Building Board Regular Meeting Materials (PDF)
Village of Brown Deer · Milwaukee County · meeting of Nov 16, 2026 · Agendas
Open the original document More from Village of Brown Deer
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
BUILDING BOARD MEETING
Monday, November 16, 2026
Virtual Meeting Phone/Video
4:00 P.M.
PLEA
SE TAKE NOTICE that a meeting of the Brown Deer Building Board will be held virtually.
The public can access this meeting of the Building Board by dialing 1-312-626-6799. The public
would then need to enter the code: 880 0853 9547 to join the meeting. The public can also join by
video using the following link https://us02web.zoom.us/j/88008539547. Please remember to mute your
microphone to reduce background noise. The following items of business will be discussed and
possibly acted upon:
I
II
III
IV
V
VI
Roll Call
Persons Desiring to be Heard
Consideration of Minutes: November 2, 2026
Old Business
Plans Submitted for Consideration:
1. Resubmittal – New Car Wash Building – Jilly’s Car Wash – 4200 W Brown Deer Rd
Adjournment
Caren Brustmann
C aren Brustmann, Village Clerk
November 11, 2026
PE
RSONS REQUIRING SPECIAL ACCOMMODATIONS FOR ATTENDANCE AT THE
MEETING SHOULD CONTACT THE VILLAGE CLERK AT LEAST ONE BUSINESS DAY
PRIOR TO THE MEETING.
MINUTES OF THE
BROWN DEER BUILDING BOARD
Virtual Meeting Phone/Video
November 2, 2026
The meeting was called to order at 4:07 p.m.
I ROLL CALL
Present: Mary Buckley, Will Manley, Nicole Robbins, Ryan Thacker
Excused: Chris Eger
Also Present: Hannah Keckeisen, Community Development Director; Tyler Burkart, Village
Manager; Devon Pittman, Briohn; Lucille Sells, North Drawn Designs; Megan Anderson, Village
Resident; Jim Jens, Village Resident; Chris Wenzler, Briohn; Kyle Roadt, Briohn; Jon Zimmerman,
Jilly’s Car Wash; Todd Gesund, Jilly’s Car Wash; Thomas McCrossin, New Lane Management
II PERSONS DESIRING TO BE HEARD
None
III CONSIDERATION OF MINUTES
Mr. Manley motioned and Mr. Thacker seconded to approve the minutes of August 17, 2026.
Approval was unanimous.
IV OLD BUSINESS
1. None
V PLANS SUBMITTED FOR CONSIDERATION
The following items were on the agenda for review:
1. Proposed Addition – Residential Property – 9306 N. 52nd Street
Ms. Keckeisen reviewed the home addition. This is a garage addition with interior home
renovations. The material for the addition will be white steel lap siding, which pairs well with the
existing brick exterior. The addition is within the setbacks for the R2 residential zoning district.
Ms. Sells provided additional context stating that existing garage turning into living spaces and
new addition will become the garage. The new garage doors match the existing shed door on the
property.
Mr. Manley asked if the roofing materials will be consistent and if they will match. Ms. Sells stated
that there is significant work that is needed on the roofing and everything will match.
Mr. Thacker asked what the reasoning was for the gable in the garage . Ms. Sells stated that
additional interior space is needed for the owners.
Mr. Manley asked if the siding on the new porch will match the siding that will be part of the
addition and the other portions of the home. Ms. Sells stated that all the siding will match. Ms.
Anderson and Mr. Jens stated that the current siding on the porch is falling apart and will be
replaced during construction.
Ms. Buckley asked to see a photo of the home. Ms. Sells presented a photo of the home for the
Building Board to review. Ms. Buckley suggested that this helped the Board understand the project.
Mr. Thacker motioned for approval of the proposed addition Mr. Manley seconded. Motion to
approve the proposed addition unanimous.
2. New Car Wash Building – Jilly’s Car Wash – 4200 N. Deerwood Drive
Ms. Keckeisen introduced Jilly’s Car Wash project on the northwest corner of Green Bay Road and
Brown Deer Road. The scope of this discussion is limited to the building design and materials.
Ms. Keckeisen identified that comments had been provided to the design team for the project. Some
key comments were removing the tan banding, making the garage doors black, removing the tan
brick and replacing it with white brick, identifying if the blue w indows are decorative and if they
filter light, adding additional materials to the workers’ exterior check in enclosure, and including
renderings of the trash enclosure as well as the gates and pay terminals. Mr. Eger provided
comments ahead of time as he was unable to attend the meeting. His comments stated that materials
do not line up, he suggested that the plan needs to be simplified. He also recommended that the
bollards are black.
