Installation Of Four
In-Vehicle Radios For The Public Works Fleet.
Plan Commission
11-11-2026 PLAN COMMISSION AGENDA.PDF
Discuss Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
CG_VAR_PC_DIPPINDOG-CUP_2026-11-12.PDF
CG_DIPPINDOG-CUP_2026-11-05.PDF
ALESCH_CUPRESPONSE_2026-10-27.PDF
Consider Approval Of A Conditional Use Permit Application From Dippin’ Dog
Daycare, Located At 390 Progress Drive, To Expand Current ‘Commercial Animal
Boarding’ Conditional Use To Include Overnight Boarding.
Reports From Village Officers
Village President
i. Discuss appointment of Trustee Stoa to Plan Commission. (replacing Trustee
Murphy)
ii. Consider appointment of Trustee Stoa to Plan Commission.
iii. Discuss appointment of Trustee Villavicencio to Law Enforcement Committee.
(replacing Trustee Stoa)
iv. Consider appointment of Trustee Villavicencio to Law Enforcement Committee.
Village Attorney
i. Legal briefings/status update.
Village Administrator
VILLAGE ADMINISTRATOR REPORT - 11.16.26.PDF
PROJECTS, INITIATIVES, AND DEVELOPMENT TRACKER 11.13.26.PDF
Communications And Miscellaneous Business
Consider Approval Of Vouchers
BILLS LIST.PDF
Correspondence
Upcoming Community Events
Future Agenda Items
Adjournment
Any item on the agenda is subject to final action. Notice: Persons needing special
accommodations should call 608-839-4704 at least 24 hours prior to the meeting. It is possible
that members of and possibly a quorum of members of other governmental bodies may attend the
above stated meeting to gather information; no action will be taken by any governmental body at
the above-stated meeting other than the governmental body specifically referred to above in this
notice.
Upcoming meetings:
11/18- Library Board
11/19- DGEMS
11/23- Natvig Landfill
11/23 Jt. Fire
11/24-LEC
1.
2.
3.
4.
5.
Documents:
a.
6.
Documents:
a.
a.i.
7.
a.
Documents:
a.i.
b.
Documents:
b.i.
c.
Documents:
d.
Documents:
e.
Documents:
e.i.
8.
a.
a.i.
Documents:
a.i.1.
b.
Documents:
c.
Documents:
c.i.
Documents:
c.i.1.
d.
Documents:
d.i.
Documents:
d.i.1.
9.
a.
b.
c.
Documents:
10.
a.
Documents:
b.
c.
d.
11.
VILLAGE OF COTTAGE GROVE
VILLAGE BOARD OF TRUSTEES
Monday, November 2, 2026
MINUTES
1. Call to Order
President Kelm-Nelson called the Village Board of Trustees to order at 6:30 pm. This was a virtual meeting.
2. Determination of quorum and that the agenda was properly posted.
It was determined that there was a quorum of members present, and that the agenda was properly posted. The
Village Board members present were Cindi Kelm-Nelson, Heidi Murphy, Chris Stoa, Paula Severson, JP Villavicencio,
Casey Erlandson and Dr. Rene Buenzow. Staff present were Administrator Matt Giese, Administrator/Finance
Director Cameron Sawyer, Assistant Administrator/HR Manager Inga Cushman, Director of Parks and Recreation
Sean Brusegar, Police Chief, Mark Garry, Clerk Lisa Kalata, EMS Director Eric Lang, and Village Attorney Rick
Manthe
3. Pledge of Allegiance.
4. PUBLIC APPEARANCES – Public’s opportunity to speak- None
5. Discuss the minutes of the Village Board meeting on October 19, 2026.
a. Consider the minutes of the Village Board meeting on October 19, 2026.
Motion by Erlandson to approve the minutes from October 19, 2026, seconded by Murphy. Motion carried with a
voice vote of 7-0-0.
6. Unfinished Business
a. Discuss Ordinance 19-2026 RE: Village Committee Meeting Attendance. (Presented by Village Attorney)
a.i. Consider Ordinance 19-2026 RE: Village Committee Meeting Attendance.
Motion by Erlandson to approve Ordinance 19-2026, seconded by Villavicencio. Motion carried with a roll call vote of
Buenzow No, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson No, Stoa Aye, Villavicencio Aye.
b. Discuss Rules Governing Teleconferences and Virtual Attendance at meetings. (Presented by Village
President)
b.i. Consider Rules Governing Teleconferences and Virtual Attendance at meetings.
Postponed to the next meeting.
7. New Business
a. Annual review of Village consultants and service providers.
i. Associated Appraisal.
Nick Laird from Associated Appraisal was present to give a brief overview of the services provided to
the Village.
b. Discuss Proclamation RE: Declare November Deer Donation Month. (Presented by President Kelm -
Nelson and Trustee Stoa)
b.i. Consider Proclamation RE: Declare November Deer Donation Month.
Motion by Erlandson to approve Proclamation RE: Declare November Deer Donation Month, seconded by
Murphy. Motion carried with a roll call vote of Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye,
Severson Aye, Stoa Aye, Villavicencio Aye.
c. Discuss adoption of Land Statement. (Presented by President Kelm-Nelson)
c.i. Consider adoption of Land Statement.
Postponed to the next meeting.
d. Discuss zoning and land use changes to encourage infill, slow sprawl, and preserve farmland.
(Presented by Trustee Stoa and President Kelm-Nelson)
d.i. Consider zoning and land use changes to encourage infill, slow sprawl, and preserve farmland.
Motion by Erlandson to direct staff to draft language with both options for further discussion at a Village Board
meeting, seconded by Villavicencio. Motion carried with a roll call vote of Buenzow No, Erlandson Aye, Kelm-
Nelson Aye, Murphy Aye, Severson No, Stoa Aye, Villavicencio Aye.
e. Discuss the creation of a zoning overlay map along commercial corridors along with certain
requirements for properties within the overlay map. (Presented by Trustee Stoa and Trustee Erlandson)
e.i. Consider the creation of a zoning overlay map along commercial corridors along with certain
requirements for properties within the overlay map.
Motion by Erlandson to direct staff to draft language for an overlay district and zoning changes as in the memo to
be discussed at the Village Board and then to Plan Commission, seconded by Murphy. Motion carried with a roll
call vote of Buenzow No, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson No, Stoa Aye, Villavicencio
Aye.
8. Reports from Village Boards, Commissions & Committees
a. Deer-Grove EMS Commission
a.i. Discuss Memorandum of Understanding with Deer-Grove Paramedics Local 311.
a.i.1. Consider Memorandum of Understanding with Deer-Grove Paramedics Local 311.
Motion by Erlandson to approve the memorandum of understanding with Deer-Grove Paramedics Local 311,
seconded by Murphy. Motion carried with a roll call vote of Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye,
Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye.
b. Library Board
Villavicencio reported they discussed national friends of the library week and the upcoming all community read.
c. Parks, Recreation & Forestry Committee
Murphy reported they discussed the cottonwood tree ban for future plantings. The next meeting will be December 17 th.
c.i. Discuss Female Cottonwood tree ban in the Village.
c.i.1. Consider Female Cottonwood tree ban in the Village.
No action taken.
d. Board of Review
Kelm-Nelson reported they had an objection and they sustained the assessor’s value.
e. Emergency Management Committee
Kelm-Nelson reported they approved the emergency action plan. There was an update on the Dane County Natural
Mitigation Plan and the Directors report was given.The next meeting will be January 28th.
9. Reports From Village Officers
a. Village President
i. Discuss Focus Group Appointments.
ii. Consider Focus Group Appointments
Motion by Murphy to approve the Focus Group Appointments, seconded by Erlandson. Motion carried
with a roll call vote of Buenzow Abstaining, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson
Aye, Stoa Aye, Villavicencio Aye.
b. Village Attorney
i. Legal briefings/status update.
c. Village Administrator
Giese reported there are two developers looking at the Uphoff property. Jason Anderson has completed
two years with the Village. Inga Cushman will continue as a board member for the Cities/Villages
association.
d. Assistant Administrator/Finance Director
i. Presentation of 2026 Quarter 3 Budget to Actual Report.
Smith presented the report.
10. Communications and Miscellaneous Business
a. Consider approval of vouchers.
Motion by Erlandson to approve the vouchers, seconded by Murphy. Motion carried with a roll call vote of Buenzow
No, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye.
b. Correspondence- Kelm-Nelson had conversation with Stoughton Health. The School District has information on
school vouchers and the impact on real estate taxes.
c. Upcoming community events- Village Voices on November 10th, GRAEF community center meeting on
November 12th.
d. Future agenda items- Village Board handbook, NDA policy, TID#9, update to burn ordinance, budget hearing.
11. Adjournment
Motion by Murphy to adjourn at 8:43 p.m., seconded by Erlandson. Motion carried with a voice vote of 7-0-0.
Lisa Kalata, Clerk
Village of Cottage Grove
Approved:
These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the
subjects and conversations that took place.
VILLAGE OF COTTAGE GROVE
VILLAGE BOARD OF TRUSTEES
2027 Budget Workshop
Monday, October 26, 2026
MINUTES
1. Call to Order
President Kelm-Nelson called the Village Board of Trustees to order at 5:30 pm. This was a hybrid meeting.
2. Determination of quorum and that the agenda was properly posted.
It was determined that there was a quorum of members present, and that the agenda was properly posted. The
Village Board members present were Cindi Kelm-Nelson, Heidi Murphy, Chris Stoa, Paula Severson (virtually), JP
Villavicencio, Casey Erlandson and Dr. Rene Buenzow(virtually). Staff present were Village Administrator Matt Giese,
Assistant Administrator/Finance Director Cameron Sawyer, Assistant Administrator/HR Manager Inga Cushman,
Comptroller Cassie Smith, Director of Parks and Recreation Sean Brusegar, Public Works and Utilities Director Kyela
O’Laughlin, Sgt. Jeff Comstock, Clerk, Lisa Kalata, Fire Chief Nick Archibald, and EMS Chief Eric Lang.
3. Pledge of Allegiance.
4. PUBLIC APPEARANCES – Public’s opportunity to speak- None
5. New Business
a. Discuss 2027 Preliminary budget as recommended by the Budget Review Committee and select date of
Public Hearing for adoption of the 2027 budget.
a.i. Consider 2027 Preliminary budget as recommended by the Budget Review Committee and select date of
Public Hearing for adoption of the 2027 budget.
Motion by Murphy to approve the 2027 preliminary budget as recommended by the Budget Review Committee with
the addition of $7,500 to be added for trees, seconded by Erlandson. Motion carried with a roll call vote of Buenzow
No, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Abstain, Stoa Aye, Villavicencio Aye.
Motion by Murphy to set the public hearing for adoption of the 2027 budget as November 16, 2026, seconded by
Erlandson. Motion carried with a roll call vote of Buenzow Aye, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye,
Severson Aye, Stoa Aye, Villavicencio Aye.
b. Discuss location for November 12th Visioning and Design Workshop regarding the “Village Center”
Project/Redevelopment.
b.i. Consider location for November 12th Visioning and Design Workshop regarding the “Village Center”
Project/Redevelopment.
Motion by Erlandson to approve the location of Grace Coffee for the November 12th visioning and design workshop
regarding the Village Center project and redevelopment, seconded by Villavicencio. Motion carried with a roll call vote
of Buenzow Abstain, Erlandson Aye, Kelm-Nelson Aye, Murphy Aye, Severson Aye, Stoa Aye, Villavicencio Aye.
6. Adjournment
Motion by Murphy to adjourn at 7:04 p.m., seconded by Erlandson. Motion carried with a voice vote of 6-0-0.
Lisa Kalata, Clerk
Village of Cottage Grove
Approved:
These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the
subjects and conversations that took place.
VILLAGE OF COTTAGE GROVE & TOWN OF COTTAGE GROVE
VILLAGE BOARD OF TRUSTEES & TOWN BOARD OF SUPERVISORS
Wednesday, November 4, 2026
MINUTES
1. Call to Order
a. Cottage Grove Town Board of Supervisors- Chairperson Anders called the Town Board of Supervisors meeting
to order at 5:30 pm
b. Cottage Grove Village Board of Trustees- President Kelm-Nelson called the Village Board of Trustees to order at
5:30 pm. This was a hybrid meeting.
2. Determination of quorum and that the agenda was properly posted.
It was determined that there was a quorum of members present, and that the agenda was properly posted. The
Village Board members present were Cindi Kelm-Nelson, Chris Stoa (left at 6:30 pm), Heidi Murphy, Paula Severson,
Casey Erlandson, and JP Villavicencio. Dr. Rene Buenzow was absent and excused. Town Board members present
were Steve Anders, Mike Fonger, Kristi Williams, Troy Eickhoff and Patrick Buchholz. Staff present were Assistant
Administrator/Finance Director Cameron Sawyer, Assistant Administrator/ HR Manager Inga Cushman, Lt. Matt
Wagner, Clerk Lisa Kalata, EMS Director Eric Lang, Fire Chief Nick Archibald and Village Attorney Larry Konopacki.
3. Pledge of Allegiance.
4. PUBLIC APPEARANCES – Public’s opportunity to speak- Mark Spahos
5. Unfinished Business
a. Update on joint ESB lease agreements. (Presented by the Village Attorney)
The Attorneys are reviewing the draft agreements.
b. Discuss and consider proposal to investigate an emergency connection at Meadowlark St.
Postponed to the next joint meeting.
6. Presentations
a. PAA final report and presentation of the commissioned 2026 Fire - EMS organizational review with
future needs analysis update.
Kevin Brunner, Tim Franz, Jim Austad and Kris Dressler were present to give an overview of the study.
7. Discuss and consider future joint meeting date and agenda items.
Edits to the study, ESB updates, Meadowlark St connection and ESB lease agreements.
8. Adjournment-Town
Motion by Williams to adjourn at 8:43 pm, seconded by Anders. Motion carried with a voice vote of 5-0-0.
9. Adjournment-Village
Motion by Murphy to adjourn at 8:44 pm, seconded by Severson. Motion carried with a voice vote of 5-0-0.
Lisa Kalata, Clerk
Village of Cottage Grove
Approved: October 19, 2026
These minutes represent the general subject discussed in this meeting but do not reflect a verbatim documentation of the
subjects and conversations that took place.
2027 Village Board Preliminary Budget
November 16, 2026 - Public Hearing and Final Budget Adoption
1
Table of Contents
Int
roduction
Budget Overview/Notes from Administrator 4
Highlights from Assistant Administrator/Finance Director 6
St
aff Budget Memo Narratives
Administration Department 11
Colonial Club 13
Clerk’s Office 16
Deer-Grove EMS 17
Cottage Grove Fire Department 21
Library Board 27
Parks, Recreation, and Forestry Department 31
Police Department 34
Public Works Department 43
Vil
lage Fund Budgets
Levy Breakdown 50
General Fund 51
Debt Service Fund 67
Capital Projects Fund 69
Equipment Replacement and Infrastructure Maintenance Fund 72
Public Infrastructure Fund 75
Park Development Fees Fund 77
Library Fund 79
Tourism Fund 81
Affordable Housing Fund 83
Tax Incremental District 6 86
Tax Incremental District 8 87
Tax Incremental District 9 88
Tax Incremental District 10 89
Ut
ility Commission Adopted Budget
Water 91
Sewer 101
Appe
ndix
2026 Budget Amendments 108
2
Introduction
3
Village of Cottage Grove, WI
Staff Memo
Memo Date: October 27, 2026
To: Village Board
From: Matt Giese – Village Administrator
Subject: 2027 Budget – Public Hearing – Budget Overview
Backgr
ound
The Village Board approved a preliminary 2027 budget at the annual “Budget Workshop”
meeting on October 26th, and set a public hearing date of November 16th at 6:30 p.m. These
final seps conclude a seven-month budget process, which involved 15+ Committee and Board
meetings.
--Fi
nal Step: Public hearing and adoption of 2027 Budget (currently planned for November 16th)
The fol
lowing is a table of contents for the “2027 Budget Packet” (memos/ recommendations/
supplementary materials)
2027
Budget Packet
• Introductory Summary of proposed 2027 Village Budget
o “Budget Notes”: Summary of tax levy, assessed value, levy limits, and tax
impacts – Village Administrator Matt Giese
o Overview and Budget Highlights – Assistant Administrator/Finance Director
Cameron Sawyer
• Budget Requests/Memos
o Administration – Administrator Giese and Assistant Administrator/HR Manager
Inga Cushman
o Clerk’s Office – Clerk Lisa Kalata
o EMS – Chief Eric Lang
o Fire Department – Chief Nick Archibald
o Library Board – Board President JP Villavicencio
o Parks & Recreation – Director Sean Brusegar
o Police – Chief Garry
o Public Works – Director Kyela O’Loughlin
2027
Budget Notes
Equalized Value (TID in) = estimated fair market value of all taxable property in the Village
--2025 Equalized Value (TID in): $1,545,983,000
--2026 Equalized Value (TID in): $1,886,285,900 (+$340,302,900; 22% increase)
As
sessed Value (TID out) = all property outside of TIF Districts as assessed by Village
Assessor. Assessed Value (TID out) is the Village’s “tax base” for purposes of establishing a tax
rate and levy.
--202
5 Assessed Value (TID out): $832,674,355
--2026 Assessed Value (TID out): $1,452,160,316 (+$619,485,961; 74.4% increase)
4
p
Village of Cottage Grove, WI
Staff Memo
Average assessed value home in the Village = $440,000 (+$125,000; 39.7% increase)
• The Village’s current assessment to equalized value ratio is about 101.6%. This means
the Village’s average assessed value home is valued about 1.6% higher than “fair
market value”. By law, the Village must maintain an assessment ratio between 90% -
110% of fair market value. The Village contracted with Associated Appraisal to complete
a full revaluation process which concluded in 2026. The revaluation process does not
result in the Village collecting any additional tax revenue.
Tax Lev
y and Tax Impact
--2025 tax levy for 2026 budget: $6,512,526
--Financial Management Plan levy for 2027 Budget: $7,996,499
• +$1,483,973; 22.8% increase
• Total Village property tax = $2,424 for $440,000 property
o $40 decrease on the average tax bill (1.6%)
--2027 “all in” Department/Committee requested levy for 2027 Budget: $8,202,487
• +$1,689,961; 25.9% increase
• Total Village property tax = $2,485 for $440,000 property
o $22 increase on the average tax bill (.9%)
--2027 Administration proposed/recommended levy for 2027 Budget: $7,933,788
• +$1,421,262; 21.8% increase ($62,711 less than the approved FMP levy)
• Total Village property tax = $2,404 for $440,000 property
o $60 decrease on the average tax bill (2.4%)
--2027 BRC recommended levy for 2027 Budget: $7,933,788
• +$1,421,262; 21.8% increase ($62,711 less than the approved FMP levy)
• Total Village property tax = $2,404 for $440,000 property
o $60 decrease on the average tax bill (2.4%)
--2027 Preliminary Budget levy for 2027 Budget: $7,941,288
• +$1,428,762; 21.9% increase ($55,211 less than the approved FMP levy)
• Total Village property tax = $2,406 for $440,000 property
o $58 decrease on the average tax bill (2.4%)
Not
e for context: every $10,000 in the adopted tax levy = $3.03 in taxes for the average
assessed value home in the Village ($440,000)
5
Village of Cottage Grove, WI
Staff Memo
To: Village Board
From: Cameron Sawyer – Assistant Administrator/Finance Director
Subject: 2027 – Overview and Budget Highlights
Fiscal
responsibility/fiscal health of the Village: Overall fiscal health plays a significant role
in the budget process. Significant factors include general fund reserves, growth, and
infrastructure.
Gener
al Fund reserves: The Village’s unrestricted fund balance remains strong and continues
to be managed in accordance with its formal fund balance policy, which calls for maintaining an
unrestricted General Fund balance between 20% and 30% of annual General Fund operating
expenditures. The Village has consistently met or exceeded this target range over the past
several years.
Gener
al Fund operating budgets are not developed with the objective of generating annual
surpluses. Rather, the Village’s current reserve levels are largely the result of prudent fiscal
management, conservative budgeting practices, and favorable market conditions. During
periods of elevated inflation, economic uncertainty, or weaker market performance, fund
balances may naturally decline. In some cases, the Village may also strategically utilize
reserves to support one-time expenditures or other financial priorities.
It
is important to recognize that maintaining adequate reserves is a critical component of the
Village’s financial stability. Fund balance serves as working capital to support ongoing
operations and cash flow needs throughout the year, particularly during periods between
property tax collection cycles. Because property taxes represent the Village’s largest revenue
source and are received at specific times of the year, reserves help ensure the Village can
continue providing essential services without disruption.
Gr
owth: The Village is experiencing the highest growth rate in Dane County, and the 3rd highest
rate in the State. For 2026, the Village’s net new construction (NNC) percentage was 23.92%,
significantly exceeding the Dane County average of 2.43%. This growth is particularly important
because net new construction is the primary factor in calculating allowable levy increases under
Wisconsin’s levy limit law. Aside from voter-approved referendums and debt-related
adjustments, NNC is the only option available to increase the Village’s levy authority.
Whi
le growth expands the tax base and creates additional levy capacity, it also generates
increased demand for municipal services and infrastructure. Public safety often experiences
growing service demands as new residents and development are added to the community.
Despite this rapid growth, the Village continues to operate with one of the leanest staffing levels
among Dane County municipalities. This reflects the Village’s ongoing commitment to efficient
service delivery and prudent fiscal management while continuing to meet the needs of a rapidly
growing community.
Inf
rastructure: The Village has made significant investments in infrastructure over the past
several years and has proactively addressed many of its major capital improvement needs. As a
result, the Village’s roads and related infrastructure systems are generally in good condition.
Continued investment in maintenance and replacement is essential, as aging infrastructure and
6
p
Village of Cottage Grove, WI
Staff Memo
deferred repairs can lead to higher future costs, increased service disruptions, and potential levy
pressures.
The Village’s commitment to maintaining and reinvesting in its existing infrastructure has
positioned the community well for long-term sustainability and financial stability. Through its
most recent capital prioritization process, the Village established sustainable annual funding
strategies to address ongoing roadway, sidewalk, and trail maintenance needs. These
dedicated investments help preserve public assets, support community safety and mobility, and
reduce the likelihood of significant tax impacts resulting from deferred maintenance in the future.
Budget
Highlights: Wisconsin’s Consumer Price Index for All Urban Consumers (CPI-U) is
currently 3.27%, which closely reflects the annual cost increases the Village can expect to
experience in maintaining existing service levels and operations. Historically, the Village has
provided cost-of-living adjustments (COLA) for employees that are generally consistent with
CPI-U trends, helping maintain competitive compensation and support employee retention.
Consistent with this practice, the preliminary budget includes a 3.27% COLA adjustment for
staff, effective January 3, 2027.
The Vi
llage Board’s adopted Financial Management Plan projected a total levy of $7,996,499.
The preliminary budget, as presented, requires levy support of $7,941,288, approximately
$55,211 below the levy amount anticipated in the Financial Management Plan. As a result, the
preliminary budget remains consistent with the Board’s long-term financial strategy while
utilizing less levy support than originally projected.
Gener
al Fund
Gener
al Government: Expenditures related to the Village Board, Municipal Court,
Administration, and Clerk’s Office are projected to increase by $55,582, or 4.74%, compared to
the 2026 amended budget. The primary factors contributing to this increase are higher workers’
compensation insurance costs of approximately $10,600 and an estimated $50,000 increase in
municipal building operating expenses associated with the anticipated opening of the new
Police Station in the second quarter of 2027.
These i
ncreases are partially offset by a $20,849 reduction in election-related expenditures,
reflecting lower anticipated election costs in 2027. Overall, the preliminary budget adjustments
ensure continued support for core administrative functions while accounting for the operational
impacts of new Village facilities and changing service needs.
Publ
ic Safety: Consistent with prior years, public safety accounts for the largest increase in
operating expenditures among all budget categories. The Cottage Grove Fire Department’s
budget request increases General Fund support by $24,321, while the Deer-Grove EMS budget
request increases General Fund support by $62,600. Both budgets are largely considered cost-
to-continue requests, with the Fire Department budget also incorporating additional
administrative resources to support ongoing operations.
The Cot
tage Grove Police Department represents the most significant increase within the public
safety category, with an additional $226,244 included in the preliminary budget. This increase is
primarily attributable to the recommendation to add one Detective position beginning in the
7
p
Village of Cottage Grove, WI
Staff Memo
fourth quarter of 2027, along with standard cost-to-continue adjustments such as wages,
benefits, and operating expenses.
Partially offsetting these increases is the transfer of inspection-related expenditures to the
Capital Projects Fund, resulting in a $102,000 reduction in General Fund expenditures
compared to the 2026 budget.
Overall, the preliminary Public Safety budget reflects a net increase of $213,015, or 5.37%, over
the 2026 amended budget. This investment supports the Village’s continued commitment to
maintaining high-quality public safety services while addressing the operational demands of a
growing community.
Public Works: Public Works preliminary budget is 2.08% less or $26,146 less than the prior
year’s budget.
Culture, Recreation, and Education: Expenditures for Parks, Recreation, and Forestry are
projected to increase by $70,004 compared to the 2026 budget. The primary factors driving this
increase include the addition of part-time forestry staffing and tree resources ($19,500), the
transfer of irrigation costs for Fireman’s Park from the Park Development Fund to the General
Fund ($15,000), and increased stormwater utility charges ($10,000).
These investments support the continued maintenance and stewardship of the Village’s parks,
recreation amenities, and urban forestry resources while ensuring operating costs are
appropriately allocated within the General Fund. Overall, the Culture, Recreation, and Education
budget category reflects a net increase of 7.19% over the 2026 budget.
Conservation and Development: No changes in overall operations of planning and economic
development are being preliminary. Village TIF Districts typically bear any major costs
associated with development or planning efforts.
Budget Summary of Major Projects:
Ollie Street Reconstruction: $2,395,000 (CP: $830,000, W: $863,000, S: $702,000)
Main Street Reconstruction, Reynolds South to Village Limits $2,259,500 (CP: $765,000, W:
$843,500, S: $651,000)
Budget Summary of Annual Road, Sidewalk, and Trail Maintenance:
In 2024, the Village established a dedicated annual funding program to address the ongoing
maintenance and preservation of roads, trails, and sidewalks. The initial annual allocation was
set at $1,000,000 and is adjusted each year by a 2.5% inflationary factor to help maintain
purchasing power and keep pace with rising construction costs.
For 2027, the available allocation for road, trail, and sidewalk maintenance is $1,077,000.
Consistent with the Village Board’s approved Financial Management Plan (FMP), the street
repaving portion of the current year's allocation will be deferred and accumulated to support a
large-scale roadway repaving program planned for 2028. This strategy is expected to provide
approximately $2,000,000 in funding for the 2028 repaving initiative, allowing the Village to
8
p
Village of Cottage Grove, WI
Staff Memo
undertake more substantial roadway improvements while maintaining a sustainable and
predictable annual funding approach.
Mai
ntenance by category:
• Street Repaving - $0
• Street Chip Sealing and Crack Fill - $185,000
• Bike Trail and Sidewalk Maintenance - $25,000
Budget
Summary of Vehicles and Equipment:
In 2024
, the Village established a dedicated annual funding program to support the replacement
of vehicles and equipment. The program began with an annual allocation of $1,000,000, which
is increased each year by an inflationary factor of 2.5% to help maintain purchasing power and
keep pace with rising replacement costs.
For 2027
, the vehicle and equipment replacement allocation totals $1,077,000. This funding is
intended for General Fund and other governmental equipment needs and does not include
vehicle or equipment purchases associated with the Water and Sewer Utilities.
The equipm
ent purchases identified below total $858,675, which is $218,325 less than the
amount available through the capital prioritization allocation. In addition, a planned election
equipment purchase originally scheduled for 2026 was deferred to 2027, with approximately
$23,000 in previously allocated funding remaining available to support that acquisition. This
approach maintains flexibility within the replacement program while ensuring critical equipment
needs continue to be addressed in a fiscally responsible manner.
Gener
al Government
• 2027 Computer and Network Infrastructure Replacement Program - $47,500
Publ
ic Safety
• Fire – Tires for Brush Truck, Command Vehicles, Chain Saws/Saws/related equipment,
and SCBA facepiece fit testing equipment - $93,675
• Police – Two Squads, Firearms, Training Weapons, E-Bike, Drone/UAS, Traffic
Monitoring Equipment, Body Armor - $284,500
Publ
ic Works
• Plow Truck - $231,000
• Facilities - $30,000
Cul
ture, Recreation, and Education
• Slope Mower, Huston/Fireman’s Field renovations, Fireman’s Park driveway repair,
Willow Run Surface Improvement - $168,000
9
p
Village of Cottage Grove, WI
Staff Memo
Capital Projects Fund (non-borrowed) Notable Initiatives:
• Building Maintenance - $45,000
• Facility Study - $50,000
• Traffic Study - $40,000
• ADA Compliance Projects - $10,000
• Playground Maintenance - $10,000
• Emergency Service Building - $5,000
• Additional Beautification - $4,000
Par
k Development Fund Notable Initiatives:
• Bakken Park Playground Removal - $25,000
10
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Matt Giese, Village Administrator
Inga Cushman, Assistant Administrator/HR Manager
Cameron Sawyer, Assistant Administrator/Finance Director
Subject: 2027 – Administration Budget Request
Capi
tal Projects Fund:
Pr
ofessional Services ($25,000) – Administration utilizes independent consulting services on
an as-needed basis to support and strengthen recruitment efforts for Department Head, Deputy,
and other management-level positions. Because staffing needs can vary significantly from year
to year, it is difficult to accurately predict the level of recruitment assistance that may be
required. The requested funding would provide sufficient resources to support the recruitment
and selection of up to two management-level positions during 2027, if needed. In addition, these
funds could be used to conduct one-off external market compensation analyses to ensure the
Village remains competitive in attracting and retaining qualified employees.
There has
been board member feedback to possibly consider conducting a consultant-led
comprehensive Wage/Compensation and Classification Study in 2027. For context, the Village
has never had a formal wage study completed, nor do we have established wage ranges across
the organization. A typical study would include a review of current positions, an assessment of
internal equity through a job analysis process, a market compensation analysis using
comparable municipalities, development of a recommended salary structure/pay plan, and
implementation recommendations.
Bas
ed on preliminary research, the cost of such a study would likely be less than $30,000,
depending on the final scope of work. If the Board directs staff to include this initiative in the
2027 budget, Administration would recommend budgeting up to $30,000 to ensure sufficient
funding is available. Any consultant services would be procured through a competitive Request
for Proposals (RFP) process, which would ultimately determine the final project cost.
Muni
cipal Services Building (MSB) Space Needs Study ($50,000) – With the Police
Department vacating their current space when they move to their new station in 2027, it would
be helpful to have a strategic and efficient plan for use of the vacated space by other Village
departments/services as needs present themselves. The study would:
• Evaluate how the vacated space should be utilized to best meet the Village’s short-term
and long-term operational needs.
o Identify which departments, services, and positions, if any, should be relocated
into the available space and establish a recommended implementation timeline.
• Assess former Police Department areas that are not readily adaptable for use by other
Village departments, including specialized spaces such as the sally port, interrogation
rooms, armory, and evidence room.
