Packet
Walworth County · Walworth County · meeting of Nov 16, 2026 · Agenda packets
Open the original document More from Walworth County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
November 16, 2026 Public Works Committee Agenda
NOVEMBER 16, 2026 PUBLIC WORKS AGENDA.PDF
November 16, 2026 Public Works Committee Packet
NOVEMBER 16, 2026 PUBLIC WORKS PACKET.PDF
1.
Documents:
2.
Documents:
County Board Public Works Committee
MEETING NOTICE
Monday, November 16, 2026
3:30 PM
County Board Room 114
Walworth County Government Center
100 W. Walworth St., Elkhorn, Wisconsin
Dennis Karbowski, Chair Ken Monroe, Vice-Chair
Supervisor Joe Schaefer Supervisor Rick Stacey Supervisor Bud Wojcik
(Posted in compliance with Sec. 19.84 Wis. Stats.)
It is possible that a quorum of the county board or any of its other committees could be in attendance at this
meeting.
Agenda enclosures are available upon request from the County Administrator’s Office or on the County’s
web page (www.co.walworth.wi.us).
A G E N D A
Note: all agenda items are subject to action.
1. Call to order
2. Roll call of committee members
3. Agenda withdrawals, if any
4. Agenda approval
5. Approval of Minutes
a) October 19, 2026, Public Works Committee Meeting (encl. pp. 1-3)
6. Public Comment Period
7. Consent Items
(One motion and second will approve all of the following items. Any item may be
pulled from the list and voted on separately)
a) Reports
1) Construction & Project Management Report – November 2026
(encl. pp. 4-9)
NOTICE: THIS MEETING IS PLANNED TO PROVIDE FOR REMOTE OR OFF-SITE ATTENDANCE
BY COMMITTEE MEMBERS.
THE PUBLIC CAN WATCH THE MEETING STREAMING LIVE: https://bit.ly/2026NovPW
Individuals wanting to provide a Public Comment can do so remotely by telephone but must contact
the County Administrator’s Office at 262-741-4357 on the day of the meeting and at least 15 minutes
prior to the start of the meeting to obtain instructions.
AGENDA – Walworth County Public Works Committee
Monday, November 16, 2026, at 3:30 PM Page 2 of 2
2) Director’s Bi-Monthly Report – November 2026 (encl. pp. 10-27)
8. New Business
a) Final Pay to Finish Excavating, Inc. for Sheriff’s Office (SO) Radio Tower Site
Development, Project #C2101 (encl. p. 28)
b) Capital Improvement Project (CIP) Change in Scope for Safety Improvements,
Project #W2439 (encl. pp. 29-30)
c) Res. No. ** - 12/26 Approving Request to the Department of Natural Resources to
Include All-Terrain Vehicle (ATV) and Utility-Terrain Vehicle (UTV) Riding on the
White River State Trail (encl. pp. 31-33)
d) Res. No. ** - 12/26 Authorizing the Public Works Department to Apply for the
Federal Recreational Trails Program Grant (RTP) and Adding the Grant to
Previously Established Pre-Approved Recurring Grants List (encl. pp. 34-36)
9. Reports/announcements by Chairperson
10. Set/confirm next meeting date and time – Monday, December 14, 2026, at 3:30 p.m.
11. Adjournment
Submitted by: Dennis Karbowski, Committee Chairperson
Richard Hough, Public Works Director
Posted: November 12, 2026
Public Works | W4097 County Road NN | Elkhorn, WI 53121
www.co.walworth.wi.us | (262) 741-3114 (o) | (262) 741-3117 (f)
Memorandum
To: Public Works Committee
Cc: Mark Luberda, County Administrator
From: Richard A. Hough, Public Works Director
Date: November 11, 2026
Re: November 16, 2026, Public Works Committee Meeting
The following is an overview from our Public Works management team concerning items
scheduled for the above -captioned Public Works Committee meeting. Should you have
any questions before this meeting, please do not hesitate to contact either the appropriate
manager or the Director of Public Works.
Consent Items
One motion and a second will approve all of the following items. Any item may be pulled
from the list and voted on separately.
Consent Items – Reports. The following reports are included on the Agenda. No action
is required unless you have questions that may be placed on file.
1) Construction & Project Management Report – November 2026 – Richard Hough
2) Director’s Bi-Monthly Report – November 2026 – Richard Hough
New Business
Final Pay to Finish Excavating, Inc. for Sheriff’s Office (SO) Radio Tower Site
Development, Project #C2101 – Captain Jacob Skibba
All work is complete and documents are on hand for the Radio Tower Site Development
Project. Department requests final payment to Finish Excavating, Inc.
Public Works Director’s Memorandum Page Two
Capital Improvement Project (CIP) Change in Scope for Safety Improvements,
Project #W2439 – Vijay Narayanan & Chris Morrison
Director requests a scope change to allow completion of an engineering analysis
needed to support a critical safety improvement and maximize the value of the
previously purchased equipment. Without analysis, the Director of Public Works will not
install the equipment because of risks posed to the Sheriff’s Office roof.
Res. No. ** - 12/26 Approving Request to the Department of Natural Resources to
Include All-Terrain Vehicle (ATV) and Utility-Terrain Vehicle (UTV) Riding on the
White River State Trail – Richard Hough
Staff provides the attached resolution following recommendations from a County
Superintendent to allow ATVs/UTVs on the White River State Trail. Staff opposes this
course of action and recommends disapproval.
Res. No ** - 12/26 Authorizing the Public Works Department to Apply for the
Federal Recreation Trails Program Grant (RTP) and Adding the Grant to Previously
Established Pre-Approved Recurring Grant List – Vijay Narayanan
Authorizing the addition of the Federal RTP Grant to the Pre-Approved Recurring Grant
List and submission of the Federal RTP Grant Application.
/sa
DRAFT Walworth County Board of Supervisors
Public Works Committee Meeting Minutes
Monday, October 19, 2026
Walworth County Government Center, County Board Room 114
100 West Walworth Street, Elkhorn, Wisconsin
Chair Dennis Karbowski called the meeting to order at 3:30 p.m.
R
oll call was conducted and the following members were present: Chair Dennis Karbowski;
Vice-Chair Kenneth H. Monroe; Supervisors Joseph H. Schaefer; Rick Stacey (Remote), and
Bud Wojcik. A quorum was declared.
O
thers in Attendance
County Staff: Walworth County Administrator Mark W. Luberda; Corporation Counsel/Director-
Land Use and Resource Management Michael Cotter; Director-Public Works Richard Hough;
Associate County Engineer Nicole Whitman; Sergeant Nathan Birch; Captain Jacob Skibba;
and Director-Health and Human Services (HHS)/Superintendent of County Institutions Carlo
Nevicosi
On
motion by Supervisor Wojcik, second by Supervisor Schaefer, the agenda was
approved with no withdrawals.
On
motion by Vice-Chair Monroe, second by Supervisor Wojcik, the September 14, 2026
Public Works Committee meeting minutes were approved.
P
ublic Comment – There was none.
C
onsent Items
(One motion and second will approve all of the following items. Any item may be pulled from
the list and voted on separately)
7
a. Reports
Vice-Chair Monroe offered a motion, second by Supervisor Schaefer, to accept Item
7a.1., the Construction & Project Management Report – October 2026.
1) C
onstruction & Project Management Report – October 2026
D
irector-Public Works Richard Hough referenced and provided additional details regarding his
Memorandum, included on Pages 5-9 of the packet, Construction & Project Management
Report – October 2026. Associate Engineer Nicole Whitman provided an update on the W2648
Government Center Facility Needs Assessment, included on Page 6 of the packet, noting that
Public Works requests Committee direction or clarification on unaddressed needs. Hough
reported significant survey changes since the 2020 assessment based on recent department
interviews, which Public Works will summarize in December. In response to Supervisor
Karbowski, Hough stated that a childcare facility in the Lakeland Health Care Center 4th wing is
ruled out to protect a restrictive $1 million grant. Director-Health and Human Services
(HHS)/Superintendent of County Institutions Carlo Nevicosi noted that the Lakeland Health
Care Center Board referred the childcare issue to the Health and Human Services (HHS)
Committee for its October 21 meeting. Nevicosi stated he has done some research on some
1 of 36
Walworth County Board of Supervisors
October 19, 2026 Public Works
Committee Meeting Minutes
Page 2 of 3
other counties on how the issue was tackled; and will discuss a number of options for the
County to pursue if so interested. Nevicosi stated it will be the Board’s decision on the
direction taken and how the County might be involved. Motion carried 5-0.
2) R
eport on the County Administrator’s Approved Project Change Order Internal Routing
A
pproval Request for Lakeland Health Care Center (LHCC) Building Renovations,
Change Order #11, Project #W2306
Vice-Chair Monroe offered a motion, second by Supervisor Karbowski, to approve Item
7a.2), Report on the County Administrator’s Approved Project Change Order Internal
Routing Approval Request for Lakeland Health Care Center (LHCC) Building
Renovations, Change Order #11, Project #W2306. Motion carried 5-0.
