RecordWell Data

Meeting Agenda and Packet

Village of Whitefish Bay · Milwaukee County · meeting of Nov 16, 2026 · Agenda packets

Open the original document More from Village of Whitefish Bay

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE BOARD – MEETING AGENDA WHITEFISH BAY VILLAGE HALL 5300 N. Marlborough Dr. Whitefish Bay, WI 53217 Monday, November 16, 2026, 6:00 PM As an alternative to attending in-person, the public may access this meeting of the Village Board by phone or by computer. Please note that those participating remotely will not have an opportunity to provide public comment. The phone number is: +1 312 626 6799. The Zoom Meeting code is: 854 6369 2688 and the Passcode is: 267748. https://us06web.zoom.us/j/85463692688?pwd=d0w0WmxVZFpyWThGSXhTejdPNU8vQT09 I. Call to Order and Roll Call II. Public Hearing on the 2027 Village Budget 1. Public Comments 2. Board Discussion III. Consent Agenda – Upon request of any Trustee, any item may be removed from the Consent Agenda for separate consideration under General Business. 1. Minutes of the regular meeting held on October 26, 2026 2. Investment Report for October, 2026 3. Check Register for October, 2026 4. Acceptance of a bench donation in honor of Hans & Dorothy Mueller at Library Park 5. Storm Sewer Outfall Rehabilitation Design Review 6. 2028 Watermain and Water Service Line Replacement Proposed Project Locations 7. Operator license for Sendik’s Food Market IV. Report of Village Officers 1. Village Attorney 2. Village Manager 3. Village President 4. Miscellaneous Trustee V. Petitions and Communications – This is an opportunity for anyone to address the Village Board on any issue NOT on the current agenda. While the Board encourages input from residents of the Village, it may not discuss or act on any issue that is not duly noticed on the agenda. VI. General Business 1. Discussion/action on Resolution No. 3209 to extend the tax levy for the year 2026 and to adopt the 2027 Budget for the following funds: • General Fund • Library Fund • Debt Service Fund • Capital Fund • Special Assessment Fund • Borrowed Money Fund • TID No.1 Fund • TID No. 2 Fund • TID No. 3 Fund 2. Discussion/action on Resolution No. 3210 to adopt the 2027 Budget for the following utility funds: • Water Utility • Sewer Utility • Stormwater Utility 3. Discussion/action on Resolution No. 3211 authorizing the extension of assessments, special charges, and delinquencies on the 2026 tax roll for the following: • Streets, sidewalks, alleys, water service lines, and sewer improvement assessments • Business Improvement District assessments • Delinquent water/sewer/stormwater user charges • Miscellaneous delinquent charges 4. Discussion/action on final site plan and design review for the Klode Warming House. 5. Discussion/action on Ordinance No. 1932 – Repealing and recreating Chapter 4 of the Municipal Code in relation to the Fire Department. 6. Discussion/action on State of Wisconsin grant funding to support implementation of Peregrine Technologies software for law enforcement. 7. The Board may convene into Closed Session pursuant to Wisconsin State Statute §19.85(1)(g) to confer with legal counsel for the governmental body who is rendering oral or written advice concerning strategy to be adopted by the body with respect to litigation in which it is or is likely to become involved – specifically regarding a parkway tree claim AND pursuant to Wisconsin State Statute 19.85(1)(e) deliberating or negotiating the purchase of public property, investing of public funds, conducting other specified business whenever competitive and/or bargaining reasons require a closed session – specifically regarding the development agreement for Beaumont Place. 8. The Board may reconvene to open session. The Board reserves the right to take action on any topic discussed in Closed Session. VII. Adjourn Upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals through appropriate aids and services. Contact Village Hall at (414) 962-6690. It is possible that members of and possibly a quorum of members of other Boards, Commissions, or Committees of the Village including in particular the Business Improvement District Board may be in attendance at the above stated meeting to gather information; no action will be taken by any other Boards, Commissions, or Committees of the Village except by the Board, Commission, or Committee noticed above. Agendas and minutes are available on the Village website (www.wfbvillage.gov) Memorandum To: President Buckley and Members of Village Board From: Jaimie Krueger, Finance Director/Clerk Date: November 10th, 2026 Re: Budget Summary & Budget Resolutions ________________________________________________________________________ Background At the October 26th Village Board budget review session, the Board reviewed the 2027 Proposed Budget and discussed impacts on the levy amount, tax rate and utility rates. A summary of the 202 7 budget achievements are listed below: 2027 Property Tax (Levy) and Utility Rate Impacts • Tax Levy: The total levy increases 2.96% from 2026 to 2027, or $409,436. • Municipal Tax Rate: The rate has increased by $0.09 (2.27%), bringing it to $4.06 per $1,000 of assessed value. • Water Utility: In early 2026, the Village of Whitefish Bay water utility filed a Conventional Rate Case application with the Public Service Commission (PSC), the state agency responsible for regulating water utilities and setting water utility rates. The Village’s last Conventional Rate Case was completed in 2020. Based on the final decision dated October 20, 2026, the overall increase approved was 22.48%, or $20.92 per quarterly bill. Following increase, Whitefish Bay’s water rates are expected to remain within the mid-range of rates charged by other municipalities in Milwaukee County. This increase reflects inflationary pressures since the last rate case in 2020 and ongoing costs associated with aging infrastructure. The rates will take effect December 1, 2026 and residents will see these rates reflected in their first bill in 2027. • No sewer or stormwater rate increase proposed in 2027. Capital Projects and Planning • Capital Improvement Plan (CIP): The 2026–2031 CIP was adopted in 2025. This strategic document guides capital projects and associated debt issuances. The 2027 Budget includes a $68,000 increase in debt payments based on the 2026 bond issuance to begin implementing the adopted CIP. • Lead Service Line Replacement: The Village will begin the first one-mile water main and corresponding lead service line replacement program in 2027 with projects on North Shoreland Avenue from East Devon Street to East Lake View Avenue and North Hollywood Avenue from East Henry Clay Street to East Courtland Place. This project begins implementing what has been a multi-year planning process and is the first of over a decade of these types of projects to comply with federal mandates under the Lead and Copper Rule Improvements. • Klode Warming House Replacement: In 2027, the aging Klode Warming House will be replaced with a new facility offering a community room, expanded restrooms, patio, and multi-use pavilion. Financial Strategy • Financial Management Plan : In collaboration with our financial advisor, a new comprehensive Financial Management Plan was approved in 2026. The 2027 Budget continues implementing this plan. • Preparing for Levy Limits : Municipalities in the State of Wisconsin must adhere to levy limits, which restrict property tax increases annually by the change in net new construction. In the Village of Whitefish Bay, net new construction is low because the community is fully built o ut. For the 2027 Budget, this was $60,923. The Village has now reached levy limits and must Village of Whitefish Bay 5300 N. Marlborough Drive Whitefish Bay, Wisconsin 53217  Page 2 strategically evaluate expenses, revenue, and operations. The 2027 Budget includes strategic steps to more closely align budget to actual expenses. Examples include increasing the solid waste disposal fee expenditure, reducing franchise fee revenue, and increasing citation revenues. This levy limit discussion will continue in 2027 with a more detailed review of alternative revenue sources and opportunities to reduce expenditures. Operational Efficiency • Emerald Ash Borer (EAB) Management Plan: The Village Board adopted an EAB Management Plan in 2010 with the goal to diversify and protect the municipal tree canopy through public ash tree removals, non-ash replanting, and protective injection treatments. As the program enters its final phase, trees scheduled for upcoming removal are being phased out of the chemical injection cycle saving an estimated $11,000 in the 2027 Budget. • Salt Shed Partnership: In 2026, the Village Board approved a partnership with Glendale and Shorewood to construct a joint salt storage facility that will replace the Village’s aging and non- conforming salt storage at 5111 Lydell. This partnership reduces long-term capital expenses. The 2027 Budget reflects Whitefish Bay’s proportional share of ongoing operating, administrative, and facility maintenance costs required to maintain joint operations. • Street Lighting Lease: Following the conclusion of the five-year street lighting LED lease in 2026, the Village has eliminated the $36,000 in annual lease payment obligations beginning with the 2027 Budget. To maintain system infrastructure, a portion of these savings are prop osed to be reinvested directly into replacing aging light poles and routine bulb replacements, resulting in a net budgetary savings of $12,000 in the 2027 Budget. • Parking Meters: The Village is considering eliminating or modifying parking meter requirements on Silver Spring. The 2027 Budget takes a conservative approach by reflecting the full elimination of parking meter revenue and expenditures. The levy impact in the 2027 Budget is $31,780. Investing In Employees • Wisconsin Retirement System (WRS) : WRS rates are set by the State of Wisconsin and outside of local control. The total contribution for non- represented employees increased to 14.50%, which is split evenly between the employer and employee. The contribution for protective employees decreas ed to 21.79%, with the Village’s share decreasing slightly to 14.54%. • Health Insurance : With the 2026 Budget, the Village transitioned to the State health plan to provide long- term stability after several years of high renewal costs. The transition required the payment of a two- year surcharge that was originally planned to be funded by bond proceeds; however, the Village was able to utilize 2025 surplus funds to cover this entire cost. The original ROI was calculated at three years, but that is now forecasted to be shortened due to lower than projected renewal rates for 2027. • Employee Benefits Committee and Collective Bargaining Agreement : In response to employee feedback, a cross -departmental Employee Benefits Working Group evaluated opportunities to improve recruitment, retention, and employee well -being. Recommendations were assessed against peer communities, internal equity, employee n eeds, and fiscal considerations. The 2027 budget includes enhanced employee recognition, additional paid holidays, modified summer schedules, expanded holiday recognition, an Employee Assistance Program, greater hiring pay flexibility, and improved vacation benefits. These changes support a competitive and sustainable benefits package. The budget also includes a 3.5% wage increase for all employees. Additionally, the Village entered into a 2027 –2028 collective bargaining agreement with the Policemen’s Prote ctive and Benevolent Association. • Levy and Utility Allocations: Staff wages, benefits, and Village expenses are reviewed annually and allocated across utility funds based on upcoming projects. These project -based  Page 3 allocations may cause year -over-year shifts between the general fund and utility accounts, reflecting expected workload changes. Intergovernmental Services and Shared Costs • North Shore Fire Department : A 4.89% increase is included for NSFD, this includes operating, capital, and capital resolution. • State Aid : Shared revenue increased by $11,948 (2.10%); however, transportation aid decreased by $67,165 ( -9.13%). • MCLFS Member Reserve Fund (previously MCFLS Reciprocal Borrowing): Increased by $9,450 (9.20%) Below are the changes that were made to the budget since the budget walkthrough on October 26th: Action Requested Approve the 2027 Proposed Budget and adopt the following Budget resolutions: Resolution No. 3209: A Resolution to extend the tax levy and adopt individual governmental funds Resolution No. 3210: A Resolution adopting individual utility funds Resolution No. 3211: A Resolution authorizing the extension of assessments, special charges and delinquent charges on the tax roll A REGULAR VILLAGE BOARD MEETING A regular meeting of the Board of Trustees of Whitefish Bay was held in-person October 26, 2026. Pursuant to law, written notice of this meeting was given to the press and posted on public bulletin boards. I. Call to Order and Roll Call President Buckley called the meeting to order at 5:01 p.m. Present: Trustees Dettmann, Haller (Zoom), Kasper (Zoom), Saunders, Serebin, Vanevenhoven and President Buckley. Also Present: Village Manager – Kelsey McElroy-Anderson Assistant Village Manager – Anna Christopherson Police Chief – Patrick Whitaker Library Director – Nyama Reed Finance Director/Clerk – Jaimie Krueger Deputy Clerk – Erin Granstrom II. Consent Agenda It was moved by Trustee Saunders, seconded by Trustee Dettmann, to approve the consent agenda as presented. Motion carried 7-0. 1. Minutes of the regular meeting held on October 5, 2026. 2. Investment Report for September, 2026. 3. Storm and Sanitary Sewer Planning Study Report. 4. Acceptance of a tree donation in memory of Karen and Vic Huedepohl from Kirsten Huedepohl for placement in Klode Park. 5. Acceptance of a bench donation in honor of our grandchildren from Jan Harland for placement in Library Park. 6. Acceptance of a bench donation in memory of John Bolger from Whitefish Bay Civic Foundation for placement in Library Park. III. Report of the Village Officers 1. Village Attorney – Excused. 2. Village Manager – No report from Village Manager. Board inquired about elections, Jaimie Krueger, provided an update on In-Person Absentee voting stating that it has been busy with an average of 250 voters daily. It was mentioned that voting will be available until 5:00 p.m. both Thursday and Friday of this week and by state statue there is no voting or registration the Monday prior to an Election. 3. Village President – The Great Pumpkin Festival starts Wednesday. It is the 40th anniversary of this event. Thank you to the Civic Foundation for putting on this event. Tudi’s in Sendik’s has recently opened. 4. Miscellaneous Trustee – DPW was complimented for their work in leaf collection despite being short staffed currently. IV. Petitions and Communications No Petitions or Communications received. V. General Business 1. Discussion on the DRAFT 2027 Village Budget. The General Fund budgets were reviewed, with key changes including increased training, employee events, planning, and employee recognition expenses. The Board agreed to replace volunteer gift cards with an in- person recognition event, including spouses if possible. Other adjustments included changes to election equipment and staffing, Village Hall utilities, legal services, and software costs. Police Department expenditures increased $54,000 (1.2%), primarily due to personnel and overtime adjustments; the Board discussed vacancies, vehicle replacements, and requested further review of fuel cost projections. Public Safety costs increased due to North Shore Fire Department and Bayside Communications budgets. Public Works expenditures increased $110,000 (3.46%), primarily due to personnel and operational costs; traffic safety improvements and the 2027 DPW roof replacement were also discussed. Building Services and Health Department budgets decreased slightly, while Contingencies, Transfers, Insurance, and Other Expenditures decreased 12%, primarily due to lower workers’ compensation and IT costs, partially offset by increased ADA accessibility and pollution coverage expenses. The 2027 budget highlights include implementation of the 2026–2031 CIP, operational efficiencies, employee compensation and benefits, and adjustments to shared service costs and intergovernmental funding. Major expenditure increases include wages, North Shore Fire Department costs, debt service, and changes in state shared revenue. The Board discussed levy limit strategies, alternative revenues, and debt capacity, noting 31% utilization and an estimated $49 annual increase for the average homeowner from the 2027 debt issuance. Partner agency budget adjustments, including wage increases, health insurance premiums, WRS contributions, and the health insurance opt-out incentive, were also reviewed. The General Fund budgets were reviewed, with key changes including increased training, employee events, planning, and employee recognition expenses. The Board agreed to replace volunteer gift cards with an in- person recognition event, including spouses if possible. Other adjustments included changes to election equipment and staffing, Village Hall utilities, legal services, and software costs. Police Department expenditures increased $54,000 (1.2%), primarily due to personnel and overtime adjustments; the Board discussed vacancies, vehicle replacements, and requested further review of fuel cost projections. Public Safety costs increased due to North Shore Fire Department and Bayside Communications budgets. Public Works expenditures increased $110,000 (3.46%), primarily due to personnel and operational costs; traffic safety improvements and the 2027 DPW roof replacement were also discussed. Building Services and Health Department budgets decreased slightly, while Contingencies, Transfers, Insurance, and Other Expenditures decreased 12%, primarily due to lower workers’ compensation and IT costs, partially offset by increased ADA accessibility and pollution coverage expenses. The Library budget reflects a $20,000 revenue decrease with no levy increase, partially offset by additional MCFLS reserve funding. The Debt Service Fund increases $1 million (30%) in revenues and expenditures, with a $68,000 net levy increase. The Capital Fund increases $41,000 (11.18%), primarily due to North Shore Fire capital costs; the Board also discussed capital requests, offered the Library Park chess table as a donation opportunity, and moved the Klode Park beach shower to the wish list. The Water Utility budget reflects a $381,000 (14%) revenue increase, including a 22.48% rate increase effective April 2027 and the loss of $50,000 in annual US Cellular lease revenue. Expenditures increased $86,000, primarily due to debt service for water main and service line replacements. The Sewer Utility budget reflects a $459,000 revenue increase with no rate increase, primarily from PPII reimbursements and higher MMSD pass-through charges. Expenditures increased $538,000, largely due to higher debt service. The Storm Water Utility budget reflects a $500 revenue increase with no rate increase and a $45,000 expenditure increase, primarily due to personnel costs, Buckley Park restoration maintenance, and debt service. The Board discussed funding the restoration through the Storm Water Utility as part of a three-year program. The remaining funds were reviewed, including the Special Assessment, Borrowed Money, TID 1, TID 2, TID 3, and newly established Private Lead Service Line funds, none of which have a property tax levy or user fee impact; the Board also discussed the state loan funding eligibility requirements for private lead service line replacements. Budget wish lists were reviewed, noting that the items were not included in the proposed budget and would be considered based on priorities and available funding. The Committee supported funding police officer mental health check-ins and gym upgrades through surplus funds, endorsed approximately $15,000 for contracted communications services offset by a reduction in the vehicle fund, supported exploring trash collection tablets to improve operational efficiency, and deferred basement storage improvements, library flooring, Village Hall HVAC upgrades, and records management solutions for further evaluation and potential inclusion in future capital planning; the proposed shower project was deferred for future consideration. 2. Adjourn There being no further business, it was moved by Trustee Saunders seconded by Trustee Serebin to adjourn the meeting at 7:44 p.m. Motion carried 7-0. General Investments Post Retirement Investments Ehlers Investments Total LGIP 11,664,136$ - $ - $ 11,664,136$ Investment Cash 30,226 13,427 4,644,972 4,688,625 US Treasury Less than 1 Year 1,161,704 341,145 9,893,980 11,396,829 1 to 3 Years 299,051 380,473 - 679,524 3 to 5 Years 1,395,162 - - 1,395,162 Total US Treasury 2,855,917 721,618 9,893,980 13,471,515 CD's Less than 1 Year $786,371 235,999 - 1,022,370 1 to 3 Years 1,007,146 247,600 - 1,254,746 3 to 5 Years 320,353 - - 320,353 Total CD's 2,113,870 483,599 - 2,597,469 Total Investments 16,664,149$ 1,218,644 $ 14,538,952 $ 32,421,745 $ Accrued Interest 178,790$ 36,853 $ - $ 215,643$ Monthly Investment Summary October 2026 35% 15% 42% 8% $- $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 $16,000,000 LGIP Investment Cash US Treasury CD's CHECK REGISTER FOR VILLAGE OF WHITEFISH BAY CHECK DATE 10/01/2026 - 10/31/2026 - CHECK SOURCE: COMPUTER GENERATED CHECKS Check Date Check Vendor Vendor Name Amount Bank Cking ASSOCIATED Check Type: ACH Transaction Cking 10/02/2026 97(A) POLICE DUE WHITEFISH BAY POLICE ASSOCIAT 420.00 10/16/2026 103(A) POLICE DUE WHITEFISH BAY POLICE ASSOCIAT 420.00 Total ACH Transaction: 840.00 Check Type: EFT Transfer Cking 10/02/2026 98(E) AFLAC AFLAC 63.23 10/02/2026 99(E) GREAT-WEST GREAT-WEST 6,850.30 10/02/2026 100(E) IRS INTERNAL REVENUE SERVICE 48,944.11 10/02/2026 101(E) STATE OF W STATE OF WISCONSIN 8,594.95 10/02/2026 102(E) WI SCTF WISCONSIN SUPPORT COLLECTIONS 591.89 10/15/2026 109(E) 102406 ELAN FINANCIAL SERVICES 89.01 10/15/2026 110(E) 102406 ELAN FINANCIAL SERVICES 12,655.90 10/16/2026 104(E) AFLAC AFLAC 63.23 10/16/2026 105(E) GREAT-WEST GREAT-WEST 6,812.26 10/16/2026 106(E) IRS INTERNAL REVENUE SERVICE 49,584.05 10/16/2026 107(E) STATE OF W STATE OF WISCONSIN 8,682.93 10/16/2026 108(E) WI SCTF WISCONSIN SUPPORT COLLECTIONS 591.89 10/27/2026 115(E) 0123 WE ENERGIES 13,261.99 10/27/2026 116(E) 103210 ETF 160,623.04 10/30/2026 117(E) GREAT-WEST GREAT-WEST 6,780.68 10/30/2026 118(E) IRS INTERNAL REVENUE SERVICE 51,257.23 10/30/2026 119(E) STATE OF W STATE OF WISCONSIN 9,113.47 10/30/2026 120(E) WI SCTF WISCONSIN SUPPORT COLLECTIONS 591.89 Total EFT Transfer: 385,152.05 Check Type: Paper Check Cking 10/02/2026 72388 102569 AMAZON CAPITAL SERVICES 139.26 10/02/2026 72389 102975 AMUNDSEN DAVIS, LLC. 20,045.70 10/02/2026 72390 103120 BATZNER PEST CONTROL 182.78 10/02/2026 72391 102172 CLARK DIETZ, INC 73,352.50 10/02/2026 72392 0039 GRAEF 992.25 10/02/2026 72393 102051 HOME DEPOT CREDIT SERVICES 50.56 10/02/2026 72394 101800 INNOVATIVE CREDIT SOLUTIONS 50.00 10/02/2026 72395 102659 JACOBUS ENERGY 1,834.30 10/02/2026 72396 103135 KELSEY MCELROY-ANDERSON 19.64 10/02/2026 72397 102000 MICHAEL BEST & FRIEDRICH LLP 1,080.00 10/02/2026 72398 101867 OTIS ELEVATOR COMPANY 437.01 10/02/2026 72399 101912 PUBLIC SERVICE COMMISSION OF 3,706.59 10/02/2026 72400 102518 SHRED-IT, C/O STERICYCLE, INC 92.25 10/02/2026 72401 101634 THE OFFICE TECHNOLOGY GROUP 217.00 10/02/2026 72402 102012 ULINE 196.14 10/02/2026 72403 0075 VILLAGE ACE HARDWARE 53.52 10/02/2026 72405 0089 WACHTEL TREE SCIENCE 2,805.50 10/02/2026 72406 0123 WE ENERGIES 278.39 10/02/2026 72407 103145 WISCONSIN HYDRANT REPAIR LLC 325.00 10/09/2026 72408 102535 ABT MAILCOM 4,039.00 10/09/2026 72409 0004 ALSCO 1,716.48 10/09/2026 72410 102728 AT&T MOBILITY 777.64 10/09/2026 72411 102798 BUREAU OF CORRECTIONAL ENTERP 88.79 10/09/2026 72412 103154 CHICAGO PARTS & SOUND ENT., L 979.60 10/09/2026 72413 102970 Flock Safety 800.00 10/09/2026 72414 102470 GENERAL CODE 365.00 10/09/2026 72415 103216 GOVERNMENT FORMS& SUPPLIES 596.18 10/09/2026 72416 102659 JACOBUS ENERGY 2,345.16 10/09/2026 72417 103218 KIMBALL MIDWEST 204.30 10/09/2026 72418 102622 KRIETE TRUCK CENTER MILWAUKEE 778.00 10/09/2026 72419 0105 LEXISNEXIS RISK DATA MGMT INC 200.00 10/09/2026 72420 102710 MACQUEEN EQUIPMENT 14,324.17 10/09/2026 72421 MISC01 MARY F. ROETS 560.00 10/09/2026 72422 103251 MILWAUKEE COUNTY 10,407.36 10/09/2026 72423 0058 MILWAUKEE COUNTY TREASURER 1,374.71 10/09/2026 72424 101848 NORTH SHORE HEALTH DEPT. 34,692.00 10/09/2026 72425 102268 NORTH SHORE WATER COMMISSION 34,514.27 10/09/2026 72426 102701 POM INCORPORATED 1,539.80 10/09/2026 72427 103156 RINGCENTRAL INC. 1,326.49 10/09/2026 72428 101656 STATE OF WI-COURT FINES/SURCH 4,681.19 10/09/2026 72429 103108 TALLGRASS RESTORATION, LLC 6,020.00 10/09/2026 72430 101634 THE OFFICE TECHNOLOGY GROUP 330.48 10/09/2026 72431 101997 TITAN PUBLIC SAFETY SOLUTIONS 1,500.00 10/09/2026 72432 103042 USA TODAY MEDIA CORP 131.00 11/11/2026 09:20 AM Page: 1/3 CHECK REGISTER FOR VILLAGE OF WHITEFISH BAY CHECK DATE 10/01/2026 - 10/31/2026 - CHECK SOURCE: COMPUTER GENERATED CHECKS Check Date Check Vendor Vendor Name Amount Bank Cking ASSOCIATED Check Type: Paper Check Cking 10/09/2026 72433 101632 VILLAGE OF BAYSIDE 134,416.00 10/09/2026 72434 0086 WEX BANK 7,222.56 10/09/2026 72435 102229 WISCONSIN DEPARTMENT OF JUSTI 63.00 10/16/2026 72436 103213 ACP CREATIVEIT LLC 99.00 10/16/2026 72437 102291 ADELMAN 4,770.00 10/16/2026 72438 0082 AIRGAS USA, LLC 79.02 10/16/2026 72439 102569 AMAZON CAPITAL SERVICES 1,193.53 10/16/2026 72440 102238 ANNMARIE WARANKA 22.58 10/16/2026 72441 0126 AT&T 386.63 10/16/2026 72442 102445 BIBLIOTHECA, LLC 2,938.55 10/16/2026 72443 103181 BLUEBEAM, INC. 330.00 10/16/2026 72444 MISC01 BP WFB 1, LLC 1,000.00 10/16/2026 72445 0021 CARLIN SALES CORPORATION 74.29 10/16/2026 72446 102888 CITY PRESS, INC. 406.88 10/16/2026 72447 102172 CLARK DIETZ, INC 30,235.00 10/16/2026 72448 102519 CORE & MAIN LP 2,676.98 10/16/2026 72449 102928 CULLIGAN OF WAUKESHA 89.00 10/16/2026 72450 101887 DAN KRALL & CO., INC. 1,000.00 10/16/2026 72451 101654 DIXON ENGINEERING, INC. 4,500.00 10/16/2026 72452 102306 FIRE DETECTION GROUP 330.00 10/16/2026 72453 102292 FORWARD TS, LTD 23.45 10/16/2026 72454 0088 GARDENER IN THE CITY 619.50 10/16/2026 72455 103209 GEMPLERS INC 44.99 10/16/2026 72456 103090 GEO-SYNTHETICS SYSTEMS LLC 304.50 10/16/2026 72457 0037 GLENDALE WATER UTILITY 420.00 10/16/2026 72458 103122 Ingram Library Services 11,941.57 10/16/2026 72459 102659 JACOBUS ENERGY 2,088.47 10/16/2026 72460 102894 JM BRENNAN INC 672.00 10/16/2026 72461 102311 JOHN FABICK TRACTOR COMPANY 24.29 10/16/2026 72462 102732 KANOPY, INC. 243.95 10/16/2026 72463 0048 LAKESIDE INTERNATIONAL, LLC 18,686.23 10/16/2026 72464 0050 LINCOLN CONTRACTORS SUPPLY 680.51 10/16/2026 72465 102710 MACQUEEN EQUIPMENT 1,456.65 10/16/2026 72466 102000 MICHAEL BEST & FRIEDRICH LLP 960.00 10/16/2026 72467 102100 MINOR'S GARDEN CENTER 69.00 10/16/2026 72468 102516 MOTION & CONTROL ENTERPRISES 391.41 10/16/2026 72469 102964 NATIVE RANGE ECOLOGICAL, LLC 190.00 10/16/2026 72470 102701 POM INCORPORATED 1,009.70 10/16/2026 72471 103179 REINHART BOERNER VAN DEUREN S 1,377.00 10/16/2026 72472 0096 RUEKERT & MIELKE. INC. 1,111.75 10/16/2026 72473 103207 RYAN FIREPROTECTION, INC. 359.00 10/16/2026 72474 101931 STAPLES ADVANTAGE 528.82 10/16/2026 72476 103247 T-MOBILE 337.80 10/16/2026 72477 101634 THE OFFICE TECHNOLOGY GROUP 86.60 10/16/2026 72478 0112 UTILITY SALES AND SERVICE, IN 1,620.00 10/16/2026 72479 0075 VILLAGE ACE HARDWARE 34.56 10/16/2026 72480 0070 VILLAGE OF SHOREWOOD 26,570.11 10/16/2026 72481 101786 WHITEFISH BAY SCHOOL DISTRICT 178.44 10/16/2026 72482 101731 WI DEPT. OF JUSTICE 25.00 10/16/2026 72484 101651 WM RECYCLE AMERICA 5,347.08 10/23/2026 72485 102847 AAA Acme Lock, Inc. 190.47 10/23/2026 72486 102569 AMAZON CAPITAL SERVICES 113.59 10/23/2026 72487 102084 AMERICAN LEAK DETECTION 585.00 10/23/2026 72488 102641 ASCENSION OCCUPATIONAL HEALTH 217.00 10/23/2026 72489 102082 BADGER UNDERGROUND INC 9,050.00 10/23/2026 72490 0012 BATTERIES PLUS 186.05 10/23/2026 72491 101655 BS&A SOFTWARE 7,960.00 10/23/2026 72492 102172 CLARK DIETZ, INC 2,185.00 10/23/2026 72493 102198 DELTA DENTAL OF WISCONSIN 573.40 10/23/2026 