11
The Village of Cottage Grove, WI
2027 Budget Request
o Determine whether these spaces should be renovated, repurposed, or
decommissioned.
o Develop cost estimates and renovation recommendations necessary to make the
space functional and suitable for ongoing Village operations.
o Establish a prioritized timeline for implementation of any recommended
improvements.
Evaluate the feasibility and operational benefits of expanding the garage area at the
Municipal Services Building (MSB).
o Develop preliminary concepts and cost estimates for any recommended
expansion.
o Identify the preferred timing and phasing of improvements based on operational
needs, facility constraints, and available funding.
Staff recommend utilizing our current Architects (Engberg Anderson) for the project, and the
current estimate is $46,000 (attached/linked in meeting packet). Following feedback, the scope
may be adjusted, so for budgeting purposes we would propose a not to exceed budget of
$50,000.
2027 Vehicle & Equipment Replacement ($47,500)
IT Equipment (Scheduled replacement) ($47,500) – Replacement of about 11 workstations,
depending on economic factors. Network and cable room related infrastructure $20,000.
Total Fiscal Impact: $122,500
Administration Recommended funding sources:
Fund Proposed Budget Notes
410 – Capital 75,000 Professional Services; Space Needs Study
411 – Capital 47,500 IT Hardware replacement
Total $ 122,500
To:
Village of Cottage Grove
Fr
om: Colonial Club Senior Activity Center
Melody Riedel, Executive Director
Dat
e: September 28, 2026
Re: Re
quest for Municipal Support
On
behalf of the Colonial Club, I submit the following information for your consideration as you
plan for your 2027 budget.
For t
he Village of Cottage Grove, in 2025 we provided services to 34 individuals and we are on
track to attain that for 2026. Those individuals received one or more of the following services:
Benefits Received in Hours 2022 2023 2024 2025 2026
Jan-Aug
Case Management 232 258 230 124 117
Adult Day Center 629 149 382 883 359
Supportive Home Care/Respite
Care
251 336 284 288 217
Benefits Received in Numbers 2022 2023 2024 2025 2026
Jan-Aug
Meals @ Colonial Club 468 342 78 159 76
Meals Delivered 2798 2844 2270 2054 1635
Transportation (miles) 5713 4796 283 806 587
Residents coming to activities 387 383 390 419 347
Residents volunteering by hours 593 371 400 182 141
Budget Justification
We are requesting $32,000 for 2027 from the Village of Cottage Grove, which is level funding
from 2026. Although the number of individuals served experienced a slight decrease during this
past year, we remain encouraged by the overall impact of our programs and services. Changes
in participation can be influenced by a variety of factors, including individual needs, health
circumstances, or transportation. Colonial Club continues to actively engage with individuals
and families, strengthen community partnerships, and identify opportunities to reach those
who may benefit from our services. We are hopeful that participants will increase in the coming
year as we continue to expand outreach, build awareness of our programs, and respond to the
13
cha
nging needs of the community. We greatly appreciate the continued support. This
investment provides stability and allows us to maintain essential services while working toward
reaching more individuals in the year ahead.
To
tal Colonial Club Service Report Comparison 2022-2026
(All Northeast Dane County municipalities which include: City & Town of Sun Prairie, the
Village & Town of Cottage Grove, Deerfield, Marshall, Medina, Bristol & Burke)
Year Case
Management
(hours)
Adult
Day
Care
(hours)
Meals Supportive
Home Care
(hours)
Transportation
(miles)
Activities
(# times
people
checked in
2026Jan-Aug 1,531 9,463 23,112 1,007 9,349 11,886
2025 2,609 15,485 37,791 1,831 17,343 15,938
2024 3,197 15,435 36,356 2,166 2,0055 12,919
2023 3,068 13,632 37,030 2,355 25,203 11,097
2022 2,995 11,431 36,800 2,403 28,176 10,739
Recap of the 2025, moving into 2026
Looking back on the past 2 years, the heart of our organization, our employees,
embraced changes in leadership and other employee changes across the organization.
First, we had the change of a new Executive Director; new Director of Services, and then
adding a new Director of Activities (and we just hired a new Director of Activities), a new
nutrition coordinator, new adult day center leaders, new supportive home care leader,
new case manager (and we just hired an additional case manager), and a new
supportive home care aide. Whew! We are excited about the welcoming our newest
team members, as they bring fresh ideas, enthusiasm, and a strong commitment to our
mission. We are grateful to have them on board and look forward to all we will
accomplish together.
Colonial Club, as well as other agencies, continue to struggle finding qualified and
trustworthy employees to work in the Supportive Home Care Program. Because of the
lack of workers, there continues to be a waitlist for this program.
A positive trend with our activities has developed over the past years. We have been
adding new activities to our calendar and increased the marketing through social media
and a variety of newsletters. We are getting better at capturing the number of people
coming in for activities. Through these efforts, our number of times people checking in
for activities has increased over the years.
Earlier in 2026 we retired our minivan, due to the repairs exceeding the actual value of
the vehicle. Therefore, we were unable to provide additional rides for our special
entertainers, meals and various activities.
Colonial Club will continue to provide the same exceptional services and activities.
14
2026 Trends for Older Adults
• In Wisconsin, the older adults are the fastest-growing demographic, with projections
showing people 65 and older reaching 1.3 million by 2030. Currently, there are 1 in 5
Wisconsinites that are now 65 or older. Nearly a quarter of older adults live in rural
areas and they are becoming more active in local advocacy.
• The more active older adults are leaning towards community based, structured group
exercise, but lower impact options as they enjoy the social part of the classes. These
active folks are also giving up passive sightseeing tours and opting for high energy active
excursions, along with hands on volunteer work. They are also utilizing more physical
therapies and smart watches to track their progress.
• The older adults with limited mobility are seeking ways for highly engaging low-impact
activities, such as online university courses or virtual book clubs or volunteering as
virtual tutors. They are relying on assistive smart home devices to maintain their aging
in place lifestyle.
• Despite all of the positive activities of our older adults, the economic trends may curtail
some of their enthusiasm. The increasing food costs, increasing gas prices and a tight
local affordable housing market may dampen their spirits slightly.
Co
lonial Club will be monitoring these trends and continue to work towards the desired
needs or wants of our older adults. We have already taken strides to meet these trends by
offering group exercise classes, that are low impact, but focus on building strength. Colonial
Club is also offering more diverse active adventure excursions. Unfortunately, with the high
price of technology, we currently are unable to offer online options, but we provide online
resources from others as much as possible.
Tha
nk you for your continued partnership and support for the older adults of Cottage
Grove. Colonial Club looks forward to continuing our mission of enhancing the well-being
and independence of older adults!
15
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Lisa Kalata, Village Clerk
Subject: 2027 – Clerk Budget Request
2026 Vehi
cle & Equipment Replacement ($23,000)
El
ection Equipment ($23,000) – The 2026 budget included $45,600 for planned replacement
of our DS200 with 6 new DS300s. Dane County subsequently informed the Village they would
cover 80% of the cost of new DS300s and Express Vote machines. The 2027 budget request
replaces/reallocates the 2026 $45,600 request with an alternative 2027 request for 6 DS300
($12,000), 4 Express Votes ($7,000), and 1 Badger Book Server ($4,000) totaling $23,000.
Tot
al Fiscal Impact: $23,000
Adm
inistration Recommended funding sources:
Fund Proposed Budget Notes
411 – Capital $ 23,000 Election Equipment
Total $ 23,000
16
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Eric Lang, EMS Chief
Subject: 2027 – Deer-Grove EMS Budget Request
Oper
ating Requests ($62,599 increase):
For additional budget context please see approved Deer-Grove Commission approved budget.
Capi
tal Requests ($91,521):
Pl
anned purchase of Chassis ($80,000), Power Cot ($31,500), Load system ($34,000), and
Stairchair ($5,500). This purchase is recommended to be paid using fund balance.
The
following have been added to the memo by Village Staff to Provide additional
financial context:
Request 2027 2026 Increase/(Decrease)
Capital $ 91,521 $ - $ 91,521
Operating 732,715 670,116 62,599
Total $ 824,236 $ 670,116 $ 154,120
Tot
al Fiscal Impact as recommended by the Budget Review Committee/Village Board
Budget Workshop: $824,236
Administration Recommended funding sources:
Fund Proposed budget Notes
100 – General $ 732,715 2027 assessment
N/A 91,521 Deer-Grove Capital Purchase utilizing fund balance
Total $ 824,236
17
DATE: September 17, 2026
The 2027 DGEMS budget as approved by the EMS Commission has no adjustments to district
staffing.
All budget categories were evaluated and adjusted for their actual expenses. Reductions were made,
where able, and increases were kept to the least amount projected to maintain a minimal impact.
THESE ARE THE APPROVED CHANGES COMPARED TO THE 2026 BUDGET:
EXPENSES
#720 WAGES
• Agreed upon increases from CBA used to calculate FTE wages
• Pay increase for the casual staff group to $25.50. Regional pay is variable for casual staff; this
rate will keep us in line and is still under entry level full-time paramedic pay at $25.92.
#721 HEALTH INSURANCE
• Rates have already been finalized, this is an accurate number
• Adjusted for staff actuals
#722 WORKERS COMPENSATION
• Adjusted for actuals
#723 RETIREMENT; #724 EMPLOYER’S FICA
• Adjusted for staff actuals
#734 OVERTIME (scheduled)
• Adjusted for staff actuals
#735 EMT STIPEND
• Decreased for actual projected amount usage
#736 LIFEQUEST BILLING
• Expected fee for service increased due to anticipated increase in reimbursement
#740 OFFICE EQUIPMENT
• Minor increase in the cost of equipment rental and usage
#742 OFFICE SUPPLIES
• Minor increase to keep pace with usage and price increases
#770 COMMUNICATIONS
• Minor increased due to added cost of phones services and dispatching access
#775 INFORMATON TECHNOLOGY
• Increase due to raised rates for scheduling, learning management, and patient care reporting
platforms.
• Increase in the cost of Adobe access for Admin Staff
• Planned replacement of staff computers
#840 EQUIPMENT (NON-DISPOS)
• Decreased for actual projected amount usage and shift of Zoll maintenance plan to #842
18
#842 EQUIPMENT MAINTENANCE
• Increase in the cost of the Stryker Cot/Power load and Zoll maintenance contracts
#845 CAPITAL PURCHASE
• Planned replacement of the 2017 ambulances, phase one.
• These funds will be transferred from DGEMS unassigned fund balance.
#850 MEDICAL SUPPLIES
• May increase to maintain supply needs and higher run volume- Will look at the trend or
ability to adjust for September commission meeting
#870 INSURANCE/BUSINESS
• Increased due to higher actual costs
#871 GROUP LIFE INSURANCE
• Increased due to actual cost of the benefits provided to staff
#880 LEGAL
• Unchanged- May need additional discussion depending upon IGA edit results
#881 ACCOUNTING
• Increased annual audit charge
#899 ADMISTRATIVE EXPENSES
• Increase due to the cost of the QuickBooks
SERVICE REVENUE –
EXPECTED INCREASES:
2026 Projected 2027
Estimated Gross Run Fees $1,150,000 $1,225,000 +$75,000
**Annualization of the 2026 ambulance run fees (#620) will project revenue at 1,223,000, which
will make this number easily attainable with the expected increase in run volume and an increase
in ambulance billing rates.**
Interest $20,000.00 $25,000.00 +$5,000
Contracted Revenue (T of DF) $94,172.53 $106,728.87 +$12,556.34
Contracted Revenue (T of PS) $77,104.88 $87,385.53 +$10,280.65
TOTAL +$102,836.99
19
2027 DGEMS Budget
As approved by the Deer Grove EMS Commission on
Page 1
Line
Item #
2026 DGEMS
Budget
2026 YTD Thru
July
Proposed 2027
DGEMS Budget
Difference
($)
Difference
(%)
720 $ 1,258,700.00 $ 656,868.89 $ 1,345,500.00 +$86,800.00 +6.90%
721 $ 282,200.00 $ 162,545.88 $ 324,300.00 +$42,100.00 +14.92%
722 $ 33,800.00 $ 19,477.90 $ 35,300.00 +$1,500.00 +4.44%
723 $ 201,100.00 $ 109,348.96 $ 202,600.00 +$1,500.00 +0.75%
724 $ 112,700.00 $ 59,427.05 $ 119,600.00 +$6,900.00 +6.12%
725 $ 12,700.00 $ 4,339.33 $ 12,700.00 +$0.00 +0.00%
726 $ 500.00 $ - $ 500.00 +$0.00 +0.00%
728 $ 12,000.00 $ 9,000.00 $ 12,000.00 +$0.00 +0.00%
734 $ 257,100.00 $ 140,670.81 $ 274,000.00
+$16,900.00 +6.57%
735 $ 16,000.00 $ 7,974.00 $ 15,000.00 -$1,000.00 -6.25%
736 $ 72,000.00 $ 37,004.33 $ 72,000.00 +$0.00 +0.00%
740 $ 2,090.00 $ 1,048.70 $ 2,360.00 +$270.00 +12.92%
742 $ 1,250.00 $ 426.89 $ 1,500.00 +$250.00 +20.00%
770 $ 7,850.00 $ 4,658.57 $ 7,930.00 +$80.00 +1.02%
775 $ 17,810.00 $ 14,041.02 $ 20,280.00 +$2,470.00 +13.87%
790 $ 2,000.00 $ 1,186.04 $ 2,000.00 +$0.00 +0.00%
791 $ 2,000.00 $ 1,194.90 $ 2,000.00 +$0.00 +0.00%
810 $ 2,000.00 $ 1,903.75 $ 2,200.00 +$200.00 +10.00%
820 $ 5,500.00 $ 1,396.93 $ 6,200.00 +$700.00 +12.73%
825 $ 1,500.00 $ 1,038.12 $ 1,500.00 +$0.00 +0.00%
829 $ 25,000.00 $ 7,782.53 $ 25,000.00 +$0.00 +0.00%
831 $ 25,000.00 $ 16,601.12 $ 30,000.00
+$5,000.00 +20.00%
840 $ 5,000.00 $ 632.74 $ 4,300.00 -$700.00 -14.00%
842 $ 8,700.00 $ 8,417.46 $ 10,900.00 +$2,200.00 +25.29%
845 Capital Purchase $ - $ - $ - +$0.00 #DIV/0!
850 $ 60,000.00 $ 30,325.78 $ 62,000.00 +$2,000.00 +3.33%
852 $ 1,000.00 $ 62.17 $ 1,000.00 +$0.00 +0.00%
860 $ 20,100.00 $ 6,082.61 $ 20,100.00 +$0.00 +0.00%
870 $ 16,000.00 $ 18,309.75 $ 19,500.00 +$3,500.00 +21.88%
871 $ 2,100.00 $ 1,274.48 $ 2,500.00 +$400.00 +19.05%
872 $ 4,000.00 $ - $ 4,000.00 +$0.00 +0.00%
878 $ 300.00 $ - $ 300.00 +$0.00
879 $ 2,800.00 $ 2,252.69 $ 2,800.00 +$0.00 +0.00%
880 $ 5,000.00 $ 7,905.00 $ 5,000.00 +$0.00 +0.00%
881 $ 11,200.00 $ 11,150.00 $ 12,000.00
+$800.00 +7.14%
898 $ 3,500.00 $ 1,818.40 $ 3,500.00 +$0.00 +0.00%
899 $ 3,500.00 $ 6,015.88 $ 5,100.00 +$1,600.00 +45.71%
$ 2,494,000.00 $ 1,352,182.68 $ 2,667,470.00 +$173,470.00 +6.96%
Estimated Ambulance Run Fees $ 1,150,000.00 $ 748,495.77 $ 1,200,000.00
Less: Overdue Run Fees $ (23,851.67)
Net Run Fees $ 724,644.10
$ 3,000.00 $ 1,862.00 $ 3,000.00
Contracted Revenue (T of DF) 94,172.53$ 94,172.53$ 106,728.87$
Contracted Revenue (T of PS) 77,104.88$ 38,552.44$ 87,385.53$
Transfer from undesignated fund balance -$ -$
$ 20,000.00 $ 18,929.39 $ 25,000.00
$ 3,000.00 $ 1,650.00 $ 3,000.00
$ 1,347,277.41 $ 879,810.46 $ 1,425,114.40
Donations
Grant Revenue $ -
$ 1,144,122.59 $ 1,144,122.59 $ 1,242,355.60
Municipality 2026 Percentage
2026
Contribution 2027 Percentage
2027 Contribution Difference % change
V. Cottage Grove 58.57% 670,116.08$ 60.61% 753,020.61$ +$82,904.52 12.37%
T. Cottage Grove 24.63% 281,836.68$ 23.49% 291,830.15$ +$9,993.47 3.55%
V. Deerfield 16.80% 192,169.83$ 15.90% 197,504.84$ +$5,335.02 2.78%
TOTALS 100% 1,144,122.59$ 100% 1,242,355.60$ +$98,233.01 8.59%
Population 2026 Population 2026 Pop %
VCG 9,763 59.90% VCG 60.61%
TCG 3,845 23.59% TCG 23.49%
VDF 2,690 16.51% VDF 15.90%
Equalized Value 2026 Equalized Value 2026 Eq Val %
VCG 1,886,285,900 60.30%
TCG 815,839,400 26.08%
VDF 426,018,300 13.62%
Calls for Service 2023 2024 2025 3-year Average 3-year call %
VCG 582 685 681 649 61.63%
TCG 212 211 233 219 20.80%
VDF 212 176 168 185 17.57%
LEGAL
LIFEQUEST BILLING
Description
WAGES
HEALTH INSURANCE
WORK. COMP.
RETIREMENT
EMPLOYER'S FICA
STAFF CONT. EDUC.
TRAVEL/MILEAGE REIMBURS
MEDICAL DIRECTOR FEE
OVERTIME
EMT STIPEND
EMT CONT EDUC.
VEHICLE MAINTENANCE
OFFICE SUPPLIES
MUNICIPAL CONTRIBUTIONS
Training Center Income
Interest
TOTAL SERVICE REVENUE
TOTAL EXPENSES
EQUIPMENT MAINTENANCE
FUEL
EQUIPMENT (NON-DISPOS)
UNEMPLOYMENT INSURANCE
COMMUNICATIONS
INFORMATION TECHNOLOGY
PUBLICITY&ADVERTISING
TRAINING CENTER (EXPENSE)
EMT RECOGNITION
Total 2026 Averages
OFFICE EQUIPMENT
HEALTH AND SAFETY
CHIEF CONTINUING EDUC.
Special Event Fees
COMMUNITY MEDIC PROGRAM
ACCOUNTING
BUILDING AND GROUNDS
MEDICAL SUPPLIES
TRAINING MEDICAL SUPPLIES
EMT CLOTHING
INSURANCE/BUSINESS
GROUP LIFE INSURANCE
ADMINISTRATIVE EXPENSES
8/11/2026
20
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Nick Archibald, Fire Chief
Subject: 2027 – Fire Budget Request
Oper
ating Requests ($30,821 increase)
Cottage Grove Fire - For additional budget context please see approved Cottage Grove Fire
approved budget. JFC recommended reducing the legal line by $2,500.
Cost previously covered by association ($6,684) – Village portion of operating cost
previously covered by Fire Department Inc. This includes payroll, accounting, and legal fees
(specific to labor related to compensation)
Capi
tal Request ($93,675) – Tires for Brush 1 ($7,000), Chainsaws/Saws/Batteries/Chargers
($8,800), SCBA facepiece fit testing Machine ($13,385), and Command Vehicle ($105,000). The
Village cost share is 69.81% or $93,675.
The following has been added to the memo by Village Staff to Provide additional financial
context:
Type 2027 2026 Increase/(Decrease)
Capital $ 93,675 $ 15,824 $ 77,851)
Operating 245,452 214,631 30,821)
Total $ 339,127 $ 230,455 $ 108,672)
Tot
al Fiscal Impact as recommended by the Budget Review Committee/Village Board
Budget Workshop: $339,127
Adm
inistration recommended funding sources:
Fund Proposed Budget Notes
100 – General $ 183,452 Requested operating expenses
410 - Capital 62,000 Fire dues eligible/Misc capital
411 – Capital 93,675 Various
Total $ 339,127
21
Cottage Grove Volunteer Fire Department Inc.
4030 CTH N, Cottage Grove, WI 53527
608-839-4343
www.cottagegrovefire.org
1
9/22/2026
Re: Budget 2027
Joint Fire Commission Members,
The fire department is requesting a 2027 Operating Budget of $$354,100.00. This is an increase of $28,575.00 from
2026. Attached are a copy of the operating budget along with an explanation of the changes from the 2026 to the 2027
Budget.
The Department is requesting FOUR Capital Budget Items for 2027 for a total of $134185.
The first item is replacement tires for Brush 1. Tires on all apparatus are replaced every seven years per NFPA and
municipal input. The current tires will reach seven years in 2027. The cost of this item is $7000.
The second item is to replace all chainsaws and cutoff saws with battery saws. The current saws are approaching end of
life. This capital budget item includes purchasing two chainsaws, four cutoff saws, batteries, and chargers to replace all
current inventory of saws. The cost of this item is $8800.
The third item is to purchase an SCBA facepiece fit testing machine. This was an unplanned capital item. See the memo
describing this item and the reasoning it was unplanned. This item includes the machine, adapter for Scott SCBA
facepieces, and a 5-year warranty. The cost of this item is $13,385.
The fourth item is to purchase a command vehicle, replacing CGC1. CGC1 will move to a support vehicle, retitled CGC2
for inspections, public education, and events. The current CGC1 is approximately 15 years old, coming to a reserve type
status making less appropriate for emergency response roles. CGC1 currently responds on average to approximately
80% of all incidents. CGC1 was originally planned for purchase in 2030, but due to usage amount and future staffing
models, this purchase plan is being advanced now to accommodate needs. The cost of this item is $105,000.
22
ASIM Safety Equipment $0.00 $8,900.00
$5,000.00
$58,000.00
$117,600.00
$5,250.00
$4,000.00
$8,500.00
$5,500.00
$15,000.00
$1,500.00
$30,500.00
$33,600.00
$21,000.00
$5,000.00
$53,550.00
$1,600.00
$6,300.00
$7,900.00
$25,000.00
$6,000.00
$1,000.00
$1,000.00
$500.00
$3,900.00
$1,250.00
$1,000.00
2027
$10,000.00
$35,000.00
$45,000.00
$16,000.00
$16,000.00
$31,200.00
$21,000.00
$5,000.00
$115,200.00
$5,250.00
$58,000.00
$4,000.00
$7,900.00
$8,500.00
$5,500.00
$15,000.00
$1,500.00
$30,500.00
$1,000.00
$5,000.00
$44,650.00
$1,600.00
$6,300.00
$25,000.00
$6,000.00
$1,000.00
$1,000.00
$500.00
$3,900.00
$1,250.00
2026
$10,000.00
$35,000.00
$45,000.00
$12,000.00
$12,000.00
Fire Foam
Batteries
Total
Apparatus Repairs
51220 Fuel
Fuel
51240 Equipment Expense
Turnout Gear and Other PPE
Fire Hose and Fittings
Total
51210 Apparatus
Apparatus Maintenance
Bloodbourne Pathogens Supplies
Handtools and Electronic Dectectors
Miscellaneous Supplies
Oil Dry
Uniforms
Total
51250 Telephone and Internet
Landline and Internet
First Net
51270 Personnel Pay
51260 Insurance
Workers Comp
Total
Accident and Sickness
Vehicles and Equipment
Employee Assistance Program
Total
Firefighter Training Pay
Sunday Duty Pay
Total
51280 Training and Safety Expense
Pay per Call
Certifications and Classes
Props, lumber, and materials
Cottage Grove Fire Department 2027 Operating Budget
Officer Pay
23
$425.00
$1,000.00
$1,000.00
$1,000.00
$2,600.00
$500.00
$3,200.00
$2,500.00
$6,200.00
$22,825.00
$354,100.00
$325,525.00
$28,575.00
$100.00
$500.00
$400.00
$2,575.00
$3,000.00
$1,400.00
$11,800.00
$41,400.00
$5,500.00
$1,500.00
$7,000.00
$9,250.00
$12,000.00
$600.00
$3,500.00
$3,000.00
$3,200.00
$2,500.00
$6,000.00
$22,625.00
$325,525.00
$228,725.00
$96,800.00
$3,000.00
$1,400.00
$425.00
$1,000.00
$1,000.00
$1,000.00
$2,600.00
$500.00
$500.00
$100.00
$500.00
$400.00
$1,000.00
$11,800.00
$3,000.00
$9,250.00
$11,000.00
$600.00
$3,500.00
Annual Physical Evaluations
51330 Fire Chief Expense
WSFCA Membership
DCFCA Membership
Total
51300 Personnel and Records Expense
First Due Fire Records System
Helmet Shields
Accountability Tags and Locker Tags
Total
51310 Fire Prevention
Annual Drug Testing
Previous Year Operating Budget
Total Increase
Total Operating Budget
Pagers and Radios
51340 Maintenance Contracts
SCBA Flow Testing
Extrication Tools
Fire Extinguishers
Breathing Air Compressor
Breathing Air Samples
Inspection Supplies
Total
Public Outreach Supplies
Other Chief Association Memberships
Total
Public Education Events
Total
51320 Fire Inspections
Aerial Annual Inspection
Ground Ladder Inspection
MDT CAD Licensing
MDT VPN Licensing
Fire Hose Testing
Total
Wisconsin Firefighters Association $0.00 $1,575.00
Accounting Fees
Legal Fees
$0.00
$0.00
$2,300.00
$5,000.00
Payroll $0.00 $3,200.00
$29,900.00
$5,500.00
$1,500.00
$7,000.00
$500.00 $500.00
$500.00
24
$4,500.00
$1,000.00
$1,000.00
$4,500.00
$1,000.00
$1,000.00
Fire Inspections Village of CG
Fire Inspections Town of CG
Fire Inspections Town of PS
25
Cottage Grove Volunteer Fire Department Inc.
4030 CTH N, Cottage Grove, WI 53527
608-839-4343
www.cottagegrovefire.org
Cottage Grove Fire Department 2027 Budget Explanation
Fuel- Increased due to current fuel price uncertainty.
ASIM Safety Equipment- Added funds to purchase vests and helmets for managing ASIM Incidents.
Officer Pay- Adjusted to reflect number of officers and workload.
First Due- Cost increases annually.
Accounting Fees- Accounting firm that manages the departments finances. Added to budget per Cameron and Kim’s
recommendations. Previously these fees were paid by the Association. Cameron and Kim told us to move this to the
municipal budget since it is an operating cost.
Payroll- Payroll service for issuing pay to staff. Added to budget per Cameron and Kim’s recommendations. Previously
these fees were paid by the Association. Cameron and Kim told us to move this to the municipal budget since it is an
operating cost.
Legal Fees- Added to budget per Cameron and Kim’s recommendations. Previously these fees were paid by the
Association. Cameron and Kim told us to move this to the municipal budget since it is an operating cost.
Wisconsin Firefighters Association- Membership for all members. Was previously paid by the association. Moved to
municipal budget since it is an operating expense.
Fire Hose Testing- Increased to account for new increased price from vendor.
26
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: JP Villavicencio, Library Board President
Subject: 2027 – Library Budget Request
Over
view: The Library Board shapes the future of library services for the Village. Our primary
responsibility is to oversee the strategic direction, development, and assurance of access to
quality library resources, programs, and services for all residents. Free1,2,3 library programming
remains central to our mission; these offerings include literacy-based educational, STEAM, and
cultural opportunities that enrich the entire Cottage Grove community.
In 2026, we c
ontinued to expand our calendar of programs while maintaining strong attendance
and community engagement. The growth of Tween Scene, along with sustained participation in
programs for children, families, and adults, reflects the continued demand for free library
services within the Village. This progress has been supported by continued investment in
programming, outreach, and partnerships that help us bring services closer to residents.
For the 2027 fi
scal year, the Library Board requests that the Village maintain the 2026 allocation
for core library programming. The increase in the salary line reflects the Village wide cost of
living adjustment and two additional staff hours per week needed to operate the pilot library
materials drop box. The request also includes mileage reimbursement for the delivery of
returned materials. Finally, we request that the Village Board transfer the remaining $25,000
from the original $150,000 Amazon donation into the Library Fund.
Justification
1. Sustaining Program Excellence and Tween Growth
Our programming has become a cornerstone of community life in Cottage Grove. In 2026, we
offered a mix of early literacy programs, tween and teen engagement activities, adult learning
opportunities, and intergenerational events. These included:
• Early literacy initiatives such as storytimes and music-based learning.
• Village wide events like the All Community Read, fostering shared experiences.
• Seasonal and thematic programs, such as our STEAM series, summer reading kick offs,
virtual lunch and learns, UW-Madison Badger Talks, and Historical Society
presentations, that connect residents to broader cultural and educational themes.
Tween S
cene is one example of this growth. Since launching in late 2025, it has become a
successful monthly program, with average attendance increasing by about 70 percent. This
growth demonstrates the demand for consistent programming designed specifically for tweens.
1 WI Stat 43.52(2)
2 https://dpi.wi.gov/sites/default/files/imce/libraries/Publib/Gov-Admin/2020TrusteeEssentials.pdf
3 https://wvls.org/charging-fees-for-library-programs/
27
The Village of Cottage Grove, WI
2027 Budget Request
Maintaining our core programming allocation ensures these offerings remain free, high quality,
and accessible to all.
2. Library Materials Drop Box Pilot
The Library Board is working with Dane County Library Service to establish a pilot drop box for
returned library materials in the Village. The drop box would give residents another local return
option when they are unable to use the Village’s scheduled Bookmobile stops. Dane County
Library Service supports the pilot but does not have the staffing capacity to collect the returned
materials. Under the proposed arrangement, the Village’s Programming and Outreach Specialist
would collect the materials and deliver them to a participating library.
The Library Board requests two additional staff hours per week and reimbursement for the
mileage required to complete these deliveries. During the pilot, the Board can track the number
of items returned, staff time, mileage, and any operational challenges. Those results will provide
a practical basis for deciding whether and how the service should continue after the pilot.
3. Transfer of the Remaining Amazon Donation
When Amazon broke ground on its Cottage Grove facility, it donated $150,000 to the Village
and indicated that the primary purpose of the donation was to support library services. Of that
amount, $125,000 was directed to the inclusive playground project with the Miracle League at
Bakken Park. The Library Board requests that the Village Board transfer the remaining $25,000
into the Library Fund. This transfer would preserve the remaining balance for library services
and honor the stated intent of the donation.
4. Contingency for External Funding Gaps
Several of our signature programs are partially supported by grants and donations. While we
actively pursue these external sources, maintaining our current budget provides a safeguard
should any of these funds lapse, ensuring no disruption to valued programs.
5. Commitment to Inclusion
We remain dedicated to diversity, equity, inclusion, accessibility, and belonging in our
programming. Continued funding supports initiatives that welcome all residents, including
historically underserved groups, and ensures our events reflect the richness of our community.
Fiscal Responsibility
By maintaining last year’s allocation for core programming, the Library Board is demonstrating
fiscal prudence while protecting the community’s access to library services. The requested
personnel increase reflects the Village wide cost of living adjustment and two additional staff
hours per week for the drop box pilot. We will continue to seek supplemental funding through
grants, sponsorships, and donations to enhance, rather than replace, programs supported by
the Village budget.
