RecordWell Data

Public Works & Utility Committee Agenda/ Packet

Town of Lisbon · Waukesha County · meeting of Nov 18, 2026 · Agenda packets

Open the original document More from Town of Lisbon

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE OF LISBON W234 N8676 Woodside Rd Lisbon, WI 53089-1545 Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov Join Zoom Online: https://us06web.zoom.us/j/88319721129?pwd=Rm1tdkgzcW9PMG5HY051MlBpbzR4UT09 Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 883 1972 1129 Passcode: 027704 MEETING AGENDA PUBLIC WORKS & UTILITY COMMITTEE – LISBON VILLAGE HALL NOVEMBER 18, 2026, at 5:00P.M. 1. Call to Order & Roll Call 2. Pledge of Allegiance 3. Citizen Comments – Please limit comments to three minutes 4. Approval of Meeting Minutes • 10/21/2026 Public Works & Utility Committee 5. Department Reports A. Dept. of Public Works – DPW Director B. Utility District – Engineer C. Special Projects - Administrator 6. New Business Discussion and necessary action regarding the following items: A. Ordinance to amend Section 32.06 Lisbon Municipal Code related to Water Services B. DPW costs and staffing for annual appliance and tire recycling event C. Resident request for consideration of alternate Compost Site hours and/or autumn leaf collection D. Preliminary discussion re: upcoming repairs to Village of Sussex lift station serving Lisbon customers 7. Items to be Placed on a Future Agenda 8. Adjournment NOTE: It is possible that members and/or a quorum of other governmental bodies may attend the above meeting to gather information. No action will be taken by any governmental body other than specifically noticed above. Citizens with disabilities who require assistance to participate in this meeting should contact Village Hall at least 72 hours in advance. VILLAGE OF LISBON W234N8676 Woodside Road Lisbon, WI 53089-1545 MEETING MINUTES PUBLIC WORKS & UTILITY COMMITTEE LISBON VILLAGE HALL – OCTOBER 21, 2026 Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov Call to Order Committee Chair Marc Moonen called the meeting to order at 5:00p.m. Roll Call Present: Trustees Marc Moonen and Linda Beal; Members Jane Mueller, and Joe Eberle; Administrator Dan Green; DPW Director Nick Wilichowski; and Clerk Elisa Cappozzo. Member Randy Chmiel and Engineer Don Neitzel were absent and excused. Pledge of Allegiance The Pledge of Allegiance was recited by all those present. Public Comments Rob and Barb Yaeger, N54W22086 Bonnie Lane, each spoke against the proposed quarry water supply project. Approval of Meeting Minutes 9/16/2026 Public Works & Utility Committee The Committee noted a t ypo on page 2 , and Clerk Cappozzo indicated she ’d make the correction. Motion by Eberle, second by Mueller, to approve the minutes as corrected. Motion carried unanimously. Department Reports Public Works Director Wilichowski reported on several recent departmental activities from the previous month. The Highway Department completed driveway and cross culverts for the year. Crews prepared the Sterling truck for installation of a new dump body, expected to be complete shortly, and continued upfitting the bucket trucks. Crews also began the final mowing cut of the year, performed ditching, and received all deliveries of early-season fill. The fall recycling event collected about 9,000 pounds of electronics. Turnout was lighter than in prior years, and a different vendor was used because the prior vendor no longer offers the service. The Parks Department performed soccer and baseball field maintenance, and surveyors began marking the playground area for utilities. The Director also worked on the road paving and chip seal budget, new shop repair spreadsheets and the 10-year road plan, and attended the STH 164 construction meeting. Public Works & Utility Committee October 21, 2026 Page 2 of 5 Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov In response to questions, the Director stated that the STH 164 project is expected to begin in mid -to- late March, weather permitting. Good Hope Road will be fully closed near Silver Spring, with a hard closure beginning near Indian Grass. Traffic is expect ed to use alternate routes such as Hillside, Plainview, County Hwy Q, and Merton roads. Committee members anticipated a lengthy construction period, with the state indicating completion around November. Chair Moonen requested that staff track and report the cost of the recycling event, including wages, along with revenue. The Director and Administrator Green indicated the event is roughly revenue neutral and was intended to recover the cost of Highway Dep artment staff time. The Chair noted the event is in about its eighth year and was started to reduce roadside dumping. The Director said that if participation remains light, the committee could consider holding the event every other year. Committee members