Joint Session Piers Harbor & Lakefront Committee and Board of Park Commissioners — Agenda Packet
City of Lake Geneva · Walworth County · General · meeting of Nov 19, 2026 · Agenda packets
Open the original document More from City of Lake Geneva
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
November 19, 2026 Board of Park Commissioners Agenda 1
City of Lake Geneva, 626 Geneva St, Lake Geneva, WI 53147-262.248.3673-www.cityoflakegeneva.gov
Joint Piers, Harbor, & Lakefront Committee & Board of Park Commissioners Agenda
Thursday, November 19, 2026 - 5:30 PM
Lake Geneva City Hall; Council Chambers
Members:
Park Board Members
President: Adam St. Marie
Members: Dana Furlo, Jessica Pokorny, David Quickel, Peggy Schneider, and Betty Volquardsen
Council Liaisons: Alderperson Cindy Yager and Mayor Todd Krause
Piers, Harbor, & Lakefront Members
Chair: Cindy Yager
Members: Sherri Ames, Linda Frame, JaNelle Powers, Cathy Stoodley
1. Call to Order
2. Roll Call
3. Comments from the public limited to 5 minutes, limited to items on this agenda
4. Discussion/Recommendation regarding Plan Review #1 of the Comprehensive Outdoor
Recreation (CORP) and Lakefront Plan
5. Adjournment
A quorum of the Council may be present; however, no official Council action will be taken.
Requests from persons with disabilities who need assistance to participate in this meeting should be made to the City Clerk’s office in advance
so that the appropriate accommodations can be made.
Page 1 of 81
Table of Contents
i
DRAFT: NOVEMBER 2026
CITY OF LAKE GENEVA
COMPREHENSIVE
OUTDOOR
RECREATION
PLAN
Page 2 of 81
LAND TO LAKE PLAN
ii
Table of Contents
Chapter 1: Introduction and Existing Conditions ............................................................................................1
Introduction ............................................................................................................................................................................................. 2
General Regional Context ............................................................................................................................................................... 5
Existing Conditions .............................................................................................................................................................................. 5
Chapter 2: Existing Park and Open Space Facilities .......................................................................................8
Description of Existing Public Park and Recreation Facilities ............................................................................... 9
Community Parks ............................................................................................................................................................................... 11
Neighborhood Parks ........................................................................................................................................................................ 13
Mini Parks ............................................................................................................................................................................................... 14
Natural, Open Space, and Special Use Areas.................................................................................................................... 15
School Facilities ................................................................................................................................................................................... 19
County and State Facilities ......................................................................................................................................................... 20
Private Facilities ................................................................................................................................................................................. 20
Chapter 3: Public Participation ................................................................................................................... 21
Planning Process ............................................................................................................................................................................... 22
Site Visits ................................................................................................................................................................................................. 22
Pop-up Engagement Events ..................................................................................................................................................... 23
Focus Group Interviews ................................................................................................................................................................. 23
Community Survey ........................................................................................................................................................................... 25
Chapter 4: Vision, Goals, and Strategies ..................................................................................................... 27
Goals ........................................................................................................................................................................................................... 29
Strategies ................................................................................................................................................................................................30
Chapter 5: Park and Open Space Standards ................................................................................................ 32
National Guidelines .......................................................................................................................................................................... 33
Lake Geneva Park Standards .....................................................................................................................................................34
Service Areas ......................................................................................................................................................................................... 35
Recreational Programming and Staffing .......................................................................................................................... 35
Chapter 6: Analysis of the Existing Park and Open Space System ................................................................. 37
Quantitative Analysis ....................................................................................................................................................................... 38
Qualitative Analysis ......................................................................................................................................................................... 40
Geographic Analysis ........................................................................................................................................................................ 41
Review of the Wisconsin Statewide Comprehensive Outdoor Recreation Plan 2025 -2030 ............42
Chapter 7: Park Facility Recommendations ................................................................................................. 43
Citywide Park Facility Recommendations ........................................................................................................................45
Recommended Improvements to Existing Parks ...................................................................................................... 47
Natural and Open Space Areas Recommendations .................................................................................................. 52
Recommended New Parks ......................................................................................................................................................... 53
Hillmoor Property .............................................................................................................................................................................. 53
Recommended Special Use Facilities ..................................................................................................................................54
Planning Assistance provided by:
Page 3 of 81
Chapter 1: Introduction and Existing Conditions
1
Chapter 1: Introduction and Existing
Conditions
Page 4 of 81
LAND TO LAKE PLAN
2
Introduction
Communities throughout the world recognize that
park lands, recreation trails, and natural areas are
key components of high-quality living
environments. Open spaces that allow people to
connect with nature and provide opportunities for
outdoor recreation create many benefits and serve
many important functions, including:
• creating and promoting activity within the
community;
• supporting and accommodating healthy
lifestyles;
• enhancing community building through
participation in recreational activities;
• improving the aesthetics of public spaces;
• increasing property values;
• attracting visitors and tourists;
• shaping development patterns; and
• protecting the natural environment.
The park and open space system of every
community should be planned and designed to
meet the diverse needs of its population. Proper
recreation-based planning requires a focus on both
the types of facilities to meet the needs of the
community as well as the geographic distribution
of those facilities relative to those who will use
them.
The Lake Geneva community’s park, recreation, and
open space system is one of its many important
amenities. The existing system plays a key role in
the community’s high quality of life, however, there
are opportunities for improvement to serve the
City’s evolving population, protect and maintain its
high-quality natural resources, and embrace
opportunities for open space preservation and
recreation.
This section of the Land to Lake Plan serves as the
City of Lake Geneva’s official Comprehensive
Outdoor Recreation Plan (CORP). As such, it
compiles, reviews, and updates information on the
physical facilities and lands that make up the
existing City park and open space system, and it
provides guidance for future improvement and
expansion of the system. This document serves as
an important element of Lake Geneva’s overall community planning program and is purposefully
aligned with the City’s recent Strategic Action Plan. It addresses the long-range park and open
space needs of the community over the next decade, with a specific focus on park and recreation
HEALTH BENEFITS OF PARKS:
• Create destinations and venues for physical
activity
• Reduce stress and improving mental
wellness
• Foster community interactions and social
support networks
• Reduce air and water pollution
• Mitigate urban heat islands
• Preserve important habitat, environmental,
and cultural sites
Source: Centers for Disease Control and Prevention and
National Park Service. Parks, Trails, and Health
Workbook, 2020.
Page 5 of 81
Chapter 1: Introduction and Existing Conditions
3
action items over the next five-year
period (2026-2031). Five years is
generally considered a reasonable
horizon in park planning because
social, cultural, and political
conditions tend to change enough
over that time for the goals,
objectives, policies, and
recommendations that derived
from previous plans to be
reevaluated.
This CORP has been prepared in
accordance with guidelines that
will make it certifiable by the State
of Wisconsin Department of
Natural Resources (WisDNR) and
qualify the City of Lake Geneva for
matching grant funds through the
Federal Land and Water Conservation
Fund and the Federal Recreation Trails
Act. The CORP must be updated every
five years to ensure that it reflects the
current needs of the community and
retains its WisDNR certification. The
plan has also been prepared in
accordance with Wisconsin Statutes
61.35, 236.29 and 66.0617.
This Plan is intended to build upon and
refine the previous analysis and
recommendations presented in the City
of Lake Geneva’s 2026 Strategic Action
Plan, 2021 Comprehensive Park and
Open Space Plan, and other plans and
guidelines related to Lake Geneva. Lake
Geneva’s public parks and open spaces are operated by the City’s Parks Department and
maintained by the Department of Public Works. This CORP was prepared under the direction of
City staff and City Council. The purpose of the plan is threefold:
Guide Decisions
• Guide the decisions of
the City and other
providers of open space
and recreational lands
in the area in order to
provide for the
increasing demand for
recreation facilities
Recommend
Opportunities
• Recommend
opportunities for
recreation and open
space improvements
within the community
Grant Funding
• Maintain Lake Geneva’s
eligibility for recreation
grant funds with
updates completed
approximately every
five years
OUTDOOR RECREATION IN WISCONSIN
In 2024, Wisconsin’s outdoor recreation industry
contributed a record-setting $12 billion to the
state’s gross domestic product surpassing the
previous record set in 2023 by 3.8%. Additionally,
the industry supports over 100,000 jobs across
various sectors in the state. Overall, outdoor
recreation throughout Wisconsin provides a high
quality of life for residents, economic opportunity,
public health benefits, community identity by
highlighting cultural and historic resources, and
natural resource preservation and enhancement.
Source: Wisconsin Office of Outdoor Recreation, 2025
Page 6 of 81
LAND TO LAKE PLAN
4
INTENDED OUTCOMES OF THIS PLAN
Building a Stronger, More Connected Lake Geneva
The Land to Lake Plan was developed as a component of the City of Lake Geneva’s proactive,
long-term community planning program and is intended to complement and support the
community’s other long-term planning initiatives. The document has been designed to
address Lake Geneva’s park and recreational needs over the next 5 – 10 years and beyond.
Community-
Informed
Decision Making
Recommendations are
grounded in extensive
public engagement and
reflect the priorities of
residents, stakeholders,
and community partners.
Strategic Park
Investments
Guide future investments
through both system-wide
and facility-specific
recommendations that
improve parks, recreation
facilities, and public spaces.
Stronger
Regional
Connections
Expand recreational
connections between Lake
Geneva and surrounding
communities through
improved trail, bicycle, and
recreation networks.
Balanced Community
Priorities
Help City leaders balance land use,
environmental stewardship, operational
needs, and capital improvement priorities.
Sustainable Parks & Natural
Resources
Protect and enhance Lake Geneva’s parks,
natural resources, and open spaces to
support recreation, environmental quality,
and a high quality of life.
Enhanced Quality of Life
Provide equitable access to
recreational opportunities that support
physical health, social interaction, and
community well-being.
Community & Economic
Vitality
Leverage parks and recreation as
community gathering places that
strengthen local identity, attract visitors,
and support economic activity.
Page 7 of 81
Chapter 1: Introduction and Existing Conditions
5
General Regional Context
The City of Lake Geneva is located in southeastern Walworth County, near the Wisconsin and
Illinois border. The City is near several larger metropolitan areas, including Kenosha, Racine,
Chicago and Milwaukee. As a City located on the shores of Geneva Lake, it is a very popular tourist
destination from these metropolitan cities. Lake Geneva was originally developed as a recreational
retreat for upper class families. However,
because of its proximity to regional
highway systems and to larger
metropolitan areas, the City has become a
place where individuals and families from
all walks of life choose to live, work, and
recreate on a daily basis.
The City is south of Interstate Highway 43
and is situated between Interstate
Highway 90 to the west and Interstate
Highway 94 to the east.
Existing Conditions
Lake Geneva’s population grew from 7,685
(2010) to 8,521 (2024), with its sharpest
increase during the pandemic period
(+4.85% in 2020). Lake Geneva is also
growing faster than its neighboring
communities and the state, growing 11%
between 2010 and 2024 compared to 1-9%
growth in neighboring communities during
the same timeframe, as shown in Figure 1.1.
This growth coincides with a pronounced
aging trend. Residents aged 50+ now
account for 46% of the population, up
from 34% in 2010. The median age increased
from 39 to 49.1 years in just over a decade.
This demographic transformation was a
significant finding in the City’s Strategic Action Plan. That plan noted that the community is
experiencing population growth alongside a notable increase in median age. Residents over the
age of 50 now represent nearly half of the population, while the proportion of younger residents
and families has declined. The strategic planning process emphasized the importance of attracting
and retaining families, workers and young professionals, while still welcoming and supporting
senior residents. Strategic planning participants emphasized that a healthy community req uires
demographic balance and opportunities for residents across all stages of life.
The Land to Lake Plan emphasizes recreational amenities and programming that support
residents across all stages of life. Focus is placed on serving young families and children to help
sustain community growth, while also providing opportunities that meet the needs of the City’s
senior population. The plan further promotes facilities and programs that encourage
multigenerational recreation, social interaction, and community engagement.
Lake Geneva’s population has shifted toward older age groups, with noticeable growth among
residents ages 50–74 and 65+, especially among women. At the same time, the base of the
population has narrowed, with fewer children and younger working-age adults than in 2010. This
Page 8 of 81
LAND TO LAKE PLAN
6
shift in age also indicates the need for a commitment to ADA accessibility throughout the Lake
Geneva Parks System. People become more prone to disability as they age.
Lake Geneva remains one of the most racially diverse among its peer cities, with 90% White (Non-
Hispanic) residents compared to 88–95% elsewhere. The Hispanic/Latino population represents 6%
of residents, far above peers, but declined in absolute numbers (from 1,323 to 511 residents since
2010). Meanwhile, the Multi-Racial population increased seven-fold (from 66 to 480 residents).
Community programming and recreational materials that reflect the diverse nature of Lake
Geneva would help the City to feel more welcoming to residents and visitors alike.
The City added approximately 990 housing units between 2010 and 2024 (from 4,225 to 5,215 units).
Despite this growth, affordability pressures have intensified. The median home value reached
$343,000 and median rent $1,389. Finding ways to decrease participation costs in recreational
programming would help alleviate some affordability pressures.
Figure 1.1: Population Trends for Walworth County Communities
MUNICIPALITY 2000* 2010 2020* 2024 2000-
2010
2010-
2024
City of Lake Geneva 7,148 7,685 8,277 8,521 ▲ 8% ▲ 11%
City of Burlington 9,874 10,464 10,258 10,987 6% 5%
City of Elkhorn 7,305 10,084 10,247 10,221 2% 1%
Village of Bloomfield — 4,400 4,781 4,780 — 9%
City of Delavan 7,943 8,542 8,505 8,689 8% 2%
Wisconsin 5,363,675 5,686,986 5,893,718 5,892,023 6% 4%
KEY FINDING
Lake Geneva experienced the strongest population growth among comparable
communities between 2010 and 2024, increasing by approximately 11%.
Source: U.S. Census Bureau, American Community Survey, 5-Year Estimates, 2024.
*U.S. Census Bureau, 2000 – 2020 Census.
The figure above shows that Lake Geneva is growing faster than its peer communities, leading to
the need for a more in-depth population projection.
Predicting future population growth is challenging and somewhat inexact. It should be noted that
Lake Geneva’s actual future population will depend on social and economic trends, market
conditions, sentiments toward growth, and new, residential development projects. A full set of
population projections through the year 2050 prepared specifically for this Plan can be found in
the Appendix.
These forecasts provide the basis for determining future need for parks and open
spaces. For the purposes of this CORP, the City should utilize the Linear Growth 2010 -2024 scenario
found in the Appendix as a reasonable population projection; this projection results in a total
projected population of 9,178 residents by 2035 and 10,119 by 2050. This population projection
should be used to project future parkland and potential park impact fees needed in the C ity.
With regard to age, the US Census reports a higher median age (49) than Wisconsin overall (40).
The City also has a lower percentage of residents under 18 years of age compared to the rest of
Wisconsin. The percentage of residents that are between the ages of 20 to 44, usually young
working professionals and those just starting families, is about 27%. The City has a significantly
higher percentage of residents over age 65 (26%) than the State (19%). Additionally, over 40% of the
population is aged 55+. These numbers point to the need for recreational amenities and
programming that are suitable for older populations and young working professionals while
keeping in mind young families.
Page 9 of 81
Chapter 1: Introduction and Existing Conditions
7
Figure 1.2: Age Distribution
Median Age Percent Under 18 Percent Over 65
2000 2010 2024 2000 2010 2024 2000 2010 2024
City of Lake Geneva 39 39 49 21% 23% 18% 16% 16% 26%
Wisconsin 36 39 40 26% 21% 21% 13% 14% 19%
Source: U.S. Census Bureau, 2000 Census.
Source: U.S. Census Bureau, 2010-2024 American Community Survey 5-Year Estimates.
Figure 1.3: Household Characteristics
Median Owner-
Occupied
Median
Gross
Rent
Median
Household
Income
Total
Housing
Units
Percent
Owner
Occupied
Average
Household
Size Home
Value
Costs per
month
with a
mortgage
City of
Lake
Geneva
$343,800 $1,690 $1,389 $75,629 5,215 54.8% 1.98
Wisconsin $266,500 $1,689 $1,087 $77,485 2,778,572 67.8% 2.33
KEY FINDING
Lake Geneva's population is older than the state average, with a median age of 49 years and 26%
of residents age 65 or older. Combined with smaller household sizes and higher housing costs,
these trends suggest continued demand for accessible parks, passive recreation, and amenities
that serve both older adults and families.
Source: U.S. Census Bureau, 2020-2024 American Community Survey 5-Year Estimates.
The City’s average household size is 1.98 persons per household which is well below the state
average; this could be connected to the older median age and higher percentage of residents over
65 years old in Lake Geneva. Also, more than half of city residents are homeowners (54.8%). As
compared to the rest of the state, Lake Geneva’s median home value and rent are much higher
and median household income is slightly lower, possibly pointing towards the need for more free
or low-cost recreational programming due high cost of housing relative to household incomes.