72494 101861 EHLERS 1,225.00 10/23/2026 72495 0088 GARDENER IN THE CITY 293.10 10/23/2026 72496 102659 JACOBUS ENERGY 3,911.71 10/23/2026 72497 103189 METLIFE 310.94 10/23/2026 72498 0060 MILWAUKEE METRO SEWERAGE DIST 296,644.80 10/23/2026 72499 101848 NORTH SHORE HEALTH DEPT. 35,832.00 10/23/2026 72500 102268 NORTH SHORE WATER COMMISSION 94,993.84 10/23/2026 72501 103177 OZINGA READY MIX CONCRETE 3,948.89 10/23/2026 72502 103156 RINGCENTRAL INC. 1,299.93 10/23/2026 72503 0061 SECURIAN FINANCIAL GROUP, INC 1,255.06 11/11/2026 09:20 AM Page: 2/3 CHECK REGISTER FOR VILLAGE OF WHITEFISH BAY CHECK DATE 10/01/2026 - 10/31/2026 - CHECK SOURCE: COMPUTER GENERATED CHECKS Check Date Check Vendor Vendor Name Amount Bank Cking ASSOCIATED Check Type: Paper Check Cking 10/23/2026 72504 0074 TAPCO 199.40 10/23/2026 72505 102513 WI DEPARTMENT OF TRANSPORTATI 2,447.21 10/30/2026 72506 103120 BATZNER PEST CONTROL 227.00 10/30/2026 72507 102172 CLARK DIETZ, INC 23,773.54 10/30/2026 72508 103245 CRIVELLO, NICHOLS & HALL S.C. 750.00 10/30/2026 72509 MISC01 Flatwater Homes 225.00 10/30/2026 72510 102738 GRAYBAR ELECTRIC COMPANY 1,047.67 10/30/2026 72511 103234 GROTH DESIGN GROUP 9,049.07 10/30/2026 72512 101806 HY-TEST SAFETY SHOE SERVICE 164.99 10/30/2026 72513 0053 M&M TREE SERVICE 8,255.00 10/30/2026 72514 102771 PERSONNELL EVALUATION INC. 55.00 10/30/2026 72515 0096 RUEKERT & MIELKE. INC. 2,252.17 10/30/2026 72516 102518 SHRED-IT, C/O STERICYCLE, INC 92.25 10/30/2026 72517 101634 THE OFFICE TECHNOLOGY GROUP 226.59 10/30/2026 72518 0075 VILLAGE ACE HARDWARE 1.35 10/30/2026 72519 0086 WEX BANK 104.94 10/30/2026 72520 101667 WHITEFISH BAY BID 23,500.00 10/30/2026 72521 102963 WISCONSIN ECONOMIC DEVELOPEME 200.00 10/30/2026 72522 102219 WISCONSIN SUPREME COURT 55.00 Total Paper Check: 1,032,787.37 Cking TOTALS: Total of 152 Checks: 1,418,779.42 Less 0 Void Checks: 0.00 Total of 152 Disbursements: 1,418,779.42 11/11/2026 09:20 AM Page: 3/3 VILLAGE BOARD MEETING STAFF REPORT REPORT TO: President Kevin Buckley & Village Board of Trustees REPORT FROM: Anna Christopherson, Assistant Village Manager DATE: November 16, 2026 AGENDA ITEM: Discussion/action on acceptance of a bench donation in honor of Hans & Dorothy Mueller at Library Park ACTION REQUESTED: ____Ordinance ____Resolution __√__Motion (Consent) BACKGROUND: In September, Niels Mueller contacted Village Staff regarding a potential bench donation for placement at Library Park. Village Staff corresponded with Niels to confirm the location of the bench within Library Park. The approximate location is included in Attachment 1. Pending approval by the Village Board, Village Staff will invoice Niels for the cost of bench, custom plaque, concrete pad, and installation (approximately $1,200). Niels will work with Village Staff on engraving of the plaque, which Village staff will install. RECOMMENDED ACTION BY VILLAGE BOARD: Staff recommends the acceptance of a bench donation in honor of Hans & Dorothy Mueller at Library Park. . ATTACHMENTS 1. Bench Location (Bench 3) C: Department Heads Attorney Jaekels Attachment 1: Library Park Bench #3 Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Mathew Collins, Director of Public Works November 16, 2026 Memo to: President Kevin Buckley and the Village Board of Trustees From: Matthew Collins, Director of Public Works Re: Storm Sewer Outfall Rehabilitation Design Review On February 17, 2025, the Village Board approved the contract for Mid City Corporation to inspect three of the Lake Michigan outfalls and contiguous manholes, document existing conditions, and complete inspection reports including repair suggestions and cost estimates. In April, 2025, Mid City performed the inspections of all accessible stormwater outfalls that discharge into Lake Michigan with the exception of LM4 that has recently been rehabilitated. Mid City completed the analysis and presented their findings within a report to the Public Works Committee on October 13th, 2025. The final report guided the Village with prioritizing critical storm water utility maintenance and rehabilitation projects and capital budget planning. The Village Board adopted a 6-year Capital Improvement Plan (CIP) that includes $200,000 in the 2026 budget for storm sewer manhole lining and repairs. Some of the available CIP funds were leveraged to for the Village Board to approve engineering services to allow for professional engineering services to complete design, field survey, utility easements, environmental impacts/permits, and bid assistance for LM#1 rehabilitation as well as safety grate installations at LM#1 and LM#3. Ruekert Mielke has completed their preliminary design scope of the LM#1 outfall and the LM#3 safety grates including evaluating rehabilitation options for LM#1. Within the scope of services, Ruekert Mielke reviewed alternative techniques to rehabilitate the outfall and apron of LM#1. To date, village staff and engineers have completed the preliminary site review, met with impacted residents, and evaluated rehabilitation alternatives including construction access and costs. LM#1 rehabilitation includes the following recommendations: - Temporary and Permanent Easements - Cured-in-Place Pipe (CIPP) Lining - Geopolymer Manhole Lining - Outfall Structure Replacement Alternative rehabilitation activities may be considered including: - Klode Park Beach Stabilization (assist with construction access to the north) - CIPP Lining – Drop Manhole west to Lake Drive MCC made recommendations to install a safety grate to the LM#3 outfall to prevent unwarranted access to the outfall. Due to long- term monitoring and maintenance required to keep the grate clear of debris, accessibility would be a requirement for DPW staff to routinely access the outfall. The only way to access the LM#3 outfall is through Silver Spring Park where no formal access path exists and substantial erosion makes it difficult to traverse the site. Based on concerns with access, village staff and Ruekert Mielke recommend placing warning signage on the outfall, but not to install safety grates at this time. Village staff and Ruekert Mielke presented the Storm Sewer Outfall recommendations to the Public Works Committee on November 9 th, 2026 to narrow the scope of work to LM#1 and LM#3. The Public Works Committee made the recommendations on the scope of construction activities to include the LM#1 rehabilitation and alternative recommendations as presented. It was also agreed upon to not process with safety grates to be installed to LM#3 due to site access and maintenance concerns. It is anticipated that the final plans, specifications, and easements will be completed by late 2027 with construction planned for 2028. Final project budget estimates will be included within the 2028 – 2033 Capital Improvement Plan Storm Utility budget recommendations that will be reviewed and adopted by the Village Board in 2027. Refer to attached presentation for a complete overview of the proposed project scope and budget estimates. Public Works Committee Recommends to the Village Board: To approve the proposed design and construction scope of the LM#1 storm sewer outfall as recommended and presented to the Public Works Committee. VILLAGE OF WHITEFISH BAY STORM SEWER REHABILITATION PROJECT UPDATE 11/9/2026 • Review recommendations from July 2025 Inspection Report • LM1 Storm Sewer Rehabilitation • Easement Acquisition • Alternative Overview & Cost Estimates • Recommended Alternative • LM3 Outfall Safety Grate • Project Schedule & Next Steps Overview Recommendations from July 2025 Inspection Report LM1 Repair/replace approximately 50-feet of 48” storm sewer tunnel immediately west of outfall structure Repair outfall structure LM1 LM3 Install safety grate at outfall structureLM3 LM1 Storm Sewer & Outfall Structure • LM1 storm sewer and outfall is located on private property north of Klode Park • Outfall structure is in failure • A drop manhole structure is located mid-yard along the property line between 5960 & 6000 N. Shore Drive • Structure is in fair to good condition • 84-feet deep • 48” storm sewer tunnel condition: • 50-feet immediately west of outfall structure is in failure • Severe deterioration • Missing sections • Radial and longitudinal cracks • Remaining pipe to mid-yard manhole is in fair condition: • Ground water infiltration • Minor cracks • Pipe from drop manhole to manhole in intersection of Lake Drive and Montclaire Avenue: • Ground water infiltration • No significant structural deficiencies noted LM1 Storm Sewer Easements • No recorded easements for the properties adjacent to the LM1 storm sewer and outfall have been located • 9/15/2026 - Letters sent to property owners of 5960 & 6000 N. Shore Drive to provide project information and request meeting to discuss proposed easements • 10/2/2026 - Met with residents to discuss project and proposed easements • Property owners expressed interest in having work completed comprehensively to minimize future risk of the storm sewer failing & impacts to the properties • Proposed easements to acquire include: • Permanent Storm Sewer Easement on 6000 N. Shore Drive • Temporary Construction Easement on 5960 N. Shore Drive • Permanent Access Easement on 5960 N. Shore Drive along the beach LM1 Storm Sewer Easements LM1 Storm Sewer Rehabilitation Alternatives Overview & Cost Estimates • Outfall Structure Replacement • Klode Park Beach Stabilization • LM1 Storm Sewer Rehabilitation Alternatives • Slipline & Open-cut replacement • Geopolymer Mortar Lining & Open-cut replacement • Hand-mined Tunnel Pipe Installation • Cured-in-Place Pipe (CIPP) Lining • Drop Manhole Rehabilitation • Geopolymer Manhole Lining • Fiberglass Insert Manhole Lining • Recommended Alternative LM1 Outfall Structure Replacement • Outfall structure is in failure and cannot be rehabilitated due to: • Degradation of concrete • Exposure of reinforcing steel • Replacement of outfall structure will largely be in kind * All estimated costs expressed in 2028 dollars Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 80,000$ 80,000$ 2 Remove and Replace Cast-in-Place Outfall Structure L.S. 1 108,000$ 108,000$ 3 Klode Park Path Restoration S.Y. 500 100$ 50,000$ 4 Erosion Control L.S. 1 32,500$ 32,500$ 270,500$ 68,500$ 339,000$ LM1 Outfall Structure Replacement Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Outfall Structure Replacement • Construction access to be from Klode Park • Permanent access easement from Klode Park to outfall to be acquired from 5960 N. Shore Drive • Construction access within Klode Park proposed to include permanent beach stabilization (5:1 slope between jetties) Item No. Item Description Unit Quantity Unit Price Cost 1 Heavy Riprap TON 1400 85$ 119,000$ 2 Fine Sand TON 550 55$ 30,250$ 149,250$ 37,750$ 187,000$ Klode Park Beach Stabilization Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Storm Sewer Rehabilitation Geopolymer Mortar Lining & Open-cut Replacement • Geopolymer mortar sprayed onto pipe to provide: • Structural support • Corrosion resistance • 3-inch-thick mortar layer would be required to provide required structural support resulting in a 42-inch Diameter pipe • Existing deficiencies in the pipe would require open-cut replacement of 50-feet immediately west of LM1 outfall structure • Pipe needs to be clean and dry to be able to apply mortar • Minimal work footprint: • Excavation at drop manhole would not be required Advantages • Minimal work footprint at drop manhole Disadvantages • Reduced hydraulic capacity of pipe • Increased efforts needed to have pipe clean and dry Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 80,000$ 80,000$ 2 Remove and Replace 48-inch CL V Storm Sewer L.F. 50 1,300$ 65,000$ 3 Cast-in-Place Pipe Encasement L.F. 50 850$ 42,500$ 4 Geopolymer Mortar L.F. 270 1,000$ 270,000$ 5 Temporary Bypass Pumping L.S. 1 50,000$ 50,000$ 507,500$ 127,500$ 635,000$ Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Geopolymer Mortar Lining LM1 Storm Sewer Rehabilitation Slipline & Open-cut Replacement • Fiberglass reinforced polymer mortar (FRPM) pipe installed within the existing pipe and the annular space would be grouted • Existing deficiencies in the pipe would require open-cut replacement of 50- feet immediately west of LM1 outfall structure • Anticipated that a 41-inch Diameter pipe would need to be installed • Minimal work footprint: • Excavation at drop manhole would be required to remove casting and brick chimney section Advantages • Minimal work footprint at drop manhole Disadvantages • Reduced hydraulic capacity of pipe Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 80,000$ 80,000$ 2 Remove and Replace 48-inch CL V Storm Sewer L.F. 50 1,300$ 65,000$ 3 Cast-in-Place Pipe Encasement L.F. 50 850$ 42,500$ 4 41-inch FRPM Pipe (Slip Line) L.F. 270 1,600$ 432,000$ 5 Cementitious Grouting of Annular Space C.Y. 30 540$ 16,200$ 6 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 662,200$ 165,800$ 828,000$ Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Slipline with FRPM Pipe Subtotal LM1 Storm Sewer Replacement Hand-Mined Tunneling • Full replacement of the pipe from the outfall to the drop manhole by hand- mined tunneling due to depth • A vertical shaft would need to be excavated at the drop manhole to connect the new pipe • Substantially longer construction duration compared to other alternatives Advantages • Full pipe replacement Disadvantages • Cost • Large construction footprint and disruption to properties • Construction duration Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 270,000$ 270,000$ 2 Hand-mining 48-inch RCP CL V Storm Sewer L.F. 270 5,900$ 1,593,000$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 1,889,500$ 472,500$ 2,362,000$ Hand-Mined Tunnel Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs • LM1 Storm Sewer Rehabilitation Cured-in-Place Pipe (CIPP) Lining – Drop Manhole to Outfall • Liner saturated with resin is inserted, inflated, & cured within the existing pipe • 1.5-inch-thick liner would be required to provide required structural support resulting in a 45-inch Diameter pipe • 50-feet immediately west of LM1 outfall structure would not need to be replaced • Minimal work footprint: • Excavation at drop manhole would be required to remove casting and brick chimney section Advantages • Cost • Minimal work footprint at drop manhole Disadvantages • Slightly reduced hydraulic capacity Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 53,000$ 53,000$ 2 48-inch Storm Sewer CIPP Lining L.F. 270 1,300$ 351,000$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 430,500$ 108,500$ 539,000$ Cured-in-Place Pipe (CIPP) Lining (Outfall to Drop Manhole) Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Storm Sewer Rehabilitation Cured-in-Place Pipe (CIPP) Lining – Drop Manhole to Lake/Montclaire Intersection • CIPP lining from drop manhole to manhole in the Lake/Montclaire intersection • No significant structural deficiencies noted in pipe presently • Current groundwater infiltration may exacerbate future structural issues • Long-term & comprehensive solution • Economy of scale • Time value of money • Contractor is mobilized • Acquisition of temporary construction easements & restoration • Additional CIPP bid as Mandatory Alternate Item No. Item Description Unit Quantity Unit Price Cost 1 48-inch Storm Sewer CIPP Lining L.F. 720 675$ 486,000$ 486,000$ 122,000$ 608,000$ Cured-in-Place Pipe (CIPP) Lining (Drop Manhole to Lake/Montclaire Manhole) Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs LM1 Storm Sewer Drop Manhole Rehabilitation • Drop manhole is in fair to good condition • Long-term & comprehensive solution • Rehabilitation of manhole can be completed by: • Geopolymer lining • Installation of fiberglass inserts (sliplining) Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 10,800$ 10,800$ 2 72-inch Geopolymer Manhole Lining V.F. 90 530$ 47,700$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 85,000$ 22,000$ 107,000$ Geopolymer Manhole Lining Subtotal Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Item No. Item Description Unit Quantity Unit Price Cost 1 Mobilization and Access L.S. 1 53,000$ 53,000$ 2 72-inch Fiberglass Insert Manhole Lining V.F. 90 970$ 87,300$ 3 Temporary Bypass Pumping L.S. 1 26,500$ 26,500$ 166,800$ 42,200$ 209,000$ Engineering, Administration, Legal, & Construction Contingency (25%, Rounded) Total Estimated Rehabilitation Costs Subtotal Fiberglass Insert Manhole Lining LM1 Storm Sewer & Outfall Recommended Alternative Item Description Cost LM1 Outfall Structure Replacement 270,500$ Klode Park Beach Stabilization 149,250$ Cured-in-Place Pipe (CIPP) Lining (Outfall to Drop Manhole) 430,500$ Cured-in-Place Pipe (CIPP) Lining (Drop Manhole to Lake/Montclaire Manhole) 486,000$ Geopolymer Manhole Lining 85,000$ Subtotal 1,421,250$ Construction Contingency (10%, Rounded) 143,500$ Engineering, Administration, Legal (15%, Rounded) 215,250$ Total Estimated Rehabilitation Costs 1,780,000$ LM1 Storm Sewer and Outfall Recommended Alternative LM3 Outfall • LM3 storm sewer outfall is located north of Silver Spring Park • LM3 Outfall structure in good condition • Wooded path present from the maintained park area east towards the outfall structure • 20-foot vertical drop in grade just above the outfall structure LM3 Outfall • Installation of a safety grate would: • Prevent persons from accessing the storm sewer • Require long-term monitoring & maintenance • Access improvements needed to install and maintain the safety grate • Current recommendation is to not install the safety grate • Warning signage may be added in the future Project Schedule & Next Steps 11/9/2026 Update to Public Works Committee 12/31/2026 Biddable Plans & Specifications Completed 2027 Easement Acquisition and Permitting Late 2027 Bidding 8 weeks 2028 Construction Questions? Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Mathew Collins, Director of Public Works 1 | Page Memo to: President Kevin Buckley and the Village Board of Trustees From: Maxine Miller, Staff Engineer Re: 2028 Watermain, Water Service Line Replacement Proposed Project Locations Starting in 2028, the Village will be mandated to replace 188 lead water service lines annually to meet EPA and DNR Lead and Copper Rule Improvement (LCRI) requirements. To meet this obligation while continuing to improve the Village's water distribution system and roadway infrastructure, village staff conducted a comprehensive evaluation of roadway segments throughout the community to identify the most suitable locations for coordinated watermain replacement, water service line replacement, and street resurfacing projects. DPW staff reviewed Village maps, historical infrastructure records, and roadway data. Several factors were considered as part of the evaluation, including: • Number of confirmed public and private lead water service lines connected to each watermain • Street condition • Age and material of existing watermains • Frequency and dates of watermain breaks • Overall project constructability and coordination of infrastructure improvements Based on this evaluation, staff identified the following two roadway segments as the highest priorities for the 2028 construction program: • N. Kent Avenue: E. Devon Street to E. Lakeview Avenue • N. Cumberland Boulevard: N. Lake Drive to E. Hampton Road By 2028, the pavement condition of these roadway segments is projected to have an average rating of approximately 4 to 5 on the 10-point PASER pavement rating scale, further supporting the coordination of underground utility improvements with street resurfacing. Upon completion of the watermain and LSL replacements, each street will be fully resurfaced. The proposed 2028 project would result in the replacement of approximately 1.08 miles of watermain and 186 lead service lines. In addition, the Village typically replaces an average of 25 resident-initiated or service line breaks annually outside of watermain replacement project limits. Together, these efforts would allow the Village to achieve its annual requirement of 188 lead service line replacements in 2028. The following table summarizes the existing water service line inventory within the proposed project limits: 2 | Page Water Service Line Classification Number of Properties Non-Lead service line on public and private 12 Lead service line on public side only 29 Lead service line on private side only 12 Lead service lines on both public and private sides 145 Total lead service lines to be replaced 186 Total properties served within project area 198 Prior to construction, DPW staff will conduct a comprehensive inspection of existing utility infrastructure within the proposed project limits and complete any necessary repairs to minimize future disruptions and avoid unnecessary roadway restoration. Additional project coordination and evaluations will include: • Sanitary Sewer Infrastructure: Continue annual sanitary sewer inspections and identify opportunities for necessary repairs and lining. • Stormwater and Flooding: Review the Village's stormwater and sanitary sewer studies and flood risk assessment to identify recommendations applicable to the proposed project areas. • Pedestrian and Bicycle Facilities: Review the Village's pedestrian and bicycle study to identify potential improvements or recommendations that can be incorporated into the projects. • Geotechnical Investigation: Obtain geotechnical samples to evaluate existing subsurface soil and pavement conditions and assist with determining appropriate roadway reconstruction and resurfacing methods. These evaluations will help ensure that the proposed projects address not only immediate water infrastructure needs but also other long-term infrastructure and transportation priorities within the project areas. Refer to attached map for the proposed 2028 watermain and LSL program area. On November 9, 2026, the Public Works Committee reviewed the proposed project area and made the recommendation to approve the scope of work to be included within the future capital improvement project plan. Public Works Committee Recommends to the Village Board: To approve the 2028 annual watermain and LSL replacement program. 2028 Watermain Replacement and Street Resurfacing Map Watermain Replacement, Water Service Line Replacements, and Street Resurfacing Street Resurfacing Only DRAFT 1 Village of Whitefish Bay 5300 N. Marlborough Drive Whitefish Bay, Wisconsin 53217 Phone: 414-962-6690 Fax: 414-962-5651 Memorandum To: Village Board Cc: Kelsey McElroy-Anderson – Village Manager From: Erin Granstrom, Deputy Clerk Date: November 11, 2026 Re: Operator License Approval Background The Village Board is the ruling body responsible for approving Operator License applications. Operator permits are renewed annually, and the following permits would be valid issuance through June 30, 2025. Action Requested To approve the Bartender Licenses as listed New Operator Permits Sendik’s Food Market (Tudi’s Restaurant) Lucus Brunette Analysis The bartender license applications listed above are being presented for approval. A background check has been performed and the applicants meet the requirements to hold a license in the Village of Whitefish Bay. Staff recommends approval of the licenses as presented above for the remainder of the current license term (issuance through June 30, 2027). STATE OF WISCONSIN : MILWAUKEE COUNTY : VILLAGE OF WHITEFISH BAY RESOLUTION NO. 3209 WHEREAS, the Village Board did on November 16, 2026 hold a public hearing on the proposed budgets for the Village of Whitefish Bay for the calendar year 2027. NOW, THEREFORE, BE IT RESOLVED by the Village Board that the Village of Whitefish Bay adopt the following individual fund budgets in the amounts indicated for the calendar year 2027: Fund Amount General Fund 13,520,719$ Library Fund 1,106,561$ Deb t Service Fund 4,561,907$ Capital Fund 400,620$ Special Assessment - Capital Projects Fund 34,200$ Borrowed Money - Capital Projects Fund 3,916,974$ Private Lead Service Line - Capital Projects Fund 1,554,977$ TID No. 1 Fund 775,675$ TID No. 2 Fund 305,338$ TID No. 3 Fund 51,701$ These said budgets in detail are open to public inspection, Monday through Friday, between the hours of 8:00 AM and 4:30 PM at the Administration Department in Village Hall, 5300 N. Marlborough Drive, Whitefish Bay, Wisconsin, and: BE IT FURTHER RESOLVED by the Village Board of the Village of Whitefish Bay, Milwaukee County, Wisconsin, that there is hereby levied upon all taxable property in said Village, to be extended upon the tax roll of said Village for the year 2026 and to be collected in and during the taxpaying period of 2026-2027 the sum of Fourteen Million, Two Hundred and Fifty Thousand, and Five Hundred and Eighty Eight Dollars ($14,250,588) for the support of said Village and the payment of projected indebtedness, all as indicated in the budget hereby adopted by the Village Board on November 16, 2026 and the Clerk of said Village is hereby directed and authorized to extend said amount upon the 2026 tax roll of said Village. PASSED AND ADOPTED this 16th day of November, 2026. ____________________________________ Kevin Buckley, President Countersigned: ____________________________________ Jaimie Krueger, Village Clerk STATE OF WISCONSIN : MILWAUKEE COUNTY : VILLAGE OF WHITEFISH BAY RESOLUTION NO. 3210 WHEREAS, the Village Board did on November 16, 2026, hold a Public Hearing on the proposed utility fund operating budgets for the Village of Whitefish Bay for t he calendar year 2027. NOW, THEREFORE, BE IT RESOLVED by the Village Board of the Village of Whitefish Bay adopt the following individ ual utility fund operating budgets in the amounts indicated for the calendar year 2027: Fund Amount Water Utility 2,623,113$ Sewer Utility 3,234,977$ Stormwater Utility 1,413,399$ BE IT FURTHER RESOLVED by the Village Board of the Village of Whitefish Bay, Milwaukee County, Wisconsin that the above said budgets are adopted for the calendar year 2027, and that these said budgets in detail are open to public inspection Monday through Friday, between the hours of 8:00 AM and 4:30 PM at the Administration Department in Village Hall, 5300 N. Marlborough Drive, Whitefish Bay, Wisconsin. PASSED AND ADOPTED this 16th day of November, 2026. _________________________________ Kevin Buckley, President Countersigned: _________________________________ Jaimie Krueger, Village Clerk STATE OF WISCONSIN : MILWAUKEE COUNTY : VILLAGE OF WHITEFISH BAY RESOLUTION NO. 3211 BE IT RESOLVED that the reports for assessments, charges, delinquent accounts, and other delinquent charges on file in the office of the Village Clerk be and the same is hereby accepted and approved. BE IT FURTHER RESOLVED that the Clerk be authorized to extend the following items against the respective lots and parcels of land as listed in said reports on file in the office of the Village Clerk, and enter the same in the tax roll for the year 2026 to be collected the same as other taxes. • Special assessments • Special charges • Business Improvement District assessments • Delinquent water/sewer/stormwater user charges • Other delinquent charges PASSED AND ADOPTED this 16th day of November, 2026. ______________________________________ Kevin Buckley, President Countersigned: ______________________________________ Jaimie Krueger, Village Clerk Village of Whitefish Bay Public Works Department 155 W. Fairmount Ave  Whitefish Bay, Wisconsin 53217  (414) 962-6690  Fax (414) 967-1391 Matthew Collins, Director of Public Works 1 | Page November 16, 2026 Memo to: President Kevin Buckley and the Village Board of Trustees From: Maxine Miller, Staff Engineer Re: Final Site Plan and Design Review for the Klode Warming House On September 21 st, 2026, the Village Board reviewed and discussed GROTH Design Group’s updated design layout and graphic renderings for the new warming house and pavilion at Klode Park. With the Village Board’s input, the project team then presented the layout and graphic renderings to the Architectural Review Commission (ARC), on October 15th and November 5th. Upon review of the layout and graphic renderings, the ARC approved the updated design of the new Klode Park Warming House. GROTH Design Group and Village staff met with the BID and the Civic Foundation on November 2nd. The project team gathered input on several topics to plan for the logistical needs at future special events in the upgraded space. The next step in the Klode Park Warming House project is to review and confirm the final site and building layout and renderings. Following the final Village Board