RecordWell Data

Village Board — Agenda Packet

Village of Germantown · Washington County · Village Board · meeting of Nov 16, 2026 · Agenda packets

Open the original document More from Village of Germantown

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MEETING: REGULAR MEETING OF THE VILLAGE BOARD DATE & TIME: Monday, November 16, 2026 at 7:00 PM LOCATION: Germantown Village Hall Board Room N112 W17001 Mequon Road Any member of the body and/or citizen may attend the meeting virtually through the WebEx platform, Meeting #: 2551 746 8900 Password: RGfHMePh684 which can be accessed by phone at 408-418-9388 or by logging in at https://villageofgermantown.my.webex.com/villageofgermantown.my/j.php?MTID=mcfd387d794f23193635cc72cae01eb8b Citizens not wishing to attend the meeting personally or virtually may submit any public comments by filling out the Online Comment Form by 4:00 PM on the day of the meeting so that it can be provided to the members of the body for their consideration. Previously recorded Board, Committee, and Commission meeting videos can be viewed at https://www.youtube.com/@villageofgermantownwi AGENDA I. CALL TO ORDER: This meeting has been given public notice in accordance with Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public and news media of subject matter that is intended for consideration and action. II. ROLL CALL: III. PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE: IV. PRESIDENT’S REPORT: V. ANNOUNCEMENTS OF FORTHCOMING EVENTS OF PUBLIC INTEREST / COMMITTEE AND DEPARTMENT REPORTS: VI. CITIZEN INPUT: (Please be advised per 19.84(2) that information and comment will be received from the public. It is the policy of this municipality that public input be limited to a four (4) minute period per person with a time extension granted at the discretion of the Chairperson. Be advised that there may be limited discussion of the information received but no action will be taken under public comments.) Comments that may be injurious to village personnel or other individuals will not be allowed. VII. CONSENT AGENDA: A. Meeting Minutes: November 5, 2026 (ACTION) B. Temporary Class "B" Beer & "Class B" Wine Application for St. Boniface Spaghetti Dinner - January 30, 2027 (ACTION) C. Temporary Class "B" Application for St. Boniface Lenten Fish Fries - February 12, 2027, February 19, 2027, and February 26, 2027 (ACTION) Page 1 of 219 VILLAGE BOARD AGENDA November 16, 2026 Page 2 D. Temporary Class "B" Beer & "Class B" Wine Application for St. Boniface Auction Fundraiser - April 24, 2027 (ACTION) E. Award of Contract to Zenith Tech, Inc. in the amount of $95,600.00 and to include a 10% contingency of $9,560.00 for a total amount of $105,160.00 for the Maple Road Bridge Repair. (ACTION) F. Award of Contract to Southern Wisconsin Appraisals for Appraisal Services for WisDot Project 2300-05-21 in the amount of $107,850.00. (ACTION) G. Update Inspection and Testing Fee Schedule (ACTION) H. Police Department Budget Amendments for Insurance Proceeds and Sale of Old Squad (ACTION) VIII. UNFINISHED BUSINESS: IX. PUBLIC HEARINGS: A. 2027 Village of Germantown Budget and 2026 Tax Levy X. NEW BUSINESS: A. Resolution Adopting the 2027 Budget (ACTION) B. Resolution Approving the Levying of Property Taxes (ACTION) C. Resolution Authorizing the Placement of Special Charges on the 2026 Tax Roll Against Certain Properties (ACTION) D. Resolution Designating Officials Authorized to Declare Official Intent Under Reimbursement Bond Regulations (ACTION) E. Resolution Accepting Funds from Washington County EMS and Fire Grant Program for 2026 (ACTION) F. Sutton Farms Development Agreement (ACTION) XI. ADJOURNMENT: UPON REASONABLE NOTICE, efforts will be made to accommodate the needs of disabled individuals through appropriate aids and services. For additional information or to request this service, please contact the Village Clerk at (262) 250-4745 at least 2 days prior to the meeting. Notice is hereby given that a possible quorum of other boards, committees, and/or commissions may attend this meeting to gather information about an item over which they have decision-making responsibility. This may constitute a meeting of these bodies per State ex rel. Badke v Greendale Village Board, even though these bodies will not take formal action at this meeting. Page 2 of 219 MEETING: REGULAR MEETING OF THE VILLAGE BOARD DATE & TIME: Thursday, November 5, 2026 at 7:00 PM LOCATION: Germantown Vi llage Hall Board Room N112 W17001 Mequon Road MINUTES I. CALL TO ORDER: This meeting has been given public notice in accordance with Section 19.83 and 19.84, Wis. Stats, in such form that will apprise the general public and news media of subject matter that is intended for consideration and action. Villa ge President Soderberg called the Village Board meeting to order at 7:00 PM. II. ROLL CALL: Present: Trustee Robert Warren, Trustee Meg Cutts, Trustee Jim Stout, Trustee Jan Miller, Trustee Patrick Kaiser, Trustee Jolene Pieper, Trustee Scott Hefle, Trustee Terri Kaminski, Village President Bob Soderberg Also Present: Village Clerk Donna Ott, Village Administrator Matt Trebatoski, Village Attorney Brian Sajdak, Fire Chief John Delain, Police Chief Pat Merten III. PLEDGE OF ALLEGIANCE / MOMENT OF SILENCE: IV. PRESIDENT’S REPORT: Village President Soderberg spoke regarding local meetings, Crash Responders Week, the General election, the groundbreaking ceremony for the Carrillon of Germantown, ongoing Village construction projects, upcoming Christmas festivities, and items on tonight's Village Board agenda. V. ANNOUNCEMENTS OF FORTHCOMING EVENTS OF PUBLIC INTEREST / COMMITTEE AND DEPARTMENT REPORTS: Trustee Kaminski announced the upcoming Public Works & Highways Committee meeting on Tuesday, December 1, 2026, at 5:30 PM. Trustee Cutts annou nced the upcoming General Government & Finance Committee meeting on Monday, November 16, 2026, at 5:30 PM, and the upcoming Public Safety DRAFT Page 3 of 219 Page 2 Committee meeting on Monday, December 7, 2026, at 6:00 PM. Trustee Hefle announced the upcoming Economic Development Commission meeting on Wednesday, November 11, 2026, at 6:00 PM. Trustee Miller announced the upcoming Tourism Commission meeting on Monday, November 9, 2026, at 6:00 PM. VI. CITIZEN INPUT: (Please be advised per 19.84(2) that information and comment will be received from the public. It is the policy of this municipality that public input be limited to a four (4) minute period per person with a time extension granted at the discretion of the Chairperson. Be advised that there may be limited discussion of the information received but no action will be taken under public comments.) Comments that may be injurious to village personnel or other individuals will not be allowed. Lynne Bednarz (W156N10121 Pawnee Ct) spoke regarding New Business Item D (Schematic Design Phase Completion for New Police Facility). Melanie Smythe (N140W17938 Cedar Ln) spoke regarding New Business Item C (Fire Department Building Needs Update) and New Business Item D (Schematic Design Phase Completion for New Police Facility). Patrick Braun (W142N10634 Magnolia Dr) spoke regarding New Business Item C (Fire Department Building Needs Update). Written comments were not read aloud but are included with these minutes. VII. CONSENT AGENDA: A. Meeting Minutes: October 19, 2026 (ACTION) Motion: Approve as presented Motioned By: Scott Hefle Seconded By: Jan Miller Yes: Robert Warren, Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: None Abstain: None Motion Carried by Voice Vote (Yes 9, No 0, Abstained 0) VIII. UNFINISHED BUSINESS: IX. PUBLIC HEARINGS: DRAFT Page 4 of 219 Page 3 X. NEW BUSINESS: A. 2026-2027 Retail Alcohol Beverage License Application for Chahal Legacy Ventures LLC (ACTION) Motion: Approve as presented Motioned By: Jolene Pieper Seconded By: Patrick Kaiser Yes: Robert Warren, Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: None Abstain: None Motion Carried by Voice Vote (Yes 9, No 0, Abstained 0) B. 2026-2027 Outside Premise Extension Application for Chahal Legacy Ventures LLC, dba Bixenberg Tavern (ACTION) Motion: Approve as presented Motioned By: Jolene Pieper Seconded By: Patrick Kaiser Yes: Robert Warren, Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: None Abstain: None Motion Carried by Voice Vote (Yes 9, No 0, Abstained 0) Motion: Discuss New Business Items E and F next Motioned By: Scott Hefle Seconded By: Jan Miller Yes: Robert Warren, Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: None Abstain: None Motion Carried by Voice Vote (Yes 9, No 0, Abstained 0) E. An Ordinance Amending Section 1.37(2) of the Germantown Municipal Code Relating to the Membership of the Building Construction Oversight Committee. (ACTION) Motion: Approve as presented Motioned By: Terri Kaminski DRAFT Page 5 of 219 Page 4 Seconded By: Jan Miller Motion to Amend: Amend to reflect 5 total voting members, with 3 members being Village residents Motioned By: Jolene Pieper Seconded By: Terri Kaminski Yes: Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: Robert Warren Abstain: None Motion to Amend Carried by Voice Vote (Yes 8, No 1, Abstained 0) Yes: Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: Robert Warren Abstain: None Motion as Amended Carried by Voice Vote (Yes 8, No 1, Abstained 0) F. An Ordinance Amending Section 1.372 of the Germantown Municipal Code Relating to the Senior Center Advisory Committee. (ACTION) Motion: Approve as presented Motioned By: Scott Hefle Seconded By: Jan Miller Yes: Robert Warren, Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle, Terri Kaminski, Bob Soderberg No: None Abstain: None Motion Carried by Voice Vote (Yes 9, No 0, Abstained 0) C. Fire Department Building Needs Update (ACTION) Fire Chief Delain and members of the building project team provided an update on current Fire Department building needs, including a facility path, cost timing, and residential impact. Motion: Approve Path 2 as presented and include up to $12,750,000 in the 2027 Capital Budget for the project Motioned By: Robert Warren Seconded By: Meg Cutts Yes: Robert Warren, Meg Cutts, Jim Stout, Jan Miller, Patrick Kaiser, Scott Hefle, Terri Kaminski, Bob Soderberg DRAFT Page 6 of 219 Page 5 No: Jolene Pieper Abstain: None Motion Carried by Roll Call Vote (Yes 8, No 1, Abstained 0) D. Schematic Design Phase Completion for New Police Facility (ACTION) Police Chief Merten and members of the building project team provided the schematic design for the new Police facility for review. Motion: Postpone this item until the November 16, 2026, Village Board meeting as presented Motioned By: Scott Hefle Seconded By: Jolene Pieper Yes: Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle No: Robert Warren, Meg Cutts, Jim Stout, Terri Kaminski, Bob Soderberg Abstain: None Motion Failed by Voice Vote (Yes 4, No 5, Abstained 0) Motion: Approve the Schematic Design Phase and move into Design Development for the New Police Facility Motioned By: Meg Cutts Seconded By: Terri Kaminski Yes: Robert Warren, Meg Cutts, Jim Stout, Terri Kaminski, Bob Soderberg No: Jan Miller, Patrick Kaiser, Jolene Pieper, Scott Hefle Abstain: None Motion Carried by Roll Call Vote (Yes 5, No 4, Abstained 0) XI. ADJOURNMENT: Village President Soderberg adjourned the Village Board meeting at 9:52 PM. DRAFT Page 7 of 219 From: noreply@civicplus.com To: Matt Trebatoski; Donna Ott; Kasie Miller; Madeline Laufenberg; Lisa Davis; Guilford Standridge; Linda Granec; Debbie Remich; Jordan Yanke; Jeff Retzlaff; Tim Zimmerman; Heidi Van Beek; John Delain; Amy Lerch; Chief Pat Merten; Julie Barth; Bob Soderberg; Terri Kaminski; Jolene Pieper; Scott Hefle; Patrick Kaiser; Jan Miller; Meg Cutts; Jim Stout; Robert Warren; Brenton Schimp; smithp@germantownlibrarywi.gov; clloyd@germantownlibrarywi.gov; clee@germantownlibrarywi.gov Subject: Online Form Submittal: Comment Form for Board, Committee, and Commission Meetings Date: Tuesday, November 3, 2026 5:11:59 PM CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Comment Form for Board, Committee, and Commission Meetings First Name CAROL Last Name SCHNEIDER Address W157N9924 Bayberry Circle City Germantown State WI Zip 53022 Email Address cash2u@outlook.com (Section Break) Which Committee/Commission/Board do you have comments for? Village Board What is the date of the meeting? 11/5/2026 For which item do you wish to provide comments? NEW BUSINESS ITEM"E" ORDIANCE AMENDING RELATING TO THE MEMERSHIP OF B.C.O.C COMMITTEE What is your opinion of the item? I am IN FAVOR of the item. Would you like to speak at the meeting? No, I do not wish to speak at the meeting. I only want to submit my comments through this form. Comments THIS WOULD BE A GREAT IDEA, TO GET ANOTHER DRAFT Page 8 of 219 RESIDENT ON THE COMMITTEE WHO HAS EXPERIENCE IN ARCHITECTURAL OR CONSTRUCTION MANAGEMENT SKILLS. ALSO TO REMOVE THE CHIEF AND OR DIRECTOR OF THE DEPARTMENT INVOLVED OF THEIR VOTING RIGHTS. THEY DON'T NEED TO HAVE A VOTE IN THIS MATTER. IT SHOULD BE DECIDED THE MEMBERS OF THE COMMITTEE TO HAVE THE DECIDING VOTE. Please Note: I acknowledge that this form does not register me to speak at the meeting. Email not displaying correctly? View it in your browser. DRAFT Page 9 of 219 From: noreply@civicplus.com To: Matt Trebatoski; Donna Ott; Kasie Miller; Madeline Laufenberg; Lisa Davis; Guilford Standridge; Linda Granec; Debbie Remich; Jordan Yanke; Jeff Retzlaff; Tim Zimmerman; Heidi Van Beek; John Delain; Amy Lerch; Chief Pat Merten; Julie Barth; Bob Soderberg; Terri Kaminski; Jolene Pieper; Scott Hefle; Patrick Kaiser; Jan Miller; Meg Cutts; Jim Stout; Robert Warren; Brenton Schimp; smithp@germantownlibrarywi.gov; clloyd@germantownlibrarywi.gov; clee@germantownlibrarywi.gov Subject: Online Form Submittal: Comment Form for Board, Committee, and Commission Meetings Date: Tuesday, November 3, 2026 5:23:30 PM CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Comment Form for Board, Committee, and Commission Meetings First Name CAROL Last Name SCHNEIDER Address W157N9924 Bayberry Circle City Germantown State WI Zip 53022 Email Address cash2u@outlook.com (Section Break) Which Committee/Commission/Board do you have comments for? Village Board What is the date of the meeting? 11/5/2026 For which item do you wish to provide comments? NEW BUSINESS ITEM "F" MAKE CHANGES TO SECTION 1.372 ORDIANCE DUE TO THE DISBAND OF THE GERMANTOWN SENIOR CLUB AND CHANGE FROM DIRECTOR TO CENTER COORDINATOR What is your opinion of the item? I am IN FAVOR of the item. Would you like to speak at the meeting? Field not completed. DRAFT Page 10 of 219 Comments THIS IS A GOOD THING TO BE UPDATED. CHANGE FROM THE GERMANTOWN SENIOR CLUB TO HAVE 4 GERMANTOWN RESIENTS WHO ARE 55, WHICH WAS DISBAND CHANGE FROM SENIOR DIRECTOR TO SENIOR CENTER COORDINATOR, Please Note: I acknowledge that this form does not register me to speak at the meeting. Email not displaying correctly? View it in your browser. DRAFT Page 11 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Temporary Class "B" Beer & "Class B" Wine Application for St. Boniface Spaghetti Dinner - January 30, 2027 (ACTION) SUBMITTED BY: Kasie Miller, Chief Deputy Clerk SUMMARY EXPLANATION: On 09/30/2026, St. Boniface Congregation submitted an application for a Temporary Class "B" Beer and "Class B" Wine license for their Spaghetti Dinner on January 30, 2027. The Police Department has reviewed this application and has no noted contingencies. ATTACHMENT: 1. St Boniface Spaghetti Dinner 01.30.27 Beer and Wine_Redacted STAFF RECOMMENDATION: To approve the Temporary Class "B" Beer and "Class B" Wine application for St. Boniface's Spaghetti Dinner on January 30, 2027. ACTION BY COMMITTEE: On 11/05/2026, the Public Safety Committee voted unanimously to approve this application (4-0). Page 12 of 219 Page 13 of 219 Page 14 of 219 Page 15 of 219 Page 16 of 219 Page 17 of 219 Page 18 of 219 Page 19 of 219 Page 20 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Temporary Class "B" Application for St. Boniface Lenten Fish Fries - February 12, 2027, February 19, 2027, and February 26, 2027 (ACTION) SUBMITTED BY: Kasie Miller, Chief Deputy Clerk SUMMARY EXPLANATION: On 09/30/2026, St. Boniface Congregation submitted an application for a Temporary Class "B" Beer license for their Lenten Fish Fries on February 12, February 19, and February 26, 2027. The Police Department has reviewed this application and has no noted contingencies. ATTACHMENT: 1. St Boniface Lent Fish Fry 02.12.27, 02.19.27, 02.26.27 Beer only_Redacted STAFF RECOMMENDATION: To approve the Temporary Class "B" Beer application for St. Boniface's Lenten Fish Fries on February 12, 19, and 26, 2027. ACTION BY COMMITTEE: On 11/05/2026, the Public Safety Committee voted unanimously to approve this application (4-0). Page 21 of 219 Page 22 of 219 Page 23 of 219 Page 24 of 219 Page 25 of 219 Page 26 of 219 Page 27 of 219 Page 28 of 219 Page 29 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Temporary Class "B" Beer & "Class B" Wine Application for St. Boniface Auction Fundraiser - April 24, 2027 (ACTION) SUBMITTED BY: Kasie Miller, Chief Deputy Clerk SUMMARY EXPLANATION: On 09/30/2026, St. Boniface Congregation submitted an application for a Temporary Class "B" Beer and "Class B" Wine license for their Auction Fundraiser on April 24, 2027. The Police Department has reviewed this application and has no noted contingencies. ATTACHMENT: 1. St Boniface Auction Fundraiser 04.24.27 Beer and Wine_Redacted STAFF RECOMMENDATION: To approve the Temporary Class "B" Beer and "Class B" Wine application for St. Boniface's Auction Fundraiser on April 24, 2027. ACTION BY COMMITTEE: On 11/05/2026, the Public Safety Committee voted unanimously to approve this application (4-0). Page 30 of 219 Page 31 of 219 Page 32 of 219 Page 33 of 219 Page 34 of 219 Page 35 of 219 Page 36 of 219 Page 37 of 219 Page 38 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Award of Contract to Zenith Tech, Inc. in the amount of $95,600.00 and to include a 10% contingency of $9,560.00 for a total amount of $105,160.00 for the Maple Road Bridge Repair. (ACTION) SUBMITTED BY: Timothy Zimmerman, Public Works Director SUMMARY EXPLANATION: The 2026 Road Program includes money for the repair of the Maple Road Bridge over the Goldendale Creek. The PWHC approved Option “A” repair at the May 2026 PWHC meeting which includes the following: Repair the Deficient West Outer Channel Beam with Concrete Surface Repairs, Galvanic Anodes and Fiber Wrap. Estimated cost range includes Embedded Galvanic Anodes, Concrete Surface Repair, and Fiber Wrap Reinforcing Non-Structural, some minor traffic control, and the cost of Mobilization. In addition, the cost of surface repairs to the other channels is included in the estimate. On behalf of the Village, MSA Professional Services bid this project, and the bid results are as follows: Zenith Tech, Inc. $95,600.00 Engineers estimate $65,000-$85,000 ATTACHMENT: 1. 7 - Maple Road Bridge Repair - Staff Memo - cover 2. 01 Owner Recommendation of Award Ltr 10.22.2026 STAFF RECOMMENDATION: Staff requests the PWHC recommend to the Village Board approval of a contract with Zenith Tech, Inc. for the Maple Road Bridge repair in the amount of $95,600.00 and allow a 10% contingency of $9,560.00 for the total amount of $105,160.00. Funded in 40-5561000-594300 Bridges in the amount of $275,000.00. ACTION BY COMMITTEE: Page 39 of 219 BUSINESS OF THE PUBLIC WORKS & HIGHWAYS COMMITTEE GERMANTOWN, WI MEETING DATE: May 13, 2026 AGENDA ITEM: New Business ITEM TITLE: Maple Road Bridge Repair over Goldendale Creek SUBMITTED BY: Kevin Driscoll – Village Engineer SUMMARY EXPLANATION: An inspection was completed by Washington County and Village staff was notified of the necessary repair work. This work was budget ed and approved, and a consultant delivered a conceptual design report. See attached. Staff anticipates bidding out to repair work once a design approach is selected. The steel beam and concrete surface repair alternatives were evaluated in th e study. Both are feasible options for addressing the deficient western, exterior channel beam. Replacement with a new precast concrete channel beam is not a feasible repair option because of the post-tensioned tie rods connecting the channel beams. Supplementing the precast concrete channel beam with a new steel beam addresses the deficient strength of the structure, but would also require traffic control (option B). The concrete surface repair and fiber wrap system offers the improved strength with less traffic control required during construction (option A). The Village may select a preferred option based on budget, desired durability, and long-term maintenance considerations. Alternative A: Estimated Cost amount $65,000 - $80,000 Repair the Deficient West Outer Channel Beam with Concrete Surface Repairs, Galvanic Anodes and Fiber Wrap . Estimated cost range includes Embedded Galvanic Anodes, Concrete Surface Repair, and Fiber Wrap Reinforcing Non-Structural, some minor traffic control, and the cost of Mobilization. In addition, the cost of surface repairs to the other channels is included in the estimate. Construction Engineering & Contingency is not included in these costs. Alternative B: Estimated Cost amount $85,000 - $120,000 Partial Replacement of the West Outer Channel Beam Exterior Web (Outer Leg) with a Steel Beam Estimated cost range includes jacking existing channel beam, sawcutting, removal of the deficient exterior web (outer leg) of the western channel beam, placing a new steel beam, traffic control, and the cost of Mobilization. In addition, the cost of surface repairs to the other channels is included in the estimate. Construction Engineering & Contingency is not included in these costs. ATTACHMENT: ORDINANCE RESOLUTION OTHER __X___ Exhibit A – Budget, Exhibit B - Study RECOMMENDATION: Staff requests the Public Works and Highways Committee direct staff to pursue an alternate for plan development by MSA, an proceed with repair process, and look to Page 40 of 219 program for future bridge replacement of Structure V-66-041. COMMITTEE ACTION: A motion to support authorize staff and a vote “Aye” is in the affirmative to support the contract Page 41 of 219 G:\00\00223\00223006\Spec\00 Construction Contracts\00223006 NOA, NTP Ltrs.docx 1230 South Blvd. Baraboo, WI 53913 P: (608) 356-2771 TF: (800) 362-4505 F: (608) 807-5148 www.msa-ps.com October 22, 2026 Bob Soderberg, Village President Village of Germantown N112 W17001 Mequon Road Germantown, WI 53022 Re: Maple Road Over Goldendale Creek Bridge Repair Village of Germantown Dear Mr. Soderberg: Upon review of the bidreceived on October 22, 2026 for the above-referenced project, it was found that it was submitted by a qualified contractor. It is our recommendation that the responsive bidder listed below be accepted and award made at your next meeting. Zenith Tech, Inc. N6w23673 Bluemound Road Waukesha, WI 53188 Bid Amount $95,600.00 Please execute the enclosed Notice of Award for the contract . Once the form is signed, please email a copy backto dspindler@msa-ps.com. After receiving the executed copy, we will forward one copy of the Notice of Award and the remaining contract package to the Contractor. Sincerely, MSA Professional Services, Inc. Julia Zehner, PE Project Manager Engineering dds Enc. Page 42 of 219 00 51 00 Notice of Award EJCDC® C-510, Notice of Award. Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. G:\00\00223\00223006\Spec\00 Construction Contracts\00223006 NOA, NTP, Bonds.docx NOTICE OF AWARD Date of Issuance: Owner: Village of Germantown Owner's Contract No.: Engineer: MSA Professional Services, Inc Engineer's Project No.:00223006 Contract: Village of Germantown - Maple Road Over Goldendale Creek Bridge Repair Bidder: Zenith Tech, Inc. Bidder's Address: N6w23673 Bluemound Road, Waukesha, WI 53188 You are notified that your Bid dated October 22, 2026, for the above Contract, and that you are the Successful Bidder and are awarded a Contract for Maple Road Over Goldendale Creek Bridge Repair. Base Bid The Contract Price of your Contract is Ninety-five thousand six-hundred Dollars and 00/100 Cents ($95,600.00). Contract Price is subject to adjustment based on the provisions of the Contract, including but not limited to those governing changes, Unit Price Work, and Work performed on a cost-plus-fee basis, as applicable. [1] unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to Bidder electronically. ☑ Drawings will be delivered separately from the other Contract Documents. You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice of Award: 1. Deliver to Owner [1] counterparts of the Agreement, signed by Bidder (as Contractor). 2. Deliver with the signed Agreement(s) the Contract security (such as required performance and payment bonds) and insurance documentation, as specified in the Instructions to Bidders and in the General Conditions, Articles 2 and 6. 