U
nfinished Business
8a. E-Bike Safety, Regulation, and Policy Recommendations – Law Enforcement Perspectives
Hough summarized the memorandum, included on Pages 12–26, highlighting major safety and
enforcement concerns. Sgt. Nathan Birch reviewed e-bike regulations. Sgt. Birch noted that
the Sheriff’s Office has no specific directive on e-bikes and that Walworth County has no
recorded e-bike complaints or crashes, though injuries are rising. He stated that the county
plans to launch proactive community education events next spring. Hough questioned the
county's role in e-bike safety, noting that a drafted ordinance covering definitions and penalties
was paused for law enforcement input. He asked the Committee to either advance the
ordinance or focus on public outreach. After discussing whether to legislate or educate, Hough
suggested waiting for clearer state action and collecting better accident data. Ultimately, the
Committee decided to defer action until the State provides further direction.
N
ew Business
9a. 2027 Preliminary Budget (An additional opportunity for discussion or to propose
amendments, if any)
Hough explained this item is on the Agenda to provide the opportunity to propose
amendments to the preliminary budget.
9
b. Capital Improvement Project (CIP) Change in Scope for Dive Boat Replacement, Project
#C2408
Captain Jacob Skibba referred to and discussed details of the Change in Scope, included on
Pages 27-28 of the packet. Captain Skibba stated the justification for the change in scope is to
retain the existing dive team pontoon boat and not declare it as surplus for this project. The old
pontoon boat can serve as a secondary vehicle for shuttling equipment and storage space on
the water. No additional money is needed for maintenance. The Sheriff’s Office currently has
storage arranged for both boats. Discussion ensued. Supervisor Wojcik offered a motion,
second by Supervisor Schaefer, to approve Item 9b., the Capital Improvement Project
(CIP) Change in Scope for Dive Boat Replacement, Project #C2408. Motion carried 5-0.
2 of 36
Walworth County Board of Supervisors
October 19, 2026 Public Works
Committee Meeting Minutes
Page 3 of 3
9c. New 2026 Capital Project – Comprehensive Land Use Plan 2029 Update
Deputy Director/County Conservationist Mandy Bonneville presented a Memorandum,
included on Page 29 of the packet, regarding a request from Land Use Resource Management
(LURM). Bonneville explained that LURM is seeking approval to establish a new 2026 Capital
Improvement Project (CIP) to fund professional services for updating the Walworth County
Multi-Jurisdictional Comprehensive Plan. Corporation Counsel/Director-Land Use and
Resource Management Michael Cotter stated the Plan is driven by the towns, with guidance
from Southeastern Wisconsin Regional Planning Commission (SEWRPC), and the County
coordinates the final outcome, which forms the Comprehensive Plan. This request is made with
anticipation of next year’s tight budget. Discussed ensued. Vice-Chair Monroe offered a
motion, second by Supervisor Wojcik, to approve Item 9c., the New 2026 Capital Project
–
Comprehensive Land Use Plan 2029 Update. Motion carried 5-0.
9
d. Res. No. ** - 11/26 Authorizing Acceptance of Community Project Funding/Congressionally
Directed Spending (CPF/CDS) Grant
Walworth County Administrator Mark W. Luberda referenced and summarized Item 9d, the
resolution, included on Pages 30-32 of the packet, to authorize staff to accept and administer
the Community Project Funding/Congressionally Directed Spending (CPF/CDS) grant for the
Lakeland Health Care Center Vacant Wing Modification project. He noted that contractual legal
issues with the concept study and financial analysis will cause both project phases to fall
behind. However, completing the business plan will allow the County to begin the pre-design
phase, and accepting this grant prepares the County for that next step.
Supervisor Schaefer offered a motion, second by Supervisor Wojcik, to approve Item 9d.,
the resolution, Authorizing Acceptance of Community Project Funding/ Congressionally
Directed Spending (CPF/CDS) Grant. Motion carried 5-0.
R
eports/Announcements by Chairperson – There were none.
C
onfirmation of next meeting date and time: The next meeting was confirmed for Monday,
November 16, 2026 at 3:30 p.m.
A
djournment
On motion and second by Vice-Chair Monroe and Supervisor Stacey. Chair Karbowski
adjourned the meeting at 4:04 p.m.
_________________________________________________________________________________
Submitted by Kathleen Aukland, Administrative Assistant. Meeting minutes are not considered
final until approved by the Public Works Committee at the next regularly scheduled meeting.
3 of 36
Public Works | W4097 County Road NN | Elkhorn, WI 53121
www.co.walworth.wi.us | (262) 741-3114 (o) | (262) 741-3117 (f)
Memorandum
To: Public Works Committee Members
Cc: W alworth County Administrator – Mark Luberda
From: Public Works Director – Richard Hough
Date: November 9, 2026
Re: Construction and Project Management Summary Report – November 2026
E
xecutive Summary
This report presents the month’s most significant construction, design, facility, and public-information activities.
It emphasizes matters affecting public access and travel, decisions or risks requiring Committee awareness,
and the work completed by the Director and project managers since the prior report.
C
ommittee Attention
Two public-information meetings are scheduled for November: CTH L (East Troy) on November 12 and CTH B
on November 19 at the Town of Sharon. The Government Center study has advanced from physical
assessment to a review of space needs and a comparison with existing capital projects.
T
o improve consistency and keep the Committee report concise, the Director, engineers, deputy directors, and
project manager updates should answer the same five questions:
• What changed since the last report that is noteworthy for the committee?
• What is the current status: on schedule, monitor, attention required, or complete?
• What effect does the project have on the public, service delivery, cost, schedule, or risk?
• What will occur during the next 30 to 60 days within this project?
• Does the Committee need to know, decide, authorize, or communicate anything in the immediate
future?
4 of 36
Director’s Priority Highlights
Rank Project S tatus Current Month Committee / Public
Significance
1 Webster House
Phase 2 Pre-Con
Initiated early coordination for spring
construction. The department needs to
update agreements with the Historical
Society.
Minor in-scope changes to the
project were addressed to
meet grant requirements.
2 Government
Center Study
Initial
Phase
Consultants have substantially
completed the physical assessment of
the structure and begun reviewing
space needs, comparing them to
existing capital projects, and
recommending further study of the
exterior paneling.
Preparation for initial
consultant presentation in
December to the Public
Works Committee.
3 Phase 2 Security
Project(s)
Design
Phase
Establish new project parameters to
facilitate forward progress.
Limiting the scope to high-
payoff and affordable
solutions that maximize on-
hand resources, e.g., excess
cameras.
4 Calibration Event Complete
Public Works hosted a two-day
calibration event for 22 municipal
trucks in order to improve salt use
throughout the county.
This will likely become an
annual event and an
extension of our winter
preparation program.
A
t-a-Glance Communications Calendar
Date Activity Audience Purpose Location Date & Time
Nov. 12 CTH L public-
information meeting
Residents,
businesses,
commuters
Explain the project and
collect public input.
Village of East Troy
Town Hall
Complete,
12 November
Nov. 19
CTH B public-
information meeting,
Town of Sharon
Residents,
businesses,
commuters
Explain the project and
collect public input.
Sharon Village Hall
located at 125
Plain Street,
Sharon, WI 53585
Wednesday,
November
18,
4-6:00 PM
Nov. 24
Parks & Open Space
Plan public-information
meeting
Residents
Outline changes and
capture public input on
2027 update to the
Parks & Open Space
Plan
Lodge Geneva
National
W4240 State Hwy
50
Lake Geneva, WI
53147
Tuesday,
November
24, 6:30 PM
Spring 2027 I-43 long-term lane
closures anticipated
Regional
commuters
and freight
traffic
Early awareness and
coordination; confirm
details through future
WisDOT updates.
I-43 Elkhorn – T. of
East Troy 2026 - 2029
5 of 36
I. Transportation Projects and Commuter Information
Wi
sDOT Project Update
I
-43 ROCK FREEWAY: BOWERS ROAD TO WIS 83
WisDOT’s October project overview describes pavement replacement and improvements along approximately
9.8 miles of I-43 in Waukesha and Walworth Counties, with completion scheduled for summer 2029. Work
includes pavement replacement and resurfacing, bridge improvements, culvert and drainage work, guardrail,
signing, and pavement markings.
It
em Public-Facing Summary
Current / most recent reported
impact
Periodic overnight lane and ramp closures were identified through early
November 2026 for emergency pullouts, temporary shoulders, and ramp
widening.
Upcoming commuter impact Long-term I-43 lane closures are anticipated to begin in spring 2027.
County communication focus Translate each WisDOT update into location, timing, closure type, detour
or access implications, and action residents should take.
Project information WisDOT project page:
https://projects.hub.wisconsindot.gov/pages/10900905
Public contact Rachel Andreoli, Construction Public Involvement Lead, (414) 758-9386,
Randreoli@hntb.com
C
ounty Engineer’s Priority Transportation Project Highlights
Rank Project Status Current Month Committee / Public
Significance
1
26-003 - CTH-H
George St. to
Ge
neva Square
Const.
Project is substantially complete, and the
roadway is open to traffic. Punch-list items are
being completed before closeout.
Transfer of a small amount of
excess funding to CTH-B
Project for culvert work.
2
26-009- CTH-H
USH-12 to Co.
Line
Constr.
Project is substantially complete, and the
roadway is open to traffic. Punch-list items are
being completed before closeout.