approval, the project plans will be bid by contractors for construction. The drawings and ARC submittal packet are attached as an exhibit to this memorandum. Staff is requesting final feedback from the Board on the attached plan set and would like to draw additional attention to the items listed below. Staff is also completing our final review and those comments will also be incorporated into the final plan set. • Fourth of July: During construction activities in 2027, the warming house and pavilion area will need to be fenced off for safety of park users and contractors. It is anticipated that the park will have construction activities that will impact spectator areas typically used during the 4 th of July layout. This will reduce the footprint but still allow the event to proceed during construction. The timeline for the building’s electrical disconnects and installation will be coordinated with the project plan for the Fourth of July. The Village’s requirements for the construction site cleanliness and temporary electric during the Fourth of July event will be included in the project’s contract. There may be a need for additional generators that will be discussed with the design team and Civic Foundation. • Audio/Visual equipment: The bid documents include an alternate bid to include four speakers, microphones, basic stage lighting, and sound amps to the pavilion to accommodate smaller music performances. The pavilion’s sound and lighting equipment is beyond the original project’s scope of work and will require an audio/visual design consultant to assist with developing the bid documents. • IT equipment: The bid documents include security cameras. Staff is recommending a satellite modem instead of a hardwired fiber connection based on cost and connectivity needs. The cost to run fiber internet to this location was $7,000 upfront plus $150 per month for service or no up-front cost and $550 per month. The satellite modem is approximately $50 per month and has been tested by Bayside IT. 2 | Page • Electrical: The project includes two electrical pedestals for use during special events (one by the pavilion and the other by the new asphalt area on the northwest side of the building). The project also includes outdoor outlets around the building. • Building access: The bid documents include door lock programming and key fobs for efficient and secure door access to the exterior doors, community room, closets, and restrooms. This system will work well for future rentals as the doors can be programmed during the rentals for easy access and will ensure the doors are locked at the conclusion of the rental. • Interior needs: The project documents include furniture such as a bench and hooks in main corridor for ice skater use, rubber mats, tables, and chairs. There will also be kitchen appliances in the community room such as a refrigerator, microwave, and sink. • Exterior needs: The project will include a bike rack, exterior trash cans, a drinking fountain, hose bibs for exterior water access, and a children’s sand wash-off area. • Project Budget: The proposed additions to the project’s scope of work will likely extend beyond the original budget. There are modifications that could be made if the bids come in over budget or the Village Board could choose to use unallocated debt funds to supplement the project. • Trees: There were originally two Norway Maple trees proposed to be removed as part of this project. Both trees are located on the northwest corner of the new building. The design team is working on a plan to shift the proposed northwest pathway to preserve one of the trees. The other tree was evaluated by Wachtel and was labeled as “OK” condition. Village Staff Recommends to the Village Board: To approve GROTH Design Group’s site plan and design as presented subject to additional staff review and comment. KLODE PARK WARMING HOUSE - Whitefish Bay, WI SUBMITTAL 10.19.2026 KLODE PARK WARMING HOUSE - Whitefish Bay, WI SUBMITTAL 10.05.2026 10.19.2026 KLODE PARK WARMING HOUSE - Whitefish Bay, WI SUBMITTAL 10.05.2026 10.19.2026 1373 SF COMMUNITY ROOM 97 SF MECH 754 SF VEST / WARM 152 SF STORAGE VIEWING 305 SF MEN 305 SF WOMEN DOUBLE SIDED FIREPLACE HOSPITALITY BAR CUBBIES AND BENCH WITH WALL HOOKS OCCUPANT LOAD: +/ - 135 ROOF ABOVE VIEWING VIEWING 39 SF JAN 8' - 0" 14' - 0" 8' - 0" 94' - 8" 12' - 0" 94' - 8" 61 SF FAMILY COVERED PATIO 400 SF BUILDING FOOTPRINT 3,755 SQ FT SHED ROOF ABOVE 94' - 8" 39' - 4" VILLAGE OF WHITEFISH BAY KLODE PARK WARMING HOUSE 10.19.2026 FLOOR PLAN - OPTION A 0' 4' 8' 16' 32' N W S E SUBMITTAL KLODE PARK WARMING HOUSE - Whitefish Bay, WI SUBMITTAL 10.19.2026 KLODE PARK WARMING HOUSE - Whitefish Bay, WI SUBMITTAL 10.19.2026 09.172026 RENDERING PACKETKLODE PARK - Whitefish Bay, WI View 3 - Looking Northeast Original Material Palette: Dark Natural Colors Exterior Elevations 1/8" = 1'-0" (when formatted on 11x17) CREAM COLORED BRICK WOOD TEXTURED FIBER CEMENT SIDING BOD; JAMES HARDIE COLOR: BROWN ASPHALT SHINGLES BOD; GAF TIMBERLINE HDZ COLOR: BARKWOOD PAINTED TRIM COLOR: LIGHT BROWN ALUM STOREFRONT WINDOWS W/ SIMULATED DIVIDED LITES BOD; KAWNEER 451T COLOR: MED BRONZE WALL SCONCE LIGHT FIXTURE COLOR: MED BRONZE PENDANT LIGHT FIXTURE COLOR: MED BRONZE PAINTED BOX BEAMS AND TRUSSES COLOR: LIGHT BROWN BRICK INLAY DETAILING BRICK SOLDIER COURSE DETAILING GAS FIREPLACE 10.19.2026 EAST ELEVATION SOUTH ELEVATION SUBMITTAL VILLAGE OF WHITEFISH BAY KLODE PARK WARMING HOUSE 09.21.2026 RENDERING PACKET 10.19.2026 WEST ELEVATION NORTH ELEVATION Exterior Elevations 1/8" = 1'-0" (when formatted on 11x17) SUBMITTAL VILLAGE OF WHITEFISH BAY KLODE PARK WARMING HOUSE 09.21.2026 RENDERING PACKET WOOD TEXTURED FIBER CEMENT SIDING BOD; JAMES HARDIE COLOR: BROWN ASPHALT SHINGLES BOD; GAF TIMBERLINE HDZ COLOR: BARKWOOD PAINTED TRIM COLOR: LIGHT BROWN POURED CONCRETE PAINTED BOX BEAMS AND FRAMING COLOR: LIGHT BROWN 10.19.2026 SUBMITTAL KLODE PARK WARMING HOUSE - Whitefish Bay, WI SUBMITTAL 10.05.2026 10.19.2026 PROJECT LOCATION SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA PRELIMINARYNOT FORCONSTRUCTION V I C I N I T Y M A P PLAN INDE; SHEET NODESCRIPTION ISSUED FOR:SHEET NO.'SISSUE DATEREVISIONS PLAN DATE: PRELIMINARY SITE CIVIL PLANSFORKLODE PARK WARMING HOUSE5960 N LAKE DRWHITEFISH BAY, WI 53217 C000 TITLE SHEETC100 DEMOLITION PLAN &EROSION CONTROL PLANC200 SITE PLANC300 GRADING PLANC400 UTILITY PLANC500 EROSION CONTROL DETAILSC501 SITE & UTILITY DETAILSC600 SPECIFICATIONSL100 SITE LANDSCAPE PLAN ARCHITECT:GROTH DESIGN GROUPN58 W16181 COLUMBIA ROADCEDARBURG, WI 53012CONTACT: DAN KONCZALPH: 262-377-8001 ENGINEER AND LANDSCAPE ARCHITECT: 10282026 PROPOSED TYPE 3A CURB RAMP (SEE DETAIL SHEET.NOTE LINEWORK ON PLAN IS SYMBOLIC ONLY.) PROPOSED TYPE 7 CURB RAMP (SEE DETAIL SHEET.NOTE LINEWORK ON PLAN IS SYMBOLIC ONLY.) PROPOSED TYPE 3 CURB RAMP (SEE DETAIL SHEET.NOTE LINEWORK ON PLAN IS SYMBOLIC ONLY.) PROPOSED TYPE 4 CURB RAMP (SEE DETAIL SHEET.NOTE LINEWORK ON PLAN IS SYMBOLIC ONLY.) PROPOSED TYPE 4A CURB RAMP (SEE DETAIL SHEET.NOTE LINEWORK ON PLAN IS SYMBOLIC ONLY.) SAWCUT LINE EXISTING ASPHALT PAVEMENT TO BEREMOVED HEAVY-DUTY CONCRETE PAVEMENT CONCRETE SIDEWALK HEAVY-DUTY ASPHALT PAVEMENT STANDARD-DUTY ASPHALT PAVEMENT TREE REMOVAL SIGN MONUMENT SIGNS(CONSTRUCTION DETAILS BY OTHERS) LEGEND(PROPOSED FEATURES) PROPOSED ACCESSIBLE PAVEMENT MARKING 870869 PROPOSED 1-FOOT GRADE CONTOURPROPOSED 5-FOOT GRADE CONTOURPROPOSED SPOT GRADEPROPOSED TOP OF CURB PROPOSED 18" REJECT CURB & GUTTER(AS SHOWN ON SITE PLAN) PROPOSED STONE TRACKING MAT PROPOSED TEMPORARY DIVERSION SWALE &BERM PROPOSED EROSION CONTROL BALETEMPORARY DITCH CHECK PROPOSED SILT FENCE PROPOSED PERMANENT TURF REINFORCEMENTMAT PROPOSED INLET PROTECTION EROSION CONTROL BLANKET COLORED AND STAMPED CONCRETE DOORSTRUCTURAL RETAINING WALL - (DESIGNED BY OTHERS) EXISTING BUILDING/STRUCTURE TOBE REMOVED EXISTING CONCRETE PAVEMENT TOBE REMOVED 869.5PROPOSED 0.5-FOOT GRADE CONTOUR (ONLYUSED WHEN CRITICAL) VAN ACCSSSIBLE STALLVAN PROPOSED RIPRAP PROPOSED LEVEL SPREADER PROPOSED GAS LINE PROPOSED 18" STANDARD CURB & GUTTER(AS SHOWN ON SITE PLAN) PROPOSED SITE LIGHTING (DESIGNEDBY OTHERS, FOR REFERENCE ONLY) (877.70) 877.70 PROPOSED PROPERTY LINE PROPOSED WATER MAINPROPOSED STORM SEWERPROPOSED SANITARY SEWERPROPOSED FIRE DEPARTMENT CONNECTIONPROPOSED WATER VALVEPROPOSED FIRE HYDRANTPROPOSED INLET/ CBPROPOSED STORM MANHOLEPROPOSED AREA DRAINPROPOSED SANITARY MANHOLE XXXXXXXXXXXXXXXXXXXX S PROPOSED ELECTRIC LINEPROPOSED TELEPHONE LINE EXISTING GRAVEL TO BE REMOVED PROPOSED FINISHED SURFACE GRADE ADJACENT TOTOP OF WALL 877.00 BW 877.70 TW PROPOSED FINISHED SURFACE GRADE ADJACENT TOBASE OF WALL ELECTRIC MANHOLE LIGHT POLEGUY WIREGUY POLE CABLE PEDESTAL TRAFFIC SIGNAL SIGNMAILBOXFLAGPOLE CONTROL BOX SOIL BORING/MONITORING WELLBOLLARD DECIDUOUS TREECONIFEROUS TREE SHRUB ST FO -MARKED FIBER OPTIC -EDGE OF TREES OHW STO -STORM SEWER -OVERHEAD WIRES -MARKED CABLE TV LINE -BUREAU ELEC. SERV. -SANITARY SEWER -MARKED TELEPHONE -MARKED ELECTRIC-MARKED GAS MAIN-WATERMAINW G E T S B TV SPOT/YARD/PEDESTAL LIGHT GAS WARNING SIGN LEGEND OR ( ) INDICATES RECORDED DIMENSION WHERE DIFFERENT FROM ACTUAL MEASUREMENTSECTION OR 1/4 SECTIONCORNER AS DESCRIBED 1" DIA. IRON PIPE, 18" LONG-SET(UNLESS OTHERWISE NOTED) 1" DIA. IRON PIPE FOUND(UNLESS OTHERWISE NOTED) INDICATES EXISTING INDICATES EXISTING SPOT ELEVATION CONTOUR ELEVATION780+780.55 MARSHWETLANDS FLAGWATER SURFACE WATER SERVICE CURB STOP SANITARY INTERCEPTOR MANHOLE STORM SEWER END SECTION RAILROAD CROSSING SIGNAL BILLBOARD HANDICAPPED PARKING WELLWATER MANHOLE HYDRANTWATER VALVEMISCELLANEOUS MANHOLE TELEPHONE PEDESTALTELEPHONE MANHOLE SANITARY MANHOLESANITARY CLEANOUT OR SEPTIC VENT SQUARE INLETROUND INLETSTORM MANHOLE POWER POLE GAS METERGAS VALVEMARKED FIBER OPTIC ELECTRIC METERELECTRIC PEDESTAL AIR CONDITIONER ELECTRIC TRANSFORMERR -EXISTING PROPERTYLINE-EXISTING EASEMENTLINE COPYRIGHT 2026 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY 10/28/20261" = 500'3260116 C000 TITLE SHEET ANDREW STASIUKEVICIUS, P.E.TJRAJS3 N Know what'sbelow.before you dig.Call R R.A.SMITH, INC. ASSUMES NO RESPONSIBILITY FOR DAMAGES,LIABILITY OR COSTS RESULTING FROM CHANGES OR ALTERATIONSMADE TO THIS PLAN WITHOUT THE EXPRESSED WRITTEN CONSENT OFR.A.SMITH, INC.ALL COPYRIGHTS TO THESE DRAWINGS ARE RESERVED. THEY MAY NOTBE COPIED, CHANGED, OR ASSIGNED TO ANY THIRD PARTY IN ANYMANNER WITHOUT OBTAINING THE EXPRESSED WRITTENPERMISSION OF R.A.SMITH, INC. NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88)VERTICAL DATUM: HORIZONTAL DATUM:WISCONSIN STATE PLANES COORDINATE SYSTEM, SOUTH ZONE (NAD 83) P:\3260116\Dwg\Sheets\3260116-TS & DT01.dwg, TITLE SHEET, 10/26/2026 8:02:10 PM, Ajs3 N. SHORE DR. N. SHORE DR. CONTRACTOR TORECONNECT POWER LINETO PICKLEBALL COURTS EXISTING BUILDING TOBE RAZED, SEEARCHITECTURAL PLANS ABANDON EXISTING UTILITIES, REFER TOGEOTECHNICAL ENGINEERING REPORT.LOCATIONS OF EXISTING WATER AND SANITARYSERVICES ARE APPROXIMATED FROM GIS ANDPREVIOUS DESIGN PLANS. CONTRACTOR TOVERIFY LOCATIONS PRIOR TO CONSTRUCTION TEMPORARY TREEPROTECTION FENCE (TYP.) XXXXXXXXXXX PROPOSED STONETRACKING PAD (TYP.) PROPOSED INLETPROTECTION (TYP.) REMOVE TREE (TYP.) SAWCUT ASPHALT (TYP.) PROPOSED BUILDINGOUTLINE PROPOSED PAVILIONOUTLINE DEMOLISHELECTRICAL BOXCONTRACTOR TO REMOVEOR RELOCATE LIGHT POLECONTRACTOR TO REMOVEOR RELOCATE LIGHT POLE PROPOSED SILTFENCE (TYP.) COPYRIGHT 2026 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY 10/28/20261" = 20'3260116 C100 DEMOLITION & EROSION CONTROL PLAN ANDREW STASIUKEVICIUS, P.E.TJRAJS3 SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA Know what'sbelow.before you dig.Call R R.A.SMITH, INC. ASSUMES NO RESPONSIBILITY FOR DAMAGES,LIABILITY OR COSTS RESULTING FROM CHANGES OR ALTERATIONSMADE TO THIS PLAN WITHOUT THE EXPRESSED WRITTEN CONSENT OFR.A.SMITH, INC.ALL COPYRIGHTS TO THESE DRAWINGS ARE RESERVED. THEY MAY NOTBE COPIED, CHANGED, OR ASSIGNED TO ANY THIRD PARTY IN ANYMANNER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMISSIONOF R.A.SMITH, INC. N GRAPHIC SCALEFeet 0 4020 EROSION CONTROL NOTES 1.EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED PER DNR, AND VILLAGE STANDARDS (WHICHEVER IS MOST FREQUENT AND CONSERVATIVE)2.ANY SEDIMENT REACHING A PUBLIC OR PRIVATE ROAD OR SIDEWALK SHALL BE REMOVED BY STREET CLEANING,OTHER THAN FLUSHING, IMMEDIATELY.3.CONTRACTOR SHALL KEEP A COPY OF THE EROSION CONTROL PLANS AT THE PROJECT SITE AND PROVIDECOMPLETED EROSION CONTROL CHECK SHEETS TO THE CONSTRUCTION INSPECTOR. VILLAGE OF WHITEFISH BAYAND WDNR MAY REQUEST INSPECTION REPORTS AT ANY TIME.4.ALL EROSION CONTROL METHODS SHALL BE IN ACCORDANCE WITH WDNR TECHNICAL STANDARDS AND VILLAGE OFWHITEFISH BAY REQUIREMENTS AND STANDARDS.5.COPIES OF THE INSPECTION REPORTS SHALL BE KEPT AT THE PROJECT SITE FOR VILLAGE OR WDNR ACCESS.6.IF NEEDED, DEWATERING AS NEEDED TO BE DONE ACCORDING TO WDNR STANDARD 1061.7.DISTURBED AREAS THAT CANNOT BE STABILIZED WITH A DENSE GROWTH OF VEGETATION BY SEEDING ANDMULCHING DUE TO TEMPERATURE (WINTER) OR TIMING OF CONSTRUCTION, SHALL BE STABILIZED BY APPLYINGANIONIC POLYACRYLAMIDE (PAM) IN ACCORDANCE WITH WDNR TECHNICAL STANDARD 1050.8.CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL MEASURES AND PERFORMING MAINTENANCE THROUGHOUTTHE DURATION OF CONSTRUCTION ACTIVITIES.9.EXCESS SOILS ARE TO BE HAULED OFF SITE OR ENCLOSED WITH AN APPROVED SEDIMENT CONTROL DEVICE WITHIN24 HRS.10.SOIL PILES LEFT UNDISTURBED FOR 7 OR MORE DAYS WILL NEED TO BE STABILIZED BY AN APPROVED METHOD.11.ALL DISTURBED AREAS NOT COVERED BY PERMANENT STRUCTURES OR PAVEMENT SHALL BE FINISHED GRADEDWITH 3"-6" TOPSOIL, SEEDED, AND STABILIZED WITHIN 7 DAYS OF REACHING FINAL GRADE.12.CONTRACTOR SHALL NOTIFY THE VILLAGE OF WHITEFISH BAY OF ALL CHANGES TO THE EROSION CONTROL PLAN.VILLAGE OF WHITEFISH BAY SHALL REVIEW AND APPROVE ALL CHANGES PRIOR TO COMMENCING WORK.13.CONTRACTOR SHALL NOTIFY THE VILLAGE OF WHITEFISH BAY WHEN THE SITE IS FULLY ESTABLISHED AND READY FORFINAL INSPECTION. UPON VILLAGE'S APPROVAL OF SITE, CONTRACTOR SHALL BE PERMITTED TO REMOVE ALLEROSION CONTROL.14.THE VILLAGE OF WHITEFISH BAY SHALL TEMPORARILY TERMINATE CONSTRUCTION UNTIL ALL EROSION CONTROLMEASURES ARE UPDATED AND TO THE SATISFACTION OF THE VILLAGE. IF CONSTRUCTION IS TEMPORARILY SHUTDOWN BY THE VILLAGE OF WHITEFISH BAY, THE CONTRACTOR SHALL GET APPROVAL FROM THE VILLAGE WHENTHEY ARE ALLOWED TO COMMENCE WORK. CONSTRUCTION SEQUENCE 1.INSTALL APPROPRIATE SILT FENCE, INLET PROTECTION AND CONSTRUCTIONENTRANCE AS SHOWN. CONSTRUCTION ENTRANCE TO BE RELOCATED ASNECESSARY FOR PHASING.2.BEGIN CLEARING THE SITE AS SHOWN ON THE DEMOLITION PLANS.3.STRIP TOPSOIL AND STOCKPILE ONSITE. STOCKPILES ARE TO BE SEEDED IF NOTDISTURBED WITHIN 7 DAYS.4.GRADE THE SITE AS SHOWN ON THE GRADING PLANS. GRADE THE SITE ININCREMENTS AS NOT TO DISTURB PORTIONS OF THE SITE UNNECESSARILY. AFTERGRADING HAS BEEN COMPLETED, STABILIZE THE DISTURBED AREAS.5.INSTALL UTILITIES INCLUDING WATER MAIN, AND SANITARY SEWER AS SHOWN ONTHE UTILITY PLAN.6.PREPARE THE BUILDING PADS AS DETERMINED BY THE GEOTECHNICAL &STRUCTURAL ENGINEERS, AND BEGIN BUILDING CONSTRUCTION.7.PAVE AREAS AS SHOWN ON THE SITE PLAN.8.TOPSOIL, SEED, FERTILIZER, AND MULCH TURF AREAS BROUGHT TO FINAL GRADE.9.ONCE THE PROJECT SITE IS 80% STABILIZED, ALL REMAINING TEMPORARY EROSIONCONTROL BMPS SHALL BE REMOVED AND RESTORED AS NECESSARY.10.REMOVE EROSION CONTROL DEVICES AFTER SITE IS FULLY ESTABLISHED AND THEREIS NO CHANCE EROSION CAN TAKE PLACE. PROPOSED SILT FENCE PROPOSED INLET PROTECTION PROPOSED STONE TRACKING PAD SAWCUT LINE EXISTING ASPHALT PAVEMENTTO BE REMOVED TREE REMOVAL EXISTING BUILDING/STRUCTURETO BE REMOVED EXISTING CONCRETE PAVEMENTTO BE REMOVED PROPERTY LINE XXXXXXXXXXXXXX DEMOLITION & EROSIONCONTROL LEGEND EXISTING 1-FOOT GRADE CONTOUREXISTING 5-FOOT GRADE CONTOUR 869 870 PROPOSED BUILDING OUTLINE DEMOLITION NOTES 1.EXISTING TOPOGRAPHY SHOWN WAS OBTAINED BY RASMITH, INC. DATED 07/22/2026 & 10/05/2026.2.OBJECTS IN BOLD ARE TO BE DEMOLISHED OR ABANDONED AS MARKED. 3.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSION OF ENTRANCES,VESTIBULES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 4.THE LOCATION OF EXISTING UTILITY INSTALLATIONS AS SHOWN ON THIS PLAN ARE APPROXIMATE. THERE MAY BEOTHER UNDERGROUND UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. THECONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXISTENCE AND LOCATION OF ALL UNDERGROUNDUTILITIES. 5.ALL EXISTING UTILITY VAULTS AND STRUCTURES SHALL BE ADJUSTED TO MEET PROPOSED GRADE. 6.CONTRACTOR SHALL CONTACT 811 ONE CALL AND/OR THE APPROPRIATE UTILITY COMPANIES PRIOR TOEXCAVATION.7.EROSION CONTROL DEVICES MUST BE INSTALLED PRIOR TO GROUND DISTURBING WORK, INCLUDING DEMOLITION.8.DEMOLITION AND DISPOSAL SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. 9.REFER TO THE SPECIFICATIONS FOR ADDITIONAL DEMOLITION NOTES.10.CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING OF THE BUILDING DEMOLITION WITH THE PROPOSEDBUILDING CONSTRUCTION. 11.ALL PRIVATE WET UTILITIES SHALL BE DEMOLISHED TO THE THE PUBLIC MAIN AS REQUIRED BY THE VILLAGE. TEMPORARY TREE PROTECTION FENCE EXISTING BRICK PAVERS TO BERELOCATED OR REMOVED P:\3260116\Dwg\Sheets\3260116-DP & EC01.dwg, 3260116-DP & EC01 - DEMO & EC, 10/26/2026 8:02:25 PM, Ajs3 N. SHORE DR. N. SHORE DR. EXISTING PLAYGROUND PROPOSEDWARMING HOUSE PROPOSEDPAVILIONPROPOSED OVERHANG(TYP.) RELOCATE OR REPLACE BRICKS ASNEEDED FOR GRADING CHANGES PROPERTY LINE (TYP.) 5.0' 19.6' 17.0' 30.0' R5.0' 25.4' 54.3' 36.3' 31.8' 153.0' 110.5' 25.0' 25.0' 94.7' 52.7' CONCRETE PAD FOR POWERPEDESTAL. SEE ARCHITECTURALPLANS FOR POWER PEDESTAL SEE ARCHITECTURAL PLANSFOR POWER PEDESTAL INSTALL BIKE RACK,SEE DETAIL 8.0'8.0' COPYRIGHT 2026 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY 10/28/20261" = 20'3260116 C200 SITE PLAN ANDREW STASIUKEVICIUS, P.E.TJRAJS3 SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA Know what'sbelow.before you dig.Call R R.A.SMITH, INC. ASSUMES NO RESPONSIBILITY FOR DAMAGES,LIABILITY OR COSTS RESULTING FROM CHANGES OR ALTERATIONSMADE TO THIS PLAN WITHOUT THE EXPRESSED WRITTEN CONSENT OFR.A.SMITH, INC.ALL COPYRIGHTS TO THESE DRAWINGS ARE RESERVED. THEY MAY NOTBE COPIED, CHANGED, OR ASSIGNED TO ANY THIRD PARTY IN ANYMANNER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMISSIONOF R.A.SMITH, INC. N GRAPHIC SCALEFeet 0 4020 SITE & PAVING NOTES 1.EXISTING TOPOGRAPHY OBTAINED BY RASMITH, INC. DATED 07/22/2026 & 10/05/2026.2.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR PRECISE BUILDING DIMENSIONS, DOORLOCATION, AND BUILDING UTILITY ENTRANCE LOCATIONS, ETC.3.ALL DIMENSIONS AND CORRESPONDING HORIZONTAL CONTROL RELATED TO PAVING REPRESENT FACE OFCURB. BUILDINGS ARE DIMENSIONED TO FACE OF BUILDING.4.ALL CURB RADII ARE MEASURED TO FACE OF CURB. CURB RADII ARE 3' UNLESS OTHERWISE NOTED.5.ALL SITE SIGNAGE AND MARKINGS MUST COMPLY WITH THE MOST RECENT EDITION OF THE FEDERALHIGHWAY ADMINISTRATION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.6.ALL IMPROVEMENTS ARE TO BE MADE IN COMPLIANCE WITH FEDERAL ADA STANDARDS. CONCRETE SIDEWALK STANDARD-DUTY ASPHALT PAVEMENT RELOCATED OR REPLACED BRICKS PROPERTY LINE SITE & PAVING LEGEND P:\3260116\Dwg\Sheets\3260116-SP01.dwg, 3260116-SP01 - SITE PLAN, 10/26/2026 8:02:36 PM, Ajs3 N. SHORE DR. N. SHORE DR. FFE: 662.50 EXISTING PLAYGROUND PROPOSEDWARMING HOUSE PROPOSEDPAVILION 662 662 662 663 663 663 663 663.25 663.25 663.25 663.25 662.70 662.70663.25663.25 663.25663.25 663.10 663.20 663.25 663.15663.25 663.25663.15 663.15663.25 662.50 662.50 662.50 662.50 663.40 663.00 663.05 662.61± 662.64± 662.83 662.89 662.80 662.48±662.55± 662.80 662.80662.80 662.80 662.25 662.70 662.90 FFE: 663.25 10.0' GRADE BREAKLINE (TYP.) COPYRIGHT 2026 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY 10/28/20261" = 20'3260116 C300 GRADING PLAN ANDREW STASIUKEVICIUS, P.E.TJRAJS3 SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA Know what'sbelow.before you dig.Call R R.A.SMITH, INC. ASSUMES NO RESPONSIBILITY FOR DAMAGES,LIABILITY OR COSTS RESULTING FROM CHANGES OR ALTERATIONSMADE TO THIS PLAN WITHOUT THE EXPRESSED WRITTEN CONSENT OFR.A.SMITH, INC.ALL COPYRIGHTS TO THESE DRAWINGS ARE RESERVED. THEY MAY NOTBE COPIED, CHANGED, OR ASSIGNED TO ANY THIRD PARTY IN ANYMANNER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMISSIONOF R.A.SMITH, INC. N GRAPHIC SCALEFeet 0 4020 PROPOSED 1-FOOT GRADE CONTOURPROPOSED 5-FOOT GRADE CONTOUR PROPOSED SPOT GRADE PROPERTY LINE 869 870 PROPOSED SPOT GRADE TO MATCH EXISTING EXISTING 1-FOOT GRADE CONTOUREXISTING 5-FOOT GRADE CONTOUR 869 870 GRADING NOTES 1.EXISTING TOPOGRAPHY OBTAINED BY RASMITH, INC. DATED 07/22/2026 & 10/05/2026.2.CONTRACTOR TO VERIFY ALL EXISTING TOPOGRAPHY AND STRUCTURES ON THE SITE AND IMMEDIATELYNOTIFY THE ENGINEER ON ANY DISCREPANCIES PRIOR TO STARTING WORK.3.THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR THE COMPUTATIONS OF ALL GRADING ANDFOR ACTUAL LAND BALANCE, INCLUDING UTILITY TRENCH SPOIL. THE CONTRACTOR SHALL IMPORT OREXPORT MATERIAL AS NECESSARY TO COMPLETE THE PROJECT.4.THE CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT INCLUDED IN THE BID DOCUMENTS FORSTRUCTURAL FILL AND COMPACTION REQUIREMENTS.5.FILL AND MATERIAL COMPACTION SHALL BE INSPECTED BY THE OWNERS TESTING AGENCY PRIOR TOPAVING.6.NO FILL SHALL BE PLACED ON WET, FROZEN, OR SOFT SUBGRADE.7.ALL SIDEWALKS AND ACCESSIBLE ROUTES SHALL HAVE A MAXIMUM 2.00% CROSS SLOPE AND A RUNNINGSLOPE NO GREATER THAN 5.00%.8.MATCH EXISTING ELEVATION AT LIMITS OF CONSTRUCTION.9.ADJUST ALL EXISTING MANHOLES, VALVES, INLETS, ETC. TO FINISHED GRADE, AS NECESSARY. GRADING LEGEND LIMITS OF DISTURBANCE (0.40AC) P:\3260116\Dwg\Sheets\3260116-GP01.dwg, GRAD PLAN, 10/26/2026 8:02:50 PM, Ajs3 N. SHORE DR. N. SHORE DR. EXISTING PLAYGROUND PROPOSEDWARMING HOUSE PROPOSEDPAVILION W W W W W W W W W W W W W W W S S S S S S S S S S PROPOSED 6" SANITARYSEWER SERVICE PROPOSED WATER SERVICE ABANDONED EXISTINGSANITARY AND WATERLATERAL PROPOSED SANITARYBEND WITH CLEANOUTPROPOSED SANITARYBEND WITH CLEANOUT CONNECT TO EXISTINGSANITARY MANHOLE CONNECT TO EXISTING WATERMAIN IN NORTH SHORE DRIVE.LOCATION OF EXISTING WATERMAIN UNKNOWN PROPOSED WATERGATE VALVE PROPOSED BUILDINGCONNECTIONS COPYRIGHT 2026 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY 10/28/20261" = 20'3260116 C400 UTILITY PLAN ANDREW STASIUKEVICIUS, P.E.TJRAJS3 SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA Know what'sbelow.before you dig.Call R R.A.SMITH, INC. ASSUMES NO RESPONSIBILITY FOR DAMAGES,LIABILITY OR COSTS RESULTING FROM CHANGES OR ALTERATIONSMADE TO THIS PLAN WITHOUT THE EXPRESSED WRITTEN CONSENT OFR.A.SMITH, INC.ALL COPYRIGHTS TO THESE DRAWINGS ARE RESERVED. THEY MAY NOTBE COPIED, CHANGED, OR ASSIGNED TO ANY THIRD PARTY IN ANYMANNER WITHOUT OBTAINING THE EXPRESSED WRITTEN PERMISSIONOF R.A.SMITH, INC. N GRAPHIC SCALEFeet 0 4020 UTILITY LEGEND PROPOSED GAS LINE PROPOSED WATER MAINPROPOSED SANITARY SEWERPROPOSED FIRE DEPARTMENT CONNECTIONPROPOSED WATER GATE VALVEPROPOSED FIRE HYDRANTPROPOSED SANITARY CLEANOUT PROPOSED ELECTRIC LINEPROPOSED TELEPHONE LINE G E W S T PROPOSED PROPERTY LINEEXISTING GAS LINE EXISTING WATER MAINEXISTING STORM SEWEREXISTING SANITARY SEWER EXISTING ELECTRIC LINEEXISTING TELEPHONE LINE G E W STO S TV UTILITY NOTES 1.EXISTING TOPOGRAPHY OBTAINED BY RASMITH, INC. DATED 07/22/2026 & 10/05/2026.2.THE CONTRACTOR SHALL CONTACT DIGGERS HOTLINE TO LOCATE UTILITIES PRIOR TO START OFEXCAVATION.3.THE LOCATION AND ELEVATION OF UNDERGROUND UTILITIES SHOWN ON THE PLANS BASED ONINFORMATION PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ) OR, FIELD SURVEY, WHEREPOSSIBLE. THE UTILITIES SHOWN ON THE PLAN CANNOT BE GUARANTEED AS EXACT OR COMPLETE.4.BEFORE PROCEEDING WITH ANY UTILITY CONSTRUCTION, THE CONTRACTOR SHALL EXCAVATE EACHEXISTING LATERAL OR POINT OF CONNECTION AND VERIFY THE LOCATION AND ELEVATION OF ALL UTILITIES.IF ANY EXISTING UTILITIES ARE NOT AS SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL NOTIFY THEENGINEER IMMEDIATELY FOR POSSIBLE REDESIGN.5.CONTRACTOR SHALL VERIFY ALL BUILDING SERVICE CONNECTION POINTS WITH ARCHITECTURAL PLANSPRIOR TO CONSTRUCTION.6.PIPE LENGTH DISTANCES AND ELEVATION ARE GIVEN TO THE CENTER OF STORM STRUCTURES. OUTFALLSTRUCTURES SHALL BE PLACED TO BLEND WITH EXISTING OR PROPOSED TOPOGRAPHY.7.RIM ELEVATION ARE GIVEN TO THE FLOWLINE FOR INLET GRATES OR THE CENTER OF MANHOLE CASTINGFOR MANHOLES.8.REFER TO THE CONSTRUCTION SPECIFICATION FOR PIPE MATERIALS.9.VERTICAL AND HORIZONTAL SEPARATION STANDARDS FOR WATER AND SEWER SHALL CONFORM TO THESTANDARD SPECIFICATIONS FOR WATER AND SEWER CONSTRUCTION IN WISCONSIN.10.WATERMAIN SHALL BE INSTALLED A MINIMUM OF 6' BELOW FINISHED GRADE TO TOP OF PIPE. P:\3260116\Dwg\Sheets\3260116-UP01.dwg, 3260116-UP01 - UTIL, 10/26/2026 8:03:02 PM, Ajs3 STONE TRACKING PAD AND TIRE WASHING(NOT TO SCALE) NOTES:A. TRACKING PAD:1.THE TRACKING PAD SHALL BE INSTALLED PRIOR TO ANY TRAFFIC LEAVING THE SITE.2.THE AGGREGATE FOR THE TRACKING PAD SHALL BE HARD, DURABLE, ANGULAR STONE OR RECYCLEDCONCRETE MEETING THE GRADATION OF TABLE 1 OF THE WISCONSIN DNR TECHNICAL STANDARD1057. WHERE THIS GRADATION IS NOT AVAILABLE, MEET THE GRADATION IN WISCONSINDEPARTMENT OF TRANSPORTATION (DOT) 2018 STANDARD SPECIFICATION, SECTION 312, SELECTCRUSHED MATERIAL.3.THE AGGREGATE SHALL BE PLACED IN A LAYER AT LEAST 12 INCHES THICK. ON SITES WITH A HIGHWATER TABLE, OR WHERE SATURATED CONDITIONS ARE EXPECTED DURING THE LIFE OF THEPRACTICE, STONE TRACKING PADS SHALL BE UNDERLAIN WITH A WISDOT TYPE R GEOTEXTILEFABRIC TO PREVENT MIGRATION OF UNDERLYING SOIL INTO THE STONE.4.THE TRACKING PAD SHALL BE THE FULL WIDTH OF THE EGRESS POINT. THE TRACKING PAD SHALL BE AMINIMUM OF 50 FEET LONG.5.SURFACE WATER MUST BE PREVENTED FROM PASSING THROUGH THE TRACKING PAD. FLOWS SHALLBE DIVERTED AWAY FROM TRACKING PADS OR CONVEYED UNDER AND AROUND THEM BY USING AVARIETY OF PRACTICES, SUCH AS CULVERTS, WATER BARS, OR OTHER SIMILAR PRACTICES.B. TIRE WASHING:IF CONDITIONS ON THE SITE ARE SUCH THAT THE SEDIMENT IS NOT REMOVED FROM VEHICLE TIRES BY THETRACKING PAD, THEN TIRES SHALL BE WASHED UTILIZING PRESSURIZED WATER BEFORE ENTERING A PUBLICROAD.1.THE WASHING STATION SHALL BE LOCATED ON-SITE ON AN AREA THAT IS STABILIZED AND DRAINS INTOA SUITABLE SEDIMENT TRAPPING OR SETTLING DEVICE.2.THE WASH RACK SHALL CONSIST OF A HEAVY GRATING OVER A LOWERED AREA. THE RACK SHALL BESTRONG ENOUGH TO SUPPORT THE VEHICLES THAT WILL CROSS IT.C. MAINTENANCE1.ROCKS LODGED BETWEEN THE TIRES IF DUAL WHEEL VEHICLES SHALL BE REMOVED PRIOR TO LEAVINGTHE CONSTRUCTION SITE.2.TRACKING PADS AND TIRE WASHING STATIONS SHALL, AT AT MINIMUM, BE INSPECTED WEEKLY ANDWITHIN 24 HOURS AFTER EVERY PRECIPITATION EVENT THAT PRODUCES 0.5 INCHES OF RAIN ORMORE DURING A 24-HOUR PERIOD.3.THE TRACKING PAD PERFORMANCE SHALL BE MAINTAINED BY SCRAPING OR TOP-DRESSING WITHADDITIONAL AGGREGATE.4.A MINIMUM 12-INCH THICK PAD SHALL BE MAINTAINED. PUBLICRIGHT-OF-WAY EXIST. PAVEMENT CONSIDERATIONS:1.TIRE WASHING AND TRACKING PAD TO CONFORM TO WDNRCONSERVATION PRACTICE STANDARD 1057.2.VEHICLES TRAVELING ACROSS THE TRACKING PAD SHOULD MAINTAINA SLOW CONSTANT SPEED.3.THE BEST APPROACH TO PREVENTING OFF-SITE TRACKING IS TORESTRICT VEHICLES TO STABILIZED AREAS.4.IT IS ALWAYS PREFERABLE TO PREVENT SEDIMENT FROM BEINGDEPOSITED UPON THE ROAD THAN CLEANING THE ROAD LATER.SEDIMENT ON A ROAD CAN CREATE A SAFETY HAZARD AS WELL AS APOLLUTION PROBLEM.5.ANY SEDIMENT TRACKED ONTO A PUBLIC OR PRIVATE ROAD SHOULDBE REMOVED BY STREET CLEANING, NOT FLUSHING, BEFORE THE ENDOF EACH WORKING DAY. FILTER CLOTHSTRIP TOPSOIL & SETTO PLAN SUBGRADE TRACKING MAT 12" MIN. FULL WIDTHOF EGRESS50' MIN. DRIPLINE:THE AREA LOCATEDUNDER THE OUTERCIRCUMFERENCE OFTHE TREE BRANCHES PLAN VIEW ELEVATION TREE PROTECTION FENCING(NOT TO SCALE) GRADE ORANGECONSTRUCTIONFENCING METAL T STAKES 10' MAX. NOTES:1.INSTALL 4' HIGH ORANGE VINYL SNOW /CONSTRUCTION FENCING OR SIMILARFENCING AT OR BEYOND THE DRIPLINE OFALL TREES TO SAVE.2.ERECT FENCE WITH 5' METAL T-STAKES ATLEAST EVERY 10'.3.THE FENCING SHALL BE IN PLACE BEFORECONSTRUCTION ACTIVITY BEGINS ANDREMAIN UNTIL ALL EXTERIOR WORK HASBEEN COMPLETED.4.NO CONSTRUCTION ACTIVITY SHALL TAKEPLACE NOR SHALL ANY EQUIPMENT BESTORED INSIDE OF THE FENCING.