2024 Outdoor Recreation Plan i
Draft: November 2026
City of Lake Geneva
EXECUTIVE
SUMMARY
LAND TO LAKE PLAN
ii
Acknowledgements
Parks Department Staff
David Winger, Parks Director
Luke Riesterer, Harbormaster
Board of Park Commissioners
Adam St. Marie, President
Dana Furio
Todd Krause, Mayor
Jessica Pokorny
David Quickel
Peggy Schneider
Betty Volqaurdsen
Cindy Yager, Alderperson
Piers, Harbor, and Lakefront Committee
Alderperson Cindy Yager, Chairperson
Alderperson Linda Frame
Alderperson Sherri Ames
Alderperson JaNelle Powers
Alderperson Cathy Stoodley
City Council
Mayor Todd Krause
Sherri Ames
Mary Jo Fesenmaier
Linda Frame
Joel Hoiland
JaNelle Powers
Brian Smith
Cathy Stoodley
Cindy Yager
Consultant Team
Vandewalle & Associates, Inc.
Jackie Mich, AICP, Principal-in-Charge
Kyle Estrada, Assistant Planner
Jeff Maloney, Principal Designer
Dan Eckberg, AICP, GIS Planner
Nicole Anderson, Project Assistant
Edgewater Resources
Gregy Weykamp, Principal
Suzie Fromson, Principal
Savannah Gunderson, Landscape Designer
Bill Clevenger, Operations Consultant
Vandewalle & Associates 2026. All rights reserved.
The party to whom this document is conveyed (“Client”) from Vandewalle & Associates is granted the limited,
non-transferable, non-exclusive right to copy this document in its entirety and to distribute such copies to
others.
In no event shall Vandewalle & Associates be liable to Client or any third party for any losses, lost profits, lost
data, consequential, special, incidental, or punitive damages, delays, or interruptions arising out of or related
to the recommendations contained in this document.
Vandewalle & Associates shall not be liable or otherwise responsible for any future modifications to this
document or their effect on the results of the implementation of the recommendations contained herein. In
the event that Client modifies this document, the following disclaimer applies:
This document is based on copyrighted materials of Vandewalle & Associates. This document contains
modifications that have not been reviewed or approved by Vandewalle & Associates. As a result, Vandewalle &
Associates expressly disclaims any and all warranties associated with, or liability resulting or arising in any way
from, this modified document.
Introduction
1
Introduction
The Land to Lake Plan is Lake Geneva’s first ever integrated parks and lakefront plan. This plan
incorporates a Lakefront Plan and a Comprehensive Park and Open Space Plan, and it examines
several other areas central to the growth and development of the City Parks Department.
Specifically, it includes the following elements. Each which is summarized in this Executive
Summary.
Comprehensive
Outdoor
Recreation Plan
Lakefront Plan
Community
Recreation and
Programming
Paths and Trails
Plan
Organizational
Framework for
the Parks
Department
Implementation
Plan
Appendices
LAND TO LAKE PLAN
2
Park System Vision
Implementing the Vision through Strategic Priorities
COMMUNITY
STEWARDSHIP
CHARACTER &
LIVABILITY
PARTNERSHIPS
& PROGRAMS
CONNECTIVITY
& INVESTMENT
LAKE GENEVA PARK SYSTEM VISION
The Lake Geneva Park System is the heart of our community, preserving natural beauty,
fostering connection among residents and visitors, and creating accessible, sustainable
spaces that bring generations together.
Lake Geneva Parks:
The Heart of Our Community
The Values that Define our Park System
Together, these core values and strategic priorities guide future decisions,
investments, and improvements throughout the Lake Geneva Park System
Kind-Hearted Fun
Creating joyful
experiences for all.
Connection & Safety
Linking people, places,
and possibilities.
Wellness & Belonging
Supporting a healthy, inclusive,
and resilient community.
Pathfinding & Stewardship
Leading with purpose and caring for
what makes Lake Geneva special.
Trust through Collaboration
Working together to earn
confidence and get results.
Executive Summary
3
Executive Summary
Comprehensive Park and Open Space Plan
The Comprehensive Outdoor Recreation Plan (CORP) is Lake Geneva's official roadmap for parks,
trails, recreation, and open spaces. The plan recognizes that parks are essential to quality of life,
community health, tourism, economic vitality, and environmental stewardship. Because Lake
Geneva already has sufficient park acreage, exceeding its local standard, the CORP concludes that
the City's priority should be improving existing parks, increasing accessibility, enhancing
recreational opportunities, and thoughtfully developing existing parks rather than acquiring a
significant amount of new parkland.
The CORP was prepared in accordance with guidelines that will make it certifiable by the State of
Wisconsin Department of Natural Resources and qualify the City of Lake Geneva for certain grant
programs. A summary of key findings from the CORP are provided below. Refer to the CORP for
further detail.
The purpose of the plan is threefold:
Guide Decisions
• Guide the decisions of the
City and other providers
of open space and
recreational lands in the
area in order to provide
for the increasing
demand for recreation
facilities
Recommend
Opportunities
• Recommend
opportunities for
recreation and open
space improvements
within the community
Grant Funding
• Maintain Lake Geneva’s
eligibility for recreation
grant funds with updates
completed approximately
every five years
LAND TO LAKE PLAN
4
Intended Outcomes
INTENDED OUTCOMES OF THIS PLAN
Building a Stronger, More Connected Lake Geneva
The Land to Lake Plan was developed as a component of the City of Lake Geneva’s proactive,
long-term community planning program and is intended to complement and support the
community’s other long-term planning initiatives. The document has been designed to
address Lake Geneva’s park and recreational needs over the next 5 – 10 years and beyond.
Community-
Informed
Decision Making
Recommendations are
grounded in extensive
public engagement and
reflect the priorities of
residents, stakeholders, and
community partners.
Strategic Park
Investments
Guide future investments
through both system-wide
and facility-specific
recommendations that
improve parks, recreation
facilities, and public spaces.
Stronger
Regional
Connections
Expand recreational
connections between Lake
Geneva and surrounding
communities through
improved trail, bicycle, and
outdoor recreation
networks.
Balanced Community
Priorities
Help City leaders balance land use,
environmental stewardship, operational
needs, and capital improvement priorities.
Sustainable Parks & Natural
Resources
Protect and enhance Lake Geneva’s parks,
natural resources, and open spaces to
support recreation, environmental quality,
and a high quality of life.
Enhanced Quality of Life
Provide equitable access to
recreational opportunities that support
physical health, social interaction, and
community well-being.
Community & Economic
Vitality
Leverage parks and recreation as
community gathering places that
strengthen local identity, attract visitors,
and support economic activity.
Executive Summary
5
Existing Conditions
Themes from Community
Engagement
The City collected feedback
through:
• Community surveys
• Pop-up events
• Park tours
• Focus groups
Residents generally expressed
strong support for the park system
while identifying opportunities for
improvement.
KEY PARK SYSTEM
FACTS
Existing Recreation Assets
• 268 Acres of Parks &
Open Space
• 26 Facilities across City
and School Properties
• 230 Acres of Future
Parkland at Hillmoor
WHAT WE HEARD
Key Themes from Community Engagement
Public engagement activities, including focus groups,
pop-up events, site visits, and the community survey,
identified several recurring priorities for the future of
Lake Geneva's parks and recreation system.
Improve accessibility throughout parks and lakefront areas
Continue investing in Veterans Park as a community
destination
Enhance trail, walking, and bicycle connections
Expand family-friendly recreation opportunities
Improve communication and awareness of programs and
facilities
Balance resident needs with tourism and event activity
Planning Takeaway
Residents value Lake Geneva's parks and lakefront amenities
and support strategic investments that improve access,
connectivity, inclusivity, and year-round recreational
opportunities.
LAND TO LAKE PLAN
6
Park System Goals
COMMUNITY GOALS
GOAL 1
: Invest in City beautification,
placemaking, parks, and gathering spaces.
GOAL 4
: Build a vibrant year-round
community – elevate the needs of residents.
GOAL 11: Continue to support events and
gathering on the lakefront and in
downtown.
STEWARDSHIP
GOAL 3: Protect natural assets and
environmental quality.
GOAL 5: Maintain parkland, green space,
landscaping, and natural resources to
preserve Lake Geneva’s accessible
natural amenities.
CHARACTER & LIVABILITY
GOAL 2: Preserve Lake Geneva’s unique
character while managing growth.
GOAL 8
: Support community livability,
connectivity and communication, and sense
of belonging.
PARTNERSHIPS & PROGRAMS
GOAL 7
: Continue and expand
community programming to create
opportunities for recreation as well as
cultural expression and community
development.
GOAL 9
: Strengthen community
partnerships and volunteer initiatives.
CONNECTIVITY & INVESTMENT
GOAL 6: Ensure the provision of a sufficient number of quality parks, recreational facilities
and open space areas to enhance the health and welfare of City residents and visitors. Such
facilities should be available to everyone regardless of income, age, race, ability, or geographic
location.
GOAL 10
: Improve walkability, bikeability, and connectivity. Maintain and expand a safe,
accessible, and interconnected pedestrian and bicycle network to connect the City’s park and
recreation system to areas of activity and community neighborhoods.
GOAL 12: Grow the park budget, which will continue financing operations, maintenance,
and capital improvements of existing parks, as well as allowing for future parkland acquisition
and development of new facilities.
Indicates alignment with Strategic Pillars from the 2026 Strategic Action Plan
Executive Summary
7
Park System Standards and Park System Needs
Key Findings
Based on City staff and public input, the following key findings were identified and are addressed by this
Plan’s recommended policies and park improvements.
• The parks in the
downtown area of Lake
Geneva are popular
and well utilized while
parks outside of this
area are underutilized.
Public input also
revealed that residents
do not know that some
parks exist.
• Many of the parks and
recreational amenities
in Lake Geneva are not
fully ADA accessible.
Ensuring equal access
to parks for all ages
and abilities should be
a high priority for the
City, especially with an
older and aging
population.
• Geneva Lake is an asset,
providing beautiful outdoor
spaces for residents, but its
public access points are limited
for water recreation.
• While Lake Geneva has an
abundance of parks, there are
some parks without any
amenities and there are many
parks with outdated
playground equipment,
presenting safety issues.
• Given the lower number of
children per household relative
to past generations, the City
will need to be strategic about
tot lots and playgrounds,
thinking carefully about their
distribution throughout the
community and when and
where to invest in new or
replacement playgrounds.
• Many residents love Veterans Park
and it is highly utilized throughout
the year. Opportunities to update
and further develop this park
should be pursued to make the
park an “all-day” destination. The
park could also be a venue for
community events not hosted in
the downtown area.
• The Hillmoor property will provide
significant additional acreage to
the Lake Geneva parks system. The
property presents many
opportunities for thoughtful
development and planning by the
community.
• There is strong community support
for sustainability measures such as
native plantings, preservation of
open space, stormwater
management best practices, and
lake water quality protections.
LAND TO LAKE PLAN
8
Park Facility Recommendations
This chapter provides detailed park facility recommendations, including:
• Citywide recommendations for all parks
• Recommended improvements to existing parks – including new amenities and upgrading
playgrounds
• New amenities in existing parks
• Recommended new special use facilities such as splash pads, outdoor fitness equipment, ice
rinks, community gardens, and accessible playgrounds
• Recommendations for natural and open space areas
Executive Summary
9
Lakefront Plan
A Vision for Lake Geneva's Waterfront
The Lakefront Plan establishes a long-term vision for enhancing and preserving Lake Geneva's
lakefront while balancing the needs of residents, boaters, visitors, and businesses. The plan
recognizes that the waterfront is one of the community's most valuable assets and that its
popularity creates both opportunities and challenges. Overall, the lakefront is in good condition,
but demand for recreational amenities, boating access, and public facilities often exceeds available
capacity.
The plan recommends targeted investments to improve accessibility, expand recreational
opportunities, modernize waterfront facilities, and better accommodate boating demand while
maintaining the character that residents value.
Existing Waterfront Conditions
The assessment found that the lakefront is generally safe, well-maintained, and widely used.
Existing docks largely meet accessibility standards, and shoreline conditions are stable. However,
several areas could benefit from upgrades and maintenance.
Key findings:
• Improve pavement and pathway conditions to eliminate trip hazards.
• Add an ADA-accessible paddlecraft launch to improve access for kayaks, canoes, and moored
boats
• Continue monitoring and maintaining shoreline and drainage infrastructure.
• Evaluate and improve safety around the public boat launch where pedestrians and vehicles
currently share space
While the boat launch does not meet modern design standards, the study notes that it has
operated for decades with few documented safety issues and remains an important recreational
asset.
Community Engagement Summary
A major focus of the planning process was hearing directly from lake users, particularly the boating
community. Several recurring themes emerged:
• Public Access: Strong support for maintaining and improving public access to the lake
• Demand for Boat Slips: Many residents reported long waiting lists for municipal boat slips,
with some individuals waiting more than a decade for access.
• Affordability: Residents expressed differing opinions about slip rental rates. Some favored
market-rate pricing, while others felt affordable public slips are an important benefit for local
residents.
• Replacement of Lagoon Slips: Many boaters remain concerned about the loss of slips formerly
located in the lagoon and would like to see those docking opportunities restored elsewhere
along the waterfront.
• Better Boating Access: Participants generally supported adding more slips and replacing buoy
moorings with docks that provide easier and more convenient access.
Recommended Marina Improvements
The Lakefront Plan presents several options for marina improvements. The options vary in scale
and cost, allowing the City to select a solution that best balances community priorities, budget,
and operational considerations.
One of the plan's most significant recommendations is expanding docking opportunities to
address long-standing demand for boat access. The preferred strategy would replace existing
swing-buoy moorings with fixed docks similar to the current West Docks.
LAND TO LAKE PLAN
10
The recommendations would:
• Increase the number of available boat slips
• Improve accessibility for boat owners
• Replace slips lost when lagoon facilities were removed
• Reduce reliance on buoy moorings that require users to travel between shore and boats by
small watercraft
Several alternatives were evaluated for both the east and west harbor areas, with varying costs and
capacities. Depending on the option selected, the waterfront could gain dozens of additional slips
while maintaining public access and recreational uses.
Improving the West Harbor Area
The plan evaluates multiple concepts for the West Docks. These concepts generally include:
• Replacing mooring buoys with additional boat slips
• Expanding dock capacity
• Extending fishing piers
• Providing improved public access and gathering opportunities
Improving the East Harbor Area
Several concepts were also developed for the East Harbor. Potential improvements include:
• Replacing moorings with modern docks
• Adding replacement slips for former lagoon users
• Creating shopper docks for short-term visits
• Reconfiguring portions of Wrigley Drive to improve circulation and boat-launch operations
Beach and Beach Recreation Improvements
The Lakefront Plan also identifies opportunities to enhance the public beach area while preserving
its character and increasing accessibility. Two concept options focus on making the beach more
welcoming, comfortable, and accessible for all users.
Recommended improvements include:
• New and expanded restroom and changing facilities
• Improved ADA access between the waterfront and beach
• Beach access mats and accessible pathways
• Enhanced entrance features and wayfinding
• Expanded seating and gathering areas
• Potential observation areas overlooking the lake
The Lakefront Plan encourages the City to consider new waterfront attractions that could enhance
family recreation and increase activity along the lakefront. One idea identified for future
consideration is the addition of floating water-play features. Any future attraction would need to
balance recreation, safety, maintenance costs, and impacts on the lake environment.
Executive Summary
11
Community Recreation and Programming
This element explores two related topics: the future of community recreation programming in
Lake Geneva and the potential development of a community center.
Key Recommendations for Recreation Programming
The plan finds that residents generally value the City's longstanding partnership with the Geneva
Lakes Family YMCA, but many believe there are opportunities to expand recreation offerings and
improve program quality. Community members expressed interest in a broader range of
opportunities beyond traditional youth sports, including arts, wellness, educational, environmental,
social, and senior-focused programming.
Goals and strategies for City-run recreational programming include:
• Expand recreation programming for underserved groups, including teens, adults, seniors, and
young families
• Broaden program offerings to include arts, fitness, nature education, cultural activities,
volunteer opportunities, community events, and wellness programs
• Improve the quality of sports programming through facility upgrades, improved equipment,
enhanced field conditions, and expanded opportunities for skill development
• Increase recreation opportunities at Veterans Park through additional programming,
tournaments, events, and park improvements
• Improve communication and marketing so residents are more aware of available programs
and opportunities
• Grow revenue sources through tournaments, concessions, and other activities to help support
future recreation investments
WHAT WE HEARD
• Residents generally value current
recreation offerings but desire a
broader variety of programs.
• Cost, scheduling, awareness, and
facility limitations were the most
frequently cited participation
barriers.
• Strong demand exists for senior
and adult programming, among
survey respondents.
• Interest extends beyond
traditional team sports to include
arts, wellness, nature-based,
educational, and social
programming.
• Respondents expressed mixed
opinions regarding the City's
recreation partnership model and
future role in program delivery.
WHAT THIS MEANS FOR THE PLAN
• Expand programming opportunities for
underserved age groups, particularly teens,
middle school students, adults, and seniors.
