Plan Commission — Agenda Packet

Village of Jackson · Washington County · Plan Commission · meeting of Nov 19, 2026 · Agenda packets

Open the original document More from Village of Jackson

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

November 19, 2026 Village of Jackson - Plan Commission Meeting Agenda VILLAGE OF JACKSON PLAN COMMISSION MEETING AGENDA Thursday, November 19, 2026 at 7:00 PM Jackson Municipal Complex Village Board Room N168W19851 Main Street Jackson, WI 53037 1. Call to Order and Roll Call 2. Citizens/Village Staff to Address the Plan Commission (Please sign-in with the Clerk prior to speaking. Please note this is a business meeting, not a public hearing. People wishing to speak on an item on the agenda should present their comments under this agenda item. Each commenter will be limited to a total of 2 minutes.) 3. Approval of Minutes for the Plan Commission Meeting of October 15, 2026 4. Ordinance #26-12 – Repealing Chapter 48 of the Zoning Code and Establishing Chapter 50 – Zoning 5. Ordinance #26-13 – Amending Chapter 2, Section 183 of the Village Code Regarding Plan Commission Meeting Date 6. Adjourn Persons with disabilities requiring special accommodations for attendance at the meeting should contact the Administration Department at the Jackson Municipal Complex at least one (1) business day prior to the meeting. It is possible that members of the Village Board may attend the above meeting. No action will be taken by any governmental body at this meeting other than the governmental body specifically referred to in this meeting notice. This notice is given so that members of the Village Board may attend the meeting without violating the open meeting law. Page 1 of 328 October 15, 2026 Village of Jackson - Plan Commission Meeting Minutes Page 1 of 2 VILLAGE OF JACKSON PLAN COMMISSION MEETING Thursday, October 15, 2026 at 7:00 PM Minutes 1. Call to Order and Roll Call The meeting was called to order at 7:00 PM by Pres. Heckendorf. Members Present: Pres. Heckendorf, Tr. Engelhardt, Jon Molkentin, Dan Reik, and Duane Hafemeister Members Excused: None Members Absent: Tr. Emmrich, Matt Van Eperen Staff Present: Administrator Jen Heidtke, Inspections and Zoning Director Collin Johnson, and Clerk Lisa Heiser 2. Citizens/Village Staff to Address the Plan Commission (Please sign in with the Clerk prior to speaking. Please note this is a business meeting, not a public hearing. People wishing to speak on an item on the agenda should present their comments under this agenda item. Each commenter will be limited to a total of 2 minutes.) None. 3. Approval of Minutes for the Plan Commission Meeting of August 20, 2026 The motion to approve minutes for the Plan Commission Meeting of August 20, 2026 was made by D. Hafemeister and seconded by Tr. Engelhardt. Vote: 5 ayes, 0 nays. Motion carried. 4. Certified Survey Map - N172W21930 Caymus Court - Houseware Distributers, Inc. (HDI) The motion to recommend the Village Board approve the Certified Survey Map No.7177 for Parcel: V3_008700R, Lot 1 and Parcel: V3_008700S, Lot 2 was made by Tr. Englehardt and seconded by J. Molkentin. Vote: 5 ayes, 0 nays. Motion carried. 5. Conditional Use and Site Plan Review - N174W21361 Alcan Drive - Jacklin Properties, LLC d/b/a P.W. Walsh & Company The motion to recommend the Village Board approve the conditional use request and site plan for Jacklin Properties, LLC d/b/a P.W. Walsh & Company, to construct a stand-alone warehouse and office building at N174 W21361 Alcan Drive with the following condition: 1. Except for company passenger vehicles, outdoor storage of materials and equipment is prohibited. DRAFT Page 2 of 328 October 15, 2026 Village of Jackson - Plan Commission Meeting Minutes Page 2 of 2 was made by Tr. Engelhardt and secondend by D. Hafemeister. Vote: 5 ayes, 0 nays. Motion carried. 6. Adjourn The motion to adjourn the meeting was made by Tr. Engelhardt and seconded by D. Hafemeister. Vote: 5 ayes, 0 nays. Motion carried. The meeting adjourned at 7:05 PM. Respectfully Submitted, Lisa Heiser Village Clerk Village of Jackson DRAFT Page 3 of 328 Municipal Planning Services for Growing Communities Date: November 10, 2026 To: Village of Jackson Plan Commission Collin Johnson, Director of Inspections & Zoning Jen Heidtke, Village Administrator From: Tim Schwecke, Civi Tek Consulting Craig Huebner, GRAEF ne Subject: Zoning Code Update Project – Plan Commission meeting on November 19, 2026 In partnership with the Village of Jackson, the consultant team of Civi Tek and GRAEF and has completed a final draft of the City’s new Zoning Ordinance. This memo includes the following sections: Section 1 – Open House overview Section 2 – Summary of changes Section 3 – Organization and general description Section 4 – Next steps Section 5 – Resources Section 1 - Open house overview Village staff and the consultant team held a community open house on September 30, 2026, to obtain public feedback on the draft zoning code dated September 30, 2026. Approximately 30 people attended the event, asked questions, and shared comments. Many of the questions and comments related to individual properties and how the proposed zoning regulations would apply to them. Attendees also raised questions about community living arrangements, particularly how these uses are addressed in the proposed code in light of applicable state law. Section 2 – Summary of changes Based on feedback received through the community survey and open house, along with staff's continued review, the consultant team has prepared a final draft of the zoning code for the Plan Commission's consideration. The draft is dated November 5, 2026, and a digital copy has been posted to the project website. The following summarizes the more substantive changes made since the various drafts reviewed by the Plan Commission over the past 14 months. 1. New and emerging land uses. Added a new section addressing land uses that may warrant additional consideration because of their emerging nature, potential impacts, or unresolved regulatory issues (§ 50- 2102 (c), page 14-1). The following uses, which were previously listed in the land use tables in Appendices A1 and A2, have been removed from those tables and are now addressed in the new section: o Battery energy storage facility (as a principal use) o Commercial drone delivery hub Page 4 of 328 Page 2 o Data center exceeding 100,000 square feet o Direct air carbon dioxide capture facility This approach allows the Village to consider these uses through future code amendments when sufficient information is available to establish appropriate regulations. 2. Groundwater separation. Changed groundwater separation requirements in § 50-2402 (page 17-1) to 2 feet, instead of 1 foot. 3. Foundation landscaping. Revised the foundation landscaping requirements to provide greater flexibility and reduce the burden on property owners (§ 50-2721; page 20-1). The revised standards apply only to building frontages facing a public street and do not apply in industrial zoning districts. 4. Nonconforming signs. Added a section (§ 50-3105; page 24-3) to address nonconforming signs. 5. Radio broadcast facilities. Added radio broadcast facilities to the review procedures in Article 5 and the land use tables in Appendices A1 and A2, with corresponding use-specific provisions in Appendix B. State law places limitations on how municipalities may regulate these facilities. 6. Accessory dwelling units. Removed accessory dwelling units as an allowable use in the RD-4 zoning district (Appendix A1) and all project-based zoning districts (Appendix A2). Modified some requirements for ADUs (Appendix B). 7. Data centers. Limited data centers to a maximum of 100,000 square feet of floor area (Series 10.05, page B-25). A developer seeking to establish a larger facility would need to request a text amendment to the zoning code. This process would provide an opportunity to establish more detailed standards addressing the potential impacts and concerns associated with larger data centers. 8. Accessory building limitations. In Appendix C, revised accessory building requirements in RD-1 through RD-4, RT-10, and RT-11 districts to prohibit multiple accessory buildings of the same type and limit the size of the smaller building to no more than 200 sf. (This increases the maximum floor area of a shed by 50 sf.) 9. Supplemental signage. In Appendix D, revised the permitting requirements for supplemental signage in all locations. A sign permit is required for supplemental signs exceeding 12 square feet, and such signs are limited to a maximum of 90 days in a calendar year. In addition to these substantive changes, minor editorial revisions were made throughout the code to improve clarity, consistency, and readability. Technical corrections and clarifications were also incorporated. The proposed zoning map was revised to correct the zoning classification of several parcels. Section 3 – Organization of the proposed zoning code The proposed zoning code is organized into 25 articles and seven appendices (A1, A2, and B through E). The articles establish the Village's zoning regulations, administrative responsibilities, review procedures, zoning districts, and development standards. The appendices provide detailed land use classifications, dimensional requirements, sign standards, and definitions. The following descriptions are intended to generally describe the purpose and general content of each part of the code without having to review every individual provision. Page 5 of 328 Page 3 Article 1. General provisions Establishes the legal foundation for the zoning code, including its authority, jurisdiction, and purposes. It describes the relationship between the zoning code and the Village's comprehensive plan, other laws and regulations, and private agreements. It also addresses compliance, previously granted approvals, and other general legal provisions. Article 2. Interpretation, construction, and definitions Establishes rules for interpreting and applying the zoning code to ensure consistent administration. It addresses how terms, measurements, time periods, zoning district boundaries, illustrations, and references to other laws are interpreted. It also directs readers to Appendices B and E for land use descriptions and general definitions. Article 3. Administrative bodies Defines the responsibilities and authority of the Plan Commission, Zoning Board of Appeals, and Zoning Administrator. It establishes requirements relating to membership, appointments, meetings, voting, and other administrative matters. This article identifies which officials and bodies are responsible for administering the code, reviewing development proposals, making decisions, and considering appeals and variances. Article 4. General procedural requirements Establishes requirements that apply to multiple development review procedures. These include application submittal and processing, public notices, public hearings, site visits, neighborhood meetings, and financial guarantees. The article is intended to promote a consistent, efficient, and transparent review process while providing opportunities for public participation when appropriate. Article 5. Specific procedural requirements Establishes the review procedures for the various permits, approvals, and other actions authorized by the zoning code. These include zoning amendments, planned development districts, conditional uses, site plan and architectural reviews, administrative adjustments, special exceptions, variances, appeals, and zoning permits. It also addresses specialized reviews, including wireless communication facilities, wind energy systems, community living arrangements, and radio broadcast facilities. For each procedure, the article identifies applicable review requirements and the responsibilities of the reviewing bodies. Article 6. Zoning map Establishes the official zoning map as part of the zoning code. The map identifies the location and boundaries of the Village's base zoning districts and overlay districts. This article also addresses the maintenance and administration of the map. Article 7. Base zoning and overlay districts Establishes and describes the Village's base zoning districts and identifies the overlay districts that may impose additional regulations on certain properties. The base districts distinguish areas intended for different types and intensities of residential, business, industrial, civic, and other development. Each district includes a description of its intended character and purpose. The corresponding allowable land uses are identified in Appendix A1 and A2. Article 8. Alternative development options Provides alternatives to conventional zoning regulations to accommodate projects that may benefit from greater flexibility in land use, housing types, or site design. The options include conventional planned developments, cottage housing projects, adaptive reuse projects, traditional neighborhood design projects, cluster subdivisions, and mixed residential housing projects. Each option establishes a framework for considering projects that may not be feasible or desirable under standard zoning requirements. Article 9. Project-based zoning districts Documents the development standards applicable to individual planned development districts (PDDs) and mixed residential housing (MRH) districts. Unlike conventional zoning districts, Page 6 of 328 Page 4 these districts have standards tailored to a particular development or property. The article provides a centralized location for the requirements governing these districts, while Appendix A2 identifies allowable land uses. Article 10. Wellhead protection overlay district Establishes additional land use and development regulations intended to protect the Village's municipal drinking water supply from contamination. The overlay district addresses activities and land uses that could threaten groundwater quality in areas associated with municipal wells. Article 11. Shoreland-wetland overlay district Establishes regulations for wetlands located within designated shoreland areas, consistent with applicable state requirements. The provisions are intended to protect wetlands and their environmental functions, preserve water quality, and regulate development and land disturbance within these sensitive areas. Article 12. Shoreland overlay district Establishes additional regulations for development within designated shoreland areas. The provisions are intended to protect water quality, natural resources, and shoreland conditions while allowing development consistent with applicable state requirements. Article 13. Environmental corridor overlay district Establishes additional protections for designated environmental corridors and associated natural resources. The regulations are intended to preserve important environmental features, including woodlands and other sensitive areas, while addressing how development may occur within or near these resources. Article 14. Land uses Establishes the general framework for regulating land uses throughout the Village. It explains how allowable uses are determined, addresses uses not specifically listed in the code, and recognizes limitations imposed by state and federal law. The article works together with the land use tables in Appendices A1 and A2 and the detailed land use provisions in Appendix B. Article 15. Performance standards Establishes standards to minimize the potential adverse impacts of land uses on surrounding properties and the community. These requirements address operational characteristics and potential nuisances or hazards, such as noise, vibration, odors, and other impacts. The standards apply as appropriate to land uses regardless of whether they require a discretionary approval. Article 16. Dimensional and related standards Establishes how dimensional requirements are applied and measured, including lot area, lot width, building setbacks, building height, and related standards. The article provides the rules for interpreting these requirements, while Appendix C identifies the specific dimensional standards applicable to individual base zoning districts. Article 17. Engineering and environmental standards Establishes requirements intended to ensure that development is suitable for the physical conditions of a property and does not create unacceptable environmental or engineering impacts. Topics include site constraints, groundwater separation, grading, stormwater management, erosion control, and other environmental considerations. The article also references related requirements established elsewhere in the Village's municipal code. Article 18. Architectural standards Establishes standards for the exterior design and appearance of buildings to promote quality development and compatibility with surrounding properties. The requirements address building design characteristics, exterior materials, architectural features, and other elements that influence the appearance of development. Standards vary as appropriate based on the type of building or development. Article 19. Site improvements and design standards Establishes requirements for the layout, design, and improvement of development sites, particularly projects subject to site plan review. These standards address how Page 7 of 328 Page 5 buildings, outdoor activities, equipment, and other site features are arranged and designed to promote functional, attractive, and compatible development. Article 20. Landscaping and buffers Establishes landscaping requirements for development sites and buffering requirements between potentially incompatible land uses. The article addresses the location, quantity, type, installation, and maintenance of landscaping, along with the design of landscaped buffers. These provisions are intended to improve community appearance, provide environmental benefits, and reduce potential conflicts between adjoining properties. Article 21. Parking, loading, and access Establishes standards for the location, design, and operation of off-street parking areas, loading facilities, driveways, and other access improvements. The provisions are intended to promote safe and efficient vehicle and pedestrian circulation, provide appropriate access to development sites, and minimize conflicts with adjoining streets and properties. Article 22. Outdoor lighting Establishes requirements for outdoor lighting to provide adequate illumination while minimizing glare, light trespass, excessive brightness, and other adverse impacts. The standards address lighting fixture design, placement, illumination levels, and related considerations to balance safety, functionality, energy conservation, and neighborhood compatibility. Article 23. Signs Establishes regulations for the location, size, height, number, design, and installation of signs. The provisions are intended to allow effective communication and business identification while promoting traffic safety, protecting community appearance, and reducing visual clutter. The article establishes general requirements and regulations for different sign types, while Appendix D provides additional sign standards based on location. Article 24. Nonconformities Establishes regulations for lots, buildings, structures, land uses, and signs that were lawfully established but no longer comply with current zoning requirements. The article addresses the continued use, maintenance, alteration, expansion, replacement, and discontinuation of these nonconformities. Its purpose is to recognize legally established development while establishing reasonable limitations on changes that could increase the degree of nonconformity. Article 25. Enforcement and penalties Establishes the Village's authority and procedures for enforcing the zoning code. It identifies available enforcement measures and remedies for violations, including stop-work orders, forfeitures, permit revocation, and other actions authorized by law. These provisions are intended to encourage compliance and provide a means of addressing violations when they occur. Appendix A1. Land use table – Base zoning districts Provides a comprehensive table identifying the land uses allowed within each base zoning district. The table indicates whether a use is permitted, requires conditional use approval, or is subject to another specified review procedure. It serves as a primary reference for determining whether a particular use may be established on a property. Appendix A2. Land use table – Project-based zoning districts Provides a similar land use table for the Village's project-based zoning districts, including planned development districts and mixed residential housing districts. It identifies allowable uses and applicable review requirements for these districts, which are subject to the development standards established in Article 9. Appendix B. Land use details Provides descriptions and supplemental regulations for individual land uses identified in the land use tables. Uses are organized into numbered series based on their general characteristics, including principal, accessory, and temporary uses. Depending on the use, the appendix identifies specific operating Page 8 of 328 Page 6 standards, development limitations, parking requirements, and other conditions that apply. This appendix is an important companion to the land use tables because it explains how individual uses are defined and regulated. Appendix C. Dimensional standards Provides tables identifying the dimensional requirements applicable to the Village's base zoning districts. These include minimum lot area and width, building setbacks, building height, and other applicable dimensional standards. The appendix is intended to be used with Article 16, which explains how the standards are applied and measured. Appendix D. Sign standards Provides detailed sign regulations organized by zoning district or location. The appendix identifies allowable sign types and applicable limitations, including sign area, height, number, and other requirements. It is intended to be used with Article 23, which establishes the general sign regulations and related requirements. Appendix E. General definitions Provides definitions of words and phrases used throughout the zoning code. These definitions establish consistent meanings for technical terms and other terminology important to interpreting and administering the regulations. Land use descriptions are addressed separately in Appendix B. Section 4 - Next steps The November 5, 2026, draft is presented for the Plan Commission's final review and consideration. Once the Plan Commission determines that the proposed zoning code is ready to move forward, it may vote to send it to the Village Board for adoption. The following motions are provided for the Plan Commission's consideration. The second option allows the Commission to recommend adoption subject to specified revisions in the draft. Option 1 — Recommend adoption without revisions Motion to recommend that the Village Board adopt the proposed zoning code dated November 5, 2026, as set forth in the draft ordinance. Option 2 — Recommend adoption with revisions Motion to recommend that the Village Board adopt the proposed zoning code dated November 5, 2026, as set forth in the draft ordinance, subject to the following revisions: 1. _______ 2. _______ Following the Plan Commission's recommendation, the proposed ordinance will be forwarded to the Village Board for consideration. The Village Board will conduct the required public hearing and take final action on the proposed zoning code. If adopted, the code will become effective January 1, 2027. Page 9 of 328 Page 7 Section 5 – Resources Ordinance #26-12 (attached) Draft Zoning Code - Digital version posted online at: https://villageofjacksonwi.gov/345/Village-Zoning-Code- Update-Project ZoningHub site – The key elements of the proposed code are posted to the Village’s ZoningHub site. https://villageofjacksonwi.zoninghub.com/Home As homework, open the site and navigate to Tools > Find Your Zoning. Then enter your property address. This will create a Parcels Details page. Open the accordions to get curated zoning details. Page 10 of 328 Village of Jackson Chapter 50 – Zoning Discussion Draft November 5, 2026 Page 11 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - i TABLE OF CONTENTS Article 1. General Provisions 2. Interpretation, Construction, and Definitions 3. Administrative Bodies Division 1 – Plan Commission Division 2 – Zoning Board of Appeals Division 3 – Zoning Administrator 4. General Procedural Requirements Division 1 – Generally Division 2 – Notice Requirements Division 3 – Public Hearings Division 4 – Site Visits Division 5 – Neighborhood Meetings Division 6 – Financial Guarantees 5. Specific Procedural Requirements Division 1 – Code Amendment Division 2 – Planned Development District Division 3 – Conditional Use Division 4 – Wireless Telecommunication Facility – Class 1 Collocation and New Tower Division 5 – Wireless Telecommunication Facility – Class 2 Collocation Division 6 – Wind Energy System Facility Review Division 7 – Community Living Arrangements Review Division 8 – Radio Broadcast Facility Review Division 9 – Site Plan Review Division 10 – Architectural Plan Review Division 11 – Administrative Adjustment Division 12 – Special Exception Division 13 – Expansion of a Nonconforming Building Division 14 – Registration of a Nonconforming Use Division 15 – Conversion of a Nonconforming Use Division 16 – Zoning Permit Division 17 – Occupancy Permit Division 18 – Termination of Approval Division 19 – Code Interpretation Division 20 – Administrative Appeal Division 21 – Variance Division 22 – Reasonable Accommodation Division 23 – Determination of Navigability Division 24 – Determination of Ordinary High-Water Mark 6. Zoning Map 7. Base Zoning and Overlay Districts 8. Alternative Development Options Division 1 – General Overview of Options Division 2 – Conventional Planned Development District Division 3 – Cottage Housing Project Division 4 – Adaptive Reuse Project Division 5 – Traditional Neighborhood Design Project Division 6 – Cluster Subdivision Division 7 – Mixed Residential Housing Project 9. Project-Based Zoning Districts 10. Wellhead Protection Overlay District 11. Shoreland-Wetland Overlay District 12. Shoreland Overlay District 13. Environmental Corridor Overlay District 14. Land Uses 15. Performance Standards 16. Dimensional and Related Standards 17. Engineering and Environmental Standards 18. Architectural Standards 19. Site Improvements and Design Standards 20. Landscaping and Buffers 21. Parking, Loading, and Access 22. Outdoor Lighting 23. Signs 24. Nonconformities 25. Enforcement and Penalties Appendix A1. Land Use Table – Base Zoning Districts A2. Land Use Table – Project-Based Zoning Districts B. Land Use Details C. Dimensional Standards D. Sign Standards E. General Definitions Page 12 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 1-1 CHAPTER 50 ZONING ARTICLE 1 GENERAL PROVISIONS 50-01 Title This chapter shall be known as “Zoning” and may be referred to herein as “this chapter” or the “Village’s zoning regulations.” 50-02 Authority This chapter is adopted under the authority granted under § 62.23, Wis. Stats., as amended, and other provisions referenced in other parts of this chapter. 50-03 Jurisdiction This chapter applies to the area within the corporate limits of the Village of Jackson, the boundary of which may change over time through annexations and detachments.[1] Editorial notes: [1] An annexation removes land from a town and adds it to a city or village. A detachment removes land from a city or village and adds it to a town or to another city or village. 50-04 Legislative findings a. General findings. The Village Board makes the following legislative findings: (1) The Village Board adopted a comprehensive plan pursuant to § 66.1001, Wis. Stats., and has made various amendments since initial adoption. (2) This chapter is intended to be consistent with the overall intent of the Village’s comprehensive plan, as may be amended. b. Other findings. Other legislative findings are included in various articles, divisions, and sections of this chapter as may be appropriate. 50-05 Purpose a. General purpose. This chapter promotes public health, safety, and welfare and is intended to: (1) Implement the Village’s comprehensive plan to the extent possible under zoning, as authorized by Wisconsin Statutes, and to promote public health, safety, comfort, convenience, prosperity and general welfare of the community; (2) Encourage reasonable flexibility of development design through appropriate innovation; (3) Isolate or control the location of unavoidable nuisance producing uses; (4) Foster a more rational pattern of relationship between nonindustrial and industrial uses for the mutual benefit of all; (5) Limit urban sprawl and facilitate the sustainable development of land with adequate provisions for transportation, water, sewerage, schools, parks, light, air, and open spaces for all residents; (6) Encourage the thoughtful redevelopment of those uses of land, buildings, and structures consistent with the intent and purposes of this chapter and which contributes positively to the character, development, and taxable value of property in each district; (7) Enhance quality of life for Jackson residents through the preservation of historically significant neighborhoods and districts such as the downtown area, strengthening public resources that build Page 13 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 1-2 social connection such as urban gardens, markets, parks, waterfronts, and open spaces, and strengthening public health through access to resources such as healthy foods, outdoor recreation, health care, active transportation, and clean air and water; and (8) Define the powers and duties of the administrative officers and bodies, as provided in this chapter; b. Specific purposes. Consistent with § 62.23 (7)(c), Wis. Stats., this chapter is also intended to: (1) Secure safety from fire, panic, and other dangers; (2) Promote health and general welfare; (3) Provide adequate light and air, including access to sunlight for solar collectors and to wind for wind energy systems; (4) Encourage the protection of groundwater resources; (5) Prevent the overcrowding of land; (6) Facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements; and (7) Preserve burial sites, as defined in § 157.70 (1)(b), Wis. Stats. c. Other purposes. Other purposes may be included in various articles, divisions, and sections as may be appropriate. 