(TREE PROTECTION FENCING FORMULTIPLE TREES) 2' INLET WITH ORWITHOUT GRATE ATTACH GEOTEXTILEFABRIC, TYPE FF TOTHE STAKES ANDCROSS BRACING GEOTEXTILEFABRIC, TYPE FF 2" x 4" STAKEAND CROSSBRACING FLAP POCKET INLET PROTECTION, TYPE D(CAN BE INSTALLED IN ANY INLET TYPE WITHOR WITHOUT A CURB BOX AS PER NOTE 2 )INLET PROTECTION, TYPE C (WITHCURB BOX)INLET PROTECTION, TYPE A GENERAL NOTES:INLET PROTECTION DEVICES SHALL CONFORM TO WDNR CONSERVATION PRACTICE STANDARD 1060 AND BE MAINTAINED OR REPLACED ATTHE DIRECTION OF THE ENGINEER.MANUFACTURED ALTERNATIVES APPROVED AND LISTED ON THE WISDOT'S EROSION CONTROL PRODUCT ACCEPTABILITY LIST MAY BESUBSTITUTED IF ALLOWED BY ENGINEER.TYPE A IS TO BE USED PRIOR TO PAVING AND INSTALLATION OF CURB AND GUTTER, AND TYPES B, C, AND D ARE TO BE USED AFTER PAVING ISPLACED.TYPE A SHALL BE USED AROUND INLETS AND UNPAVED AREAS UNTIL PERMANENT STABILIZATION METHODS HAVE BEEN ESTABLISHED.TYPE B SHALL BE USED AFTER THE CASTING AND GRATE ARE IN PLACE, ON INLETS WITHOUT A CURB BOX WHEN TYPE D INLET DEVICESCANNOT BE USED.TYPE C SHALL BE USED AFTER THE CASTING AND GRATE ARE IN PLACE, ON STREET INLETS WITH CURB HEADS.TYPE D SHALL BE USED IN AREAS WHERE OTHER TYPES OF INLET PROTECTION ARE INCOMPATIBLE WITH ROADWAY AND TRAFFIC CONDITIONS(I.E. POSSIBLE SAFETY HAZARD IF PONDING OCCURS), OR WHERE MORE EFFECTIVE INLET FILTERING IS NEEDED.TAPER BOTTOM OF BAG TO MAINTAIN 3" OF CLEARANCE BETWEEN THE BAG AND THE STRUCTURE, MEASURED FROM THE BOTTOM OF THEOVERFLOW OPENINGS TO THE STRUCTURE WALL.GEOTEXTILE FABRIC TYPE FF FOR FLAPS, TOP AND BOTTOM OF OUTSIDE OF FILTER BAG. FRONT, BACK, AND BOTTOM OF FILTER BAG BEINGONE PIECE. STORM DRAIN INLET PROTECTION(NOT TO SCALE) INSTALLATION NOTES:TYPE B & C:TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE.THE CONTRACTOR SHALL DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDSOR OTHER METHOD TO PREVENT ACCUMULATED SEDIMENT FROM ENTERING THE INLET.TYPE D:DO NOT INSTALL INLET PROTECTION TYPE D IN INLETS SHALLOWER THAN 30", MEASURED FROM THE BOTTOMOF THE INLET TO THE TOP OF THE GRATE.TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE.THE INSTALLED BAG SHALL HAVE A MINIMUM SIDE CLEARANCE, BETWEEN THE INLET WALLS AND THE BAG,MEASURED AT THE BOTTOM OF THE OVERFLOW HOLES, OF 3". WHERE NECESSARY THE CONTRACTOR SHALLCINCH THE BAG, USING PLASTIC ZIP TIES, TO ACHIEVE THE 3" CLEARANCE. THE TIES SHALL BE PLACED AT AMAXIMUM OF 4" FROM THE BOTTOM OF THE BAG. MAINTENANCE:REMOVE INLET PROTECTION DEVICES ONCE THE CONTRIBUTING DRAINAGE AREA IS STABILIZED WITHAPPROPRIATE VEGETATION OR IMPERVIOUS SURFACE.INLET PROTECTION SHALL BE, AT A MINIMUM, INSPECTED WEEKLY AND WITHIN 24 HOURS AFTER EVERYPRECIPITATION EVENT THAT PRODUCES 0.5 INCHES OF RAIN OR MORE DURING A 24-HOUR PERIOD.FOR TYPE A, B OR C INLET PROTECTION, SEDIMENT DEPOSITS SHALL BE REMOVED AND THE INLET PROTECTIONDEVICE RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED BETWEEN 1/3 TO 1/2THE DESIGN DEPTH OF THE DEVICE, OR WHEN THE DEVICE IS NO LONGER FUNCTIONING AS DESIGNED.FOR TYPE D INLET PROTECTION (INCLUDING D-M AND D-HR), REMOVE SEDIMENT WHEN SEDIMENT ACCUMULATESTO WITHIN 6" OF THE BOTTOM OF THE OVERFLOW HOLES, OR WHEN STANDING WATER REMAINS WITHIN 6" OFTHE BOTTOM OF THE OVERFLOW HOLES 24 HOURS AFTER A RUNOFF EVENT. HOLES IN THE TYPE FF FABRIC MAY BEREPAIRED BY STITCHING IF LESS THAN 2" IN LENGTH, BUT THE FABRIC SHOULD BE REPLACED IF THE HOLES AREGREATER THAN 2" IN LENGTH IN THE TYPE FF FABRIC OR IF THERE ARE ANY HOLES IN THE TYPE HR FABRIC. THEFILTER MUST ALSO BE REPLACED IF THE FLAP POCKETS SUSTAIN DAMAGE THAT COMPROMISES FILTER INTEGRITYOR THE ABILITY TO PERFORM MAINTENANCE.REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND STABILIZED.WHEN REMOVING OR MAINTAINING INLET PROTECTION, DUE CARE SHALL BE TAKEN TO ENSURE SEDIMENT DOESNOT FALL INTO THE INLET AND IMPEDE THE INTENDED FUNCTION OF THE DEVICE. ANY MATERIAL FALLING INTOTHE INLET SHALL BE REMOVED IMMEDIATELY. 1 FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL.2 FOR INLET PROTECTION, TYPE C (WITH CURB BOX), AN ADDITIONAL 18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT OF THE CURB BOX OPENING.3 FLAP POCKETS SHALL BE LARGE ENOUGH TO ACCEPT WOOD 2X4. THE REBAR, STEEL PIPE, OR WOOD SHALL BE INSTALLED IN THE REAR FLAP AND SHALL NOT BLOCK THE TOP HALF OF THE CURB FACE OPENING.4 SIDE FLAPS SHALL BE A MAXIMUM OF 2" LONG. FOLD THE FABRIC OVER AND REINFORCE WITH MULTIPLE STITCHES. INLET SPECIFICATIONSAS PER THE PLANDIMENSION LENGTH ANDWIDTH TO MATCH FRONT, BACK, AND BOTTOM TOBE MADE FROM SINGLE PIECE OFFABRIC, TYPE FF 3 1 MINIMUM DOUBLESTITCHED SEAMS ALLAROUND SIDE PIECESAND ON FLAP POCKETS 4" x 6" OPENINGS WITH ROUNDEDCORNERS SHALL BE HEAT CUT INTO ALLFOUR SIDE PANELS USE REBAR, STEEL PIPE, OR2"x4" FOR REMOVAL FOR INLETS WITH CAST CURBBOX USE WOOD 2" x 4",EXTEND 10" BEYOND GRATEWIDTH ON BOTH SIDES,LENGTH VARIES. SECURE TOGRATE WITH WIRE ORPLASTIC TIES. 12"(MIN.) 12" 8" 4 TAPER BOTTOM OF BAG TOMAINTAIN 3.0" SEPARATIONBETWEEN THE BAG AND THESTRUCTURE AT THE OVERFLOWHOLES. FRONT LIFTING FLAP IS TO BE USEDWHEN REMOVING ANDMAINTAINING FILTER BAG 1 *NOTE: DEPENDING ON EXPOSEDSOIL TEXTURE, TYPE D-M ORTYPE D-HR INLET PROTECTIONMAY BE USED IN PLACE OF TYPED. GEOTEXTILEFABRIC, TYPE FF2" x 4" STAKE ANDCROSS BRACING GRATEDINLET BURIED FABRICMIN. 6" DEPTH DIRECTION OFRUNOFF WATERFLOW 4' 2' INLET PROTECTION, TYPE B(WITHOUT CURB BOX)(CAN BE INSTALLED IN ANY INLET WITHOUT ACURB BOX) GEOTEXTILEFABRIC, TYPE FF 1 WOOD 2" x 4" EXTENDS8" BEYOND GRATEWIDTH ON BOTH SIDES,LENGTH VARIES. SECURETO GRATE WITH WIRE ORPLASTIC TIES 21 GEOTEXTILEFABRIC, TYPE FF GEOTEXTILE FABRIC,TYPE FF TRENCH DETAIL TWIST METHOD HOOK METHODJOINING TWO LENGTHS OF SILT FENCE NOTES:1.SILT FENCE INSTALLATION AND MATERIALS SHALL CONFORM TO WDNR CONSERVATION STANDARD 10562.SILT FENCE SHALL BE PLACED ON THE CONTOUR AND NOT PERPENDICULAR TO THE CONTOUR. THE ENDS SHALL BEEXTENDED UPSLOPE TO PREVENT WATER FROM FLOWING AROUND THE ENDS OF THE FENCE.3.WHEN SILT FENCE IS INSTALLED ON A SLOPE, THE PARALLEL SPACING SHALL NOT EXCEED THE REQUIREMENTS IN THETABLE BELOW: ATTACH THE FABRIC TO THE POSTSWITH WIRE STAPLES OR WOODENLATH AND NAILS * NOTE: 8'-0" POST SPACINGALLOWED IF A WOVENGEOTEXTILE FABRIC ISUSED. 3'-0" MAX FOR NONWOVEN FABRIC NOTE:ADDITIONAL POST DEPTH OR TIEBACKS MAY BE REQUIRED INUNSTABLE SOILS SILT FENCE TIE BACK(WHEN ADDITIONAL SUPPORT IS REQUIRED) SLOPEFENCE SPACING< 2% 100 FEET2 TO 5%75 FEET5 TO 10%50 FEET 10 TO 33%25 FEET> 33% 20 FEET 4.INSTALLED SILT FENCES SHALL BE MINIMUM 14 INCHES HIGH AND A MAXIMUM OF 28 INCHES IN HEIGHT MEASUREDFROM THE INSTALLED GROUND ELEVATION.5.A MINIMUM OF 20 INCHES OF THE POST SHALL EXTEND INTO THE GROUND AFTER INSTALLATION.6.SILT FENCE SHALL BE ANCHORED BY SPREADING AT LEAST 8 INCHES OF THE FABRIC IN A 4-INCH TRENCH WIDE BY 6-INCHDEEP TRENCH, OR 6-INCH V-TRENCH ON THE UPSLOPE SIDE OF THE FENCE. TRENCH SHALL BE BACKFILLED ANDCOMPACTED. TRENCHES SHALL NOT BE EXCAVATED WIDER THAN NECESSARY FOR PROPER INSTALLATION.7.CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTING LENGTHS TO AVOID JOINTS. IF A JOINT ISNECESSARY USE ONE OF THE FOLLOWING TWO METHODS:A) TWIST METHOD--OVERLAP THE END POSTS AND TWIST, OR ROTATE,AT LEAST180 DEGREES.B) HOOK METHOD--HOOK THE END OF EACH SILT FENCE LENGTH.8.SILT FENCE SHALL AT A MINIMUM BE INSPECTED WEEKLY AND WITHIN 24 HOURS AFTER EACH PRECIPITATION EVENTTHAT PRODUCES 0.5 INCHES OF RAIN OR MORE DURING A 24-HOUR PERIOD.9.DAMAGED OR DECOMPOSED FENCES, UNDERCUTTING, OR FLOW CHANNELS AROUND THE END OF BARRIERS SHALL BEREPAIRED OR CORRECTED.10.SEDIMENT SHALL BE PROPERLY DISPOSED OF ONCE THE DEPOSITS REACH ONE HALF THE HEIGHT OF THE FENCE.11.SILT FENCES SHALL BE REMOVED ONCE THE DISTURBED AREA IS PERMANENTLY STABILIZED AND IS NO LONGERSUSCEPTIBLE TO EROSION. WOOD POSTSLENGTH 3'-4'20" DEPTH INGROUND GEOTEXTILEFABRIC ONLY BACKFILL & COMPACTTRENCH WITHEXCAVATED SOIL FLOW DIRECTION GEOTEXTILEFABRIC FOLD 3"MAX.SUPPORT CORD GEOTEXTILEFABRIC FLOW DIRECTION FLOW DIRECTION EXCESSFABRIC ANCHORSTAKE MIN.18" LONG SILTFENCE TIEBACK BETWEENFENCE POST ANDANCHOR GEOTEXTILEFABRIC GEOTEXTILEFABRICWOOD POST GEOTEXTILEFABRIC WOOD POST GEOTEXTILEFABRIC WOOD POST GEOTEXTILEFABRIC WOOD POST FLOWDIRECTION FLOWDIRECTION 1'-0"MIN.2'-0" MIN. 3'-0" MAX.* 3'-0" MAX.* 3'-0" MAX.* 3'-0" MAX.* 2'-0" FLOW DIRECTION SILT FENCE SHALL BE SUPPORTED BY EITHER WOOD OR STEEL SUPPORTS AS SPECIFIED BELOW:A.WOOD - 1 1/8" X 1 1/8" AIR OR KILN DRIED OAK OR HICKORY; FABRIC SHALL BE STAPLED USING1/2-INCHMINIMUM STAPLES TO THE UPSLOPE SIDE OF THE FENCE IN AT LEAST 3 PLACES; POSTS SHALLBE A MINIMUM OF 3 FEET LONG FOR 24-INCH FENCE AND 4 FEET LONG FOR 36-INCH FENCE.B. STEEL - MINIMUM 5 FEET IN LENGTH WITH STRENGTH OF 1.33 LBS/FT AND HAVE PROJECTIONS FORFASTENERS; FABRIC SHALL BE ATTACHED IN AT LEAST THREE PLACES ON THE UPSLOPE SIDE WITH 50LB.PLASTIC TIE STRAPS OR WIRE FASTENERS. NOTE: NOTES:1. TRENCH SHALL BE A MINIMUM OF 4" WIDE & 6" DEEPTO BURY AND ANCHOR THE GEOTEXTILE FABRIC. FOLDMATERIAL TO FIT TRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL. SILT FENCE(NOT TO SCALE) COPYRIGHT 2026 10/28/20261:13260116 C500 ANDREW STASIUKEVICIUS, P.E.TJRAJS3 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY EROSION CONTROL DETAILS SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA P:\3260116\Dwg\Sheets\3260116-TS & DT01.dwg, 3260116-TS & DT01 - EROSION CONTROL, 10/26/2026 8:03:12 PM, Ajs3 NOT TO SCALEFILE NO. 37 REF: CHAP. 4.8.0 STANDARD GATE VALVEBOX SETTING PIPE DIA.INCHESX=SETTINGINCHES23468101216 6781213172130 BOX TOP6"X 2" X 6" X 18" WOOD BLOCKINGENCASE VALVE IN POLYETHYLENEWRAPSIDE VIEW FRONT VIEW BEDDING MATERIAL 2" X 6" X 18"WOOD BLOCKING BACKFILL TRENCH WIDTH GRADE BEDDING MATERIAL BACKFILL NOTE:DETAIL FOR USE WITH PUBLIC FACILITIESPROJECTS WITHIN PUBLIC ROW. CLEAN-OUT CASTING NEENAH FOUNDARY CAST IRON OR APPROVED EQUAL CLEAN-OUT CASTINGNEENAH FOUNDARYCAST IRON ORAPPROVED EQUAL DETAIL PVC THREADED CAP & PLUG PVC LONG SWEEP 45° BEND PVC WYE ENCASE WYEIN CONCRETE PVC RISER FROST SLEEVE - PVC SCH. 40 FLOW FROST SLEEVE - PVC SCH. 40 CLEAN-OUT STRUCTURE DETAIL(NOT TO SCALE) NOTES:1. RISER PIPE SHALL BE EXTENDED ABOVE GROUND LEVEL INITIALLY & THEN IT MAY BECUT BACK TO MATCH FINAL GRADE (BY OTHERS).2. POSITION CLEAN-OUTS UPSTREAM OF BENDS, WHEN FEASIBLE.3. REMOVABLE WATERTIGHT TOP ON FROST SLEEVES SUBJECT TO VEHICLE TRAFFIC SHALL BE CAST IRON. EXTEND TO TOP OF 45° BEND 12" ASPHALT PAVEMENT SECTION(STANDARD DUTY)(NOT TO SCALE) CONCRETE SIDEWALK PAVEMENT SECTION(NOT TO SCALE) XX" BITUMINOUS SURFACECOURSE (5 LT 58-28 S)PER WISDOT SECTION 460 XX" BITUMINOUS BINDERCOURSE (4 LT 58-28 S)PER WISDOT SECTION 460 NOTE: ALL PAVEMENT SECTIONS ARE FOR REPRESENTATIVE PURPOSES ONLY. REFER TO GEOTECHNICAL REPORT AND GEOTECHNICAL ENGINEER FOR PAVEMENT SECTIONS TO BE CONSTRUCTED. 10" BASE COURSEWISDOT SECTION 3051-1/4" CRUSHED STONECOMPACTED SUBGRADE SEE ARCHITECTURAL PLANS FORSCORING, JOINT PATTERNS, TEXTUREAND COLOR ADJACENT TO BUILDING TACK COAT 5"-4,000 PSI (28 DAY COMPRESSIVESTRENGTH) AIR ENTRAINED CONCRETE(4.5-7.5% AIR ENTRAINED) 4" BASE COURSEWISDOT SECTION 3053/4" CRUSHED AGGREGATECOMPACTED SUBGRADE COPYRIGHT 2026 10/28/20261:13260116 C501 ANDREW STASIUKEVICIUS, P.E.TJRAJS3 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY SITE & UTILITY DETAILS SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA P:\3260116\Dwg\Sheets\3260116-TS & DT01.dwg, 3260116-TS & DT01 - SITE DETAILS, 10/26/2026 8:03:14 PM, Ajs3 DIVISION 33 - UTILITIES33 10 00 - WATER DISTRIBUTION1.WORK SHALL CONSIST OF INSTALLATION AND TESTING OF THE WATER DISTRIBUTION SYSTEM AND ALL APPURTENANCES.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.ALL PUBLIC WATER DISTRIBUTION WORK SHALL BE IN ACCORDANCE WITH WISCONSIN ADMINISTRATIVE CODE NR 811, MUNICIPALITYDEVELOPMENT STANDARDS AND SSSWCW.4.ALL PRIVATE WATER DISTRIBUTION WORK SHALL BE IN ACCORDANCE WITH WISCONSIN ADMINISTRATIVE CODE SPS 382, MUNICIPALITYDEVELOPMENT STANDARDS AND SSSWCW.5.POLYVINYL CHLORIDE (PVC) PIPE SHALL BE SDR 18, CLASS 150 CONFORMING TO AWWA C900 WITH INTEGRAL ELASTOMERIC BELL AND SPIGOTJOINTS IN ACCORDANCE WITH SECTION 8.20.0 OF SSSWCW.6.DUCTILE IRON PIPE (DIP) SHALL BE CLASS 150 CONFORMING TO AWWA C151 WITH RUBBER GASKETED JOINTS IN ACCORDANCE WITH SECTION8.18.0 OF SSSWCW.7.POLYETHYLENE TUBING SHALL BE SDR 9 IN ACCORDANCE WITH SECTION 8.24.0 OF SSSWCW AND CONFORM TO AWWA C901.8.COPPER TUBING SHALL BE TYPE “K” IN ACCORDANCE WITH SECTION 8.24.0 OF SSSWCW AND CONFORM TO ASTM B88.9.BALL VALVES SHALL BE IN ACCORDANCE WITH SECTION 8.30.0 OF SSSWCW AND CONFORM TO AWWA C800 AND ASTM B62.10.GATE VALVES SHALL BE IN ACCORDANCE WITH SECTION 8.27.0 OF SSSWCW AND CONFORM TO AWWA C500.11.BUTTERFLY VALVES SHALL BE IN ACCORDANCE WITH SECTION 8.28.0 OF SSSWCW AND CONFORM TO AWWA C504.12.VALVE BOXES SHALL BE IN ACCORDANCE WITH SECTION 8.29.0 OF SSSWCW AND CONFORM TO ASTM A48. VALVE BOXES SHALL BE SIZE DD,SCREW TYPE, 3 PIECE ASSEMBLY, WITH COVERS MARKED “WATER”. ALL VALVE BOXES SHALL BE SET TO PROPOSED GRADE, TRULY VERTICAL, ANDSUPPORTED BY USE OF ADAPTOR.13.HYDRANTS SHALL BE IN ACCORDANCE WITH SECTION 8.26.0 OF SSSWCW AND CONFORM TO AWWA C502. PUMPER NOZZLE SHALL BEPERPENDICULAR TO AND ORIENTED TOWARDS THE PAVEMENT. HYDRANTS SHALL BE ATTACHED BY MEANS OF TEE AND HAVE A GROUND LINETO CENTER DISTANCE OF 18 TO 21 INCHES.14.FITTINGS SHALL BE CLASS 150 IN ACCORDANCE WITH SECTION 8.22.0 OF SSSWCW, CONFORMING TO AWWA C110, AND PROVIDED WITHMECHANICAL JOINTS.15.MECHANICAL JOINTS SHALL BE MADE WITH “COR TEN” NUTS AND BOLTS, OR CORROSION-RESISTANT EQUIVALENTS CONFORMING TO AWWAC111.16.POLYETHYLENE WRAP SHALL BE IN ACCORDANCE WITH SECTION 8.21.0 OF SSSWCW AND PROVIDED FOR ALL METAL PIPES AND FITTINGS.17.THRUST RESTRAINT SHALL BE IN ACCORDANCE WITH SECTION 4.3.13 OF SSSWCW AND PROVIDED FOR ALL BENDS, CAPS, PLUGS, AND TEES.18.TRENCH SECTION SHALL BE IN ACCORDANCE WITH FILE NO. 36 OF SSSWCW. MAXIMUM ALLOWABLE TRENCH WIDTH SHALL BE OUTSIDEDIAMETER OF PIPE PLUS 20 INCHES.19.PIPE BEDDING AND COVER MATERIAL SHALL BE IN ACCORDANCE WITH SECTION 8.43.0 OF SSSWCW. MINIMUM COVER OVER PIPE SHALL BE 12INCHES.20.TRENCH BACKFILL MATERIAL SHALL BE MECHANICALLY COMPACTED GRANULAR BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OF SSSWCWBENEATH AND WITHIN 5 FEET OF PAVEMENT AREAS, AND SHALL BE SPOIL BACKFILL IN ACCORDANCE WITH SECTION 8.43.5 OF SSSWCWBENEATH GREENSPACE AREAS, UNLESS ALTERNATIVE COMPACTION IS RECOMMENDED IN THE GEOTECHNICAL REPORT OR BY THEGEOTECHNICAL ENGINEER DURING CONSTRUCTION, IN WHICH CASE THE CONTRACTOR IS TO FOLLOW THE RECOMMENDATIONS OF THEGEOTECHNICAL ENGINEER.21.CAUTION MUST BE FOLLOWED REGARDING THE COMPACTION OF ALL UTILITY TRENCHES. FLOODING OF BACKFILL MATERIAL IS NOT ALLOWED.22.TRACER WIRE SHALL BE BLUE AND INSTALLED IN ACCORDANCE WITH SECTION 2.11.2 OF SSSWCW ON ALL BURIED NON-METALLIC PUBLIC WATERMAIN PIPE, PRIVATE WATER MAIN PIPE, AND BUILDING WATER SERVICE PIPE. TRACER WIRE SHALL BE INSULATED, SINGLE-CONDUCTOR, 12GAUGE SOLID COPPER OR COPPER COATED STEEL WIRE, SECURED AT LEAST EVERY 10 FEET AND AT ALL BENDS, WITH ACCESS POINTS AT LEASTEVERY 400 FEET.23.PROPOSED WATER SERVICES SHOWN ON THIS PLAN SHALL TERMINATE AT A POINT FIVE (5) FEET FROM THE EXTERIOR BUILDING WALL.24.THE CONTRACTOR IS RESPONSIBLE FOR THE SIZE, TYPE AND NUMBER OF BENDS REQUIRED TO COMPLETE CONSTRUCTION, WHICH SHALL BEINCIDENTAL AND INCLUDED IN THE COST OF WORK.25.THE CONTRACTOR SHALL ADJUST ALL VALVE BOXES TO FINISHED SURFACE.26.THE CONTRACTOR IS RESPONSIBLE FOR PRESSURE TESTING AND SAFE WATER SAMPLING. HYDROSTATIC TESTING SHALL BE IN ACCORDANCEWITH SECTION 4.15.0 OF SSSWCW. DISINFECTION SHALL BE IN ACCORDANCE WITH SECTION 4.16.0 OF SSSWCW AND CONFORM TO AWWA C651.WATER MAINS SHALL BE FLUSHED AND TESTED IN THE PRESENCE OF THE WATER UTILITY OPERATOR. 33 30 00 - SANITARY SEWERAGE1.WORK SHALL CONSIST OF INSTALLATION AND TESTING OF THE SANITARY SEWERAGE SYSTEM AND ALL APPURTENANCES.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.ALL PUBLIC SANITARY SEWERAGE WORK SHALL BE IN ACCORDANCE WITH WISCONSIN ADMINISTRATIVE CODE NR 110, MUNICIPALITYDEVELOPMENT STANDARDS AND SSSWCW.4.ALL PRIVATE SANITARY SEWERAGE WORK SHALL BE IN ACCORDANCE WITH WISCONSIN ADMINISTRATIVE CODE SPS 382, MUNICIPALITYDEVELOPMENT STANDARDS AND SSSWCW.5.POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS SHALL BE SDR 35 CONFORMING TO ASTM D3034 FOR DEPTHS LESS THAN 18 FEET, AND SHALL BESDR 18 CONFORMING TO AWWA C900 FOR DEPTHS GREATER THAN 18 FEET, BOTH WITH PUSH-ON RUBBER GASKETED JOINTS IN ACCORDANCEWITH SECTIONS 8.10.6 AND 8.41.4 OF SSSWCW.6.MANHOLES SHALL BE PRECAST REINFORCED CONCRETE IN ACCORDANCE WITH SECTION 8.39.0 OF SSSWCW AND CONFORM TO ASTM C478.SIZES SHALL BE AS INDICATED AND VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING.7.TRENCH SECTION SHALL BE CLASS B IN ACCORDANCE WITH SECTION 3.2.6 OF SSSWCW. MAXIMUM ALLOWABLE TRENCH WIDTH SHALL BEOUTSIDE DIAMETER OF PIPE PLUS 20 INCHES.8.PIPE BEDDING AND COVER MATERIAL SHALL BE IN ACCORDANCE WITH SECTION 8.43.0 OF SSSWCW. MINIMUM COVER OVER PIPE SHALL BE 12INCHES.9.TRENCH BACKFILL MATERIAL SHALL BE MECHANICALLY COMPACTED GRANULAR BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OF SSSWCWBENEATH AND WITHIN 5 FEET OF PAVEMENT AREAS, AND SHALL BE SPOIL BACKFILL IN ACCORDANCE WITH SECTION 8.43.5 OF SSSWCWBENEATH GREENSPACE AREAS, UNLESS ALTERNATIVE COMPACTION IS RECOMMENDED IN THE GEOTECHNICAL REPORT OR BY THEGEOTECHNICAL ENGINEER DURING CONSTRUCTION, IN WHICH CASE THE CONTRACTOR IS TO FOLLOW THE RECOMMENDATIONS OF THEGEOTECHNICAL ENGINEER.10.CAUTION MUST BE FOLLOWED REGARDING THE COMPACTION OF ALL UTILITY TRENCHES. FLOODING OF BACKFILL MATERIAL IS NOT ALLOWED.11.ALL CONNECTIONS TO EXISTING SANITARY SEWER PIPES AND STRUCTURES SHALL BE CORED CONNECTIONS, UNLESS NOTED OTHERWISE.PREFABRICATED WYE CONNECTIONS ARE REQUIRED FOR ALL BUILDING SANITARY SERVICE PIPES, UNLESS NOTED OTHERWISE. DIVISION 32 - EXTERIOR IMPROVEMENTS32 12 00 - ASPHALT PAVING1.WORK SHALL CONSIST OF FINE GRADING SUBGRADE, EXCAVATION BELOW SUBGRADE (IF NECESSARY), PLACEMENT OF CRUSHED STONEBASE, INSTALLATION OF HOT-MIX ASPHALT, PAVEMENT MARKING, SIGNAGE, AND CLEANUP.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.ASPHALT PAVEMENT MIX DESIGNS SUBMITTED FOR REVIEW SHALL BE FORMATTED USING WISDOT MIX DESIGN STANDARD DATA INPUTFORM/REPORT 249.4.CRUSHED STONE BASE SHALL BE IN ACCORDANCE WITH SECTION 305 OF WISDOT STANDARD SPECIFICATIONS.5.ASPHALTIC MATERIALS SHALL BE IN ACCORDANCE WITH SECTION 455 OF WISDOT STANDARD SPECIFICATIONS.6.AGGREGATE SHALL BE IN ACCORDANCE WITH SECTION 460 OF WISDOT STANDARD SPECIFICATIONS.7.DO NOT CONDUCT ASPHALT PAVING IF ANY OF THE FOLLOWING CONDITIONS EXIST: CRUSHED STONE BASE IS WET OR EXCESSIVELY DAMP;TEMPERATURE IS BELOW 30 DEGREES FAHRENHEIT AT TIME OF BINDER COURSE INSTALLATION; TEMPERATURE HAS BEEN BELOW 35DEGREES FAHRENHEIT WITHIN 12 HOURS PRIOR TO TACK COAT APPLICATION; TEMPERATURE IS BELOW 40 DEGREES FAHRENHEIT AT TIMEOF SURFACE COURSE INSTALLATION.8.COMPACT ASPHALT IN ACCORDANCE WITH SECTION 450 OF WISDOT STANDARD SPECIFICATIONS. COMPACT ASPHALT TO PRODUCE THETHICKNESS INDICATED WITHIN PLUS/MINUS 1/4-INCH FOR BINDER COURSE, AND WITHIN PLUS 1/4-INCH FOR SURFACE COURSE (NOMINUS).9.APPLY TACK COAT BETWEEN ASPHALT COURSES AT A MINIMUM RATE OF 0.25 GAL/SY.10.NO TRAFFIC SHALL BE ALLOWED ON ASPHALT AFTER FINAL ROLLING UNTIL IT HAS COOLED AND HARDENED.11.FINAL ASPHALT SURFACE SHALL BE WITHIN A 1/8-INCH TOLERANCE AS DETERMINED BY USING A 10-FOOT STRAIGHTEDGE APPLIEDLONGITUDINALLY OR TRANSVERSELY. REMOVE AND REPLACE ALL RAISED AND DEPRESSED AREAS EXCEEDING TOLERANCE.12.A SLOPE NO GREATER THAN 2% IN ALL DIRECTIONS AT ADA PARKING STALLS AND ADJACENT UNLOADING AREAS IS REQUIRED. NOTIFYENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WORK.13.A SLOPE NO GREATER THAN 5% ALONG THE LENGTH OF THE ACCESSIBLE ROUTE IS REQUIRED. A SLOPE NO GREATER THAN 2% ACROSS THEWIDTH OF THE ACCESSIBLE ROUTE IS REQUIRED. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WORK. 32 13 00 - CONCRETE PAVING1.WORK SHALL CONSIST OF FINE GRADING SUBGRADE, EXCAVATION BELOW SUBGRADE (IF NECESSARY), PLACEMENT OF CRUSHED STONEBASE, INSTALLATION OF CONCRETE, AND CLEANUP.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.CRUSHED STONE BASE SHALL BE IN ACCORDANCE WITH SECTION 305 OF WISDOT STANDARD SPECIFICATIONS.4.CONCRETE PAVING SHALL BE IN ACCORDANCE WITH WISDOT STANDARD SPECIFICATIONS:a.SECTION 405- COLORED AND STAMPED CONCRETE PAVINGb.SECTION 415- CONCRETE PAVEMENTc.SECTION 416- CONCRETE PAVEMENT REPAIRd.SECTION 601- CONCRETE CURBINGe.SECTION 602- CONCRETE SIDEWALK AND PATIO PAVING5.CONCRETE SHALL BE GRADE A AIR-ENTRAINED IN ACCORDANCE WITH SECTION 501 OF WISDOT STANDARD SPECIFICATIONS, WITH AMINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI.6.AGGREGATE SHALL BE IN ACCORDANCE WITH SECTION 501 OF WISDOT STANDARD SPECIFICATIONS.7.WATER SHALL BE IN ACCORDANCE WITH SECTION 501 OF WISDOT STANDARD SPECIFICATIONS AND ASTM C94 / C94M.8.AIR-ENTRAINING SHALL BE IN ACCORDANCE WITH SECTION 501 OF WISDOT STANDARD SPECIFICATIONS AND ASTM C260. DIVISION 31 - EARTHWORK31 10 00 - SITE CLEARING & DEMOLITION1.WORK SHALL CONSIST OF DEMOLITION, ABANDONMENT, AND REMOVAL OF EXISTING FOUNDATIONS, WALLS, SLABS, FENCES, PIPING,PAVEMENTS, AND OTHER MANMADE ITEMS INTERFERING WITH NEW CONSTRUCTION. WORK SHALL ALSO CONSIST OF CLEARING ANDGRUBBING OF TREES, SHRUBS, VEGETATION, ROOTS, STUMPS, RUBBISH, AND OTHER PERISHABLE MATTER INTERFERING WITH NEWCONSTRUCTION.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.CALL 811 TO NOTIFY UTILITY PROVIDERS AND REQUEST FIELD LOCATION OF EXISTING UTILITIES WITHIN PROJECT LIMITS PRIOR TO ANYCONSTRUCTION RELATED ACTIVITIES.4.INSTALL PERIMETER FENCING AS INDICATED PRIOR TO COMMENCING ANY CONSTRUCTION RELATED ACTIVITY.5.CLEARLY IDENTIFY ALL VEGETATION TO BE PRESERVED AND/OR RELOCATED PRIOR TO CLEARING AND GRUBBING.6.PROTECT EXISTING IMPROVEMENTS TO REMAIN DURING CONSTRUCTION. ANY DAMAGED IMPROVEMENTS SHALL BE RESTORED TOORIGINAL CONDITION, OR AS OTHERWISE ACCEPTABLE TO THE OWNER.7.REMOVE EXISTING ABOVE-GRADE AND BELOW-GRADE IMPROVEMENTS AS INDICATED AND AS NECESSARY TO CONSTRUCT PROPOSEDIMPROVEMENTS.8.SAWCUT ALL PAVEMENT TO BE REMOVED IN STRAIGHT LINES TO FULL DEPTH.9.DEMOLISH CONCRETE AND MASONRY IN SMALL SECTIONS. BREAK UP CONCRETE SLABS THAT ARE 2 FEET OR MORE BELOW PROPOSEDSUBGRADE TO PERMIT DRAINAGE.10.DISCONNECT AND SEAL/CAP EXISTING UTILITIES TO BE REMOVED, RELOCATED, OR ABANDONED IN ACCORDANCE WITH REQUIREMENTS OFUTILITY PROVIDERS.11.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING OWNERSHIP OF AND COORDINATING NECESSARY REMOVAL AND/OR RELOCATION OF ALLEXISTING UTILITIES WITHIN THE PROJECT LIMITS.12.DO NOT INTERRUPT UTILITY SERVICE TO EXISTING FACILITIES UNLESS PERMITTED BY THE OWNER.13.VOIDS LEFT BY REMOVALS SHALL BE LEVELED TO PREVENT PONDING OF WATER.14.REMOVE AND LEGALLY DISPOSE OF DEMOLISHED MATERIALS, TRASH, AND DEBRIS FROM THE PROJECT SITE. RUBBISH, TRASH, GARBAGE,AND LITTER SHALL BE PLACED IN SEALED CONTAINERS THROUGHOUT CONSTRUCTION. 31 20 00 - EARTH MOVING1.WORK SHALL CONSIST OF STRIPPING AND STORAGE OF TOPSOIL, EXCAVATION, EMBANKMENT, IMPORTING OR EXPORTING MATERIAL TOACHIEVE LAND BALANCE, COMPACTION, FINISH GRADING, SUBGRADE PREPARATION, AND REPLACEMENT OF TOPSOIL.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.ALL EARTHWORK SHALL BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT AND SUBSEQUENTRECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER DURING CONSTRUCTION BASED ON FIELD CONDITIONS, AND THESE REQUIREMENTS.THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER SHALL GOVERN.4.EXCAVATE TO SUBGRADE REGARDLESS OF THE CHARACTER OF SURFACE AND SUBSURFACE CONDITIONS ENCOUNTERED. EXCAVATEDMATERIAL MAY INCLUDE ROCK AND UNCLASSIFIED OBSTRUCTIONS, WHICH IS CONSIDERED INCIDENTAL AND SHALL BE INCLUDED IN THEWORK.5.EXISTING FOUNDATIONS, BUILDING REMNANTS, AND UNSATISFACTORY MATERIAL SHALL BE COMPLETELY REMOVED FROM WITHIN AND AMINIMUM OF 10 FEET BEYOND BUILDING PAD AREAS. ANY RELATED EXCAVATION SHALL BE BACKFILLED WITH COMPACTED ENGINEERED FILLMATERIAL.6.EXISTING FOUNDATIONS, BUILDING REMNANTS, AND UNSATISFACTORY MATERIAL SHALL BE REMOVED TO A MINIMUM OF 2 FEET BELOWPROPOSED SUBGRADE WITHIN GREENSPACE AND PAVEMENT AREAS. ANY RELATED EXCAVATION SHALL BE BACKFILLED WITH COMPACTEDENGINEERED FILL MATERIAL.7.AREAS SHALL BE GRADED TO WITHIN 1 INCH, MORE OR LESS, OF PROPOSED SUBGRADE. DEVIATIONS SHALL NOT BE CONSISTENT IN ONEDIRECTION.8.DISKING, HARROWING, AND AERATION TECHNIQUES SHALL BE USED TO DRY SUBGRADE PRIOR TO PROOF ROLLING.9.IN THE PRESENCE OF THE GEOTECHNICAL ENGINEER, PROOF ROLL SUBGRADE BELOW BUILDING PAD AND PAVEMENT AREAS DURING DRYWEATHER WITH A FULLY LOADED TANDEM AXLE DUMP TRUCK WHERE COHESIVE SOILS ARE PREDOMINANT, AND WITH A SMOOTHDRUMMED VIBRATORY ROLLER WHERE GRANULAR SOILS ARE PREDOMINANT. SUBGRADE WHICH IS OBSERVED TO RUT OR DEFLECTEXCESSIVELY SHALL BE UNDERCUT IN ACCORDANCE WITH RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. DO NOT PROOF ROLLWET OR SATURATED SUBGRADE.10.THE CONTRACTOR SHALL MAINTAIN POSITIVE SITE DRAINAGE THROUGHOUT CONSTRUCTION. THIS MAY INCLUDE EXCAVATION OFTEMPORARY DITCHES OR PUMPING TO ALLEVIATE WATER PONDING. SURFACE WATER AND GROUNDWATER SHALL BE PREVENTED FROMENTERING EXCAVATIONS, PONDING ON PREPARED SUBGRADES, AND FLOODING PROJECT SITE AND/OR SURROUNDING AREAS.11.THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ALL EARTHWORK COMPUTATIONS AND FOR ACTUAL LAND BALANCE,INCLUDING UTILITY TRENCH SPOIL. THE CONTRACTOR SHALL IMPORT OR EXPORT MATERIAL AS NECESSARY TO COMPLETE THE PROJECT.12.TOPSOIL REPLACEMENT DEPTH SHALL BE AS CALLED OUT ON THE CIVIL OR LANDSCAPE PLANS, OR A MINIMUM OF SIX INCHES IF NOT CALLEDOUT ON LANDSCAPE PLAN.13.TOPSOIL IN PARKING ISLANDS: ALL PARKING LOT ISLANDS TO BE BACKFILLED WITH TOPSOIL TO A MINIMUM DEPTH OF 18'' BY GRADINGCONTRACTOR TO INSURE LONG TERM PLANT HEALTH. CROWN ALL PLANTING ISLANDS A MINIMUM OF 6'' TO PROVIDE PROPER DRAINAGE,UNLESS OTHERWISE SPECIFIED. 31 25 00 - EROSION & SEDIMENTATION CONTROLS1.WORK SHALL CONSIST OF INSTALLATION OF TEMPORARY AND PERMANENT PRACTICES FOR SEDIMENTATION CONTROL, EROSION CONTROL,SLOPE PROTECTION, AND REMOVAL OF PRACTICES UPON FINAL SITE STABILIZATION.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.INSTALLATION AND MAINTENANCE OF PRACTICES SHALL BE IN ACCORDANCE WITH THE APPLICABLE WDNR TECHNICAL STANDARD, OR THEWISCONSIN CONSTRUCTION SITE BEST MANAGEMENT PRACTICE HANDBOOK IF A TECHNICAL STANDARD IS NOT AVAILABLE.4.ALL PRACTICES SHALL BE INSTALLED PRIOR TO COMMENCING ANY LAND DISTURBING CONSTRUCTION RELATED ACTIVITY. EARTHWORKASSOCIATED WITH INSTALLATION OF PRACTICES MAY OCCUR CONCURRENTLY.5.ALL PRACTICES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT AND WARRANTY PERIOD IN CONFORMANCE WITHPERMIT REQUIREMENTS.6.ALL PRACTICES SHALL BE ROUTINELY INSPECTED EVERY 7 DAYS AND WITHIN 24 HOURS OF A RAINFALL GREATER THAN 0.5 INCHES. THECONTRACTOR IS REQUIRED TO PERFORM INSPECTIONS, KEEP A LOG, AND CONDUCT REPAIRS AS NEEDED.7.ALL DISTURBED AREAS SHALL DRAIN TO A CONTROL PRACTICE AT ALL TIMES DURING CONSTRUCTION UNTIL FINAL STABILIZATION ISACHIEVED. DEPENDING UPON HOW THE CONTRACTOR GRADES THE SITE, IT MAY BE NECESSARY TO INSTALL ADDITIONAL CONTROLPRACTICES IN VARIOUS LOCATIONS THROUGHOUT THE PROJECT SITE. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANYADDITIONAL CONTROL PRACTICES NECESSARY TO PREVENT EROSION AND SEDIMENTATION.8.ALL DISTURBED GROUND LEFT INACTIVE FOR 7 DAYS SHALL BE STABILIZED WITH A TEMPORARY SEED MIXTURE AND MULCH. THETEMPORARY SEED MIXTURE SHALL BE IN ACCORDANCE WITH SECTION 630 OF WISDOT STANDARD SPECIFICATIONS. WINTER WHEAT OR RYESHALL BE USED FOR TEMPORARY SEED AFTER SEPTEMBER 1.9.DISTURBED AREAS THAT CAN NOT BE STABILIZED WITH A DENSE GROWTH OF VEGETATION DUE TO TEMPERATURE OR TIMING OFCONSTRUCTION SHALL BE STABILIZED BY APPLYING ANIONIC POLYACRYLAMIDE (PAM).10.ALL ACTIVITIES ON THE PROJECT SITE SHALL BE CONDUCTED IN A LOGICAL SEQUENCE TO MINIMIZE THE AREA OF BARE SOIL EXPOSED AT ANYONE TIME.11.DUST GENERATED BY CONSTRUCTION RELATED ACTIVITIES SHALL BE MINIMIZED BY USE OF WATERING, CALCIUM CHLORIDE SURFACETREATMENT, CONSTRUCTION SCHEDULING, OR OTHER APPROPRIATE MEASURES.12.THE CONTRACTOR SHALL BE PREPARED FOR DEWATERING CONDITIONS BY HAVING APPROPRIATE PUMPS AND FILTER BAGS ONSITE. ALLWATER FROM CONSTRUCTION DEWATERING SHALL BE TREATED PRIOR TO DISCHARGE FROM THE PROJECT SITE.13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE CLEANLINESS OF THE PROJECT SITE AND PUBLIC ROADS DURINGCONSTRUCTION. PUBLIC ROADS SHALL BE KEPT FREE OF SEDIMENT TRACKED FROM AREAS UNDER CONSTRUCTION BY DAILY SWEEPING OROTHER APPROPRIATE MEASURES.14.FINAL STABILIZATION OF LANDSCAPED AREAS SHALL BE IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLAN.15.ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLANTO MAINTAIN A VIGOROUS DENSE VEGETATIVE COVER. DIVISION 1 - GENERAL REQUIREMENTS01 41 00 - REGULATORY REQUIREMENTS1.THE LATEST EDITIONS OF THE FOLLOWING DOCUMENTS AND ANY SUPPLEMENTS THERETO, SHALL GOVERN ALL CONSTRUCTION ITEMS ONTHIS PLAN UNLESS OTHERWISE NOTED:a.WISCONSIN DEPARTMENT OF NATURAL RESOURCES (WDNR) STORM WATER TECHNICAL STANDARDSb.WISCONSIN EROSION CONTROL PRODUCT ACCEPTABILITY LISTc.STANDARD SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN WISCONSIN (SSSWCW)d.WISCONSIN ADMINISTRATIVE CODE, SECTIONS SPS 381-387e.WISCONSIN DEPARTMENT OF TRANSPORTATION (WISDOT) STANDARD SPECIFICATIONS FOR HIGHWAY AND STRUCTURECONSTRUCTIONf. WISCONSIN DEPARTMENT OF TRANSPORTATION (WISDOT) APPROVED PRODUCT LISTS (APL)g.FEDERAL HIGHWAY ADMINISTRATION MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)h.WISCONSIN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (WMUTCD)i. UNITED STATES DEPARTMENT OF JUSTICE ADA STANDARDSj. UNITED STATES DEPARTMENT OF TRANSPORTATION ADA STANDARDS FOR TRANSPORTATION FACILITIESk.MUNICIPALITY DEVELOPMENT STANDARDSl. COUNTY DEVELOPMENT STANDARDS2.THE OWNER, ENGINEER AND MUNICIPALITY SHALL BE NOTIFIED AT LEAST 48 HOURS IN ADVANCE OF PERFORMING ANY CONSTRUCTIONACTIVITIES.3.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING COPIES OF ALL PERMITS AND FOR ABIDING BY ALL PERMIT REQUIREMENTS ANDRESTRICTIONS.4.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTSTOGETHER WITH EXERCISING PRECAUTIONS AT ALL TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. ITIS ALSO THE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS,AND PROGRAMS IN CONNECTION WITH THE WORK.5.SHOP DRAWINGS AND/OR MANUFACTURER'S PRODUCT DATA SUBMITTALS ARE REQUIRED ONLY IF THE PRODUCT OR METHOD OFCONSTRUCTION IS DIFFERENT FROM THAT SPECIFIED OR IF REQUIRED BY THE MUNICIPAL ENGINEER.a.ALL DOCUMENTS SUBMITTED FOR REVIEW SHALL HAVE THE SPECIFIC MATERIAL, PART, SIZE, ETC. HIGHLIGHTED IN SOME FASHION.EXAMPLE: A FITTING CUT SHEET HAS MULTIPLE PRESSURE RATING FOR DIFFERENT SIZE BENDS. HIGHLIGHT THE PRESSURE CLASS &SIZE TO BE USED ON PROJECT. ALL SUBMITTALS NOT PROPERLY IDENTIFYING THE SPECIFIC MATERIAL BEING USED WILL BEREJECTED.b.CONTRACTOR SHALL SUBMIT A PDF COPY AND AN EXPLANATION AS TO HOW THE SUBSTITUTION MEETS THE PROPOSED DESIGN(PRODUCT SPECIFICATION SHEETS WITHOUT EXPLANATION WILL NOT BE ACCEPTED) TO THE OWNER'S REPRESENTATIVE ORENGINEER FOR REVIEW AND APPROVAL. THE CONTRACTOR SHALL NOT PROCEED UNTIL THE OWNER'S APPROVAL IS GIVEN. INPROJECT SCHEDULING CONTRACTOR SHALL ACCOUNT FOR 5 WORKING DAYS FOR SUBMITTAL REVIEW. IN THE EVENT SUCHSUBSTITUTION IS APPROVED, THE OWNER WILL REQUIRE FROM THE CONTRACTOR A CREDITED DEDUCTION FROM THE CONTRACTAMOUNT EQUAL TO ANY SAVINGS IN MATERIAL COST RESULTING FROM USE OF THE PROPOSED SUBSTITUTE.6.THE CONTRACTOR SHALL ASSUME COMPLETE AND SOLE RESPONSIBILITY FOR THE QUALITY OF WORK. IF CHANGES OR ADJUSTMENTS ARERECOMMENDED BY THE CONTRACTOR, THEY MAY BE MADE ONLY UPON WRITTEN APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.a.ALL WORK SHALL BE DONE IN COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALLDECIDE ALL QUESTIONS WHICH SHALL ARISE AS TO THE QUALITY AND ACCEPTABILITY OF MATERIALS FURNISHED, WORKPERFORMED, AND WORKMANSHIP. INTERPRETATION OF THE PLANS AND SPECIFICATIONS BY THE OWNER OR THEIRREPRESENTATIVE SHALL DETERMINE THE AMOUNT OF WORK PERFORMED AND MATERIALS FURNISHED.b.FAILURE OR NEGLIGENCE ON THE PART OF THE OWNER OR THEIR REPRESENTATIVE TO CONDEMN OR REJECT SUBSTANDARD ORINFERIOR WORK OR MATERIALS SHALL NOT BE CONSTRUED TO IMPLY AN ACCEPTANCE OF SUCH WORK OR MATERIALS, IF ITBECOMES EVIDENT AT ANY TIME PRIOR TO THE FINAL ACCEPTANCE OF THE WORK BY THE OWNER. NEITHER SHALL IT BECONSTRUED AS BARRING THE OWNER, AT ANY SUBSEQUENT TIME, FROM THE RECOVERY OF DAMAGES OR OF SUCH A SUM OFMONEY AS MAY BE NEEDED TO BUILD ANEW ALL PORTIONS OF THE SUBSTANDARD OR INFERIOR WORK OR REPLACEMENT OFIMPROPER MATERIALS WHEREVER FOUND.c.INSPECTORS EMPLOYED BY THE OWNER SHALL BE AUTHORIZED TO INSPECT ALL WORK DONE AND ALL MATERIAL FURNISHED.SUCH INSPECTION MAY EXTEND TO ALL OR ANY PART OF THE WORK AND TO THE PREPARATION, FABRICATION OR MANUFACTUREOF THE MATERIALS TO BE USED. THE INSPECTOR IS NOT AUTHORIZED TO REVOKE, ALTER OR WAIVE ANY REQUIREMENTS OF THESPECIFICATIONS, NOR IS HE AUTHORIZED TO APPROVE OR ACCEPT ANY PORTION OF THE COMPLETED PROJECT. HE SHALL CALLTHE ATTENTION OF THE CONTRACTOR TO ANY FAILURE OF THE WORK OR MATERIALS TO CONFORM TO THE SPECIFICATIONS ANDCONTRACT, AND SHALL HAVE THE AUTHORITY TO REJECT MATERIALS. ANY DISPUTE BETWEEN THE INSPECTOR AND CONTRACTORSHALL BE REFERRED TO THE OWNER OR THEIR REPRESENTATIVE. ANY ADVICE WHICH THE INSPECTOR MAY GIVE THE CONTRACTORSHALL IN NO WAY BE CONSTRUED AS BINDING THE ENGINEER IN ANY WAY OR RELEASING THE CONTRACTOR FROM FULFILLINGANY OF THE TERMS OF THE CONTRACT.d.ALL MATERIALS AND EACH PART OF DETAIL OF THE WORK SHALL BE SUBJECT AT ALL TIMES TO INSPECTION BY THE OWNER OR HISAUTHORIZED REPRESENTATIVE OR THE AUTHORITY HAVING JURISDICTION AND THE CONTRACTOR WILL BE HELD STRICTLY TO THETRUE INTENT OF THE SPECIFICATIONS IN REGARD TO QUALITY OF MATERIALS, WORKMANSHIP, AND THE DILIGENT EXECUTION OFTHE CONTRACT. SUCH INSPECTION MAY INCLUDE MILL, PLANT OR SHOP INSPECTION, AND ANY MATERIAL FURNISHED UNDERTHESE SPECIFICATIONS IS SUBJECT TO SUCH INSPECTION. THE OWNER OR HIS REPRESENTATIVES SHALL BE ALLOWED ACCESS TOALL PART OF THE WORK, AND SHALL BE FURNISHED WITH SUCH INFORMATION AND ASSISTANCE BY THE CONTRACTOR AS ISDETERMINED BY THE OWNER OR HIS REPRESENTATIVE, TO MAKE A COMPLETE AND DETAILED INSPECTION.e.ALL WORKMANSHIP SHALL CONFORM TO THE BEST STANDARD PRACTICE. UNLESS OTHERWISE SPECIFIED, THE SPECIFICATIONS ORRECOGNIZED ASSOCIATION OF MANUFACTURERS AND CONTRACTORS OR INDUSTRIAL MANUFACTURERS SHALL BE USED ASGUIDES FOR THE STANDARDS OF WORKMANSHIP.f. ALL EXPOSED ITEMS OF WORK SHALL PRESENT A NEAT WORKMANLIKE APPEARANCE AND SHALL BE AS TRUE TO SHAPE ANDALIGNMENT AS POSSIBLE TO OBTAIN WITH MEASURING OR LEVELING INSTRUMENTS GENERALLY USED IN THE RESPECTIVE TYPESOF WORK. ITEMS OF WORK SHALL BE SOUND AND FULLY PROTECTED AGAINST DAMAGE AND PREMATURE DETERIORATION. IT ISSPECIFICALLY UNDERSTOOD THAT IN ALL QUESTIONS OF QUALITY AND ACCEPTABILITY OF WORKMANSHIP, THE CONTRACTORAGREES TO ABIDE BY THE DECISION OF THE OWNER OR THEIR REPRESENTATIVE.g.ALL MATERIALS AND WORKMANSHIP NOT CONFORMING TO THE REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL BECONSIDERED AS DEFECTIVE, AND ALL SUCH MATERIALS, WHETHER IN-PLACE OR NOT, SHALL BE REJECTED AND SHALL BE REMOVEDFROM THE WORK BY THE CONTRACTOR AT HIS EXPENSE. UPON FAILURE ON THE PART OF THE CONTRACTOR TO COMPLY WITHANY ORDER OF THE OWNER RELATIVE TO THE PROVISIONS OF THIS ARTICLE, THE OWNER SHALL HAVE THE AUTHORITY TO REMOVEAND REPLACE SUCH DEFECTIVE MATERIAL AND TO DEDUCT THE COST OF REMOVAL AND REPLACEMENT FROM ANY MONIES DUEOR WHICH MAY BECOME DUE THE CONTRACTOR.h.THE CONTRACTOR SHALL KEEP A LEGIBLE COPY OF THE PLANS, SPECIFICATIONS, AND ALL PERMITS AT THE SITE OF THE WORK ATALL TIMES.i. AT THE COMPLETION OF THE WORK AND PRIOR TO FINAL PAYMENT, THE CONTRACTOR SHALL PROVIDE THE OWNER OR THEIRREPRESENTATIVE WITH A MARKED-UP SET OF DRAWINGS SHOWING ALL CHANGES OR VARIATIONS FROM THE ORIGINALDRAWINGS. THESE CHANGES SHALL BE MADE ON A SET OF FIELD DRAWINGS AS THE WORK TAKES PLACE, NOT AFTER THE WORK ISCOMPLETE. THIS SET OF DRAWINGS SHOULD BE KEPT CLEAN IN A LOCATION AT THE SITE WHERE THE OWNER OR THEIRREPRESENTATIVE MAY EXAMINE THEM.j. THE MARKED-UP DRAWINGS SHALL BE ACCURATE. ARBITRARY MARKINGS ARE OF NO VALUE. CAREFUL MEASUREMENTS SHALL BEMADE TO LOCATE UNDERGROUND EXTERIOR AND UNDERGROUND INTERIOR SEWERS, GAS LINES, WATER LINES, ELECTRICALCONDUIT AND MISCELLANEOUS PIPING.7.CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRAFFIC CONTROL PLANS AND PERMITTING FOR ALL WORK TO BE COMPLETEDONSITE OR IN THE PUBLIC RIGHT-OF WAY. 01 70 00 - EXECUTION & CLOSEOUT REQUIREMENTS1.THE CONTRACTOR IS RESPONSIBLE FOR EXAMINING ALL EXISTING SITE CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION ANDSHALL COMPARE WITH THIS PLAN.2.EXISTING UTILITY INFORMATION IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY, BASED ON BEST AVAILABLE PUBLIC RECORDS,AS-BUILT DRAWINGS, AND FIELD OBSERVATIONS. NO RESPONSIBILITY IS ASSUMED BY THE OWNER OR ENGINEER FOR ACCURACY ORCOMPLETENESS. THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION AS TO THE TYPE AND NATURE OF EXISTINGUTILITIES, AS MAY BE NECESSARY TO AVOID DAMAGE THERETO.3.THE CONTRACTOR SHALL VERIFY ALL LOCATIONS, ELEVATIONS, AND SIZES OF EXISTING UTILITIES AND SHALL CHECK ALL PROPOSED UTILITYCONNECTIONS AND CROSSINGS PRIOR TO PROCEEDING WITH ANY WORK. ANY CONFLICTS SHALL BE REPORTED TO THE ENGINEER SOREDESIGN MAY OCCUR IF NEEDED. COST OF REPLACEMENT OR REPAIR OF EXISTING UTILITIES DAMAGED AS A RESULT OF THECONTRACTOR'S OPERATIONS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.4.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING SOIL CONDITIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. A GEOTECHNICALREPORT MAY BE AVAILABLE FROM THE OWNER. THE CONTRACTOR SHALL ABIDE BY THE RECOMMENDATIONS OF THE GEOTECHNICALREPORT AND SUBSEQUENT RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER DURING CONSTRUCTION.5.THE CONTRACTOR SHALL FIELD VERIFY ELEVATIONS OF THE BENCHMARKS AND HORIZONTAL CONTROL BY REFERENCING SHOWNCOORDINATES TO KNOWN PROPERTY LINES, AND SHALL NOTIFY THE ENGINEER OF DISCREPANCIES IN EITHER VERTICAL OR HORIZONTALCONTROL PRIOR TO PROCEEDING WITH ANY WORK.6.SURVEY BENCHMARKS AND CONTROL POINTS SHALL BE MAINTAINED AND PROTECTED FROM DISTURBANCE.7.PROPERTY CORNERS SHALL BE CAREFULLY PROTECTED AT ALL TIMES. PROPERTY MONUMENTS DISTURBED BY THE CONTRACTOR'SOPERATIONS SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.8.ANY ADJACENT PROPERTIES OR ROAD RIGHT-OF-WAYS WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE RESTORED BY THECONTRACTOR. THE COST OF RESTORATION IS CONSIDERED INCIDENTAL AND SHALL BE INCLUDED.9.PUBLIC ROADS SHALL NOT BE FULLY CLOSED TO TRAFFIC AT ANY TIME. ALL INGRESS AND EGRESS TRAFFIC TO THE PROJECT SITE SHALL BELIMITED TO THE CONSTRUCTION ENTRANCE.10.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES, SHALL BID ON THEIR OWN ESTIMATE OF THE WORKREQUIRED, AND SHALL NOT RELY ON THE ENGINEER'S ESTIMATE.11.REQUESTS FOR CLARIFICATION WILL BE INTERPRETED BY THE OWNER/ENGINEER PRIOR TO AWARD OF CONTRACT, AND WHEN NECESSARY,OFFICIAL WRITTEN RESPONSES WILL BE ISSUED. OFFICIAL WRITTEN RESPONSES SHALL BE BINDING TO THE WORK. IN NO WAY SHALLVERBAL DIALOGUE CONSTITUTE OFFICIAL RESPONSE.12.SHOULD ANY DISCREPANCIES BE DISCOVERED BY THE CONTRACTOR AFTER AWARD OF CONTRACT, NOTIFY OWNER/ENGINEER IN WRITINGIMMEDIATELY. CONSTRUCTION OF ITEMS AFFECTED BY THE DISCREPANCIES SHALL NOT COMMENCE OR CONTINUE UNTIL AN OFFICIALWRITTEN RESPONSE IS ISSUED.13.ALL WORK SHALL BE GUARANTEED BY THE CONTRACTOR FOR A MINIMUM PERIOD OF 12 MONTHS FROM THE DATE OF FINALACCEPTANCE. THIS GUARANTEE SHALL INCLUDE ALL DEFECTS IN MATERIALS AND WORKMANSHIP.14.THE CONTRACTOR SHALL INDEMNIFY THE OWNER, THE ENGINEER, AND THE MUNICIPALITY, THEIR AGENTS, ETC., FROM ALL LIABILITYINVOLVED WITH THE CONSTRUCTION, INSTALLATION, AND TESTING OF THE WORK ON THIS PROJECT. DIVISION 32 - EXTERIOR IMPROVEMENTS9.RETARDING, WATER-REDUCING, AND NON-CHLORIDE ACCELERATING ADMIXTURES SHALL BE IN ACCORDANCE WITH SECTION 501 OF WISDOTSTANDARD SPECIFICATIONS AND AASHTO M194.10.LIQUID CURING COMPOUND SHALL BE IN ACCORDANCE WITH SECTION 415 OF WISDOT STANDARD SPECIFICATIONS AND AASHTO M 148.11.CONCRETE FORMS SHALL REMAIN IN PLACE AT LEAST 24 HOURS AFTER CONCRETE INSTALLATION AND SHALL BE CLEANED AFTER EACH USE.CONCRETE FORMS SHALL BE COATED WITH RELEASE AGENT TO ALLOW SEPARATION WITHOUT DAMAGE TO CONCRETE.12.CONSTRUCTION AND CONTRACTION JOINTS SHALL BE IN ACCORDANCE WITH SECTION 415 OF WISDOT STANDARD SPECIFICATIONS. JOINTPATTERN SHALL FOLLOW ARCHITECTURAL PLANS IF AVAILABLE.13.ISOLATION JOINTS SHALL CONSIST OF PREFORMED JOINT FILLER STRIPS ABUTTING CURBING, INLETS, CATCH BASINS, MANHOLES, STRUCTURES,AND OTHER FIXED OBJECTS.14.EDGES OF CONCRETE PAVEMENT, CURBING, SIDEWALK, PATIOS, AND JOINTS SHALL BE TOOLED IN CONCRETE AFTER INITIAL FLOATING WITH ANEDGING TOOL TO A 1/4-INCH RADIUS. REPEAT TOOLING AFTER APPLYING SURFACE FINISHES AND ELIMINATE TOOL MARKS ON SURFACES.15.FINISH, CURE, AND PROTECT CURBING IN ACCORDANCE WITH SECTION 601 OF WISDOT STANDARD SPECIFICATIONS.16.FINISH (LIGHT BROOM), CURE, AND PROTECT SIDEWALK AND PATIOS IN ACCORDANCE WITH SECTION 602 OF WISDOT STANDARDSPECIFICATIONS.17.FINISH (ARTIFICIAL TURF DRAG), CURE, AND PROTECT VEHICULAR PAVEMENT AND PADS IN ACCORDANCE WITH SECTION 415 OF WISDOTSTANDARD SPECIFICATIONS.18.MAINTAIN CONCRETE FREE OF STAINS, DISCOLORATION, DIRT, AND OTHER FOREIGN MATERIAL. SWEEP CONCRETE PRIOR TO SUBSTANTIALCOMPLETION INSPECTION.19.MAXIMUM DIFFERENCE BETWEEN CONCRETE SIDEWALKS AND ADJACENT PAVEMENT SURFACES SHALL NOT EXCEED 1/4-INCH VERTICAL.20.A SLOPE NO GREATER THAN 2% IN ALL DIRECTIONS AT ADA PARKING STALLS AND ADJACENT UNLOADING AREAS IS REQUIRED. NOTIFYENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WORK.21.A SLOPE NO GREATER THAN 5% ALONG THE LENGTH OF THE ACCESSIBLE ROUTE IS REQUIRED. A SLOPE NO GREATER THAN 2% ACROSS THEWIDTH OF THE ACCESSIBLE ROUTE IS REQUIRED. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WORK.22.ALL ACCESSIBLE DOORWAYS REQUIRE AN EXTERIOR LANDING THAT IS A MINIMUM OF 5 FEET BY 5 FEET WITH A SLOPE NO GREATER THAN 2%IN ALL DIRECTIONS. NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCING WORK.23.REMOVE AND REPLACE CONCRETE THAT IS BROKEN, DAMAGED, DEFECTIVE, OR DOES NOT COMPLY WITH THE REQUIREMENTS LISTED ABOVE. 32 17 00 - PAVEMENT MARKING1.WORK SHALL CONSIST OF INSTALLATION OF PARKING LOT STRIPING, DIRECTIONAL ARROWS, AND ACCESSIBLE SYMBOLS.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.PAVEMENT MARKING SHALL BE IN ACCORDANCE WITH SECTION 646 OF WISDOT STANDARD SPECIFICATIONS AND WISDOT APPROVEDPRODUCTS LIST. COLOR SHALL BE WHITE UNLESS NOTED OTHERWISE ON THIS PLAN. MARKINGS SEPARATING OPPOSING TRAFFIC SHALL BEYELLOW.4.ALL PARKING LOT STRIPING SHALL BE 4-INCH WIDTH UNLESS NOTED OTHERWISE ON THIS PLAN.5.BARRICADE WORK AREA DURING INSTALLATION AND UNTIL PAVEMENT MARKING IS DRIED. PROTECT ADJACENT AREAS FROM RECEIVING PAINTOR EPOXY.6.APPLY PAVEMENT MARKING IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS TO PRODUCE MARKINGS AS INDICATED WITH UNIFORM,STRAIGHT EDGES. TEMPLATES SHALL BE PROFESSIONALLY MADE TO INDUSTRY STANDARDS.7.APPLY PAVEMENT MARKING TO CLEAN AND DRY SURFACE, FREE FROM FROST, TO ENSURE PROPER BONDING.8.NOTIFY OWNER OF ANY UNSOUND CONDITIONS PRIOR TO COMMENCING WORK. APPLYING PAVEMENT MARKING CONSTITUTESCONTRACTOR'S ACCEPTANCE OF SURFACE AS SUITABLE FOR INSTALLATION. 32 32 00 - RETAINING WALLS1.WORK SHALL CONSIST OF FURNISHING DETAILED DESIGN, MATERIALS, LABOR, EQUIPMENT, SUPERVISION, AND DIRECTION TO CONSTRUCTRETAINING WALL SYSTEMS IN REASONABLY CLOSE CONFORMITY TO THE LINES, GRADES, AND DIMENSIONS SHOWN ON THIS PLAN. RETAININGWALLS SHOWN ON THIS PLAN ARE FOR GENERAL LOCATION AND MATERIAL REFERENCE ONLY.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.THE CONTRACTOR SHALL PROCURE DETAILED DESIGN CALCULATIONS AND DRAWINGS, PREPARED AND SEALED BY A PROFESSIONAL ENGINEEREXPERIENCED WITH RETAINING WALL DESIGN AND LICENSED IN THE STATE IN WHICH THE RETAINING WALLS ARE TO BE CONSTRUCTED.4.THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SURROUNDING STRUCTURES AND UTILITIES ARE PROTECTED FROM THE EFFECTSOF EXCAVATION AND PROVIDING ANY NECESSARY EXCAVATION SUPPORT.5.THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT CONSTRUCTION ADJACENT TO THE RETAINING WALLS DOES NOT DISTURB OR PLACETEMPORARY LOADS ON THE RETAINING WALLS THAT EXCEED DESIGN LOADS. DIVISION 33 - UTILITIES12.CLEANOUTS AND RISER EXTENSIONS SHALL BE INSTALLED IN ACCORDANCE WITH SPS 382.35 FROM SEWER PIPES TO GROUND SURFACE.LIGHT DUTY LOADING CLASSIFICATION SHALL BE USED IN UNPAVED AREAS. MEDIUM DUTY LOADING CLASSIFICATION SHALL BE USED INPAVED FOOT TRAFFIC AREAS. HEAVY DUTY LOADING CLASSIFICATION SHALL BE USED IN PAVED VEHICULAR TRAFFIC AREAS. FRAMES ANDCOVERS SHALL BE SET FLUSH WITH SURFACE.13.TRACER WIRE SHALL BE GREEN AND INSTALLED IN ACCORDANCE WITH SECTION 2.11.2 OF SSSWCW ON ALL BURIED NON-METALLIC PUBLICSANITARY SEWER PIPE, PRIVATE SANITARY INTERCEPTOR PIPE, AND BUILDING SANITARY SERVICE PIPE. TRACER WIRE SHALL BE INSULATED,SINGLE-CONDUCTOR, 12 GAUGE SOLID COPPER OR COPPER COATED STEEL WIRE, SECURED AT LEAST EVERY 10 FEET AND AT ALL BENDS,WITH ACCESS POINTS AT LEAST EVERY 400 FEET.14.PROPOSED SANITARY SERVICES SHOWN ON THIS PLAN SHALL TERMINATE AT A POINT FIVE (5) FEET FROM THE EXTERIOR BUILDING WALL.15. THE CONTRACTOR SHALL ADJUST ALL MANHOLE RIMS TO FINISHED SURFACE.16. AFTER INSTALLATION OF SANITARY SEWERAGE SYSTEM, CLEAN ALL DEBRIS FROM SYSTEM AND INSPECT FOR DAMAGE. CONDUCT TESTING OFINSTALLED PIPE IN ACCORDANCE WITH SSSWCW. REPAIR ANY DAMAGE AND REPLACE ANY PIPE NOT PASSING TESTING. 33 40 00 - STORMWATER DRAINAGE1.WORK SHALL CONSIST OF INSTALLATION AND TESTING OF THE STORMWATER DRAINAGE SYSTEM AND ALL APPURTENANCES.2.ALL ITEMS SHALL INCLUDE ALL NECESSARY MATERIALS AND LABOR TO COMPLETE THE ITEM IN PLACE.3.ALL PUBLIC STORMWATER DRAINAGE WORK SHALL BE IN ACCORDANCE WITH WISCONSIN ADMINISTRATIVE CODE SPS 382, MUNICIPALITYDEVELOPMENT STANDARDS AND SSSWCW.4.ALL PRIVATE STORMWATER DRAINAGE WORK SHALL BE IN ACCORDANCE WITH WISCONSIN ADMINISTRATIVE CODE SPS 382 ANDMUNICIPALITY DEVELOPMENT STANDARDS.5.REINFORCED CONCRETE PIPE (RCP) AND END SECTIONS SHALL BE IN ACCORDANCE WITH SECTION 8.6.0 OF SSSWCW AND CONFORM TOASTM C76 WITH RUBBER GASKETED JOINTS CONFORMING TO ASTM C443. UNLESS NOTED OTHERWISE, 12-INCH DIAMETER PIPE SHALL BECLASS V, 15-INCH DIAMETER PIPE SHALL BE CLASS IV, AND 18-INCH DIAMETER PIPE AND LARGER SHALL BE CLASS III.6.CORRUGATED METAL PIPE (CMP) AND END SECTIONS SHALL BE 16 GAUGE CONFORMING TO ASTM A760.7.HIGH-DENSITY POLYETHYLENE (HDPE) PIPE SHALL BE ADS N12 WT IB PIPE CONFORMING TO ASTM F2648 WITH WATER TIGHT JOINTSCONFORMING TO ASTM D3212, GASKETS CONFORMING TO ASTM F477 AND FITTINGS CONFORMING TO ASTM F2306.8.POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS SHALL BE SDR 35 CONFORMING TO ASTM D3034 WITH PUSH-ON RUBBER GASKETED JOINTSCONFORMING TO ASTM D3212.9.MANHOLES SHALL BE PRECAST REINFORCED CONCRETE IN ACCORDANCE WITH SECTION 8.39.0 OF SSSWCW AND CONFORM TO ASTM C478.SIZES SHALL BE AS INDICATED AND VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING.10.CATCH BASINS SHALL BE PRECAST REINFORCED CONCRETE IN ACCORDANCE WITH SECTION 3.6.0 OF SSSWCW AND CONFORM TO ASTMC478. SIZES SHALL BE AS INDICATED AND VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING.11.INLETS SHALL BE PRECAST REINFORCED CONCRETE IN ACCORDANCE WITH SECTION 3.6.0 OF SSSWCW AND CONFORM TO ASTM C913. SIZESSHALL BE AS INDICATED AND VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING.12.AREA DRAINS SHALL BE ADS NYLOPLAST AS APPROVED BY THE WISCONSIN DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICESPLUMBING PRODUCTS REGISTER.13.FRAMES AND GRATES SHALL BE AS INDICATED. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING FRAMES AND GRATES ARE COMPATIBLEWITH PRECAST STRUCTURES PRIOR TO ORDERING.14.TRENCH SECTION SHALL BE CLASS B IN ACCORDANCE WITH SECTION 3.2.6 OF SSSWCW. MAXIMUM ALLOWABLE TRENCH WIDTH SHALL BEOUTSIDE DIAMETER OF PIPE PLUS 20 INCHES.15.PIPE BEDDING AND COVER MATERIAL SHALL BE IN ACCORDANCE WITH SECTION 8.43.0 OF SSSWCW. MINIMUM COVER OVER PIPE SHALL BE12 INCHES.16.TRENCH BACKFILL MATERIAL SHALL BE MECHANICALLY COMPACTED GRANULAR BACKFILL IN ACCORDANCE WITH SECTION 8.43.4 OFSSSWCW BENEATH AND WITHIN 5 FEET OF PAVEMENT AREAS, AND SHALL BE SPOIL BACKFILL IN ACCORDANCE WITH SECTION 8.43.5 OFSSSWCW BENEATH GREENSPACE AREAS, UNLESS ALTERNATIVE COMPACTION IS RECOMMENDED IN THE GEOTECHNICAL REPORT OR BY THEGEOTECHNICAL ENGINEER DURING CONSTRUCTION, IN WHICH CASE THE CONTRACTOR IS TO FOLLOW THE RECOMMENDATIONS OF THEGEOTECHNICAL ENGINEER.17.CAUTION MUST BE FOLLOWED REGARDING THE COMPACTION OF ALL UTILITY TRENCHES. FLOODING OF BACKFILL MATERIAL IS NOTALLOWED.18.ALL CONNECTIONS TO EXISTING STORM SEWER PIPES AND STRUCTURES SHALL BE CORED CONNECTIONS, UNLESS NOTED OTHERWISE.19.FLEXIBLE COMPRESSION COUPLINGS SHALL BE USED IN THE CONNECTION OF DISSIMILAR PIPE MATERIALS.20.CLEANOUTS AND RISER EXTENSIONS SHALL BE INSTALLED IN ACCORDANCE WITH SPS 382.35 FROM SEWER PIPES TO GROUND SURFACE.LIGHT DUTY LOADING CLASSIFICATION SHALL BE USED IN UNPAVED AREAS. MEDIUM DUTY LOADING CLASSIFICATION SHALL BE USED INPAVED FOOT TRAFFIC AREAS. HEAVY DUTY LOADING CLASSIFICATION SHALL BE USED IN PAVED VEHICULAR TRAFFIC AREAS. FRAMES ANDCOVERS SHALL BE SET FLUSH WITH SURFACE.21.TRACER WIRE SHALL BE BROWN AND INSTALLED IN ACCORDANCE WITH SECTION 2.11.1 OF SSSWCW ON ALL BURIED NON-METALLIC PUBLICSTORM SEWER PIPE, PRIVATE STORM INTERCEPTOR PIPE, AND BUILDING STORM SERVICE PIPE. TRACER WIRE SHALL BE INSULATED,SINGLE-CONDUCTOR, 12 GAUGE SOLID COPPER OR COPPER COATED STEEL WIRE, SECURED AT LEAST EVERY 10 FEET AND AT ALL BENDS,WITH ACCESS POINTS AT LEAST EVERY 400 FEET.22.FIELD TILE ENCOUNTERED DURING CONSTRUCTION SHALL BE CONNECTED TO THE STORMWATER DRAINAGE SYSTEM. IF THIS CANNOT BEACCOMPLISHED, THEN IT SHALL BE REPAIRED WITH NEW PIPE OF SIMILAR SIZE AND MATERIAL. DOCUMENTATION OF SUCH FIELD TILE SHALLBE PROVIDED TO THE OWNER.23.PROPOSED STORM SERVICES SHOWN ON THIS PLAN SHALL TERMINATE AT A POINT FIVE (5) FEET FROM THE EXTERIOR BUILDING WALL.CONNECTIONS TO DOWNSPOUTS SHALL BE PER DETAILS ON THE BUILDING PLUMBING PLANS. THE EXACT LOCATION OF DOWNSPOUTSSHALL BE PER THE ARCHITECTURAL PLANS.24.THE CONTRACTOR SHALL ADJUST ALL MANHOLE RIMS AND INLETS TO FINISHED SURFACE.25.AFTER INSTALLATION OF STORMWATER DRAINAGE SYSTEM, CLEAN ALL DEBRIS FROM SYSTEM AND INSPECT FOR DAMAGE. REPAIR ANYDAMAGE. COPYRIGHT 2026 10/28/20261:13260116 C600 ANDREW STASIUKEVICIUS, P.E.TJRAJS3 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY SPECIFICATIONS SHEET NUMBER DESIGNED BY: CHECKED BY: JOB NO. DATE: PROJECT MANAGER: R.A. Smith, Inc.C SCALE: DATE DESCRIPTION Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA P:\3260116\Dwg\Sheets\3260116-TS & DT01.dwg, 3260116-TS & DT01 - SPECIFICATIONS, 10/26/2026 8:03:16 PM, Ajs3 N. SHORE DR. N. SHORE DR. EXISTING PLAYGROUND PROPOSEDWARMING HOUSE PROPOSEDPAVILION W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S (6) HL(9) PV6 (3) PV6 (6) SDN(5) HR2 (3) HR2 LAWN STONEMAINTENANCESTRIP STONEMAINTENANCESTRIPLAWN LAWN EXISTING PLAYGROUND 662 662 662 663 663 663 663 CODEQTYCOMMON NAMEBOTANICAL NAMEINSTALLED SIZEROOTSPACINGMATURE SIZE DECIDUOUS SHRUBSSDN6 Nikko Slender DeutziaDeutzia gracilis `Nikko`15" HTCONTSpacing as shown2` x 4`HR28 Invincibelle Limetta® HydrangeaHydrangea arborescens 'NCHA8'18" HTCONTSpacing as shown3.5` x 3.5`HL6 Little Quick Fire® HydrangeaHydrangea paniculata `SMHPLQF`18" HTCONTSpacing as shown4` x 4` ORNAMENTAL GRASSESPV612Apache Rose Switch GrassPanicum virgatum `Apache Rose`1 GAL CONT30" Spacing3` x 2.5` PLANT SCHEDULE COPYRIGHT 2026 KLODE PARK WARMING HOUSEVILLAGE OF WHITEFISH BAY 10/28/20261" = 20'3260116 L100 SITE LANDSCAPE PLAN ANDREW STASIUKEVICIUS, P.E.REWAJS3 SHEET NUMBER Brookfield, WI | Appleton, WI | Madison, WICedarburg, WI | Naperville, IL | Irvine, CA Know what'sbelow.before you dig.Call R N GRAPHIC SCALEFeet 0 4020 P:\3260116\Dwg\Sheets\3260116-LSP01.dwg, L100, 10/26/2026 8:03:29 PM, Ajs3 TO: Whitefish Bay Village Board FROM: Chief Whitaker DATE: November 5, 2026 SUBJECT: Proposed Update to Municipal Code – Chapter 4 – Fire Department The Fire Department recommends approval of the proposed revisions to Chapter 4 of the Whitefish Bay Code. These revisions are part of an ongoing effort with the North Shore municipalities to establish consistent fire prevention ordinances, align local provisions with state requirements, and clarify procedures for property owners, contractors, and Department personnel. Using the standard ordinance template developed through this effort, I prepared proposed revisions to Whitefish Bay’s existing ordinance. The draft has been reviewed by the Village Manager, Building Inspector, and Village Attorney. The principal changes are summarized below: • Alignment of sprinkler and fire detection requirements with state code: The existing ordinance contains automatic fire sprinkler and fire/smoke detection requirements that have been in place for more than two decades. Some of these provisions differ from current state requirements, creating confusion for architects, developers, and property owners. The proposed ordinance removes these separate local requirements and relies on the applicable state requirements. This approach provides a consistent basis for plan review and enforcement while reducing conflicting or duplicative language in the Village Code. • Appeals process – Section 4-7: The proposed ordinance adds language identifying the process for appealing enforcement actions. This provides occupants/owners and other affected parties with a clear procedure for requesting review of a decision. • Inspection, testing and maintenance records – Section 4-8: The proposed ordinance authorizes the Fire Department to use a third-party service to collect and manage inspection, testing, and maintenance records for automatic fire sprinkler systems, commercial kitchen hood systems, fire alarm systems, private fire hydrant systems, and foam systems. Electronic collection would make these records more readily accessible to the Fire Department and support more consistent tracking of required testing and maintenance. It would also provide a common submission process for property owners and service contractors. The current process requires the third-party services to leave paper copies of reports on-site which don’t align with the electronic reporting systems. • Tent permits and inspections – Section 4-12: Adds language requiring a permit and inspection for tents over 400 square feet. This is currently the policy of the Village but is now in the ordinance. • Recovery of hazardous materials response costs – Sections 4-13 and 4-14: Adds language addressing recovery of costs for spills of hazardous substances and materials. • Local specifications for fire safety measures—Sections 4-15, 4-17, and 4-18: The proposed ordinance establishes local requirements and procedures for items already in the State Fire Code that refer to the Authority Having Jurisdiction (fire department) for local procedures: o Fire watch—Section 4-15: Procedures for providing a fire watch when required. o Roof access—Section 4-17: Roof access provisions for newly constructed commercial and multifamily buildings. o Key box systems—Section 4-18: Requirements for key box systems that provide emergency access. Including these provisions in the Village Code gives property owners, architects, developers, and contractors a readily available reference for the Department’s requirements. The proposed revisions provide a clearer and more consistent framework for fire prevention in Whitefish Bay and support the broader effort to standardize ordinances throughout the North Shore. I recommend that the Village Board approve the proposed ordinance. STATE OF WISCONSIN MILWAUKEE COUNTY VILLAGE OF WHITEFISH BAY ORDINANCE NO: 1932 AN ORDINANCE TO REPEAL AND RECREATE CHAPTER 4 OF THE MUNICIPAL CODE IN RELATION TO THE FIRE DEPARTMENT The Village Board of the Village of Whitefish Bay, Milwaukee County, Wisconsin does ordain as follows: Section One: Chapter 4 of the Municipal Code is hereby repealed and recreated as follows: § 4-1. Supervisory Control. The Village jointly owns and operates the North Shore Fire Department pursuant to the amended and restated North Shore Fire Department Agreement dated December 30, 1994, and under authority of the provisions of § 61.65 and 66.0301. The Village Board of the Village of Whitefish Bay shall operate as the Governing Authority in the Village of Whitefish Bay. § 4-2. General Power and Duties of the Fire Chief. A. The Fire Chief of the Fire Department or his/her designees shall have the following duties and powers in addition to those specified in the State Statutes and the State Fire Code (SPS 314). (1) The Fire Chief or his/her designees shall serve as the Authority Having Jurisdiction and be charged with the enforcement and authority to enforce any and all provisions of this chapter. (2) It shall be the duty of the Fire Chief or his/her designees to investigate and to recommend to the Building Inspector and the Village Manager such additional ordinances, or amendments to existing ordinances, as he/she may deem necessary for safeguarding life and property against fire and the dangers associated with fire. (3) It shall be the duty of the Fire Chief and his/her designees to