Parks and Public Works Committee
City of Prescott · Pierce County · meeting of Nov 16, 2026 · Agendas
Open the original document More from City of Prescott
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF PRESCOTT
PARKS & PUBLIC WORKS COMMITTEE
MONDAY, NOVEMBER 16 , 2026
5:00 PM
MUNICIPAL BUILDING
800 BORNER ST
PRESCOTT, WI 54021
1) Call to Order
2) Roll Call
3) Approve Minutes for October 19, 2026
4) Concept Plan Review for The Bluffs Park
5) Review and Consideration of Multi-Use Trail Plans and Specifications from Dexter Street to
Borner Street
6) Consideration of Easement Agreement with Xcel Energy
7) Consideration of Cedar Corporation Surveying Proposal for Prescott Business Park
8) Discussion on Elster Water Meter Replacement
9) Other Business
a) Boating Infrastructure Grant – Dock Design Update
b) Lead Service Line Verification Updates
10) Adjourn
NOTICE
ACCESS TO THE MUNICIPAL BUILDING FOR THE DISABLED IS AVAILABLE AT
THE MAIN ENTRANCE. ALL THOSE WITH SPECIAL NEEDS SHOULD CALL CITY
HALL OFFICES (715-262-5544) IF ASSISTANCE IS REQUIRED
IT IS POSSIBLE THAT A QUORUM OF THE COMMON COUNCIL OR OTHER CITY
COMMITTEES MAY BE PRESENT AT THIS MEETING. THIS IS INCIDENTAL AND
NO ACTION WILL BE TAKEN BY THE COUNCIL OR ANY OTHER COMMITTEES.
Parks and Public Works Committee Meeting Minutes
October 19th, 2026
Pursuant to due call and notice thereof, a meeting of the Parks and Public Works Committee
was held on October 19, 2026, at the Municipal Building, 800 Borner Street, Prescott,
Wisconsin 54021. The meeting was called to order at 5:26 PM.
Committee Present: Ben Bettis, Lindsey Sorenson
Committee Absent: Dar Hintz
Staff Present: City Administrator Matt Wolf, City Planner Luke Wiese, Public Works Director
Ryan Newland
Others Present: Mayor Mike Gerke
1. Approve Minutes for September 21st, 2026
Bettis motioned to approve the minutes for September 21st. Sorenson seconded;
motion passed without a negative voice (2-0).
2. Consideration to Purchase and Install Snowplow Equipment on Public Works
Truck
City Administrator Wolf presented a proposal to purchase and install snowplow equipment
on the City’s 2024 Chevrolet Silverado. The newer truck would replace the 2017 flatbed
currently used to plow alleys and parking lots, which has experienced wear and has limited
ground clearance.
Kinni Sport & Power provided the only quote received for a 9-foot-6-inch SnowDogg V-Wing
plow, including installation, for $13,187.92. Wolf explained that the purchase was not
included in the 2026 budget but could be addressed through a year-end budget
amendment using higher-than-anticipated interest revenue.
The Committee asked whether the proposed plow would be a good long-term purchase for
the price. Public Works Director Ryan Newland explained that it was a good plow and the
quote was reasonable.
Bettis motioned to recommend approval of the snowplow purchase and installation
from Kinni Sport & Power for $13,187.92 to City Council. Sorenson seconded; motion
passed without a negative voice (2-0).
3. Discussion on Spraying Riverfront with Herbicide Aqua Neat
City Administrator Wolf explained that the City budgets $1,500 annually for weed control
along the riverfront but has not resumed spraying since funding was increased in 2025 due
to certification and licensing requirements. Staff asked whether to resume AquaNe at
treatments in 2027 or remove the funding from the budget.
Wolf explained that any treatment would take place above the ordinary high -water mark,
along the riverfront from the Highway 10 bridge. Staff would need to complete certification
and licensing before spraying. He also shared Councilmember Ruona’s concerns about
environmental impacts and employee safety.
Bettis motioned to recommend the City not resume weed control treatments along the
riverfront. Sorenson seconded; motion passed without a negative voice (2-0).
4. Fairy Wonderland Project Grant Contract and Cedar Corporation Engineering
Services Contract
City Administrator Wolf presented the Fairy Wonderland Park improvements, including the
Land and Water Conservation Fund (LWCF) grant contract and Cedar Corporation’s
engineering agreement. The City was awarded $387,594 through the Wisconsin DNR in
September 20 25, and Healing Play, Inc. has raised more than $500,000 for the earlier
playground improvements.