50-06 Re-enactment and repeal This chapter carries forward by re-enactment some of the provisions of the regulations governing zoning and related matters which the Village Board adopted under authority of state law prior to the effective date of this chapter. This chapter is not intended to repeal those regulations in their entirety, but rather to re-enact and continue in force such existing provisions so that all rights and liabilities that have accrued thereunder are preserved and may be enforced, unless explicitly surrendered by specific provisions of this chapter. If a provision in the regulations which were in effect on the date this chapter became effective is not specifically carried forward in this chapter, such provision is repealed. As to the effect of this section on existing land uses refer to Article 24. 50-07 Compliance a. Generally. Except as specifically provided, the provisions of this chapter apply to all development within the Village of Jackson. No development shall be undertaken without the prior authorizations required by this chapter and other applicable rules and regulations of the Village of Jackson. b. Exception for a previously granted permit or other approval. If a permit or other approval has been previously granted and the authorized work, in whole or in part, is no longer allowed under the current zoning regulations, the holder of the permit is authorized to establish the use or undertake the authorized work within one year of the date of the approval. If the authorized work does not commence within that time period and continue in good faith to completion, such permit or other approval shall lapse and be null and void without any further action by the Village. c. Exception for the establishment of a use, structure, or building not requiring authorization. If prior to the adoption of this chapter, or amendment thereto, a lawful land use, structure, or building is actively being established that did not require a permit or other approval under the zoning regulations in effect at that time, that work may continue to completion even when such land use, structure, or building (1) now requires a permit or other authorization under this chapter, (2) is being developed contrary to this chapter, or (3) is otherwise prohibited under this chapter. If such work does not continue in good faith to completion, any work must thereafter conform to this chapter. Page 14 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 1-3 50-08 Liability The Village of Jackson and its officials, agencies, employees, agents, and assigns are not liable for any flood damage, sanitation problems, structural damage, or other damages or loss of property value that may occur as a result of reliance upon and conformance with this chapter. 50-09 Severability If any section, clause, provision, or portion of this chapter is determined to be unconstitutional or otherwise invalid by a court of competent jurisdiction, the remainder of this chapter shall not be affected by such ruling. If any application of this chapter to a particular structure or parcel is determined to be unconstitutional or otherwise invalid by a court of competent jurisdiction, such ruling shall not apply to any other structure or parcel not specifically included in the ruling. 50-10 Relationship of this chapter to other regulations In addition to meeting the requirements of this chapter, development must comply with all applicable federal and state laws and regulations. When this chapter and another applicable law or regulation impose different requirements addressing the same subject, the more restrictive requirement applies. 50-11 Relationship of this chapter to private agreements This chapter does not repeal or modify private easements, covenants, or deed restrictions that apply to any property that is subject to this chapter. When a private restriction is more restrictive than this chapter, the private restriction applies. When this chapter is more restrictive, this chapter applies. 50-12 Additional local regulations In addition to meeting the regulations in this chapter, development must comply with all applicable regulations in the municipal code, including the following and any amendments thereto: (1) Chapter 8 – Buildings and Construction (2) Chapter 10 – Businesses (3) Chapter 16 – Environment (Floodplains) (4) Chapter 18 – Fire Prevention and Protection (5) Chapter 26 – Manufactured and Mobile Homes (6) Chapter 34 – Solid Waste (7) Chapter 35 – Stormwater Management (8) Chapter 38 – Subdivisions In all cases, the strictest of the applicable provisions shall apply. 50-13 No defense to nuisance action Compliance with the standards and requirements in this chapter does not constitute an absolute defense to an action to abate a public or private nuisance. 50-14 Applicability to public entities This chapter applies to all publicly-owned land to the fullest extent allowed by state and federal law. When a public entity undertakes any development that is exempted by state or federal law from this chapter, in whole or in part, it is strongly encouraged to meet the provisions of this chapter. Page 15 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 1-4 50-15 Relief from other provisions Nothing in these provisions shall relieve any person from satisfying any condition or requirement associated with a previous approval issued under this chapter, or any local, state, or federal law or requirement. 50-16 Applicability to projects under the purview of the Public Service Commission This chapter applies to projects under the purview of the Public Service Commission (PSC) of Wisconsin to the fullest extent allowed by state law.[1] The plan commission and/or the Village Board may submit a written request to the PSC outlining those standards and/or requirements of this chapter that the PSC should impose as conditions of project approval, if approval is to be granted. Editorial notes: [1] See § 196.491(3)(i), Wis. Stats., and also American Transmission Co., LLC v. Dane County, 2009 WI App. 126 50-17 Repeal of conflicting provisions All other ordinances or parts of ordinances of the Village that are inconsistent or conflicting with this chapter, to the extent of the inconsistency only, are repealed. 50-18 Copyright protection This chapter contains images that are copyright protected and are denoted as such. All such images are used with the permission of the copyright holder for the exclusive purposes of this chapter. Any images subject to copyright protection may be reproduced as part of this chapter and are subject to the open records law of Wisconsin but may not be used in other works without the permission of the copyright holder. 50-19 through 50-49 reserved The remainder of this page is intentionally left blank. Page 16 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 2-1 ARTICLE 2 INTERPRETATION, CONSTRUCTION, AND DEFINITIONS 50-50 General rules a. Generally. In the interpretation and application of this chapter, all provisions shall be liberally construed in favor of the Village so the true intent and meaning of this chapter is carried out as set forth in § 50-05. b. Minimum requirements. The interpretation and application of any provision of this chapter shall be held to be the minimum requirement adopted for the promotion of public health, safety, and general welfare and not be deemed a limitation or repeal of any other power granted by state statute. 50-51 Interpretation If a question arises concerning any provision or the application of any provision of this chapter, interpretations shall be issued consistent with Article 5 (Specific Procedure Requirements). 50-52 Delegation of authority When this chapter assigns an administrative or ministerial act or duty to the Village Clerk, Village Attorney, Zoning Administrator, department supervisor, or other Village official or employee, that person may designate or authorize another Village employee or consultant to perform the act or duty, unless state law or this chapter specifically provides otherwise. 50-53 Internal conflicts More specific provisions of this chapter shall be followed in lieu of more general provisions unless the context otherwise requires. Additionally, the most restrictive provisions shall apply. 50-54 Website The Village may create and maintain a website to share the key aspects of this chapter, including the zoning map, in an interactive platform. If there is any discrepancy between that website and this chapter, this chapter controls. 50-55 Use of graphics, illustrations, headings, references, and editorial notes a. Purpose. Graphics, illustrations, headings, references, statutory citations, and editorial notes are included to improve the readability of this chapter and increase reader comprehension. Specifically, graphics and illustrations are included to help the reader visualize the meaning of the text. Headings and subheadings generally state the content of that section and are intended to help the reader quickly find information. References are included when the section is related to a state or local law or another section in this chapter. These are included to help the reader understand the relationship among various provisions. Editorial notes are included to supplement and/or further clarify a sentence or provision but are not part of this chapter. b. Interpretation. A graphic, illustration, heading, reference, statutory citation, or commentary note does not govern, limit, modify, or in any manner affect the scope, meaning, or intent of any provision in this chapter. c. Effect of deficiency. No provision in this chapter shall be held invalid by reason of any deficiency in any graphic, illustration, heading, reference, statutory citation, or editorial note. 50-56 Reference to state and federal law If a provision in this chapter references a specific state or federal law, such reference shall be interpreted to mean the most current version of the referenced section at the time the reference is applied. If a referenced section is Page 17 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 2-2 repealed and replaced by another section with comparable subject matter, the replacement section shall control. If a referenced section is repealed and not replaced, the repealed section shall control if it is determined by the Village Attorney that the Village has the authority to apply the repealed language. 50-57 Interpretation of boundaries and designations for zoning districts a. Boundary line interpretations. Interpretations regarding boundaries of zoning districts shall be made in accordance with the following rules: (1) Municipal boundaries. Boundaries shown as following, or approximately following, any municipal boundary shall be construed as following such line. (2) Section lines. Boundaries shown as following, or approximately following, a section line, half-section line, or quarter-section line shall be construed as following such line. (3) Centerlines. Boundaries shown as following, or approximately following, any railroad, alley, road, street, highway, or similar feature shall be construed as following the centerline of such feature. (4) Property lines. Boundaries shown as following, or approximately following, any platted lot line or other property line shall be construed as following such line. If adjoining property owners transfer land as allowed by state law and both of the original lots were in different zoning districts, the zoning district boundary line can only be changed with a revision of the zoning map as set forth in Article 5. (5) Natural boundaries. Boundaries shown as following, or approximately following, any natural feature such as a stream, river, other bodies of water, or topographical features, such as a watershed boundary, shall be construed as following such natural feature as verified by field inspection when necessary. b. Street abandonment. If a public road, street, or alley is officially vacated or abandoned, the zoning provisions applicable to the land to which it reverted shall apply to such vacated or abandoned road, street, or alley, unless otherwise provided by Village action. 50-58 General rules of interpretation In the construction of this chapter, the following shall be observed, unless such construction would be inconsistent with the text or with the manifest intent of this chapter: (1) Gender. Words of the masculine gender include the feminine and neuter, and vice versa. (2) Singular and plural words. Words in the singular include the plural and words in the plural include the singular. (3) Tense. Words in the present tense include the past and future tense, and the future tense includes the present tense. (4) “Must”, “shall” and “will”. The words “must”, “shall” and “will” are mandatory. (5) “May” or “should”. The words “may” and “should” are permissive. (6) “Includes” or “including”. The words “includes” or “including” do not limit a provision to the specific example(s) listed, but are intended to extend their meaning to all other instances or circumstances of like kind or character. (7) “Such as”. The phrase “such as” does not limit a provision to the specific example(s) listed but is intended to extend its meaning to all other instances or circumstances of like kind or character. (8) Conjunctions. When used at the end of a series, the word “and” indicates that all listed items apply. When the word “or” is used at the end of a series, it indicates that one or more of the listed items apply. 50-59 Computation of time When a time period is specified in this chapter, the first day of the period is the first day after the event that triggered the time clock to start. If the last day of the time period is a Saturday, Sunday, or a legal holiday Page 18 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 2-3 recognized by the State of Wisconsin, that day is excluded and the time period is extended to the next business day. 50-60 Land use descriptions For purposes of this chapter, land uses are described in Appendix B. For organizational purposes, similar land uses are grouped into series. Series 1 through 12 contain principal land uses, Series 13 through 15 contain accessory land uses, and Series 16 contains temporary land uses. 50-61 General definitions a. Words and phrases defined. For the purpose of this chapter, certain words and phrases are defined in Appendix E and shall have the meaning ascribed to them, except where the context clearly indicates a different meaning. b. Words and phrases not defined. Unless specifically defined in Appendix E, words and phrases used in this chapter shall be interpreted to give them the meaning they have in common usage and to give this chapter its most reasonable application. 50-62 through 50-99 reserved The remainder of this page is intentionally left blank. Page 19 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-1 ARTICLE 3 ADMINISTRATIVE BODIES Divisions 1. Plan Commission 2. Zoning Board of Appeals 3. Zoning Administrator DIVISION 1 PLAN COMMISSION 50-100 Establishment A Plan Commission is established pursuant to § 62.23 (1), Wis. Stats., to undertake the responsibilities as defined in this chapter and as allowed by state law. 50-101 Authority a. Generally. The Plan Commission has such powers as may be necessary to enable it to perform its functions and promote the proper planning for the Village of Jackson, whether enumerated in this section or not.[1] b. Staff. The Plan Commission may employ, or contract for the services of, such professional planning technicians and staff as are considered necessary for the discharge of the duties and responsibilities of the commission, provided such expense does not exceed the appropriation that may be made for the commission by the Village Board for such purpose.[2] c. Comprehensive plan. The Plan Commission may, by resolution, recommend that the Village Board adopt a comprehensive plan or amend an adopted comprehensive plan.[3] d. Development review. The Plan Commission must render decisions and recommendations relating to development applications required by this chapter. e. Amendments to this chapter. The Plan Commission may recommend amendments to this chapter, including the zoning map.[5] f. Official map. The Plan Commission may recommend amendments to the Village’s official map adopted pursuant to § 62.23 (6), Wis. Stats.[4,5] g. Recommendations upon referral. Upon referral by the Village Board or other public body or officer of the village having final authority thereon, the Plan Commission must review and make a report with any recommendations on (1) the location and architectural design of any public building; (2) the location of any statue or other memorial; (3) the location, acceptance, extension, alteration, vacation, abandonment, change of use, sale, acquisition of land for or lease of land for any street, alley or other public way, park, playground, airport, area for parking vehicles, or other memorial or public grounds; (4) the location, extension, abandonment or authorization for any public utility whether publicly or privately owned; (5) all plats of lands in the village or within the territory over which the village is given platting jurisdiction by Ch. 236, Wis. Stats.; (6) the location, character and extent or acquisition, leasing or sale of lands for public or semipublic housing, slum clearance, relief of congestion, or vacation camps for children; and (7) the amendment or repeal of this chapter. Unless such report is made within 30 days, or such longer period as may be stipulated by the Village Board, the council or other public body or officer, may take final action without it.[6] h. Miscellaneous powers. The Plan Commission may make reports and recommendations relating to the planning and development of the village to public officials and agencies; public utility companies; civic, educational, professional and other organizations; and citizens. It may recommend to the Village President or Village Board, programs for public improvements and the financing thereof. All public officials shall, upon Page 20 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-2 request, furnish to the commission, within a reasonable time, such available information as it may require for its work.[7] Editorial notes: [1] See § 62.23 (4), Wis. Stats. [2] See § 62.23 (1)(e), Wis. Stats. [3] See § 62.23 (2), Wis. Stats. [4] See § 62.23 (6)(c), Wis. Stats. [5] Commentary: An official map depicts existing and planned public infrastructure and facilities, including planned streets. [6] See § 62.23 (5), Wis. Stats. [7] See § 62.23 (4), Wis. Stats. 50-102 Composition and appointment of members a. Number and appointment. The Plan Commission consists of 7 members as follows: the Village President, who shall be the presiding officer; 2 village trustees; and 4 citizen members who are not elected or appointed village officials. b. Terms. Each citizen member of the Plan Commission shall be appointed to a 3-year term.[1] The term of any village-elected or appointed official shall coincide with the term of their elected or appointed term of office. The term of the Village President shall coincide with their elected term. c. Citizen appointments. The citizen members shall be persons of recognized experience and qualification and reside in the village. Unless otherwise noted, all members shall be appointed by the Village President and approved by the Village Board. Appointments shall be made by the Village President during the month of April for terms that expire in April or at any other time if a vacancy occurs during the middle of a term. d. Vacancies. Vacancies on the Plan Commission must be filled for the unexpired term of any member whose term becomes vacant. e. Conditions for removal. A citizen member must be removed from the Plan Commission and the member's office declared vacant when the member moves outside of the village. If the Village President or a village- elected or appointed official resigns or is removed from their office, their term on the commission shall automatically terminate. Editorial notes: [1] See § 62.23 (1)(d), Wis. Stats. [2] See § 62.23 (1)(a), Wis. Stats. 50-103 Officers a. Chair. The Village President shall act as chair and be a voting member of the Plan Commission. b. Vice-Chair. A village trustee, elected by the commission, shall act as vice-chair. c. Second vice-chair. A member of the Plan Commission who is elected by the commission shall serve as second vice-chair. This election will take place annually at the May Plan Commission meeting. d. Recording secretary. The Village Clerk shall serve as the recording secretary for the Plan Commission but may not participate in any deliberations or any vote. 50-104 Commission procedures The Plan Commission may adopt rules of procedure to carry out its purposes. Such rules must conform to this chapter, other village regulations, and state law and be filed in the office of the Village Clerk.[1] Editorial notes: [1] See § 62.23 (2), Wis. Stats. 50-105 Meetings a. Open meetings. Meetings of the Plan Commission are open to the public unless conducted in closed session as authorized by state law. b. Location. Meetings, except for site visits described in Article 4, must be conducted in the Village hall or in such other public place as may be selected by the commission. Page 21 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-3 c. Schedule. The Plan Commission must establish a regular schedule of meetings. Other meetings may be held at the call of the chair and at such other times as the commission may determine. d. Presiding officer. If the chair is absent for a meeting, the vice-chair shall run the meeting. If both the chair and vice-chair are absent, the second vice-chair shall run the meeting. If the chair, vice-chair, and second vice-chair are absent, the secretary shall call the meeting to order and the commission shall appoint a chair for that meeting by majority vote. e. Minutes. The Plan Commission must keep minutes of its proceedings, showing the vote of each member upon each question, or, if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the board and shall be a public record. 50-106 Voting and quorum a. Requirements for quorum. A quorum of the Plan Commission consists of 4 members. If there is not a quorum, the meeting must be adjourned and the meeting minutes should reflect that a quorum was not present and the meeting was adjourned. b. Requirements for voting. Unless otherwise prescribed by state law, a decision of the Plan Commission must be approved by a majority vote of the members voting at a meeting in which a quorum is in attendance. c. Disqualification or voluntary abstention. A member of the Plan Commission must abstain from voting on a particular issue or be disqualified by majority vote of the remaining members present when (1) the member has a direct financial interest in the outcome of the matter at issue; (2) the member has such close personal ties to the applicant, the project, or to a party opposing the application that the member cannot reasonably be expected to exercise sound judgment in the public interest; (3) the member would violate the code of ethics set forth in Ch. 19, Wis. Stats., (4) the member would violate the code of ethics set forth in Chapter 2 of the municipal code; (5) participation in the matter might violate the letter or spirit of a member's code of professional responsibility; or (6) another law precludes participation. If a member abstains or is disqualified, they may participate in the meeting as a member of the public. 50-107 Compensation Citizen members of the Plan Commission may be compensated for their service on the commission. 50-108 Official oath Citizen members of the Plan Commission must take the official oath as required by § 19.01, Wis. Stats. The Village Clerk must keep a copy of such oaths. 50-109 through 50-119 reserved DIVISION 2 ZONING BOARD OF APPEALS 50-120 Establishment A Zoning Board of Appeals is established pursuant to § 62.23 (7)(e), Wis. Stats., to undertake the responsibilities as defined in this chapter and as allowed by state law. 50-121 Authority a. Administrative appeals. The Zoning Board of Appeals shall hear and decide administrative appeals consistent with the requirements in Article 5 where it is alleged that the Zoning Administrator made an error Page 22 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-4 in the administration of the zoning code. In exercising these powers, the board may compel the administrative official to act as required or reverse or affirm, in whole or in part, or modify the order, requirement, decision, or determination being appealed and may make such order, requirement, decision, or determination as ought to be made and to that end shall have all the powers of the officer from whom the appeal is taken.[1] b. Variances. The Zoning Board of Appeals shall hear and decide variances consistent with the requirements in Article 5.[2] c. Amendments to this chapter. The Zoning Board of Appeals may recommend amendments to this chapter. d. Employees. The Zoning Board of Appeals may employ a secretary and other employees.[3] Editorial notes: [1] See § 62.23 (7)(e)(4), Wis. Stats. [2] See § 62.23 (7)(e)(7)(b), Wis. Stats. [3] See § 62.23 (7)(e)(2), Wis. Stats. 50-122 Authority of chair The chair of the Zoning Board of Appeals or acting chair may administer oaths and compel the attendance of witnesses.[1] The chair may request the attendance of the Zoning Administrator and the Building Inspector. Editorial notes: [1] See § 62.23 (7)(e)(3), Wis. Stats. 50-123 Composition and appointment of members a. Number and appointment. The Zoning Board of Appeals consists of 5 regular members as appointed by the Village President, subject to confirmation by the Village Board.[1] At the first regular board meeting in April of the year in which a term or terms expire, the Village President shall designate the successors to the Village Board. b. Alternates. The Village President must appoint 2 alternates to the Zoning Board of Appeals for staggered 3- year terms. Annually, at the first regular Village Board meeting in April, the Village President shall designate one of the alternate members as first alternate and the other as second alternate.[2] c. Terms. Each regular member on the Zoning Board of Appeals will hold office for a period of 3 years which terminates April 30 of the year in which the term expires.[3] Terms should be staggered. If a successor is not appointed to fill an expired term, the incumbent shall remain at the position until a successor is appointed. d. Considerations in making appointments. Regular members and alternate members of the Zoning Board of Appeals must reside in the Village of Jackson. A village employee may not serve as a regular member or as an alternate. e. Vacancies. Vacancies on the Zoning Board of Appeals shall be filled for the unexpired term of any member or alternate whose term becomes vacant. f. Conditions for removal. The Village President may remove a regular member or an alternate from the Zoning Board of Appeals for cause upon written charges and after a public hearing.[4] Editorial notes: [1] See § 62.23 (7)(e)(2), Wis. Stats. [2] See § 62.23 (7)(e)(2), Wis. Stats. [3] See § 62.23 (7)(e)(2), Wis. Stats. [4] See § 62.23 (7)(e)(2), Wis. Stats. 50-124 Officers a. Chair. The Village President shall appoint one of the regular members as the chair of the Zoning Board of Appeals.[1] b. Other. The board may designate other officers deemed necessary. Editorial notes: [1] See § 62.23 (7)(e)(2), Wis. Stats. Page 23 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-5 50-125 Board procedures The Zoning Board of Appeals may adopt rules of procedure to carry out its purposes. Such rules must conform to this chapter, other village regulations, and state law and be filed in the office of the Village Clerk. 50-126 Recording secretary The Village Clerk shall serve as the recording secretary for the Zoning Board of Appeals but may not participate in any deliberations or any vote. 50-127 Meetings a. Open meetings. Meetings of the Zoning Board of Appeals are open to the public unless conducted in closed session as authorized by state law.[1] b. Location. Meetings, except for site visits described in Article 4, must be conducted in the village hall or in such other public place as may be selected by the board. c. Schedule. The Zoning Board of Appeals shall meet at the call of the chair and at other times as the board may determine. d. Presiding officer. If the chair is absent for a meeting, the recording secretary shall call the meeting to order and the board shall appoint a chair for that meeting. e. Minutes. The Zoning Board of Appeals must keep minutes of its proceedings, showing the vote of each member upon each question, or, if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the board and shall be a public record.[2] Editorial notes: [1] See § 62.23 (7)(e)(3), Wis. Stats. [2] See § 62.23 (7)(e)(3), Wis. Stats. 50-128 Voting and quorum a. Requirements for quorum. A quorum consists of 3 voting members. If there is not a quorum, the meeting must be adjourned and the meeting minutes should reflect that a quorum was not present and the meeting was adjourned. b. Requirements for voting. A decision of the Zoning Board of Appeals shall be by majority vote of the members present at a meeting in which a quorum is in attendance and voting.[1] c. Disqualification or voluntary abstention. A member of the Zoning Board of Appeals must abstain from voting on a particular issue or be disqualified by majority vote of the remaining members present when (1) the member has a direct financial interest in the outcome of the matter at issue; (2) the member has such close personal ties to the applicant, the project, or to a party opposing the application that the member cannot reasonably be expected to exercise sound judgment in the public interest; (3) the member would violate the code of ethics set forth in Ch. 19, Wis. Stats., (4) the member would violate the code of ethics set forth in Chapter 2 of the municipal code; (5) participation in the matter might violate the letter or spirit of a member's code of professional responsibility; or (6) another law precludes participation. If a member abstains or is disqualified, they may participate in the meeting as a member of the public. d. Voting by alternates. The first alternate may vote only when one of the regular members of the Zoning Board of Appeals is absent or is not able to vote on a pending matter. The second alternate may vote only when the first alternate is absent or is not able to vote or when more than one regular member is absent or is not able to vote.