enforce all statutory laws, orders, regulations and ordinances of the State as set forth in this Chapter. (4) The Fire Chief, as a Deputy of the State, shall inspect or cause to be inspected by Fire Department officers or members as designated by the Fire Chief, all public buildings and places of employment as defined in Wis. Stat. §101.01 within the Village for the purposes of ascertaining and causing to be corrected any conditions likely to cause fire, or any violations of any law or ordinance relating to fire hazards or to the prevention of fire and from any other hazard likely to affect the life safety of occupants, the public or emergency personnel at least once in each calendar year provided the interval does not exceed fifteen months pursuant to Wis. Admin. Code § SPS 314.01(13)(b)7. (5) The Fire Chief or his/her designees upon receiving a complaint from a citizen, occupant or owner of a property within the Village of Whitefish Bay, may cause any building or property to be inspected as is deemed necessary and in accordance with this chapter. (6) The Fire Chief or his/her designees shall investigate the origin and cause of fires by which property has been destroyed or damaged in accordance with Wis. Stat. § 165.55(1). (7) The Fire Chief or his/her designees is empowered to close any property, building, or structure and order it vacated at once when the public is exposed to immediate danger. § 4-3. Adoption of Codes. A. All orders, rules and regulations of the Department of Safety and Professional Services, as are set forth in the Wisconsin Administrative Code and from time to time as amended, are hereby adopted. This includes but is not limited to the Commercial Building Code, the Fire Prevention Code, the Electrical Code, and all applicable Administrative Codes not listed. B. In cases of conflict between local, state and national code provisions, the most restrictive provisions shall govern, except as listed by § SPS 361.03(5) Wis. Adm. Code. C. The provisions of this chapter shall not be applied retroactively to building construction or a project that was in conformity with the codes and regulations in effect at the time of the granting of the building permit, however, all buildings are subject t o applicable maintenance, operational and existing building requirements of the Fire Code. D. Owners of buildings with fire protection and detection systems required by prior editions of this Chapter that are no longer required by the current edition of this Chapter may submit a request to remove such systems in writing to the Fire Chief. § 4-4. Right of Entry. A. The Fire Chief or his/her designees may conduct inspections and reinspections of buildings, structures, and premise subject to applicable fire prevention laws and this chapter, to determine compliance and verify correction of violations. B. Except as otherwise authorized by law, such inspections shall be conducted at reasonable times after presentation of official identification and obtaining consent from an owner, occupant, or other person legally authorized to consent to the inspection. Entry and inspection shall remain within the scope of the consent given. C. If consent is refused, withdrawn, or cannot be obtained, the Fire Chief or his/her designees may seek a special inspection warrant under Wis. Stat. §66.0119 or other appropriate judicial authorization. Entry and inspection pursuant to a warrant or court order shall comply with its terms. D. Nothing in this section limits entry or action otherwise permitted by law in response to a fire or other emergency. Warrantless entry and inspection shall be limited in scope and duration to that permitted by the circumstances and applicable law. E. No person shall obstruct or interfere with an inspection lawfully conducted pursuant to consent, a warrant, a court order, or another lawful basis for entry. This section does not prohibit a person from declining or withdrawing consent for entry or inspection where legally entitled to do so. § 4-5. Fire Inspection Correction Order Process. A. Fire inspection Order of Correction, which identifies specific deficiencies in writing to the owner or occupant of a property shall be understood to be an order to correct such deficiencies. B. Documentation of such deficiencies shall be provided to the owner or occupant at the time of inspection whenever possible but no later than five business days after the inspection from which the deficiency was observed. All corrections of violations included in the Order of Correction shall be made prior to the compliance date on the corrective order. C. If the owner or occupant of the building, space, property, or premise cannot be found, such written Order of Correction shall be affixed in a conspicuous place on the entrance door to such building or structure or on the premise. Thereafter a copy of the deficiencies shall be mailed to the owner and the occupant addressed to their last known post office address. No person shall remove such affixed notice without the written consent of the Fire Chief. Any such order shall be complied with by the owner and occupant of such building, structure, property, or premise. § 4-6. Enforcement and Citations. With regard to violations of this Chapter, t he Fire Chief or his/her designees may issue citations to the owner or occupant of any building, space, property or premise for each day an identified violation(s) exists after an Order of Correction is served in accordance with this Chapter. The Fire Department may request that the Village issue a summons and complaint for municipal court or circuit court prosecution. A violation of this Chapter or any condition in violation of this Chapter shall constitute a public nuisance which may be abated, restrained and enjoined by municipal court or circuit court action. § 4-7. Appeals. The Village of Whitefish Bay shall exercise final authority over the Authority Having Jurisdiction in all matters related to local code interpretation and code enforcement. Any orders written under this Chapter shall be served in writing. All orders shall be complied with by the owner or occupant forthwith of such building, structure, property or premise. The owner or occupant may within 5 business days of receipt of any such orders, appeal to the Fire Chief for a review of such order. The Fire Chief shall thereafter as soon as possible file a written decision. Unless such order is revoked or modified by the Fire Chief, it shall remain in full force and be complied within the time fixed in said order. The owner or occupant may then appeal to the Board of Appeals using all processes and procedures necessary. § 4-8. Third Party Inspections and Reporting Systems. The Fire Department may retain a third-party person or entity to collect the records of inspection, testing, and maintenance of automatic fire sprinkler systems, commercial kitchen hood systems, fire alarm systems, private fire hydrant systems and foam systems which shall act as a repository for said records. The designated reporting system may directly charge the qualified service personnel a reasonable fee for these services, which shall not exceed the cost of administering such services. § 4-9. Permits and Fees. The Fire Department shall have the ability and authority to establish, charge and collect fees for items such as plan review and associated inspections and other items as established in accordance with the North Shore Fire Services Agreement. Fees shall be charged, collected and retained by the Fire Department. Plans and permits shall be secured from the Fire Department prior to the start of any new construction, alteration, addition or remodeling work in all commercial buildings and places of employment wi thin the Village. Information on permits and fees is available on the Fire Department website. Municipal buildings, municipal sponsored events, and municipal construction projects shall be exempt from fire department permits and fees. § 4-10. Investigation of Fires. The Fire Chief or his/her designees shall investigate the origin and cause of fires in accordance with Wis. Stat. §165.55(1). If it appears that the fire is of suspicious origin, the Fire Chief, his/her designees or the on -scene commander shall immediately notify the Police Chief for further investigation and collection of any physical evidence. The Fire Department shall file a report of all facts known relating to the origin, cause and circumstances of such fire and other information as may be required. Potentially incendiary fires should be reported to the State Fire Marshal under §165.55(1). § 4-11. False Alarms/Unwanted Alarms. The Village Board may establish a fee for any fire alarm system activation that occurs and is not the result of a potentially hazardous condition. § 4-12. Tents Over 400 Square Feet. A. No tent exceeding 400 square feet in area shall be erected, maintained or used without a permit. B. Tents shall be designed and constructed as flame proofed, located on the site appropriately, and properly maintained. Flame proofing documentation shall be provided at time of inspection. Tents may be required to provide exit and emergency lighting based on occupant load and use. C. Open flame devices for heating or cooking are prohibited from being under the tent. Cooking appliances shall be located no closer than 10 feet to the tent. § 4-13. Hazardous Substances and Materials. A. Every person, firm or corporation using, storing, handling or transporting flammable or combustible liquids, chemicals, gasses or other hazardous materials shall be liable to the Village for the actual cost of labor and materials associated with the use of any specialized extinguishing agent, chemical, neutralizer or similar material or equipment employed to extinguish, confine or clean up any such hazardous material which is involved in any accidental spill or in threat of any fire or accidental spill. B. Upon learning that a prohibited discharge or spill has taken place, all persons with knowledge shall immediately notify the Police and Fire Department of the time and place of the prohibited discharge and the substance discharged, if known. C. Any person who possesses or controls a hazardous material which was discharged or who caused the discharge of a hazardous material shall reimburse the Village for actual and necessary expenses incurred by the Village or its agent to contain, remove or dispose of the hazardous substance or take any other appropriate action which is deemed appropriate under the circumstances. D. Nothing herein shall obligate the Village to perform any of the remedial measures. The Village shall endeavor in all cases to have such remedial measures performed by the spiller, and in default of such performance, shall itself perform such remedial measures only if the exigencies of time and circumstances indicate that the public health, safety and welfare require such intervention. E. No person shall discharge, allow, or cause to be discharged upon or into any public street, alley or public property or onto the ground, surface water, or aquifers, or on any private property, any hazardous material, except in those areas licensed for wast e disposal or landfill activities for hazardous waste and/or hazardous material as identified in this Chapter. F. Any person in violation of this Chapter upon the direction of the Village’s Police Chief, Fire Chief, or public health officials, shall take immediate action to contain, clean up and remove to an approved depository the offending material(s) and restore the site to its original condition. Should any person fail to engage or complete the cleanup/containment requirement, the Village may order the owner or occupant to take the required corrective action or, in default thereof, may on behalf of the Village, without taking bids, do the necessary work with all costs incurred by the Village to be reimbursed by the violator(s). G. Should any prohibited discharge occur that reasonably causes a threat to the life, safety, welfare or health of the public, the Village Manager or the Fire Chief or his/her designees on the scene may order evacuation of the area or take other appropriate protective steps for such period of time as needed. H. When a prohibited discharge has occurred or is reasonably thought to have occurred, access to the site, upon notice to the owner or occupant whether on public or private land, shall be granted to police, fire and health department personnel for the purpose of evaluating the extent of the discharge, monitoring the cleanup and restoration of the site. Notice to the owner or occupant is not required if the delay will result in imminent risk to public health or safety or the environment. § 4-14. Cost Recovery. In addition to any available causes of action under the Wisconsin Spill Statute or federal or common law, t he Village shall have all rights of recovery for costs related to the prevention, control, or extinguishing of any fire, and for subsequent cleanup or remedial action necessary pertaining to any fire, as provided by Wis . Stat. §323.71, which is specifically adopted in its entirety, together with such amendments and reenactments as shall occur subsequent to the enactment of this section. § 4-15. Fire Watch. A. Where required by applicable State Fire Codes, and/or when any fire suppression systems are taken out of service for four or more hours, the owner or occupant shall provide an approved fire watch. The Fire Chief or his/her designees may require a fire watch or other protective measures to the extent authorized by applicable law. B. The owner or occupant shall arrange and pay for the required fire watch. Fire watch personnel, coverage, duties, communications, and records shall be approved by the Fire Chief or his/her designees and comply with applicable code requirements. C. A required fire watch shall continue until the applicable code requirements and conditions of approval have been satisfied. A fire watch does not authorize continued occupancy or operations where evacuation, closure, or discontinuance is required by law. § 4-16. Hot Work. All hot work performed on public buildings and places of employment requires a permit and approval from the fire department prior to the start of any work. Proper safety precautions including a spotter and a readily accessible extinguishing device at the w ork location must be in place. Work may include but is not limited to: cutting and welding, open flame tar kettles, roof welding and seaming. § 4-17. Roof Access. In every newly constructed commercial or multi -family building and structure there shall be provided a permanent means of access to the attic or roof. All attics and roofs of commercial and multi-family buildings and structures shall be accessible by means of a stairway or scuttle. If the scuttle opening in the attic floor is provided in lieu of a stairway, the same shall be located in a public hallway situated below the attic floor and shall be provided with an approved fixed ladder or balanced stairway to such opening, securely anchored in place. Roof and ceiling scuttles of commercial and multi -family buildings and structures shall be at least two feet by three feet, and roof scuttles shall be located immediately above the attic stairway or ceiling scuttle or in a location approved by the Fire Chief or Building Inspector. § 4-18. Key Box System. A. Commercial and multi-family buildings with monitored fire alarm systems shall install a key box system, as specified by the Fire Department, except in any building which has personnel on duty 24 hours a day, seven days a week to allow immediate entry of emergency personnel. The key box shall be installed and building keys provided, at the owner’s or occupant’s expense, at such locations as designated by the Fire Department. B. Properties with restricted vehicle ingress and egress such as gates may be required to install a key box system to allow for ingress and egress of emergency response vehicles. § 4-19. Injunctive Relief. The violation of this Chapter or any condition in violation of this Chapter shall constitute a public nuisance which may be abated, restrained and enjoined by court action at the suit of the Village. § 4-20. Definitions. As used in this Chapter, the following terms shall have the meanings indicated: FIRE DEPARTMENT — That North Shore Fire Department created by an intergovernmental cooperation agreement for fire and emergency services, which Department is jointly owned and operated by the Villages of Bayside, Brown Deer, Fox Point, River Hills, Shorewood, Whitefish Bay, and the City of Glendale, pursuant to the amended and restated North Shore Fire Department Agreement dated December 30, 1994, and under authority of the provisions of § 66.0301, Wis. Stat. FIRE CHIEF — The highest-ranking officer in charge of the North Shore Fire Department, as established pursuant to the intergovernmental cooperation agreement under § 66.0301, Wis. Stat., and responsible for the administration, management, and operation of the Department. The Fire Chief shall serve as the chief officer of the Department and may designate authorized representatives to carry out duties and responsibilities as permitted by applicable law. GOVERNING AUTHORITY — The Village Board of the Village of Whitefish Bay, WI. ORDER OF CORRECTION — A written directive issued by the Fire Chief or his/her designees identifying one or more violations of this chapter or applicable fire -prevention requirements and directing the responsible owner or occupant to correct each violation within a specified period. Section Two: All ordinances or parts of ordinances conflicting with the provisions of this Ordinance are hereby and to such extent repealed. Section Three: This Ordinance shall take effect and be in force from and after its passage and posting. PASSED AND ADOPTED by the Village Board of Trustees of the Village of Whitefish Bay this 16th day of November, 2026. VILLAGE OF WHITEFISH BAY ________________________ Kevin Buckley, Village President Jaimie Krueger, Village Clerk VILLAGE BOARD MEETING STAFF REPORT REPORT TO: President Kevin Buckley & Village Board of Trustees REPORT FROM: Patrick Whitaker, Chief of Police DATE: November 16, 2026 AGENDA ITEM: State of Wisconsin Grant Funding to Implement Peregrine Technologies Software for Law Enforcement ACTION REQUESTED: _Ordinance __Resolution __ Motion __ Direction to Staff BACKGROUND: The Wisconsin Department of Justice is offering one-time funding for a 2-year period to assist eligible agencies in Milwaukee, Ozaukee, Racine, Washington, and Waukesha counties with acquiring platforms that improve access to law enforcement information and coordination among participating agencies. The Department applied for the grant and was awarded $81,000 which will cover all costs related to implementation, training, and usage Peregrine Technologies software for two years. Law enforcement agencies use different records management systems, which can limit their ability to access information maintained by other jurisdictions. Officers may need to contact another agency and request a separate records search to obtain information relevant to an investigation. The Peregrine Technologies platform would allow authorized personnel to search available information across participating agencies and systems. This capability could reduce time spent requesting records, help identify connections between investigations, and provide officers with more comprehensive information to support investigations and officer safety. The Department would determine which information is shared and with which participating agencies through memoranda of understanding. Grant requirements include secure, permission-controlled sharing; restrictions on access based on roles, responsibilities, and investigative needs; and detailed audit logs of user interactions with data. Platforms must also support integration with existing authentication systems, operate in an environment compliant with Criminal Justice Information Services standards, and preserve agency rights to its data. Participating agencies are responsible for certifying that their selected platform meets the grant’s statutory requirements. The Department selected Peregrine Technologies based on its experience integrating with our current records management system and its selection by other grant-funded agencies in the region. Participation on a common platform would support information sharing among agencies, subject to applicable agreements and access permissions. In addition to supporting information sharing among participating agencies, the Peregrine platform would help Department personnel search and analyze information maintained in our existing records management system. Potential uses include identifying crime patterns, evaluating calls for service, directing patrol resources, and preparing departmental reports. These capabilities could reduce time spent compiling information manually and provide clearer information about police activity and community needs in Whitefish Bay. The grant would cover the $80,200 agreement cost for the initial two-year term, with no Village contribution required. Before the agreement expires, the Department would evaluate the platform’s effectiveness, including time saved, assistance provided to investigations, and improvements in reporting. Any proposal to continue the platform using Village funds would be presented to the Village Board with anticipated costs for consideration through the budget process. RECOMMENDED ACTION BY VILLAGE BOARD: To accept the Wisconsin Department of Justice Law Enforcement Grant in the amount of $81,000 and approve the two-year agreement with Peregrine Technologies at a total cost of $80,200, payable from grant funds, subject to Village Attorney approval of the final agreement. ATTACHMENTS 1. 2025 Wisconsin Act 58 2. Peregrine Standard Order Form 3. DOJ Law Enforcement Grant Award Date of enactment: December 9, 2025 2025 Senate Bill 279 Date of publication*: December 10, 2025 2025 WISCONSIN ACT 58 AN A CT to create 165.981 of the statutes; relating to: grants to law enforcement agencies for data-sharing platforms. The people of the state of Wisconsin, represented in sen- ate and assembly, do enact as follows: SECTION 1 . 165.981 of the statutes is created to read: 165.981 Grants for data-sharing platforms for law enforcement. (1) In this section, “law enforcement agency” has the meaning given in s. 165.98 (1). (2) The department of justice shall award grants to law enforcement agencies for the acquisition of a data- sharing platform. (3) A law enforcement agency that receives a grant under sub. (2) shall use the grant funds to acquire a data- sharing platform to which all of the following apply: (a) The platform is able to integrate data from com- mon law enforcement systems on a real-time basis. (b) The platform is able to identify and eliminate re- dundant records in law enforcement systems. (c) The platform is able to provide advanced, con- figurable search, analytics, and visualization capabili- ties that support common mission needs for law enforcement. (d) The platform allows law enforcement agencies to appropriately restrict access to information by data type, organization, roles, responsibilities, individual in- vestigations, and other parameters. (e) The platform allows for secure, permission-con- trolled data integration and sharing among participating law enforcement agencies. (f) The platform is able to be accessed on various devices commonly used by law enforcement agencies. (g) The platform has a demonstrated record of meet- ing or exceeding similar mission needs and the ability to reach full operational capability within 90 days of initiation. (h) The platform allows for integration with existing law enforcement agency identity and access manage- ment solutions, such as single-sign-on and multifactor authentication. (i) The platform is hosted in a secure environment that is compliant with Criminal Justice Information Ser- vices standards and that can scale to accommodate vol- ume and velocity of law enforcement data needs. (j) The platform is able to provide granular audit logging for all user interactions with data. (k) The platform is able to provide an open, interop- erable architecture and business terms that ensure the law enforcement agency retains all rights to agency data. (4) No grants may be awarded under this section af- ter June 30, 2027. * Section 991.11, WISCONSIN STATUTES: Effective date of acts. “Every act and every portion of an act enacted by the legislature over the gov- ernor's partial veto which does not expressly prescribe the time when it takes effect shall take effect on the day after its date of publication.” Josh Kaul Attorney General Post Office Box 7857 Madison, WI 53707-7857 www.wisdoj.gov STATE OF WISCONSIN DEPARTMENT OF JUSTICE Office of the Attorney General October 15, 2026 SENT VIA EMAIL (pwhitaker@whitefishbaywi.gov) Chief Patrick Whitaker Whitefish Bay Police Department Re: Law Enforcement Data-Sharing Grant Dear Chief Whitaker: The Wisconsin Department of Justice (DOJ), Division of Law Enforcement Services (DLES) has approved a grant award to Whitefish Bay Police Department in the amount of $81,000. These funds are from DOJ’s Law Enforcement Data-Sharing grant and support Whitefish Bay Police Department’s Program. To accept this award, please have the authorized signing official and project director sign and initial where applicable in the Grant Award, and Attachments A and B. Please return a copy of the entire award with the required signatures to DLES within 30 days. A copy should be maintained for your records. Funds cannot be released until the signed award document is received. If you have any questions regarding this grant, please contact Lara Kenny, Director of the Bureau of Justice Programs, at Lara.Kenny@wisdoj.gov. I appreciate the valuable service your agency provides to your community. Congratulations on the receipt of this grant award. Sincerely, Joshua L. Kaul Attorney General Enclosures LAW ENFORCEMENT DATA-SHARING GRANT AWARD The Wisconsin Department of Justice (DOJ) hereby awards to Whitefish Bay Police Department, (hereinafter referred to as the Grantee), the amount of $81,000 for programs or projects pursuant to 2025 Wisconsin Act 58 (Wis. Stat. § 165.981). This grant may be used until May 31, 2027, for the program consistent with the budget in Attachment A and the general conditions, terms, and assurances in Attachment B. The Grantee shall administer the programs or projects for which this grant is awarded in accordance with the applicable rules, regulations, and conditions of the Wisconsin Department of Justice. The submitted Act 58 Data-Sharing Grant Application is hereby incorporated as reference into this award. This grant shall become effective, and funds may be obligated (unless otherwise specified in Attachments A and B) when the Grantee signs and returns one copy of this grant award to the Wisconsin Department of Justice. BY: ___________________________________ Joshua L. Kaul Attorney General 10/15/2026 Date The (Grantee), Whitefish Bay Police Department, hereby signifies its acceptance of the above-described grant award on the terms and conditions set forth above or incorporated by reference therein. GRANTEE: Whitefish Bay Police Department BY: _________________________________________ NAME: Kevin Buckley TITLE: Village Board President _________________ Date LAW ENFORCEMENT DATA-SHARING GRANT PROGRAM Budget - Attachment A Grantee: Whitefish Bay Police Department Grant Period: October 1, 2026 - May 31, 2027 State ID #: 455.212 APPROVED LAW ENFORCEMENT DATA-SHARING GRANT BUDGET The approved budget may be used to pay for a contract with a vendor who will provide a data-sharing system that meets the requirements listed in 2025 Wisconsin Act 58 (Wis. Stat. § 165.981). Any cost exceeding this award amount is the responsibility of the grantee. Reimbursement requests must include an invoice from the vendor and a copy of the signed grant award document. The documents must be submitted via email to dojacctspayable@wisdoj.gov and Lara.Kenny@wisdoj.gov. Signing Official Initials: Project Director Initials: STATE FUNDS $81,000 LAW ENFORCEMENT DATA-SHARING GRANT PROGRAM General Award Conditions, Terms, and Assurances - Attachment B Whitefish Bay Police Department agrees by acceptance of this grant award to the following general award conditions: Allowable Expenses/Activities • The Grantee shall make expenditures with project funds only for items contained