RecordWell Data

Joint Session Piers Harbor & Lakefront Committee and Board of Park Commissioners — Agenda Packet

City of Lake Geneva · Walworth County · General · meeting of Nov 19, 2026 · Agenda packets

Open the original document More from City of Lake Geneva

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

November 19, 2026 Board of Park Commissioners Agenda 1 City of Lake Geneva, 626 Geneva St, Lake Geneva, WI 53147-262.248.3673-www.cityoflakegeneva.gov Joint Piers, Harbor, & Lakefront Committee & Board of Park Commissioners Agenda Thursday, November 19, 2026 - 5:30 PM Lake Geneva City Hall; Council Chambers Members: Park Board Members President: Adam St. Marie Members: Dana Furlo, Jessica Pokorny, David Quickel, Peggy Schneider, and Betty Volquardsen Council Liaisons: Alderperson Cindy Yager and Mayor Todd Krause Piers, Harbor, & Lakefront Members Chair: Cindy Yager Members: Sherri Ames, Linda Frame, JaNelle Powers, Cathy Stoodley 1. Call to Order 2. Roll Call 3. Comments from the public limited to 5 minutes, limited to items on this agenda 4. Discussion/Recommendation regarding Plan Review #1 of the Comprehensive Outdoor Recreation (CORP) and Lakefront Plan 5. Adjournment A quorum of the Council may be present; however, no official Council action will be taken. Requests from persons with disabilities who need assistance to participate in this meeting should be made to the City Clerk’s office in advance so that the appropriate accommodations can be made. Page 1 of 81 Table of Contents i DRAFT: NOVEMBER 2026 CITY OF LAKE GENEVA COMPREHENSIVE OUTDOOR RECREATION PLAN Page 2 of 81 LAND TO LAKE PLAN ii Table of Contents Chapter 1: Introduction and Existing Conditions ............................................................................................1 Introduction ............................................................................................................................................................................................. 2 General Regional Context ............................................................................................................................................................... 5 Existing Conditions .............................................................................................................................................................................. 5 Chapter 2: Existing Park and Open Space Facilities .......................................................................................8 Description of Existing Public Park and Recreation Facilities ............................................................................... 9 Community Parks ............................................................................................................................................................................... 11 Neighborhood Parks ........................................................................................................................................................................ 13 Mini Parks ............................................................................................................................................................................................... 14 Natural, Open Space, and Special Use Areas.................................................................................................................... 15 School Facilities ................................................................................................................................................................................... 19 County and State Facilities ......................................................................................................................................................... 20 Private Facilities ................................................................................................................................................................................. 20 Chapter 3: Public Participation ................................................................................................................... 21 Planning Process ............................................................................................................................................................................... 22 Site Visits ................................................................................................................................................................................................. 22 Pop-up Engagement Events ..................................................................................................................................................... 23 Focus Group Interviews ................................................................................................................................................................. 23 Community Survey ........................................................................................................................................................................... 25 Chapter 4: Vision, Goals, and Strategies ..................................................................................................... 27 Goals ........................................................................................................................................................................................................... 29 Strategies ................................................................................................................................................................................................30 Chapter 5: Park and Open Space Standards ................................................................................................ 32 National Guidelines .......................................................................................................................................................................... 33 Lake Geneva Park Standards .....................................................................................................................................................34 Service Areas ......................................................................................................................................................................................... 35 Recreational Programming and Staffing .......................................................................................................................... 35 Chapter 6: Analysis of the Existing Park and Open Space System ................................................................. 37 Quantitative Analysis ....................................................................................................................................................................... 38 Qualitative Analysis ......................................................................................................................................................................... 40 Geographic Analysis ........................................................................................................................................................................ 41 Review of the Wisconsin Statewide Comprehensive Outdoor Recreation Plan 2025 -2030 ............42 Chapter 7: Park Facility Recommendations ................................................................................................. 43 Citywide Park Facility Recommendations ........................................................................................................................45 Recommended Improvements to Existing Parks ...................................................................................................... 47 Natural and Open Space Areas Recommendations .................................................................................................. 52 Recommended New Parks ......................................................................................................................................................... 53 Hillmoor Property .............................................................................................................................................................................. 53 Recommended Special Use Facilities ..................................................................................................................................54 Planning Assistance provided by: Page 3 of 81 Chapter 1: Introduction and Existing Conditions 1 Chapter 1: Introduction and Existing Conditions Page 4 of 81 LAND TO LAKE PLAN 2 Introduction Communities throughout the world recognize that park lands, recreation trails, and natural areas are key components of high-quality living environments. Open spaces that allow people to connect with nature and provide opportunities for outdoor recreation create many benefits and serve many important functions, including: • creating and promoting activity within the community; • supporting and accommodating healthy lifestyles; • enhancing community building through participation in recreational activities; • improving the aesthetics of public spaces; • increasing property values; • attracting visitors and tourists; • shaping development patterns; and • protecting the natural environment. The park and open space system of every community should be planned and designed to meet the diverse needs of its population. Proper recreation-based planning requires a focus on both the types of facilities to meet the needs of the community as well as the geographic distribution of those facilities relative to those who will use them. The Lake Geneva community’s park, recreation, and open space system is one of its many important amenities. The existing system plays a key role in the community’s high quality of life, however, there are opportunities for improvement to serve the City’s evolving population, protect and maintain its high-quality natural resources, and embrace opportunities for open space preservation and recreation. This section of the Land to Lake Plan serves as the City of Lake Geneva’s official Comprehensive Outdoor Recreation Plan (CORP). As such, it compiles, reviews, and updates information on the physical facilities and lands that make up the existing City park and open space system, and it provides guidance for future improvement and expansion of the system. This document serves as an important element of Lake Geneva’s overall community planning program and is purposefully aligned with the City’s recent Strategic Action Plan. It addresses the long-range park and open space needs of the community over the next decade, with a specific focus on park and recreation HEALTH BENEFITS OF PARKS: • Create destinations and venues for physical activity • Reduce stress and improving mental wellness • Foster community interactions and social support networks • Reduce air and water pollution • Mitigate urban heat islands • Preserve important habitat, environmental, and cultural sites Source: Centers for Disease Control and Prevention and National Park Service. Parks, Trails, and Health Workbook, 2020. Page 5 of 81 Chapter 1: Introduction and Existing Conditions 3 action items over the next five-year period (2026-2031). Five years is generally considered a reasonable horizon in park planning because social, cultural, and political conditions tend to change enough over that time for the goals, objectives, policies, and recommendations that derived from previous plans to be reevaluated. This CORP has been prepared in accordance with guidelines that will make it certifiable by the State of Wisconsin Department of Natural Resources (WisDNR) and qualify the City of Lake Geneva for matching grant funds through the Federal Land and Water Conservation Fund and the Federal Recreation Trails Act. The CORP must be updated every five years to ensure that it reflects the current needs of the community and retains its WisDNR certification. The plan has also been prepared in accordance with Wisconsin Statutes 61.35, 236.29 and 66.0617. This Plan is intended to build upon and refine the previous analysis and recommendations presented in the City of Lake Geneva’s 2026 Strategic Action Plan, 2021 Comprehensive Park and Open Space Plan, and other plans and guidelines related to Lake Geneva. Lake Geneva’s public parks and open spaces are operated by the City’s Parks Department and maintained by the Department of Public Works. This CORP was prepared under the direction of City staff and City Council. The purpose of the plan is threefold: Guide Decisions • Guide the decisions of the City and other providers of open space and recreational lands in the area in order to provide for the increasing demand for recreation facilities Recommend Opportunities • Recommend opportunities for recreation and open space improvements within the community Grant Funding • Maintain Lake Geneva’s eligibility for recreation grant funds with updates completed approximately every five years OUTDOOR RECREATION IN WISCONSIN In 2024, Wisconsin’s outdoor recreation industry contributed a record-setting $12 billion to the state’s gross domestic product surpassing the previous record set in 2023 by 3.8%. Additionally, the industry supports over 100,000 jobs across various sectors in the state. Overall, outdoor recreation throughout Wisconsin provides a high quality of life for residents, economic opportunity, public health benefits, community identity by highlighting cultural and historic resources, and natural resource preservation and enhancement. Source: Wisconsin Office of Outdoor Recreation, 2025 Page 6 of 81 LAND TO LAKE PLAN 4 INTENDED OUTCOMES OF THIS PLAN Building a Stronger, More Connected Lake Geneva The Land to Lake Plan was developed as a component of the City of Lake Geneva’s proactive, long-term community planning program and is intended to complement and support the community’s other long-term planning initiatives. The document has been designed to address Lake Geneva’s park and recreational needs over the next 5 – 10 years and beyond. Community- Informed Decision Making Recommendations are grounded in extensive public engagement and reflect the priorities of residents, stakeholders, and community partners. Strategic Park Investments Guide future investments through both system-wide and facility-specific recommendations that improve parks, recreation facilities, and public spaces. Stronger Regional Connections Expand recreational connections between Lake Geneva and surrounding communities through improved trail, bicycle, and recreation networks. Balanced Community Priorities Help City leaders balance land use, environmental stewardship, operational needs, and capital improvement priorities. Sustainable Parks & Natural Resources Protect and enhance Lake Geneva’s parks, natural resources, and open spaces to support recreation, environmental quality, and a high quality of life. Enhanced Quality of Life Provide equitable access to recreational opportunities that support physical health, social interaction, and community well-being. Community & Economic Vitality Leverage parks and recreation as community gathering places that strengthen local identity, attract visitors, and support economic activity. Page 7 of 81 Chapter 1: Introduction and Existing Conditions 5 General Regional Context The City of Lake Geneva is located in southeastern Walworth County, near the Wisconsin and Illinois border. The City is near several larger metropolitan areas, including Kenosha, Racine, Chicago and Milwaukee. As a City located on the shores of Geneva Lake, it is a very popular tourist destination from these metropolitan cities. Lake Geneva was originally developed as a recreational retreat for upper class families. However, because of its proximity to regional highway systems and to larger metropolitan areas, the City has become a place where individuals and families from all walks of life choose to live, work, and recreate on a daily basis. The City is south of Interstate Highway 43 and is situated between Interstate Highway 90 to the west and Interstate Highway 94 to the east. Existing Conditions Lake Geneva’s population grew from 7,685 (2010) to 8,521 (2024), with its sharpest increase during the pandemic period (+4.85% in 2020). Lake Geneva is also growing faster than its neighboring communities and the state, growing 11% between 2010 and 2024 compared to 1-9% growth in neighboring communities during the same timeframe, as shown in Figure 1.1. This growth coincides with a pronounced aging trend. Residents aged 50+ now account for 46% of the population, up from 34% in 2010. The median age increased from 39 to 49.1 years in just over a decade. This demographic transformation was a significant finding in the City’s Strategic Action Plan. That plan noted that the community is experiencing population growth alongside a notable increase in median age. Residents over the age of 50 now represent nearly half of the population, while the proportion of younger residents and families has declined. The strategic planning process emphasized the importance of attracting and retaining families, workers and young professionals, while still welcoming and supporting senior residents. Strategic planning participants emphasized that a healthy community req uires demographic balance and opportunities for residents across all stages of life. The Land to Lake Plan emphasizes recreational amenities and programming that support residents across all stages of life. Focus is placed on serving young families and children to help sustain community growth, while also providing opportunities that meet the needs of the City’s senior population. The plan further promotes facilities and programs that encourage multigenerational recreation, social interaction, and community engagement. Lake Geneva’s population has shifted toward older age groups, with noticeable growth among residents ages 50–74 and 65+, especially among women. At the same time, the base of the population has narrowed, with fewer children and younger working-age adults than in 2010. This Page 8 of 81 LAND TO LAKE PLAN 6 shift in age also indicates the need for a commitment to ADA accessibility throughout the Lake Geneva Parks System. People become more prone to disability as they age. Lake Geneva remains one of the most racially diverse among its peer cities, with 90% White (Non- Hispanic) residents compared to 88–95% elsewhere. The Hispanic/Latino population represents 6% of residents, far above peers, but declined in absolute numbers (from 1,323 to 511 residents since 2010). Meanwhile, the Multi-Racial population increased seven-fold (from 66 to 480 residents). Community programming and recreational materials that reflect the diverse nature of Lake Geneva would help the City to feel more welcoming to residents and visitors alike. The City added approximately 990 housing units between 2010 and 2024 (from 4,225 to 5,215 units). Despite this growth, affordability pressures have intensified. The median home value reached $343,000 and median rent $1,389. Finding ways to decrease participation costs in recreational programming would help alleviate some affordability pressures. Figure 1.1: Population Trends for Walworth County Communities MUNICIPALITY 2000* 2010 2020* 2024 2000- 2010 2010- 2024 City of Lake Geneva 7,148 7,685 8,277 8,521 ▲ 8% ▲ 11% City of Burlington 9,874 10,464 10,258 10,987 6% 5% City of Elkhorn 7,305 10,084 10,247 10,221 2% 1% Village of Bloomfield — 4,400 4,781 4,780 — 9% City of Delavan 7,943 8,542 8,505 8,689 8% 2% Wisconsin 5,363,675 5,686,986 5,893,718 5,892,023 6% 4% KEY FINDING Lake Geneva experienced the strongest population growth among comparable communities between 2010 and 2024, increasing by approximately 11%. Source: U.S. Census Bureau, American Community Survey, 5-Year Estimates, 2024. *U.S. Census Bureau, 2000 – 2020 Census. The figure above shows that Lake Geneva is growing faster than its peer communities, leading to the need for a more in-depth population projection. Predicting future population growth is challenging and