[2] Editorial notes: [1] See § 62.23 (7)(e)(3m), Wis. Stats. [2] See § 62.23 (7)(e)(2), Wis. Stats. Page 24 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-6 50-129 Role of an alternate in meetings An alternate that is not otherwise voting on a matter on the agenda may participate in the deliberations by asking questions and sharing their perspective. 50-130 Compensation The members of the Zoning Board of Appeals may not be compensated. 50-131 Official oath Members of the Zoning Board of Appeals must take the official oath as required by § 19.01, Wis. Stats. The Village Clerk shall keep a copy of such oaths. 50-132 through 50-149 reserved DIVISION 3 ZONING ADMINISTRATOR 50-150 Establishment The position of Zoning Administrator is established to undertake the responsibilities as defined in this chapter and state law. 50-151 Authority The Zoning Administrator shall administer, supervise, and enforce the provisions of this chapter and in furtherance of those duties shall have the authority to: (1) Meet with applicants to advise them of the requirements of this chapter; (2) Issue administrative permits; (3) Revoke or modify any administratively-issued permit or interpretation with reasonable cause; (4) Keep a written record of permits issued, interpretations made, inspections, work approved, enforcement activities, and other similar official actions; (5) Prepare staff reports consistent with this chapter and make recommendations as may be required or deemed appropriate; (6) Work with the Village Clerk in the preparation of meeting agendas for the Plan Commission and Zoning Board of Appeals; (7) Develop, amend, and utilize application forms, checklists, and other forms they deem appropriate to administer the development review processes set forth in this chapter; (8) Recommend amendments to this chapter and to other chapters of the municipal code of the Village of Jackson relating to land use and development; (9) Undertake enforcement proceedings as may be requested; and (10) Undertake any other activity not enumerated in this section but necessary to administer and enforce this chapter. 50-152 Conflict of interest The Zoning Administrator must not perform work on a proposed or approved development project in which they have a direct financial interest in the outcome of the matter at issue or otherwise have a conflict of interest. Page 25 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 3-7 50-153 through 50-199 reserved The remainder of this page is intentionally left blank. Page 26 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-1 ARTICLE 4 GENERAL PROCEDURAL REQUIREMENTS Divisions 1. Generally 2. Notice requirements 3. Public hearings 4. Site visits 5. Neighborhood meetings 6. Financial guarantees DIVISION 1 GENERALLY 50-200 Legislative findings The Village Board makes the following legislative findings: (1) Development review procedures should be easily understood and well-structured and only involve those steps and requirements that are needed to properly review the application. Excessive procedural requirements add unnecessary costs to development projects. (2) The general public, property owners in the area, and affected agencies have a right to know about proposed development projects and have meaningful participation in the review process to the extent allowed or required by this chapter. (3) Enforcing the rules and regulations contained in this chapter is an important function of government. 50-201 Purpose The development review requirements and procedures in this chapter are intended to: (1) Provide efficient and timely review of applications and ensure fairness and due process, (2) Ensure that applications are reviewed consistently by establishing criteria in making recommendations and final decisions, and (3) Ensure complete and timely compliance. 50-202 Authority to file an application Unless otherwise specified in this chapter, the owner of the property or their agent must sign the application submitted for review. 50-203 Permission to enter subject property Submission of an application as may be required in this chapter authorizes Village officials and employees, or other designated agents to enter the subject property to verify information in the application and to conduct other site investigations as may be necessary to review the application. This does not authorize any individual to enter any building on the subject property in the absence of the property owner or his or her authorized agent. Failure to allow access to the subject property is sufficient grounds to deny the application. Page 27 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-2 50-204 Burden of proof a. Application review process. During the application review process, the applicant has the burden of proof to show that the application should be approved based on the decision criteria relating to that application. b. Appeal of an administrative decision. During an administrative appeal proceeding, the petitioner has the burden of proof to show that such decision is not consistent with this chapter. c. Enforcement proceedings. During an enforcement proceeding, the Zoning Administrator or administrative unit taking enforcement action has the burden of proof to show that the action or development is in violation of this chapter. 50-205 Effect of an outstanding violation If the Zoning Administrator determines that a parcel is in violation of this chapter, no permit or approval of any kind shall be granted under this chapter that would benefit such parcel, except to correct the violation or as may be required by state law. 50-206 Effect of an outstanding obligation No permit or approval of any kind shall be granted by the Village that would benefit a parcel for which taxes, assessments, special assessments, or other required payments are delinquent and unpaid. 50-207 Concurrent review To the extent possible, a development project requiring multiple reviews should be done concurrently. When one approval is a condition precedent to approval of another application, the approvals must be issued in the requisite order. 50-208 Application fees and other charges a. Assessment of fees. From time to time, the Village Board may establish application fees and other charges it deems necessary in the administration of this chapter. b. After the fact fees. The Village Board may establish an “after-the-fact” fee for any procedure it deems appropriate. Payment of such fees does not release the applicant from full compliance with this chapter nor from prosecution for a violation of this chapter. c. Timing for payment. Application fees must be paid at the time the application is submitted for review. d. Refunds. Application fees are nonrefundable, except when Village staff accepts the payment in error. 50-209 Public nature of submitted information All written information that an applicant submits during a pre-submittal meeting or at any point in the review process is considered part of the public record subject to disclosure under state and local law. 50-210 Nature of staff comments Any statements or recommendations that are made by the Zoning Administrator, Village staff and officials, and other representatives prior to or during the application review process are not binding on the decision-making body responsible for making the final decision. 50-211 Withdrawal of application a. Timing of withdrawal. An applicant may withdraw an application at any time after submittal but before a final decision is made. Page 28 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-3 b. Effect of withdrawal. A request to withdraw an application terminates the review process and no decision shall be made. Upon request, the Zoning Administrator may, in their sole discretion, return the petitioner’s application fee if the Village has not done any work to process the application. c. Retention of application materials. A withdrawn application and related review documents should be kept as a permanent public record and is subject to the Village’s record retention policy. 50-212 Appeals If an application for a development project is approved under this chapter, the applicant may, upon receipt of the decision notice and satisfaction of all precedent conditions of approval, commence the work as authorized under the approval with the understanding that an aggrieved person may file an appeal with the appropriate review body. Prior to the end of the appeal period, all such work proceeds at the risk of the applicant. Similarly, any work that is done while an appeal is pending is done at the risk of the applicant. 50-213 Revocation or modification of an approval If a development project is approved under this chapter, the review authority granting final approval may revoke or modify an approval if it is determined that information in the application or otherwise provided by the applicant or the applicant’s agent was incomplete, false, misleading, or inaccurate and such information would have altered its decision to approve the application or the conditions of approval which were or were not imposed. 50-214 Application review schedule The Zoning Administrator must make the current review schedules available to the public and may post them on the Village’s website. 50-215 Application forms The Zoning Administrator must prepare application forms and may amend them from time to time. 50-216 Other approvals It is the responsibility of those undertaking development projects within the Village to obtain all applicable permits and other approvals as may be required by the Village of Jackson, Washington County, and federal and state authorities as may be required. 50-217 Building permit A building permit for the construction of a new building or the expansion of an existing building may not be issued until such time as a zoning permit has been issued or a written determination is made that one is not required. 50-218 through 50-229 reserved DIVISION 2 NOTICE REQUIREMENTS 50-230 Generally The type of notice that is given for each of the various procedures outlined in this article is dictated by the nature of the decision. Administrative decisions, such as a zoning permit, involve very little discretion. Either the proposed Page 29 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-4 development meets the standards in this chapter, or it does not. In contrast, there are other decisions that involve more discretion and judgment based on particular circumstances. The review of a conditional use application, for example, involves discretion on the part of those involved in making recommendations, and a final determination whether the application should be approved or not. As a general rule, notice for an application is not given for administrative decisions. More notice is given when a proposed action could potentially affect other parties, including nearby property owners, other governmental bodies, and the general public. This division describes the different types of notice and related requirements. 50-231 Cost to provide notice The Village pays the costs related to the provision of notice required under this division, unless otherwise specified in the adopted fee schedule. 50-232 Public hearing notice a. Generally. When required in Article 5, the Village Clerk is responsible for placing the public hearing notice in the official newspaper as set forth in this section. b. Time requirements. A Class 1 public hearing notice must be published one time at least 7 days before the meeting or hearing. A Class 2 public hearing notice must be published once each week for 2 consecutive weeks, the last one occurring at least 7 days before the meeting or hearing.[1] c. Content. The notice must include the information listed in Exhibit 4-1. Editorial notes: [1] See §§ 985.01 (1m) and 985.07, Wis. Stats. 50-233 Property owner notice a. Generally. When required by Article 5, the Village Clerk is responsible for mailing a notice, as set forth in this section, to owners of properties located within the Village and within 100 feet of the subject property. If an outlot associated with a certified survey map or subdivision is located within the 100-foot area and lot owners within the certified survey map or subdivision have a property interest in the outlot, each of those property owners do not need to be sent a notice. b. Additional notice. When the applicant also owns the land adjoining the subject property involved in the application, the Village Clerk must mail a notice to owners of properties located within the Village and within 100 feet of such property. c. Time requirements. The notice must be mailed by regular mail at least 10 business days prior to the date of the meeting at which the matter will be considered. d. Content. The notice must include the information listed in Exhibit 4-1. e. Source of names and addresses. The names and addresses of property owners are those listed on the tax records maintained by Washington County. f. Failure to receive notice. The failure of a person to receive notice as described in this section does not invalidate or otherwise have any effect upon a public hearing or other action taken on the application. g. Affidavit of mailing. The person sending the notices should prepare an affidavit of mailing to certify that notice was provided as described in this section. Such affidavit must be kept as a public record. 50-234 Distribution list notice [1] a. Establishment of distribution list. The Village Clerk must maintain a list of persons who submit a written request to receive notice of any proposed regulation or amendment thereof that may affect the allowable use of the person’s property. b. When notice is required. The body conducting the public hearing must send a notice, which contains a copy of the proposed regulation or amendment, to each person on the distribution list whose property, the allowable use of which may be affected by the proposed regulation or amendment. Page 30 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-5 c. Method of distribution of notices. The notice shall be by mail or in any reasonable form that is agreed to by the person and the Village Clerk. d. Establishment of charges. The Village Board may from time to time adopt a resolution establishing a processing fee that shall be charged to each person on the list who is sent a notice. The amount of that fee may not exceed the approximate cost of providing the notice to the person. e. Effect of failure to send notice. An ordinance or amendment shall take effect if the body conducting the meeting fails to send the notice as required by this section. Editorial notes: [1] See § 62.23 (7)(d)(4), Wis. Stats. 50-235 Meeting agenda notice When required, the body responsible for acting on the application must place the item on its meeting agenda. 50-236 Content of required notice Notices must include the information listed in Exhibit 4-1. Exhibit 4-1. Content of notice Public Hearing Notice (§ 50-232) Property Owner Notice (§ 50-233) Distribution List Notice (§ 50-234) Applicant name X X X Subject property address or other description by which the public can locate the subject property X X X Nature of the application X X X A description of the proposed project or request X X X Name of body or official who will consider the application X X X Date, time and location of the public hearing X X X Location where the public can view the application X X X General location map (or available from the Village Clerk during normal office hours) X X - Key: An “X” means that the indicated information is required; a dash “-“ means that the indicated information is not required 1. If the proposed amendment would have the effect of changing the allowable use of any property, the notice must include either a map showing the property affected by the amendment or a description of the property affected by the amendment and a statement that a map may be obtained from the Village Clerk. 50-237 through 50-249 reserved DIVISION 3 PUBLIC HEARINGS 50-250 Legislative findings The Village Board makes the following legislative findings relating to public hearings: (1) Public hearings should be conducted in an orderly, timely, and efficient manner. (2) Public input is important and should be encouraged. Page 31 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-6 50-251 General requirements a. Meetings to be public. All public hearings must be conducted in the Village hall or in such other public place as may be selected by the body conducting the hearing. b. Notice of meetings. Notice of public hearings must be given as provided for in Division 2 of this article. 50-252 General procedure When conducting a public hearing, the presiding officer may follow the following steps listed in this section as a general guideline. As such, the steps listed below are intended to provide a general format for all participants. For matters of little complexity or controversy, the presiding officer may use their discretion in applying the procedures as appropriate. 1. Announce the purpose and subject of the public hearing. 2. Determine whether public notice as required by this chapter has been provided. If notice has not been provided, the hearing must be postponed until such time as proper notice has been provided. 3. Ask if any member of the body conducting the public hearing has a conflict of interest in regard to the matter being discussed and excuse those who do. 4. Ask if any member of the body conducting the public hearing believes another member has a conflict of interest in regard to the matter being discussed. If so, and following a discussion of the alleged conflict of interest, the members (except the member with the alleged conflict) must determine by vote whether a reasonable person may conclude that the member has a conflict of interest and should be removed from the pending decision. 5. Ask the applicant to describe the proposal. 6. Ask the staff to present a staff report, if required. 7. Allow members of the body conducting the public hearing to direct questions to the applicant and staff, if present. 8. Ask for statements from the public. 9. Read aloud written comments that were submitted when the individual submitting the comments is not in attendance, subject to the time limitations the presiding office may establish. 10. Call for discussion of the members of the body conducting the public hearing during which time they may ask questions of a member of the public, the applicant, and the staff, if present. 11. Ask the applicant if they want to (1) respond to any comment made by an individual during the proceeding, (2) submit additional information, (3) amend the application, or (4) request a continuance. 12. Announce that the body will not accept any additional comment from the applicant or any member of the public once the public hearing is closed. 13. Ask for a motion and second and vote to close the public hearing. 50-253 Continuances a. Prior to start of public hearing. If the applicant or the applicant’s agent is not present for the public hearing, the body conducting the public hearing may authorize a continuance. b. During a public hearing. Prior to the close of the public hearing, the applicant may request a continuance and the body conducting the public hearing may agree to the continuance upon a showing of good cause. Likewise, the body conducting the public hearing may ask the applicant for a continuance but the applicant is not required to grant such request. If the applicant does not grant a continuance, the body must act on the information available at that time. c. Effect. A continuance stops the time clock, if any, for making a decision. Page 32 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-7 d. Notice requirements. A public hearing may be continued to a later date without again providing public notice, provided the location, date, and time for the continued hearing are announced at the time of the continuance. 50-254 Public comment a. Time limitations on public comment. The presiding officer may impose a time limit on members of the public who wish to address the body conducting the public hearing to assure completion of the agenda in a timely manner. The time limit may not be less than 2 minutes. b. Written comment. Prior to the close of the public hearing, members of the public may submit written comments to the body conducting the public hearing. Such documents must be retained and made part of the public record for the proceeding. If a person submits written comments, a member of the reviewing authority should read the comments into the record and for the benefit of all attending, but the time dedicated to reading such written comments is subject to the same time limits imposed upon those providing oral comments at the public hearing. For example, if speakers have a 2-minute time limit, the reading of any written comment will stop at 2 minutes. Materials supporting any written comment can be identified by reference and do not need to be read into the record. 50-255 through 50-269 reserved DIVISION 4 SITE VISITS 50-270 Authorization The Plan Commission, Zoning Board of Appeals, and Village Board may conduct a site visit to inspect a property as it relates to a pending development application, provided the site visit is stated on the meeting agenda. 50-271 Open meeting requirements A site visit is a public meeting and must comply with Wisconsin's open meeting requirements and the requirements of the Americans with Disabilities Act (ADA). Any person who would like to attend a site visit should notify the Village Clerk in advance of the date. The Village Clerk will follow established procedures in complying with such request. 50-272 Rules of conduct a. Participation. To ensure everyone hears what is being said during a site visit, participants should stay together as they tour the subject property. b. Comments. No recommendations can be offered, and no decisions can be made during a site visit. c. Overview of site visit. When the review authority reconvenes their meeting or public hearing, the presiding officer should initiate a discussion of the members to document the major points that were discussed and/or observations made on the site visit. 50-273 through 50-279 reserved Page 33 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-8 DIVISION 5 NEIGHBORHOOD MEETINGS 50-280 Generally A developer may hold a neighborhood meeting before submitting a development application to the Village for review to inform neighbors of a potential development project and to establish a forum for those attending the meeting to learn more about the project, ask questions, and offer any feedback. Having heard the feedback, the developer has the opportunity to modify their proposal and/or provide more information with their application that is submitted to the Village for review. Nothing in this division precludes a developer from meeting with any person or group to discuss their project before or after holding a neighborhood meeting. 50-281 Meetings to be public A neighborhood meeting must be held in a public place (e.g., school, community center) within or near the neighborhood to the extent possible. 50-282 Coordination with Village The developer should work with the Zoning Administrator in scheduling a neighborhood meeting to ensure staff are able to attend if so requested. 50-283 Notice of meeting The developer hosting a neighborhood meeting should send a written notice to those property owners within 400 feet of the subject property at least 14 days in advance of the scheduled date. The same notice should also be sent to the Zoning Administrator at least 14 days before the scheduled date so that the Village can publish a notice indicating that elected officials may be in attendance but not participating in the meeting. 50-284 Staff attendance Village staff and elected officials may attend a neighborhood meeting to listen to the developer’s presentation and any feedback from those in attendance. Village staff will not directly participate in the formal presentation but may respond to questions relating to the Village’s review process. 50-285 through 50-289 reserved DIVISION 6 FINANCIAL GUARANTEES 50-290 Performance bond For the purpose of this chapter, a performance bond is not an acceptable financial guarantee, unless otherwise required to be allowed by Wisconsin Statutes. 50-291 Letter of credit a. Form. The letter of credit must be irrevocable and in a form acceptable to the Village Attorney. b. Amount. The amount of the letter of credit must conform to the amount established under this chapter. If an amount is not specified in this chapter, the Village Board can establish the amount. c. Acceptance required. A letter of credit is not accepted by the Village until formal action by the Village Board upon the recommendation of the Village Attorney. Page 34 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 4-9 d. Minimum requirements for issuer. The bank, savings and loan, or other financial institution issuing the letter of credit must be authorized to do business in the State of Wisconsin and have a financial standing acceptable to the Village Attorney. e. Obligation of private party. The provision of a letter of credit does not remove the burden of performing the work the letter of credit is intended to guarantee. 50-292 Cash deposit a. Generally. If a cash deposit is provided under this chapter as a financial guarantee, the cash deposit may be held by the Village or by a third-party escrow agent, financial institution, title company, or similar entity approved by the Village. b. Amount. The amount of the cash deposit must conform to the amount established under this chapter. If an amount is not specified in this chapter, the Village Board can establish the amount. c. Acceptance required. A cash deposit is not accepted as a financial guarantee until approved by the Village Board and all required agreements have been fully executed. d. Agreement required. A cash deposit agreement, escrow agreement, or similar instrument must be entered into in a form acceptable to the Village Attorney. If the cash deposit is held by a third party, the agreement must identify the approved holder of the funds and the conditions governing release or disbursement of the funds. e. Obligation of private party. The provision of a cash deposit does not relieve any person of the obligation to complete or perform the work, improvements, or other obligations the cash deposit is intended to guarantee. f. Administrative fee. When a cash deposit is held by the Village, the Village may charge a fee for the additional work required of the Village staff to monitor and handle the cash deposit. The amount of the fee must be set by the Village Board from time to time by resolution. g. Accrued interest. When a cash deposit is held by the Village, the Village is not obligated to pay interest thereon unless otherwise provided in the written agreement. 50-293 Insufficient funds If the Village exercises its right to use a financial guarantee and the cost of performing the authorized work exceeds the amount of the financial guarantee, the Village must send a bill to the property owner for the outstanding balance. If the property owner does not pay such costs within 30 days after billing, such costs constitute a special charge under § 66.0628, Wis. Stats., or as otherwise authorized by state law. 50-294 through 50-299 reserved The remainder of this page is intentionally left blank. Page 35 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-1 ARTICLE 5 SPECIFIC PROCEDURAL REQUIREMENTS Divisions 1. Zoning code amendment 2. Planned development district 3. Conditional use 4. Wireless telecommunication facility – Class 1 collocation and new tower 5. Wireless telecommunication facility – Class 2 collocation 6. Wind energy system review 7. Community living arrangement review 8. Radio broadcast facility review 9. Site plan review 10. Architectural plan review 11. Administrative adjustment 12. Special exception 13. Expansion of a nonconforming building 14. Registration of a nonconforming use 15. Conversion of a nonconforming use 16. Zoning permit 17. Occupancy permit 18. Termination of approval 19. Code interpretation 20. Administrative appeal 21. Variance 22. Reasonable accommodation 23. Determination of navigability 24. Determination of ordinary high-water mark DIVISION 1 ZONING CODE AMENDMENT 50-925 Generally From time to time, it may be necessary or desirable to amend the text of this chapter and the zoning map. This division describes the procedures and requirements to amend this chapter and the zoning map. 50-926 Initiation a. Text amendment. An amendment to the text of this chapter may be initiated by (1) any property owner in the Village, (2) the Village Board or any Trustee, (3) the Plan Commission or any member of the commission, (4) the Zoning Board of Appeals or any member of the board; and (5) the Zoning Administrator. b. Map amendment (rezoning). An amendment to the zoning map may be initiated by (1) the owner of the property to be affected, (2) the Village Board or any Trustee, (3) the Plan Commission or any member of the commission, (4) the Zoning Board of Appeals or any member of the board; and (6) the Zoning Administrator. 50-927 Review procedure [1] The general steps below describe the process for reviewing an application to amend the zoning regulations, including the zoning map. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant's agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a complete application to the Zoning Administrator along with the application fee as may be established by the Village Board. Page 36 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-2 3. Distribution to Department of Natural Resources. If the proposed amendment would revise floodplain or shoreland-wetland regulations in this chapter, the Zoning Administrator sends a copy of the application to the regional office of the Wisconsin Department of Natural Resources within 5 workdays of receipt. 4. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 5. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 6. General notice by type of application. If a proposed amendment would revise the text of this chapter, the Zoning Administrator provides for (i) a class 2 public notice, (ii) distribution list notice, and (iii) meeting agenda notice consistent with Article 4. If a property owner initiates a proposed amendment that would revise the zoning map, the Zoning Administrator provides for (i) class 2 public notice, (ii) property owner notice, (iii) distribution list notice, and (iv) meeting agenda notice consistent with Article 4. If the Village initiates a proposed amendment that would revise the zoning map, the Zoning Administrator provides for (i) class 2 public notice, (ii) distribution list notice, and (iii) meeting agenda notice consistent with Article 4. 7. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any other person upon request. 8. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing to review the application consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 9. Plan Commission recommendation. After the public hearing has been closed , the Plan Commission makes a recommendation to the Village Board, based on the decision criteria in this division, to (i) approve the amendment, (ii) approve the amendment with conditions, or (iii) deny the amendment. In making its determination, the Commission will consider the information submitted by the applicant, any comments made at the public hearing, and the staff report, if any. General Flowchart for Zoning Code Amendment Page 37 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-3 10. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Village Board. 11. Village Board meeting. Allowing for proper notice, the Village Board considers the application at a regular or special meeting. 12. Decision. The Village Board makes a decision, based on the decision criteria in this division, to (i) approve the amendment, (ii) approve the amendment with conditions, or (iii) deny the amendment. In making its determination, the Board will consider the information submitted by the applicant, the Plan Commission’s recommendation, any public comments made at the public hearing, and the staff report, if any. 13. Required vote with downzoning. An amendment must be approved by at least two−thirds of the members−elect if the amendment would decrease the development density of the land to be less dense than was allowed under its previous usage or that would reduce the number of permitted uses of the land to fewer uses than were allowed under its previous usage. If the property owner requests or agrees to the downzoning, the ordinance may be enacted by a simple majority of the members-elect.[2] 14. Preparation of decision document. If the Village Board approves the proposed amendment, the Zoning Administrator prepares a final ordinance for signature. 15. Applicant notification. Within a reasonable time following the Village Board’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 16. Notification to Department of Natural Resources. If the proposed amendment is approved and modifies the floodplain regulations in this chapter, the Zoning Administrator sends a copy of the ordinance to the regional office of the Wisconsin Department of Natural Resources via regular mail and/or email within 10 days of the date of decision. 17. Preparation of new zoning map. If the proposed amendment is approved and modifies the zoning map, a new zoning map is prepared consistent with Article 6. Editorial notes: [1] See § 62.23 (7)(d), Wis. Stats. [2] See § 66.10015 (3), Wis. Stats. 50-928 Effective date of adopted ordinance An adopted ordinance shall take effect as prescribed in state law. 50-929 Basis of decision a. Generally. The adoption of a zoning code, along with any amendments to it, is a legislative action taken within parameters established by state statutes, federal law, and court rulings. To help guide the review of a proposed code amendment, various factors are listed below which can be used to the extent deemed appropriate in exercising the Village’s legislative discretion. b. Text amendment. If a proposed amendment would revise the text of this chapter, the Plan Commission, in making its recommendation, and the Village Board, in making its decision, should consider the following factors, as applicable: (1) whether the amendment is consistent with the Village’s comprehensive plan; (2) whether the amendment is consistent with other planning documents adopted by the Village Board; (3) whether this chapter with the amendment is internally consistent; (4) whether the amendment is the least restrictive approach to address issues of public health, safety, and welfare; (5) the extent to which the text amendment will likely create new nonconforming uses and structures; (6) if the proposed amendment relates to shoreland-wetland regulations, whether the chapter as amended complies with § 62.231, Wis. Stats.; Ch. NR 117, Wis. Admin. Code; and other state laws; (7) whether the proposed amendment is needed to comply with a new or revised state or federal law; and Page 38 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-4 (8) any other factor not specifically or generally listed but deemed appropriate by the Plan Commission or Village Board given the circumstances. c. Zoning map amendment. If a proposed amendment would revise the zoning map, the Plan Commission, in making its recommendation, and the Village Board, in making its decision, should consider the following factors, as applicable: (1) whether the amendment is consistent with the Village’s comprehensive plan, including future land use maps or similar maps; (2) whether the amendment is consistent with other planning documents adopted by the Village Board; (3) the extent to which the amendment will or will likely increase or decrease the number of nonconforming uses and structures; and (4) any other factor not specifically or generally listed but deemed appropriate by the Plan Commission or Village Board given the circumstances. d. Special review criteria for amendments to the shoreland-wetland overlay district boundary. To ensure this chapter remains consistent with the shoreland protection objectives of § 281.31, Wis. Stats., the Village Board may not rezone a wetland in a shoreland-wetland zoning district, or any portion thereof, where the proposed rezoning may result in a significant adverse impact upon any of the following wetland functions: (1) storm and flood water storage capacity; (2) maintenance of dry season stream flow or the discharge of groundwater to a wetland, the recharge of groundwater from a wetland to another area or the flow of groundwater through a wetland; (3) filtering or storage of sediments, nutrients, heavy metals or organic compounds that would otherwise drain into navigable waters; (4) shoreline protection against erosion; (5) fish spawning, breeding, nursery, or feeding grounds; (6) wildlife habitat; or (7) areas of special recreational, scenic, or scientific interest, including scarce wetland types and habitat of endangered species. 50-930 Imposition of conditions a. Generally. The Plan Commission may recommend, and the Village Board may impose, one or more conditions of approval deemed necessary to grant approval. b. Mandatory conditions of approval relating to certain existing land uses. If a property owner applies for a zoning map amendment and the current land use on the subject property is not permitted in the proposed zoning district, that use must be removed as a condition of approval. If the existing land use is considered a conditional use in the proposed zoning district, the property owner must, as a condition of approval, submit a conditional use application and obtain approval for that land use. If conditional use approval is not granted, the use must be removed as a condition of approval. 50-931 Staff report content The staff report should include the following: (1) preliminary findings for the decision criteria listed in this division, (2) a preliminary recommendation for approval or denial, (3) a preliminary list of conditions for approval whether the preliminary staff recommendation is for approval or denial, and (4) other information deemed necessary. Page 39 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-5 50-932 Appeal An aggrieved person may appeal the Village Board’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-308 through 50-324 reserved DIVISION 2 PLANNED DEVELOPMENT DISTRICT 50-325 Generally A planned development district allows for more flexibility in the development of land while ensuring substantial compliance with the intent of this chapter and the Village’s comprehensive plan. As further described in Article 8, the following may be reviewed as a planned development district: (1) conventional planned development district, (2) cottage housing project, (3) adaptive reuse project, (4) traditional neighborhood design (TND) project, and (5) cluster subdivision. 50-326 Development agreement If a planned development district is established pursuant to this division, the Village and developer may enter into a development agreement that specifies the duties and obligations of both parties with respect to the development project. 50-327 Coordination with land division requirements If the project involves a land division, the developer must submit a preliminary plat or a certified survey map as set forth in Chapter 38 of the municipal code at the same time the general development plan is submitted for review. This requirement is intended to ensure the project as intended will be able to comply with all applicable land division requirements. Review of the preliminary plat or certified survey map will occur as a separate action 50-328 Implementation schedule and project phasing a. Application materials. If project phasing is proposed, the applicant must include with the application a proposed implementation schedule identifying the anticipated commencement and completion dates for each phase, along with any related details necessary to evaluate the timing and coordination of the overall development. b. Development agreement. Depending on the nature of the project, the development agreement should incorporate an implementation schedule and address project phasing as appropriate. 50-329 Review procedure Establishment of a planned development district involves a two-step process. The review of a proposed project begins with a general development plan. If the general development plan is approved (i.e., an ordinance is adopted), a final development plan for all or a part of the project is reviewed. If the final development plan is approved, the project is officially approved. The general steps below describe the process for reviewing an application for a planned development district. Step One – General Development Plan Page 40 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-6 1. Neighborhood meeting. Before submitting an application, the applicant or the applicant's agent may hold a neighborhood meeting as described in Article 4. 2. Pre-submittal meeting. Before submitting an application, the applicant or the applicant's agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 3. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 4. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 5. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 6. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 7. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 8. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing to review the application consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research related to the proposed district. 9. Plan Commission recommendation. After the public hearing has been General Flowchart for General Development Plan Page 41 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-7 closed, the Plan Commission makes a recommendation to the Village Board, based on the decision criteria in this division, to (i) approve the general development plan, subject to approval of a final development plan; (ii) approve the general development plan with conditions, subject to approval of a final development plan; or (iii) deny the general development plan. In making its determination, the Commission will consider the information submitted by the applicant, any comments made at the public hearing, and the staff report, if any. 10. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Village Board. 11. Preparation of ordinance. If the Plan Commission recommends approval, the Zoning Administrator prepares a draft ordinance. 12. Village Board meeting. Allowing for proper notice, the Village Board considers the application at a regular or special meeting. 13. Decision. The Village Board makes a decision, based on the decision criteria in this division, to (i) approve the general development plan, subject to approval of a final development plan; (ii) approve the general development plan with conditions, subject to approval of a final development plan; or (iii) deny the general development plan. In making its determination, the Board will consider the information submitted by the applicant, the Plan Commission’s recommendation, any comments made at the public hearing, and the staff report, if any. 14. Preparation of decision document. If the general development plan is approved, the Zoning Administrator prepares a final ordinance for signature. 15. Applicant notification. Within a reasonable time following the Village Board’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. Step Two – Final development plan 1. Submittal of final development plan. The applicant submits a final development plan and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. At the discretion of the applicant, such materials may be submitted concurrently with the review of the general development plan. 2. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The General Flowchart for Final Development Plan Page 42 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-8 Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 3. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 4. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. 5. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division that evaluates whether the final development plan is consistent with the approved general development plan and the suitability of the proposed plan given the additional information provided in the plan and supplemental materials. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 6. Plan Commission meeting. Allowing for proper notice, the Plan Commission reviews the final development plan and the staff report, if any. 7. Plan Commission decision. If the final development plan is deemed to be consistent with the general development plan, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the final development plan, (ii) approve the final development with conditions, or (iii) deny the final development plan. 8. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division. 9. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-330 Basis of decision a. General development plan. The review of a general development plan for a proposed planned development district is a legislative action carried out within the framework of this code, applicable state statutes, federal law, and relevant court decisions. To help guide this review, a set of factors is provided below. These factors may be considered, as appropriate, in the exercise of the Village’s legislative discretion. (1) whether development in the proposed project is in keeping with the spirit and intent of this chapter; (2) whether development in the proposed project is consistent with the Village’s comprehensive plan; (3) whether development in the proposed district is consistent with a neighborhood plan or other subarea plan that may have been prepared for land in or near the proposed district; (4) the effects of development in the proposed project on traffic safety and efficiency, both within and outside of the district; (5) whether the proposed plan for development in the proposed project is properly planned and is properly coordinated with the existing and anticipated land uses on properties in the immediate and surrounding area; (6) the extent to which the natural features and open space on the site are preserved; (7) whether development in the proposed project complies with provisions of this chapter and other land development regulations of the Village that may apply; (8) the effects of development in the proposed project on public services and facilities; (9) whether adequate water and sanitary sewer facilities can be provided; (10) the proposed means of maintaining any undeveloped areas of the proposed project for the purpose for which it was set aside; Page 43 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-9 (11) effects of the proposed use on surrounding properties, including existing and anticipated uses; (12) effects of the proposed use on the normal and orderly development and improvement of the surrounding property for uses permitted in the zoning district and adjoining districts; and (13) any other factor that relates to the purposes of this chapter set forth in § 46-05 or as allowed by state law. b. Final development plan. If the Village Board approves a general development plan, the Plan Commission in their review of the final development plan should consider the factors listed below. (1) Whether the final development plan is consistent with the approved general development plan. (2) Whether the final development plan is consistent with the standards in Article 9. (3) Whether the final development plan is consistent with the approved phasing and development timing. (4) Whether the final development plan is consistent with the development standards in this code as applicable. 50-331 Imposition of conditions a. Generally. The Plan Commission may recommend, and the Village Board may impose, conditions of approval deemed necessary to grant approval. Such conditions may relate to any of the factors it considered in reaching its decision. In addition, the Plan Commission may recommend and the Village Board may require the provision of off-site exactions that may be necessary to approve the establishment of the planned development district project. b. Effect on contracts with another party. The Village Board may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-332 Staff report content The staff report should include the following: (1) preliminary findings for the decision criteria listed in this division, (2) a preliminary recommendation for approval or denial, (3) a preliminary list of conditions for approval whether the preliminary staff recommendation is for approval or denial, and (4) other information deemed necessary. 50-333 Effect of approval The approval of a planned development district runs with the land and is binding on all future property owners. 50-334 Effect of approved planned development district on land division standards Development in a planned development district is subject to the Village’s land division regulations to the extent applicable, except that the Plan Commission or Village Board may waive a development standard in the land division regulations as provided therein. 50-335 Expiration of an approval If any portion of a planned development district that can be developed remains substantially undeveloped 5 years after the date of the final approval required for completion of the project, the Village Board may rescind the approval, in whole or in part, following a public hearing with a 30-day notice to the property owner. Upon petition and with cause, the Village Board may grant a one-time extension, not to exceed 2 years.[1] If the Village Page 44 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-10 Board rescinds an approval, undeveloped lands in the district must be reclassified based on the zoning regulations in effect at that time. Developed portions of the planned development district may either be allowed to retain the planned development district designation or reclassified based on the zoning regulations in effect at that time. Editorial notes: [1] See § 66.10015 (5)23 (7)(gm), Wis. Stats. 50-336 Amendment of an approved general development plan A general development plan may be amended by following the review procedures in effect at the time of application. 50-337 Amendment of an approved final development plan a. Generally. The property owner may submit an application to propose a change to a previously issued approval for a final development plan. b. Minor change. If the Zoning Administrator determines the proposed change to the approval is minor, the Zoning Administrator is authorized to review and act on the petition with notice to the Plan Commission. c. Major change. If the Zoning Administrator determines the proposed change to the approval is major, the review procedure in effect at the time of submittal must be followed. 50-338 Appeal a. General development plan. An aggrieved person may appeal the Village Board’s decision for the general development plan by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. b. Final development plan. An aggrieved person may appeal the Plan Commission’s decision for the final development plan by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. c. Administrative decision regarding amendment. An aggrieved person may appeal the Zoning Administrator’s decision made pursuant to § 50-337 (b) by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-339 through 50-399 reserved DIVISION 3 CONDITIONAL USE 50-400 Generally Although each zoning district is primarily intended for a predominant type of land use, there are a number of uses that may be appropriate under certain conditions. These are referred to as conditional uses. This division describes the requirements and procedures for reviewing a conditional use, including an amendment of an approved conditional use. 50-401 Applicability and restrictions a. General applicability. Those land uses designated as a conditional use in the land use tables in Appendices A1 and A2 must comply with the requirements of this division. b. Limitation due to nonconforming lot. If an existing lot is considered a nonconforming lot (e.g., due to lot area or lot width), conditional uses are not allowed unless the Plan Commission determines, on a case-by- case basis, that the specific nonconformity does not impact the lot’s suitability for the proposed conditional use. A favorable determination does not influence or predetermine the Plan Commission’s ultimate decision on the conditional use application under this division. Page 45 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-11 c. Limitation due to a nonconforming use on the lot. If an existing lot has a nonconforming use, conditional uses are not allowed, unless the Plan Commission determines, on a case-by-case basis, the nonconforming use and the proposed conditional use are compatible. A favorable determination does not influence or predetermine the Plan Commission’s ultimate decision on the conditional use application under this division. d. Limitation due to existing conditional use on the lot. If an existing lot has an approved conditional use, all other conditional uses are not allowed, unless the Plan Commission determines, on a case-by-case basis, that the existing and proposed conditional uses are compatible. A favorable determination does not influence or predetermine the Plan Commission’s ultimate decision on the conditional use application under this division. 50-402 Review procedure The general steps below describe the process for reviewing a conditional use application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant's agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Neighborhood meeting. If the scope of the project is comparatively large or the proposed use has the potential of affecting other properties in the area, the applicant may conduct a neighborhood meeting as described in Article 4. 3. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 4. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. General Flowchart for Conditional Use Page 46 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-12 5. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 6. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 7. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 8. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing to review the application consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 9. Decision. After the public hearing has been closed, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the conditional use; (ii) approve the conditional use; or (iii) deny the conditional use. In making its determination, the Commission will consider the information submitted by the applicant, any comments made at the public hearing, and the staff report, if any. 10. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 11. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 12. Acceptance by property owner. If the application is approved, the property owner must sign the decision document to acknowledge the terms of the approval and return the same to the Zoning Administrator within 4 months of the decision. Prior to the expiration of the previously specified time period, the property owner may submit a petition to the Zoning Administrator requesting an extension and the Zoning Administrator may, with cause, extend the period within which the decision document must be signed. If the signed decision document is not returned within the initial or extended time period, if any, the decision shall automatically become null and void without any further action by the Village at the expiration of such time limit. 13. Recording of decision document. If the property owner returns the decision document within the required time period with the required signatures, the decision document is recorded against the subject property in the Washington County Register of Deeds Office. 50-403 Basis of decision The Plan Commission, in making its decision, should consider whether the proposal complies with: (1) the standard conditions of approval set forth in § 50-405, (2) each of the special conditions of approval set forth in § 50-406, (3) each of the performance standards set forth in Article 15, (4) each of the development standards prescribed for the requested conditional use, (5) all other applicable sections of the zoning code, and (6) all other applicable sections of the municipal code. In addition, the Plan Commission must ensure compliance with the following standards: (1) The establishment, maintenance or operation of the conditional use will not be detrimental to or endanger the public health, safety or welfare of the Village. (2) The uses, values, and enjoyment of other property in the surrounding area that are already permitted shall be, in no foreseeable manner, substantially impaired or diminished by the establishment, maintenance or operation of the conditional use. Page 47 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-13 (3) The establishment, maintenance, or operation of the conditional use is compatible with surrounding properties, whether in the same or different zoning districts. In making this determination, the Plan Commission must determine whether the petitioner has demonstrated there are no adverse effects on surrounding properties or that potentially adverse effects have been eliminated or reduced to an acceptable level. Approaches that could be employed to mitigate potentially adverse effects will depend on the circumstances but may include (i) adjusting the location of the use, or parts thereof, on the subject property; (ii) limiting hours of operation; (iii) limiting the size or scope of the use, or parts thereof; (iv) controlling how the use is managed on an on-going basis; (v) providing additional landscaping; (vi) providing additional screening; and (vii) limiting operations conducted out-of-doors, if otherwise allowed. (4) The establishment, maintenance, or operation of the conditional use will not impede the normal and ordinary development and improvement of the surrounding property for uses permitted within the district and/or which are consistent with the standards in the comprehensive plan. (5) Adequate utilities, access roads, drainage and other necessary site improvements have been or are being made to accommodate the use. (6) Adequate measures have been taken or will be taken providing ingress and egress to minimize traffic congestion on public streets so as not to diminish the level of service of any intersection which is impacted by traffic arising from the conditional use. In making such determination, the personal experience of surrounding property owners may be considered substantial evidence to the extent deemed appropriate. 50-404 Effect of comprehensive plan While § 66.1001 (2m)(b), Wis. Stats. does not require a conditional use be consistent with the Village’s adopted comprehensive plan, the Village encourages consistency. 