The Library Board is also working with the Village Finance Department to revise the budget
documents so they clearly identify grants and donations received and the expenditures
28
The Village of Cottage Grove, WI
2027 Budget Request
supported by each source. This will make it easier for the Board and the public to distinguish
Village funding from grants and donations and understand how those funds are used.
Sust
aining Our Momentum
The Library Board is proud of the role we play in making Cottage Grove a vibrant, connected,
and informed community. With continued Village support, we can sustain the momentum we
have built, preserve the quality and accessibility of our programs, and ensure that residents
continue to benefit from the services they value.
Tot
al Fiscal Impact as recommended by the Budget Review Committee/Village Board
Budget Workshop $29,000:
Administration Recommended funding sources:
Fund Proposed budget Notes
204 – Library $ 4,000 Additional 2 hours per week
410 – Capital 25,000 Transfer to Library fund**
Total $ 29,000
29
/0 /1 /2 /3 /4/5/i255 /7 /8 /9 /10
/1 /11 /i255 /12 /8 /13 /8 /14 /15 /8/16 /17 /18 /19 /20 /20/21 /22 /23 /22 /24 /i255 /23 /26 /27 /i255 /28 /29 /30 /26 /22 /31 /i255 /32 /33 /33 /29 /34 /22 /35 /29 /26/36/24/26 /22 /i255 /37 /29 /34 /36
/38 /39 /39 /40 /41 /42 /43 /i255 /45 /41/46/47/48 /49/50 /40/51/41/42 /52 /i255 /50 /40 /53 /48/54 /48 /55 /49
/38/46/40/41 /42 /43 /i255 /56 /48 /57 /52 /48 /53
/i255 /58 /59 /i255 /60 /16 /61 /17/5 /62 /63 /i255 /7 /5 /60 /64 /12 /5 /17 /64 /i255 /64 /62 /65 /61 /60
/66 /59
/67 /59
/68 /59
/19 /59
/69 /59
/70 /59
/71 /59
/72 /59
/73 /59
/66 /20 /59
/66 /66 /59
/66 /67 /59
/66 /68 /59
/66 /69 /59
/66 /70 /59
/66 /71 /59
/66 /72 /59
/66 /73 /59
/67 /66 /59
/67 /67 /59
/67 /68 /59
/67 /19 /59
/67 /70 /59
/67 /71 /59
/67 /72 /59
/67 /73 /59
/68 /20 /59
/68 /66 /59
/68 /67 /59
/68 /68 /59
/i255 /62 /59 /i255 /17/74/75/76/64 /77 /i255 /64 /62 /65 /61 /60 /i255 /78 /62 /9 /9 /1 /2 /10 /79 /1 /14 /8 /80 /i255 /64 /5 /7 /i255/74/75/64 /81
/i255 /i255 /i255 /i255 /38 /82 /83 /i255 /84 /40 /49/43 /52 /40 /42 /i255 /40 /85 /i255 /86 /43 /55 /43 /48 /i255 /86 /87 /48 /39 /52 /55 /56 /i255 /39 /88 /55 /49 /89 /48 /86 /i255 /40 /42 /i255 /39 /40 /41 /42 /43 /90 /91
/i255 /50 /88 /55 /49 /52/43 /55 /47 /56 /48 /i255 /55 /42 /53 /i255 /87 /48 /42 /55 /56
/i255/92/43/88 /48 /49/i255 /86 /43 /55 /43 /48 /i255 /86 /87 /48 /39 /52 /55 /56 /i255 /39 /88 /55 /49 /89 /48 /86
/i255 /60 /75 /58 /64/74/64/62 /63 /i255 /18 /i255 /60 /8 /93 /10 /79 /1 /14 /i255 /62 /66 /i255 /78 /8 /14 /10 /8 /2 /i255 /1 /14 /i255 /60 /10 /94 /10 /8/3/8/14 /10 /i255 /1 /11 /i255 /64 /94 /95 /8 /96 /i255 /78 /60/74/64/81 /97 /i255 /63 /79 /14 /8 /i255 /62 /66 /81
/i255 /i255 /i255 /i255 /38 /98 /83 /i255/92/43/88/48 /49 /i255 /39 /40 /41 /42 /43 /90 /i255 /43 /55 /99 /48 /86 /i255 /56 /48 /57 /52 /48 /53 /i255 /40 /42 /i255 /48 /42 /43 /52 /49 /48 /i255 /43 /40 /100 /42 /101 /i255 /57 /52 /56 /56 /55 /89 /48 /i255 /40 /49 /i255 /39 /52 /43 /90
/i255 /102 /48 /55 /56 /43/88
/i255 /103 /52 /47 /49 /55 /49/90 /i255 /104 /86 /48 /39 /83 /i255 /105 /106 /83 /82 /98 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /50 /40 /41 /42/43 /90 /i255 /110 /49 /52 /53 /89 /48 /i255 /38 /52 /53 /i255 /104 /86 /48 /39 /83 /i255 /111 /98 /83 /112 /111 /104 /98 /109 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /108 /55 /42 /52 /43/55 /43 /52 /40 /42
/i255 /50 /88 /52 /56 /53/49 /48 /42 /i255 /100 /52 /43 /88 /i255 /113 /52 /86 /55 /47 /52 /56 /52 /43 /52 /48 /86 /i255 /114 /53 /41 /39 /55 /43 /52 /40 /42 /i255 /110 /40 /55 /49 /53 /86 /i255 /104 /40 /42 /i255 /48 /42 /43 /52 /49 /48 /i255 /43 /40 /100 /42 /101 /57 /52 /56 /56 /55 /89 /48 /i255 /40 /49 /i255 /39 /52 /43 /90 /109 /i255 /104 /86 /48 /39 /83 /82 /98 /82 /83 /82 /106 /115 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /84 /49 /40 /87 /48/49 /43 /90 /i255 /43 /55 /99 /48 /86 /i255 /39 /88 /55 /49 /89 /48 /53 /i255 /47 /55 /39 /116 /i255 /104 /86 /48 /39 /83 /i255 /117 /105 /83 /105 /82 /i255 /118 /i255 /117 /105 /83 /105 /98 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /50 /40 /41 /42/43 /90 /100 /52 /53 /48 /i255 /48/46/48/49 /89 /48 /42 /39 /90 /i255/46/48/53 /52 /39 /55 /56 /i255 /86 /90 /86 /43 /48/46/i255/104 /86 /48 /39 /83 /i255 /98 /115 /119 /83 /106 /115 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255/92/43/88 /48 /49/i255 /104 /53 /48 /86 /39 /49 /52 /47 /48 /109 /i255 /91
/i255 /38 /56 /56 /i255 /40 /43 /88/48 /49 /i255 /39 /40 /41 /42 /43 /90 /i255 /43 /55 /99 /48 /86 /i255 /104 /56 /48 /57 /52 /48 /53 /i255 /40 /42 /i255 /48 /57 /48 /49 /90 /i255 /43 /40 /100 /42 /101 /i255 /57 /52 /56 /56 /55 /89 /48 /101 /i255 /55 /42 /53 /i255 /39 /52 /43 /90 /109
/i255 /50 /40 /41 /42/43 /90 /i255 /108 /55 /56 /48 /86 /i255 /120 /55 /99 /i255 /50 /49 /48 /53 /52 /43
/i255 /60 /75 /58 /64/74/64/62 /63 /i255 /18 /i255 /60 /8 /93 /10 /79 /1 /14 /i255 /62 /67 /i255 /64 /94 /95 /8 /96 /i255 /10 /1 /i255 /121 /8 /i255 /122 /8 /13 /79 /8 /80 /i255 /1 /14 /i255 /8 /14 /10 /79 /2 /8 /i255/3/15/14 /79 /93 /79 /9 /94 /122 /79 /10 /123 /i255 /78 /8 /14 /10 /8 /2 /i255 /1 /14 /i255 /60/74/64/97 /i255 /63 /79 /14 /8 /i255 /62 /67 /81
/i255 /i255 /i255 /38 /106 /83 /i255 /50 /40 /41/42 /43 /90 /i255 /43 /55 /99 /48 /86 /i255 /56 /48 /57 /52 /48 /53 /i255 /40 /42 /i255 /87 /55 /49 /43 /i255 /40 /85 /i255 /43 /40 /100 /42 /101 /i255 /57 /52 /56 /56 /55 /89 /48 /i255 /40 /49 /i255 /39 /52 /43 /90 /i255 /i255 /104 /48 /42 /43 /48 /49 /i255 /40 /42 /i255 /108/92/120/101 /i255 /56 /52 /42 /48 /i255 /38 /106 /109
/i255 /50 /88 /52 /56 /53/49 /48 /42 /i255 /100 /52 /43 /88 /i255 /113 /52 /86 /55 /47 /52 /56 /52 /43 /52 /48 /86 /i255 /114 /53 /41 /39 /55 /43 /52 /40 /42 /i255 /110 /40 /55 /49 /53 /86
/i255 /64/74/64/62/63 /i255 /76 /61 /64 /i255 /17/74/75/76 /64 /77 /i255 /64 /62 /65 /61 /60 /i255 /78 /96 /15/3/i255/1 /11 /i255 /60 /8 /93 /96 /59 /i255 /62 /66 /18 /62 /68 /81 /i255 /78 /11 /1 /2 /i255 /93 /1 /15 /14 /10 /123 /i255 /10 /94 /95 /i255 /2 /94 /10 /8 /81
/i255 /108 /87 /48 /39/52 /55 /56 /i255 /53 /52 /86 /43 /49 /52 /39 /43 /i255 /39 /40 /53 /48 /91 /38/46/40/41 /42 /43 /i255 /56 /48 /57 /52 /48 /53
/i255 /108 /87 /48 /39/52 /55 /56 /i255 /53 /52 /86 /43 /49 /52 /39 /43 /i255 /39 /40 /53 /48 /91
/i255 /17 /59 /i255 /64/74/4 /76/97 /i255 /124 /5 /63 /63 /62/125/61/i255/74/12/i255 /17 /5 /64 /77 /i255 /64 /62 /65 /61 /60
/i255 /i255 /i255 /i255 /50 /82 /83 /i255/92/43/88/48 /49 /i255 /86 /43 /55 /43 /48 /i255 /86 /87 /48 /39 /52 /55 /56 /i255 /39 /88 /55 /49 /89 /48 /86
/i255/92/43/88 /48 /49/91
/i255/92/43/88 /48 /49/91
/i255 /60 /75 /58 /64/74/64/62 /63 /i255 /18 /i255 /60 /8 /93 /10 /79 /1 /14 /i255 /17 /66 /i255 /78 /8 /14 /10 /8 /2 /i255 /1 /14 /i255 /60/74/64/97 /i255 /63 /79 /14 /8 /i255 /17 /19 /81
/i255 /i255 /i255 /i255 /50 /98 /83 /i255 /50 /40/41 /42 /43 /90 /i255 /108 /87 /48 /39 /52 /55 /56 /i255 /50 /88 /55 /49 /89 /48 /86 /91
/i255 /126 /56 /56 /48 /89 /55/56 /i255 /49 /48 /55 /56 /i255 /48 /86 /43 /55 /43 /48 /i255 /39 /88 /55 /49 /89 /48 /53 /i255 /47 /55 /39 /116 /i255 /104 /86 /48 /39 /83 /i255 /117 /112 /83 /117 /105 /104 /98 /109 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /102 /52 /89 /88 /100/55 /90 /86 /i255 /55 /42 /53 /i255 /47 /49 /52 /53 /89 /48 /86 /i255 /104 /86 /48 /39 /83 /i255 /111 /106 /83 /112 /106 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /102 /52 /89 /88 /100/55 /90 /i255 /55 /52 /53 /i255 /104 /86 /48 /39 /83 /i255 /111 /106 /83 /82 /105 /101 /i255/107/52/86 /83 /i255 /108 /43 /55 /43 /86 /83 /109
/i255 /i255 /i255 /i255 /i255 /i255 /60 /75 /58 /64/74/64/62 /63 /i255 /18 /i255 /60 /8 /93 /10 /79 /1 /14 /i255 /17 /67 /i255 /78 /8 /14 /10 /8 /2 /i255 /1 /14 /i255 /60/74/64/97 /i255 /63 /79 /14 /8 /i255 /17 /69 /81
/i255 /68 /19 /59 /i255 /64/74/64/62/63 /i255 /18 /i255 /62 /63 /63 /i255 /64 /62 /65 /61 /60 /i255 /62 /76 /7 /i255 /17 /127 /62 /12/125/61/60 /i255 /18 /i255 /96 /15/3/i255/1 /11 /i255 /60 /8 /93 /96 /59 /i255 /62 /18 /17
/66 /19 /59
/67 /20 /59
/67 /69 /59
/128 /129 /128 /130 /131 /132 /131 /131/128/129 /132 /133/130/134/135 /136 /136 /137/138/139/i255/141/142/i255 /143/141/144/144 /137/138/139/i255/138/145/141/134/139
/146 /147 /132 /148 /132 /130
/146 /129 /148 /129 /129
/149 /150 /151 /152 /151 /153
/146 /128 /154/147 /155 /154 /129 /154 /148 /128 /130
/146 /132 /154/154 /155 /147 /132 /128 /148 /132 /128
/146 /128 /155 /133 /131/156 /155 /128 /128 /132 /148 /132 /133
/149 /151 /157 /151 /158/159 /157 /160 /153 /161 /152 /161 /162
/146 /129 /148 /129 /129
/149 /151 /157 /151 /158/159 /157 /151 /160 /151 /152 /160 /161
/163 /137 /146 /129 /148 /129 /129
/163 /137 /146 /129 /148 /129 /129
/149 /159 /152 /159 /159
/146 /129 /148 /129 /129
/146 /129 /148 /129 /129
/146 /129 /148 /129 /129
/149 /159 /152 /159 /159
/149 /151 /157 /151 /158/159 /157 /151 /160 /151 /152 /160 /161
/164/165/166/167/168/168/i255/165/170/171/172/173/174/173/175/176/172/173/177/178/i255/177/174/i255/172/179/170/i255/180/181/181/177/171/172/173/177/178/182/170/178/172/i255/177/174/i255/183/172/176/172/170/i255/176/178/184/i255/165/177/185/178/172/186/i255/164/171/177/181/170/171/172/186/i255/187/176/188/170/189/i255/176/178/184/i255/165/179/176/171/190/170/189
30
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Sean Brusegar, Director of Parks, Recreation & Forestry
Subject: 2027 – Parks, Recreation, and Forestry Budget Request
Oper
ating Requests:
Forestry ($12,000 increase) – The Forestry Division currently has one dedicated staff member
responsible for managing the Village's urban tree canopy. The Parks, Recreation & Forestry
Department is requesting funding for a seasonal forestry position to assist the Village Forester
in managing more than 3,500 terrace and park trees.
This position would provide up to 1,100 additional hours of forestry management annually,
allowing the Village to increase tree maintenance, inspections, pruning, and overall
management of the urban canopy.
Insur
ance recovery carryover – The Village received $8,017.89 due to the destruction of a
mature New Horizon Elm tree on Oak Street in July of 2025. This money has been designated
for general tree replacement throughout the Village. We will be using a portion of that money for
a Fall 2026 plant. The remaining amount, roughly half, is planned to be utilized in 2027.
Capi
tal Requests:
Par
k Development Fund ($25,000)
Bakken P
ark Playground Removal ($25,000) – This is a carryover request from the 2026
budget. The project would involve carefully removing and harvesting usable components from
the existing Bakken Park playground for repurposing. Stand-alone equipment, such as swings,
teeter-totters, and spring riders, would be salvaged and reused at other Village parks when
feasible. Other usable components would be repurposed for park projects, including picnic table
repairs and other community uses.
Capi
tal Projects Fund ($20,000):
Engi
neered Wood Fiber (Playground Wood Chips) ($10,000) – With the exception of
Community Park, Huston Park, and Shady Grove Park, Village playgrounds utilize Engineered
Wood Fiber (EWF) as their safety surfacing. Over time, EWF breaks down and loses its
effectiveness as a protective surface. This recurring request would provide funding to replenish
EWF at a selected number of playgrounds.
ADA
($10,000) – This recurring request allows the Village to continue to address ADA
deficiencies in parks and open spaces.
31
The Village of Cottage Grove, WI
2027 Budget Request
2027 Vehicle & Equipment Replacement (CP: $197,000):
Sl
ope Mower ($85,000) – Slope Mower provides adequate wheelbase to allow for mowing
slopes up to 30%, whereas current equipment at the recommendation of insurance is limited to
15%. The Village currently has slopes that exceed 25%. This machine would also be utilized
during snow removal operations on trails and sidewalks.
Hust
on Park Baseball Field Renovation ($20,000) – The Huston Park baseball field is the
most used in the Village. Over time, the field is showing drainage and maintenance issues
which in turn can lead to unsafe play. A renovation of this field would provide an improved play
surface with better drainage and act as preventative maintenance that may require a larger
commitment in the future.
Fir
eman’s Park Drive Repair ($35,000) – This project would address the 2 main areas of the
drive that are in disrepair. The project would not address any infrastructure improvements.
These can be addressed should the Village choose to master plan the entire park.
Fir
eman’s Park Baseball Field Renovation ($12,000) – Fireman’s Park is the home to the
Village’s only full-size baseball field. Each spring, summer and fall, over 100 games and
practices are played on the Village’s only full size (90’ base lengths) baseball field. High usage
fields require periodic maintenance outside of the normal day to day maintenance to prevent
injury and provide playability. The project would re-grade the infield to allow for an improved
play surface with better drainage and act as preventative maintenance that may require a larger
commitment in the future.
Wi
llow Run Park Playground Surfacing Improvement ($26,000) – Much of Willow Run Park
is situated in an area that collects stormwater runoff. A 1,200 square foot area that contains the
2yr old to 5yr old play area washes out even with moderate rain. Replacing the EWF (wood
chips) with poured in place surfacing would eliminate this recurring maintenance issue.
Bakken P
ickleball Courts Kiosk/Message Board ($4,000) – The Bakken Park pickleball
courts have daily and weekly events that are promoted via social media and signage that is
secured to the chain link fencing. A central message board/kiosk would allow us to promote
events in one central, organized location.
Com
munity Park Pickleball Court Windscreen ($15,000) – The Community Park Pickleball
Courts currently do not have anything that prevents wind from obstructing play. Windscreen
slats would be purchased (like the ones at Bakken Park PB/tennis courts) and installed to
provide more shelter and playability of the courts during stronger wind days.
Tot
al Fiscal Impact: $254,000
Par
ks, Recreation, & Forestry Committee prioritized funding the following projects 1 - Slope
Mower, 2 – Huston Park Baseball Field, 3 - Fireman’s Park Driveway, 4 - Willow Run Park
Playground Surface, 5 – Fireman’s Park Baseball Field Renovation, 6 – Community Park
Pickleball Court Windscreen, 7 – Bakken Pickleball Courts Kiosk/Message Boards. The
Committee further recommended the Willow Run Park Playground Surface as the ADA project,
effectively reducing the total capital request by $10,000.
32
The Village of Cottage Grove, WI
2027 Budget Request
Adm
inistration recommends reducing the department’s requests outlined above as follows:
• Remove the Community Park pickleball court windscreen project. This item was
previously removed from the 2026 budget during the Village Board’s budget review
process and is therefore not recommended for inclusion in the 2027 budget.
• Reduce the Vehicle and Equipment allocation to reflect the use of $10,000 in ADA funds
for the Willow Run surface improvement project. This adjustment allows the project to be
funded from a more appropriate source while reducing the amount required from the
Vehicle and Equipment Replacement Program.
These r
ecommended adjustments help align the proposed budget with prior Board direction and
available funding sources while maintaining support for the Village’s overall capital improvement
priorities.
Budget
Review Committee recommended the following:
• Remove Bakken Pickleball Courts Kiosk/Message Board ($4,000) and reallocate to
Beautification (Public Works and Utilities)
Vi
llage Board Budget Workshop added the following:
• Increased tree planting supplies by $7,500
Revi
sed Fiscal Impact: $232,500
Adm
inistration Recommended funding sources:
Fund Proposed Budget Notes
100 – General $ 19,500 Forestry PT Hours and supplies
205 – Park Dev $ 25,000 Playground removal
410 – Capital $ 20,000 ADA and Woodchips
411- Capital $ 168,000 Vehicle and Equipment
Total $ 232,500
Al
ternate Proposal for Fireman’s Park Drive ($225,000) – Replace all (from Reynolds Street
to Grove Street) blacktop, water service and address stormwater/drainage issues.
This proposal is not recommended. These larger scale improvements can be addressed should
it be determined that a master plan for Fireman’s Park is needed.
33
The Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Chief Mark W. Garry II, Police Chief
Subject: 2027 – Police Department Budget Request
Int
roduction
These requests are aligned with the Cottage Grove Police Department 5-Year Strategic Plan for
2026-2030, which identifies rapid community growth, increased calls for service, investigative
complexity, traffic safety, technology reliability, training, transparency, and workforce
development as core priorities. The 2027 budget requests are intended to translate those
strategic priorities into actionable staffing, equipment, technology, and facility investments.
Oper
ating Requests ($199,800):
This section has been revised following the budget review committee for clarity.
Additional Detective, 1 FTE to 2 FTE ($76,000) – A second detective will improve follow-up
investigations, reduce delays in case review, strengthen evidence coordination, and allow patrol
officers to return more quickly to proactive patrol duties. Current investigative demands require
timely attention to crimes involving fraud, theft, domestic violence, sensitive victim interviews,
digital evidence, drug activity, and other cases that require specialized follow-up beyond the
initial patrol response. The request is to hire for July 1, 2027.
Additional Patrol Officer, 13 FTE to 14 FTE ($109,800) – The request aligns with the Strategic
Plan’s workforce objective of establishing a data-driven staffing baseline in response to the
documented increase in calls for service and projected community growth. With additional patrol
resource the department could implement three officer shift minimums. The request is to hire for
January 1, 2027.
Part-Time (.5 FTE) Support Service Specialist ($14,000) – The Police Department is
requesting implementation of a part-time support services employee working 20 hours per week
effective July 1, 2027. This position will provide administrative and operational support in
records processing, data entry, public counter assistance, case file preparation, evidence-
related documentation, citation and report workflow support, and other essential support
functions.
The justification for this request is that sworn officers and command staff increasingly spend
time completing tasks that can be handled more efficiently by trained support personnel. A part-
time support services employee will improve internal workflow, reduce administrative backlogs,
strengthen records accuracy, and allow sworn staff to focus on patrol, investigations, traffic
34
The Village of Cottage Grove, WI
2027 Budget Request
safety, community engagement, and emergency response. (Strategic Plan Goal 2: Optimize
Resources and Infrastructure and MAG 2.2)
• Improves the timeliness and accuracy of records processing and report management.
• Provides consistent support for public-facing administrative functions.
• Reduces sworn staff time spent on administrative tasks that do not require a law
enforcement officer.
• Supports the transition into the new police facility and the expanded operational needs
associated with that facility.
The July 1 start date provides a measured implementation schedule and allows the department
to align onboarding, training, workstation needs, and budget impact with the second half of the
fiscal year.
Estimated 2027 Cost: $199,800 for the second detective assignment, two patrol officers, and
the part-time support services employee, including estimated wages, benefits, training, and
onboarding costs. Impact of split. Full year cost if hired as of January 1 would be $296,000.
2027 Vehicle & Equipment Replacement ($334,500)
Two New Squad Cars ($170,000) – The department is requesting two new squad cars for 2027
as part of the continued fleet replacement plan. Regular replacement of marked patrol vehicles
is essential to maintaining a safe, reliable, and professional fleet that can support emergency
response, routine patrol, traffic enforcement, prisoner transport, and community policing
functions. This includes vehicle purchase, emergency lighting, radios, graphics, computers,
prisoner transport equipment, and upfitting.
The rationale for the request is to avoid excessive mileage, reduce maintenance costs, limit
vehicle downtime, maintain safe operating condition, and ensure officers have dependable
vehicles equipped for modern policing needs.
• Maintain fleet reliability and reduce the risk of unexpected breakdowns during patrol or
emergency response.
• Support officer safety through modern safety features and properly functioning
emergency equipment.
• Preserve operational readiness by ensuring patrol vehicles remain available, properly
equipped, and cost-effective to operate.
When available and operationally appropriate, the department will continue to evaluate hybrid
vehicle options to balance performance, reliability, fuel savings, and environmental
responsibility. (Strategic Plan Goal 1: Enhance Operational Efficiency and Community-Centered
Policing and Goal 2: Optimize Resources and Infrastructure, MAG 1.1, 1.3, and 2.2)
Replacement of Agency Long Weapons/Rifles 12 ($30,000) – Replacing the department’s
agency long weapons is requested to maintain officer safety, reliability, consistency, and
35
The Village of Cottage Grove, WI
2027 Budget Request
readiness. The department is requesting replacement of 12 rifles to ensure issued long
weapons meet current operational standards and can be supported through standardized
training, maintenance, parts, optics, and accessories. Purchase includes weapon platforms,
optics, slings, lights, magazines, accessories, and related setup costs.
The justification for replacement includes mechanical wear, evolving equipment standards, the
need for common platforms across the agency, and the importance of giving officers reliable
tools during high-risk incidents. Standardized rifles also improve training consistency and
reduce long-term maintenance complexity. (Strategic Plan Goal 3: Personnel Development and
Workforce Excellence, MAG 3.2)
• Improves reliability and reduces the risk of weapon failures during critical incidents.
• Allows consistent training, qualification, inspection, maintenance, and deployment
procedures.
• Supports officer safety and public safety by ensuring agency long weapons remain
modern, serviceable, and mission-ready.
Implementation of Force-on-Force Firearms Training Weapons and Safety Equipment 8
($15,000) – The department is requesting implementation of force-on-force firearms training
equipment, including 8 simulation training weapons and corresponding sets of safety
equipment. This equipment will allow officers to participate in realistic, scenario-based training
that cannot be safely replicated with duty firearms or traditional range training alone. Purchase
includes force-on-force training weapons and sets of required safety equipment, including
protective masks, throat/neck protection, groin protection, gloves, marking cartridges,
conversion/support gear, and initial instructor/training supplies.
The rationale for this request is to improve decision-making, communication, de-escalation,
suspect control, room movement, contact-and-cover tactics, and judgment under stress. Force-
on-force training provides a controlled environment where officers can practice critical skills with
immediate feedback, improving both officer safety and community outcomes. (Strategic Plan
Goal 3: Personnel Development and Workforce Excellence, MAG 3.2)
Upgrade of Bicycle Unit with E-Bikes 2 ($12,000) – The department is requesting two e-bikes
to upgrade the bicycle unit. E-bikes will improve mobility, expand patrol coverage, and allow
officers to respond more quickly during community events, trail patrols, parks patrols, downtown
or neighborhood details, and situations where a squad car is less practical. Purchase includes
bikes, lights, bags/racks, helmets, safety equipment, maintenance supplies, and patrol
accessories
The justification is that e-bikes serve as a practical force multiplier by improving officer visibility,
approachability, response time, and patrol efficiency while reducing physical fatigue during
longer deployments. They also support community engagement by placing officers in a more
accessible patrol posture. (Strategic Plan Goal 1: Enhance Operational Efficiency and
Community-Centered Policing)
36
The Village of Cottage Grove, WI
2027 Budget Request
LiveScan Fingerprint/Mugshot/Processing Workstation ($50,000) – The department is
requesting a LiveScan fingerprint, mugshot, and processing workstation to support in-house
booking and processing functions in the new facility. This workstation will reduce reliance on
transporting individuals to the Dane County Jail for routine processing and will improve
efficiency, officer availability, and records accuracy. (Note: Previously requested in 2026 Capital
Budget process, removed with the understanding that monies from the Police Department
Building project contingency funds to be utilized if possible.) Purchase includes LiveScan
fingerprint/mugshot/processing workstation, including hardware, software, camera, fingerprint
capture equipment, installation, configuration, training, and integration costs.
1. Efficiency and Speed:
• Real-time Digital Capture: LiveScan systems capture fingerprints and palm prints
digitally, eliminating the messy and time-consuming process of ink and paper. This
significantly reduces the time it takes to book and process an arrestee.
• Immediate Transmission: Digital prints and mugshots can be immediately transmitted to
state and federal databases (like the FBI's Next Generation Identification - NGI system).
This dramatically speeds up the identification process, often providing results within
minutes or hours, compared to days or even weeks with traditional methods.
• Reduced Processing Time: Faster identification allows officers to quickly confirm an
individual's identity, criminal history, and outstanding warrants, enabling quicker
decisions on charges, release, or continued detention. This frees up officer time for other
duties and reduces detention facility strain.
• Streamlined Workflows: A combined station integrates fingerprinting, mugshot capture,
and biographical data entry into a single, efficient workflow, reducing redundant data
entry and improving overall operational efficiency.
2. Accuracy and Quality:
• Higher Quality Prints: LiveScan technology significantly reduces the risk of smudged,
smeared, or incomplete prints common with ink methods. The system often provides
real-time quality checks, allowing operators to retake poor-quality prints immediately,
leading to a much lower rejection rate by identification bureaus (e.g., FBI rejection rates
for LiveScan are below 0.5% compared to 7-10% for ink prints).
• Enhanced Mugshot Quality: Dedicated mugshot stations ensure consistent lighting,
background, and facial capture, resulting in high-quality images crucial for identification,
intelligence, and court proceedings.
• Reduced Human Error: Digital capture and automated data entry reduce the potential for
human error associated with manual record-keeping.
3. Enhanced Investigative Capabilities and Public Safety:
• Rapid Identification of Suspects: Quick access to fingerprint and facial recognition
databases allows for faster identification of suspects, linking them to other crimes, and
potentially solving cases more rapidly.
37
The Village of Cottage Grove, WI
2027 Budget Request
• Proactive Intelligence: By quickly identifying individuals, law enforcement can uncover
potential connections to known criminal networks or ongoing investigations, enabling
more proactive policing.
• Officer Safety: Knowing an individual's criminal history and potential threats quickly
enhances officer safety during interactions and arrests.
• Victim and Community Safety: Faster identification and apprehension of offenders
directly contribute to increased public safety and provide quicker resolution for victims.
4. Cost Savings and Resource Optimization:
• Reduced Manual Labor: Automation of the fingerprinting and mugshot process reduces
the need for extensive manual labor, freeing up personnel for other duties.
• Elimination of Supplies: No more ink, paper fingerprint cards, or photo development
materials, leading to direct cost savings on consumables.
• Reduced Mailing Costs: Electronic transmission eliminates the need for mailing physical
fingerprint cards.
• Reduced Rejection Rates: Lower rejection rates mean fewer re-prints and re-
submissions, saving time and resources.
• Optimized Detention Time: Faster processing means arrestees spend less time in
custody.
5. Compliance and Best Practices:
• FBI Certification: Modern LiveScan systems are FBI Appendix F certified, ensuring
compliance with national standards for fingerprint submission.
• Interoperability: These systems are designed for seamless integration with state and
federal criminal justice information systems, promoting data sharing and interoperability
across jurisdictions.