• Broaden recreation offerings to include arts,
nature, wellness, education, and
community-building activities.
• Expand opportunities to add programming
that serves young families – including
unique programs that encourage young
families to come to Lake Geneva
• Desires for volunteer opportunities indicate
interest in community connection and
giving back, most likely by seniors seeking
meaningful ways to spend their time.
• Improve communication and marketing of
available programs.
• Explore opportunities to strengthen
recreation partnerships while identifying
service gaps that are currently unmet.
LAND TO LAKE PLAN
12
Future Partnership Options
This element evaluates the strengths
and weaknesses of the current YMCA
partnership and presents several
potential paths forward:
1. Continue the existing YMCA
partnership
2. Renegotiate the partnership to
create a more financially equitable
arrangement
3. Offer City-led recreational programs
that fill gaps not currently served by
the YMCA
4. Transition to a fully City-operated
recreation program
Rather than recommending a single
option today, the plan suggests that the
City continue evaluating these
approaches while expanding recreation
opportunities and building its capacity
to play a larger role in programming if
desired in the future.
Community Center Potential
Public input indicated more support than opposition for a future community center. Residents
expressed interest in a facility that could provide year-round recreation, educational programming,
social opportunities, and community gathering space for people of all ages. Before pursuing a
community center, the City will need to conduct a detailed feasibility study to better understand
costs, operations, partnerships, and long-term financial sustainability of the project.
The plan identifies two locations for further evaluation:
• A new community center at Hillmoor, allowing a purpose-built facility designed around
modern recreation needs and future expansion.
• Reuse of the existing City Hall building if municipal functions relocate, with a recommendation
to complete a building reuse feasibility study to evaluate this option
Executive Summary
13
Paths and Trails Plan
The Paths and Trails Plan provides a vision for creating a more connected, accessible, and user-
friendly trail network throughout the City of Lake Geneva. The plan recognizes that trails are more
than recreational amenities. They help connect neighborhoods, parks, schools, businesses, and
community destinations while supporting health, tourism, and economic activity.
Public feedback showed strong support for expanding and improving the trail system, particularly
to better connect key destinations and provide safer, more accessible routes for walking, biking,
and rolling
Path and Trail Recommendations
STRATEGIC PRIORITIES FOR TRAILS & ACTIVE TRANSPORTATION
The following recommendations focus on expanding trail connectivity, improving access
to destinations, and enhancing the overall user experience throughout Lake Geneva.
Expand the
Trail Network
• Complete identified
trail gaps
• Extend neighborhood
connections
• Improve regional trail
access
OUTCOME:
More connected recreation
opportunities
Improve
Community
Connections
• Link neighborhoods to
parks
• Improve downtown
access
• Connect destinations
and activity centers
OUTCOME:
Safe and convenient
transportation choices
Enhance User
Experience
• Improve signage and
wayfinding
• Increase visibility of trail
routes
• Strengthen trail identity
OUTCOME:
Easier navigation and
greater trail use
LAND TO LAKE PLAN
14
Organizational Framework for the Parks Department
This organizational framework provides a roadmap for how the City of Lake Geneva can strengthen
its parks, recreation services, lakefront operations, and community amenities over time. The
framework calls for a gradual, phased approach that improves coordination, accountability, and
customer service while expanding recreation opportunities for residents.
Key Recommendations:
• Create a unified Parks & Recreation
Department to oversee parks, recreation
programs, waterfront facilities, events, and
special properties under a shared vision
• Expand recreation programming for
residents of all ages while continuing to
partner with organizations such as the
Geneva Lakes Family YMCA and other
community groups
• Improve customer service and
accountability by creating clear points of
contact, simplifying facility reservations, and
making recreation information easier to
access
• Evaluate park maintenance operations to
determine the most effective way to
manage maintenance, programming needs,
and long-term facility stewardship
• Establish dedicated leadership and staffing for recreation programming, waterfront
operations, events, and park management
• Adopt clear financial policies for program fees, facility rentals, partnerships, grants, and
capital investment to ensure long-term sustainability
• Prioritize accessibility, safety, and asset management across all parks, facilities, and
recreation services
• Continue investing in parks and facilities so that recreation opportunities and public
amenities keep pace with community needs
• Implement changes gradually over several years to allow the City to build capacity, maintain
service quality, and adapt as needs evolve
Implementation Plan
This element summarizes the prioritization process, outlines next steps for implementing the plan.
It also includes an Action Plan Matrix, which provides a detailed list and timeline of the major
actions that the City intends to complete in implementing the Land to Lake Plan.
Appendices
The appendices include necessary background information, many which are CORP requirements.
This section includes:
• Characteristics of the type of parks recommended in the CORP (Mini Parks, Neighborhood
Parks, Community Parts, etc.)
• Data inventory and analysis forming the basis for the Land to Lake Plan
• Review of existing plans and reports
• Natural resources inventory
• Detailed public input responses
• Table of potential funding sources to implement the plan
Existing Parks and Recreation Functions
i
DRAFT: NOVEMBER 2026
CITY OF LAKE GENEVA
ORGANIZATIONAL
FRAMEWORK
FOR THE PARKS & RECREATION
DEPARTMENT
Existing Parks and Recreation Functions
1
Table of Contents
Introduction and Existing Organizational Structure...................................................... 2
Existing Parks and Recreation Functions ......................................................................................................... 3
Organizational Transition Recommendations .............................................................................................. 5
Other Recommendations ......................................................................................................................................... 12
Conclusion .......................................................................................................................................................................... 13
Planning Assistance provided by:
LAND TO LAKE PLAN
2
Introduction and Existing
Organizational Structure
The City of Lake Geneva is in the process of
evolving its Parks & Recreation function from a
traditional park-maintenance model
associated primarily with Public Works toward
a more comprehensive Parks, Recreation &
Waterfront Department led by dedicated
professional parks and recreation leadership.
This evolution is a logical response to the
changing scope and complexity of the City's
parks and recreation responsibilities. The City
now manages a significant park system,
waterfront assets, recreational facilities, natural
resources, special-use properties, events, and
capital investments, while community
expectations for recreational programming
and outdoor opportunities continue to
increase.
The role of the Parks Director is consequently
evolving as well. As this position grows from
manager of park-related maintenance
activities to include all types of activities, the
Parks Director is increasingly becoming the
City's subject-matter expert and organizational
leader for the broader parks, recreation, and
waterfront system.
This distinction is important. The issue facing the City is not whether the previous organizational
structure has been effective. The previous structure served the City for many years and was
appropriate for the scope of services and responsibilities that existed when it was established. The
issue is whether that structure remains appropriate as the City's parks and recreation system
becomes larger and more diverse.
EVOLUTION OF THE EXISTING MODEL
The City's existing organizational model developed
over time around individual functions and
departmental responsibilities. This approach has
allowed the City to provide basic park
maintenance, recreation services, waterfront
operations, and other related functions through a
combination of City departments, staff positions,
boards, and external partners.
The City's responsibilities have now expanded
beyond a traditional park-maintenance function.
The combination of additional parkland, waterfront
responsibilities, recreational programming, special
properties, capital planning, natural-resource
management, events, and facility use creates a
more integrated parks and recreation system.
As these responsibilities expand, a function-by-
function organizational model can create
challenges in establishing consistent priorities,
coordinating resources, assigning accountability,
and providing a unified customer experience.
The City, therefore, has an opportunity to evolve its
existing structure into a more comprehensive
Parks, Recreation & Waterfront Department
without unnecessarily disrupting services that are
currently being provided effectively.
Existing Parks and Recreation Functions
3
Existing Parks and Recreation Functions
Although the organizational structure continues to reflect multiple departmental and operational
responsibilities, the City already performs most of the functions associated with a comprehensive
parks and recreation agency.
These functions include:
• Park System Management: Manage,
improve, operate, and plan for the City's
20-plus park sites and more than 400
acres of parkland.
• Park Maintenance and Operations:
Coordinate the maintenance of parks,
trails, recreational facilities, restrooms,
natural areas, and related assets. Public
Works currently retains responsibility for
park maintenance and construction.
• Recreation: Provide recreation primarily
through the City's relationship with the
Geneva Lakes Family YMCA.
• Lakefront Operations: Oversee the City's lakefront assets, including the boat launch, piers,
buoys, Riviera Beach, and related facilities through the Harbormaster. The Harbormaster now
reports to the Parks Director.
• Natural Resources and Forestry: Incorporate natural-resource management, forestry, and
environmental stewardship into park operations and long-range planning.
• Capital Planning: Develop long-range park plans, identify and prioritize capital improvements,
pursue grants, and guide investment in the park system.
• Events and Facility Use: Administer park reservations, event permits, facility scheduling, and
rules governing the use of public park spaces.
• Special Projects and Properties: Provide planning, management, and operational support for
properties and initiatives such as the Hillmoor planning effort as they become part of the City's
broader parks and recreation system.
Taken together, these responsibilities demonstrate that Lake Geneva already has the basic
components of a comprehensive parks and recreation agency. The organizational challenge is
increasingly one of integration, accountability, capacity, and coordination , rather than simply
defining what functions exist.
Community Input Implications
Recent community input provides an important indication of how residents view the City's parks
and recreation system and what they would like to see in the future. The community survey results
indicate interest in expanded and more diverse recreation programming, increased outdoor
opportunities, and continued exploration of a community center concept. (Full survey results are
found in the Appendix of this Plan)
The community input also identifies several areas of concern related to the existing park system,
including park maintenance, improvements to park amenities, and the prioritization of park
investments. These findings are important because they address both sides of the City's parks and
recreation responsibility: maintaining and improving the assets that currently exist while also
considering how the City can expand the programs and services available to residents.
The community survey should be viewed as one component of the City's broader decision- making
process. Survey results should be considered together with park usage, facility conditions,
demographic trends, financial resources, staffing capacity, capital requirements, and operational
demands.
LAND TO LAKE PLAN
4
The significance of the community input is that it demonstrates an expectation for the City's parks
and recreation system to continue evolving.
Residents are expressing interest in more recreational opportunities while also identifying the
need for improved maintenance, amenities, and investment in the existing park system. At the
same time, the City's responsibilities are expanding through additional parkland, waterfront
operations, special properties, capital projects, and other public assets.
Meeting these expectations will require more than additional programs or facilities. It will require
organizational capacity to plan, coordinate, operate, maintain, program, communicate, and
evaluate the City's parks and recreation system.
Organizational Accountability
As the City's parks and recreation responsibilities expand, the relationship between management
responsibility and operational authority becomes increasingly important.
The Parks Director is increasingly responsible for the planning, management, development, and
overall direction of the City's parks and recreation system. At the same time, certain operational
responsibilities, particularly park maintenance and construction, remain within Public Works.
This structure can be effective when responsibilities are clearly defined and communication is
strong. However, as the City expands recreation programming, increases park utilization, acquires
additional property, and invests in new facilities and amenities, the division of responsibilities
should be periodically evaluated to meet current organizational requirements.
The fundamental organizational question is whether the department responsible for planning and
managing the City's parks and recreation system also has sufficient operational authority and
resources to achieve the service levels established by the City and expected by citizens/customers.
This does not necessarily require an
immediate transfer of all maintenance
responsibilities. Rather, it establishes the need
for the City to evaluate the appropriate
alignment of planning, programming,
operations, maintenance, capital investment,
and asset management as the department
evolves.
Board of Park Commissioners
The City also has a Board of Park
Commissioners that advises the City Council
on parks, recreation, and related matters. The
Board has responsibilities involving park
policies, budgets, master planning, land
acquisition, and staffing.
As the department evolves, it will be important to maintain clear lines of responsibility among the
City Council, Board of Park Commissioners, City administration, and Parks & Recreation staff. The
Board should continue to provide policy guidance, community perspective, and oversight within
its established authority, while day-to-day administration, staffing, programming, operations, and
implementation remain the responsibility of City staff. Clear distinction between policy and
administration will become increasingly important as the scope of the Parks & Recreation
Department expands.
Recreation Service Delivery and YMCA Partnership
Lake Geneva has historically relied, in part, on its relationship with the Geneva Lakes Family YMCA
to provide sports and recreation services and utilize outdoor facilities.
Organizational Transition Recommendations
5
Under the existing arrangement, the City provides
direct financial support for sports and recreation
services and provides access to Veterans Park and
other City-owned outdoor facilities. The City also
bears significant maintenance and capital costs
associated with those facilities, while the YMCA
provides limited financial compensation to the City
through a concession fee and a portion of
tournament revenue.
The YMCA relationship has provided the City with
an established mechanism for delivering
recreational services without requiring the City to
directly provide programming.
However, as community expectations for expanded
and more diverse recreation opportunities increase, the City should evaluate the role of external
partnerships within the broader Parks & Recreation service-delivery model.
The question should not simply be whether the YMCA partnership should continue. Rather, the
City should determine how the YMCA and other potential partners can complement a municipal
recreation function and help the City reach a broader segment of the comm unity.
The City's agreement with the Geneva Lakes Family YMCA should also be periodically reviewed.
The review should consider:
• Community utilization
• Service duplication or gaps
• Financial contributions by each organization (cost-benefit analysis)
• Facility use
• Maintenance responsibilities
• Capital investment and asset replacement
• Program accessibility
• Cost recovery
• Long-term community recreation objectives
The community survey results, particularly the level of reported YMCA participation, suggest that
the City should evaluate whether the current partnership structure provides the broadest possible
community benefit. This topic is detailed in the Community Recreation and Programming
element of the Land to Lake Plan.
Organizational Transition Recommendations
Transition to a Comprehensive Department
The City's current organizational evolution presents an opportunity to establish a more integrated
Parks & Recreation Department while maintaining continuity of existing services. The objective
should be to align organizational responsibility with community expectations and operational
requirements.
A comprehensive department would provide a single organizational framework for parks,
recreation, waterfront operations, natural resources, events, facility use, capital planning, and
related public assets.
The transition should be deliberate and incremental, allowing the City to evaluate staffing, financial
requirements, interdepartmental responsibilities, external partnerships, operational performance,
and customer experience as additional functions are brought together.
LAND TO LAKE PLAN
6
This approach recognizes that the City's parks and recreation system is no longer simply a
maintenance function. It is an increasingly important component of the City's public infrastructure,
community services, quality of life, and long-term investment strategy.
The objective should not simply be to create a larger department. Rather, the objective should be
to establish a clear, accountable, and coordinated organizational structure capable of delivering
high-quality parks and recreation services while responsibly managing public resources.
The current departmental structure provides an appropriate foundation for this transition.
Expansion of the existing department should occur incrementally and should ultimately integrate
or coordinate:
• Parks operations and maintenance
• Recreation programming
• Waterfront and marina management
• Special-use properties such as Hillmoor
• Riviera facilities and related operations
• Park and facility scheduling
• Natural resources and forestry
• Capital planning and asset management
• Community events and partnerships
As the role and responsibilities of the department expand, several organizational issues should be
addressed.
Key Organizational Issues:
• Incremental versus immediate structural and operational change
• Interdepartmental relationships and clarification of responsibilities
• External partnerships and contractual relationships
• Creation of distinct Parks and Recreation functions within one department
• Staffing and workforce development
• Budget and financial responsibility
• Cost recovery and revenue generation
• Customer experience and service accessibility
• ADA compliance and accessibility
• Safety and risk management
• Asset management and capital replacement
• Long-range planning and service evaluation
Organizational Transition Recommendations
7
Recommendations
Implement an Incremental Organizational Transition
The City should pursue incremental organizational change rather than attempting to restructure
all parks and recreation functions simultaneously. An incremental approach will provide the Parks
& Recreation Director with the opportunity to establish operational systems, clarify responsibilities,
evaluate staffing needs, and measure results before additional changes are implemented. This
approach will also allow employees, partner organizations, policymakers, and the public to
understand and adapt to changes in responsibilities and service delivery.
The addition and expansion of recreation programming will represent a significant change in the
City's role. Implementing these changes in stages will reduce disruption and allow the City to
evaluate program participation, financial performance, staffing requirements, and customer
response.
Clarify Interdepartmental and External Responsibilities
As the Parks & Recreation Department assumes broader responsibilities, clear communication and
defined roles among City departments will become increasingly important. One of the most
significant areas for future operational relalignment is the current Public Works Department and
its responsibilities as related to park maintenance and construction. As the Parks and Recreation
Department takes on a broader scope of responsibility, it will become increasingly more difficult
for Public Works to adequately service the seven-days-a week responsibility that comes with a
comprehensive Parks & Recreation Department dedicated to customer experience, including
evening and weekend events.
The existing arrangement will continue to provide value in the short term. However, as recreation
programming increases, park utilization expands, and the City adds parkland and facilities, the
operational relationship between Parks & Recreation and Public Works should be evaluated
accordingly. Over time, it may become appropriate to transition park maintenance and related
operational responsibilities to the Parks & Recreation Department.
Such a transition would place planning, programming, operations, maintenance, asset
stewardship and customer experience under a more unified organizational structure. This would
allow the department to establish a shared vision for the park system and crea te greater
accountability for the condition, appearance, functionality, and customer experience associated
with City parks.