3. Other conditions precedent (if any): N/A Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within 10 days after you comply with the above conditions, Owner will return to you one fully signed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions. Owner: Village of Germantown __________________________________________________ __ By (signature): ________________________________________________________ Name (printed):Bob Soderberg Title: Village President Copy to Engineer Page 43 of 219 Village of Germantown - Maple Road Over Goldendale Creek Bridge Repair (#10321078) Owner: Germantown, Village of Solicitor: MSA Professional Services - Baraboo 10/22/2026 10:00 AM CDT Item No.Item Description UofM QuantityUnit Price Extension General 203.0335Debris Containment Over Waterway V-66-41EACH 1 $700.00 $700.00 509.0150Concrete Surface Repair SF 32 $530.00$16,960.00 619.1000Mobilization EACH 1 $54,600.00$54,600.00 643.5000Traffic Control EACH 1 $1,500.00 $1,500.00 SPV.0165Fiber Wrap Reinforcing Non-Structural SF 52 $420.00$21,840.00 Base Bid Total: $95,600.00 Zenith Tech, INC. Page 44 of 219 Page 45 of 219 Page 46 of 219 Page 47 of 219 Page 48 of 219 Page 49 of 219 Page 50 of 219 Page 51 of 219 Page 52 of 219 Page 53 of 219 Page 54 of 219 Page 55 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Award of Contract to Southern Wisconsin Appraisals for Appraisal Services for WisDot Project 2300-05-21 in the amount of $107,850.00. (ACTION) SUBMITTED BY: Timothy Zimmerman, Public Works Director SUMMARY EXPLANATION: WisDOT Project ID 2300-05-21 is a connecting highway project between IH-41 E Ramps and S STH 145. This project will address deteriorating pavement and decreased ride quality on STH 167. Along with addressing existing pavement conditions, the project will replace the out-of-date signals at six intersections, replace curb ramps to current standards throughout the corridor, add sidewalk at key locations to connect existing, replace an at-grade railroad crossing surface, and perform maintenance at existing cross culverts and ditches. The Village is responsible for the real estate acquisition and coordination on the parcels impacted by the improvements outside of the right-of-way. Staff received three qualified proposals for this project. They are as follows: Southern Wisconsin Appraisals (SWA) Traditional $107,850.00 Jewell Associates Engineers Hybrid $64,000 Base + $2,000 ea. If converted to appraisal $118,000.00 Terra Venture Advisors, LLC Hybrid $105,850 Incl.12 Appraisals Additional appraisals at $2,500.00. ATTACHMENT: 1. VGT RFP Summary and Description for STH 167 STAFF RECOMMENDATION: Staff requests the PWHC recommend to the Village Board approval of a Professional Services Agreement with Southern Wisconsin Appraisals (SWA) because its fixed-cost proposal avoids the Sales Study/Nominal Acquisition process and related risk of additional appraisal costs. The Village has successfully worked with SWA on previous land acquisitions, and WisDOT supports the proposal and associated costs. Page 56 of 219 Reimbursement procedures by WisDOT are included in the project scope. Money is budgeted in 40561000-593800 HWY 167 Improvements. ACTION BY COMMITTEE: Page 57 of 219 Village of Germantown Project #2703 STH 167 (Mequon Road) WisDOT Project ID 2300-05-21 is a connecting highway project between IH-41 E Ramps and S STH 145. This project will address deteriorating pavement and decreased ride quality on STH 167. Along with addressing existing pavement conditions, the project will replace the out-of-date signals at six intersections, replaced curb ramps to current standards throughout the corridor, add sidewalk at key locations to connect existing, replaced an at-grade railroad crossing surface, and perform maintenance at existing cross culverts and ditches. The Village is responsible for the real estate acquisition and coordination on the parcels impacted by the improvements outside of the right-of-way. Following the WisDOT land acquisition process, the Village sent out RFP’s (request for proposals) to the state approved list of appraisers and consultants. We received seven proposals, three of which met the criteria for the project scope: • Southern Wisconsin Appraisals (SWA) • Jewell Associates Engineers, Inc. • TerraVenture Advisors LLC The selected consultant is anticipated to be approved by Village Board on November 16, 2026. A WisDOT kickoff meeting is scheduled for November 18, 2026, at 10:00am. Other project target dates include: • WisDOT PS&E – 5/1/2028 (Advanced) or 5/1/2029 (Programmed) • WisDOT Let – 9/11/2028 (Advanced) or 9/11/2029 (Programmed) Below is a summary of the three proposals including cost estimates and schedules: Page 58 of 219 Southern Wisconsin Appraisals (SWA) Cost Estimate: Schedule and Summary of Services: SWA anticipates that acquisitions will be completed by May 1, 2028. This timeline may be negotiable and may also change based on the addition of properties to the project or changes in project design or other considerations. Upon completion of acquisition services, we shall provide the Village of Germantown copies of documents per parcel, as appropriate, and project reports including: Negotiation Diary, Copies of all recorded conveyances, Copies of all recorded Partial Release of Mortgage or waiver (if applicable), Statement to Construction Engineer, Payment Request and Copies of Payment(s), Administrative Revision (if applicable), Closing Statement (if applicable), Disposition of RE tax - pro-rated (if applicable), Introduction Letter & Correspondence (most recent on top), Approved Offering Price Report, Appraisal Report, and LPA Certification of Right-of-Way. These documents will be provided electronically, or hard copies may be provided upon request. Additionally, our services include fees for project management services and for recording forty-one (41) documents at the register of deeds. Our scope of work also includes the preparation of the Certification of LPA Right of Way Acquisition Form, required for WisDOT right of way clearance, and the Statement of Expenditures form, required for applicable WisDOT real estate reimbursement. Our fees include attending meetings for the purpose of discussing and reviewing the services to be provided, the project start-up meeting, and a visit to the project site. Based on the information that twenty-nine (29) parcels are expected to be appraised and acquired, the total cost for the services required to complete this project is $107,850. Should the number of parcels on the final plat be more or less than twenty-nine (29), our scope of work will be adjusted accordingly. Page 59 of 219 Jewell Associates Engineers, Inc. Cost Estimate: Page 60 of 219 Schedule and Summary of Services: Based on our review of the preliminary plat, the project consists primarily of temporary limited easement acquisitions (TLE) with several fee acquisitions affecting commercial parcels. We believe the project is well-suited for a proactive acquisition approach that emphasizes early coordination and nominal settlements while providing the tools necessary to successfully address more complex acquisitions if they arise. Page 61 of 219 TerraVenture Advisors LLC Cost Estimate: Page 62 of 219 Schedule and Summary of Services: TerraVenture Advisors (TVA) proposes completing the following scope of services for acquiring the real estate interests needed for this project: • Project Management • Sales Study/Appraisals • Acquisition Services • Encroachments (if necessary) • Relocation Services The parcels for the project are considered Nominal acquisitions, which means they are considered less than $25,000. This indicates that a Sales Study is sufficient to determine just compensation offers for the project parcels. The cost for TVA to complete the Sales Study is included in our proposal’s cost. We are including up to 12 appraisals to be completed for this project. Any additional parcels that would need to be appraised, whether requested by a property owner or deemed necessary by the agency, can also be completed as shortform appraisal by TVA. If needed, appraisal costs associated with obtaining estimates from contractors for improvements (ex: landscaping) will be either billed to the municipality directly or reimbursed to TVA at actual cost. The costs are based Page 63 of 219 on an actual cost-plus fixed fee, not to exceed basis. Expenses associated with contractor estimates (landscaping, etc.) that may be needed for completing appraisals, if necessary; and fees charged by banks for partial release of mortgages, if necessary, are all variable costs and not included in the costs outlined above. These expenses will be billed to the municipality based on actual costs. All other costs such as postage, mileage and recording fees are included in the totals on the cost form. Engineering/DPW Recommendation: We recommend Southern Wisconsin Appraisals (SWA) because its fixed-cost proposal avoids the Sales Study/Nominal Acquisition process and related risk of additional appraisal costs. The Village has successfully worked with SWA on previous land acquisitions, and WisDOT supports the proposal and associated costs. Reimbursement procedures by WisDOT are included in the project scope. Page 64 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Update Inspection and Testing Fee Schedule (ACTION) SUBMITTED BY: SUMMARY EXPLANATION: GFD has compared our fee schedule with the fees of other area departments. The items in red are what we would like to update to ATTACHMENT: 1. testing comps STAFF RECOMMENDATION: Approval of the fee updates ACTION BY COMMITTEE: Page 65 of 219 Germantown Cedarburg Brookfield Mequon Falls Jackson Devices Sp. Heads 125 $1.00 per head $1.00 per head (0-15) no charge,(15- 250) $95, each additional 100 $30 $60.00 (1-10) $50, $.25 each additional $1.00 per head Pump $125 $75 $75 Spray booth $125 $75 $95 $116 $50 Hoods $125 $75 $95 $116 $75 $50 Chem. $125 $75 $60 $100 Flow test $100 $55 $60 Site Inspection $100 $75 $95 $100 Alarms Notification Devices $125 $1.00 per device $1.00 per device 50 or less fixtures $60, 50+$95 (1-10) $50, 11+ $2.00 each $1.00 per device *Minimum fee $125 *Fees double if started prior to permit issuance *retest fee same as origional *Occupancy before final inspection = double fee Page 66 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Police Department Budget Amendments for Insurance Proceeds and Sale of Old Squad (ACTION) SUBMITTED BY: Patrick Merten, Police Chief SUMMARY EXPLANATION: CVMIC Insurance Payments for Damaged Squad Vehicles • The Village received $16,431.63 and $2,500.00 in insurance proceeds from CVMIC related to recently damaged squad vehicle. • The funds will be used to offset the repair costs associated with the affected vehicles. Sale of old Squad • The Village received $4,600.00 from Wisconsin Surplus, for the sale of old squad #14. • The funds will offset the expenditures in the vehicle maintenance account for 2026. Budget Adjustment • Increase General Fund - PD Squad Maintenance & Repairs (10541000-552700) $23,531.63 o CVMIC $18,931.63 o Squad Sale $4,600.00 Fiscal Impact There is no net impact on the General Fund, as the additional expenditures are fully offset by corresponding insurance reimbursements and sale of equipment. ATTACHMENT: Page 67 of 219 STAFF RECOMMENDATION: Move to approve of the Police Department budget amendment as outlined above to ensure accurate financial reporting and proper use of restricted or reimbursed funds ACTION BY COMMITTEE: Page 68 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Presentation ITEM TITLE: 2027 Village of Germantown Budget and 2026 Tax Levy SUBMITTED BY: SUMMARY EXPLANATION: ATTACHMENT: 1. 2027 Budget Notice for Public Hearing 2. 2027 Budget – Public Hearing 3. Budget Quick Reference 4. 27001 Operating Budget Report 5. 27002 Special Revenue Funds Budget Report 6. 27003 TID Budget Report 7. 27004 Capital Reserve Fund Budget Report 8. 27005 Capital Fund Budget Report STAFF RECOMMENDATION: ACTION BY COMMITTEE: Page 69 of 219 RESIDENTS AND TAXPAYERS OF THE VILLAGE OF GERMANTOWN PLEASE NOTE that a public hearing on the proposed 2027 budget will be held at 7:00 p.m. on November 16, 2026 at the Germantown Village Hall, N112 W17001, Mequon Rd, Germantown WI, 53022. This is a proposed budget, the final levy amount may increase or decrease depending on the majority vote of the board members at the meeting. The Village of Germantown's detailed 2027 budget proposal is available for public inspection at the Germantown Village Clerk's Office, 8:00 a.m - 4:00 p.m. Monday - Friday, and online at the Village's website - www.germantownwi.gov Percent 2026 2026 2027 Change Budget Estimated Proposed Increase Year End (Decrease) Revenues: over prior budget Taxes (other than property taxes) 1,328,591 1,328,591 1,383,499 4.13% Intergovernmental revenues 4,427,395 4,427,395 4,657,869 5.21% Licenses and permits 1,123,285 1,123,285 1,303,385 16.03% Fines, forfeits and penalties 150,500 150,500 150,500 0.00% Public charges for services 2,415,988 2,415,988 2,493,838 3.22% Miscellaneous 294,621 294,621 687,738 133.43% Total Revenues 9,740,380 9,740,380 10,676,829 9.61% Expenditures: General government 1,312,032 1,312,032 1,438,307 9.62% Public safety 12,107,136 12,107,136 13,036,198 7.67% Public works 6,003,376 6,003,376 6,187,548 3.07% Culture, recreation and education 2,638,671 2,638,671 2,932,023 11.12% Conservation and development 780,208 780,208 665,559 -14.69% Transfers Out 263,748 263,748 0 0.00% Total Expenditures 23,105,171 23,105,171 24,259,635 5.00% Excess (deficiency) of revenues over expenditures (13,364,791) (13,364,791) (13,582,806) Local property taxes 13,364,791 13,364,791 13,582,806 1.63% Net increase (decrease) in fund balance 0 0 0 Fund Balance - Beginning of Year 6,049,287 6,049,287 6,049,287 FUND BALANCE - END OF YEAR 6,049,287 6,049,287 6,049,287 Proposed Tax Levy 2026 2027 % Levy Change $ Amount By Fund Budget Budget Difference GENERAL FUND 13,364,791 13,582,806 1.63% 218,015 DEBT SERVICE 4,644,572 6,693,636 44.12% 2,049,064 TOTAL LEVY 18,009,363 20,276,442 12.59% 2,267,079 Following are the proposed budgets for all funds of the Village for Budget Year 2027 Fund Total Revenue Total Expenditure Excess/Deficit Projected Projected Property Tax Balance Jan 1 Balance Dec 31 Contribution General Fund 24,259,635 24,259,635 0 6,049,287 6,049,287 13,582,806 Special Revenue * 31,821 29,821 2,000 314,082 316,082 Impact Fees (All) 60,000 0 60,000 1,370,653 1,430,653 Debt Service 7,131,455 7,864,463 (733,008) 916,189 183,181 6,693,636 Capital Projects 52,431,368 50,157,967 2,273,401 (2,273,401) 0 T.I.F. District #6 912,471 528,378 384,093 779,054 1,163,147 T.I.F. District #7 1,146,048 838,656 307,392 (570,921) (263,529) T.I.F. District #8 3,867,904 1,710,752 2,157,152 (3,092,879) (935,727) T.I.F. District #9 453,621 602,483 (148,862) (680,369) (829,231) Water Utility 3,661,624 6,159,757 (2,498,133) 34,703,212 32,205,079 Sewer Utility 8,630,750 9,045,903 (415,153) 60,685,620 60,270,467 Village Health Plan 2,800,000 2,800,000 0 1,221,565 1,221,565 Village Dental Plan 115,000 115,000 0 81,452 81,452 Library Capital 20,681 0 20,681 984,442 1,005,123 Total 105,522,378 104,112,815 1,409,563 100,487,986 101,897,549 20,276,442 NOTE: Impact Fees: Police, Fire, Library, Park/Recreation and Water The Village's outstanding debt on December 31, 2026 is projected to be: General Obligation Notes & Bonds $103,955,000 Utility Revenue Bonds $4,170,158 $108,125,158 Impact Fee Budgets 2026 2027 Percent 2026 2027 Percent Revenue Change Expenditure Change Police 19,500 0 -100.00% 0 0 0.00% FIre 36,600 0 -100.00% 0 0 0.00% Library 13,650 0 -100.00% 0 0 0.00% Recreation 33,000 0 -100.00% 50,000 0 0.00% Water 60,000 60,000 0.00% 0 0 0.00% Total 162,750 60,000 -63.13% 50,000 0 0.00% (as Required by Section 65.90(3)) NOTE: * Special Revenue Funds: Senior Van Replacement, Canine Fund, Historic Preservation, Recreation Facility Fee Fund, Honor Guard, Police Asset Forfeiture, Property Maintenance Fund, Fire Department Explorer funds, Capital Reserve, and ARPA funds are shown as one total. (as Required by Section 65.90(3)) Public Hearing November 16, 2026 VILLAGE OF GERMANTOWN 2027 PROPOSED BUDGET SUMMARY GENERAL FUND VILLAGE OF GERMANTOWN 2027 PROPOSED BUDGET SUMMARY ALL FUNDS Page 70 of 219 2027 Budget – Public Hearing November 16, 2026 Page 71 of 219 Budget Development Process Compile Materials Department Drafting Review and Balance Presentation and Changes Adoption Initial Budget Materials Adopted Budget Page 72 of 219 Budget Process ￿ Capital Budgeting and Operational Budgeting should be two separate tracks. Due to the timing of hiring the Village Administrator and Finance Director, these two were combined in 2026. Budget Personnel Preview – June 2026 Departmental Budget Development – July 2026 Admin Budget Review and Dept Capital Plan– August 2026 Recommended Capital Presented – September 2026 Committee of the Whole Meeting on Capital Plan Recommended Operating Budget Presented – October 2026 3 Committee of the Whole Meetings on Operating Budget Public Hearing and Adoption on Nov 16th Page 73 of 219 Budget Challenges Increased Demand For Services Limited Revenue Options Competitive Labor Market Inflationary Factors Page 74 of 219 Changes that Helped to Produce a Balanced Budget ￿ $263,748 debt service on levy limit side moved back to debt service. ￿ $325,743 interest earnings shifted from capital fund to general fund. ￿ $247,628 increase in Transportation Aid. ￿ $218,015 in net new construction increase, or 1.6%. Page 75 of 219 General Fund Revenues Page 76 of 219 Page 77 of 219 General Fund Expenditures by Expense Classification Page 78 of 219 General Fund Expenditures by Functional Area Page 79 of 219 General Fund Expenditures by Cost Center Page 80 of 219 2027 Capital Projects Overview Total Borrowing $50,157,967 Page 81 of 219 Property Tax Levy 2023 DPW Building Debt Service 2025 Public Safety Referendum 2027 PD Design, Fire Station Renovation Page 82 of 219 Property Tax Rate Page 83 of 219 General Levy ￿ It is recommended to take the full amount of available levy, including the $4,000 that was cut from building maintenance. ￿ When levy is not taken in the first year available, there is a 5-year limit on its use, and it is not included in the new base. ￿ For example: assuming 2% NNC in 2028: ￿ 2027 without $4,000 and 2028 with 2027 Base $13,582,806 2028 Base - (13,582,806*1.02)+4,000 = $13,858,462 ￿ 2027 with $4,000 and 2028 2027 Base $13,586,806 2028 Base - (13,586,806*1.02) = $13,858,542 Page 84 of 219 Thank you! Page 85 of 219 Village of Germantown 2027 Recommended Budget Quick Reference Budget Overview • Total Recommended 2027 General Fund Budget: $24.259 million • Change from 2025: +6.21% Primary Funding Sources • Property Taxes – $13.583 million (56.0%) • State Aid – $4.658 million (19.2%) • Fees & Charges – $2.644 million (10.9%) • Other Revenues – $3.375 million 13.9% Property Tax Impact • 2025 Mill Rate: $4.598 • 2026 Mill Rate for 2027 Budget: $5.112 • Change: +$0.514 per $1,000 of assessed value • Impact on Average Home ($450,000 value): $231 per year Major Investments in 2027 Public Safety – $13.036 million (53.74%) • 42 sworn Police Department personnel • 27 sworn Fire Department personnel Public Works – $5.539 million (22.83%) • Road maintenance and reconstruction • Snow removal • Tree, building, and park maintenance Page 86 of 219 Debt & Capital Planning Borrowing planned for 2027 projects: Major Projects Division Road - $1.4 Million Road Program - $1.688 Million Fire Station – $12.75 million PD Building – $31.8 million Projected 2028 Budget Impact from 2027 Borrowing • 2026 Mill Rate: $5.11 • 2027 Mill Rate for 2028 Budget: $5.50 • Difference: 0.39 • Impact on Average Home: $175.50 per year Debt service is spread over 1, 5, 10, and 20 years to limit tax impact. Resident Engagement • Budget discussions at Open Meetings of Committee of the Whole (broadcast and recorded) • Public Hearing: November 16, 2026 at 7:00 PM, Village Hall Boardroom Department Cost Administration $66,000 DPW $4,897,180 Parks & Recreation $69,000 Public Safety $45,125,787 Total $50,157,967 Page 87 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 1 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10500000 Non-Departmental 10500000 411000 Gen PropTX -12,826,555.00 -13,101,043.00 -13,101,043.00 -13,101,043.00 .00 -13,582,806.00 3.7% 10500000 411050 MFL TAXES -1,302.75 -1,308.00 -1,308.00 -1,046.52 .00 -1,025.00 -21.6% 10500000 411100 MobHome TX -76,012.38 -105,000.00 -105,000.00 -97,961.01 .00 -105,000.00 .0% 10500000 411200 H&M TX -266,460.43 -312,849.00 -312,849.00 -326,823.74 .00 -266,460.00 -14.8% 10500000 411300 Wtr ILT -770,758.00 -660,000.00 -660,000.00 .00 .00 -795,427.00 20.5% 10500000 411400 PILOT -9,292.67 -10,000.00 -10,000.00 -9,281.82 .00 -9,200.00 -8.0% 10500000 411500 PILOT FK -193,387.41 -226,434.00 -226,434.00 -195,701.05 .00 -193,387.00 -14.6% 10500000 411600 Ag UVP -14,378.54 -10,000.00 -10,000.00 -7,628.80 .00 -10,000.00 .0% 10500000 411700 Int&Pen TX -48.96 -3,000.00 -3,000.00 .00 .00 -3,000.00 .0% 10500000 431300 ST ShrdRev -729,528.21 -737,890.00 -737,890.00 -210,040.53 .00 -768,000.00 4.1% 10500000 431400 Util Pymnt -650,517.40 -612,195.00 -612,195.00 .00 .00 -635,000.00 3.7% 10500000 431500 SA Comp Ex -198,191.22 -198,191.00 -198,191.00 -198,191.22 .00 -198,191.00 .0% 10500000 431600 PPE Aid -297,531.04 -296,560.00 -296,560.00 -297,531.04 .00 -297,531.00 .3% 10500000 431900 SA VidServ -52,360.30 -52,360.00 -52,360.00 -52,360.30 .00 -52,360.00 .0% 10500000 443800 Franch Fee -131,785.04 -215,000.00 -215,000.00 -117,860.33 .00 -160,000.00 -25.6% 10500000 461100 CTV Lease -18,817.15 -21,000.00 -21,000.00 -19,837.70 .00 -33,750.00 60.7% 10500000 461200 USC Rental -28,222.85 -34,000.00 -34,000.00 -24,990.77 .00 -7,000.00 -79.4% 10500000 471100 Int Invc -7.30 .00 .00 -44.21 .00 .00 .0% 10500000 471300 M&S Sales -1,269.24 -1,100.00 -1,100.00 -1,236.66 .00 -1,100.00 .0% 10500000 472500 Ins Recov -39,456.88 -15,000.00 -15,000.00 -3,226.90 .00 -15,000.00 .0% 10500000 472600 Refund PYE -1,123.98 .00 .00 -73,330.80 .00 .00 .0% 10500000 472700 Misc Revs -155,407.29 -8,000.00 -8,000.00 -18,531.36 .00 -8,000.00 .0% 10500000 511300 ND COLA .00 234,920.00 20,072.49 .00 .00 .00 -100.0% 10500000 511400 ND SWAG .00 -125,000.00 -125,000.00 .00 .00 -125,000.00 .0% 10500000 521000 ND FICA .00 17,822.00 1,386.17 .00 .00 .00 -100.0% 10500000 521100 ND WRS .00 20,235.00 2,790.99 .00 .00 .00 -100.0% 10500000 521400 Life .00 -163,723.00 -163,723.00 .00 .00 -135,920.00 -17.0% 10500000 531000 ND Gen S&E 382.00 600.00 600.00 398.00 .00 600.00 .0% 10500000 531010 ND Off Sup 3,530.41 500.00 500.00 3,413.65 .00 500.00 .0% 10500000 531030 ND Postage 37.23 500.00 500.00 383.94 .00 500.00 .0% 10500000 531080 Prof Devl .00 .00 .00 89,785.10 .00 25,000.00 .0% 10500000 532040 ND Weed Ex 1,075.50 1,750.00 1,750.00 .00 .00 1,750.00 .0% 10500000 552200 ND M&R Eqp .00 400.00 400.00 .00 .00 400.00 .0% 10500000 561000 ND Bld Utl 148,216.34 100,000.00 100,000.00 100,817.88 .00 106,667.00 6.7% 10500000 561400 ND Teleph 8,652.70 600.00 600.00 .00 .00 600.00 .0% 10500000 571000 ND Ins&Bnd 3,224.80 3,365.00 3,365.00 3,044.19 .00 3,365.00 .0% 10500000 582900 ND TX&Ref 124,769.96 .00 .00 6,573.89 .00 .00 .0% 10500000 583000 ND UnC Itm 123,747.88 .00 .00 .00 .00 .00 .0% TOTAL Non-Departmental -16,048,777.22 -16,528,961.00 -16,777,688.35 -14,552,251.11 .00 -17,263,775.00 4.4% 10510000 Village Board 10510000 511200 VB S&W 44,274.06 42,000.00 42,000.00 41,868.76 .00 45,000.00 7.1% Page 88 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 2 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10510000 511600 VB Comm OT 4,013.93 .00 .00 2,646.77 .00 4,630.00 .0% 10510000 521000 VB FICA 4,152.40 4,000.00 4,000.00 3,503.45 .00 4,662.00 16.6% 10510000 521100 WRS 199.06 .00 .00 190.58 .00 333.00 .0% 10510000 521200 Health 507.27 .00 .00 446.58 .00 -48,351.00 .0% 10510000 521300 Dental 21.05 .00 .00 18.47 .00 32.00 .0% 10510000 531000 VB Gen S&E 8,505.64 9,600.00 9,600.00 4,871.60 .00 9,500.00 -1.0% 10510000 531010 VB Off Sup 417.50 500.00 500.00 .00 .00 500.00 .0% 10510000 531030 VB Postage 569.45 1,000.00 1,000.00 715.75 .00 800.00 -20.0% 10510000 531050 VB Member 10,810.78 11,000.00 11,000.00 11,301.38 .00 11,500.00 4.5% 10510000 531080 VB ProDevl 340.55 500.00 500.00 .00 .00 500.00 .0% 10510000 531140 VB Notices 41.00 1,000.00 1,000.00 .00 .00 400.00 -60.0% 10510000 541100 VB Legal 200,019.05 120,000.00 120,000.00 201,696.42 .00 150,000.00 25.0% 10510000 552200 VB M&R Eqp .00 100.00 100.00 .00 .00 1,500.00 1400.0% 10510000 561500 VB Comms 7,436.66 5,000.00 5,000.00 1,708.71 .00 5,000.00 .0% 10510000 571000 VB Ins&Bnd 1,612.39 1,644.00 1,644.00 1,487.29 .00 1,677.00 2.0% 10510000 582700 VB Empl Rc 1,450.91 2,000.00 2,000.00 502.65 .00 1,500.00 -25.0% TOTAL Village Board 284,371.70 198,344.00 198,344.00 270,958.41 .00 189,183.00 -4.6% 10521000 Administrator's Office 10521000 511000 Adm RegS&W 121,723.78 122,740.00 127,035.89 91,485.39 .00 139,104.00 13.3% 10521000 521000 Adm FICA 8,668.38 9,390.00 9,718.64 6,659.89 .00 10,641.00 13.3% 10521000 521100 Adm WRS 8,230.39 8,837.00 9,146.30 6,256.74 .00 10,085.00 14.1% 10521000 521200 Adm Hlth 27,483.47 25,101.00 25,101.00 17,440.09 .00 25,101.00 .0% 10521000 521300 Adm Dental 1,268.73 1,281.00 1,281.00 789.48 .00 2,562.00 100.0% 10521000 521400 Adm Life 421.68 431.00 431.00 159.30 .00 431.00 .0% 10521000 531000 Adm GenSup 310.48 200.00 200.00 583.97 .00 300.00 50.0% 10521000 531010 Adm OffSup 965.47 1,000.00 1,000.00 104.91 .00 1,000.00 .0% 10521000 531030 Adm Post 569.45 1,000.00 1,000.00 715.75 .00 700.00 -30.0% 10521000 531050 Adm Member 1,542.50 2,000.00 2,000.00 215.00 .00 2,000.00 .0% 10521000 531080 Adm ProDev 2,172.41 1,800.00 1,800.00 .00 .00 2,000.00 11.1% 10521000 531240 Adm Travel 258.00 450.00 450.00 .00 .00 500.00 11.1% 10521000 552200 Adm M&REqp .00 1,500.00 1,500.00 .00 .00 .00 -100.0% 10521000 552700 Adm M&R VH .00 .00 .00 450.00 .00 1,800.00 .0% 10521000 561400 Adm Teleph 7,355.33 7,370.00 7,370.00 2,662.96 .00 7,370.00 .0% 10521000 571000 Adm Ins 2,149.86 1,930.00 1,930.00 1,745.24 .00 2,236.00 15.9% TOTAL Administrator's Office 183,119.93 185,030.00 189,963.83 129,268.72 .00 205,830.00 11.2% 10522000 Information Technology 10522000 531000 IT Gen S&E 75.00 250.00 250.00 .00 .00 250.00 .0% 10522000 531010 IT Off Sup 237.50 1,000.00 1,000.00 647.98 .00 1,000.00 .0% 10522000 531020 IT Copy 14,562.54 16,000.00 16,000.00 16,000.00 .00 16,000.00 .0% 10522000 531290 IT Website 15,065.98 18,000.00 18,000.00 17,064.68 .00 18,000.00 .0% Page 89 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 3 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10522000 531300 IT Maint 208,086.25 170,000.00 170,000.00 157,392.77 .00 170,000.00 .0% 10522000 552200 IT M&R Eqp 345.32 500.00 500.00 .00 .00 500.00 .0% 10522000 561400 IT Phone 20,663.68 19,838.00 19,838.00 18,897.20 .00 19,838.00 .0% 10522000 571000 IT Ins&Bnd 537.47 582.00 582.00 526.13 .00 582.00 .0% TOTAL Information Technology 259,573.74 226,170.00 226,170.00 210,528.76 .00 226,170.00 .0% 10531000 Clerk's Office 10531000 441000 Liq&Malt -25,689.38 -24,000.00 -24,000.00 -25,540.00 .00 -24,000.00 .0% 10531000 441100 Operators -13,970.00 -9,000.00 -9,000.00 -12,906.00 .00 -9,500.00 5.6% 10531000 441300 Cigarette -2,100.00 -1,700.00 -1,700.00 -2,300.00 .00 -1,700.00 .0% 10531000 441400 Vend Mach -2,070.00 -2,000.00 -2,000.00 -1,245.00 .00 -1,500.00 -25.0% 10531000 441500 MobHme Prk -700.00 -700.00 -700.00 -700.00 .00 -700.00 .0% 10531000 441700 Pet Lics -4,992.39 -6,000.00 -6,000.00 -2,728.63 .00 -2,500.00 -58.3% 10531000 441900 Oth Lics -5,877.48 -6,200.00 -6,200.00 -7,263.75 .00 -6,000.00 -3.2% 10531000 461000 AsseLetter -20,529.73 -18,000.00 -18,000.00 -19,635.13 .00 -18,000.00 .0% 10531000 461300 Elctn Rev -1,720.47 .00 .00 -1,363.07 .00 .00 .0% 10531000 511000 CK Reg S&W 179,250.85 182,173.00 188,283.76 