Public Works & Utility Committee Agenda/ Packet
Town of Lisbon · Waukesha County · meeting of Nov 18, 2026 · Agenda packets
Open the original document More from Town of Lisbon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF LISBON
W234 N8676 Woodside Rd
Lisbon, WI 53089-1545
Office: (262) 246-6100 | Email: villagehall@lisbonwi.gov | Website: www.lisbonwi.gov
Join Zoom Online: https://us06web.zoom.us/j/88319721129?pwd=Rm1tdkgzcW9PMG5HY051MlBpbzR4UT09
Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 883 1972 1129 Passcode: 027704
MEETING AGENDA
PUBLIC WORKS & UTILITY COMMITTEE – LISBON VILLAGE HALL
NOVEMBER 18, 2026, at 5:00P.M.
1. Call to Order & Roll Call
2. Pledge of Allegiance
3. Citizen Comments – Please limit comments to three minutes
4. Approval of Meeting Minutes
• 10/21/2026 Public Works & Utility Committee
5. Department Reports
A. Dept. of Public Works – DPW Director
B. Utility District – Engineer
C. Special Projects - Administrator
6. New Business
Discussion and necessary action regarding the following items:
A. Ordinance to amend Section 32.06 Lisbon Municipal Code related to Water Services
B. DPW costs and staffing for annual appliance and tire recycling event
C. Resident request for consideration of alternate Compost Site hours and/or autumn leaf collection
D. Preliminary discussion re: upcoming repairs to Village of Sussex lift station serving Lisbon customers
7. Items to be Placed on a Future Agenda
8. Adjournment
NOTE: It is possible that members and/or a quorum of other governmental bodies may attend the above meeting to gather information.
No action will be taken by any governmental body other than specifically noticed above. Citizens with disabilities who require assistance
to participate in this meeting should contact Village Hall at least 72 hours in advance.
VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PUBLIC WORKS & UTILITY COMMITTEE
LISBON VILLAGE HALL – OCTOBER 21, 2026
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
Committee Chair Marc Moonen called the meeting to order at 5:00p.m.
Roll Call
Present: Trustees Marc Moonen and Linda Beal; Members Jane Mueller, and Joe Eberle; Administrator
Dan Green; DPW Director Nick Wilichowski; and Clerk Elisa Cappozzo. Member Randy Chmiel and
Engineer Don Neitzel were absent and excused.
Pledge of Allegiance
The Pledge of Allegiance was recited by all those present.
Public Comments
Rob and Barb Yaeger, N54W22086 Bonnie Lane, each spoke against the proposed quarry water supply
project.
Approval of Meeting Minutes
9/16/2026 Public Works & Utility Committee
The Committee noted a t ypo on page 2 , and Clerk Cappozzo indicated she ’d make the correction.
Motion by Eberle, second by Mueller, to approve the minutes as corrected. Motion carried unanimously.
Department Reports
Public Works
Director Wilichowski reported on several recent departmental activities from the previous month. The
Highway Department completed driveway and cross culverts for the year. Crews prepared the Sterling
truck for installation of a new dump body, expected to be complete shortly, and continued upfitting
the bucket trucks. Crews also began the final mowing cut of the year, performed ditching, and received
all deliveries of early-season fill. The fall recycling event collected about 9,000 pounds of electronics.
Turnout was lighter than in prior years, and a different vendor was used because the prior vendor no
longer offers the service. The Parks Department performed soccer and baseball field maintenance,
and surveyors began marking the playground area for utilities. The Director also worked on the road
paving and chip seal budget, new shop repair spreadsheets and the 10-year road plan, and attended
the STH 164 construction meeting.
Public Works & Utility Committee
October 21, 2026
Page 2 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
In response to questions, the Director stated that the STH 164 project is expected to begin in mid -to-
late March, weather permitting. Good Hope Road will be fully closed near Silver Spring, with a hard
closure beginning near Indian Grass. Traffic is expect ed to use alternate routes such as Hillside,
Plainview, County Hwy Q, and Merton roads. Committee members anticipated a lengthy construction
period, with the state indicating completion around November.
Chair Moonen requested that staff track and report the cost of the recycling event, including wages,
along with revenue. The Director and Administrator Green indicated the event is roughly revenue
neutral and was intended to recover the cost of Highway Dep artment staff time. The Chair noted the
event is in about its eighth year and was started to reduce roadside dumping. The Director said that if
participation remains light, the committee could consider holding the event every other year.