• Legal and Evidentiary Value: High-quality digital prints and mugshots hold strong
evidentiary value in court.
6. Modernization and Professionalism:
• Upgraded Image: Investing in modern technology demonstrates a commitment to
efficiency, accuracy, and best practices in law enforcement.
• Improved Officer Morale: Providing officers with modern, effective tools can boost
morale and confidence in their ability to perform their duties.
In essence, a LiveScan fingerprint, mugshot, and processing station is a crucial technological
upgrade for any modern law enforcement agency. It transforms a historically tedious and error-
prone process into a fast, accurate, and highly efficient operation, ultimately contributing to
increased public safety, more effective investigations, and more responsible use of taxpayer
dollars. (Strategic Plan Goal 2: Optimize Resources and Infrastructure, MAG 2.1)
38
The Village of Cottage Grove, WI
2027 Budget Request
Drone/UAS Program 2 with Camera and Infrared/Heat-Sensing Capabilities ($30,000) - The
department is requesting implementation of Drone Program 2, including drones equipped with
camera and infrared/heat-sensing capabilities. This request builds on the value of unmanned
aerial systems by adding enhanced search, rescue, tactical assessment, scene documentation,
and emergency response capabilities. Purchase includes Drone/UAS Program 2, including
aircraft, camera and infrared/heat-sensing package, batteries, controllers, accessories, pilot
training/certification, software, data management, and initial program implementation supplies.
The justification for enhanced camera and infrared/heat-sensing capability is especially
important for locating missing persons, identifying heat signatures in low-light or wooded
environments, assessing hazardous scenes from a safe distance, and providing real-time
situational awareness to responding officers.
• Provides real-time aerial observation for critical incidents, searches, large events, crash
scenes, and tactical assessments.
• Improves officer safety by allowing remote evaluation of hazardous or unknown
environments before personnel enter.
• Adds infrared/heat-sensing capability for nighttime searches, missing person calls,
wooded-area searches, and other low-visibility conditions.
• Strengthens evidence documentation and incident command decision-making through
high-quality aerial imagery.
2. Increased Operational Efficiency and Effectiveness:
• Rapid Response and Assessment: Drones can often reach a scene faster than ground
units, especially in congested areas or challenging terrain. This quick aerial assessment
provides immediate information to dispatch and responding officers, enabling more
timely and informed decisions.
• Search and Rescue: Equipped with thermal imaging (FLIR) cameras, drones are
incredibly effective for locating missing persons, lost children, or vulnerable adults (e.g.,
those with dementia) in vast or difficult-to-access areas, both day and night. They can
cover significantly more ground than human search teams in the same amount of time.
• Crime Scene and Accident Reconstruction: Drones can rapidly and accurately document
crime scenes and traffic collisions from multiple angles, creating highly detailed images,
videos, and even 3D models. This speeds up the documentation process, reduces road
closures for accidents, and provides invaluable evidence for investigations and court
proceedings.
• Crowd Monitoring and Event Security: During large public gatherings, parades, or
demonstrations, drones can provide real-time crowd monitoring, identify potential issues
or threats, and assist with crowd management and traffic flow.
• Evidence Collection: Drones can locate and document evidence that might be difficult to
spot from the ground or in challenging environments.
• Force Multiplier: A single drone operated by one or two officers can perform tasks that
would otherwise require multiple officers, a helicopter, or extensive ground resources,
effectively multiplying the department's capabilities.
39
The Village of Cottage Grove, WI
2027 Budget Request
3. Cost-Effectiveness:
• Alternative to Manned Aircraft: Drones are significantly less expensive to acquire,
operate, and maintain than manned helicopters or fixed-wing aircraft. This makes aerial
support accessible to smaller departments that could not traditionally afford it.
• Reduced Overtime and Resource Allocation: By streamlining operations, reducing
search times, and providing rapid assessments, drones can lead to reduced overtime
costs for personnel and more efficient allocation of resources.
• Fuel and Maintenance Savings: Drones consume minimal fuel and have lower
maintenance requirements compared to traditional aircraft.
4. Community Relations and Transparency (with proper policy):
• Non-Intrusive Observation: In many situations, a drone can provide necessary
observation without requiring officers to physically enter and potentially escalate a
situation, promoting de-escalation.
• Public Safety Focus: When used responsibly and with clear policies, drones are viewed
by the public as a tool to enhance public safety, find missing persons, and respond to
emergencies more effectively.
• Transparency: A well-defined drone policy that is transparent to the community
regarding use cases, data retention, and privacy safeguards is crucial for building and
maintaining public trust. Cottage Grove's small-town nature allows for greater direct
engagement with the community on these policies.
5. Training and Compliance:
• FAA Regulations: Operating a drone program requires compliance with Federal Aviation
Administration (FAA) regulations, including pilot certification (Part 107) and adherence to
airspace restrictions. This ensures safe and legal operation.
• Departmental Policies: Developing clear, comprehensive departmental policies on drone
use, including strict guidelines on privacy, data collection, data retention, and prohibited
uses (e.g., random surveillance without cause, weaponization), is paramount to ensure
constitutional and ethical deployment.
In summary, implementing a drone program equips the Cottage Grove Police Department with a
cutting-edge tool that significantly enhances its ability to protect and serve the community. It
provides critical aerial intelligence, improves officer safety, increases operational efficiency, and
offers a cost-effective alternative to traditional aerial assets, all while supporting a commitment
to modern, effective, and community-oriented policing. (Strategic Plan Goal 1: Enhance
Operational Efficiency and Community-Centered Policing, MAG 1.1 and Goal 3: Personnel
Development and Workforce Development, MAG 3.2 and 3.3)
Traffic Monitoring Equipment/Services and Body Armor ($27,500) – This request addresses
recurring and essential equipment needs that directly support officer safety, traffic safety, and
data-informed enforcement strategies. (Strategic Plan Goal 1: Enhance Operational Efficiency
40
The Village of Cottage Grove, WI
2027 Budget Request
and Community-Centered Policing, MAG 1.3 and Strategic Plan Goal 3: Personnel
Development and Workforce Excellence, MAG 3.3) Estimated allocation: $20,000 for traffic
monitoring equipment/services and $7,500 for body armor.
Officer Safety and Readiness:
• Body Armor: Funding is requested to replace body armor that reaches the end of its
service life and to provide properly fitted armor for staff as needed. Keeping body armor
current is a critical officer safety requirement and reduces risk during high-threat calls.
Traffic Safety and Data Collection:
• Traffic Monitoring Equipment/Services: Continued investment in traffic monitoring
equipment and related services will improve the department’s ability to collect accurate
speed, volume, and traffic-pattern data. This supports evidence-based enforcement,
helps address citizen complaints, identifies problem areas, and assists with planning for
safer roadways throughout the Village.
The 2027 budget requests represent a responsible and strategically aligned investment in public
safety. Each request directly supports the 2026–2030 CGPD Strategic Plan, addresses
documented workload increases, and enhances the department’s ability to provide modern,
professional, and community-centered policing.
These investments will ensure the Cottage Grove Police Department remains a highly effective,
trusted, and forward-looking agency capable of meeting the needs of a rapidly growing
community.
Total Fiscal Impact: $534,300
Law Enforcement Committee Recommendations:
• Remove Livescan fingerprint/mugshot/processing workstation request of $50,000 and
revisit if there is contingency left in the Police Station project budget, following
substantial completion.
--Administration recommends reducing the department’s requests outlined above as follows:
• Remove the proposed addition of two Police Officer positions and associated part-time
support staff.
• Defer the start date of the proposed Detective position to October 1, 2027.
These recommended adjustments reduce the staffing-related request from $199,800 to
$38,200. The proposed budget will maintain existing service levels, and address a public safety
need through the addition of a Detective position in Q4. These recommendations balance
service demands associated with community growth with the Village’s ongoing commitment to
prudent fiscal management and long-term financial sustainability.
Revised Fiscal Impact: $322,700
41
The Village of Cottage Grove, WI
2027 Budget Request
Administration Recommended funding sources:
Fund Proposed Budget Notes
100 – General $ 38,200 Detective
411 - Capital $ 284,500 Squads, and equipment
Total $ 322,700
Law E
nforcement Committee requested a table to clarify staffing requests. Note the Support
staff also support municipal court, which equates to .5 FTE.
Position Current FTE Requested FTE Proposed FTE
Chief 1 1 1
Lieutenant 1 1 1
Sergeant 3 3 3
Detective 1 2 2
Canine Officer 1 1 1
School Resource Officer 1 1 1
Patrol 13 14 13
Support Staff 2 2.5 2
Total 23 25.5 24
42
The Village
of Cottage Grove, WI
2027 Budget Request
Meeting Date: 11/16/2026
Memo Date: October 30, 2026
To: Village Board
From: Kyela O’Loughlin, PE, Director of Public Works & Utilities
Dave Yearous, Utility Superintendent & Jason Anderson, Street
Superintendent
Subject: 2027 – Public Works Budget Request
Operating Requests:
Utility Operations Tech
nician – The Water and Sewer utility have approximately 40 miles of
sanitary sewer and water main, 3 municipal wells, 2 water towers, and 6 lift stations. The
additional staffing will improve operational efficiency, provide greater responsiveness to routine
and emergency needs, reduce workload demands on existing staff, and help ensure the
continued reliability of the Village's water and sanitary sewer utilities. This position would be
90% funded by the utilities. General fund impact estimate $5,500.
Committee Requested Information:
Weekly Recycling – The additional cost of weekly recycling would be $3.00 a month or $36
annually per household, which would be subject to trip fuel surcharges.
Cardboard dumpster – An 8-yard cardboard dumpster, which would be placed at the Bonnie
Road Shop by the Compost Site, would cost $105.55 per month or $1,266.60 annually, which
would be subject to trip fuel surcharges.
Capital Projects Fund:
Tr
affic Study (CP: $40,000) - The project will include traffic counts and determination of
existing Level of Service for several of the intersections along Main Street and Cottage Grove
Road. These intersections that will be studied include, Cottage Grove Road/Main Street, Main
Street/Parkview, Main Street/Northlawn, Main Street/School, Main Street/Gaston, Cottage
Grove Road/Oak, Cottage Grove Road/Damascus, and Cottage Grove Road/Buss.
Village Building Maintenance (CP: $75,000) – This accounts for the Municipal Service
Building, Village Hall, and Old Public Works Shop repairs. Maintenance contracts come out of
the Municipal Operations operating account. Recent repairs have been to failing HVAC units
and windows. The budget for 2027 includes replacement and expansion of the vehicle parking
areas Dual Toxic Gas Sensor/Controller, which includes sensors for
CO/NO2/Propane/Methane. The current system, only located on half of the shop and parking
areas, is a Brasch system. To have cohesiveness as this system has not been maintained and
services in over 12 years, it is recommended to move forward with the Senva system to match
the new Police Station System.
43
The Village
of Cottage Grove, WI
2027 Budget Request
The following projects originate in the 2027 Financial Management Plan/2027-2036
Capital Prioritization Plan.
2027 Major Projects (CP: $1,560,000, W: $1,681,500, S: $1,600,500)
Ollie Street Reconstruc
tion (CP: $830,000, W: $863,000, S: $702,000) - The project will
replace the old, aging clay sanitary sewer main as well as the undersized 6-inch water main
beneath the street. At the same time as the utilities are replaced, the street will get new asphalt
to replace the failed existing asphalt. Additionally, concrete curb and gutter and sidewalk will be
replaced throughout the corridor. Most of the costs incurred will be utility costs, but some costs
will be incurred by the capital projects fund. Engineering is included in the amount above CP:
$80,000, W: $93,000, S: $92,000. Engineering started in 2026.
Main Street Reconstruction, Reynolds South to Village Limits (CP: $765,000, W: $843,500,
S: $651,000) - The project will incorporate replacing the undersized 6-inch water main as well
as replace the aging, old concrete sanitary sewer pipe beneath the street. While the utilities are
being replaced, the street will be reconstructed due to the aging and failed pavement along the
corridor. Additionally, concrete curb and gutter and sidewalk will be replaced throughout the
corridor. Most of the costs incurred will be utility costs, but some costs will be incurred by the
capital projects fund. Engineering is included in the amount above CP: $115,000, W: $98,500,
S: $91,000. Engineering started in 2026.
2027 Vehicle & Equipment Replacement (CP: $231,000, W: $49,500, S: $49,500)
We are requesting the planned replac
ement of a Plow truck, including upfitting. If approved the
department would order a truck and receive it either in 2027 or 2028. Upfitting would occur in
2028 or 2029 based on current lead times. The water portion would be funded by cash on hand.
2027 Road, Street and Trail Maintenance (CP: $210,000):
Street Repaving Projects – There are no planne
d street pulverization and repaving projects
planned for 2027 as it is currently recommended to do a larger project every two years.
Street Chip Sealing and Crack Filling Maintenance Projects (CP: $185,000) - To further
extend the useful life of several Village asphalt roads to delay the need for total reconstruction,
chip sealing and crack filling are applied on asphalt roads that are still structurally sound and is
a preventive measure. Staff recommends moving forward with staff recommended roads to be
determined in spring/summer 2027 based on current conditions.
Bike Trail and Sidewalk Maintenance (CP: $25,000) - Annual sidewalk maintenance and
replacement is planned to be continued in 2027. To keep a proactive replacement schedule,
staff recommends contributing funds yearly to not fall behind in village-wide replacements and
grinding efforts. Public Works staff will continue to complete the sidewalk replacements in house
and grinding trip hazards will continue to be outsourced. Staff recommends moving forward with
staff recommended sidewalks and bike trail maintenance to be determined in summer 2027.
44
The Village
of Cottage Grove, WI
2027 Budget Request
2028 Engineering in 2027 Budget (CP: $45,000)
The following projects are in the Financial Management Plan in 2028 which require engineering
and design in 2027.
Vilas Road Path Connection to Bakken Park (CP $45,000) - Progress Drive is planned for
repaving as part of the 2028 Road Maintenance schedule. The Village completed the Vilas Rd.
creek crossing project several years ago and this project will continue the multi-use path from
Progress Drive south, over the railroad tracks, across Clark Street and all the way south to the
driveway entrance at Bakken Park. This project will investigate the feasibility of working with the
property owner to construct the missing portion of the path along Clark Street as well.
Coordination with the Town of Cottage Grove and the Wisconsin and Southern Railroad will be
necessary as part of the project. Completion of this project will allow residents to access the
popular Bakken Park safely outside of a car from either the east or west side of the park.
Total Fiscal Impact: $2,006,500
Public Works, Properties, & Sustainability Committee
Recommended the addition of the cardboard dumpster at Bonnie Road.
Budget Review Committee recommended the following:
Add to Beautification ($4,000), which was reallocated from removed Bakken Pickleball
Courts Kiosk/Message Board (Parks, Recreation, & Forestry)
Total Revised Fiscal Impact: $2,012,500
Administration Recommended funding sources:
Fund Proposed budget Notes
100 – General $ 5,500 Utility Operations Technician
100 – General $ 2,000 Cardboard dumpste r
410 - Capital $ 40,000 Traffic Study
410 - Capital $ 45,000 Village Building Maintenance*
410 – Capital $ 4,000 Additional Beautification
411 - Capital $ 240,000 Street Repaving, Chipseal, Trail, and Sidewalk Maint.
411 - Capital $ 231,000 Vehicle and Equipment
412 – Capital $ 1,400,000 Ollie and Main Reconstructions
412 – Capital $ 45,000 Engineering for 2028 Project
Total $ 2,012,500
*Shifted $30,000 for CO2 system replacement to 411 due to
410 resource constraints.
45
Bu ss
Rd
Oli n Way
TT
94
Cedar Knolls
Park
Elmargo Park
D o o r
C r e e
k
Mourn ing D ov e Dr
Vilas Rd
Vilas R
d
Buss
Rd
Bonnie Ave
BB
BB
Door Creek Golf
Course
Gas ton Rd Commerce Pk wy
TT
TT
N
N
N
94
McCarthy Youth
& Conservation
County Park
Blackhawk
Airfield
Bonnie Rd
O
lli
e St
Taylo r St
Heathe
r Dr
Ke nnedy Rd
Vilas Rd
Pr ogress Dr
Myer R
d
W Ridge Rd
N
Parkv
ie
w
St
W
estlawn Dr
Sch o ol Rd E Sch ool Rd
Molly Ln
Clark St S Main St
BB
N
N
Cottage Grove
Uphoff R d
Coffeyto wn RdVi
las
R d
Laudo n Rd
ArcGIS Web Map
Sources: Esri, T
omTom, Garmin, FAO, NOAA, USGS, ©
OpenStreetMap contributors, and the GIS User Community
Municipal Boundaries
7/7/2025, 10:09:59 AM
0 0.4 0.80.2 mi
0 0.65 1.30.33 km
1:26,957
2027
2030
2031
2032
2033
46
Bu ss
Rd
Oli n Way
TT
94
Cedar Knolls
Park
Elmargo Park
D o o r
C r e e
k
Mourn ing D ov e Dr
Vilas Rd
Vilas R
d
Buss
Rd
Bonnie Ave
BB
BB
Door Creek Golf
Course
Gas ton Rd Commerce Pk wy
TT
TT
N
N
N
94
McCarthy Youth
& Conservation
County Park
Blackhawk
Airfield
Bonnie Rd
O
lli
e St
Taylo r St
Heathe
r Dr
Ke nnedy Rd
Vilas Rd
Pr ogress Dr
Myer R
d
W Ridge Rd
N
Parkv
ie
w
St
W
estlawn Dr
Sch o ol Rd E Sch ool Rd
Molly Ln
Clark St S Main St
BB
N
N
Cottage Grove
Uphoff R d
Coffeyto wn RdVi
las
R d
Laudo n Rd
ArcGIS Web Map
Sources: Esri, T
omTom, Garmin, FAO, NOAA, USGS, ©
OpenStreetMap contributors, and the GIS User Community
Municipal Boundaries
7/7/2025, 10:09:59 AM
0 0.4 0.80.2 mi
0 0.65 1.30.33 km
1:26,957
2026
2028
2030
2032
2034
2028
2030
2032
2034
2036
46
47
WisDOT
WISLR Map
wislr-fl3
3-4
5-6
7-8
9-10
Railroads
State Trunk Network
Interstate Highway
State Trunk Highways
On-Off Ramp
Connector
County Roads
County Trunk Hwy
Local Roads
Municipal/Local Roads
Ineligible Roads
Rivers
Cities/Villages/Towns
City
Village
Town
Counties
Copyright(C) 2026 Wisconsin Department of Transportation
The information contained in this data set and information produced
from this dataset were created for the official use of the Wisconsin
Department of Transportation (WisDOT). Any other use while not
prohibited, is the sole responsibility of the user. WisDOT
expressly
disclaims all liability regarding fitness of use of the information for
other than official WisDOT business.
Map created on October 6, 2025
0 0.75 1.50.38 mi
0 1 20.5 km
±
48
Rating pavement surface condition 15
Rating system
Surface rating Visible distress* General condition/
treatment measures
None. New construction.
10
Excellent
None. Recent overlay. Like new.
9
Excellent
No longitudinal cracks except reflection of paving joints.
Occasional transverse cracks, widely spaced (40’ or greater).
All cracks sealed or tight (open less than
1⁄4”).
Recent sealcoat or new cold mix.
Little or no maintenance
required.
8
Very Good
Very slight or no raveling, surface shows some traffic wear.
Longitudinal cracks (open
1⁄4”) due to reflection or paving joints.
Transverse cracks (open 1⁄4”) spaced 10’ or more apart, little or slight
crack raveling. No patching or very few patches in excellent condition.
First signs of aging. Maintain
with routine crack filling.
7
Good
Slight raveling (loss of fines) and traffic wear.
Longitudinal cracks (open
1⁄4”–1⁄2 ”).
Transverse cracks (open 1⁄4”–1⁄2 ”), some spaced less than 10’.
First sign of block cracking. Sight to moderate flushing or polishing.
Occasional patching in good condition.
Moderate to severe raveling (loss of fine and coarse aggregate).
Longitudinal and transverse cracks (open
1⁄2 ” or more) show first
signs of slight raveling and secondary cracks. First signs of longitudinal
cracks near pavement edge. Block cracking up to 50% of surface.
Extensive to severe flushing or polishing. Some patching or edge
wedging in good condition.
Severe surface raveling. Multiple longitudinal and transverse cracking
with slight raveling. Longitudinal cracking in wheel path. Block
cracking (over 50% of surface). Patching in fair condition.
Slight rutting or distortions (
1⁄2 ” deep or less).
Closely spaced longitudinal and transverse cracks often showing
raveling and crack erosion. Severe block cracking. Some alligator
cracking (less than 25% of surface). Patches in fair to poor condition.
Moderate rutting or distortion (greater than 1⁄2 ” but less than 2"
deep). Occasional potholes.
Alligator cracking (over 25% of surface).
Severe rutting or distortions (2” or more deep).
Extensive patching in poor condition.
Potholes.
Severe distress with extensive loss of surface integrity.
Shows signs of aging. Sound
structural condition. Could
extend life with sealcoat.
Surface aging. Sound structural
condition. Needs sealcoat or
thin non-structural overlay (less
than 2”)
Significant aging and first signs
of need for strengthening. Would
benefit from a structural overlay
(2” or more).
Needs patching and repair prior
to major overlay. Milling and
removal of deterioration extends
the life of overlay.
Severe deterioration. Needs
reconstruction with extensive
base repair. Pulverization of old
pavement is effective.
Failed. Needs total
reconstruction.
6
Good
5
Fair
4
Fair
3
Poor
2
Very Poor
1
Failed
* Individual pavements will not have all of the types of distress listed for any particular rating. They may have only one or two types.
48
49
Tax year 2021 2022 2023 2024 2025 2026 Increase
Fund Budget year 2022 2023 2024 2025 2026 2027 (Decrease)
General 100 3,585,470 3,847,991 4,173,257 4,580,689 4,677,155 5,066,765 389,610
Capital 410 400,000 100,000 - - - - -
Debt 300 719,517 1,106,122 1,309,626 1,566,111 1,835,371 2,874,523 1,039,152
4,704,987 5,054,113 5,482,883 6,146,800 6,512,526 7,941,288 1,428,762
Assessed value 738,262,421 756,439,132 773,776,906 822,676,856 832,674,355 1,452,160,316
Net new construction 4.24% 5.77% 7.11% 4.36% 5.30% 23.92%
Taxes per $1,000 of equalized value 6.50 6.66 6.80 6.48 5.49 5.56
Taxes per $1,000 of assessed value 6.37 6.68 7.09 7.47 7.82 5.47
Assessment ratio 97.29% 93.88% 81.60% 76.97% 70.23% 101.61%
Average home assessment 315,000 315,000 315,000 315,000 315,000 440,000
Village taxes on average home 2,007.51 2,104.66 2,232.05 2,353.59 2,463.68 2,406.19
Increase on average home 99.73 97.15 127.39 121.54 110.10 (57.50)
5.23% 4.84% 6.05% 5.45% 4.68% -2.33%
General 4.86 5.09 5.39 5.57 5.62 3.49
Capital 0.54 0.13 - - - -
Debt 0.97 1.46 1.69 1.90 2.20 1.98
6.37 6.68 7.09 7.47 7.82 5.47
Assessed value 738,262,421 756,439,132 773,776,906 822,676,856 832,674,355 1,452,160,316
Equalized value (TID out) 724,294,100 758,797,500 805,759,200 948,230,500 1,185,685,600 1,429,144,500
2022 2023 2024 2025 2026 2027
Equalized value (TID in) 1,006,437,800 1,241,981,400 1,358,209,100 1,545,983,000 1,886,285,900 2,050,772,267 *
Debt limit 50,321,890 62,099,070 67,910,455 77,299,150 94,314,295 102,538,613
Debt outstanding 17,444,325 23,541,488 31,936,707 31,711,521 46,936,794 50,436,334
Debt percentage of limit 34.67% 37.91% 47.03% 41.02% 49.77% 49.19%
Unused debt amount 32,877,565 38,557,582 35,973,748 45,587,629 47,377,501 52,102,279
* 2027 Estimated
Levy Breakdown
Taxes per $1,000 breakdown by fund
50
GENERAL FUND
51
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Taxes
100-41110-000 General Property Taxes 4,677,155 4,677,155 4,677,155 5,320,414 5,066,765 389,610 (253,649)
100-41310-000 Taxes From Municipal Utility 315,000 236,250 375,000 390,000 390,000 75,000 -
100-41800-000 Interest and Penaltie s 6,500 * 6,651 6,651 1,000 1,000 (5,500) -
Total Taxes 4,998,655 4,920,056 5,058,806 5,711,414 5,457,765 459,110 (253,649)
Intergovernmental Aid
100-43410-000 State Shared Revenue - Municipal ai d 48,655 7,298 48,655 49,677 49,677 1,022 -
100-43411-000 State Shared Revenue - Supplemental ai d 239,322 35,898 239,322 244,348 244,348 5,026 -
100-43412-000 State Shared Revenue - Utility Ai d 211 32 211 206 206 (5) -
100-43413-000 State Shared Revenue - ER P 88,873 88,873 88,873 70,471 70,471 (18,402) -
100-43510-000 State Aid - Exempt Computer Aid 2,637 2,637 2,637 11,876 11,876 9,239 -
100-43515-000 State Aid - Personal Property Ai d 12,135 12,135 12,135 23,322 23,322 11,187 -
100-43515-012 State Aid - Personal Property Aid - Act 1 2 36,821 36,821 36,821 87,273 87,273 50,452 -
100-43520-000 State Aid - Police 15,000 6,602 7,650 15,000 15,000 - -
100-43521-000 State Aid - Digital Records 15,753 15,753 15,753 15,753 15,753 - -
100-43530-000 State Aid - Transportation 623,678 467,759 623,678 702,457 702,457 78,779 -
100-43540-000 State Aid - Recycling Gran t 9,750 9,684 9,684 9,684 9,684 (66) -
Total Intergovernmental Aid 1,092,835 683,491 1,085,419 1,230,067 1,230,067 137,232 -
Licenses and Permits
100-44110-000 Liquor & Malt Bev License 8,100 8,310 8,310 8,300 8,300 200 -
100-44111-000 Operator's License 5,000 5,690 5,990 5,250 5,700 700 450
100-44120-000 Cigarette License 700 700 700 700 700 - -
100-44150-000 Publication Fees 500 476 476 500 500 - -
100-44210-000 Dog License 1,500 419 1,800 1,500 1,750 250 250
100-44250-000 Other Permits/Fees; Amusement 1,000 1,860 1,860 1,000 1,250 250 250
100-44250-001 Special event permit 750 2,400 2,400 750 2,100 1,350 1,350
100-44300-000 Building Permits 120,000 * 132,363 147,000 95,000 - (120,000) (95,000)
100-44340-000 Conditional use Permits 750 - - - - (750) -
100-44375-000 Sign Permit 1,000 850 850 1,000 1,000 - -
100-44400-000 Zoning Permits & Fees 16,750 * 16,770 16,770 2,500 3,000 (13,750) 500
100-44410-000 Erosion Control Fees 7,000 3,311 4,211 3,000 3,000 (4,000) -
100-44420-000 Land Disturbance Permi t 5,000 2,730 3,230 3,000 3,000 (2,000) -
100-44430-000 Extraterritorial Jurisdiction - - - - - - -
Total Licenses and Permits 168,050 175,879 193,597 122,500 30,300 (137,750) (92,200)
Fines and Forfeitures
100-45100-000 Fines, Forfeitures - Village Share 55,500 38,019 45,148 50,000 50,000 (5,500) -
100-45110-000 Court Penalties and Cost s 35,500 19,276 25,208 36,000 36,000 500 -
100-45130-000 Parking Violations 19,000 13,595 16,295 17,500 17,500 (1,500) -
Total Fines and Forfeitures 110,000 70,890 86,651 103,500 103,500 (6,500) -
52
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Public Charges for Service
100-46112-000 Other Earnings General Governmen t 750 475 625 500 750 - 250
100-46122-000 Tax & Title Search Fees 6,000 4,760 5,400 5,500 7,500 1,500 2,000
100-46320-000 Public Works Misc Charges 2,500 1,923 2,400 2,400 3,000 500 600
100-46400-000 Recycling Fee from Tax Roll 143,053 * 143,053 143,053 160,503 160,503 17,450 -
100-46410-000 Garbage Fee from Tax Roll 299,581 * 299,581 299,581 336,100 336,100 36,519 -
100-46420-000 Garbage and Recycle Fee from Occupanc y 3,600 4,586 4,586 - 5,000 1,400 5,000
100-46700-100 Recreation - Coach Pitch/Tball 5,000 5,060 5,060 5,000 5,000 - -
100-46700-341 Recreation - Baseball/Softball 15,300 11,417 11,552 14,500 14,500 (800) -
100-46700-342 Recreation - Basketball 13,000 5,756 13,000 12,000 12,000 (1,000) -
100-46700-344 Enrichment Programs - Youth 58,000 53,536 65,000 52,000 58,000 - 6,000
100-46700-345 Enrichment Programs - Adult 15,000 17,542 17,542 18,500 18,500 3,500 -
100-46700-346 Recreation - Flag Football 10,000 10,750 10,780 10,000 10,000 - -
100-46700-347 Recreation - Gol f 1,800 1,000 1,000 1,700 1,700 (100) -
100-46700-348 Recreation - Tennis 4,000 4,445 4,445 4,500 4,500 500 -
100-46700-349 Recreation - Volleyball 7,000 4,160 7,000 8,000 8,000 1,000 -
100-46700-350 Recreation - Teener/Legion Baseball 6,000 4,165 4,165 4,500 4,500 (1,500) -
100-46700-351 Recreation - Senior programmin g 3,200 2,720 3,200 - - (3,200) -
100-46700-352 Recreation - Start Smar t 8,000 8,545 8,545 9,000 9,000 1,000 -
100-46700-353 Community Night Out 2,000 5,750 5,750 5,000 5,000 3,000 -
100-46700-354 Music in the Grove donations/sponsorships 1,000 1,500 1,500 1,000 1,000 - -
100-46700-720 Bark Park Donations 500 - - - - (500) -
100-46710-000 Park Rental Fee s 10,000 8,560 8,335 10,000 10,000 - -
100-46715-000 Parks - Concession Revenue 500 1,197 1,197 500 1,100 600 600
100-46716-000 Recreation - Ticket Sales - 312 468 - 300 300 300
100-46718-000 Recreation - Diamond Use Charge 1,200 1,200 1,200 1,100 1,200 - 100
100-46730-000 Misc Recreation Donations 5,000 1,600 1,600 1,600 1,600 (3,400) -
Total Public Charges for Service 621,984 603,593 626,984 663,903 678,753 56,769 14,850
Miscellaneous Revenue
100-48110-000 Interest on Investments 200,000 179,958 211,938 200,000 225,000 25,000 25,000
100-48130-000 Patronage Dividend 684 689 689 - - (684) -
100-48230-000 Tower Rental Income 14,257 14,258 14,258 14,685 14,685 428 -
100-48310-000 Sale of Village Propert y - 695 695
100-48400-000 Insurance Recoveries 21,000 * 20,648 20,648 - - (21,000) -
100-48450-000 Payment for School Resource Office r 120,000 * 64,888 110,659 105,000 115,000 (5,000) 10,000
100-48460-000 Miscellaneous Income 25,000 24,442 24,442 5,000 20,000 (5,000) 15,000
100-48510-000 Donations From Individ/Organization - 670 670 - - - -
Total Miscellaneous Revenue 380,941 306,249 383,999 324,685 374,685 (6,256) 50,000
Other financing sources
100-49000-405 Transfer in - TID 5 200,000 200,000 200,000 - - (200,000) -
Total Other financing sources 200,000 200,000 200,000 - - (200,000) -
Revenues 7,572,465 6,960,158 7,635,456 8,156,069 7,875,070 302,605 (280,999)
53
Village Board
100-51100-110 Salaries Village board president and trustee compensation
100-51100-140 Citizen Per Diem Payment to citizen members of committees and commission s
100-51100-151 FICA Employer share of social security and medicare
100-51100-340 Operating Supplies and Expenses Membership to the League of Wisconsin Municipalities and Dane County Cities and Villages Association, miscellaneous supplies and expenses
Municipal Court
100-51200-115 Wages Court Clerk
100-51200-125 Judge Stipend Fixed stipend for Judge
100-51200-151 FICA Employer share of social security and medicare
100-51200-152 Retirement Employer share of pension contribution
100-51200-153 Dental Insurance Employer share of dental premiums
100-51200-154 Health Insurance Employer share of health premiums
100-51200-155 Life Insurance Employer share of life premiums
100-51200-332 Mileage Employer mileage reimbursement
100-51200-340 Operating Supplies and Expenses Judge association fee, judicial education fee, municipal court clerk association fee, office supplies, training/traveling, public official bond, software
Communications
100-51250-115 Wages Digital Communications Coordinator
100-51250-151 FICA Employer share of social security and medicar
e
100-51250-340 Operating Supplies and Expenses Annual website, Community guide, adobe software, content development, social media tools, office supplies and printing
Administration
100-51410-110 Salaries Administrator, Assistant Adminstrator/Human Resource Manage r
100-51410-151 FICA Employer share of social security and medicare
100-51410-152 Retirement Employer share of pension contribution
100-51410-153 Dental Insurance Employer share of dental premiums
100-51410-154 Health Insurance Employer share of health premiums
100-51410-155 Life Insurance Employer share of life premiums
100-51410-332 Mileage Employer mileage reimbursement
100-51410-340 Operating Supplies and Expenses Training, postage, printing, travel, publications, professional organization dues, misc. supplies
Clerk
100-51420-110 Salaries Clerk
100-51420-115 Wages Deputy Clerk
100-51420-151 FICA Employer share of social security and medicare
100-51420-152 Retirement Employer share of pension contribution
100-51420-153 Dental Insurance Employer share of dental premiums
100-51420-154 Health Insurance Employer share of health premiums
100-51420-155 Life Insurance Employer share of life premiums
100-51420-210 Professional Services Codification of ordinances
100-51420-332 Mileage Employer mileage reimbursement
100-51420-340 Operating Supplies and Expenses Training, postage, printing, Laserfiche, background checks, travel, publications, dues, minutes, misc. supplies
54
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Expenditures
General Government
Village Board
100-51100-110 Salaries 26,843 18,602 26,843 26,843 26,843 - -
100-51100-140 Citizen Per Diem 5,000 1,360 3,260 5,000 5,000 - -
100-51100-151 FICA 2,053 1,424 2,053 2,053 2,053 - -
100-51100-340 Operating Supplies and Expenses 9,500 8,636 8,786 9,750 9,750 250 -
Total Village Board 43,396 30,021 40,942 43,646 43,646 250 -
Municipal Court
100-51200-115 Wages 28,226 19,962 26,962 30,289 30,226 2,000 (63)
100-51200-116 Overtime - 19 19 - - - -
100-51200-125 Judge Stipend 3,000 2,050 3,000 3,000 3,000 - -
100-51200-151 FICA 2,389 1,585 2,288 2,547 2,542 153 (5)
100-51200-152 Retirement 2,032 1,505 1,942 2,196 2,191 159 (5)
100-51200-153 Dental Insurance 696 514 686 727 727 31 -
100-51200-154 Health Insurance 10,650 7,987 10,650 11,142 11,142 492 -
100-51200-155 Life Insurance 30 36 50 60 60 30 -
100-51200-332 Mileage - 222 222 250 250 250 -
100-51200-340 Operating Supplies and Expenses 67,500 56,737 70,000 67,000 65,000 (2,500) (2,000)
Total Municipal Court 114,523 90,619 115,819 117,211 115,138 615 (2,073)
Communications
100-51250-115 Wages 5,000 2,034 3,600 5,000 4,000 (1,000) (1,000)
100-51250-151 FICA 383 156 275 383 306 (77) (77)
100-51250-340 Operating Supplies and Expenses 22,125 20,651 22,831 25,000 23,500 1,375 (1,500)
Total Communications 27,508 22,841 26,706 30,383 27,806 298 (2,577)
Administration
100-51410-110 Salaries 106,096 72,423 106,452 112,519 112,279 6,183 (240)
100-51410-151 FICA 8,116 5,649 7,952 8,608 8,589 473 (19)
100-51410-152 Retirement 7,639 5,444 7,665 8,158 8,140 501 (18)
100-51410-153 Dental Insurance 1,218 857 1,179 1,272 1,272 54 -
100-51410-154 Health Insurance 7,825 5,314 7,708 8,642 8,642 817 -
100-51410-155 Life Insurance 210 147 211 244 244 34 -
100-51410-332 Mileage 1,000 342 542 1,000 750 (250) (250)
100-51410-340 Operating Supplies and Expenses 11,000 6,782 8,482 14,920 14,000 3,000 (920)
Total Administration 143,104 96,957 140,191 155,363 153,916 10,812 (1,447)
Clerk
100-51420-110 Salaries 90,920 67,016 93,471 90,210 90,017 (903) (193)
100-51420-115 Wages 51,064 36,114 51,516 51,683 51,572 508 (111)
100-51420-151 FICA 10,862 7,894 10,809 10,855 10,832 (30) (23)
100-51420-152 Retirement 10,223 7,727 10,440 10,287 10,265 42 (22)
100-51420-153 Dental Insurance 1,872 1,383 1,848 1,894 1,894 22 -
100-51420-154 Health Insurance 12,666 9,500 12,835 12,665 12,665 (1) -
100-51420-155 Life Insurance 780 694 1,002 1,201 1,201 421 -
100-51420-210 Professional Services - Codification of ord 6,000 3,515 6,000 6,700 6,700 700 -
100-51420-332 Mileage 500 404 600 550 550 50 -
100-51420-340 Operating Supplies and Expenses 18,945 8,378 18,122 19,209 19,000 55 (209)
Total Clerk 203,832 142,625 206,643 205,254 204,696 864 (558)
55
Elections
100-51440-115 Wages Wages for election worker s
100-51440-151 FICA Employer share of social security and medicare.