176,235.75 .00 231,884.00 27.3% 10531000 511100 PT S&W 710.97 .00 .00 630.00 .00 .00 .0% 10531000 511500 CK Elc Wrk 16,374.32 55,000.00 55,000.00 27,145.59 .00 25,000.00 -54.5% 10531000 511600 Clerk OT 1,746.71 .00 1,925.00 10,218.35 .00 6,500.00 .0% 10531000 521000 CK FICA 13,572.72 18,144.00 18,758.73 13,906.66 .00 16,591.00 -8.6% 10531000 521100 CK WRS 12,579.77 13,117.00 13,556.97 13,405.90 .00 15,724.00 19.9% 10531000 521200 CK Health 40,355.60 29,785.00 29,785.00 51,750.82 .00 64,455.00 116.4% 10531000 521300 CK Dental 2,443.50 2,373.00 2,373.00 2,183.14 .00 2,723.00 14.7% 10531000 521400 CK Life 297.81 323.00 323.00 250.62 .00 323.00 .0% 10531000 531000 CK Gen S&E 1,888.57 .00 .00 40.57 .00 .00 .0% 10531000 531010 CK Off Sup 760.53 4,500.00 4,500.00 333.00 .00 3,000.00 -33.3% 10531000 531030 CK Postage 4,543.60 3,000.00 3,000.00 2,213.61 .00 3,000.00 .0% 10531000 531080 CK Pro Dev 1,013.00 2,000.00 2,000.00 -658.00 .00 2,000.00 .0% 10531000 531240 CK Travel 733.67 2,500.00 2,500.00 .00 .00 2,500.00 .0% 10531000 531650 CK Elc S&E 9,691.00 26,000.00 26,000.00 8,132.01 .00 20,000.00 -23.1% 10531000 552200 CK M&R Eqp .00 2,000.00 2,000.00 .00 .00 2,000.00 .0% 10531000 561400 CK Teleph 323.40 540.00 540.00 228.00 .00 540.00 .0% 10531000 571000 CK Ins&Bnd 2,149.86 4,476.00 4,476.00 4,048.34 .00 4,476.00 .0% 10531000 5PCARD UNALLOPCRD 308.00 .00 .00 .00 .00 .00 .0% TOTAL Clerk's Office 211,094.43 278,331.00 287,421.46 236,382.78 .00 336,816.00 21.0% 10532000 Treasurer's Office 10532000 471000 Int Invest -109,081.69 .00 .00 -192,214.19 .00 -325,743.00 .0% 10532000 471100 Int Invc .00 -750.00 -750.00 -20.01 .00 -750.00 .0% 10532000 471200 Int Assess -712.50 -500.00 -500.00 -6.34 .00 -500.00 .0% 10532000 472000 LEASEINT -37,955.00 .00 .00 .00 .00 .00 .0% Page 90 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 4 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10532000 473000 UnrealGain -123,480.69 .00 .00 55,395.87 .00 .00 .0% 10532000 511000 TR Reg S&W 170,769.52 170,811.00 175,613.18 148,245.90 .00 193,794.00 13.5% 10532000 511600 Treas OT 10,966.87 .00 .00 9,124.34 .00 5,000.00 .0% 10532000 521000 TR FICA 13,465.57 13,067.00 13,434.37 11,301.01 .00 14,825.00 13.5% 10532000 521100 TR WRS 12,639.72 12,298.00 12,643.76 10,972.10 .00 14,050.00 14.2% 10532000 521200 TR Health 28,184.38 26,435.00 26,435.00 19,902.40 .00 36,505.00 38.1% 10532000 521300 TR Dental 1,306.03 1,255.00 1,255.00 808.50 .00 1,255.00 .0% 10532000 521400 TR Life 605.97 662.00 662.00 432.05 .00 662.00 .0% 10532000 531000 TR Gen S&E 1,142.65 2,000.00 2,000.00 433.10 .00 2,000.00 .0% 10532000 531001 Bank Fees .00 .00 .00 14,882.72 .00 20,000.00 .0% 10532000 531010 TR Off Sup 325.63 1,150.00 1,150.00 1,057.91 .00 1,150.00 .0% 10532000 531030 TR Postage 1,510.46 2,200.00 2,200.00 1,669.47 .00 2,200.00 .0% 10532000 531080 TR Pro Dev 1,428.65 2,500.00 2,500.00 175.00 .00 3,000.00 20.0% 10532000 531240 TR Travel 421.50 1,250.00 1,250.00 .00 .00 5,000.00 300.0% 10532000 541600 TR Audit 24,514.65 24,000.00 24,000.00 30,696.65 .00 35,000.00 45.8% 10532000 552200 TR M&R Eqp 999.99 1,500.00 1,500.00 .00 .00 1,500.00 .0% 10532000 561400 TR Teleph 127.96 .00 .00 .00 .00 .00 .0% 10532000 571000 TR Ins&Bnd 2,687.35 2,631.00 2,631.00 2,379.87 .00 2,795.00 6.2% 10532000 5PCARD UNALLOPCRD .00 .00 .00 27.99 .00 .00 .0% TOTAL Treasurer's Office -132.98 260,509.00 266,024.31 115,264.34 .00 11,743.00 -95.5% 10533000 Assessor 10533000 442800 ApInsp Fee -14,295.14 -12,000.00 -12,000.00 -65,603.65 .00 -12,000.00 .0% 10533000 511200 AS Review .00 500.00 500.00 230.87 .00 .00 -100.0% 10533000 521000 AS FICA .00 38.00 38.00 .00 .00 .00 -100.0% 10533000 531000 AS Gen S&E .00 .00 .00 .00 .00 500.00 .0% 10533000 541000 AS Contrct 85,230.87 90,000.00 90,000.00 90,000.00 .00 90,000.00 .0% 10533000 542000 AS Mun Fee 23,527.66 18,000.00 18,000.00 .00 .00 26,251.00 45.8% 10533000 571000 AS Ins&Bnd 537.47 292.00 292.00 264.09 .00 559.00 91.4% TOTAL Assessor 95,000.86 96,830.00 96,830.00 24,891.31 .00 105,310.00 8.8% 10541000 Police Administration 10541000 431200 FA Law Enf -11,378.00 -5,000.00 -5,000.00 -16,616.26 .00 .00 -100.0% 10541000 432100 SA LawEnf -26,587.53 -5,000.00 -45,763.81 -21,258.49 .00 -10,000.00 100.0% 10541000 441600 Bicycle -555.00 -50.00 -50.00 -5.00 .00 -50.00 .0% 10541000 444100 Park Perm -4,479.77 -2,500.00 -2,500.00 -4,391.40 .00 -2,500.00 .0% 10541000 451000 Court Pen -96,007.78 -136,000.00 -136,000.00 -71,880.20 .00 -136,000.00 .0% 10541000 451100 Park Viol -2,860.00 -7,500.00 -7,500.00 -1,475.00 .00 -7,500.00 .0% 10541000 451200 Oth L&O -4,834.94 -7,000.00 -7,000.00 -6,387.87 .00 -7,000.00 .0% 10541000 461500 PD Invest -4,913.76 -4,000.00 -4,000.00 -4,730.62 .00 -4,000.00 .0% 10541000 461600 Twr Rental -51,462.95 -72,000.00 -72,000.00 -38,579.78 .00 -72,000.00 .0% 10541000 471100 Int Invc -13.64 .00 .00 -607.63 .00 .00 .0% Page 91 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 5 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10541000 471700 PD Donate -12,610.00 .00 -1,500.00 -14,618.77 .00 -17,000.00 .0% 10541000 472500 Ins Recov -166,328.70 .00 -15,081.35 -53,411.07 .00 .00 .0% 10541000 475100 SRO -173,634.82 -148,766.00 -148,766.00 -138,561.31 .00 -187,900.00 26.3% 10541000 511000 PD Reg S&W 1,670,569.59 1,815,174.00 1,827,888.29 1,559,818.01 .00 1,891,717.00 4.2% 10541000 511200 PD P&F Com .00 3,000.00 3,000.00 .00 .00 3,000.00 .0% 10541000 511600 PD OT 81,932.60 .00 .00 54,974.94 .00 53,000.00 .0% 10541000 521000 PD FICA 126,117.10 138,861.00 139,833.64 119,378.86 .00 148,771.00 7.1% 10541000 521100 PD WRS 226,131.67 234,820.00 235,735.43 215,265.20 .00 282,762.00 20.4% 10541000 521200 PD Health 297,013.47 312,023.00 312,023.00 250,016.58 .00 329,284.00 5.5% 10541000 521300 PD Dental 14,950.72 15,900.00 15,900.00 13,734.45 .00 15,900.00 .0% 10541000 521400 PD Life 3,343.77 5,880.00 5,880.00 2,890.28 .00 5,880.00 .0% 10541000 531000 PD Gen S&E 15,919.04 7,000.00 7,000.00 5,482.86 .00 7,000.00 .0% 10541000 531010 PD Off Sup 6,033.04 7,600.00 7,600.00 2,389.76 .00 7,600.00 .0% 10541000 531020 PD Copy 5,612.04 7,000.00 7,000.00 5,299.41 .00 6,700.00 -4.3% 10541000 531030 PD Postage 2,098.67 2,000.00 2,000.00 2,412.72 .00 3,100.00 55.0% 10541000 531070 PD Med S&E 4,000.37 3,000.00 3,000.00 2,942.28 .00 3,000.00 .0% 10541000 531080 PD Train 42,997.82 35,000.00 55,250.00 48,711.06 .00 44,000.00 25.7% 10541000 531240 PD Travel 24,850.59 8,000.00 18,449.87 13,357.71 .00 10,000.00 25.0% 10541000 531300 PD IT Mnt 74,144.21 74,000.00 74,000.00 36,947.46 .00 85,000.00 14.9% 10541000 531450 PD Uniform 39,381.41 45,000.00 47,559.85 28,898.17 .00 45,000.00 .0% 10541000 531480 PD Gas&Oil 94,572.22 115,000.00 115,000.00 107,279.37 .00 110,000.00 -4.3% 10541000 531630 PD Animal 1,994.10 3,000.00 3,000.00 1,994.10 .00 2,400.00 -20.0% 10541000 532070 PD Recruit 7,628.87 3,500.00 3,500.00 2,134.96 .00 3,500.00 .0% 10541000 541300 PD Counsel 9,721.20 2,000.00 2,000.00 400.00 .00 10,000.00 400.0% 10541000 541400 PD Court 25,911.96 20,000.00 20,000.00 21,273.00 .00 20,000.00 .0% 10541000 541500 PD Oth Crt 1,050.90 2,000.00 2,000.00 1,585.82 .00 2,000.00 .0% 10541000 541900 PD Conslt 9,033.50 .00 .00 .00 .00 17,000.00 .0% 10541000 543200 Chaplain 4,920.00 .00 .00 .00 .00 .00 .0% 10541000 551000 PD B&G Mnt 670.55 1,500.00 1,500.00 2,946.40 .00 2,600.00 73.3% 10541000 552400 PD M&R Off 293.00 2,000.00 2,000.00 .00 .00 2,000.00 .0% 10541000 552600 PD Radar 963.00 1,200.00 1,200.00 .00 .00 1,200.00 .0% 10541000 552700 PD M&R Vhl 215,026.58 45,000.00 70,950.59 118,989.86 .00 55,000.00 22.2% 10541000 561000 PD Bld Utl 48,772.35 43,000.00 43,000.00 53,049.41 .00 50,000.00 16.3% 10541000 561200 PD Wtr&Swr .00 1,500.00 1,500.00 .00 .00 1,500.00 .0% 10541000 561400 PD Teleph 6,954.44 6,681.00 6,681.00 2,562.99 .00 6,681.00 .0% 10541000 561500 PD Comms 95,738.60 65,000.00 65,000.00 40,600.87 .00 60,000.00 -7.7% 10541000 571000 PD Ins&Bnd 189,512.57 150,740.00 150,740.00 136,351.64 .00 180,070.00 19.5% 10541000 591000 PD Msc Eqp 59,179.71 8,100.00 8,100.00 8,041.49 .00 .00 -100.0% 10541000 5PCARD UNALLOPCRD 352.58 .00 .00 .00 .00 .00 .0% TOTAL Police Administration 2,851,725.35 2,796,663.00 2,813,130.51 2,487,206.26 .00 3,021,715.00 8.0% 10542000 Patrol 10542000 511000 PT Reg S&W 2,042,101.95 2,342,373.00 2,393,763.68 2,021,230.44 .00 2,553,437.00 9.0% Page 92 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 6 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10542000 511600 PT OT 190,995.59 190,000.00 190,000.00 141,747.68 .00 133,000.00 -30.0% 10542000 521000 PT FICA 163,016.61 195,753.00 199,684.39 158,980.35 .00 205,512.00 5.0% 10542000 521100 PT WRS 325,967.03 372,260.00 379,814.43 319,922.01 .00 390,608.00 4.9% 10542000 521200 PT Health 350,464.82 480,167.00 480,167.00 352,475.55 .00 455,662.00 -5.1% 10542000 521300 PT Dental 15,910.95 23,337.00 23,337.00 15,157.30 .00 23,337.00 .0% 10542000 521400 PT Life 1,193.35 2,520.00 2,520.00 1,578.08 .00 2,520.00 .0% 10542000 531560 PT Prt S&E 7,642.49 7,000.00 15,900.00 10,857.70 .00 7,000.00 .0% TOTAL Patrol 3,097,292.79 3,613,410.00 3,685,186.50 3,021,949.11 .00 3,771,076.00 4.4% 10543000 Detective 10543000 511000 DT Reg S&W 324,033.56 322,856.00 322,856.00 285,755.83 .00 344,391.00 6.7% 10543000 511600 DT OT 30,838.85 .00 .00 35,822.96 .00 32,000.00 .0% 10543000 521000 DT FICA 26,315.73 24,700.00 24,700.00 23,810.90 .00 28,794.00 16.6% 10543000 521100 DT WRS 53,246.91 47,460.00 47,460.00 47,593.65 .00 54,727.00 15.3% 10543000 521200 DT Health 82,391.25 8,010.00 8,010.00 73,342.50 .00 83,529.00 942.8% 10543000 521300 DT Dental 3,596.67 3,492.00 3,492.00 3,211.86 .00 3,493.00 .0% 10543000 521400 DT Life 419.96 636.00 636.00 506.40 .00 636.00 .0% 10543000 531580 DT Jvi Sup 1,666.56 1,500.00 1,500.00 1,031.95 .00 1,500.00 .0% 10543000 531600 DT Prop&EV 2,920.82 2,800.00 4,384.85 3,576.22 .00 2,800.00 .0% 10543000 531610 DT Invtgt 6,746.98 7,000.00 9,500.00 5,224.77 .00 8,000.00 14.3% TOTAL Detective 532,177.29 418,454.00 422,538.85 479,877.04 .00 559,870.00 33.8% 10544000 Dispatch 10544000 511000 DP Reg S&W 130,399.85 .00 .00 .00 .00 .00 .0% 10544000 511600 DP OT 33,658.33 .00 .00 .00 .00 .00 .0% 10544000 521000 DP FICA 12,331.08 .00 .00 .00 .00 .00 .0% 10544000 521100 DP WRS 11,402.04 .00 .00 .00 .00 .00 .0% 10544000 521200 DP Health 12,968.76 .00 .00 .00 .00 .00 .0% 10544000 521300 DP Dental 1,155.61 .00 .00 .00 .00 .00 .0% 10544000 521400 DP Life 285.36 .00 .00 .00 .00 .00 .0% TOTAL Dispatch 202,201.03 .00 .00 .00 .00 .00 .0% 10545000 Emergency Government 10545000 511000 EM Reg S&W 7,112.10 6,795.00 6,795.00 6,326.63 .00 7,421.00 9.2% 10545000 521000 EM FICA 520.00 520.00 520.00 459.33 .00 568.00 9.2% 10545000 521100 EM WRS 952.86 999.00 999.00 936.41 .00 1,079.00 8.0% 10545000 521200 EM Health 1,143.44 1,140.00 1,140.00 1,045.88 .00 1,191.00 4.5% 10545000 521300 EM Dental 57.63 58.00 58.00 53.46 .00 58.00 .0% 10545000 521400 EM Life 14.76 21.00 21.00 17.40 .00 21.00 .0% 10545000 531010 EM Off Sup 78,011.80 100.00 100.00 1,605.90 .00 100.00 .0% 10545000 541000 EM Contr 7,153.50 9,000.00 9,000.00 3,300.00 .00 9,000.00 .0% Page 93 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 7 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10545000 571000 EM Ins&Bnd 1,074.94 931.00 931.00 842.42 .00 1,118.00 20.1% TOTAL Emergency Government 96,041.03 19,564.00 19,564.00 14,587.43 .00 20,556.00 5.1% 10551000 Fire Administration 10551000 431800 SA Fire In -165,735.91 -165,735.00 -165,735.00 -171,325.93 .00 -171,325.00 3.4% 10551000 432000 SA Act102 -74,848.52 .00 .00 -70,770.82 .00 .00 .0% 10551000 432700 Cnty Grant -177,000.00 -177,000.00 -177,000.00 .00 .00 .00 -100.0% 10551000 442300 Sprnk Insp -250.00 -5,000.00 -5,000.00 .00 .00 -5,000.00 .0% 10551000 461700 Amb Fees -842,519.21 -871,838.00 -871,838.00 -792,793.75 .00 -871,838.00 .0% 10551000 466400 HwyRep Fee .00 -25,000.00 -25,000.00 .00 .00 -25,000.00 .0% 10551000 471100 Int Invc .00 .00 .00 -71.79 .00 .00 .0% 10551000 471700 FireDonate -4,000.00 .00 .00 -8,500.00 .00 -5,000.00 .0% 10551000 472700 Misc Revs -23,421.21 -6,000.00 -15,107.92 -23,078.46 .00 -15,000.00 150.0% 10551000 511000 FA Reg S&W 467,412.25 465,876.00 478,659.59 432,194.68 .00 495,537.00 6.4% 10551000 511600 FA OT 82,082.46 .00 .00 70,885.17 .00 59,000.00 .0% 10551000 521000 FA FICA 40,547.25 35,640.00 36,617.94 37,031.32 .00 37,909.00 6.4% 10551000 521100 FA WRS 77,650.66 64,306.00 66,038.97 70,329.45 .00 72,051.00 12.0% 10551000 521200 FA Health 121,301.92 117,795.00 117,795.00 109,923.97 .00 122,979.00 4.4% 10551000 521300 FA Dntl 5,201.62 5,050.00 5,050.00 4,741.72 .00 5,051.00 .0% 10551000 521400 FA Life 1,490.71 1,102.00 1,102.00 926.10 .00 1,102.00 .0% 10551000 531000 FA Gen S&E 21,473.84 15,000.00 15,000.00 13,108.73 .00 15,000.00 .0% 10551000 531010 FA Off Sup 4,074.54 3,000.00 3,000.00 230.04 .00 3,000.00 .0% 10551000 531020 FA Copy 7,227.63 4,500.00 4,500.00 9,400.00 .00 4,500.00 .0% 10551000 531030 FA Postage 460.86 100.00 100.00 395.40 .00 100.00 .0% 10551000 531260 FA Insp Ed 2,723.53 3,000.00 3,000.00 383.17 .00 3,000.00 .0% 10551000 531270 FA Meals 1,009.86 1,000.00 1,000.00 429.52 .00 1,000.00 .0% 10551000 532400 FA SVA 4,047.38 3,450.00 3,450.00 2,775.29 .00 3,450.00 .0% 10551000 541000 FA Contrct 33,246.35 20,000.00 29,107.92 23,564.55 .00 30,000.00 50.0% 10551000 561000 FA Bld Utl 30,918.91 30,000.00 30,000.00 33,311.04 .00 30,000.00 .0% 10551000 561100 FA Hyd PFP 537,400.00 537,400.00 537,400.00 .00 .00 537,400.00 .0% 10551000 561200 FA Wtr&Swr .00 3,500.00 3,500.00 .00 .00 3,500.00 .0% 10551000 561400 FA Teleph 32,628.14 26,500.00 26,500.00 10,539.12 .00 26,500.00 .0% 10551000 5PCARD UNALLOPCRD 1,894.58 .00 .00 1,283.84 .00 .00 .0% TOTAL Fire Administration 185,017.64 86,646.00 102,140.50 -245,087.64 .00 357,916.00 313.1% 10552000 Fire Protection Services 10552000 432000 SA Act102 .00 .00 .00 .00 .00 -70,770.00 .0% 10552000 511000 FP Reg S&W 1,493,185.43 1,911,990.00 1,918,150.00 1,550,266.23 .00 2,040,668.00 6.7% 10552000 511100 FP PT S&W 129,967.55 176,000.00 176,000.00 29,099.02 .00 215,436.00 22.4% 10552000 511600 FP OT 250,526.88 100,000.00 100,000.00 177,681.92 .00 163,000.00 63.0% 10552000 521000 FP FICA 139,016.30 167,381.00 167,852.24 128,931.28 .00 189,575.00 13.3% 10552000 521100 FP WRS 273,793.01 295,762.00 295,762.00 254,717.74 .00 357,095.00 20.7% Page 94 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 8 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10552000 521200 FP Health 328,412.85 431,265.00 431,265.00 280,377.96 .00 370,706.00 -14.0% 10552000 521300 FP Dental 14,626.10 20,600.00 20,600.00 12,200.86 .00 20,600.00 .0% 10552000 521400 FP Life 1,706.92 2,813.00 2,813.00 1,992.43 .00 2,813.00 .0% 10552000 531040 FP Custod 1,985.12 1,500.00 1,500.00 957.83 .00 1,500.00 .0% 10552000 531070 FP Med Exp 54,564.76 52,000.00 52,000.00 45,040.21 .00 52,000.00 .0% 10552000 531080 FP Train 23,683.85 15,000.00 15,000.00 14,329.69 .00 15,000.00 .0% 10552000 531450 FP Uniform 20,231.38 20,000.00 20,000.00 13,806.92 .00 20,000.00 .0% 10552000 531480 FP Gas 32,678.51 23,000.00 23,000.00 40,334.22 .00 23,000.00 .0% 10552000 531560 FP Protect 65,347.84 35,000.00 35,000.00 21,643.77 .00 35,000.00 .0% 10552000 532200 FP Act 102 23,173.11 .00 .00 43,550.13 .00 65,000.00 .0% 10552000 532210 EMS Grant 8,095.44 .00 .00 .00 .00 .00 .0% 10552000 552200 FP M&R Eqp 54,171.38 30,000.00 30,000.00 28,660.03 .00 30,000.00 .0% 10552000 552700 FP M&R Vhl 56,564.90 70,000.00 70,000.00 64,668.92 .00 65,000.00 -7.1% 10552000 561500 FP Comms 14,002.64 10,000.00 10,000.00 5,610.49 .00 10,000.00 .0% 10552000 571000 FP Ins&Bnd 52,909.31 72,094.00 72,094.00 67,062.50 .00 91,559.00 27.0% TOTAL Fire Protection Servic 3,038,643.28 3,434,405.00 3,441,036.24 2,780,932.15 .00 3,697,182.00 7.7% 10561000 Engineering 10561000 443500 SW Permit -1,750.00 -500.00 -500.00 -300.00 .00 -500.00 .0% 10561000 444300 Fiber Perm .00 .00 .00 -17,057.50 .00 -360,000.00 .0% 10561000 462100 EnginFee -87,576.50 -50,000.00 -50,000.00 -70,622.78 .00 -50,000.00 .0% 10561000 462600 YG Adj Fee -200.00 -400.00 -400.00 -200.00 .00 -500.00 25.0% 10561000 462700 Prop Rev .00 -1,750.00 -1,750.00 .00 .00 -1,750.00 .0% 10561000 471100 Int Invc -.37 .00 .00 -330.15 .00 .00 .0% 10561000 511000 ENG Rg S&W 59,737.40 85,533.00 88,608.07 46,504.01 .00 109,951.00 28.5% 10561000 511600 ENG OT 319.05 2,860.00 2,860.00 1,334.01 .00 1,500.00 -47.6% 10561000 521000 ENG FICA 4,317.80 6,721.00 6,956.24 3,545.96 .00 8,526.00 26.9% 10561000 521100 ENG WRS 3,957.50 6,158.00 6,373.54 3,277.64 .00 8,080.00 31.2% 10561000 521200 ENG Hlth 12,897.03 12,524.00 12,524.00 9,558.49 .00 15,875.00 26.8% 10561000 521300 ENG Dental 452.02 915.00 915.00 296.22 .00 915.00 .0% 10561000 521400 ENG Life 43.46 200.00 200.00 15.30 .00 200.00 .0% 10561000 531000 ENG Gen 3,839.85 2,500.00 2,500.00 1,906.42 .00 2,500.00 .0% 10561000 531010 ENG Of Sup 784.87 1,250.00 1,250.00 315.85 .00 1,250.00 .0% 10561000 531020 ENG Copy 3,009.42 2,500.00 2,500.00 3,269.46 .00 4,680.00 87.2% 10561000 531030 ENG Post 1,653.43 2,500.00 2,500.00 1,763.29 .00 2,500.00 .0% 10561000 531080 ENG ProDev 5,614.09 4,500.00 4,500.00 407.97 .00 4,500.00 .0% 10561000 531240 ENG Travel 1,545.00 1,000.00 1,000.00 .00 .00 1,000.00 .0% 10561000 531300 ENG IT Mnt 4,862.39 6,000.00 6,000.00 2,320.00 .00 6,000.00 .0% 10561000 531480 ENG Gas 301.39 2,000.00 2,000.00 1,000.86 .00 .00 -100.0% 10561000 541000 ENG Contr 99,252.14 38,000.00 38,000.00 46,377.67 .00 70,000.00 84.2% 10561000 541800 ENG DNR 23,250.00 24,000.00 24,000.00 23,655.00 .00 30,000.00 25.0% 10561000 541810 FbrPrmSrvs .00 .00 .00 21,945.00 .00 360,000.00 .0% 10561000 552200 ENG M&R Eq 3,100.00 1,500.00 1,500.00 .00 .00 3,000.00 100.0% Page 95 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 9 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10561000 552700 ENG M&R Vh 4,717.38 3,000.00 3,000.00 1,483.02 .00 3,000.00 .0% 10561000 561400 ENG Teleph 859.60 972.00 972.00 721.97 .00 1,000.00 2.9% 10561000 571000 ENG In&Bnd 13,352.26 12,398.00 12,398.00 12,907.55 .00 13,886.00 12.0% 10561000 591000 ENG Msc Eq 7,310.21 10,000.00 10,000.00 .00 .00 .00 -100.0% 10561000 5PCARD UNALLOPCRD .00 .00 .00 108.00 .00 .00 .0% TOTAL Engineering 165,649.42 174,381.00 177,906.85 94,203.26 .00 235,613.00 35.1% 10562000 Highway 10562000 431100 FA Misc -15.04 .00 .00 -15.04 .00 .00 .0% 10562000 432200 SA Transp. -1,590,641.06 -1,805,522.00 -1,805,522.00 -1,354,141.20 .00 -2,053,150.00 13.7% 10562000 462200 Hwy Fees -86,509.59 -30,000.00 -30,000.00 -53,688.69 .00 -55,000.00 83.3% 10562000 462300 Snow & Ice -1,495.26 -4,000.00 -4,000.00 -2,109.53 .00 -2,000.00 -50.0% 10562000 462500 DrWay Fee -1,350.00 -2,000.00 -2,000.00 -700.00 .00 -2,000.00 .0% 10562000 471100 Int Invc -11.39 .00 .00 -14.00 .00 .00 .0% 10562000 511000 HWY Rg S&W 713,202.46 683,982.00 694,104.20 605,046.67 .00 724,392.00 5.9% 10562000 511100 HWY PT S&W 75,171.91 61,000.00 61,000.00 75,526.64 .00 63,135.00 3.5% 10562000 511600 HWY OT 24,171.63 10,000.00 8,198.05 29,557.39 .00 25,000.00 150.0% 10562000 521000 HWY FICA 58,799.93 57,659.00 58,433.35 51,259.95 .00 62,158.00 7.8% 10562000 521100 HWY WRS 51,969.40 51,047.00 51,663.09 46,486.01 .00 58,908.00 15.4% 10562000 521200 HWY Hlth 186,270.24 184,333.00 184,333.00 151,486.94 .00 192,444.00 4.4% 10562000 521300 HWY Dental 8,221.79 8,554.00 8,554.00 7,339.71 .00 8,554.00 .0% 10562000 521400 HWY Life 1,658.27 1,938.00 1,938.00 1,290.38 .00 1,938.00 .0% 10562000 531000 HWY Gen 3,301.39 8,000.00 8,000.00 3,929.85 .00 7,000.00 -12.5% 10562000 531080 HWY ProDev 5,746.85 6,000.00 6,000.00 2,085.00 .00 6,000.00 .0% 10562000 531280 HWY Beauty 13,403.44 14,000.00 14,000.00 6,586.89 .00 10,000.00 -28.6% 10562000 531330 HWY Roads 54,295.50 67,000.00 67,000.00 48,461.66 .00 67,000.00 .0% 10562000 531340 HWY Asphlt 274,716.00 250,000.00 250,000.00 250,000.00 .00 .00 -100.0% 10562000 531350 HWY St Sup 47,831.80 72,000.00 72,000.00 60,812.84 .00 68,000.00 -5.6% 10562000 531360 HWY Snow 236,125.91 190,000.00 190,000.00 187,720.01 .00 137,000.00 -27.9% 10562000 531370 HWY Signs 93,906.23 85,000.00 85,000.00 84,543.76 .00 90,000.00 5.9% 10562000 531380 HWY Bridge 228.65 6,000.00 6,000.00 12,251.90 .00 6,000.00 .0% 10562000 531390 HWY SdWlk .00 5,000.00 5,000.00 8,593.00 .00 5,000.00 .0% 10562000 531400 HWY SmWtr 13,080.00 17,000.00 17,000.00 18,690.54 .00 15,000.00 -11.8% 10562000 531420 HWY Shed 4,656.65 6,500.00 6,500.00 5,308.79 .00 .00 -100.0% 10562000 531450 HWY Unifor 9,872.17 8,000.00 8,000.00 7,028.81 .00 9,000.00 12.5% 10562000 531480 HWY Gas 109,029.61 114,000.00 114,000.00 118,184.99 .00 127,000.00 11.4% 10562000 541200 Hwy Privte 130.00 6,500.00 6,500.00 988.14 .00 3,000.00 -53.8% 10562000 541700 HWY GIS 11,170.00 19,000.00 19,000.00 11,071.00 .00 16,000.00 -15.8% 10562000 542100 HWY Curb 2,519.94 13,000.00 13,000.00 3,722.36 .00 8,000.00 -38.5% 10562000 542300 SldWst Con 812,172.24 778,000.00 778,000.00 660,722.56 .00 808,000.00 3.9% 10562000 551000 HWY BldMnt 224.81 .00 .00 177.10 .00 .00 .0% 10562000 552200 HWY M&R Eq 162,551.93 145,000.00 145,000.00 119,609.31 .00 145,000.00 .0% 10562000 552500 HWY Rental .00 10,000.00 10,000.00 7,400.00 .00 10,000.00 .0% Page 96 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 10 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10562000 552800 HWY Signal 14,727.89 20,000.00 20,000.00 11,036.92 .00 16,000.00 -20.0% 10562000 561300 HWY St lgh 133,092.51 180,000.00 180,000.00 108,112.38 .00 160,000.00 -11.1% 10562000 561400 HWY Teleph 1,700.99 1,992.00 1,992.00 679.98 .00 1,992.00 .0% 10562000 571000 HWY In&Bnd 95,131.51 98,324.00 98,324.00 88,938.52 .00 98,937.00 .6% 10562000 591000 HWY Msc Eq 62,958.91 .00 3,000.00 2,234.85 .00 .00 .0% 10562000 5PCARD UNALLOPCRD -42.19 .00 .00 .00 .00 .00 .0% TOTAL Highway 1,601,976.03 1,337,307.00 1,350,017.69 1,386,216.39 .00 838,308.00 -37.3% 10563000 Buildings & Grounds 10563000 511000 Reg S&W 455,446.13 420,370.00 422,375.40 368,860.09 .00 439,970.00 4.7% 10563000 511100 BG Reg S&W -9,806.09 .00 .00 .00 .00 .00 .0% 10563000 511600 BG OT 14,454.51 2,600.00 6,050.98 20,443.13 .00 15,000.00 476.9% 10563000 521000 BG FICA 33,205.13 32,159.00 32,312.41 28,250.89 .00 34,805.00 8.2% 10563000 521100 BG WRS 31,468.15 30,267.00 30,411.39 27,636.55 .00 32,985.00 9.0% 10563000 521200 BG Health 118,308.62 116,672.00 116,672.00 92,289.43 .00 127,405.00 9.2% 10563000 521300 BG Dental 5,753.23 5,300.00 5,300.00 4,513.54 .00 5,300.00 .0% 10563000 521400 BG Life 1,109.76 1,339.00 1,339.00 832.37 .00 1,339.00 .0% 10563000 531000 BG Gen S&E 11,647.67 16,000.00 16,000.00 10,397.56 .00 14,000.00 -12.5% 10563000 531040 BG Custo 33,429.55 33,000.00 33,000.00 29,194.54 .00 34,000.00 3.0% 10563000 541000 BG Contrct 182,611.00 203,000.00 203,000.00 169,803.00 .00 194,000.00 -4.4% 10563000 551100 BG M&R Vlg 17,655.34 19,000.00 19,000.00 11,040.06 .00 19,000.00 .0% 10563000 551200 BG M&R Wlf 1,827.56 7,000.00 7,000.00 3,335.00 .00 4,000.00 -42.9% 10563000 551300 BG M&R PD 15,596.67 18,000.00 18,000.00 20,328.72 .00 15,000.00 -16.7% 10563000 551400 BG M&R FD 11,046.18 15,000.00 15,000.00 5,469.91 .00 13,000.00 -13.3% 10563000 551500 BG M&R FrC 3,116.89 2,000.00 2,000.00 1,107.71 .00 2,000.00 .0% 10563000 551600 BG M&R SVA 2,261.84 5,000.00 5,000.00 573.59 .00 .00 -100.0% 10563000 551700 BG M&R Rec 8,818.93 8,000.00 8,000.00 3,748.95 .00 8,000.00 .0% 10563000 551800 BG M&R DPW 32,618.44 40,000.00 40,000.00 41,496.53 .00 40,000.00 .0% 10563000 551810 M&R DPW 3,561.00 4,000.00 4,000.00 924.05 .00 2,000.00 -50.0% 10563000 551820 M&R Add 1,303.06 3,000.00 3,000.00 207.92 .00 2,000.00 -33.3% 10563000 551900 BG M&R Lib 28,294.17 38,000.00 35,562.00 29,196.96 .00 34,000.00 -10.5% 10563000 552000 BG M&R Snr 17,217.58 13,000.00 13,000.00 13,543.45 .00 14,000.00 7.7% 10563000 552200 BG M&R Eqp 257.31 .00 .00 .00 .00 .00 .0% 10563000 561000 BG Utility 8,544.11 8,500.00 8,500.00 14,211.52 .00 8,500.00 .0% 10563000 561400 BG Teleph 1,200.00 1,200.00 1,200.00 300.00 .00 1,200.00 .0% 10563000 571000 BG Ins&Bnd 12,361.72 13,500.00 13,500.00 12,211.54 .00 13,500.00 .0% 10563000 591000 BG Msc Eqp .00 25,000.00 25,000.00 21,647.80 .00 .00 -100.0% 10563000 591200 BG MR Vlg .00 10,000.00 10,000.00 4,596.93 .00 .00 -100.0% 10563000 591800 BG MR Lib 4,820.00 20,000.00 44,438.00 13,768.00 .00 .00 -100.0% 10563000 591900 BG MR Snr 65.89 .00 9,900.00 .00 .00 .00 .0% TOTAL Buildings & Grounds 1,048,194.35 1,110,907.00 1,148,561.18 949,929.74 .00 1,075,004.00 -3.2% 10564000 Parks 10564000 511000 PK Reg S&W 445,640.04 420,370.00 425,439.65 368,860.09 .00 439,970.00 4.7% Page 97 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 11 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10564000 511100 PK PT S&W 16,274.40 75,000.00 75,000.00 72,053.73 .00 75,000.00 .0% 10564000 511600 PK OT 14,454.51 7,700.00 6,050.97 20,956.62 .00 15,000.00 94.8% 10564000 521000 PK FICA 34,450.30 38,856.00 39,243.83 33,868.02 .00 40,543.00 4.3% 10564000 521100 PK WRS 31,468.15 36,570.00 36,935.02 28,517.82 .00 38,423.00 5.1% 10564000 521200 PKHealth 118,308.62 116,672.00 116,672.00 92,289.43 .00 127,405.00 9.2% 10564000 521300 PK Dental 5,753.23 5,300.00 5,300.00 4,513.54 .00 5,300.00 .0% 10564000 521400 PK Life 1,109.76 1,339.00 1,339.00 832.37 .00 1,339.00 .0% 10564000 531000 PK Gen S&E 7,396.58 14,000.00 14,000.00 5,235.25 .00 11,500.00 -17.9% 10564000 531080 PK Pro Dev .00 4,000.00 4,000.00 3,022.25 .00 3,000.00 -25.0% 10564000 531480 PK Gas&Oil 4,248.00 23,000.00 23,000.00 10,565.10 .00 23,000.00 .0% 10564000 541000 PKContrSer 8,815.88 12,000.00 12,000.00 2,159.00 .00 11,000.00 -8.3% 10564000 551000 PK B&G Mnt 17,827.27 20,000.00 20,000.00 2,329.55 .00 17,000.00 -15.0% 10564000 551700 M&R FirPrk 6,944.24 5,000.00 5,000.00 3,258.42 .00 5,000.00 .0% 10564000 551710 M&R Kinder 1,851.60 5,000.00 5,000.00 1,316.50 .00 5,000.00 .0% 10564000 551720 M&R Spass 356.00 4,000.00 4,000.00 129.49 .00 3,000.00 -25.0% 10564000 552100 PK St Tree 31,374.05 116,000.00 116,000.00 80,734.63 .00 115,000.00 -.9% 10564000 552200 PK M&R Eqp 38,612.52 28,000.00 28,000.00 26,272.51 .00 29,000.00 3.6% 10564000 561000 PK Utility 35,406.11 34,000.00 34,000.00 42,594.01 .00 34,000.00 .0% 10564000 571000 PK Ins&Bnd 18,811.33 20,254.00 20,254.00 18,320.38 .00 20,254.00 .0% 10564000 591000 PK Msc Eqp 2,473.98 .00 .00 .00 .00 .00 .0% 10564000 592100 PK Lnd Imp 31,000.00 .00 .00 .00 .00 .00 .0% 10564000 5PCARD UNALLOPCRD .00 .00 .00 11.99 .00 .00 .0% TOTAL Parks 872,576.57 987,061.00 991,234.47 817,840.70 .00 1,019,734.00 3.3% 