Any transition should be based on workload, staffing, equipment, cost, service -level expectations,
customer service and demonstrated operational need rather than organizational preference alone.
Estimated Timeline for Incremental Organization Transition
The City should implement the Parks & Recreation organizational transition through a phased 24 -
to 36-month process. The purpose of the phased approach is to align organizational change with
demonstrated workload, community demand, staffing capacity, finan cial resources, and
operational performance.
The transition should not require all parks, recreation, waterfront, and maintenance functions to be
reorganized simultaneously. Instead, the City should establish the organizational foundation first,
develop recreation capacity, evaluate operational responsibilities, and then integrate additional
functions as appropriate.
Phase 1 — Establish the Foundation for Transition | Months 0–6
The City should establish clear organizational responsibilities and develop a baseline
understanding of the existing parks and recreation system. Activities should include clarification of
the roles of the Parks & Recreation Director, City administration, Common Council, Board of Park
Commissioners, Public Works, and other departments; an inventory of parks and facilities; an
LAND TO LAKE PLAN
8
assessment of staffing and operating costs; identification of current recreation services and
providers; and establishment of initial performance measures.
Phase 2 — Build Recreation Capacity | Months 6–12
The City should develop the capacity to provide and coordinate a broader range of recreation
services. This phase should include evaluation of Recreation Supervisor staffing, development of
initial municipally-run recreation programs, establishment of registration and scheduling
procedures, development of marketing and community outreach, and evaluation of existing
recreation partnerships, including the YMCA.
Phase 3 — Evaluate Operational Alignment | Months 12–18
The City should conduct a formal evaluation of the existing Public Works/Parks & Recreation
operating relationship. The evaluation should examine workload, staffing, equipment, fleet, costs,
service levels, seasonal demands, facility conditions, response t imes, and customer service. The
objective should be to determine whether park maintenance and related operational
responsibilities should remain within Public Works, transition to Parks & Recreation, or operate
through a defined hybrid model.
Phase 4 — Integrate Appropriate Functions | Months 18–24
Based on the findings of the operational
evaluation, the City should integrate
appropriate functions under the Parks &
Recreation Department. Potential areas
include park maintenance, seasonal staffing,
facility scheduling, park reservations,
waterfront operations, special-use properties,
asset management, and capital planning.
Phase 5 — Evaluate | Months 24–36
The City should conduct a formal review of the
new organizational structure after sufficient
operating experience has been established.
The review should examine service levels,
recreation participation, customer satisfaction,
operating costs, cost recovery, staffing, facility conditions, capital needs, and interdepartmental
coordination. Adjustments should be made based on measurable results rather than
organizational assumptions.
The phased approach provides the City with an opportunity to make meaningful organizational
progress while maintaining service continuity and avoiding unnecessary disruption. Each phase
should have defined objectives, responsible parties, anticipated costs , and measurable outcomes
before proceeding to the next phase.
It will be important to maintain a flexible timeline based on conditions. A phased approach is much
more credible for a municipal organizational change. It also gives the City Council an opportunity
to make decisions based on actual workload, cost, and performance information rather than
committing today to an organizational structure that may look different after the first year .
Organizational Transition Recommendations
9
Establish a Distinct Parks and Recreation Operating Structure
The future Parks & Recreation Department should maintain distinct Parks and Recreation
functions while operating under one department and one accountable department head.
A potential organizational structure is outlined below:
A. Director of Parks & Recreation: Department Leadership and Administration
The Director should serve as the City's principal subject matter expert for parks, recreation,
waterfront operations, and related public assets.
B. Parks Supervisor: Parks Operations and Maintenance
• Parks Operations and Maintenance
• Park maintenance and operations
• Equipment maintenance
• Fleet management
• Playground inspections and installation
• Athletic field maintenance
• Landscape and grounds management
• Natural-resource coordination
• Capital project supervision
• Seasonal workforce supervision
• Park safety and operational standards
The Parks Supervisor would provide day-to-day operational leadership for the physical park system
and would coordinate closely with the Director on maintenance standards, capital needs, asset
management, and long-range park planning.
C. Recreation Supervisor: Recreation and Community Programming
• Recreation and Community Programming
• Program development and administration
Director of Parks &
Recreation
Department Leadership
Parks
Supervisor
Parks Operation &
Maintenance
Recreation
Supervisor
Community
Recreation
Programming
Harbormaster
Lakefront & Marina
Operations
Events
Manager
Community Events &
Partnerships
Administrative
Assistant /
Clerical
Registration &
Customer Support
Seasonal
Employees
Operational Support
LAND TO LAKE PLAN
10
• Senior, youth, adult, and family programming
• Special events
• Facility scheduling
• Volunteer coordination
• Sponsorship development
• Marketing and promotion
• Community outreach
• Program evaluation
• Partnership coordination
The Recreation Supervisor would provide
dedicated leadership for expanding the City's
direct recreation programming and would
allow the city to develop services based on
community needs rather than relying
primarily on external providers.
D. Harbormaster
• Harbor and Marina Operations
• Boating Safety and Regulatory
Compliance
• Facility and Asset Management
• Financial and Administrative Management
• Customer Service and Public Relations
• Staff and Seasonal Employee Supervision
• Environmental Stewardship and Lake Protection
• Winter and Off-Season Responsibilities
• The Harbor Master is responsible for the daily management, safe operation, maintenance, and
administration of the City's municipal harbor and boating facilities.
E. Events Manager
• Sales & Booking
• Event coordination
• Vendor Management
• Financial Management
• Marketing & Sales Development
• Assist with City-Wide events
• Serve primarily as the manager of the Riviera Ballroom and other large event spaces, with
crossover responsibilities for citywide events
F. Administrative Assistant / Clerical Support
Responsibilities could include:
• Registration and customer service
• Scheduling
• Permit and reservation administration
• Financial and purchasing support
• Recordkeeping
• Communications
• Departmental administrative support
Administrative support should be provided on a full- or part-time basis based on demonstrated
workload.
Organizational Transition Recommendations
11
G. Seasonal Employees
Seasonal employees should continue to provide operational support based on seasonal workload,
programming demands, and park utilization.
Establish Clear Budget and Financial Expectations
Budget and financial management will be a critical component of the department's restructuring.
A more comprehensive Parks & Recreation Department will likely result in additional operating
costs, particularly as the City expands direct recreation programming and assumes additional
operational responsibilities. However, the evaluation of these costs should occur in the context of
the level and quality of service delivered to the community.
City policymakers and staff should establish clear expectations regarding general fund support,
program cost recovery, user fees, facility fees, sponsorships, grants, partnerships, capital funding,
asset replacement, and desired levels of public subsidy. For instance, the Recreation Supervisor
position could be funded by recreation-related fees, the Harbormaster could continue to be
funded through lakefront revenue streams, and the Event Manager position could be funded
through Riviera Ballroom bookings and through continued partnership with the Tourism
Commission. The Parks Supervisor position could be funded by the City budget and offset by park
use fees, grants, and other sources. City policymakers and staff should continue to develop a
funding framework to support the department’s restructuring.
A key policy question will be the appropriate balance between cost recovery and public benefit.
Not every park and recreation service should necessarily be self-sustaining. Some services
provide a broad public benefit and may appropriately receive significant public support. Other
programs may reasonably be expected to recover a greater portion of their direct costs. The City
should therefore establish a formal cost-recovery philosophy that identifies which services are
expected to generate revenue and which services are primarily supported as community benefits.
The department should also be expected to operate within its adopted budget while actively
pursuing grants, sponsorship opportunities, appropriate user fees, and other revenue sources.
Focus on Customer Experience
The proposed Parks & Recreation structure should
ultimately be evaluated by its ability to improve
customer experience.
A single department responsible for parks,
recreation, waterfront operations, and related
services provides the opportunity for clearer
accountability and more coordinated service
delivery.
Residents should have a clear understanding of:
• Who manages the City's parks
• Who develops recreation programs
• Who handles facility reservations
• Who is responsible for park conditions
• Who manages waterfront facilities
• Where to obtain information
• How to provide feedback
• How the City prioritizes improvements
LAND TO LAKE PLAN
12
The department should establish measurable service expectations and periodically evaluate
customer satisfaction, participation, facility conditions, program performance, and community
needs.
Address Accessibility, Safety, and Risk Management
As the City expands programming and assumes greater responsibility for parks and recreational
facilities, accessibility and safety should be incorporated into departmental planning and
operations.
The department should establish consistent processes for:
• ADA accessibility
• Playground inspections
• Facility safety
• Risk assessment
• Emergency procedures
• Event safety
• Waterfront safety
• Staff training
• Incident reporting
• Preventive maintenance
Accessibility and safety should be viewed not simply as compliance requirements, but as
fundamental components of a quality parks and recreation system.
Other Recommendations
Recreation Programming
As noted above, the community’s expressed interest in additional and more diverse recreation
programming suggests an opportunity for the City to expand its role as a direct provider and
coordinator of recreation services.
A broader recreation function would allow the City to evaluate community needs, develop
programs, coordinate facilities, establish partnerships, market available opportunities, and
measure participation and customer satisfaction.
This does not mean that the City should replace the YMCA or other existing private, nonprofit, or
community-based providers. Rather, the City should establish the organizational capacity to
identify gaps in recreation services and determine where direct municipal programming,
partnerships, or other service-delivery approaches can provide the greatest community benefit.
Specific recommendations are provided in the Community Recreation and Programming portion
of the Land to Lake Plan.
Parks, Facilities and Capital Priorities
Community input also identifies the continued importance of the City's existing park system.
Concerns regarding maintenance, park amenities, and the prioritization of improvements indicate
that residents are not simply seeking additional programs; they als o expect the City to maintain
and improve the physical assets that support those programs. This creates an important
organizational consideration. Expanded programming and increased park use will place additional
demands on facilities, maintenance, scheduling, safety, and capital planning. As the City acquires
additional open space and considers investments in existing and new facilities, the Parks &
Recreation Department will need sufficient organizational capacity to evaluate needs, establish
priorities, coordinate improvements, and manage the resulting increase in use. Specific
recommendations for park facilities investments are provided in the Comprehensive Outdoor
Recreation Plan portion of the Land to Lake Plan.
Conclusion
13
Creation of a Parks Foundation
It is recommended that the City establish an independent, nonprofit 501 (c)(3) Parks Foundation to
support, enhance, and expand the City's parks, recreational facilities, programs, special events, and
community amenities. Creation of a Parks Foundation represents an opportunity to increase the
City’s ability to expand and improve parks, recreation facilities and community experiences
without placing the entire burden on the taxpayers.
The Foundation's mission would be to generate private and public financial support, community
involvement, and partnerships that enhance the parks and recreation system. A not-for-profit
foundation will also allow for access to philanthropy and grants that might otherwise be
unavailable for units of local government.
The Foundation would serve as a private-sector fundraising and community partnership
organization dedicated to improving the quality of life for residents and visitors. It would provide an
additional funding source for projects and initiatives that may not be f ully funded through the
City's annual operating budget or traditional capital improvement program.
The Foundation would complement, not replace, the City's financial responsibility for maintaining
and operating its parks and recreation system.
Foundation would be established as a separate 501(c)(3) charitable organization , governed by an
independent volunteer board of directors working in partnership with the City Parks and
Recreation Department.
Conclusion
Lake Geneva's parks and recreation system is
evolving from a traditional park-maintenance
model into a more comprehensive system
involving parks, recreation, waterfront
management, natural resources, capital
planning, community programming, and
increasingly complex public assets.
The City has an opportunity to address this
evolution proactively by establishing a clear
organizational framework rather than
continuing to add responsibilities to a structure
designed for a different level of service.
The recommended approach is an incremental
transition to a comprehensive Parks &
Recreation Department, with clear departmental leadership, distinct Parks and Recreation
functions, defined interdepartmental responsibilities, appropriate staffing, and measurable
financial and service expectations.
The goal is not simply to create a new organizational structure. The goal is to create a department
capable of planning for the City's long-term needs, managing its public assets responsibly,
responding to community demand, expanding recreational opportunities, and providing residents
and visitors with a consistent, accessible, and high-quality parks and recreation experience.
Table of Contents
i
w
P
DRAFT: NOVEMBER 2026
CITY OF LAKE GENEVA
PATHS AND
TRAILS PLAN
CONNECTING PEOPLE TO
PARKS, NATURE, AND ONE
ANOTHER
Table of Contents
i
Table of Contents
Introduction .................................................................................................................................... 1
Why Trails Matter ......................................................................................................................... 1
Community-Wide Benefits of Trails ..................................................................................... 2
Existing Conditions .................................................................................................................... 4
Figure 1. Existing Multi-Use Paths and Designated Routes .................................................................................. 6
Existing and Recommended Trails Map ............................................................................................................................. 7
Public Participation Findings ..................................................................................................8
Types of Recommended Bicycle and Pedestrian Facilities .........................................8
Goals and Strategies ................................................................................................................... 9
Bicycle and Pedestrian Recommendations ..................................................................... 11
Strategic Priorities for Trails & Active Transportation ................................................................................................ 11
Planning Assistance provided by:
Paths and Trails Plan
1
Paths and Trails Plan
Introduction
Lake Geneva's unique natural setting, vibrant
downtown, and exceptional recreational
amenities make it a destination for residents
and visitors throughout the year. Trails play a
vital role in supporting this identity by providing
opportunities for recreation, exercise,
transportation, and exploration while
connecting people to the community's parks,
neighborhoods, schools, businesses, and natural
resources. As interest in outdoor recreation
continues to grow, a well-planned and
connected trail network has become an
essential component of maintaining Lake
Geneva's high quality of life and strengthening
its appeal as a premier destination community.
Why Trails Matter
Trails provide benefits that extend far beyond
recreation. They create safe and accessible
routes for walking, bicycling, running, and other
non-motorized activities, offering residents and
visitors alternatives to automobile travel. In
popular destinations such as Lake Geneva,
expanding trail connectivity can help alleviate
traffic congestion, reduce parking demand in
busy areas, and improve safety for pedestrians
and bicyclists.
26
mile
Geneva
Lake Shore
Path
19
mile
White
River State
Trail
5
designated
bike routes
0
on-street
bike lanes
today
THE BIG IDEA
Lake Geneva's setting, downtown, and recreation
draw visitors all year. A well-planned, connected
trail network links parks, neighborhoods, schools,
businesses, and natural resources, and keeps the
city a premier destination community as interest in
outdoor recreation grows.
THE GAP
Residents describe a network that is fragmented,
poorly signed, and unsafe in key places.
Sidewalks are missing in newer neighborhoods, no
on-street bike lanes exist, and many routes do not
reach schools, downtown, or Big Foot Beach State
Park.
LAND TO LAKE PLAN
2
Community-Wide Benefits of Trails
Trails and paths provide tangible benefits to communities across the country as they promote
physical and mental health, offer inclusive and equitable outdoor recreation opportunities,
stimulate economic development, and provide sustainable transportation infrastructure. Together,
these benefits increase the local quality of life for all residents and visitors of the community.
Physical & Mental Health
• Living near bicycle and
pedestrian infrastructure
is associated with higher
levels of regular physical
activity.
• Studies have found
measurable links
between trail access and
improved physical health
outcomes.
• Spending time outdoors
can improve mental
health, reduce stress, and
promote overall well-
being.
• Proximity matters. Many
documented health
benefits are associated
with residents living
within approximately two
miles of a trail
Equity
• Trails improve access to
outdoor recreation
opportunities for people
of all ages, abilities, and
backgrounds.
• Connected trail systems
can strengthen
community cohesion and
improve quality of life.
• Access to trails and
recreation amenities is an
important factor in where
people choose to live,
work, and play.
• Trails help expand
opportunities for
underserved populations
to participate in outdoor
recreation
Sustainable
Transportation
• Trails connect
neighborhoods,
destinations, parks,
schools, and commercial
areas.
• Well-connected trail
networks provide
alternatives to automobile
travel and support active
transportation.
• Trails can spark local and
regional economic activity
by attracting residents
and visitors.
• Expanding trail
infrastructure can help
reduce vehicle trips, lower
emissions, and support
environmental
sustainability
Sources: American Journal of Public Health (2014); American Heart Association (2017); University of Exeter
(2019); American Trails (2022).
Paths and Trails Plan
3
Residents benefit from trails in numerous
ways:
• Access to safe and convenient trails
promotes physical activity, improves
public health, and provides
opportunities for people of all ages
and abilities to enjoy the outdoors.
• Trails enhance mobility and
independence for individuals who may not
drive, including youth, older adults, and
people with disabilities.
• Research has also shown that proximity to
trails and recreational amenities can increase
property values and make communities more
attractive places to live and work.
• As demographic trends, transportation
preferences, and recreational interests
continue to evolve, providing a
comprehensive trail network will become
increasingly important to meeting
community needs.
Additionally, communities throughout Wisconsin
have demonstrated that investments in trails and
active transportation infrastructure generate
substantial economic benefits.