50-405 Standard terms for an approved conditional use The terms and conditions listed below are automatically incorporated into a conditional use order authorizing a use, unless otherwise specifically stated in the approval. (1) Any use not specifically listed as permitted shall be considered to be prohibited except as may be otherwise specifically provided herein. In case of a question as to the classification of use, the question shall be submitted to the Plan Commission for determination. (2) No use is hereby authorized unless the use is conducted in a lawful, orderly, and peaceful manner. Nothing in this order shall be deemed to authorize any public or private nuisance or to constitute a waiver, exemption, or exception to any law, ordinance, order or rule of either the municipal governing body, Washington County, the State of Wisconsin, the United States of America or other duly constituted authority, except only to the extent that it authorizes the use of the subject property above described in any specific respects described herein. (3) This conditional use order does not constitute a building permit or any license or other permit required by Village ordinance or other law. (4) The approved conditional use shall be confined to the subject property described, without extension or expansion other than as noted herein, and may not vary from the purposes herein mentioned unless expressly authorized in writing by the Plan Commission as being in compliance with all pertinent ordinances. (5) The property shall comply with all rules and regulations of the Village and the local fire department, including submission to routine inspections by the Village staff and fire department staff. (6) Prior to the execution of the conditional use permit, the applicant must obtain any and all approvals that must be obtained before the use may be established or the commencement of any land-disturbing activity related to the approved conditional use. (7) Should the permitted conditional use be abandoned in any manner, or discontinued in use for 12 months, or continued other than in strict conformity with the conditions of the original approval, or should the petitioner be delinquent in payment of any monies due and owing to the Village, or should a change in the character of the surrounding area or the use itself cause it to be no longer compatible with the Page 48 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-14 surrounding area or for similar cause based upon consideration of public health, safety or welfare, the conditional use may be terminated by action of the Village Board, pursuant to the enforcement provisions of this conditional use order, and all applicable ordinances. (8) Any change, addition, modification, alteration and/or amendment of any aspect of this conditional use, including but not limited to an addition, modification, alteration, and/or amendment to the use, premises, structures, lands or owners, other than as specifically authorized herein, shall require a new permit and all procedures in place at the time must be followed. (9) Unless this conditional use order expressly states otherwise, plans that are specifically required by this conditional use order may be amended upon the prior approval of the Plan Commission if the Plan Commission finds the plan amendment to be minor and consistent with the conditional use permit. Any change in any plan that the Plan Commission feels, in its sole discretion, to be substantial shall require a new permit, and all procedures in place at the time must be followed. (10) As a condition precedent to the issuance of the conditional use permit, the owner of the subject property must approve the issuance of this conditional use order upon the terms and conditions described herein in writing, and the petitioner is required to accept the terms and conditions of the same in its entirety in writing. (11) The petitioner must, on demand, reimburse the Village for all costs and expenses of any type that the Village incurs in connection with this application, including the cost of professional services incurred by the Village (including engineering, legal, planning and other consulting fees) for the review and preparation of the necessary documents or attendance at meetings or other related professional services for this application, as well as for any actions the Village is required to take to enforce the conditions in this conditional approval due to a violation of these conditions. (12) Any unpaid bills owed to the Village by the subject property owner or their tenants, operators or occupants, for reimbursement of professional fees (as described above); or for personal property taxes; or for real property taxes; or for licenses, permit fees or any other fees owed to the Village; shall be placed upon the tax roll for the subject property if not paid within 30 days of billing by the Village, pursuant to § 66.0627, Wis. Stats. Such unpaid bills also constitute a breach of the requirements of this conditional approval that is subject to all remedies available to the Village, including possible cause for termination of this approval. (13) The petitioner must file with the Village Clerk a current mailing address and current phone number at which the petitioner can be reached, which must be continually updated by the petitioner if such contact information should change, for the duration of the conditional use. If the petitioner fails to maintain such current contact information, the petitioner thereby automatically waives notice of any proceedings that may be commenced under this approval, including proceedings to terminate this conditional use. (14) All conditions of approval imposed by duly adopted motion of the Plan Commission in its consideration of the petitioner’s application, as noted in the minutes of the Plan Commission meeting at which approval was granted, are specifically incorporated herein by reference. (15) Should any paragraph or phrase of this conditional use order be determined by a court of competent jurisdiction to be unlawful, illegal, or unconstitutional, said determination as to the particular phrase or paragraph will not void the rest of the approval and the remainder shall continue in full force and effect. (16) If any aspect of this conditional use order or any aspect of any plan contemplated and approved under this conditional use is in conflict with any other aspect of the conditional use or any aspect of any plan of the conditional use, the more restrictive provision shall be controlling as determined by the Plan Commission. (17) If the property owner/operator is a business entity, such as a limited liability company or a corporation, such entity shall for the life of the conditional use continuously maintain a registered office in the State of Wisconsin as evidenced by registration with the Wisconsin Department of Financial Institutions. (18) The property owner may not change the size and/or shape of the subject property by any means without the approval of the Plan Commission. If the Plan Commission determines that a proposed change is substantial with regard to the overall size of the parcel and/or configuration, such change shall require issuance of a new conditional use approval pursuant to the requirements in effect at the time of application. Page 49 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-15 (19) This approval is given under the Village’s zoning code and is not to be, in any way, interpreted to abrogate any private rights other property owners may have pursuant to an easement or a deed restriction. (20) If this conditional use terminates for any reason, the property owner must remove equipment, buildings, structures, or any improvements specifically related to the conditional use and which cannot be utilized for an approved use (i.e., a use permitted by right or a different conditional use as approved). (21) If the subject property is found to be in violation and then brought into compliance, the Plan Commission reserves the right to impose periodic reviews to ensure continued compliance. (22) Following approval, the petitioner must comply with any requests for self-certification as described in § 50- 412. 50-406 Special conditions of approval a. Generally. Based on substantial evidence, the Plan Commission may impose one or more conditions of approval deemed necessary to grant approval. Conditions and restrictions may relate to the establishment, location, construction, maintenance, operation of the use, off-site impacts, and any other aspect of the use that impacts the public health, safety, or general welfare. Examples of such conditions may include, but are not limited to, the following. Issue Potential condition 1. Hours of operation Limit hours of operation to hours to be more compatible with surrounding uses. 2. Buffering Require more of a buffer than what is otherwise required by this chapter. Buffering may include landscaping, walls or fences, berms, and other features to physically separate adjoining uses. 3. Maximum floor area Establish a maximum floor area that may be less than what is otherwise allowed. 4. Maximum number of patrons Limit the size of the use by establishing maximum patron loads, often by seats and/or tables. 5. Uses within buildings Limit commercial uses to the first floor of a multistory building. 6. Number and/or location of entrances Design the site and building so that entrances are located in areas away from adjoining properties. 7. Outdoor activity Restrict locations and/or times of outdoor activity. 8. Outdoor storage Establish a maximum area for outdoor storage that may be less than what is otherwise allowed. 9. Take-out food service Prohibit drive-up service windows and/or walk-up service windows in certain areas of the property (e.g., near a residential use). If these are allowed, limitations could be set. 10. Delivery services Prohibit delivery services that entail frequent trips or establish upper limits on the activity. 11. Signage Prohibit signage in areas of the property that may cause an impact on surrounding areas. b. Limitation on imposing conditions. A condition of approval may not lessen a development standard or other requirement in this chapter. c. Effect on contracts with another party. The review authority may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Page 50 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-16 Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-407 Financial guarantee a. Generally. The Plan Commission may require a financial guarantee as set forth in Article 4 to remove a building, structure, or other improvement that may pose a hazard or nuisance after a conditional use has been terminated or abandoned, unless otherwise required by an applicable state law or administrative code provision. Any such financial guarantee must expressly state that it will remain in full force and effect for a period of at least 6 months after the Village receives a written notice of an expiration or termination of the financial guarantee. The applicant must remove any equipment or structure placed or erected pursuant to a conditional use order that may pose a hazard or nuisance after the use has been abandoned or revoked but not less than 30 days prior to termination or expiration of the financial guarantee. b. Amount. Unless specifically stated in the zoning code, the amount of the financial guarantee is based upon the estimated cost of the removal of the equipment, building or structure, or any other improvement plus 20 percent. 50-408 Staff report content The staff report should include the following: (1) preliminary findings for the decision criteria listed in this division, (2) a preliminary recommendation for approval or denial, (3) a preliminary list of conditions for approval whether the preliminary staff recommendation is for approval or denial, and (4) other information deemed necessary. 50-409 Content of decision document a. Approval. If the application for a conditional use is approved, the decision document may include the following: (1) a statement that the conditional use is approved; (2) a description of the conditional use; (3) a description of where the conditional use will occur on the property; (4) reasons for the decision based on the criteria listed in this division; (5) conditions of approval that must be satisfied prior to the establishment of the conditional use, if any; (6) conditions of approval that must be complied with during the life of the conditional use, if any; (7) a statement indicating that the property owner must sign the decision document and return it to the Zoning Administrator to acknowledge acceptance of the same; (8) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (9) a statement that an aggrieved person, other than the applicant, may appeal the decision to a court of competent jurisdiction and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (10) a statement indicating the nature of the approval (i.e., personal to the property owner or runs with the land); (11) other information the Plan Commission or Zoning Administrator deems appropriate; (12) the signature of the Zoning Administrator; and (13) the date of the decision. Page 51 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-17 b. Denial. If the application for a conditional use is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the conditional use is denied, (2) a description of the project, including acreage and proposed use characteristics, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant's ability to resubmit a revised application for consideration, (5) a statement that the decision may be appealed as provided for in this division, (6) other information the Plan Commission or Zoning Administrator deems appropriate, (7) the signature of the Zoning Administrator, and (8) the date of the decision. 50-410 Term for an approval a. Generally. A conditional use order authorizing a conditional use runs with the land unless otherwise specified in the conditional use order. b. Change in term as part of renewal. If a term is specified in a conditional use order (i.e., the approval is not permanent), the Plan Commission during the renewal process may revise the term to be a longer period (e.g., change renewal from 5 years to 10 years) or make the approval permanent (e.g., remove the renewal requirement from the order). c. Administrative renewal. The order may describe an administrative renewal process to allow for streamlined renewal of the conditional use order with a provision that allows the Plan Commission to remove the conditional use order from administrative renewal if there are concerns with compliance with the conditional use order or concerns raised by the public about the applicant’s operations. If the Plan Commission pulls the conditional use order from administrative renewal, the conditional use order will remain in effect while the Plan Commission provides due process to the applicant in reviewing the conditional use order and its potential renewal. d. Temporary uses. If a use is listed as a temporary use in the land use tables in Appendices A1 and A2 and is approved by the Plan Commission as a conditional use, the use may be re-established with the written approval of the Zoning Administrator if they determine that the use to be re-established is substantially the same as what was originally approved and that the approved use did not create any potentially adverse impacts on the public health, safety, or welfare. 50-411 Expiration of an approval a. Commencement of work. A conditional use approval automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced. Upon petition and with cause, the Zoning Administrator may grant a one-time extension of up to 12 additional months if (1) the property owner submits a written request to the Administrator before the original approval expires; (2) the property owner demonstrates that the failure to commence substantial work was due primarily to circumstances beyond their control; and (3) the project is in compliance with the zoning regulations in effect at the time the extension is requested. b. Completion of work. If substantial work, as authorized by the approval, begins within the initial time period but fails to progress in good faith toward completion, the Zoning Administrator should initiate the process to terminate the approval as outlined in Division 18 of this article. c. Cessation. If the Zoning Administrator determines that an approved conditional use has not been in operation for more than 12 consecutive months, they should begin the process to terminate the approval as outlined in Division 18 of this article. Page 52 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-18 50-412 Self-certification a. Generally. To ensure compliance with this zoning code and any conditions of approval, the Zoning Administrator may, from time to time, submit a written request to the property owner and, if different, the operator for information regarding the approved conditional use. Self-certification allows the property owner and, if different, the operator the opportunity to identify and correct any aspect of their use that may not fully comply before the Village initiates enforcement proceedings. The purpose of self-certification is to encourage accountability, streamline administrative oversight, and promote transparency and public trust. b. Nature of self-certification. Submission of a self-certification does not prevent the Village from initiating enforcement action it deems appropriate. c. Failure to comply. If the property owner and, if different, the operator fail to submit a self-certification response within the time period specified in the request, the Village may initiate enforcement actions, including revocation, suspension of permits, or other remedies authorized under this zoning code or state law. 50-413 Amendment of an approved conditional use a. Generally. The property owner may submit an application to propose a change to a previously issued approval for a conditional use. b. Minor change. If the Zoning Administrator determines the proposed change to the approval is minor, the Administrator is authorized to review and act on the petition with notice to the Plan Commission. c. Major change. If the Zoning Administrator determines the proposed change to the approval is major, the review procedure in effect at the time of submittal must be followed. 50-414 Appeal a. Plan Commission decision. An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. b. Administrative decision regarding amendment. An aggrieved person may appeal the Zoning Administrator’s decision made pursuant to § 50-413 (b) by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-415 through 50-424 reserved The remainder of this page is intentionally left blank. Page 53 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-19 DIVISION 4 WIRELESS TELECOMMUNICATION FACILITY – CLASS 1 COLLOCATION AND NEW TOWER 50-425 Review procedure The general steps below describe the process for reviewing an application for a Class 1 collocation and a new telecommunication tower. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant's agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 5. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 6. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 7. Decision. After considering the information submitted by the applicant and the staff report, if any, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the application, (ii) approve the application with conditions, or (iii) deny the application. 8. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. General Flowchart for Class I Collocation and New Tower Page 54 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-20 9. Applicant notification. Within a reasonable time following the Plan Commission's decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 10. Recording of decision document. If the property owner returns the decision document within the required time period with the required signatures, the decision document is recorded against the subject property in the Washington County Register of Deeds Office. If an applicant believes the Village has exceeded its authority as described in § 66.0404, Wis. Stats., and other such laws as may apply which may include 47 USCA § 1455, the applicant must notify the Zoning Administrator in writing and the reviewing authority reserves the right to reconsider the matter to ensure that applicable laws are followed. 50-426 Application form An application form for a Class 1 collocation and a new telecommunication tower must include the following information as appropriate: (1) The name and business address of, and the contact individual for, the applicant. (2) The location of the proposed tower or affected tower. (3) The location of the proposed mobile service facility. (4) If an application is to substantially modify an existing telecommunication tower, a construction plan which describes the proposed modifications to the tower, and equipment and network components, including antennas, transmitters, receivers, base stations, power supplies, cabling, and related equipment associated with the proposed modifications. (5) If an application is to construct a new telecommunication tower, a construction plan which describes the proposed tower and equipment and network components, including antennas, transmitters, receivers, base stations, power supplies, cabling, and related equipment to be placed on or around the new tower. (6) If an application is to construct a new telecommunication tower, an explanation as to why the applicant chose the proposed location, and why the applicant did not choose collocation, including a sworn statement from the responsible party attesting that collocation within the applicant’s service area would not result in the same mobile service functionality, coverage, and capacity; is technically infeasible; or is economically burdensome. 50-427 Imposition of conditions a. Generally. The reviewing authority may impose one or more conditions of approval deemed necessary to grant approval. Such conditions may relate to any aspect of the use that impacts the public health, safety, or general welfare, subject to subsection (B) below. b. Limitations. The reviewing authority may not impose any of the following as a condition of approval: (1) A requirement relating to environmental testing, sampling, or monitoring. (2) A requirement relating to radio frequency emissions. (3) A requirement to pay a reoccurring fee. (4) A requirement that the structure or mobile service facility owner must provide space on or near the structure for the use of or by the Village at less than the market rate, or to provide the Village other services via the structure or facilities at less than the market rate. (5) Limit the duration of the approval. (6) A requirement that the applicant must indemnify or insure the Village in connection with the political subdivision’s exercise of its authority to approve the application. (7) A requirement that the applicant must give the Village the right to place at or collocate with the applicant’s support structure any mobile service facilities provided or operated by, whether in whole or in part, the Village or an entity in which the Village has a governance, competitive, economic, financial, or other interest. Page 55 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-21 50-428 Staff report content The staff report should include the following: (1) preliminary findings for the decision criteria listed in this division, (2) a preliminary recommendation for approval or denial, (3) a preliminary list of conditions for approval whether the preliminary staff recommendation is for approval or denial, and (4) other information deemed necessary. 50-429 Fees a. Professional service reimbursement. Costs incurred by the Village in obtaining legal, planning, engineering, and other technical and professional advice in connection with an application may be charged to the applicant as allowed by state law. b. Limitation on fees. The total of all fees, excluding professional service reimbursement, associated with the review of an application may not exceed the limits established by § 66.0404 (4)(d), Wis. Stats. 50-430 Expiration of an approval a. Non-establishment. If the Zoning Administrator determines that substantial work as authorized by the approval did not commence within 12 months of the date of approval or if substantial work did commence within 12 months of the date of approval but has not continued in good faith to completion, they must initiate the process to terminate the approval pursuant to Division 18 of this article. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 6 months, provided (1) the permit holder requests the extension prior to the expiration of the approval, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. b. Cessation. If the Zoning Administrator determines that a wireless telecommunication facility has ceased to operate for any reason, whether intentional or otherwise, for more than 12 continuous months, they must initiate the process to terminate the approval pursuant to Division 18 of this article. 50-431 Amendment of an approval a. Generally. The property owner may submit an application to propose a change to a previously issued approval for a new tower or a Class 1 collocation. b. Minor change. If the Zoning Administrator determines the proposed change to the approval is minor, the Administrator is authorized to review and act on the petition with notice to the Plan Commission. c. Major change. If the Zoning Administrator determines the proposed change to the approval is major, the review procedure in effect at the time of submittal must be followed. 50-432 Appeal a. Plan Commission decision. An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. b. Administrative decision regarding amendment. An aggrieved person may appeal the Zoning Administrator’s decision made pursuant to § 50-431 (b) by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-433 through 50-449 reserved Page 56 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-22 DIVISION 5 WIRELESS TELECOMMUNICATION FACILITY – CLASS 2 COLLOCATION 50-450 Review procedure The general steps below describe the process for reviewing a Class 2 collocation application . 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant's agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Decision. The Zoning Administrator makes a decision on the application within 45 days of the date the application is deemed complete, unless the time is extended by the applicant. The decision must be stated in writing. If approval is not granted, the reasons must be stated. If an applicant believes the Village has exceeded its authority as described in § 66.0404, Wis. Stats., and other such laws as may apply which may include 47 USCA § 1455, the applicant must notify the Zoning Administrator in writing and the reviewing authority reserves the right to reconsider the matter to ensure that applicable laws are followed. 50-451 Expiration of an approval a. Non-establishment. If the Zoning Administrator determines that substantial work as authorized by the approval did not commence within 12 months of the date of approval or if substantial work did commence within 12 months of the date of approval but has not continued in good faith to completion, they must initiate the process to terminate the approval pursuant to Division 18 of this article. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 6 months, provided (1) the permit holder requests the extension prior to the expiration of the approval, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. b. Cessation. If the Zoning Administrator determines that a wireless telecommunication facility has ceased to operate for any reason, whether intentional or otherwise, for more than 12 continuous months, they must initiate the process to terminate the approval pursuant to Division 18 of this article. 50-452 Amendment of an approval Following approval, the Zoning Administrator will review proposed changes to an approval consistent with the requirements of this division. 50-453 Fees a. Professional service reimbursement. Costs incurred by the Village in obtaining legal, planning, engineering, and other technical and professional advice in connection with an application shall be charged to the applicant as allowed by state law. Page 57 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-23 b. Limitation on fees. The total of all fees, excluding professional service reimbursement, associated with the review of an application may not exceed the limits established by § 66.0404 (4)(d), Wis. Stats. 50-454 Appeal An aggrieved person may appeal a final decision made pursuant to this division by filing an administrative appeal with the Zoning Board of Appeals within 30 days of the date of that decision. 50-455 through 50-474 reserved DIVISION 6 WIND ENERGY SYSTEM REVIEW 50-475 Review procedure The review of a wind energy system must follow the requirements set forth in Ch. PSC 128, Wis. Admin. Code and § 66.0401, Wis. Stats. 50-476 through 50-499 reserved DIVISION 7 COMMUNITY LIVING ARRANGEMENT REVIEW 50-500 Generally Community living arrangements are a special type of congregate housing that is regulated by state law, and which are allowed by right in certain zoning districts and with a discretionary review in others.[1] This division describes the requirements and procedures for reviewing a community living arrangement that is subject to a discretionary review. Editorial notes: [1] See § 62.23 (7)(i), Wis. Stats. 50-501 Review procedure The general steps below describe the process for reviewing an application for a community living arrangement that is subject to discretionary review. 1. Pre-submittal meeting. The applicant or their agent may meet with the Zoning Administrator to and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. Page 58 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-24 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule 5. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 6. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 7. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing to review the application consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare any documents it deems necessary. 8. Plan Commission decision. After the public hearing has been closed, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the community living arrangement, (ii) approve the community living arrangement, or (iii) deny the community living arrangement. In making its determination, the Commission will consider the information submitted by the applicant, any public comments made at the public hearing, and the staff report, if any. 9. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 10. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-502 Basis of decision The Plan Commission, in making its decision, must ensure compliance with the following standards: (1) The establishment of the community living arrangement will not be detrimental to or endanger the public health, safety or welfare of the Village. (2) The establishment of the community living arrangement will not impair or diminish the uses, values, and enjoyment of other property in the surrounding area that are already permitted. (3) The establishment of the community living arrangement is compatible with surrounding properties, whether in the same or different zoning districts. In making this determination, the Plan Commission must determine whether the petitioner has demonstrated there are no adverse effects on surrounding properties or that potentially adverse effects have been eliminated or reduced to an acceptable level. Approaches that could be employed to mitigate potentially adverse effects will depend on the particular circumstances but may include (i) adjusting the location of the use, or parts thereof, on the subject property; (ii) limiting the size or scope of the use, or parts thereof; (iii) providing additional landscaping; and (iv) providing additional screening. (4) The establishment of the community living arrangement will not impede the normal and ordinary development and improvement of the surrounding property for uses permitted within the district and/or which are consistent with the standards in the Village’s comprehensive plan. 50-503 Imposition of conditions a. Generally. When approving a community living arrangement, the Plan Commission may impose conditions it deems necessary to support the intent and purpose of this chapter. b. Effect on contracts with another party. The review authority may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. Page 59 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-25 50-504 Content of decision document a. Approval. If the proposed work is approved, the decision document should include the following: (1) a statement that the proposed work is approved; (2) a description of the project; (3) reasons for the decision based on the criteria listed in this division; (4) conditions of approval, if any; (5) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (6) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (7) any other information the Plan Commission or Zoning Administrator deems appropriate; and (8) the date of the decision. b. Denial. If the proposed work is denied, the decision document should include the following: (1) a statement that the proposed work is denied, (2) a description of the proposed work, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant's ability to resubmit a revised application for consideration, (5) a statement that the decision may be appealed as provided for in this division, (6) any other information the Plan Commission or Zoning Administrator deems appropriate, and (7) the date of the decision. 50-505 Effect of approval An approval of a community living arrangement runs with the land and is binding on all future property owners. 50-506 Special provisions for community living arrangements a. Limitations. Under state law, a Village may not limit the number of community living arrangements so long as the total capacity of such facilities does not exceed 25 or one percent of the Village’s population, whichever is greater. When that threshold is exceeded, the Village Board may prohibit additional community living arrangements from being located in the Village. Additionally, when the capacity of community living arrangements in a ward reaches 25 or one percent of the population, whichever is greater, the Village Board may prohibit additional community living arrangements from being located in the ward. A foster home or a foster treatment home that is the primary domicile of a foster parent or foster treatment parent and that is licensed under § 48.62, Wis. Stats., and an adult family home certified under § 50.032 (lm)(b), Wis. Stats., are exempt from this provision.[1] b. Periodic review of existing facilities. Not less than 11 months but not more than 13 months after the first licensure of an adult family home under § 50.033, Wis. Stats., or of a community living arrangement and every year thereafter, the Village Board may make a determination pursuant to § 59.69 (15)(j), Wis. Stats., as to the effect of such facility on the health, safety, or welfare of residents of the municipality. If the Village Board determines such facility poses a threat to the health, safety, or welfare of the residents of the municipality, the Village Board may order such facility to cease operation or obtain a conditional use permit to continue operation. Such facility must cease operation within 90 days after date of the order, or the date of final judicial review of the order, or the date of the denial of a conditional use permit, whichever is later. The fact that an individual with acquired immunodeficiency syndrome or a positive test for the presences of HIV, as defined in § 252.01 (1M), Wis. Stats., antigen or nonantigenic products of HIV or an antibody to HIV resides in a community living arrangement with a capacity of 8 or fewer persons may not be used under this subsection to assert or prove that the existence of the community living Page 60 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-26 arrangement in the community poses a threat to the health, safety, or welfare of the residents of the Village.[1] Editorial notes: [1] See § 62.23, Wis. Stats. 50-507 Expiration of an approval a. Commencement of work. An approval for a community living arrangement automatically expires 12 months from the date of the decision unless substantial work, as authorized by the approval, has commenced. Upon petition and with cause, the Zoning Administrator may grant a one-time extension of up to 12 additional months if (1) the property owner submits a written request to the Administrator before the original approval expires; (2) the property owner demonstrates that the failure to commence substantial work was due primarily to circumstances beyond their control; and (3) the project is in compliance with the zoning regulations in effect at the time the extension is requested. b. Completion of work. If substantial work, as authorized by the approval, begins within the initial time period but fails to progress in good faith toward completion, the Zoning Administrator should initiate the process to terminate the approval as outlined in Division 18 of this article. 50-508 Appeal An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-509 through 50-549 reserved DIVISION 8 RADIO BROADCAST FACILITY REVIEW 50-550 Generally The Village Board makes the following legislative findings regarding radio broadcast facilities: (1) Radio broadcast facilities provide an essential public communications service by transmitting radio and television signals to the general public. (2) Radio broadcast facilities support public safety, emergency communications, news, weather alerts, education, and other information that benefits the public. (3) The location, design, and construction of radio broadcast facilities can affect neighboring properties and the community and should be reviewed to minimize adverse impacts where consistent with state and federal law. (4) The Village has a legitimate interest in protecting the public health and safety through reasonable land- use regulations governing radio broadcast facilities. (5) The development standards in this code that apply to radio broadcast facilities relate to the Village’s public health and safety concerns and do not prohibit or have the effect of prohibiting radio broadcast facilities in the Village. (6) The review of radio broadcast facilities must be conducted in a manner consistent with § 66.0406, Wis. Stats., and other applicable state and federal laws. 50-551 Review procedure The general steps outlined below describe the process for reviewing an application for a new radio broadcast facility and amendments to a previously approved facility. 1. Pre-submittal meeting. The applicant or their agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. Page 61 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-27 2. Submittal of application materials. The applicant submits a completed application to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule 5. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 6. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 7. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing to review the application consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare any documents it deems necessary. 8. Plan Commission decision. After the public hearing has been closed, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the radio broadcast facility, (ii) approve the radio broadcast facility, or (iii) deny the radio broadcast facility. 9. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 10. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-552 Basis of decision A radio broadcast facility may only be denied based on the Village’s public health or safety concerns.[1] If the Village denies the petitioner’s application, the Village must provide substantial written evidence that supports its reasons for the denial. Editorial notes: [1] See § 66.0406 (4), Wis. Stats. 50-553 Imposition of conditions a. Generally. When approving a radio broadcast facility, the Plan Commission may impose conditions it deems necessary to support the intent and purpose of this chapter. b. Effect on contracts with another party. The review authority may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. Page 62 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-28 50-554 Effect of approval An approval of a radio broadcast facility runs with the land and is binding on all future property owners. 50-555 Expiration of an approval a. Commencement of work. An approval for a radio broadcast facility automatically expires 24 months from the date of the decision unless substantial work, as authorized by the approval, has commenced. Upon petition and with cause, the Zoning Administrator may grant a one-time extension of up to 12 additional months if (1) the property owner submits a written request to the Administrator before the original approval expires; (2) the property owner demonstrates that the failure to commence substantial work was due primarily to circumstances beyond their control; and (3) the project is in compliance with the zoning regulations in effect at the time the extension is requested. b. Completion of work. If substantial work, as authorized by the approval, begins within the initial time period but fails to progress in good faith toward completion, the Zoning Administrator may initiate the process to terminate the approval as outlined in Division 18 of this article. 50-556 Appeal An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-557 through 50-574 reserved DIVISION 9 SITE PLAN REVIEW 50-575 Generally The operational characteristics of a land use and the way in which a land use occupies a lot has a direct effect on the overall functionality of the site, the extent to which the land use can be expanded on the site in the future, effects of the land use on nearby properties, and impacts on existing and anticipated public and private infrastructure. This division describes the requirements and procedures for reviewing a site plan. 50-576 Applicability Those land uses designated as requiring site plan review (SP) in the land use tables in Appendices A1 and A2 must comply with the requirements of this division. 50-577 Review procedure The general steps below describe the process for reviewing a site plan application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 3 months from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to Page 63 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-29 4. process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 5. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 6. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 7. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. 8. Decision. After considering the information submitted by the applicant and the staff report, if any, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the site plan, (ii) approve the site plan with conditions, or (iii) deny the site plan. 9. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 10. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-578 Basis of decision The Plan Commission, in making its decision, should consider the following factors, as applicable: (1) effects of the project on traffic safety and efficiency and pedestrian circulation, both on-site and off-site; (2) effects of the project on the natural environment; (3) effects of the project on surrounding properties; (4) actions the applicant will undertake to mitigate the negative effects, if any, of the proposed land use; (5) compliance with the general site design principles and requirements in Article 19; (6) compliance with the landscaping requirements in Article 20; (7) compliance with the parking requirements in Article 21; (8) compliance with the outdoor lighting requirements in Article 22; (9) compliance with other applicable requirements of this chapter; and General Flowchart for Site Plan Review Page 64 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-30 (10) any other factor that relates to the purposes of this chapter set forth in § 50-05 or as allowed by state law. 50-579 Imposition of conditions a. Generally. In approving a site plan, the Plan Commission may impose one or more conditions deemed necessary to further the intent and purposes of this chapter. Such conditions, for example, may relate to landscaping and screening, and revisions to the site design. b. Effect on contracts with another party. The Plan Commission may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-580 Staff report content The staff report should include the following: (1) a description of the proposed project, (2) preliminary findings for the decision criteria listed in this division, (3) a preliminary recommendation for approval or denial, (4) a preliminary list of conditions whether the preliminary staff recommendation is for approval or denial, and (5) other information deemed necessary. 50-581 Content of decision document a. Approval. If the application for a site plan is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the site plan is approved; (2) a description of the land use along with operational characteristics; (3) reasons for the decision based on the criteria listed in this division; (4) conditions of approval, if any; (5) a statement indicating that the property owner and operator, if different, must sign the decision document and return it to the Zoning Administrator to acknowledge acceptance of the same; (6) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (7) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (8) other information the Plan Commission or Zoning Administrator deems appropriate; (9) the signature of the Plan Commission chairperson; and (10) the date of the decision. b. Denial. If the application for a site plan is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the site plan is denied, (2) a description of the land use, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant’s ability to resubmit a revised application for consideration, (5) a statement that the decision may be appealed as provided for in this division, Page 65 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-31 (6) other information the Plan Commission or Zoning Administrator deems appropriate, (7) the signature of the Plan Commission chairperson, and (8) the date of the decision. 50-582 Effect of approval The approval of a site plan runs with the land and is binding on all future property owners. 50-583 Expiration of an approval An approval of a site plan automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 12 months, provided (1) the permit holder requests the extension prior to the expiration of the permit, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. 50-584 Amendment of an approved site plan a. Generally. The property owner may submit an application to propose a change to a previously issued site plan approval. b. Minor change. If the Zoning Administrator determines the proposed change to the approval is minor, the Administrator is authorized to review and act on the petition with notice to the Plan Commission. c. Major change. If the Zoning Administrator determines the proposed change to the approval is major, the review procedure in effect at the time of submittal must be followed. 50-585 Appeal a. Plan Commission decision. An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. b. Administrative decision regarding amendment. An aggrieved person may appeal the Zoning Administrator’s decision made pursuant to § 50-584 (b) by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-586 through 50-599 reserved DIVISION 10 ARCHITECTURAL PLAN REVIEW 50-600 Generally Architectural review is intended to promote high-quality building design and site development that contributes to the visual character of the Village by ensuring that new construction, additions, and exterior alterations are compatible with surrounding development and comply with the architectural and design standards established in this code. 50-601 Applicability Those land uses designated as requiring architectural review in the land use tables in Appendices A1 and A2 must comply with the requirements of this division. The exterior of an existing building designated as requiring architectural review may be resided or re-roofed with the same or similar type of materials. Page 66 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-32 50-602 Review procedure The general steps below describe the process for reviewing an architectural plan application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. 5. Plan Commission meeting. Allowing for proper notice, the Plan Commission considers the application at a regular or special meeting. 6. Decision. After considering the information submitted by the applicant and the staff report, if any, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the architectural plan, (ii) approve the architectural plan with conditions, or (iii) deny the architectural plan. 7. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Commission. 8. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-603 Basis of decision The Plan Commission in making its decision should determine whether the building complies with all applicable provisions of this chapter. General Flowchart for Architectural Plan Review Page 67 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-33 50-604 Imposition of conditions a. Generally. In approving an architectural plan, the Plan Commission may impose one or more conditions deemed necessary to further the intent and purposes of this chapter. b. Effect on contracts with another party. The review authority may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-605 Content of decision document a. Approval. If the architectural plan is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the architectural plan is approved; (2) a description of the project; (3) reasons for the decision based on the criteria listed in this division; (4) conditions of approval, if any; (5) if one or more conditions of approval are imposed, a statement indicating that the property owner must sign the decision document and return it to the Zoning Administrator to acknowledge acceptance of the same; (6) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (7) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (8) other information the Plan Commission or administrator deems appropriate; the signature of the Plan Commission chairperson; and (9) the date of the decision. b. Denial. If the architectural plan is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the architectural plan is denied, (2) a description of the project, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant’s ability to resubmit a revised application for consideration, (5) a statement that the decision may be appealed as provided for in this division, (6) other information the Plan Commission or Zoning Administrator deems appropriate, (7) the signature of the Plan Commission chairperson; and (8) the date of the decision. 50-606 Effect of approval An approval of an architectural plan runs with the land and is binding on all future property owners. 50-607 Expiration of an approval An approval of an architectural plan automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 12 Page 68 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-34 months, provided (1) the permit holder requests the extension prior to the expiration of the permit, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. 50-608 Amendment of an approved architectural plan a. Generally. The property owner may submit an application to propose a change to a previously issued architectural plan approval. b. Minor change. If the Zoning Administrator determines the proposed change to the approval is minor, the Administrator is authorized to review and act on the petition with notice to the Plan Commission. c. Major change. If the Zoning Administrator determines the proposed change to the approval is major, the review procedure in effect at the time of submittal must be followed. 50-609 Appeal a. Plan Commission decision. An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. b. Administrative decision regarding amendment. An aggrieved person may appeal the Zoning Administrator’s decision made pursuant to § 50-608 (b) by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-610 through 50-624 reserved DIVISION 11 ADMINISTRATIVE ADJUSTMENT 50-625 Generally Upon written petition, the Zoning Administrator may, on a case-by-case basis, approve an administrative adjustment, but only for development standards identified in this chapter as eligible for an administrative adjustment. 50-626 Review procedure The general steps below describe the process for reviewing an administrative adjustment application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. Page 69 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-35 4. Decision. When the Zoning Administrator determines the application is complete, they will make a decision to (i) approve the administrative adjustment, (ii) approve the administrative adjustment with conditions, or (iii) deny the administrative adjustment. 5. Applicant notification. Within a reasonable time following their decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-627 Basis of decision The Zoning Administrator, in making their final decision, should consider the following factors, as applicable: (1) the size of the property in comparison to other properties in the area; (2) the extent to which the issuance of the administrative adjustment would be in keeping with the overall intent of this chapter; (3) whether there are any unique circumstances and the nature of those circumstances that warrant the issuance of the administrative adjustment; (4) the nature and extent of anticipated impacts to the natural environment that could potentially occur if the administrative adjustment was granted; (5) the nature and extent of anticipated positive and negative effects on properties in the area; (6) actions the applicant will undertake to mitigate the negative effects, if any, of the proposed administrative adjustment; (7) a factor specifically listed under a section of this chapter authorizing the issuance of a administrative adjustment; and (8) any other factor that relates to the purposes of this chapter set forth in § 50-05 or as allowed by state law. 50-628 Imposition of conditions a. Generally. In approving an administrative adjustment, the Zoning Administrator may impose one or more conditions deemed necessary to further the intent and purposes of this chapter. b. Effect on contracts with another party. The review authority may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-629 Expiration of an approval a. Project involving construction. For a project involving any construction, an administrative adjustment automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 12 months, provided (1) the permit holder requests the extension prior to the expiration of the permit, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. b. Change in use. For a change in use, the administrative adjustment automatically expires 4 months after the date of issuance if the applicant does not move into the vacant space. 50-630 Appeal An aggrieved person may appeal the Zoning Administrator’s decision by filing an appeal with the Plan Commission within 30 days of the date of that decision. Page 70 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-36 50-631 through 50-649 reserved DIVISION 12 SPECIAL EXCEPTION 50-650 Generally Upon written petition, the Plan Commission may, on a case-by-case basis, approve a special exception, but only for development standards identified in this chapter as eligible for a special exception. 50-651 Review procedure The general steps below describe the process for reviewing a special exception application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 5. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 6. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. General Flowchart for Special Exception Page 71 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-37 7. Plan Commission meeting. Allowing for proper notice, the Plan Commission considers the application at a regular or special meeting. 8. Decision. After considering the information submitted by the applicant and the staff report, if any, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the special exception, (ii) approve the special exception with conditions, or (iii) deny the special exception. 9. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 10. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-652 Basis of decision The Plan Commission, in making its decision, should consider the following factors, as applicable: (1) the size of the property in comparison to other properties in the area; (2) the extent to which the issuance of the special exception would be in keeping with the overall intent of this chapter; (3) whether there are any unique circumstances and the nature of those circumstances that warrant the issuance of the special exception; (4) the nature and extent of anticipated impacts to the natural environment that could potentially occur if the special exception was granted; (5) the nature and extent of anticipated positive and negative effects on properties in the area; (6) actions the applicant will undertake to mitigate the negative effects, if any, of the proposed special exception; (7) a factor specifically listed under a section of this chapter authorizing the issuance of a special exception; and (8) any other factor that relates to the purposes of this chapter set forth in § 50-05 or as allowed by state law. 50-653 Imposition of conditions a. Generally. In approving a special exception, the Plan Commission may impose one or more conditions deemed necessary to further the intent and purposes of this chapter. b. Effect on contracts with another party. The review authority may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-654 Limitations on issuing a special exception A special exception can only be approved in those instances where issuance is specifically authorized in this chapter. 50-655 Staff report content The staff report should include the following: (1) a description of the requested special exception, (2) preliminary findings for the decision criteria listed in this division, (3) a preliminary recommendation for approval or denial, Page 72 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-38 (4) a preliminary list of conditions whether the preliminary staff recommendation is for approval or denial; and (5) other information deemed necessary. 50-656 Content of decision document a. Approval. If the application for a special exception is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the special exception is approved; (2) a description of the special exception; (3) reasons for the decision based on the criteria listed in this division; (4) conditions of approval, if any; (5) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (6) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (7) other information the Plan Commission or Zoning Administrator deems appropriate; (8) the signature of the Plan Commission chairperson; and (9) the date of the decision. b. Denial. If the application for a special exception is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the special exception is denied, (2) a description of the special exception, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant’s ability to resubmit a revised application for consideration, (5) a statement that the decision may be appealed as provided for in this division, (6) other information the Plan Commission or Zoning Administrator deems appropriate, (7) the signature of the Plan Commission chairperson, and (8) the date of the decision. 50-657 Effect of approval An approval of a special exception runs with the land and is binding on all future property owners. 50-658 Expiration of an approval An approval for a special exception automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 12 months, provided (1) the permit holder requests the extension prior to the expiration of the permit, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. 50-659 Appeal An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. Page 73 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-39 50-660 through 50-674 reserved DIVISION 13 EXPANSION OF A NONCONFORMING BUILDING 50-675 Generally A nonconforming building (e.g., a building built too close to a lot line) with a conforming use may be expanded in compliance with all requirements of the zoning code and with the procedures and requirements of this division. 50-676 Review procedure The general steps below describe the process for reviewing an application to expand a nonconforming building. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 5. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 6. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. 7. Plan Commission meeting. Allowing for proper notice, the Plan Commission considers the application at a regular or special meeting. 8. Decision. The Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the expansion, (ii) approve the expansion with conditions, or (iii) deny the expansion. 9. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division. 10. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 11. Recording of decision document. When approval is granted, the decision document is recorded with the Washington County Register of Deeds Office. 