Utilizing the population projections and methodology described earlier in this Plan, the projected
number of households were also calculated. By 2050, it is projected that the City could add 777
total new households.
A complete inventory, analysis, and review of Lake Geneva’s natural resource components, data
trends, and existing plans can be found in the Appendix.
Page 10 of 81
LAND TO LAKE PLAN
8
Chapter 2: Existing Park and Open
Space Facilities
Page 11 of 81
Chapter 2: Existing Park and Open Space Facilities
9
The presence of outdoor recreation sites and open
spaces add significant opportunities for dynamic
activity, social connection, physical exercise, and
numerous other health benefits to a community’s
quality of life. They enhance the attractiveness of the
community and foster a sense of civic pride and
identity. Furthermore, even small green spaces,
playgrounds, or parks create a sense of social
cohesion and focal point for their surrounding
neighborhood.
The City of Lake Geneva provides numerous
opportunities for residents to enjoy the outdoors. As
provided below, Lake Geneva’s park, recreation, and
open space system consists of a range of facilities
including passive recreation areas, playgrounds,
pathways and walking trails, and athletic fields. In
total, the City, and Lake Geneva J1 School District
own and operate a total of 330 acres of parkland in 31 park and school facilities. The City itself owns
or operates 28 park sites, while the School District provides the community with additional
facilities.
The City’s park system includes
Neighborhood Parks, Community
Parks, Mini Parks, and School
Facilities located throughout the
community. The City of Lake
Geneva recently acquired the
Hillmoor property, providing an
additional 230 acres, which will be
integrated into the parks system in
the near future. While future park
acreage needs will be met, there is
also space for Lake Geneva to
grow. As new residential
developments are established,
parkland should also be provided
to avoid gaps in service.
Description of Existing Public Park and Recreation Facilities
A brief description of each of the community’s existing park and open space sites is included on
the following pages. Existing Facilities are depicted on Map 1. A full inventory of parkland and
amenities are provided in Figure 2.1 Park Inventory and Figure 2.2 Park Facility Matrix.
KEY PARK SYSTEM FACTS
Existing Recreation Assets
• 268 Acres of Parks & Open
Space
• 26 Facilities across City and
School Properties
• 230 Acres of Future Parkland
at Hillmoor
Planning Focus: Prioritize
reinvestment, accessibility,
neighborhood service, and long-
term stewardship over major
parkland acquisition.
Page 12 of 81
LAND TO LAKE PLAN
10
Map 1: Existing Facilities
Page 13 of 81
Chapter 2: Existing Park and Open Space Facilities
11
Community Parks
Community parks are areas of diverse
environmental quality and may include areas
suited for intense recreational facilities, such
as athletic complexes. Community parks are
intermediate in size and are able to
accommodate visitors from the surrounding
community and multiple neighborhoods.
These sites focus on both the developed
aspects of the park, such as playfields and
tennis courts, as well as the natural resource
amenities. In Lake Geneva, Community Parks
include the most heavily used parks that
attract users from within and outside the
community.
Dunn Field: Dunn Field is a 14.1-acre park
adjacent to Eastview Elementary School. It is
owned by the School District, but under a 1984
agreement, the land is under the control and
use of the City for recreational purposes.
Facilities include a state-of-the-art skate park,
six pickleball courts, a playground, soccer
facilities, concessions, restrooms, and parking.
Some amenities such as the skate park and
the pickleball courts have at least one
accessible path to access the amenity.
Waverly Street is closed to automobile traffic
but allows pedestrian access to Dunn Field
and Hillmoor. The playground is not ADA
accessible.
Elm Park (Library Park): This 7.1-acre
community park is located on the north
shore of Geneva Lake. The Lake Geneva Public
Library is located on the east end of the park.
Facilities include open space, the Geneva Lake
Shore Path, a pier, fishing pier, and boat slips.
The Shore Path is ADA accessible, exceeding
the minimum six-foot width. Public restrooms
are located on the west side of the park.
Flat Iron Park: This 1.8-acre park sits adjacent to the convergence of Geneva Lake and the White
River. The park is the site of the Visit Lake Geneva Tourist Information Center. Facilities include the
iconic wooden gazebo, a pavilion, a fountain, and restrooms. Paths on the perimeter of the park are
ADA accessible, however, there are no internal paved paths leading to park amenities.
Hillmoor Zone 1: Previously known as White River Park, Hillmoor Zone 1 is a 32-acre park adjacent
to Dunn Field. The property includes open space, natural areas, an 18-hole disc golf course, walking
path, and dog park. Also included is a pond with lighted spray and landscaped cascading falls.
Hillmoor Zone 1 is part of the larger Hillmoor property, a former golf course, which was purchased
by the City for public open space. While there is an accessible entrance to the dog park, the rest of
the dog park is not ADA accessible and would benefit from a paved area with seating connected
by a paved path to the entrance. ADA paths are needed to ensure access to the disc golf holes.
Dunn Field
COMMUNITY PARKS
AT A GLANCE
Community Parks serve residents citywide
and provide a diverse mix of recreation
opportunities, gathering spaces, athletic
facilities, and natural resource amenities.
Lake Geneva Community Parks include:
Dunn Field
Elm (Library) Park
Flat Iron Park
Hillmoor Zone 1
Riviera Beach and Plaza
Seminary Park
Veterans Park
Key Features:
🛝🛝 Playgrounds & Family Recreation
⚽ Athletic Fields & Courts
🚶🚶 Walking Trails & Open Space
Page 14 of 81
LAND TO LAKE PLAN
12
In addition to Hillmoor Zone 1, four other zones are included as part of the 230 -acre Hillmoor
property. Due to the unique and varied nature of the terrain, topography, and ecosystems of the
overall property, it has been organized into five different planning zones. Zone 1 contains the White
River Corridor, Zone 2 contains wetland areas, Zone 3 contains forested areas, Zone 4 is a highly
visible area facing Highway 50, and Zone 5 is a high point of the site that is suitable for
development. Hillmoor Zones 2-5 are owned by the City but are not currently part of the Lake
Geneva park system. Hillmoor Zone 1 has also undergone a conceptual master planning process ,
separate from the Land to Lake Plan. Recommended facilities for Hillmoor Zone 1 are described in
Chapter 7.
Riviera Beach and Plaza: Riviera Beach and Plaza are approximately 2.1 acres and located on
Geneva Lake. The historic Riviera Building is located on the east end of the beach. Facilities include
a swimming beach and restrooms. The Riviera beach has an ADA accessible entrance.
Seminary Park: Seminary Park is a 3-acre park located downtown. The site provides an open-air
shelter, playground equipment, restrooms, and parking. There is one ADA accessible path within
the park that leads to the open-air shelter. However, the rest of the park does not have any internal
paved paths. There is a path on the northwest corner of the park that is paved, but steep. This path
would benefit from evenly spaced landings and strategically placed hand rails. This path also does
not connect to anything within the park. The existing playground equipment is not accessible
either.
Veterans Park: Veterans Park is a 25-acre
park located on the east side of the City.
Facilities at the park include a lighted
baseball diamond, two lighted softball
diamonds, three unlit softball diamonds, six
soccer fields, a basketball court, playground
equipment, concessions, restrooms (in two
separate buildings), two open air shelters,
and three parking lots. While the park has
paved paths that connect to amenities in the
park, paths may need to be widened and
repaved to become ADA accessible. Notably,
this park has a specifically accessible and
inclusive playground.
Veterans Park
Page 15 of 81
Chapter 2: Existing Park and Open Space Facilities
13
Neighborhood Parks
These parks are designed specifically to
accommodate residents living within the
service area. They are characterized by active
recreational facilities such as baseball and
soccer fields, court games, playground area,
and skating but can also incorporate areas for
passive recreation such as picnicking.
Cobb Park: Cobb Park is a 4.9-acre park
located just west of the City. The mostly
wooded site features a nature trail,
playground equipment, benches, a picnic
shelter, restrooms, and parking. This park is
not ADA accessible. There are no internal
paths that are paved that connect from the
parking lot to amenities in the park. The
existing playground equipment is not
accessible either.
Maple Park: Adjacent to Central Denison
Elementary School, this 3-acre park is owned
by the City and managed by the School
District. The City and School District have an
agreement that allows this City-owned park to
be used as the school playground. This
includes two basketball courts, a playfield, a
playground, one softball diamond. The park
also includes two tennis courts managed by
the City.
Rushwood Park: Rushwood Park is a 3.3-acre
neighborhood park on the City’s south side.
The park includes a grass softball diamond,
playground equipment, open playfield, open-
air shelter, drinking water, and a sledding hill.
Rushwood Park does not have any internal
paths that are paved, making amenities in the
park inaccessible by ADA standards. Existing
playground equipment is not accessible
either.
Cobb Park
NEIGHBORHOOD PARKS
AT A GLANCE
Local Recreation Close to Home
Neighborhood Parks are designed to serve
residents within walking or biking distance
and provide convenient access to everyday
recreation opportunities.
Lake Geneva Neighborhood Parks include:
Cobb Park
Maple Park
Rushwood Park
Key Features:
🛝🛝 Playgrounds & Family Recreation
⚽ Courts, Fields & Active Play
🌳🌳 Informal Gathering Spaces
🚶🚶 Neighborhood Walking Opportunities
🍃🍃 Everyday Access to Parks
Page 16 of 81
LAND TO LAKE PLAN
14
Mini Parks
Mini parks include specialized facilities
that serve a concentrated or limited
population or specific group such as
young children or senior citizens. They
are typically one acre or less.
Baker Park: This 0.5-acre area of open
space is located on the lakefront south of
downtown.
Manning Way Tot Lot: Manning Way Tot
Lot is a 0.5-acre park next to Hidden
Woods that has relatively new
playground equipment and has access
to Hidden Woods via trail. The path next
to the playground is accessible, however
the playground is not ADA accessible.
Moss Park: This 0.1-acre park is located on the
City’s north side and provides a small area of
open space. There is no signage that
accompanies this park. From an outside
perspective, this park appears to be a strip of
lawn adjacent to the street.
Oak Hill Tot Lot: This 0.1-acre park is located on
the City’s north side and offers a small amount of
playground equipment. This park is steeply
sloped and is not ADA accessible. The
playground equipment is outdated and lacks a
soft landing surface, and the steps leading up to
the park are unsafe. The City is exploring the
possibility of relocating this park to a flatter site
across the street.
Olive-Longland Park: This park is 0.3 acres and
is located on the north side of the City. It
provides a small area of open space and tree
cover. There is no signage that indicates that this
park is a park.
Westgate Tot Lot: Westgate Tot Lot is a 0.7-acre
park located on the City’s west side and offers a
variety of playground equipment and benches.
This park is not ADA accessible. Playground
equipment is outdated and lacks a soft landing
surface. The park has a steep slope that angles
downwards towards Dodge Street.
Willow Park: This 0.5-acre park is located on
Wrigley Drive across from Flat Iron Park,
extending from the boat ramp to Riviera Plaza. It is undeveloped and does not have any signage or
amenities.
Oak Hill Tot Lot
MINI PARKS
AT A GLANCE
Small Parks, Big Neighborhood Impact
Mini Parks provide convenient recreation
opportunities in areas where larger park
sites may not be available. These parks are
typically one acre or less and serve nearby
residents with playgrounds, open space, and
informal recreation opportunities.
Lake Geneva Neighborhood Parks include:
Baker Park
Manning Way Tot Lot
Moss Park
Oak Hill Tot Lot
Olive Longland Park
Westgate Tot Lot
Willow Park
Key Features:
🛝🛝 Neighborhood Playgrounds
🌳🌳 Small Open Spaces
🚶🚶 Easy Walk-to Access
� �� � Family-Friendly Recreation
🏘🏘 Local Neighborhood Gathering Places
Page 17 of 81
Chapter 2: Existing Park and Open Space Facilities
15
Natural, Open Space, and
Special Use Areas
Special Use Areas and Natural & Open
Space Areas enhance an overall park
system by maintaining and improving the
community’s natural resource base,
accommodating special activities that are
not included in other parks, and providing
interconnections between isolated parks
and recreation areas.
Examples of Special Use Areas are varied
but can include those lands that
accommodate passive or special
recreational activities, such as golf courses,
sledding/skiing hills, marinas, beaches,
display gardens, arboreta, and outdoor
amphitheaters, as well as lands that have
been protected for their environmental or
archaeological significance or sensitivity
and provide limited opportunity for
recreational use. Examples of Natural &
Open Space Areas may include water
bodies, floodplains, wetlands, shorelands
and shoreland setback areas,
drainageways, stormwater management
basins, conveyance routes, environmental
corridors, wildlife habitats, areas of rare or
endangered plant or animal species,
prairie remnants, and restoration areas.
Typically, Special Use and Natural & Open
Space Areas provide unique and diverse
contributions to the community that are
not easily quantifiable. For this reason, they
are not included in the overall community
calculation of park and recreation space
per 1,000 persons. Nevertheless, they are a
vital part of the City’s park and open space
system.
Natural & Open Space Areas
Nature preserves are established to
conserve forest lands, marshlands,
floodplains, prairies, wildlife habitats, and
other areas having cultural, scenic, or
natural values. Desirable size depends on
function.
• Dodge Water Tower Pond Park: This
park is a 2.7-acre site located on the western side of the City, east of the water tower and
includes a detention pond. This park has no ADA accessible entrance nor any ADA accessible
paths within the park. There are no amenities at this park other than open space and the pond.
There is no signage that would even suggest that this is a park.
Donian Wetland Nature Preserve
NATURAL & OPEN SPACE AREAS
AT A GLANCE
Conserving Lake Geneva’s Natural Resources
Natural & Open Space Areas help preserve forests,
wetlands, prairies, wildlife habitat, floodplains, and
environmentally sensitive lands while providing
opportunities for passive recreation and nature
exploration.
Natural & Open Space Areas include:
Dodge Water Tower Pond
Donian Wetland Nature Preserve
Edgewood Hills Park
Fermano Park
Hidden Woods
Home Depot Park
Mary Koutsky Four Seasons Nature Preserve
Price Fremont Park
Southbridge Property
Symphony Bay Park
Key Features:
🌳🌳 Forests & Woodlands
🦋🦋 Wildlife Habitat
💧💧 Wetlands & Water Resources
🚶🚶 Nature Trails & Passive Recreation
🌿🌿 Environmental Preservation
Page 18 of 81
LAND TO LAKE PLAN
16
• Donian Wetland Nature Preserve: Donian Wetland Nature Preserve is a 4.1-acre wooded site
that encompasses a mill race, boardwalk, wetland overlook, and the 100 -year recurrence
interval floodplain along the White River in downtown Lake Geneva. This park contains an ADA
accessible pathway along the main branch of the White River, but does not offer any accessible
ways to access the secondary branch of the river.
• Edgewood Hills Park: This 3.2-acre site is on the City’s north side and contains wetlands and
an environmental corridor. It is adjacent to the Duck Lake Nature Trail. This park does not have
an accessible entrance nor any amenities. There is also no signage that would distinguish the
park as a park.
• Fermano Park: This 6.4-acre site is located in the Lake Geneva Business Park and includes a
pond with a path. Fermano Park has an ADA accessible walking path around the perimeter of
the pond and has access from nearby sidewalks.
• Hidden Woods: This 12-acre site is located near the center of the City. Facilities include a path
on the west and south sides of the woods. While there are paved paths, there are many areas
that are too steep to be ADA accessible.
• Home Depot Park: Home Depot Park
is a 4.4-acre site located northwest of
the intersection of US Highway 12 and
State Highway 50. It includes a
detention pond and has asphalt bike
trails. Lands immediately to the north
are held by the Lake Geneva
Conservancy.
• Mary Koutsky Four Seasons Nature
Preserve: This 66.7-acre site is
located southeast of the City. Facilities
include an open-air shelter,
observation deck, nature trail, dog
exercise area, and boardwalk amid a
wetland, prairie, and oak opening. The
Preserve is bordered by an additional
250 acres of land that lies within a
primary environmental corridor and is
open to the public. This park is not
ADA accessible at all.
• Price-Fremont Park: Price-Fremont Park is 4.6-acres of wooded property in the northwest
area of the City.
• Southbridge Park: This 43.4-acre property is located south of Highway 12 and immediately
north of the Stone Ridge neighborhood. It is steeply sloped and heavily wooded. It does not
include any amenities and currently lacks public access.
• Symphony Bay Park: Located in the southeast side of the City, this Symphony Bay Park is new
to the Lake Geneva parks system. This 11.9-acre park includes a dog park as well as walking
paths throughout the wooded area. This park is not ADA accessible.
Special Use Areas
Special use areas are used for single purpose recreational activities, such as golf courses, skate
parks, and specialized sports facilities.