The project is estimated at $959,210, with a City share of $571,616 from previously allocated
funding. The concept includes additional playground equipment, a parking lot and street
parking, a youth athletic field, stormwater improvements, and restrooms. Cedar’s $110,300
engineering agreement would support the design and construction, with completion
anticipated by August 31, 2027.
Wolf asked for the Committee’s thoughts on the concept plan, including the restroom
location. The Committee preferred that the restrooms be located centrally near the parking
lot.
Mayor Gerke questioned the need for another youth athletic field given the number of
existing fields that are not being used.
Sorenson recommended keeping the field in the plans.
Wolf said he would reach out to the school district to see if there was interest in using the
field.
Bettis motioned to recommend the City moves forward with the Grant Contract and
approval of Cedar Corporations Engineering Services Agreement to Council for
approval. Sorenson seconded; motion passed without a negative voice (2-0).
5. Review of Parks Improvement Fund and Capital Improvement Items
City Administrator Wolf reviewed proposed park projects for the 2027 –2033 Capital
Improvement Plan, including the non-motorized boat launch, The Bluffs Park, Magee Park
shelter, and planned trail connections. The Parks Improvement Fund has a balance of
$252,596, with $100,000 committed to trail improvements and up to $20,000 in additional
matching funds.
Wolf explained that the City also has $157,995 in available parks impact fees, but The Bluffs
Park is not currently listed in the Community Needs Assessment Report. Staff asked whether
the Committee supported pursuing an amendment to potentially use impact fees for the
park and whether any other projects should be added to the plan.
The Committee supported pursuing an amendment to include The Bluffs Park in the
Community Needs Assessment Report.
Sorenson said she would like to keep The Bluffs Park as a skate park if possible and
suggested that staff coordinate with the school district to gather feedback from students on
what they would like to see at the park.
6. Other Business
City Planner Luke Wiese and Public Works Director Ryan Newland provided an update on the
trail connection from Magee Park to Walnut Circle. Staff explained that initial clearing had
been completed and Cedar Corporation was preparing a survey of the area.
Committee member Bettis motioned to adjourn. Sorenson seconded; motion passed
without a negative voice (2-0). The meeting was adjourned at 6:09 PM.
The next Parks & Public Works Committee will be November 16, 2026, at 5:00 PM.
Respectfully Submitted,
Luke Wiese, Planner
To: Parks and Public Works Committee
From: Luke Wiese, Planner
Date: November 12, 2026
Subject: The Bluffs Park Concept Plan
Background
At the September 21, 2026 Parks and Public Works Committee meeting, staff presented an
initial concept for the redevelopment of the existing Prescott Skate Park near Well 4. The
concept proposed transforming the existing skate park into a neighborhood park that would
serve a wider range of users, particularly with the continued development of The Bluffs.
The Committee provided feedback on the proposed improvements and supported moving
forward with a more developed concept. At the October meeting, the Committee also
supported pursuing an amendment to the Parks Impact Fee Community Needs Assessment
Report to include improvements to The Bluffs Park.
Since the September meeting, staff has further developed the concept plan, identified potential
equipment, and prepared a preliminary cost estimate.
Discussion
The attached concept plan is intended to establish the general layout and direction for future
park improvements. Specific equipment, materials, and other design details may continue to
change based on community feedback, available funding, and further project planning. The
updated concept plan includes a traditional playground structure, a climbing garden, a
relocated swing set from Shane Park Circle, a picnic pavilion, cornhole, table tennis, and
additional landscaping. Concrete walkways would connect the proposed amenities to the
planned walking trail.
The proposed improvements are intended to provide activities for different age groups. The
climbing garden would offer an activity for older children and teenagers that provides a
challenge and allows them to improve their skills over time. Staff has also included a potential
skate plaza in the southern portion of the park. This area would be considered a future second
phase, depending on available funding and community priorities. The skate plaza has not been
designed and is not included in the current Phase 1 cost estimate.
Staff has prepared a preliminary Phase 1 cost estimate of approximately $190,000, including a
10% contingency. An itemized cost breakdown is attached for the Committee's review. These
costs are based on final equipment selections and estimated construction expenses and are
subject to change as the project moves forward.
In addition, staff has developed a survey intended for students in grades 4–12. The survey will
be distributed through the Prescott School District to gather input on the types of recreational
equipment and activities students would like to see. The results will help guide final equipment
selections and any necessary adjustments to the concept.