also discussed rotating the event among neighboring communities, and noted that the village's waste hauler, GFL, now offers pickup of appliances for a fee. Utility District Trustee Moonen reviewed Engineer Neitzel’s monthly report, noting monthly flows and run time for the Jeanine, Plainview, Willow Springs, and Richmond lift stations. September flows increased over August, by 5 gallons per minute for Jeanine and 3 gallons per minute for Plainview. Willow Springs flows were averaged at 26 gallons per minute based on historical data because of an electrical service issue with the flow meter. We Energies installed the new pedestal on October 1, but the meter had not yet been installed. Administrator Green reported that We Energies was awaiting an inspection approval, after which installation was expected within approximately one and a half to two weeks. Sabol is to install new plug and check valves this month. The Richmond Lift Station recorded 173 hours of run time for September, split roughly evenly between pumps 1 and 2 at about 2.8 to 3 hours per day. The well reading was 40,100 gallons, compared with 17,300 gallons the prior month. September water usage inc reased over August because school was back in session, but flows remained below those of September 2024 and 2025. The fire station well used 6,800 gallons, consistent with prior months. Casey's used 68,121 gallons, similar to August. On September 11, Casey's engineer reported that the cause of the elevated usage had been identified and private repairs were being arranged. Special Projects Administrator Green r eviewed status updates for various ongoing and upcoming projects in the Village. that a public informational meeting on the quarry water project was held, attended by DNR representatives and three representatives of Strand Associates. The meeting included a presentation and breakout group discussions. A second meeting was planned for late November or early December, with the location still to be determined. Staff were seeking a larger venue and proposed an open house format beginning at 5:00 PM so residents could come and go. The village website carries a detailed project page with the meeting report and presentatio n slides. The Administrator had received about ten emails, mostly questions and requests for clarification, and invited further Public Works & Utility Committee October 21, 2026 Page 3 of 5 Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov comments. Notice will be given through the "Notify Me" function on the village website and by direct mailers, which staff hoped to send early the following week. On the sanitary sewer project, the Administrator reported that staff were still trying to locate a document submitted to the DNR in connection with the STH 164 project, which would help establish the intended capacity. Staff planned to contact additional p arties. The village was also continuing to pursue the comprehensive plan amendment and had reached out to citizen members to move that process forward. New Business Pay Request by NEXT Electric for Flow Meter at Business Park East Chair Moonen referenced the October 9 memo from the Engineer to Administrator Green describing the final payment request. Administrator Green explained that the flow meter project had been completed and that NEXT Electric was requesting its final payment. The committee took Item 6.B ahead of this item at the Administrator's suggestion, since the two were related, and then returned to this item. Members confirmed that this was the final payment. Motion by Eberle, second by Mueller, to approve Payment Request #2, the final payment, from NEXT Electric, LLC for the Sewer Flow Meter at Business Park East in the amount of $28,781.06 . Motion carried unanimously. Change Order #1 for Business Park East Flow Meter in the amount of $5,590.91 Administrator Green explained that We Energies' actual costs for its portion of the work came in substantially above its original estimate. The original plans included an additional transformer, and significant ductwork was required to the meter, including extra concrete encasement. The cost was funded through the TID budget. Chair Moonen noted that the village board approved the NEXT Electric contract on June 18 in the amount of $70,503, so the change order must be forwarded to the board for approval. Motion by Eberle, second by Mueller, to approve Change Order No. 1 to NEXT Electric's contract in the amount of $5,590.91. Motion carried unanimously. Discussion only re: 2027 Road Rehabilitation projects The committee reviewed two documents in the packet, covering crack filling and chip sealing and pavement resurfacing. Director Wilichowski stated that because no chip sealing had been done in the past two years, the 2027 plan includes North Lisbon Road and North Road, from Hillside to North Road and from North Road