Mr. Gesund with Jilly’s Car Wash, introduced himself and Mr. Zimmerman, the founder of Jilly’s.
Mr. Zimmerman stated that this will be the first indoor vacuum space for Jilly’s, and they wish to
have a high-quality building due to the high visibility of the intersection.
Mr. Thacker stated that the overall shape of the building is good and the two roof forms are good.
He questioned the roof pitch into the other roof pitch. He said that there is a lot going on in the
initial design submittal. The amount of glazing that has horizontal banding and amount of various
material is unnecessary.
Ms. Buckley suggested that simplifying the plan would make the building much stronger.
Mr. Wenzler with Briohn presented a revised version during the meeting that begins to simplify the
project. The new design removes the horizontal banding and follows a three material approach. The
tan material is removed and replaced with white masonry product. He also changed the garage
doors to black.
Mr. Thacker asked if the roof pitching to the parapet has a saddle to direct water away on the roof.
Mr. Wenzler stated that it is framed to push water away from the building.
Mr. Thacker suggested that the building has a good foundation as it is broken into two thirds and
one third, this is a good design choice.
Mr. Manley asked if the wood material at the top façade upper element may be removed. He likes
the wood at the human scale.
Ms. Buckley stated that the revisions discussed in the meeting are an upgrade from the initial
submittal. Mr. Thacker would like to see a final revised plan at the next Building Board meeting.
It was consensus of the Board to request a resubmittal of the building plans.
3. Exterior Commercial Building Improvements – North Shore Commerce
Center – 9091 N. Deerwood Drive and 9050-9088 N. Deerbrook Trail
Ms. Keckeisen introduced the project. This project includes exterior building improvements on
existing buildings on Deerwood Drive and Deerbrook Trail. Improvements include a new sign,
exterior painting improvements, and new garage doors. Ms. Keckeisen stated that Mr. Eger
provided comments prior to the meeting and he liked the orange color on the building but
recommended the garage doors be a darker color.
Mr. McCrossin provided an overview of the improvements and stated that this is a new fresh look
for the buildings and the area. All garage doors will become 10ft by 11ft to align with new business
standards.
Mr. Manley motioned for approval of the exterior commercial building improvements contingent
on changing the garage door s to black Mr. Thacker seconded. Motion to approve the exterior
commercial building improvements contingent on changing the garage doors to black was
unanimous.
VI ADJOURNMENT
Mr. Manley moved adjournment and Mr. Thacker seconded.
Approval was unanimous.
The meeting adjourned at 4:50 p.m.
The next regularly scheduled meeting is November 16, 2026
Hannah Keckeisen
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Community Development Director, Village of Brown Deer
NOTE:
ALL MECHANICAL, ELECTRICAL,
PLUMBING AND FIRE SPRINKLER
ENGINEERTING BY DESIGN-BUILD
CONTRACTORS
SECONDARY S-1 (MODERATE HAZARD STORAGE)
PRIMARY
TYPE 5B
NONE
1
1
15,576 SF
(+64 SF FOR BOOTH)
15,045 SF
(+35 SF FOR BOOTH)
OCCUPANCY :
CLASS OF CONSTRUCTION :
SPRINKLER SYSTEM :
FLOOR LEVELS :
NUMBER OF STORIES
BUILDING FOOTPRINT :
PLAN COMMISSION RESUBMITTAL SET NOVEMBER 05, 2026
PROJECT INFORMATION:OWNER :
PROPOSED ADDITION FOR:
CAR WASH
4200 WEST BROWN DEER ROAD
BROWN DEER, WISCONSIN 53209
PROJECT LOCATION:
VIEW LOOKING SOUTHEAST
BUILDING AREA :
B OFFICE/BUSINESS)
PD ZONING: PLANNED DEVELOPEMENT
STREET: SETBACKS : X'
1
PARKING:
HANDICAPPED STALLS
SIDE: X'
REAR: X'
5 STANDARD STALLS
6 TOTAL STALLS
BUILDING CODE:
2021 INTERNATIONAL BUILDING CODE WITH WISCONSIN AMENDMENTS SPS 362
2021 INTERNATIONAL EXISTING BUILDING CODE WITH WISCONSIN AMENDMENTS SPS 366
ACCESSIBILITY CODE:
2021 INTERNATIONAL BUILDING CODE WITH WISCONSIN AMENDMENTS SPS 362
2017 ICC/ANSI A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
ENERGY CODE:
2021 IECC INTERNATIONAL ENERGY CONSERVATION CODE WITH WISCONSIN AMENDMENTS SPS 363
MECHANICAL CODE:
2021 INTERNATIONAL MECHANICAL CODE WITH WISCONSIN AMENDMENTS SPS 364
PLUMBING CODE:
2023 WISCONSIN PLUMBING CODE SPS 381-387
ELECTRICAL CODE:
2017 NFPA 70 NATIONAL ELECTRICAL CODE WITH WISCONSIN AMENDMENTS SPS316
FIRE CODE:
SPS 314 FIRE PREVENTION
BMW KAR WASH INC.