10565000 Recycling 10565000 432300 SA Recycle -23,941.88 -23,942.00 -23,942.00 -23,941.18 .00 -23,942.00 .0% 10565000 471100 Int Invc -2.49 .00 .00 -.51 .00 .00 .0% 10565000 471500 Rycle Sale -2,950.40 -1,745.00 -1,745.00 -2,664.00 .00 -1,745.00 .0% 10565000 471600 W&M sales -745.00 .00 .00 -50.00 .00 .00 .0% 10565000 511000 RE Reg S&W 49,188.27 48,414.00 49,714.02 37,729.38 .00 49,714.00 2.7% 10565000 511100 RE PT S&W 8,629.18 10,506.00 10,506.00 147.25 .00 12,400.00 18.0% 10565000 511600 RE OT 733.49 .00 .00 1,520.84 .00 500.00 .0% 10565000 521000 RE FICA 3,734.21 4,507.00 4,606.45 2,869.83 .00 3,956.00 -12.2% 10565000 521100 RE WRS 3,463.82 3,485.00 3,552.13 2,819.48 .00 3,749.00 7.6% 10565000 521200 RE Health 12,245.98 11,920.00 11,920.00 9,919.07 .00 12,444.00 4.4% 10565000 521300 RE Dental 558.52 545.00 545.00 422.61 .00 560.00 2.8% 10565000 521400 RE Life 59.65 46.00 46.00 56.00 .00 60.00 30.4% 10565000 531000 RE Gen S&E 2,869.94 1,800.00 1,800.00 1,528.72 .00 1,800.00 .0% 10565000 531480 RE Gas 3,279.03 5,000.00 5,000.00 3,856.53 .00 5,000.00 .0% 10565000 532700 RecMatExp 25,253.07 33,800.00 33,800.00 12,298.40 .00 30,000.00 -11.2% 10565000 542200 RE Crb PkU 380,729.85 351,705.00 351,705.00 307,752.03 .00 370,617.00 5.4% 10565000 552200 RE M&R Eqp 2,154.13 500.00 500.00 847.38 .00 500.00 .0% 10565000 571000 RE Ins&Bnd 2,149.86 2,689.00 2,689.00 2,432.07 .00 2,689.00 .0% Page 98 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 12 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE TOTAL Recycling 467,409.23 449,230.00 450,696.60 357,543.90 .00 468,302.00 4.2% 10570000 Library 10570000 432600 Cnty Lib -339,526.61 -342,000.00 -342,000.00 -339,645.82 .00 -372,000.00 8.8% 10570000 462900 Lib F&F -13,843.58 -12,000.00 -12,000.00 -14,087.23 .00 -12,000.00 .0% 10570000 471700 Lib Donate -95,256.07 .00 -51,000.00 -51,251.54 .00 .00 .0% 10570000 511000 LB Reg S&W 313,920.38 306,124.00 327,840.52 280,853.85 .00 361,341.63 18.0% 10570000 511100 LB PT S&W 314,390.55 320,807.00 320,807.00 289,528.13 .00 345,432.37 7.7% 10570000 511200 LB B&C 1,315.14 1,200.00 1,200.00 1,295.00 .00 1,739.00 44.9% 10570000 511600 LB OT 172.67 .00 .00 547.10 .00 .00 .0% 10570000 521000 LB FICA 46,308.25 47,960.00 49,621.31 42,593.97 .00 54,201.00 13.0% 10570000 521100 LB WRS 38,690.29 40,336.00 41,146.87 35,020.67 .00 43,759.00 8.5% 10570000 521200 LB Health 101,925.17 98,978.00 98,978.00 92,068.03 .00 114,940.00 16.1% 10570000 521300 LB Dental 6,832.94 5,050.00 5,050.00 5,175.74 .00 5,050.00 .0% 10570000 521400 LB Life 1,352.50 1,557.00 1,557.00 1,234.59 .00 1,557.00 .0% 10570000 531000 LB Gen S&E 49,170.26 4,000.00 4,000.00 1,945.17 .00 4,000.00 .0% 10570000 531010 LB Off Sup 5,982.73 6,000.00 6,000.00 4,801.69 .00 6,000.00 .0% 10570000 531080 LB Pro Dev 3,329.83 5,000.00 5,000.00 1,574.99 .00 5,000.00 .0% 10570000 531100 LB Mats 70,990.66 76,000.00 104,000.00 79,230.73 .00 82,000.00 7.9% 10570000 531190 Marketing 4,934.75 6,000.00 6,000.00 1,123.72 .00 6,000.00 .0% 10570000 531240 LB Travel 916.44 1,500.00 1,500.00 1,146.69 .00 1,500.00 .0% 10570000 531430 LB Process 9,912.92 8,000.00 8,000.00 6,714.46 .00 8,000.00 .0% 10570000 531440 LB Period 5,285.67 6,000.00 6,000.00 3,670.02 .00 6,000.00 .0% 10570000 531460 LB AV 25,000.00 .00 .00 .00 .00 .00 .0% 10570000 531470 LB Cmp Srv 23,207.53 24,000.00 24,000.00 14,780.17 .00 26,000.00 8.3% 10570000 531490 LB Prg S&E 51,095.58 20,000.00 43,000.00 24,977.35 .00 22,000.00 10.0% 10570000 552300 LB Sys AtM 23,330.48 26,000.00 26,000.00 26,473.87 .00 27,000.00 3.8% 10570000 561000 LB Utility 71,536.26 70,000.00 70,000.00 65,684.14 .00 76,950.00 9.9% 10570000 561400 LB Teleph 1,865.40 3,408.00 3,408.00 2,063.53 .00 2,500.00 -26.6% 10570000 571000 LB Ins&Bnd 8,173.00 8,283.00 8,283.00 7,603.74 .00 8,500.00 2.6% 10570000 5PCARD UNALLOPCRD 87.24 .00 .00 .00 .00 .00 .0% TOTAL Library 731,100.38 732,203.00 756,391.70 585,122.76 .00 825,470.00 12.7% 10581000 Inspection and Permitting 10581000 442000 Bldg Perms -531,765.70 -515,000.00 -515,000.00 -594,929.96 .00 -415,065.00 -19.4% 10581000 442100 Elec Perms -84,098.25 -76,000.00 -76,000.00 -135,897.33 .00 -66,990.00 -11.9% 10581000 442200 Plmb Perms -58,330.48 -52,700.00 -52,700.00 -49,204.09 .00 -40,980.00 -22.2% 10581000 442400 EroCon Fee -16,823.42 -18,900.00 -18,900.00 -12,693.54 .00 -15,450.00 -18.3% 10581000 442500 CPR Fee -65,034.00 -59,000.00 -59,000.00 -73,602.00 .00 -52,800.00 -10.5% 10581000 442600 Sealer W&M -8,023.00 -8,025.00 -8,025.00 -8,948.00 .00 -8,025.00 .0% 10581000 442700 TchMnt Fee -6,381.04 -7,600.00 -7,600.00 -7,644.22 .00 -6,950.00 -8.6% 10581000 471400 PS Numbers -1,026.66 -2,760.00 -2,760.00 -888.58 .00 .00 -100.0% Page 99 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 13 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10581000 511000 IN Reg S&W 32,369.73 32,430.00 33,565.03 30,971.44 .00 36,744.00 13.3% 10581000 511600 IN OT 151.37 .00 .00 290.06 .00 400.00 .0% 10581000 521000 IN FICA 2,393.70 2,480.00 2,566.83 2,293.33 .00 2,842.00 14.6% 10581000 521100 IN WRS 2,262.45 2,334.00 2,415.72 2,246.00 .00 2,693.00 15.4% 10581000 521200 IN Health 5,986.62 5,808.00 5,808.00 5,500.68 .00 6,064.00 4.4% 10581000 521300 IN Dental 269.84 262.00 262.00 240.84 .00 262.00 .0% 10581000 521400 IN Life 203.21 218.00 218.00 173.65 .00 218.00 .0% 10581000 531000 IN Gen S&E .00 700.00 700.00 42.17 .00 700.00 .0% 10581000 531010 IN Off Sup 1,160.77 200.00 200.00 1,495.52 .00 200.00 .0% 10581000 531030 IN Postage 155.85 250.00 250.00 196.73 .00 250.00 .0% 10581000 531210 IN Weights 5,250.00 5,250.00 5,250.00 5,250.00 .00 5,250.00 .0% 10581000 531320 IN Bldg Sp 1,722.78 2,500.00 2,500.00 .00 .00 2,500.00 .0% 10581000 531480 IN Gas .00 1,100.00 1,100.00 .00 .00 500.00 -54.5% 10581000 541000 IN Contrct 433,093.38 390,800.00 390,800.00 407,178.43 .00 303,880.00 -22.2% 10581000 552200 IN M&R Eqp .00 200.00 200.00 .00 .00 200.00 .0% 10581000 552700 IN M&R Vhl .00 250.00 250.00 .00 .00 250.00 .0% 10581000 571000 IN Ins&Bnd 12,361.72 11,248.00 11,248.00 10,174.58 .00 12,856.00 14.3% TOTAL Inspection and Permitt -274,101.13 -283,955.00 -282,651.42 -417,754.29 .00 -230,451.00 -18.8% 10582000 Planning and Zonning 10582000 443000 Zone Fees -53,875.68 -48,325.00 -48,325.00 -36,548.23 .00 -48,325.00 .0% 10582000 443100 Appeal Fee -570.00 -1,710.00 -1,710.00 -1,950.00 .00 -2,600.00 52.0% 10582000 443200 PCR Fees -22,510.96 -18,000.00 -18,000.00 -53,700.00 .00 -25,000.00 38.9% 10582000 443300 CUP -4,380.00 -7,300.00 -7,300.00 -4,820.00 .00 -8,400.00 15.1% 10582000 443600 PlatRv Fee -25,120.00 -23,500.00 -23,500.00 -7,200.00 .00 -23,500.00 .0% 10582000 444200 LicPubFee -420.00 -800.00 -800.00 -980.00 .00 -800.00 .0% 10582000 511000 PL Reg S&W 174,522.42 174,882.00 181,002.89 163,718.54 .00 196,162.00 12.2% 10582000 511200 PL B&C 1,388.63 1,800.00 1,800.00 1,360.00 .00 1,800.00 .0% 10582000 511600 PL Oth Exp 857.81 .00 .00 1,643.64 .00 1,500.00 .0% 10582000 521000 PL FICA 13,045.52 13,379.00 13,847.25 12,217.49 .00 15,121.00 13.0% 10582000 521100 PL WRS 12,201.46 12,591.00 13,031.70 11,878.77 .00 14,331.00 13.8% 10582000 521200 PL Health 33,501.97 32,450.00 32,450.00 32,393.22 .00 34,843.00 7.4% 10582000 521300 PL Dental 1,587.44 1,542.00 1,542.00 1,419.06 .00 1,542.00 .0% 10582000 521400 PL Life 805.34 915.00 915.00 729.35 .00 915.00 .0% 10582000 531000 PL Gen S&E 2,145.99 2,850.00 2,850.00 40.37 .00 2,850.00 .0% 10582000 531010 PL Off Sup 1,005.20 700.00 700.00 1,188.72 .00 700.00 .0% 10582000 531020 PL Copy .00 1,100.00 1,100.00 .00 .00 1,100.00 .0% 10582000 531030 PL Postage 352.74 600.00 600.00 415.22 .00 600.00 .0% 10582000 531080 PL Pro Dev 2,232.53 1,200.00 1,200.00 65.95 .00 2,200.00 83.3% 10582000 531090 PL Print 5,739.93 2,300.00 2,300.00 2,762.03 .00 2,300.00 .0% 10582000 531240 PL Travel 172.20 100.00 100.00 .00 .00 100.00 .0% 10582000 532060 PL Oth Exp .00 .00 .00 53.55 .00 1,750.00 .0% 10582000 541000 PL Contrct 12,572.39 65,000.00 65,000.00 1,769.54 .00 7,500.00 -88.5% Page 100 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 14 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10582000 552200 PL M&R Eqp 494.08 500.00 500.00 .00 .00 500.00 .0% 10582000 571000 PL Ins&Bnd 3,224.80 3,936.00 3,936.00 3,560.08 .00 3,936.00 .0% TOTAL Planning and Zonning 158,973.81 216,210.00 223,239.84 130,017.30 .00 181,125.00 -16.2% 10583000 Municipal Development 10583000 532090 EDC 2,227.06 10,000.00 10,000.00 4,650.09 .00 10,000.00 .0% 10583000 532100 Hist. Soc 8,165.80 13,900.00 13,900.00 6,950.05 .00 13,900.00 .0% 10583000 581000 July 4th 25,653.40 8,000.00 37,185.00 33,967.60 .00 8,000.00 .0% 10583000 581100 HotelMotel 118,970.05 50,000.00 72,365.35 77,665.35 .00 50,000.00 .0% TOTAL Municipal Development 155,016.31 81,900.00 133,450.35 123,233.09 .00 81,900.00 .0% 10591000 Recreation 10591000 441800 FrmMrktPer -2,625.00 -1,775.00 -1,775.00 -3,300.00 .00 -2,550.00 43.7% 10591000 463100 Fac Rental -40,126.96 -40,000.00 -40,000.00 -43,769.36 .00 -40,000.00 .0% 10591000 463300 Rec Fees -1,174,271.62 -1,115,000.00 -1,115,000.00 -1,131,077.24 .00 -1,175,000.00 5.4% 10591000 463400 Advertise .00 -1,000.00 -1,000.00 -1,080.00 .00 -2,000.00 100.0% 10591000 463500 RecFac Fee -91,411.56 -78,000.00 -78,000.00 -78,522.47 .00 -85,000.00 9.0% 10591000 463800 Credit Crd -705.00 .00 .00 -1,250.00 .00 .00 .0% 10591000 471100 Int Invc -.15 .00 .00 .00 .00 .00 .0% 10591000 471700 Rec Donate -49,371.00 -50,000.00 -50,000.00 -45,676.12 .00 -50,000.00 .0% 10591000 471800 MAP Donate -84,359.81 -60,000.00 -60,000.00 -77,279.56 .00 -60,000.00 .0% 10591000 511000 RC Reg S&W 300,262.03 304,812.00 330,588.96 281,088.85 .00 348,460.00 14.3% 10591000 511100 RC PT S&W 420,399.84 442,285.00 442,285.00 411,530.55 .00 457,765.00 3.5% 10591000 511200 RC B&C 577.23 1,000.00 1,000.00 405.00 .00 1,000.00 .0% 10591000 511600 RC OT -135.03 .00 .00 2,049.54 .00 .00 .0% 10591000 521000 RC FICA 55,913.71 57,153.00 59,124.94 52,144.40 .00 61,676.00 7.9% 10591000 521100 RC WRS 32,429.33 36,732.00 37,473.38 29,576.40 .00 37,473.00 2.0% 10591000 521200 RC Health 92,355.73 96,781.00 96,781.00 83,742.13 .00 111,373.00 15.1% 10591000 521300 RC Dental 4,297.61 .00 .00 4,603.06 .00 4,297.00 .0% 10591000 521400 RC Life 744.33 850.00 850.00 656.55 .00 850.00 .0% 10591000 531000 RC Gen S&E 2,067.97 2,000.00 2,000.00 525.00 .00 7,000.00 250.0% 10591000 531010 RC Off Sup 1,833.65 3,000.00 3,000.00 1,491.81 .00 3,000.00 .0% 10591000 531030 RC Postage 1,009.45 1,300.00 1,300.00 923.37 .00 1,300.00 .0% 10591000 531080 RC Pro Dev 2,830.00 2,300.00 2,300.00 775.00 .00 2,300.00 .0% 10591000 531090 RC Print 9,963.00 10,000.00 10,000.00 7,000.00 .00 10,000.00 .0% 10591000 531240 RC Travel 1,963.09 2,000.00 2,000.00 1,371.30 .00 2,000.00 .0% 10591000 531480 RC Gas .00 700.00 700.00 88.38 .00 1,500.00 114.3% 10591000 531490 RC Prg S&E 193,953.26 182,000.00 182,000.00 136,989.29 .00 210,000.00 15.4% 10591000 531530 RC M&E Spr 3,088.99 6,000.00 6,000.00 3,505.25 .00 4,500.00 -25.0% 10591000 531550 RC Celeb 52,244.97 42,000.00 42,000.00 41,649.95 .00 60,000.00 42.9% 10591000 531570 RC ChargeC 44,797.66 21,000.00 21,000.00 39,996.67 .00 45,000.00 114.3% 10591000 531640 RC Rental 77,579.25 74,000.00 74,000.00 50,282.75 .00 78,000.00 5.4% Page 101 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 15 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT General Fund ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 10591000 532060 RC Oth Exp 38,126.00 14,700.00 14,700.00 19,210.00 .00 23,316.00 58.6% 10591000 552200 RC M&R Eqp 18,878.12 19,000.00 19,000.00 16,864.84 .00 24,100.00 26.8% 10591000 552700 RC M&R Vhl .00 1,500.00 1,500.00 2,174.09 .00 1,500.00 .0% 10591000 561400 RC Teleph 1,668.77 1,812.00 1,812.00 1,139.93 .00 1,812.00 .0% 10591000 571000 RC Ins&Bnd 50,053.14 47,370.00 47,370.00 42,847.88 .00 52,055.00 9.9% 10591000 5PCARD UNALLOPCRD -193.47 .00 .00 -33.98 .00 .00 .0% TOTAL Recreation -36,162.47 24,520.00 53,010.28 -149,356.74 .00 135,727.00 453.5% 10592000 Senior Center 10592000 431000 FA Nutri -600.00 .00 .00 -600.00 .00 -600.00 .0% 10592000 432700 Cnty Grant .00 -6,000.00 -6,000.00 -2,932.68 .00 -5,000.00 -16.7% 10592000 463600 SnrCn Fee -12,482.58 -12,000.00 -12,000.00 -18,130.95 .00 -12,000.00 .0% 10592000 463700 SnrCn Rent -10,907.33 -9,000.00 -9,000.00 -9,773.00 .00 -10,000.00 11.1% 10592000 463900 SnrCn Trip -12,017.05 -15,000.00 -15,000.00 -9,825.00 .00 -15,000.00 .0% 10592000 511000 SR Reg S&W 37,163.70 47,219.00 49,573.44 19,845.07 .00 57,645.00 22.1% 10592000 511100 SR PT S&W 32,235.92 20,051.00 20,051.00 25,050.23 .00 20,753.00 3.5% 10592000 511600 SR OT 78.75 .00 .00 .00 .00 .00 .0% 10592000 521000 SR FICA 3,525.26 5,146.00 5,326.11 3,389.60 .00 5,997.00 16.5% 10592000 521100 SR WRS 1,637.06 3,400.00 3,518.99 1,829.96 .00 5,684.00 67.2% 10592000 521200 SR Health .00 .00 .00 4,168.53 .00 28,548.00 .0% 10592000 521300 SR Dental 228.59 395.00 395.00 181.27 .00 1,164.00 194.7% 10592000 521400 SR Life .00 .00 .00 12.30 .00 390.00 .0% 10592000 531000 SR Gen S&E 1,469.45 1,000.00 1,000.00 1,278.95 .00 1,000.00 .0% 10592000 531010 SR Off Sup .00 350.00 350.00 .00 .00 350.00 .0% 10592000 531080 SR Pro Dev .00 425.00 425.00 75.00 .00 635.00 49.4% 10592000 531240 SR Travel .00 300.00 300.00 .00 .00 300.00 .0% 10592000 531480 SR Gas 60.62 750.00 750.00 15.00 .00 1,025.00 36.7% 10592000 531500 SR Sr Prog 11,180.12 8,000.00 8,000.00 9,465.75 .00 11,180.00 39.8% 10592000 531520 SR Sr Trip 11,748.86 15,000.00 15,000.00 4,876.27 .00 13,000.00 -13.3% 10592000 551000 SR B&G Mnt 62.18 .00 .00 .00 .00 .00 .0% 10592000 552200 SR M&R Eqp 547.40 3,300.00 3,300.00 2,754.92 .00 3,300.00 .0% 10592000 552700 SR M&R Vhl 717.75 1,000.00 1,000.00 252.50 .00 800.00 -20.0% 10592000 561000 SR Utility 13,099.55 15,038.00 15,038.00 13,418.44 .00 15,038.00 .0% 10592000 561400 SR Teleph 4,674.05 2,931.00 2,931.00 971.73 .00 2,931.00 .0% 10592000 571000 SR Ins&Bnd 2,149.86 2,536.00 2,536.00 2,293.89 .00 2,536.00 .0% TOTAL Senior Center 84,572.16 84,841.00 87,494.54 48,617.78 .00 129,676.00 52.8% TOTAL General Fund -37,446.47 .00 60,013.93 -1,099,878.55 .00 .00 .0% Page 102 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 16 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Water ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 50000000 Water Utility 50000000 5PCARD UNALLOPCRD 119.95 .00 .00 .00 .00 .00 .0% TOTAL Water Utility 119.95 .00 .00 .00 .00 .00 .0% 50611000 Source of Supply Operation 50611000 511000 SoSO RgS&W 53,368.61 .00 .00 30,499.36 .00 68,009.00 .0% 50611000 511601 SW Labor .00 65,710.00 65,710.00 .00 .00 .00 -100.0% 50611000 521000 SoSO FICA 729.49 5,026.00 5,026.00 2,141.12 .00 5,203.00 3.5% 50611000 521100 SoSO WRS 713.04 4,731.00 4,731.00 2,191.57 .00 4,931.00 4.2% 50611000 521200 SoSO Hlth 2,900.92 .00 .00 10,776.26 .00 12,694.00 .0% 50611000 521300 SoSO Dntl 135.18 .00 .00 944.90 .00 1,233.00 .0% 50611000 531000 SoSO GnS&E 2,504.00 .00 .00 .00 .00 .00 .0% 50611000 531603 GE Misc 51,918.99 15,000.00 15,000.00 12,407.71 .00 15,000.00 .0% 50611000 582800 SoSO Misc 2,072.86 .00 .00 10,626.30 .00 .00 .0% TOTAL Source of Supply Opera 114,343.09 90,467.00 90,467.00 69,587.22 .00 107,070.00 18.4% 50612000 Source of Supply Maint 50612000 511000 SoSM RgS&W 55,751.98 65,710.00 65,710.00 30,499.68 .00 68,009.00 3.5% 50612000 521000 SoSM FICA 729.44 5,026.00 5,026.00 2,141.11 .00 5,203.00 3.5% 50612000 521100 SoSM WRS 713.01 4,731.00 4,731.00 2,191.62 .00 4,931.00 4.2% 50612000 531680 SoSM DigHL 8,262.68 9,200.00 9,200.00 6,191.68 .00 .00 -100.0% 50612000 531780 SoSM Impro 104,741.84 .00 .00 9,196.00 .00 .00 .0% 50612000 531880 SoSM WtrSr 12,798.80 .00 .00 .00 .00 .00 .0% 50612000 541610 CS Sup&Eng .00 .00 .00 .00 .00 10,000.00 .0% 50612000 542400 SoSM WtrSt 21,268.00 .00 .00 .00 .00 .00 .0% 50612000 551611 MT StrcImp 2,493.80 55,000.00 55,000.00 24,600.43 .00 76,000.00 38.2% 50612000 551614 MT Wells .00 24,000.00 24,000.00 .00 .00 18,000.00 -25.0% TOTAL Source of Supply Maint 206,759.55 163,667.00 163,667.00 74,820.52 .00 182,143.00 11.3% 50621000 Pumping Operation 50621000 511000 PmpO RgS&W 59,622.90 65,710.00 65,710.00 30,499.68 .00 68,009.00 3.5% 50621000 521000 PmpO FICA 2,078.43 5,026.00 5,026.00 2,141.11 .00 5,203.00 3.5% 50621000 521100 PmpO WRS 1,985.08 4,731.00 4,731.00 2,191.62 .00 4,931.00 4.2% 50621000 521200 Health 9,322.03 .00 .00 10,776.32 .00 .00 .0% 50621000 521300 Dental 415.47 .00 .00 500.06 .00 .00 .0% 50621000 531220 Elec Sup 228,427.25 .00 .00 151,470.38 .00 .00 .0% 50621000 531622 GE PwrPrd .00 240,000.00 240,000.00 4,149.72 .00 240,000.00 .0% 50621000 531790 PmpO MSEng 15,231.92 .00 .00 .00 .00 .00 .0% 50621000 531810 PmpO Pump 826.00 .00 .00 .00 .00 .00 .0% Page 103 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 17 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Water ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 50621000 541620 CS Sup&Eng .00 25,000.00 25,000.00 8,289.26 .00 15,000.00 -40.0% 50621000 561600 PmpO Fuel 17,344.56 .00 .00 30,988.97 .00 .00 .0% 50621000 561621 UT FuelPwr .00 15,000.00 15,000.00 25,810.82 .00 15,000.00 .0% 50621000 561623 UT FuelPur .00 .00 .00 63,831.79 .00 .00 .0% TOTAL Pumping Operation 335,253.64 355,467.00 355,467.00 330,649.73 .00 348,143.00 -2.1% 50622000 Pumping Maintenance 50622000 511000 PmpM RgS&W 18,583.85 35,045.00 35,045.00 10,166.50 .00 36,272.00 3.5% 50622000 521000 FICA 243.14 2,681.00 2,681.00 713.72 .00 2,775.00 3.5% 50622000 521100 WRS 237.66 2,796.00 2,796.00 730.58 .00 2,630.00 -5.9% 50622000 531690 PmpM PmpEq 469.09 15,000.00 15,000.00 7,531.97 .00 .00 -100.0% 50622000 531760 PmpM PwrPd 11,804.84 .00 .00 .00 .00 .00 .0% 50622000 531780 PmpM Strct 32,280.66 .00 .00 115.06 .00 .00 .0% 50622000 531790 PmpM MSEng 2,295.36 .00 .00 .00 .00 36,000.00 .0% 50622000 551631 MT StrcImp .00 75,000.00 75,000.00 35,592.45 .00 30,000.00 -60.0% 50622000 551632 MT PwrPrd .00 .00 .00 .00 .00 5,000.00 .0% TOTAL Pumping Maintenance 65,914.60 130,522.00 130,522.00 54,850.28 .00 112,677.00 -13.7% 50631000 Water Treatment Operation 50631000 531000 WTOP GnS&E 39,939.12 .00 .00 .00 .00 .00 .0% 50631000 531641 GE Chemica 31.00 28,000.00 28,000.00 61,857.64 .00 58,000.00 107.1% 50631000 531642 GE Lab&Exp .00 .00 .00 .00 .00 27,000.00 .0% 50631000 531643 GE Misc .00 30,000.00 30,000.00 9,104.08 .00 12,000.00 -60.0% 50631000 531660 WTOP Chem 63,623.01 58,000.00 58,000.00 30,809.32 .00 .00 -100.0% 50631000 531790 WTOP MSEng 24,657.67 .00 .00 .00 .00 .00 .0% 50631000 541640 CS Sup&Eng .00 25,000.00 25,000.00 9,537.41 .00 16,000.00 -36.0% 50631000 582800 WTOP MscEx 8,039.84 .00 .00 .00 .00 .00 .0% TOTAL Water Treatment Operat 136,290.64 141,000.00 141,000.00 111,308.45 .00 113,000.00 -19.9% 50632000 Water Treatment Maintenance 50632000 511000 WTMT RgS&W 18,583.85 21,903.00 21,903.00 10,166.50 .00 22,670.00 3.5% 50632000 521000 WTMT FICA 243.14 1,675.00 1,675.00 713.72 .00 1,734.00 3.5% 50632000 521100 WTMT WRS 237.66 1,577.00 1,577.00 730.58 .00 1,644.00 4.2% 50632000 531780 WTMT Strct 1,758.59 .00 .00 .00 .00 .00 .0% 50632000 531790 WTMT MSEng 699.13 .00 .00 .00 .00 .00 .0% 50632000 541650 CS Sup&Eng .00 10,000.00 10,000.00 11,109.44 .00 10,000.00 .0% 50632000 551651 MT StrcImp .00 10,000.00 10,000.00 .00 .00 3,000.00 -70.0% 50632000 551652 MT WtrTrtE .00 10,000.00 10,000.00 277.43 .00 3,000.00 -70.0% TOTAL Water Treatment Mainte 21,522.37 55,155.00 55,155.00 22,997.67 .00 42,048.00 -23.8% 50640000 Customer Accounts Expense 50640000 511000 CT Reg S&W 18,702.70 21,903.00 21,903.00 10,166.50 .00 22,670.00 3.5% Page 104 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 18 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Water ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 50640000 521000 CT FICA 243.14 1,675.00 1,675.00 713.72 .00 1,734.00 3.5% 50640000 521100 CT WRS 237.66 1,577.00 1,577.00 730.58 .00 1,644.00 4.2% 50640000 521200 CT Health 966.86 .00 .00 3,592.01 .00 .00 .0% 50640000 521300 CT Dental 45.06 .00 .00 166.57 .00 .00 .0% 50640000 531900 CT Records 20,865.02 24,000.00 24,000.00 9,196.12 .00 .00 -100.0% 50640000 531903 GE CstRec .00 .00 .00 147.35 .00 18,000.00 .0% 50640000 531905 GE Misc .00 80,000.00 80,000.00 71,249.58 .00 75,000.00 -6.3% 50640000 541600 CT Audit 23,126.87 15,000.00 15,000.00 500.00 .00 15,000.00 .0% 50640000 552700 CT M&R Vhl 5,751.38 .00 .00 .00 .00 .00 .0% 50640000 571000 Ins&Bonds 47,834.49 .00 .00 .00 .00 .00 .0% 50640000 581700 CT Transp .00 22,000.00 22,000.00 2,988.85 .00 15,000.00 -31.8% 50640000 581800 CT MscCtAc 89,074.57 .00 .00 22,044.40 .00 .00 .0% TOTAL Customer Accounts Expe 206,847.75 166,155.00 166,155.00 121,495.68 .00 149,048.00 -10.3% 50641000 Trans & Distribition Operation 50641000 511000 TDO Rg S&W 74,336.33 87,614.00 87,614.00 40,666.19 .00 90,680.00 3.5% 50641000 521000 TDO FICA 972.81 6,702.00 6,702.00 2,854.72 .00 6,937.00 3.5% 50641000 521100 TDO WRS 950.58 6,308.00 6,308.00 2,921.39 .00 6,574.00 4.2% 50641000 531661 GE StrgFac .00 15,000.00 15,000.00 12,820.33 .00 10,000.00 -33.3% 50641000 531663 GE Meter .00 5,000.00 5,000.00 .00 .00 .00 -100.0% 50641000 531664 GE CustIns .00 18,000.00 18,000.00 20,604.56 .00 18,000.00 .0% 50641000 531665 GE Misc .00 20,000.00 20,000.00 1,436.00 .00 20,000.00 .0% 50641000 531670 TDO Instll 20,616.00 .00 .00 .00 .00 .00 .0% 50641000 531790 TDO MS Eng 2,211.90 .00 .00 .00 .00 .00 .0% 50641000 531920 TDO Lines 2,011.26 .00 .00 921.60 .00 .00 .0% 50641000 561662 UT TransDi .00 .00 .00 481.11 .00 2,400.00 .0% 50641000 581900 TDO Storge 3,988.16 .00 .00 .00 .00 .00 .0% 50641000 582800 TDO MscExp 3,101.20 .00 .00 10,606.80 .00 .00 .0% TOTAL Trans & Distribition O 108,188.24 158,624.00 158,624.00 93,312.70 .00 154,591.00 -2.5% 50642000 Trans & Distribition Maint 50642000 511000 TDM Rg S&W 74,336.33 87,614.00 87,614.00 40,666.19 .00 90,680.00 3.5% 50642000 521000 TDM FICA 972.67 6,702.00 6,702.00 2,854.94 .00 6,937.00 3.5% 50642000 521100 TDM WRS 950.65 6,308.00 6,308.00 2,921.88 .00 6,574.00 4.2% 50642000 531710 TDM DstRes 67,087.66 .00 .00 .00 .00 .00 .0% 50642000 531730 TDM MS Hyd 24,646.81 .00 .00 .00 .00 .00 .0% 50642000 531740 TDM MSPlnt 6.07 .00 .00 .00 .00 .00 .0% 50642000 531750 TDM MS Mtr 12,029.72 .00 .00 .00 .00 .00 .0% 50642000 531770 TDM MS Srv 13,447.11 .00 .00 .00 .00 .00 .0% 50642000 551671 MT StrcImp .00 30,000.00 30,000.00 1,019.02 .00 20,000.00 -33.3% 50642000 551673 MT Mains .00 119,000.00 119,000.00 25,225.90 .00 120,000.00 .8% 50642000 551675 MT Service .00 50,000.00 50,000.00 29,950.49 .00 30,000.00 -40.0% Page 105 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 19 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Water ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 50642000 551676 MT Meters .00 15,000.00 15,000.00 12,110.70 .00 11,000.00 -26.7% 50642000 551677 MT Hydrant .00 184,000.00 184,000.00 61,116.82 .00 112,000.00 -39.1% 50642000 552900 TDM St&Imp 6,948.21 .00 .00 .00 .00 .00 .0% 50642000 553000 TDM MntT&D 326,249.25 .00 .00 .00 .00 .00 .0% TOTAL Trans & Distribition M 526,674.48 498,624.00 498,624.00 175,865.94 .00 397,191.00 -20.3% 50650000 Water Administration 50650000 444000 PubSit Fee -83,770.48 -60,000.00 -60,000.00 -60,335.87 .00 -60,000.00 .0% 50650000 461600 Twr Rental -1,260.48 .00 .00 .00 .00 .00 .0% 50650000 464000 UnMtr GenC -232.72 .00 .00 65.82 .00 .00 .0% 50650000 464100 Residental -1,448,086.46 -1,415,144.00 -1,415,144.00 -1,182,449.15 .00 -1,457,598.00 3.0% 50650000 464200 Commerical -494,675.38 -474,909.00 -474,909.00 -445,783.92 .00 -489,156.00 3.0% 50650000 464300 Industrial -398,312.80 -440,075.00 -440,075.00 -466,567.08 .00 -453,277.00 3.0% 50650000 464400 Public Sch -21,575.11 -23,628.00 -23,628.00 -17,656.64 .00 -24,337.00 3.0% 50650000 464500 MultiFam -262,910.58 -259,928.00 -259,928.00 -212,621.29 .00 -267,726.00 3.0% 50650000 464600 Prv FP -192,507.02 -176,760.00 -176,760.00 -145,963.20 .00 -176,760.00 .0% 50650000 464700 PFP -661,135.63 -683,801.00 -683,801.00 -94,669.41 .00 -683,801.00 .0% 50650000 464800 Vlg Sale -17,159.87 -12,000.00 -12,000.00 -15,760.22 .00 -12,000.00 .0% 50650000 465000 Jnt Meter -32,064.18 -20,000.00 -20,000.00 -4,113.09 .00 -20,000.00 .0% 50650000 465100 Wtr ConFee -960.00 .00 .00 -960.00 .00 .00 .0% 50650000 471000 Int Invest -64,239.10 -45,000.00 -45,000.00 -38,959.11 .00 -45,000.00 .0% 50650000 471045 INTADVTIDS -40,843.76 .00 .00 .00 .00 -19,469.00 .0% 50650000 471100 Int Invc -154.15 .00 .00 .00 .00 .00 .0% 50650000 471200 Int Assess -6,714.19 .00 .00 -337.74 .00 .00 .0% 50650000 472700 Misc Revs -2,737.59 -2,500.00 -2,500.00 -42,281.29 .00 -2,500.00 .0% 50650000 473000 UnrealGain -27,408.69 -10,000.00 -10,000.00 6,829.61 .00 -10,000.00 .0% 50650000 473300 Oth Income -17,600.48 .00 .00 -3,963.68 .00 .00 .0% 50650000 473500 CIAC Rev -592,444.49 .00 .00 .00 .00 .00 .0% 50650000 511000 WA Reg S&W 316,290.81 293,557.00 308,718.92 390,066.78 .00 318,558.00 8.5% 50650000 511100 WA PT S&W 37,769.59 25,000.00 25,000.00 30,833.91 .00 25,000.00 .0% 50650000 511600 WA OT 8,798.65 .00 .00 22,947.66 .00 10,000.00 .0% 50650000 521000 WA FICA 47,054.56 22,812.00 23,971.89 32,110.54 .00 27,889.00 22.3% 50650000 521100 WA WRS 59,540.14 21,136.00 22,215.94 28,734.76 .00 26,430.00 25.0% 50650000 521200 WA Health 168,356.44 188,116.00 188,116.00 88,161.43 .00 183,699.00 -2.3% 50650000 521300 WA Dental 7,055.34 9,632.00 9,632.00 3,791.73 .00 8,399.00 -12.8% 50650000 521400 WA Life 2,057.18 .00 .00 1,715.59 .00 .00 .0% 50650000 531010 WA Off Sup 2,134.47 .00 .00 890.00 .00 .00 .0% 50650000 531921 GE OffSupp 67.84 6,000.00 6,000.00 2,481.04 .00 3,000.00 -50.0% 50650000 531930 GE Misc GE .00 1,000.00 1,000.00 214.00 .00 20,000.00 1900.0% 50650000 541100 WA Legal 10,000.00 .00 .00 .00 .00 .00 .0% 50650000 541923 CS OutsSrv .00 15,000.00 15,000.00 13,723.00 .00 15,000.00 .0% 50650000 561000 Bld Util 10,688.68 .00 .00 13,664.78 .00 16,000.00 .0% 50650000 571000 WA Ins&Bnd .00 54,281.00 54,281.00 49,100.02 .00 54,281.00 .0% Page 106 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 20 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Water ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 50650000 581429 AmortPrem -27,060.87 .00 .00 .00 .00 -27,061.00 .0% 50650000 582800 WA Msc Exp 918.01 .00 .00 53.33 .00 .00 .0% 50650000 630922 Leg Exp .00 700.00 700.00 .00 .00 700.00 .0% 50650000 630928 RegCom Exp 473.90 .00 .00 .00 .00 .00 .0% TOTAL Water Administration -3,722,648.42 -2,986,511.00 -2,969,109.25 -2,047,037.69 .00 -3,039,729.00 1.8% 50660000 Other Operating Expense 50660000 571300 WOt Deprec 770,461.00 