Excess $100K will be returned
to Highway & Bridge
Reserves
3 2027 Project
Prep Design
Public Involvement Meetings (PIM) are
scheduled this month for CTH-L / Stone School
Road Safety Improvements (WisDOT project)
and CTH-B from Rock Co. Line to CTH-C. PIM
for CTH-ES from CTH-A to US-12 tentatively
scheduled for December 2026
Public Input Gathering
6 of 36
II. Facilities and Project Manager Highlights
P
roject Manager Highlights:
Project
Manager
ID
Project Status Monthly Highlight
Next Step
(Of Committee
Interest)
Nicole
Whitman
W2424
Webster House
Restoration
Phase 2
Pre-Con
October 26th, the team (architect, contractor, and
building) met for a preconstruction meeting.
Submittals and material procurement are ongoing.
September 30th was the end of period 1 reporting
on the National Park Service (NPS) Save
America's Treasures (SAT) grant, for which
paperwork is due by December 31st. The project
sign requirement for this grant was submitted for
review/approval and will be installed once the SAT
grant manager formally approves it.
Construction is
anticipated to start
March 1, 2027,
weather permitting.
Nicole
Whitman
W2648
Government
Center
Facility Needs
Assessment
Initial
Phase
Task 1 - Physical Facility Assessment and Task 2 -
Functional Facility Assessment are both ongoing
with a lot of progress (and some questions). We
have been meeting with Excel to determine the
condition of the existing building and develop a
greater level of confidence in the current planned
CIP projects, as well as identifying more CIP
projects potentially. In parallel, the team has met
with the departments and is generating a new
building program (department square footage
requirements with adjacencies) for the
Government Center.
The engineering
team will provide an
update of the
process to the
Committee this
winter.
Nicole
Whitman
24-056 / W2306,
W2307, W2414
Lakeland Health
C
are Center
Renovation
Closer
Honey Creek Haven has moved in!
Closeout punchlist and paperwork (As-Built
Drawings and O&M Manuals) continues as we
finalize this 2-year long renovation project.
Final pay submission
to committee.
Barry
Pierce HWY 50 DMA Comp. Highway finished this crackfill DMA from Grand
Geneva to Kenosha Cty Line.
Barry
Pierce
Winter Operations
Calibration Comp. All winter operations equipment was properly
calibrated ahead of the upcoming winter.
Barry
Pierce
Salt Wise Training
Courses Comp.
DPW held this annual training educating municipal
and public works staff on the environmental
impacts of road salt and best practices for winter
maintenance operations.
Assessing recently
published data on
chloride study for
best practices.
7 of 36
Project
Manager
ID
Project Status Monthly Highlight
Next Step
(Of Committee
Interest)
Vijay
Narayanan Service Contracts Ongoing
Continuing workload for Service Contracts and/or
Cooperative Purchase Agreements.
1) Completed: Water Treatment Services; JC –
Xray PM & Services; Janitorial Cleaning Services
Extension
2) In-Progress: SO Range - HVAC PMs & Services
& Lead Filter Removal; Elevator Maintenance &
Repair Service; CRAC Unit PMs & Repairs;
Laundry Equipment PMs & Repairs; Waste
Collection & Recycling; MY2027 Vehicle Purchase
State Contract(s)
Vijay
Narayanan
Field Test
Lessons Learned
of Robotic
Mowers
Comp.
Document 'lessons learned' from the field testing
of the robotic mower at the SO and development
of a larger-scale robotic mower fleet &
deployment.
Equipment selection
& procurement of
additional mowers
(2027 CIP)
Vijay
Narayanan
HHS Fleet
Analysis Ongoing
Analysis of the current HHS fleet, operating costs,
mileage reimbursement costs, and replacement
strategies, including an assessment of alternative
fleet models and leasing strategies.
Brief County
Administrator and
Departments.
Joe
Latocha
W2606 SO Tube
System Repairs Constr.
WOC approved, contract routing, background
checks approved, work expected to start late
November
Joe
Latocha
W2610 DA Office/
Additional Storage Closer
Project punchlist has been completed, furniture
delivered and employees moved in. Working
through close-out documents.
Joe
Latocha
W2506 Lakeland
School Siding
Replacement
Design
Working through final RFB details. Project
solicitation is expected to hit the street early
January with an award recommendation to DPW in
February. Construction planned for summer break
in 2027.
Elliott
Blaszczyk
W2514 LHCC
Rekey Constr.
The project resumed following completion of the
LHCC remodel. The KeyWatcher cabinet will be
relocated, new key sets loaded, and lock changes
completed after cabinet preparation.
Elliott
Blaszczyk
W2405 Judicial
Center HVAC
Valve
Replacement
Constr.
Penthouse and basement heating-valve
replacements are complete. Two VAVs remain on
the first floor. Boilers and air handlers are
supplying heat. Will continue 2nd floor work, as
weather allows.
Elliott
Blaszczyk
W2601 Judicial
Center Lighting
Controls
Replacement
Design
The engineering firm completed its initial site visit
and drawing review and is researching
replacement options.
8 of 36
COMMUNITY FORUM LEARN · DISCUSS · COMMENT
HELP SHAPE OUR
COUNTY PARKS
Draft Walworth County Park and Open Space Plan: 2050
Join us for an information and participatory forum on the future of parks, trails and open space
across Walworth County. See the draft plan, ask questions, and find out how to share your
comments and feedback. Walworth County updates the plan every five years; this fifth edition
covers 2027–2032 and is anchored to 2050 expectations and Southeastern Wisconsin
Regional Planning Commission (SEWRPC) datasets.
01See the Draft Plan
An overview of the 2050
vision for county parks and
open space.
02 Ask & Discuss
Talk through the plan and
what it means for your
community.
03 Share Feedback
Learn the ways to comment
and have your voice heard.
WHEN
Tuesday, November 24,
2026
6:30 pm
WHERE
Lodge Geneva National
W4240 State Hwy 50
Lake Geneva, WI 53147
FACILITATED BY
Mary Jo Fesenmaier
City of Lake Geneva District 2 Alderperson
Retired teacher and current substitute teacher
for Lake Geneva Schools
MADE POSSIBLE BY
Lake Geneva Public Library
lakegeneva.lib.wi.us
Barrett Memorial Library
williamsbay.lib.wi.us
Fontana Public Library
fontana.lib.wi.us
In partnership with Lodge Geneva National Free and open to the public
9 of 36
Public Works | W4097 County Road NN | Elkhorn, WI 53121
www.co.walworth.wi.us | (262) 741-3114 (o) | (262) 741-3117 (f)
M
emorandum
To: Public Works Committee Members
Cc: Walworth County Administrator – Mark Luberda
From: Public Works Director – Richard Hough
Date: November 9, 2026
Re: Department of Public Works Bi-Monthly Report – November 2026
Executive Summary
The Department of Public Works remained operationally effective during the reporting period while managing
significant workforce turnover within the Highway Division. Major maintenance programs continued, fleet
readiness remained acceptable, and policy and asset-management initiatives advanced. The principal
organizational concern entering the winter season is the rapid loss of five Highway Maintenance Workers from
a beginning workforce of 28. Three Highway Maintenance Workers were hired during September and October
and are progressing through onboarding and training.
Committee Status Overview
Area Committee Status Summary
Workforce Capacity ATTENTION REQUIRED
Five Highway Maintenance Worker separations
materially reduced experienced staffing
capacity. Three employees were hired during
the period.
Highway Operations MONITOR
Seasonal programs advanced; crackfill work was
completed, while crack filling and bridge
maintenance remained partially complete.
Fleet and Equipment MONITOR
Preventive maintenance was approximately one
week behind schedule. Overtime was scheduled
to reduce the backlog.
Asset Management ON SCHEDULE
Inventories of parts, tool cabinets, radios, fleet,
and equipment were completed or underway for
year-end reconciliation.
Policy and Governance IN PROGRESS Four policy reviews were completed and four
remained pending.
Fuel and Resources IMPLEMENTED
The transition to 87E gasoline began September
28 to reduce fuel cost exposure, with operational
controls in place.
10 of 36
Subject: Bi-Monthly PW Report
M
atters for Committee Awareness
• Workforce stability and winter coverage remain the Department’s highest near-term operational
concerns.
• Preventive fleet maintenance is approximately one week behind schedule; overtime has been
s
cheduled to reduce the backlog.
• The 2026 chip seal program was completed as planned. Other seasonal programs remain partially
complete.
• The transition from 87C conventional gasoline to 87E ethanol-blended gasoline was implemented to
reduce operating cost pressure.
• Four internal policy reviews were completed and four remained pending at the close of the reporting
period.
I. Workforce Capacity and Organizational Readiness
The Highway Division experienced five employee separations in less than two months. This level of turnover
re
duced experienced operating capacity at a time when the Department was preparing for winter maintenance.
Recruitment and onboarding actions partially offset the losses while identifying 2 of 5 seasonal (LTE)
employees; however, replacement hiring does not immediately restore the operational knowledge, equipment
proficiency, and mentoring capacity associated with experienced staff.