TODD GESUND
28845 TELEGRAPH ROAD
SOUTHFIELD, MICHIGAN 48034
(248) 514-5565 PHONE
Todd@JaxKarWash.net
BRIOHN DESIGN GROUP LLC
CIVIL ENGINEER:
RIZAL W. ISKANDARSJACH, P.E., P.L.S.
LANDC02
(414) 622-0103 PHONE
LANDSCAPE DESIGNER:
P.O. BOX 12043
MILWAUKEE, WISCONSIN 53212
HEATHER GROGAN, PLA
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
riz@briohn.com
BRIOHN BUILDING CORPORATION
KYLE ROADT
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
kroadt@briohn.com
BRIOHN DESIGN GROUP LLC
CHRISTOPHER WENZLER, AIA, NCARB, LEED AP BD+C
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
cwenzler@briohn.com
BRIOHN DESIGN GROUP LLC
KEVIN JANKOWSKI, PE
GENERAL CONTRACTOR : ARCHITECT : STRUCTURAL ENGINEER:
3885 N. BROOKFIELD RD., SUITE 200
BROOKFIELD, WISCONSIN 53045
(262) 790-0500 PHONE
kjankowski@briohn.com
CHRIS CLINE, PE
ccline@briohn.com
heather@landc02.com
PLAN COMMISSION SET OCTOBER 02, 2026
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
APPLICABLE
TO ALL
PLAN VIEWS
PROGRESS SET
NOT FOR CONSTRUCTION
T1.0
JILLY'S TITLE SHEETJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW/CJR
CW
240158
PC SHEET INDEX
Sheet Number Sheet Name
0-GENERAL
T1.0 JILLY'S TITLE SHEET
T1.1 EXTERIOR RENDERINGS
T1.2 EXTERIOR RENDERINGS
1-CIVIL
C1.0 SITE DIMENSIONS AND PAVEMENT ID PLAN
C1.1 CAR STACKING/QUEUING EXHIBIT
C2.0 SITE GRADING PLAN
C2.1 SITE EROSION CONTROL PLAN
C3.0 SITE UTILITY PLAN
C4.0 SITE NOTES AND DETAILS
C4.1 SITE NOTES AND DETAILS
2-LANDSCAPING
L1.0 LANDSCAPE PLAN
L2.0 LANDSCAPE NOTES, DETAILS AND PLANT SCHEDULE
4-ARCHITECTURAL
A1.1 OVERALL FLOOR PLAN
A1.2 CLERESTORY PLAN
A4.1 ROOF PLAN
A5.1 EXTERIOR ELEVATIONS
A6.1 EXTERIOR EQUIPMENT
7-ELECTRICAL
EL1 EXTERIOR LIGHTING AND PHOTOMETRIC PLAN
Date Revision
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
PROGRESS SET
NOT FOR CONSTRUCTION
T1.1
EXTERIOR RENDERINGSJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CW
240158
Date Revision
VIEW LOOKING S0UTHEAST (EYE VIEW)
VIEW LOOKING NORTHEAST (BIRD'S EYE VIEW)
V
IEW LOOKING SOUTHEAST (BIRD'S EYE VIEW)
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
PROGRESS SET
NOT FOR CONSTRUCTION
T1.2
EXTERIOR RENDERINGSJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CW