• Lake Geneva Bocce Ball Park: The 0.5-acre Lake Geneva Bocce Ball Park was dedicated to the
community by the Lake Geneva Utility Commission. Located on East Street, the site features
two bocce courts, which are in poor condition and rarely used. This park is not ADA accessible.
Hidden Woods
Page 19 of 81
Chapter 2: Existing Park and Open Space Facilities
17
Figure 2.1: Park Inventory
Park/Facility Location Acres
Community
Parks
Total Acres: 85.2
Dunn Field 425 Sage St 14.1
Elm Park (Library Park) West of Library, south of Main St 7.1
Flat Iron Park Wrigley Dr and Center St 1.8
Hillmoor Zone 1 299 Mill St 32.0
Riviera Beach and Plaza 211 Wrigley Dr 2.1
Seminary Park Wrigley Dr and S Lakeshore Dr 3.0
Veterans Park 901 E Townline Rd 25.0
Neighborhood
Parks
Total Acres: 11.5
Cobb Park 2101 McDonald Rd 4.9
Maple Park 900 Wisconsin St 3.3
Rushwood Park 991 Timothy Dr 3.3
Mini Parks
Total Acres: 2.6
Baker Park Campbell St and Wrigley Dr 0.4
Manning Way Tot Lot Manning Way and Highland Way 0.5
Moss Park George St and Williams St 0.1
Oak Hill Tot Lot 1350 Tomike St 0.1
Olive Longland Park Williams St and E Sheridan Springs Rd 0.3
Westgate Tot Lot 1701 Miller Ct 0.7
Willow Park Wrigley Dr, across from Flat Iron Park 0.5
Natural and
Open Space
Areas
Total Acres: 159.4
Dodge Water Tower
Pond Park Behind 1885 Dodge St 2.7
Donian Wetland Nature
Preserve Main St and S Lakeshore Dr 4.1
Edgewood Hills Park 1340 Edgewood Dr 3.2
Fermano Park 120 Edwards Blvd 6.4
Hidden Woods Hill St and West Dr 12.0
Home Depot Park 615 N Edwards Blvd 4.4
Mary Koutsky Four
Seasons Nature Preserve N1889 County Trunk H 66.7
Price-Fremont Park 1525 Conant St 4.6
Southbridge Park 43.4
Symphony Bay Park Townline Rd and Sonata Way 11.9
Special Use
Areas
Total Acres: 0.5
Lake Geneva
Bocce Ball Park 140 East St 0.5
Note: Total Acres may not equal the sum of individual values due to rounding.
Page 20 of 81
LAND TO LAKE PLAN
18
Figure 2.2: Park Facility Matrix
Note: “x” indicates the presence of an amenity in a park.
Park/Facility
Baseball Fields
Basketball Court
Batting Cages
Benches
Bike/Walking Trail
Boat Slips
Bocce Ball
Canoe/Kayak Launch
Concession Stand
Disc Golf Course
Dog Exercise Area
Drinking Water
Fishing Pier
Grass/Sandlot Softball
Ice Skating/Hockey
League Softball
Open-Air Shelter
Parking Lot
Pickleball Court
Picnic Tables
Playfield
Playground Equipment
Restroom
Skate Park
Sledding Hill
Soccer Field
Swimming
Tennis Court
Volleyball Court
Community Parks
Dunn Field x x x x x x x x x
Elm Park (Library Park) x x x x x
Flat Iron Park x x x
Hillmoor Zone 1 x x x x x
Riviera Beach and Plaza x x x
Seminary Park x x x x x x
Veterans Park x x x x x x x x x x x x x x
Neighborhood Parks
Cobb Park x x x x x x
Maple Park x x x x x x
Rushwood Park x x x x x x x x
Mini Parks
Baker Park
Manning Way Tot Lot x x
Moss Park
Oak Hill Tot Lot x
Olive Longland Park
Westgate Tot Lot x
Willow Park x x
Natural and Open Space Areas
Dodge Water Tower Pond Park
Donian Wetland Preserve x x
Edgewood Hills Park
Fermano Park x
Hidden Woods x
Home Depot Park x
Mary Koutsky Four Seasons Nature
Preserve x x x x x x x
Price-Fremont Park
Southbridge Park
Symphony Bay Conservation Area x x
Special Use
Lake Geneva Bocce Ball Park x
Page 21 of 81
Chapter 2: Existing Park and Open Space Facilities
19
School Facilities
Schools can also fulfill local park needs in communities
as they provide many of the same facilities found in
neighborhood parks, such as playground equipment
and athletic fields. Access to school facilities is
generally more limited than access to City parks, as
certain facilities are unavailable for public use during
school hours.
The City is within the Lake Geneva J1 School District,
which includes elementary and middle schools, and
the Lake Geneva-Genoa City Union High School
District. The districts serve the Cities of Lake Geneva
and Genoa, the Town of Bloomfield, and segments of
the Towns of Geneva, Lyons, and Linn. Enrollment in all
schools has been declining over the past four years.
Four of the districts’ schools are located within Lake Geneva’s borders.
The City currently partners with the Lake Geneva School District on park maintenance and
ownership for two locations. For Dunn Field, the City maintains and manages the facility for
recreational purposes, but it is owned by the School District. For Maple P ark, the school district
manages the use and the City owns the property.
Badger High and Lake Geneva Middle School: This 55-acre athletics area includes a regulation
baseball diamond, two basketball courts, two league softball fields, eight tennis courts, a football
stadium, track and soccer stadium, sand volleyball, and numerous soccer practice fields. Badger
High School contains an indoor swimming pool and staffed weight room facilities.
Central Denison Elementary School: This school does not have its own park but uses the City -
owned Maple Park for its recreation needs. Maple Park is
located on the same block as the school. Maple Park is
owned by the City and managed by the School District.
Eastview Elementary School: This school has a
playground and basketball courts. This property
includes the 13-acre site referred to as Dunn Field, which
is owned by the School District but managed by the City.
Because it is managed by the City, Dunn Field is
considered to be a Community Park. For a full
description of Dunn Field, refer to the Community Parks
section of this chapter.
The following private schools are all within Lake Geneva’s
borders and offer the following amenities:
First Evangelical Lutheran School: Located at 1101
Logan Street in Lake Geneva, the facilities at this four-
acre church and school site include two basketball courts
and playground equipment.
St. Francis School de Sales Catholic Church & School:
Located at 148 W. Main Street in Lake Geneva, this four-acre site includes a basketball court and
playground equipment.
Badger High School
SCHOOL FACILITIES
PARTNERSHIP
Lake Geneva residents benefit from a
strong partnership with Lake Geneva J1
School District. School facilities
throughout the community
supplement the City's park system by
providing additional athletic fields,
courts, playgrounds, open space, and
recreational opportunities.
School properties play an important
role in meeting recreation needs and
should continue to be considered part
of the broader community recreation
network.
Page 22 of 81
LAND TO LAKE PLAN
20
County and State Facilities
State and County parks and natural areas exist as conservation and recreational areas typically
isolated from population centers. These facilities play an important role in providing larger swaths
of preserved wilderness that are often accessible for recreational use and encourage regional
tourism. Facilities located near Lake Geneva in Walworth County act as an important part of the
regional recreational system surrounding the City.
• Big Foot Beach State Park: This 271-acre park on
the shore of Lake Geneva in the City offers wooded
campsites, shower and restroom facilities, 5.5 miles
of hiking trails, a sand beach and a 100-foot
swimming area, volley ball and horseshoe courts,
and a 40-acre picnic area.
• Duck Lake Nature Area: This is a DNR-owned
wildlife habitat area with public access.
• White River County Park: This park is owned and
maintained by Walworth County. It lies outside the
City of Lake Geneva in the town of Lyons and
protects 190.5 acres of wetlands, upland woods and
wildlife habitat. The park includes trails, a
canoe/kayak launch, parking lots, and a park shelter.
Recreational uses include hunting, fishing, hiking,
cross-country skiing, snowshoeing, picnicking and
canoeing/kayaking.
Private Facilities
In addition to public recreation facilities, the residents of Lake Geneva have access to a variety of
other private recreational resources:
• Covenant Harbor Bible Camp: Located at 1724 Main Street in Lake Geneva, this lakeside site
contains 56-acres of woodland that includes picnic areas, two tennis courts, a ropes course, and
archery facilities.
• Grand Geneva Resort and Spa: Located northeast of Lake Geneva, this resort offers golf, a
health spa, tennis, hiking, horseback riding, downhill skiing, indoor lap -swimming, and other
activities that are open to the public for a fee
• Lake Geneva Youth Camp: This 22-acre summer camp site is located at W 2655 South Street in
the Town of Lynn. Facilities include two basketball courts, soccer facilities, various playfields,
playground equipment, four sandlot softball diamonds, and two tennis courts.
• Paradise Golf Park: An 18-hole miniature golf park located near downtown Lake Geneva
• Geneva Lakes Family YMCA: Located at 203 Wells Street, the YMCA includes a full wellness
center, two gymnasiums, a 25-meter swimming pool, a large therapy pool, saunas, steam
rooms, racquetball courts, and spin cycling equipment. The City currently contracts with the
YMCA to provide recreational sports programming, primarily for youth.
REGIONAL RECREATION
ASSETS
Recreation Beyond City Boundaries
In addition to City-owned parks,
residents have convenient access to
regional recreation destinations
including state parks, county facilities,
conservation areas, private recreation
providers, and regional trail
opportunities.
Planning Takeaway
These regional recreation assets expand the
variety of outdoor experiences available to
residents and help reduce pressure on the
City's park system.
Page 23 of 81
Chapter 3: Public Participation
21
Chapter 3: Public Participation
Page 24 of 81
LAND TO LAKE PLAN
22
Planning Process
The Land to Lake planning process began in the
spring of 2026. It included extensive upfront
public engagement, which is described below.
The Park Board and the Piers, Harbor, and
Lakefront Committee jointly served as the
steering committee for the project. These bodies
reviewed drafts of the plan at meetings held on
September 22, 2026, November 19, 2026, and
January 6, 2027. Following public open houses
on_____ and ____, 2027, the Park Board and the
Piers, Harbor, and Lakefront Committee
recommended the plan to the City Council
Commission at their meeting on _____. The City
Council formally adopted the Land to Lake Plan
on _____.
Future Updates or Amendments
To update or amend the Land to Lake Plan, the
Park Board should hold at least one public
meeting on the amendment/update, solicit
additional public participation as appropriate to
the nature of the amendment, prepare the
update to the plan, and formally recommend the
updated plan to the Plan Commission and City
Council. If the proposed changes relate to the
lakefront, the Park Board should coordinate with
the Piers, Harbor, and Lakefront Committee.
Following public input and review and
recommendation by the Park Board (and the
Piers, Harbor, and Lakefront Committee when
applicable), the Plan Commission should review
and recommend the plan to the City Council, and
the City Council should adopt the plan by
resolution.
Site Visits
On June 2, 2026, planning consultants
coordinated with City and staff to conduct a tour
of the community and its various park and open
space assets to gain further understanding and
familiarity with specific sites, the community’s
characteristics and values, and recreational
opportunities. On June 23, 2026, planning
consultants returned to survey the existing
conditions of the lakefront and lakefront
amenities. The data gathered in these site visits informed the Land to Lake Plan’s existing
conditions analysis and recommendation development.
Page 25 of 81
Chapter 3: Public Participation
23
Pop-up Engagement Events
As a part of the public engagement process, pop-up engagement events were held on July 2 and
August 22, 2026. These events coincided with well-attended community events in Lake Geneva in
an effort to reach a larger population of parks and lakefront users. These events included Concert s
in the Park at Flat Iron Park and the Jaycee’s Venetian Festival. The purpose of these pop-ups was
to gather input from the public and to encourage participation in the online community survey.
Focus Group Interviews
Throughout the months of June and July, planning consultants conducted six stakeholder focus
group interviews. Focus groups were organized around common themes, including Community
Organizations, Young Families, Adult Sports, Institutional and Tourism Organizations, and two
groups of Boaters. Each focus group discussion explored key topics about the current park and
recreation system and lakefront, how it was serving different populations and constituencies, and
what members of each group would like to see added or improved about the Lake Geneva park
system and lakefront in the future. Discussions were robust with committed focus group members
sharing a variety of insights. A few key themes that emerged from these discussions are provided
below, as they pertain to the CORP. More details from the focus groups can be found in the other
sections of the Land to Lake Plan and in the Appendix of this Plan. In addition to the focus group
interviews, the consultant team also interviewed two boating businesses that use the lakefront:
Gage Marine and Elmer’s Lake Geneva Boat Rentals.
Community Organizations
• Participants felt that community events are growing and starting to run out of space, especially
at Flat Iron Park. Participants felt that the lakefront is necessary for the success of events, so
expanding onto public roads may be the next progression of these events.
• Rather than having new and more events on the lakefront, some participants saw Hillmoor as
an opportunity to host new events or
relocate some existing events.
Participants felt that these events
could be oriented towards locals who
want to enjoy their community
without going into Downtown.
Young Families
• Participants felt that Veterans Park
could become an “all day” destination
if more amenities were provided.
Participants felt that there was
untapped potential for park events,
field upgrades to make the fields
ready for sports tournaments, space
for food trucks, or the potential to
partner with businesses to create new
amenities geared toward locals.
• Participants felt that the lakefront is
difficult for locals and especially young
families to access. Participants felt that the area is incredibly busy and hard to navigate with
strollers. Additionally, participants felt that the chaos of all the people and congestion makes
going to the lakefront unpleasant.
Walking Site Visit
Page 26 of 81
LAND TO LAKE PLAN
24
• Participants felt that it was important
that a community center should
meet a wide variety of needs of the
community as a one-stop-shop for a
variety of potential amenities that
could be initiated through public-
private partnerships. Participants also
felt that it was important to keep low-
income families in mind and to
perhaps provide free or sliding scale
services.
Adult Sports
• The new pickleball courts are viewed
by participants as an extremely
successful investment and were
widely praised by participants.
Several participants noted that the
City has been highly responsive to
user feedback, with improvements
implemented quickly after concerns
were raised.
• Participants noted that disc golf
participation is increasing, and there
is strong support for course upgrades
and redesign.
Institutional and Tourism Organizations
• Participants noted that the School District, Library, and YMCA provide youth programming ,
however, there is no single listing of all programing in one place. Participants expressed a
desire for a single, unified recreation guide.
• Participants representing their organizations were agreeable to partnering with one another
and with the City to move forward the goals of the lakefront and of the Lake Geneva
community at large.
• A community center was favored by most participants of the group. They noted that a
community center would have high demand, especially from families with young children.
• Participants felt that bathrooms are particularly important to visitors and lakefront users in
general. Participants noted that City bathrooms are often closed during peak visitor hours
(nights and weekends). Participants expressed a strong need for more public bathrooms
downtown.
Shared Themes
• Many of the groups saw the Veterans Park as an important park for the community that needs
to be invested in for improvements and to become a place for the local community to gather.
• Accessibility was also something that came up in most, if not all, of the groups. Many
participants felt that the parks and the lakefront were not accessible in Lake Geneva. Many also
supported the construction of more inclusive playgrounds and of accessib le pathways in parks.
WHAT WE HEARD
Key Themes from Community Engagement
Public engagement activities, including focus groups,
pop-up events, site visits, and the community survey,
identified several recurring priorities for the future of
Lake Geneva's parks and recreation system.
Improve accessibility throughout parks and lakefront areas
Continue investing in Veterans Park as a community
destination
Enhance trail, walking, and bicycle connections
Expand family-friendly recreation opportunities
Improve communication and awareness of programs and
facilities
Balance resident needs with tourism and event activity
Planning Takeaway
Residents value Lake Geneva's parks and lakefront amenities
and support strategic investments that improve access,
connectivity, inclusivity, and year-round recreational
opportunities.
Page 27 of 81
Chapter 3: Public Participation
25
Community Survey
The City of Lake Geneva conducted an
online questionnaire via Survey Monkey
from July 1 to July 31, 2026. Approximately
537 individuals started the survey, and
344 individuals completed the full survey.
Respondents had the option to skip
questions that did not apply to them,
including several questions oriented to
boaters.
About 61% of survey respondents were
Lake Geneva residents, and
approximately 51% of respondents were
over 60 years of age. Nearly 30% of
respondents had at least one minor (age 18 or under) in the household. Additionally, 23% of
respondents reported having a child that was enrolled in the Lake Geneva School District.
Additional highlights of the survey are described below:
RECREATION PARTICIPATION
Walking, Hiking, and Trail Use Lead
Participation
Survey respondents most frequently
reported participating in walking, hiking,
trail use, dog walking, swimming, and
wildlife viewing activities, highlighting the
importance of maintaining and enhancing
outdoor recreation opportunities.
MOST VISITIED PARKS
Lakefront Parks Are Community
Destinations
The most frequently visited parks include
Big Foot Beach State Park, Flat Iron Park,
Library/Elm Park, Riviera Beach & Plaza,
and Veterans Park, demonstrating the
importance of the lakefront and
community gathering spaces.