725,000.00 725,000.00 .00 .00 915,659.00 26.3% 50660000 571500 Debt Princ .00 640,820.00 640,820.00 .00 .00 657,930.00 2.7% 50660000 571800 WOt CIACDp 492,113.00 512,500.00 512,500.00 .00 .00 512,500.00 .0% 50660000 582300 WOt TxEqv 770,758.00 660,000.00 660,000.00 .00 .00 795,427.00 20.5% 50660000 582400 WOt PSC 3,166.80 2,500.00 2,500.00 .00 .00 3,832.00 53.3% 50660000 582500 WOt IntLTD 367,630.60 355,814.00 355,814.00 288,415.66 .00 328,603.00 -7.6% TOTAL Other Operating Expens 2,404,129.40 2,896,634.00 2,896,634.00 288,415.66 .00 3,213,951.00 11.0% TOTAL Water 403,395.29 1,669,804.00 1,687,205.75 -703,733.84 .00 1,780,133.00 6.6% Page 107 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 21 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Sewer ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 60000000 Sewer Utility 60000000 471100 Int Invc 5.44 .00 .00 .00 .00 .00 .0% 60000000 5PCARD UNALLOPCRD 400.99 .00 .00 .00 .00 .00 .0% TOTAL Sewer Utility 406.43 .00 .00 .00 .00 .00 .0% 60710000 Operation 60710000 511000 SO Reg S&W .00 135,220.00 135,220.00 .00 .00 139,953.00 3.5% 60710000 521000 SO FICA .00 10,342.00 10,342.00 .00 .00 10,706.00 3.5% 60710000 521100 SO WRS .00 9,736.00 9,736.00 .00 .00 10,147.00 4.2% 60710000 531000 SO Gen S&E 100.00 13,000.00 13,000.00 .00 .00 5,000.00 -61.5% 60710000 531950 SO Sample 150.00 .00 .00 .00 .00 .00 .0% 60710000 531980 SO JntMtr 97,547.38 133,000.00 133,000.00 133,000.00 .00 133,000.00 .0% 60710000 531990 SO PwrLift 101,986.74 99,500.00 99,500.00 89,725.39 .00 99,500.00 .0% 60710000 571100 SO MMSDSwr 2,590,773.54 3,000,000.00 3,000,000.00 2,503,088.45 .00 3,000,000.00 .0% 60710000 571200 SO MMSDCap 2,875,559.00 2,987,215.00 2,987,215.00 2,118,946.00 .00 2,987,215.00 .0% TOTAL Operation 5,666,116.66 6,388,013.00 6,388,013.00 4,844,759.84 .00 6,385,521.00 .0% 60720000 Maintenance 60720000 511000 SM Reg S&W .00 163,130.00 163,130.00 .00 .00 168,840.00 3.5% 60720000 511600 SM OT .00 10,000.00 10,000.00 .00 .00 10,000.00 .0% 60720000 521000 SM FICA .00 12,479.00 12,479.00 .00 .00 13,681.00 9.6% 60720000 521100 SM WRS .00 11,745.00 11,745.00 .00 .00 12,966.00 10.4% 60720000 521400 SM Life 1,240.76 1,403.00 1,403.00 .00 .00 1,403.00 .0% 60720000 531930 SM M&E Lft 54,404.86 52,000.00 52,000.00 50,252.49 .00 52,000.00 .0% 60720000 531960 SM Collect 58,491.57 81,000.00 81,000.00 70,479.17 .00 81,000.00 .0% 60720000 531970 SM M&EPlnt 11,443.34 13,000.00 13,000.00 7,338.56 .00 13,000.00 .0% 60720000 552700 SM M&R Vhl 4,714.53 8,000.00 8,000.00 1,638.13 .00 8,000.00 .0% TOTAL Maintenance 130,295.06 352,757.00 352,757.00 129,708.35 .00 360,890.00 2.3% 60730000 Customer Accounting 60730000 511000 Reg S&W .00 37,166.00 37,166.00 .00 .00 38,467.00 3.5% 60730000 521000 FICA .00 2,845.00 2,845.00 .00 .00 2,943.00 3.4% 60730000 521100 WRS .00 2,675.00 2,675.00 .00 .00 2,789.00 4.3% 60730000 531010 Office Sup 142.97 .00 .00 300.99 .00 .00 .0% 60730000 531300 IT Maint 86,528.41 85,000.00 85,000.00 80,766.98 .00 85,000.00 .0% 60730000 532050 Oth Sup 3,245.84 10,000.00 10,000.00 .00 .00 10,000.00 .0% TOTAL Customer Accounting 89,917.22 137,686.00 137,686.00 81,067.97 .00 139,199.00 1.1% 60740000 Sewer Administration 60740000 464800 SA Vlg Srv -35,855.15 -30,000.00 -30,000.00 -25,261.81 .00 -30,000.00 .0% Page 108 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 22 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Sewer ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 60740000 465300 SA PA Serv -102,857.10 -85,000.00 -85,000.00 -32,332.21 .00 -85,000.00 .0% 60740000 465800 SA Swr Con -399,396.92 -230,000.00 -230,000.00 -315,271.50 .00 -230,000.00 .0% 60740000 466100 SA Res Srv -3,430,605.54 -3,300,000.00 -3,300,000.00 -2,660,733.23 .00 -3,399,000.00 3.0% 60740000 466200 SA Com Srv -841,121.28 -875,000.00 -875,000.00 -745,599.09 .00 -901,250.00 3.0% 60740000 466300 SA Ind Srv -2,884,418.35 -3,700,000.00 -3,700,000.00 -3,221,245.43 .00 -3,811,000.00 3.0% 60740000 471000 Int Invest -84,759.29 -85,000.00 -85,000.00 -65,983.64 .00 -85,000.00 .0% 60740000 471100 Int Invc -1,251.68 -500.00 -500.00 -520.25 .00 -500.00 .0% 60740000 471200 SA Assess -11,941.37 -9,000.00 -9,000.00 -779.58 .00 -9,000.00 .0% 60740000 472700 SA Msc Rvs -906.77 .00 .00 -5,930.49 .00 .00 .0% 60740000 472900 SA Interst -513.09 .00 .00 -122.14 .00 .00 .0% 60740000 473000 UnrealGain -66,728.53 -80,000.00 -80,000.00 13,165.66 .00 -80,000.00 .0% 60740000 473300 SA OthIncm -1,030.80 .00 .00 .00 .00 .00 .0% 60740000 473500 SA CIAC -265,805.00 .00 .00 -9,525.00 .00 .00 .0% 60740000 511000 SA Reg S&W 613,191.72 276,305.00 288,463.53 464,635.67 .00 308,559.00 11.7% 60740000 511100 SA PT S&W 5,310.59 .00 .00 4,840.91 .00 5,769.00 .0% 60740000 511200 SA B&C 934.47 1,200.00 1,200.00 590.00 .00 1,200.00 .0% 60740000 511600 SA OT 10,814.62 .00 .00 20,731.45 .00 15,000.00 .0% 60740000 521000 SA FICA 41,757.28 21,137.00 22,067.13 35,378.01 .00 25,194.00 19.2% 60740000 521100 SA WRS 63,020.00 19,599.00 20,462.69 33,927.17 .00 23,876.00 21.8% 60740000 521200 SA Health 145,998.12 143,173.00 143,173.00 111,107.70 .00 143,173.00 .0% 60740000 521300 SA Dental 6,285.91 6,812.00 6,812.00 4,638.14 .00 6,812.00 .0% 60740000 521400 Life 5.40 .00 .00 963.14 .00 600.00 .0% 60740000 531010 SA Off Sup 6,593.27 5,500.00 5,500.00 7,048.41 .00 5,500.00 .0% 60740000 531480 SA Gas 17,761.24 25,000.00 25,000.00 10,640.84 .00 25,000.00 .0% 60740000 541000 SA Cnt Srv 30,174.40 85,000.00 85,000.00 582,216.07 .00 85,000.00 .0% 60740000 541100 SA Legal .00 .00 .00 3,911.00 .00 .00 .0% 60740000 541600 SA Audit 23,111.48 20,000.00 20,000.00 13,098.00 .00 20,000.00 .0% 60740000 542600 SA Diggers 2,327.19 3,500.00 3,500.00 1,957.00 .00 3,500.00 .0% 60740000 561000 SA Bld Utl 1,099.84 .00 .00 9,412.52 .00 14,917.00 .0% 60740000 561400 SA Teleph 7,051.64 7,000.00 7,000.00 3,441.71 .00 7,000.00 .0% 60740000 571000 SA Ins&Bnd 42,997.29 60,868.00 60,868.00 54,893.60 .00 60,868.00 .0% 60740000 582800 SA Msc Exp 6,048.32 5,500.00 5,500.00 3,958.26 .00 5,500.00 .0% TOTAL Sewer Administration -7,102,708.09 -7,713,906.00 -7,699,953.65 -5,702,749.11 .00 -7,873,282.00 2.1% 60750000 Other Operating Expense 60750000 571300 Deprecat 1,125,450.00 1,150,000.00 1,150,000.00 .00 .00 1,177,944.00 2.4% 60750000 571500 Debt Princ .00 295,000.00 295,000.00 .00 .00 305,000.00 3.4% 60750000 582500 Int on LTD 230,611.72 238,556.00 238,556.00 238,556.26 .00 224,881.00 -5.7% TOTAL Other Operating Expens 1,356,061.72 1,683,556.00 1,683,556.00 238,556.26 .00 1,707,825.00 1.4% TOTAL Sewer 140,089.00 848,106.00 862,058.35 -408,656.69 .00 720,153.00 -15.1% Page 109 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 23 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Health ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 70800000 Health Insurance Admin 70800000 471000 HI Int Inv -55.58 .00 .00 -6.04 .00 .00 .0% 70800000 474100 HI Premium -2,291,006.16 .00 .00 .00 .00 .00 .0% 70800000 474200 HI EmplCon -333,591.58 .00 .00 .00 .00 .00 .0% 70800000 474210 FSA -30,086.01 .00 .00 -30,348.33 .00 .00 .0% 70800000 521500 HI Adm Exp 695,412.38 .00 .00 549,503.80 .00 .00 .0% 70800000 521600 HI HAS 96,419.07 .00 .00 65,312.49 .00 .00 .0% 70800000 521700 HI Claims 1,871,945.39 .00 .00 859,056.35 .00 .00 .0% TOTAL Health Insurance Admin 9,037.51 .00 .00 1,443,518.27 .00 .00 .0% TOTAL Health 9,037.51 .00 .00 1,443,518.27 .00 .00 .0% Page 110 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:38 User: ldavis Program ID: bgnyrpts Page 24 PROJECTION: 27001 2027 Operating Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Dental ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 71810000 Dental Insurance Admin 71810000 471000 DI Int Inv -5.67 .00 .00 -.27 .00 .00 .0% 71810000 471100 Int Invc -.16 .00 .00 .00 .00 .00 .0% 71810000 474300 DI Premium -111,625.36 .00 .00 -95,387.65 .00 .00 .0% 71810000 521500 DI Adm Exp 8,728.20 .00 .00 6,631.20 .00 .00 .0% 71810000 521800 DI Claims 95,364.37 .00 .00 79,909.42 .00 .00 .0% TOTAL Dental Insurance Admin -7,538.62 .00 .00 -8,847.30 .00 .00 .0% TOTAL Dental -7,538.62 .00 .00 -8,847.30 .00 .00 .0% TOTAL REVENUE -38,532,431.85 -34,859,668.00 -34,977,121.08 -30,736,310.57 .00 -36,612,009.00 5.0% TOTAL EXPENSE 39,039,968.56 37,377,578.00 37,586,399.11 29,958,712.46 .00 39,112,295.00 4.6% GRAND TOTAL 507,536.71 2,517,910.00 2,609,278.03 -777,598.11 .00 2,500,286.00 -.7% ** END OF REPORT - Generated by Lisa Davis ** Page 111 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 1 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Property Maintenance ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 11000000 Property Maintenance Fund 11000000 462700 Prop Rev -3,752.30 -2,500.00 -2,500.00 -7,032.50 .00 -4,000.00 60.0% 11000000 532040 Prop Mnt 2,621.60 2,500.00 2,500.00 7,032.50 .00 4,000.00 60.0% TOTAL Property Maintenance F -1,130.70 .00 .00 .00 .00 .00 .0% TOTAL Property Maintenance -1,130.70 .00 .00 .00 .00 .00 .0% Page 112 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 2 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Police Honor Guard ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 15540000 Honor Guard Administration 15540000 471700 Donations -171.00 -1,000.00 -1,000.00 -10.00 .00 -1,000.00 .0% 15540000 531000 Gen S&E 306.09 1,000.00 1,000.00 753.41 .00 1,000.00 .0% TOTAL Honor Guard Administra 135.09 .00 .00 743.41 .00 .00 .0% TOTAL Police Honor Guard 135.09 .00 .00 743.41 .00 .00 .0% Page 113 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 3 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Recreation Fac. ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 16590000 Recreation Facility Fund Admin 16590000 474500 VlgFac Rev -8,135.49 -25,000.00 -25,000.00 -9,263.30 .00 .00 .0% 16590000 474700 Ath Club -16,300.00 -9,000.00 -9,000.00 -21,340.00 .00 -23,821.00 164.7% 16590000 532000 FacFee Vil .00 11,000.00 11,000.00 .00 .00 .00 .0% 16590000 532020 Ath Club 6,625.00 9,000.00 28,385.00 33,711.00 .00 23,821.00 164.7% TOTAL Recreation Facility Fu -17,810.49 -14,000.00 5,385.00 3,107.70 .00 .00 -100.0% TOTAL Recreation Fac. -17,810.49 -14,000.00 5,385.00 3,107.70 .00 .00 -100.0% Page 114 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 4 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Historic ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 17580000 Historic Preservation Admin 17580000 531000 Gen S&E 86.96 .00 .00 .00 .00 .00 .0% TOTAL Historic Preservation 86.96 .00 .00 .00 .00 .00 .0% TOTAL Historic 86.96 .00 .00 .00 .00 .00 .0% Page 115 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 5 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Police Canine ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 18540000 Police Canine Administration 18540000 471700 Donations 742.74 -500.00 -500.00 .00 .00 .00 .0% 18540000 531000 Gen S&E 1,727.82 1,000.00 1,000.00 .00 .00 .00 .0% TOTAL Police Canine Administ 2,470.56 500.00 500.00 .00 .00 .00 -100.0% TOTAL Police Canine 2,470.56 500.00 500.00 .00 .00 .00 -100.0% Page 116 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 6 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Police Impact ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 21540000 Police Imact Fee Admin 21540000 444000 PubSit Fee -18,793.20 -18,000.00 -18,000.00 -16,621.35 .00 .00 .0% 21540000 471000 Int Invest -2,059.15 -1,500.00 -1,500.00 -2,170.01 .00 .00 .0% TOTAL Police Imact Fee Admin -20,852.35 -19,500.00 -19,500.00 -18,791.36 .00 .00 -100.0% TOTAL Police Impact -20,852.35 -19,500.00 -19,500.00 -18,791.36 .00 .00 -100.0% Page 117 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 7 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Fire Impact ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 22550000 Fire Impact Fee Administration 22550000 444000 PubSit Fee -35,912.19 -35,000.00 -35,000.00 -30,413.91 .00 .00 .0% 22550000 471000 Int Invest -2,485.49 -1,600.00 -1,600.00 -2,539.41 .00 .00 .0% TOTAL Fire Impact Fee Admini -38,397.68 -36,600.00 -36,600.00 -32,953.32 .00 .00 -100.0% TOTAL Fire Impact -38,397.68 -36,600.00 -36,600.00 -32,953.32 .00 .00 -100.0% Page 118 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 8 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Library Impact ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 23570000 Library Impact Fee Admin 23570000 444000 PubSit Fee -27,861.00 -13,000.00 -13,000.00 -23,463.00 .00 .00 .0% 23570000 471000 Int Invest -1,193.95 -650.00 -650.00 -1,332.53 .00 .00 .0% TOTAL Library Impact Fee Adm -29,054.95 -13,650.00 -13,650.00 -24,795.53 .00 .00 -100.0% TOTAL Library Impact -29,054.95 -13,650.00 -13,650.00 -24,795.53 .00 .00 -100.0% Page 119 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 9 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Park & Rec Impact ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 24590000 Parks Impact Fee Admin 24590000 444000 PubSit Fee -52,026.00 -50,000.00 -50,000.00 -43,263.00 .00 .00 .0% 24590000 471000 Int Invest -1,915.85 -2,000.00 -2,000.00 -3,253.78 .00 .00 .0% 24590000 500000 InFundExp .00 50,000.00 50,000.00 .00 .00 .00 .0% TOTAL Parks Impact Fee Admin -53,941.85 -2,000.00 -2,000.00 -46,516.78 .00 .00 -100.0% TOTAL Park & Rec Impact -53,941.85 -2,000.00 -2,000.00 -46,516.78 .00 .00 -100.0% Page 120 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 10 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Fire Explorers ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 25550000 Fire ExplorersImpact Fee Admin 25550000 471000 Int Invest -4.17 .00 .00 -1.81 .00 .00 .0% 25550000 471700 Donations -638.00 -1,000.00 -1,000.00 -2,535.37 .00 -1,000.00 .0% 25550000 531000 Gen S&E 3,215.27 2,000.00 2,000.00 520.00 .00 1,000.00 -50.0% TOTAL Fire ExplorersImpact F 2,573.10 1,000.00 1,000.00 -2,017.18 .00 .00 -100.0% TOTAL Fire Explorers 2,573.10 1,000.00 1,000.00 -2,017.18 .00 .00 -100.0% Page 121 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 11 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Senior Van Replacement ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 28590000 Senior Replacement Van Admin 28590000 461400 SnrVan Fee -4,559.30 -2,000.00 -2,000.00 -2,143.00 .00 -2,000.00 .0% TOTAL Senior Replacement Van -4,559.30 -2,000.00 -2,000.00 -2,143.00 .00 -2,000.00 .0% TOTAL Senior Van Replacement -4,559.30 -2,000.00 -2,000.00 -2,143.00 .00 -2,000.00 .0% Page 122 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:42 User: ldavis Program ID: bgnyrpts Page 12 PROJECTION: 27002 2027 Special Revenue Funds FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Debt Service ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 30300000 Debt Service Adminstration 30300000 411000 Gen PropTX -4,823,265.00 -4,908,320.00 -4,908,320.00 -4,908,320.00 .00 -6,693,636.00 36.4% 30300000 468000 Rent -152,022.92 -425,807.00 -425,807.00 -393,127.66 .00 -437,819.00 2.8% 30300000 471000 Int Invest -6,111.67 -3,800.00 -3,800.00 -2,280.81 .00 .00 .0% 30300000 472000 LEASEINT -59,058.00 .00 .00 .00 .00 .00 .0% 30300000 481000 Prem Ins -278,205.75 .00 .00 .00 .00 .00 .0% 30300000 481100 Procds LTD -485,135.80 .00 .00 .00 .00 .00 .0% 30300000 571500 Debt Princ 3,530,000.00 3,110,000.00 3,110,000.00 3,143,500.00 .00 4,820,000.00 55.0% 30300000 571600 Debt Int 1,690,469.44 2,300,017.00 2,300,017.00 2,300,017.96 .00 3,042,063.00 32.3% 30300000 571700 Dbt Issue 800.00 800.00 800.00 2,400.00 .00 2,400.00 200.0% TOTAL Debt Service Adminstra -582,529.70 72,890.00 72,890.00 142,189.49 .00 733,008.00 905.6% TOTAL Debt Service -582,529.70 72,890.00 72,890.00 142,189.49 .00 733,008.00 905.6% TOTAL REVENUE -5,978,863.49 -5,500,677.00 -5,500,677.00 -5,469,111.44 .00 -7,163,276.00 30.2% TOTAL EXPENSE 5,235,852.18 5,487,317.00 5,506,702.00 5,487,934.87 .00 7,894,284.00 43.9% GRAND TOTAL -743,011.31 -13,360.00 6,025.00 18,823.43 .00 731,008.00-5571.6% ** END OF REPORT - Generated by Lisa Davis ** Page 123 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:43 User: ldavis Program ID: bgnyrpts Page 1 PROJECTION: 27003 2027 Tax Increment Districts Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT TID ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 45406410 Project Administration 45406410 411800 Tx Inc -785,404.03 -896,019.00 -896,019.00 -909,423.06 .00 -901,315.00 .6% 45406410 431600 T6AD PPE -10,156.23 .00 .00 -10,156.23 .00 -10,156.00 .0% 45406410 471000 T6AD InInv -1,117.88 .00 .00 -490.51 .00 -1,000.00 .0% 45406410 511000 T6AD RgS&W 10,791.10 10,850.00 11,156.25 10,295.05 .00 12,057.00 11.1% 45406410 521000 T6AD FICA 795.28 830.00 853.43 757.28 .00 922.00 11.1% 45406410 521100 T6AD WRS 749.30 781.00 803.05 727.02 .00 874.00 11.9% 45406410 521200 T6AD Hlth 2,325.44 2,258.00 2,258.00 2,079.76 .00 2,300.00 1.9% 45406410 521300 T6AD Dntl 98.36 95.00 95.00 88.80 .00 120.00 26.3% 45406410 521400 T6AD Life 19.02 17.00 17.00 18.06 .00 17.00 .0% 45406410 531000 T6AD GnS&E 150.00 2,000.00 2,000.00 .00 .00 150.00 -92.5% 45406410 541100 T6AD Legal 673.00 500.00 500.00 .00 .00 500.00 .0% TOTAL Project Administration -781,076.64 -878,688.00 -878,336.27 -906,103.83 .00 -895,531.00 1.9% 45406490 Other Financing Uses 45406490 571500 Debt Princ 380,000.00 380,000.00 380,000.00 380,000.00 .00 405,000.00 6.6% 45406490 571600 Debt Int 135,312.50 120,112.00 120,112.00 120,112.50 .00 106,438.00 -11.4% 45406490 571650 INTADV 17,375.00 .00 .00 .00 .00 .00 .0% TOTAL Other Financing Uses 532,687.50 500,112.00 500,112.00 500,112.50 .00 511,438.00 2.3% 45407410 Project Administration 45407410 411800 T7AD TxInc -666,398.08 -817,183.00 -817,183.00 -829,409.06 .00 -1,175,714.00 43.9% 45407410 431600 PPE Aid -27,165.78 .00 .00 -27,165.78 .00 27,166.00 .0% 45407410 471000 T7AD InInv -2,512.75 .00 .00 -1,102.55 .00 2,500.00 .0% 45407410 511000 T7AD RGS&W 47,440.94 41,576.00 42,957.66 39,878.87 .00 46,228.00 11.2% 45407410 511600 T7AD OT 48.47 .00 .00 398.84 .00 .00 .0% 45407410 521000 T7AD FICA 3,459.80 3,180.00 3,285.70 2,947.33 .00 3,536.00 11.2% 45407410 521100 T7AD WRS 3,296.19 2,993.00 3,092.48 2,760.19 .00 3,352.00 12.0% 45407410 521200 T7AD Hlth 10,103.93 8,197.00 8,197.00 7,681.83 .00 8,862.00 8.1% 45407410 521300 T7AD Dntl 419.16 367.00 367.00 313.22 .00 367.00 .0% 45407410 521400 Life 129.03 110.00 110.00 75.87 .00 110.00 .0% 45407410 531000 T7AD GnS&E 150.00 2,000.00 2,000.00 .00 .00 150.00 -92.5% 45407410 541100 T7AD Legal 1,728.00 .00 .00 198.00 .00 500.00 .0% 45407410 541600 T7AD Audit .00 500.00 500.00 .00 .00 .00 -100.0% 45407410 543000 T7AD CSOth 6,800.00 .00 .00 .00 .00 .00 .0% 45407410 581600 Land Purch 299,450.00 .00 .00 .00 .00 .00 .0% TOTAL Project Administration -323,051.09 -758,260.00 -756,673.16 -803,423.24 .00 -1,082,943.00 42.8% 45407460 Water Mains & Improvements 45407460 542800 T7WM CSCnt 14,101.11 .00 .00 .00 .00 .00 .0% Page 124 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:43 User: ldavis Program ID: bgnyrpts Page 2 PROJECTION: 27003 2027 Tax Increment Districts Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT TID ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE TOTAL Water Mains & Improvem 14,101.11 .00 .00 .00 .00 .00 .0% 45407490 Other Financing Uses 45407490 571500 Debt Princ 205,000.00 530,000.00 530,000.00 530,000.00 .00 545,000.00 2.8% 45407490 571600 Debt Int 166,957.50 154,747.00 154,747.00 154,757.50 .00 137,020.00 -11.5% 45407490 571650 INTADV 23,468.76 .00 .00 .00 .00 19,469.00 .0% 45407490 581500 T7OF Rbate .00 .00 .00 .00 .00 74,062.00 .0% TOTAL Other Financing Uses 395,426.26 684,747.00 684,747.00 684,757.50 .00 775,551.00 13.3% 45408410 Project Administration 45408410 411800 T8AD TxInc -3,022,033.07 -3,491,491.00 -3,491,491.00 -3,543,725.13 .00 -3,842,959.00 10.1% 45408410 431600 T8AD PPE -19,945.24 .00 .00 -19,945.24 .00 -19,945.00 .0% 45408410 471000 T8AD Intrt -5,280.74 .00 .00 -2,317.10 .00 -5,000.00 .0% 45408410 472700 T8AD MscRv -206,700.00 .00 .00 -153,783.92 .00 .00 .0% 45408410 511000 T8AD RgS&W 88,336.88 101,410.00 104,885.87 71,267.41 .00 108,557.00 7.0% 45408410 511600 T8AD OT 97.08 .00 .00 844.97 .00 .00 .0% 45408410 521000 T8AD FICA 6,445.17 7,757.00 8,022.90 5,289.01 .00 8,305.00 7.1% 45408410 521100 T8AD WRS 5,921.78 6,966.00 7,204.54 4,763.48 .00 7,870.00 13.0% 45408410 521200 T8AD Hlth 17,356.62 20,027.00 20,027.00 12,419.68 .00 14,816.00 -26.0% 45408410 521300 T8AD Dntl 710.28 922.00 922.00 505.88 .00 922.00 .0% 45408410 521400 T8AD Life 225.38 198.00 198.00 107.03 .00 198.00 .0% 45408410 531000 T8AD GnS&E 150.00 2,000.00 2,000.00 759.21 .00 150.00 -92.5% 45408410 541100 T8AD Legal 352.00 .00 .00 3,618.00 .00 1,000.00 .0% 45408410 541600 T8AD Audit .00 5,000.00 5,000.00 400.00 .00 400.00 -92.0% 45408410 542900 T8AD Plan .00 .00 .00 96,850.00 .00 .00 .0% TOTAL Project Administration -3,134,363.86 -3,347,211.00 -3,343,230.69 -3,522,946.72 .00 -3,725,686.00 11.3% 45408440 Street Improvements 45408440 542700 T8SI Engin 36,000.00 .00 .00 .00 .00 .00 .0% 45408440 542800 T8SI Const 2,677,506.88 500,000.00 500,000.00 136,086.31 .00 .00 -100.0% 45408440 543000 T8SI Other 236,364.75 .00 .00 .00 .00 .00 .0% TOTAL Street Improvements 2,949,871.63 500,000.00 500,000.00 136,086.31 .00 .00 -100.0% 45408460 Water Mains & Improvements 45408460 542800 T8WM Const 24,041.40 650,000.00 650,000.00 159,607.09 .00 .00 -100.0% 45408460 543100 T8WM W12 456,558.80 .00 .00 119,135.96 .00 .00 .0% 45408460 543300 CS - Boost 21,322.45 .00 .00 3,048.63 .00 .00 .0% TOTAL Water Mains & Improvem 501,922.65 650,000.00 650,000.00 281,791.68 .00 .00 -100.0% 45408480 Sanitary Sewer Mains & Improv 45408480 542800 T8SS Const 3,940.00 850,000.00 850,000.00 .00 .00 .00 -100.0% Page 125 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:43 User: ldavis Program ID: bgnyrpts Page 3 PROJECTION: 27003 2027 Tax Increment Districts Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT TID ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE TOTAL Sanitary Sewer Mains & 3,940.00 850,000.00 850,000.00 .00 .00 .00 -100.0% 45408490 Other Financing Uses 45408490 571500 Debt Princ 680,000.00 865,000.00 865,000.00 865,000.00 .00 945,000.00 9.2% 45408490 571600 Debt Int 499,532.92 480,893.00 480,893.00 480,893.75 .00 444,075.00 -7.7% 45408490 581500 T8OF Rbate 105,277.46 105,277.00 105,277.00 142,368.33 .00 179,459.00 70.5% TOTAL Other Financing Uses 1,284,810.38 1,451,170.00 1,451,170.00 1,488,262.08 .00 1,568,534.00 8.1% 45409410 Project Administration 45409410 411800 T9AD TxInc -354,882.72 -528,942.00 -528,942.00 -536,855.43 .00 -453,621.00 -14.2% 45409410 511000 T9AD RgS&W 89,163.18 102,234.00 105,738.71 72,023.71 .00 109,440.00 7.0% 45409410 511600 T9AD OT 97.08 .00 .00 844.97 .00 .00 .0% 45409410 521000 T9AD FICA 6,505.92 7,820.00 8,088.11 5,344.18 .00 8,372.00 7.1% 45409410 521100 T9AD WRS 5,979.20 7,026.00 7,266.62 4,818.08 .00 7,934.00 12.9% 45409410 521200 T9AD Hlth 17,592.62 20,300.00 20,300.00 12,664.10 .00 15,112.00 -25.6% 45409410 521300 T9AD Dntl 722.15 933.00 933.00 516.64 .00 933.00 .0% 45409410 521400 T9AD Life 226.01 198.00 198.00 107.73 .00 198.00 .0% 45409410 531000 T9AD GnS&E 150.00 1,500.00 1,500.00 .00 .00 150.00 -90.0% 45409410 541100 T9AD Legal 317.50 .00 .00 660.00 .00 1,000.00 .0% 45409410 541600 T9AD Audit 10,026.05 10,000.00 10,000.00 1,396.00 .00 1,500.00 -85.0% 45409410 542700 T9AD Engin 250.00 .00 .00 .00 .00 .00 .0% TOTAL Project Administration -223,853.01 -378,931.00 -374,917.56 -438,480.02 .00 -308,982.00 -18.5% 45409440 Street Improvements 45409440 542800 T9SI Const -38,952.17 .00 .00 .00 .00 .00 .0% TOTAL Street Improvements -38,952.17 .00 .00 .00 .00 .00 .0% 45409490 Other Financing Uses 45409490 571500 Debt Princ .00 140,000.00 140,000.00 140,000.00 .00 150,000.00 7.1% 45409490 571600 Debt Int 160,700.00 157,000.00 157,000.00 157,200.00 .00 149,950.00 -4.5% 45409490 581500 T9OF Rbate 194,182.72 .00 .00 156,215.31 .00 157,894.00 .0% TOTAL Other Financing Uses 354,882.72 297,000.00 297,000.00 453,415.31 .00 457,844.00 54.2% TOTAL TID 1,536,345.48 -430,061.00 -420,128.68 -2,126,528.43 .00 -2,699,775.00 527.8% TOTAL REVENUE -5,101,596.52 -5,733,635.00 -5,733,635.00 -6,034,374.01 .00 -6,380,044.00 11.3% TOTAL EXPENSE 6,637,942.00 5,303,574.00 5,313,506.32 3,907,845.58 .00 3,680,269.00 -30.6% GRAND TOTAL 1,536,345.48 -430,061.00 -420,128.68 -2,126,528.43 .00 -2,699,775.00 527.8% ** END OF REPORT - Generated by Lisa Davis ** Page 126 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 13:50 User: ldavis Program ID: bgnyrpts Page 1 PROJECTION: 27004 Capital Reserve Fund Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Capital Reserve ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 49000000 Capital Reserve Fund 49000000 471000 Int Invest -101,256.47 -167,000.00 -167,000.00 -75,198.93 .00 .00 .0% 49000000 531001 Bank Fees .00 .00 .00 6,787.01 .00 .00 .0% TOTAL Capital Reserve Fund -101,256.47 -167,000.00 -167,000.00 -68,411.92 .00 .00 -100.0% TOTAL Capital Reserve -101,256.47 -167,000.00 -167,000.00 -68,411.92 .00 .00 -100.0% TOTAL REVENUE -101,256.47 -167,000.00 -167,000.00 -75,198.93 .00 .00 -100.0% TOTAL EXPENSE .00 .00 .00 6,787.01 .00 .00 .0% GRAND TOTAL -101,256.47 -167,000.00 -167,000.00 -68,411.92 .00 .00 -100.0% ** END OF REPORT - Generated by Lisa Davis ** Page 127 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 14:09 User: ldavis Program ID: bgnyrpts Page 1 PROJECTION: 27005 2027 Capital Fund Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Capital ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 40000000 Capital Fund 40000000 432500 SA Misc -1,487,233.60 .00 .00 .00 .00 -2,211,294.00 .0% 40000000 433100 Lib Cap .00 -10,000.00 -10,000.00 .00 .00 .00 -100.0% 40000000 433200 Oth Grant -19,225.00 .00 .00 .00 .00 .00 .0% 40000000 471000 Int Invest -3,497.13 .00 .00 .00 .00 .00 .0% 40000000 471700 Donations .00 -20,000.00 -20,000.00 .00 .00 .00 -100.0% 40000000 472700 Misc Revs -40,747.25 .00 .00 -35,300.00 .00 .00 .0% 40000000 481000 Prem Ins -33,834.80 .00 .00 -928,946.35 .00 .00 .0% 40000000 481300 GO Bond -12,224,864.20 -17,104,400.00 -17,104,400.00 -17,170,000.00 .00 -50,157,967.00 193.2% 40000000 571600 Debt Int 42,920.42 .00 .00 8,584.08 .00 .00 .0% 40000000 571700 Dbt Issue 182,284.80 185,000.00 185,000.00 190,433.75 .00 200,000.00 8.1% TOTAL Capital Fund -13,584,196.76 -16,949,400.00 -16,949,400.00 -17,935,228.52 .00 -52,169,261.00 207.8% 40500000 Non-Departmental 40500000 468000 AscensRent -1,159.43 .00 .00 .00 .00 .00 .0% 40500000 471000 Int Invest -129,028.45 -100,000.00 -100,000.00 -37,893.43 .00 -62,106.57 -37.9% 40500000 490000 InterFund -29,271.30 .00 .00 .00 .00 .00 .0% TOTAL Non-Departmental -159,459.18 -100,000.00 -100,000.00 -37,893.43 .00 -62,106.57 -37.9% 40522000 Information Technology 40522000 531300 IT Maint 94,057.10 .00 .00 .00 .00 50,000.00 .0% TOTAL Information Technology 94,057.10 .00 .00 .00 .00 50,000.00 .0% 40531000 Clerk's Office 40531000 531650 Elect S&E .00 17,000.00 17,000.00 15,937.50 .00 16,000.00 -5.9% TOTAL Clerk's Office .00 17,000.00 17,000.00 15,937.50 .00 16,000.00 -5.9% 40541000 Police Administration 40541000 531560 Prot Eqp .00 25,000.00 25,000.00 22,661.00 .00 14,795.00 -40.8% 40541000 561500 Comms .00 .00 .00 .00 .00 15,600.00 .0% 40541000 591000 Misc Equip .00 .00 .00 .00 .00 19,606.00 .0% 40541000 592200 Vehicle 301,167.72 338,000.00 338,000.00 246,206.34 .00 360,246.00 6.6% 40541000 592300 Bldg Imp .00 3,000,000.00 3,000,000.00 183,554.91 .00 31,795,540.00 959.9% 40541000 592600 Video 14,384.00 .00 .00 .00 .00 170,000.00 .0% TOTAL Police Administration 315,551.72 3,363,000.00 3,363,000.00 452,422.25 .00 32,375,787.00 862.7% 40551000 Fire Administration 40551000 532200 Act 102 -2,714.60 .00 .00 .00 .00 .00 .0% Page 128 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 14:09 User: ldavis Program ID: bgnyrpts Page 2 PROJECTION: 27005 2027 Capital Fund Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Capital ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 40551000 592200 Vehicle .00 775,000.00 775,000.00 211,456.56 .00 .00 -100.0% 40551000 592300 Bldg Imp 29,519.59 6,500,000.00 6,500,000.00 472,000.00 .00 12,750,000.00 96.2% TOTAL Fire Administration 26,804.99 7,275,000.00 7,275,000.00 683,456.56 .00 12,750,000.00 75.3% 40561000 Engineering 40561000 531340 Asphalt Pv 3,382,393.99 4,922,400.00 4,922,400.00 3,470,372.10 .00 1,688,000.00 -65.7% 40561000 541700 GIS .00 40,000.00 40,000.00 .00 .00 24,000.00 -40.0% 40561000 541800 DNr Permit 29,975.00 75,000.00 75,000.00 69,971.44 .00 .00 -100.0% 40561000 541900 OS Conslt .00 .00 .00 15,268.75 .00 .00 .0% 40561000 591000 Equip .00 20,000.00 20,000.00 18,291.44 .00 .00 -100.0% 40561000 592710 DPW SPrep 491,264.45 .00 .00 .00 .00 .00 .0% 40561000 593000 StmWtr Rly .00 .00 .00 .00 .00 449,780.00 .0% 40561000 593100 Flood Mit .00 10,000.00 10,000.00 .00 .00 .00 -100.0% 40561000 593300 MS4 Prog 4,550.00 .00 .00 .00 .00 .00 .0% 40561000 593400 Maple/Lann 121,530.67 .00 .00 .00 .00 .00 .0% 40561000 593800 HWY167 .00 .00 .00 41,296.35 .00 .00 .0% 40561000 593810 StreetsDOT .00 594,978.30 594,978.30 8,940.17 .00 1,463,000.00 145.9% 40561000 593820 StreetsOth .00 679,021.70 679,021.70 9,109.84 .00 .00 -100.0% 40561000 593900 RCHFLD EXT 236.00 .00 .00 .00 .00 .00 .0% 40561000 594300 Bridges .00 275,000.00 275,000.00 85,456.50 .00 .00 -100.0% 40561000 594400 S&L Improv .00 85,000.00 85,000.00 118,800.00 .00 222,400.00 161.6% TOTAL Engineering 4,029,950.11 6,701,400.00 6,701,400.00 3,837,506.59 .00 3,847,180.00 -42.6% 40562000 Highway 40562000 531340 Asphalt Pv -62,432.49 .00 .00 .00 .00 .00 .0% 40562000 591000 Misc Equip .00 6,000.00 6,000.00 5,900.30 .00 9,000.00 50.0% 40562000 592100 Land Imp 29,250.00 30,000.00 30,000.00 27,866.00 .00 .00 -100.0% 40562000 592200 Vehicle 312,691.14 341,000.00 341,000.00 325,309.63 .00 919,000.00 169.5% 40562000 594400 S&L Improv .00 144,000.00 144,000.00 137,073.58 .00 27,000.00 -81.3% TOTAL Highway 279,508.65 521,000.00 521,000.00 496,149.51 .00 955,000.00 83.3% 40563000 Buildings & Grounds 40563000 591200 MR VlgHall 20,515.00 .00 .00 .00 .00 .00 .0% 40563000 591800 MR Lib 88,000.00 .00 .00 .00 .00 62,000.00 .0% 40563000 591900 MR SnrCntr .00 .00 .00 .00 .00 23,000.00 .0% 40563000 592500 MR Parks .00 .00 .00 .00 .00 10,000.00 .0% TOTAL Buildings & Grounds 108,515.00 .00 .00 .00 .00 95,000.00 .0% 40564000 Parks 40564000 591000 Misc Equip .00 52,000.00 52,000.00 45,494.88 .00 .00 -100.0% Page 129 of 219 Village of Germantown, WI - PRODUCTION NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS Report generated: 11/12/2026 14:09 User: ldavis Program ID: bgnyrpts Page 3 PROJECTION: 27005 2027 Capital Fund Budget FOR PERIOD 12 ACCOUNTS FOR: 2025 2026 2026 2026 2026 2027 PCT Capital ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION AdministrationCHANGE 40564000 592100 Land Imp .00 .00 54,000.00 5,585.08 .00 .00 .0% 40564000 592200 Vehicle 68,246.21 222,000.00 222,000.00 218,832.29 .00 .00 -100.0% TOTAL Parks 68,246.21 274,000.00 328,000.00 269,912.25 .00 .00 -100.0% 40565000 Recycling 40565000 592100 Land Imp .00 54,000.00 .00 .00 .00 .00 .0% TOTAL Recycling .00 54,000.00 .00 .00 .00 .00 -100.0% 40570000 Library 40570000 531060 Office E&F .00 40,000.00 10,000.00 10,000.00 .00 .00 -100.0% TOTAL Library .00 40,000.00 10,000.00 10,000.00 .00 .00 -100.0% 40582000 Planning and Zonning 40582000 594200 Pil/Meq RD 106,283.11 .00 .00 151,367.50 .00 .00 .0% TOTAL Planning and Zonning 106,283.11 .00 .00 151,367.50 .00 .00 .0% 40591000 Recreation 40591000 591000 Misc Equip .00 .00 .00 .00 .00 21,000.00 .0% 40591000 592100 Land Imp 70,115.90 55,500.00 55,500.00 48,731.55 .00 33,000.00 -40.5% 40591000 592200 Vehicle .00 .00 .00 .00 .00 15,000.00 .0% 40591000 592300 Bldg Imp 2,262.00 .00 37,738.00 26,978.83 .00 .00 .0% TOTAL Recreation 72,377.90 55,500.00 93,238.00 75,710.38 .00 69,000.00 24.3% 40592000 Senior Center 40592000 591000 Misc Equip .00 22,500.00 22,500.00 22,500.00 .00 .00 .0% TOTAL Senior Center .00 22,500.00 22,500.00 22,500.00 .00 .00 -100.0% TOTAL Capital -8,642,361.15 1,274,000.00 1,281,738.00 -11,958,159.41 .00 -2,073,400.57 -262.7% TOTAL REVENUE -13,968,861.16 -17,234,400.00 -17,234,400.00 -18,172,139.78 .00 -52,431,367.57 204.2% TOTAL EXPENSE 5,326,500.01 18,508,400.00 18,516,138.00 6,213,980.37 .00 50,357,967.00 172.1% GRAND TOTAL -8,642,361.15 1,274,000.00 1,281,738.00 -11,958,159.41 .00 -2,073,400.57 -262.7% ** END OF REPORT - Generated by Lisa Davis ** Page 130 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Resolution Adopting the 2027 Budget (ACTION) SUBMITTED BY: SUMMARY EXPLANATION: ATTACHMENT: 1. 20-2026 Resolution Adopting the 2027 Budget STAFF RECOMMENDATION: ACTION BY COMMITTEE: Page 131 of 219 STATE OF WISCONSIN VILLAGE OF GERMANTOWN RESOLUTION NO. 20-2026 WASHINGTON COUNTY A RESOLUTION APPROVING THE 2027 VILLAGE OF GERMANTOWN BUDGET WHEREAS, the Committee of the Whole held budget review meetings in the months of September and October 2026, to study, review, and consider the 2027 Village of Germantown Budget; and WHEREAS, on Monday, November 16, 2026, the Village of Germantown Village Board held a public hearing to consider the 2027 Proposed Budget; and WHEREAS, the Village of Germantown Village Board ha s carefully examined the proposed budget and supporting information and found them to be true and correct and to properly represent the income anticipated and the required expenditures of the Village and all funds and departments as set forth in the budget; and WHEREAS, after careful review and discussion, on November 16, 2026, the Village of Germantown Village Board moved to recommend the adoption of Resolution 20-2026 approving the 2027 Village of Germantown, Washington County, Wisconsin Budget as set forth in the attached schedule and made a part hereof inclusive of all funds including the General Fund, Capital Projects Funds, Special Revenue Funds, Debt Service Funds, the Water Utility, Wastewater Utility Fund, and the Health & Dental Employee Insurance Funds; and, NOW THEREFORE BE IT RESOLVED by the Village Board of the Village of Germantown, Washington County, Wisconsin, hereby approves the budget of the Village of Germantown, Washington County, Wisconsin, for the year 2027 as set forth in the attached schedule and made a part hereof inclusive of all funds including the General Fund, Capital Projects Funds, Special Revenue Funds, Debt Service Funds, the Water Utility, Wastewater Utility Fund, and the Health & Dental Employee Insurance Funds. Adopted: November 16, 2026 Robert A Soderberg, Village President ATTEST: Donna Ott, Village Clerk Page 132 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Resolution Approving the Levying of Property Taxes (ACTION) SUBMITTED BY: SUMMARY EXPLANATION: ATTACHMENT: 1. 21-2026 Resolution approving levy of property taxes STAFF RECOMMENDATION: ACTION BY COMMITTEE: Page 133 of 219 STATE OF WISCONSIN VILLAGE OF GERMANTOWN WASHINGTON COUNTY RESOLUTION NO. 21-2026 A RESOLUTION APPROVING LEVYING OF PROPERTY TAXES FOR VILLAGE PURPOSES WHEREAS, on Monday, November 16, 2026 the Village of Germantown Village Board met to consider levying taxes for Village purposes; and WHEREAS, after careful review and consideration, the Village Board moved to recommend the adoption of Resolution 21-2026 approving that the amounts set forth in the 2027 Budget be levied as taxes against the taxable property of the Village of Germantown for General Fund Operations and Debt Service, for the purposes stated herein, and that the same be placed on the tax roll for the year 2026, collectible in 2027, and that the total levy is hereby determined to be $20,276,442. NOW THEREFORE BE IT RESOLVED, The Village Board of the Village of Germantown, Washington County, Wisconsin, hereby approves the amounts set forth in the 2027 Budget and that the same be placed on the tax roll for the year 2026, collectible in 2027, and that the total levy is hereby determined to be $20,276,442. Adopted: November 16, 2026 Robert A Soderberg, Village President ATTEST: Donna Ott, Village Clerk Page 134 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Resolution Authorizing the Placement of Special Charges on the 2026 Tax Roll Against Certain Properties (ACTION) SUBMITTED BY: SUMMARY EXPLANATION: ATTACHMENT: 1. 19-2026 Resolution Authorizing the placement of special charges STAFF RECOMMENDATION: ACTION BY COMMITTEE: Page 135 of 219 STATE OF WISCONSIN VILLAGE OF GERMANTOWN RESOLUTION NO. 19-2026 WASHINGTON COUNTY A RESOLUTION AUTHORIZING THE PLACEMENT OF SPECIAL CHARGES ON THE 2026 TAX ROLL AGAINST CERTAIN PROPERTIES WHEREAS, certain services have been provided by the Village of Germantown, and have directly benefited specific properties within the Village, said services including water and sewer, special assessments and other miscellaneous charges for services provided during 2026; and, WHEREAS, in specific instances, charges for services provided have not been paid, and no alternative arrangements have been reached to reimburse the Village for providing said services, or by mutual agreement, special assessment charges are to be placed on the tax roll as a means of collection; and, NOW THEREFORE, BE IT RESOLVED by the Village Board of the Village of Germantown, Washington County, Wisconsin, that for the Village to be reimbursed for the cost it has incurred in providing certain services, a listing of which is attached, hereto and made a part hereof, pursuant to Section 66.069, 66.076, 66.60 ( 16) and 66.98 Wisconsin Statutes, the Village Treasurer is hereby authorized and directed to place such charges upon the 2026 Tax Roll for collection in 2026 and 2027. Adopted: November 16, 2026 Robert A Soderberg, Village President ATTEST: Donna Ott, Village Clerk Page 136 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Resolution Designating Officials Authorized to Declare Official Intent Under Reimbursement Bond Regulations (ACTION) SUBMITTED BY: SUMMARY EXPLANATION: ATTACHMENT: 1. 22-2026 Resolution designating officials authorized to declare official intent STAFF RECOMMENDATION: ACTION BY COMMITTEE: Page 137 of 219 STATE OF WISCONSIN VILLAGE OF GERMANTOWN WASHINGTON COUNTY RESOLUTION NO. 22-2026 A RESOLUTION DESIGNATING OFFICIALS AUTHORIZED TO DECLARE OFFICIAL INTENT UNDER REIMBURSEMENT BOND REGULATIONS WHEREAS, the Department of the Treasury has issued final regulations (Treas. Reg. Section 1.150-2) (the "Reimbursement Bond Regulations") that, for the purpose of determining whether interest on certain obligations of a state or local government is excluded from gross income for federal income tax purposes, permit the use of the proceeds of tax-exempt obligations to reimburse capital expenditures made prior to the date such obligations are issued only if the state or local government, not later than 60 days of the date of expenditure, declares its official intent to reimburse the expenditure with proceeds of a tax-exempt borrowing; WHEREAS, the Reimbursement Bond Regulations require that if a current expenditure is to be permanently financed by a later issue of tax-exempt obligations a state or local government must declare its intention to reimburse itself for the expenditure from proceeds of a borrowing not later than 60 days from when the expenditure is made (the "Declaration of Official Intent"); WHEREAS, the Reimbursement Bond Regulations permit a state or local government to designate officials or employees to make Declarations of Official Intent on its behalf; WHEREAS, the Village Board (the "Governing Body") of the Village of Germantown (the "Issuer") deems it to be necessary, desirable and in the best interest of the Issuer to authorize the Finance Director to make Declarations of Official Intent on its behalf when the Issuer reasonably expects to reimburse itself from the proceeds of a borrowing for certain expenditures for a specific property, project or program which it pays for from other funds prior to the receipt of the proceeds of the borrowing; and WHEREAS, the Governing Body hereby finds and determines that designating the Finance Director with the authority to make Declarations of Official Intent will facilitate compliance with the Reimbursement Bond Regulations. NOW, THEREFORE, BE IT RESOLVED by the Governing Body of the Issuer, pursuant to Treas. Reg. Section 1.150-2(e)(1), that: Section 1. Authorization to Declare Official Intent. The Finance Director is hereby authorized and designated to make Declarations of Official Intent pursuant to the above-referenced Reimbursement Bond Regulations. Section 2. Form of Declaration. Any such Declaration of Official Intent shall be made in substantially the form attached hereto. Section 3. Public Availability. Any Declaration of Official Intent shall be maintained in the files of the Issuer and shall be made available for public inspection in compliance with applicable State law governing the availability of records of official acts of the Governing Body including Subchapter II of Chapter 19, Wisconsin Statutes (the "Public Records Law"). Page 138 of 219 Section 4. Further Authorizations. The Finance Director is hereby further authorized to take such other actions as may be necessary or desirable to comply or evidence compliance with the Reimbursement Bond Regulations. Section 5. Effective Date. This Resolution shall take effect immediately upon its adoption and approval. Adopted, recorded and approved this 16th day of November, 2026. Robert A Soderberg, Village President ATTEST: Donna Ott, Village Clerk RESOLUTION NO. 22-2026 PAGE 2 Page 139 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Resolution Accepting Funds from Washington County EMS and Fire Grant Program for 2026 (ACTION) SUBMITTED BY: Lisa Davis, Finance Director SUMMARY EXPLANATION: This is the final year of a three-year (2024-2026) grant funding program for EMS and Fire from Washington County. ATTACHMENT: 1. 18-2026 Resolution Accepting Funds from Wash Cty EMS STAFF RECOMMENDATION: Move to approve Resolution Accepting Funds from Washington County EMS and Fire Grant Program for 2026. ACTION BY COMMITTEE: Page 140 of 219 STATE OF WISCONSIN VILLAGE OF GERMANTOWN WASHINGTON COUNTY RESOLUTION NO. 18-2026 A RESOLUTION TO ACCEPT FUNDS FROM THE WASHINGTON COUNTY EMERGENCY MEDICAL SERVICE (EMS) & FIRE GRANT PROGRAM WHEREAS, Washington County has allocated a pool of dollars to create a grant program to provide direct assistance to partner fire and Emergency Medical Services (EMS) agencies in the County; and WHEREAS, the County has created a distribution formula and has calculated the award amounts for each eligible municipality; and WHEREAS, Washington County has awarded $ 177,000 to Village of Germantown for this purpose; and WHEREAS, Village of Germantown has reviewed the terms and conditions of the grant program, as described in the program description; and NOW, THEREFORE, BE IT RESOLVED by the Village of Germantown Board that the Village Board does hereby accept the grant award in accordance with the Washington County Emergency Medical Service (EMS) & Fire Grant Program. Adopted: November 16, 2026 Robert A Soderberg, Village President ATTEST: Donna Ott, Village Clerk Page 141 of 219 BUSINESS OF THE VILLAGE BOARD MEETING DATE: November 16, 2026 PLACEMENT: Action Item ITEM TITLE: Sutton Farms Development Agreement (ACTION) SUBMITTED BY: Timothy Zimmerman, Public Works Director SUMMARY EXPLANATION: Before the Board is the Development Agreement for the Sutton Farms development located at the north-east corner of Lannon Road and County Line Road. The Agreement is the Village's standard-form agreement modified to reflect the specifics of the development. The biggest difference in this agreement vs agreements previously approved is that the Developer plans to complete the development in multiple phases, which is reflected. The agreement also reflects the private lift station that will be used for part of the development. Maintenance and operation of the lift station will remain with the Homeowner's Association, as is called for in the agreement. Following the Public Works Committee meeting, the parties worked through a couple changes to address issues raised by the Committee. In the packet are two items: a clean copy of the agreement with the revisions and a blacklined copy which illustrates the specific changes when compared to the version the Committee had before it. These changes are: 1. Blasting: We removed blasting from section 1.05, which relates generally to grading and surfacing of streets. This language was moved to its own new section, 1.17, to provide a clearer indication the requirements apply to all blasting and not just for grading activities. The language was also revised to add specific reference to complying with state and federal regulations. 2. Fees: Sections 4.01 and 4.02 were revised to address concerns raised about the long-term nature of this development. The language was revised to make it clear that future fees will apply when future work is completed. 3. Insurance: Section 7.03 was amended to require that the Developer’s contractors must have minimum levels of insurance and that those policies name the Village as an additional insured to provide an additional level of direct protection to the Village. ATTACHMENT: Page 142 of 219 1. Sutton Farm DA - Final 2. Sutton Farm DA - Blacklined STAFF RECOMMENDATION: A motion to approve the development agreement as presented. ACTION BY COMMITTEE: The Public Works and Highways Committee recommended approval by a 3-1 vote. Page 143 of 219 1 SUTTON FARM SUBDIVISION DEVELOPMENT AGREEMENT THIS SUTTON FARM SUBDIVISION DEVELOPMENT AGREEMENT (“Agreement”) is entered into as of the Effective Date (as defined below) by and between the Village of Germantown, a municipal corporation of the State of Wisconsin located in Washington County, hereinafter called the "Village", and Home Path Financial Limited Partnership, the developer of the Sutton Farm Subdivision, hereinafter referred to as “Developer”. WHEREAS, the Developer has certain lands within the Village under ownership or contract to develop, said lands being more specifically described in Exhibit A (the “Property”); and WHEREAS, Developer has submitted, and the Village has approved, a preliminary plat and development plan for development of the Property into a residential subdivision, which will consist of 143 single-family residential lots, 26 duplex condo units and 102 multi-family condo units (the “Development” or “Subdivision”). A copy of the approved preliminary plat is attached as Exhibit B (“Plat”); and WHEREAS, Developer has submitted for approval by the Village a development plan (“Development Plan”) for the Development to be developed in five (5) phases (each a “Phase” and collectively the “Phases”). The approved Development Plan is attached as Exhibit E; and WHEREAS, the Village may require that Developer make and install certain public improvements reasonably necessary and/or that Developer execute a certified check or irrevocable letter of credit to ensure that those public improvements will be made within a reasonable time; and further that the acceptance of dedication of these public improvements may be conditioned upon the construction of such public improvements according to Village specifications and without cost to the Village, all as detailed and described in this Agreement; and WHEREAS, it will be necessary that Developer construct and install certain water main, sanitary sewer, storm sewer, landscaping, lighting, signs, and roadway facilities in public right-of- way and storm water management facilities in a dedicated easement on the subject Property, and the Village will require that such plans and designs be approved and permitted, and that the Developer furnish an appropriate financial guarantee, all as detailed and described in this Agreement; and WHEREAS, all improvements (other than Advance Site Work, as defined below) required to support the lots within that particular Phase (including but not limited to a water looping system to the extent necessary) shall be completed with such Phase. Notwithstanding the foregoing, which shall generally consist of erosion control, minor earthwork to strip and fill overburden material and build staging area for crushing activities, blasting necessary to fracture all expected bedrock on the site and crushing of excavated bedrock, and those improvements and site work items specifically identified on Exhibit F attached hereto (collectively, “Advance Site Work”) shall be Page 144 of 219 2 completed as part of Phase I of the Development. All other improvements and site work, including any sanitary sewer, water main, grading, blasting, rock crushing, or other earth work not identified on Exhibit F, shall be completed as part of the Phase of the Development that such improvements or work will support. WHEREAS, the Village seeks to protect the health, safety and general welfare of the Village as a whole and, in particular, property owners who abut the site or are potentially affected by the project through application of the Municipal Code and rules and regulations of governmental agencies with jurisdiction. NOW, THEREFORE, in consideration of these recitals, the mutual agreements, benefits and responsibilities outlined herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE I - REQUIRED IMPROVEMENTS 1.01 GENERALLY. The recitals set forth above are hereby incorporated into and made a part of this Agreement. Developer, entirely at its own expense, shall, except as herein provided, design and install the public improvements required under this Agreement for the Development in accordance with the provisions of Sec.18.08 of the Municipal Code and as directed by the Village Engineer or Village Board (“Public Improvements”). It is the intent of this Agreement that all Public Improvements shall be installed by Developer. 