100-51440-340 Operating Supplies and Expenses Ballots, publications, and updates to the prom pack for electronic voting machine, new booths
Finance and Professional Services
100-51520-110 Salaries Assistant Adminstrator/Finance Director, Comptrolle r
100-51520-115 Wages Accounting Assistant
100-51520-151 FICA Employer share of social security and medicare
100-51520-152 Retirement Employer share of pension contribution
100-51520-153 Dental Insurance Employer share of dental premiums
100-51520-154 Health Insurance Employer share of health premiums
100-51520-155 Life Insurance Employer share of life premiums
100-51520-210 Professional Services Audit, assessor, IT contract, information systems, legal, accounting software
100-51520-332 Mileage Employer mileage reimbursement
100-51520-340 Operating Supplies/Expenses Training, postage, printing, travel, publications, professional organization dues, misc. supplies
100-51520-500 Taxes due others - Annexation Village taxes for annexation of property
100-51520-510 Property/Liability Insurance Property, General liability, Crime, and Cyber Insurance
100-51520-511 Workers Compensation Insurance Workman's compensation insurance premiums
100-51520-900 Contingent Fund Merit increases, annual holiday gift cards, longevity pay, retirement insurance premiums. Note costs allocated to respective payroll accounts
Municipal Buildings Operation
100-51600-340 Operating Supplies and Expenses Electric, water, sewer, telephone, cleaning services, and general supplies for Village Hall, Municipal Service Building, and Old Public Works Buildin g
Flynn Hall
100-51610-720 Contribution Village contribution towards the maintenance and operating of Flynn Hall .
Police Department
100-52100-110 Salaries Police Chief and Lieutenan t
100-52100-115 Wages Full time officers, Administrative Assistants
100-52100-116 Overtime Wages Full time officers overtime
100-52100-151 FICA Employer share of social security and medicare
100-52100-152 Retirement Employer share of pension contribution
100-52100-153 Dental Insurance Employer share of dental premiums
100-52100-154 Health Insurance Employer share of health premiums
100-52100-155 Life Insurance Employer share of life premiums
100-52100-210 Professional Services Legal, cleaning, officer testing and wellness
100-52100-332 Mileage Employer mileage reimbursement
100-52100-340 Operating Supplies/Expenses Data processing, telephone, repair/maintenance, office supplies, postage, professional dues, office supplies, uniforms, police professional liability
100-52100-600 K9 Expenses Costs associated to care for police K-9. Note donations have historically offset expenditures
56
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Elections
100-51440-115 Wages 22,532 10,435 17,435 10,822 10,822 (11,710) -
100-51440-151 FICA 1,724 796 1,334 828 828 (896) -
100-51440-340 Operating Supplies and Expenses 15,893 11,651 14,500 7,650 7,650 (8,243) -
Total Elections 40,149 22,882 33,269 19,300 19,300 (20,849) -
Finance and Professional Services
100-51520-110 Salaries 83,620 56,635 85,385 85,799 85,617 1,997 (182)
100-51520-115 Wages 38,827 27,591 39,442 39,062 38,979 152 (83)
100-51520-151 FICA 9,367 6,663 9,017 9,552 9,532 165 (20)
100-51520-152 Retirement 8,816 6,329 8,988 9,052 9,033 217 (19)
100-51520-153 Dental Insurance 2,245 1,623 2,217 2,253 2,253 8 -
100-51520-154 Health Insurance 14,018 10,070 14,436 14,199 14,199 181 -
100-51520-155 Life Insurance 314 212 293 311 311 (3) -
100-51520-210 Professional Services 205,000 180,728 223,886 205,000 203,000 (2,000) (2,000)
100-51520-332 Mileage 750 289 489 525 525 (225) -
100-51520-340 Operating Supplies and Expenses 12,650 3,434 10,000 12,175 11,000 (1,650) (1,175)
100-51520-500 Taxes due others - Annexation 50 * 50 50 1,400 1,400 1,350 -
100-51520-510 Property/Liability Insurance 67,300 * 67,214 67,214 69,000 69,000 1,700 -
100-51520-511 Workers Compensation Insurance 35,400 * 35,383 35,383 46,000 46,000 10,600 -
100-51520-900 Contingent Fund 39,000 725 1,725 39,000 40,000 1,000 1,000
Total Finance and Professional Services 517,357 396,946 498,525 533,328 530,849 13,492 (2,479)
Municipal Buildings Operation
100-51600-340 Operating Supplies and Expenses 80,000 49,464 70,000 88,150 130,000 50,000 41,850
Total Municipal Buildings Operation 80,000 49,464 70,000 88,150 130,000 50,000 41,850
Flynn Hall
100-51610-720 Contribution 2,500 2,500 2,500 2,600 2,600 100 -
Total Flynn Hall 2,500 2,500 2,500 2,600 2,600 100 -
General Government 1,172,369 854,855 1,134,595 1,195,235 1,227,951 55,582 32,716
Public Safety
Police Department
100-52100-110 Salaries 259,486 186,497 266,317 272,576 271,997 12,511 (579)
100-52100-115 Wages 1,580,633 1,049,440 1,508,232 1,800,662 1,692,019 111,386 (108,643)
100-52100-116 Overtime Wages 75,162 35,846 52,024 81,912 80,702 5,540 (1,210)
100-52100-151 FICA 146,519 96,532 139,733 164,825 156,421 9,902 (8,404)
100-52100-152 Retirement 276,515 190,513 270,333 303,700 289,618 13,103 (14,082)
100-52100-153 Dental Insurance 28,524 18,251 25,424 32,714 30,214 1,690 (2,500)
100-52100-154 Health Insurance 331,103 233,665 328,287 421,855 395,291 64,188 (26,564)
100-52100-155 Life Insurance 5,420 3,876 5,306 6,175 6,050 630 (125)
100-52100-210 Professional Services 3,000 2,412 2,500 10,000 8,000 5,000 (2,000)
100-52100-332 Mileage - 121 300 300 300 300 -
100-52100-340 Operating Supplies and Expenses 230,000 127,931 205,400 230,500 220,000 (10,000) (10,500)
100-52100-600 K9 Expenses 2,000 504 1,500 2,000 - (2,000) (2,000)
Total Police Department 2,938,362 1,945,587 2,805,356 3,327,219 3,150,612 212,250 (176,607)
57
Police Commission
100-52110-110 Salaries Committee Per Diem when require d
100-52110-210 Professional Services Legal services associated with any action by the police commission
100-52110-340 Operating Supplies and Expenses Printing, postage, and other misc. supplies
Crossing Guards
100-52150-115 Wages Wages for crossing guards
100-52150-151 FICA Employer share of social security and medicare.
100-52150-340 Operating Supplies and Expenses Misc. supplies associated with supporting crossing guards
Fire Department
100-52200-340 Operating Supplies and Expenses Cottage Grove Fire Department village share of cost
s
Emergency Services Building
100-52210-340 Operating Supplies and Expenses Village portion of electric, water, sewer, telephone, cleaning services, and general supplies for Emergency Services Buildin g
Emergency Government
100-52300-350 Dane Com Danecom contrac t
100-52300-340 Operating Supplies and Expenses misc. supplies associated with supporting emergency government
Inspections
100-52400-210 Professional Services - Building Contract with village inspecto r
100-52400-350 Weights and Measure Annual costs related to weights and measure inspections
Emergency Medical Services
100-52500-210 Deer-Grove EMS Contrac t Contract with Deer-Grove EMS
58
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Police Commission
100-52110-110 Salaries 1,000 - - - - (1,000) -
100-52110-210 Professional Services 1,500 - - - - (1,500) -
100-52110-340 Operating Supplies and Expenses 200 - - - - (200) -
Total Police Commission 2,700 - - - - (2,700) -
Crossing Guards
100-52150-115 Wages 30,420 19,005 30,840 30,420 30,420 - -
100-52150-151 FICA 2,327 1,454 2,359 2,327 2,327 - -
100-52150-340 Operating Supplies and Expenses 750 88 520 750 750 - -
Total Crossing Guards 33,497 20,547 33,719 33,497 33,497 - -
Fire Department
100-52200-340 Operating Supplies and Expenses 159,131 96,162 159,131 183,452 183,452 24,321 -
Total Fire Department 159,131 96,162 159,131 183,452 183,452 24,321 -
Emergency Services Building
100-52210-340 Operating Supplies and Expenses 28,000 20,808 28,000 32,550 32,550 4,550 -
Total Emergency Services Building 28,000 20,808 28,000 32,550 32,550 4,550 -
Emergency Government
100-52300-350 Dane Com 23,000 4,280 23,000 23,000 22,500 (500) (500)
100-52300-340 Operating Supplies and Expenses 10,500 * 10,422 10,500 11,000 11,000 500 -
Total Emergency Government 33,500 14,702 33,500 34,000 33,500 - (500)
Inspections
100-52400-210 Professional Services - Building 102,000 * 115,467 125,000 80,750 - (102,000) (80,750)
100-52400-350 Weights and Measure 2,500 2,250 2,250 2,500 2,500 - -
Total Inspections 104,500 117,717 127,250 83,250 2,500 (102,000) (80,750)
Emergency Medical Services
100-52500-210 Deer-Grove EMS Contrac t 670,116 670,116 670,116 732,716 732,716 62,600 -
Total Emergency Medical Services 670,116 670,116 670,116 732,716 732,716 62,600 -
Public Safety 3,969,806 2,885,638 3,857,072 4,426,684 4,168,827 199,021 (257,857)
59
Public Works Administration
100-53100-110 Salaries Public Works Directo r
100-53100-115 Wages Public work technicians wages
100-53100-116 Overtime Public work technicians overtime
100-53100-151 FICA Employer share of social security and medicare
100-53100-152 Retirement Employer share of pension contribution
100-53100-153 Dental Insurance Employer share of dental premiums
100-53100-154 Health Insurance Employer share of health premiums
100-53100-155 Life Insurance Employer share of life premiums
100-53100-332 Mileage Employer mileage reimbursement
100-53100-340 Operating Supplies and Expenses Training, postage, printing, travel, publications, professional organization dues, misc. supplies
Street Maintenance and Operations
100-53300-210 Professional Services Contract with Strand Associates as the Village Engineer and GIS
100-53300-340 Operating Supplies/Expenses Supplies to repair vehicles, equipment and streets
100-53300-350 Street Lights Alliant expenses for street lights
100-53300-370 Roadway Supplies Salt for roads
100-53300-385 Vehicle Fuel Fuel for village vehicles
100-53300-850 Sustainability Rain barrel and compost bin
Stormwater Sewer
100-53440-210 Professional Services Televising, GIS, and engineering
100-53440-340 Operating Supplies and Expenses Mowing of detention basins and miscellaneous supplies.
100-53440-820 DNR Storm Water Managemen
t DNR Storm Water Management. Yahara WINS, MAMSWap, LWM Leaf Study, permit.
Beautification
100-53500-000 Professional Services Village beautification
Refuse, Recycling, Landfill
100-53620-295 Garbage Contrac t Garbage Contract
100-53620-296 Recycle Contrac t Recycling Contract
100-53620-340 Operating Supplies and Expenses Misc. supplies to support compost services
100-53620-298 Landfill Contract Contact to support Natvig Landfill, testing and maintenance
Social Services
100-54500-720 Senior Outreach Contribution to the Colonial Club Senior Activity Center for providing meals, activities and outreach services to the senior citizens in Cottage Grov e
Diversity, Equity, Inclusion
100-54800-720 Diversity, Equity, Inclusion Diversity, Equity, and Inclusion training and initiatives
60
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Public Works
Public Works Administration
100-53100-110 Salaries 69,220 48,956 71,312 65,087 64,947 (4,273) (140)
100-53100-115 Wages 202,286 145,285 206,165 182,062 181,679 (20,607) (383)
100-53100-116 Overtime Wages 10,496 3,925 10,600 9,240 9,240 (1,256) -
100-53100-151 FICA 21,573 15,008 22,038 19,614 19,574 (1,999) (40)
100-53100-152 Retirement 20,304 14,951 20,742 18,588 18,550 (1,754) (38)
100-53100-153 Dental Insurance 5,742 4,956 6,515 5,315 5,315 (427) -
100-53100-154 Health Insurance 65,027 54,969 66,555 65,967 65,967 940 -
100-53100-155 Life Insurance 985 563 775 758 758 (227) -
100-53100-332 Mileage 500 744 775 500 500 - -
100-53100-340 Operating Supplies and Expenses 21,500 11,404 16,250 19,747 18,000 (3,500) (1,747)
Total Public Works Administration 417,633 300,759 421,727 386,878 384,530 (33,103) (2,348)
Street Maintenance and Operations
100-53300-210 Professional Services 29,450 24,169 28,500 27,500 27,500 (1,950) -
100-53300-340 Operating Supplies and Expenses 82,500 * 51,972 82,500 80,000 78,500 (4,000) (1,500)
100-53300-350 Street Lights 113,000 * 80,657 103,146 125,000 110,000 (3,000) (15,000)
100-53300-370 Roadway Supplies 49,500 25,776 49,500 56,138 55,888 6,388 (250)
100-53300-385 Vehicle Fuel 38,000 * 28,556 40,000 33,000 33,000 (5,000) -
100-53300-850 Sustainability 500 825 825 - - (500) -
Total Street Maintenance and Operations 312,950 211,955 304,471 321,638 304,888 (8,062) (16,750)
Stormwater Sewer
100-53440-210 Professional Services 6,500 3,295 5,895 - - (6,500) -
100-53440-340 Operating Supplies and Expenses 6,000 3,473 5,424 - - (6,000) -
100-53440-820 DNR Storm Water Managemen t 22,000 18,274 21,278 - - (22,000) -
Total Stormwater Sewer 34,500 25,042 32,597 - - (34,500) -
Beautification
100-53500-000 Professional Services 6,500 5,574 6,500 10,000 9,500 3,000 (500)
Total Beautification 6,500 5,574 6,500 10,000 9,500 3,000 (500)
Refuse, Recycling, Landfill
100-53620-295 Garbage Contrac t 302,505 * 231,617 316,000 336,100 336,100 33,595 -
100-53620-296 Recycle Contrac t 147,579 * 112,191 151,500 160,503 160,503 12,924 -
100-53620-340 Operating Supplies and Expenses 11,500 6,894 8,500 12,500 12,500 1,000 -
100-53620-298 Landfill Contract 21,000 17,870 18,750 21,000 20,000 (1,000) (1,000)
Total Refuse, Recycling, Landfill 482,584 368,572 494,750 530,103 529,103 46,519 (1,000)
Public Works 1,254,167 911,902 1,260,045 1,248,619 1,228,021 (26,146) (20,598)
Human Services
Social Services
100-54500-720 Senior Outreach 32,000 32,000 32,000 32,000 32,000 - -
Total Social Services 32,000 32,000 32,000 32,000 32,000 - -
Diversity, Equity, Inclusion
100-54800-720 Diversity, Equity, Inclusion 4,600 4,822 4,822 - - (4,600) -
Total Diversity, Equity, Inclusion 4,600 4,822 4,822 - - (4,600) -
Human Services 36,600 36,822 36,822 32,000 32,000 (4,600) -
61
Parks and Playgrounds
100-55200-110 Salaries Parks, Recreation, and Forestry Directo r
100-55200-115 Wages Parks Maintenance Supervisor
100-55200-116 Overtime Overtime for Parks Maintenance Supervisor
100-55200-151 FICA Employer share of social security and medicare
100-55200-152 Retirement Employer share of pension contribution
100-55200-153 Dental Insurance Employer share of dental premiums
100-55200-154 Health Insurance Employer share of health premiums
100-55200-155 Life Insurance Employer share of life premiums
100-55200-210 Professional Services Attorney, IT, and engineer expenses
100-55200-332 Mileage Employer mileage reimbursement
100-55200-340 Operating Supplies and Expenses Training, postage, printing, travel, publications, utilities, professional organization dues, misc. supplies
100-55200-360 Turf Services Turf service contract
100-55200-710 Splash Pad/Shelter Operating Expens e Chemicals and maintenance for splash pad, supplies for shelter
100-55200-720 Bark Par k Supplies for municipal own dog park
Recreation Programs
100-55310-110 Salaries Parks, Recreation, and Forestry Directo r
100-55310-115 Wages Recreation Supervisor, Recreation Program Coordinator
100-55310-151 FICA Employer share of social security and medicare
100-55310-152 Retirement Employer share of pension contribution
100-55310-153 Dental Insurance Employer share of dental premiums
100-55310-154 Health Insurance Employer share of health premiums
100-55310-155 Life Insurance Employer share of life premiums
100-55310-332 Mileage Employer mileage reimbursement
100-55310-340 Operating Supplies and Expenses Training, postage, printing, travel, publications, professional organization dues, misc. supplies
100-55310-100 Coach pitch t-ball Coach pitch t-ball
100-55310-341 Baseball & Softball Baseball & Softball
100-55310-342 Basketball Basketball
100-55310-344 Youth Enrichment Youth Enrichment
100-55310-345 Adult Enrichment Adult Enrichment
100-55310-346 Football Football
100-55310-347 Golf Golf
100-55310-348 Tennis Tennis
100-55310-349 Volleyball Volleyball
100-55310-350 Teener/Legion Baseball Program Teener/Legion Baseball Program
100-55310-351 Senior Program Activities Senior Program Activities
100-55310-352 Start Smar t Start Smart
100-55310-353 Community Night Out Community Night Out
100-55310-354 Music In The Grove Music In The Grove
62
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Culture, Recreation, Education
Parks and Playgrounds
100-55200-110 Salaries 45,847 32,425 47,632 47,899 47,797 1,950 (102)
100-55200-115 Wages 73,663 54,060 74,500 78,475 78,307 4,644 (168)
100-55200-116 Overtime wages 5,180 4,056 6,185 5,475 5,475 295 -
100-55200-151 FICA 9,539 6,556 9,816 10,086 10,066 527 (20)
100-55200-152 Retirement 8,978 6,789 8,794 9,559 9,539 561 (20)
100-55200-153 Dental Insurance 2,610 1,929 2,571 2,726 2,726 116 -
100-55200-154 Health Insurance 39,936 29,952 39,936 41,781 41,781 1,845 -
100-55200-155 Life Insurance 613 440 592 625 625 12 -
100-55200-210 Professional Services 4,000 - - 4,000 2,000 (2,000) (2,000)
100-55200-332 Mileage 500 211 300 300 300 (200) -
100-55200-340 Operating Supplies and Expenses 36,000 26,908 36,000 82,000 65,000 29,000 (17,000)
100-55200-360 Turf Services 15,000 8,325 15,000 15,000 13,000 (2,000) (2,000)
100-55200-710 Baken Park Splash Pad/Shelter Operating Expens e 32,000 35,409 36,600 35,000 34,000 2,000 (1,000)
100-55200-720 Bark Par k 2,000 - - 2,000 2,000 - -
Total Parks and Playground 275,866 207,059 277,927 334,926 312,616 36,750 (22,310)
Recreation Programs
100-55310-110 Salaries 126,119 89,198 127,219 131,764 131,483 5,364 (281)
100-55310-115 Wages 54,392 38,667 55,071 57,576 57,455 3,063 (121)
100-55310-151 FICA 13,809 11,708 13,945 14,485 14,454 645 (31)
100-55310-152 Retirement 12,997 9,596 13,125 13,727 13,698 701 (29)
100-55310-153 Dental Insurance 3,210 2,372 3,162 3,352 3,352 142 -
100-55310-154 Health Insurance 50,769 38,076 50,760 69,635 53,123 2,354 (16,512)
100-55310-155 Life Insurance 688 497 672 725 725 37 -
100-55310-332 Mileage 250 347 400 500 500 250 -
100-55310-340 Operating Supplies and Expenses 27,700 19,969 27,700 27,700 27,700 - -
100-55310-100 Coach pitch t-ball 1,100 731 731 1,100 1,100 - -
100-55310-341 Baseball & Softball 14,000 6,293 6,500 12,000 12,000 (2,000) -
100-55310-342 Basketball 8,000 4,239 8,000 7,000 7,000 (1,000) -
100-55310-344 Youth Enrichment 52,000 42,110 52,000 46,000 46,000 (6,000) -
100-55310-345 Adult Enrichment 9,000 7,768 9,000 11,000 11,000 2,000 -
100-55310-346 Football 11,000 4,424 11,000 9,000 9,000 (2,000) -
100-55310-347 Golf 1,500 920 1,000 1,400 1,400 (100) -
100-55310-348 Tennis 2,200 2,515 2,515 3,200 3,200 1,000 -
100-55310-349 Volleyball 4,200 2,674 4,200 5,500 5,500 1,300 -
100-55310-350 Teener/Legion Baseball Program 4,000 3,994 3,994 3,000 3,000 (1,000) -
100-55310-351 Senior Program Activities 2,700 1,233 2,700 - - (2,700) -
100-55310-352 Start Smar t 4,000 3,791 4,000 4,000 4,000 - -
100-55310-353 Community Night Out 2,300 2,532 2,532 2,300 2,300 - -
100-55310-354 Music In The Grove 5,000 3,500 3,500 5,000 3,500 (1,500) (1,500)
Total Recreation Programs 410,934 297,152 403,727 429,964 411,490 556 (18,474)
63
Parks Maintenance
100-55400-115 Wages Park Maintenance
100-55400-116 Overtime Wages Overtime for Parks Maintenance employe e
100-55400-117 Part Time Wages Seasonal parks maintenance staff
100-55400-151 FICA Employer share of social security and medicare.