somewhat inexact. It should be noted that Lake Geneva’s actual future population will depend on social and economic trends, market conditions, sentiments toward growth, and new, residential development projects. A full set of population projections through the year 2050 prepared specifically for this Plan can be found in the Appendix. These forecasts provide the basis for determining future need for parks and open spaces. For the purposes of this CORP, the City should utilize the Linear Growth 2010 -2024 scenario found in the Appendix as a reasonable population projection; this projection results in a total projected population of 9,178 residents by 2035 and 10,119 by 2050. This population projection should be used to project future parkland and potential park impact fees needed in the C ity. With regard to age, the US Census reports a higher median age (49) than Wisconsin overall (40). The City also has a lower percentage of residents under 18 years of age compared to the rest of Wisconsin. The percentage of residents that are between the ages of 20 to 44, usually young working professionals and those just starting families, is about 27%. The City has a significantly higher percentage of residents over age 65 (26%) than the State (19%). Additionally, over 40% of the population is aged 55+. These numbers point to the need for recreational amenities and programming that are suitable for older populations and young working professionals while keeping in mind young families. Page 9 of 81 Chapter 1: Introduction and Existing Conditions 7 Figure 1.2: Age Distribution Median Age Percent Under 18 Percent Over 65 2000 2010 2024 2000 2010 2024 2000 2010 2024 City of Lake Geneva 39 39 49 21% 23% 18% 16% 16% 26% Wisconsin 36 39 40 26% 21% 21% 13% 14% 19% Source: U.S. Census Bureau, 2000 Census. Source: U.S. Census Bureau, 2010-2024 American Community Survey 5-Year Estimates. Figure 1.3: Household Characteristics Median Owner- Occupied Median Gross Rent Median Household Income Total Housing Units Percent Owner Occupied Average Household Size Home Value Costs per month with a mortgage City of Lake Geneva $343,800 $1,690 $1,389 $75,629 5,215 54.8% 1.98 Wisconsin $266,500 $1,689 $1,087 $77,485 2,778,572 67.8% 2.33 KEY FINDING Lake Geneva's population is older than the state average, with a median age of 49 years and 26% of residents age 65 or older. Combined with smaller household sizes and higher housing costs, these trends suggest continued demand for accessible parks, passive recreation, and amenities that serve both older adults and families. Source: U.S. Census Bureau, 2020-2024 American Community Survey 5-Year Estimates. The City’s average household size is 1.98 persons per household which is well below the state average; this could be connected to the older median age and higher percentage of residents over 65 years old in Lake Geneva. Also, more than half of city residents are homeowners (54.8%). As compared to the rest of the state, Lake Geneva’s median home value and rent are much higher and median household income is slightly lower, possibly pointing towards the need for more free or low-cost recreational programming due high cost of housing relative to household incomes. Utilizing the population projections and methodology described earlier in this Plan, the projected number of households were also calculated. By 2050, it is projected that the City could add 777 total new households. A complete inventory, analysis, and review of Lake Geneva’s natural resource components, data trends, and existing plans can be found in the Appendix. Page 10 of 81 LAND TO LAKE PLAN 8 Chapter 2: Existing Park and Open Space Facilities Page 11 of 81 Chapter 2: Existing Park and Open Space Facilities 9 The presence of outdoor recreation sites and open spaces add significant opportunities for dynamic activity, social connection, physical exercise, and numerous other health benefits to a community’s quality of life. They enhance the attractiveness of the community and foster a sense of civic pride and identity. Furthermore, even small green spaces, playgrounds, or parks create a sense of social cohesion and focal point for their surrounding neighborhood. The City of Lake Geneva provides numerous opportunities for residents to enjoy the outdoors. As provided below, Lake Geneva’s park, recreation, and open space system consists of a range of facilities including passive recreation areas, playgrounds, pathways and walking trails, and athletic fields. In total, the City, and Lake Geneva J1 School District own and operate a total of 330 acres of parkland in 31 park and school facilities. The City itself owns or operates 28 park sites, while the School District provides the community with additional facilities. The City’s park system includes Neighborhood Parks, Community Parks, Mini Parks, and School Facilities located throughout the community. The City of Lake Geneva recently acquired the Hillmoor property, providing an additional 230 acres, which will be integrated into the parks system in the near future. While future park acreage needs will be met, there is also space for Lake Geneva to grow. As new residential developments are established, parkland should also be provided to avoid gaps in service. Description of Existing Public Park and Recreation Facilities A brief description of each of the community’s existing park and open space sites is included on the following pages. Existing Facilities are depicted on Map 1. A full inventory of parkland and amenities are provided in Figure 2.1 Park Inventory and Figure 2.2 Park Facility Matrix. KEY PARK SYSTEM FACTS Existing Recreation Assets • 268 Acres of Parks & Open Space • 26 Facilities across City and School Properties • 230 Acres of Future Parkland at Hillmoor Planning Focus: Prioritize reinvestment, accessibility, neighborhood service, and long- term stewardship over major parkland acquisition. Page 12 of 81 LAND TO LAKE PLAN 10 Map 1: Existing Facilities Page 13 of 81 Chapter 2: Existing Park and Open Space Facilities 11 Community Parks Community parks are areas of diverse environmental quality and may include areas suited for intense recreational facilities, such as athletic complexes. Community parks are intermediate in size and are able to accommodate visitors from the surrounding community and multiple neighborhoods. These sites focus on both the developed aspects of the park, such as playfields and tennis courts, as well as the natural resource amenities. In Lake Geneva, Community Parks include the most heavily used parks that attract users from within and outside the community. Dunn Field: Dunn Field is a 14.1-acre park adjacent to Eastview Elementary School. It is owned by the School District, but under a 1984 agreement, the land is under the control and use of the City for recreational purposes. Facilities include a state-of-the-art skate park, six pickleball courts, a playground, soccer facilities, concessions, restrooms, and parking. Some amenities such as the skate park and the pickleball courts have at least one accessible path to access the amenity. Waverly Street is closed to automobile traffic but allows pedestrian access to Dunn Field and Hillmoor. The playground is not ADA accessible. Elm Park (Library Park): This 7.1-acre community park is located on the north shore of Geneva Lake. The Lake Geneva Public Library is located on the east end of the park. Facilities include open space, the Geneva Lake Shore Path, a pier, fishing pier, and boat slips. The Shore Path is ADA accessible, exceeding the minimum six-foot width. Public restrooms are located on the west side of the park. Flat Iron Park: This 1.8-acre park sits adjacent to the convergence of Geneva Lake and the White River. The park is the site of the Visit Lake Geneva Tourist Information Center. Facilities include the iconic wooden gazebo, a pavilion, a fountain, and restrooms. Paths on the perimeter of the park are ADA accessible, however, there are no internal paved paths leading to park amenities. Hillmoor Zone 1: Previously known as White River Park, Hillmoor Zone 1 is a 32-acre park adjacent to Dunn Field. The property includes open space, natural areas, an 18-hole disc golf course, walking path, and dog park. Also included is a pond with lighted spray and landscaped cascading falls. Hillmoor Zone 1 is part of the larger Hillmoor property, a former golf course, which was purchased by the City for public open space. While there is an accessible entrance to the dog park, the rest of the dog park is not ADA accessible and would benefit from a paved area with seating connected by a paved path to the entrance. ADA paths are needed to ensure access to the disc golf holes. Dunn Field COMMUNITY PARKS AT A GLANCE Community Parks serve residents citywide and provide a diverse mix of recreation opportunities, gathering spaces, athletic facilities, and natural resource amenities. Lake Geneva Community Parks include:  Dunn Field  Elm (Library) Park  Flat Iron Park  Hillmoor Zone 1  Riviera Beach and Plaza  Seminary Park  Veterans Park Key Features: 🛝🛝 Playgrounds & Family Recreation ⚽ Athletic Fields & Courts 🚶🚶 Walking Trails & Open Space Page 14 of 81 LAND TO LAKE PLAN 12 In addition to Hillmoor Zone 1, four other zones are included as part of the 230 -acre Hillmoor property. Due to the unique and varied nature of the terrain, topography, and ecosystems of the overall property, it has been organized into five different planning zones. Zone 1 contains the White River Corridor, Zone 2 contains wetland areas, Zone 3 contains forested areas, Zone 4 is a highly visible area facing Highway 50, and Zone 5 is a high point of the site that is suitable for development. Hillmoor Zones 2-5 are owned by the City but are not currently part of the Lake Geneva park system. Hillmoor Zone 1 has also undergone a conceptual master planning process , separate from the Land to Lake Plan. Recommended facilities for Hillmoor Zone 1 are described in Chapter 7. Riviera Beach and Plaza: Riviera Beach and Plaza are approximately 2.1 acres and located on Geneva Lake. The historic Riviera Building is located on the east end of the beach. Facilities include a swimming beach and restrooms. The Riviera beach has an ADA accessible entrance. Seminary Park: Seminary Park is a 3-acre park located downtown. The site provides an open-air shelter, playground equipment, restrooms, and parking. There is one ADA accessible path within the park that leads to the open-air shelter. However, the rest of the park does not have any internal paved paths. There is a path on the northwest corner of the park that is paved, but steep. This path would benefit from evenly spaced landings and strategically placed hand rails. This path also does not connect to anything within the park. The existing playground equipment is not accessible either. Veterans Park: Veterans Park is a 25-acre park located on the east side of the City. Facilities at the park include a lighted baseball diamond, two lighted softball diamonds, three unlit softball diamonds, six soccer fields, a basketball court, playground equipment, concessions, restrooms (in two separate buildings), two open air shelters, and three parking lots. While the park has paved paths that connect to amenities in the park, paths may need to be widened and repaved to become ADA accessible. Notably, this park has a specifically accessible and inclusive playground. Veterans Park Page 15 of 81 Chapter 2: Existing Park and Open Space Facilities 13 Neighborhood Parks These parks are designed specifically to accommodate residents living within the service area. They are characterized by active recreational facilities such as baseball and soccer fields, court games, playground area, and skating but can also incorporate areas for passive recreation such as picnicking. Cobb Park: Cobb Park is a 4.9-acre park located just west of the City. The mostly wooded site features a nature trail, playground equipment, benches, a picnic shelter, restrooms, and parking. This park is not ADA accessible. There are no internal paths that are paved that connect from the parking lot to amenities in the park. The existing playground equipment is not accessible either. Maple Park: Adjacent to Central Denison Elementary School, this 3-acre park is owned by the City and managed by the School District. The City and School District have an agreement that allows this City-owned park to be used as the school playground. This includes two basketball courts, a playfield, a playground, one softball diamond. The park also includes two tennis courts managed by the City. Rushwood Park: Rushwood Park is a 3.3-acre neighborhood park on the City’s south side. The park includes a grass softball diamond, playground equipment, open playfield, open- air shelter, drinking water, and a sledding hill. Rushwood Park does not have any internal paths that are paved, making amenities in the park inaccessible by ADA standards. Existing playground equipment is not accessible either. Cobb Park NEIGHBORHOOD PARKS AT A GLANCE Local Recreation Close to Home Neighborhood Parks are designed to serve residents within walking or biking distance and provide convenient access to everyday recreation opportunities. Lake Geneva Neighborhood Parks include:  Cobb Park  Maple Park  Rushwood Park Key Features: 🛝🛝 Playgrounds & Family Recreation ⚽ Courts, Fields & Active Play 🌳🌳 Informal Gathering Spaces 🚶🚶 Neighborhood Walking Opportunities 🍃🍃 Everyday Access to Parks Page 16 of 81 LAND TO LAKE PLAN 14 Mini Parks Mini parks include specialized facilities that serve a concentrated or limited population or specific group such as young children or senior citizens. They are typically one acre or less. Baker Park: This 0.5-acre area of open space is located on the lakefront south of downtown. Manning Way Tot Lot: Manning Way Tot Lot is a 0.5-acre park next to Hidden Woods that has relatively new playground equipment and has access to Hidden Woods via trail. The path next to the playground is accessible, however the playground is not ADA accessible. Moss Park: This 0.1-acre park is located on the City’s north side and provides a small area of open space. There is no signage that accompanies this park. From an outside perspective, this park appears to be a strip of lawn adjacent to the street. Oak Hill Tot Lot: This 0.1-acre park is located on the City’s north side and offers a small amount of playground equipment. This park is steeply sloped and is not ADA accessible. The playground equipment is outdated and lacks a soft landing surface, and the steps leading up to the park are unsafe. The City is exploring the possibility of relocating this park to a flatter site across the street. Olive-Longland Park: This park is 0.3 acres and is located on the north side of the City. It provides a small area of open space and tree cover. There is no signage that indicates that this park is a park. Westgate Tot Lot: Westgate Tot Lot is a 0.7-acre park located on the City’s west side and offers a variety of playground equipment and benches. This park is not ADA accessible. Playground equipment is outdated and lacks a soft landing surface. The park has a steep slope that angles downwards towards Dodge Street. Willow Park: This 0.5-acre park is located on Wrigley Drive across from Flat Iron Park, extending from the boat ramp to Riviera Plaza. It is undeveloped and does not have any signage or amenities. Oak Hill Tot Lot MINI PARKS AT A GLANCE Small Parks, Big Neighborhood Impact Mini Parks provide convenient recreation opportunities in areas where larger park sites may not be available. These parks are typically one acre or less and serve nearby residents with playgrounds, open space, and informal recreation opportunities. Lake Geneva Neighborhood Parks include:  Baker Park  Manning Way Tot Lot  Moss Park  Oak Hill Tot Lot  Olive Longland Park  Westgate Tot Lot  Willow Park Key Features: 🛝🛝 Neighborhood Playgrounds 🌳🌳 Small Open Spaces 🚶🚶 Easy Walk-to Access � �� � Family-Friendly Recreation 🏘🏘 Local Neighborhood Gathering Places Page 17 of 81 Chapter 2: Existing Park and Open Space Facilities 15 Natural, Open Space, and Special Use Areas Special Use Areas and Natural & Open Space Areas enhance an overall park system by maintaining and improving the community’s natural resource base, accommodating special activities that are not included in other parks, and providing interconnections between isolated parks and recreation areas. Examples of Special Use Areas are varied but can include those lands that accommodate passive or special recreational activities, such as golf courses, sledding/skiing hills, marinas, beaches, display gardens, arboreta, and outdoor amphitheaters, as well as lands that have been protected for their environmental or archaeological significance or sensitivity and provide limited opportunity for recreational use. Examples of Natural & Open Space Areas may include water bodies, floodplains, wetlands, shorelands and shoreland setback areas, drainageways, stormwater management basins, conveyance routes, environmental corridors, wildlife habitats, areas of rare or endangered plant or animal species, prairie remnants, and restoration areas. Typically, Special Use and Natural & Open Space Areas provide unique and diverse contributions to the community that are not easily quantifiable. For this reason, they are not included in the overall community calculation of park and recreation space per 1,000 persons. Nevertheless, they are a vital part of the City’s park and open space system. Natural & Open Space Areas Nature preserves are established to conserve forest lands, marshlands, floodplains, prairies, wildlife habitats, and other areas having cultural, scenic, or natural values. Desirable size depends on function. • Dodge Water Tower Pond Park: This park is a 2.7-acre site located on the western side of the City, east of the water tower and includes a detention pond. This park has no ADA accessible entrance nor any ADA accessible paths within the park. There are no amenities at this park other than open space and the pond. There is no signage that would even suggest that this is a park. Donian Wetland Nature Preserve NATURAL & OPEN SPACE AREAS AT A GLANCE Conserving Lake Geneva’s Natural Resources Natural & Open Space Areas help preserve forests, wetlands, prairies, wildlife habitat, floodplains, and environmentally sensitive lands while providing opportunities for passive recreation and nature exploration. Natural & Open Space Areas include:  Dodge Water Tower Pond  Donian Wetland Nature Preserve  Edgewood Hills Park  Fermano Park  Hidden Woods  Home Depot Park  Mary Koutsky Four Seasons Nature Preserve  Price Fremont Park  Southbridge Property  Symphony Bay Park Key Features: 🌳🌳 Forests & Woodlands 🦋🦋 Wildlife Habitat 💧💧 Wetlands & Water Resources 🚶🚶 Nature Trails & Passive Recreation 🌿🌿 Environmental Preservation Page 18 of 81 LAND TO LAKE PLAN 16 • Donian Wetland Nature Preserve: Donian Wetland Nature Preserve is a 4.1-acre wooded site that encompasses a mill race, boardwalk, wetland overlook, and the 100 -year recurrence interval floodplain along the White River in downtown Lake Geneva. This park contains an ADA accessible pathway along the main branch of the White River, but does not offer any accessible ways to access the secondary branch of the river. • Edgewood Hills Park: This 3.2-acre site is on the City’s north side and contains wetlands and an environmental corridor. It is adjacent to the Duck Lake Nature Trail. This park does not have an accessible entrance nor any amenities. There is also no signage that would distinguish the park as a park. • Fermano Park: This 6.4-acre site is located in the Lake Geneva Business Park and includes a pond with a path. Fermano Park has an ADA accessible walking path around the perimeter of the pond and has access from nearby sidewalks. • Hidden Woods: This 12-acre site is located near the center of the City. Facilities include a path on the west and south sides of the woods. While there are paved paths, there are many areas that are too steep to be ADA accessible. • Home Depot Park: Home Depot Park is a 4.4-acre site located