1.02 SANITARY SEWERAGE SYSTEMS. Except as set forth below, with each Phase, Developer shall extend and install public sanitary sewer with privately owned lateral stubs extending to the edge of right-of-way to provide wastewater utility service to all lots within the Subdivision. Notwithstanding the foregoing, all sanitary sewerage system work constituting Advance Site Work shall be completed as part of Phase I of the Development. (1) The Village has approved certain exceptions to Village specifications regarding sanitary sewer depth and private lift stations conditioned on conformity to preliminary plans and conditions set by the Village Board. Developer shall construct, install, furnish, and provide private sanitary sewers leading to a private sanitary lift station with private sanitary force mains through part of the Subdivision. Installation to be in accordance with plans and specifications approved by the Wisconsin Department of Natural Resources (WDNR), Wisconsin Department of Safety and Professional Services (DSPS), Milwaukee Metropolitan Sewerage District (MMSD) and Southeast Wisconsin Regional Planning Commission (SEWRPC). The proposed Private sanitary system plans will be transmitted to the Village, reviewed and inspected by the Village. (a) Developer shall prepare a pro forma showing the total estimated costs of operation, maintenance, repair and replacement of the private lift station over its expected useful life cycle to ensure perpetual operation. Prior to the Developer transferring the private sanitary system facilities, including the private lift station, to the applicable homeowners Page 145 of 219 3 association, the Developer shall make a one-time capital contribution to the applicable homeowners association reserve fund for the purpose of funding future maintenance of the private lift station. The amount of such capital contribution shall equal one (1) year’s portion of the estimated total cost identified in the pro forma as amortized over the lift station’s design life. The pro forma shall be shared with purchasers of lots within the subdivision to help ensure that the applicable homeowners association appropriately budgets for perpetual operating expenses related to the private lift station. (b) Once the Developer transfers private sanitary facilities to the applicable homeowners association, the maintenance, repair, and replacement of the private lift station shall be the responsibility of the applicable homeowners association, or its assignee, in perpetuity. In the event that the applicable homeowners association ceases to exist, the individual owners of the lots served by the private lift station shall be jointly and severally be responsible for the private lift station. (c) The private sanitary lift station will continuously display signage indicating it is private. The installation of the signage is the responsibility of the Developer. Maintenance and replacement of the signage, as needed, shall be the responsibility of the applicable homeowners association, or its assignee. (2) Developer shall design and submit to the Village Engineer for review and approval all proposed plans, specifications and contract documents for all sanitary sewerage system facilities before authorization for construction will be given. Design and installation shall conform to MMSD Ch. 2 Rule, WDNR Standards, Sec. 18.08(7) of the Municipal Code, and the applicable provisions of the Village of Germantown Development Handbook, including Section 3 “Sanitary Sewer System”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. All sanitary sewer Public Improvements that are to be transferred to the Germantown Wastewater Utility shall be contained within the Village right- of-way or a utility easement. The easement shall be dedicated to the Village through plat (provided that said plat also contains specific terms associated with the easement and not just a location) or an easement document prepared and submitted by Developer, subject to review and approval by the Village Engineer and the Village Attorney. (3) Public utility permits shall be applied for by the Developer and secured from the Village Engineering Department, the WDNR and MMSD. Sanitary sewer extension forms shall be prepared by Developer and provided to the Village Engineer. All sanitary sewer Public Improvements that will be transferred to the Village shall be inspected by Wastewater Utility personnel prior to acceptance by the Public Works & Highway Committee. The Wastewater Utility may televise the sewer, create a punch list of defects, and perform one follow-up televised Page 146 of 219 4 inspection at no expense to Developer. Additional follow-up televised inspections shall occur at Developer expense. (4) Construction of the public sanitary sewer system Public Improvements will be completed to the point of substantial completion within each Phase, before any conditional occupancy permits are issued for lots within such Phase; provided, however, that any sanitary sewerage system work constituting Advance Site Work shall be completed as part of Phase I. Following completion of the punch list to the Village’s satisfaction, final acceptance of the sanitary sewer Public Improvements for each Phase will be considered at the next available Public Works and Highways Committee Meeting. The public sanitary sewer Public Improvements within each Phase shall be completed, dedicated, and accepted within one year from the commencement of work on such Phase. If requested by Developer, and provided Developer has used commercial reasonable efforts to commence and continue such work, the Village Engineer shall extend this deadline in up to one (1) year increments upon receipt of a formal written request by the Developer. (5) Sanitary sewer main and lateral trenches in an existing roadway shall be aggregate compacted backfilled or as required by ordinance or published specifications of governing body. Street resurfacing required due to surface disturbance for connection to the Village sanitary sewer shall be inspected and approved by the Highway Superintendent prior to acceptance by the Public Works & Highway Committee. Lateral ends shall be marked with green painted boards 2" x 4". (6) Developer to provide a sanitary easement for future connection at CTH Y and “L Street” or in dedicated accessible easement (in northbound right turn lane). This is consistent with the Village of Germantown 2050 comprehensive plan for future sanitary sewer service, in lieu of extending the sanitary sewer along the north side of the County Line Road right of way. (7) Village acknowledges and agrees that sewer main connection at the SE corner of the Development shall be accessed by an easement granted from WE Energies for such purposes of pipe installation only and maintaining that pipe. The effort and cost of acquiring such easement shall be the responsibility of Developer. Easement will be granted to Village and Village agrees to work with Developer to acquire and execute necessary documents related to this easement. 1.03 WATER SUPPLY FACILITIES. Except as set forth below, with each Phase, Developer shall extend and install public water main with publicly owned lateral stubs extending to the edge of right-of-way to provide potable water utility service to all lots within the Subdivision. Notwithstanding the foregoing, all water supply facilities work constituting Advance Site Work, shall be completed as part of Phase I of the Development. (1) Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all water supply facilities before authorization of construction will be given. Design and installation shall conform to Sec. 18.08(8) Page 147 of 219 5 of the Municipal Code and the applicable provisions of the Village of Germantown Development Handbook, including Section 2 “Water System”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. All water utility improvements that are to be transferred to the Germantown Water Utility shall be contained in Village right-of-way or a utility easement dedicated to the Village. The easement shall be dedicated to the Village through plat (provided that said plat also contains specific terms associated with the easement and not just a location) or an easement document prepared and submitted by Developer, subject to review and approval by the Village Engineer and the Village Attorney. (2) Public utility permits shall be applied for by Developer and secured from the Village Engineering Department. and the WDNR with water main extension forms prepared by Developer and submitted to WDNR. All water system improvements that will be transferred to the Village shall be inspected by Water Utility personnel prior to acceptance by the Public Works & Highway Committee. (3) Water main and lateral trenches in an existing roadway shall be aggregate slurry backfilled. Street resurfacing required due to surface disturbance for connection to the Village water system shall be inspected and approved by the Highway Superintendent prior to acceptance by the Public Works & Highway Committee. Lateral ends shall be marked with blue painted maple heart boards 2" x 4". A minimum of 6 feet of engineered fill shall be maintained over the pipe in all areas of installation. (4) A portion of the Property has been reserved for future use by the Village for the purpose of constructing a municipal water well for the Germantown Water Utility as is shown on the Preliminary Plat. This parcel shall be dedicated to the Village upon acceptance of the Final Plat in accordance with Wis. Stat. § 236.29. 1.04 OTHER UTILITIES. Developer shall be responsible for and cause electrical power, telephone, cable, fiberoptic, natural gas, and like facilities to be installed in such manner as to make proper and adequate service available to each occupied building in the Subdivision. All such services shall be located underground in accordance with applicable codes. Design and installation shall conform to Sec. 18.08(11) of the Municipal Code. Public utility and/or work-in-right-of-way permits shall be applied for by Developer or the contractor doing work in the Development (e.g., We-Energies) and secured from the Village Engineering Department. Private utility permits shall be applied for and secured from the Village Building Inspection Department. 1.05 GRADING AND SURFACING OF PUBLIC STREETS. Except as set forth below, with each Phase, all Development streets shall be graded and surfaced in accordance with Sections 18.08(2), (3) and (5) of the Municipal Code and shall be located and be of the dimensions as depicted on the site Development Plan. The Development’s internal roads shall have an urban Page 148 of 219 6 cross section for vehicular access to all lots within the Subdivision. Unless otherwise identified in the approved Development Plan, the final layer of street surfacing shall be installed within thirty (30) days of the issuance of an occupancy permit for 80% of all the lots within the Phase of the Subdivision except as may be directed by the Village Engineer. Disturbed edges of existing asphalt created by connecting to existing Village or County streets shall be saw-cut full road width prior to resurfacing. Notwithstanding the foregoing, the Village acknowledges and agrees that the Developer may obtain building permits for up to three (3) model homes prior to completion of street grading, surfacing, and acceptance of public streets; provided that (i) safe and adequate temporary access acceptable to the Village Engineer is provided, and (ii) all other applicable requirements for issuance of building permits are satisfied. The incomplete status of street grading or surfacing shall not, by itself, be grounds for denial of building permits for such model homes. All grading and surfacing work constituting Advance Site Work shall be completed as part of Phase I of the Development. (1) Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all grading, street surfacing, concrete curb and gutter, sidewalks, and traffic signs and street signs before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(2), 18.08(3), 18.08(4), 18.08(6), and 18.08(13) and 18.08(15) of the Municipal Code and the applicable provisions of the Village of Germantown Development Handbook including but not limited to Sections 1.3 “Master Grading and Drainage Plans”, Section 5 “Road System” and 6.3.6 “Grading Certification Plan”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications in the best interests of the Village. All grading, street surfacing, concrete curb and gutter, traffic signs and street signs that are to be transferred to the Village shall be contained in Village right- of-way dedicated to the Village. (2) Final yard grades, building elevations and contours shall conform to a 0.25- feet tolerance as compared to the grading plan pursuant to Sec. 14.076 of the Municipal Code. Developer shall not export topsoil without permission from the Public Works & Highway Committee pursuant to Sec. 17.441 of the Municipal Code. (3) Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department and, as necessary based upon jurisdiction, the Washington and Waukesha County Highway Departments. All grading, street surfacing, concrete curb and gutter, sidewalks, and traffic signs and street signs related to the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. (4) Intentionally deleted. Page 149 of 219 7 (5) The Developer shall maintain all private streets within the Subdivision until such time as maintenance responsibility is formally transferred to the applicable homeowners association, or its assignee, in accordance with Paragraph 9.11(4) below. 1.06 CURB AND GUTTER. With each Phase, Developer shall construct, at a minimum, concrete curb and gutter in accordance with Sec. 18.08(4) of the Municipal Code within the Development at the locations depicted on the approved Development Plan. 1.07 IMPROVEMENTS TO STREETS ABUTTING SUBDIVISION. Developer shall install entrance intersections connecting the Subdivision’s internal roads to County Line Road (CHT Q) and to Lannon Road (CTH Y) including acceleration/deceleration lanes and any by-pass turn lanes, as required by the respective permitting authorities. Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all improvements to streets abutting development before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(15) and Chapter 29 of the Municipal Code and the applicable provisions of the Village Development Handbook including Section 1.4. “Erosion Control Plan” and Sec. 5 “Road System”. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. All improvements to streets abutting development that are to be transferred to the Village shall be contained in Village right-of-way dedicated to the Village. Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department and, as necessary based upon jurisdiction, the Washington and Waukesha County Highway Departments. All improvements to streets abutting the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. Developer shall remain responsible for maintenance of all monument signs and boulevard islands until such time as maintenance responsibility is formally transferred to the applicable homeowners association, or its assignee, in accordance with Paragraph 9.11(4) below. 1.08 SIDEWALK/PATHWAY. With each Phase, Developer shall construct a sidewalk directly connected to the existing sidewalk dead end. The sidewalks in the right-of-way are to be a public improvement. Paved pathways outside of the right-of-way are to be maintained and replaced by the applicable homeowners association. The Developer shall be responsible for all costs for design and installation of the sidewalks in the right-of-way and pathways on private property. Snow removal and ice control of the sidewalks and pathways shall be the responsibility of the respective owners, as outlined in Village ordinances. Page 150 of 219 8 Developer shall install a paved sidewalk in the right-of-way, or as pathway on private property in Outlot 1, extending the dead end sidewalk with full connectivity through the northwest corner of County Line Road (CTH Q) and Lannon Road (CTH Y) to the new road labeled “Street D” that is located approximately 900 feet east of Lannon Road (CTH Y). Sidewalks and Pathways to be designed and constructed shall conform to Sec. 8.02 of the Municipal Code and the Village Development Handbook including Section 5.2.13. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer. 1.09 STREET SIGNS & MARKINGS. With each Phase, a street sign marking plan (the “Sign Plan”) shall be submitted by Developer as required in Paragraph 2.03 for review and approval by the Village Engineer. Developer shall pay to the Village Treasurer the cost of all materials and installation of street signs by the Village, pursuant to Section18.08(13) of the Municipal Code. Street signs to include at a minimum stop signs, street name signs, pedestrian walk sign and traffic directional signs. Markings at a minimum shall include stop bars and any other miscellaneous markings as required for public safety. (1) All private roads shall have signage indicating they are private. The street name signage shall indicate the road is private and will consist of white lettering on a blue sign. The private road indication on these signs shall appear above or below the street name but will be in a consistent location on private street signs throughout the Subdivision. (2) Public roads will be labeled with white lettering on a green sign, per MUTCD and Village of Germantown standards. In addition, the Village agrees and acknowledges that the approved Sign Plan may include the following temporary and development-related signage, all subject to final review and approval by the Village Engineer and compliance with applicable codes and ordinances: (i) one (1) 4-foot by 8-foot entrance sign at each entrance to the Subdivision; (ii) one (1) 4-foot by 8-foot “V” sign located at or near the intersection of Lannon Road (CTH Y) and County Line Road (CTH Q); (iii) four (4) 4-foot by 4-foot signs to be displayed in the front yard area of each model home; and (iv) up to ten (10) directional signs within the Subdivision and along approved approach routes to direct traffic to the model homes. Such signage shall be located outside of Village right-of-way. All signage described in this subparagraph shall be installed, maintained, and removed by the Developer at its sole cost and Page 151 of 219 9 expense and shall not be deemed public improvements or accepted by the Village for ownership or maintenance. 1.10 EROSION CONTROL. Developer shall install and maintain erosion and sediment control devices within the Subdivision and for all related work abutting the Subdivision. Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all construction site erosion and sediment control before authorization for construction will be given. Design and installation shall conform to Wisconsin Department of Natural Resources Conservation Practice Standards, Ch. 29 of the Municipal Code, and the Village Development Handbook including Section 1.4 Erosion Control Plan requirements. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. Developer to secure an Erosion Control Permit for each Phase of work, in addition to any necessary Excavation for Utility Work in the Right-of-Way permit shall be applied for and secured from the Village Engineering Department. Developer to secure a construction site storm water permit from WDNR and provide a copy to the Village Engineer. Individual building site erosion control permits shall be applied for and secured from the Village Building Inspection Department. Developer shall monitor and mitigate off-site tracking through use of tracking pads and daily sweeping of streets. In event Developer defaults in keeping the abutting streets clear of tracking, the Developer will reimburse the Village for performing street sweeping services within 30 days of invoice. In event Developer defaults payment, the Village shall provide Developer with written notice of such default and Developer shall have five (5) days from receipt of such notice to cure such default before the Village may charge the Developer’s escrow account or draw from the Developer’s letter-of-credit to recover such costs. Notwithstanding the foregoing, the right of the Village to respond to off-site sediment tracking hereunder shall not excuse Developer from strict compliance with required erosion control measures or be considered a substitute or replacement for such measures. Developer shall remove and dispose of all erosion and sediment control devices after landscaping and after 85% successful vegetative cover has been achieved to the satisfaction of the Village Engineer. 1.11 POST-CONSTRUCTION STORMWATER MANAGEMENT AND STORMWATER DRAINAGE FACILITIES. Developer shall install publicly owned storm sewer to adequately drain publicly owned roadways within the Subdivision, and shall install publicly owned roadway ditches and storm sewer abutting the Subdivision. Developer shall install privately owned storm sewer, ditches, and swales to adequately drain privately owned roadways and lands Page 152 of 219 10 within the Subdivision. Developer shall install and maintain privately owned wet detention ponds and a dry pond to control storm water runoff peak flows and volumes in conformance with MMSD requirements and to control storm water runoff water quality in conformance with WDNR requirements prior to discharge from the Subdivision. The privately-owned storm sewers, ditches, swales, wet detention ponds, and dry pond shall be situated in privately owned easements. Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for all post-construction storm water management and storm water drainage facilities before authorization for construction will be given. Design and installation shall conform to WDNR Conservation Practice Standards, MMSD Ch. 13 Rule, Ch. 27 and Sec. 18.08(10) of the Municipal Code, and the applicable provisions of the Village of Germantown Development Handbook including Sec. 6.3.7 Storm Water BMP Certification Plan and Sec. 4 “Storm Sewer System” requirements. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department, WDNR and MMSD storm water management forms shall be prepared by Developer and provided to the Village Engineer. Developer shall prepare, submit to the Village Engineer and Village Attorney for review and approval, and record with the Washington County Register of Deeds a Declaration of Covenant for Storm Water Management Facility Maintenance before applying for an occupancy permit. Developer shall prepare and submit to the Village Engineer a Storm Water Management Facility Compliance Report and an Engineering/Construction Certification letter before applying for an occupancy permit. 1.12 LANDSCAPING. With each Phase, Developer shall provide permanent landscaping, including topsoil, seeding, trees and other vegetation, of all publicly owned rights of way and privately-owned common areas within and abutting the Subdivision. Developer shall also provide temporary landscaping of privately-owned lots to establish and maintain vegetative cover. Developer shall design and submit to the Village Zoning Administrator for approval all proposed plans, specifications and contract documents for all landscaping before authorization for construction will be given. Design and installation shall conform to Sec. 14.085 and 17.43(5) of the Municipal Code. All such documents shall be prepared in accordance with state and local standards by a Landscape Architect registered in the State of Wisconsin and submitted stamped and signed for review by the Village Zoning Administrator and by all applicable governmental agencies. Implicit in this provision is the right of the Village Zoning Administrator and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. Page 153 of 219 11 A minimum of 4-inches of topsoil (after settlement) free of deleterious materials shall cover all areas of the site not covered by impervious roofs and/or pavements. Section 17.441(4)(a) of the Municipal Code prohibits topsoil export without special exception by the Village Public Works & Highway Committee. All landscaping related to the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. All landscaping related to the Subdivision in privately owned areas shall be inspected by Community Development Department personnel prior to issuing an occupancy permit. 1.13 STREET TREES. With each Phase, Developer shall install street trees in roadway terraces of the Subdivision in a quantity equal or greater than one tree per 50 linear feet as generally depicted in a landscape plan for said street trees and all other common areas and/or outlots within which landscaping will be installed approved by the Village Forester and Community Development Director as required as a condition of preliminary plat approval. Notwithstanding anything in this Agreement to the contrary, the Developer shall not be required to install the street trees required herein for any Phase until the final layer of street surfacing has been installed for such Phase in accordance with Paragraph 1.05, and the deferral of street tree installation shall not, by itself, delay acceptance of the other Public Improvements or the issuance of building or occupancy permits for such Phase. Developer shall design and submit to the Village Forester for approval all proposed plans, specifications and contract documents for all street trees before authorization for construction will be given. Design and installation shall conform to Sec. 18.08(14) of the Municipal Code and the Village of Germantown Comprehensive Tree Plan. All such documents shall be prepared in accordance with state and local standards by a Landscape Architect registered in the State of Wisconsin and submitted stamped and signed for review by the Village Forester and by all applicable governmental agencies. Implicit in this provision is the right of the Village Forester to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. The Developer shall warranty all street trees, including trees replaced under this warranty, for a period of two (2) growing seasons as required under Sec 18.08(14) of the Municipal Code. Work-in-right-of-way permits shall be applied for by Developer and secured from the Village Engineering Department. All street trees related to the Subdivision that will be transferred to the Village shall be inspected by Engineering Department and Highway Department personnel prior to acceptance by the Public Works & Highway Committee. 1.14 STREET LIGHTS AND YARD LIGHTS. With each Phase, Developer shall design and submit to the Village Engineer for approval all proposed plans, specifications and contract documents for street lamps and to the Zoning Administrator for approval of proposed plans, specifications and contract documents for yard lights before authorization for construction will be Page 154 of 219 12 given. Design and installation shall conform to Sec. 18.08(12) of the Municipal Code. All such documents shall be prepared in accordance with state and local standards by a Professional Engineer registered in the State of Wisconsin and submitted stamped and signed for review by the Village Engineer and by all applicable governmental agencies. Implicit in this provision is the right of the Village Engineer and Building Inspector to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. (1) Developer shall be required to provide street lights in accordance with Section 18.08(12) of the Municipal Code and the Village of Germantown Development Handbook 5.4.1. Said street lights shall be of a design approved by the Village Engineering Department and furnished and installed by Developer within the Development and all costs for the furnishing and installation of such street lights shall be borne by Developer. Street lights shall be LED. Lights and Installation to be completed by We-energies. (2) Street lights to be owned and maintained by WE Energies. 1.15 CLUSTER MAILBOXES. With each Phase, the Developer shall install cluster mailbox site(s) at a location(s) determined by the Developer and approved by the Village Engineer and the USPS. Mailbox sites shall not interfere with winter snowplow operations. Cluster Mailbox locations shall be included on final plans. 1.16 SURVEY MONUMENTS. The Developer shall install survey monuments placed in accordance with Sections 18.02(4)(c) and 18.08(1) of the Municipal Code, and the Village of Germantown Development Handbook Section 7.4, not later than one year (12 months) after the acceptance of this Agreement. Notwithstanding the foregoing, all monumenting interior to the Subdivision may be deferred for a reasonable time, not to exceed two (2) years after the recording of the Final Plat. The financial guarantee set forth in Article VI below includes the per lot sum required as a financial guarantee that such monuments will be placed within the time required. Developer understands that no occupancy permits shall be issued prior to the required monumenting. 