Highway Maintenance Workforce Measures
Measure Result Committee Interpretation
Beginning workforce (FTE / LTE) 28 / (2 of 5) Highway Maintenance Workers at the start of the reporting
period
Separations 5 Employee departures during the reporting period
Employees retained from
beginning workforce (FTEs) 23 Beginning workforce less separations
Period retention/separation rate 82.1% / 17.9% 23 retained employees divided by 28 beginning employees
New hires (FTE / LTE) (3 of 5) / (2 of 5) Highway Maintenance Workers (FTE / LTE) hired during
September and October
Summation We will find qualified staff for full-time positions, but the lack of seasonal
employees puts our night shift at risk.
Operational Implications
Area Current Implication
Winter response Reduced flexibility in assigning operators, e.g., plow
routes.
Training and supervision Greater demand on supervisors and experienced
employees to qualify and mentor new personnel.
Overtime exposure Potential for additional overtime to maintain required
service levels and coverage.
Maintenance production Reduced capacity to complete planned work when
personnel are redirected to essential services.
Continuity and succession Loss of institutional knowledge and a greater need
for documented procedures and cross-training.
11 of 36
Subject: Bi-Monthly PW Report
M
anagement Actions: November-December 2026
• Continue recruitment, candidate screening, and timely hiring actions for authorized vacancies.
• Complete onboarding, safety instruction, equipment qualification, and winter-operations preparation for
re
cently hired employees.
• Review aggregate separation reasons and identify recurring factors affecting retention, without
disclosing confidential personnel information.
• Monitor staffing sufficiency, shift coverage, overtime, and service impacts leading into the winter
season, and potential impacts on night shift management.
• Establish routine reporting of authorized positions, filled positions, vacancies, separations, hires, time to
fi
ll, and rolling 12-month retention.
II. Operations, Fleet, and Resource Stewardship
Seasonal Highway Maintenance
Activity Planned Completed Completion Next Action
State crack filling 103 miles 101 miles 98% Close out or identify carryover based on
weather and staffing.
County crack filling 47 miles 51.3 miles 109% Continue as conditions permit; document
remaining work.
Chip seal 18.9 miles 18.9 miles 100% Program complete.
State bridge
maintenance 36 items 21 items 58.3% Schedule remaining items based on priority
and conditions.
County bridge
maintenance 3 items Not reported Not available Will be reassessing county bridge
maintenance strategy.
State roadside
mowing 13 routes 8 routes 61.5% Continue vision-related mowing assessment
and document revised approach.
County mowing, first
run 10 routes 10 routes 100% Program complete.
County mowing,
second run 10 routes 7 routes Not available Mowing continues into November.
Material Management and Equipment
Activity Current Condition Next Reporting Period
Preventive
maintenance
Approximately one week behind
schedule
Continue authorized overtime and prioritize
winter-critical units.
Winter fleet readiness Preparation underway Complete inspections, repairs, calibration, and
operator assignments.
Surplus equipment Sales complete except E-Poke sprayer
system
Retain the unit for potential 2027 surplus
disposition.
Equipment
procurement
Pending procurements to be reported;
reevaluating grader procurement
strategy
Identify schedule, budget status, and
operational consequence for each major item.
Fuel Management Diesel Fuel Gallons YOY: 200 Unleaded Fuel Gallons YOY: 1600
Salt Charges
WisDOT and Compass Minerals have agreed that Compass Minerals will recover its
tariff costs by applying a surcharge of $1.17 per ton to all remaining guaranteed
deliveries under the contract.
12 of 36
Subject: Bi-Monthly PW Report
F
uel Management
The Department transitioned from 87C conventional unleaded gasoline to 87E gasoline beginning September
28, 2026. The decision responded to sustained fuel-price pressure and a reported load-price differential of
approximately $0.92 per gallon. Weekly unleaded usage was reported at approximately 3,000 to 4,000 gallons.
Operational controls include additives, pre-fueling selected low-use equipment, and monitoring for moisture,
phase separation, and shortened storage life.
• Report actual gallons purchased and actual savings compared with the prior fuel grade.
• Monitor fuel-efficiency variance and equipment performance concerns.
• Continue seasonal management of gasoline and diesel inventories.
• Continued operational management with fuel budgets while year-over-year, quarter comparison reflects
slight increase in use of both fuel types.
III. Governance, Planning, and Two-Month Outlook
Po
licy and Internal Control Program
Policy Review Type Status
Backing Policy Three-year review Complete
Equipment Licensing Three-year review Complete
Plow Blade Control and Replacement New policy Complete
Code Compliance Assessment and Public Safety Mitigation Three-year review Complete
WISLR Utilization Three-year review Pending
Capital Asset Management Three-year review Pending
Consumable Supplies Three-year review Pending
Office Supply Three-year review Pending
Planning and Organizational Development
Initiative Lead Current Focus
Parks and Open Space Plan Richard Hough Public information and long-range planning activities; public
information meeting scheduled for November 24.
AssetWorks Working Group Sarah Arndt
Now meets monthly in a smaller, focused format to expand
the software utilization within the Asset Management division.
Quarterly meetings with the larger group will provide
progress updates, share improvements, and maintain
department-wide communication and collaboration.
Key Performance Indicator
Development Richard Hough Develop measures that communicate operational
performance and resource requirements.
COOP/COG Update Richard Hough Develop five departmental continuity and contingency plans.
13 of 36
Subject: Bi-Monthly PW Report
Department Priorities: November-December 2026
Priority Planned Action Next Report Should Show
Workforce Stabilize staffing; fill authorized vacancies;
complete training and winter qualifications.
Retention, vacancies, hiring progress, overtime,
and service coverage.
Winter operations
Complete fleet readiness and confirm
staffing, routes, materials, and response
procedures.
Equipment availability, staffing sufficiency,
material inventory, and event performance.
Fleet
maintenance
Eliminate the preventive-maintenance
backlog and protect critical-unit availability.
Backlog age, completed PMCS, downtime, and
critical equipment exceptions.
Governance Complete priority policy reviews and
continue continuity planning.
Policies completed, exceptions, and
implementation actions.
Financial
stewardship
Validate fuel-transition savings and monitor
staffing-related overtime.
Actual fuel cost, usage, efficiency variance,
overtime, and budget impact.
Director’s Assessment
The Department remains positioned to provide essential services; however, workforce stabilization is necessary
to preserve operating flexibility, particularly through the winter season. Management will focus on staffing,
winter readiness, fleet availability, policy completion, and cost stewardship. Material effects on service,
overtime, safety, or budget performance will be elevated for Committee awareness.
14 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
JOB DESCRIPTION QUESTIONNAIRE
The purpose of the Job Description Questionnaire (JDQ) is to provide the information necessary to evaluate jobs for salary placement, classify jobs for
various legal requirements, and to compile appropriate job descriptions.
Please read this JDQ carefully before answering any of the questions and then complete it as accurately, completely, and briefly as possible. While it is
not necessary to describe each duty in great detail, it is important to provide sufficient information so the job can be accurately evaluated and classified.
Keep in mind that the purpose of the JDQ is to collect information about the job and is not designed to evaluate employee performance.
Consider the typical responsibilities of the job; even those that might only occur cyclically (e.g. annually, quarterly, etc.). The responses should be based
on duties and responsibilities that are a regular and ongoing part of the job, under typical conditions, and not special projects or temporary assignments.
Further, unless specifically directed by management, describe the job as it is today, not as you believe it should be or what it might be in the future.
SECTION 1 DEMOGRAPHIC INFORMATION
Employee Name Employer Name Walworth County
Job Title Highway Maintenance Worker Work Location Elkhorn, Wisconsin
Department Public Works Division Highway
Full-Time / Part-Time Full time Part-Time (Hrs per Wk)
Supervisor Name Dale Poggensee Supervisor Title Superintendent
SECTION 2 JOB SUMMARY/PURPOSE
What is the primary purpose of your job? Briefly state what your job is—including why your job exists—in such a manner that could easily be explained to
another person. In other words, if someone came up to you on the street and asked what your job entailed, how would you describe it?
The primary purpose of my job is to keep the roads clear, clean, and free of obstructions and debris for the traveling public in a safe and professional
manner. I am responsible for inspecting, repair, maintaining roadside infrastructure to keep highways safe and functional. Duties often include fixing
potholes, maintaining signage and guardrails, clearing debris, operating heavy equipment, responding to weather related hazards and emergencies. I
work outdoors in all weather conditions and follow strict safety procedures to protect both myself and the traveling public.
15 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
SECTION 3 DESCRIPTION OF ESSENTIAL DUTIES & RESPONSIBILITIES
Positions are made up of various duties that generally fall into a handful of categories/responsibilities. For example, a Street Operator’s categories may
include Streets Maintenance, Snow Plowing, Equipment Operation, Refuse Collection, etc. An Administrative Assistant’s categories may include
Document Preparation, Meeting Coordination, Records Management, etc.
Identifying the main functions and the percent of time spent on each category provides the best information to correctly classify your position. Adding
the significant duties within each category allows us to better understand your work in each area. As you list the specific duties, please focus on WHAT is
done, rather than HOW it is done. This provides adequate detail without requiring your responses to be more labor-intensive than needed. Please try to
avoid terminology and acronyms that are not widely known outside of your line of work.