northwest of the intersection of US Highway 12 and State Highway 50. It includes a detention pond and has asphalt bike trails. Lands immediately to the north are held by the Lake Geneva Conservancy. • Mary Koutsky Four Seasons Nature Preserve: This 66.7-acre site is located southeast of the City. Facilities include an open-air shelter, observation deck, nature trail, dog exercise area, and boardwalk amid a wetland, prairie, and oak opening. The Preserve is bordered by an additional 250 acres of land that lies within a primary environmental corridor and is open to the public. This park is not ADA accessible at all. • Price-Fremont Park: Price-Fremont Park is 4.6-acres of wooded property in the northwest area of the City. • Southbridge Park: This 43.4-acre property is located south of Highway 12 and immediately north of the Stone Ridge neighborhood. It is steeply sloped and heavily wooded. It does not include any amenities and currently lacks public access. • Symphony Bay Park: Located in the southeast side of the City, this Symphony Bay Park is new to the Lake Geneva parks system. This 11.9-acre park includes a dog park as well as walking paths throughout the wooded area. This park is not ADA accessible. Special Use Areas Special use areas are used for single purpose recreational activities, such as golf courses, skate parks, and specialized sports facilities. • Lake Geneva Bocce Ball Park: The 0.5-acre Lake Geneva Bocce Ball Park was dedicated to the community by the Lake Geneva Utility Commission. Located on East Street, the site features two bocce courts, which are in poor condition and rarely used. This park is not ADA accessible. Hidden Woods Page 19 of 81 Chapter 2: Existing Park and Open Space Facilities 17 Figure 2.1: Park Inventory Park/Facility Location Acres Community Parks Total Acres: 85.2 Dunn Field 425 Sage St 14.1 Elm Park (Library Park) West of Library, south of Main St 7.1 Flat Iron Park Wrigley Dr and Center St 1.8 Hillmoor Zone 1 299 Mill St 32.0 Riviera Beach and Plaza 211 Wrigley Dr 2.1 Seminary Park Wrigley Dr and S Lakeshore Dr 3.0 Veterans Park 901 E Townline Rd 25.0 Neighborhood Parks Total Acres: 11.5 Cobb Park 2101 McDonald Rd 4.9 Maple Park 900 Wisconsin St 3.3 Rushwood Park 991 Timothy Dr 3.3 Mini Parks Total Acres: 2.6 Baker Park Campbell St and Wrigley Dr 0.4 Manning Way Tot Lot Manning Way and Highland Way 0.5 Moss Park George St and Williams St 0.1 Oak Hill Tot Lot 1350 Tomike St 0.1 Olive Longland Park Williams St and E Sheridan Springs Rd 0.3 Westgate Tot Lot 1701 Miller Ct 0.7 Willow Park Wrigley Dr, across from Flat Iron Park 0.5 Natural and Open Space Areas Total Acres: 159.4 Dodge Water Tower Pond Park Behind 1885 Dodge St 2.7 Donian Wetland Nature Preserve Main St and S Lakeshore Dr 4.1 Edgewood Hills Park 1340 Edgewood Dr 3.2 Fermano Park 120 Edwards Blvd 6.4 Hidden Woods Hill St and West Dr 12.0 Home Depot Park 615 N Edwards Blvd 4.4 Mary Koutsky Four Seasons Nature Preserve N1889 County Trunk H 66.7 Price-Fremont Park 1525 Conant St 4.6 Southbridge Park 43.4 Symphony Bay Park Townline Rd and Sonata Way 11.9 Special Use Areas Total Acres: 0.5 Lake Geneva Bocce Ball Park 140 East St 0.5 Note: Total Acres may not equal the sum of individual values due to rounding. Page 20 of 81 LAND TO LAKE PLAN 18 Figure 2.2: Park Facility Matrix Note: “x” indicates the presence of an amenity in a park. Park/Facility Baseball Fields Basketball Court Batting Cages Benches Bike/Walking Trail Boat Slips Bocce Ball Canoe/Kayak Launch Concession Stand Disc Golf Course Dog Exercise Area Drinking Water Fishing Pier Grass/Sandlot Softball Ice Skating/Hockey League Softball Open-Air Shelter Parking Lot Pickleball Court Picnic Tables Playfield Playground Equipment Restroom Skate Park Sledding Hill Soccer Field Swimming Tennis Court Volleyball Court Community Parks Dunn Field x x x x x x x x x Elm Park (Library Park) x x x x x Flat Iron Park x x x Hillmoor Zone 1 x x x x x Riviera Beach and Plaza x x x Seminary Park x x x x x x Veterans Park x x x x x x x x x x x x x x Neighborhood Parks Cobb Park x x x x x x Maple Park x x x x x x Rushwood Park x x x x x x x x Mini Parks Baker Park Manning Way Tot Lot x x Moss Park Oak Hill Tot Lot x Olive Longland Park Westgate Tot Lot x Willow Park x x Natural and Open Space Areas Dodge Water Tower Pond Park Donian Wetland Preserve x x Edgewood Hills Park Fermano Park x Hidden Woods x Home Depot Park x Mary Koutsky Four Seasons Nature Preserve x x x x x x x Price-Fremont Park Southbridge Park Symphony Bay Conservation Area x x Special Use Lake Geneva Bocce Ball Park x Page 21 of 81 Chapter 2: Existing Park and Open Space Facilities 19 School Facilities Schools can also fulfill local park needs in communities as they provide many of the same facilities found in neighborhood parks, such as playground equipment and athletic fields. Access to school facilities is generally more limited than access to City parks, as certain facilities are unavailable for public use during school hours. The City is within the Lake Geneva J1 School District, which includes elementary and middle schools, and the Lake Geneva-Genoa City Union High School District. The districts serve the Cities of Lake Geneva and Genoa, the Town of Bloomfield, and segments of the Towns of Geneva, Lyons, and Linn. Enrollment in all schools has been declining over the past four years. Four of the districts’ schools are located within Lake Geneva’s borders. The City currently partners with the Lake Geneva School District on park maintenance and ownership for two locations. For Dunn Field, the City maintains and manages the facility for recreational purposes, but it is owned by the School District. For Maple P ark, the school district manages the use and the City owns the property. Badger High and Lake Geneva Middle School: This 55-acre athletics area includes a regulation baseball diamond, two basketball courts, two league softball fields, eight tennis courts, a football stadium, track and soccer stadium, sand volleyball, and numerous soccer practice fields. Badger High School contains an indoor swimming pool and staffed weight room facilities. Central Denison Elementary School: This school does not have its own park but uses the City - owned Maple Park for its recreation needs. Maple Park is located on the same block as the school. Maple Park is owned by the City and managed by the School District. Eastview Elementary School: This school has a playground and basketball courts. This property includes the 13-acre site referred to as Dunn Field, which is owned by the School District but managed by the City. Because it is managed by the City, Dunn Field is considered to be a Community Park. For a full description of Dunn Field, refer to the Community Parks section of this chapter. The following private schools are all within Lake Geneva’s borders and offer the following amenities: First Evangelical Lutheran School: Located at 1101 Logan Street in Lake Geneva, the facilities at this four- acre church and school site include two basketball courts and playground equipment. St. Francis School de Sales Catholic Church & School: Located at 148 W. Main Street in Lake Geneva, this four-acre site includes a basketball court and playground equipment. Badger High School SCHOOL FACILITIES PARTNERSHIP Lake Geneva residents benefit from a strong partnership with Lake Geneva J1 School District. School facilities throughout the community supplement the City's park system by providing additional athletic fields, courts, playgrounds, open space, and recreational opportunities. School properties play an important role in meeting recreation needs and should continue to be considered part of the broader community recreation network. Page 22 of 81 LAND TO LAKE PLAN 20 County and State Facilities State and County parks and natural areas exist as conservation and recreational areas typically isolated from population centers. These facilities play an important role in providing larger swaths of preserved wilderness that are often accessible for recreational use and encourage regional tourism. Facilities located near Lake Geneva in Walworth County act as an important part of the regional recreational system surrounding the City. • Big Foot Beach State Park: This 271-acre park on the shore of Lake Geneva in the City offers wooded campsites, shower and restroom facilities, 5.5 miles of hiking trails, a sand beach and a 100-foot swimming area, volley ball and horseshoe courts, and a 40-acre picnic area. • Duck Lake Nature Area: This is a DNR-owned wildlife habitat area with public access. • White River County Park: This park is owned and maintained by Walworth County. It lies outside the City of Lake Geneva in the town of Lyons and protects 190.5 acres of wetlands, upland woods and wildlife habitat. The park includes trails, a canoe/kayak launch, parking lots, and a park shelter. Recreational uses include hunting, fishing, hiking, cross-country skiing, snowshoeing, picnicking and canoeing/kayaking. Private Facilities In addition to public recreation facilities, the residents of Lake Geneva have access to a variety of other private recreational resources: • Covenant Harbor Bible Camp: Located at 1724 Main Street in Lake Geneva, this lakeside site contains 56-acres of woodland that includes picnic areas, two tennis courts, a ropes course, and archery facilities. • Grand Geneva Resort and Spa: Located northeast of Lake Geneva, this resort offers golf, a health spa, tennis, hiking, horseback riding, downhill skiing, indoor lap -swimming, and other activities that are open to the public for a fee • Lake Geneva Youth Camp: This 22-acre summer camp site is located at W 2655 South Street in the Town of Lynn. Facilities include two basketball courts, soccer facilities, various playfields, playground equipment, four sandlot softball diamonds, and two tennis courts. • Paradise Golf Park: An 18-hole miniature golf park located near downtown Lake Geneva • Geneva Lakes Family YMCA: Located at 203 Wells Street, the YMCA includes a full wellness center, two gymnasiums, a 25-meter swimming pool, a large therapy pool, saunas, steam rooms, racquetball courts, and spin cycling equipment. The City currently contracts with the YMCA to provide recreational sports programming, primarily for youth. REGIONAL RECREATION ASSETS Recreation Beyond City Boundaries In addition to City-owned parks, residents have convenient access to regional recreation destinations including state parks, county facilities, conservation areas, private recreation providers, and regional trail opportunities. Planning Takeaway These regional recreation assets expand the variety of outdoor experiences available to residents and help reduce pressure on the City's park system. Page 23 of 81 Chapter 3: Public Participation 21 Chapter 3: Public Participation Page 24 of 81 LAND TO LAKE PLAN 22 Planning Process The Land to Lake planning process began in the spring of 2026. It included extensive upfront public engagement, which is described below. The Park Board and the Piers, Harbor, and Lakefront Committee jointly served as the steering committee for the project. These bodies reviewed drafts of the plan at meetings held on September 22, 2026, November 19, 2026, and January 6, 2027. Following public open houses on_____ and ____, 2027, the Park Board and the Piers, Harbor, and Lakefront Committee recommended the plan to the City Council Commission at their meeting on _____. The City Council formally adopted the Land to Lake Plan on _____. Future Updates or Amendments To update or amend the Land to Lake Plan, the Park Board should hold at least one public meeting on the amendment/update, solicit additional public participation as appropriate to the nature of the amendment, prepare the update to the plan, and formally recommend the updated plan to the Plan Commission and City Council. If the proposed changes relate to the lakefront, the Park Board should coordinate with the Piers, Harbor, and Lakefront Committee. Following public input and review and recommendation by the Park Board (and the Piers, Harbor, and Lakefront Committee when applicable), the Plan Commission should review and recommend the plan to the City Council, and the City Council should adopt the plan by resolution. Site Visits On June 2, 2026, planning consultants coordinated with City and staff to conduct a tour of the community and its various park and open space assets to gain further understanding and familiarity with specific sites, the community’s characteristics and values, and recreational opportunities. On June 23, 2026, planning consultants returned to survey the existing conditions of the lakefront and lakefront amenities. The data gathered in these site visits informed the Land to Lake Plan’s existing conditions analysis and recommendation development. Page 25 of 81 Chapter 3: Public Participation 23 Pop-up Engagement Events As a part of the public engagement process, pop-up engagement events were held on July 2 and August 22, 2026. These events coincided with well-attended community events in Lake Geneva in an effort to reach a larger population of parks and lakefront users. These events included Concert s in the Park at Flat Iron Park and the Jaycee’s Venetian Festival. The purpose of these pop-ups was to gather input from the public and to encourage participation in the online community survey. Focus Group Interviews Throughout the months of June and July, planning consultants conducted six stakeholder focus group interviews. Focus groups were organized around common themes, including Community Organizations, Young Families, Adult Sports, Institutional and Tourism Organizations, and two groups of Boaters. Each focus group discussion explored key topics about the current park and recreation system and lakefront, how it was serving different populations and constituencies, and what members of each group would like to see added or improved about the Lake Geneva park system and lakefront in the future. Discussions were robust with committed focus group members sharing a variety of insights. A few key themes that emerged from these discussions are provided below, as they pertain to the CORP. More details from the focus groups can be found in the other sections of the Land to Lake Plan and in the Appendix of this Plan. In addition to the focus group interviews, the consultant team also interviewed two boating businesses that use the lakefront: Gage Marine and Elmer’s Lake Geneva Boat Rentals. Community Organizations • Participants felt that community events are growing and starting to run out of space, especially at Flat Iron Park. Participants felt that the lakefront is necessary for the success of events, so expanding onto public roads may be the next progression of these events. • Rather than having new and more events on the lakefront, some participants saw Hillmoor as an opportunity to host new events or relocate some existing events. Participants felt that these events could be oriented towards locals who want to enjoy their community without going into Downtown. Young Families • Participants felt that Veterans Park could become an “all day” destination if more amenities were provided. Participants felt that there was untapped potential for park events, field upgrades to make the fields ready for sports tournaments, space for food trucks, or the potential to partner with businesses to create new amenities geared toward locals. • Participants felt that the lakefront is difficult for locals and especially young families to access. Participants felt that the area is incredibly busy and hard to navigate with strollers. Additionally, participants felt that the chaos of all the people and congestion makes going to the lakefront unpleasant. Walking Site Visit Page 26 of 81 LAND TO LAKE PLAN 24 • Participants felt that it was important that a community center should meet a wide variety of needs of the community as a one-stop-shop for a variety of potential amenities that could be initiated through public- private partnerships. Participants also felt that it was important to keep low- income families in mind and to perhaps provide free or sliding scale services. Adult Sports • The new pickleball courts are viewed by participants as an extremely successful investment and were widely praised by participants. Several participants noted that the City has been highly responsive to user feedback, with improvements implemented quickly after concerns were raised. • Participants noted that disc golf participation is increasing, and there is strong support for course upgrades and redesign. Institutional and Tourism Organizations • Participants noted that the School District, Library, and YMCA provide youth programming , however, there is no single listing of all programing in one place. Participants expressed a desire for a single, unified recreation guide. • Participants representing their organizations were agreeable to partnering with one another and with the City to move forward the goals of the lakefront and of the Lake Geneva community at large. • A community center was favored by most participants of the group. They noted that a community center would have high demand, especially from families with young children. • Participants felt that bathrooms are particularly important to visitors and lakefront users in general. Participants noted that City bathrooms are often closed during peak visitor hours (nights and weekends). Participants expressed a strong need for more public bathrooms downtown. Shared Themes • Many of the groups saw the Veterans Park as an important park for the community that needs to be invested in for improvements and to become a place for the local community to gather. • Accessibility was also something that came up in most, if not all, of the groups. Many participants felt that the parks and the lakefront were not accessible in Lake Geneva. Many also supported the construction of more inclusive playgrounds and of accessib le pathways in parks. WHAT WE HEARD Key Themes from Community Engagement Public engagement activities, including focus groups, pop-up events, site visits, and the community survey, identified several recurring priorities for the future of Lake Geneva's parks and recreation system.  