to County Road Q. Richmond Road is also planned, depending on the timing of the bridge work. A member suggested adjusting the starting point of one segment to avoid areas that may be reconstructed. The Director noted that a recent contractor quote had been provided to the Engineer, who would update his figures. Chair Moonen asked why the Engineer's estimate included erosion control and traffic control line items not seen in earlier estimates. The Director believed erosion Public Works & Utility Committee October 21, 2026 Page 4 of 5 Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov control is a standard line item for contingencies and agreed to ask the Engineer. Traffic control covers flaggers and signage, and the village would request that contractors distribute notices to affected residents. The stone type (¼-inch, ⅜-inch, or smaller aggregate) will be determined with the Engineer and specified in the bid. Official quotes will be obtained in the spring. Administrator Green stated that Mary Hill Road reconstruction would cost an estimated $4 million and would likely require borrowing, possibly in conjunction with another project. Member Eberle stated that the road's current cross section is that of a former town road and does not reflect current traffic from several subdivisions. He urged that a paved shoulder be considered and asked that the cross section be reviewed. Staff anticipated reconstruction around 2030 to 2031. The Director said the existing pavement is rutted in places and that in-house patching may be done next year to extend its life. The Director proposed shifting from the village's historical pulverize-and-pave approach to a mill and overlay approach where pavement conditions allow. The plan includes the following: ● Hillside Road: from the cul-de-sac south of Good Hope to Plainview, with a 2-inch mill and a 2- or 3-inch overlay. Core sampling found the pavement to be about 7 inches thick, so the Director considered this approach appropriate. ● North Road: two sections near Crooked Bridge and the Park River Crossing subdivision, with milling and a 2-inch overlay before chip sealing. ● Lake Five Road: the section in front of Hass Farms. ● Alternates: Hillside Lane and Hickory View Lane, each with a 2-inch mill and 2-inch overlay. ● Indian Grass Road: possible pulverize and repave, with a wider roadway and larger shoulders, because of truck traffic. The Director stated that remaining paving funds would allow additional roads to be completed, and that work on Hillside and Indian Grass could coincide with the STH 164 closure. Administrator Green recommended deferring one of the smaller streets pending p otential development interest and favored combining Indian Grass and Hillside in the same year if budget permits, with the alternates considered based on bid prices. Chair Moonen asked whether the Hillside Lane entrance could be relocated or connected at the north end, citing complaints about delivery trucks parking on Hillside. The Director said he had raised this with the Engineer, who would study options. Members di scussed sight -line considerations. The Engineer will also review reconfiguring the Good Hope and Hillside intersection, including the stop sign island, in light of heavy traffic backups. Members raised questions about how the Indian Grass entrance to STH 164 will function once the state's intersection improvements are built, and about truck traffic from the gravel pit. This was a discussion-only item and no action was taken. Items to be Placed on a Future Agenda Member Eberle requested a review of the typical road section used for village roads such as Mary Hill Road, which he noted is about 50 years old. It was agreed this could be taken up in the spring. Public Works & Utility Committee October 21, 2026 Page 5 of 5 Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov Chair Moonen asked that the Director provide recycling event cost and revenue information for discussion at the next meeting. Adjournment There being no further business, motion by Eberle, second by Beal, to adjourn the meeting at 5:51p.m. Respectfully submitted, Elisa M. Cappozzo, WCMC Lisbon Village Clerk DPW Monthly Report October 2026 Highway: • Light ditching and drainage repairs • 970 ton of early fill salt delivered • Tree stump removal • Reclaim shoulders on the mains • Shoulder small section of Hickory Rd • Finish up retrofitting bucket truck • Asphalt shoulder Janet Dr. • Patch Holes • Underbody pressure wash patrol trucks • Start on rust converting and undercoating patrol trucks Parks: • Continue on mowing parks • Mulching and blowing leaves • Maintenance on 9-11 memorial • Blow out water lines before winter • Shelter building maintenance performed DPW Director: • Work on redesign of Lisbon Highway logo and installing graphics on newer trucks and equipment • Submit SMALS salt storage