Category (Area of Responsibility): Ditching % of Annual Total Time Spent on Category: 5 %
Duties within Category:
Responsible for constructing, maintaining, and repairing roadside ditches, to ensure proper drainage and
roadway safety. Duties include excavating and shaping ditches while using a laser to shoot proper grade to
ensure accurate water flow, removing debris and sediment, grading slopes to specification, and repairing erosion
or washouts. Replacing pipe such as culverts, end sections, catch basins, manholes, grates, and other various
sizes pipes for water flow is necessary more often than not. Operates heavy equipment such as excavator, skid
steer, backhoe, bull dozer, Class A and B trucks to haul material in and out of the jobsite, and use hand tools
while following traffic control plans and safety regulations. Inspect drainage systems, installs and maintains
culverts, and restore disturbed areas to prevent erosion wish grass seeding, erosion matting, and straw matting
to enable good growth of vegetation rapidly which all helps keep the road structure secure. All while having a safe
traffic controlled work area with the correct signage and rumble strips when necessary to warn the traveling
public of what is up ahead and properly trained and certified flaggers to control the work area and keep the
workers and general public safe during operations.
Category (Area of Responsibility): Shouldering % of Annual Total Time Spent on Category: 5 %
Duties within Category:
Placed, graded, and compacted roadway shoulder material to maintain edge stability and ensure safe vehicle
recovery. Corrected edge drop-offs and repaired eroded or damaged shoulders while maintaining proper slope
and alignment for effective drainage and water runoff. Must operate Class A and B heavy duty trucks, skid steer,
bull dozer, graders, rollers, front end loaders, tractors with wobble wheel compactor, road widener and various
hand tools. All while having a safe traffic controlled work area with the correct signage and rumble strips when
necessary to warn the traveling public of what is up ahead and properly trained and certified flaggers to control
the work area and keep the workers and general public safe during operations.
Category (Area of Responsibility): Snow Removal/De-icing operations/winter
operations % of Annual Total Time Spent on Category: 15 %
Duties within Category:
Perform snow removal and de-icing operations on highway roadways to maintain safe driving conditions during
winter weather events. Operate snowplows in class A and B heavy duty trucks while controlling a 12 foot front
snow plow, left and right side 9 foot wing plows in all-weather conditions day and night usually with extremely low
visibility. Operate spreaders and spray bars with electronic in cab controls and the proper rate to ensure
efficiency of material being applied. We are responsible to loading your own trucks with a front end loader and
liquid pumps to fill tanks. Products being used is rock salt, sand salt mixture when temperatures are extremely
16 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
low for traction, liquid salt brine and calcium chloride mixtures for the liquid de-icing. Must monitor pavement and
concrete temperatures and conditions to properly adjust application rates as needed. Called to respond to
hazardous areas such as bridges, curves, and intersections as well as unexpected slippery areas especially in
shaded areas from trees and buildings.
Category (Area of Responsibility): Chip seal % of Annual Total Time Spent on Category: 5 %
Duties within Category:
Roadway chip seal operations, preparing and maintaining asphalt surfaces to extend pavement life and improve
driving safety. Tasks including surface cleaning, applying asphalt binder, spreading aggregate chips, and rolling
to ensure proper adhesion and smooth surface texture. Operates and maintains chip sealing equipment,
spreaders, rollers, skid steers, tractors, and compacting equipment. Adhere to work-zone safety protocols, traffic
control procedures while having a safe traffic controlled work area with the correct signage and rumble strips
when necessary to warn the traveling public of what is up ahead and properly trained and certified flaggers to
control the work area and keep the workers and general public safe during operations. Personal protective
equipment requirements must be followed. Inspect completed chip seal work for uniform coverage, proper
embedment, overall quality, and documents materials used and work performed to support municipal pavement
preservation programs.
Category (Area of Responsibility): Tree work % of Annual Total Time Spent on Category: 15 %
Duties within Category:
Perform roadside tree maintenance along highway corridors to ensure motorist safety and protect roadway
infrastructure. Duties include trimming and removing tree, limbs, and stumps, clearing fallen or hazardous
vegetation and maintain clear zones and sight lines for visibility. Operate chainsaws, wood chippers, skid steer
with a stump removal attachment, excavator and bucket truck, front end loader for loading the removal of the
trees and brush into Class A and B heavy duty dump trucks, semi and dump trailer and hauled to the designated
dump area. Identify diseased, damaged, dead or unstable trees that can potentially cause issues and danger in
the future. Must be conscious of power lines in the trees or nearby, falling limbs, pinched saws, trip hazards,
equipment moving in the area, traffic, and assist with emergency response following storms or high wind events
to clear the roadway in all-weather events. After the removal of certain species of vegetation you may apply
chemical to prevent any future growth. All while having a safe traffic controlled work area with the correct signage
and rumble strips when necessary to warn the traveling public of what is up ahead and properly trained and
certified flaggers to control the work area and keep the workers and general public safe during operations.
Category (Area of Responsibility): Roadside Mowing/weed control % of Annual Total Time Spent on Category: 15 %
Duties within Category:
Roadside maintenance and vegetation control includes mowing and trimming along roads, medians, shoulders,
and right-of-way to ensure clear visibility and public safety. Skilled in controlling invasive and noxious weeds
using mechanical and approved chemical methods working alongside the DNR to be in compliance with
regulations. Operating large size tractors with ten and fifteen foot winged pull behind mowers at steep angles and
slopes safely while avoiding obstacles that may be hidden in the tall grass and as well as going around signs,
electrical boxes, culvert ends, tree and tree stumps, edges of the roadway, mailboxes, and anything else
imaginable that could be laying hidden from view. Must be conscious of vehicle and foot traffic to keep everybody
safe from flying debris and dangers. I am responsible for maintaining my own equipment which includes keeping
all glass clean and clear, minimize damage to tractor and mower, greasing both tractor and mower regularly,
17 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
remove and sharpen mowing blades as often as needed then re-install, as well as perform any other
maintenance that comes along with the job. For spraying the noxious weeds in the ditch we apply growth
inhibitors to slow the grass growth for safety and helps motorist see wildlife crossing the road. We use a large
Class B dump truck with a tank full of the chemical and a sprayer on the side to apply the liquid. Proper mixing
rates must be accurately measured and applied and hold a chemical applicators license to perform the job.
Always use the proper PPE and safety protocols while doing so. Controlling the weeds helps with vegetation
management, support environmental protection, response to public service request of vison issues the tall grass
may create, report hazards that you may come up upon, and maintain accurate records of work performed and
materials used.
Category (Area of Responsibility): Crack filling % of Annual Total Time Spent on Category: 10 %
Duties within Category:
The Duties of crack filling roads and pavement maintenance include preparing and cleaning the roadway cracks
for sealing using hand tools and air compressor to blow cracks clean to ensure a good seal of tar over the cracks.
Using a walk behind gas powered router to open the cracks bigger to get a big enough opening to fully penetrate
the crack properly. Apply hot or cold pour crack sealants to asphalt and concrete surfaces to prevent water
infiltration and extend pavement lifespan. Operates and maintains crack filling machines and associated tool, tar
squeegee, scraper, picks, and loading the machine with tar blocks from a truck. Safety equipment and proper
Personal protective equipment is needed during these operations including ear/hearing protection, gloves, safety
boots, pants, safety glasses, and high visibility clothing. Dangers can include extremely high temperature tar that
can cause serious burns, some protection from the sun is necessary at times and staying cool and hydrated. All
while having a safe traffic controlled work area with the correct signage and rumble strips when necessary to
warn the traveling public of what is up ahead and properly trained and certified flaggers to control the work area
and keep the workers and general public safe during operations. We also bring a crash truck with us to stage
behind the work zone as protection from cars to the works standing on the roadway. The crash truck has an
electronic message board to let traffic know what operations are being conducted and how to safely maneuver
around the work zone.
Category (Area of Responsibility): Road Repair % of Annual Total Time Spent on Category: 15 %
Duties within Category:
Municipal road repair and maintenance, performing tasks such as pothole, patching, asphalt, and concrete
repairs, and roadway milling and resurfacing to ensure safe and durable roads. Operates hand and power tools,
paving machines, bull dozer, milling machines, skid steer, laser to shoot grade and follow specifications of new
road, excavator, front end loader to tear up and remove the roadway, Class A and B heavy duty trucks to haul
milling spoils and asphalt in and out of the job site and other maintenance equipment. Prepares work area by
cleaning, cutting, and grading surfaces and inspects completed repairs to ensure quality, smoothness, and long-
term durability. Applying road paint both yellow and white to help keep motorist safe, as well signs in the road
right-of-way. Assist in maintaining accurate records of materials used, repairs completed, and maintenance
schedules to support effective municipal infrastructure management. All while having a safe traffic controlled
work area with the correct signage and rumble strips when necessary to warn the traveling public of what is up
ahead and properly trained and certified flaggers to control the work area and keep the workers and general
public safe during operations.
18 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
Category (Area of Responsibility): Computer work/Record Keeping/inventory % of Annual Total Time Spent on Category: 5 %
Duties within Category:
We use a large assortment of computer software such as MS Word, MS Excel, Outlook E-mail, Outlook Calendar,
Copilot, Google Maps, Google Earth, WebMDSS, Frost Solutions, Samsara, Community Maps, ArcGIS Enterprise,
Konexus, Assetworks, Tyler Time and Attendance, and Henderson Brine Xtreme Computer. We use these
programs to maintain record keeping, inventory, individual time management, and for operations of some of our
more advanced equipment with computer software onboard.