FUTURE RECREATION
PRIORITIES
Residents Support New Recreation
Amenities
Top requested investments included
splash pads, inclusive playgrounds, public
art, outdoor fitness equipment, and
walking path improvements.
DESIRED PARK AMENITIES
Basic Amenities Remain Important
The amenities most desired at parks were
drinking fountains, picnic tables, and
restrooms, reinforcing the value of
comfort and convenience improvements.
SURVEY SNAPSHOT
Lake Geneva residents expressed strong satisfaction with the community's parks and
recreation system while identifying opportunities to improve accessibility, modernize
amenities, strengthen trail connections, and expand family-oriented recreation opportunities.
Page 28 of 81
LAND TO LAKE PLAN
26
Figure 3.1: Park Usage
Note: Maple Park was inadvertently omitted from this survey question.
Figure 3.2: Playground Satisfaction
Baker Park
Big Foot Beach State Park
Cobb Park
Dodge Water Tower Pond Park
Donian Wetland Nature Preserve
Dunn Field
Edgewood Hills Park
Fermano Park
Flat Iron Park
Hidden Woods
Hillmoor Zone 1
Home Depot Park
Lake Geneva Bocce Ball Park
Library Park
Manning Way Tot Lot
Mary Koutsky Four Season Nature Preserve
Moss Park
Oak Hill Tot Lot
Olive Longland Park
Price-Fremont Woods
Riviera Beach and Plaza
Rushwood Park
Seminary Park
Veterans Park
Westgate Tot Lot
Willow Park
0%
10%
20%
30%
40%
50%
60%
70%
80%
Which of the following Lake Geneva parks do you or your
family use most often? (Select up to 5 options below)
Excellent Very Good Good Fair Poor No opinion / Not
applicable
0%
5%
10%
15%
20%
25%
30%
35%
How would you rate the quality of existing playgrounds located in
Lake Geneva parks?
Page 29 of 81
Chapter 4: Vision, Goals, and Strategies
27
Chapter 4: Vision, Goals, and
Strategies
Page 30 of 81
LAND TO LAKE PLAN
28
This chapter presents a Vision, Strategic Pillars, Goals, and
Strategies for the future of the Lake Geneva Park and
Recreation System that reflect the community’s input and
serve as the basis for the recommendations in this Plan.
Vision: Overall desire for the future of the Park and
Recreation System that is to be achieved by this Plan.
Strategic Pillars: Developed with the 2026 Strategic Action
Plan, the six Strategic Pillars are intended to produce
systemic and catalytic shifts that will drive the future
economic growth, community experience, and the
reputation and character of Lake Geneva. These pillars have
been integrated into the goals and recommendation of the
Land to Lake Plan.
Goals: Broad statements that express general public priorities for the Park and Recreation System.
Goals are based on the identification of key issues, opportunities, and priorities that affect the park
system.
Strategies: More specific than goals, strategies are actions and implementation activities that can
be taken to achieve a broad goal. Specific recommendations for individual parks are found in
Chapter 7.
Strategic Pillars
LAKE GENEVA PARK
SYSTEM VISION
The Lake Geneva Park
System is the heart of our
community, preserving
natural beauty, fostering
connection among
residents and visitors, and
creating accessible,
sustainable spaces that
bring generations together.
Page 31 of 81
Chapter 4: Vision, Goals, and Strategies
29
CORP Goals
♦ Indicates alignment with Strategic Pillars from the 2026 Strategic Action Plan
COMMUNITY GOALS
GOAL 1 : Invest in City beautification,
placemaking, parks, and gathering spaces.
GOAL 4: Build a vibrant year-round
community – elevate the needs of residents.
GOAL 11: Continue to support events and
gathering on the lakefront and in
downtown.
STEWARDSHIP
GOAL 3: Protect natural assets and
environmental quality.
GOAL 5: Maintain parkland, green space,
landscaping, and natural resources to
preserve Lake Geneva’s accessible
natural amenities.
CHARACTER & LIVABILITY
GOAL 2: Preserve Lake Geneva’s unique
character while managing growth.
GOAL 8: Support community livability,
connectivity and communication, and
sense of belonging.
PARTNERSHIPS & PROGRAMS
GOAL 7: Continue and expand
community programming to create
opportunities for recreation as well as
cultural expression and community
development.
GOAL 9: Strengthen community
partnerships and volunteer initiatives.
CONNECTIVITY & INVESTMENT
GOAL 6: Ensure the provision of a sufficient number of quality parks, recreational facilities
and open space areas to enhance the health and welfare of City residents and visitors. Such
facilities should be available to everyone regardless of income, age, race, ability, or geographic
location.
GOAL 10: Improve walkability, bikeability, and connectivity. Maintain and expand a safe,
accessible, and interconnected pedestrian and bicycle network to connect the City’s park and
recreation system to areas of activity and community neighborhoods.
GOAL 12: Grow the park budget, which will continue financing operations, maintenance,
and capital improvements of existing parks, as well as allowing for future parkland acquisition
and development of new facilities.
Page 32 of 81
LAND TO LAKE PLAN
30
Strategies
Resident Focus
• Neighborhood park improvements should be designed and
planned to enhance community and neighborhood
cohesion.
• Focus on recreational amenities and programming tailored
to young families with children, a demographic the City is
seeking to grow, and seniors, who comprise a significant
proportion of the City’s current population.
• Seek opportunities for multigenerational participation in
park facilities and programming.
• Balance the needs of residents in downtown and lakefront-
area parks with tourism needs, while prioritizing the needs of
residents in other City parks.
• Expand year-round recreational opportunities for residents,
including indoor activities and winter activities.
Accessibility
• Ensure that existing park facilities are upgraded to comply
with ADA design guidelines. All new park development and
amenity improvements should be inclusive, accessible, and
to ADA design standards at a minimum. Future parks and
amenities should be designed so that they are barrier-free
and accessible to persons of all ages and abilities.
Sustainability
• Expand and support environmental and sustainability
initiatives. Engage the community in local stewardship
activities such as community clean-ups, native planting
initiatives, environmental education programs, and
volunteer stewardship opportunities. Build these initiatives
into the Parks Department’s recreational programming. ♦
• Utilize management practices that protect and enhance the natural features of all City parks.
This includes efforts to establish and maintain buffers for sensitive environmental areas,
minimize fertilizer and pesticide use, and incorporate native species plantings in landscaping
initiatives, to the greatest extent possible.
• When planning for facility and equipment improvements, incorporate sustainable building
materials, design elements, and green energy sources.
• Replace unused lawn areas with native plantings to provide native habitat and reduce mowing
costs by the City. Recruit volunteers to plant and maintain native planting beds.
🏡🏡 COMMUNITY
🌳🌳 STEWARDSHIP
♦ Indicates Pillars from the 2026 Strategic Action Plan
Page 33 of 81
Chapter 4: Vision, Goals, and Strategies
31
Enhanced Communication and Wayfinding
• Establish uniform identification signage at all Lake Geneva park and recreation facilities.
• Establish wayfinding signage to allow residents or visitors to effectively travel throughout the
City on foot or bicycle.
• Market the park system’s facilities and programs to the community by utilizing the City, Parks
Department, and partners’ websites, social media, email lists, recreational guides, signage, and
developing new informational publications in print and/or online. Coordinate with the School
District, Walworth County, and local partners to make these resources widely available.
Regional Cooperation
• Coordinate park system and connectivity improvements and any relevant land acquisition s
with local, county, and state agencies to ensure an interconnected system of outdoor
recreational facilities within the City and its surrounding area.
• Work with neighboring jurisdictions, Walworth County, and the state to coordinate trails
planning and planning for potential future trail corridors through multiple communities and
jurisdictions.
Programming
• Coordinate with the Lake Geneva Public Library to develop educational, cultural and arts
programming, events, and activities to further activate the community’s parks and recreation
facilities and preserve and protect the community’s natural resources.
• Expand the City’s recreation program offerings via community partners and the newly
established City Parks Department.
• Detailed programming recommendations are found in the Community Recreation and
Programming element of the Land to Lake Plan.
Park Improvement
• Master plans should be considered for future parkland development and existing parkland
improvements. These plans should indicate the future use and locations of land, facilities, and
equipment.
• In general, focus on enhancing the current park system to meet the needs and desires of Lake
Geneva residents and future recreation trends, rather than the acquisition of new parks.
Considerations for new parks are discussed in Chapter 7.
• Maintain mini parks as open space, adding benches and paths as necessary to make them
usable for residents. Update tot lot playground equipment strategically to align with current
needs.
Funding
• Continue to fund the modernization of facilities and equipment in older parks, provide new
facilities and equipment in undeveloped or partially developed parks , and monitor and
maintain existing park equipment to ensure longevity and safety.
• Utilize grants, fundraising campaigns, and other funding sources as well as the City’s 5-year
Capital Improvements Plan to pursue and implement the recommendations of this Plan.
• Utilize a parks foundation to broaden the range of funding sources available to support the
parks. Increase revenue-generating activities.
🏙🏙 CHARACTER & LIVABILITY
🤝🤝 PARTNERSHIPS & PROGRAMS
🚶🚶 CONNECTIVITY & INVESTMENT
Page 34 of 81
LAND TO LAKE PLAN
32
Chapter 5: Park and Open Space
Standards
Page 35 of 81
Chapter 5: Park and Open Space Standards
33
In order to guide the park planning process, it is important to establish a set of minimum
standards for park and recreational facilities. Such standards enable a community to quantitively
measure how well its existing facilities are meeting the needs of residents and to plan for future
facilities based on projected population growth. As such, park and recreation standards are
commonly developed using a ratio of the number of minimum acres recommended per 1,000
residents.
The following section details the local
standards for park and recreational
facilities. These standards are a
combination of National Recreation
and Park Association (NRPA)
guidelines and best practice for
Comprehensive Outdoor Recreation
Plans. A calculation of community-
specific standards is more likely to
identify those park system deficiencies
that would not otherwise be captured
by universal or national standards.
Furthermore, a locally derived standard
does a better job of considering the
quality of the park system as well as
the quantity of park and recreational
facilities provided.
For a full description of each park type
in the City, see Chapter 2.
National Guidelines
To understand the role that the City’s park and trail system should play in providing park and
recreation services, it is useful to understand the role of a municipal park system in the context of
national, state, and county services provided.
• National Parks are scattered throughout the United States with massive tracts of land that
serve as vacation destinations or wilderness areas. They are run by the Department of Interior
of the United States government. There are no National Parks in Walworth County.
• State Parks exist as conservation areas, scenic drives, or as weekend getaways, typically away
from population centers. State Parks are often designed to encourage tourism, but their
primary purpose is to serve residents of their respective states. Nearby State Park and Natural
Areas include Big Foot Beach State Park, the Kettle Moraine State Forest –Southern Unit. The
White River State Trail is also in the vicinity of Lake Geneva.
• County Parks function to fill in the gaps that municipal and state governments do not serve.
The gaps can include serving a municipal function in portions of a county with municipalities
too small to have enough resources to provide parks, conserving large areas of open space that
municipalities cannot, or as a tourist venue for people from outside the county . The City of Lake
Geneva is served by the nearby White River County Park, about three miles northeast of the
City.
• Municipal Parks exist to serve residents of municipalities, providing passive space for
recreation and community gathering as well as facilities for active athletic or recreation
programs. The two most common types of municipal parks are Neighborhood and Community
parks. Neighborhood Parks are usually 1-10 acres and Community Parks are generally larger
(10+ acres) and typically serve larger portions of the community. Both types of parks have a ½-
mile service radius.
Riviera Fountain
Page 36 of 81
LAND TO LAKE PLAN
34
The National Recreation and Park Association (NRPA) compiles data from around the U.S. on park
and recreational departments and services provided. It is important to compare the services that
Lake Geneva provides to the national averages as a benchmark for analysis. A few of the most
applicable metrics are shown in Figure 5.1.
Figure 5.1. NRPA Parkland Standards Comparison
NRPA Standard (2025) Lake Geneva Park System
Total Park Acres per 1,000 Residents 10.2 30.4
Average Number of Residents per Park 2,411 304.3
Full Time Park and Recreation
Employees (per 10,000 Residents) 8.9 2
While it is important to evaluate Lake Geneva based
on national averages, it is difficult to make a one-to-
one comparison between parks departments in other
communities and in Lake Geneva. This is because of
the variability in department structure, amenities,
distribution of county and state parks, and the
number of natural resources in the area. Therefore,
this comparison should be taken as context for the
Lake Geneva system and not necessarily a judgement
or a direct benchmark for performance.
Lake Geneva Park Standards
As seen in Figure 5.2, the City currently maintains a
rate of service of approximately 30.4 total park acres
per 1,000 residents. Future parkland needs are
discussed in Chapter 6.
For the purposes of its park and recreation planning,
the City should utilize the standard described in
previous CORPs of 11 acres per 1,000 residents as its
community standard. Below, Figure 5.2 shows that
Lake Geneva currently provides 30.4 park acres per
1,000 residents, based on 2024 population, easily
meeting the standard of 11 acres per 1,000 residents.
Figure 5.2
Page 37 of 81
Chapter 5: Park and Open Space Standards
35
Figure 5.3 Current City of Lake Geneva Park Standards
2024 Lake
Geneva
Population
2026 Total
Lake
Geneva
Park Acres
2026 Total
Acres Per
1,000
Residents
Lake Geneva
CORP
Standard:
Park Acreage
Per 1,000
Residents
Total Acres
Needed to
Meet
Standard
Additional
Acres Needed
to Meet
Standard
8,521 256.1 30.4 11 93.7 0
Note: 2026 Total Acres includes all parks within Lake Geneva. All figures used in this table are rounded.
Service Areas
Map 2 depicts the service areas of Neighborhood Parks, Community Parks, and outdoor School
District facilities based on their location within the community. This analysis is used to determine
the existing service coverage of the City Park and Recreation System and forms the basis of any
recommended new park locations as discussed in Chapter 7.
For the purposes of this plan, all parks
will have a service area radius of 1/2 mile.
In most municipalities, service areas
range between 1/4 – 1/2 mile because of
the need to accommodate all modes of
transportation access, especially people
who may not own or be able to operate
a vehicle (children, disabled individuals,
the elderly, etc.). A 1/4 – 1/2-mile radius is
seen as representative distance of
mobility or how far most individuals can
walk comfortably depending on age,
health, and other factors.
An additional consideration in the park
service areas are barriers to access such
as large roadways, natural features,
bridges, etc. and general development
density. Lake Geneva has two minimal
barriers, US-12 and the natural feature of Geneva Lake, which doubles as recreational space . These
barriers are reflected on Map 2.
Given the relatively compact nature of the City’s layout and its position on the shores of Geneva
Lake, a majority of the City is well covered by the 1/2-mile service area radius. However, Map 2
illustrates that US-12 acts as a barrier to access that leaves an eastern portion of the City out of a
park service area.
Recreational Programming and Staffing
Youth and adult recreational sports programming is provided by the Geneva Lake Family YMCA on
behalf of the City of Lake Geneva. This topic is discussed in greater depth in the Community
Recreation and Programming element and the Parks Department Organizational Framework
element of the Land to Lake Plan.
Westgate Tot Lot
Page 38 of 81
LAND TO LAKE PLAN
36
Map 2: Park Service Areas
Page 39 of 81
Chapter 6: Analysis of the Existing Park and Open Space System
37
Chapter 6: Analysis of the Existing
Park and Open Space System
Page 40 of 81
LAND TO LAKE PLAN
38
This Chapter presents an analysis of how well Lake Geneva’s existing park and recreational facilities
meet community needs, evaluating the following components:
• An application of established local
and national park and recreational
facility service standards to reliable
population projections for the City
(Chapter 5).
• A qualitative analysis of the City’s
park system based on both an
understanding of the City’s goals and
objectives and an evaluation of the
local demand for parkland and
recreational facilities.
• An analysis of the geographic
distribution and accessibility of each
park location.
• A consideration of public input
regarding the future of the City’s
park and open space system.
• A review of the Wisconsin’s State
Comprehensive Outdoor Recreation Plan.
The results of this analysis will serve as the basis for the recommendations presented in Chapter 7.
Quantitative Analysis
The quantitative analysis below considers the acreage of all public parks in the City and how
projected population growth might impact future service needs.
Existing Facilities
As documented in Chapter 5, Lake Geneva’s existing park acres exceed the CORP standard of 11
acres of parkland per 1,000 residents. Figure 6.1 summarizes existing park acreage, by park type,
per 1,000 residents. Refer to Figure 2.1: Park Facility Matrix in Chapter 2 for a full summary of parks
by category and acreage.