form for the DOT • Prep equipment items for auction – Kubota Tractor, Light tower, 2 Fire Department Tenders • Ran grader for reclaiming shoulders • Attended Waukesha County Highway Department meeting • Order no parking signs for Mary Hill Road • Meet with Dan and Mitch in October fields about drainage issues • Water softener installed at Good Hope Fire Station • Shop hoist install start date first week in December (2-2.5-week project) • November 30th start grinding at compost site 107 Parallel Street Beaver Dam, WI 53916 • 1115 S Main Street West Bend, WI 53095 • T 920-356-9447 www.kunkelengineering.com November 12, 2026 To: Village of Lisbon Utility Committee From: Don Neitzel Re: Monthly Report (October) __________________ The monthly engineer’s report for the Village of Lisbon Public Works & Utility Committee is as follows: • October 2026 Flows – Flows for the month of September were once again up from the previous month of August. o The Jeanine Lift Station had an average flow of 23 GPM (average 30,000 GPD) for the month of October, while the month of September was 26 GPM (average 33,000 GPD). o The Plainview Lift Station for the month of October had an average flow of 24 GPM (average 33,000 GPD), while the month of September was 24 GPM (33,000 GPD). o Willow Springs flows for the month of October were once again averaged due to the electric service issue with the flow meter. An average flow of 30 GPM was once again used for the month based on historical data for this same time period. Next Electric has completed all of their work associated with getting the new electric service installed at the flow meter location and including electrical inspection approvals. The last remaining items is for WE Energies to install the electric meter. I have not heard back from WE Energies about the schedule for installing the meter, but I’m assuming it should be in the next week or so. At that point, Sussex will begin receiving flow information again for Willow Springs. o Sabel Mechanical completed planning the new plug and check valves in the lift stations yesterday (November 11th). Waiting on invoices for the new valves and the labor to install them. • Richmond School Lift Station – o October 2026 - The lift station had a total run time of approximately 244.3 hours for the month of October, with 123.3 hours on Pump #1 (average of 4 hrs run time/day) and 121.0 hours on Pump #2 (3.9 hrs run time/day). o The well reading for the month of October was 40,600 gallons and for the prior month of September it was 40,100 gallons. (see attached water usage chart and sewer flow information). The historical flows for the month of October have the 2026 flows below what was seen during the same month in 2024 and about the same as 2025. 107 Parallel Street Beaver Dam, WI 53916 • 1115 S Main Street West Bend, WI 53095 • T 920-356-9447 www.kunkelengineering.com • Fire station Well – o October 2026 - The water usage for the month of October was 6,900 gallons, while the water usage in the prior month of September was 6,800 gallons. (see attached water usage chart). This remains in-line with the monthly flows for both 2025 and 2026 thru the month of October. • Casey’s Well – o October 2026 -The water usage at Casey’s for the month of October was down considerably from the previous month, with 19,988 gallons of water being used in October while the well reading for the month of September was 68,121 gallons. Casey’s final determined that there was an issue with the water softener and made whatever repairs were necessary after 5 months of high-water usage. The water usage for the month of October 2026 falls in-line with what was recorded for the same month in 2024 and 2025. 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 10 20 30 40 50 60 1st 2nd 3rd 4th 5th* 6th 7th 8th 9th 10th 11th 12th* 13th 14th 15th 16th 17th 18th 19th* 20th 21st 22nd 23rd 24th 25th 26th* 27th 28th 29th 30th 31st Rainfall (in) Flow Totals (Kgals) * = Monday Jeanine Daily Flow Totals with Rainfall Data - October 2026 Flow Totals Rainfall 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0 500 1000 1500 2000 2500 3000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Flows (Kgals) Jeanine LS Total Monthly Flows with Monthly Average Rainfall Data Flow 24 Flow 25 Flow 26 Rainfall 24 Rainfall 25 Rainfall 26 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 10 20 30 40 50 60 1st 2nd 3rd 4th 5th* 6th 7th 8th 9th 10th 11th 12th* 13th 14th 15th 16th 17th 18th 19th* 20th 21st 22nd 23rd 24th 25th 26th* 27th 28th 29th 30th 31st Rainfall (in) Flow Totals (Kgals) * = Monday Plainview Daily Flow Totals with Rainfall Data - October 2026 Flow Totals Rainfall 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0 500 1000 1500 2000 2500 3000 3500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Rainfall (in) Total Flows (Kgals) Plainview LS Total Monthly