Improve accessibility throughout parks and lakefront areas  Continue investing in Veterans Park as a community destination  Enhance trail, walking, and bicycle connections  Expand family-friendly recreation opportunities  Improve communication and awareness of programs and facilities  Balance resident needs with tourism and event activity Planning Takeaway Residents value Lake Geneva's parks and lakefront amenities and support strategic investments that improve access, connectivity, inclusivity, and year-round recreational opportunities. Page 27 of 81 Chapter 3: Public Participation 25 Community Survey The City of Lake Geneva conducted an online questionnaire via Survey Monkey from July 1 to July 31, 2026. Approximately 537 individuals started the survey, and 344 individuals completed the full survey. Respondents had the option to skip questions that did not apply to them, including several questions oriented to boaters. About 61% of survey respondents were Lake Geneva residents, and approximately 51% of respondents were over 60 years of age. Nearly 30% of respondents had at least one minor (age 18 or under) in the household. Additionally, 23% of respondents reported having a child that was enrolled in the Lake Geneva School District. Additional highlights of the survey are described below: RECREATION PARTICIPATION Walking, Hiking, and Trail Use Lead Participation Survey respondents most frequently reported participating in walking, hiking, trail use, dog walking, swimming, and wildlife viewing activities, highlighting the importance of maintaining and enhancing outdoor recreation opportunities. MOST VISITIED PARKS Lakefront Parks Are Community Destinations The most frequently visited parks include Big Foot Beach State Park, Flat Iron Park, Library/Elm Park, Riviera Beach & Plaza, and Veterans Park, demonstrating the importance of the lakefront and community gathering spaces. FUTURE RECREATION PRIORITIES Residents Support New Recreation Amenities Top requested investments included splash pads, inclusive playgrounds, public art, outdoor fitness equipment, and walking path improvements. DESIRED PARK AMENITIES Basic Amenities Remain Important The amenities most desired at parks were drinking fountains, picnic tables, and restrooms, reinforcing the value of comfort and convenience improvements. SURVEY SNAPSHOT Lake Geneva residents expressed strong satisfaction with the community's parks and recreation system while identifying opportunities to improve accessibility, modernize amenities, strengthen trail connections, and expand family-oriented recreation opportunities. Page 28 of 81 LAND TO LAKE PLAN 26 Figure 3.1: Park Usage Note: Maple Park was inadvertently omitted from this survey question. Figure 3.2: Playground Satisfaction Baker Park Big Foot Beach State Park Cobb Park Dodge Water Tower Pond Park Donian Wetland Nature Preserve Dunn Field Edgewood Hills Park Fermano Park Flat Iron Park Hidden Woods Hillmoor Zone 1 Home Depot Park Lake Geneva Bocce Ball Park Library Park Manning Way Tot Lot Mary Koutsky Four Season Nature Preserve Moss Park Oak Hill Tot Lot Olive Longland Park Price-Fremont Woods Riviera Beach and Plaza Rushwood Park Seminary Park Veterans Park Westgate Tot Lot Willow Park 0% 10% 20% 30% 40% 50% 60% 70% 80% Which of the following Lake Geneva parks do you or your family use most often? (Select up to 5 options below) Excellent Very Good Good Fair Poor No opinion / Not applicable 0% 5% 10% 15% 20% 25% 30% 35% How would you rate the quality of existing playgrounds located in Lake Geneva parks? Page 29 of 81 Chapter 4: Vision, Goals, and Strategies 27 Chapter 4: Vision, Goals, and Strategies Page 30 of 81 LAND TO LAKE PLAN 28 This chapter presents a Vision, Strategic Pillars, Goals, and Strategies for the future of the Lake Geneva Park and Recreation System that reflect the community’s input and serve as the basis for the recommendations in this Plan. Vision: Overall desire for the future of the Park and Recreation System that is to be achieved by this Plan. Strategic Pillars: Developed with the 2026 Strategic Action Plan, the six Strategic Pillars are intended to produce systemic and catalytic shifts that will drive the future economic growth, community experience, and the reputation and character of Lake Geneva. These pillars have been integrated into the goals and recommendation of the Land to Lake Plan. Goals: Broad statements that express general public priorities for the Park and Recreation System. Goals are based on the identification of key issues, opportunities, and priorities that affect the park system. Strategies: More specific than goals, strategies are actions and implementation activities that can be taken to achieve a broad goal. Specific recommendations for individual parks are found in Chapter 7. Strategic Pillars LAKE GENEVA PARK SYSTEM VISION The Lake Geneva Park System is the heart of our community, preserving natural beauty, fostering connection among residents and visitors, and creating accessible, sustainable spaces that bring generations together. Page 31 of 81 Chapter 4: Vision, Goals, and Strategies 29 CORP Goals ♦ Indicates alignment with Strategic Pillars from the 2026 Strategic Action Plan COMMUNITY GOALS GOAL 1 : Invest in City beautification, placemaking, parks, and gathering spaces. GOAL 4: Build a vibrant year-round community – elevate the needs of residents. GOAL 11: Continue to support events and gathering on the lakefront and in downtown. STEWARDSHIP GOAL 3: Protect natural assets and environmental quality. GOAL 5: Maintain parkland, green space, landscaping, and natural resources to preserve Lake Geneva’s accessible natural amenities. CHARACTER & LIVABILITY GOAL 2: Preserve Lake Geneva’s unique character while managing growth. GOAL 8: Support community livability, connectivity and communication, and sense of belonging. PARTNERSHIPS & PROGRAMS GOAL 7: Continue and expand community programming to create opportunities for recreation as well as cultural expression and community development. GOAL 9: Strengthen community partnerships and volunteer initiatives. CONNECTIVITY & INVESTMENT GOAL 6: Ensure the provision of a sufficient number of quality parks, recreational facilities and open space areas to enhance the health and welfare of City residents and visitors. Such facilities should be available to everyone regardless of income, age, race, ability, or geographic location. GOAL 10: Improve walkability, bikeability, and connectivity. Maintain and expand a safe, accessible, and interconnected pedestrian and bicycle network to connect the City’s park and recreation system to areas of activity and community neighborhoods. GOAL 12: Grow the park budget, which will continue financing operations, maintenance, and capital improvements of existing parks, as well as allowing for future parkland acquisition and development of new facilities. Page 32 of 81 LAND TO LAKE PLAN 30 Strategies Resident Focus • Neighborhood park improvements should be designed and planned to enhance community and neighborhood cohesion. • Focus on recreational amenities and programming tailored to young families with children, a demographic the City is seeking to grow, and seniors, who comprise a significant proportion of the City’s current population. • Seek opportunities for multigenerational participation in park facilities and programming. • Balance the needs of residents in downtown and lakefront- area parks with tourism needs, while prioritizing the needs of residents in other City parks. • Expand year-round recreational opportunities for residents, including indoor activities and winter activities. Accessibility • Ensure that existing park facilities are upgraded to comply with ADA design guidelines. All new park development and amenity improvements should be inclusive, accessible, and to ADA design standards at a minimum. Future parks and amenities should be designed so that they are barrier-free and accessible to persons of all ages and abilities. Sustainability • Expand and support environmental and sustainability initiatives. Engage the community in local stewardship activities such as community clean-ups, native planting initiatives, environmental education programs, and volunteer stewardship opportunities. Build these initiatives into the Parks Department’s recreational programming. ♦ • Utilize management practices that protect and enhance the natural features of all City parks. This includes efforts to establish and maintain buffers for sensitive environmental areas, minimize fertilizer and pesticide use, and incorporate native species plantings in landscaping initiatives, to the greatest extent possible. • When planning for facility and equipment improvements, incorporate sustainable building materials, design elements, and green energy sources. • Replace unused lawn areas with native plantings to provide native habitat and reduce mowing costs by the City. Recruit volunteers to plant and maintain native planting beds. 🏡🏡 COMMUNITY 🌳🌳 STEWARDSHIP ♦ Indicates Pillars from the 2026 Strategic Action Plan Page 33 of 81 Chapter 4: Vision, Goals, and Strategies 31 Enhanced Communication and Wayfinding • Establish uniform identification signage at all Lake Geneva park and recreation facilities. • Establish wayfinding signage to allow residents or visitors to effectively travel throughout the City on foot or bicycle. • Market the park system’s facilities and programs to the community by utilizing the City, Parks Department, and partners’ websites, social media, email lists, recreational guides, signage, and developing new informational publications in print and/or online. Coordinate with the School District, Walworth County, and local partners to make these resources widely available. Regional Cooperation • Coordinate park system and connectivity improvements and any relevant land acquisition s with local, county, and state agencies to ensure an interconnected system of outdoor recreational facilities within the City and its surrounding area. • Work with neighboring jurisdictions, Walworth County, and the state to coordinate trails planning and planning for potential future trail corridors through multiple communities and jurisdictions. Programming • Coordinate with the Lake Geneva Public Library to develop educational, cultural and arts programming, events, and activities to further activate the community’s parks and recreation facilities and preserve and protect the community’s natural resources. • Expand the City’s recreation program offerings via community partners and the newly established City Parks Department. • Detailed programming recommendations are found in the Community Recreation and Programming element of the Land to Lake Plan. Park Improvement • Master plans should be considered for future parkland development and existing parkland improvements. These plans should indicate the future use and locations of land, facilities, and equipment. • In general, focus on enhancing the current park system to meet the needs and desires of Lake Geneva residents and future recreation trends, rather than the acquisition of new parks. Considerations for new parks are discussed in Chapter 7. • Maintain mini parks as open space, adding benches and paths as necessary to make them usable for residents. Update tot lot playground equipment strategically to align with current needs. Funding • Continue to fund the modernization of facilities and equipment in older parks, provide new facilities and equipment in undeveloped or partially developed parks , and monitor and maintain existing park equipment to ensure longevity and safety. • Utilize grants, fundraising campaigns, and other funding sources as well as the City’s 5-year Capital Improvements Plan to pursue and implement the recommendations of this Plan. • Utilize a parks foundation to broaden the range of funding sources available to support the parks. Increase revenue-generating activities. 🏙🏙 CHARACTER & LIVABILITY 🤝🤝 PARTNERSHIPS & PROGRAMS 🚶🚶 CONNECTIVITY & INVESTMENT Page 34 of 81 LAND TO LAKE PLAN 32 Chapter 5: Park and Open Space Standards Page 35 of 81 Chapter 5: Park and Open Space Standards 33 In order to guide the park planning process, it is important to establish a set of minimum standards for park and recreational facilities. Such standards enable a community to quantitively measure how well its existing facilities are meeting the needs of residents and to plan for future facilities based on projected population growth. As such, park and recreation standards are commonly developed using a ratio of the number of minimum acres recommended per 1,000 residents. The following section details the local standards for park and recreational facilities. These standards are a combination of National Recreation and Park Association (NRPA) guidelines and best practice for Comprehensive Outdoor Recreation Plans. A calculation of community- specific standards is more likely to identify those park system deficiencies that would not otherwise be captured by universal or national standards. Furthermore, a locally derived standard does a better job of considering the quality of the park system as well as the quantity of park and recreational facilities provided. For a full description of each park type in the City, see Chapter 2. National Guidelines To understand the role that the City’s park and trail system should play in providing park and recreation services, it is useful to understand the role of a municipal park system in the context of national, state, and county services provided. • National Parks are scattered throughout the United States with massive tracts of land that serve as vacation destinations or wilderness areas. They are run by the Department of Interior of the United States government. There are no National Parks in Walworth County. • State Parks exist as conservation areas, scenic drives, or as weekend getaways, typically away from population centers. State Parks are often designed to encourage tourism, but their primary purpose is to serve residents of their respective states. Nearby State Park and Natural Areas include Big Foot Beach State Park, the Kettle Moraine State Forest –Southern Unit. The White River State Trail is also in the vicinity of Lake Geneva. • County Parks function to fill in the gaps that municipal and state governments do not serve. The gaps can include serving a municipal function in portions of a county with municipalities too small to have enough resources to provide parks, conserving large areas of open space that municipalities cannot, or as a tourist venue for people from outside the county . The City of Lake Geneva is served by the nearby White River County Park, about three miles northeast of the City. • Municipal Parks exist to serve residents of municipalities, providing passive space for recreation and community gathering as well as facilities for active athletic or recreation programs. The two most common types of municipal parks are Neighborhood and Community parks. Neighborhood Parks are usually 1-10 acres and Community Parks are generally larger (10+ acres) and typically serve larger portions of the community. Both types of parks have a ½- mile service radius. Riviera Fountain Page 36 of 81 LAND TO LAKE PLAN 34 The National Recreation and Park Association (NRPA) compiles data from around the U.S. on park and recreational departments and services provided. It is important to compare the services that Lake Geneva provides to the national averages as a benchmark for analysis. A few of the most applicable metrics are shown in Figure 5.1. Figure 5.1. NRPA Parkland Standards Comparison NRPA Standard (2025) Lake Geneva Park System Total Park Acres per 1,000 Residents 10.2 30.4 Average Number of Residents per Park 2,411 304.3 Full Time Park and Recreation Employees (per 10,000 Residents) 8.9 2 While it is important to evaluate Lake Geneva based on national averages, it is difficult to make a one-to- one comparison between parks departments in other communities and in Lake Geneva. This is because of the variability in department structure, amenities, distribution of county and state parks, and the number of natural resources in the area. Therefore, this comparison should be taken as context for the Lake Geneva system and not necessarily a judgement or a direct benchmark for performance. Lake Geneva Park Standards As seen in Figure 5.2, the City currently maintains a rate of service of approximately 30.4 total park acres per 1,000 residents. Future parkland needs are discussed in Chapter 6. For the purposes of its park and recreation planning, the City should utilize the standard described in previous CORPs of 11 acres per 1,000 residents as its community standard. Below, Figure 5.2 shows that Lake Geneva currently provides 30.4 park acres per 1,000 residents, based on 2024 population, easily meeting the standard of 11 acres per 1,000 residents. Figure 5.2 Page 37 of 81 Chapter 5: Park and Open Space Standards 35 Figure 5.3 Current City of Lake Geneva Park Standards 2024 Lake Geneva Population 2026 Total Lake Geneva Park Acres 2026 Total Acres Per 1,000 Residents Lake Geneva CORP Standard: Park Acreage Per 1,000 Residents Total Acres Needed to Meet Standard Additional Acres Needed to Meet Standard 8,521 256.1 30.4 11 93.7 0 Note: 2026 Total Acres includes all parks within Lake Geneva. All figures used in this table are rounded. Service Areas Map 2 depicts the service areas of Neighborhood Parks, Community Parks, and outdoor School District facilities based on their location within the community. This analysis is used to determine the existing service coverage of the City Park and Recreation System and forms the basis of any recommended new park locations as discussed in Chapter 7. For the purposes of this plan, all parks will have a service area radius of 1/2 mile. In most municipalities, service areas range between 1/4 – 1/2 mile because of the need to accommodate all modes of transportation access, especially people who may not own or be able to operate a vehicle (children, disabled individuals, the elderly, etc.). A 1/4 – 1/2-mile radius is seen as representative distance of mobility or how far most individuals can walk comfortably depending on age, health, and other factors. An additional consideration in the park service areas are barriers to access such as large roadways, natural features, bridges, etc. and general development density. Lake Geneva has two minimal barriers, US-12 and the natural feature of Geneva Lake, which doubles as recreational space . These barriers are reflected on Map 2. Given the relatively compact nature of the City’s layout and its position on the shores of Geneva Lake, a majority of the City is well covered by the 1/2-mile service area radius. However, Map 2 illustrates that US-12 acts as a barrier to access that leaves an eastern portion of the City out of a park service area. Recreational Programming and Staffing Youth and adult recreational sports programming is provided by the Geneva Lake Family YMCA on behalf of the City of Lake Geneva. This topic is discussed in greater depth in the Community Recreation and Programming element and the Parks Department Organizational Framework element of the Land to Lake Plan. Westgate Tot Lot Page 38 of 81 LAND TO LAKE PLAN 36 Map 2: Park Service Areas Page 39 of 81 Chapter 6: Analysis of the Existing Park and Open Space System 37 Chapter 6: Analysis of the Existing Park and Open Space System Page 40 of 81 LAND TO LAKE PLAN 38 This Chapter presents an analysis of how well Lake Geneva’s existing park and recreational facilities meet community needs, evaluating the following components: • An application of established local and national park and recreational facility service standards to reliable population projections for the City (Chapter 5). • A qualitative analysis of the City’s park system based on both an understanding of the City’s goals and objectives and an evaluation of the local demand for parkland and recreational facilities. • An analysis of the geographic distribution and accessibility of each park location. • A consideration of public input regarding the future of the City’s park and open space system. • A review of the Wisconsin’s State Comprehensive Outdoor Recreation Plan. The results of this analysis will serve as the basis for the recommendations presented in Chapter 7. Quantitative Analysis The quantitative analysis below considers the acreage of all public parks in the City and how projected population growth might impact future service needs. Existing Facilities As documented in Chapter 5, Lake Geneva’s existing park acres exceed the CORP standard of 11 acres of parkland per 1,000 residents. Figure 6.1 summarizes existing park acreage, by park type, per 1,000 residents. Refer to Figure 2.1: Park Facility Matrix in Chapter 2 for a full summary of parks by category and acreage. Figure 6.1: Total Parkland by Type Park Type 2026 Total Acres 2026 Total Acres Per 1,000 Residents* Community Parks 85.2 10.0 Neighborhood Parks 11.5 1.3 Mini Parks 2.6 0.3 Natural and Open Space Areas 159.4 18.7 Special Use Parks 2.6 0.3 Total City Owned/Operated 259.1 30.4 School Facilities 71 8.3 State Park 261.9 30.7 Total All Facilities 592 70.8 *The City of Lake Geneva’s 2024 population was used to calculate the above (8,521). Total acreage includes all parks within the City of Lake Geneva. Source: Vandewalle & Associates and City of Lake Geneva Dodge Water Tower Pond Park Page 41 of 81 Chapter 6: Analysis of the Existing Park and Open Space System 39 Future Park System Needs The future park acreage needs of the City are determined by applying the recommended minimum acreage standards to a reasonable population projection for the City in future years. This type of needs assessment is included in part to satisfy Wisconsin Statutes 66.0617 and 236.29 regarding the collection of fees and also to assist the City with planning and budgeting for the development of future parks. For the purposes of this Plan, Lake Geneva will utilize the previously established standard