Recommendation
Review and provide feedback on the Well 4 Park concept plan and recommend forwarding the
plan to Council for approval.
Attachments
1. The Bluffs Park Concept Map
2. The Bluffs Park Preliminary Cost Estimate
172,433.85$
17,243.36$
189,677.21$
Concrete (1st Phase) 12.00$ 2,271 27,252.00$
Subtotal :
1,500.00$ 1 1,500.00$ Corn hole
Table Tennis
Estimated Total:
6,000.00$ 16,000.00$
Contingency (10%):
QuantityPrice
117,616.85$
1 -$
80,000.00$
40,065.00$
-$
Item Total
17,616.85$
40,065.00$ 1
240,000.00$ Eldorado Boulders
Kilpatrick
Swings (Shane Park)
Pavilion (16x16)
Item
To: Parks and Public Works Committee
From: Matt Wolf, City Administrator
Date: November 12, 2026
Subject: Multi-Use Trail Approval-The Bluffs
Background
As part of the Development Agreement approved between the City of Prescott and
CapVest for The Bluffs development, the developer is required to construct certain
public improvements, including a multi-use trail from Borner Street to Dexter Street.
CapVest's engineer, Advanced Engineering Concepts (AEC), has submitted plans for
the proposed trail along the north side of the development. The proposed improvements
include an 8-foot-wide asphalt multi-use trail extending from Borner Street to Dexter
Street, along with associated grading, retaining walls, and other necessary
improvements.
Discussion
Staff is requesting that the Parks and Public Works Committee review and consider
approval of the proposed trail plans (see attached). While the plans have been
submitted for review, there are two items that will need to be discussed further with
CapVest before construction moves forward.
1. Future Borner Street Sidewalk Improvements: As part of the future US Highway
10 pedestrian improvements, the City is anticipating sidewalk construction along
Borner Street. The City will need to coordinate with CapVest to determine how
the proposed trail will connect with these future improvements to ensure a
consistent pedestrian connection.
2. Potential City Building Construction: If the City moves forward with its proposed
building project, the timing of the trail construction will need to be coordinated
with that work. Ideally, the trail construction, or at least the final asphalt
installation, would be delayed until after the building construction is completed to
avoid potential damage from construction activities.
Recommendation
Staff recommends that the Parks and Public Works Committee consider approval of the
multi-use trail plans, subject to further coordination with CapVest regarding the
connection to future Borner Street pedestrian improvements and the timing of
construction relative to the City's potential building project.
Attachment
1. AEC – The Bluffs Multi-Use Trail Plans from September 2026
SHEET SCHEDULEDESCRIPTIONSHEETNO.1
THE BLUFFS MULTI-USE PATHCAPITAL INVESTMENT PARTNERS, LLCGLENRIDGE DRIVEPRESCOTT, WI 54021PROJECT LOCATIONKnow what'sbelow.before you dig.Call
R
TITLE SHEETPLAN & PROFILE: ALIGNMENT 1SITE & EROSION CONTROL PLANEXISTING CONDITIONS & DEMOLITION PLAN2345-7DETAILS & ALIGNMENT REPORTOVERALL GRADING PLAN8
Know what'sbelow.before you dig.Call
R
BORNER ST.
PINE ST.
GLENRIDGE DR.
DEXTER ST.
Know what'sbelow.before you dig.Call
R
BORNER ST.
PINE ST.
GLENRIDGE DR.
DEXTER ST.
’’
Know what'sbelow.before you dig.Call
R
BORNER ST.
DEXTER ST.
PINE ST.
GLENRIDGE DR.
Know what'sbelow.before you dig.Call
R
Know what'sbelow.before you dig.Call
R
Know what'sbelow.before you dig.Call
R
SILT FENCE DETAILEROSION CONTROL MAT
TYPICAL SECTION FOR ASPHALT MULTI-USE PATH
SEGMENTAL BLOCKRETAINING WALLSEGMENTAL BLOCKRETAINING WALLRETAINING WALLRAILING TAPER
To: Parks and Public Works Committee
From: Matt Wolf, City Administrator
Date: November 12, 2026
Subject: Xcel Energy Easement Agreement
Background
As part of the ongoing development of The Bluffs by CapVest, Xcel Energy has requested an
underground electrical distribution easement across City-owned property near Well #4,
extending toward Dexter Street. The proposed easement encompasses approximately 4,777
square feet and would allow Xcel Energy to install and maintain underground electrical
facilities to serve the development.