240158
Date Revision
VIEW LOOKING SOUTHEAST AT EMPLOYEE BOOTH
VIEW LOOKING SOUTHEAST AT TRASH ENCLOSURE
VIEW LOOKING NORTHWEST (EYE VIEW)
LV
HV
A5.1 2
A5.1
A5.1
A5.1
1
3
4
D
5431
9' - 0" 34' - 4" 43' - 4" 43' - 4" 10' - 0"
MECHANICAL
106
13' - 8" 2' - 7 5/8" 10' - 6 3/8" 91' - 2" 8' - 0" 4' - 0"
A
B
14' - 2" 10' - 0 1/16" 10' - 1 15/16" 7' - 10" 10' - 0" 18' - 0" 10' - 0" 18' - 0" 10' - 0" 12' - 10" 5' - 0" 10' - 0" 18' - 0"
22' - 0" 21' - 10" 62' - 8"
10' - 8" 10' - 0" 18' - 0" 10' - 0"
11' - 0" 95' - 6"
03-603-6
103A
ELECTRICAL PANEL LOCATIONS
5' - 0"
7' - 6"
5' - 0"
106
C
2 6
130' - 0" 10' - 0"
10' - 0"7' - 4"10' - 0"5' - 4"10' - 0"10' - 4"
20' - 4" 20' - 0 3/4"
24' - 8 3/8" 10' - 0" 27' - 0"
6' - 11" 8' - 6" 5' - 5 3/8"
197 SF
MAT ROOM
110
8810 SF
VACUUM
108
197 SF
VACUUMS
109
2880 SF
CAR WASH TUNNEL
107
BREAK RM
103
09-2
7
163' - 0"
106' - 6"
4' - 0" 8' - 0" 10' - 0"10' - 0"
12' - 0"
60.0°
20' - 8 3/4"20' - 0"
20' - 0"
12' - 0"
03-9
03-9
9"
(18 VACUUM STALLS)
MEN'S
101
WOMEN'S
102
OFFICE
104
VESTIBULE
100 CORRIDOR
A
BOOTH
120
103
104
102
101
107C
100A
109
108D
108A
110A
120
106' - 4 3/4"
5' - 8" 11' - 0" 4' - 2 3/8"
6' - 11" 8' - 6" 5' - 5 3/8"
4' - 0"
1' - 3"1' - 3"
4' - 0"
1' - 3"1' - 3"
11-1
11-1
22-432-4
32-4
22-5 22-5
14' - 0"
10' - 0"
TRASH
ENCLOSURE
FLOOR PLAN LEGEND
PARTITION TYPE
SURFACE
MOUNTED FIRE
EXTINGUISHER
ROOM NUMBER
DOOR NUMBER
ROOM NAME
100
ROOM
100
NEW DOOR & FRAME
NEW
PARTITION
NEW MASONRY
CONSTRUCTION
RECESSED
EXTINGUISHER
CABINET & FIRE
EXTINGUISHER
F.E.
F.E.C.
EXIT LIGHT
EXIT LIGHT (DIRECTIONAL)
A
PLAN NOTES1
PARTITION TYPES
TAG STUD TYPE STUD HEIGHT INSULATION VAPOR
BARRIER
NOTED SIDE
SURFACE
MATERIAL
NOTED SIDE
S
URFACE
HEIGHT
OPPOSITE SIDE
SURFACE
MATERIAL
OPPOSITE SIDE
SURFACE
HEIGHT
REMARKS
4.
3.
2.
1. ALL STEEL STUDS SHALL BE 25 GAUGE STUDS @ 24" O.C.. (UNLESS NOTED OTHERWISE)
ALL EXPOSED GYPSUM WALL BOARD SHALL BE TAPED & COATED SMOOTH, READY FOR PAINT.
USE 6" METAL STUDS AND INSTALL MOISTURE RESISTANT GYPSUM WALL BOARD AT ALL "WET WALL" LOCATIONS.
AT EXTERIOR WALLS, RETURN GYPSUM WALL BOARD INTO WINDOW JAMBS AND HEAD.
STUDS EXTENDED TO DECK SHALL HAVE A SLIP CONNECTION TO ALLOW FOR DEFLECTION5.