1.17 BEDROCK. All rock crushing and blasting shall be permitted by the Village and comply with Sec. 12.181 of the Municipal Code and the applicable provisions of federal and state law. Advance Site Work shall be completed as part of Phase I of the Development. Developer shall provide a pre-blasting video and post-blasting video survey of structures on adjacent private properties unless reasonable access is denied by the owner of such adjacent property. The video surveys shall include foundation walls, windows, and interior walls as well as an exterior survey. The pre and post blasting video shall be stored by the Developer for a period of three (3) years and made available to the property owner and/or the Village upon request. ARTICLE II - CONSTRUCTION 2.01 GENERALLY. Developer, entirely at its own expense, shall construct and install all Public Improvements and provide all plans, specifications and other documents in accordance Page 155 of 219 13 with Sec. 18.09 of the Municipal Code or as required by the Village Engineer pursuant to Sec. 18.09. Developer understands and acknowledges that the Municipal Code may be and is subject to revision from time to time, and that such revisions may impose altered or additional obligations on individual and entities creating subdivisions and other developments in the Village, including Developer, provided, however, that any revisions and modifications requested by the Village are requested solely to the extent necessary to make the Public Improvements compliant with applicable law. (1) Developer shall provide a schedule of construction setting forth approximate dates of commencement and completion of each Phase of the Development. (2) A pre-construction meeting shall be scheduled between Developer, the Contractors and the Village prior to commencement of any construction on the Public Improvements. Developer shall, prior to such meeting, notify all utilities of the planned construction and the date and location of the pre-construction meeting. 2.02 BUILDING AND OCCUPANCY PERMITS. No building permits, other than early model building permits, shall be issued by the Village for any construction within the Subdivision until all roads, sidewalks, water main, sanitary sewer, storm sewer, survey monuments, and all other improvements required in any given Phase of the Development are substantially completed in accordance with Chapter 236 of the Wisconsin Statutes. Consistent with Chapter 236 of the Wisconsin Statutes, upon such substantial completion, any outstanding building permits for home sites within such Phase that meet the requirements of applicable building codes, zoning ordinances, and other municipal regulations shall be released and shall not be withheld solely because of the status of the Public Improvements, including the status of inspection, approval, receipt of record- drawings, or acceptance by the Public Works & Highway Committee. Notwithstanding the foregoing, and notwithstanding any provision of this Agreement to the contrary (including without limitation Paragraph 1.05), the Village shall issue up to three (3) building permits for model homes prior to completion, surfacing, or acceptance of all roads, sidewalks, water main, sanitary sewer, storm sewer, and all other improvements required in any given Phase, provided that: (i) all underground utilities serving such model homes (including water, sanitary sewer, and storm sewer) are installed, tested, and operational; and (ii) all other applicable zoning, building, and code requirements unrelated to street completion are satisfied. The absence of final street grading, surfacing, or acceptance shall not, by itself, constitute grounds for denial of building permits for such model homes. Occupancy Permits will not be issued for the model homes until such time that all requirements for occupancy as stated above are satisfied and the Final Plat is recorded. In an effort to expedite the issuance of building permits for non-model residential lots, the Village agrees to work cooperatively with Developer, in accordance with the Municipal Code and the Village’s standard review practices, to review and approve a set of master architectural plans covering the anticipated styles and elevations of homes to be constructed within the Subdivision. Following approval of such master architectural plans, individual building permit applications for Page 156 of 219 14 homes substantially conforming to the approved master plans may be reviewed on an expedited basis, subject to compliance with all applicable zoning, building, and code requirements. 2.03 REQUIRED PLANS. Developer shall submit to the Village Engineer for approval all of the plans, profiles and specifications required by Sec. 18.09(3) of the Municipal Code. Required plans for improvements shall include the following: (i) Grading plans, including interim and final, include cluster mailbox site locations; (ii) Erosion & sediment control plans, including interim and final; (iii) Private utility plans and capacity computations, including sanitary sewer & laterals, water main & laterals, and storm sewer & laterals; (iv) Public utility plans, profiles and capacity computations, including sanitary sewer & laterals, water main & laterals, and storm sewer & laterals; (v) Paving plans & profiles, including public roads, curb-and-gutter, road entrance intersections of “Street L” at Lannon Road (CTH Y) and “Street D” and “Street E” County Line Road (CTH Q), and sidewalk/path extensions from the intersection (CTH Y) and County Line Road (CTH Q) east to the proposed paved sidewalk along “Street D”. (vi) Storm water management plan; (vii) Landscape plans; (viii) Sign Plans; and (ix) Lighting plan. In addition, Developer shall submit to the Village Engineer for approval all specifications before authorization for construction will be given. Implicit in this provision is the right of the Village Engineer to require document revisions and modifications solely to the extent necessary to make the Public Improvements compliant with applicable law. 2.04 EXISTING FLORA. Developer shall, in accordance with Sec. 18.09(5) of the Municipal Code, make commercially reasonable efforts to protect and retain all existing trees, shrubbery, vines and grasses not actually lying within public roadways, drainage-ways, building foundation sites, private driveways and parking areas, soil absorption waste and disposal areas, paths and trails, except as necessary for implementation of the Development Plan and except for any nuisance or invasive vegetation. Such trees are to be protected and preserved during construction in accordance with sound conservation practices, including the preservation of trees Page 157 of 219 15 by use of wells or islands or retaining walls whenever abutting grades are altered. 2.05 RECORD DRAWING DOCUMENTS. Developer shall, not later than sixty (60) days following Final Acceptance of the Public Improvements, provide the Village with draft record-drawing documents as outlined in Section 6.3 of the Village of Germantown Development Handbook in digital format using the latest version of AutoCAD and PDF. Final record-drawings shall be submitted on non-fading, Copy Tough media and digitally using the latest version of AutoCAD and PDF. Drawings shall include both Plan & Profile view. Record drawings shall include all public and private utilities including water main, sanitary sewer, storm sewer, pond outlet structure(s), emergency overflow area, sign plan and street lighting. GPS location of all pertinent items such as but not limited to pipe fittings, valves, hydrants, laterals, manholes, inlets, outfalls, street lighting (public) and traffic signs shall be provided to the Village. Reproducible copies of all final plans supplied by Developer to the Village pursuant to Sec. 18.09(3) of the Municipal Code shall include record-drawing information for all public and private improvements. All record-drawing measurements shall include horizontal and vertical location referenced to the Village coordinate system (Wisconsin State Plane Coordinate System, South Zone, based on North American Datum of 1983 (NAD 1983) and profiles in NAVD 1988. Each original or copy shall be certified by Developer's engineer and/or architect, in accordance with requirements of the Village Engineering Department. Record drawings shall be submitted by Developer before applying for a Village occupancy permit. ARTICLE III - DEDICATION AND ACCEPTANCE Developer agrees that the Public Improvements will not be accepted by the Village until: (i) all outstanding charges actually due and owing by Developer under the Ordinances have been paid in full, (ii) affidavits and lien waivers are received by the Village indicating that all contractors providing work, services or materials in connection with the Public Improvements on that Phase of the Development, have been paid in full for all such work, services and materials, and (iii) the Village has received evidence satisfactory to it that no liens or other encumbrances (except those approved in writing by the Village) encumber the Public Improvements. Any water main installation shall not be accepted until two (2) consecutive bacteriological safe samples have satisfactorily pass and one pressure test has successfully passed. Developer or his Contractor shall flush the main and obtain the samples required for this testing under the supervision of the Village Public Works Engineering or Water Utility. Upon completion of the water mains and service laterals and acceptance of the system by the Village Public Works & Highway Committee, ownership and control shall be turned over without reservation to the Village. With each Phase, Developer shall request in writing to the Village Engineer acceptance of the Public Improvements. The Village Engineer will order an inspection of the Public Improvements by Village Public Works, Highway, Engineering, Water Utility, and/or Wastewater Utility (as applicable), and a punch-list of corrections (if needed) shall be forwarded to Developer as part of such inspection. The Village agrees to complete the inspection of the Public Page 158 of 219 16 Improvements within thirty (30) days from Developer’s request. When such applicable Public Improvements, and punch-list of corrections (if any) of same are completed, such Public Improvements shall be formally accepted by the Public Works and Highways Committee. As long as the Public Improvements have been constructed in the manner required herein, and Developer has provided all required documentation for acceptance as required under this Agreement, the Village agrees to complete the acceptance of the Public Improvements within sixty (60) days (the "Final Acceptance"). The Final Acceptance of the Public Improvements for each Phase by the Public Works & Highway Committee shall commence running of the one-year warranty period provided for and in accordance with Paragraph 7.01 of this Agreement. ARTICLE IV - PAYMENT OF FEES 4.01 GENERALLY. Developer shall pay all fees, expenses, costs and disbursements which Developer is required to pay, pursuant to Sec. 18.10 of the Municipal Code. Unless required to be pre-paid under the terms of this Agreement or the Village Code, such amount shall be paid by Developer within thirty (30) days after being billed by the Village. Nothing in this provision, nor in the remaining provisions of this article, shall be construed as exempting Developer, its successors and assigns, from such future fees, expenses, costs, or assessments which might be imposed by way of general operation of law or ordinance, and as otherwise assessable against properties within the Village of Germantown; provided, however, that no such future fee, expense, cost, or assessment shall be imposed upon Developer, its successors and assigns, or the Development to the extent it is for the same or substantially similar purpose, improvement, or service as those paid for, provided, or otherwise addressed under this Agreement. 4.02 IMPACT FEES. The Village will assess impact fees pursuant to Sec. 3.14 of the Municipal Code. The Village retains the right to amend and modify its impact fee ordinance, the methodology by which impact fees are calculated or the numerical component values of the impact fee calculation in the future. Such impact fees shall be paid by the Developer or the purchaser of the lot prior to obtaining a building permit, except as allowed and provided for under Wis. Stat. § 66.0617(6)(g). The impact fees payable shall be based upon the impact fee calculation in effect at the time of the issuance of any building permit. As of the Effective Date of this Agreement, these fees include: (i) Water: ($1,003.00/residential unit equivalent) (ii) Parks: ($1,311.00/residential unit) (iii) Fire: ($171.00/residential unit) (iv) Police: ($148.00/residential unit) (vi) Library: ($711.00/residential unit) Page 159 of 219 17 4.03 SEWER CONNECTION FEE. Developer shall, at the time of Building Permit issuance, pay a sewer connection fee at a rate of $5,244.00/residential unit equivalent in accordance with Section 15.07(2) of the Municipal Code and Resolution No. 27-07, establishing the sewer connection charge. 4.04 IMPROVEMENT REVIEW FEE. Developer shall pay a fee based on the cost of required Public Improvements for all Phases of the Development to cover the cost of the Village for checking and reviewing plan and specification documents. Such improvement review fee shall be as provided by Sec. 18.10(3) of the Municipal Code. The fee shall be calculated as follows: (i) 2.25% of the first $250,000 of construction costs; plus (ii) 1.75% of the next $250,000 of construction costs; plus (iii) 1.25% of construction costs which exceed $500,000. The fee may be recomputed, upon demand of the Village Engineer or Developer, after completion of Public Improvement construction in accordance with the actual cost of such improvements and the difference, if any, shall be remitted to the Developer. Evidence of cost shall be in such detail and form as required by the Village Engineer. 4.05 PROFESSIONAL FEES AND INSPECTION FEES. In accordance with Sec. 18.10(4), 18.10(7), and 18.10(8) of the Municipal Code, Developer shall be responsible for all professional (technical and legal) fees incurred by the Village in connection with this Development. Inspection costs shall be reimbursed to Village by Developer, whether performed by the Village Engineering Department, Water Utility, Wastewater Utility, Highway Department, or outsourced to a third-party engineering consultant, and shall also be reimbursed for services rendered by the Village Attorney. Developer will be billed for Village personnel at the standard rates presented in Exhibit C. Developer will be billed for third-party engineering consultants by presenting their invoices. A minimum $5,000 Developer’s Agreement fee pursuant to Section 18.10(3) of the Municipal Code. 4.06 DATA CONVERSION FEE. In accordance with Section 18.10(13) of the Municipal Code, Developer shall be responsible for all fees associated with the upload of Geographic Information System data incurred by the Village in connection with this project. 4.07 PREPAYMENT OF CERTAIN FEES. Developer, and/or a lot owner in the case of impact fees, shall pay the fees specified above that are due and owning prior to the issuance of any building permit for the Property. ARTICLE V - SPECIAL PROVISIONS 5.01 SEWER CONNECTIONS. In accordance with the rules and regulations of the Village, Developer has been authorized one (1) sewer connection for this Development, subject to Page 160 of 219 18 the provisions of Paragraph 5.02 of this Agreement. 5.02 SEWER CAPACITY. It is understood by and between the parties that the Village, by entering into this Agreement, makes no representations or guarantees with respect to sewer capacity for the Development contemplated by this Agreement. It is understood by Developer that other governmental authorities having jurisdiction may impose limitations or restrictions upon the Village's decision to authorize the sewer connections referred to in Paragraph 5.01 of this Agreement. 5.03 WETLAND AND FLOODPLAIN CONDITIONS. It shall be an explicit condition that Developer shall comply with all required regulations and shall obtain all necessary approvals in writing from the appropriate agencies relative to the wetlands and floodplain areas which may be on the Property. Approval of the subject Development Plan by the Village Plan Commission shall not be construed to be Village approval of intrusions into wetland or floodplain areas, or Village approval of filling or modifications to wetlands or floodplain areas. Developer, except as required on approved plans, will not be allowed to grade, fill, or conduct any other type of development within 75 feet of the high water mark of a navigable waterway or 25 feet from a wetland. If the Zoning Administrator suspects the presence of wetlands or navigable stream upon site inspection, an updated delineation will be required. Final delineation of wetlands and navigable streams shall be confirmed by SEWRPC. 5.04 PHASES. Developer has represented that it intends to construct the Development in five (5) separate Phases (each, a “Phase”). Developer shall provide a schedule of phasing for the initial Phase, and an updated schedule for each subsequent Phase, together with a corresponding exhibit depicting the work limits for that Phase. Except as otherwise expressly stated in this Agreement, Developer shall have no obligation or duty to commence, complete, or construct any improvements, including any Public Improvements, for any Phase other than the Phase for which Developer has obtained permits and is actively undertaking construction (the "Current Phase"). Nothing in this Agreement shall be construed to require Developer to complete, or to commit to completing, any future Phase, nor to install any Public Improvements associated with any Phase other than the Current Phase with the exception of the Advance Site Work identified on Exhibit F, which shall be completed as part of Phase I. All Public Improvements associated with the Current Phase shall be completed within one (1) year following the date of issuance of permits for such Public Improvements by the Village, subject to extensions expressly permitted under this Agreement. 5.05 FINAL PLAT. Developer may seek final plat approval for each Phase described in Paragraph 5.04 above. Final plat approval shall not be granted for any Phase until Developer has installed, and Village has accepted, all Public Improvements reasonably necessary for that Phase. If requested by the Developer, Village shall grant final plat approval for any Phase upon receipt from Developer of a letter of credit in the amount of 120% of the estimated total cost to complete any required Public Improvements that have not been completed. Page 161 of 219 19 ARTICLE VI - FINANCIAL GUARANTY 6.01 AMOUNT. Developer shall deposit with the Village a financial guarantee (certified check, irrevocable letter of credit, or a Performance Bond at the option of the Developer) which shall assure the faithful performance of Developer's obligations under this Agreement for the Phase then being developed, as itemized in Exhibit D attached hereto and incorporated herein by reference. Notwithstanding any provision of this Agreement to the contrary, any bond, letter of credit, or other financial security required under this Agreement shall cover only the Public Improvements for the current Phase being completed, and Developer shall not be required to provide any bond or other financial security for any future Phases of the Development until such time as Developer commences development of such future Phase. Prior to any draw on the financial guarantee by the Village, the Village shall provide Developer with written notice specifying the nature and extent of the alleged default and Developer shall have thirty (30) days from receipt of such notice to cure such default; provided, however, that if such default cannot reasonably be cured within such 30-day period, Developer shall have such additional time as is reasonably necessary to cure such default, so long as Developer commences such cure within the initial 30-day period and diligently pursues such cure to completion. Notwithstanding the foregoing, if the financial guarantee is scheduled to expire, terminate, or lapse before the expiration of the cure period described above, then the Village may shorten the cure period to the extent commercially reasonable and necessary to preserve its ability to draw on the financial guarantee and the Village shall provide Developer with written notice of such shortened cure period (which notice may be given concurrently with the notice of default). The Village may in its sole discretion following Developer’s request and acceptance by the Village Public Works & Highway Committee of some but not all of the improvements constructed as part of any Phase, reduce the deposit or letter of credit to the amount estimated by the Village Engineer (in a manner consistent with the Ordinances) to be necessary to secure performance by Developer for such Phase. In no event shall the amount of the guaranty be reduced below the aggregate total estimated cost of the Public Improvements for the current Phase not yet installed or accepted, plus fifteen percent (15%). The Village is hereby authorized to contact directly Developer's financial agent from time to time regarding the sufficiency of the financial guaranty. The termination date of the financial guaranty shall be no earlier than one (1) year following the date of substantial completion of the Public Improvements for the applicable Phase. If the Public Improvements to be undertaken by Developer under this Agreement for any Phase are not complete within fifteen (15) months following the issuance of permits for such work, for any reason including force majeure under Paragraph 8.03 below and without regard to the fault of Developer, then Developer’s obligation to provide a letter of credit for such Phase shall be extended through the completion of the work and its inspection and acceptance by the Village. After construction and total completion of each Phase and acceptance of the Phase by the Village Public Works & Highway Committee, the surety for such Phase will be reduced to 10% of the actual cost of construction for a period of one (1) year (the guaranty period). In the event the original surety would, by its terms, expire prior to the end of the one year guaranty period, or if the guaranty period is extended due to repairs of defects as provided in Paragraph 7.01, a new surety shall be issued to cover the remaining guaranty period for the 10% of actual original construction costs for such Phase. Page 162 of 219 20 6.02 FORM. The form of the financial guaranty shall be approved by the Village Attorney prior to acceptance of the letter of credit by the Village as satisfying Developer’s obligation as provided in Paragraph 6.01 above. 6.03 LIABILITY NOT RELEASED. All deposits, bonds or Letters of Credit given hereunder are security devices only which in no manner limit the liability of Developer to the Village, however arising and regardless of the amount. For clarity, Developer's liability under this Paragraph 6.03 shall be limited to the Phase for which such deposit or Letter of Credit was provided. 6.04 RESERVATION OF ASSESSMENT RIGHTS. In addition to the remedies for default provided to the Village by this financial guaranty, the Village reserves the right, following written notice to Developer and expiration of the applicable cure period set forth in Section 6.01 above, to impose special assessments or charges for any amounts to which it is specifically entitled by virtue of this Agreement for improvements specifically provided for herein upon the property described in Exhibit A attached hereto; provided, however, that such special assessments or charges shall be limited to the actual, documented costs incurred by the Village and shall not include any punitive or consequential damages. Such special assessments or charges shall be collected on the next succeeding tax roll as are other special assessments or charges. This provision constitutes Developer's Waiver of Notice and Consent to all special assessment or special charges proceedings which may be required by law, subject to the notice and cure provisions set forth in Section 6.01. 6.05 REMEDIES. At the option of the Village, following written notice to Developer and expiration of the applicable cure period set forth in Section 6.01 above, a material breach of this Agreement shall result in the Village having the right to revoke any and all occupancy or use permits, or to rescind any zoning granted in consideration of the proposed project; provided, however, that the Village shall not exercise such remedies unless the breach remains uncured following the notice and cure period. Compliance with this Agreement shall be deemed a condition of any such zoning, which shall revert to the original zoning classification upon action of the Village Board under authority of this provision. As an alternative thereto, and at the option of the Village, the Village may impose a liquidated damage penalty in the amount of $500.00 per diem until such time as there shall be compliance; provided, however, that such liquidated damages shall not commence until expiration of the cure period set forth in Section 6.01 and shall not exceed, in the aggregate, the greater of (i) $50,000.00 or (ii) the amount of the financial guaranty then held by the Village for the applicable Phase. In addition, the Village shall have the right to remedy such breach at its expense and assess the actual, documented cost thereof against the subject property. All remedies as stated herein shall be deemed alternative remedies, and cumulative as and to such other remedies in law or equity as the Village may assert and herein reserves. ARTICLE VII - GUARANTEE AND INDEMNIFICATION 7.01 GUARANTEE OF IMPROVEMENTS. Developer shall guarantee all dedicated improvements against defects due to faulty materials or workmanship which appear within one (1) Page 163 of 219 21 year from the date of Final Acceptance by the Village, as provided in Article III of this Agreement. Developer shall repair or replace any such improvements as required by the Village Engineer to eliminate such defects and shall pay for all damages to Village property resulting from such defects. Each repair or replacement performed pursuant to this paragraph shall be guaranteed for one (1) year from the completion thereof. 7.02 GENERAL INDEMNIFICATION. Developer shall indemnify and hold the Village harmless against and from any and all liability, judgments, costs and expenses incurred by the Village as the result of any action by whomsoever or whenever brought or obtained against the Village or Developer, or both, to the extent resulting from or arising in the course of, out of, or as a result of the care

Text truncated. Open the original for the full document.

Source: Village of Germantown website. First collected Nov 16, 2026.