Category (Area of Responsibility): Equipment Maintenance % of Annual Total Time Spent on Category: 10 %
Duties within Category:
Equipment maintenance and repair for highway operations, performing routine inspections, preventive
maintenance, and repairs on mowers and blade replacement, trucks, paving equipment, rollers, excavators, skid
steers, front end loaders, and backhoes, bucket truck, plows and blade replacement, etc. Ensure all equipment is
properly lubricated, cleaned, and in safe working condition, following manufacture guidelines and safety
protocols. Diagnose mechanical issues, replace worn or damaged parts, and coordinate with supervisors and
shop foreman, and external service providers for major repairs. Maintains accurate maintenance logs, service
records, and inventory of tools and parts to support efficient and reliable operations.
SECTION 4 TOOLS, SOFTWARE, & TECHNOLOGY
Identify the software programs that proficiency is required in to successfully perform your duties. Please include standard programs (i.e. MS Word or Excel)
in addition to job-specific programs (i.e. accounting software, engineering software). If none are required, please list n/a.
MS Word, MS Excel, Outlook E-mail, Outlook Calendar, Copilot, Google Maps, Google Earth, WebMDSS, Frost Solutions, Samsara, Community Maps, ArcGIS
Enterprise, Assetworks, Tyler Time and Attendance, and Henderson Brine Xtreme Computer.
Identify technical equipment that proficiency is required in to successfully perform your duties. Examples include office equipment (i.e. copier, multi-line
phone system) as well as equipment used in the field (i.e. calibration equipment, GPS units, locating devices).
Desktop Computer, Microsoft Tablet, Sharp MX-4071 Printer/Copier, Mitel Multi-line Desk Phone, GPS Measuring Device, L3Harris XL-45 Handheld Radio,
Brine Xtreme Computer, Grade / Slope Laser
Identify vehicles and machinery that proficiency is required in to successfully perform your duties. Examples include forklift, squad car, lawn mower, etc.
Sign Truck, One Ton Pick-ups, Tandem Dump Trucks/Highway Plow Trucks, Tractor Trailer Semi’s, Tankers, Low-boy, Equipment Trailers, Heavy Wheel
Loaders, Excavators, Backhoe, Road widener machine, Bucket/boom truck, Skid steers; with various attachments, Steel Wheel Rollers, Wobble Wheel
Rollers, Bituminous Asphalt Patch Buggy, Crack filler melter, Road Saws, Brine Xtreme Brine Maker, John Deere Tractors, Bat Wing Mowers, Dozers,
Graders, Assortment of Power Tools, Air Compressors, Pneumatic Jack-Hammer, Cut-off Saws, Chain saw, Zero turn mower, Submersible water pump,
Generators, Plate compactor, Jumping Jack compactor, Forklift, Aerial lift, Vac/sweeper truck, rear mounted shoulder re-claimer, paint truck, walk
behind line painter, weed eater, power rake, backpack blower, hedge trimmer, pole saw, Crack router.
19 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
SECTION 5 JUDGMENTS / DECISION-MAKING
Identify at least five of the most typical judgments/decisions that you make in performing your job (throughout the course of a year) as well as the
possible solutions to these problems. Finally, identify those who may assist in the decision-making process and/or those who may review the decisions
made.
Typical Problems/Challenges Possible Solution(s) to Problem/Challenge Job Title(s) of Collaborators and/or
Who Reviews
Jobs change rapidly with little to no notice.
Flexibility in your job and multi skillset in your
toolbox. Being able to adapt to the ever changing
environment at a moment’s notice.
Superintendents and Assistant Superintendents
Interacting with the general public for issues and
complaints that may arise.
Possibly de-escalate the confrontation and
respond in a calm professional manner.
Respond promptly, document complaints, and
prioritize repairs. Communicate status to public
and supervisors.
Superintendents and Assistant Superintendents
Weather and environmental conditions (winter,
snow, rain, flooding, heat, storms, etc.)
Preparation of weather and keeping a close eye
on what is expected to come for weather. Have
the appropriate clothing on hand to help combat
the environment.
Superintendents and Assistant Superintendents
Responding to the unexpected. (road closures,
emergency response assistance, road repairs,
trees across road, flooding, etc.)
Always be ready and have a plan to execute
promptly and to ensure safety and efficiency to
react to the unexpected work.
Superintendents and Assistant Superintendents
Limited budget and resources with an aging
infrastructure.
Prioritize projects, perform preventive
maintenance and maximize efficiency. Schedule
regular inspections, maintenance, and long term
capital improvement plans.
Superintendents and Assistant Superintendents
SECTION 6 WORKING RELATIONSHIPS / INTERACTIONS / CONTACTS
Please identify your typical work relationships with other persons inside or outside of your own organization.
Title of Individuals With Whom
You Typically Interact Describe the Interaction (What Was Going On?) Why Was It Necessary?
Highway maintenance coworkers A meeting to designate the work to the employee with
no confusion.
To coordinate who is doing what job with what equipment is
needed to complete the task properly.
Emergency response personnel To coordinate who is doing what job and what needs
to be accomplished.
To meet the expectations of what they needed our
assistance with.
General public/public officials A compliment or complaint or assistance To help address the issue and find a resolution.
20 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
Superintendents/Assistants Description of task to be performed and location To ensure the job could be completed and what the
expectations are.
Other municipality/other
Department employees
Asked to help or do a job where assistance or group
effort is needed.
Provide a skillset that may lack in one area to help
complete the job.
SECTION 7 SUPERVISION / MANAGEMENT
Please indicate the type of responsibility you have as it pertains to leading or managing others. Understanding that some areas (e.g. terminating
employees) may require approval at a higher level (e.g. Human Resources), give a “yes” response if the primary recommendation comes from this
position and give a “provides input” response if the recommendation is handled through the “chain of command” in a department.
Area of Action / Responsibility Yes No Provides Input
Screen / Interview Applicants x
Hire / Promote Employees x
Evaluate Performance Of Others x
Provide Written / Verbal Warnings x
Suspend Employees x
Terminate Employees x
Prepare Work Schedules For Others x
Formal Project Management x
Provide Work Direction For Others x
Counsel Employees (e.g. Guiding/Coaching/Mentoring) x
Developing Training/Development Plans for Employees x
Train Employees (As Part Of The Normal Duties Of The Job) x
Approving/Assigning Overtime x
Approve Time Off Request For Others x
Develop / Implement Policies x
Do you directly supervise any employees?
If yes, please list the number of FTEs and job titles of those employees below: x
Job Title # of FTEs
21 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
SECTION 8 PHYSICAL REQUIREMENTS / WORK ENVIRONMENT
Please indicate the amount of time typically spent in the following categories throughout the course of a year. Although an explanation is invited for each
element, we ask that you provide a brief explanation of those elements marked with an * in the space provided.
Physical Requirements
[Place an “X” in the appropriate cells]
N/A Low Frequency Moderate
Frequency
High
Frequency
Carrying / Lifting 10 - 25 Pounds x
Carrying / Lifting 25 - 50 Pounds x
Carrying / Lifting > 50 Pounds *some jobs require brief moments of this X
Sitting x
Standing / Walking / Climbing x
Specific Vision, Hearing, Taste, or Smell Requirements *needing to see
exceptionally well during harsh winter storms while operating equipment and
keeping ears open for traffic when it is to your back
X
Squatting / Crouching / Kneeling / Bending x
Repetitive Hand/Foot Movement *operating controls on heavy equipment x
Pushing / Pulling / Reaching Above Shoulder x
Work Environment N/A Low Frequency Moderate
Frequency
High
Frequency
Indoor/Office Work Environment X
Outdoor Weather Conditions x
Noise >85dB (e.g. mower, heavy traffic, milling machine, etc.) *heavy
equipment, load diesel engine noise and motors running next to you majority
of the day.
x
Extreme Hot/Cold Temperatures (>90 degrees / <40 degrees) *winter storm
work and summer road repair x
22 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
Irritated or Agitated Individuals *try to avoid or deescalate the situation x
Hostile or Violent Individuals *have not experienced this yet x
Hazardous Fumes / Odors / Toxic Chemicals *fuel, bridge deck sealin
chemicals, heated tar and oils, etc. x
Electrical Hazards *sometimes come across down power lines and electrical
boxes in the field. x
Confined Spaces (as identified by OSHA) *against work policy for us x
Close Proximity to Moving Machinery / Equipment * everyday this is
experienced x
Bodily Fluids / Communicable Diseases *clothing item, needles, medical
devices found on roadway frequently X
Work-Related Travel x
Working Alongside Moving Traffic on Roads x
Provide Any Additional Information Regarding the Physical Requirements or Work Environment
(e.g. description of required vision, hearing, taste, smell; type of work travel; etc.):
SECTION 9 ADDITIONAL EMPLOYEE COMMENTS
Please identify any other job-related information that is not otherwise addressed in the JDQ, or would help someone else understand this job more
clearly:
Served in a 24/7 on-call capacity, responding promptly to emergency and after-hours situations including road hazards, weather-related events,
infrastructure failures, and public safety concerns. Provide immediate support for snow and ice control, flooding, fallen trees, traffic incidents, and urgent
roadway repairs to ensure safe travel conditions. Coordinated with supervisors, law enforcement, and other municipal departments as needed,
demonstrating reliability, flexibility, and strong problem-solving skills while maintaining readiness to respond at all times. (primary emphasis of being on
call and available during the winter months, to include; nights, weekends, and holidays as needed)
23 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
TO BE COMPLETED BY THE EMPLOYEE’S SUPERVISOR
SECTION 10 SUPERVISOR INFORMATION
Supervisor Name Dale Poggensee Supervisor Title Superintendent – County Operations
SECTION 11 EDUCATION REQUIRED FOR HIRE
Level of Education REQUIRED
(Select one with an “X”) Field(s) of Study (e.g. Degrees/Concentrations)
Less than High School Education n/a
High School Education (or Equivalent) x
One Year Certificate (or Equivalent)
Associate’s Degree (or Equivalent)
Bachelor’s Degree
Master’s Degree
Professional Degree (Juris Doctor, Medicine, etc.)