Flows and Monthly Average Rainfall Data Flow 24 Flow 25 Flow 26 Rain 24 Rain 25 Rain 26 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 5 10 15 20 25 30 35 1st 2nd 3rd 4th 5th* 6th 7th 8th 9th 10th 11th 12th* 13th 14th 15th 16th 17th 18th 19th* 20th 21st 22nd 23rd 24th 25th 26th* 27th 28th 29th 30th 31st Rainfall (in) Flow Totals (Kgals) * = Monday Willow Springs Daily Flow Totals with Rainfall Data - October 2026 **2025 October Average used for flow estimates Flow Totals Rainfall 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 2,800 3,000 3,200 3,400 3,600 3,800 4,000 4,200 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Rainfall (in) Total Flows (Kgals) Willow Springs LS Total Monthly Flows with Monthly Average Rainfall Data Flow 24 Flow 25 Flow 26 Rain 24 Rain 25 Rain 26 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000 55000 60000 65000 70000 75000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Gallons Richmond Monthly Well Totals 2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Gallons Firehouse Monthly Well Totals 2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 110000 120000 130000 140000 150000 160000 170000 180000 190000 200000 210000 220000 230000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Gallons Casey's Monthly Well Totals 2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons STATE OF WISCONSIN VILLAGE OF LISBON WAUKESHA COUNTY ORDINANCE 2026-XX AN ORDINANCE TO AMEND SECTION 32.06 OF THE VILLAGE OF LISBON MUNICIPAL CODE RELATED TO WATER SERVICES WHEREAS, the Village of Lisbon regulates water services in Chapter 32 of the Village of Lisbon Municipal Code; and WHEREAS, the Village Board of the Village of Lisbon finds that it is in the best interest of the Village of Lisbon to require a property or structure to connect to the Sussex Water Utility when an operational public water main becomes available. NOW, THEREFORE, the Village Board of the Village of Lisbon, Waukesha County, Wisconsin, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Chapter 32 of the Village of Lisbon Municipal Code entitled “Sewer Service,” Section 32.06 entitled “Administrative rules and regulations,” Subsection (15) is hereby created as follows: 15. Compulsory connection. a. Connection required. As set forth in this ordinance section, when an operational Village water main becomes available to any property or structure thereon that is used or capable of being used for human occupation or use, such property or structure shall be connected to the municipal water system within six months of the sewer main becoming available to the property. b. Private water supply. As part of the connection to the municipal water system in subsection (a) of this ordinance, any private water supply shall be either: 1. Abandoned according to statute and the state administrative code; or 2. Maintained as a nonportable source of water for lawn irrigation if the following conditions are met: a) The water in such well tests bacteriologically safe; and b) Every two years from the date such well is separated from the building, the property owner provides the Village Clerk with a testing laboratory certification that the water in such well continues to test safe. 3. If the property owner fails or neglects to provide such water test, then such well shall immediately be abandoned according to law. SECTION 2. SEVERABILITY. The several sections of this ordinance are declared to be severable. If any section or portion thereof shall be declared by a court of competent jurisdiction to be invalid, unlawful or unenforceable, such decision shall apply only to the specific section o r portion thereof directly specified in the decision and shall not affect the validity of any other provisions, sections or portions thereof the ordinance. The remainder of the ordinance shall remain in full force and effect. Any other ordinances whose terms conflict with the provisions of this ordinance are hereby repealed as to those terms that conflict. SECTION 3. EFFECTIVE DATE. This ordinance shall be effective upon publication or posting as provided by law. PASSED AND ADOPTED by the Village Board of the Village of Lisbon, Waukesha County, Wisconsin on this ______ day of ____________, 2026. VILLAGE BOARD, VILLAGE OF LISBON WAUKESHA COUNTY, WISCONSIN BY: ________________________________________ MATTHEW GEHRKE, President BY: ________________________________________ PAULA QUINN, Trustee #1 BY: ________________________________________ MARC MOONEN, Trustee #2 BY: ________________________________________ LINDA BEAL, Trustee #3 BY: ________________________________________ ROB BAUM, Trustee #4 ATTEST: BY: ________________________________________ ELISA CAPPOZZO, Village Clerk Published and/or posted this ______ day of ______________________________, 20______.

Source: Town of Lisbon website. First collected Nov 17, 2026.