50-677 Basis of decision The Plan Commission, in making its decision, should consider the following factors, as applicable: Page 74 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-40 (1) the degree of the existing nonconformity (i.e., 1 foot into the setback or 1 foot from the lot line), (2) the size and configuration of the lot, (3) whether the lot conforms to the dimensional standards of the zoning district in which it is located, (4) the size and location of the existing nonconforming building, (5) the size and location of other existing structures and those structures reasonably anticipated on the lot, (6) the impact, if any, that the expansion may have on adjoining properties, (7) whether the proposed expansion would violate the intent of this chapter, and (8) any other factor that relates to the purposes of this chapter set forth in § 50-05 or as allowed by state law. 50-678 Imposition of conditions a. Generally. In approving an expansion of a nonconforming building, the Plan Commission may impose one or more conditions of approval deemed necessary to further the intent and purposes of this chapter. Such conditions, for example, may relate to landscaping, screening, and the maximum size of the building(s), or impose limitations on additional buildings otherwise allowed on the subject property under the applicable zoning district regulations. b. Effect on contracts with another party. The Plan Commission may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-679 Content of decision document a. Approval. If the application for an expansion of a nonconforming building is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the building expansion is approved; (2) a description of the building project; (3) reasons for the decision based on the criteria listed in this division; (4) conditions of approval, if any; (5) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (6) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (7) other information the Plan Commission or Zoning Administrator deems appropriate; (8) the signature of the Plan Commission chairperson; and (9) the date of the decision. b. Denial. If the application for expansion of a nonconforming building is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the building expansion is denied, (2) reasons for the decision based on the criteria listed in this division, (3) a statement indicating that the denial does not limit the applicant’s ability to resubmit a revised application for consideration, (4) a statement that the applicant may appeal the decision to a court of competent jurisdiction, (5) other information the Plan Commission or Zoning Administrator deems appropriate, (6) the signature of the Plan Commission chairperson, and Page 75 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-41 (7) the date of the decision. 50-680 Effect of decision An approval of an expansion of a nonconforming building runs with the land and is binding on all future property owners. 50-681 Expiration of an approval An approval to expand a nonconforming building automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 12 months, provided (1) the permit holder requests the extension prior to the expiration of the permit, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. 50-682 Appeal An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-683 through 50-699 reserved DIVISION 14 REGISTRATION OF A NONCONFORMING USE 50-700 Generally Some existing land uses may not comply with current zoning regulations but were legally established under regulations in effect at the time. These are known as nonconforming uses and, under Article 24, may continue to operate within defined parameters. To confirm the legal status of these uses and help prevent future disputes, property owners are encouraged to register their nonconforming use. Registration creates a record that shows (1) when the use was first established; (2) that the use was established consistent with the rules and regulations in effect at the time, if any; (3) that the use has operated continuously, without cessation of more than 12 continuous months; and (4) the nature of the use. 50-701 Initiation Any of the following may submit an application to determine whether a use should be registered as a nonconforming use: (1) a person having a financial interest in the property or in the use occurring on the property; (2) the Village Board, or any member of the council; (3) the Plan Commission, or any member of the commission; and (4) the Zoning Administrator. 50-702 Review procedure The general steps below describe the process for reviewing an application to register a nonconforming use. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent must meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. The Zoning Administrator may waive the requirement to Page 76 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-42 hold a pre-submittal meeting when they determine the meeting is not necessary given the nature of the project and/or the extent to which the applicant understands the Village’s zoning requirements. 2. Submittal of application materials. The applicant submits a completed application to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 5. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 6. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 7. Special notice to property owner. If the application process is not initiated by the property owner, the Zoning Administrator sends a written notice to the property owner by regular and certified mail at least 60 days prior to the date of the Plan Commission meeting. The notice shall invite the property owner to submit evidence relating to the pending determination. In addition, the notice should state (i) the reasons why the application has been submitted; (ii) the date and time of the meeting; (iii) contact information for the Zoning Administrator; and (iv) other information deemed appropriate by the Zoning Administrator. 8. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing to review the application consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 9. Staff follow-up. After the close of the public hearing, the Plan Commission may direct the Zoning Administrator to prepare a preliminary decision document. 10. Plan Commission decision. The Plan Commission determines whether it has sufficient evidence to make a final decision, and if so whether the use should or should not be classified as a nonconforming use. 11. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 12. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the property owner by regular mail and/or email. 13. Inclusion in registry. If the use is determined to be a nonconforming use, the Zoning Administrator will include the nonconforming use in the registry authorized in Article 6. 14. Recording of decision document. The decision document is recorded, at the applicant’s expense, with the Washington County Register of Deeds Office. 50-703 Basis of decision In making its decision, the Plan Commission will determine whether there is sufficient evidence to show that (1) the use in question was legally established; (2) the use does not now comply with one or more of the requirements of this chapter; and (3) the use has continued from the date, or approximate date, of establishment to the current date without an interruption of more than 12 continuous months. Page 77 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-43 50-704 Content of decision document a. Approval. If the application for registering a nonconforming use is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the application is approved, (2) a description of the use, (3) reasons for the decision based on the criteria listed in this division, (4) a statement that the applicant may appeal the decision as provided for in this division, (5) other information the Plan Commission or the Zoning Administrator deems appropriate, (6) the signature of the Plan Commission chairperson, and (7) the date of the decision. b. Denial. If the application for registering a nonconforming use is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the application is denied, (2) a description of the use, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant’s ability to resubmit a revised application for consideration, (5) a statement that the applicant may appeal the decision as provided for in this division, (6) other information the Plan Commission or the Zoning Administrator deems appropriate, (7) the signature of the Plan Commission chairperson, and (8) the date of the decision. 50-705 Effect of decision If the Plan Commission determines that a land use meets the criteria for a nonconforming use, such decision constitutes documentary evidence establishing the legitimacy and nature of the use as a nonconforming use. 50-706 Appeal An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-707 through 50-724 reserved DIVISION 15 CONVERSION OF A NONCONFORMING USE 50-725 Generally An existing nonconforming use (e.g., a tavern in a residential district) which has been registered as a nonconforming use, pursuant to Division 14 of this article, may be converted to another nonconforming use provided the new use is less nonconforming (e.g., from a tavern to a restaurant). 50-726 Review procedure The general steps below describe the process for reviewing an application for the conversion of a nonconforming use. Page 78 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-44 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent must meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. The Zoning Administrator may waive the requirement to hold a pre-submittal meeting when they determine the meeting is not necessary given the nature of the project and/or the extent to which the applicant understands the Village’s zoning requirements. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Plan Commission consistent with the commission’s meeting schedule. 5. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. 6. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notice, and (iii) meeting agenda notice. 7. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing consistent with Article 4. Prior to the close of the public hearing, the applicant or Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 8. Decision. After the public hearing has been closed, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the conversion, (ii) approve the conversion with conditions, or (iii) deny the conversion. In making its determination, the Commission will consider the information submitted by the applicant, any comments made at the public hearing, and the staff report, if any. 9. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. If approved, the Zoning Administrator shall also prepare a conversion order. 10. Applicant notification. If the application is denied, the Zoning Administrator, within a reasonable time following the Plan Commission’s decision, sends the decision document to the applicant by regular mail and/or email. 11. Acceptance by property owner. If the application is approved, the property owner must sign the conversion order to acknowledge the terms of the approval and return the same to the Zoning Administrator within 4 months of the decision. Prior to the expiration of the previously specified time period, the property owner may submit a petition to the Zoning Administrator requesting an extension and the Zoning Administrator may, with cause, extend the period within which the decision document must be signed. If the signed decision document is not returned within the initial or extended time period, if any, the decision shall automatically become null and void without any further action by the Village at the expiration of such time limit. 12. Recording of decision document. If the property owner signs the approved conversion order, the conversion order is recorded, at the applicant’s expense, with the Washington County Register of Deeds Office. Page 79 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-45 50-727 Basis of decision The Plan Commission, in making its decision, should compare the known and anticipated impacts of the existing nonconforming use on properties in the area and those of the proposed nonconforming use. The Plan Commission may not approve a conversion when the proposed nonconforming use would be more of a nonconformity than the existing nonconforming use. 50-728 Imposition of conditions a. Generally. In approving a conversion, the Plan Commission may impose one or more conditions deemed necessary to further the intent and purposes of this chapter. Such conditions, for example, may relate to landscaping and screening, outdoor lighting, and hours of operation. b. Effect on contracts with another party. The Plan Commission may not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying, extending, or renewing any contract, with a third party under which the third party is engaging in a lawful use of the property.[1] Editorial notes: [1] See § 62.23 (7)(gm), Wis. Stats. The Village, for example, could not require an applicant to terminate an existing contract with another party that is engaged in a lawful use of the property. 50-729 Staff report content The staff report should include the following: (1) a description of the requested conversion, (2) preliminary findings for the decision criteria listed in this division, (3) a preliminary recommendation for approval or denial, (4) a preliminary list of conditions whether the preliminary staff recommendation is for approval or denial; and (5) other information deemed necessary. 50-730 Content of decision document a. Approval. If the application for a conversion is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the conversion is approved; (2) a description of the new nonconforming use; (3) a statement indicating that the property owner must sign the conversion order and return it to the Zoning Administrator; (4) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (5) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (6) other information the Plan Commission or Zoning Administrator deems appropriate; (7) the signature of the Plan Commission chairperson; (8) the date of the decision; and (9) the copy of the conversion order described in § 50-731. b. Denial. If the application for a conversion is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the application is denied, (2) a description of the proposed conversion, (3) reasons for the decision based on the criteria listed in this division, Page 80 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-46 (4) a statement indicating that the denial does not limit the applicant’s ability to resubmit a revised application for consideration, (5) a statement that the decision may be appealed as provided for in this division, (6) other information the Plan Commission or Zoning Administrator deems appropriate, (7) the signature of the Plan Commission chairperson, and (8) the date of the decision. 50-731 Content of conversion order If the conversion is approved, a conversion order must be prepared and adopted. The conversion order must include (1) a description of the subject property’s location (e.g., address, parcel number, reference to a parcel in a certified survey map or subdivision plat); (2) a description of the existing and of the new nonconforming use; (3) conditions of approval, if any; and (4) other provisions deemed necessary given the nature of the conversion. 50-732 Effect of approval An approval of a conversion runs with the land and is binding on all future property owners. 50-733 Expiration of an approval If the Zoning Administrator determines that substantial work as authorized by a conversion approval did not commence within 12 months of the date of approval or if substantial work did commence within 12 months of the date of approval but has not continued in good faith to completion, they must initiate the process to terminate the approval pursuant to Division 18 of this article. Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed 6 months. 50-734 Amendment of an approved conversion a. Generally. The property owner may submit an application to propose a change to a previously issued approval of a conversion. b. Minor change. If the Zoning Administrator determines the proposed change to the approval is minor, the Administrator is authorized to review and act on the petition with notice to the Plan Commission. c. Major change. If the Zoning Administrator determines the proposed change to the approval is major, the review procedure in effect at the time of submittal must be followed. 50-735 Appeal a. Plan Commission decision. An aggrieved person may appeal the Plan Commission’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. b. Administrative decision regarding amendment. An aggrieved person may appeal the Zoning Administrator’s decision made pursuant to § 50-734 (b) by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-736 through 50-749 reserved DIVISION 16 ZONING PERMIT 50-750 Generally Those land uses designated as requiring a zoning permit in the land use tables in Appendices A1 and A2 must comply with the requirements of this division. Page 81 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-47 50-751 Review procedure The general steps below describe the process for reviewing a zoning permit application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to 4. process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 5. Decision. When the Zoning Administrator determines the application is complete, they will make a decision to (i) approve the zoning permit, (ii) approve the zoning permit with conditions, or (iii) deny the zoning permit. 6. Applicant notification. Within a reasonable time following their decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-752 Basis of decision In determining whether to issue a zoning permit or deny the permit, the Zoning Administrator must determine whether the proposed use is consistent with (1) any prior approvals, such as a conditional use approval, (2) this chapter, and (3) other provisions of the municipal code. 50-753 Expiration of an approval a. Project involving construction. For a project involving any construction, a zoning permit automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion. Upon petition and with cause, the Zoning General Flowchart for Zoning Permit Page 82 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-48 Administrator may grant a one-time extension, not to exceed 12 months, provided (1) the permit holder requests the extension prior to the expiration of the permit, (2) the permit holder clearly demonstrates that circumstances beyond their control prevented the start of construction and the continuation of the same, and (3) the project complies with this chapter in effect at the time the extension is granted. b. Change in use. For a change in use, the zoning permit automatically expires 4 months after the date of issuance if the applicant does not move into the vacant space. 50-754 Appeal An aggrieved person may appeal a final decision made pursuant to this division by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-755 through 50-774 reserved DIVISION 17 OCCUPANCY PERMIT 50-775 Generally An occupancy permit is required prior to the occupancy or use of any building, structure, or land under the following circumstances: (1) Completion of construction of a new building or structure. (2) Completion of an addition or alteration of a new building or structure. (3) Establishment of a new land use. (4) A change in use or occupancy of an existing building or site. (5) Any other circumstance where compliance with this zoning code must be verified before occupancy. For the purposes of this code, a change in occupancy occurs when a new owner or tenant occupies an existing building or continues the use of land without changing the nature of the permitted use. A change in use occurs when an existing building, structure, or land, or any portion thereof, is established for a different use than the use that previously occupied the building, structure, or site. 50-776 Inspection and issuance Prior to issuance of an occupancy permit by the Zoning Administrator, the Building Inspector, Public Works Director, Fire Chief, Zoning Administrator, and other Village officials as appropriate must verify that the building, structure, site, or use complies with (1) any prior approvals, such as architectural plans, site plans reviews, (2) this chapter, and (3) other provisions of the municipal code or the previous use has ceased for 12 months or more. 50-777 Temporary occupancy permit Pending the issuance of a regular permit, the Building Inspector or Zoning Administrator may issue a temporary occupancy permit allowing occupancy for no more than 6 months prior to completion of all required improvements, provided that the incomplete items do not pose a safety risk and the applicant agrees to complete the remaining work within a specified period of time. 50-778 Appeal An aggrieved person may appeal a final decision made pursuant to this division by filing an appeal with the Plan Commission within 30 days of the date of that decision. 50-779 through 50-799 reserved Page 83 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-49 DIVISION 18 TERMINATION OF APPROVAL 50-800 Generally There are certain situations when the approval for a land use may be terminated. This division describes the procedures for terminating an approved use. 50-801 Initiation a. Voluntary termination of a conditional use. The property owner may submit an application to terminate a conditional use approval for their property. b. Involuntary termination of conditional use approval due to cessation. The Zoning Administrator may submit an application to terminate a conditional use approval when they determine the land use authorized by such approval has ceased to operate for more than 12 months. c. Involuntary termination of a conditional use approval due to violation. The Zoning Administrator may submit an application to terminate a conditional use approval when they determine that the property owner has violated one or more conditions of approval and satisfactory action has not been taken to correct the violation. d. Involuntary termination of a specified land use due to cessation. The Zoning Administrator may submit an application to terminate an approved land use when they determine that such use is no longer in use for the time period specified for such use. e. Involuntary termination due to stoppage of work. The Zoning Administrator may submit an application to terminate an approval if work authorized by the approval has commenced but has not continued in good faith to completion. f. Involuntary termination of a nonconforming use. The Zoning Administrator may submit an application to terminate a nonconforming use when they determine that such use is having a significant harmful effect on the public health, safety, and welfare or the nonconforming use has ceased to operate for the period of time required by this chapter to retain designation as a nonconforming use. 50-802 Review procedure for voluntary termination The general steps below describe the process for reviewing an application to voluntarily terminate an approval of a land use authorized under this chapter. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant’s agent may meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. 5. Meeting. Allowing for proper notice, the Plan Commission considers the application at a regular or special meeting. Page 84 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-50 6. Decision. The Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the termination, (ii) approve the termination with conditions, or (iii) deny the termination. 7. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Plan Commission. 8. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 9. Administrative steps. If the application is approved, the Zoning Administrator updates any Village records to indicate that the use as specified in the application has been terminated. 50-803 Review procedure for involuntary termination The general steps below describe the process for reviewing an application to involuntarily terminate an approval of a land use authorized under this chapter. 1. Report. The Zoning Administrator prepares a report describing the reasons why the approval should be terminated. 2. Review date. The Zoning Administrator schedules the review with the Plan Commission consistent with the commission’s meeting schedule. 3. Special notice to property owner. The Zoning Administrator sends a written notice to the property owner by regular and certified mail at least 30 days prior to the date of the public hearing. The notice should state (i) the reasons why the Zoning Administrator has submitted an application to terminate the specified use; (ii) the date and time of the public hearing; (iii) contact information for the Zoning Administrator, including telephone number; and (iv) other information deemed appropriate by the Zoning Administrator. If the action is intended to terminate an approval for a violation, the notice should also state the alleged violation along with supporting evidence. If the action is intended to terminate an inactive land use, the notice should also state the time period when the land use was not in use along with any supporting evidence. 4. General public notice. Consistent with Article 4, the Zoning Administrator provides for a class 2 public notice, property owner notice, and meeting agenda notice. 5. Public hearing. Allowing for proper notice, the Plan Commission conducts a public hearing consistent with Article 4. Prior to the close of the public hearing, the applicant or the Plan Commission may request a continuance. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 6. Plan Commission recommendation. After the public hearing has been closed, the Plan Commission makes a recommendation to the Village Board, based on the decision criteria in this division, to (i) approve the termination, (ii) approve the termination with conditions, or (iii) deny the termination. In making its determination, the Commission will consider the information submitted by the applicant, any comments made at the public hearing, and the staff report, if any 7. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Village Board. 8. Village Board meeting. Allowing for proper notice, the Village Board considers the application at a regular or special meeting. 9. Decision. After considering the information submitted by the applicant, public comments received at the public hearing, and the staff report, if any, the Village Board makes a decision, based on the decision criteria in this division, to (i) approve the termination, (ii) approve the termination with conditions, or (iii) deny the termination. 10. Preparation of decision document. Based on the action of the Village Board, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Village Board. 11. Applicant notification. Within a reasonable time following the Village Board’s decision, the Zoning Administrator sends the decision document to the property owner by regular mail and/or email. Page 85 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-51 12. Administrative steps. If the application is approved, the Zoning Administrator updates any Village records to indicate that the use as specified in the application has been terminated. 50-804 Basis of decision The Plan Commission, in making their recommendation, and the Village Board, in making their decision, should consider the following factors, as applicable: (1) the nature of those buildings or other structures, if any, on the subject property that relate to the use and the extent to which they are or are not otherwise permitted in the district in which the subject property is located; (2) effects of the existing use on surrounding properties, including detriment to the full and complete use of such properties and potential for concerns related to possible nuisances; (3) effects of the existing use on the normal and orderly development and improvement of the surrounding property for those uses permitted in the zoning district in which they are located; and (4) any other factor that relates to the purposes of this chapter as set forth in § 50-05 or as allowed by state law. 50-805 Content of decision document a. Approval. If the application to terminate an approval is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the specified use is terminated; (2) a description of the land use being terminated; (3) reasons for the decision based on the criteria listed in this division; (4) requirements for the removal of any building or other structure, if any, on the subject property that are related to the terminated use and that are not otherwise permitted in the zoning district in which the subject property is located; (5) a statement that the decision may be appealed as provided for in this division; (6) other information the Village Board or Zoning Administrator deems appropriate; (7) the signature of the Mayor; and (8) the date of the decision. b. Denial. If the application to terminate an approval is denied, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the specified use continues to be an approved use, (2) a description of the land use, (3) reasons for the decision based on the criteria listed in this division, (4) a statement that the decision may be appealed as provided for in this division, (5) other information the Village Board or Zoning Administrator deems appropriate, (6) the signature of the Mayor, and (7) the date of the decision. 50-806 Compliance with requirements of zoning district If the Village Board terminates an approval as allowed under this division, the property owner must bring the subject property into compliance with the permitted use regulations of the applicable zoning district. The Village Board may establish a timeframe it considers appropriate for achieving compliance. In setting this timeframe, the Village Board should consider (1) the nature of the required actions, (2) the estimated time needed to complete Page 86 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-52 the work, (3) any relevant weather conditions, and (4) any other relevant consideration. The compliance period must be no less than 30 days and no more than 12 months. 50-807 Appeal An aggrieved person may appeal the Village Board’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-808 through 50-824 reserved DIVISION 19 CODE INTERPRETATION 50-825 Generally When there is uncertainty or disagreement as to the intent or meaning of a provision in this chapter, a person can ask for a code interpretation. For example, the question may relate to (1) the zoning map, (2) a specific provision in the code, (3) how a specific provision in the code is applied in a specific instance, or (4) terms and conditions of an approval. This division describes the procedures and requirements to issue such interpretations. 50-826 Initiation Any person, including the Zoning Administrator, may submit a question for interpretation. 50-827 Limitations on interpretations The responsibility for issuing an interpretation may not be construed as overriding the responsibilities specifically given to any commission, board, or official named in any other part of this chapter. 