100-55400-152 Retirement Employer share of pension contribution
100-55400-153 Dental Insurance Employer share of dental premiums
100-55400-154 Health Insurance Employer share of health premiums
100-55400-155 Life Insurance Employer share of life premiums
Forestry
100-55500-115 Wages Village Forester
100-55500-116 Overtime wages Overtime
100-55500-151 FICA Employer share of social security and medicare
100-55500-152 Retirement Employer share of pension contribution
100-55500-153 Dental Insurance Employer share of dental premiums
100-55500-154 Health Insurance Employer share of health premiums
100-55500-155 Life Insurance Employer share of life premiums
100-55500-210 Professional Services Cost associated with contracting with tree cutting and GIS services
100-55500-340 Operating Supplies and Expenses Misc. supplies to support village forester
Planning
100-56300-110 Salaries Village Planner
100-56300-151 FICA Employer share of social security and medicare
100-56300-152 Retirement Employer share of pension contribution
100-56300-153 Dental Insurance Employer share of dental premiums
100-56300-154 Health Insurance Employer share of health premiums
100-56300-155 Life Insurance Employer share of life premiums
100-56300-340 Operating Supplies and Expenses Training, postage, printing, travel, publications, professional organization dues, misc. supplies
Economic Development
100-56700-110 Salaries Village Planner
100-56700-151 FICA Employer share of social security and medicare
100-56700-152 Retirement Employer share of pension contribution
100-56700-153 Dental Insurance Employer share of dental premiums
100-56700-154 Health Insurance Employer share of health premiums
100-56700-155 Life Insurance Employer share of life premiums
100-56700-340 Operating Supplies and Expenses Training, postage, printing, travel, publications, professional organization dues, misc. supplies
64
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Parks Maintenance
100-55400-115 Wages 55,458 38,838 51,650 57,381 57,259 1,801 (122)
100-55400-116 Overtime Wages - 2,922 3,922 3,000 3,000 3,000 -
100-55400-117 Part Time Wages 86,000 61,553 76,265 86,000 86,000 - -
100-55400-151 FICA 10,822 7,950 10,086 11,198 11,189 367 (9)
100-55400-152 Retirement 3,993 3,235 4,001 4,160 4,151 158 (9)
100-55400-153 Dental Insurance 600 443 542 627 627 27 -
100-55400-154 Health Insurance 10,833 8,125 9,931 27,854 27,854 17,021 -
100-55400-155 Life Insurance 825 618 1,044 850 850 25 -
Total Parks Maintenance 168,531 123,684 157,440 191,070 190,930 22,399 (140)
Forestry
100-55500-115 Wages 57,717 40,430 57,775 59,719 59,591 1,874 (128)
100-55500-116 Overtime Wages - 1,520 2,520 2,000 2,000 2,000 -
100-55500-117 Part Time Wages - - - 12,000 12,000 12,000 -
100-55500-151 FICA 4,415 3,039 4,613 5,640 5,630 1,215 (10)
100-55500-152 Retirement 4,156 3,157 4,341 4,330 4,320 164 (10)
100-55500-153 Dental Insurance 1,392 1,029 1,371 1,454 1,454 62 -
100-55500-154 Health Insurance 21,299 15,974 21,299 22,283 22,283 984 -
100-55500-155 Life Insurance 340 245 327 340 340 - -
100-55500-210 Professional Services 9,000 6,128 9,000 9,000 9,000 - -
100-55500-340 Operating Supplies and Expenses 19,800 * 7,606 11,800 11,800 19,300 (500) 7,500
Total Forestry 118,119 79,128 113,046 128,566 135,918 17,799 7,352
Culture, Recreation, Education 973,450 707,024 952,139 1,084,526 1,050,954 77,504 (33,572)
Conservation and Development
Planning
100-56300-110 Salaries 39,989 28,552 40,809 38,318 38,236 (1,753) (82)
100-56300-151 FICA 3,059 2,114 3,122 2,931 2,925 (134) (6)
100-56300-152 Retirement 2,879 2,142 2,938 2,778 2,772 (107) (6)
100-56300-153 Dental Insurance 570 421 561 541 541 (29) -
100-56300-154 Health Insurance 8,719 6,539 8,719 8,287 8,287 (432) -
100-56300-155 Life Insurance 139 104 140 134 134 (5) -
100-56300-340 Operating Supplies and Expenses 4,250 3,266 5,000 5,500 4,750 500 (750)
Total Planning 59,605 43,138 61,289 58,489 57,645 (1,960) (844)
Economic Development
100-56700-110 Salaries 39,989 28,552 40,809 38,318 38,236 (1,753) (82)
100-56700-151 FICA 3,059 2,114 3,122 2,931 2,925 (134) (6)
100-56700-152 Retirement 2,879 2,142 2,938 2,778 2,772 (107) (6)
100-56700-153 Dental Insurance 570 421 561 541 541 (29) -
100-56700-154 Health Insurance 8,719 6,540 8,719 8,287 8,287 (432) -
100-56700-155 Life Insurance 139 104 140 134 134 (5) -
100-56700-340 Operating Supplies and Expenses 4,250 2,670 5,000 5,500 4,750 500 (750)
Total Economic Development 59,605 42,542 61,289 58,489 57,645 (1,960) (844)
Conservation and Development 119,210 85,680 122,579 116,978 115,290 (3,920) (1,688)
65
General Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Other Financing Uses
100-59201-300 Transfer out - Debt service - - - - - - -
100-59201-207 Transfer out - Librar y 46,863 46,863 46,863 52,027 52,027 5,164 -
Total Other Financing Uses 46,863 46,863 46,863 52,027 52,027 5,164 -
Expenditures 7,572,465 5,528,784 7,410,115 8,156,069 7,875,070 302,605 (280,999)
Net Income/(Use of Fund balance) - 1,431,374 225,341 - - - -
* Amended from original 2026 Budget. Detail available in Appendix
66
DEBT SERVICE FUND
67
Debt Service Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Taxes
300-41110-000 General Property Taxes 1,835,371 1,835,371 1,835,371 2,882,073 2,874,523 1,039,152 (7,550)
Total Taxes 1,835,371 1,835,371 1,835,371 2,882,073 2,874,523 1,039,152 (7,550)
Miscellaneous Revenue
300-48110-000 Interest on Investments 30,000 30,451 35,000 4,000 4,000 (26,000) -
300-48900-000 Premium on debt issue 614,383 614,383 614,383 - - (614,383) -
Total Miscellaneous Revenue 644,383 644,834 649,383 4,000 4,000 (640,383) -
Other Financing Sources
300-49000-000 Use of prior year debt premium 189,845 - - 584,741 584,741 394,896 -
300-49000-001 Use of debt reserves to offset levy 350,000 - - 50,000 50,000 (300,000) -
300-49000-002 Use of prior year TID 5 transfer - - - 291,182 291,182 291,182 -
300-49000-100 Transfer from general fund - - - - - - -
300-49000-411 Transfer from ERIM 100,000 100,000 100,000 - - (100,000) -
300-49405-000 Transfer from TID 5 1,769,760 1,769,757 1,769,757 - - (1,769,760) -
300-49406-000 Transfer from TID 6 116,775 116,775 116,775 118,550 118,550 1,775 -
300-49509-000 Transfer from TID 9 764,517 764,517 764,517 761,143 761,143 (3,374) -
Total Other Financing Sources 3,290,897 2,751,049 2,751,049 1,805,616 1,805,616 (1,485,281) -
Revenues 5,770,651 5,231,254 5,235,803 4,691,689 4,684,139 (1,086,512) (7,550)
Expenditures
Principal
300-58100-610 Principal payments 3,651,694 3,651,694 3,651,694 2,534,812 2,534,812 (1,116,882) -
Total Principal 3,651,694 3,651,694 3,651,694 2,534,812 2,534,812 (1,116,882) -
Interest and fiscal charges
300-58200-622 Interest on debt 1,133,697 1,130,028 1,133,697 2,084,327 2,084,327 950,630 -
300-58200-691 Fiscal Agent Charges 4,000 3,600 3,600 4,000 4,000 - -
Total Interest and fiscal charges 1,137,697 1,133,628 1,137,297 2,088,327 2,088,327 950,630 -
Other Financing Uses
300-59201-406 Forgiveness of TID 6 advance 116,348 116,348 116,348 - - (116,348) -
Total Other Financing Uses 116,348 116,348 116,348 - - (116,348) -
Expenditures 4,905,739 4,901,670 4,905,339 4,623,139 4,623,139 (282,600) -
Net Income/(Use of Fund balance) 864,912 329,584 330,464 68,550 61,000 (803,912) (7,550)
68
CAPITAL PROJECTS FUND
69
Capital Projects Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Intergovernmental Aid
410-43620-000 DNR Trailhead Grant 39,000 - 39,000 - - (39,000) -
410-43520-000 WDNR Stormwater Planning Grant 47,455 47,455 47,455 - - (47,455) -
410-43550-000 State Fire Dues 61,454 61,454 61,454 62,000 62,000 546 -
410-43790-000 Federal Grant - MPO 120,000 - 120,000 - - (120,000) -
Total Intergovernmental Aid 267,909 108,909 267,909 62,000 62,000 (205,909) -
Special Assessment Revenue
410-42124-000 Special assessment 1,128 1,128 1,128 1,128 1,128 - -
410-48112-000 Interest on special assessment 141 141 141 71 71 (70) -
Total Special Assessment Revenue 1,269 1,269 1,269 1,199 1,199 (70) -
Miscellaneous Revenue
410-44300-000 Building Permits - - - - 100,000 100,000 100,000
410-48110-000 Interest on investments 8,000 8,622 10,125 6,000 6,000 (2,000) -
410-48190-000 Cable Franchise Fees 25,000 13,171 26,100 25,000 25,000 - -
410-48310-000 Sale of property 12,950 12,950 12,950 - - (12,950) -
410-48510-000 Donations from Individuals/organizations 10,150 10,150 10,150 - - (10,150) -
Total Miscellaneous Revenue 56,100 44,893 59,325 31,000 131,000 74,900 100,000
Other financing sources
410-49200-100 Transfer-in - General - - 100,000 ^- - - -
Total Other financing sources - - 100,000 - - - -
Revenues 325,278 155,071 428,503 94,199 194,199 (131,079) 100,000
70
Capital Projects Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Expenditures
Capital Outlay
General Government
410-57100-225 IT Equipment - Failed 7,000 6,592 6,592 5,000 - (7,000) (5,000)
410-57100-270 Communications 7,000 4,964 7,000 - - (7,000) -
410-57100-226 Comprehensive Plan Update 100,000 8,368 100,000 - - (100,000) -
410-57100-261 Fire and EMS Operational and Facility Study 22,000 12,502 22,000 - - (22,000) -
410-57100-271 MSB Space Needs Study - - - 50,000 50,000 50,000 -
410-52400-210 Professional Services - Building - - - - 85,000 85,000 85,000
410-57100-820 Village Building Maintenance 40,150 23,589 40,150 75,000 45,000 4,850 (30,000)
Total General Government 176,150 56,014 175,742 130,000 180,000 3,850 50,000
Fire and EMS
410-57220-850 Emergency Service Building - - - 5,000 5,000 5,000 -
410-57220-860 Fire Dues Expenses 55,500 28,516 35,000 62,000 62,000 6,500 -
Total Fire and EMS 55,500 28,516 35,000 67,000 67,000 11,500 -
Total Public Safety 55,500 28,516 35,000 67,000 67,000 11,500 -
Public Works
410-57300-810 PW Maintenance (Beautification) - - - - 4,000 4,000 4,000
410-57300-840 Stormwater Planning 32,640 32,640 32,640 - - (32,640) -
410-57300-850 MPO Planning Grant 150,000 - 150,000 - - (150,000) -
410-57300-830 Street Lights for DNR Trailhead 49,000 21,775 49,000 - - (49,000) -
410-57300-851 Stormwater Utility Feasibility 100,000 70,212 73,500 - - (100,000) -
410-57300-820 Traffic Study - - - 40,000 40,000 40,000 -
Total Public Works 331,640 124,627 305,140 40,000 44,000 (287,640) 4,000
Culture, Recreation, & Education
410-57500-100 ADA Compliance Projects 10,000 6,268 6,268 10,000 10,000 - -
410-57500-101 Playground maintenance - Woodchips 10,000 7,584 10,000 10,000 10,000 - -
Total Culture, Recreation, & Education 20,000 13,852 16,268 20,000 20,000 - -
Miscellaneous
410-57800-820 Professional Services 25,000 - - 25,000 25,000 - -
Total Miscellaneous 25,000 - - 25,000 25,000 - -
Other financing uses
410-59000-204 Transfer out - Library - - - 25,000 25,000 25,000 -
Total Other financing uses - - - 25,000 25,000 25,000 -
Expenditures 608,290 223,009 532,150 307,000 361,000 (247,290) 54,000
Net Income/(Use of Fund balance) (283,012) (67,939) (103,647) (212,801) (166,801) 116,211 46,000
^ Administration will be recommending a transfer of unrestricted fund balance in 2026.
2026/2027 Budget Amendment expected to carry over funds
71
EQUIPMENT REPLACEMENT AND
INFRASTRUCTURE MAINTENANCE FUND
72
Equipment Replacement and Infrastructure Maintenance Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Miscellaneous Revenue
411-48110-000 Interest on Investments 24,865 26,090 30,000 15,000 15,000 (9,865) -
Total Miscellaneous Revenue 24,865 26,090 30,000 15,000 15,000 (9,865) -
Other Financing Sources
411-49120-000 Proceeds from long term debt 1,555,000 1,555,000 1,555,000 765,327 716,327 (838,673) (49,000)
411-49999-000 Carry over funds 217,210 - - 178,174 178,174 (39,036) -
411-48310-000 Sale of property 89,205 89,205 89,205 - - (89,205) -
411-48400-000 Insurance reimbursement 32,451 32,451 32,451 - - (32,451) -
411-49000-412 Transfer in - Public Infrastructure 294,000 - 294,000 - - (294,000) -
411-48900-000 Premium on debt issue 17,967 17,967 17,967 - - (17,967) -
Total Other Financing Sources 2,205,833 1,694,622 1,988,623 943,501 894,501 (1,311,332) (49,000)
Revenues 2,230,698 1,720,712 2,018,623 958,501 909,501 (1,321,197) (49,000)
73
Equipment Replacement and Infrastructure Maintenance Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Expenditures
Capital Outlay
General Government
411-57100-026 2026 Equipment Purchases 62,850 17,200 17,200 23,000 23,000 (39,850) -
411-57100-027 2027 Equipment Purchases - - - 47,500 47,500 47,500 -
General Government 62,850 17,200 17,200 70,500 70,500 7,650 -
Public Safety
411-57200-002 EMS Equipment - - - - - - -
411-57200-003 Fire Equipment 15,825 16,373 16,373 93,675 93,675 77,850 -
411-57200-026 2026 Equipment Purchases 280,000 211,591 241,591 - - (280,000) -
411-57200-027 2027 Equipment Purchases - - - 334,500 284,500 284,500 (50,000)
Total Public Safety 295,825 227,964 257,964 428,175 378,175 82,350 (50,000)
Public Works
411-57300-000 Annual Road, Sidewalk, and Chipseal 1,029,378 988,092 1,001,729 210,000 210,000 (819,378) -
411-57300-026 2026 Equipment Purchases 599,720 187,101 582,101 - - - -
411-57300-027 2027 Equipment Purchases - - - 231,000 261,000 - -
Total Public Works 1,629,098 1,175,193 1,583,830 441,000 471,000 (819,378) -
Culture, Recreation, & Education
411-57500-026 2026 Equipment Purchases 138,277 109,333 109,333 - - (138,277) -
411-57500-027 2027 Equipment Purchases - - - 197,000 168,000 168,000 (29,000)
Total Culture, Recreation, & Education 138,277 109,333 109,333 197,000 168,000 29,723 (29,000)
Other financing uses
411-59000-300 Transfer out - debt service fund 100,000 100,000 100,000 - - (100,000) -
411-58200-000 Debt Issuance Costs 32,214 32,214 32,214 - - (32,214) -
Total Other financing uses 132,214 132,214 132,214 - - (132,214) -
Expenditures 2,258,264 1,661,904 2,100,541 1,136,675 1,087,675 (831,869) (79,000)
Net Income/(Use of Fund balance) (27,566) 58,808 (81,918) (178,174) (178,174) (489,328) 30,000
74
PUBLIC INFRASTRUCTURE FUND
75
Public Infrastructure Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Miscellaneous Revenue
412-48110-000 Interest on Investments 187,651 202,662 232,662 25,000 25,000 (162,651) -
Total Miscellaneous Revenue 187,651 202,662 232,662 25,000 25,000 (162,651) -
Other Financing Sources
412-49200-000 Carry forward for police station 1,388,805 - - - - (1,388,805) -
412-49300-000 Carry forward for road work - - - 93,927 93,927 93,927 -
412-49000-405 Transfer in - TID 5 600,000 600,000 600,000 - - (600,000) -
412-48000-000 Misc. Revenue 110,000 110,361 110,361 - - (110,000) -
412-49120-000 Proceeds from long term debt 15,150,000 15,150,000 15,150,000 1,138,219 1,138,219 (14,011,781) -
412-48900-000 Premium on debt issue 175,044 175,044 175,044 - - (175,044) -
Total Other Financing Sources 17,423,849 16,035,405 16,035,405 1,232,146 1,232,146 (16,191,703) -
Revenues 17,611,500 16,238,067 16,268,067 1,257,146 1,257,146 (16,354,354) -
Expenditures
Capital Outlay
Public Safety
412-57200-024 Police Station 15,124,199 5,860,426 15,124,199 - - (15,124,199) -
Public Safety 15,124,199 5,860,426 15,124,199 - - (15,124,199) -
Public Works
412-57300-025 2025 - Engineering 2,960 2,960 2,960 - - (2,960) -
412-57300-026 2026 - Engineering 78,550 71,256 73,575 - - (78,550) -
412-57300-027 2027 - Engineering 195,000 38,429 195,000 - - (195,000) -
412-57300-028 2028 - Engineering - - - 45,000 45,000 45,000 -
412-57300-125 E Taylor/Weald Bridge/Main St. (CTH N) 28,500 28,500 28,500 - - (28,500) -
412-57300-225 Bike Path Extension Southing Grange to CTH N 46,400 46,400 46,400 - - (46,400) -
412-57300-126 BB/Buss Bike Path & Damascus Bike Path Impr 347,000 302,786 302,786 - - (347,000) -
412-57300-127 Ollie and Main Road Reconstruction - - - 1,400,000 1,400,000 1,400,000 -
Total Public Works 698,410 490,331 649,221 1,445,000 1,445,000 746,590 -
Other financing uses
412-59000-411 Transfer out - ERIM 294,000 - 294,000 - - (294,000) -
412-58200-000 Debt Issuance Costs 303,741 303,741 303,741 - - (303,741) -
Total Other financing uses 597,741 303,741 597,741 - - (597,741) -
Expenditures 16,420,350 6,654,498 16,371,161 1,445,000 1,445,000 (14,975,350) -
Net Income/(Use of Fund balance) 1,191,150 9,583,568 (103,094) (187,854) (187,854) (1,379,004) -
2026/2027 Budget Amendment expected to carry over funds
76
PARK DEVELOPMENT FEES FUND
77
Park Development Fees Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Public charges for service
205-46000-000 Park development fees 85,000 38,868 53,802 50,000 30,000 (55,000) (20,000)
205-46810-000 Fees in Lieu of Parkland 60,000 19,614 29,421 30,000 14,616 (45,384) (15,384)
Total Public charges for service 145,000 58,482 83,223 80,000 44,616 (100,384) (35,384)
Miscellaneous Revenue
205-48110-000 Interest on investments 20,000 34,822 42,322 25,000 25,000 5,000 -
205-48510-100 Donations 17,000 4,500 4,500 2,000 2,000 (15,000) -
37,000 39,322 46,822 27,000 27,000 (10,000) -
Revenues 182,000 97,804 130,045 107,000 71,616 (110,384) (35,384)
Expenditures
Park Improvements Operating
205-55000-210 Professional Services 32,500 18,386 31,145 25,000 25,000 (7,500) -
205-55000-340 Operating Supplies and Expenses 7,500 10,702 13,700 - - (7,500) -
205-57500-000 Shady Grove 524,628 484,689 524,628 - - - -
Total Park Improvements Operating 564,628 513,777 569,473 25,000 25,000 (15,000) -
Parks Donation Expense
205-57500-001 Baseball Donation Expense 15,000 - - - - (15,000) -
205-57500-002 Soccer Donation Expense 2,000 2,000 - 2,000 2,000 - -
205-57500-003 Recreation Donation Expense - - - - - - -
205-57500-004 Pickleball Donation Expense - 477 - - - - -
Total Parks Donation Expense 17,000 2,477 - 2,000 2,000 (15,000) -
Expenditures 581,628 516,254 569,473 27,000 27,000 (30,000) -
Net Income/(Use of Fund balance) (399,628) (418,450) (439,428) 80,000 44,616 (80,384) (35,384)
78
LIBRARY FUND
79
Library Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Other Financing Sources
204-43000-000 Library Grants - 1,250 1,250 - - - -
204-48000-000 Donations - 5,740 5,740 - - - -
204-49100-000 Transfer in - General Fund 46,863 46,863 46,863 52,027 52,027 5,164 -
204-49410-000 Transfer in - Capital Projects Fund - - - 25,000 25,000 25,000 -
Total Other Financing Sources 46,863 53,853 53,853 77,027 77,027 30,164 -
Revenues 46,863 53,853 53,853 77,027 77,027 30,164 -
Expenditures
Library
204-55100-115 Wages 28,796 18,956 27,844 33,593 33,593 4,797 -
204-55100-151 FICA 2,203 1,450 2,130 2,570 2,570 367 -
204-55100-332 Mileage - - - 288 288 288 -
204-55100-340 Operating Supplies/Expenses 15,864 13,466 18,426 15,576 15,576 (288) -
Total Library 46,863 33,873 48,400 52,027 52,027 5,164 -
Expenditures 46,863 33,873 48,400 52,027 52,027 5,164 -
Net Income/(Use of Fund balance) - 19,980 5,453 25,000 25,000 25,000 -
80
TOURISM FUND
81
Tourism Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Taxes
207-41125-000 Municipal Room Tax 140,000 89,539 130,000 150,000 150,000 10,000 -
Total Taxes 140,000 89,539 130,000 150,000 150,000 10,000 -
Revenues 140,000 89,539 130,000 150,000 150,000 10,000 -
Expenditures
Economic Development
207-56700-220 Post Development Grant 36,000 24,763 38,000 42,600 42,600 6,600 -
207-56700-230 Tourism 70% share 98,000 62,677 88,665 105,000 105,000 7,000 -
207-56700-340 Unrestricted funds 7,000 5,824 5,824 6,057 6,057 (943) -
Total Economic Development 141,000 93,264 132,489 153,657 153,657 12,657 -
Expenditures 141,000 93,264 132,489 153,657 153,657 12,657 -
Net Income/(Use of Fund balance) (1,000) (3,725) (2,489) (3,657) (3,657) (2,657) -
82
AFFORDABLE HOUSING FUND
83
Affordable Housing Fund 12/31/2026 "All in"
2027 Preliminary Budget Department Village Board
Requested Village Board Preliminary 2027 2027 Preliminary
Budget Actual Projected Budget Preliminary Budget Budget Compared to Compared to 2026
2026 9/30/2026 2026 2027 2027 2026 Budget Department Request
Revenues
Miscellaneous Revenue
208-48110-000 Interest Income 25,000 23,682 28,000 25,000 25,000 - -
Total Miscellaneous Revenue 25,000 23,682 28,000 25,000 25,000 - -
Revenues 25,000 23,682 28,000 25,000 25,000 - -
Expenditures
Economic Development
208-56700-340 Housing Stock - Utility Master Plan (25%) - - - - - - -
208-56700-341 Affordable Housing Program - Park Fees (75%) - - - - - - -
Total Economic Development - - - - - - -
Expenditures - - - - - - -
Net Income/(Use of Fund balance) 25,000 23,682 28,000 25,000 25,000 - -
84
Tax Incremental Districts (TID)
85
TID 6 Fund
2027 Preliminary Budget
Budget
2027
Revenues
Taxes
406-41120-000 Tax Increment 55,573
Total Taxes 55,573
Intergovernmental Aid
406-43510-000 Exempt Computer Aid 649
406-43515-000 Personal Property Aid 1,364
Total Intergovernmental Aid 2,013
Revenues 57,586
Project Costs
Professional Services
406-56701-210 Plan, Legal, and Admin 150
Total Professional Services 150
Debt
Principal
Principal payments 110,000
Interest and fiscal charges
Interest 8,550
406-59300-900 Total Debt (Transfer to debt service) 118,550
Expenditures 118,700
Net Income (Loss) (61,114)
*Final determination of increment the later of Tax Increment Worksheet (anticipated Nov 13)
availability and adoption of Village municipal budget (anticipated Nov 16).
86
TID 8 Fund
2027 Preliminary Budget
Budget
2027
Revenues
Taxes
508-41120-000 Tax Increment 80,825
508-48900-001 Tax Guarantee 7,600
Total Taxes 88,425
Revenues 88,425
Project Costs
Administration, internal
508-51410-110 Salaries 27,845
508-51410-151 FICA 2,130
508-51410-152 Retirement 2,019
508-51410-153 Dental Insurance 318
508-51410-154 Health Insurance 4,875
508-51410-155 Life Insurance 70
508-51410-340 Operating Supplies and Expenses 3,500
Total Administration, internal 40,757
Professional Services
508-56701-210 Plan, Legal, and Admin 3,500
Total Professional Services 3,500
Developer Incentives
508-56100-000 Developer Incentives 76,000
Total Developer incentives 76,000
Expenditures 120,257
Net Income (Loss) (31,832)
*Final determination of increment the later of Tax Increment Worksheet (anticipated Nov 13)
availability and adoption of Village municipal budget (anticipated Nov 16).
87
TID 9 Fund
2027 Preliminary Budget
Budget
2027
Revenues
Taxes
509-41120-000 Tax Increment 911,919
Total Taxes 911,919
Intergovernmental Aid
509-43515-012 Personal Property Aid - Act 12 8,959
Total Intergovernmental Aid 8,959
Miscellaneous
509-48110-000 Interest Income 10,000
509-48200-000 Lease Revenue 116,040
Total Miscellaneous 126,040
Revenues 1,046,918
Project Costs
Administration, internal
509-51410-110 Salaries 42,546
509-51410-151 FICA 3,255
509-51410-152 Retirement 3,085
509-51410-153 Dental Insurance 463
509-51410-154 Health Insurance 7,103
509-51410-155 Life Insurance 102
509-51410-340 Operating Supplies and Expenses 141,625
Total Administration, internal 198,179
Professional Services
509-56701-210 Plan, Legal, and Admin 20,000
Total Professional Services 20,000
Debt
Principal
Principal payments 580,000
Interest and fiscal charges
Interest 181,143
509-59300-900 Total Debt (Transfer to debt service) 761,143
Expenditures 979,322
Net Income (Loss) 67,596
*Final determination of increment the later of Tax Increment Worksheet (anticipated Nov 13)
availability and adoption of Village municipal budget (anticipated Nov 16).
88
TID 10 Fund
2027 Preliminary Budget
Budget
2027
Revenues
Taxes
510-41120-000 Tax Increment 7,439,108
Total Taxes 7,439,108
Intergovernmental Aid
510-43515-012 Personal Property Aid - Act 12 24
Total Intergovernmental Aid 24
Miscellaneous
510-48110-000 Interest Income 20,000
Total Miscellaneous 20,000
Revenues 7,459,132
Project Costs
Administration, internal
510-51410-110 Salaries 42,546
510-51410-151 FICA 3,255
510-51410-152 Retirement 3,085
510-51410-153 Dental Insurance 463
510-51410-154 Health Insurance 7,103
510-51410-155 Life Insurance 102
510-51410-340 Operating Supplies and Expenses 10,000
Total Administration, internal 66,554
Professional Services
510-56701-210 Plan, Legal, and Admin 20,000
Total Professional Services 20,000
Developer Incentives
510-56100-000 Developer Incentives 6,670,000
Total Developer incentives 6,670,000
Expenditures 6,756,554
Net Income (Loss) 702,578
*Final determination of increment the later of Tax Increment Worksheet (anticipated Nov 13)
availability and adoption of Village municipal budget (anticipated Nov 16).
89
2027 Utility Commission Adopted Budget
90
Water Utility
91
Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: September 16, 2026
Memo Date: September 10, 2026
To: Utility Commission
From: Kyela O’Loughlin - Director of Public Works and Utilities
Cameron Sawyer – Assistant Administrator/Finance Director
Subject: 2027 Budget Request - Water
Operating Requests
The Village
has initiated a conventional rate case following the 2027 Water Long Range Cash Flow
Analysis. It is anticipated that the Wisconsin Public Service Commission will approve a rate increase of
approximately 27.70%. It is anticipated that the rate increase would take effect July 1, 2027. The last
Water rate increase was April 1, 2024.
Utility Operations Technician – The Water and Sewer utility have approximately 40 miles of sanitary
sewer and water main, 3 municipal wells, 2 water towers, and 6 lift stations. The additional staffing will
improve operational efficiency, provide greater responsiveness to routine and emergency needs, reduce
workload demands on existing staff, and help ensure the continued reliability of the Village's water and
sanitary sewer utilities.
Capital Expenses
2027 Vehicle & Equipment Replacement (CP: $231,0
00, W: $49,500, S: $49,500)
We are reque
sting the planned replacement of a Plow truck, including upfitting. If approved the
department would order a truck and receive it either in 2027 or 2028. Upfitting would occur in 2028 or
2029 based on current lead times. The water portion would be funded by cash on hand.
Tower Security System (W: $26,000) - To protect our tower facilities, it is recommended to install a
security system for Towers 2 and 3. This system would include 2 exterior cameras at each tower. This
would allow staff to monitor any activity at the tower facilities, and review footage, should it be
necessary for an incident. This project would be funded by cash on hand.
2027 Major Projects (CP: $1,560,000, W: $1,681,500, S: $1,600,500)
Ollie Street Reconstruction (CP: $830,000, W: $863,000, S: $702,000) - The project will
replace the old,
aging clay sanitary sewer main as well as the undersized 6-inch water main beneath the street. At the
same time as the utilities are replaced, the street will get new asphalt to replace the failed existing
asphalt. Additionally, concrete curb and gutter and sidewalk will be replaced throughout the corridor.
Most of the costs incurred will be utility costs, but some costs will be incurred by the capital projects
fund. Engineering is included in the amount above CP: $80,000, W: $93,000, S: $92,000. Engineering
started in 2026.
92
p
Village of Cottage Grove, WI
Main Street Reconstruction, Reynolds South to Village Limits (CP: $765,000, W: $843,500, S: $651,000)
- The project will incorporate replacing the undersized 6-inch water main as well as replace the aging,
old concrete sanitary sewer pipe beneath the street. While the utilities are being replaced, the street
will be reconstructed due to the aging and failed pavement along the corridor. Additionally, concrete
curb and gutter and sidewalk will be replaced throughout the corridor. Most of the costs incurred will
be utility costs, but some costs will be incurred by the capital projects fund. Engineering is included in
the amount above CP: $115,000, W: $98,500, S: $91,000. Engineering started in 2026.
2028 Engineering in 2027 Budget
The following projects are in the Financial Management Plan in 2028, which require engineering and
design in 2027. Well 4 Improvements, Well 4 Hole Rehab, and Flush Station do not require engineering
in 2027.
Dentaria Water Main Design (W: $45,000) - In the last 4 years there have been three different water
main breaks near the same section of Dentaria Drive. As part of the planned pulverization of Dentaria
Drive in 2028, the section of Dentaria Drive where the previous water main breaks are planned to be
replaced. To ensure design is completed prior to bidding the project in early 2028, design of the water
main is planned for 2027.
Well 3 Improvements – (W: $50,000) - Well 3 was built in 1993 when DNR regulations did not require
separate chemical rooms at the wellhouse. Presently, both chlorine and fluoride storage containers are
in the same chemical room at Well 3. In 2010, regulations were modified to require separate chemical
rooms for each chemical. This deficiency has also been noted several times in our Sanitary Survey. This
project would create a second chemical room where the previously right-angle drive (backup generator)
existed before the new generator was installed as part of the SCADA project in 2025. Additionally, a
separate sample tap will be provided at Well 3 as part of this project. The design for the project would
occur in 2027 with construction slated in 2028.