Committee members also discussed rotating the event among neighboring communities, and noted
that the village's waste hauler, GFL, now offers pickup of appliances for a fee.
Utility District
Trustee Moonen reviewed Engineer Neitzel’s monthly report, noting monthly flows and run time for the
Jeanine, Plainview, Willow Springs, and Richmond lift stations. September flows increased over August,
by 5 gallons per minute for Jeanine and 3 gallons per minute for Plainview. Willow Springs flows were
averaged at 26 gallons per minute based on historical data because of an electrical service issue with
the flow meter. We Energies installed the new pedestal on October 1, but the meter had not yet been
installed. Administrator Green reported that We Energies was awaiting an inspection approval, after
which installation was expected within approximately one and a half to two weeks. Sabol is to install
new plug and check valves this month.
The Richmond Lift Station recorded 173 hours of run time for September, split roughly evenly between
pumps 1 and 2 at about 2.8 to 3 hours per day. The well reading was 40,100 gallons, compared with
17,300 gallons the prior month. September water usage inc reased over August because school was
back in session, but flows remained below those of September 2024 and 2025. The fire station well
used 6,800 gallons, consistent with prior months. Casey's used 68,121 gallons, similar to August. On
September 11, Casey's engineer reported that the cause of the elevated usage had been identified and
private repairs were being arranged.
Special Projects
Administrator Green r eviewed status updates for various ongoing and upcoming projects in the
Village. that a public informational meeting on the quarry water project was held, attended by DNR
representatives and three representatives of Strand Associates. The meeting included a presentation
and breakout group discussions. A second meeting was planned for late November or early
December, with the location still to be determined. Staff were seeking a larger venue and proposed an
open house format beginning at 5:00 PM so residents could come and go. The village website carries
a detailed project page with the meeting report and presentatio n slides. The Administrator had
received about ten emails, mostly questions and requests for clarification, and invited further
Public Works & Utility Committee
October 21, 2026
Page 3 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
comments. Notice will be given through the "Notify Me" function on the village website and by direct
mailers, which staff hoped to send early the following week.
On the sanitary sewer project, the Administrator reported that staff were still trying to locate a
document submitted to the DNR in connection with the STH 164 project, which would help establish the
intended capacity. Staff planned to contact additional p arties. The village was also continuing to
pursue the comprehensive plan amendment and had reached out to citizen members to move that
process forward.
New Business
Pay Request by NEXT Electric for Flow Meter at Business Park East
Chair Moonen referenced the October 9 memo from the Engineer to Administrator Green describing
the final payment request. Administrator Green explained that the flow meter project had been
completed and that NEXT Electric was requesting its final payment. The committee took Item 6.B
ahead of this item at the Administrator's suggestion, since the two were related, and then returned to
this item. Members confirmed that this was the final payment.
Motion by Eberle, second by Mueller, to approve Payment Request #2, the final payment, from NEXT
Electric, LLC for the Sewer Flow Meter at Business Park East in the amount of $28,781.06 . Motion carried
unanimously.
Change Order #1 for Business Park East Flow Meter in the amount of $5,590.91
Administrator Green explained that We Energies' actual costs for its portion of the work came in
substantially above its original estimate. The original plans included an additional transformer, and
significant ductwork was required to the meter, including extra concrete encasement. The cost was
funded through the TID budget. Chair Moonen noted that the village board approved the NEXT Electric
contract on June 18 in the amount of $70,503, so the change order must be forwarded to the board for
approval.
Motion by Eberle, second by Mueller, to approve Change Order No. 1 to NEXT Electric's contract in the
amount of $5,590.91. Motion carried unanimously.
Discussion only re: 2027 Road Rehabilitation projects
The committee reviewed two documents in the packet, covering crack filling and chip sealing and
pavement resurfacing. Director Wilichowski stated that because no chip sealing had been done in the
past two years, the 2027 plan includes North Lisbon Road and North Road, from Hillside to North Road
and from North Road to County Road Q. Richmond Road is also planned, depending on the timing of
the bridge work. A member suggested adjusting the starting point of one segment to avoid areas that
may be reconstructed. The Director noted that a recent contractor quote had been provided to the
Engineer, who would update his figures. Chair Moonen asked why the Engineer's estimate included
erosion control and traffic control line items not seen in earlier estimates. The Director believed erosion
Public Works & Utility Committee
October 21, 2026
Page 4 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
control is a standard line item for contingencies and agreed to ask the Engineer. Traffic control covers
flaggers and signage, and the village would request that contractors distribute notices to affected
residents. The stone type (¼-inch, ⅜-inch, or smaller aggregate) will be determined with the Engineer
and specified in the bid. Official quotes will be obtained in the spring.