in the approved project budget. Disbursements • These one-time grant funds will be disbursed upon submission of paid invoice for contractual service. • Grantee is responsible for maintaining accurate accounting records that support expenditures for this grant project. Contractual/Consultants/Subawards • All procurement transactions, whether negotiated or competitively bid and without regard to dollar value, shall be conducted in a manner to provide maximum open and free competition. General • To be allowable under a grant program, costs must be paid or obligated for services provided in accordance with 2025 Wisconsin Act 58 (Wis. Stat. § 165.981). Whitefish Bay Police Department agrees by acceptance of this grant award to the following terms and assurances: A. The Grantee assures that it will comply with all provisions of the program established by DOJ, in accordance with 2025 Wisconsin Act 58 (Wis. Stat. § 165.981). B. The Grantee assures that the funds received will only be expended for the purposes set forth in Act 58, the guidance from DOJ, and the Act 58 Data-Sharing Grant Application , and in accordance with all applicable laws, regulations, policies, and procedures of the State of Wisconsin. C. The Grantee agrees to perform and accomplish the purposes and activities outlined in 2025 Wisconsin Act 58 (Wis. Stat. § 165.981). D. DOJ reserves the right upon advance notice to the Grantee, to make reasonable adjustments, revisions and modifications to the amount, terms, and scope of this agreement as is deemed necessary. E. The Grantee agrees to maintain adequate financial procedures and accounting records and to submit required financial and other information and data requested by DOJ. F. All records and reports shall be maintained for a minimum of six years after completion of the project, and representatives of DOJ shall have the right to inspect grant records and programs. G. The Grantee agrees to indemnify without waiving any statutory or common law immunities or limitations on liability, and save and hold harmless DOJ, its agents and employees, from any and all claims or causes of action arising from the performance of this grant by the Grantee, its agents, employees or delegates. This clause shall not be construed to bar any legal remedies the Grantee may have for DOJ’s failure to fulfill its obligations pursuant to this grant. H. The Grantee shall conduct all procurement transactions, regardless of whether by sealed bids or by negotiation and regardless of dollar value of the transactions, in a manner that provides open and free competition. ACKNOWLEDGEMENT The materials referenced above were received and reviewed by the appropriate members of this organization. I understand that this grant is awarded subject to our compliance with requirements and restrictions set forth in this contract and defined under 2025 Wisconsin Act 58 (Wis. Stat. § 165.981). , PROJECT DIRECTOR DATE PATRICK WHITAKER , SIGNING OFFICIAL DATE KEVIN BUCKLEY Copyright 2022, Peregrine Technologies, Inc. All rights reserved. Copyright extends to all pages of this document. PEREGRINE CUSTOMER ORDER FORM & SCOPE OF SERVICES Customer Information Customer Name: Village of Whitefish Bay Police Department Contact: Patrick Whitaker Address: 5300 N Marlborough Dr., Whitefish Bay, WI 53217 Phone: 414-962-3830 Email: p.whitaker@wfbvillage.gov Email (For Invoice Receipt): Peregrine Services Pricing Expiration: The following fee schedule is available to the Customer if Order Form is signed on or before December 30, 2026. Effective Date: January 1, 2027 Initial Term: From the Effective Date through December 31, 2028 (“Initial Term”). Description: Annual license subscription to the Peregrine platform. Service Fee: Unless otherwise terminated as set forth in the Terms and Conditions, Customer shall pay Peregrine a service fee for the Initial Term as follows: a. $80,200 within 30 days of the Effective Date It is acknowledged that payment of this service fee is contingent upon the full appropriation and availability of funds from the State of Wisconsin. No payment is due and Customer is not obligated to pay any service fee in the event of non-appropriation of funds from the State of Wisconsin. Payment of the amounts above shall be made within 30 days after actual receipt of funds by the Customer from the State of Wisconsin. No legal or financial obligation shall arise on the part of the Customer unless and until such full appropriation and availability of funds have occurred, and Peregrine has received written notice confirming the availability of funds. Peregrine may not terminate services for a lack of appropriated funds unless and until the State of Wisconsin has determined that the Customer will not receive any funding for the services provided. However, Peregrine shall have no obligation to perform, deliver software access, provide onboarding, training, or support services, or otherwise incur costs under this Agreement until such written confirmation of the availability of funds has been received. Peregrine shall not be liable for any delay, suspension, or failure to perform caused by the Customer’s failure to appropriate, allocate, or certify the availability of funds. Users: Customer may allow an unlimited number of employees of the Village of Whitefish Bay Police Department to access and use the Service, provided that such access is solely for Customer’s internal business purposes and not for the benefit of any third-party. Ancillary Services: In Accordance with Section 2.2 of the Terms and Conditions, Peregrine will provide Ancillary Services as part of the Service, including implementation, configuration, initial data October 22, 2026 2 Peregrine services are provided subject to the terms set forth above on this Order Form together with the attached terms and conditions (the “ Terms and Conditions ,” and together with this Order Form, the “Agreement”). Any capitalized term used in this Order Form but not defined herein shall have the meaning ascribed to it in the Terms and Conditions. By signing this Order Form, Peregrine and Customer each agree to the terms and conditions set forth in this Agreement. In the event of any conflict between this Order Form and the Terms and Conditions, the terms of this Order Form shall govern to the extent of such conflict. This Order Form may be executed in counterparts (which may be delivered by electronic mail of .pdf files), each of which counterparts, when so executed and delivered, shall be deemed to be an original, and all of which counterparts, taken together, shall constitute one and the same instrument. Peregrine Customer By: By: Name: Adam Butler Name: Title: Director of Contracts Title: Date Signed: Date Signed: Attest: Name: integrations, onboarding, and training necessary to enable Customer’s use of the Service. Peregrine will provide Customer with an introductory training session that includes an overview of the Service, background on accessible data sources as of the Effect ive Date, and an introduction to the analytic capabilities of the Service. Any services requested by Customer that are outside the scope of the Ancillary Services described herein (“Additional Services”), including with respect to data integrations that are not set forth in this Order Form, shall be subject to mutual written agreement of the parties, including with respect to fees, and will be set forth in a separate statement of work. Data Integrations: The Customer Data sources and systems that Peregrine will integrate with the Service for Customer are: • ProPhoenix CAD; • ProPhoenix RMS; and • Axon Digital Evidence Management System. The Customer is responsible for any third-party API or data access fees. October 22, 2026 3 Peregrine Customer Terms and Conditions These Peregrine Customer Terms and Conditions govern the provision of the services described on the attached Order Form (“Order Form”) by Peregrine Technologies, Inc. (“Peregrine”) to Village of Whitefish Bay Police Department (“Customer”). By executing an Order Form with Peregrine, Customer agrees to be bound by these Terms and Conditions. 1. Definitions. “Ancillary Services” has the meaning specified in Section 2.2. “Authorized Sharing” means the disclosure of Customer Data to one or more third parties solely to support Customer’s operational needs, as expressly permitted in a separate written agreement between Peregrine and Customer. Any such sharing will occur only as specifically auth orized by Customer and implemented by deliberate configuration within Peregrine’s platform. Customer Data will not otherwise be disclosed to any third party. “CJIS Security Policy ” means the FBI CJIS Security Policy document as published by the FBI CJIS Information Security Officer, currently located at https://www.fbi.gov/services/cjis/cjis -security-policy- resource-center. “Client-Side Software” means any software in source or object code form that Peregrine makes available for use in connection with the Service, including Peregrine’s mobile application(s). “Criminal Justice Information Services Division ” or “CJIS ” means the FBI division responsible for the collection, warehousing, and timely dissemination of relevant criminal justice information to the FBI and to qualified law enforcement, criminal justice, civilian, academic, employment and licensing agencies. “Customer Data ” means any of Customer’s data, information, documents or electronic files that are provided to Peregrine via the Service or otherwise in connection with this Agreement, including any databases Customer procures from third party vendors for Peregrine’s integration with the Service; provided that, for purposes of clarity, Customer Data as defined herein does not include Usage Analytics. “Customer-Owned or Licensed Products” means software, services, databases, or systems owned by Customer or licensed by Customer from a third party, which interoperate with the Service. “Documentation” means the materials supplied by Peregrine hereunder, in any media, including any and all installer’s, operator’s and user’s manuals, training materials, guides, functional or technical specifications or other materials for use in conjunction with the Service. “Embedded Components” means third-party technologies incorporated into Peregrine’s platform and provided as part of the Service. “Personal Information” means any information that, individually or in combination, does or can identify a specific individual or by or from which a specific individual may be identified, contacted, or located, including without limitation all data considered “personal data”, “personally identifiable information”, or something similar under applicable laws, rules, or regulations relating to data privacy. “Peregrine Technology” means (a) the Peregrine name, the Peregrine logo, and other trademarks and service marks; (b) audio and visual information, documents, software and other works of authorship, including training materials; (c) other technology included in the Service, including Client -Side Software, graphical user interfaces, workflows, products, processes, algorithms, know -how and other trade secrets, techniques, designs, inventions and other tangible or intangible technical material or information provided by Peregrine under this Agreement; and (d) the work product or other results of Ancillary Services . Peregrine Technology does not include Embedded Components. “Service” means Peregrine’s proprietary platform, consisting of a hosted web- based interface and the Client-Side Software. “SOW” has the meaning specified in Section 2.2. October 22, 2026 4 “Third-Party Data” means data or content made available through the Service that originates from a source other than Peregrine or Customer, and that Peregrine is authorized to provide access to as part of the Service. Third-Party Data does not include Customer Data or data accessed through Customer-Owned or Licensed Products. “Usage Analytics” means data relating to the operation, support, and/or Customer’s use of the Service, including logs, telemetry, operational metrics, performance data, and other technical information generated in connection with such use. Usage Analytics does not include Customer Data but may be derived from Customer’s interaction with the Service. Peregrine owns all right, title, and interest in Usage Analytics. Peregrine may use Usage Analytics solely for internal business purposes to operate, maintain, and improve the Service, to develop new features, and for security and compliance uses. “Users” means the individuals authorized by Customer to use the Service in accordance with the terms in the Order Form (including number and type of individuals who may access the Service) and that have been supplied user identifications and passwords by Peregrine. 2. Provision of the Service and Additional Services. 2.1. License Grant . During the Term and subject to the terms and conditions of this Agreement, including payment of the fees set forth on the Order Form, Peregrine shall license the Service to Customer on a nonexclusive, non-transferable, and non-sublicensable basis and permit Customer to (a) access and use the Service for Customer’s internal business purposes and (b) download, install and use any Client - Side Software for such purposes. 2.2. Ancillary Services . Peregrine will provide Ancillary Services as part of Customer’s use of the Service, as described in the Order Form. Unless otherwise expressly stated in the Order Form, Ancillary Services are included in the fees set forth therein and do not require a separate statement of work. From time to time, Customer may request, and Peregrine may agree to provide, services that are outside the scope of Ancillary Services (“Additional Services”). Any such Additional Services will be described in a separate written statement of work executed by the parties (each, an “ SOW”), which will set forth the applicable scope, assumptions, and fees. To the extent any Ancillary Services or Additional Services result in any software code or other tangible work product (“ Work Product ”), all such Work Product will remain owned solely and exclusively by Peregrine and may be used by Customer solely in connection with Customer’s authorized use of the Service under this Agreement. Customer shall permit Peregrine access to Customer’s offices and any other facilities necessary for Peregrine to provide Ancillary Services and any Additional Services, as applicable, provided that Peregrine shall comply with Customer’s standard security requirements, including escort requirements and background checks, as applicable. 2.3. Access and Policies. Customer will permit Peregrine access to Customer’s offices and any other facilities necessary for Peregrine to provide the Service, provided that Peregrine shall comply with Customer’s standard security requirements, including escort requirements and background checks, as applicable, Technical Support, and any Ancillary Services. Peregrine agrees to, and cause its personnel to, abide by Customer’s facilities access and use policies as provided by Customer to Peregrine in writing in advance of any on- site visits. Customer will also permit and enable Peregrine personnel to have offsite access to Customer Data and the Customer’s production platform for the Service in order to provide the Service, Technical Support , and Ancillary Services (and, if applicable, any Additional Services) , provided that Peregrine shall comply with Customer’s standard security requirements. Peregrine agrees to comply with the CJIS Security Policy in connection with its access to Customer Data, including CJIS -defined policies for remote access. 2.4. Compliance with Applicable Laws. Each party and its agents shall comply with all laws applicable to the performance or receipt, as applicable, of the Service hereunder. October 22, 2026 5 2.5. Licenses and Permits . As applicable, Peregrine and its employees, agents, and any subcontractors have, and will maintain at their sole cost and expense, all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions . In addition to the foregoing, Peregrine and any subcontractors shall obtain and maintain during the term of this Agreement valid business licenses from Customer as required by law. 2.6. Nondiscrimination and Equal Opportunity . Peregrine shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, genetic information, marital status, sex, sexual orientation, gender or gender identity, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Peregrine under this Agreement. Peregrine shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Peregrine thereby. 2.7. Suspension. Notwithstanding anything to the contrary in this Agreement, Peregrine may temporarily suspend Customer’s and any User’s access to any portion or all of the Service if: (a) Peregrine reasonably determines that (i) there is a threat or attack on the Servic e; (ii) Customer’s or any User’s use of the Service disrupts or poses a security risk to the Service or to any other customer or vendor of Peregrine; (iii) Customer, or any User, is using the Service for fraudulent or illegal activities; (iv) Customer’s use of the Service is in violation of applicable law or the usage restrictions set forth herein ; (v) subject to applicable law, Customer has ceased to continue its business in the ordinary course, made an assignment for the benefit of creditors or similar disposition of its assets, or become the subject of any bankruptcy, reorganization, liquidation, dissolution, or similar proceeding; (v i) Peregrine’s provision of the Service to Customer or any User is prohibited by applicable law; or (vi i) any Customer Data submitted, posted, or otherwise transmitted by or on behalf of Customer or an User through the Service may infringe or otherwise violate any third party’s intellectual property or other rights; (b) any vendor of Peregrine has suspended or terminated Peregrine’s access to or use of any Third Party Products required to enable Customer to access the Service; or (c) if Customer fails to pay any undisputed fees when due (any such suspension described in subclauses (a), (b), or (c), a “Service Suspension”). Peregrine shall use commercially reasonable efforts to provide written notice of any Service Suspension to Customer and to provide updates regarding resumption of access to the Service following any Service Suspension. Peregrine shall use commercially reasonable efforts to resume providing access to the Service as soon as reasonably possible after the event giving rise to the Service Suspension is cured. Peregrine will have no liability for any damage, liabilities, losses (including any loss of data or profits), or any other consequences that Customer or any User may incur as a result of a Service Suspension. 2.8. Customer-Owned or Licensed Products . The Service may interoperate with Customer-Owned or Licensed Products. Customer is solely responsible for obtaining and maintaining all necessary rights to Customer-Owned or Licensed Products, and Peregrine is not responsible for their availability, performance, or compliance. Customer represents and warrants that it has all necessary rights, power, and authority to authorize Peregrine to access and transmit Customer Data from Customer -Owned or Licensed Products into the Service. Customer’s use of Customer -Owned or Licensed Products remains subject to the applicable terms and conditions for those products. The availability of integrations with Customer -Owned or Licensed Products may depend on t he continued support of those products and their interfaces by the applicable third-party provider. Peregrine will make commercially reasonable efforts to maintain integrations but is not responsible for changes to or discontinuation of such products or th eir interfaces, or for any unavailability, interruption, or loss of data to the extent caused by Customer-Owned or Licensed Products. 2.9. Embedded Components. The Service may include Embedded Components. Embedded Components are provided as part of the Service, do not require Customer to obtain separate licenses, and are subject to the same security standards and controls as the rest of the platform. Embedded Components do not create any independent right or mechanism for sharing Customer Data with third parties. 2.10. Open Source Components . Certain aspects of the Service, such as the Client -Side Software, may contain or be distributed with open source software code or libraries (“ Open Source Components”). Peregrine will provide a list of Open Source Components for a particular version of any distributed portion October 22, 2026 6 of the Service, such as the Client -Side Software, on Customer’s request. To the extent required by the license applicable to such Open Source Components: (a) Peregrine will use reasonable efforts to deliver to Customer any notices or other materials (such as source code); and (b) the terms of such licenses will apply to such Open Source Components in lieu of the terms of this Agreement. To the extent the terms of such licenses prohibit any of the restrictions in this Agreement with respect to any particular Open Source Component, such restrictions will not apply to such Open Source Component. To the extent the terms of such licenses require Peregrine to make an offer to provide source code or related information in connection with the Open Source Component, such offer is hereby made. For purposes of clarity, Open Source Components are Third Party Products. 3. Customer Responsibilities. 3.1. Generally. Customer is responsible for all activities that occur under User accounts. Customer also shall: (a) ensure it has all rights necessary for Peregrine to integrate the Customer Data with the Service; (b) have sole responsibility for the accuracy, quality, integrity, legality, reliability, and appropriateness of all Customer Data; (c) prevent unauthorized access to, or use of, the Service, and notify Peregrine immediately of any unauthorized access or use; (d) ensure each User has its own unique account on the Service and that Users do not share their account credentials with one another or any third party; and ( e) comply with all applicable laws in using the Service. Customer agrees to provide its Users with the applications necessary to run the Service as set forth in the Documentation. 3.2. Use Restrictions. Customer shall not use the Service for any purposes beyond the scope of access granted under this Agreement or in violation of applicable law. Without limiting the generality of the foregoing, Customer shall not, and shall ensure Users do not: (a) license, sublicense, sell, resell, rent, lease, transfer, assign, distribute, time share or otherwise commercially exploit or make the Service available to any third party; (b) send spam or otherwise duplicative or unsolicited messages via the Service; (c) send or store infringing or unlawful material; (d) send or store material containing software viruses, worms, Trojan horses or other harmful computer code, files, scripts, agents or programs; (e) interfere with or disrupt the integrity or performance of the Service or the data contained therein; (f) attempt to gain unauthorized access to the Service or its related systems or networks; (g) copy, modify, or create derivative works based upon the Service or any component thereof; (h) reverse engineer, disassemble, decompile, decode, adapt, or otherwise attempt to derive or gain access to any software component of the Service or any component thereof; (i) use the Service in any manner or for any purpose that infringes, misappropriates, or otherwise violates any intellectual property or other right of any third party or that violates any applicable law; (j) access or use the Service for purposes of competitive analysis of Peregrine or the Service, the development, provision, or use of a competing service or product, or any other purpose that is to Peregrine’s detriment or commercial disadvantage; or (k) input, upload, transmit, or otherwise provide to or through the Service any information or materials, including Customer Data, that are unlawful or injurious in any way. 3.3. CJIS Requirements. Customer certifies that it and its Users will comply with the following CJIS requirements: (a) Customer agrees to use training, policy and procedures to ensure Users use proper handling, processing, storing and communication protocols for Customer Data an d any Third Party Data; (b) Customer agrees to protect the Service and any Third Party Data by monitoring and auditing staff user activity to ensure that it is only within the purview of system application development, system maintenance and the support ro les assigned; (c) Customer will only provide access to the Service and any Third Party Data through Customer -managed role-based access and applied sharing rules configured by Customer; (d) Customer agrees to create and retain activity transaction logs to enable auditing by Peregrine staff, CJIS and any Third Party Data owners; (e) Customer agrees to perform independent employment background screening for its staff at Customer’s own expense; and (f) Customer agrees to reinforce staff policies for creating Us er accounts with only one Customer domain email address for each User, with exceptions only as granted in writing by Peregrine. 3.4. Operation Restrictions. Under certain circumstances, it may be dangerous to operate a moving vehicle while attempting to operate a laptop, mobile device or other touch screen and any of their applications. Customer agrees that the Users will be instructed to only utilize the int erface for the Service at times when it is safe to do so. Peregrine is not liable for any accident caused by a result of distraction such as from viewing the screen while operating a moving vehicle. October 22, 2026 7 3.5. Access and Policies Timely and sufficient access is essential to Peregrine’s ability to deliver the Service. Customer will provide Peregrine with the access reasonably necessary to deliver the Service and any Ancillary Services, including access to designated systems and environments as agreed by the parties. Such access may include remote access where agreed by the parties. Peregrine’s obligations under this Agreement are conditioned on Customer providing such access, and Peregrine will not be liable for delays or failures in performance to the extent Customer does not do so. Any onsite access to Customer facilities will be subject to Customer’s standard security requirements, including escort requirements and background checks where applicable. Peregrine personnel accessing Customer systems or facilities will comply with Customer’s reasonable security and conduct policies of general applicability. 3.6. Customer Logo. Customer grants Peregrine the right to use Customer’s name and logo in Peregrine’s marketing materials, website, and customer lists to identify Customer as a user of the Service. 3.7. Feedback. If Customer or any of its employees or contractors sends or transmits any communications or materials to Peregrine by mail, email, telephone, or otherwise, suggesting or recommending changes to the Service, including without limitation, new features or f unctionality relating thereto, or any comments, questions, suggestions, or the like (“ Feedback”), Peregrine is free to use such Feedback irrespective of any other obligation or limitation between the parties governing such Feedback. 3.8. Customer’s Use of the Service. Customer acknowledges that the Service, and/or any Customer Data or Customer-Owned or Licensed Products integrated into the Service, may contain errors, omissions, or incomplete information, Customer remains solely responsible for independently verifying all information and all decisions and actions taken based on information generated by the Service. 4. Fees & Payment. 4.1. Fees. Customer shall pay the fees for the Service as specified in the Order Form and in any SOWs. All fees are non-refundable except to the extent otherwise expressly set forth in this Agreement. 4.2. Payment Terms. Except as set forth on the Order Form, Customer shall pay all fees within thirty (30) days of Peregrine issuing an invoice. 