93
Water Utility
Adopted Budget 12/31/2025 8/31/2026 8 12/31/2026
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Operating Revenue
Residential
600-46100-000 Metered Sales-Residental 926,444 650,646 975,969 915,000 1,108,000
600-46105-000 Metered Sales-Multi Family 224,267 150,250 225,374 225,000 256,000
Total Residential 1,150,711 800,896 1,201,343 1,140,000 1,364,000
Commercial
600-46101-000 Metered Sales-Commercial 152,074 112,076 168,114 155,000 191,000
Total Commercial 152,074 112,076 168,114 155,000 191,000
Industrial
600-46102-000 Metered Sales-Industrial 90,578 58,557 87,836 95,000 100,000
Total Industrial 90,578 58,557 87,836 95,000 100,000
Public Authority
600-46103-000 Metered Sales-Public Authority 26,301 19,119 28,679 27,000 33,000
600-46200-000 Private Fire Protection 67,945 84,623 126,934 58,500 66,500
600-46300-000 Public Fire Protection 646,457 439,823 659,734 645,000 750,000
Total Public Authority 740,703 543,565 815,347 730,500 849,500
Other operating
600-47001-000 Penalty Revenue 8,787 5,115 7,672 7,500 8,000
600-47400-000 Other Water Operating Revenue 16,011 9,173 13,759 8,500 14,000
Total other operating 24,798 14,287 21,431 16,000 22,000
Operating Revenue Total 2,158,864 1,529,381 2,294,071 2,136,500 2,526,500
94
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Operating Expenses
Source of Supply Expenses
Operation labor - 600
600-60600-120 Operation labor 54,577 - - - -
Operation labor - 640 subtotal 54,577 - - - -
Operation supplies and expenses - 602
600-60602-340 Operation supplies and expenses 3,369 25,499 38,248 14,500 14,750
Operation supplies and expenses - 602 subtotal 3,369 25,499 38,248 14,500 14,750
Maintenance of water source plant - 605
600-60605-340 Maintenance of water source plant 4,060 1,770 2,655 20,000 20,500
Maintenance of water source plant - 605 subtotal 4,060 1,770 2,655 20,000 20,500
Total Source of Supply Expenses 62,005 27,269 40,903 34,500 35,250
Pumping Expenses
Fuel or power purchased for pumping - 622
600-60622-340 Power purchased for pumping - Alliant 88,934 63,752 95,628 87,550 100,000
Fuel or power purchased for pumping - 622 subtotal 88,934 63,752 95,628 87,550 100,000
Total Pumping Expenses 88,934 63,752 95,628 87,550 100,000
Water Treatment Expenses
Chemicals - 631
600-60631-210 Professional Services - Chemicals 10,158 6,330 9,495 13,133 13,250
Chemicals - 631 subtotal 10,158 6,330 9,495 13,133 13,250
Operation supplies and expenses - 632
600-60632-340 Operation supplies and expenses - Lab testing 3,097 5,557 8,335 5,500 4,000
Operation supplies and expenses - 632 subtotal 3,097 5,557 8,335 5,500 4,000
Maintenance of water treatment plant - 635
600-60635-340 Maintenance of water treatment plant 9,895 - - 5,000 5,100
Maintenance of water treatment plant - 635 subtotal 9,895 - - 5,000 5,100
Total Water Treatment Expenses 23,149 11,887 17,830 23,633 22,350
95
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Trans. & Distribution Expenses
Operation labor - 640
600-60640-120 Operation labor 54,577 - - - -
Operation labor - 640 subtotal 54,577 - - - -
Maintenance of distr. Reservoirs - 650
600-60650-340 Standpipe Mt-Oper Supplies 19,914 20,042 30,063 18,500 28,000
Maintenance of distr. Reservoirs - 650 subtotal 19,914 20,042 30,063 18,500 28,000
Maintenance of mains - 651
600-60651-340 Mains Maintenance-Oper Sup/Exp 20,587 24,143 36,214 20,300 20,750
Maintenance of mains - 651 subtotal 20,587 24,143 36,214 20,300 20,750
Maintenance of services - 652
600-60652-340 Services Mt-Oper Sup/Exp 3,858 206 308 3,000 3,800
Maintenance of services - 652 subtotal 3,858 206 308 3,000 3,800
Maintenance of meters - 653
600-60653-120 Meters-MT Wages 54,577 - - - -
600-60653-210 Professional Services - Meter testing 5,245 2,245 3,368 7,000 7,250
600-60653-340 Meters Mt-Operating Supplies 1,122 224 336 2,500 2,750
Maintenance of meters - 653 subtotal 60,944 2,469 3,704 9,500 10,000
Maintenance of Hydrants - 654
600-60654-340 Hydrants Mt-Operating Supplies 27,523 14,970 22,455 30,000 21,000
Maintenance of Hydrants - 654 subtotal 27,523 14,970 22,455 30,000 21,000
Total Trans. & Distribution Expenses 187,403 61,829 92,744 81,300 83,550
96
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Customer accounts expenses
Meter reading labor - 901
600-60901-120 Meter reading labor 54,577 - - - -
Meter reading labor - 901 subtotal 54,577 - - - -
Accounting and collection labor - 902
600-60902-110 Salaries 61,077 39,680 59,521 61,072 63,562
600-60902-115 Wages 39,307 25,564 38,346 41,878 42,985
600-60902-116 Overtime - - - - -
600-60902-332 Mileage 374 193 289 525 551
Accounting and collection labor - 902 subtotal 100,759 65,437 98,155 103,475 107,098
Supplies and expenses -903
600-60903-210 Professional Services 18,584 19,495 19,495 17,700 13,000
600-60903-340 Cust Acct - Operating Supplies 36,760 23,640 35,460 39,500 30,000
Supplies and expenses - 903 subtotal 55,344 43,135 54,955 57,200 43,000
Uncollectable accounts - 904
600-60904-340 Uncollectable accounts - 4 5 - -
Uncollectable accounts - 904 subtotal - 4 5 - -
Total Customer accounts expenses 210,679 108,576 153,116 160,675 150,098
97
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Administrative and general expenses
Administrative and general salaries -920
600-60920-110 Salaries 140,491 87,374 131,062 136,502 140,818
600-60920-115 Wages 0 134,171 201,257 204,674 234,603
600-60920-116 Overtime 0 7,085 10,627 11,173 13,277
600-60920-332 Admin & Gen-Mileage 454 317 475 500 550
600-60920-340 Admin & Gen Operating Supplies 27,821 22,026 33,039 47,000 48,500
Administrative and general salaries - 920 subtotal 168,766 250,973 376,460 399,849 437,748
Outside Services employed - 923
600-60923-125 Utility Commission Wages 438 225 450 500 500
600-60923-210 Admin & Gen Professional Serv 114,620 75,377 129,218 125,000 130,000
Outside Services employed - 923 subtotal 115,058 75,602 129,668 125,500 130,500
Property Insurance - 924
600-60924-510 Property & Liability Insurance 27,028 28,966 28,966 28,500 35,500
Property Insurance - 924 subtotal 27,028 28,966 28,966 28,500 35,500
Injuries and damages - 925
600-60925-511 Workers Compensation Insurance 12,202 11,794 11,794 12,750 16,000
Injuries and damages - 925 subtotal 12,202 11,794 11,794 12,750 16,000
Employee pensions and benefits - 926
600-62926-000 Pension - GASB 68 5,956 - - - -
600-62926-131 Sick & Vacation - GASB 101 17,969 - - - -
600-62926-151 FICA 34,364 21,968 32,952 34,830 37,886
600-62926-152 Retirement 31,307 21,768 32,651 32,782 35,905
600-62926-153 Dental insurance 9,456 6,238 9,356 8,482 9,265
600-62926-154 Health insurance 80,334 55,246 82,869 88,268 103,364
600-62926-155 Life insurance 1,357 901 1,351 1,591 1,707
Employee pensions and benefits - 926 subtotal 180,743 106,120 159,179 165,953 188,127
98
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Regulatory Commission expenses - 928
600-60928-211 Regulatory Commission Exp 2,639 - 2,850 2,500 6,500
Regulatory Commission expenses - 928 subtotal 2,639 - 2,850 2,500 6,500
Miscellaneous general expenses - 930
600-60930-340 Misc General Exp-Oper Supplies 3,248 1,115 1,673 7,000 7,140
Miscellaneous general expenses - 930 subtotal 3,248 1,115 1,673 7,000 7,140
Transportation expenses - 933
600-60933-380 Equipment-Veh Supplies 9,511 1,545 2,318 15,000 15,500
600-60933-385 Equipment/Veh Fuel 6,409 4,733 7,100 8,000 9,975
Transportation expenses - 933 subtotal 15,920 6,278 9,418 23,000 25,475
Maintenance of general plant - 935
600-60935-340 Gen Plant Mt-Operating Supp 7,028 7,643 11,464 20,000 18,500
Maintenance of general plant - 935 7,028 7,643 11,464 20,000 18,500
Total Administrative and general expenses 532,630 488,492 732,738 785,052 865,490
Total operation and maintenance 1,104,801 761,803 1,142,705 1,172,710 1,256,738
Depreciation and amortization
Deprecation
600-60403-541 Depreiciation Exp-CIAC Assets 189,371 - 189,431 195,000 19,500
600-60403-540 Depreciation Expense 317,551 - 390,000 300,000 400,000
Total Deprecation 506,922 - 579,431 495,000 419,500
Total Depreciation and amortization 506,922 - 579,431 495,000 419,500
Operating Expenses 1,611,723 761,803 1,722,136 1,667,710 1,676,238
Operating Income (Loss) 547,141 767,577 571,935 468,790 850,262
99
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Nonoperating Revenue (Expense)
600-60428-691 Amortization Debt Discount 1,005 - - - -
600-47421-001 Misc income 7,500 4,141 6,212 - -
600-60408-999 Joint metering allocation 8,946 - 9,200 - -
600-47419-000 Interest on Investments 107,443 63,541 95,312 70,000 75,000
600-60427-621 Interest on Debt (73,676) (50,270) (86,759) (86,759) -
600-48310-000 Gain/(Loss) on disposal 9,705 2,197 2,197 - -
600-47201-000 Lease payment for tower lease 16,000 26,675 36,425 36,600 37,720
600-68200-692 Debt issuance costs (18,534) (45,956) (45,956) - -
Total Nonoperating Revenue (Expense) 58,389 328 16,631 19,841 112,720
Contributions and transfers
600-60408-550 Taxes Due Municipality (317,252) (236,250) (375,000) (305,000) (375,000)
600-47421-000 Contributions for Construction 1,404,998 26,944 40,416 50,000 40,000
Total Contributions and transfers 1,087,746 (209,306) (334,584) (255,000) (335,000)
Net Income 1,693,276 558,599 253,982 233,631 627,982
100
Sewer Utility
101
Village of Cottage Grove, WI
2027 Budget Request
Meeting Date: September 16, 2026
Memo Date: September 10, 2026
To: Utility Commission
From: Kyela O’Loughlin - Director of Public Works and Utilities
Cameron Sawyer – Assistant Administrator/Finance Director
Subject: 2027 Budget Request – Sewer
Operating Requests
Ba
sed on the required revenue to support operations staff recommends the Utility Commission approve
a rate increase for sewer of 5% based on the sewer rate case study effective January 1, 2027.
Ut
ility Technician
Utility Operations Technician – The Water and Sewer utility have approximately 40 miles of sanitary
sewer and water main, 3 municipal wells, 2 water towers, and 6 lift stations. The additional staffing will
improve operational efficiency, provide greater responsiveness to routine and emergency needs, reduce
workload demands on existing staff, and help ensure the continued reliability of the Village's water and
sanitary sewer utilities.
MMSD Sewer service charges - Madison Metropolitan Sewerage District charges represent the largest
operating expense for the sewer utility. The Village currently does not have its own wastewater
treatment plant, and we continue to recommend that constructing our own treatment facility is not
economically feasible. MMSD communicated approx. 12% increase in service charge estimate.
Mai
ntenance of Collection System ($211,000)
Included in the budget line is an increase of $211,000 for the engineering and construction of
maintenance of the Vilas Road sanitary sewer sag. Completing the design and construction, and
including it in one of the capital projects, should allow for competitive pricing and for the work to be
completed in the summer of 2027. Fixing the discovered sanitary sewer sag will allow for sanitary sewer
flow from the west side of the Village to use this newly installed interceptor.
Sa
nitary Flow Metering ($55,000)
As recommended in the 2022 Utility Master, flow monitoring efforts should be provided at critical
manholes to continue to monitor the actual flows of the sanitary sewer system, specifically the
interceptors. By completing flow monitoring within the system, this will provide the ability to track used
and remaining capacities within our system over time to assist in developing a timeline for future
projects, as needed.
102
p
Village of Cottage Grove, WI
Capital Expenses
20
27 Vehicle & Equipment Replacement (CP: $231,000, W: $49,500, S: $49,500)
We
are requesting the planned replacement of a Plow truck, including upfitting. If approved the
department would order a truck and receive it either in 2027 or 2028. Upfitting would occur in 2028 or
2029 based on current lead times. The sewer portion would be funded by cash on hand.
20
27 Major Projects (CP: $1,560,000, W: $1,681,500, S: $1,600,500)
Ollie
Street Reconstruction (CP: $830,000, W: $863,000, S: $702,000) - The project will replace the old,
aging clay sanitary sewer main as well as the undersized 6-inch water main beneath the street. At the
same time as the utilities are replaced, the street will get new asphalt to replace the failed existing
asphalt. Additionally, concrete curb and gutter and sidewalk will be replaced throughout the corridor.
Most of the costs incurred will be utility costs, but some costs will be incurred by the capital projects
fund. Engineering is included in the amount above CP: $80,000, W: $93,000, S: $92,000. Engineering
started in 2026.
Main Street Reconstruction, Reynolds South to Village Limits (CP: $765,000, W: $843,500, S: $651,000)
- The project will incorporate replacing the undersized 6-inch water main as well as replace the aging,
old concrete sanitary sewer pipe beneath the street. While the utilities are being replaced, the street
will be reconstructed due to the aging and failed pavement along the corridor. Additionally, concrete
curb and gutter and sidewalk will be replaced throughout the corridor. Most of the costs incurred will
be utility costs, but some costs will be incurred by the capital projects fund. Engineering is included in
the amount above CP: $115,000, W: $98,500, S: $91,000. Engineering started in 2026.
Ne
w Pump at Business Park Lift Station ($25,000)
The two pumps at Business Park Lift Station are approximately 25 years old and are nearing the end of
their expected service life. To reduce the risk of a complete station outage resulting from simultaneous
pump failures, it is proposed to proactively replace one of the existing pumps while retaining the second
pump as a backup until replacement becomes necessary. This approach will minimize the likelihood of a
service disruption. This would be funded through the equipment replacement fund.
2028
Engineering Projects in 2027 budget
The following projects are in the Financial Management Plan in 2028, which require engineering and
design in 2027.
Sewer Lining Project – $65,000 in 2027
Several sanitary sewer mainlines within the Village are constructed of clay or reinforced concrete pipe.
With the televising of the Village's sanitary sewer system near completion, this project will include
rehabilitating these existing clay and reinforced concrete sanitary sewers through cured-in-place pipe
(CIPP) lining or a similar lining method. The rehabilitation will extend the service life of the sewer
mainlines, improve structural integrity, and reduce the potential for future maintenance and repair
costs.
103
Sewer Utility
Adopted Budget 12/31/2025 8/31/2026 8 12/31/2026
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Operating Revenue
Residential
601-46210-000 Residential Sales 1,598,617 1,143,664 1,715,496 1,650,000 1,800,000
601-46215-000 Multi-family 405,773 272,307 408,461 420,000 430,000
Total Residential 2,004,390 1,415,972 2,123,957 2,070,000 2,230,000
Commercial
601-46220-000 Commercial Sales 267,589 198,062 297,093 285,000 312,000
Total Commercial 267,589 198,062 297,093 285,000 312,000
Industrial
601-46230-000 I ndustrial Sales 193,923 131,267 196,901 205,000 207,000
601-46230-100 Hydraulic Barrier System Fees 310,419 364,117 546,175 480,000 572,000
Total Industrial 504,342 495,384 743,076 685,000 779,000
Public Authority
601-46240-000 Public Authorit y 45,866 32,565 48,847 51,000 51,500
601-46321-000 Penalty Revenue 11,205 5,622 8,433 8,000 8,500
Total Public Authority 57,071 38,187 57,280 59,000 60,000
Operating Revenue Total 2,833,392 2,147,605 3,221,407 3,099,000 3,381,000
104
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Operating Expenses
Operation and maintenance
Treatment charges
601-60822-222 MMSD sewer charges 1,049,426 562,949 1,125,898 1,250,000 1,250,000
Total Treatment charges 1,049,426 562,949 1,125,898 1,250,000 1,250,000
Treatment Supplies
601-60821-221 Power pumping lift stations 41,140 25,979 38,969 55,000 58,300
Treatment Supplies 41,140 25,979 38,969 55,000 58,300
Transportation expenses
601-60828-385 Equipment/Veh Fuel 6,733 4,733 7,100 8,000 9,975
Total Transportation expenses 6,733 4,733 7,100 8,000 9,975
Maintenance of collection system
601-60831-340 Operating and Supplies - collection system 60,802 23,634 35,450 63,000 275,300
Total Maintenance of collection system 60,802 23,634 35,450 63,000 275,300
Maintenance of pumping equipment
601-60832-340 Operating and Supplies - pumping 4,718 10,196 15,295 20,600 76,000
Total Maintenance of pumping equipment 4,718 10,196 15,295 20,600 76,000
Maintenance of general plant equipment
601-60834-340 Gen plt mt bld/eq operating 33,950 13,191 19,787 35,000 34,000
Total Maintenance of general plant equipment 33,950 13,191 19,787 35,000 34,000
Billing, collecting and accounting
601-60840-110 Salaries 61,077 39,680 59,521 61,072 63,562
601-60840-115 Wages 39,309 25,564 38,346 41,878 42,985
601-60840-116 Overtime - - - - -
601-60840-151 FICA 1,140 - - - -
601-60840-210 Professional Services 18,295 19,495 29,243 17,700 13,000
601-60840-332 Mileage 374 192 289 525 525
Total Billing, collecting and accounting 120,195 84,932 127,398 121,175 120,072
105
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Administrative and general salaries
601-60850-110 Salaries 140,491 87,374 131,061 136,502 140,818
601-60850-115 Wa ges 207,134 134,171 201,257 204,674 234,603
601-60850-116 Overtime 11,171 7,085 10,627 11,173 13,277
601-60850-332 Milea ge 454 317 474.98 500 550
601-60850-340 Operating and Supplies 86,067 51,886 77,830 85,725 87,725
Total Administrative and general salaries 445,317 280,833 421,250 438,574 476,973
Outside services employed
601-60852-140 Utilit y commission Per Diem 438 225 338 500 500
601-60852-210 Professional Services 110,796 67,833 101,749 110,000 110,000
Total Outside services employed 111,234 68,058 102,086 110,500 110,500
Employee pensions and benefits
601-60853-510 Pro perty and Liability Ins 27,028 28,966 43,449 28,500 35,500
601-60853-511 Workers Com pensation Ins 12,202 11,794 17,692 12,750 16,000
601-60854-000 Pension - GASB 68 5,955 - - - -
601-60854-131 Sick & Vacation - GASB 101 17,969 - - - -
601-60854-151 FICA 33,224 21,967 32,951 34,830 37,886
601-60854-152 Retirement 31,306 21,768 32,652 32,782 35,905
601-60854-153 Dental Insurance 9,457 6,238 9,357 8,482 9,265
601-60854-154 Health Insurance 80,333 55,246 82,868 88,268 103,364
601-60854-155 Life Insurance 1,358 900 1,350 1,591 1,707
Total Employee pensions and benefits 218,830 146,880 220,320 207,203 239,627
Total Operation and maintenance 2,092,345 1,221,385 2,113,552 2,309,052 2,650,747
106
2025 2026 2026 2026 2027
Account No Title Actual August Estimate Budget Budget
Depreciation and amortization
Deprecation
601-60300-541 Depreciation Expense 635,237 - 642,000 625,000 650,000
Total Deprecation 635,237 - 642,000 625,000 650,000
Total Depreciation and amortization 635,237 - 642,000 625,000 650,000
Operating Expenses 2,727,582 1,221,385 2,755,552 2,934,052 3,300,747
Operating Income (Loss) 105,810 926,219 465,855 164,948 80,253
Nonoperating Revenue (Expense)
601-42801-000 Amortization of Issuance Costs 1,834 - - - -
601-46419-000 Interest on investments 151,323 58,499 87,749 90,000 85,000
601-48120-000 Gain/Loss on sale of asset 9,705 2,197 3,295 - -
601-60426-621 Interest on debt (93,489) (46,732) (84,621) (84,621) -
601-68200-692 Debt issuance costs (3,003) (4,279) (4,279) - -
Total Nonoperating Revenue (Expense) 66,370 9,685 2,144 5,379 85,000
Contributions and transfers
601-46423-000 Contributions fo r Construction 1,642,491 31,967 47,951 50,000 80,000
Total Contributions and transfers 1,642,491 31,967 47,951 50,000 80,000
Net Income 1,814,671 967,872 515,950 220,327 245,253
107
Appendix 1 - 2026 Budget Amendments
108
The Village
of Cottage Grove, WI
Staff Memo
Meeting Date: February 16, 2026
Memo Date: February 10, 2026
To: Village Board
From: Cameron Sawyer, Assistant Administrator/Finance Director
Subject: 2026 Budget Amendment (2026-001)
Proposed Amendment:
Stormwater project to be finalized in 2026 (decrease budgeted rev/exp 2025/increase budgeted rev/exp 2026)
2026 Street Project cost incurred in 2025 (increase budgeted expense 2025/decrease budgeted expense 2026)
2026 Budgeted Vehicles purchased in 2025 (increase budgeted expense 2025/decrease budgeted expense 2026)
2026 Police Station Project cost reduced by 2024 and 2025 expenditures. ($255,950 & $896,712)
2025 Engineering Project cost to incur in 2026 (increase budgeted exp 2025/decrease budgeted exp 2026)
2026 Engineering Project cost to incur in 2026 (decrease budgeted exp 2025/increase budgeted exp 2026)
2025 Tail and Intersection Project costs to incur in 2026(decrease budgeted exp 2025/increase budgeted exp 2026)
2026 TID 9 lease revenue and associated costs not known during 2026 budget
Account Description Budget Amendment Change
410-57300-840 Stormwater Planning - 40,461 40,461
410-43520-000 State Aid - Stormwater - 51,365 51,365
411-57300-000 Annual Road,Sidewalk,Chipseal 1,051,000 1,031,378 (19,622)
411-57300-026 2026 Equipment Purchases 250,600 199,720 (50,880)
411-57500-026 2026 Equipment Purchases 197,500 138,277 (59,223)
412-57200-024 Police Station 16,276,861 15,124,199 (1,152,662)
412-57300-025 2025 - Engineering - 12,172 12,172
412-57300-026 2026 - Engineering - 78,550 78,550
412-57300-125 E Taylor/Weald Bridge/Main St. - 36,838 36,838
412-57300-225 Bike Path Extension Southing G - 49,784 49,784
205-57500-000 Shady Grove Park - 524,628 524,628
Recommend
ation:
Approve the budget amendment as presented.
109
The Village
of Cottage Grove, WI
Staff Memo
Meeting Date: April 6, 2026
Memo Date: March 31, 2026
To: Village Board
From: Cameron Sawyer, Assistant Administrator/Finance Director
Subject: 2026 Budget Amendment (2026-002)
Proposed Amendment:
Results of 2026A debt issuance
Street Project bid adjustment for removal of Johnson Health Tech trail replacement
BB/Buss Bike Path & Damascus project due to favorable bid results
Fire and EMS Op & facility study shared with the Town
Reduce insurance reimbursement for amount received in 2025
Account Description Budget Amendment Change
300-48900-000 Premium on debt issuance - 614,383 614,383
411-49120-000 Proceeds from long term debt 1,726,065 1,555,000 (171,065)
411-48900-000 Premium on debt issuance - 17,967 17,967
411-58200-000 Debt issuance costs - 32,214 32,214
412-49120-000 Proceeds from long term debt 14,883,056 15,150,000 266,944
412-48900-000 Premium on debt issuance - 175,044 175,044
412-58200-000 Debt issuance costs - 303,741 303,741
411-48110-000 Interest on investments - 16,173 16,173
412-48110-000 Interest on investments - 157,651 157,651
411-57300-000 Annual Road,Sidewalk,Chipseal 1,031,378 979,378 (52,000)
412-57300-126 BB/Buss Bike Path & Damascus 400,000 347,000 (53,000)
410-57100-261 Fire and EMS Op & Fac Study 40,000 17,500 (22,500)
411-48400-000 Insurance Reimbursement 47,000 24,348 (22,652)
Recommend
ation:
Approve the budget amendment as presented.
110
The Village of Cottage Grove, WI
Staff Memo
Meeting Date: July 20, 2026
Memo Date: July 15, 2026
To: Village Board
From: Cameron Sawyer, Assistant Administrator/Finance Director
Subject: 2026 Budget Amendment (2026-003)
General Fund:
Proposed increase in revenue and expenses equal $61,952 resulting in no change in budgeted
net income. Insurance recoveries and related expenditure make up large portion of amendment.
Debt service fund:
TID 5 payments scheduled for 2027 removed from 2026 budget. Interest income from premium
held higher than anticipated. Slight increase in fiscal agent cost for debt issuance.
Capital project funds:
To account for insurance recoveries and related costs in Fund 410. Reestablish Johnson Health
Tech Path in Fund 411 after project was added back in post bid. Formally account for revenue
related to school district reimbursement in Fund 412.
Account Description Budget Amendment Change
100-41800-000 Interest & Penalties - 6,500 6,500
100-44300-000 Building Permits 90,000 120,000 30,000
100-44400-000 Zoning Permits & Fees 3,750 16,750 13,000
100-46400-000 Recycling Revenue from Tax Roll 140,865 143,053 2,188
100-46410-000 Garbage Revenue from Tax Roll 295,317 299,581 4,264
100-48400-000 Insurance Recoveries - 21,000 21,000
100-48450-000 Payment for School Resource Officer 135,000 120,000 (15,000)
100-51520-500 Taxes due other - annexation 3,000 50 (2,950)
100-51520-510 Property/Liability Insurance 60,400 67,300 6,900
100-51520-511 Workers Compensation Insurance 40,800 35,400 (5,400)
100-52300-340 Emergency Management Plan 2,000 10,500 8,500
100-52400-210 Building Permits Inspections 75,000 102,000 27,000
100-53300-340 Street Operating Supplies 76,500 82,500 6,000
100-53620-295 Garbage Contract 295,317 302,505 7,188
100-53620-296 Recycling Contract 140,865 147,579 6,714
100-55500-340 Forestry Operating Supplies 11,800 19,800 8,000
300-48110-000 Interest on investments 3,400 30,000 26,600
300-58100-610 Principal payments 3,936,506 3,651,694 (284,812)
300-58200-622 Interest on debt 1,140,068 1,133,697 (6,371)
300-58200-691 Fiscal agent charges 3,400 4,000 600
410-48510-000 Donations/insurance recoveries 5,000 10,150 5,150
410-57100-820 Village Building Maintenance 35,000 40,150 5,150
-
411-57300-000 Annual Road, Sidewalk, Chipseal 979,378 1,029,378 50,000
412-48000-000 Miscellaneous Revenue - 110,000 110,000
111
The Village
of Cottage Grove, WI
Staff Memo
Meeting Date: August 17, 2026
Memo Date: August 12, 2026
To: Village Board
From: Cameron Sawyer, Assistant Administrator/Finance Director
Subject: 2026 Budget Amendment (2026-004)
TID
6:
Formally forgive 2025 and 2026 planned amounts. See supplemental memos.
TID 5:
Update to recognize final revenue and expenditure amounts.
TID 8:
Increase amount due to contractual obligation based on increment created.
TID 9:
Increase to account for property acquisition and related costs.
TID 10:
Increase amount due to contractual obligation based on increment created.
Park Development Fund:
Bakken Park playground removal delayed by Miracle League ($25,000 reduction).
Formalize addition of master planning approved for Juniper Fields. ($30,000 addition).
Capital Project Fund:
MPO Transportation grant is reimbursement-based. Our accounting principles do not allow the
netting of revenues and expenditures; therefore, we need to add the revenue and increase the
expense for the expected amounts. The impact on fund balance is zero.
112
The Village
of Cottage Grove, WI
Staff Memo
Account Description Budget Amendment Change
406-48800-300 TID 6 Advance Forgiveness - 116,348 116,348
300-59201-406 Forgiveness of TID 6 - 116,348 116,348
-
300-49405-000 Transfer From TID 5 1,786,839 1,769,760 (17,079)
405-59300-300 TID 5 Transfer Out 200,000 182,921 (17,079)
405-46112-000 Commerce Park Maintenance 9,250 11,374 2,124
405-48110-000 Investment Income 25,000 33,719 8,719
405-56100-000 Developer Incentives 355,000 390,960 35,960
-
508-56100-000 Developer Incentives 72,000 58,209 (13,791)
-
509-48110-000 Interest Income 5,000 15,000 10,000
509-51410-340 Operating Supplies and Expenses 35,775 60,775 25,000
509-57320-820 Property Acquisition - 350,000 350,000
-
510-48110-000 Investment Income - 18,000 18,000
510-56100-000 Developer Incentives 610,000 672,000 62,000
205-55000-210 Professional Services 27,500 32,500 5,000
-
410-43790-000 MPO Planning Grant Revenue - 120,000 120,000
410-57300-850 MPO Planning Grant Expense 30,000 150,000 120,000
Recommendation:
Approve the budget amendment as presented.
113
The Village
of Cottage Grove, WI
Staff Memo
Meeting Date: October 5, 2 026
Memo Date: September 25, 2026
To: Village Board
From: Cameron Sawyer, Assistant Administrator/Finance Director
Subject: 2026 Budget Amendment (2026-005)
General (100):
Reallocate funds to cover fuel projected overages.
Capital Projects (410):
Account for additional trailhead project grant revenue
Account for additional 2% fire dues received
Account for additional property sale revenue
Account for projected actual investment income results
Account for failing AV system equipment overages
Account for additional PAA scope approved by Village Board
Account for actual stormwater planning grant
ERIM (411)/ Public Infrastructure (412)
Account for street sweeper purchase utilizing current resources
Account Description Budget Amendment Change
100-53300-350 Street Lights 123,000 113,000 (10,000)
100-53300-385 Vechicle Fuel 28,000 38,000 10,000
410-43620-000 DNR Trailhead grant 30,000 39,000 9,000
410-43550-000 State Fire Dues 55,500 61,454 5,954
410-43520-000 State aid - stormwater 51,365 47,455 (3,910)
410-48310-000 Sale of property 5,000 12,950 7,950
410-48110-000 Interest on investments 15,000 8,000 (7,000)
410-57100-225 IT Equipment - Failed 5,000 7,000 2,000
410-57100-261 Fire and EMS Study 17,500 22,000 4,500
410-57300-840 Stormwater planning 40,461 32,640 (7,821)
411-49000-412 Transfer in - Public Infrastructure - 294,000 294,000
411-48310-000 Sale of property - 89,205 89,205
411-48400-000 Insurance recovery 24,348 32,451 8,103
411-48110-000 Interest on investments 16,173 24,865 8,692
411-57300-026 2026 Equipment Purchases 199,720 599,720 400,000
412-48110-000 Interest on investments 157,651 187,651 30,000
412-57300-025 2025 - Engineering 12,172 2,960 (9,212)
412-57300-125 E Taylor/Weald Bridge/Main St. 36,838 28,500 (8,338)
412-57300-225 Bike Path Extension Southing G 49,784 46,400 (3,384)
412-59000-411 Transfer out - ERIM - 294,000 294,000
Recomme
ndation: Approve the budget amendment as presented.
114
RESOLUTION 2026-20
A RESOLUTION FOR BUDGET ADOPTION AND APPROVAL OF
A TAX LEVY FOR THE VILLAGE OF COTTAGE GROVE AND
TAX INCREMENTAL DISTRICTS
WHEREAS, the Board of Trustees is appropriating the necessary funds for the
operation of the government and administration of the Village of Cottage Grove for the
year 2027, and
WHEREAS, the Public Water and Sewer Utility budgets have been approved by Utility
Commission on September 16, 2026, and
WHEREAS, the Public Stormwater Utility budget has been approved by Utility
Commission on November 11, 2026, and
NOW, THEREFORE, BE IT RESOLVED, the Village authorizes the tax levy amount as
approved by the Village Board in the amount of $7,941,288, along with consideration for
Tax Incremental Districts #6, #8, #9 and #10 on all the taxable property within the
Village of Cottage Grove as returned by the assessor in the year 2026, for the uses and
purposes set forth in the budget, and
BE IT FURTHER RESOLVED, the Village Clerk is hereby authorized and directed to
levy this tax over the current tax roll for the Village of Cottage Grove.