Administrator Green stated that Mary Hill Road reconstruction would cost an estimated $4 million and
would likely require borrowing, possibly in conjunction with another project. Member Eberle stated that
the road's current cross section is that of a former town road and does not reflect current traffic from
several subdivisions. He urged that a paved shoulder be considered and asked that the cross section
be reviewed. Staff anticipated reconstruction around 2030 to 2031. The Director said the existing
pavement is rutted in places and that in-house patching may be done next year to extend its life.
The Director proposed shifting from the village's historical pulverize-and-pave approach to a mill and
overlay approach where pavement conditions allow. The plan includes the following:
● Hillside Road: from the cul-de-sac south of Good Hope to Plainview, with a 2-inch mill and a
2- or 3-inch overlay. Core sampling found the pavement to be about 7 inches thick, so the
Director considered this approach appropriate.
● North Road: two sections near Crooked Bridge and the Park River Crossing subdivision, with
milling and a 2-inch overlay before chip sealing.
● Lake Five Road: the section in front of Hass Farms.
● Alternates: Hillside Lane and Hickory View Lane, each with a 2-inch mill and 2-inch overlay.
● Indian Grass Road: possible pulverize and repave, with a wider roadway and larger shoulders,
because of truck traffic.
The Director stated that remaining paving funds would allow additional roads to be completed, and
that work on Hillside and Indian Grass could coincide with the STH 164 closure. Administrator Green
recommended deferring one of the smaller streets pending p otential development interest and
favored combining Indian Grass and Hillside in the same year if budget permits, with the alternates
considered based on bid prices.
Chair Moonen asked whether the Hillside Lane entrance could be relocated or connected at the north
end, citing complaints about delivery trucks parking on Hillside. The Director said he had raised this
with the Engineer, who would study options. Members di scussed sight -line considerations. The
Engineer will also review reconfiguring the Good Hope and Hillside intersection, including the stop sign
island, in light of heavy traffic backups. Members raised questions about how the Indian Grass
entrance to STH 164 will function once the state's intersection improvements are built, and about truck
traffic from the gravel pit. This was a discussion-only item and no action was taken.
Items to be Placed on a Future Agenda
Member Eberle requested a review of the typical road section used for village roads such as Mary Hill
Road, which he noted is about 50 years old. It was agreed this could be taken up in the spring.
Public Works & Utility Committee
October 21, 2026
Page 5 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Chair Moonen asked that the Director provide recycling event cost and revenue information for
discussion at the next meeting.
Adjournment
There being no further business, motion by Eberle, second by Beal, to adjourn the meeting at 5:51p.m.
Respectfully submitted,
Elisa M. Cappozzo, WCMC
Lisbon Village Clerk
DPW Monthly Report
October 2026
Highway:
• Light ditching and drainage repairs
• 970 ton of early fill salt delivered
• Tree stump removal
• Reclaim shoulders on the mains
• Shoulder small section of Hickory Rd
• Finish up retrofitting bucket truck
• Asphalt shoulder Janet Dr.
• Patch Holes
• Underbody pressure wash patrol trucks
• Start on rust converting and undercoating patrol trucks
Parks:
• Continue on mowing parks
• Mulching and blowing leaves
• Maintenance on 9-11 memorial
• Blow out water lines before winter
• Shelter building maintenance performed
DPW Director:
• Work on redesign of Lisbon Highway logo and installing graphics on newer trucks
and equipment
• Submit SMALS salt storage form for the DOT
• Prep equipment items for auction – Kubota Tractor, Light tower, 2 Fire
Department Tenders
• Ran grader for reclaiming shoulders
• Attended Waukesha County Highway Department meeting
• Order no parking signs for Mary Hill Road
• Meet with Dan and Mitch in October fields about drainage issues
• Water softener installed at Good Hope Fire Station
• Shop hoist install start date first week in December (2-2.5-week project)
• November 30th start grinding at compost site
107 Parallel Street Beaver Dam, WI 53916 • 1115 S Main Street West Bend, WI 53095 • T 920-356-9447
www.kunkelengineering.com
November 12, 2026
To: Village of Lisbon Utility Committee
From: Don Neitzel
Re: Monthly Report (October)
__________________
The monthly engineer’s report for the Village of Lisbon Public Works & Utility Committee is as follows:
• October 2026 Flows – Flows for the month of September were once again up from the previous month
of August.