• Trails attract visitors who support local
businesses, restaurants, lodging
establishments, and recreational outfitters.
• Enhanced visitor experience by allowing
people to explore destinations without relying
exclusively on cars. The Geneva Lake Shore
Path is an example of such a trail – it attracts
visitors and provides a unique experience only available on foot.
• A connected trail system also reinforces Lake Geneva's reputation as a resort community,
encouraging repeat visits and helping sustain tourism-related economic activity.
• In addition, trails contribute to community vitality by increasing foot traffic in commercial
districts and creating attractive public spaces that support local commerce.
$1 → $3
saved in medical
costs per $1
invested in trails
(AHA, 2011)
2 hrs
a week outdoors
improves
mental health
2 mi
typical distance
from trail for
people studied
Hidden Woods Trail
KEY FINDING
In sum, by encouraging active transportation
and providing enjoyable outdoor experiences,
trails help create a more connected, livable, and
resilient community.
LAND TO LAKE PLAN
4
Existing Conditions
Existing Pedestrian Paths and Trails
Path or Trail Length What to know
Duck Lake Nature
Area Trail 1.75 mile
The Duck Lake Nature Area Trail begins at a
trailhead in Edgewood Hills Park on the far
northwest side of Lake Geneva. From there, the
trail continues west within the Town of Geneva,
following the southern edge of Lake Como until
it reaches South Shore Drive in Como. This trail is
not paved and is intended for pedestrians only.
Geneva Lake Shore
Path
26 miles
(about 3.25 miles
within city limits)
The Geneva Lake Shore Path is a pedestrian-only
path that surrounds Geneva Lake. The trail
provides public access to the lakeshore and
provides a unique view of the lake and some of
the city’s finest historic architecture.
Private property owners are responsible for
maintaining the trail area adjacent to their
property. There are areas of the trail that are not
accessible, particularly for young children or
people with mobility concerns. The path also has
few public access points.
White River Walkway About 1,000 feet
This paved sidewalk follows the White River in
the downtown. It begins at the lakefront at Flat
Iron Park, continues through Donian Wetland
Nature Preserve and terminates at Main Street.
From here, users can cross Main Street and
access Hillmoor Zone 1.
White River State Trail
(Walworth County) 19 miles
The White River Trail is a former rail corridor that
connects Elkhorn in Walworth County and Dover
in Racine County. The trail passes less than five
miles from Lake Geneva. A potential connection
from Downtown Lake Geneva to the off-street
path along Edwards Boulevard and on to the
State Trail would address a critical gap in the
existing trail network.
Internal Trail
Networks Varies
Internal trail networks within many City park,
including Hillmoor Zone 1, Flat Iron Park,
Veterans Park, Donian Wetland Nature Preserve,
and Fermano Park.
Paths and Trails Plan
5
Existing Multi-Use Paths and Trails
Several trail routes can be found throughout Lake
Geneva, which the City has designated as the Blue,
Brown, Green, Red, and Yellow Routes. The Blue Route
runs from downtown Lake Geneva towards the
southeast, primarily using a former railroad bed that is
separate from the road network. While most of this
route features off-street paths, it contains a few road
crossings and short distances where users must ride on
streets with low traffic. The Brown Route follows part of
South Street and Bloomfield Road, and the Green
Route follows Townline Road. Both the Brown and
Green Routes consist entirely of off-road trails, with
occasional road crossings. Similarly, the Red Route is an
off-street path, and it follows Edwards Boulevard from
County Highway H to East Sheridan Springs Road.
Finally, the Yellow Route connects neighborhoods and
the business park to Hillmoor Heights and Veterans
Park.
While these routes tend to separate bicycle and
pedestrian users from high-traffic, high-speed roads,
many of them do not directly connect major
destinations such as schools, downtown Lake Geneva,
and Big Foot Beach State Park. Some of the existing routes require users to navigate between
separate trails and on-street facilities. Opportunities exist to upgrade these facilities while adding
new trails and sidewalks where gaps exist.
Existing Sidewalks
While some neighborhoods are well served by sidewalks, other areas have limited walkability. The
City maintains an inventory of existing sidewalks and paths. Sidewalks are provided in many of the
older neighborhoods north of Main Street but are lacking in comparatively newer subdivisions
south of Campbell Street and on the west side of the City. Residents of these neighborhoods lack
safe walkable connections to schools, shopping, jobs, and other nearby destinations.
Existing On-Street Bicycle Facilities
There are currently no on-street bicycle lanes within the City.
Geneva Lake Shore Path
Signage
LAND TO LAKE PLAN
6
FIGURE 1. EXISTING MULTI-USE
PATHS AND DESIGNATED ROUTES
KEY FINDING
Blue Route: Runs from
downtown southeast
along a former railroad
bed separate from the
road network. Mostly off-
street, with a few road
crossings and short low-
traffic street segments.
Brown Route: Follows
part of South Street and
Bloomfield Road. Entirely
off-road trail with
occasional road crossings.
Green Route: Follows
Townline Road. Entirely
off-road trail with
occasional road crossings.
Red Route: Off-street
path along Edwards
Boulevard from County
Highway H to East
Sheridan Springs Road.
Yellow Route: Connects
neighborhoods and the
business park to Hillmoor
Heights and Veterans
Park.
Paths and Trails Plan
7
EXISTING AND RECOMMENDED TRAILS MAP
LAND TO LAKE PLAN
8
Public Participation Findings
A common theme in the community survey was a desire
for expanded trail connections, particularly at Hillmoor.
The community survey also included a question about the
biking and walking trail network in Lake Geneva. When
asked if they felt that the trail network adequately
connects them to destinations to which they would like to
walk or bike, nearly 45% of respondents indicated that it
did, while nearly 36% of respondents indicated that it did
not. About 19% selected “not applicable.”
Those who felt that the network needed improvement
conveyed a strong and consistent perception that Lake
Geneva's walking and biking network is fragmented,
lacking clear signage, insufficiently maintained, and does
not safely connect many key destinations. The most
frequent concerns centered on missing connections to
Hillmoor, downtown, schools, shopping areas, Veterans
Park, and residential neighborhoods, along with safety
concerns on major roadways such as Highway 50,
Highway 120, Wells Street, Edwards Boulevard, and
Lakeshore Drive.
Many respondents also expressed concern about
deteriorating trail conditions, dangerous road crossings,
limited bike lanes, and inadequate accommodations for
pedestrians, bicyclists, and individuals with disabilities. A
recurring recommendation was to create a more
comprehensive and connected system that links parks, neighborhoods, schools, commercial areas,
and regional trail networks.
Conversations in focus groups echoed some of these sentiments, noting a need for flat, well
maintained accessible trails, noting a need for improvement to existing trails at Veterans Park and
behind the YMCA.
Types of Recommended Bicycle and Pedestrian Facilities
The following types of facilities are depicted on the Existing and Recommended Trails Map.
Planned Off-Street Multi-Use Paths
Off-Street Multi-Use Paths, sometimes referred to as “trails,” accommodate two-way bicycle,
pedestrian, and other nonmotorized travel on a paved or gravel surface. As paths are completely
separated from vehicular traffic, they are among the safest facilities and tend to be the preferred
choice of recreational users and users of all ages or abilities.
Multi-use paths are typically 10 to 14 feet wide. They may share a right-of-way with a nearby road, or
they may be located entirely within their own right-of-way. A center stripe may be added to the
center of these paths, and careful design should minimize the number of dangerous road
crossings that path users will encounter.
45%
Said the
network
connects
them to the
places they
want to go
36%
Said it
does not
19%
Not
applicable
Community survey: Does the trail network
adequately connect you to destinations
you would like to walk or bike to?
WHAT WE HEARD
Participants called for flat, well-
maintained, accessible trails and
noted the need to improve existing
trails at Veterans Park and behind the
YMCA. A recurring recommendation
was a more comprehensive,
connected system linking parks,
neighborhoods, schools, commercial
areas, and regional trail networks.
Paths and Trails Plan
9
Planned On-Street Bike Facilities
This category includes both bicycle routes and bicycle lanes. Bicycle routes are existing streets
where biking is encouraged. Typically, there is no additional infrastructure other than signage that
identifies the route. These routes should primarily consist of low-speed, low-traffic streets that
divert cyclists away from higher-speed roads through quiet neighborhoods.
Bicycle lanes are recommended for higher-traffic streets. They may include a painted white stripe
a minimum of five feet in width along a roadway. The best practice is to provide protected bicycle
lanes which provide a vertical barrier between the bicycle lane and vehicular lanes. In some cases,
bicycle lanes can be added to an existing road simply by restriping the road and installing the
barrier. In other cases, more width is needed, requiring the redesign of the roadway to
accommodate bicycle lanes.
Regional Tourism Connections
Regional tourism connections are routes that
are integrated into existing rural roads that
connect the City of Lake Geneva to other
nearby communities. They are included in this
plan due to their relationship with Lake
Geneva’s tourism and parks and recreation
economy. On the southeast side of the site,
the former rail line presents an opportunity to
connect to Genoa City. Regional tourism
connections are primarily signed bicycle
routes, although bike lanes and multi-use
paths may be incorporated where feasible. As
rural roads may not be wide enough for on-
street bike lanes, routes may share the road
with vehicular traffic in certain stretches.
These connections would typically be used by
confident and experienced bicyclists. Regional routes should be identified with signage so that
tourists can easily follow the route and navigate between communities.
Goals and Strategies
Goals:
Love Lake Geneva heart
sculpture and destination photo
attraction at Riviera Beach
������������������ INTERCONNECTED TRAIL NETWORK
GOAL 1 : Maintain and expand a safe, accessible,
and interconnected trail network to connect the
City’s park and recreation system to areas of activity,
regional destinations, and community
neighborhoods.
�����������������������������TRAIL-BASED TOURISM
GOAL 2 : Encourage trail based
tourism as an economic
development tool.
LAND TO LAKE PLAN
10
Strategies:
• Establish wayfinding signage to allow residents or visitors to effectively travel throughout the
City on foot or bicycle.
• Work with neighboring jurisdictions, Walworth County, and the state to coordinate trails
planning and planning for potential future trail corridors through multiple communities and
jurisdictions.
• Prioritize bicycle and pedestrian paths and routes that link City parks to one another.
• In new neighborhoods, plan for multi-use paths linking the neighborhood to the rest of the City
and to planned parks and open space facilities.
• New trails should be paved, relatively flat, and a minimum width of five feet to meet ADA
standards. Existing unpaved trails should be paved to meet ADA requirements, as funding
allows.
• Amend the municipal code to allow e-bikes, e-scooters, and similar mobility devices on City
trails and paths; consider speed limits or other safeguards to promote safety for all users
Wayfinding & User Experience
• Encourage group cycling, running, and walking events in the City.
• Create a user-friendly bike and trail map for tourists and residents. Post the map on the City
website and on partner websites.
• Maintain paths so that they remain enjoyable and safe for all users and ADA accessible.
• Encourage public awareness of the City’s parks, trails, outdoor recreational facilities, and other
bicycle and pedestrian facilities by promoting them through maps, signage, and other
materials.
Tourism & Implementation
• Utilize grants, fundraising campaigns, and other funding sources as well as the City’s 5-year
Capital Improvements Plan to pursue and implement the recommendations of this Plan.
• In new neighborhoods, plan for multi-use paths linking the neighborhood to the rest of the City
and to planned parks and open space facilities.
�� TRAIL NETWORK & CONNECTIVITY
������� WAYFINDING & USER EXPERIENCE
�����������������������������TOURISM & IMPLEMENTATION
Paths and Trails Plan
11
Bicycle and Pedestrian Recommendations
STRATEGIC PRIORITIES FOR TRAILS & ACTIVE TRANSPORTATION
The following recommendations focus on expanding trail connectivity, improving access
to destinations, and enhancing the overall user experience throughout Lake Geneva.
In 2018, the City of Lake Geneva adopted the City’s first Bicycle and Pedestrian Plan. Many of the
recommendations of that plan are carried forward into the Land to Lake Plan and are represented
on the Existing and Recommended Trails Map.
Recommended Trail and Trailhead Improvements:
• Maintain and enhance the Duck Lake Trail
trailhead at Edgewood Hills Park.
• Incorporate new trailheads along the White River
in Hillmoor Zones 1-5. Replace the gate near Main
Street to allow people walking, biking and rolling
to access the Hillmoor trails but not cars. Add
signage to encourage public use of the Hillmoor
trails.
• Ensure a safe pedestrian connection between
downtown and Hillmoor Zone 1 via the White
River Walkway and Main Street. Seek
opportunities to improve pedestrian crossings of
Main Street. Add signage identifying the White
River Walkway and directing users to Hillmoor.
• Add a new trailhead at Veterans Park and on the path behind the YMCA.
• Connect the trails in Hidden Woods to existing trails on Edwards Boulevard and Townline Road
• If the City grows to the southwest, plan for multi-use paths linking the neighborhood to the
rest of the City and to planned parks and open space facilities.
Additionally, the Existing and Recommended Trails Map reflects WisDOT’s WIS 50 (Main Street)
project, which will involve the construction of a 10-foot wide shared-use path on the north side of
Main Street between Curtis Street and Edwards Boulevard. The project, which is planned for 2027-
2028, will also include rapid rectangular flashing beacons at key pedestrian crossings along Main
Street to increase pedestrian safety and connectivity.
GATEWAYS TO TRAILS
Trailheads provide welcoming
gateways to the trail system, offering
parking, amenities, and essential
information. Strategically locating
trailheads throughout the trail
network improves access, enhances
user safety and comfort, and helps
connect residents and visitors to
parks and other local destinations.
Expand the
Trail Network
• Complete identified
trail gaps
• Extend neighborhood
connections
• Improve regional trail
access
OUTCOME:
More connected recreation
opportunities
Improve
Community
Connections
• Link neighborhoods to
parks
• Improve downtown
access
• Connect destinations
and activity centers
OUTCOME:
Safe and convenient
transportation choices
Enhance User
Experience
• Improve signage and
wayfinding
• Increase visibility of trail
routes
• Strengthen trail identity
OUTCOME:
Easier navigation and
greater trail use
LAND TO LAKE PLAN
12
Regional Trail Connections
Lake Geneva is positioned to access several
regional tourism and recreation destinations.
Surrounding regional trails include the Duck
Lake Nature Trail and the White River State
Trail. A regional trail system that connects the
City to other Walworth County communities,
as recommended in the Lake Geneva Bicycle
and Pedestrian Plan, would enhance Lake
Geneva’s tourism economy. Such a network
would also provide recreational and active
transportation opportunities that make Lake
Geneva an attractive place to live for current
and future residents. These are indicated as
Regional Connectors on the Existing and
Recommended Trails Map.
Wayfinding and Pathway Identification System
The ability to navigate a community safely and effectively is just
as important as providing infrastructure to facilitate travel. A key
to improving bicycle and pedestrian navigation throughout
Lake Geneva can be accomplished by increased signage,
particularly through wayfinding signage that directs users to
key destinations and better identifies destinations and
amenities in the City. Bicycle and pedestrian-oriented signage
assists not only users in finding and navigating bike routes, bike
lanes, and trails, it also helps notify drivers of areas where those
users are more prevalent. Additionally, providing important
destination-oriented signage gives all people the ability to find
key locations within the City, which increases safe travel along
designated routes, boosts economic activity at key locations, and provides the community with
opportunities to brand itself through unique signage. Signage updates can also include signage at
playgrounds and other recreation facilities about the safe and age-appropriate usage of
equipment and facilities. The City should establish a community-wide Sign Plan that highlights key
locations, connections to regional trails, and emphasizes awareness and safety for both bicyclists
and pedestrians and drivers.
Lakeshore Path
WHY WAYFINDING
MATTERS
Wayfinding improvements
help residents and visitors
identify trail routes, locate
destinations, navigate
connections, and better
understand the
community's bicycle and
pedestrian network.
2024 Outdoor Recreation Plan i
w
DRAFT: NOVEMBER 2026
CITY OF LAKE GENEVA
APPENDICES
LAND TO LAKE PLAN
ii
Table of Contents
Part 1: Characteristics of Recommended Recreational Facilities ..................................................... 1
Mini Park ............................................................................................................................................................................................................ 1
Neighborhood Park .................................................................................................................................................................................... 2
Community Park .......................................................................................................................................................................................... 3
Special Use Parks and Facilities .......................................................................................................................................................... 5
Conservancy Areas..................................................................................................................................................................................... 6
School Parks ................................................................................................................................................................................................... 7
Recreation Trails .......................................................................................................................................................................................... 8
On-Street Bicycle Facilities ................................................................................................................................................................... 9
Trailheads ........................................................................................................................................................................................................ 9
Part 2: Data Inventory and Analysis ............................................................................................................... 10
Part 3: Review of Existing Plans and Reports ........................................................................................... 15
Plan Review Summary ........................................................................................................................................................................... 15
Part 4: Natural Resource Inventory ................................................................................................................ 21
Natural Resources .................................................................................................................................................................................... 22
Part 5: Public Input Responses ......................................................................................................................... 25
Stakeholder Focus Groups .................................................................................................................................................................. 25
2026 Community Survey ....................................................................................................................................................................... 31
Part 6: Potential Funding Sources .................................................................................................................. 33
Planning Assistance provided by:
Part 1: Characteristics of Recommended Recreational Facilities
1
Part 1: Characteristics of Recommended
Recreational Facilities
Mini Park
General Description:
Mini parks include specialized facilities that serve a
concentrated population within their immediate
geographic vicinity, oftentimes with amenities
that are geared towards a specific demographic
within the population, such as tot lot playgrounds
for children or passive open space areas for the
enjoyment of adults.