Figure 6.1: Total Parkland by Type
Park Type 2026 Total Acres
2026 Total Acres Per 1,000
Residents*
Community Parks 85.2 10.0
Neighborhood Parks 11.5 1.3
Mini Parks 2.6 0.3
Natural and Open Space Areas 159.4 18.7
Special Use Parks 2.6 0.3
Total City Owned/Operated 259.1 30.4
School Facilities 71 8.3
State Park 261.9 30.7
Total All Facilities 592 70.8
*The City of Lake Geneva’s 2024 population was used to calculate the above (8,521). Total acreage includes all parks within the
City of Lake Geneva. Source: Vandewalle & Associates and City of Lake Geneva
Dodge Water Tower Pond Park
Page 41 of 81
Chapter 6: Analysis of the Existing Park and Open Space System
39
Future Park System Needs
The future park acreage needs of the City are
determined by applying the recommended
minimum acreage standards to a reasonable
population projection for the City in future years.
This type of needs assessment is included in part
to satisfy Wisconsin Statutes 66.0617 and 236.29
regarding the collection of fees and also to assist
the City with planning and budgeting for the
development of future parks.
For the purposes of this Plan, Lake Geneva will
utilize the previously established standard of 11
acres per 1,000 residents. Figure 6.2 shows a 20-
year projection of parkland needs and compares it
to the total acreage of existing facilities. This Plan
assumes that Hillmoor Zones 2-5 will be fully
integrated into the park system by 2030, increasing the City’s total park acreage from 259.1 acres in
2026 to 450.1 acres in 2030. As seen in Figure 6.2, no additional parkland acreage will be needed
to support recreation in Lake Geneva through 2050.
Figure 6.2: Projected Parkland Needs 2030-2050
Year Projected
Population
Lake Geneva
Park Acreage
Standard Per
1,000 Residents
Projected Parkland
Needs (11 Acres Per
1,000 Residents)
Total Park
Acreage
Provided
Additional
Acres
Needed
2030 8,879 11 97.7 450.1 0
2035 9,178 11 101 450.1 0
2040 9,476 11 104.2 450.1 0
2045 9,775 11 107.5 450.1 0
2050 10,119 11 111.3 450.1 0
Note: Total Park Acreage includes 191 acres for Hillmoor Zones 2-5, with the assumption that the Hillmoor
Property will be fully integrated into the park system by 2030.
Source: Vandewalle & Associates
While there is no projected need for parkland, the City should be responsive to needs for new
amenities, maintenance, and to portions of the City that are not within a park service area. As Lake
Geneva continues to grow, the City should explore updating its parkland dedication policy to
require future residential development, especially those that add new residential units, to provide
open space that is suitable for active outdoor recreation and is accessible to the public.
Additionally, the City should look to work with private property owners and the School District to
establish shared use policies that increase public access to additional recreational amenities that
are not City owned.
KEY FINDING
Lake Geneva currently exceeds its
adopted parkland standard and is
projected to continue meeting
parkland needs through 2050. As a
result, future investments should
prioritize improving existing parks,
expanding recreation opportunities,
enhancing accessibility, and
integrating the Hillmoor Property into
the City's park system rather than
focusing on parkland acquisition.
Page 42 of 81
LAND TO LAKE PLAN
40
Qualitative Analysis
Although quantitative standards provide a good basis for
formulating the recommendations, a thorough
assessment of the City’s existing facilities must include
an analysis that takes into consideration those
characteristics that make Lake Geneva unique from
other communities. This includes:
• Identifying those park system deficiencies and
strengths that are not captured by universal
standards.
• Ensuring that future parks and recreational facilities
are tailored to meet the needs of Lake Geneva
residents.
• Allowing for the establishment of a more reasonable
and specialized level-of-service standard by which
the City can plan its future park system.
Tourism Community Dynamic
As a popular summer tourist destination, seasonal shifts in Lake Geneva’s population occur
between summer and winter. The City's parks near the lakefront and south of Main Street,
including Elm Park (Library Park), Flat Iron Park, Donian Wetland Nature Preserve, and Seminary
Park, play a unique role as highly visible destinations that attract tourists and host special events,
particularly during the peak tourist season.
Because the lakefront-area parks serve this broader regional and tourism-oriented role, they must
be designed to support visitor activity and special events. This includes providing adequate
parking, lighting, electrical access, and flexible open areas suitable for a range of public gatherings
and events. Additionally, the high usage during the peak season increases the need for
maintenance schedules that respond to extra wear and tear withstood by popular facilities during
the summer months.
While residents also enjoy and value
these lakefront-area parks, they
sometimes avoid these parks during
the busiest times. This dynamic
highlights the importance of ensuring
that other City parks are designed
primarily to meet the needs of Lake
Geneva residents. Resident-oriented
parks should prioritize amenities such
as walking paths, playgrounds, exercise
facilities, and open green spaces that
offer opportunities for recreation,
relaxation, and community connection
away from seasonal crowds.
View from Brunk Pavilion
KEY FINDING
Lake Geneva's park system
benefits from strong lakefront
amenities, tourism assets, natural
resources, and community
partnerships. Future investments
should focus on enhancing
recreation opportunities that serve
residents year-round while
balancing the demands of
seasonal visitors and preserving
the community's unique character.
Page 43 of 81
Chapter 6: Analysis of the Existing Park and Open Space System
41
Other important factors to consider include the following:
• In 2020, the City acquired the Hillmoor property, which is centrally located within the City and
along the White River. This acquisition adds a substantial amount of acreage to the park
system. A planning process to determine the design, features, and amenities for Hillmoor Zone
1 was prepared concurrently with the development of the Land to Lake Plan. Planning for
Zones 2-5 will be completed in future years.
• Big Foot Beach State Park is located entirely within Lake Geneva’s City limits, providing
residents and visitors with easy access to a Wisconsin State Park.
• The Geneva Lake Family YMCA runs youth recreational sports programming for the City. While
the YMCA has been a longstanding partner with the City, a newly formed City Parks
Department provides opportunities for City-run recreational programs and expanded use of
City parks.
• The Lake Geneva J1 School District is another longstanding partnership with the City. Several
recreational facilities are shared between the City and the School District. Some parks, like
Maple Park, are owned by the City, but are used by the nearby Central-Denison Elementary
School during the day. Other parks, like Dunn Field are owned by the School District and
managed by the City.
• The Lake Geneva Public Library may have potential as a future partner for expanding
recreational offerings. The library currently provides free and low-cost programming to the
community. The Parks Department and Library could coordinate and collaborate on new
programs to meet the needs of City residents, and Library programming could be hosted in
City parks.
• Given the lower number of children per household relative to past generations, the City will
need to be strategic about tot lots and playgrounds, thinking carefully about their distribution
throughout the community and when and where to invest in new or replacement playgrounds.
• The high proportion of active seniors in the community will continue to shape current and
future recreational needs. Passive activities such as gathering with friends in the park, walking,
wildlife viewing, and taking in nature will become increasingly imp ortant as the community
ages. The City’s current park inventory is well suited to meet these needs, as it contains many
acres of passive open space. Opportunities to expand trail networks and add seating to expand
the utility of these open space areas to seniors and the community as a whole.
Geographic Analysis
The location and distribution of the park and open space
facilities in relation to a community’s residents is also an
important indicator of how well existing facilities meet the
needs of the community. Map 2 illustrates how effectively
the City of Lake Geneva’s parklands serve the various
developed areas of the community. These service areas are
based on the local standards identified in Chapter 5.
The area served by a park is influenced by several factors.
These include the size of the park, location, transportation
accessibility, and natural or manufactured barriers.
Displaying park service areas based on these factors
suggests locations where additional park facilities might
be necessary to serve residents.
The Park Service Area map indicates areas of the City that are not currently served by a City park.
Within the City, Geneva Lake, the White River, USH 12, WI 120, and WI 50 all serve as either natural
for manmade barriers to park access. While Geneva Lake and the White River are natural barriers
to park access in some respects, they are also valuable assets for recreation as well, providing
KEY FINDING
Lake Geneva's existing park system
provides strong community-wide
access to recreation opportunities;
however, continued residential
growth, particularly on the
southwest side of the city, may
create future service gaps that
should be addressed through new
neighborhood parks, trail
connections, and improved
accessibility.
Page 44 of 81
LAND TO LAKE PLAN
42
opportunities for fishing, nature viewing, swimming, and other water -centered recreational
activities.
While the City is well served by parkland overall, in the future, the City could consider opportunities
to acquire land within residential areas outside of the park service areas to create neighborhood
parks or provide trails to bridge the gaps caused by man-made barriers to parks.
As the City continues to grow and as new neighborhoods are added, existing and future gaps in
park and recreation facility services will need to be addressed. Currently, there are no community
or neighborhood parks that serve the southwest growth area of Lake Geneva . If the community
continues to grow in these areas, parks should be provided for these new neighborhoods. As Lake
Geneva continues to grow outward, it will be necessary to acquire additional parkland so future
residents have equitable access to all types of parks and open space and recreational
opportunities. Future park locations are shown on Map 3.
Review of the Wisconsin Statewide Comprehensive Outdoor
Recreation Plan 2025-2030 (SCORP)
The Wisconsin Statewide Comprehensive Outdoor
Recreation Plan (SCORP) serves as a blueprint for
state and local outdoor recreation planning through
support of national initiatives, sets the course for
recreation within the state by describing current
recreation supply and trends, and provides a
framework for future recreation development and
focus.
The Statewide Comprehensive Outdoor Recreation
Plan has three overarching goals:
• Ensure that all Wisconsinites have equitable
opportunities to participate in outdoor
recreation, regardless of where they live or their
ethnicity, gender, income, abilities, or age.
• Maintain and expand the sustainability of
recreational opportunities in our state, ensuring
that existing opportunities are well funded and
have the support to grow and expand where
needed.
• Grow the collaborative partnership approach across federal, state, regional and local agencies
and private non-profit organizations and businesses to provide high-quality outdoor
experiences for all Wisconsinites
The plan also introduces 11 main strategies to achieve the goals of the plan:
1. Provide more opportunities for outdoor
recreation close to home
2. Provide needed recreation facilities
3. Improve affordability of participation
4. Develop and enhance mentoring
programs
5. Create more welcoming outdoor spaces
6. Improve the distribution of information
on recreation opportunities
7. Expand and diversify funding sources
8. Adapt to new conditions for outdoor
recreation
9. Adapt management of recreation
opportunities and facilities
10. Mitigate climate change
11. Create an implementation plan that
identifies desired outcomes as well as the
group(s) to coordinate and advocate for
outdoor recreation throughout Wisconsin
🌲🌲 WISCONSIN SCORP ALIGNMENT
Many of the priorities identified through the
Land to Lake planning process closely align
with Wisconsin's 2025-2030 Statewide
Comprehensive Outdoor Recreation Plan
(SCORP), including expanding recreation
access, improving affordability and
inclusivity, enhancing outdoor recreation
opportunities, strengthening community
partnerships, and improving access to
recreation information.
As a result, the recommendations presented
in this plan support both local community
priorities and broader statewide outdoor
recreation goals.
Page 45 of 81
Chapter 7: Park Facility Recommendations
43
Chapter 7: Park Facility
Recommendations
Page 46 of 81
LAND TO LAKE PLAN
44
This chapter provides detailed
recommendations to expand and improve
Lake Geneva’s existing park and open space
system based on current deficiencies and
opportunities identified in the preceding
chapters of this Plan and collected through
public input in the planning process. These
recommendations are also guided by the
goals, objectives, and policies outlined earlier
in this Plan.
Based on the City’s projected population in
2035 (9,178 residents) and 2050 (10,119
residents), and its local standard of 11 acres of
parkland per 1,000 residents, Lake Geneva
would not need to provide additional acres of
total parkland by 2035 nor 2050, but should
consider expansion opportunities when they
are presented, particularly for new residential
developments that would cause gaps in park
service areas. In order to accommodate the
current needs and desires of residents and to
accommodate the population in the future, it
is primarily recommended that improvements
and additions to existing parks be made. This
Plan also recommends additional trail and
pathway connections to existing parklands
and City destinations. The timing of any park
acquisitions and development should coincide
with the actual demand for recreational
facilities in the City’s developed areas.
Map 3 shows the approximate locations for
future recreational facilities and pathways in
the City. More precise boundaries for park
expansion should be determined during
formulation of specific, detailed site
redevelopment plans or when lands are
acquired. Proactive identification of lands
suitable for active parks or natural areas
worthy of conservation is recommended early
in all future development processes.
Page 47 of 81
Chapter 7: Park Facility Recommendations
45
Citywide Park Facility Recommendations
KEY FINDINGS
Based on City staff and public input, the following key findings were identified and are addressed by this
Plan’s recommended policies and park improvements.
• The parks in the downtown area of Lake
Geneva are popular and well utilized while
parks outside of this area are underutilized.
Public input also revealed that residents do
not know that some parks exist.
• Many of the parks and recreational amenities
in Lake Geneva are not fully ADA accessible.
Ensuring equal access to parks for all ages
and abilities should be a high priority for the
City, especially with an older and aging
population.
• Geneva Lake is an asset, providing beautiful
outdoor spaces for residents, but its public
access points are limited for water recreation.
• While Lake Geneva has an abundance of
parks, there are some parks without any
amenities and there are many parks with
outdated playground equipment, presenting
safety issues.
• Given the lower number of children per
household relative to past generations, the
City will need to be strategic about tot lots
and playgrounds, thinking carefully about
their distribution throughout the community
and when and where to invest in new or
replacement playgrounds.
• Many residents love Veterans Park and it is
highly utilized throughout the year.
Opportunities to update and further develop
this park should be pursued to make the park
an “all-day” destination. The park could also
be a venue for community events not hosted
in the downtown area.
• The Hillmoor property will provide significant
additional acreage to the Lake Geneva parks
system. The property presents many
opportunities for thoughtful development
and planning by the community.
• There is strong community support for
sustainability measures such as native
plantings, preservation of open space,
stormwater management best practices, and
lake water quality protections.
Provide Essential Park Amenities
• Assess and replace park water fountains as needed. Add water
bottle fillers to parks with playgrounds and athletic fields.
• Revisit policies for when park bathrooms are open and closed to
align with peak park use and known activities or events. Keep
lakefront bathrooms open as often as possible to accommodate
high demand in the lakefront area.
• Ensure all parks have an adequate number of benches and picnic
tables.
• Ensure all parks have an adequate number of trash receptacles.
• Establish a unified style with approved designs for trash
receptacles, benches, tables, and other similar amenities to
achieve a coherent look across all City parks. Adhere to approved
designs as amenities are added or replaced.
Page 48 of 81
LAND TO LAKE PLAN
46
Increase Accessibility
• Upgrade all Lake Geneva parks and recreation facilities to ensure
basic ADA accessibility, specifically when upgrading playground
equipment and ground surfaces, shelter, and restroom access,
and by providing contiguous paved pathway access to amenities
within each park and to parking spaces and sidewalks leading to
the park.
• Add accessible and universal design features to parks such as
entrances to play areas being level with paths, wheelchair
accessible amenities, sensory gardens.
Foster Community Connections and Livability
• Consider strategic locations in parks for public art
• Support placemaking efforts by other entities such as the Broad
Street Alleyway Project
• Partner with volunteer organizations such as Rotary Club to
implement beautification projects and other volunteer
opportunities.
• Assess the feasibility of new fishing areas along the lakefront and
on the White River.
Support Tourism and Events
• Convene local tourism groups annually to discuss opportunities
for collaboration with one another and with the City.
• Support and encourage local tourism groups to create a one-
stop-shop website that acts as a directory of community events
and tourism resources.
• Review City policies to ensure that seasonal or year-round
uplighting of trees in parks is allowable.
• Establish an entertainment district during certain special events
that would allow for open containers in designated areas.
• Increase permit/event fees for large events in City parks that
consume significant City resources and use City facilities.
Page 49 of 81
Chapter 7: Park Facility Recommendations
47
Recommended Improvements to Existing Parks
Park improvement recommendations were developed through feedback from the Park Board, City
staff, and the public, a review of the goals, strategies, and recommendations of existing plans, and
the inventory and analysis of existing park and recreation system conditions within Lake Geneva .
This comprehensive analysis led to the following list of recommendations for existing parks.
While not every park and trail project is expected to be completed within the next five years, these
recommendations establish a flexible roadmap for continued implementation. This plan prioritizes
projects over the short, medium, and long term, enabling the City to steadily enhance its parks and
trail network in a manner that aligns with available resources and evolving community needs.
Improve Park System Information and Wayfinding
• Update the list of parks on the City of Lake Geneva website and
make the full listing of City Parks more prominent on the Parks
Department webpage.
• Update the map of all City parks and trails with available
features/amenities on the Parks Department webpage to
increase awareness of all available parks and recreation facilities.
Place in a prominent location on the Parks Department
webpage.
• Provide information and maps about bike trails on the City of
Lake Geneva website.
• Ensure that all parks have addresses so that they may be easily
found with GPS and mapping applications.