The proposed easement overlaps with the planned multi-use trail that CapVest is required to
construct as part of its development improvements. Additionally, the City has future plans for
water treatment improvements at Well #4 that will need to be considered.
Discussion
Staff has been working with Xcel Energy and CapVest to ensure the proposed easement does
not interfere with the City's planned improvements. One of the primary concerns was ensuring
that the City retains the ability to construct and maintain the proposed paved trail over the
underground electrical facilities.
Following discussions, Xcel Energy revised the easement agreement to specifically allow
construction and maintenance of the multi-use trail within the easement area. However, future
changes to the trail would require Xcel Energy's written approval.
One remaining concern is coordinating the location and depth of the underground electrical
facilities with the City's planned trail and future Well #4 improvements. Staff have requested
additional engineering information from Xcel Energy to identify potential conflicts before
construction. Xcel has indicated that it does not provide detailed CAD files or engineering
plans of its facilities and has suggested locating the utilities after installation.
Staff would suggest that utility location be surveyed by CapVest and a CAD file be sent to the
City after installation.
Recommendation
Staff recommend that the Parks and Public Works Committee consider recommending
approval of the proposed underground electrical distribution easement with Xcel Energy,
subject to satisfactory coordination of the electrical installation with the planned multi-use trail
and future Well #4 improvements.
Attachments
1. Xcel Energy Easement Agreement
Page 1 of 2 Rev. 11-2015
ELECTRIC UNDERGROUND
DISTRIBUTION EASEMENT
Name: The City of Prescott, Wisconsin
The undersigned, hereinafter referred to as "Grantor", hereby
grants to Northern States Power Company, a Wisconsin corporation,
hereinafter referred to as "NSP", this Electrical Underground
Distribution Easement (“Easement”) as set forth below.
RECITALS
A. Grantor owns real property in Pierce County, Wisconsin described
as follows:
See Exhibit A attached hereto and made part of
(the “Property”)
B. NSP wishes to locate within the Property the facilities described
as follows:
The necessary cables, wires, supports, conduits, vaults,
pedestals, manholes, fixtures, devices, and other facilities and
appurtenances necessary for the purposes of conducting electric
energy, light, and communication impulses.
(the “Facilities”)
C. Grantor agrees to grant to NSP, its successors and assigns, the right, privilege and easement to construct, operate, maintain,
use, rebuild or remove the Facilities over, under and upon the following described portion of the Property:
See Exhibit A attached hereto and made part of
(the “Easement Area”)
1. Easement. In consideration of the foregoing Recitals, which are incorporated herein, and other good and valuable consideration,
the receipt and sufficiency of which are hereby acknowledged, Grantor hereby grants to NSP a perpetual, non-exclusive easement
to construct, install, operate, repair, remove, replace, reconstruct, alter, relocate, patrol, inspect, mark, improve, enlarge, and
maintain the Facilities described above within the Easement Area. Grantor also grants to NSP the full right and authority to (1)
reasonably access the Easement Area and the Facilities over and across the P roperty for the purpose of maintaining, replacing and
constructing the Facilities; (2) the reasonable temporary use by NSP of the Property adjacent to the Easement Area during
construction, repair or replacement of the Facilities; and (3) cut, remove, prune or otherwise control, all trees, brush and other
vegetation on or overhanging the Easement Area or located outside of the Easement Area which by falling might interfere with or
endanger the Facilities.
2. Grantor’s Responsibilities. G rantor agrees that it will not perform any act on the Easement Area which will interfere with or
endanger the Facilities. Grantor shall not locate any structure or o bstruction, nor plant any trees, shrubs, bushes or plants of any
kind, nor change the ground elevation within the Easement Area without the express written consent of NSP. Not withstanding the
foregoing, NSP consents to Grantor installing and maintaining a multi -use trail (the “Trail”) within the Easement Area. Future
changes to the Trail require prior written consent of NSP.
3. Restoration. After installation of the Facilities or after the exercise of any of the rights granted herein, NSP agrees to restore the
Property and the Easement Area to as near their original condition as is reasonably possible and remove therefrom all debris, spoils,
and equipment resulting from the use of the Property and the Easement Area.