Basic Facilities & Activities:
• Low-intensity active recreation facilities such
as playground equipment, grass fields, or
limited sports courts.
• Passive recreation facilities such as internal
trails (with connections to larger regional
system), picnic/sitting areas, general open
space, and nature study area.
• Landscaped areas which provide buffering and
shade.
Desirable Site Characteristics:
• Suited for infill development in residential
neighborhoods and areas of pedestrian activity
• Easily accessible to the neighborhood
population
• Geographically centered with safe walking and biking access
• 2 acres in size or less
Model 1-Acre Mini Park
LAND TO LAKE PLAN
2
Neighborhood Park
General Description:
These parks are designed specifically to accommodate
residents living within the service area. They are often
characterized by active recreational facilities such as a
playground or baseball and soccer fields but can also
incorporate passive recreational areas for picnicking and
nature-study.
Basic Facilities & Activities:
• Active recreation facilities such as playground
equipment, playfields (softball, soccer, football, etc.),
pickleball/tennis courts, volleyball courts, basketball
courts, shuffleboard areas, horseshoe courts, and ice-
skating rinks.
• Passive recreation facilities such as internal trails (with
connections to larger regional system), picnic/sitting
areas, general open space, and nature study area.
• Service buildings for shelter, storage, concessions, and
restrooms.
• Landscaped areas which provide buffering and shade.
• Lighting for security at night. Lighting must be
designed to be directly cut-off and not spill into
adjacent properties.
• Adequate on-street and off-street parking spaces.
Desirable Site Characteristics:
• Suited for intense development
• Easily accessible to the neighborhood population
• Geographically centered with safe walking and biking
access
• May be developed as a shared school-park facility
• 1-10 acres in size
Model 5-Acre Neighborhood Park
Part 1: Characteristics of Recommended Recreational Facilities
3
Community Park
General Description:
Community parks are larger in size and are able to
accommodate visitors from the surrounding
community and multiple neighborhoods. These
sites focus on both the developed aspects of the
park, such as playfields and tennis courts, as well
as the natural-resource amenities.
Basic Facilities & Activities:
• Active recreation facilities such as playground
equipment, playfields (softball, soccer, football,
etc.), pickleball/tennis courts, volleyball courts,
basketball courts, shuffleboard areas,
horseshoe courts, ice skating areas, swimming
pools, swimming beaches, archery ranges, disc
golf areas, or dog parks.
• Passive recreational facilities such as walking
trails, picnic/sitting areas, and nature study
areas, individual and group picnic/sitting areas,
general open space and unique
landscapes/features, natural study areas, and
ornamental gardens.
• Facilities for cultural activities, such as plays
and concerts in the park.
• Community Center building with multi-use
rooms for crafts, theater, restrooms, social
activities, and senior adult use.
• Service buildings for shelter, storage,
concessions, and restrooms.
• Landscaped areas which provide buffering and
shade.
• Lighting for security at night. Lighting must be
designed to be direct cut-off and not spill into
adjacent properties.
• Adequate off-street parking spaces.
Desirable Site Characteristics:
• Suited for intense development
• May include natural areas, such as water
bodies or wooded areas
• Easily accessible to the neighborhood population
• Easily accessible for walking and biking
• Serves neighborhood and community recreational needs
• 10+ aces in size
Model 20-Acre Community
LAND TO LAKE PLAN
4
Model 40-Acre Community
Part 1: Characteristics of Recommended Recreational Facilities
5
Special Use Parks and Facilities
General Description:
Areas of open space that cannot be measured by a quantifiable standard because of their unique and
diverse contributions to the community. Special Use Parks and Facilities enhance an overall park and
open space system by maintaining and improving the community’s natural resource base,
accommodating special activities that aren’t included in other parks, and providing interconnections
between isolated parks and recreation areas.
Examples of Special Use Parks and Facilities are varied but can include those lands that accommodate
passive or special recreational activities, such as golf courses, sledding/skiing hills, marinas, beaches,
display gardens, arboreta, and outdoor amphitheaters, as well as lands that have been protected for their
environmental significance or sensitivity and provide limited opportunity for recreational use. Examples of
the latter may include water bodies, floodplains, wetlands, shorelands and shoreland setback areas,
drainageways, stormwater management basins, conveyance routes, environmental corridors, wildlife
habitats, areas of rare or endangered plant or animal species, prairie remnants, and restoration areas.
Basic Facilities & Activities:
• Active recreational facilities such as areas for
swimming and boating, skiing hills,
biking/walking/skiing trails, skating rinks,
and golf courses.
• Passive recreational facilities such as
walking trails, picnic/sitting areas, and
natural study areas.
• Service buildings for shelter, equipment
storage/rental, concessions, and restrooms.
• Signage, trail markers, trash receptacles, and
information booths.
• Lighting for security at night.
• Off-street parking spaces, if appropriate to
the area.
• Historic/Cultural/Social – historic downtown
areas, performing arts parks, arboretums,
ornamental gardens, performing arts
facilities, indoor theaters, public buildings,
zoos, and amphitheaters.
Desirable Site Characteristics:
• Variable, depending on use
LAND TO LAKE PLAN
6
Conservancy Areas
General Description:
Permanently protected areas of environmental
significance or sensitivity, generally with limited
opportunities for recreational use. Acquisition of
conservancy areas often has secondary benefits
such as flood control or enhancement of
adjacent private property values. May include
bodies of water, floodplains, wetlands,
shorelines and shoreland setback areas,
drainageways, stormwater management basins,
environmental corridors, wildlife habitat, areas
of endangered plant or animal species, prairie
remnants or restoration areas, scenic vistas, or
environmentally constrained lands or open
spaces as recommended in other adopted
components of the City’s Comprehensive Plan.
These sites may also be appropriate for utilities
and secondary recreational uses, such as trails.
Basic Facilities & Activities:
• Passive, nature-based, and low impact
recreational facilities.
Desirable Site Characteristics:
• Variable, depending on resource being
protected.
Part 1: Characteristics of Recommended Recreational Facilities
7
School Parks
General Description:
School parks have many of the same
characteristics as neighborhood or community
parks, depending on their size. As such, school
parks primarily serve as locations for active
recreational facilities associated with school
functions; however, these sites can and do
benefit the surrounding community during off-
school hours. These parks may be owned and
maintained by the School District but are open
to all neighborhood residents.
Basic Facilities & Activities:
• Active recreational facilities such as
playfields, tennis courts, basketball courts,
playgrounds, and ice-skating rinks.
• Passive recreational facilities such as
picnic/sitting areas and nature study areas.
• Service buildings for shelter, storage,
concessions, and restrooms
• Lighting for security at night.
• Adequate on-street and off-street parking
spaces.
Desirable Site Characteristics:
• Easily accessible to the neighborhood
population
• Accessible by walking or biking
LAND TO LAKE PLAN
8
Recreation Trails
General Description:
Recreation trails accommodate various outdoor activities, such as biking, hiking, walking, jogging,
horseback riding, nature study, and cross-country skiing. A well-designed park system provides
connections between parks and open space areas and effectively integrates urban and suburban areas
with the surrounding natural environment by linking off-street trail segments with on-street bike routes.
There are two primary types of off-street recreation trails: multi-use paths and unpaved walking/hiking
trails.
• Multi-use paths are designed to
accommodate bicyclists, walkers, runners,
and in-line skaters. Such facilities are often
located along railroad and street rights-of-
way, rivers and lakeshores, and through
parks and environmental corridors.
• Unpaved trails often provide access within
parks and open spaces, especially in areas
designated primarily for conservation and
environmental preservation. Walkways may
be restricted to pedestrian use because of
environmental conditions. In certain
locations, they may also be suitable for
equestrian and/or bicycle use. Unpaved
walkways are often sited within conservancy
areas or along creeks, streams, rivers, field
boundaries, and other natural linear systems.
Desirable Design Criteria for Multi-Use Paths:
• In urban areas, paths should be a minimum
of 10 feet to accommodate two-way bicycle
traffic. Paved surfacing is recommended to
facilitate biking, walking, running, and
skating. American Association of State
Highway and Transportation Officials
standards should be applied to all design,
markings, and signage.
• In rural areas, the path should be a
minimum of 10 feet wide but could be
reduced to 8 feet for a short distance because of physical constraints. They are typically surfaced with
limestone screenings or similar material.
• Avoid placement alongside roadways where multiple cross-streets and driveways are or will be
present.
Desirable Design Criteria for Unpaved Walking/Hiking Trails:
• Because these trail facilities often travel through sensitive environmental areas, they are generally not
paved. Rather, they are surfaced with crushed limestone, wood chips, hard packed earth, or mowed
grass.
Part 1: Characteristics of Recommended Recreational Facilities
9
On-Street Bicycle Facilities
General Description:
There are a wide variety of on-street bicycle facilities including bike routes, bike lanes, cycle tracks,
sharrows, bike boxes, and paved shoulders. Bicycle routes, bike boulevards, and sharrows are the pre-
identified and preferred streets for bicycle travel within an urban area. Many times, they are marked by
signage on or along the road. Bicycle lanes are areas of the road striped off for exclusive use by bicyclists.
They are the preferred bicycle facility for urban arterial and higher volume collector streets (generally
more than 2,000 vehicles per day). Striping bicycle lanes establishes designated traffic channels that
promote an orderly flow of both bicyclist and motorist traffic. Typically, bicycle lanes are established on
roadways that are 32 feet or wider. Depending on the size of the roadway and traffic volumes, bike lanes
are typically buffered with striping, bollards, or on-street vehicle parking. An even greater level of
separation can be achieved by creating a dedicated on-street two-way separated path, referred to as a
cycle track. This is usually used for one-way streets in areas that are the most heavily traveled by bicyclists,
such as a downtown. Used in conjunction with other on-street facilities are bike boxes. These are
dedicated painted areas for bicyclists to stop ahead of vehicles at potentially dangerous or heavily
traveled intersections.
Paved shoulders are not a bicycle facility per se, but rather a roadway condition that improves bicycle
travel and bicyclist safety. They function much like a bicycle lane by separating the motor vehicle travel
from bikes. Paved shoulders are ideal for higher volume streets or highways (more than 1,000 vehicles per
day) with rural cross sections (i.e., no curb and gutter)
Desirable Design Criteria for Bicycle Lanes:
• Shared bicycle and vehicle lanes can be used on any lane width but should follow the AASSHTO
standards for marking and signage.
• Minimum width should be 5 feet.
• When used alongside a parking lane (minimum 7 feet), bike lanes should be at least 5 feet wide and
located on the traffic-facing side of the parking lane.
• Where shared bike lanes and parallel on-street parking are used, minimum combined width should be
12 feet.
• Any lane markings or signage should meet the AASSHTO standards.
• Street signs should be used to identify bicycle lanes.
Desirable Design Criteria for Paved Shoulders:
• Minimum width should be 4 feet on uncurbed roadways, or 5 feet on curbed roadways or where traffic
speeds exceed 50 miles per hour.
• A stripe separating the shoulder from the roadway is recommended.
• These are generally not marked as an exclusive bike facility.
Trailheads
Trailheads can provide visible access points to major off-street paths in the community’s system and help
connect off-street and on-street facilities. They generally provide a parking area, locational and directional
maps, or other information about the trail system. Some might contain restroom facilities, picnic tables,
art or informational exhibits and features, or benches for snacks or breaks. Such facilities should be sited
with easy and direct access to the trail system.
LAND TO LAKE PLAN
10
Part 2: Data Inventory and Analysis
Population Trends and Forecasts
In 2000, the U.S. Census recorded a City population of 7,148 residents. In 2010 the U.S. Census recorded a
slight increase to 7,685 residents. Following recent population gains since the last decennial Census
count, the population has grown 11% between 2010-2024 with a population of 8,521 in 2024.
Figure 1.1: Population Comparison
Municipality 2000* 2010 2020* 2024 2000-
2010
2010-
2024
City of Lake Geneva 7,148 7,685 8,277 8,521 ▲ 8% ▲ 11%
City of Burlington 9,874 10,464 10,258 10,987 6% 5%
City of Elkhorn 7,305 10,084 10,247 10,221 2% 1%
Village of Bloomfield — 4,400 4,781 4,780 — 9%
City of Delavan 7,943 8,542 8,505 8,689 8% 2%
Wisconsin 5,363,675 5,686,986 5,893,718 5,892,023 6% 4%
Source: U.S. Census Bureau, American Community Survey, 5 -Year Estimates, 2024.
*U.S. Census Bureau, 2000 – 2020 Census.
Predicting future population growth is challenging and somewhat inexact. It should be noted that Lake
Geneva’s actual future population will depend on social and economic trends, market conditions,
attitudes toward growth, and development regulations. Figure 1.2 below depicts seven population
projection methods. This set of projections was prepared specifically for this Plan and by the Wisconsin
Department of Administration. All are projected through 2050. These forecasts provide the basis for
determining future need for parks and open spaces.
Figure 1.2: City of Lake Geneva Population Projections
1990 2000 2010 2020 2024 2025 2030 2035 2040 2045 2050
WisDOA Projections* 5,979 7,148 7,685 8,277 8,521 8,585 8,893 9,045 9,197 9,155 9,113
Linear Growth 1990-
2024 5,979 7,148 7,685 8,277 8,521 8,596 8,970 9,343 9,717 10,091 10,465
Linear Growth 2000-
2024 5,979 7,148 7,685 8,277 8,521 8,578 8,864 9,150 9,436 9,722 10,061
Linear Growth 2010-
2024 5,979 7,148 7,685 8,277 8,521 8,581 8,879 9,178 9,476 9,775 10,119
Linear Growth 2020-
2024 5,979 7,148 7,685 8,277 8,521 8,582 8,887 9,192 9,497 9,802 10,107
Compounded Growth
1990-2024 5,979 7,148 7,685 8,277 8,521 8,628 9,181 9,769 10,395 11,062 11,565
Compounded Growth
2000-2024 5,979 7,148 7,685 8,277 8,521 8,589 8,938 9,302 9,680 10,074 10,460
Compounded Growth
2010-2024 5,979 7,148 7,685 8,277 8,521 8,587 8,926 9,278 9,644 10,025 10,406
Compounded Growth
2020-2024 5,979 7,148 7,685 8,277 8,521 8,584 8,905 9,238 9,583 9,942 10,313
Source: U.S. Census Bureau, 1990-2020 Census. *Source: Wisconsin Department of Administration, 2024 population
estimate.
1. Extrapolated based on the average annual population change over the given years.
2. Extrapolated based on the average annual percent change over the given years.
Part 2: Data Inventory and Analysis
11
3. WI DOA projections. Years ending in 5 are interpolated from the WI DOA projections.
These projections were derived using the following methodologies:
• Wisconsin Department of Administration (WisDOA) Projection: In 2024, the State Department of
Administration forecasted population change for all communities in Wisconsin based on 2020 U.S.
Census data.
• Linear Growth Rate (1990-2024, 2000-2024, 2010-2024): These projections were calculated using the
average annual population change over the time period and projecting that rate forward to 2050. The
average annual population change for the various time periods ranged from a loss of 170 to a gain of
2,210 new people per year.
• Annual Compounded Percentage Growth Rate (1990-2024, 2000-2024, 2010-2024): These estimations
are determined utilizing the annual average percentage change over the time period and
extrapolating that rate forward to 2050. The average annual percentage change for the four time
periods ranged from 7% to 34% growth.
With regard to age, the City of Lake Geneva reports a higher median age (49) than the State overall (40). It
also has a lower percentage of residents under 18 years of age compared to the State of Wisconsin. The
percentage of residents that are between the ages of 20 to 44, usually young working professionals and
those just starting families, is about 27%. The City has a significantly higher percentage of residents over
age 65 (26%) than the State (19%). Additionally, over 40% of the population is aged 55+. These numbers
point to the need for recreational amenities and programming that are suitable for older populations and
young working professionals while keeping young families in mind. Regarding race, approximately 3.2% of
the City identifies as multiracial and 10.3% of the City identifies as Hispanic or Latino as well (see Figure
1.5).
Age and Gender Distribution
Figure 1.3: Age Distribution
Median Age Percent Under 18 Percent Over 65
2000 2010 2024 2000 2010 2024 2000 2010 2024
City of Lake Geneva 39 39 49 21% 23% 18% 16% 16% 26%
Wisconsin 36 39 40 26% 21% 21% 13% 14% 19%
Source: U.S. Census Bureau, 2000 Census.
Source: U.S. Census Bureau, 2010-2024 American Community Survey 5-Year Estimates.
