Town of Lisbon · Waukesha County · meeting of Oct 21, 2026 · Minutes
Open the original document More from Town of Lisbon
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF LISBON
W234N8676 Woodside Road
Lisbon, WI 53089-1545
MEETING MINUTES
PUBLIC WORKS & UTILITY COMMITTEE
LISBON VILLAGE HALL – OCTOBER 21, 2026
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Call to Order
Committee Chair Marc Moonen called the meeting to order at 5:00p.m.
Roll Call
Present: Trustees Marc Moonen and Linda Beal; Members Jane Mueller, and Joe Eberle; Administrator
Dan Green; DPW Director Nick Wilichowski; and Clerk Elisa Cappozzo. Member Randy Chmiel and
Engineer Don Neitzel were absent and excused.
Pledge of Allegiance
The Pledge of Allegiance was recited by all those present.
Public Comments
Rob and Barb Yaeger, N54W22086 Bonnie Lane, each spoke against the proposed quarry water supply
project.
Approval of Meeting Minutes
9/16/2026 Public Works & Utility Committee
The Committee noted a t ypo on page 2 , and Clerk Cappozzo indicated she ’d make the correction.
Motion by Eberle, second by Mueller, to approve the minutes as corrected. Motion carried unanimously.
Department Reports
Public Works
Director Wilichowski reported on several recent departmental activities from the previous month. The
Highway Department completed driveway and cross culverts for the year. Crews prepared the Sterling
truck for installation of a new dump body, expected to be complete shortly, and continued upfitting
the bucket trucks. Crews also began the final mowing cut of the year, performed ditching, and received
all deliveries of early-season fill. The fall recycling event collected about 9,000 pounds of electronics.
Turnout was lighter than in prior years, and a different vendor was used because the prior vendor no
longer offers the service. The Parks Department performed soccer and baseball field maintenance,
and surveyors began marking the playground area for utilities. The Director also worked on the road
paving and chip seal budget, new shop repair spreadsheets and the 10-year road plan, and attended
the STH 164 construction meeting.
Public Works & Utility Committee
October 21, 2026
Page 2 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
In response to questions, the Director stated that the STH 164 project is expected to begin in mid -to-
late March, weather permitting. Good Hope Road will be fully closed near Silver Spring, with a hard
closure beginning near Indian Grass. Traffic is expect ed to use alternate routes such as Hillside,
Plainview, County Hwy Q, and Merton roads. Committee members anticipated a lengthy construction
period, with the state indicating completion around November.
Chair Moonen requested that staff track and report the cost of the recycling event, including wages,
along with revenue. The Director and Administrator Green indicated the event is roughly revenue
neutral and was intended to recover the cost of Highway Dep artment staff time. The Chair noted the
event is in about its eighth year and was started to reduce roadside dumping. The Director said that if
participation remains light, the committee could consider holding the event every other year.
Committee members also discussed rotating the event among neighboring communities, and noted
that the village's waste hauler, GFL, now offers pickup of appliances for a fee.
Utility District
Trustee Moonen reviewed Engineer Neitzel’s monthly report, noting monthly flows and run time for the
Jeanine, Plainview, Willow Springs, and Richmond lift stations. September flows increased over August,
by 5 gallons per minute for Jeanine and 3 gallons per minute for Plainview. Willow Springs flows were
averaged at 26 gallons per minute based on historical data because of an electrical service issue with
the flow meter. We Energies installed the new pedestal on October 1, but the meter had not yet been
installed. Administrator Green reported that We Energies was awaiting an inspection approval, after
which installation was expected within approximately one and a half to two weeks. Sabol is to install
new plug and check valves this month.
The Richmond Lift Station recorded 173 hours of run time for September, split roughly evenly between
pumps 1 and 2 at about 2.8 to 3 hours per day. The well reading was 40,100 gallons, compared with
17,300 gallons the prior month. September water usage inc reased over August because school was
back in session, but flows remained below those of September 2024 and 2025. The fire station well
used 6,800 gallons, consistent with prior months. Casey's used 68,121 gallons, similar to August. On
September 11, Casey's engineer reported that the cause of the elevated usage had been identified and
private repairs were being arranged.
Special Projects
Administrator Green r eviewed status updates for various ongoing and upcoming projects in the
Village. that a public informational meeting on the quarry water project was held, attended by DNR
representatives and three representatives of Strand Associates. The meeting included a presentation
and breakout group discussions. A second meeting was planned for late November or early
December, with the location still to be determined. Staff were seeking a larger venue and proposed an
open house format beginning at 5:00 PM so residents could come and go. The village website carries
a detailed project page with the meeting report and presentatio n slides. The Administrator had
received about ten emails, mostly questions and requests for clarification, and invited further
Public Works & Utility Committee
October 21, 2026
Page 3 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
comments. Notice will be given through the "Notify Me" function on the village website and by direct
mailers, which staff hoped to send early the following week.
On the sanitary sewer project, the Administrator reported that staff were still trying to locate a
document submitted to the DNR in connection with the STH 164 project, which would help establish the
intended capacity. Staff planned to contact additional p arties. The village was also continuing to
pursue the comprehensive plan amendment and had reached out to citizen members to move that
process forward.