• Where opportunities arise, ensure that all park land is properly
platted to reduce ambiguity among City departments.
• Update/replace wayfinding signage and map kiosks in the
downtown area.
• Ensure signage is consistent and clear about dog policies in City
parks and on trails.
Promote Sustainability
• Use native plantings whenever possible in City parks and open
spaces. Create a native planting guide for parks facilities, open
spaces, and landscaped areas in Lake Geneva.
• Review opportunities to use sustainable design elements and
materials when designing and constructing future park and
pathway improvements.
• Review opportunities to incorporate green infrastructure in City
parks such as rain gardens, bioswales, native prairie plantings,
pollinator gardens, woodland restoration projects, and permeable
paving.
Page 50 of 81
LAND TO LAKE PLAN
48
New Amenities in Existing Parks
Cobb Park, Dunn Field, Seminary Park, and Veterans
Park present opportunities for additional amenities
that would attract users citywide due to their larger
size and availability of on-site parking lots.
Recommendations for these parks are detailed in
park-specific recommendations below. In some
cases, a park master plan is recommended to
analyze and recommend how the new amenities
would be best arranged within the park.
The City has several parks with limited amenities.
These include Baker Park, Edgewood Hills Park,
Fermano Park, Hidden Woods, Home Depot Park,
Price-Fremont Park, Southbridge Park,
Dodge Water Tower Pond Park, and
Willow Park. These parks benefit the City
and its residents by providing open
space, infiltration for stormwater, and
natural beauty, however they do not
provide recreational features typically
expected for a park. Due to the small
size of these facilities, this Plan does not
recommend adding new playgrounds or
other active recreational features to
these parks; instead, it recommends that
they be maintained as usable open
space. In some cases, accessible trails
could be added to encourage residents
to walk through and better utilize the
area. In other cases, new placemaking
features could be added to enhance the
presence of the park within the
neighborhood. Examples include the addition of
native trees and plants, community orchard, public art,
benches, educational signage, and bird/bat houses.
These recommendations are detailed in park-specific
recommendations below.
Upgrading Playgrounds
The City currently has nine parks with playgrounds,
which are well distributed throughout the community.
Most of these should be preserved as parks with
playgrounds going forward. However, there are
opportunities to bring in more interesting and creative
playground types such as nature playgrounds,
adventure playgrounds, and accessible playgrounds.
These recommendations are detailed in the figure
below. These creative play spaces can make a park feel
special – a destination in itself. Playgrounds also
support the City’s goals of making the community
more attractive to families with young children.
Veteran’s Park
STORMWATER INFILTRATION
Stormwater infiltration allows
rainwater to soak into the ground
where it falls, helping to reduce
flooding, improve water quality, and
replenish groundwater supplies.
Stormwater infiltration is increasingly
important as climate change
contributes to more intense rainfall
events.
PLAYGROUND
RECOMMENDATIONS
This Plan recommends playgrounds in
the following parks:
1. Cobb Park – update needed
2. Dunn Field – update needed (by
School District)
3. Hillmoor Zone 1 – add new
4. Manning Way Tot Lot
5. Maple Park
6. Rushwood Park – update needed
7. Seminary Park – add new
8. Veterans Park
9. Westgate Tot Lot – update needed
10. Oak Hill Tot Lot – relocate/replace
Page 51 of 81
Chapter 7: Park Facility Recommendations
49
Figure 7.1 Recommended Improvements to Existing Parks
Park Name Project/Recommendation
Community Parks
Dunn Field
Replace playground (by School District)
Add lighting at pickleball courts
Skatepark maintenance
Add signage
Add benches to active areas
Elm / Library Park Add signage
Flat Iron Park
Add internal ADA path between amenities
Support events by increasing number of power sources and outlets and
fixing broken outlets
Hillmoor Zone 1
Per Conceptual Master Plan
Add signage
Add benches to active areas
Park shelter
Dog park
Fishing area
Ecological restoration
Amphitheater
Splash Pad (large)
Playgrounds
Sledding hill
Restrooms
Improve disc golf course
Gate/barriers at all entrance points
Trail completion
Seminary Park
Add benches to active areas
Master plan
Add ADA accessible path between parking areas, playground, and
pavilion
Splash pad (small)
Add playground
Ice skating rink
Add park sign
Provide clear signage for boat parking at both entrances to parking lot
Extend electricity to the park. Coordinate with event organizers on
desired locations for outlets.
Riviera Beach and Plaza See Lakefront element of Land to Lake Plan
Veterans Park
Master Plan
Repair fencing
Add signage
Replace rusted bathroom sinks
Page 52 of 81
LAND TO LAKE PLAN
50
Park Name Project/Recommendation
Repair and update paved paths
ADA restroom updates
Plan community events to bring more people to the park
Designate new gathering areas within the park
Establish a beer garden
Add picnic tables and shade sails
Splash pad (large)
Fitness equipment
Upgrade baseball fields to be tournament-ready, with new dugouts,
batting cages, scoreboards, and properly maintained natural turf
Upgrade baseball field lighting to LED and automatic timing
Replace or repair existing scoreboards
Neighborhood Parks
Cobb Park
Master plan
ADA paths
Add surfacing under playground equipment
Add signage
Add benches to active areas
Replace playground equipment with nature-based playground
Maple Park None
Rushwood Park
Master plan
Fitness equipment
Add signage
Add benches near activity areas
Drinking fountains/water bottle filler
Add restrooms
Add surfacing under all playground equipment
Extend electricity to park shelter
Update playground equipment. Consider adventure play.
Add an ADA accessible street parking space
ADA paths between amenities
Mini Parks
Baker Park
Maintain as open space. Add/maintain native plants along shoreline.
Add signage
Manning Way Tot Lot
Add Manning Way Bike Trail Bridge
Maintain existing playground. Replace with accessible playground
suitable for young children when equipment reaches end of life.
Add signage to entrance to path to Hidden Woods Park
Page 53 of 81
Chapter 7: Park Facility Recommendations
51
Park Name Project/Recommendation
Moss Park
Add signage
Maintain as open space. Add small amenities that encourage
connection and sustainability such as native trees and plants,
community orchard, public art, benches, educational signage, bird/bat
houses, etc.
Oak Hill Tot Lot
Remove play equipment and repurpose as a passive open space. Plant
native trees and plants.
Investigate opportunities to relocate the playground to a property that
is flatter and ADA accessible. The current park is on a steep incline that
is not safe nor ADA accessible. A City-owned open space across the
street from the park has been identified as a potential location.
Olive Longland Park
Add signage
Maintain as open space. Plant native trees and plants
Westgate Tot Lot
Replace playground equipment with accessible playground oriented to
young children
Add signage
Add benches to active areas
Add fence along Dodge Street
Willow Park Maintain as open space. Preserve lake views.
Natural and Open Space
Areas
Dodge Water Tower
Pond Park
Maintain as open space. Plant native trees and plants.
Add trail connection from Pond View Lane that encircles the pond
Add benches to the pond area
Add signage
Donian Wetland Nature
Preserve Replace signage
Edgewood Hills Park
Maintain Duck Trail Trailhead to encourage trail access. Add small
amenities that encourage connection and sustainability such as native
trees and plants, community orchard, public art, benches, educational
signage, bird/bat houses, etc.
Add signage
Fermano Park
Maintain as open space and maintain trails.
Add benches to active areas
Hidden Woods Park
Maintain as woodland and maintain trail. Coordinate with Town of Lyons
on placement of educational signage along trail.
Add signage to path entrance at Manning Way Tot Lot. Coordinate with
Town of Lyons about signage placement at path entrances at the south
end of Lockwood Blvd, at the corner of West Drive and Hill Street, and
at the south side of the park.
Home Depot Park
Maintain as open space. Add small amenities that encourage
connection and sustainability such as educational signage, art, and
native trees and plants
Add signage
Add benches to active areas
Page 54 of 81
LAND TO LAKE PLAN
52
Park Name Project/Recommendation
Mary Koutsky Four
Seasons Nature Preserve
Add information kiosk at park entrance and update signage
Consider adding archery range
Improve trails over marsh
Level gravel in parking lot
Add seating and picnic tables to the gazebo
Continue to maintain trails and gravel parking area
Price-Fremont Park Prepare trail development plan to include trails, educational signage,
and benches
Southbridge Park Negotiate with surrounding land owners to provide easements to allow
public access to the property
Symphony Bay Park
Add benches to active areas
Rename the park; add signage with new park name
Add gravel to trails
Special Use Areas
Lake Geneva
Bocce Ball Park
Consider different uses for the park, such as bags or outdoor fitness
equipment
Rename park to reflect park’s new purpose; add signage with new park
name
Assign an address to the park
Natural and Open Space Areas Recommendations
The City of Lake Geneva is extraordinarily green and lush with many areas of mature trees and
neighborhoods with full tree canopies. For more than 30 years, Lake Geneva has been recognized
as a Tree City, highlighting its excellent maintenance and care for its urban forest. The City also
holds national designations as a Bird City (2010), which recognizes its abundance of bird habitat.
Multiple City departments, the Avian Committee, the Hillmoor Commission, the Tree Board, and
passionate community members and volunteer groups work together to achieve and maintain
these designations and uphold the City’s commitment to sustainable, wildlife, and environmentally
friendly practices.
In addition to the City’s substantial forestlands, the City also has wetland, environmental corridor,
and floodplain areas that make proper stormwater management and flood control practices
important. Environmentally sensitive pathway projects should be considered by the City where
permissible in its wetland and environmental corridor areas.
Page 55 of 81
Chapter 7: Park Facility Recommendations
53
Recommended New Parks
Future development and population growth in
the City may result in the need for the addition
of park space to the overall park system in the
coming decades.
Although most areas of the City are well-served
by existing parks, the City should develop new
parks in areas where further residential growth
is planned, as those new residents will be
physically distant from existing parks. These
new parks should be developed when new
residential subdivisions are platted. Map 3
identifies potential locations for potential new
Neighborhood Parks and Community Parks. As
seen in the City of Lake Geneva
Comprehensive Plan, the undeveloped land to
the southwest of City limits is Lake Geneva’s
primary residential growth area. While this area
is not expected to develop within the next five
years, parks should be included if and when
development occurs.
Additionally, the City should consider adding
park acreage where possible when
opportunities for new parkland become
available. Additional neighborhood parks
should be prioritized if acquisition
opportunities are presented. This additional
parkland could include smaller lots or
greenspace in residential areas. Pursuing
opportunities for green corridor and bike and
pedestrian connections, potentially through
corridor acquisition and development, could
also expand the park system for residents in
the future. The City should work with private
property owners, particularly businesses with
additional greenspace on their campuses, to
establish publicly accessible recreation and
natural spaces as well as trail connections.
Hillmoor Property
The City has prepared a conceptual master
plan for Hillmoor Zone 1. This conceptual plan
imagines amenities such as a new dog park,
large shelter, beautification efforts through
native plantings, an accessible playground,
splash pad, and amphitheater. The City is in the
process of designing specific amenities, which
will be implemented in phases.
STEPS TO ACQUIRE
ADDITIONAL PARKLANDS AND
RECONFIGURE EXISTING PARKS
There are several key steps to expanding existing
parks and redesigning facilities to make the most
efficient use of space that allows for the
development of additional playfields. These include:
1. Identification of land suitable for expansion.
There are many factors that should be
considered in the identification of land for the
park including, but not limited to, size, location,
accessibility, topography, proximity to utilities,
buildability, and constraints. An investigation of
all land within the City and directly adjacent to
the City and School Districts’ existing facility
boundaries should be evaluated. During this
investigation, a feasibility study should be done
to ensure identified properties are adequate to
facilitate the desired size, facilities, layout, etc.
2. Property negotiation and acquisition. The vast
majority of lands identified in step one will most
likely yield sites that are privately held. Through
property owner outreach, the City can determine
willingness to sell, land price, and donation
opportunities to narrow the pre-identified sites
into one or a select few best-fit options. Property
acquisition will require several steps including
fundraising, grant procurement, or budgeting;
negotiation of land sale price; property transfer;
entitlements; and potentially Comprehensive
Plan Amendments.
3. Park master planning. In advance of major
improvements to existing parks or after an
existing park has been expanded, it is
recommended that a Park Master Plan be
developed to determine its future programming,
amenities, layout, and facility makeup. This
process will include detailed engineering plans
for park development, community, and
stakeholder engagement, estimated costs,
implementation strategies, and City adoption.
4. Bidding, awards, and construction. Utilizing
the Park Master Plan, the City will need to
acquire and/or allocate funds toward the
construction of the new park. This can come in
form of donations, grant procurement,
sponsorships, budgeting, or more likely a
combination of each. The project will then need
to be bid out for construction and contractors
will need to be selected to complete the work.
Following bid awards, construction can
commence.
Page 56 of 81
LAND TO LAKE PLAN
54
Hillmoor Zones 2-5 are expected to be added to the park system, adding approximately 191 park
acres to the community. The Hillmoor Commission intends to engage the community in a process
to develop a master plan for trails and amenities for the Zones 2-5 of the Hillmoor property in the
future.
Recommended Special Use Facilities
Through the planning process, unique recreational opportunities were identified. In the future
development and upgrades of existing parks, it is recommended that the City consider the
following special use facilities, amenities, and partnerships as population and demand increases:
ADA Accessibility & Universal Playground Design
It is recommended that as upgrades and improvements are made to each playground in the City,
whether City-owned or on public or private school property, ADA accessibility standards are
incorporated into designs and implemented incrementally over the planni ng period. Focus should
be placed on making improvements based on similar types of projects (sidewalks, pavement
stripping, signage, etc.) as part of an annual line item in the City’s Capital Improvement Plan.
Additionally, with any new facility upgrades, replacements, or construction, special attention
should be placed on creating an equitable and fully
ADA accessible facility that reflects all federal
guidelines, and when possible, goes beyond these
standards.
ADA accessibility considerations include ensuring that
there are accessible paved or rubberized surface
pathways from public sidewalks to the various
amenities within each park that are easily navigable for
all park users. The design of new park equipment and
playground features should also incorporate the
principles of universal design. Universally designed
facilities are thoughtfully designed to be usable by all
people to the greatest extent possible without the
need for adaptation or specialization. Playground
design should be inclusive and accommodate and
challenge users at their own developmental levels so
that as many children as possible can enjoy the
community’s playgrounds. Universally designed
playgrounds include equity and flexibility in use and
provide assorted sizes and spaces to allow for
individuals of varying abilities to use assistive devices or
personal assistance. Key design strategies include:
• Use different modes (pictorial, verbal, tactile) for
redundant presentation of essential information.
• Provide facilities that are compatible with and present options for a variety of techniques or
devices used by people with sensory limitations.
• Eliminating unnecessary complexity.
• Providing choice and flexibility in methods of use of various playground features.
• Providing adequate space for the use of assistive devices or personal assistance.
Cobb Park
Page 57 of 81
Chapter 7: Park Facility Recommendations
55
Splash Pad
A splash pad has become a very popular alternative to
community swimming pools because they are far less
expensive to build and maintain, and because they do not
require lifeguard supervision. Splash pads can also function
as interesting features of community public spaces.
When planning for the development of a splash pad, it is
important to consider the intended size of the facility, its
proposed location in relationship to water and stormwater
infrastructure, and long-term operating expenses. There
are two common types of splash pads, flow-through and
recirculation. A flow-through facility draws through new water each day and then drains that water
into stormwater sewers. This type of facility is less expensive to construct and operate
(approximately $350,000-$400,000) but is limited in size to 2,400-3,000 square feet because the
maximum water capacity of a flow-through system is 50,000 gallons per day. A recirculation facility
brings water through the features splash pad’s features, recollects the water used, filters the wa ter,
and then recirculates it through the system. This type of facility is more expensive to construct and
operate long-term (approximately $600,000-$700,000) because it is required to meet the state
pool code and requires regular County and City staff inspections. However, it does provide greater
flexibility in overall size and number of features. Most often, a recirculation splash pad makes the
most sense for a larger planned facility with lots of infrastructure. Flow -through splash pads are
commonly used in smaller settings such as a neighborhood park.
Outdoor Ice Rink
There can be a lack of inexpensive,
active recreation opportunities during
the winter months in Wisconsin, but
outdoor ice rinks provide a fun,
convenient and healthful way for
community members to enjoy the
outdoors through figure skating or
hockey. Options for the City include
adding an ice rink to an existing park or
a “dry” rink which provides a non-ice
surface for skating. Including a
warming house with skate rentals
provides a more comfortable
experience for families. Currently, some
residents skate on the frozen pond in
Dodge Water Tower Pond Park.