o The Jeanine Lift Station had an average flow of 23 GPM (average 30,000 GPD) for the month of
October, while the month of September was 26 GPM (average 33,000 GPD).
o The Plainview Lift Station for the month of October had an average flow of 24 GPM (average
33,000 GPD), while the month of September was 24 GPM (33,000 GPD).
o Willow Springs flows for the month of October were once again averaged due to the electric service issue
with the flow meter. An average flow of 30 GPM was once again used for the month based on historical
data for this same time period. Next Electric has completed all of their work associated with getting the new
electric service installed at the flow meter location and including electrical inspection approvals. The last
remaining items is for WE Energies to install the electric meter. I have not heard back from WE Energies
about the schedule for installing the meter, but I’m assuming it should be in the next week or so. At that
point, Sussex will begin receiving flow information again for Willow Springs.
o Sabel Mechanical completed planning the new plug and check valves in the lift stations yesterday
(November 11th). Waiting on invoices for the new valves and the labor to install them.
• Richmond School Lift Station –
o October 2026 - The lift station had a total run time of approximately 244.3 hours for the month
of October, with 123.3 hours on Pump #1 (average of 4 hrs run time/day) and 121.0 hours on
Pump #2 (3.9 hrs run time/day).
o The well reading for the month of October was 40,600 gallons and for the prior month of
September it was 40,100 gallons. (see attached water usage chart and sewer flow information).
The historical flows for the month of October have the 2026 flows below what was seen during
the same month in 2024 and about the same as 2025.
107 Parallel Street Beaver Dam, WI 53916 • 1115 S Main Street West Bend, WI 53095 • T 920-356-9447
www.kunkelengineering.com
• Fire station Well –
o October 2026 - The water usage for the month of October was 6,900 gallons, while the water
usage in the prior month of September was 6,800 gallons. (see attached water usage chart). This
remains in-line with the monthly flows for both 2025 and 2026 thru the month of October.
• Casey’s Well –
o October 2026 -The water usage at Casey’s for the month of October was down considerably
from the previous month, with 19,988 gallons of water being used in October while the well
reading for the month of September was 68,121 gallons. Casey’s final determined that there was
an issue with the water softener and made whatever repairs were necessary after 5 months of
high-water usage. The water usage for the month of October 2026 falls in-line with what was
recorded for the same month in 2024 and 2025.
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0
10
20
30
40
50
60
1st 2nd 3rd 4th 5th* 6th 7th 8th 9th 10th 11th 12th* 13th 14th 15th 16th 17th 18th 19th* 20th 21st 22nd 23rd 24th 25th 26th* 27th 28th 29th 30th 31st
Rainfall (in)
Flow Totals (Kgals)
* = Monday
Jeanine Daily Flow Totals with Rainfall Data - October
2026
Flow Totals Rainfall
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0
500
1000
1500
2000
2500
3000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Flows (Kgals)
Jeanine LS Total Monthly Flows with Monthly Average Rainfall Data
Flow 24
Flow 25
Flow 26
Rainfall
24
Rainfall
25
Rainfall
26
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0
10
20
30
40
50
60
1st 2nd 3rd 4th 5th* 6th 7th 8th 9th 10th 11th 12th* 13th 14th 15th 16th 17th 18th 19th* 20th 21st 22nd 23rd 24th 25th 26th* 27th 28th 29th 30th 31st
Rainfall (in)
Flow Totals (Kgals)
* = Monday
Plainview Daily
Flow Totals with Rainfall Data - October
2026
Flow Totals Rainfall
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0
500
1000
1500
2000
2500
3000
3500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rainfall (in)
Total Flows (Kgals)
Plainview LS Total Monthly Flows and Monthly Average Rainfall Data
Flow 24
Flow 25
Flow 26
Rain 24
Rain 25
Rain 26
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0
5
10
15
20
25
30
35
1st 2nd 3rd 4th 5th* 6th 7th 8th 9th 10th 11th 12th* 13th 14th 15th 16th 17th 18th 19th* 20th 21st 22nd 23rd 24th 25th 26th* 27th 28th 29th 30th 31st
Rainfall (in)
Flow Totals (Kgals)
* = Monday
Willow Springs Daily Flow Totals with Rainfall Data - October