4.3. Taxes. Unless otherwise provided herein, Peregrine’s fees do not include any local, state, federal or foreign taxes, levies or duties of any nature (“ Taxes”). Customer is responsible for paying all Taxes, excluding only taxes based on Peregrine’s income. If Peregrine has the legal obligation to pay or collect Taxes for which Customer is responsible under this section, the appropriate amount shall be invoiced to and paid by Customer unless Customer provides Peregrine with a valid tax exemption certificate authorized by the appropriate taxing authority. Customer is responsible for all sales, use, excise, value- added, goods and services, consumption, and other similar taxes and duties of any kind imposed by any governmental authority in connection with this Agreement, other than taxes imposed on Peregrine’s net income, property, or employees. If Customer claims exemption from any such taxes, Customer will provide Peregrine with all required documentation to evidence its tax-exempt status. If Customer is required by law to withhold taxes from payments to Peregrine, Customer will provide prompt notice to Peregrine and will cooperate in good faith to minimize such withholding. 5. Proprietary Rights. Peregrine owns and shall retain all rights in the Peregrine Technology , the Documentation and the Usage Analytics , including all improvements, modifications, derivative works, configurations and integrations developed in connection with Customer’s use of the Service. Other than as expressly set forth in Section 2.1 above, no license or other rights in or to the Peregrine Technology or related intellectual property rights are granted to Customer or Users, and all such licenses and rights are hereby expressly reserved to Peregrine. Customer retains all right, title, and interest in Customer Data. 6. Data Access, Sharing and Security. 6.1. Customer Data. Customer hereby grants Peregrine a non- exclusive worldwide license to use access, store reproduce, process, transmit and display and Customer Data as necessary to provide the Service, including to provide Technical Support, Ancillary Services, and any Additional Services , as applicable. Peregrine may choose to terminate the provision of any Customer Data via the Service if the provision of such data may be harmful to the Service, as determined by Peregrine in its reasonable discretion. October 22, 2026 8 6.2. Usage Analytics. Customer agrees that Peregrine may generate Usage Analytics about Customer’s usage of the Service, including operating, maintaining, securing and improving the Service and developing new features and/or functionality. Custome r agrees that Peregrine may use such Usage Analytics for Peregrine’s internal business purposes and to operate and improve Peregrine’s proprietary software and services. Upon instruction, Peregrine shall destroy Usage Analytics with respect to Customer following termination of this Agreement. 6.3. CJIS Security Policy. Peregrine has implemented procedures to allow for adherence to the CJIS Security Policy. The hosting facility for the Service uses access control technologies that meet or exceed CJIS requirements. In addition, Peregrine has installed and configured solid network intrusion prevention appliances for adherence to the CJIS Security Policy. 6.4. Processing of Personal Information. Peregrine’s rights and obligations with respect to Personal information it collects directly from individuals are set forth in Peregrine’s Privacy Policy <https://peregrine.io/privacy-policy/> and Peregrine’s Platform Privacy Policy https://peregrine.io/platform- privacy-policy>, each incorporated by reference herein. Personal Information included within Customer Data and processed by Peregrine on behalf of Customer is governed by this Agreement . 6.5. Sensitive Information; Marking Requirements. To the extent Customer provides Customer Data that Customer considers to be sensitive, proprietary, restricted, or otherwise requiring sensitive treatment (“Sensitive Information”), Customer is solely responsible for providing appropriate markings to designate the applicable Customer Data as Sensitive Information. Customer shall provide Peregrine with documentation and/or instructions in writing with sufficient detail for Peregrin e to identify and distinguish content that is Sensitive Information within other provided Customer Data. Customer shall ( a) mark Sensitive Information on its face, ( b) make the appropriate designations for Sensitive Information in document metadata, (c) provide Peregrine with a table or other list of Sensitive Information that contains sufficient detail to identify the Sensitive Information; or (d) identify Sensitive Information to Peregrine in some other mutually agreed upon method . Peregrine shall not be responsible for failure to designate Sensitive Information with specific access control status based on Customer failure to provide sufficient information to identify Sensitive Information. 6.6. Third-Party Data. Any Third- Party Data provided to Peregrine in connection with Peregrine’s provision of the Service is subject to the ownership rights and retention policies of the applicable third-party provider. Customer’s rights to use such Third-Party Data are limited to those expressly granted to Peregrine by such third-party provider. Peregrine makes no representations or warranties regarding Third-Party Data and Peregrine is not responsible for the accuracy, timeliness or completeness of Third- Party Data. Both Customer and Peregrine agree to use commercially reasonable efforts to maintain Customer’s access, and facilitate Peregrine’s access, to such Third- Party Data during the term of this Agreement. Peregrine may suspend or terminate access to Third- Party Data for inclusion in the Service if (a) Peregrine’s rights to provide such data expire or are terminated, or (b) continued provision of such data would materially impair the Service. 7. Confidentiality. 7.1. Definition of Confidential Information. The term “ Confidential Information ” means all confidential and proprietary information of a party (“ Disclosing Party”) disclosed to the other party (“Receiving Party”), whether orally or in writing, that is designated as confidential or that reasonably should be understood to be confidential given the nature of the information and the circumstances of disclosure, including Customer Data, any Third Party Data, the Service, the Documentation, the Peregrine Technology, business and marketing plans, technology and technical information, product designs, and business processes. 7.2. Confidentiality. The Receiving Party shall not disclose or use any Confidential Information of the Disclosing Party except to perform its obligations or exercise its rights under this Agreement, except with the Disclosing Party’s prior written permission on a case- by-case basis. Each party agrees to protect the confidentiality of the Confidential Information of the other party in the same manner that it protects the confidentiality of its own proprietary and confidential information of like kind, but in no event with less than reasonable care. If the Receiving Party is compelled by law or a government authority to disclose Confidential Information of the Disclosing Party, it shall provide the Disclosing Party with prior notice of October 22, 2026 9 such compelled disclosure (to the extent practicable and legally permitted) and reasonable assistance, at Disclosing Party’s cost, if the Disclosing Party wishes to contest the disclosure. 7.3. Exceptions. The parties’ obligations in Section 7.2 shall not apply to any information that: (a) is or becomes publicly available without breach of any obligation owed to the Disclosing Party; (b) was known to the Receiving Party prior to its disclosure by the Disclosing Party without breach of any obligation owed to the Disclosing Party; (c) was independently developed by the Receiving Party without breach of any obligation owed to the Disclosing Party; (d) is received from a third party without breach of any obligation owed to the Disclosing Party; or (e) has been distributed pursuant to Customer’s request in connection with Authorized Sharing (as separately agreed between the Parties). 7.4. Public Records Act s. Peregrine acknowledges that Customer is a public entity and may be governed by applicable laws, rules, or regulations relating to public records . Customer agrees to use commercially reasonable efforts to provide notice before any disclosure of Peregrine’s confidential or proprietary information. 7.5. Remedies. If the Receiving Party discloses or uses (or threatens to disclose or use) any Confidential Information of the Disclosing Party in breach of this Section 7, the Disclosing Party shall have the right, in addition to any other remedies available to it, to seek injunctive relief to enjoin such acts, it being specifically acknowledged by the parties that such unauthorized disclosure or use may cause irreparable harm to the Disclosing Party for which any other available remedies are inadequate. 8. Warranties & Disclaimers. 8.1. Warranties. Each party represents and warrants that it has the legal power and authority to enter into this Agreement. Peregrine represents and warrants that (i) it will provide the Service in a professional manner consistent with the standards observed by a competent practitioner of the profession in which Peregrine is engaged, and (ii) the Service will perform in accordance with and otherwise substantially conform to its associated documentation. 8.2. Disclaimer. EXCEPT AS EXPRESSLY PROVIDED IN SECTION 8.1, PEREGRINE MAKES NO WARRANTY OF ANY KIND, WHETHER EXPRESS, IMPLIED, STATUTORY, OR OTHERWISE WITH RESPECT TO THE SERVICE, THE PEREGRINE TECHNOLOGY, ANY THIRD -PARTY DATA, CUSTOMER-OWNED OR LICENSED PRODUCTS AND ANY OTHER PRODUCTS OR SERVICES PROVIDED UNDER THIS AGREEMENT. PEREGRINE HEREBY SPECIFICALLY DISCLAIMS ALL IMPLIED WARRANTIES, INCLUDING ANY WARRANTY OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE OR NON- INFRINGEMENT, TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW. PEREGRINE DOES NOT GUARANTEE THE ACCURACY, COMPLETENESS, OR RELIABILITY OF ANY INFORMATION GENERATED BY THE SERVICE. 9. Indemnification. 9.1. Indemnification by Peregrine. Without waiving any statutory or common law immunities or limitations on liability, Peregrine shall at its expense defend Customer and its officers, directors, officials, agents, volunteers and employees (“Customer Indemnified Parties”) against any claim made or brought against any Customer Indemnified Party by a third party alleging that the Service as provided to Customer and when used in accordance with this Agreement infringes any intellectual property rights of a third party (each, a “ Customer Claim”), and shall indemnify and hold Customer Indemnified Parties harmless from and against any and all liability, loss, damage, claims, expenses, and costs, including without limitation, attorney’s fees, awarded by a court or agreed to by Peregrine in a settlement with respect to such Customer Claim; provided, that Customer (a) promptly gives written notice of the Customer Claim to Peregrine; (b) gives Peregrine sole control of the defense and settlement of the Customer Claim (provided that Peregrine may not agree to any settlement that imposes any liability or obligation on Customer without Customer’s prior written consent, such consent not to be unreasonably withheld, conditioned, or delayed); and (c) provides to Peregrine, at Peregrine’s cost, all reasonable assistance in the defense and settlement of the Customer Claim. Peregrine shall have no obligation under this Section 9.1 or otherwise regarding claims that arise from or relate to (i) Customer’s use of the Service other than as contemplated by this Agreement, (ii) any modifications to the Service made by any entity ot her than Peregrine (where the liability would not have arisen but for such modification), (iii) any combination of the Service with services or technologies not October 22, 2026 10 provided by Peregrine (where the liability would not have arisen but for such combination), (iv) Customer’s use of the Service or portion thereof after Peregrine has terminated this Agreement or such portion of the Service in accordance with this Section 9.1, or (v) Third Party Products. If in Peregrine’s opinion a Customer Claim is likely to be made, or if an existing Customer Claim may cause Peregrine liability, Peregrine may in its discretion (x) obtain a license to enable Customer to continue to use the potentially infringing portion of the Service, (y) modify the Service to avoid the potential infringement, or (z) if the foregoing cannot be achieved after using reasonable commercial efforts, terminate the Agreement or the license to the infringing portion of the Service and refund the amount of any pre-paid fees applicable to the portion of the terminated Services to be provided after the termination date. 9.2. Indemnification by Customer. To the extent permitted by applicable law, Customer shall at its expense defend Peregrine and its officers, directors, officials, agents, volunteers and employees (“Peregrine Indemnified Parties”) against any claim made or brought against any Peregrine Indemnified Party by a third party based on: (a) Customer’s or any User’s negligence, gross negligence, fraud, or willful misconduct; (b) Customer’s or any User’s use of the Service in a manner not authorized by this Agreement or in violation of applicable law; or (c) Customer Data or Peregrine’s authorized use of such Customer Data (each, a “ Peregrine Claim”), and shall indemnify and hold Peregrine Indemnified Parties harmless from and against any and all liability, loss, damage, claims, expenses, and costs, including without limitation, attorney’s fees, awarded by a court or agreed to by Customer in a settlement with respect to such Peregrine Claim; provided, that Peregrine (i) promptly gives written notice of the Peregrine Claim to Customer; (ii) gives Customer sole control of the defense and settlement of the Peregrine Claim (provided that Customer may not agree to any settlement that imposes any liability or obligation on Peregrine without Peregrine’s prior written consent, such consent not to be unreasonably withheld, conditioned, or delayed); and (iii) provides to Customer, at Customer’s cost, all reasonable assistance in the defense and settlement of the Peregrine Claim. 9.3. Sole Remedy. THIS SECTION 9 SETS FORTH CUSTOMER’S SOLE REMEDIES AND PEREGRINE’S SOLE LIABILITY AND OBLIGATION FOR ANY ACTUAL, THREATENED, OR ALLEGED CLAIMS BY THIRD PARTIES RELATING TO THE SERVICE OR ITS USE. 10. Limitation of Liability. 10.1. Exclusion of Consequential and Related Damages. EXCEPT FOR A PARTY’S BREACH OF SECTION 7, A PARTY’S INDEMNIFICATION AND DEFENSE OBLIGATIONS, OR A PARTY’S GROSS NEGLIGENCE, FRAUD, OR WILLFUL MISCONDUCT, IN NO EVENT SHALL EITHER PARTY HAVE ANY LIABILITY TO THE OTHER PARTY FOR ANY LOST PROFITS, LOSS OF USE , COSTS OF PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES, OR FOR ANY INDIRECT, SPECIAL, INCIDENTAL, MULTIPLE, EXEMPLARY, PUNITIVE, OR CONSEQUENTIAL DAMAGES HOWEVER CAUSED AND, WHETHER IN CONTRACT, TORT OR UNDER ANY OTHER THEORY OF LIABILITY, WHETHER OR NOT THE PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. 10.2. Liability Cap. IN NO EVENT SHALL PEREGRINE’S AGGREGATE LIABILITY NOT COVERED BY INSURANCE, ARISING OUT OF OR RELATING TO THIS AGREEMENT UNDER ANY LEGAL OR EQUITABLE THEORY, INCLUDING BREACH OF CONTRACT, TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY, OR OTHERWISE, EXCEED THE TOTAL AMOUNTS PAID TO PEREGRINE UNDER THIS AGREEMENT IN THE TWELVE (12) MONTHS IMMEDIATELY PRECEDING THE CLAIM. 11. Term & Termination. 11.1. Term of Agreement. This Agreement commences on the Effective Date and continues for the duration of the term set forth on the Order Form (“Term”), unless earlier terminated in accordance with the Order Form or Section 11.2 11.2. Termination for Cause. A party may terminate this Agreement for cause upon thirty (30) days written notice of a material breach to the other party if such breach remains uncured at the expiration of such period. Termination shall not relieve Customer of the obligation to pay any fees accrued or payable to Peregrine prior to the effective date of termination. 11.3. Data. Upon expiration or termination of this Agreement, Peregrine shall have no obligation to maintain or provide any Customer Data or Third Party Data. Unless legally prohibited, Peregrine shall delete October 22, 2026 11 all Customer Data in its systems or otherwise in its possession or under its control. Notwithstanding the foregoing, Peregrine may retain and use Usage Analytics in perpetuity. 11.4. Survival. The following provisions shall survive termination or expiration of this Agreement: Sections 4, 5, 6.1, 6.2, 7, 8, 9, 10, 11.3, 11.4, and 12. 12. General Provisions. 12.1. Insurance. Peregrine shall maintain the insurance coverages described on Appendix A: Insurance Requirements. 12.2. Relationship of the Parties. This Agreement does not create a partnership, franchise, joint venture, agency, fiduciary or employment relationship between the parties. There are no third- party beneficiaries to this Agreement. At all times during the term of this Agreement, Peregrine shall be an independent contractor and shall not be an employee of Customer. Except as Customer may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of Customer in any capacity whatsoever as an agent. Peregrine shall have no authority, express or implied, pursuant to this Agreement to bind Customer to any obligation whatsoever. 12.3. Peregrine’s Books and Records. To the extent required by applicable laws, rules, or regulations, Peregrine shall maintain any and all records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the Customer under this Agreement for a minimum of 3 years, or for any longer period required by law, from the date of final payment to Peregrine to this Agreement. All such records shall be maintained in accordance with generally accepted standards and shall be made available for inspection, audit, and/or copying during regular business hours, upon written request of the Customer. 12.4. Force Majeure. Neither party shall be liable by reason of any failure or delay in performance of its obligations under this Agreement (except for the payment of money) on account of events beyond the reasonable control of such party, which may include Internet denial -of-service attacks, strikes, shortages, riots, insurrection, fires, flood, storm, explosions, acts of God, war, terrorism, governmental action, labor conditions, earthquakes, and material shortages (each, a “Force Majeure Event”). Upon the occurrence of a Force Majeure Event, the non- performing party will be excused from any further performance of its obligations affected by the Force Majeure Event for so long as the event continues and such party continues to use commercially reasonable efforts to resume performance. 12.5. Additional Government Terms. Peregrine acknowledges that Customer may be a public entity and, accordingly, certain additional laws, rules, and regulations may take precedence over the terms and conditions of this Agreement (the “ Additional Government Terms ”). The Additional Government Terms, if any, are attached hereto as Appendix B: Additional Government Terms and will govern to the extent of any conflict with any other term of this Agreement. 12.6. Export Controls. Customer shall comply with all applicable export control laws and sanctions regulations. Customer shall not use the Service in violation of U.S. export control or trade sanctions laws. 12.7. Notices. All notices under this Agreement shall be in writing and shall be deemed to have been given upon: (a) personal delivery; (b) the second business day after mailing; (c) the second business day after sending by confirmed facsimile; or (d) after confirmed receipt of an email. Notices to Peregrine shall be addressed to the attention of Chief Legal Officer, Peregrine Technologies, legal@peregrine.io. Notices to Customer are to be addressed to the individual identified in the Order Form. 12.8. Waiver; Cumulative Remedies Severability. No failure or delay by either party in exercising any right under this Agreement shall constitute a waiver of that right. Other than as expressly stated herein, the remedies provided herein are in addition to, and not exclusive of, any other remedies of a party at law or in equity. If any provision of this Agreement is held by a court of competent jurisdiction to be contrary to law, the provision shall be modified by the court and interpreted so as best to accomplish the objectives of the original provision to the fullest extent permitted by law, and the remaining provisions of this Agreement shall remain in effect. 12.9. Assignment. Neither party may assign any of its rights or obligations hereunder, whether by operation of law or otherwise, without the prior express written consent of the other party. Notwithstanding October 22, 2026 12 the foregoing, Peregrine may assign this Agreement, together with all rights and obligations hereunder, without consent of Customer, in connection with a merger, acquisition, corporate reorganization, or sale of all or substantially all of its stock or ass ets that relate to this Agreement. Any attempt by a party to assign its rights or obligations under this Agreement in breach of this section shall be void and of no effect. Subject to the foregoing, this Agreement shall bind and inure to the benefit of the parties, their respective successors and permitted assigns. 12.10. Governing Law. This Agreement shall be governed by the laws of Wisconsin. The state courts located in Milwaukee County, WI or in the United States District Court for the Eastern District of Wisconsin shall have exclusive jurisdiction to adjudicate any dispute arising out of or relating to this Agreement. Each party hereby consents to the exclusive jurisdiction of such courts provided that nothing in this Section 12.10 prohibits either party from seeking or obtaining in any jurisdiction injunctive or similar relief in connection with the enforcement of this Agreement. 12.11. Construction. The division of this Agreement into Sections and the insertion of captions and headings are for convenience of reference only and will not affect the construction or interpretation of this Agreement. The terms “this Agreement,” “hereof,” “hereunder” and any similar expressions refer to this Agreement and not to any particular Section or other portion hereof. The parties hereto agree that any rule of construction to the effect that ambiguities are to be resolved against the drafting party will not be applied in the construction or interpretation of this Agreement. As used in this Agreement, the words “include” and “including,” and variations thereof, will be deemed to be followed by the words “without limitation” and “discretion” means sole discretion. 12.12. Entire Agreement. This Agreement constitutes the entire agreement between the parties, and supersedes all prior and contemporaneous agreements, proposals or representations, written or oral, concerning its subject matter. No modification, amendment, or waiver of any provision of this Agreement shall be effective unless in writing and signed by the party against whom the modification, amendment or waiver is to be asserted. Notwithstanding any language to the contrary therein , no terms or conditions stated in a Customer purchase order or in any other Customer order documentation (excluding the Order Form) shall be incorporated into or form any part of this Agreement, and all such terms or conditions are hereby rejected and shall be null and void. October 22, 2026 13 Appendix A: Insurance Requirements 1. Insurance Coverage Requirements Peregrine shall maintain the insurance coverage described in this Appendix during the Term of the Agreement, subject to the terms and conditions of the applicable insurance policies. Peregrine may satisfy the insurance requirements of this Appendix through equivalent insurance coverage or successor policies maintained as part of Peregrine’s insurance program. 1.1 Workers’ Compensation and Employer’s Liability Peregrine shall maintain Workers’ Compensation insurance as required by applicable law and Employer’s Liability insurance for personnel performing work under this Agreement. 1.2 Commercial General Liability and Automobile Liability Peregrine shall maintain: • Commercial General Liability insurance written on an occurrence basis; and • Automobile Liability insurance covering owned, hired, or non-owned vehicles where applicable, with limits of not less than: • $1,000,000 per occurrence, and • $2,000,000 aggregate. Such insurance applies solely to liabilities arising from Peregrine’s operations under the Agreement, including products/completed operations and contractual liability where applicable. Peregrine’s Commercial General Liability coverage is maintained as part of a company -wide insurance program and is not provided on a per-project aggregate basis, unless otherwise required by applicable law or expressly agreed by the parties in writing. Peregrine’s insurance program is not maintained on a project- specific basis. [Additional Insured (Upon Request) Upon Customer’s written request, Customer and its officers, officials, employees, and agents may be included as additional insureds under Peregrine’s Commercial General Liability policy with respect to liability arising from Peregrine’s performance of the Services, subject to the terms and limitations of the applicable policy. If Customer is included as an additional insured, Peregrine’s insurance shall be primary and non- contributory with respect to any insurance maintained by Customer. Policies shall include severability of insureds provisions.] 1.3 Technology Errors and Omissions / Cyber Liability Peregrine shall maintain Technology Errors and Omissions and Network Security & Privacy Liability (Cyber Liability) insurance with limits of not less than $1,000,000 per claim or in the aggregate, covering liabilities arising from errors, omissions, or negligent acts in the performance of the Services, including liabilities arising from security incidents, unauthorized access to systems, or breaches of confidential or personal information. Such coverage may be provided under a single policy or combined insurance program, and may also be provided through layered primary and excess policies that together satisfy the required limits. If the coverage is written on a claims-made basis, Peregrine shall maintain such coverage during the Term of the Agreement and for at least three (3) years thereafter, or maintain equivalent extended reporting coverage. 1.4 Excess / Umbrella Liability October 22, 2026 14 The insurance limits required under this Appendix may be satisfied through a combination of primary, umbrella, or excess liability insurance policies. 2. General Insurance Conditions Evidence of Insurance Upon request, Peregrine shall provide certificates of insurance evidencing the coverage required under this Appendix. Certificates of insurance are provided for informational purposes only and do not amend, extend, or alter the coverage provided by the applicable insurance policies. Certificates of insurance shall not be deemed to modify, expand, or otherwise affect the insurance coverage provided by the applicable policies. Nothing in this Appendix shall be construed to create any rights in any third party, including any certificate holder. Insurers Insurance shall be placed with insurers authorized to conduct business in the applicable jurisdiction and having a financial rating of at least A-, VII or better by A.M. Best, or an equivalent rating agency. Deductibles / Retentions Any deductibles or self-insured retentions shall be the sole responsibility of Peregrine. Waiver of Subrogation To the extent permitted by applicable insurance policies and law, Peregrine’s insurance policies shall include waivers of subrogation in favor of Customer. Subcontractors Peregrine shall require subcontractors performing Services to maintain insurance appropriate to the work performed or to be covered under Peregrine’s insurance. Cancellation or Material Change Peregrine shall provide reasonable notice of cancellation or material reduction in coverage if such notice is received from the insurer. 3. Effect on Liability The insurance requirements set forth in this Appendix are not intended to and shall not expand, modify, or increase either party’s liability beyond the limitations of liability set forth in the Agreement. The insurance limits required under this Appendix s hall not be interpreted as a representation of the maximum liability of either party. October 22, 2026 15 Appendix B: Additional Government Terms No additional government terms and conditions.

Source: Village of Whitefish Bay website. First collected Nov 15, 2026.