S6D
2
6" STEEL
STUDS ----
5/8" TYPE "X"
GYPSUM
WALLBOARD
5/8" TYPE "X"
GYPSUM
WALLBOARD
6"
SOUND BATT
TO UNDERSIDE
OF STRUCTURE
( 17' - 9" +/- )
TO UNDERSIDE
OF STRUCTURE
(17' - 9" +/- )
TO UNDERSIDE
OF STRUCTURE
( 17' - 9" +/- )
----
S3C
2
3 5/8" STEEL
STUDS ----
5/8" TYPE "X"
GYPSUM
WALLBOARD
5/8" TYPE "X"
GYPSUM
WALLBOARD
3"
SOUND BATT
TO 6" ABOVE
CEILING, BRACED
TO 6" ABOVE
CEILING ----TO 6" ABOVE
CEILING
S6C
2
6" STEEL
STUDS ----
5/8" TYPE "X"
GYPSUM
WALLBOARD
5/8" TYPE "X"
GYPSUM
WALLBOARD
6"
SOUND BATT
TO 6" ABOVE
CEILING, BRACED
TO 6" ABOVE
CEILING ----TO 6" ABOVE
CEILING
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
APPLICABLE
TO ALL
PLAN VIEWS
PROGRESS SET
NOT FOR CONSTRUCTION
A1.1
OVERALL FLOOR PLANJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CJR
240158
1/8" = 1'-0"1 OVERALL FLOOR PLAN
0' 4' 8' 16' 32'
GENERAL NOTES - NEW FLOOR PLAN
1
VERIFY ALL CONDITIONS, DIMENSIONS AND ALIGNMENT OF WALLS. BRING ANY
DISCREPANCIES TO BRIOHN'S ATTENTION PRIOR TO FABRICATION/CONSTRUCTION BEGINS.
2 VERIFY LOCATION OF ACCESS PANELS WITH MECHANICAL AND ELECTRICAL DRAWINGS.
3 AREA SHALL BE KEPT BROOM CLEAN AND FREE OF DEBRIS DURING CONSTRUCTION.
4 SEE EXTERIOR AND INTERIOR ELEVATIONS FOR WINDOW TYPES.
5 SEE SHEET A4.2 FOR SUNSHADE AND CANOPY PLAN INFORMATION AND DIMENSIONS
6 SEE SHEET A0.1 FOR PARTITION TYPES AND FLOOR PLAN LEGEND.
7 EXTERIOR WALLS IN OFFICE AREA TO BE FURRED OUT WITH STUD HELD 1" OFF FACE OF
EXTERIOR WALL, CAVITY FILLED WITH BATT INSULATION. SEE FLOOR PLAN FOR PARTITION
TYPE.
8 FURNITURE AND APPLIANCES PROVIDED BY TENANT AND ARE SHOWN FOR REFERENCE ONLY.
KEYNOTE LEGEND
VALUE FLOOR PLAN CODED NOTES
03-6 CONCRETE STOOP
03-9 CONCRETE WHEEL STOPS BY OWNER
09-2 DASHED LINE INDICATES FRP ON 5/8" MOISTURE RESISTANT GYPSUM
BOARD TO 4'-0" A.F.F.
11-1 INDUSTRIAL VACUUM EQUIPMENT BY OWNER
22-4 CATCH BASIN - SEE CIVIL DRAWINGS
22-5 FLOOR DRAIN (TO SANITARY) - SEE PLUMBING FOR RIM ELEVATIONS
32-4 6" DIAMETER X 4'-0" TALL CONCRETE FILLED STEEL PIPE BOLLARD(S),
PAINTED SAFETY YELLOW
Date Revision
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
D AB
106' - 6"
9' - 0"
07-15
05-2
C
22' - 0" 21' - 10" 48' - 8" 14' - 0"
08-2 26-1 08-2 26-104-1 08-126-1 26-1108-2
08-2
120' - 0 1/32"
32-4
122' - 3 1/8"
07-4 07-4
07-3 04-1
07-4
07-308-2308-23 07-4
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
5431
05-2
10' - 0"43' - 4"43' - 4"34' - 4"
08-2
2 6
23' - 0"140' - 0"
9' - 0"
08-2
08-1
08-2
08-2
08-2 26-1 08-2 26-1
08-1 07-1521-7
08-2 26-1107-4
04-1 32-4
7
07-3 04-1
07-4 08-2 07-4
07-3 07-3 07-3 04-1
07-507-5
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