Seminary Park
SPLASH PAD
RECOMMENDATIONS
This Plan recommends splash
pads in the following parks:
1. Hillmoor Zone 1
2. Seminary Park
3. Veterans Park
Page 58 of 81
LAND TO LAKE PLAN
56
Outdoor Fitness Equipment / Urban Gym
Numerous survey respondents noted an interest in outdoor fitness equipment. Essentially a
playground for adults, weather-proof fitness equipment varies from static pieces like chin-up bars
to cardio and weight machines that use
a person’s body weight to create
resistance. Some pieces are utilitarian,
while others are designed to serve a
public art purpose as well. The concept
aligns with wellness and recreation
goals of this Plan. These parks occupy
less space than other types of
recreation facilities and can take
advantage of unused spaces or spaces
that are too small for other typical park
uses. They reflect a growing interest in
incorporating fitness into everyday life.
An urban gym could be incorporated
into an existing park in Lake Geneva or
a future park. This Plan recommends
outdoor fitness equipment in
Rushwood Park.
Community Gardens
Community gardens provide benefits to both the environment and the health and wellbeing of
community members. Community gardens increase the availability of nutritious food, providing
increased access to fresh produce to help residents create healthier lifestyles. They also strengthen
community ties, reduce environmental hazards, and water runoff, and contribute to the creation of
more sustainable food systems. Opportunities to grow food locally reduce the environmental and
financial costs of transporting food to stores, helping to improve air quality. The installation of
gardens creates additional habitat, increasing local biodiversity of both plants and animals.
Community gardens also play a role in waste reduction, allowing neighborhood residents to
compost their food waste.
Establishing community gardens in existing or future City parks is a great way to activate
underutilized park areas. The City should work with neighborhood groups and the City’s schools to
establish community gardens on school properties or in residential neighborhoods through mini
parks. The City could work with its volunteer organizations to establish a community garden
program and set guidelines for creating community gardens on non-City property.
Rushwood Park
Page 59 of 81
Chapter 7: Park Facility Recommendations
57
Map 3: Proposed Facilities
Page 60 of 81
LAND TO LAKE PLAN
58
Page 61 of 81
Table of Contents
i
DRAFT:
N
OVEM
BER
2026
CITY OF LAKE GENEVA
L
AKEFRONT
P
LAN
Page 62 of 81
Table of Contents
i
Table of Contents
Marina Benchmarking & Market Analysis
................................
................................
............
1
Introduction
................................
................................
................................
................................
................................
................................
1
Goals and Objectives
................................
................................
................................
................................
................................
.............
1
Methodology
................................
................................
................................
................................
................................
...............................
1
Study Area
................................
................................
................................
................................
................................
................................
...
2
Summary of Recent Trends
................................
................................
................................
................................
.............................
2
Local Regional Marina Analysis
................................
................................
................................
................................
.....................
3
Waterfront Condition Assessment
................................
................................
................................
................................
............
8
Survey Response Considerations
................................
................................
................................
................................
..............
10
Marina Configuration Options
................................
................................
................................
................................
.......................
11
West Dock
Concept
Options
................................
................................
................................
................................
.........................
12
East Dock
Concept
Options
................................
................................
................................
................................
..........................
14
Beach Concept Options
................................
................................
................................
................................
................................
....
17
Planning Assistance provided by:
Page 63 of 81
Marina Benchmarking & Market Analysis
1
Marina Benchmarking & Market
Analysis
Introduction
The purpose of this study is to evaluate the existing demand for and supply of marina services on
Geneva Lake. The study assesses demand for marina slips by examining slip sizes, slip mix, rental
rates, and amenities. Research methods include site visits t
o marinas, interviews with marina
managers and staff, reviews of publicly available information on marina websites, and
supplemental online research.
Goals and Objectives
The goal of this marina market analysis is to assess the current state of the recreational boating
market on Geneva Lake. This
exercise will identify the level of quality, programing, and costs of
other nearby facilities to provide context for comparison to the existing facilities. This will provide
the background information necessary to suggest high
-
level improvements to the marina facilities
to expand access to the water, improve product offerings, and improve the overall finances of the
marina operation.
The market analysis will consider a wide range of factors among marinas in the region including:
•
Marina location and adjacency to recreational and shopping opportunities
•
Current occupancy considering slip size, mix, rates, and transient/seasonal mix
•
Services and amenities offered, such as utilities, repairs, and landside boater lounges,
restrooms, internet access, etc.
•
Unique features
Methodology
Approach
The data presented in this report was collected by Edgewater staff in the summer of 2026 unless
otherwise noted. The sources of the data include direct conversations with marina staff, physical
inspections, and marina websites.
During the course of
the market analysis, marina sites were physically inspected in the summer of
2026 to assess the general conditions of the facility and adjacent amenities. Information was
collected for the marinas through visual inspections, utilizing available data onlin
e, and phone
interviews with local marina staff to seek additional input. Data on amenities, utilities, and services
are tabulated for ease of comparison.
In addition to the marinas studied, this analysis is informed by multiple additional market analyses
performed over the last five years throughout the United States. These studies included site visits to
dozens of marinas and boater surveys of more than 4,
000 boaters. Over the past fifteen years,
Edgewater has completed dozens of market analyses for marinas across the United States, which
provides broader relevant context for the overall direction of the marina industry.
Page 64 of 81
LAND TO
LAKE PLAN
2
Study Area
Summary of Recent Trends
Slip occupancy, boat sales, used boat sales, and participation reached record
-
setting levels during
and just after the Covid Pandemic, and have now generally stabilized. Market analyses performed
over the last fifteen years have identified several key trends that directly relate to the ongoing
success of marinas while also highlight
ing the source of challenges faced by marinas that are
struggling.
These include:
•
Slip demand between one marina and another is driven more by the relative quality and
location of the facilities much more than pricing.
Demand levels on Geneva Lake are currently
very high, and thus the primary driver for boaters selecting a marina is availability.
We were
able to locate only one available swing mooring and offsite dry storage currently, with no other
wet slips available at any of the facilities on Geneva Lake.
•
The general list of amenities provided by marinas is reasonably consistent from one marina to
another within a region, with few marinas lacking any significant amenities compared to their
competitors. The age and quality of maintenance of those amenities d
oes make a difference
,
however, and obviously newer facilities are more desirable than dated facilities.
For this market
area, nearly all the facilities we visited utilized the same type of fixed dock system that is
removed every winter with no utilities, so there is very little difference in any of the products
offered no matter the facility.
Only one private yacht club facility offered floating docks, which
could represent a significant competitive advantage in some markets.
•
Marinas have become more and more
a part of the hospitality industry, and boater
expectations for service have increased. Friendly, competent, and helpful marina staff create a
significant intangible culture at a marina that can make a difference in a boater’s choice of
marina.
•
Transient slip occupancy on inland lakes is primarily dependent on the quality of the
destination. Transient docks, or “shopper docks” located near downtown areas or shops and
restaurants can be very successful.
•
Compliance with current National and Federal standards remains low, providing an
opportunity for marinas to reduce their liability exposure while also providing a safer, higher
-
quality boating experience for their customers. In particular, the Americans with Disability Act
enacted specific requirements for recreational boating facilities in 2010. All facilities, even those
privately owned, that provide services to the general pub
lic
must comply. Additionally, there
has been a dramatic increase in the awareness of electrical shock drowning prevention within
Page 65 of 81
Marina Benchmarking & Market Analysis
3
marinas, with new National Electric Codes requiring individual protection for leaks greater than
30mA. The existing dock systems in use on Geneva Lake are compatible with ADA (assuming
they provide acceptable ramp connections to land), so that is not likel
y to be an issue.
We did
not see any public dock systems with permanent shore power or AC power installed, which
limits the risk of electric shock drowning.
Many boaters have lifts that rely on small solar
powered DC/battery systems, which present a much lower risk.
Local Regional Marina Analysis
Five marinas in the region were studied in detail during this marina market analysis. A wide range
of criteria and characteristics were documented and are summarized on the following pages.
In
addition to the commercial public marinas, the planning team visited more than a dozen smaller
private boat clubs, yacht clubs, and small neighborhood facilities.
While these facilities were
excluded from this study as they do not provide an appropriate comparison for determining rates,
we found that every one of them was completely full
–
often with waiting lists exceeding ten or
even twenty years.
Slip Availability Analysis
As noted above, we were unable to locate a single slip available for rent anywhere on Geneva Lake.
The only available option we found was one swing mooring capable of handling boats less than 25’
in length.
The price for that swing mooring was $5,000, which represents a per foot cost of $200
per linear foot for a 25’ boat.
For comparison purposes, a 40’ slip located on Lake Michigan in a full
-
service marina (with shore power, water, restrooms, showers, boater lounge, and services) costs as
little as $4,700 per year.
A similar 25’ swing mooring in Monroe Harbor in the heart of downtown
Chicago costs only $45 per linear foot for a season, or $1,125.
We also located a 30’ slip that was
being leased from the private slip owner for $25,000 for one season.
This equates to $833 per linear
foot for the season, which is the among the highest slip rates we have identified anywhere in the
United States.
The bottom line is that Geneva Lake has the highest demand of any inland water body we have
ever studied, with occupancy rates on par with the highest demand regions in the country, such as
Grand Traverse Bay in Michigan, Fort Lauderdale/Miami in Florida,
or Santa Cruz/Monterey in
California.
Wet Slip Breakdown
The five marinas in the study area provide approximately 287 wet slips, with the City of Lake
Geneva offering the highest number of berths at 130.
Slip Size/Mix
The majority of the slips in the marinas studied on Geneva Lake are between 24’ and 26’ in length,
with a small number of 30’ slips.
Given the navigability of the lake, and the majority of the boats
being smaller runabouts, fishing boats, pontoon boats, and small cruisers, this slip mix is
appropriate, and new slips should
fall in the same size range.
Figure 1
–
Slip Mix
Page 66 of 81
LAND TO
LAKE PLAN
4
Slip Rates
Regional Rate Analysis
The data below represents the annualized monthly average cost per foot for each of the specified
marinas. This data was collected through direct conversations with marina staff, websites, and/or
rate sheets provided by the marinas during our site visits.
Figure
2
–
Slip
Rates
Rate Summary and Recommendations
As noted above, slip leasing rates on Geneva Lake are well above regional Great Lakes facilities, and
reflect the very high demand for slips on Geneva Lake.
There are three municipal marinas on the
lake, with the Fontana on the Lake and Lake Geneva City docks commanding higher prices due to
their excellent locations immediately adjacent to vibrant downtown areas with shops, attractions,
and restaurants. Willia
ms Bay Municipal Marina charges lower rates, which may be attributed in
part to their somewhat more remote location and/or possibly policy decisions.
The average slip rate for the five facilities in the study is $186.17 per foot for the season, compared to
the current average slip rate of $141.42 for the City of Lake Geneva
–
roughly 25% below the average
price on the lake.
The average rate for the two private facilities is $260.95, while the average slip
rate for the three public facilities is $137.22.
Relative to the cost of the infrastructure, all of these
rates should result in a profitable operation.
There are two schools of thought for establishing slip rates for municipal marinas that are located
on bodies of water that also have privately operated marinas.
Market Rate Approach
The first approach is based on the idea that public marinas occupy public trust waterfront and
bottomlands and serve a relatively small portion of the community that funds these operations. Of
the approximate 8,800 residents in Lake Geneva, only 160 or so
households have a slip or mooring.
These households occupy (
more or less exclusively and permanently during the boating season)
public trust waterfront and bottomlands, and therefore the non
-
boating residents have a right to
expect that those
occupying public trust lands pay fair market value for the use of this resource.
This is a distinctly different situation than public parks, trails, boat launches, tennis courts, etc.,
which are generally shared and available equally to all residents.
Under this scenario, we also need to consider the idea that the public marina facilities have an
unfair competitive advantage over the private facilities, and it can be reasonably argued that
taxpayer funded marinas should charge at least the same price as
private facilities offering
equivalent facilities.
In these cases, the additional profit would be reinvested in the waterfront to
expand access to the water for the non
-
boating public.
The City of Chicago has generated
significant excess revenues from their marina system that were subsequently invested in upland
park spaces for everyone.
If the City of Lake Geneva decided this approach is appropriate, we would
recommend that the average slip rate increase to at least the Geneva Lake average of $186 per
linear foot per year.
Page 67 of 81
Marina Benchmarking & Market Analysis
5
The primary advantage to this approach is that the marina will usually generate sufficient revenues
to cover the cost of construction of the facilities, high
-
quality maintenance, and quality operations,
which protects both the environment and the general p
ublic.
There will be a much lower likelihood
of the need for capital expenditures from the general fund to invest in the marina, as the facility
will be financially self
-
sufficient. Many facilities using this approach are operated as Enterprise
Funds separate fro
m other city budgets.
The downside of course is higher rates for the boaters,
which in some cases could result in older or lower income residents being priced out of their slip.
Social Equity Approach
The “social equity approach” is more common in areas with high wealth inequality, with the intent
of keeping prices lower than market rates to make access to slips more affordable.
The State of
Idaho, for example, charges extremely low rates at their state
-
owned marinas (below even the cost
of operations) in an effort to keep slip rates low for long time lower income residents who find
themselves competing for homes and slips with ne
w high net worth residents moving in from
California.
It is important to note, however, that there are no water bodies where both state
-
owned
and private facilities compete on the same lake.
We recommend that agencies utilizing this approach charge rates that at minimum provide
sufficient funding for high
-
quality maintenance and operational staff.
Since the dock infrastructure
is set aside for the exclusive use of the boaters, we further recommend that the rates provide
sufficient funds to cover the cost of construction of the revenue generating slips and infrastructure.
This would normally be determined by establishing the construction cost of the facilities and then
identifying the cost of funding that construction via a 20
-
year revenue bond at current rates.
For
example, if the construction cost for the marina was $2,000,000, the cost of financing that amount
would be approximately $150,000 per year at 4% interest for 20 years.
If the marina had 50 slips,
then the boaters would pay at least $3,000 per year, plus the additional cost of marina staff,
insurance, utilities, etc.
Whichever approach is selected, we recommend that slip rates automatically be adjusted each
year to match the rate of inflation.
This is critical, as the cost of staffing and maintenance increases
every year.
We have worked with dozens of municipal marinas around the country that do not
increase their rates every year to keep up with inflation, and within 3
-
5 years they often start to
experience budget deficits.
This leads to either reduced staffing, reduced maintenance, or both.
The marina begins to fall into disrepair, liabilities increase, and when major improvements are
required, there is no money available to fund reconstruction.
This downward spiral is difficult to
escape (“
Y
ou want me to pay more for my slip?
This place is a mess!”).
Seasonal Slip Occupancy
We generally recommend marinas target seasonal
occupancy around 95% effective occupancy, which
balances the need to keep space available for new
customers, with rates near the top of what the market will
bear. If a marina is 100% full with a waiting list,
we would
usually recommend increasing rates until demand drops
to about 95%.
In this case, every facility on the lake is 100%
occupied with long waiting lists, so all financial projections
will be based on 100% occupancy
.
Transient Occupancy
Transient boating on Geneva Lake is limited to shopper docks that allow boaters from across the
lake to visit downtown shops, attractions, and restaurants.
With the high number of boaters on the
lake and high
-
quality attractions, we believe the number of shopper docks at the City of Lake
Geneva facilities can and should be increased to accommodate up to ten
-
twenty visiting boats.
Figure
3
–
Slip
Occupancy
Page 68 of 81
LAND TO
LAKE PLAN
6
Slip / Storage Availability Analysis
Swing Moorings
Swing moorings, also known as buoy moorings or can moorings, are permanently anchored
floating moorings boaters tie off to from the bow.
Moorings are spaced such that boats can swing
freely 360 degrees around the mooring buoy without contacting other boats or structures. Access
to landside facilities requires the use of small tender craft, either carried on board the boat or as a
tender ser
vice provided by the marina facility.
This makes them significantly less convenient, and
our conversations with local boaters suggest that very few boaters would choose swing moorings
over slips.
Construction of buoy moorings is very cost effective, but they require much more space than dock
structures.
While boats moored on buoy moorings can tolerate much higher wave conditions, they
must
still be located in protected waters.
Dry Stack Storage
Dry Stack storage, also known as dry slips, dry rack, boatel, or high & dry storage, are large
structures that house boats on racks on land inside a structure. Boats are lifted out of the water
using specialized forklift vehicles or automated systems and l
ifted on to racks three, four and
sometimes more levels high. This creates a natural size limitation, and rack storage generally
accommodates smaller boats up to 40’ due to weight limitations. Rack structure buildings are
located near the water’s edge, adj
acent to lift wells and courtesy docks where boats are docked
awaiting storage or retrieval. The boater calls ahead to schedule the launch, and when they arrive
their boat is waiting for them at the courtesy dock. When it is done, they leave the boat at th
e
courtesy dock and marina staff return the boat to storage.
Advantages to the dry stack system include excellent protection for the boat, lower costs
compared to traditional wet slips, the potential for reduced permitting issues as waterside
infrastructure is greatly reduced, and the ability to store large numbers
of boats in a very small
area. Disadvantages include a loss of the dockside wet slip boating experience, potential waiting,
and frustration if the boat launch is busy or delayed, and the structures themselves are generally
very large, and some people disli
ke their appearance.