of 11 acres per 1,000 residents. Figure 6.2 shows a 20- year projection of parkland needs and compares it to the total acreage of existing facilities. This Plan assumes that Hillmoor Zones 2-5 will be fully integrated into the park system by 2030, increasing the City’s total park acreage from 259.1 acres in 2026 to 450.1 acres in 2030. As seen in Figure 6.2, no additional parkland acreage will be needed to support recreation in Lake Geneva through 2050. Figure 6.2: Projected Parkland Needs 2030-2050 Year Projected Population Lake Geneva Park Acreage Standard Per 1,000 Residents Projected Parkland Needs (11 Acres Per 1,000 Residents) Total Park Acreage Provided Additional Acres Needed 2030 8,879 11 97.7 450.1 0 2035 9,178 11 101 450.1 0 2040 9,476 11 104.2 450.1 0 2045 9,775 11 107.5 450.1 0 2050 10,119 11 111.3 450.1 0 Note: Total Park Acreage includes 191 acres for Hillmoor Zones 2-5, with the assumption that the Hillmoor Property will be fully integrated into the park system by 2030. Source: Vandewalle & Associates While there is no projected need for parkland, the City should be responsive to needs for new amenities, maintenance, and to portions of the City that are not within a park service area. As Lake Geneva continues to grow, the City should explore updating its parkland dedication policy to require future residential development, especially those that add new residential units, to provide open space that is suitable for active outdoor recreation and is accessible to the public. Additionally, the City should look to work with private property owners and the School District to establish shared use policies that increase public access to additional recreational amenities that are not City owned. KEY FINDING Lake Geneva currently exceeds its adopted parkland standard and is projected to continue meeting parkland needs through 2050. As a result, future investments should prioritize improving existing parks, expanding recreation opportunities, enhancing accessibility, and integrating the Hillmoor Property into the City's park system rather than focusing on parkland acquisition. Page 42 of 81 LAND TO LAKE PLAN 40 Qualitative Analysis Although quantitative standards provide a good basis for formulating the recommendations, a thorough assessment of the City’s existing facilities must include an analysis that takes into consideration those characteristics that make Lake Geneva unique from other communities. This includes: • Identifying those park system deficiencies and strengths that are not captured by universal standards. • Ensuring that future parks and recreational facilities are tailored to meet the needs of Lake Geneva residents. • Allowing for the establishment of a more reasonable and specialized level-of-service standard by which the City can plan its future park system. Tourism Community Dynamic As a popular summer tourist destination, seasonal shifts in Lake Geneva’s population occur between summer and winter. The City's parks near the lakefront and south of Main Street, including Elm Park (Library Park), Flat Iron Park, Donian Wetland Nature Preserve, and Seminary Park, play a unique role as highly visible destinations that attract tourists and host special events, particularly during the peak tourist season. Because the lakefront-area parks serve this broader regional and tourism-oriented role, they must be designed to support visitor activity and special events. This includes providing adequate parking, lighting, electrical access, and flexible open areas suitable for a range of public gatherings and events. Additionally, the high usage during the peak season increases the need for maintenance schedules that respond to extra wear and tear withstood by popular facilities during the summer months. While residents also enjoy and value these lakefront-area parks, they sometimes avoid these parks during the busiest times. This dynamic highlights the importance of ensuring that other City parks are designed primarily to meet the needs of Lake Geneva residents. Resident-oriented parks should prioritize amenities such as walking paths, playgrounds, exercise facilities, and open green spaces that offer opportunities for recreation, relaxation, and community connection away from seasonal crowds. View from Brunk Pavilion KEY FINDING Lake Geneva's park system benefits from strong lakefront amenities, tourism assets, natural resources, and community partnerships. Future investments should focus on enhancing recreation opportunities that serve residents year-round while balancing the demands of seasonal visitors and preserving the community's unique character. Page 43 of 81 Chapter 6: Analysis of the Existing Park and Open Space System 41 Other important factors to consider include the following: • In 2020, the City acquired the Hillmoor property, which is centrally located within the City and along the White River. This acquisition adds a substantial amount of acreage to the park system. A planning process to determine the design, features, and amenities for Hillmoor Zone 1 was prepared concurrently with the development of the Land to Lake Plan. Planning for Zones 2-5 will be completed in future years. • Big Foot Beach State Park is located entirely within Lake Geneva’s City limits, providing residents and visitors with easy access to a Wisconsin State Park. • The Geneva Lake Family YMCA runs youth recreational sports programming for the City. While the YMCA has been a longstanding partner with the City, a newly formed City Parks Department provides opportunities for City-run recreational programs and expanded use of City parks. • The Lake Geneva J1 School District is another longstanding partnership with the City. Several recreational facilities are shared between the City and the School District. Some parks, like Maple Park, are owned by the City, but are used by the nearby Central-Denison Elementary School during the day. Other parks, like Dunn Field are owned by the School District and managed by the City. • The Lake Geneva Public Library may have potential as a future partner for expanding recreational offerings. The library currently provides free and low-cost programming to the community. The Parks Department and Library could coordinate and collaborate on new programs to meet the needs of City residents, and Library programming could be hosted in City parks. • Given the lower number of children per household relative to past generations, the City will need to be strategic about tot lots and playgrounds, thinking carefully about their distribution throughout the community and when and where to invest in new or replacement playgrounds. • The high proportion of active seniors in the community will continue to shape current and future recreational needs. Passive activities such as gathering with friends in the park, walking, wildlife viewing, and taking in nature will become increasingly imp ortant as the community ages. The City’s current park inventory is well suited to meet these needs, as it contains many acres of passive open space. Opportunities to expand trail networks and add seating to expand the utility of these open space areas to seniors and the community as a whole. Geographic Analysis The location and distribution of the park and open space facilities in relation to a community’s residents is also an important indicator of how well existing facilities meet the needs of the community. Map 2 illustrates how effectively the City of Lake Geneva’s parklands serve the various developed areas of the community. These service areas are based on the local standards identified in Chapter 5. The area served by a park is influenced by several factors. These include the size of the park, location, transportation accessibility, and natural or manufactured barriers. Displaying park service areas based on these factors suggests locations where additional park facilities might be necessary to serve residents. The Park Service Area map indicates areas of the City that are not currently served by a City park. Within the City, Geneva Lake, the White River, USH 12, WI 120, and WI 50 all serve as either natural for manmade barriers to park access. While Geneva Lake and the White River are natural barriers to park access in some respects, they are also valuable assets for recreation as well, providing KEY FINDING Lake Geneva's existing park system provides strong community-wide access to recreation opportunities; however, continued residential growth, particularly on the southwest side of the city, may create future service gaps that should be addressed through new neighborhood parks, trail connections, and improved accessibility. Page 44 of 81 LAND TO LAKE PLAN 42 opportunities for fishing, nature viewing, swimming, and other water -centered recreational activities. While the City is well served by parkland overall, in the future, the City could consider opportunities to acquire land within residential areas outside of the park service areas to create neighborhood parks or provide trails to bridge the gaps caused by man-made barriers to parks. As the City continues to grow and as new neighborhoods are added, existing and future gaps in park and recreation facility services will need to be addressed. Currently, there are no community or neighborhood parks that serve the southwest growth area of Lake Geneva . If the community continues to grow in these areas, parks should be provided for these new neighborhoods. As Lake Geneva continues to grow outward, it will be necessary to acquire additional parkland so future residents have equitable access to all types of parks and open space and recreational opportunities. Future park locations are shown on Map 3. Review of the Wisconsin Statewide Comprehensive Outdoor Recreation Plan 2025-2030 (SCORP) The Wisconsin Statewide Comprehensive Outdoor Recreation Plan (SCORP) serves as a blueprint for state and local outdoor recreation planning through support of national initiatives, sets the course for recreation within the state by describing current recreation supply and trends, and provides a framework for future recreation development and focus. The Statewide Comprehensive Outdoor Recreation Plan has three overarching goals: • Ensure that all Wisconsinites have equitable opportunities to participate in outdoor recreation, regardless of where they live or their ethnicity, gender, income, abilities, or age. • Maintain and expand the sustainability of recreational opportunities in our state, ensuring that existing opportunities are well funded and have the support to grow and expand where needed. • Grow the collaborative partnership approach across federal, state, regional and local agencies and private non-profit organizations and businesses to provide high-quality outdoor experiences for all Wisconsinites The plan also introduces 11 main strategies to achieve the goals of the plan: 1. Provide more opportunities for outdoor recreation close to home 2. Provide needed recreation facilities 3. Improve affordability of participation 4. Develop and enhance mentoring programs 5. Create more welcoming outdoor spaces 6. Improve the distribution of information on recreation opportunities 7. Expand and diversify funding sources 8. Adapt to new conditions for outdoor recreation 9. Adapt management of recreation opportunities and facilities 10. Mitigate climate change 11. Create an implementation plan that identifies desired outcomes as well as the group(s) to coordinate and advocate for outdoor recreation throughout Wisconsin 🌲🌲 WISCONSIN SCORP ALIGNMENT Many of the priorities identified through the Land to Lake planning process closely align with Wisconsin's 2025-2030 Statewide Comprehensive Outdoor Recreation Plan (SCORP), including expanding recreation access, improving affordability and inclusivity, enhancing outdoor recreation opportunities, strengthening community partnerships, and improving access to recreation information. As a result, the recommendations presented in this plan support both local community priorities and broader statewide outdoor recreation goals. Page 45 of 81 Chapter 7: Park Facility Recommendations 43 Chapter 7: Park Facility Recommendations Page 46 of 81 LAND TO LAKE PLAN 44 This chapter provides detailed recommendations to expand and improve Lake Geneva’s existing park and open space system based on current deficiencies and opportunities identified in the preceding chapters of this Plan and collected through public input in the planning process. These recommendations are also guided by the goals, objectives, and policies outlined earlier in this Plan. Based on the City’s projected population in 2035 (9,178 residents) and 2050 (10,119 residents), and its local standard of 11 acres of parkland per 1,000 residents, Lake Geneva would not need to provide additional acres of total parkland by 2035 nor 2050, but should consider expansion opportunities when they are presented, particularly for new residential developments that would cause gaps in park service areas. In order to accommodate the current needs and desires of residents and to accommodate the population in the future, it is primarily recommended that improvements and additions to existing parks be made. This Plan also recommends additional trail and pathway connections to existing parklands and City destinations. The timing of any park acquisitions and development should coincide with the actual demand for recreational facilities in the City’s developed areas. Map 3 shows the approximate locations for future recreational facilities and pathways in the City. More precise boundaries for park expansion should be determined during formulation of specific, detailed site redevelopment plans or when lands are acquired. Proactive identification of lands suitable for active parks or natural areas worthy of conservation is recommended early in all future development processes. Page 47 of 81 Chapter 7: Park Facility Recommendations 45 Citywide Park Facility Recommendations KEY FINDINGS Based on City staff and public input, the following key findings were identified and are addressed by this Plan’s recommended policies and park improvements. • The parks in the downtown area of Lake Geneva are popular and well utilized while parks outside of this area are underutilized. Public input also revealed that residents do not know that some parks exist. • Many of the parks and recreational amenities in Lake Geneva are not fully ADA accessible. Ensuring equal access to parks for all ages and abilities should be a high priority for the City, especially with an older and aging population. • Geneva Lake is an asset, providing beautiful outdoor spaces for residents, but its public access points are limited for water recreation. • While Lake Geneva has an abundance of parks, there are some parks without any amenities and there are many parks with outdated playground equipment, presenting safety issues. • Given the lower number of children per household relative to past generations, the City will need to be strategic about tot lots and playgrounds, thinking carefully about their distribution throughout the community and when and where to invest in new or replacement playgrounds. • Many residents love Veterans Park and it is highly utilized throughout the year. Opportunities to update and further develop this park should be pursued to make the park an “all-day” destination. The park could also be a venue for community events not hosted in the downtown area. • The Hillmoor property will provide significant additional acreage to the Lake Geneva parks system. The property presents many opportunities for thoughtful development and planning by the community. • There is strong community support for sustainability measures such as native plantings, preservation of open space, stormwater management best practices, and lake water quality protections. Provide Essential Park Amenities • Assess and replace park water fountains as needed. Add water bottle fillers to parks with playgrounds and athletic fields. • Revisit policies for when park bathrooms are open and closed to align with peak park use and known activities or events. Keep lakefront bathrooms open as often as possible to accommodate high demand in the lakefront area. • Ensure all parks have an adequate number of benches and picnic tables. • Ensure all parks have an adequate number of trash receptacles. • Establish a unified style with approved designs for trash receptacles, benches, tables, and other similar amenities to achieve a coherent look across all City parks. Adhere to approved designs as amenities are added or replaced. Page 48 of 81 LAND TO LAKE PLAN 46 Increase Accessibility • Upgrade all Lake Geneva parks and recreation facilities to ensure basic ADA accessibility, specifically when upgrading playground equipment and ground surfaces, shelter, and restroom access, and by providing contiguous paved pathway access to amenities within each park and to parking spaces and sidewalks leading to the park. • Add accessible and universal design features to parks such as entrances to play areas being level with paths, wheelchair accessible amenities, sensory gardens. Foster Community Connections and Livability • Consider strategic locations in parks for public art • Support placemaking efforts by other entities such as the Broad Street Alleyway Project • Partner with volunteer organizations such as Rotary Club to implement beautification projects and other volunteer opportunities. • Assess the feasibility of new fishing areas along the lakefront and on the White River. Support Tourism and Events • Convene local tourism groups annually to discuss opportunities for collaboration with one another and with the City. • Support and encourage local tourism groups to create a one- stop-shop website that acts as a directory of community events and tourism resources. • Review City policies to ensure that seasonal or year-round uplighting of trees in parks is allowable. • Establish an entertainment district during certain special events that would allow for open containers in designated areas. • Increase permit/event fees for large events in City parks that consume significant City resources and use City facilities. Page 49 of 81 Chapter 7: Park Facility Recommendations 47 Recommended Improvements to Existing Parks Park improvement recommendations were developed through feedback from the Park Board, City staff, and the public, a review of the goals, strategies, and recommendations of existing plans, and the inventory and analysis of existing park and recreation system conditions within Lake Geneva . This comprehensive analysis led to the following list of recommendations for existing parks. While not every park and trail project is expected to be completed within the next five years, these recommendations establish a flexible roadmap for continued implementation. This plan prioritizes projects over the short, medium, and long term, enabling the City to steadily enhance its parks and trail network in a manner that aligns with available resources and evolving community needs. Improve Park System Information and Wayfinding • Update the list of parks on the City of Lake Geneva website and make the full listing of City Parks more prominent on the Parks Department webpage. • Update the map of all City parks and trails with available features/amenities on the Parks Department webpage to increase awareness of all available parks and recreation facilities. Place in a prominent location on the Parks Department webpage. • Provide information and maps about bike trails on the City of Lake Geneva website. • Ensure that all parks have addresses so that they may be easily found with GPS and mapping applications. • Where opportunities arise, ensure that all park land is properly platted to reduce ambiguity among City departments. • Update/replace wayfinding signage and map kiosks in the downtown area. • Ensure signage is consistent and clear about dog policies in City parks and on trails. Promote Sustainability • Use native plantings whenever possible in City parks and open spaces. Create a native planting guide for parks facilities, open spaces, and landscaped areas