D
05-2
A B
106' - 6"
61' - 8 3/8" 11 5/8" 43' - 10"
9' - 0"
C
62' - 8" 21' - 10" 22' - 0"
26-1
26-1
08-23 08-2
08-208-1 26-11
08-208-2
26-107-4
04-1
07-4 07-404-1
07-15
07-308-2
122' - 3 1/8"
07-5 07-5
120' - 0"
07-4
04-1 08-23
FIRST FLOOR
100' - 0"
T.O. LOW WALL
116' - 8"
5 4 3 1
10' - 0" 43' - 4" 43' - 4" 43' - 4"
26
34' - 4" 9' - 0"
26-1 26-1 08-2
05-2
9' - 0"
26-1
04-1
07-4
08-2 08-2 08-2 08-2 08-2
7
26-11
07-3 07-3 07-304-107-4
07-407-10 07-5 07-5
EXTERIOR MATERIALS LEGEND
INSULATED CONCRETE MASONRY UNITS
(COLOR: DARK GREY 'XXXXXX' )
HORIZONTAL METAL PANEL (COLOR: WHITE
'XXXXXX')
VERTICAL METAL PANEL (COLOR: WOOD
L
OOK)
VERTICAL FASCIA TRIM (COLOR: DARK
BRONZE 'XXXXX' )
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
PROGRESS SET
NOT FOR CONSTRUCTION
A5.1
EXTERIOR ELEVATIONSJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CW/CJR
240158
1/8" = 1'-0"3 SOUTH ELEVATION.
1/8" = 1'-0"4 WEST ELEVATION
1/8" = 1'-0"2 NORTH ELEVATION.
1/8" = 1'-0"1 EAST ELEVATION
Date Revision
KEYNOTE LEGEND
VALUE FLOOR PLAN CODED NOTES
04-1 INSULATED CONCRETE MASONRY UNITS - COLOR 1 (DARK GREY)
05-2 PREFINISHED METAL TRIM FINISHED ON STEEL FRAMING CANOPY WITH
DOWNLIGHTING
07-3 VERTICAL METAL WALL PANEL SYSTEM, 'WOOD' FINISH, COLOR:
07-4 HORIZONTAL METAL WALL PANEL SYSTEM, COLOR: (WHITE)
07-5 VERTICAL METAL FASCIA SYSTEM, COLOR: (DARK BRONZE)
07-10 ROOF ASSEMBLY A: STANDING SEAM METAL ROOF ON UNDERLAYMENT AND ICE
SHIELD, DIRECT TO DECK APPROVED EPS ROOF INSULATION ON PLYWOOD DECK ON
STRUCTURAL WOOD FRAMING (SEE STRUCTURAL DRAWINGS)
07-15 PROVIDE PRE-FINISHED METAL DOWNSPOUT AND GUTTER, HOLD DOWNSPOUT
CLOSE TO BUILDING, PROVIDE SPLASH BLOCK.
08-1 ALUMINUM STOREFRONT ENTRY SYSTEM
08-2 ALUMINUM STOREFRONT
08-23 INSULATED FACTORY PRE-FINISHED STEEL OVERHEAD DOOR (BY OWNER)
21-7 FIRE DEPARTMENT CONNECTION AND ALARM AS REQUIRED BY LOCAL GOVERNING
MUNICIPALITY - REFER FLOOR PLAN.
26-1 EXTERIOR LIGHT FIXTURE - CUT-OFF LED WALLPACK - SEE LIGHTING PLAN FOR FIXTURE
TYPE AND MOUNTING HEIGHT
26-11 BACKLIT BUILDING SIGNAGE (BY OWNER), PROVIDE UTILITIES TO LOCATION.
32-4 6" DIAMETER X 4'-0" TALL CONCRETE FILLED STEEL PIPE BOLLARD(S), PAINTED SAFETY
YELLOW
DATE:
SHEET:
CHECKED:
JOB:
DRAWN:
SHEET TITLE
3885 N BROOKFIELD ROAD, SUITE 200
BROOKFIELD WISCONSIN 53045-1950
(262) 790-0500 PHONE
(262) 790-0505 FAX
DESIGN GROUP
B R I O H N
PROGRESS SET
NOT FOR CONSTRUCTION
A6.1
EXTERIOR EQUIPMENTJILLY'S
CAR WASH
BROWN DEER, WI
NEW BUILDING FOR:
2026-10-02
CW
CJR
240158
Date Revision
EXTERIOR PAY KIOSKS
Source: Village of Brown Deer website. First collected Nov 15, 2026.