4. Ownership of Property. Grantor covenants with NSP, its successors and assigns, that Grantor is the owner of the above described
Property and has the right to sell and convey an easement in the manner and form aforesaid.
___________________________________________
RETURN TO: NSP
Siting & Land Rights, Dawn Schultz
1414 W. Hamilton Ave., PO Box 8
Eau Claire WI 54702-0008
PIN: 271-01160-2100
Page 2 of 2 Rev. 11-2015
5. Additional Documents. Grantor agrees to execute and deliver to NSP, at NSP’s cost, without additional compensation, any
additional documents needed to correct the legal description of the Easement Area to conform to the right of way actually occupied
by the Facilities.
6. Pre-Existing Property Condition. Grantor shall disclose to NSP any pre-existing waste materials (“Pre -Existing Wastes”), that
Grantor knows or reasonably suspects to be present in soils, water (surface or groundwater), vapors or air, whether on, in, a bove,
migrating to or from, or under the Easement Area and any other information that would help NSP assess the risks of working in the
area. NSP shall have the right to perform environmental sampling in the Easement Area at its discretion. If NSP encounters any
Pre-Existing Wastes, Company may stop work. Grantor shall be responsible for any costs to manage, transport, or dispose of any
Pre-Existing Wastes that NSP encounters during installation, relocation, or maintenance of the Facilities in the Easement Area.
NSP shall not assume, and Grantor shall retain its obligation to comply with all applicable environmental laws and regulations,
including federal or state reporting requirements related to such Pre -Existing Wastes. Grantor shall release and indemnify NSP
from and against any claims or responsibilities related to such Pre-Existing Wastes.
7. Entire Agreement. It is mutually understood and agreed that this instrument covers all agreements and stipulations between the
parties and that no representation or statements, verbal or written, have been made modifying, adding to or changing the terms
hereof.
8. Removal of Facilities. The rights granted herein may be exercised at any time subsequent to the execution of this document and
said rights shall continue until such time as NSP, its successors and assigns have notified Grantor, its successors or assigns, that
NSP has abandoned and relinquishes its easement rights. Following such notification by NSP, Grantor, its successors or assigns
may require by written notification that NSP remove all of its Facilities from the Easement Area at NSP’s expense, or if no
notification is given, then NSP may decide to abandon such Facilities in place. NSP shall deliver a recordable release of easement
to be recorded at the expense of Grantor or its successor or assigns.
9. Binding Agreement. All provisions of this Easement, including the benefits and burdens, shall be deemed to run with title to the
Property and shall inure to the benefit of, and shall be binding upon, the successors and assigns of the parties hereto as fully as upon
themselves.
IN WITNESS WHEREOF, Grantor has executed this Easement as of this ____ day of , 20__.
Grantor(s): The City of Prescott, Wisconsin
_______________________________________
By:
Its:
_______________________________________
By:
Its:
STATE OF )
) ss.
COUNTY OF )
Personally came before me as of ____________________, 20__, _________________________________ and
__________________________________ to me known to be the ________________________ and
_____________________________ of said corporation and acknowledged that they executed the foregoing instrument on behalf
of the company.
______________________________________
Name:
Notary Public, State of ___________________
My Commission Expires: _________________
This instrument drafted by: Dawn Schultz, an employee of Xcel Energy Services Inc.
11/03/26
3rd
NOVEMBER
”” “ ” ”
” ” ” “”
” ” ””
To: Parks and Public Works Committee
From: Matt Wolf, City Administrator
Date: November 12, 2026
Subject: Cedar Corporation Surveying Proposal – Ryden Road Extension
Background
At the September 23 Finance Committee, it was agreed to move forward with
construction of the Ryden Road extension in 2028. This project is an important
component of the City's efforts to expand the Prescott Business Park and make
additional properties available for commercial and industrial development.
In 2025, the City hired Cedar Corporation to complete preliminary engineering for the
extension, including roadway grading, stormwater management, utility layouts, and
preliminary construction cost estimates.
With construction tentatively planned for 2028, staff would like to begin moving forward
with the necessary engineering and surveying work in preparation for the project. The
goal would be to complete final engineering design, permitting, and bidding in 2027 to
allow construction to begin in 2028.
Discussion
Cedar Corporation has submitted a proposal to complete a topographic survey of the
proposed Ryden Road extension. The survey would provide the detailed existing site
information necessary to complete engineering and design of the roadway and
associated infrastructure.