PhD w/ Dissertation
Other:
Provide Any Additional Information Regarding the Required Education (e.g. preferred vs. required, specific coursework, etc.):
High school diploma or equivalent competencies
SECTION 12 TOTAL EXPERIENCE REQUIRED UPON HIRE
[Place an “X” in the appropriate cells]
No Experience < 2 yr. 2 to 3 yrs. 4 to 5 yrs. 6 to 7 yrs. 8 to 9 yrs. 10 to 11 yrs. ≥ 12 yrs.
X
Describe Specific Experience Required for Hiring (e.g. 5 total years of customer service experience 2 of which were in a supervisory capacity):
24 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
Two to three years of relevant prior experience.
SECTION 13 CERTIFICATION / LICENSURE / TRAINING TO PERFORM JOB
List Required Certification/Licensure/Training How Attained/Provided Required
Upon Hire?
May Obtain
After Hire?
Valid Wisconsin Commercial Driver's License - Class A or B Wisconsin Department of Motor Vehicle x
Wisconsin CDL - Tanker Endorsement N Wisconsin Department of Motor Vehicle 30 day
minimum
Good driving record for the past 10 years n/a x
Must wear steel-toe safety shoes n/a x
Comments - Describe any time requirement for certification, recertification requirements, and any current practices as it relates to licensure or
certification (e.g. extra pay for certification, employer payment for obtaining or renewing, etc.):
SECTION 14 SUPERVISOR’S CORRECTIONS / ADDITIONS
In lieu of altering an employee’s JDQ, please provide any corrections, clarifications, or additional information in the space provided below.
JDQ Section Correction / Addition
3 Merge Ditching, Shouldering, Chip seal, Crack filling categories and all the duties within, into the category Road Repair, and set
the percentage at 43%
3 Merge Tree work and Roadside Mowing/weed control, and all the duties within, into a new category titled Vegetation
Management, and set the percentage at 30%
3 Lower Equipment Maintenance to 7%
3
Change Computer work/Record Keeping/inventory category to Data Entry/Training – set at 5% and change the duties within to:
Employees use a number of programs to navigate our training requirements; accessing our email; ensuring Time & Attendance
entries are correct, requesting time off, and approving pay periods; entering time at the end of each shift into AssetWorks;
conduct classroom and hands-on training for flaggers in accordance with the state and MUTCD standards. .
25 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
SECTION 15 ADDITIONAL SUPERVISOR COMMENTS
Please identify any other job-related information that is not otherwise addressed in the JDQ, or would help someone else understand this job more
clearly:
The Highway Maintenance Worker position provides critical yet often underappreciated benefits to the County and its residents. Beyond the visible tasks
of snow removal and road repair, these employees safeguard public safety and the integrity of infrastructure through a diverse range of specialized
duties—vegetation management, drainage control, emergency response, and equipment maintenance—all performed under challenging conditions and
strict safety protocols. Their adaptability ensures continuity of essential services during severe weather, emergencies, and infrastructure failures,
reducing costly disruptions and protecting taxpayer investments. This role demands proficiency across multiple disciplines, from heavy equipment
operation to chemical application and computerized systems, making these employees indispensable to the County’s operational resilience. Their work
not only preserves roadway functionality but also enhances environmental stewardship, public confidence, and long-term infrastructure sustainability—
benefits that extend far beyond the scope of a typical maintenance position.
Despite these critical contributions, Highway Maintenance Workers in Walworth County are underpaid compared to similar roles in neighboring counties
and private-sector organizations. This disparity poses a serious risk to retention and recruitment, as competing employers offer higher wages for
comparable technical and multi-skilled positions. Addressing this gap through a more competitive pay structure is essential to maintaining workforce
stability, protecting institutional knowledge, and ensuring the uninterrupted delivery of vital highway services.
26 of 36
© Job Description Questionnaire (JDQ) (Revised 01/2020)
TO BE COMPLETED BY ADMINISTRATIVE DESIGNEE (AS NEEDED)
SECTION 16 SUPERVISOR INFORMATION
Administrative Designee Name Administrative Designee Title
SECTION 17 ADMINISTRATIVE COMMENTS / CORRECTIONS / ADDITIONS
In lieu of altering an employee’s JDQ, please provide any corrections, clarifications, or additional information in the space provided below.
JDQ Section Comment / Clarification / Addition
27 of 36
1. VENDOR # * 2. DATE SUBMITTED
3. SUBMITTED TO
4. VENDOR NAME
5. PO # *
6. ACCOUNT # 58150 C2101 *
7. ORDERED AMOUNT *
8. LIQUIDATED TO DATE *
9. BALANCE ON PO *
10. AMOUNT TO BE PAID
11. INVOICE / PAY APP
#
12. BALANCE 13. FINAL INVOICE YES NO
YES NO
14. LIQUIDATE BALANCE YES NO PWC FINANCE
Date Vote
15. CLOSE PO YES NO
19. INITIALS
SUBMITTED BY:
APPROVED BY DIVISION
DIRECTOR:
APPROVED BY PUBLIC
WORKS DIRECTOR:
21. ADDITIONAL COMMENTS:
Contract #2346
109499
FINISH EXCAVATING INC.
18. PRINT NAME
PAYMENT REQUEST * obtain information from Munis Purchase Order Inquiry Screen
6-Nov-26
15
-$
18,812.00$
18,812.00$
5,757,150.00$
5,775,962.00$
41130
PWC
RICHARD HOUGH 6-Nov-26
attach invoice
VIJAY NARAYANAN
20. DATE SIGNED
6-Nov-26
VIJAY NARAYANAN 6-Nov-26
16. COMMITTEE
APPROVAL REQUIRED
17. COMMITTEE
APPROVAL OBTAINED
Saved in T:\Misc Forms\Payment Request Form\Payment Request Form - Finish Excavating Password DPW
28 of 36
Form 1-220-B: Capital Improvement Project Change in Scope
Approved
Enacted 11/19/2020 Form 1-220-B
Revised 10/22/2021 Capital Improvement Budget Page 1 of 2
☐ Requesting change in scope within Administrator Authority, Report to Public Works Committee.
☒ Change in scope requires Public Works Committee approval.
Requesting department: Public Works Approving committee: Public Works Committee
Capital Project Name Project Identifier Project Budget
Safety Improvements W2439
Justification to Change Scope Cost (Savings): $35,000.00
W2439 was originally established to support enhancements to DPW’s safety program through the purchase and
installation of safety-related equipment, funded by ARPA, including hard hats, cage ladders, davit cranes, and
roof safety barriers. Funds were committed to equipment purchases and installations, including cage ladders and
davit cranes.
One high-priority project was installing a davit crane at the Sheriff's Office (SO) to safely handle large rooftop
motors and fan units weighing more than 300 pounds. This need was further supported by a prior worker injury
sustained while replacing rooftop equipment. After purchase, the planned installation could not proceed because
the rooftop parapet wall was found to lack the structural support originally assumed. Subsequent evaluation by
DPW and its in-house engineer did not identify a feasible alternative installation method.
To address this issue and ensure the davit crane investment can be utilized as intended, DPW proposes expanding
the project scope to include engineering and design services to determine the structural modifications necessary
to safely install and operate the davit crane and provide cost estimates for future construction. Structural upgrades
and davit socket installation final costs to be evaluated following completion of the design work.
The requested scope change will allow completion of the engineering analysis needed to support a critical safety
improvement and maximize the value of the previously purchased equipment.
☒ I have reviewed and approve the request. Funds are available within the project.
6 Nov 2026
Department Head Signature Date
Managing Project Department Head/Elected Official:
“W” or Road Project – PW Director “I” Project – IT Director “C” Project – No further signature required
I have reviewed from an operational perspective with the following comments:
The original equipment purchase failed to identify structural requirements. With equipment already
on hand and to avoid creating a safety challenge, assessment of the rooftop structure and an engineering
solution is necessary.