Adopted this 16th day of November, 2026
_________________________________
Cynthia Kelm-Nelson, Village President
ATTEST:
_________________________________
Lisa Kalata, Village Clerk
November 3, 2026
AGREEMENT FOR MUNICIPAL SERVICES BUILDING NEEDS STUDY
VILLAGE OF COTTAGE GROVE | MUNICIPAL SERVICES BUILDING
between and
Village of Cottage Grove Engberg Anderson, Inc.
221 E. Cottage Grove Road 305 W. Washington Avenue
Cottage Grove, WI 53527 Madison, WI 53703
c/o: Matt Giese, ICMA -CM, Village Administrator
Engberg Anderson Project No. 264052
EA File Name: Y:\Madison Projects\2026 3959\264052 Cottage Grove Municipal Facilities Study\0-BD & Marketing\Proposal\Cottage Grove MSB Proposal
REVISED.Docx
Dear Mr. Giese,
Engberg Anderson is pleased to submit our proposal for the Municipal Services Building Space Needs Study.
When the Police Department moves to its new station in 2027, the Village will have space to reassign at the MSB
and a chance to plan how the building best serves the Village residents through Public Works, Parks and
Recreation, Planning and Development, and other Village services in the years ahead. We welcome the
opportunity to help and are excited for the challenge.
Much of our work involves renovating and reorganizing existing public buildings, and we are skilled at seeing the
potential in familiar spaces. Our work on the new police station has also given our team a working knowledge of
the MSB, the police spaces being vacated, and the staff who work there. Buildings built for a particular purpose
can pose challenges: we understand what the sally port, armory, evidence room, and interview rooms were built
for, which can be reused, and which will take more work to convert.
The plan will come from the people who use the building. We will sit down with each department, from Public
Works to the Clerk's Office to the Library, to understand how they work today and what they will need as the
Village grows. Those conversations shape a space needs program and concept plans that staff will review with us
in a series of workshops, with the Village Board setting direction at the end of each phase, and signing off on
final outcomes.
We will also take the time to understand the building itself. With JDR Engineering, we will assess the condition of
the MSB and its systems, and map out their remaining life and replacement costs in an interactive Excel
workbook; the capital maintenance inventory you added to the scope of this project. This will give the Village
more than a space plan. It will give staff a clear picture of the building's long term needs for capital planning.
The study includes a cost estimate for the recommended improvements, grounded in current market conditions,
so the Village can make informed decisions about what to do and when. The study also evaluates a potential
Page 2
addition to the garage space of the MSB, with its cost and a recommended timeline. Based on your note that the
work could begin January 1, 2027, we anticipate completing the study within 150 days.
For all these reasons, we believe our team offers the Village the right mix of experience, understanding, and
care. We look forward to helping the Village take this next step. If you have any questions about our proposal,
please give me or Mike a call. Thank you for your consideration.
PROJECT UNDERSTANDING
The Village has asked for a strategic and efficient plan for the space the Police Department will vacate at the
Municipal Services Building. The study will determine how best to use that space in the short and long term,
including which departments, services, and positions should relocate there and when. It will evaluate the former
police spaces that are not readily usable by other departments, such as the sally port, interview rooms, armory,
and evidence room, and identify what it would take to repurpose or renovate them. It will establish the cost of
the recommended renovations and a timeline for implementing them, and it will provide a capital maintenance
inventory of the building's major elements with estimated replacement costs and useful life. It will also evaluate
a potential addition to the garage space of the MSB, determine its cost, and establish a recommended timeline.
This study builds a new basis from firsthand interviews with each Village department and a direct assessment of
the building. Earlier work is useful background, but the program, the plan, and the costs will reflect current
conditions and current needs.
Engberg Anderson's work on the new police station gives our team a working knowledge of the Municipal
Services Building, the police spaces being vacated, and the Village's process. That familiarity shortens the early
steps of the study and leaves more of the Village's time for the decisions the study is meant to inform. And our
prior study for the Public Library gives Village staff a clear idea of our process and outcomes.
The design of multi-function municipal facilities is often centered around two issues – flexible use of shared and
collaborative spaces, and when appropriate to the departments addressed, the ease with which the public can
access and navigate the facility to have their needs addressed easily and efficiently.
The first of these issues centers on reviewing the needs of multiple departments who might share a facility, and
identifying spaces, such as community or meeting spaces, print and copy facilities, and staff break areas that
might be shared, rather than duplicated, creating efficiency that can save the Village money, but also foster
interaction and collaboration between departments. And in facilities where the public needs to access needed
services directly with Village staff, simplifying wayfinding or even creating central service areas can support a
“no wrong door” approach to public service that clarifies access and gives public users the sense that the Village
understands and can serve their needs efficiently and with minimal intervention.
METHODOLOGY
The Municipal Services Building has served the Village as a shared home for Police, Public Works, Parks and
Recreation, and Planning and Development. When the Police Department moves to its new station in 2027, the
Village has an opportunity to rethink how this building serves the departments that remain, or others within the
Village, now and as the community grows. Our work plan will give the Village a practical plan for that space,
based on current building conditions and direct conversations with the people who use it every day.
Engberg Anderson's approach is interactive and built on consensus. Through interviews and working sessions,
we bring Village leadership, department heads, and staff into the process alongside our design team. Together
Page 3
we identify what each department needs, put forward options, and test them against the Village's priorities,
timeline and budget. By the time a recommendation reaches the Village Board, staff have already helped shape
it.
From the first weeks of the study, our team is in the building with the staff who use it, walking the spaces and
reviewing the building systems with our engineers and your facilities staff. The department interviews and the
building assessment happen at the same time and feed one plan. What we learn about the building shapes what
we recommend for the people in it. An independent cost estimator then prices the recommendations against
current market conditions, giving the Village an objective basis for its choices.
Phase 1: Facility Assessment, Department Interviews, and Space Needs Program
Phase 1 establishes the facts the rest of the study depends on: the condition of the building, the needs of each
department, and a space needs program that ties them together. It closes with a Village Board presentation of
findings and a decision point where the Village provides direction on which departments and services are best
suited to the vacated space.
We begin by gathering what the Village already has, including existing drawings, the current floor plan,
maintenance and equipment records, staffing information, and prior studies for reference. A kickoff meeting
with a key stakeholder group sets the direction for the study. At this meeting we review the scope and schedule,
confirm the departments and staff to be interviewed, set guidelines and boundaries for the study, and identify
final decision makers who will sign off on the results.
Following the kickoff, we hold a one hour meeting focused on the building and its systems with the staff
responsible for its operation and maintenance. This conversation captures known issues, service history, and
operating concerns, and it focuses our visual inspection of the building.
We then conduct a Building Assessment of the existing facility and a walkthrough of the building. JDR
Engineering leads the assessment of the mechanical, electrical, plumbing, fire protection, and technology
systems. Their work includes comment on electrical service capacity and energy conservation opportunities in
the mechanical, lighting, and controls systems. We flag any discernible life safety or code concerns in our report.
The review covers:
• Site: paving, parking, and walks.
• Roof assemblies: roofing, flashing, and roof drainage
• Exterior walls: wall assemblies, windows, entrances, and overhead doors
• Interiors: interior finishes, millwork, and vehicle bays
• Fire protection and plumbing: sprinkler systems, fixtures, piping, and water heating
• HVAC: heating, ventilating, and air conditioning equipment, distribution, and controls
• Electrical: service and distribution capacity, lighting, emergency lighting, and IT and telecommunications
infrastructure
The primary product of the assessment is an interactive Excel workbook the Village can keep current as repairs
are made and of use for capital planning. Each component is listed once with its condition at the time of
observation, notes on abnormal wear or deterioration, remaining useful life, projected repair or replacement
year, and an opinion of probable cost. Schedules are built from industry standards, supplier input, and our
experience. Costs are based on current data, escalated annually, and include allowances for removal,
installation, public sector labor rates, design fees, and permitting. The workbook projects costs over 20 years
Page 4
and summarizes them by year, by building system, and in 5 year windows. A summary report accompanies the
workbook.
Each item is also assigned a priority so the Village can see what needs attention first:
• Priority 1, Life Safety or Building Code: repairs needed to meet applicable codes
• Priority 2, Building Enclosure: repairs to roofs, walls, windows, and doors that maintain thermal
integrity and prevent water intrusion
• Priority 3, Building System Function: repairs to heating, cooling, ventilation, electrical, and other
systems at risk of failure
• Priority 4, Appearance and Use: repairs that restore finishes and spaces that have worn to the point of
affecting public and staff use
Because the inventory and the space plan are developed together, replacements can be timed with the
recommended renovations so work is addressed only once. The workbook is issued in draft for Village review
and finalized with the Village's comments.
Running concurrently with the assessment, we interview each Village department and service listed below. Each
interview covers current staffing and projected growth, how the department works, who it works with inside
and outside the building, and its space, storage, fleet, and equipment needs. For the Library, the interview also
considers what near term workspace, storage, or programming space the Village may want to provide. For
Public Works and Parks, the interview also documents vehicle storage needs, so we can determine whether the
existing garage meets them or an addition is warranted. Fire and EMS are separate districts, and we do not plan
to interview them. We also evaluate the former police spaces, identifying which can be reused as they are,
which can be adapted with modest renovation, and which are poorly suited to other uses.
Department or service Divisions and key positions Current location Proposed engagement
Administration Village Administrator; Assistant
Administrator/Finance Director; Assistant
Administrator/HR Manager; Finance
Division (Comptroller, Accounting
Assistant, Utility Clerk)
Village Hall Department interview
Clerk's Office Village Clerk, Deputy Clerk; elections,
licensing, records
Village Hall Department interview
Parks, Recreation and
Forestry
Director, Deputy Director, Parks
Superintendent, Recreation Program
Coordinator, Village Forester
MSB Department interview
Planning and
Development, with
Building Inspection
Director of Planning and Development;
Building Inspector; Plan Commission, CDA
MSB Department interview
Public Works and
Utilities
Director, Street Superintendent, Utility
Superintendent; streets, fleet, water and
sewer utility
MSB Department interview
Library Library Board; Library Programming and
Outreach Specialist
No dedicated facility Interview with Library Board
representatives and staff, including
near term workspace, storage, and
programming needs
Police Chief, Lieutenant/Emergency
Management, patrol, detectives, support
staff
MSB, Suite 1; moving to
the new station in 2027
Not included; needs addressed by the
new station
Village Board Village President and Trustees Village Hall Presentations at the end of Phase 1,
Phase 2, and Phase 3
Page 5
We will confirm the final list, and who attends each interview, with the Village at the kickoff meeting.
The interview process can take several forms. For smaller teams or teams easily represented by a small number
of key staff, direct conversations can easily produce needed data. For larger teams or departments, or for public
input if appropriate, online surveys can gather targeted data that can be organized and reported out in a format
that serves to synthesize a larger cross section of users. Our team has the expertise and tools to target groups in
the most effective ways to pull out relevant themes and specifics needed. When identifying the groups to be
interviewed, we will work with you to identify the best tools to reach each target audience.
We also review the site for a potential garage addition, including zoning setbacks, lot coverage, and vehicle
circulation through the yard.
From the interviews and the building assessment we develop a Space Needs Program document that defines the
current and future space needs of each department, the adjacencies between them, and how those needs
compare to the space available in the building, including whether the existing garage can meet vehicle and
equipment needs. We then present the assessment findings and the program to the Village Board and ask for
direction on which departments and services should occupy the vacated space. That direction becomes the basis
for Phase 2.
Deliverables
• Building Assessment summary report
• Capital maintenance inventory in an interactive Excel workbook with life expectancy and replacement
cost data
• Space Needs Program document including fleet and garage needs
• Phase 1 Village Board presentation
Phase 2: Space Diagrams and Space Plans
With the Village's direction in hand, we translate the program into space diagrams that test how departments fit
within the building, where they relate to one another, and how the public and staff move through the space.
Through two to three workshops with the Village, the diagrams evolve into concept space plans, refined at each
step against the program and the priorities set in Phase 1. Each workshop is followed by a period of refinement
before the next, giving staff time to review and our team time to respond.
The plans address both the short and long term goals, including which departments, services, and positions
should relocate and when. We also develop concept options for a potential garage addition, including footprint,
location on the site, and vehicle circulation, and test them in the workshops alongside the space plans. Once the
Village confirms the preferred direction, we develop a scope narrative describing the architectural and building
system effort needed for the renovation and the garage addition, with input from JDR Engineering, to be used
by the cost estimator. Phase 2 closes with a Village Board presentation of the concept space plans. Phase 2 work
remains at the concept level and does not include design development or construction documents.
Each step in the process adds a level of detail to the concepts: We begin with department organization and
adjacencies – what benefits and synergies exist by virtue of locating departments and staff adjacent to (or apart
from) each other. What services might the public need in one visit, or what departments support each other?
Once the organization is established, shared spaces, concept plan options and other refinements come into
platplay, and the criteria we use to evaluate different options are weighted against each other, from ease of
public access to security, flexibility for future growth and change, and of course, cost.
Page 6
Deliverables
• Space diagrams
• Concept space plans for the preferred direction
• Garage addition concept options
• Scope narrative for cost estimating
• Phase 2 Village Board presentation
Phase 3: Cost Estimate, Refinement, and Final Report
With the concept space plans and scope narrative complete, we prepare a cost estimate for the recommended
improvements, with the garage addition priced separately so the Village can weigh it on its own. We review the
estimate with the Village and refine the plan and scope until the recommendations fit the Village's priorities and
budget. Read together, the estimate and the capital maintenance inventory show the Village both the cost of
the renovation and what the building will need over time.
We then compile the assessment, the program, the space plans, the cost estimate, and a recommended
implementation timeline into a draft report for Village review. Following review, we finalize the report and
present it to the Village Board.
That report will include the building assessment, capital maintenance inventory, final building program (the goal
at the end of incremental changes that may occur), conceptual plans, garage addition options, the cost estimate
and timeline in phases. An executive summary will clarify the goals and outcomes. We will also summarize this
in a presentation to the Village Board and in a PowerPoint presentation that you can use for further public
events if needed.
Deliverables
• Cost estimate
• Recommended implementation timeline
• Draft and final study report
• Executive summary
• Village Board presentation
Cost Control
Effective cost control starts with an accurate picture of the existing building and the program. The study
estimate benchmarks square foot costs against comparable projects and the local market, and accounts for
items such as working within an occupied building, phasing, and the local bidding market. At this stage we
typically recommend a 10 to 15 percent design contingency for unforeseen conditions. We review the estimate
with the Village before the report is finalized and adjust the recommendations to reflect it.
Phasing in an Occupied Building
The Municipal Services Building will remain in operation throughout any renovation. Public Works, Parks and
Recreation, and other departments need to keep serving the community while work is underway. The
recommended implementation timeline will consider how the work can be sequenced to keep departments
operating, where displaced functions can be housed temporarily, and how to balance cost with disruption.
Page 7
Engberg Anderson has completed many phased renovations of occupied public buildings where service to the
community could not stop. We bring that experience to the implementation timeline, weighing each approach
for cost and disruption to operations. Key considerations include:
• Safety and security: protecting the public, staff, records, equipment, and building systems throughout
construction.
• Public access: keeping public service counters, permit and recreation services open and easy to find,
with clear routes for visitors that do not cross work areas
• Fleet and operations: maintaining Public Works and Parks vehicle access, equipment storage, and yard
operations, including snow season readiness
• Clear transitions: sequencing work so departments move once where possible and operations transfer
smoothly from one phase to the next
• Relocation planning: coordinating the timing of moves with the vacated police space, even for simple
relocations, to avoid disruption to staff and the public
Phasing is part of the plan from the start. The implementation timeline shows how the recommendations can be
carried out while departments keep serving the community.
Sustainability
The building assessment identifies energy conservation opportunities across the mechanical, lighting, and
controls systems. We weigh these measures alongside the renovation recommendations and identify those that
pay back in lower operating costs, and in a reasonable time frame.
Functional and Planning Considerations
Municipal facilities vary primarily on the basis of how much the public must enter and interact with staff in the
facility. A municipal garage and storage facility need only establish flexible and interconnected spaces to
function well, but the introduction of the public poses a different challenge. Visitors to the facility must be
equipped to quickly and easily navigate to the services they need or staff they need to see.
One model we have used to great effect in some municipal facilities is the “no wrong doors” model, in which
visitors arrive at a single service point which is either directly connected to the various services they might need,
or to which staff from those departments come to the resident or visitor and deliver services to a single point.
This sounds potentially complex, but the model is actually easy to implement and sends a message to residents
about the attention they receive from public services. If that model does not seem to fit, then clear and
consistent wayfinding is needed to ensure the public can “self-navigate” to the best degree possible. Having the
public in the space also requires attention to public/staff separation and security, and necessitates a clear
demarcation of where the public can and cannot go.
As mentioned earlier, combining multiple municipal departments also creates opportunities for overlapping and
shared resources, be they storage, meeting, break or conference spaces, or accommodation for technology or
secure record storage. In addition, departments are bound to grow or shrink over time, so designing spaces that
can accommodate flexibility in size and service may be needed over time.
SCHEDULE
Page 8
We anticipate completing the study within 150 days of notice to proceed. With a January 2027 start, the final
report would be ready for Village Board presentation in late May or June 2027, depending on the Board
calendar.
Phase Timeframe Key meetings
Phase 1: Facility Assessment,
Interviews, and Program
Weeks 1 to 9 Kickoff meeting, facility meeting, building
walkthrough, seven department interviews, Village
Board presentation
Phase 2: Space Diagrams and Space
Plans
Weeks 10 to 16 Two to three workshops, Village Board
presentation
Phase 3: Cost Estimate,
Refinement, and Final Report
Weeks 17 to 22 Cost review meeting, Village Board presentation
ASSUMPTIONS AND EXCLUSIONS
• The building assessment is based on visual observation and review of available drawings and records. No
destructive investigation or testing is included.
• Hazardous materials testing and structural analysis are not included.
• Space planning is limited to the existing building and a potential garage addition. Other building
additions are not included.
• The garage addition is evaluated at the concept level. Site survey, civil engineering, geotechnical
investigation, stormwater design, and structural design are not included.
In the end, our collective efforts will provide the Village with a plan for the best and highest use of this existing
facility, a road map and timeline for staged implementation, a budget for making these improvements and the
data to support the decisions made. Our final report will also give you the needed information to explain these
decisions to a public whose resources will fund these next steps in delivering quality services to the Village.
Above all we recognize that resources are finite, and the stewardship of public dollars and the efficient use of
public facilities is in the best interests of all the residents of Cottage Grove.
OWNER SUPPLIED INFORMATION
The following are of use in preparing the drawings and cost models included in the scope of this agreement.
• Existing building drawings from the original construction or any subsequent renovations
• Environmental Assessments or Hazardous Materials Reports
• Other condition studies
• Site survey or plat
• Contacts at various agencies having jurisdiction over the project
• Maintenance and equipment records, and staffing information
FEE PROPOSAL
Engberg Anderson is pleased to submit the following lump sum fee for the Municipal Services Building Space
Needs Study. The fee is organized by study phase and broken out by discipline, and includes building assessment
and capital maintenance inventory, department interviews and space needs program, concept space plans,
concept options for a potential garage addition, an independent cost estimate, and the final report with three
Village Board presentations.
This fee is comprised of an allocation of fees by phase and discipline as shown in the following table.
Page 9
Service Firm Cost Fee
Phase 1: Facility Assessment, Interviews, and Program $21,500
Architectural: building assessment and capital
maintenance inventory
Engberg Anderson $4,500
Architectural: kickoff, interviews, space needs
program, Board presentation
Engberg Anderson $8,000
MEPFP Engineering: building assessment JDR Engineering $9,000
Phase 2: Space Diagrams and Space Plans $19 ,000
Architectural: space diagrams, concept plans,
workshops, Board presentation
Engberg Anderson $10,000
MEPFP Engineering and Cost Estimates:
Garage Addition
JDR Engineering & Estimator $3,000
Architectural and MEPFP Engineering: Garage
Addition
Engberg Anderson and JDR
Engineering
$6,000
Phase 3: Cost Estimate, Refinement, and Final Report $5,500
Cost Estimate $3,000
Architectural: cost review, refinement,
report, Board presentation
Engberg Anderson $2,500
TOTAL STUDY FEE (LUMP SUM) $4 6,000
Fee valid for 90 days from the submittal date. The fee is a lump sum based on the meetings and deliverables
described in the work plan.
Reimbursable Expenses
In addition to the Fees, expenses incurred in the course of completing the work will be invoiced to the Client.
Detailed records of reimbursable expenses shall be included in monthly invoices.
Expense of professional liability insurance dedicated exclusively to this Project or the expense of additional
insurance coverage or limits requested by the Owner in excess of that normally carried by the Architect. The
Architect currently maintains the coverages identified in the Insurance Coverages Exhibit .
Incidental expenses will be invoiced in accordance with the attached Reimbursable Expenses Exhibit . Incidental
Expenses shall be invoiced at our cost.
Progress Payments
Invoices shall be submitted monthly and shall reflect the status of the work at the time of the invoice.
Additional Services
No additional service will be undertaken without a defined scope and written authorization. Any Additional
Service will be itemized and invoiced against a limit established and agreed to in writing by both parties. Any
additional service shall be invoiced separately to allow tracking of project expenses.
ATTACHMENTS
The following Exhibits are made part of this agreement:
• Current Rate Schedule; Insurance Coverages; Expenses
Page 10
ACCEPTANCE
We ask that an individual authorized to bind the Village to this agreement sign two copies of the agreement.
Keep one for your records and return the second to us. We will begin work upon receipt of a signed copy.
For For
Engberg Anderson, Inc. Village of Cottage Grove
Signature: Signature:
Name: Shaun Kelly, AIA, LEED AP Name:
Title: Principal Title:
Date: 11-3-26 Date:
Page 11
EXHIBITS
2026 Rate Schedule
Invoices for basic and additional services will be based on time charged to the project during the invoice period.
The time will be invoiced based on the following schedule up to the limits specified for each service or phase of
the project. Rates are reviewed and adjusted annually.
DESCRIPTION RATE
Senior Principal $220
Principal $210
Partner $190
Senior Team Leader $180
Team Leader $170
Senior Project Architect or Interior Designer $160
Project Architect or Interior Designer $150
Project Designer $140
Intern $95
Insurance Coverage
Engberg Anderson currently maintains the coverages shown, the costs of which are included in the base fees
proposed for the project. Additional coverage is negotiated on a project by project basis.
• Commercial General Liability: $2,000,000 each Occurrence; $4,000,000 Annual Aggregate.
• Business Automobile: $1,000,000 Combined Single Limit, coverage includes hired and non-owned vehicles.
• Workers Compensation: Statutory requirements, $1,000,000.
• Umbrella/Excess Liability: $5,000,000 per Occurrence/Annual Aggregate
• Professional Liability: $3,000,000 per Claim; $3,000,000 Annual Aggregate
• Expense of professional liability insurance dedicated exclusively to this Project or the expense of additional
insurance coverage or limits requested by the Owner in excess of that normally carried by the Architect will
be a reimbursable expense.
Reimbursable Expenses Exhibit
In addition to the Fees included in the Agreement, expenses incurred in the course of completing the work will
be invoiced to the Owner in accordance with the following parameters.
• Transportation in connection with the Project including authorized out-of-town travel, lodging and
sustenance.
• Mileage is calculated using the prevailing IRS reimbursement rates.
• Sustenance is limited to $10/$15/$20 or $45 per day.
• Reproductions, plots, standard form documents, postage, handling and delivery of instruments of service.
• Renderings, models and mock-ups other than those normally produced by the architect as a part of the
process and requested by the Village will be provided as an additional expense.
• Expense of professional liability insurance dedicated exclusively to this Project or the expense of additional
insurance coverage or limits requested by the Owner in excess of that normally carried by the Architect.
The Architect currently maintains shown in the Insurance Coverages Exhibit.
Trustee Memo
Village of Cottage Grove, WI 1
Meeting Date: 11-16-2026
Memo Date: 11-3-26
To: Village Board
From: Cindi Kelm-Nelson, Village President
Subject: Handbook Update for Board, Committee, and Commission Meetings
Background/Overview
To promote transparency, consistency, and public access, I recommend updating the Village handbook
to require all standing Village Board, committee, and commission meetings to be held at Village Hall and
include a hybrid participation option.
Trustee Request/Recommendation
I recommend adding this requirement to the handbook to formalize these expectations and reinforce
the Village’s commitment to transparency and public engagement.
1
Rules Governing Teleconferences
and Virtual Attendance at Meetings
Established/Adopted Date Revision/Review Date Effective Date
August 16, 2021 February 16, 2026 November 2,
2026
February 16, 2026 November 2,
2026
Teleconference and virtual meeting attendance shall be subject to the following rules adopted by the
Village Board:
1. Definitions
a. “Meeting” means a meeting of the Village board or another Village committee, board,
or commission.
b. “Member(s)” means a Village board trustee, or a member of another Village committee,
board, or commission.
c. “Public” means any member of the public.
d. “Teleconference” means a meeting for which the official public notice for the meeting
specifies that the meeting will be held by telephone conference with no in -person
option.
e. “Virtual hybrid meeting” means a meeting for which the official public notice for the
meeting specifies that attendees of the meeting may attend the meeting either virtually
or in-person.
f. “Virtual meeting” means a meeting for which the official public notice for the meeting
specifies that the meeting will be held virtually with no in-person option.
2. Village Meetings
Village meetings may be held either entirely in -person or as a virtual meeting, virtual hybrid
meeting, or teleconference, as provided in the official public notice for the meeting. The official
notice for any meeting for which virtual or telephone partici pation is allowed shall include
information regarding how to access these rules.
3. Attendance Other Than In-Person.
Virtual attendance shall be through use of an Internet meeting service designated by the Village
Board. The official meeting notice for a meeting in which virtual attendance will be allowed or that
will be conducted by a teleconference shall provide information regarding the methods for joining
the meeting virtually or by telephone. If virtual attendance is allowed for a meeting, the meeting
notice shall also specify a method for attendees to join by telephone. If virtual attendance is
allowed for a meeting, it is recommended that members join a meeting in person or by video
connection when feasible, instead of by telephone. Effort shall be made to allow attendees of a
meeting for which attendance is allowed virtually or by telephone to join the meeting at least five
(5) minutes prior to the start of the meeting. If available with the Internet meeting service
utilized for a meeting for which virtual attendance is allowed, members shall identify themselves
using their first and last names and Village title, as appropriate.
2
4. Reasonable Accommodation.
The presiding officer and Village staff shall make appropriate and reasonable accommodation
for people who inform them prior to a virtual meeting or meeting to be conducted by teleconference
that attendance of the meeting is particularly burdensome or infeasible for the person due to the
meeting format to be used. If an internet connection fails or becomes unstable, members
shall make additional reasonable efforts to reconnect or, when available, call into the
meeting by telephone to maintain participation.
Members who intend to attend a meeting virtually or by teleconference shall notify the presiding
officer and Village staff in advance of the meeting.
5. Access to Meeting Information and Meeting Procedures.
The presiding officer for a virtual me eting or a meeting conducted by teleconference shall take
reasonable action to ensure that important aspects of the discussion or deliberation at the meeting
will be communicated to attendees. A meeting may not be conducted by teleconference if the use
of that meeting format will not sufficiently provide access to important aspects of the discussion
or deliberation. Members who join a meeting virtually shall make reasonable effort to maintain
their video connection to the meeting when voting or speaking.
Members attending a meeting virtually shall keep their video cameras on throughout the meeting
and shall be visible on screen when speaking or voting, except when technical difficulties or other
circumstances prevent them from doing so. Members shall make every reasonable effort to
communicate any issues affecting their virtual participation to the Chair as soon as
practicable, including unstable internet connections, audio or video disruptions, or other
technical difficulties. Members sh all make reasonable efforts to restore their connection
and resume full participation when possible.
Members attending a meeting virtually shall use the meeting platform’s raise hand feature or
another available method to indicate their desire to speak. Members attending in person shall
raise their physical hand to signal their desire to speak. The presid ing officer shall recognize
members before they speak to support orderly discussion and ensure all members have an
opportunity to participate. Members participating virtually are not required to use the virtual
hand-raising feature or otherwise indicate a desire to speak before raising a point or
making a motion that, under Robert's Rules of Order, is permitted to interrupt a speaker or
the pending proceedings. Members shall verbally interject as permitted under Robert's
Rules of Order, and the Chair shall recognize and address the procedural matter
accordingly.
Members attending a meeting virtually shall unmute their microphones and verbally state their
votes when a vote is called. The presiding officer or designee shall ensure that each member’s
vote is clearly communicated and recorded. As necessary, an alphabe tical roll-call vote may be
conducted to ensure all votes are captured and accurately recorded in the meeting minutes.
6. Quorum to Conduct Business.
All members participating in a meeting in -person, virtually, or by telephone may vote and are
considered present for purposes of establishing a quorum.
7. Technical Requirements and Malfunctions.
Each member participating in a meeting virtually or by telephone is responsible for the member’s
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: Bold
Formatted: Font: Not Italic
3
own audio, video, and Internet connections to the meeting. Actions taken at the meeting shall not
be invalidated because a member is unable to participate due to the quality of the member’s
connection to the meeting.
8. Interference with the Meeting.
The presiding officer may cause or direct the termination of the audio or video feed of a member
or other attendee participating in a meeting virtually or by telephone if that person’s participation
in the meeting is causing interference with the meeting. The presiding officer may also cause or
direct the termination of an Internet or teleconference service for a meeting if such service is being
used to disrupt the meeting.
9. Loss of Meeting Room Connection.
For a virtual meeting or meeting held by teleconference, if the Internet meeting service or
teleconference service is disconnected, no business may be transacted until the presiding officer
determines that the service has been restored and virtual or teleconference participants have had
sufficient time to reconnect to the service. For a virtual hybrid meeting, the business of the meeting
may continue while the Internet meeting service is disconnected, regardless of whether the
Internet meeting is disconnected due to technical reasons or the service has been terminated by
the Presiding officer due to disruption of the meeting under Section 8, in the discretion of the
presiding officer, but only if a quorum of the body is present in-person. If a quorum of the body is
not present in -person for a virtual hybrid meeting while the Internet meeting service is
disconnected, no business may be transacted until a quorum of in -person and virtual member
participants is present. Any members or other attendees who choose to participate virtually or by
telephone in a meeting do so under the assumption of the risk that the connection to the meeting
may be lost and the meeting will continue without their attendance.
10. Closed Session.
When a Village body moves from a teleconference or a meeting for which virtual attendance is
allowed into a closed session, the teleconference or virtual connection to the meeting shall remain
open to attendees who choose to wait for the body to return to open session.
Members attending a closed session virtually shall participate from a private location where they
are alone and where the discussion cannot be heard by or disclosed to unauthorized individuals.
Members shall maintain the confidentiality of closed session d iscussions and comply with all
applicable closed session requirements.
Meeting Date: November 16, 2026
PLANNING STAFF REPORT
Text truncated. Open the original for the full document.
Source: Village of Cottage Grove website. First collected Nov 15, 2026.