2026 **2025 October Average used for flow estimates
Flow Totals Rainfall
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
3,000
3,200
3,400
3,600
3,800
4,000
4,200
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rainfall (in)
Total Flows (Kgals)
Willow Springs LS Total Monthly Flows with Monthly Average Rainfall Data
Flow 24
Flow 25
Flow 26
Rain 24
Rain 25
Rain 26
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
75000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Gallons
Richmond Monthly Well Totals
2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Gallons
Firehouse Monthly Well Totals
2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
110000
120000
130000
140000
150000
160000
170000
180000
190000
200000
210000
220000
230000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Total Gallons
Casey's Monthly Well Totals
2024 Monthly Gallons 2025 Monthly Gallons 2026 Monthly Gallons
STATE OF WISCONSIN VILLAGE OF LISBON WAUKESHA COUNTY
ORDINANCE 2026-XX
AN ORDINANCE TO AMEND SECTION 32.06 OF THE VILLAGE OF LISBON
MUNICIPAL CODE RELATED TO WATER SERVICES
WHEREAS, the Village of Lisbon regulates water services in Chapter 32 of the Village of Lisbon
Municipal Code; and
WHEREAS, the Village Board of the Village of Lisbon finds that it is in the best interest of the
Village of Lisbon to require a property or structure to connect to the Sussex Water Utility when an
operational public water main becomes available.
NOW, THEREFORE, the Village Board of the Village of Lisbon, Waukesha County, Wisconsin,
DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Chapter 32 of the Village of Lisbon Municipal Code entitled “Sewer
Service,” Section 32.06 entitled “Administrative rules and regulations,” Subsection (15) is hereby
created as follows:
15. Compulsory connection.
a. Connection required. As set forth in this ordinance section, when an
operational Village water main becomes available to any property or structure
thereon that is used or capable of being used for human occupation or use,
such property or structure shall be connected to the municipal water system
within six months of the sewer main becoming available to the property.
b. Private water supply. As part of the connection to the municipal water system
in subsection (a) of this ordinance, any private water supply shall be either:
1. Abandoned according to statute and the state administrative code; or
2. Maintained as a nonportable source of water for lawn irrigation if the
following conditions are met:
a) The water in such well tests bacteriologically safe; and
b) Every two years from the date such well is separated from
the building, the property owner provides the Village Clerk
with a testing laboratory certification that the water in such
well continues to test safe.
3. If the property owner fails or neglects to provide such water test, then
such well shall immediately be abandoned according to law.
SECTION 2. SEVERABILITY. The several sections of this ordinance are declared to be
severable. If any section or portion thereof shall be declared by a court of competent
jurisdiction to be invalid, unlawful or unenforceable, such decision shall apply only to the
specific section o r portion thereof directly specified in the decision and shall not affect the
validity of any other provisions, sections or portions thereof the ordinance. The remainder of
the ordinance shall remain in full force and effect. Any other ordinances whose terms conflict
with the provisions of this ordinance are hereby repealed as to those terms that conflict.
SECTION 3. EFFECTIVE DATE. This ordinance shall be effective upon publication or posting
as provided by law.
PASSED AND ADOPTED by the Village Board of the Village of Lisbon, Waukesha County,
Wisconsin on this ______ day of ____________, 2026.
VILLAGE BOARD, VILLAGE OF LISBON
WAUKESHA COUNTY, WISCONSIN
BY: ________________________________________
MATTHEW GEHRKE, President
BY: ________________________________________
PAULA QUINN, Trustee #1
BY: ________________________________________
MARC MOONEN, Trustee #2
BY: ________________________________________
LINDA BEAL, Trustee #3
BY: ________________________________________
ROB BAUM, Trustee #4
ATTEST:
BY: ________________________________________
ELISA CAPPOZZO, Village Clerk
Published and/or posted this ______ day of ______________________________, 20______.