LAND TO LAKE PLAN
12
Figure 1.4: Lake Geneva Population Pyramid, 2023
Source: Source: City of Lake Geneva, Strategic Plan Existing Conditions
Part 2: Data Inventory and Analysis
13
Racial & Ethnic Distribution
Figure 1.5: Race and Ethnicity 2010-2023
Source: City of Lake Geneva, Strategic Plan Existing Conditions
Households and Health
Housing in Lake Geneva is generally more expensive than the rest of the State of Wisconsin. The median
home value in Lake Geneva is $77,300 more than the median home value of Wisconsin. Although there is
this great difference between median home values, household costs with mortgages are very similar with
Lake Geneva being only $1 more than the state. The average household size in Lake Geneva was 1.98
persons in 2024, which is much lower than the state (2.33) average size.
Lake Geneva is located in Walworth County, which generally has better health outcomes than
neighboring counties. The only outlier is Waukesha County which has consistently been in the top five
spots over the past few years. Walworth County also has the lowest adult obesity percentage when
compared to neighboring counties. The leading cause of death in Walworth County is heart disease,
which points to the need for more opportunities for recreation to keep residents active.
LAND TO LAKE PLAN
14
Figure 1.8: 2024 Household Characteristics
Median Owner-
Occupied Median
Gross
Rent
Median
Household
Income
Total
Housing
Units
Percent
Owner
Occupied
Average
Household
Size Home
Value
Costs per
month with
a mortgage
City of Lake
Geneva $343,800 $1,690 $1,389 $75,629 5,215 54.8% 1.98
Wisconsin $266,500 $1,689 $1,087 $77,485 2,778,572 67.8% 2.33
Source: U.S. Census Bureau, 2020-2024 American Community Survey 5-Year Estimates.
Figure 1.12: Public Health Context
Overall Health Outcome Ranking* Percentage of Adult Obesity
Walworth County 22 out of 72 33%
Rock County 54 out of 72 38%
Waukesha County 2 of 72 32%
Jefferson County 27 out of 72 40%
Kenosha County 55 out of 72 43%
Racine County 66 out of 72 40%
Wisconsin N/A 38%
*2025 Health outcomes rankings are a combination of factors including length of life, quality of life, health behaviors,
clinical care, social and economic factors, and physical environment.
Source: 2025 County Health Rankings, University of Wisconsin Population Health Institute.
Figure 1.13: Public Health Context
Diagnosed With
Diabetes* Leading Cause of Death** Life
Expectancy***
Walworth County 8.3% Heart Disease (204.6 per 100,000) 78.0
Rock County 9.1% Cancer (208.1 per 100,000) 76.3
Waukesha County 7.4% Cancer (190.3 per 100,000) 80.3
Jefferson County 7.3% Cancer (196.8 per 100,000) 78.0
Kenosha County 10.2% Heart Disease (190.0 per 100,000) 76.7
Racine County 10.2% Cancer (200.7 per 100,000) 75.8
Wisconsin 8.8% Heart Disease (201.4 per 100,000) 77.8
*Source: CDC, 2022.
**Source: 2017 Wisconsin Public Health Profiles. Wisconsin Department of Health Services.
***Source: National Center for Health Statistics - Natality and Mortality Files; Census Population Estimates Program
2020-2022
Part 3: Review of Existing Plans and Reports
15
Part 3: Review of Existing Plans and
Reports
A critical step in the park planning process is the
examination of past planning efforts in the City
of Lake Geneva and other related municipal,
county, and state plans. A comprehensive
understanding of how the City and its
surrounding area have evolved over time and of
how this Comprehensive Outdoor Recreational
Plan can support additional future planning
efforts helps establish guidelines for the
recommendations and implementation
strategies of this Plan.
Moreover, a review of existing plans helps
identify ways this CORP can be adapted so that
its goals, objectives, and policies align and
coordinate with ongoing planning efforts within
the City, County, and region. The following is a
summary of information from existing plans
that informs the goals, objectives, and
recommendations of the City of Lake Geneva
Comprehensive Outdoor Recreation Plan.
Plan Review Summary
City of Lake Geneva Comprehensive Outdoor Recreation Plan (2021-2026)
The last City of Lake Geneva Comprehensive Outdoor Recreation Plan was completed in 2021. This
document served as the basis for the 2026 update. Overall, the previous plan features the same elements
as this plan, but, due to its age, some elements were no longer relevant or applicable.
Goals and recommendations of the 2021 plan include:
• Develop a branding and marketing plan for the City’s parks. This should include unified signage and
wayfinding throughout the community.
• The City should develop new parks in areas that are underserved by existing facilities and areas where
future residential expansion is expected to occur.
• Consider a partnership with Walworth County on creation of a water trail on the White River
(Walworth County Park and Open Space Plan).
• Take into consideration long-range maintenance and operations costs at the time new parklands are
acquired through land dedications or other means.
• Review and update use agreements with School District and private organizations for shared park
facilities. Agreements should be reviewed to ensure they still meeting all parties’ needs.
• Encourage public awareness of the City’s parks and outdoor recreational facilities by promoting them
through maps, signage, and other materials.
LAND TO LAKE PLAN
16
In total, the 2021 plan provided guidance for the City between its adoption and the development of this
new plan. All relevant remaining key recommendations were incorporated into this plan and its
recommendations.
City of Lake Geneva Comprehensive Master Plan (2020)
The City’s Comprehensive Plan, last amended in 2025, provides guidance on how and where the City
might grow, develop, and change over the next 20 years. The Plan provides an overall vision, goals,
objectives and policies, and specific issues and opportunities for the community, and covers all nine
essential elements of the state statutes governing long-term comprehensive planning. Some of the key
opportunities and recommendations within the Comprehensive Plan that are relevant to the Land to
Lake Plan include:
• Establish a permanently protected, undeveloped Greenbelt Corridor surrounding the City of Lake
Geneva. This corridor would serve as a community separation area, and improve groundwater
infiltration, protect wildlife habitat, and provide recreational opportunities.
• Protect Geneva Lake and its watershed as the defining feature of the City and the region.
• Actively promote infill development and redevelopment where opportunities exist as a means to
improve neighborhood conditions, increase local economic and shopping opportunities, and make
use of existing infrastructure investments.
• Prepare an updated woodland inventory to ensure that the existing Woodland Protection Overlay
Zoning District remains an effective tool for preservation of forests and trees.
• Enhance Lake Geneva as a walkable, bikeable City through continued development of an
interconnected sidewalk and trail network, carefully considering the needs of bicyclists and
pedestrians in road design and requiring designs of new developments that have the pedestrian in
mind.
• Prioritize development of bike and pedestrian trails to enhance non-vehicular connectivity and
provide tourism and recreational opportunities.
• Continue to support tourism development based on the City’s natural and recreational resources.
Partner with local businesses, recreation providers, and economic development organizations to
explore new initiatives that will strengthen the tourism industry and address changing market
demands by leveraging the Lake Geneva brand name, including a regional farmers market and
ecotourism.
• Consider developing a detailed Sustainability Plan to support and strengthen the City’s current
sustainability initiatives.
Many of the issues, opportunities, goals, objectives, and recommendations identified in the Lake Geneva
Comprehensive Plan are still relevant and applicable in 2026 and are reflected and supported throughout
this Plan. This plan builds upon Comprehensive Plan information and recommendations, providing
strategic updates to key areas to further advance and prioritize future park and recreation planning,
development, upgrades, and integration into the community.
A Long-Range Park and Open Space Plan for Walworth County (2022-2050)
This Plan, prepared for Walworth County by the Southeastern Wisconsin Regional Planning Commission
(SEWRPC), details an inventory of the existing parks and facilities in Walworth County, facility specific
recommendations, preservation and protection initiatives, and ongoing projects and programs. This
includes planning and acquisition priorities for regional bicycle, pedestrian, and water trail systems. Each
of these plans are components of the greater County Comprehensive Plan.
Overall goals of each plan include:
• Provide sufficient park land and recreation facilities to meet the current and projected future demand
of County residents without adversely affecting existing natural and cultural resources.
Part 3: Review of Existing Plans and Reports
17
• Showcase and reserve the characteristics and diversity of the natural, cultural, and historical resources
of the County.
• Preserve large tracts of natural and open space landscapes at urban fringe areas that will provide
regional resource protection and recreation benefits.
• Protect lakes, rivers and streams, including wetlands, high infiltration areas, and associated vegetative
buffers to maintain high water quality, manage water quantity, and sustain water-related recreation
throughout the County.
• Provide an inclusive parks system for all County residents, regardless of age, race, gender or gender
identity, national origin, ethnicity, culture, religion, sexual orientation, political affiliation, place of
residence, veteran status, physical ability, cognitive capacity, or family, marital, or economic status.
The Walworth County Plan places a major emphasis on recommendations for new trails to connect
existing and proposed parks, natural resource sites, and municipalities within the County. The Walworth
County Plan proposes specific on and off-street trail connections within the City limits of Lake Geneva.
The plan also proposes water trails along the coast of Geneva Lake.
Vision 2050: A Regional Land Use and Transportation Plan for Southeastern Wisconsin
The Vision 2050 Plan, developed by the Southeastern Wisconsin Regional Planning Commission
(SEWRPC) serves as a region-wide comprehensive plan for Milwaukee County and six other adjacent
counties, providing guidance on how and where each County might grow, develop, and change over the
next twenty years. The plan provides an overall vision, goals, objectives and policies, specific issues and
opportunities for the region, and each plan covers all nine comprehensive planning elements as required
by state statutes. Some of the key issues and opportunities include:
• The County is a growth community, in terms of both development and population.
• The dynamic of the County’s populations is changing, in terms of an increasingly aging population,
larger Hispanic and Latino population, and more educated population.
• Growth and changing population dynamics will have various implications including more diverse
services needed, more annexations and land being taken out of agricultural use, increasing
transportation and utility needs, and need for more multi-jurisdictional cooperation and planning.
The Plan inventories primary and secondary environmental corridors, isolated natural areas, and parks
within the seven-county system. It also weaves park and recreation policies into the implementation
framework of the plan with the overarching goals of encouraging the development of neighborhoods
with walking access to parks and increasing the region’s bicycle and pedestrian network to improve
access to activity centers, parks, and recreational resources. The Plan also includes recommendations for
countywide transportation facilities that provide express commuter transit and vanpool services between
the central Milwaukee area and outlying villages and cities, including park and ride lots along major travel
corridors and at transit system transfer points.
The Vision 2050 planning process and community input feature significant focus on encouraging the
preservation of environmental corridors and assets, including parks and recreational open space,
controlling residential and commercial development sprawl, and promoting more transportation options,
such as sidewalks, multiuse trails, and high-quality bicycle infrastructure and facilities.
Many of the other issues and opportunities identified in the plan are still applicable in 2025 and reflect
many of the goals, objectives, and policies mirrored and supported in this plan.
LAND TO LAKE PLAN
18
Wisconsin State Park System Strategic Directions
(2015-2020) and Wisconsin Trail Network Plan
(2003)
The State of Wisconsin Department of Natural
Resources (WDNR) has developed these two
plans for its entire systems of state parks and
trails. There are not specific recommendations
related to Lake Geneva; however, the plan
identifies several area state trail facilities that
should be considered in regional bicycle and
pedestrian network connection planning. The
plan looks at the Duck State Trail as well as the
shoreline of Geneva Lake as a potential for trails
improvements and implementation.
The Wisconsin State Park System Strategic Plan
set forth five strategic directions:
• Provide quality outdoor recreation
opportunities and settings
• Conserve, manage, and interpret natural,
cultural, and scenic resources
• Actively promote excellence in our
workforce
• Strengthen the Wisconsin State Park System
financial condition
• Build and strengthen outreach and
partnerships
The Wisconsin State Trails Network Plan provides a vision for establishing trail network connectivity
statewide; and focuses on abandoned rail, road, utility line, natural features and resources, interstate, and
public lands. The plan recognizes the important role that trails developed by local units of governments
serve as critical links. Under the plan, WDNR staff will continue to work with local governments and
encourage them to connect trails onto this network as they update local plans.
The 2025-2030 Wisconsin Statewide Comprehensive Outdoor Recreation Plan
The Wisconsin Statewide Comprehensive Outdoor Recreation Plan (SCORP) serves as a blueprint for state
and local outdoor recreation planning through support of national initiatives, sets the course for
recreation within the state by describing current recreation supply and trends, and provides a framework
for future recreation development and focus. At the time of this plan’s development, the SCORP was
released as a draft. Because of this, some of the language that appears in this section may differ from the
final approved SCORP.
The Statewide Comprehensive Outdoor Recreation Plan has two overarching goals:
• Ensure that all Wisconsinites have equitable opportunities to participate in outdoor
recreation, regardless of where they live or their ethnicity, gender, income, abilities,
or age.
• Maintain and expand the sustainability of recreational opportunities in our state,
ensuring that existing opportunities are well funded and have the support to grow
and expand where needed.
Part 3: Review of Existing Plans and Reports
19
The plan also introduces eleven main strategies to achieve the two goals of the plan:
1. Provide more opportunities for outdoor recreation close to home.
2. Provide needed recreation facilities.
3. Improve affordability of participation.
4. Support, develop, and enhance mentoring programs.
5. Create more welcoming outdoor spaces.
6. Improve the distribution of information on recreation opportunities.
7. Expand and diversify funding sources.
8. Adapt to new environmental conditions both in terms of participation in outdoor activities as well as
the management of recreation opportunities and facilities.
9. Lead by example on climate change mitigation.
10. Create an implementation plan that identifies desired outcomes as well as the partners to coordinate
and advocate for outdoor recreation throughout Wisconsin.
Factors affecting participation in outdoor recreation:
• Participation in outdoor recreation activities spiked during the pandemic.
• Motivations to participate in outdoor recreation include improved physical, mental, social
opportunities, and access to healthy foods.
• The most common barrier to participation in outdoor recreation is a lack of time.
• Other barriers include: the need for mentoring, providing information in multiple languages, and
improving access to places.
The SCORP also notes that communities that
face barriers to outdoor recreation may also face
barriers to important needs such as healthy
foods, living in places without pollution, and lack
of access to quality early childhood recreation.
• Many of the goals within the Statewide
Comprehensive Outdoor Recreational Plan
are also reflected in this Plan and were heard
throughout the public participation process
as goals directly applicable to the City of
Lake Geneva.
Wisconsin’s Changing Climate Report (2022)
The Wisconsin Initiative on Climate Change
Impacts (WICCI), a statewide collaboration of
scientists and stakeholders formed as a
partnership between UW-Madison’s Nelson
Institute for Environmental Studies and the
Wisconsin Department of Natural Resources,
published a comprehensive study evaluating
climate change impacts on Wisconsin
communities.
Wisconsin’s climate continues to change. In the 10 years since the 2011 WICCI Assessment report, new
data shows continued warming, increases in rain and snow, and more frequent extreme rainfall events.
The effects of climate change are felt in nearly every region in the state and affect the places we work and
play, including farms, lakes and rivers, forests, and the built environment. All regions of Wisconsin have
reported their wettest decade in recorded history over the past ten years, and average precipitation has
LAND TO LAKE PLAN
20
increased by 17% (about five inches) since 1950. The average daily temperature across the state has
increased by three degrees Fahrenheit over the same time period, and the last two decades have been
the warmest on record. It is projected that extreme precipitation and weather events will increase in the
future.
The report calls for actions by communities across the state to decrease carbon emissions and promote
environmental and climate justice by investing in solutions that reduce greenhouse gas emissions and
associated climate impacts. Many of the goals, objectives, and recommendations of this Comprehensive
Outdoor Recreation Plan align with this report, serving to preserve the natural environment and decrease
automobile dependency by providing alternative means of transportation to the City of Lake Geneva’s
various park and recreational amenities.
Wisconsin Land Legacy Report (2006)
In the Wisconsin Land Legacy Report, the DNR identified those key places around the state that are
critical to meeting Wisconsin’s conservation and outdoor recreation needs over the next 50 years. The
Report indicates that Lake Geneva lies within the Southern Glacial Plains ecological landscape and
identifies two sites in Milwaukee County proximate to the City: The White River and Bloomfield Area and
Sugar Creek Valley. Continued forest management and strategic expansions of outdoor recreational
facilities are important in maintaining the steadily growing urban area’s natural features. The report
recommends that the expansion of future recreational opportunities should be accomplished by restoring
somewhat degraded natural areas to provide a range of hiking, biking, horseback, and other types of
trails. To the greatest practical degree, buffering, linking, and expanding existing public lands would
enable considerably more conservation and recreational opportunities.
Connect 2050 Wisconsin Statewide Long-Range Transportation Plan (2022)
Connections 2050 links statewide transportation policy to implementation, planning, programming, and
other Wisconsin Department of Transportation (WisDOT) activities. The plan calls for improved system
integration for passengers and freight, as well as modernization to correct outdated infrastructure design
and combine technological advancements with more traditional transportation infrastructure designs.