in Lake Geneva. • Review opportunities to use sustainable design elements and materials when designing and constructing future park and pathway improvements. • Review opportunities to incorporate green infrastructure in City parks such as rain gardens, bioswales, native prairie plantings, pollinator gardens, woodland restoration projects, and permeable paving. Page 50 of 81 LAND TO LAKE PLAN 48 New Amenities in Existing Parks Cobb Park, Dunn Field, Seminary Park, and Veterans Park present opportunities for additional amenities that would attract users citywide due to their larger size and availability of on-site parking lots. Recommendations for these parks are detailed in park-specific recommendations below. In some cases, a park master plan is recommended to analyze and recommend how the new amenities would be best arranged within the park. The City has several parks with limited amenities. These include Baker Park, Edgewood Hills Park, Fermano Park, Hidden Woods, Home Depot Park, Price-Fremont Park, Southbridge Park, Dodge Water Tower Pond Park, and Willow Park. These parks benefit the City and its residents by providing open space, infiltration for stormwater, and natural beauty, however they do not provide recreational features typically expected for a park. Due to the small size of these facilities, this Plan does not recommend adding new playgrounds or other active recreational features to these parks; instead, it recommends that they be maintained as usable open space. In some cases, accessible trails could be added to encourage residents to walk through and better utilize the area. In other cases, new placemaking features could be added to enhance the presence of the park within the neighborhood. Examples include the addition of native trees and plants, community orchard, public art, benches, educational signage, and bird/bat houses. These recommendations are detailed in park-specific recommendations below. Upgrading Playgrounds The City currently has nine parks with playgrounds, which are well distributed throughout the community. Most of these should be preserved as parks with playgrounds going forward. However, there are opportunities to bring in more interesting and creative playground types such as nature playgrounds, adventure playgrounds, and accessible playgrounds. These recommendations are detailed in the figure below. These creative play spaces can make a park feel special – a destination in itself. Playgrounds also support the City’s goals of making the community more attractive to families with young children. Veteran’s Park STORMWATER INFILTRATION Stormwater infiltration allows rainwater to soak into the ground where it falls, helping to reduce flooding, improve water quality, and replenish groundwater supplies. Stormwater infiltration is increasingly important as climate change contributes to more intense rainfall events. PLAYGROUND RECOMMENDATIONS This Plan recommends playgrounds in the following parks: 1. Cobb Park – update needed 2. Dunn Field – update needed (by School District) 3. Hillmoor Zone 1 – add new 4. Manning Way Tot Lot 5. Maple Park 6. Rushwood Park – update needed 7. Seminary Park – add new 8. Veterans Park 9. Westgate Tot Lot – update needed 10. Oak Hill Tot Lot – relocate/replace Page 51 of 81 Chapter 7: Park Facility Recommendations 49 Figure 7.1 Recommended Improvements to Existing Parks Park Name Project/Recommendation Community Parks Dunn Field Replace playground (by School District) Add lighting at pickleball courts Skatepark maintenance Add signage Add benches to active areas Elm / Library Park Add signage Flat Iron Park Add internal ADA path between amenities Support events by increasing number of power sources and outlets and fixing broken outlets Hillmoor Zone 1 Per Conceptual Master Plan Add signage Add benches to active areas Park shelter Dog park Fishing area Ecological restoration Amphitheater Splash Pad (large) Playgrounds Sledding hill Restrooms Improve disc golf course Gate/barriers at all entrance points Trail completion Seminary Park Add benches to active areas Master plan Add ADA accessible path between parking areas, playground, and pavilion Splash pad (small) Add playground Ice skating rink Add park sign Provide clear signage for boat parking at both entrances to parking lot Extend electricity to the park. Coordinate with event organizers on desired locations for outlets. Riviera Beach and Plaza See Lakefront element of Land to Lake Plan Veterans Park Master Plan Repair fencing Add signage Replace rusted bathroom sinks Page 52 of 81 LAND TO LAKE PLAN 50 Park Name Project/Recommendation Repair and update paved paths ADA restroom updates Plan community events to bring more people to the park Designate new gathering areas within the park Establish a beer garden Add picnic tables and shade sails Splash pad (large) Fitness equipment Upgrade baseball fields to be tournament-ready, with new dugouts, batting cages, scoreboards, and properly maintained natural turf Upgrade baseball field lighting to LED and automatic timing Replace or repair existing scoreboards Neighborhood Parks Cobb Park Master plan ADA paths Add surfacing under playground equipment Add signage Add benches to active areas Replace playground equipment with nature-based playground Maple Park None Rushwood Park Master plan Fitness equipment Add signage Add benches near activity areas Drinking fountains/water bottle filler Add restrooms Add surfacing under all playground equipment Extend electricity to park shelter Update playground equipment. Consider adventure play. Add an ADA accessible street parking space ADA paths between amenities Mini Parks Baker Park Maintain as open space. Add/maintain native plants along shoreline. Add signage Manning Way Tot Lot Add Manning Way Bike Trail Bridge Maintain existing playground. Replace with accessible playground suitable for young children when equipment reaches end of life. Add signage to entrance to path to Hidden Woods Park Page 53 of 81 Chapter 7: Park Facility Recommendations 51 Park Name Project/Recommendation Moss Park Add signage Maintain as open space. Add small amenities that encourage connection and sustainability such as native trees and plants, community orchard, public art, benches, educational signage, bird/bat houses, etc. Oak Hill Tot Lot Remove play equipment and repurpose as a passive open space. Plant native trees and plants. Investigate opportunities to relocate the playground to a property that is flatter and ADA accessible. The current park is on a steep incline that is not safe nor ADA accessible. A City-owned open space across the street from the park has been identified as a potential location. Olive Longland Park Add signage Maintain as open space. Plant native trees and plants Westgate Tot Lot Replace playground equipment with accessible playground oriented to young children Add signage Add benches to active areas Add fence along Dodge Street Willow Park Maintain as open space. Preserve lake views. Natural and Open Space Areas Dodge Water Tower Pond Park Maintain as open space. Plant native trees and plants. Add trail connection from Pond View Lane that encircles the pond Add benches to the pond area Add signage Donian Wetland Nature Preserve Replace signage Edgewood Hills Park Maintain Duck Trail Trailhead to encourage trail access. Add small amenities that encourage connection and sustainability such as native trees and plants, community orchard, public art, benches, educational signage, bird/bat houses, etc. Add signage Fermano Park Maintain as open space and maintain trails. Add benches to active areas Hidden Woods Park Maintain as woodland and maintain trail. Coordinate with Town of Lyons on placement of educational signage along trail. Add signage to path entrance at Manning Way Tot Lot. Coordinate with Town of Lyons about signage placement at path entrances at the south end of Lockwood Blvd, at the corner of West Drive and Hill Street, and at the south side of the park. Home Depot Park Maintain as open space. Add small amenities that encourage connection and sustainability such as educational signage, art, and native trees and plants Add signage Add benches to active areas Page 54 of 81 LAND TO LAKE PLAN 52 Park Name Project/Recommendation Mary Koutsky Four Seasons Nature Preserve Add information kiosk at park entrance and update signage Consider adding archery range Improve trails over marsh Level gravel in parking lot Add seating and picnic tables to the gazebo Continue to maintain trails and gravel parking area Price-Fremont Park Prepare trail development plan to include trails, educational signage, and benches Southbridge Park Negotiate with surrounding land owners to provide easements to allow public access to the property Symphony Bay Park Add benches to active areas Rename the park; add signage with new park name Add gravel to trails Special Use Areas Lake Geneva Bocce Ball Park Consider different uses for the park, such as bags or outdoor fitness equipment Rename park to reflect park’s new purpose; add signage with new park name Assign an address to the park Natural and Open Space Areas Recommendations The City of Lake Geneva is extraordinarily green and lush with many areas of mature trees and neighborhoods with full tree canopies. For more than 30 years, Lake Geneva has been recognized as a Tree City, highlighting its excellent maintenance and care for its urban forest. The City also holds national designations as a Bird City (2010), which recognizes its abundance of bird habitat. Multiple City departments, the Avian Committee, the Hillmoor Commission, the Tree Board, and passionate community members and volunteer groups work together to achieve and maintain these designations and uphold the City’s commitment to sustainable, wildlife, and environmentally friendly practices. In addition to the City’s substantial forestlands, the City also has wetland, environmental corridor, and floodplain areas that make proper stormwater management and flood control practices important. Environmentally sensitive pathway projects should be considered by the City where permissible in its wetland and environmental corridor areas. Page 55 of 81 Chapter 7: Park Facility Recommendations 53 Recommended New Parks Future development and population growth in the City may result in the need for the addition of park space to the overall park system in the coming decades. Although most areas of the City are well-served by existing parks, the City should develop new parks in areas where further residential growth is planned, as those new residents will be physically distant from existing parks. These new parks should be developed when new residential subdivisions are platted. Map 3 identifies potential locations for potential new Neighborhood Parks and Community Parks. As seen in the City of Lake Geneva Comprehensive Plan, the undeveloped land to the southwest of City limits is Lake Geneva’s primary residential growth area. While this area is not expected to develop within the next five years, parks should be included if and when development occurs. Additionally, the City should consider adding park acreage where possible when opportunities for new parkland become available. Additional neighborhood parks should be prioritized if acquisition opportunities are presented. This additional parkland could include smaller lots or greenspace in residential areas. Pursuing opportunities for green corridor and bike and pedestrian connections, potentially through corridor acquisition and development, could also expand the park system for residents in the future. The City should work with private property owners, particularly businesses with additional greenspace on their campuses, to establish publicly accessible recreation and natural spaces as well as trail connections. Hillmoor Property The City has prepared a conceptual master plan for Hillmoor Zone 1. This conceptual plan imagines amenities such as a new dog park, large shelter, beautification efforts through native plantings, an accessible playground, splash pad, and amphitheater. The City is in the process of designing specific amenities, which will be implemented in phases. STEPS TO ACQUIRE ADDITIONAL PARKLANDS AND RECONFIGURE EXISTING PARKS There are several key steps to expanding existing parks and redesigning facilities to make the most efficient use of space that allows for the development of additional playfields. These include: 1. Identification of land suitable for expansion. There are many factors that should be considered in the identification of land for the park including, but not limited to, size, location, accessibility, topography, proximity to utilities, buildability, and constraints. An investigation of all land within the City and directly adjacent to the City and School Districts’ existing facility boundaries should be evaluated. During this investigation, a feasibility study should be done to ensure identified properties are adequate to facilitate the desired size, facilities, layout, etc. 2. Property negotiation and acquisition. The vast majority of lands identified in step one will most likely yield sites that are privately held. Through property owner outreach, the City can determine willingness to sell, land price, and donation opportunities to narrow the pre-identified sites into one or a select few best-fit options. Property acquisition will require several steps including fundraising, grant procurement, or budgeting; negotiation of land sale price; property transfer; entitlements; and potentially Comprehensive Plan Amendments. 3. Park master planning. In advance of major improvements to existing parks or after an existing park has been expanded, it is recommended that a Park Master Plan be developed to determine its future programming, amenities, layout, and facility makeup. This process will include detailed engineering plans for park development, community, and stakeholder engagement, estimated costs, implementation strategies, and City adoption. 4. Bidding, awards, and construction. Utilizing the Park Master Plan, the City will need to acquire and/or allocate funds toward the construction of the new park. This can come in form of donations, grant procurement, sponsorships, budgeting, or more likely a combination of each. The project will then need to be bid out for construction and contractors will need to be selected to complete the work. Following bid awards, construction can commence. Page 56 of 81 LAND TO LAKE PLAN 54 Hillmoor Zones 2-5 are expected to be added to the park system, adding approximately 191 park acres to the community. The Hillmoor Commission intends to engage the community in a process to develop a master plan for trails and amenities for the Zones 2-5 of the Hillmoor property in the future. Recommended Special Use Facilities Through the planning process, unique recreational opportunities were identified. In the future development and upgrades of existing parks, it is recommended that the City consider the following special use facilities, amenities, and partnerships as population and demand increases: ADA Accessibility & Universal Playground Design It is recommended that as upgrades and improvements are made to each playground in the City, whether City-owned or on public or private school property, ADA accessibility standards are incorporated into designs and implemented incrementally over the planni ng period. Focus should be placed on making improvements based on similar types of projects (sidewalks, pavement stripping, signage, etc.) as part of an annual line item in the City’s Capital Improvement Plan. Additionally, with any new facility upgrades, replacements, or construction, special attention should be placed on creating an equitable and fully ADA accessible facility that reflects all federal guidelines, and when possible, goes beyond these standards. ADA accessibility considerations include ensuring that there are accessible paved or rubberized surface pathways from public sidewalks to the various amenities within each park that are easily navigable for all park users. The design of new park equipment and playground features should also incorporate the principles of universal design. Universally designed facilities are thoughtfully designed to be usable by all people to the greatest extent possible without the need for adaptation or specialization. Playground design should be inclusive and accommodate and challenge users at their own developmental levels so that as many children as possible can enjoy the community’s playgrounds. Universally designed playgrounds include equity and flexibility in use and provide assorted sizes and spaces to allow for individuals of varying abilities to use assistive devices or personal assistance. Key design strategies include: • Use different modes (pictorial, verbal, tactile) for redundant presentation of essential information. • Provide facilities that are compatible with and present options for a variety of techniques or devices used by people with sensory limitations. • Eliminating unnecessary complexity. • Providing choice and flexibility in methods of use of various playground features. • Providing adequate space for the use of assistive devices or personal assistance. Cobb Park Page 57 of 81 Chapter 7: Park Facility Recommendations 55 Splash Pad A splash pad has become a very popular alternative to community swimming pools because they are far less expensive to build and maintain, and because they do not require lifeguard supervision. Splash pads can also function as interesting features of community public spaces. When planning for the development of a splash pad, it is important to consider the intended size of the facility, its proposed location in relationship to water and stormwater infrastructure, and long-term operating expenses. There are two common types of splash pads, flow-through and recirculation. A flow-through facility draws through new water each day and then drains that water into stormwater sewers. This type of facility is less expensive to construct and operate (approximately $350,000-$400,000) but is limited in size to 2,400-3,000 square feet because the maximum water capacity of a flow-through system is 50,000 gallons per day. A recirculation facility brings water through the features splash pad’s features, recollects the water used, filters the wa ter, and then recirculates it through the system. This type of facility is more expensive to construct and operate long-term (approximately $600,000-$700,000) because it is required to meet the state pool code and requires regular County and City staff inspections. However, it does provide greater flexibility in overall size and number of features. Most often, a recirculation splash pad makes the most sense for a larger planned facility with lots of infrastructure. Flow -through splash pads are commonly used in smaller settings such as a neighborhood park. Outdoor Ice Rink There can be a lack of inexpensive, active recreation opportunities during the winter months in Wisconsin, but outdoor ice rinks provide a fun, convenient and healthful way for community members to enjoy the outdoors through figure skating or hockey. Options for the City include adding an ice rink to an existing park or a “dry” rink which provides a non-ice surface for skating. Including a warming house with skate rentals provides a more comfortable experience for families. Currently, some residents skate on the frozen pond in Dodge Water Tower Pond Park. Seminary Park SPLASH PAD RECOMMENDATIONS This Plan recommends splash pads in the following parks: 1. Hillmoor Zone 1 2. Seminary Park 3. Veterans Park Page 58 of 81 LAND TO LAKE PLAN 56 Outdoor Fitness Equipment / Urban Gym Numerous survey respondents noted an interest in outdoor fitness equipment. Essentially a playground for adults, weather-proof fitness equipment varies from static pieces like chin-up bars to cardio and weight machines that use a person’s body weight to create resistance. Some pieces are utilitarian, while others are designed to serve a public art purpose as well. The concept aligns with wellness and recreation goals of this Plan. These parks occupy less space than other types of recreation facilities and can take advantage of unused spaces or spaces that are too small for other typical park uses. They reflect a growing interest in incorporating fitness into everyday life. An urban gym could be incorporated into an existing park in Lake Geneva or a future park. This Plan recommends outdoor fitness equipment in Rushwood Park. Community Gardens Community gardens provide benefits to both the environment and the health and wellbeing of community members. Community gardens increase the availability of nutritious food, providing increased access to fresh produce to help residents create healthier lifestyles. They also strengthen community ties, reduce environmental hazards, and water runoff, and contribute to the creation of more sustainable food systems. Opportunities to grow food locally reduce the environmental and financial costs of transporting food to stores, helping to improve air quality. The installation of gardens creates additional habitat, increasing local biodiversity of both plants and animals. Community gardens also play a role in waste reduction, allowing neighborhood residents to compost their food waste. Establishing community gardens in existing or future City parks is a great way to activate underutilized park areas. The City should work with neighborhood groups and the City’s schools to establish community gardens on school properties or in residential neighborhoods through mini parks. The City could work with its volunteer organizations to establish a community garden program and set guidelines for creating community gardens on non-City property. Rushwood Park Page 59 of 81 Chapter 7: Park Facility Recommendations 57 Map 3: Proposed Facilities Page 60 of 81 LAND TO LAKE PLAN 58 Page 61 of 81 Table of Contents i DRAFT: N OVEM BER 2026 CITY OF LAKE GENEVA L AKEFRONT P LAN Page 62 of 81 Table of Contents i Table of Contents Marina Benchmarking & Market Analysis ................................ ................................ ............ 1 Introduction ................................ ................................ ................................ ................................ ................................ ................................ 1 Goals and Objectives ................................ ................................ ................................ ................................ ................................ ............. 1 Methodology ................................ ................................ ................................ ................................ ................................ ............................... 1 Study Area ................................ ................................ ................................ ................................ ................................ ................................ ... 2 Summary of Recent Trends ................................ ................................ ................................ ................................ ............................. 2 Local Regional Marina Analysis ................................ ................................ ................................ ................................ ..................... 3 Waterfront Condition Assessment ................................ ................................ ................................ ................................ ............ 8 Survey Response Considerations ................................ ................................ ................................ ................................ .............. 10 Marina Configuration Options ................................ ................................ ................................ ................................ ....................... 11 West Dock Concept Options ................................ ................................ ................................ ................................ ......................... 12 East Dock Concept Options ................................ ................................ ................................ ................................ .......................... 14 Beach Concept Options ................................ ................................ ................................ ................................ ................................ .... 17 Planning Assistance provided by: Page 63 of 81 Marina Benchmarking & Market Analysis 1 Marina Benchmarking & Market Analysis Introduction The purpose of this study is to evaluate the existing demand for and supply of marina services on Geneva Lake. The study assesses demand for marina slips by examining slip sizes, slip mix, rental rates, and amenities. Research methods include site visits t o marinas, interviews with marina managers and staff, reviews of publicly available information on marina websites, and supplemental online research. Goals and Objectives The goal of this marina market analysis is to assess the current state of the recreational boating market on Geneva Lake. This exercise will identify the level of quality, programing, and costs of other nearby facilities to provide context for comparison to the existing facilities. This will provide the background information necessary to suggest high - level improvements to the marina facilities to expand access to the water, improve product offerings, and improve the overall finances of the marina operation. The market analysis will consider a wide range of factors among marinas in the region including: • Marina location and adjacency to recreational and shopping opportunities • Current occupancy considering slip size, mix, rates, and transient/seasonal mix • Services and amenities offered, such as utilities, repairs, and landside boater lounges, restrooms, internet access, etc. • Unique features Methodology Approach The data presented in this report was collected by Edgewater staff in the summer of 2026 unless otherwise noted. The sources of the data include direct conversations with marina staff, physical inspections, and marina websites. During the course of the market analysis, marina sites were physically inspected in the summer of 2026 to assess the general conditions of the facility and adjacent amenities. Information was collected for the marinas through visual inspections, utilizing available data onlin e, and phone interviews with local marina staff to seek additional input. Data on amenities, utilities, and services are tabulated for ease of comparison. In addition to the marinas studied, this analysis is informed by multiple additional market analyses performed over the last five years throughout the United States. These studies included site visits to dozens of marinas and boater surveys of more than 4, 000 boaters. Over the past fifteen years, Edgewater has completed dozens of market analyses for marinas across the United States, which provides broader relevant context for the overall direction of the marina industry. Page 64 of 81 LAND TO LAKE PLAN 2 Study Area Summary of Recent Trends Slip occupancy, boat sales, used boat sales, and participation reached record - setting levels during and just after the Covid Pandemic, and have now generally stabilized. Market analyses performed over the last fifteen years have identified several key trends that directly relate to the ongoing success of marinas while also highlight ing the source of challenges faced by marinas that are struggling. These include: • Slip demand between one marina and another is driven more by the relative quality and location of the facilities much more than pricing. Demand levels on Geneva Lake are currently very high, and thus the primary driver for boaters selecting a marina is availability. We were able to locate only one available swing mooring and offsite dry storage currently, with no other wet slips available at any of the facilities on Geneva Lake. • The general list of amenities provided by marinas is reasonably consistent from one marina to another within a region, with few marinas lacking any significant amenities compared to their competitors. The age and quality of maintenance of those amenities d oes make a difference , however, and obviously newer facilities are more desirable than dated facilities. For this market area, nearly all the facilities we visited utilized the same type of fixed dock system that is removed every winter with no utilities, so there is very little difference in any of the products offered no matter the facility. Only one private yacht club facility offered floating docks, which could represent a significant competitive advantage in some markets. • Marinas have become more and more a part of the hospitality industry, and boater expectations for service have increased. Friendly, competent, and helpful marina staff create a significant intangible culture at a marina that can make a difference in a boater’s choice of marina. • Transient slip occupancy on inland lakes is primarily dependent on the quality of the destination. Transient docks, or “shopper docks” located near downtown areas or shops and restaurants can be very successful. • Compliance with current National and Federal standards remains low, providing an opportunity for marinas to reduce their liability exposure while also providing a safer, higher - quality boating experience for their customers. In particular, the Americans with Disability Act enacted specific requirements for recreational boating facilities in 2010. All facilities, even those privately owned, that provide services to the general pub lic must comply. Additionally, there has been a dramatic increase in the awareness of electrical shock drowning prevention within Page 65 of 81 Marina Benchmarking & Market Analysis 3 marinas, with new National Electric Codes requiring individual protection for leaks greater than 30mA. The existing dock systems in use on Geneva Lake are compatible with ADA (assuming they provide acceptable ramp connections to land), so that is not likel y to be an issue. We did not see any public dock systems with permanent shore power or AC power installed, which limits the risk of electric shock drowning. Many boaters have lifts that rely on small solar powered DC/battery systems, which present a much lower risk. Local Regional Marina Analysis Five marinas in the region were studied in detail during this marina market analysis. A wide range of criteria and characteristics were documented and are summarized on the following pages. In addition to the commercial public marinas, the planning team visited more than a dozen smaller private boat clubs, yacht clubs, and small neighborhood facilities. While these facilities were excluded from this study as they do not provide an appropriate comparison for determining rates, we found that every one of them was completely full – often with waiting lists exceeding ten or even twenty years. Slip Availability Analysis As noted above, we were unable to locate a single slip available for rent anywhere on Geneva Lake. The only available option we found was one swing mooring capable of handling boats less than 25’ in length. The price for that swing mooring was $5,000, which represents a per foot cost of $200 per linear foot for a 25’ boat. For comparison purposes, a 40’ slip located on Lake Michigan in a full - service marina (with shore power, water, restrooms, showers, boater lounge, and services) costs as little as $4,700 per year. A similar 25’ swing mooring in Monroe Harbor in the heart of downtown Chicago costs only $45 per linear foot for a season, or $1,125. We also located a 30’ slip that was being leased from the private slip owner for $25,000 for one season. This equates to $833 per linear foot for the season, which is the among the highest slip rates we have identified anywhere in the United States. The bottom line is that Geneva Lake has the highest demand of any inland water body we have ever studied, with occupancy rates on par with the highest demand regions in the country, such as Grand Traverse Bay in Michigan, Fort Lauderdale/Miami in Florida, or Santa Cruz/Monterey in California. Wet Slip Breakdown The five marinas in the study area provide approximately 287 wet slips, with the City of Lake Geneva offering the highest number of berths at 130. Slip Size/Mix The majority of the slips in the marinas studied on Geneva Lake are between 24’ and 26’ in length, with a small number of 30’ slips. Given the navigability of the lake, and the majority of the boats being smaller runabouts, fishing boats, pontoon boats, and small cruisers, this slip mix is appropriate, and new slips should fall in the same size range. Figure 1 – Slip Mix Page 66 of 81 LAND TO LAKE PLAN 4 Slip Rates Regional Rate Analysis The data below represents the annualized monthly average cost per foot for each of the specified marinas. This data was collected through direct conversations with marina staff, websites, and/or rate sheets provided by the marinas during our site visits. Figure 2 – Slip Rates Rate Summary and Recommendations As noted above, slip leasing rates on Geneva Lake are well above regional Great Lakes facilities, and reflect the very high demand for slips on Geneva Lake. There are three municipal marinas on the lake, with the Fontana on the Lake and Lake Geneva City docks commanding higher prices due to their excellent locations immediately adjacent to vibrant downtown areas with shops, attractions, and restaurants. Willia ms Bay Municipal Marina charges lower rates, which may be attributed in part to their somewhat more remote location and/or possibly policy decisions. The average slip rate for the five facilities in the study is $186.17 per foot for the season, compared to the current average slip rate of $141.42 for the City of Lake Geneva – roughly 25% below the average price on the lake. The average rate for the two private facilities is $260.95, while the average slip rate for the three public facilities is $137.22. Relative to the cost of the infrastructure, all of these rates should result in a profitable operation. There are two schools of thought for establishing slip rates for municipal marinas that are located on bodies of water that also have privately operated marinas. Market Rate Approach The first approach is based on the idea that public marinas occupy public trust waterfront and bottomlands and serve a relatively small portion of the community that funds these operations. Of the approximate 8,800 residents in Lake Geneva, only 160 or so households have a slip or mooring. These households occupy ( more or less exclusively and permanently during the boating season) public trust waterfront and bottomlands, and therefore the non - boating residents have a right to expect that those occupying public trust lands pay fair market value for the use of this resource. This is a distinctly different situation than public parks, trails, boat launches, tennis courts, etc., which are generally shared and available equally to all residents. Under this scenario, we also need to consider the idea that the public marina facilities have an unfair competitive advantage over the private facilities, and it can be reasonably argued that taxpayer funded marinas should charge at least the same price as private facilities offering equivalent facilities. In these cases, the additional profit would be reinvested in the waterfront to expand access to the water for the non - boating public. The City of Chicago has generated significant excess revenues from their marina system that were subsequently invested in upland park spaces for everyone. If the City of Lake Geneva decided this approach is appropriate, we would recommend that the average slip rate increase to at least the Geneva Lake average of $186 per linear foot per year. Page 67 of 81 Marina Benchmarking & Market Analysis 5 The primary advantage to this approach is that the marina will usually generate sufficient revenues to cover the cost of construction of the facilities, high - quality maintenance, and quality operations, which protects both the environment and the general p ublic. There will be a much lower likelihood of the need for capital expenditures from the general fund to invest in the marina, as the facility will be financially self - sufficient. Many facilities using this approach are operated as Enterprise Funds separate fro m other city budgets. The downside of course is higher rates for the boaters, which in some cases could result in older or lower income residents being priced out of their slip. Social Equity Approach The “social equity approach” is more common in areas with high wealth inequality, with the intent of keeping prices lower than market rates to make access to slips more affordable. The State of Idaho, for example, charges extremely low rates at their state - owned marinas (below even the cost of operations) in an effort to keep slip rates low for long time lower income residents who find themselves competing for homes and slips with ne w high net worth residents moving in from California. It is important to note, however, that there are no water bodies where both state - owned and private facilities compete on the same lake. We recommend that agencies utilizing this approach charge rates that at minimum provide sufficient funding for high - quality maintenance and operational staff. Since the dock infrastructure is set aside for the exclusive use of the boaters, we further recommend that the rates provide sufficient funds to cover the cost of construction of the revenue generating slips and infrastructure. This would normally be determined by establishing the construction cost of the facilities and then identifying the cost of funding that construction via a 20 - year revenue bond at current rates. For example, if the construction cost for the marina was $2,000,000, the cost of financing that amount would be approximately $150,000 per year at 4% interest for 20 years. If the marina had 50 slips, then the boaters would pay at least $3,000 per year, plus the additional cost of marina staff, insurance, utilities, etc. Whichever approach is selected, we recommend that slip rates automatically be adjusted each year to match the rate of inflation. This is critical, as the cost of staffing and maintenance increases every year. We have worked with dozens of municipal marinas around the country that do not increase their rates every year to keep up with inflation, and within 3 - 5 years they often start to experience budget deficits. This leads to either reduced staffing, reduced maintenance, or both. The marina begins to fall into disrepair, liabilities increase, and when major improvements are required, there is no money available to fund reconstruction. This downward spiral is difficult to escape (“ Y ou want me to pay more for my slip? This place is a mess!”). Seasonal Slip Occupancy We generally recommend marinas target seasonal occupancy around 95% effective occupancy, which balances the need to keep space available for new customers, with rates near the top of what the market will bear. If a marina is 100% full with a waiting list, we would usually recommend increasing rates until demand drops to about 95%. In this case, every facility on the lake is 100% occupied with long waiting lists, so all financial projections will be based on 100% occupancy . Transient Occupancy Transient boating on Geneva Lake is limited to shopper docks that allow boaters from across the lake to visit downtown shops, attractions, and restaurants. With the high number of boaters on the lake and high - quality attractions, we believe the number of shopper docks at the City of Lake Geneva facilities can and should be increased to accommodate up to ten - twenty visiting boats. Figure 3 – Slip Occupancy Page 68 of 81 LAND TO LAKE PLAN 6 Slip / Storage Availability Analysis Swing Moorings Swing moorings, also known as buoy moorings or can moorings, are permanently anchored floating moorings boaters tie off to from the bow. Moorings are spaced such that boats can swing freely 360 degrees around the mooring buoy without contacting other boats or structures. Access to landside facilities