PW or IT Director Signature Date
6 Nov 2026
29 of 36
Approved Title
Form #
Enacted Page 2 of 2
Finance Director:
I have reviewed from a financial perspective with the following comments:
Finance Director Signature Date
County Administrator:
☐ Committee approval required ☐ Report to Committee, compelling need to move forward exists
Comments on Change of Scope:
County Administrator Signature Date
Public Works Committee Decision: ☐ Approved ☐ Disapproved Signature:_____________ Mtg Date: ______
Form to be maintained by Senior Accountant-Public Works.
Budgeted grant funds are spent. Budget amendment for $35,000 with ARPA
interest funding is pending Finance Committee approval.
There is a regular, periodic need for the davit crane, and the important safety enhancements need to be realized.
11-9-26
11/9/2026
30 of 36
1
Resolution No. **-12/26
Approving Request to the Department of Natural Resources to Include All-Terrain Vehicle
(ATV) and Utility-Terrain Vehicle (UTV) Riding on the White River State Trail
M
oved/Sponsored by: Parks and Public Works Committee 1
2
WHEREAS, the White River State Trail is a multi-use recreational trail spanning across 3
Walworth County, currently managed under a cooperative agreement between Walworth County 4
and the Wisconsin Department of Natural Resources (DNR); and, 5
6
WHEREAS, motorized outdoor recreation, specifically ATV and UTV riding, represents a 7
significantly growing recreational activity and a vital economic driver for tourism and local 8
businesses within Walworth County; and, 9
10
WHEREAS, expanding local trail networks to safely accommodate ATV and UTV users 11
promotes regional outdoor recreation and seamlessly connects municipal routes already 12
established by the City of Elkhorn and the Townships of Geneva and Lyons in the County; and, 13
14
WHEREAS, Wisconsin State Statutes 23.33 grants authorities for the regulation and designation 15
of ATV and UTV routes and trails, subject to appropriate safety, environmental, and engineering 16
reviews by the DNR; and, 17
18
WHEREAS, the inclusion of ATVs and UTVs on the White River State Trail requires a formal 19
modification or amendment to the existing State Trail Master Plan as outlined in the cooperative 20
management guidelines established by the DNR. 21
22
NOW, THEREFORE, BE IT RESOLVED that the Walworth County Board of Supervisors 23
officially requests the Wisconsin Department of Natural Resources to initiate a feasibility review 24
and master plan amendment process to allow seasonal or year-round ATV and UTV operation 25
along the Walworth County segment of the White River State Trail; and, 26
27
BE IT FURTHER RESOLVED that County staff are authorized to provide necessary 28
documentation to the DNR to expedite this review; and, 29
30
BE IT FURTHER RESOLVED that the County Clerk is directed to forward a certified copy of 31
this approved resolution to the Secretary of the Wisconsin Department of Natural Resources, 32
local state legislative representatives, and the governing bodies of adjacent municipalities along 33
the White River State Trail corridor. 34
35
36
37
Rick Stacey Susi Pike 38
County Board Chair County Clerk 39
40
County Board Meeting Date: December 8, 2026 41
42
DRAFT
31 of 36
2
Action Required: Majority Vote _____X Two-thirds Vote ______ Other ______ 1
Policy and Fiscal Note is attached.
Reviewed and approved pursuant to Section 2-91 of the Walworth County Code of Ordinances:
________
____________________ _____________________________
Michael P. Cotter Date Jessica Conley Date
Corporation Counsel Finance Director
Mark W. Luberda Date
County Administrator
If uns
igned, exceptions shall be so noted by the County Administrator.
32 of 36
3
Policy and Fiscal Note
Resolution No. ** -12/26
I. T
itle: Approving Request to the Department of Natural Resources to Include All-Terrain
Vehicle (ATV) and Utility-Terrain Vehicle (UTV) Riding on the White River State Trail.
II. P
urpose and Policy Impact Statement: As part of its trail and park master planning
procedures, the Wisconsin Department of Natural Resources requires a resolution from
the County concerning its desire to include ATV and UTV riding on the White River
State Trail.
III. B
udget and Fiscal Impact: ATV and UTV access to the White River State Trail would
facilitate additional funding between $100 and $300 per mile in Trail Aids. Trail Aids
procedures require an annual grant application from the Department of Public Works.
IV
. Referred to the following standing committees for consideration and date of
referral:
C
ommittee: Park Committee
M
eeting Date: November 16, 2026
V
ote:
C
ommittee: Public Works Committee
M
eeting Date: November 16, 2026
V
ote:
C
ounty Board Meeting Date: December 8, 2026
Policy and Fiscal Note is attached.
Reviewed and approved pursuant to Section 2-91 of the Walworth County Code of Ordinances:
________
____________________ _____________________________
Michael P. Cotter Date Jessica Conley Date
Corporation Counsel Finance Director
Mark W. Luberda Date
County Administrator
If uns
igned, exceptions shall be so noted by the County Administrator.
33 of 36
1
Resolution No. **-12/26
Authorizing the Public Works Department to Apply for the Federal Recreational Trails
Program Grant (RTP) and Adding the Grant to Previously Established Pre-Approved
Recurring Grants List
M
oved/Sponsored by: Parks Committee, Public Works Committee, and Finance Committee 1
2
WHEREAS, the Walworth County Public Works Department would like to apply for the 3
Federal Recreational Trails Program (RTP) Grant to be used for future improvement projects on 4
the White River State Trail; and, 5
6
WHEREAS, Section 30-313 of the Walworth County Code of Ordinances allows the 7
establishment, by resolution, of a list of authorized recurring grants; and, 8
9
WHEREAS, Resolution 08-05/05 established a list of pre-approved, recurring grants; and, 10
11
WHEREAS, the Public Works Department desires to add the RTP grant to the aforementioned 12
list; and, 13
14
WHEREAS, inclusion of a grant on the authorized list provides authority to the County 15
Administrator to approve the application and receipt of a grant so included until such time as a 16
material change in conditions of a grant occurs; and, 17
18
WHEREAS, a material change in conditions of a grant includes, but is not limited to, capital 19
expenditures, capital acquisitions, increase in percentage of County match or variation from the 20
original intent of the grant; and, 21
22
WHEREAS, the authorized list, at a minimum, will be reviewed on an annual basis and 23
revisions proposed as necessary; and, 24
25
WHEREAS, new grant opportunities for Walworth County departments may be added by 26
authorization of the County Board at a future date; and, 27
28
WHEREAS, the Director of Public Works has identified a future funding shortfall for the White 29
River State Trail, a state asset; and, 30
31
WHEREAS, per agreement with Wisconsin Department of Natural Resources (WDNR) the 32
County limits maintenance expenditures to $5,000 but has a major backlog in trail and trail 33
bridge maintenance; and, 34
35
WHEREAS, the RTP grant may be applied to recreational trail and recreational trail facility 36
improvements. 37
38
34 of 36
2
NOW, THEREFORE, BE IT RESOLVED that the Public Works department is authorized to 1
apply for and accept the Federal Recreational Trail Program Grant which will be incorporated 2
into the budget through future capital budget processes. 3
4
BE IT FURTHER RESOLVED by the Walworth County Board of Supervisors that the Federal 5
Recreational Trail Program Grant be added to the previously established pre-approved recurring 6
grants list. 7
8
9
10
Rick Stacey Susi Pike 11
County Board Chair County Clerk 12
13
County Board Meeting Date: December 8, 2026 14
15
Action Required: Majority Vote X Two-thirds Vote Other 16
Policy and Fiscal Note is attached.
Reviewed and approved pursuant to Section 2-91 of the Walworth County Code of Ordinances:
________
____________________ _____________________________
Michael P. Cotter Date Jessica Conley Date
Corporation Counsel Finance Director
Mark W. Luberda Date
County Administrator
If uns
igned, exceptions shall be so noted by the County Administrator.
35 of 36
3
Policy and Fiscal Note
Resolution No. **-12/26
I. Title: Authorizing the Public Works Department to Apply for the Federal Recreational
Trails Program Grant (RTP) and Adding the Grant to Previously Established Pre-
Approved Recurring Grants List
II. Purpose and Policy Impact Statement: The purpose of this resolution is to authorize
the Public Works Department to apply for the Federal Recreational Trail Program grant,
available through the Wisconsin Department of Natural Resources (WDNR). The RTP
grant shall be added to the list of recurring grants which may be applied for without
further County Board action. The grant will help support the Public Works Department’s
goal of maintaining a quality recreational trail system.
III. Budget and Fiscal Impact: Passage of this resolution will not have an impact on the
2027 adopted budget. The next grant cycle is the spring of 2027.
IV. Referred to the following standing committee(s) for consideration and date of
referral:
Committee: Parks Committee Date: November 16, 2026
Vote:
Committee: Public Works Committee Date: November 16, 2026
Vote:
Committee: Finance Committee Date: November 19, 2026
Vote:
County Board Meeting Date: December 8, 2026
Policy and fiscal note has been reviewed and approved as an accurate statement of the probable policy and fiscal
impacts associated with passage of the attached ordinance.
___________________________________ ____________________________________
Michael P. Cotter Date Jessica Conley Date
Corporation Counsel Finance Director
Mark W. Luberda Date
County Administrator
36 of 36
Source: Walworth County website. First collected Nov 17, 2026.