The Plan sets policy directions for the state trunk highway system, public transit, intercity travel, freight
movement, bicycle and pedestrian travel, and funding, project scheduling and prioritization decisions.
Wisconsin Healthy Communities (2021-2024)
The University of Wisconsin Population Health Institute has recently started recognizing communities
throughout the state on their pursuit of improved public health through the designation of Wisconsin
Healthy Communities. The purpose of the designation is to recognize and encourage local efforts that
improve the overall community’s health and well-being. It also aims to promote collaboration centered
around health improvement. Communities are recognized as Gold, Silver, or Bronze depending on how
well they are pursuing public health improvement efforts. While Lake Geneva has not formally been
recognized to this point, Walworth County has been given a Silver designation.
Recommendations in this Plan can serve as the foundation for various initiatives that will support the
creation of a healthier community in Lake Geneva, including the activation of critical street network
connections with multimodal transportation options, increased green space and park connectivity, and
community programming at public amenities to support physical and social activity.
Part 4: Natural Resource Inventory
21
Part 4: Natural Resource Inventory
The relationship between the City of Lake Geneva and its natural features provides a valuable point of
reference for park and open space planning. It sets up a framework for analysis, suggests possible
locational advantages for certain land uses so that they exist in harmony with the community’s natural
characteristics, highlights key resources that the park and recreation system might feature, and hints at
the relationship between the City and the rest of the region.
In growing communities like Lake Geneva,
planning often focuses on such issues as land
use, transportation, and infrastructure. Issues
pertaining to natural and cultural resources
often tend to receive less attention, and
sometimes cohesive and consistent goals and
policies regarding these features are lacking in a
growing community’s plan. These resources,
however, are critical to the long-term health,
vitality, and sustainability of every community.
Since these resources also help define a
community and strongly affect its quality of life,
they must be examined as a part of the
planning process. The City’s topography and
natural features are an important backdrop for
its parks system and can be particularly
exhibited in the surrounding county parks
focused on passive, nature-based recreation as
well as in the City’s path and trail network.
Because of the vital functions performed by
natural, cultural, and open space resource
features in and around the City of Lake Geneva,
unplanned urban development into these areas
is inappropriate and should be discouraged.
The west side of the City is located along the shores of Geneva Lake. The White River cuts through the
City and feeds into Geneva Lake. Wetlands and woodlands are mostly concentrated in in the Hillmoor
property. The City should ensure that all new or existing development does not negatively impact these
important resources. When development is proposed in close proximity to environmentally sensitive
areas and corridors, the Geneva Lake, and other natural areas, it is critical that the developer identify how
they will address direct environmental impacts such as land and habitat disturbance, vegetation clearing,
and the alteration of existing topography as well as secondary impacts such as stormwater runoff,
increased impervious surfaces, and other impacts of the development.
This Plan will examine ways to build upon the community’s natural resources and character through
coordinated park and recreational facility planning to establish and promote a community identity, while
at the same time preserving natural features and overall character that makes Lake Geneva unique.
LAND TO LAKE PLAN
22
Natural Resources
The City of Lake Geneva is a highly developed community bordered by Geneva Lake to the west and
surrounded by towns on all other sides. As such, the City has some room to grow to the north, south, and
east.
Constraints that could impact the future park system decision-making include:
Land Availability
The City of Lake Geneva is 6.4 square miles in area and positioned by Geneva Lake in a relatively rural area
of Wisconsin. This regional position provides a number of advantages including accessibility to nature, the
lake, and cultural amenities. There is room for the City to grow beyond its current boundaries and
increase its footprint to accommodate demand for new residential or commercial development as well as
more open space. Because of its location in a rural area there are open spaces or vacant areas that could
be acquired to increase the park and open space system within the city’s existing boundaries should the
need arise. The City can consider policies to add park and open space areas when redevelopment and
infill projects are pursued or when infrastructure and environmental projects present new recreation
opportunities.
A survey of Lake Geneva’s natural environment provides an important framework for guiding the park
and open space planning process. There are several characteristics of the City’s natural landscape that will
direct the development of future park and recreational facilities.
Climate
Southeastern Wisconsin’s climate is characterized by four distinct seasons. Warm summers generally
span the months of June through August. The winter months of December, January, and February are
cold, with average temperatures below freezing and accumulating snow on the ground. The region is
characterized by temperate conditions in spring and autumn. The first autumn freeze typically occurs
around the second week of October, and the last spring freeze is usually sometime during the first week
of May.
Soils
As defined by the United States Department of Agriculture, four major soil associations dominate the
Lake Geneva area. Most of these soils are classified as prime farmland by the U.S. Soil Conservation
Service. Soils in the Miami-McHenry Association extend out from the lake shore and are the primary soil
type found in the City. Miami-McHenry series soils are generally well drained with a subsoil of clay loam
and silty clay loam and usually found on uplands. These soils have only slight limitations for development.
The Houghton-Palms Association is the next most common soil, and is concentrated around the eastern
end of Lake Como and along the southern branch of the White River. This soil type has severe
development limitations because it is composed mainly of very poorly drained organic soils and is found
primarily in depressions and bottom lands.
Soils of the Pella, Kendall, Elburn Association are found north of the City along Como Creek east of Lake
Como. This concentration continues northeast along the path of Como Creek and the White River to the
Town of Lyon. It also extends a short distance along the southern branch of the White River. Characterized
by drainage problems and silty clay loam subsoils, these soils have severe to very severe development
limitations due to low strength, ponding, and frost heave.
The Plano-Griswold Association is found to the south of the City along Nippersink Creek. These soils have
moderate development limitations due to shrink-swell potential. Generally, these soils are well drained
and have a subsoil of clay, silty clay loam and sandy clay loam.
Part 4: Natural Resource Inventory
23
Water Bodies and Watersheds
The City of Lake Geneva lies in the White River
and Nippersink Creek Watershed. The
watershed is drained by approximately 239
miles of perennial rivers and streams, and flows
in a southeasterly direction toward the Illinois
border.
Geneva Lake is the most important surface
water resource in the City. Other significant
surface waters include the White River, Lake
Como, and Como Creek.
Vegetation
At the time of European settlement, much of
southeastern Wisconsin was covered with
prairie and oak savannah, oak woods, and
lowlands. Since that time, most of the land has
been converted to agricultural and urban uses.
Currently, approximately 16 percent of the City
remains wooded. The majority of these areas are
located on the western side of the City and
along the shores of Lake Geneva. Dominant
forest types include oak-hickory and maple
basswood.
Wildlife Habitat
Species of wildlife common to the southeastern Wisconsin region are rabbits, squirrels, woodchucks,
raccoons, muskrats, and beavers. Larger mammals such as white-tailed deer, coyotes, and foxes also
inhabit the region. Common bird species include cardinals, robins, woodthrushes, great blue herons,
wrens, blue jays, cranes, hawks, and killdeer.
Over the course of a ten year study, SEWRPC identified high quality natural areas and critical species
habitats throughout the region. In 1997, the results were published in a report titled “A Regional Natural
Areas and Critical Species Habitat Protection and Management Plan for Southeastern Wisconsin”. The
2010 amendment to that plan added one additional new natural area site; the 138-acre, privately owned,
Oak Hill Cemetery Woods, located in the northern portion of the City. In this
Plan, natural areas are
defined as tracts of land or water so little modified by human activity, or which have sufficiently recovered
from the effects of such activity, that they contain intact native plant and animal communities believed to
be representative of the pre-European-settlement landscape. Critical species habitats are defined as
those that support endangered, threatened, or rare plan or animal species. The amended SEWRPC plan
recommends that each of the natural areas and critical species habitat sites should be protected and
preserved to the maximum extent practicable. Eleven natural areas and critical species habitats in the
Lake Geneva area are listed in Figure 1 below.
LAND TO LAKE PLAN
24
Figure 1: Lake Geneva Area Natural Areas and Critical Species Habitat
Area Name Classification
Code
Size Description and Comments
Wychwood Natural Area 226
acres
A large tract of dry-mesic hardwoods occupying a
terminal moraine on the north side of Lake Geneva.
Generally good quality throughout, except for the large
estates, which occupy much of the woods.
Bloomfield
Sedge Meadow
and Tamarack
Relict
Natural Area 171 acres
Large wetland complex of good-quality sedge meadow,
with shrub-carr and tamarack relict. Disturbances
include past ditching attempts. Contains Alder flycatcher
and Veer, both common bird species.
Pell Lake
Railroad Prairie
Natural Area,
Rare Species
Habitat
4 acres
Small remnant of mesic and wet-mesic prairie along
abandoned railway right-of-way. Floristically rich, with
several regionally uncommon species.
Warbler Trail
Wetlands (Duck
Lake Nature
Trail)
Natural Area 40 acres
Shallow marsh, shrub-carr complex with small, shallow
lakes in depression. Adjacent development and past
ditching attempts have disturbed the site.
Lake Geneva
Tamarack Relict Natural Area 160
acres
Large tamarack relict-shrub-carr complex with small,
shallow lakes in depression. Adjacent development and
past ditching attempts have disturbed the site.
Radio Station
Wetland
Critical
Species
Habitat (Plant)
30 acres Gentiana procera, a rare plant species, grows on the site.
Section Five
Marsh and Pond
Critical
Species
Habitat (Bird)
18 acres Site contains a colony of Black terns, a rare bird species.
White River
Critical
Species
Habitat
(Aquatic)
4.5 miles
(approx.
20 acres
of
surface
water)
The entire length of the White River within the planning
area is classified as an aquatic area of countywide or
regional significance, containing a good assemblage of
mussel species. The portions of the river from the outlet
at Geneva Lake extending 1.7 miles downstream is a
critical stream reach containing the Longear sunfish, a
threatened species, and the Least darter, a species of
special concern.
Geneva Lake
Critical
Species
Habitat
(Aquatic)
5,282
acres
This deep spring lake, the largest in the Region, contains
good overall fish diversity including the Least darter and
the Lake herring (Cisco), both species of special concern
Oak Hill
Cemetery
Woods
Natural Area 138 acres No Description Available
Town of Linn
Park
Critical
Species
Habitat
153 acres
Ammodramus henslowii (T) (Henslow’s sparrow)
Sturnella magna (SC) (eastern meadowlark)
Dolichonyx oryzivorus (SC) (bobolink)
Passerculus sandwichensis (SC) (savannah sparrow)
Ammodramus savannarum (SC) (grasshopper sparrow
Source: “A Regional Natural Areas and Critical Species Habitat Protection and Management Plan for Southeastern
Wisconsin”, 1997, Amended 2010, SEWRPC.
Part 5: Public Input Responses
25
Part 5: Public Input Responses
Stakeholder Focus Groups
Throughout the months of June and July, planning consultants conducted six stakeholder focus group
interviews. Focus groups were organized around common themes, including Community Organizations,
Young Families, Adult Sports, Institutional and Tourism Organizations, and two groups of Boaters. Each
focus group discussion explored key topics about the current park and recreation system and lakefront,
how it was serving different populations and constituencies, and what members of each group would like
to see added or improved about the Lake Geneva park system and lakefront in the future. Discussions
were robust with committed focus group members sharing a variety of insights.
Below is a complete summary of those discussions.
Institutional and Tourism
• Participants identified a need for amenities
that would support events and tourism,
including:
o ADA accessibility
o More electrical outlets and repair of
broken outlets at Flat Iron Park
o More trashcans, benches, water
fountains, and dog bag disposal
containers in downtown parks. Seek
uniform design as items are added or
replaced.
o Picnic tables and trash cans should be
distributed throughout the park rather
than stacked in gazebos.
o Upgraded play structure downtown to
replace the one removed at the Library.
Tourist families are looking for this
between activities.
o Seminary Park could be improved to
better support events by opening
restrooms and adding electrical service.
o Visitors do use wayfinding signage and
map kiosks, which are due for an update or replacement.
• Bathrooms
o Bathrooms are particularly important to visitors and lakefront users in general. City bathrooms are
often closed during peak visitor hours (nights and weekends). There is a strong need for more
public bathrooms downtown.
• Youth Programming
o There is high demand and waitlist for most youth programs.
o YMCA is at physical capacity. They have low participation for preschool/parent/child programming
in the morning since the Library offers free programming at that time.
o The School District, Library, and YMCA provide youth programming. There is no single listing of all
programing in one place. Big Foot has a recreation department with programming. A single,
unified recreation guide would be nice to have.
LAND TO LAKE PLAN
26
• Community Center
o Participants felt that demand would be very high, especially for families with kids. There is concern
that it wouldn’t pass a referendum.
o Some participants noted that defining who has access to the community center will be important.
E.g., City of Lake Geneva residents or outlying areas
o There is a need for large meeting spaces – this could be accommodated at the YMCA or a future
community center
o If pursued, public private partnership would be needed. The project would need to be multifaceted
in order to bring in a wide range of partners and financial support.
o A commercial kitchen housed in the community center that is available to the public and small
businesses could be a potential revenue source.
o The Library could have another satellite location in a community center.
• Veterans Park
o The paved paths within the park need improvement, as depressions in the path surface are
challenging for people with mobility issues.
o Scoreboards do not work. Bathroom sinks are rusted.
• Partnerships
o The Library is interested in doing more programming at the parks. The Library at capacity with
programming with current staff but there is interest in doing more.
o Participants were happy with the City’s participation in major events.
o Participants were in favor of a regular meeting with the Parks Department to share news, discuss
issues, solve problems, and share ideas.
o The BID noted that would like to be a resource to the City to support downtown placemaking
initiatives. The BID is looking to transform an alleyway at 234 Broad Street into a linear park with
seating, lighting, and a gallery feature to improve safety and walkability.
• Websites
o There is no one-stop shop online for Lake Geneva tourism.
o There is no comprehensive list of parks on the City website and no information about the City’s
bike trails. These are low-hanging fruit for sharing information. Residents and tourists would
benefit from user-friendly trail maps in digital and hardcopy formats.
• Desired Ordinance Changes
o The City could modify its lighting code to allow for seasonal or year-round uplighting of trees in the
parks.
o The City could establish an entertainment district during festivals which allows for open containers
in designated areas.
o The City could modify its mural ordinance to accommodate the Broad Street alleyway project.
• Other
o Participants supported an inclusive playground, noting that families will build a trip around visiting
an inclusive playground in another community.
o Participants noted that the trail at the YMCA needs repair.
o The School District plans to reconfigure East View Elementary for early childhood education,
community space, or other educational options.
Young Families
• Veterans Park
o The park is used a lot for youth sports, with families ending up at the park four nights a week.
o The park has a lot of amenities that attract families such as bathrooms, parking, and a playground.
However, there are a few crucial amenities missing that would transform the park into something
Part 5: Public Input Responses
27
greater. More specifically, options for shade, concessions, picnic tables, and gathering areas are
needed at the park, especially near the playground.
o The park could become an “all day” destination if more amenities provided. There is a lot of
untapped potential for park events, field upgrades to make them ready for sports tournaments,
space for food trucks, or the potential to partner with businesses to create new amenities geared
toward locals.
• The Lakefront
o The lakefront is difficult for locals and
especially young families to access. The
area is incredibly busy and hard to
navigate with strollers. The chaos of all
the people and congestion makes going
there unpleasant.
o There is also a lack of things to do
between lunch and 5pm because many
businesses close up downtown in
preparation for dinner and nightlife.
o Support was indicated for an idea to
close down Wrigley to create a public
plaza that would make the lakefront
more navigable for pedestrians and allow
space for family and community events.
o Participants noted going to other
communities on Geneva Lake such as
Fontana and Williams Bay to enjoy the
lakefront. They are much more peaceful
and easier to get to.
• Community Center
o East View could be a great opportunity for a community center since it already has a building and
a parking lot.
o It is important that a community center meets a wide variety of needs of the community as a one
stop shop for a variety of potential amenities that could be initiated through public-private
partnerships. It is also important to keep low-income families in mind and perhaps provide free or
sliding scale services.
o There are not a lot of options currently for rentable spaces such as banquet halls for private events.
• Recreational Programming
o Participants were very happy with Library programming.
o There are not a lot of year-round options for programming.
o Participants noted that the YMCA has a lot of room for improvement with regard to its sports
programming. There are typically no practices for youth sports, just games, so there is little room
for learning new skills or the game in general. Registration for programming is not easy to
accomplish and is confusing. Equipment for some sports, such as baseball, is outdated or missing.
A lack of pitching machines was noted listed as one example. Recruitment for coaches is also
subpar.
o Participants noted that there is a gap for sports for the 7 to 10 age group, and the only options
available are for traveling, competitive teams. Some parents are trying to put together a little
league, but there is no unifying group to put it into action.
o Overall, participants would like to see the City take over sport programming.
LAND TO LAKE PLAN
28
• Other
o There is not a lot of ADA accessibility at the parks or throughout the City in general. Accessibility
would help with strollers and also help seniors in the community.