requires the use of small tender craft, either carried on board the boat or as a tender ser vice provided by the marina facility. This makes them significantly less convenient, and our conversations with local boaters suggest that very few boaters would choose swing moorings over slips. Construction of buoy moorings is very cost effective, but they require much more space than dock structures. While boats moored on buoy moorings can tolerate much higher wave conditions, they must still be located in protected waters. Dry Stack Storage Dry Stack storage, also known as dry slips, dry rack, boatel, or high & dry storage, are large structures that house boats on racks on land inside a structure. Boats are lifted out of the water using specialized forklift vehicles or automated systems and l ifted on to racks three, four and sometimes more levels high. This creates a natural size limitation, and rack storage generally accommodates smaller boats up to 40’ due to weight limitations. Rack structure buildings are located near the water’s edge, adj acent to lift wells and courtesy docks where boats are docked awaiting storage or retrieval. The boater calls ahead to schedule the launch, and when they arrive their boat is waiting for them at the courtesy dock. When it is done, they leave the boat at th e courtesy dock and marina staff return the boat to storage. Advantages to the dry stack system include excellent protection for the boat, lower costs compared to traditional wet slips, the potential for reduced permitting issues as waterside infrastructure is greatly reduced, and the ability to store large numbers of boats in a very small area. Disadvantages include a loss of the dockside wet slip boating experience, potential waiting, and frustration if the boat launch is busy or delayed, and the structures themselves are generally very large, and some people disli ke their appearance. Contemporary dry stack systems in southern parts of the country are incorporating residential condominiums wrapped around the structures, both hiding the mass of the building and creating a waterfront residential product. Modern automated rack systems are now being constructed, where boats are launched and retrieved by robotic cranes rather than forklifts driven by people. The precision of automated systems allows them to work in less space, and they can also make much taller rack systems above five floors. We do not recommend dry stack boat storage for the City of Lake Geneva as there are no suitable sites available. Page 69 of 81 Marina Benchmarking & Market Analysis 7 Upland/Winter Storage Upland/Winter storage of boats can be a significant part of a marina’s revenue in northern climates, with winter storage rates approaching summer seasonal slip rates in some markets. Types of upland storage include indoor heated, indoor unheated (fully enclosed), covered (not fully enclosed), and outdoor storage. Storage operations generally require lift wells and haul - out service, which creates additional liability, complexity, and ex penses to the marina operation. However, these are made up in upland storage fees. Depending on the location of the outdoor storage areas, neighbors may not like the appearance of several dozen boats stored on cradles in the parking lot of the marina. Boats stored outdoors are often shrink - wrapped for protection, so boats may have white, gray, or blue plastic sheeting. While nearly every boat in this market area will be hauled out for winter storage, there are no suitable sites for boat storage along the shoreline. Figure 4 – Storage Availability Marina Infrastructure Elements, Services, and Amenities Figures 5 and 6 address elements related to the quality of the facilities, as well as the type of facilities offered. Successful inland marinas are judged by the quality of their docks, the type and capacity of utilities provided, and landside amenities in cluding the quality of the landscape, parking, and boat launch facilities. Marinas serving smaller vessels, generally under 30’ in length, do not usually provide shore power as few vessels of this size can utilize shore power. When dock systems are removed each winter, providing shore power and water becomes more challenging as annual connecting and disconnecting of utility systems increases maintenance requirements, wear and tear, and potential attendant safety issues. Amenities such as restrooms are expected, and they must be kept exceptionally clean and well maintained at all times. Additional amenities, such as Wi - Fi, showers, laundry, and lounges are nice to have but are not required for marinas of this type. The distinction between marinas is made in the overall quality of the marina facilities, and the age of the amenities. Other elements that make a difference to marina finances and operations, but not necessarily the popularity of the marina among seasonal boaters include boat launches, lift/haul - out service, on - site repairs, and boat rental. Only two of the facilities in this study area provide those amenities. Marinas should perform regular boater surveys to stay current on boater needs, and marinas that commit to staying current will be rewarded with strong boater loyalty. While this may not be critical in an underserved market, these distinctions can make a significant difference as supply catches up with demand. Page 70 of 81 LAND TO LAKE PLAN 8 Figure 5 – Marina Amenities Figure 6 – Marina Infrastructure Waterfront Condition Assessment The existing conditions along the lakefront present no major issues in terms of safety or accessibility, and in general, the lakefront is well developed, well cared for, and very well used. The primary issues relate mainly to overuse and demand exceeding capacity. • The existing removable public docks meet all existing ADA access requirements . o The only issue noted is settlement of the ramp connection at the fixed commercial dock that should be addressed . • The addition of an ADA - compliant paddlecraft launch near the west docks would address both ADA - compliant access to the buoy moorings and paddlecraft launching . • There are no existing electrical systems on the fixed docks, so there are currently no concerns with compliance with ground fault protection requirements in current codes . o There is an electrical system on the fixed docks that supplies the fuel system . o A comprehensive inspection of the fuel and electrical system is outside the scope of this study, but should be considered . • There are a number of relatively simple maintenance issues with the paved pathways around the lake that could present trip hazards and should be addressed . • There is little in the way of shoreline erosion that presents any risk to the park or existing infrastructure, however there is some settlement near an existing storm drain near the path just west of the beach . Page 71 of 81 Marina Benchmarking & Market Analysis 9 • The existing boat launch facility does not comply with any existing standards and presents the following concerns to be considered: o The public walking path around the lake crosses the boat ramp facility and presents a risk to pedestrians when boats are backing down the ramp. Additional signage, tactile pavement markings, or other safety features should be considered. o Vehicles utilizing the ramp perform all turning and backing movements within the traffic lanes of Wrigley Drive: ▪ This condition has existed for decades and is well known/accepted by local drivers . ▪ According to the city, there is no history of accidents or serious traffic conflicts other than occasional delays while vehicles are backing . ▪ T he ramp is very lightly used and estimated to be less than one launch or retrieval per hour . Between July 1 - September 7, 2026 (total of 68 days), the launch was only used on 24 of those days (data for 4 th of July was not recorded) . Of those 24 days , the average daily average is just under 12 launch/retrievals per day, or 1.2 per hour. ▪ Accepted standards suggest that a two - lane boat ramp of this type would require 25 trailer parking spaces per launch lane, or 50 total parking spaces. There are currently 12 trailer parking spaces located in a nearby park, which is likely keeping demand for this launch facility low. ▪ There are no other public launch ramps on the east end of Geneva Lake . ▪ Construction of a new launch ramp facility at Big Foot State Park is likely the only viable alternative site on the east end of Geneva Lake, however this project would be very expensive and is entirely outside the control of the City of Geneva . ▪ It should be noted that a similar boat ramp condition exists in Fontana - on - Geneva Lake on the west side of Geneva Lake . o Upgrading this facility to meet modern boat launch standards at this site would require significant modifications (closing) to Wrigley Drive and the need to convert adjacent parkland to parking. While we would not propose to construct a new boat launch facility in this configuration, the facility has been in place and operating safely for decades and the risks outlined above are known and considered acceptable to the city. Possible strategies to reduce traffic conflicts include: ▪ Addition of paint markings and boat launch attendant operated traffic/warning lights to stop traffic during launch and retrieval activities . ▪ Provision of police/public safety officers to direct traffic during high demand periods . ▪ Roadway reconfiguration . Page 72 of 81 LAND TO LAKE PLAN 10 Survey Response Considerations Boaters Focus Group Summary • There is a strong consensus that the waitlists for slips are extremely long, with some participants stating they have been waiting for 15 to 20 years. • The group discussed the City’s unique boat launch that is accessed into the middle of a public street, noting that while it is unconventional to have vehicles with boat trailers crossing traffic, it has functioned for decades without major safety incidents. • Several participants shared their history with the waterfront, including one participant whose family had a boat stall in the lagoon for 50 years before the lagoon slips were removed. He now stores his boat in his driveway. Lagoon slip holders are frustrat ed by this situation and feel that the City should have reinvested lagoon rental fees into maintenance and/or dredging to keep the lagoon piers in place. • The group questioned whether they wanted to see more boats on the lake, including residents and tourists. • Municipal Slip Rates o Participants debated municipal slip rates. Some suggested that the City should charge market rates to avoid competition with the private sector, but others stating that affordable slips are one of the few perks offered to residents. o Participants debated who should pay for the initial construction of City - owned piers or similar improvements and who should pay for the maintenance of those improvements – slip holders or Lake Geneva taxpayers. Some felt that the taxpayers should pay for t he initial construction and the slip holders should pay for maintenance only. • Improvements o The participants generally agreed that more slips are needed and would be preferable to buoy moorings, as rowing to buoys is difficult and makes the harbor less accessible. The group was open to replacing existing buoy moorings in favor of new pier slips. The group discuss various options for new or improved pier systems on the lakefront. o One participant suggested replacing the moorings east of the Riviera building with pier slips and parking. o Participants discussed options whether wave action would necessitate fixed docks. o Vandalism was raised as a concern for the existing piers, leading to a discussion about the necessity of gates. Some noted that during major events like Venetian Fest people often climb onto private boats to watch the festivities. It was noted that while g ates can deter people and reduce nuisances, they cannot fully secure a marina against someone determined to enter from the water. • An existing parking lot northeast of the Riviera building is available for boat trailer parking. The two - year Highway 50 project starting next year will temporarily affect parking, but the plan is to eventually convert car spaces back to boat trailer space s, potentially doubling the current capacity of 1 2 trailer spots. • One participant suggested extending paid beach hours past 5:00 PM to capture more revenue . Page 73 of 81 Marina Benchmarking & Market Analysis 11 Marina Configuration Options The master planning process for the Lake Geneva waterfront is a multi - step effort. The initial stage of the process is the completion of inventory and analysis, where the design team inspected the physical condition of the site and existing infrastructure , and met with city staff, boaters, and the general public to gain the necessary base information used to develop a set of separate Preliminary Concept Plans that explore various ways to achieve the goals defined by city operations staff and the community. We generated three Preliminary Concept Plans each for the areas east and west of the beach, and two Preliminary Concept Plans for the beach area itself. The purpose of these different concepts was to explore different potential solutions and test them a gainst one another. These preliminary plans will be presented to the public in the coming months, and the feedback received will guide the development of a single Draft Consensus Master Plan for further public review and comment. The draft plan will then be revised to a Final Consensus Master Plan for final approval by the City of Lake Geneva. This is a proven process that most often results in the best ideas from two or three of the preliminary plans being incorporated into the Draft Consus Master Plan. Based on the feedback received from the boaters and broader community, we recommend the following strategies for addressing the needs of the boating community: • Replace all existing swing buoy moorings with fixed docks , similar to the existing West Docks. • The new fixed docks would be installed in one of several locations outlined below, including: o Shifting the existing West Docks to the south to add another row of slips, while also extending slightly to the east and west o Adding a potential new set of docks near the west end of the beach o Adding a new set of fixed docks between the boat launch and the Riviera Building • Given the extremely high demand for additional slips, and the concerns about the loss of the lagoon slips, we recommend replacing the lost lagoon slips near the boat launch as part of the overall project to restore the previous slip capacity. We do not recommend constructing these slips within the lagoon itself due to low bridge clearance, as well as the maintenance issues associated with dredging and maintaining the outfall. F igure 7 – Slip Counts Location Count Lagoon Docks (Removed 202 4 ) 32 slips Total Berths (Removed) 32 West Docks 50 slips West Mooring Field 56 buoys East Mooring Field 24 buoys Total Berths (Existing) 1 30 Page 74 of 81 LAND TO LAKE PLAN 12 West Dock Concept Options West Dock Concept A • Replace all moorings with new docks . • Shift existing docks south by 25’, extend east and west to increase slip count to 78 . • Add new dock s near beach with 28 new slip s and flex broadside shopper docks . • Extend existing fishing pier 50’ . • Total slip count: 10 6 (106 existing: 50 slips, 56 buoys) . West Docks Option A Cost Estimate: Removable F ix ed Main pier relocation: 1,000lf @ $400 / lf= $400k New main pier: 950lf @ $800 / lf= $760k Finger piers: 2,200lf @ $300 / lf= $660k Total: $1.82 M Permanent Fixed Main pier relocation: 1,000lf @ $400/lf= $400k New main pier: 950lf @ $ 120 0/lf= $ 1.14M Finger piers: 2,200lf @ $ 45 0/lf= $ 99 0k Total: $ 2.53 M West Dock Preliminary Concept A 100’ Page 75 of 81 Marina Benchmarking & Market Analysis 13 West Dock Concept B • Replace all moorings with new docks . • Shift existing docks south by 25’, extend east and west to increase slip count to 103 . • Add new 200’ fishing pier / shopper docks to west . • Extend existing fishing pier 50’ . • Total slip count 103 (106 existing: 50 slips, 56 buoys) . West Docks Option B Cost Estimate: Removable F ixed Main pier relocation: 1,000lf @ $400 / lf= $400k New main pier: 600lf @ $800 / lf= $480k Finger piers: 2,400lf @ $300 / lf= $720k Total: $1.6 0M Permanent Fixed Main pier relocation: 1,000lf @ $400/lf= $400k New main pier: 600lf @ $ 12 00/lf= $ 72 0k Finger piers: 2,400lf @ $ 45 0/lf= $ 1.08M Total: $ 2.2 0M West Dock Preliminary Concept B 100’ Page 76 of 81 LAND TO LAKE PLAN 14 East Dock Concept Options: East Dock Concept A • No change to existing commercially leased docks . • Replace all moorings with new docks (24) . • Add up to 60 additional docks to replace West Moorings and/or former Lagoon Docks . • Total slip count 84 (24 existing east moorings, 51 existing west mooring s) . East Docks Option A Cost Estimate: Removable Fixed New main pier: 1,380 @ $800 / lf= $1.1m Finger piers: 1,950 @ $300 / lf= $585k Total: $1.6 9M Permanent Fixed New main pier: 1,380 @ $ 1200 / lf= $1. 66 m Finger piers: 1,950 @ $ 450 / lf= $ 878 k Total: $2.53 M East Dock Preliminary Concept A 100’ Page 77 of 81 Marina Benchmarking & Market Analysis 15 East Dock Concept B • No c hange to existing commercially leased docks . • Replace all moorings with new docks (24) . • Add 32 new docks to replace former Lagoon Docks . • Total slip count 5 6 (24 existing east moorings, 32 former Lagoon Docks) . • 150’ flex broadside shopper docks . • Explore the option to c lose Wrigley and create dedicated boat ramp circulation and marina parking . East Docks Option B Cost Estimate: Removable Fixed New main pier: 860lf @ $800 / lf= $688k Finger piers: 1,300 @ $300 / lf= $390k Total: $1.08 M Permanent Fixed New main pier: 860lf @ $ 1200 / lf= $ 1.03M Finger piers: 1,300 @ $ 450 / lf= $ 585 k Total: $1. 62 M East Dock Preliminary Concept B 100’ Page 78 of 81 LAND TO LAKE PLAN 16 East Dock Concept C • No c hange to existing commercially leased docks . • Replace all moorings with new docks (24) . • Total slip count 24 (24 existing east moorings, 32 former Lagoon Docks) . • 530’ flex broadside shopper docks . • Explore the option to c lose Wrigley and create dedicated boat ramp circulation and marina parking (with one - way northbound access) . East Docks Option C Cost Estimate: Removable Fixed New main pier: 780lf @ $800 / lf= $624k Finger piers: 660 @ $300 / lf= $198k Total: $822k Permanent Fixed New main pier: 780lf @ $ 1200 / lf= $ 936 k Finger piers: 660 @ $ 450 / lf= $ 297 k Total: $ 1.23M East Dock Preliminary Concept C 100’ Page 79 of 81 Marina Benchmarking & Market Analysis 17 Beach Concept Options Key Issues to Address • Renovate/expand existing changing/restroom facilities • Beach capacity • ADA access Beach Concept A • Construct new restrooms/changing room at west end of beach • Add ADA compliant access point at west end of beach • Create raised 18’ wide boardwalk terrace with wood step seating along entire length of beach (extend beach northward into slope to prevent any visual impacts from library or path) • Renovate existing changing rooms • Add new entry portal structure at east end of beach, north of trash enclosure • Add new ADA compliant ramp and path access to existing changing rooms • Add beach access mats • Consider floating play features? 100’ Beach Preliminary Concept A 100’ Beach Cross -Section A Page 80 of 81 LAND TO LAKE PLAN 18 Beach Concept B • Construct new restrooms/changing room at west end of beach with upper level observation deck • Add ADA compliant access point at west end of beach • Extend beach northward into slope to prevent any visual impacts for library or path • Renovate existing changing rooms • Add new entry portal structure at east end of beach, north of trash enclosure • Add new ADA compliant ramp and path access to existing changing rooms • Add beach access mat • Consider floating play structures? Floating Play Structures Beach Preliminary Concept B 100’ Beach Cross -Section B Page 81 of 81

Source: City of Lake Geneva website. First collected Nov 17, 2026.