New Business
Pay Request by NEXT Electric for Flow Meter at Business Park East
Chair Moonen referenced the October 9 memo from the Engineer to Administrator Green describing
the final payment request. Administrator Green explained that the flow meter project had been
completed and that NEXT Electric was requesting its final payment. The committee took Item 6.B
ahead of this item at the Administrator's suggestion, since the two were related, and then returned to
this item. Members confirmed that this was the final payment.
Motion by Eberle, second by Mueller, to approve Payment Request #2, the final payment, from NEXT
Electric, LLC for the Sewer Flow Meter at Business Park East in the amount of $28,781.06 . Motion carried
unanimously.
Change Order #1 for Business Park East Flow Meter in the amount of $5,590.91
Administrator Green explained that We Energies' actual costs for its portion of the work came in
substantially above its original estimate. The original plans included an additional transformer, and
significant ductwork was required to the meter, including extra concrete encasement. The cost was
funded through the TID budget. Chair Moonen noted that the village board approved the NEXT Electric
contract on June 18 in the amount of $70,503, so the change order must be forwarded to the board for
approval.
Motion by Eberle, second by Mueller, to approve Change Order No. 1 to NEXT Electric's contract in the
amount of $5,590.91. Motion carried unanimously.
Discussion only re: 2027 Road Rehabilitation projects
The committee reviewed two documents in the packet, covering crack filling and chip sealing and
pavement resurfacing. Director Wilichowski stated that because no chip sealing had been done in the
past two years, the 2027 plan includes North Lisbon Road and North Road, from Hillside to North Road
and from North Road to County Road Q. Richmond Road is also planned, depending on the timing of
the bridge work. A member suggested adjusting the starting point of one segment to avoid areas that
may be reconstructed. The Director noted that a recent contractor quote had been provided to the
Engineer, who would update his figures. Chair Moonen asked why the Engineer's estimate included
erosion control and traffic control line items not seen in earlier estimates. The Director believed erosion
Public Works & Utility Committee
October 21, 2026
Page 4 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
control is a standard line item for contingencies and agreed to ask the Engineer. Traffic control covers
flaggers and signage, and the village would request that contractors distribute notices to affected
residents. The stone type (¼-inch, ⅜-inch, or smaller aggregate) will be determined with the Engineer
and specified in the bid. Official quotes will be obtained in the spring.
Administrator Green stated that Mary Hill Road reconstruction would cost an estimated $4 million and
would likely require borrowing, possibly in conjunction with another project. Member Eberle stated that
the road's current cross section is that of a former town road and does not reflect current traffic from
several subdivisions. He urged that a paved shoulder be considered and asked that the cross section
be reviewed. Staff anticipated reconstruction around 2030 to 2031. The Director said the existing
pavement is rutted in places and that in-house patching may be done next year to extend its life.
The Director proposed shifting from the village's historical pulverize-and-pave approach to a mill and
overlay approach where pavement conditions allow. The plan includes the following:
● Hillside Road: from the cul-de-sac south of Good Hope to Plainview, with a 2-inch mill and a
2- or 3-inch overlay. Core sampling found the pavement to be about 7 inches thick, so the
Director considered this approach appropriate.
● North Road: two sections near Crooked Bridge and the Park River Crossing subdivision, with
milling and a 2-inch overlay before chip sealing.
● Lake Five Road: the section in front of Hass Farms.
● Alternates: Hillside Lane and Hickory View Lane, each with a 2-inch mill and 2-inch overlay.
● Indian Grass Road: possible pulverize and repave, with a wider roadway and larger shoulders,
because of truck traffic.
The Director stated that remaining paving funds would allow additional roads to be completed, and
that work on Hillside and Indian Grass could coincide with the STH 164 closure. Administrator Green
recommended deferring one of the smaller streets pending p otential development interest and
favored combining Indian Grass and Hillside in the same year if budget permits, with the alternates
considered based on bid prices.
Chair Moonen asked whether the Hillside Lane entrance could be relocated or connected at the north
end, citing complaints about delivery trucks parking on Hillside. The Director said he had raised this
with the Engineer, who would study options. Members di scussed sight -line considerations. The
Engineer will also review reconfiguring the Good Hope and Hillside intersection, including the stop sign
island, in light of heavy traffic backups. Members raised questions about how the Indian Grass
entrance to STH 164 will function once the state's intersection improvements are built, and about truck
traffic from the gravel pit. This was a discussion-only item and no action was taken.
Items to be Placed on a Future Agenda
Member Eberle requested a review of the typical road section used for village roads such as Mary Hill
Road, which he noted is about 50 years old. It was agreed this could be taken up in the spring.
Public Works & Utility Committee
October 21, 2026
Page 5 of 5
Office: (262) 246-6100 | Email: VillageHall@LisbonWI.gov | Website: www.LisbonWI.gov
Chair Moonen asked that the Director provide recycling event cost and revenue information for
discussion at the next meeting.
Adjournment
There being no further business, motion by Eberle, second by Beal, to adjourn the meeting at 5:51p.m.
Respectfully submitted,
Elisa M. Cappozzo, WCMC
Lisbon Village Clerk