Community Organizations
• Events
o Overall, participants felt that the City was easy to work with for community events. The City assists
with setup for community events. Many events’ success relies on participation by the City to assist
with event setup, closing of streets, parking enforcement, and police services. Despite this support,
participants were not in favor of paying new or increased fees to the City to support events.
o Some participants felt that when considering changes to fee structures, the City should treat
nonprofits differently from for-profit organizations. Others felt that increased fees that would allow
parties and alcohol in the parks should be approached with caution, as public access to the areas
with alcohol would need to be controlled.
o Some participants feel that Lake Geneva Parks could be a leader in sustainability and nature
conservation practices, noting that there are groups working in native plantings for the parks and
that the Avian Committee has made excellent progress on helping purple martin birds on the
lakefront.
o Community Events are growing and starting to run out of space, especially at Flat Iron Park.
Participants note that the lakefront is necessary for the success of events, so expanding onto
public roads may be the next progression of these events.
o Rather than having new and more events on the lakefront, Hillmoor is seen an opportunity to host
new events or relocate some existing events. These could be oriented to locals who want to enjoy
their community without going into Downtown.
• Park Amenities
o The Friends of Hillmoor will propose solar and semi-composting toilet facilities the Hillmoor
Commission. This could be a pilot project for similar facilities elsewhere in the City.
o Some participants noted that Lake Geneva is not kid-friendly and noted a need for park amenities,
activities, and programs geared toward children and families.
o Participants noted that it is important to create environments for locals to enjoy, particularly
passive activities like sculpture walks and story trails.
• Top suggestions among participants:
o Adjust lighting/dark skies ordinance to focus on wildlife and birds.
o City needs to set an example with native planting initiatives, use of chemical policies, and lighting.
o Shade is important, sidewalks and pathways are lacking in many parks.
o Add a signed pedestrian connection from Downtown to Hillmoor Zone 1.
o There is an opportunity to better promote the Four Seasons Nature Preserve, since few people
know about it. It needs a restroom.
Adult Sports
• Pickleball
o The new pickleball courts are an extremely successful investment and widely praised. Several
participants noted that the City has been highly responsive to user feedback, with improvements
implemented quickly after concerns were raised.
o Pickleball demand is growing and additional amenities or future court expansion may eventually
be warranted. Participants identified several enhancements for pickleball:
Signage explaining open-play procedure
Additional benches and seating
Better notification when courts are reserved for league play or private rentals
More consistent access hours for bathrooms
Part 5: Public Input Responses
29
Shade structures and picnic table
area
Windscreen
Potential court lighting
Exploration of additional pickleball
courts elsewhere in the City, with
Veterans Park mentioned as a
possible location
• Disc Golf
o Disc golf participation is increasing, and
there is strong support for course
upgrades and redesign. Participants
noted several needs for disc golf:
Additional trash receptacles
More frequent maintenance,
particularly grass mowing. Ensuring
mowing doesn’t damage the baskets
More seating/benches throughout
the course
Replacement of aging baskets and
infrastructure
Continued collaboration with the City
on long-term planning for redesign of the course to allow higher-level/championship-quality
play
o Participant identified potential sponsorship opportunities for holes and course improvements.
• Partnerships
o User groups are willing to partner with the City through fundraising, sponsorships, and volunteer
efforts such as:
Sponsorship of amenities such as benches
Fundraising for disc golf equipment and basket replacement
Volunteer cleanup efforts following storms and routine maintenance activities
Partnerships with organizations such as Friends groups and the Library
o Participants favor strengthening existing institutions (YMCA, Library, clubs) rather than creating a
new community center unless it fills unmet needs such as event space.
Boaters (2 Focus Group Meetings)
• There was a strong consensus that the waitlists for slips are extremely long, with some participants
stating they have been waiting for 15 to 20 years.
• The group discussed the City’s unique boat launch that is accessed into the middle of a public street,
noting that while it is unconventional to have vehicles with boat trailers crossing traffic, it has
functioned for decades without major safety incidents.
• Several participants shared their history with the waterfront, including one participant whose family
had a boat stall in the lagoon for 50 years before the lagoon slips were removed. He now stores his
boat in his driveway. Lagoon slip holders are frustrated by this situation and feel that the City should
have reinvested lagoon rental fees into maintenance and/or dredging to keep the lagoon piers in
place.
LAND TO LAKE PLAN
30
• The group questioned whether they wanted
to see more boats on the lake, including
residents and tourists.
• Municipal Slip Rates
o Participants debated municipal slip rates.
Some suggested that the City should
charge market rates to avoid
competition with the private sector, but
others stating that affordable slips are
one of the few perks offered to residents.
o Participants debated who should pay for
the initial construction of City-owned
piers or similar improvements and who
should pay for the maintenance of those
improvements – slip holders or Lake
Geneva taxpayers. Some felt that the
taxpayers should pay for the initial
construction and the slip holders should
pay for maintenance only.
• Improvements
o The participants generally agreed that
more slips are needed and would be
preferable to buoy moorings, as rowing to buoys is difficult and makes the harbor less accessible.
The group was open to replacing existing buoy moorings in favor of new pier slips. The group
discuss various options for new or improved pier systems on the lakefront.
o One participant suggested replacing the moorings east of the Riviera building with pier slips and
parking.
o Participants discussed options whether wave action would necessitate fixed docks instead of
floating docks.
o Vandalism was raised as a concern for the existing piers, leading to a discussion about the
necessity of gates. Some noted that during major events like Venetian Fest people often climb
onto private boats to watch the festivities. It was noted that while gates can deter people and
reduce nuisances, they cannot fully secure a marina against someone determined to enter from
the water.
• An existing parking lot northeast of the Riviera building is available for boat trailer parking. The two-
year Highway 50 project starting next year will temporarily affect parking, but the plan is to eventually
convert car spaces back to boat trailer spaces, potentially doubling the current capacity of 10 trailer
spots.
• One participant suggested extending paid beach hours past 5:00 PM to capture more revenue, noting
the beach is often busy after the staff leaves. One participant noted that the current rate is $10 for
everyone, though residents have access to an annual pass for $3. He felt $10 was too high for children,
but another speaker felt it was fair for out-of-town visitors.
Part 5: Public Input Responses
31
2026 Community Survey
Insert full Survey Summary in final draft or as separate attachment.
LAND TO LAKE PLAN
32
Page intentionally left blank
Part 6: Potential Funding Sources
33
Part 6: Potential Funding Sources
Figure 1.14: Potential Funding Sources
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
Federal Programs Administered by WisDNR
Land and Water
Conservation Fund
(LAWCON)
To acquire or develop
public outdoor recreation
areas and facilities.
• 50% local match per
project
• Land acquisition
• Development of
recreational
facilities
May 1
A comprehensive
outdoor recreation plan
in required.
Wisconsin
DNR
https://dnr.wisconsin.go
v/topic/Stewardship/Ap
plyLUG
Recreational Trails
Program (RTP)
To maintain, develop,
rehabilitate, and acquire
land for motorized, non-
motorized, and diversified
trails.
• Grant assistance to
develop or maintain
trails up to 80%.
• Awards up to
$100,000.
• Rehabilitation and
maintenance of
existing trails and
trailhead facilities.
• Development of
new trails, trail
linkages, and
trailhead facilities
with some
restrictions on
federal lands.
• Acquisition of
property for trails in
areas with limited
trail opportunities.
May 1
• Funds may only be
used on trails which
have been identified
in, or which further a
specific goal of a
local, county, or
state trail plan.
Funds may be used
on trails that are
referenced in a
statewide
comprehensive
outdoor recreation
plan
Projects must
comply with ADA.
Wisconsin
DNR
https://dnr.wisconsin.go
v/topic/Stewardship/Ap
plyLUG
LAND TO LAKE PLAN
34
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
Statewide Multi-Modal Improvement Program (SMIP)
Transportation
Alternatives Program
(TAP)
To fund facilities for
pedestrians and bicyclists,
including rehabilitating
and operating historic
transportation buildings
and structures, restoring
railway depots, and
landscaping near
transportation facilities.
20% required match
*anticipated
January
2028
Construction
projects must be
over $100,000.
Non-construction
projects must be
over $50,000.
WisDOT
https://wisconsindot.go
v/Pages/doing-
bus/local-gov/astnce-
pgms/aid/tap.aspx
Surface Transportation
Program – Urban
(STP-U)
To fund a range of
transportation-related
activities, including
projects on higher function
local roads and local safety
improvements.
WisDOT recommends
federal funding be
approved at the 80%
maximum but allows
Transportation
Improvement Program
(TIP) Committees to
provide as low as 50%
federal funding at
approval.
Spring
2026
For 2022-2027 program
development, total
funds available are $92.5
million.
WisDOT
https://wisconsindot.go
v/Pages/doing-
bus/local-gov/astnce-
pgms/highway/stp-
urban.aspx
Surface Transportation
Program – Rural (STP-R)
To fund a wide range of
transportation-related
activities, including
projects on higher function
local roads and local safety
improvements.
WisDOT recommends
federal funding be
approved at the 80%
maximum but allows
Transportation
Improvement Program
(TIP) Committees to
provide as low as 50%
federal funding at
approval.
Spring
2026
For 2022-2027 program
development, total
funds available are
$43.3 million.
WisDOT
https://wisconsindot.go
v/Pages/doing-
bus/local-gov/astnce-
pgms/highway/stp-
rural.aspx
Part 6: Potential Funding Sources
35
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
Other Programs
Urban
Forestry
Grants
To fund tree maintenance,
planting, and public
awareness.
$1,000-$25,000 grants
awarded with a 50%
local match
October
2026
Urban forestry, training,
and street tree
inventory
Wisconsin
DNR Urban
Forestry
https://dnr.wisconsin.go
v/topic/urbanforests/gr
ants
Boating
Infrastructure
Grant Program
(BIG)
The purpose of BIG is to
construct, renovate and
maintain boating
infrastructure facilities for
transient recreational
vessels at least 26 feet long.
Tier 1 – State:
Up to $300,000
Tier 2 – National:
Up to $1,500,000
June 1 Wisconsin
DNR
https://dnr.wisconsin.
gov/aid/BIG.html
Highway Safety
Improvement
Program To improve state and local
street or highway safety,
reduce number and
severity of crashes
10% local match per
project
Late
Summer
2026
Communities are
encouraged to start
working with the
District Office.
WisDOT
Highway
Safety
Improvement
Program
(HSIP)
https://wisconsindot.go
v/pages/doing-
bus/local-gov/astnce-
pgms/highway/hsip.asp
x
PeopleForBikes
To improve bicycling in the
U.S. Fall 2026 People For
Bikes
https://www.peopleforb
ikes.org/grants
Safe Streets and
Roads for All (SS4A)
To support planning,
infrastructure, behavioral,
and operational initiatives
to prevent death and
serious injury on roads and
streets involving all
roadway users.
$200,000-$50 million Spring
2026
Eligible projects:
• Develop or update a
comprehensive
safety action plan
(Action Plan).
• Conduct planning,
design, and
development
activities in support
of an Action Plan.
• Carry out projects
and strategies
identified in an
Action Plan.
US DOT https://www.transportat
ion.gov/grants/SS4A
LAND TO LAKE PLAN
36
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
North American
Wetlands
Conservation Act
(NAWCA)
To increase bird
populations and wetland
habitat while supporting
local economies and
American traditions such
as hunting, fishing, bird
watching, family farming,
and cattle ranching.
Up to $2 million
Summer
and Fall
2026
Projects must involve
only long-term
protection, restoration,
enhancement, and/or
establishment of
wetland and associated
upland habitats to
benefit migratory birds.
US Dept of
Interior Fish
and Wildlife
Service
https://www.fws.gov/ser
vice/north-american-
wetlands-conservation-
act-nawca-grants-us-
standard
AARP Community
Challenge Small grants to fund quick-
action projects that can
help communities become
more livable for people of
all ages.
• Average grant
amount $11,500.
• 76% of grants less
than $15,000.
Spring
2026
• Improve public
spaces, housing,
transportation, and
civic engagement.
• Support diversity,
equity, and
inclusion.
• Build engagement
for programs under
new federal laws.
• Pursue innovative
ideas that support
people age 50 or
older.
AARP
https://www.aarp.org/liv
able-
communities/communi
ty-challenge/
Private
Donations Local donations,
fundraising and
sponsorship opportunities
by businesses and/or
individuals
Wisconsin
Main Street
Community
Program To revitalize
comprehensive downtown
programs, including
streetscapes.
Technical Assistance No Date
• General downtown
program.
• May benefit trail
enhancements
through
streetscaping.
National Main
Street Center
https://wedc.org/progra
ms-and-
resources/main-street/
Part 6: Potential Funding Sources
37
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
Aquatic Restoration Programs
Surface Water Restoration and
Management Grants
To provide cost-sharing for
surface water protection
and restoration. Funding
available for education,
ecological assessments,
planning, and
implementation.
• Grants cover up to
75% of costs.
• $25,000-$200,000,
depending on type
of grant.
Pre-
application
submittal
by Sept. 15,
full
application
by Nov 15
Types of grants include:
• Healthy Lakes &
Rivers
• Surface Water
Restoration
• Management Plan
Implementation
• Ordinance
Development
• Fee Simple Land
Easement &
Acquisition
• Wetland Restoration
Incentives
Wisconsin
DNR
https://dnr.wisconsin.go
v/aid/SurfaceWater.htm
l
Sustainability Programs
Natural Resources
Foundation of
Wisconsin
To fund many different
kinds of projects that
benefit wildlife.
Grants vary by type,
some open to annual
applications, and some
by invitation only.
Varies
Types of grants include:
• Bird Protection
Fund
• C.D. Besadny
Conservation Fund
• Norma and Stanley
DeBoer Quiet Trails
Fund
Natural
Resources
Foundation of
Wisconsin
https://www.wisconserv
ation.org/grant-
programs/
Choice
Neighborhoods
Planning Grants
Among other priorities,
offers grants that allow for
pocket parks and
community gardens as
part of their funding.
Maximum $500,000 Summer
2026
Types of grants:
• Planning Grants
• Implementation
Grants
HUD
https://www.hud.gov/pr
ogram_offices/public_in
dian_housing/programs
/ph/cn/planninggrants
Urban &
Community
Forestry
Program Technical, financial, and
educational assistance
program, delivering
nature-based solutions to
ensure a resilient and
equitable tree canopy.
August
2026
Some areas of focus:
• Planning
• Environmental
Health
US Forest
Service
https://www.fs.usda.gov
/managing-land/urban-
forests/ucf
LAND TO LAKE PLAN
38
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
Community
Development
Block Grant
(CDBG) Programs
To support community
development activities to
build stronger and more
resilient communities.
Can include parks and
similar green spaces. HUD https://www.hudexchan
ge.info/programs/cdbg/
Five Star and Urban Waters
Restoration Program To develop community
capacity to sustain local
natural resources by
providing modest financial
assistance to diverse local
partnerships focused on
improving water quality,
watersheds, and the
species and habitats they
support.
$20,000-$50,000 January
2026
Ecological
improvements may
include one or more of
the following: wetland,
riparian, forest and
coastal habitat
restoration; wildlife
conservation,
community tree canopy
enhancement, water
quality monitoring and
green infrastructure
best management
practices for managing
run-off.
National Fish
and Wildlife
Foundation
https://www.nfwf.org/pr
ograms/five-star-
program
Cornell Douglas
Foundation Grants
For nonprofits to advocate
for environmental health
and justice, encourage
stewardship of the
environment, and further
respect for sustainability of
resources.
Average grant amount
$10,000.
Year-
round
Some areas of focus:
• Environmental
Health & Justice
• Land Conservation
• Sustainability of
Resources
• Watershed
Protection
Cornell
Douglas
Foundation
https://www.cornelldou
glas.org/grants
Waste
Management
Charitable
Giving
For nonprofits to provide
renewal resources to
reduce our dependence on
fossil fuels and to conserve
and maintain wetlands,
wildlife habitats, and green
spaces.
Not listed Year-
round Waste
Management
https://www.wm.com/u
s/en/inside-wm/social-
impact/community-
impact
Part 6: Potential Funding Sources
39
Program Purpose Funding Details Dead-line Notes
Admin
Agency Resource
Patagonia
Environmental
Grants
Support innovative work
that addresses the root
causes of the
environmental crisis and
seeks to protect both the
environment and affected
communities.
$5,000-$20,000,
according to program Varies Patagonia https://www.patagonia.
com/how-we-fund/
Walmart Foundation
National Giving
Program Grant
For non-profits that
operate on a national
scope through affiliates in
many states around the
country or through
programs that operate
regionally/locally but seek
funding to replicate
program activities
nationally.
$250,000 and above Year-
round
Areas of focus:
• Hunger Relief &
Healthy Eating
• Sustainability
• Women's Economic
Empowerment
• Career Opportunity
Walmart
Foundation
https://walmart.org/ho
w-we-give
Rivers, Trails, and
Conservation
Assistance Program
To provide professional
services to help achieve
conservation and outdoor
recreation project vision.
Does not provide
financial assistance or
monetary grants.
March 1
Contact the state
program manager to
discuss the proposed
project and current
application process.
National Park
Service
https://www.nps.gov/or
gs/rtca/apply.htm
Source: City of Lake Geneva website. First collected Nov 17, 2026.