Contemporary dry stack systems in southern
parts of the country are incorporating residential condominiums wrapped around the structures,
both hiding the mass of the building and creating a waterfront residential product. Modern
automated rack systems are
now being constructed, where boats are launched and retrieved by
robotic cranes rather than forklifts driven by people.
The precision of automated systems allows
them to work in less space, and they can also make much taller rack systems above five floors.
We do not recommend dry stack boat storage for the City of Lake Geneva as there are no suitable
sites available.
Page 69 of 81
Marina Benchmarking & Market Analysis
7
Upland/Winter Storage
Upland/Winter storage of boats can be a significant part of a marina’s revenue in northern
climates, with winter storage rates approaching summer seasonal slip rates in some markets.
Types of upland storage include indoor heated, indoor unheated (fully enclosed), covered (not fully
enclosed), and outdoor storage. Storage operations generally require lift wells and haul
-
out service,
which creates additional liability, complexity, and ex
penses to the marina operation. However,
these are made up in upland storage fees.
Depending on the location of the outdoor storage areas,
neighbors may not like the appearance of several dozen boats stored on cradles in the parking lot
of the marina.
Boats stored outdoors are often shrink
-
wrapped for protection, so boats may have
white, gray, or blue plastic sheeting.
While nearly every boat in this market area will be hauled out for winter storage, there are no
suitable sites for boat storage along the shoreline.
Figure 4
–
Storage Availability
Marina Infrastructure Elements, Services, and Amenities
Figures 5 and 6 address elements related to the quality of the facilities, as well as the type of
facilities offered. Successful inland marinas are judged by the quality of their docks, the type and
capacity of utilities provided, and landside amenities in
cluding the quality of the landscape,
parking, and boat launch facilities.
Marinas serving smaller vessels, generally under 30’ in length, do not usually provide shore power
as few vessels of this size can utilize shore power.
When dock systems are removed each winter,
providing shore power and water becomes more challenging as annual connecting and
disconnecting of utility systems increases maintenance requirements, wear and tear, and potential
attendant safety issues.
Amenities such as restrooms are expected, and they must be kept
exceptionally clean and well maintained at all times.
Additional amenities, such as Wi
-
Fi, showers,
laundry, and lounges are nice to have but are not required for marinas of this type.
The distinction
between marinas is made in the overall quality of the marina facilities, and the age of the
amenities.
Other elements that make a difference to marina finances and operations, but not necessarily the
popularity of the marina among seasonal boaters include boat launches, lift/haul
-
out service, on
-
site repairs, and boat rental.
Only two of the facilities in this study area provide those amenities.
Marinas should perform regular boater surveys to stay current on boater needs, and marinas that
commit to staying current will be rewarded with strong boater loyalty.
While this may not be
critical in an underserved market, these distinctions can make a significant difference as supply
catches up with demand.
Page 70 of 81
LAND TO
LAKE PLAN
8
Figure 5
–
Marina Amenities
Figure 6
–
Marina Infrastructure
Waterfront
Condition Assessment
The
existing
conditions along the lakefront present no major issues in terms of safety or
accessibility, and in general, the lakefront is well developed, well cared for, and very well used. The
primary issues relate mainly to overuse and demand exceeding capacity.
•
The existing removable public docks meet all
existing
ADA access requirements
.
o
The
only issue noted
is settlement of the ramp connection at the fixed commercial dock
that should be addressed
.
•
The addition of an ADA
-
compliant paddlecraft launch
near the west docks
would address both
ADA
-
compliant access to the buoy moorings and paddlecraft launching
.
•
There are no existing electrical systems on the fixed docks, so there are currently no concerns
with compliance with ground fault protection requirements in current codes
.
o
There is an electrical system on the fixed docks that supplies the fuel system
.
o
A comprehensive inspection of the fuel and electrical system is outside the scope of this
study, but should be considered
.
•
There are a number of
relatively
simple maintenance issues with the paved pathways around
the lake that could present trip hazards and should be addressed
.
•
There is little in the way of shoreline erosion that presents any risk to the park or existing
infrastructure, however there is some settlement near an existing storm drain near the path
just west of the beach
.
Page 71 of 81
Marina Benchmarking & Market Analysis
9
•
The existing boat launch facility does not comply with any existing standards and presents the
following concerns to be considered:
o
The public walking path around the lake crosses the boat ramp facility and presents a risk
to pedestrians when boats are backing down the ramp.
Additional signage, tactile
pavement markings, or other safety features should be considered.
o
Vehicles utilizing the ramp perform all turning and backing movements within the traffic
lanes of Wrigley Drive:
▪
This condition has existed for decades and is well known/accepted by local drivers
.
▪
According to the city, there is no history of accidents or serious traffic conflicts other
than occasional delays while vehicles are backing
.
▪
T
he ramp is very lightly used and estimated to be less than one launch or retrieval per
hour
. Between
July 1
-
September 7, 2026 (total of 68 days), the launch was only used on
24 of those days
(data for 4
th
of July was not recorded)
. Of those
24 days
, the average
daily average is just under 12
launch/retrievals
per day, or 1.2 per hour.
▪
Accepted standards suggest that a two
-
lane boat ramp of this type would require 25
trailer parking spaces per launch lane, or 50 total parking spaces.
There are currently 12
trailer parking spaces located in a nearby park, which is likely keeping demand for this
launch facility low.
▪
There are no other public launch ramps on the east end of Geneva Lake
.
▪
Construction of a new launch ramp facility at Big Foot State Park is likely the only viable
alternative site on the east end of Geneva Lake, however this project would be very
expensive and is entirely outside the control of the City of Geneva
.
▪
It should be noted that a similar boat ramp condition exists in Fontana
-
on
-
Geneva Lake
on the west side of Geneva Lake
.
o
Upgrading this facility to meet modern boat launch standards at this site would require
significant modifications (closing) to Wrigley Drive and the need to convert adjacent
parkland to parking.
While we would not propose to construct a new boat launch facility in
this configuration, the facility has been in place and operating safely for decades and the
risks outlined above are known and considered acceptable to the city.
Possible strategies to
reduce traffic conflicts include:
▪
Addition of paint markings and boat launch attendant operated traffic/warning lights to
stop traffic during launch and retrieval activities
.
▪
Provision of police/public safety officers to direct traffic during high demand periods
.
▪
Roadway reconfiguration
.
Page 72 of 81
LAND TO
LAKE PLAN
10
Survey Response Considerations
Boaters Focus Group Summary
•
There is a strong consensus that the waitlists for slips are extremely long, with some
participants stating they have been waiting for 15 to 20 years.
•
The group discussed the City’s unique boat launch that is accessed into the middle
of
a public
street, noting that while it is unconventional to have vehicles with boat trailers crossing traffic, it
has functioned for decades without major safety incidents.
•
Several participants shared their history with the waterfront, including one participant whose
family had a boat stall in the lagoon for 50 years before the lagoon slips were removed. He now
stores his boat in his driveway. Lagoon slip holders are frustrat
ed by this situation and feel that
the City should have reinvested lagoon rental fees into maintenance and/or dredging to keep
the lagoon piers in place.
•
The group questioned whether they wanted to see more boats on the lake, including residents
and tourists.
•
Municipal Slip Rates
o
Participants debated municipal slip rates. Some suggested that the City should charge
market rates to avoid competition with the private sector, but others stating that affordable
slips are one of the few perks offered to residents.
o
Participants debated who should pay for the initial construction of City
-
owned piers or
similar improvements and who should pay for the maintenance of those improvements
–
slip holders or Lake Geneva taxpayers. Some felt that the taxpayers should pay for t
he initial
construction and the slip holders should pay for maintenance only.
•
Improvements
o
The participants generally agreed that more slips are needed and would be preferable to
buoy moorings, as rowing to buoys is difficult and makes the harbor less accessible. The
group was open to replacing existing buoy moorings in favor of new pier slips.
The group
discuss various options for new or improved pier systems on the lakefront.
o
One participant suggested replacing the moorings east of the Riviera building with pier
slips and parking.
o
Participants discussed options whether wave action would necessitate fixed docks.
o
Vandalism was raised as a concern for the existing piers, leading to a discussion about the
necessity of gates. Some noted that during major events like Venetian Fest people often
climb onto private boats to watch the festivities. It was noted that while g
ates can deter
people and reduce nuisances, they cannot fully secure a marina against someone
determined to enter from the water.
•
An existing parking lot northeast of the Riviera building is available for boat trailer parking. The
two
-
year Highway 50 project starting next year will temporarily affect parking, but the plan is to
eventually convert car spaces back to boat trailer space
s, potentially doubling the current
capacity of 1
2
trailer spots.
•
One participant suggested extending paid beach hours past 5:00 PM to capture more revenue
.
Page 73 of 81
Marina Benchmarking & Market Analysis
11
Marina Configuration Options
The master planning process for the Lake Geneva waterfront is a multi
-
step effort.
The initial stage
of the process is the completion of inventory and analysis, where the design team inspected the
physical condition of the site and existing infrastructure
, and met with city staff, boaters, and the
general public to gain the necessary base information used to develop a set of separate
Preliminary Concept Plans that explore various ways to achieve the goals defined by city
operations staff and the community.
We generated three Preliminary Concept Plans each for the
areas east and west of the beach, and two Preliminary Concept Plans for the beach area itself.
The
purpose of these different concepts was to explore different potential solutions and test them
a
gainst one another.
These preliminary plans will be presented to the public in the coming
months, and the feedback received will guide the development of a single Draft Consensus Master
Plan for further public review and comment.
The draft plan will then
be revised to a Final
Consensus Master Plan for final approval by the City of Lake Geneva.
This is a proven process that
most often results in the best ideas from two or three of the preliminary plans being incorporated
into the Draft Consus Master Plan.
Based on the feedback received from the boaters
and broader community, we recommend the
following strategies for addressing the needs of the
boating community:
•
Replace all
existing swing buoy moorings with
fixed docks
,
similar to the existing West Docks.
•
The new fixed docks would be installed in one
of several locations outlined below,
including:
o
Shifting the existing West Docks to the
south to add another row of slips, while also
extending slightly to the east and west
o
Adding a potential new set of docks near
the west end of the beach
o
Adding a new set of fixed docks between the boat launch and the Riviera Building
•
Given the extremely high demand for additional slips, and the concerns about the loss of the
lagoon slips, we recommend replacing the lost lagoon slips near the boat launch as part of the
overall project to restore the previous slip capacity.
We do not recommend constructing these
slips within the lagoon itself due to low bridge clearance, as well as the maintenance issues
associated with dredging and maintaining the outfall.
F
igure
7
–
Slip Counts
Location
Count
Lagoon Docks
(Removed 202
4
)
32 slips
Total
Berths
(Removed)
32
West Docks
50 slips
West Mooring Field
56 buoys
East Mooring Field
24 buoys
Total
Berths
(Existing)
1
30
Page 74 of 81
LAND TO
LAKE PLAN
12
West Dock
Concept
Options
West Dock Concept A
•
Replace all moorings with new docks
.
•
Shift existing docks south by 25’, extend east and west to increase slip count to 78
.
•
Add new dock
s
near beach with 28 new
slip
s and flex broadside shopper docks
.
•
Extend existing fishing pier 50’
.
•
Total slip count: 10
6
(106 existing: 50 slips, 56 buoys)
.
West Docks Option A Cost Estimate:
Removable
F
ix
ed
Main pier relocation: 1,000lf @ $400
/
lf= $400k
New main pier: 950lf @ $800
/
lf= $760k
Finger piers: 2,200lf @ $300
/
lf= $660k
Total:
$1.82
M
Permanent Fixed
Main pier relocation: 1,000lf @ $400/lf= $400k
New main pier: 950lf @ $
120
0/lf= $
1.14M
Finger piers: 2,200lf @ $
45
0/lf= $
99
0k
Total:
$
2.53
M
West Dock
Preliminary Concept A
100’
Page 75 of 81
Marina Benchmarking & Market Analysis
13
West Dock Concept B
•
Replace all moorings with new docks
.
•
Shift existing docks south by 25’, extend east and west to increase slip count to 103
.
•
Add new 200’ fishing pier / shopper docks to west
.
•
Extend existing fishing pier 50’
.
•
Total slip count 103
(106 existing: 50 slips, 56 buoys) .
West Docks Option B
Cost Estimate:
Removable
F
ixed
Main pier relocation: 1,000lf @ $400
/
lf= $400k
New main pier: 600lf @ $800
/
lf= $480k
Finger piers: 2,400lf @ $300
/
lf= $720k
Total:
$1.6
0M
Permanent Fixed
Main pier relocation: 1,000lf @ $400/lf= $400k
New main pier: 600lf @ $
12
00/lf= $
72
0k
Finger piers: 2,400lf @ $
45
0/lf= $
1.08M
Total:
$
2.2
0M
West Dock
Preliminary Concept B
100’
Page 76 of 81
LAND TO
LAKE PLAN
14
East Dock
Concept
Options:
East Dock Concept A
•
No change to existing commercially leased docks
.
•
Replace all moorings with new docks (24)
.
•
Add up to 60 additional docks to replace West Moorings and/or former Lagoon Docks
.
•
Total slip count 84 (24 existing east moorings, 51 existing west mooring
s)
.
East Docks Option A Cost Estimate:
Removable Fixed
New main pier: 1,380 @ $800
/
lf= $1.1m
Finger piers: 1,950 @ $300
/
lf= $585k
Total:
$1.6
9M
Permanent Fixed
New main pier: 1,380 @ $
1200
/
lf= $1.
66
m
Finger piers: 1,950 @ $
450
/
lf= $
878
k
Total:
$2.53
M
East Dock
Preliminary Concept A
100’
Page 77 of 81
Marina Benchmarking & Market Analysis
15
East Dock Concept B
•
No c
hange to existing commercially leased docks
.
•
Replace all moorings with new docks (24)
.
•
Add 32 new docks to replace former Lagoon Docks
.
•
Total slip count 5
6
(24 existing east moorings, 32 former Lagoon Docks)
.
•
150’ flex broadside shopper docks
.
•
Explore the option to c
lose Wrigley
and
create dedicated boat ramp circulation and marina
parking
.
East Docks Option B Cost Estimate:
Removable
Fixed
New main pier: 860lf @ $800
/
lf= $688k
Finger piers: 1,300 @ $300
/
lf= $390k
Total:
$1.08
M
Permanent Fixed
New main pier: 860lf @ $
1200
/
lf= $
1.03M
Finger piers: 1,300 @ $
450
/
lf= $
585
k
Total:
$1.
62
M
East Dock
Preliminary Concept B
100’
Page 78 of 81
LAND TO
LAKE PLAN
16
East Dock Concept C
•
No c
hange to existing commercially leased docks
.
•
Replace all moorings with new docks (24)
.
•
Total slip count 24
(24 existing east moorings, 32 former Lagoon Docks)
.
•
530’ flex broadside shopper docks
.
•
Explore the option to c
lose Wrigley
and
create dedicated boat ramp circulation and marina
parking (with one
-
way northbound access)
.
East Docks Option C Cost Estimate:
Removable Fixed
New main pier: 780lf @ $800
/
lf= $624k
Finger piers: 660 @ $300
/
lf= $198k
Total:
$822k
Permanent Fixed
New main pier: 780lf @ $
1200
/
lf= $
936
k
Finger piers: 660 @ $
450
/
lf= $
297
k
Total:
$
1.23M
East Dock
Preliminary Concept C
100’
Page 79 of 81
Marina Benchmarking & Market Analysis
17
Beach Concept Options
Key Issues to Address
•
Renovate/expand existing changing/restroom facilities
•
Beach capacity
•
ADA access
Beach Concept A
•
Construct new restrooms/changing room at west end of beach
•
Add ADA compliant access point at west end of beach
•
Create raised 18’ wide boardwalk terrace with wood step seating along entire length of beach
(extend beach northward into slope to prevent any visual impacts from library or path)
•
Renovate existing changing rooms
•
Add new entry portal structure at east end of beach, north of trash enclosure
•
Add new ADA compliant ramp and path access to existing changing rooms
•
Add beach access mats
•
Consider floating play features?
100’
Beach
Preliminary Concept A
100’
Beach Cross -Section A
Page 80 of 81
LAND TO
LAKE PLAN
18
Beach Concept B
•
Construct new restrooms/changing room at west end of beach with upper level observation
deck
•
Add ADA compliant access point at west end of beach
•
Extend beach northward into slope to prevent any visual impacts for library or path
•
Renovate existing changing rooms
•
Add new entry portal structure at east end of beach, north of trash enclosure
•
Add new ADA compliant ramp and path access to existing changing rooms
•
Add beach access mat
•
Consider floating play structures?
Floating Play Structures
Beach
Preliminary Concept B
100’
Beach Cross -Section B
Page 81 of 81
Source: City of Lake Geneva website. First collected Nov 17, 2026.