50-828 Review procedure a. Zoning administrator review. The general steps below describe the process for reviewing a code interpretation application. 1. Submittal of question. The individual requesting the interpretation submits the question in writing to the Zoning Administrator and the application fee as may be established by the Village Board. 2. Decision. The Zoning Administrator makes a written decision within 60 days of when the petition was submitted. 3. Notification of decision. Within a reasonable time following completion of the interpretation, the Zoning Administrator sends a copy of the interpretation by regular mail and/or email to the individual requesting the interpretation and provides a copy of the same to the Plan Commission, the Village Attorney, and those Village employees and agents involved in the administration of this chapter, as appropriate. b. Plan Commission review on appeal. If a final decision of the Zoning Administrator is appealed as provided for in this division, the general steps below apply. 1. Submittal of application materials. The Zoning Administrator forwards the application and other materials the applicant submitted to the Plan Commission along with the administrator’s interpretation. 2. General notice. Consistent with Article 4, the Zoning Administrator places the matter on the meeting agenda of the Plan Commission. 3. Meeting. Allowing for proper notice, the Plan Commission considers the appeal at a regular or special meeting. 4. Decision. In consultation with the Village Attorney, the Plan Commission makes a written decision within 60 days of when the Zoning Administrator’s decision was appealed. Page 87 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-53 5. Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division and any direction provided by the Commission. 6. Applicant notification. Within a reasonable time following the Plan Commission’s decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 50-829 Basis of decision a. General. In consultation with the Village Attorney and others as appropriate, the review authority should (1) evaluate the section of this chapter in question and those that are related, (2) consider the purposes of this chapter set forth in § 50-05 and other parts of the chapter along with applicable legislative findings in this chapter, and (3) consider other applicable interpretations that have previously been made and make a decision consistent with this division giving this chapter its most reasonable application. If the review authority cannot make a reasonable interpretation, a determination will not be issued. b. Shoreland-wetland zoning. If an unclear provision relates to the shoreland-wetland regulations and is required by Ch. NR 117, Wis. Admin. Code, the provision must be interpreted in light of the standards in Ch. NR 117 in effect on the date of the adoption of this ordinance or in effect on the date of the most recent text amendment to this ordinance. c. Similarity of land uses. When deciding if a proposed land use is similar to one already allowed under this code, the Zoning Administrator should consider (1) the nature of the proposed use; (2) whether the proposed use is consistent with the Village’s comprehensive plan; (3) whether the proposed use is consistent with the purposes of each of the zoning districts where the similar use is allowed either by right or as a conditional use; and (4) any other factor deemed appropriate. 50-830 Repeal or revision of an interpretation The Zoning Administrator may rescind or modify a previously issued interpretation if it is later found to be incorrect, either in whole or in part. An interpretation may also be rescinded if this chapter is amended in a manner that addresses the issue or subject matter covered by the interpretation. 50-831 Interpretation content An interpretation must be in writing and should include the following: (1) the name of the person posing the question, (2) the section number of this chapter in question, (3) the question or alleged ambiguity, (4) the factors that were considered in making the interpretation, (5) the interpretation, (6) other information the review authority deems appropriate, (7) the signature of the Zoning Administrator, and (8) the date of decision. 50-832 Effect of interpretation Once an interpretation is made, it carries the same weight as if it were written into this chapter. If the Zoning Administrator decides that it is not possible to make a reasonable interpretation, that decision does not affect the validity of any part of this chapter. When appropriate, interpretations should be handled through the amendment process. Page 88 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-54 50-833 Compilation of interpretations The Zoning Administrator must keep a written record of all interpretations made after January 1, 2027 and make them available for public inspection during normal office hours. 50-834 Appeal a. Zoning administrator’s decision. An aggrieved person may appeal an interpretation made by the Zoning Administrator by filing an appeal with the Plan Commission without time constraint if the Zoning Administrator determines the interpretation applies broadly and is not specifically related to a particular development project or within 30 days of the date of the decision if the Zoning Administrator determines the interpretation applies specifically to a particular development project. b. Plan Commission’s decision. If the Zoning Administrator’s decision is appealed to the Plan Commission, the Plan Commission’s decision may also be appealed to a court of competent jurisdiction within 30 days of the date of that decision. 50-835 through 50-849 reserved DIVISION 20 ADMINISTRATIVE APPEAL 50-850 Generally In situations where a property owner or another aggrieved party believes the Zoning Administrator has made an error in making an administrative decision, they may submit an administrative appeal as set forth in this division unless otherwise specified in this chapter. 50-851 Review procedure The general steps below describe the process for reviewing an administrative appeal application. 1. Submittal of appeal. The applicant submits a written appeal to the Village Clerk within 30 days of the date of the administrative decision being appealed, unless a different timeframe is established. 2. Notification of appeal. The Village Clerk provides a copy of the appeal to the Zoning Board of Appeals and the Zoning Administrator. 3. Compilation and submittal of record. The Zoning Administrator compiles a complete and accurate record relating to the action being appealed and transmits it to the Zoning Board of Appeals in a timely manner. 4. Special notice to parties in interest. The chairperson of the Zoning Board of Appeals gives notice for the public hearing to the parties in interest, including the applicant and the Zoning Administrator. 5. Special notice to Wisconsin Department of Natural Resources. If the administrative appeal relates to a decision relating to the shoreland-wetland regulations in this chapter, the Zoning Administrator sends a copy of the application and public hearing notice to the regional office of the Wisconsin Department of Natural Resources by regular mail and/or email at least 10 days before the date of the public hearing. 6. General notice. The chairperson of the Zoning Board of Appeals provides for (i) a class 2 public notice and (ii) meeting agenda notice consistent with Article 4. Page 89 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-55 7. Public hearing. Allowing for proper notice, the Zoning Board of Appeals conducts a public hearing consistent with Article 4. Prior to the close of the public hearing, the applicant or the Zoning Board of Appeals may request a continuance consistent with Article 4. If the public hearing is adjourned, the Plan Commission may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 8. Decision. After the public hearing has been closed, the Zoning Board of Appeals makes a decision, based on the decision criteria in this division, to (i) affirm the Zoning Administrator’s decision, (ii) set aside the decision, or (iii) modify the decision. 9. Notification of decision. Within a reasonable time following the Zoning Board of Appeals’ decision, the Village Clerk sends the decision document to the applicant by regular mail and/or email and provides a copy of the same to the Zoning Administrator and the Plan Commission. 10. Notification to Department of Natural Resources. If the administrative appeal relates to a decision relating to the shoreland-wetland regulations in this chapter, the Village Clerk sends a copy of the decision document to the regional office of the Wisconsin Department of Natural Resources by regular mail and/or email. 50-852 Basis of decision a. Generally. The Zoning Board of Appeals must determine whether the Zoning Administrator made an error in judgment as applied to the instance being appealed. b. Historic property. In an action involves a historic property, as defined in § 44.31(3), Wis. Stats., the Zoning Board of Appeals must consider any suggested alternatives or recommendations submitted by the landmarks commission, if one has been established, or the Plan Commission. 50-853 Effect of appeal If an appeal involves an alleged violation of this code, it pauses all legal proceedings related to the action being appealed. However, if the Zoning Administrator certifies in writing to the Zoning Board of Appeals that, in their opinion, staying the proceedings would pose an imminent threat to life or property, the pause does not take effect unless a restraining order is issued. A restraining order may be granted by the Zoning Board of Appeals or a court of record, upon application and with notice to the Zoning Administrator. 50-854 Appeal An aggrieved person may appeal a final decision made pursuant to this division by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision. 50-855 through 50-874 reserved General Flowchart for Administrative Appeal Page 90 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-56 DIVISION 21 VARIANCE 50-875 Generally Recognizing that certain zoning regulations may cause unnecessary hardship to individual landowners if enforced strictly, the state legislature has established a mechanism allowing municipalities to issue a variance. This allows for a minor deviation from the regulations to alleviate the hardship, without undermining the overall intent of the municipality’s zoning laws. This division outlines the procedures and requirements for reviewing variance applications related to dimensional standards. 50-876 Review procedure The general steps below describe the process for reviewing a variance application. 1. Pre-submittal meeting. Before submitting an application, the applicant or the applicant's agent must meet with the Zoning Administrator and other Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. The Zoning Administrator may waive the requirement to hold a pre-submittal meeting when they determine the meeting is not necessary given the nature of the project and/or the extent to which the applicant understands the Village’s zoning requirements. 2. Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. 3. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. If it is not complete, the Zoning Administrator will notify the applicant in writing not more than 10 working days after submitting the application. The written notice must describe the nature of the noncompliance and state that the application will expire 60 days from the date of the notice if the noncompliance is not remedied. If the applicant submitted an application fee with their application, the fee is forfeited on the date the application expires. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authority from requesting additional information it deems appropriate. 4. Review date. When the Zoning Administrator determines the application is complete, they will schedule the review with the Zoning Board of Appeals consistent with the board’s meeting schedule. 5. Special notice to Department of Natural Resources. If the application relates to shoreland-wetland regulations in this chapter, the Zoning Administrator sends a copy of the application and public hearing notice to the regional office of the Wisconsin Department of Natural Resources via regular mail and/or email at least 10 days before the date of the public hearing. 6. General notice. Consistent with Article 4, the Zoning Administrator provides for (i) a class 2 public notice, (ii) property owner notification, and (iii) meeting agenda notice. General Flowchart for Variance Page 91 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-57 7. Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as described in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Zoning Board of Appeals, and any person upon request. 8. Public hearing. Allowing for proper notice, the Zoning Board of Appeals holds a public hearing consistent with Article 4. Prior to the close of the public hearing, the applicant or the board may request a continuance. If the public hearing is adjourned, the Zoning Board of Appeals may direct Village staff to conduct additional research and prepare such documents it deems necessary, including a preliminary decision document. 9. Decision. After the public hearing has been closed, the Zoning Board of Appeals makes a decision, based on the decision criteria in this division, to (i) approve the variance, (ii) approve the variance with conditions, or (iii) deny the variance. In making its determination, the Board will consider the information submitted by the applicant, any comments made at the public hearing, and the staff report, if any. The Zoning Board of Appeals may render its decision at the same meeting the public hearing is conducted or at a future meeting. 10. Preparation of decision document. Based on the action of the Zoning Board of Appeals, the Zoning Administrator and/or the Village Attorney prepares a decision document consistent with this division. 11. Applicant notification. Within a reasonable time following the Board of Zoning and Appeals’ decision, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email. 12. Notification to Department of Natural Resources. If the application relates to the shoreland-wetland regulations in this chapter, the Zoning Administrator sends a copy of the decision document to the regional office of the Wisconsin Department of Natural Resources via regular mail and/or email. 13. Additional procedural steps. If the Zoning Board of Appeals grants the variance, the applicant shall then follow other review procedures as may be required. 50-877 Basis of decision The Zoning Board of Appeals must base its decision on the standards for granting a variance as outlined in § 62.23(7)(e)(7), Wis. Stats., as well as relevant judicial interpretations of the statute. 50-878 Limitations on issuing a variance a. Prohibitions. The following actions may not be allowed by a variance: (1) expansion of a nonconforming use (e.g., expansion of area, increase in operational characteristics, etc.), or (2) modification to lot size requirements so as to increase the permitted density or intensity of use. b. Use variance. The Zoning Board of Appeals may not issue a variance to allow a use not otherwise permitted under this chapter except upon proof that there can be no reasonable use of the property absent a variance as described in § 62.23(7)(e), Wis. Stats.[1] c. Variance type. If there is a question as to whether a requested variance constitutes a dimensional variance or a use variance, the Zoning Board of Appeals has the authority to make a final determination. If a provision contains a number that is the basis for a variance application, the board should consider whether the number is used to control the scope of a land use (i.e., use variance) or to control the location of an otherwise permissible improvement on a property (i.e., dimensional variance). Editorial notes: [1] Although a municipality in Wisconsin may have the implicit authority to issue a use variance, the Village has determined that use variances should not be issued. 50-879 Imposition of conditions When approving a variance, the Zoning Board of Appeals may impose such conditions and restrictions it deems necessary to further the intent and purposes of this chapter. Page 92 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-58 50-880 Staff report content The staff report should include the following: (1) preliminary findings for the decision criteria listed in this division, (2) a preliminary recommendation for approval or denial, (3) a preliminary list of conditions for approval whether the preliminary staff recommendation is for approval or denial, and (4) other information deemed necessary. 50-881 Content of decision document a. Approval. If an application for a variance is approved, the decision document may include, but not necessarily be limited to, the following: (1) a statement that the variance is approved; (2) a description of the variance; (3) reasons for the decision based on the criteria listed in this division; (4) conditions of approval, if any; (5) a statement that the approval will automatically expire 12 months after the date of approval unless substantial work as authorized by the approval has commenced and continues in good faith to completion and that the Zoning Board of Appeals may, with cause, grant a one-time extension, not to exceed 6 months; (6) a statement that the applicant may appeal the decision to a court of competent jurisdiction; (7) a statement that an aggrieved person, other than the applicant, may appeal the decision and that any work done by the applicant as authorized by the approval is done at the applicant’s risk; (8) other information the Zoning Board of Appeals or Zoning Administrator deems appropriate; (9) the signature of the chairperson of the Zoning Board of Appeals; and (10) the date of the decision. b. Denial. If the application for a variance is denied, the decision may include, but not necessarily be limited to, the following: (1) a statement that the variance request is denied, (2) a description of the proposed variance, (3) reasons for the decision based on the criteria listed in this division, (4) a statement indicating that the denial does not limit the applicant's ability to resubmit a revised application for consideration provided there is a substantial change in the circumstances relating to the application, (5) a statement that the decision may be appealed as provided for in this division, (6) other information the Zoning Board of Appeals or Zoning Administrator deems appropriate, (7) the signature of the chairperson of the Zoning Board of Appeals, and (8) the date of the decision. 50-882 Effect of approval a. Generally. An approved variance merely sets aside the rule or regulation from which relief is sought. All other rules and regulations not part of the variance decision must be followed. An approval of a variance runs with the land and is binding on all future property owners. Page 93 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-59 b. Creation of nonconformity. If a variance is granted and creates a nonconforming situation, the premises is subject to all applicable provisions relating to nonconformities set forth in Article 24. 50-883 Effect of denial If the Zoning Board of Appeals denies a variance application, the board may not rehear the same, or essentially the same, application unless there has been substantial change in the circumstances relating to the application. Editorial notes: [1] See Tateoka v City of Waukesha Bd. of Zoning Appeals, 220 Wis.2d 656, 583 N.W. 2d 871 (Ct. App. 1998). 50-884 Expiration of an approval a. Commencement of work. A variance approval automatically expires 12 months after the date of the decision unless substantial work, as authorized by the approval, has commenced. Upon petition and with cause, the Zoning Administrator may grant a one-time extension of up to 6 additional months if (1) the property owner submits a written request to the Administrator before the original approval expires; (2) the property owner demonstrates that the failure to commence substantial work was due primarily to circumstances beyond their control; and (3) the project is in compliance with the zoning regulations in effect at the time the extension is requested. b. Completion of work. If substantial work, as authorized by the approval, begins within the initial time period but fails to progress in good faith toward completion, the Zoning Administrator should initiate the process to terminate the approval as outlined in Division 18 of this article. 50-885 Appeal An aggrieved person may appeal the Zoning Board of Appeal’s decision by filing an appeal with a court of competent jurisdiction within 30 days of the date of that decision, pursuant to § 62.23 (7)(e) 10, Wis. Stats. 50-886 through 50-899 reserved DIVISION 22 REASONABLE ACCOMMODATION 50-900 Legislative findings The Village Board makes the following legislative findings relating to reasonable accommodations for persons with disabilities: (1) The federal government has adopted laws with respect to various rights afforded persons with disabilities. (2) Some of these laws, most notably the Fair Housing Act and the Americans with Disabilities Act, affect how local zoning rules and regulations are administered by municipalities. (3) Under the Fair Housing Act, reasonable accommodations must be made with respect to local zoning laws so that a person with a disability has an equal opportunity to use and enjoy a dwelling unit. (4) Under Title II of the Americans with Disabilities Act, reasonable accommodations must be made with respect to local zoning laws to avoid discrimination as provided in the act. (5) If a local municipality can demonstrate that a requested modification would fundamentally alter the nature of its service, program, or activity (in this instance zoning requirements) it is not required to grant the modification. (6) Requests for wheelchair ramps in setbacks as authorized in this section do not fundamentally alter the nature of this zoning code. (7) Requests for all other types of reasonable accommodations will be reviewed individually to determine if the requested accommodation fundamentally alters the nature of this zoning code. Page 94 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-60 50-901 Reviews a. Wheelchair ramps in setbacks. The Building Inspector is authorized to approve the construction of wheelchair access ramps in a setback pursuant to § 50-2305. b. Other reasonable accommodations. The general steps below describe the process for reviewing other requests for reasonable accommodations. (1) Pre-submittal meeting. Before submitting an application, the applicant or their agent must meet with Village staff, as appropriate, to review the proposal, along with applicable regulations and review procedures. The Zoning Administrator may waive the requirement to hold a pre-submittal meeting when they determine the meeting is not necessary given the nature of the project and/or the extent to which the applicant understands the Village’s zoning requirements. (2) Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator along with the application fee as may be established by the Village Board. (3) General notice. Consistent with Article 4, the Zoning Administrator provides property owner notice and meeting agenda notice. (4) Staff report preparation and distribution. The Zoning Administrator may prepare a staff report as set forth in this division. If one is prepared, the Zoning Administrator provides a copy to the applicant, each member of the Plan Commission, and any person upon request. (5) Decision. After considering the information submitted by the applicant and the Zoning Administrator’s staff report, if any, the Plan Commission makes a decision, based on the decision criteria in this division, to (i) approve the requested accommodation, (ii) approve the requested accommodation with conditions, or (iii) deny the requested accommodation. (6) Preparation of decision document. Based on the action of the Plan Commission, the Zoning Administrator prepares a decision document consistent with this division, subject to the direction given by the Plan Commission. (7) Applicant notification. If the application is denied, the Zoning Administrator, within a reasonable time following the Plan Commission’s decision, sends the decision document to the applicant by regular mail and/or email. (8) Acceptance by property owner. If the requested accommodation is approved, the property owner must sign the decision document to acknowledge the terms of the approval and return it to the Zoning Administrator within 6 months of the decision date. Before the end of this period, the property owner may submit a written request for an extension. The Zoning Administrator may, for good cause, grant a one-time extension. If the signed decision document is not returned within the initial or extended period, the approval will automatically become null and void without further action by the Village. (9) Recording of decision document. If the property owner signs the decision document, it is recorded, at the applicant’s expense, with the Washington County Register of Deeds Office. 50-902 Basis of decision The Plan Commission, in making its decision, should consider the following factors: (1) whether the individual(s) for whom the requested accommodation is sought has a disability as defined by applicable federal law, (2) whether the requested accommodation is necessary to afford the person(s) with a disability an equal opportunity to use and enjoy a dwelling or housing opportunity, (3) whether the requested accommodation would fundamentally alter the nature of this zoning code, (4) whether the requested accommodation would impose an undue financial or administrative burden on the Village, (5) whether the requested accommodation would result in a significant adverse impact on surrounding properties or land uses that cannot be mitigated, Page 95 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-61 (6) whether there are alternative accommodations that would be equally effective in meeting the needs of the individual(s) while imposing a lesser impact on the Village’s zoning regulations or policies, (7) whether the requested accommodation would pose a direct threat to the health or safety of other individuals or result in substantial physical damage to the property of others, and whether the threat can be reduced or eliminated, (8) whether the requested accommodation is the minimum needed to comply with federal law, and (9) any other factor allowed under state or federal law. 50-903 Confidentiality of applicant information In reviewing petitions for reasonable accommodations, the reviewing authority will attempt to balance the privacy rights and reasonable request of an applicant for confidentiality, with normal procedural requirements relating to public notice, public hearings, written decision documents that may include findings of fact and conclusions of law, and maintaining adequate records. Any document identifying the disability or medical condition of any specific person will be treated as confidential and is not subject to disclosure by the Village for any reason, including Wisconsin’s Open Records law, unless ordered to do so by a court of competent jurisdiction and notice is given to the person who provided the document to the Village. Specifically, any medical records regardless of source, including statements of medical providers, is not subject to disclosure. For any other type of document, such as an application or determination, the document may be subject to disclosure, but only after the nature or description of the person's disability or medical condition has been redacted by the Village Attorney. A statement regarding the Village’s handling of information subject to this provision should be included in the decision document. 50-904 Nature of approval An accommodation approved under this chapter is considered a personal accommodation for the individual applicant and does not run with the land. 50-905 Imposition of conditions When approving a reasonable accommodation, the Plan Commission may impose conditions it deems necessary to uphold the overall intent of this chapter. Typical conditions of approval include the following: (1) periodic inspection of the property to verify compliance with this section and any conditions of approval; (2) removal of the improvements, where removal would not constitute an unreasonable financial burden, when the need for which the accommodation was granted no longer exists; (3) time limits and/or expiration of the approval if the need for which the accommodation was granted no longer exists; (4) recordation of a deed restriction requiring removal of the accommodating feature once the need for it no longer exists; (5) measures to reduce the impact on surrounding properties and uses; (6) measures in consideration of the physical attributes of the property and structures; and (7) other conditions necessary to protect the public health, safety, and welfare. 50-906 Staff report content The staff report may include the following: (1) preliminary findings for the decision criteria listed in this division, (2) a preliminary recommendation for approval or denial, (3) a preliminary list of conditions for approval whether the preliminary staff recommendation is for approval or denial, and (4) any other information deemed necessary. Page 96 of 328 Village of Jackson Chapter 50 – Zoning - Discussion Draft (11-05-2026) - 5-62 50-907 Content of decision document a. Approval. If the application for a reasonable accommodation is approved, the decision document may include the following: (1) a statement that the reasonable accommodation is approved; (2) a description of the reasonable accommodation; (3) reasons for the decision based on the factors listed in this division; (4) conditions of approval, if any; (5) a statement that the approval will automatically expire 12 months after the date of approval unless substantial work, as authorized by the approval, has commenced and continues in good faith to completion and that the Zoning Administrator may, with cause, grant a one-time extension, not to exceed of up to 6 additional months

Text truncated. Open the original for the full document.

Source: Village of Jackson website. First collected Nov 16, 2026.