The proposed cost for the surveying services is a lump sum of $3,900, with the work
anticipated to be completed in November or December 2026. Design would then be
completed in spring/summer of 2027 for construction in spring of 2028.
Recommendation
Consider approval of the Cedar Corporation surveying proposal in the amount of $3,900
for the extension of Ryden Road
Attachment
1. Cedar Corporation Surveying Proposal
Project No.
Date: November 10, 2026
Standard Short Form Agreement for Professional Services 2021 Page 1
(Standard Conditions, Attached)
Confirmation of Client Request for Services
Between Cedar Corporation (ENGINEER)
and City of Prescott (CLIENT)
Authorization to Perform Surveying Services
ENGINEER is hereby authorized to proceed with the Project listed below. The services are to be completed
in a timely manner mutually agreeable with the CLIENT and ENGINEER.
Project: Surveying Services for Ryden Road extension, Prescott, Wisconsin.
Project Description: The project involves completing a Topographic Survey for the Ryden Road extension,
located in the Southwest quarter of the Southwest quarter and Southeast quarter of the Southwest quarter of
Section 2, Township 26 North, Range 20 West, City of Prescott, Pierce County, Wisconsin.
Proposed Scope of Work: The following is the proposed scope of work for ENGINEER to provide Surveying
services:
Surveying services include a Topographic Survey for the above Project Description.
Method of Compensation: Work will be completed on a lump sum basis to provide the proposed scope of
services, as described above. The following are the surveying cost(s).
Service: Cost:
Topographic Survey $3,900.00
Payments are due and payable thirty (30) days from the date of the ENGINEER’s invoice. Amounts unpaid
thirty (30) days after the invoice date shall bear interest at the rate of one percent (1%) per month from invoice
date.
Timetable: Proposed Work Schedule estimated delivery as follows:
Topographic Survey – November/December 2026
Project No.
Date: November 10, 2026
Standard Short Form Agreement for Professional Services 2021 Page 2
(Standard Conditions, Attached)
THIS AGREEMENT is hereby approved and executed this ____ day of _____________, 2026.
CITY OF PRESCOTT CEDAR CORPORATION
800 Borner Street North 604 Wilson Avenue
Prescott, WI 54021 Menomonie, WI 54751
By: By:
Name: Name: Greg Adams, P.E.
Title: Title: Professional Engineer
By: By:
Name: Name: Dustin J. LaBlonde, PLS
Title: Title: Professional Land Surveyor
Standard Short Form Agreement for Professional Services 2019 Standard Conditions
STANDARD CONDITIONS
PART I - DESCRIPTION OF
SERVICES
1.1 CEDAR CORPORATION
agrees to provide professional
services for the PROJECT as
more completely described in this
Agreement.
1.2 CEDAR CORPORATION
agrees to provide all professional
services within a reasonable
period of time following the date
of authorization to proceed by
OWNER. If a special time
schedule must be met for a
PROJECT, it shall be specifically
set forth in this Agreement.
PART II - CLIENT’S
RESPONSIBILITIES
Client, at its expense, shall do the
following in a timely manner so as not
to delay the services,
2.1 INFORMATION/REPORTS
Furnish Cedar Corporation with
all reports, studies, site
characterizations, regulatory
orders, and similar information in
its possession relating to the
Project. Unless otherwise
specified in Part I, Cedar
Corporation may rely upon
Client-furnished information
without independent verification
in performing the Service.
2.2 REPRESENTATIVE
Designate a representative for the
project who shall have the
authority to transmit instructions,
receive information, interpret and
define Client’s policies, and make
decisions with respect to the
services.
2.3 GIVE NOTICE
Give prompt written notice to
Cedar Corporation whenever
Client observes or otherwise
becomes aware of any defect in
the Project or other event which
may substantially affect
performance of services under this
Agreement.
PART III - BILLING, AND
PAYMENT
3.1 Cedar Corporation will
periodically bill the client with net
payment due in 30 days. Unless
Client provides Cedar Corporation
with a written objection to the bill
within 15 days of receipt, Client
shall be deemed to accept the bill
as submitted.
3.2 Where Client disputes some
portion of the charges contained
in Cedar Corporation’s bill for
services, he shall make payment
of that portion of the bill which is
undisputed. In no case may Client
elect to withhold payment to
Cedar Corporation of the entire
amount due.
3.3 If Client fails to make any
payment due Cedar Corporation
for services and expenses after
receipt of Cedar Corporation’s bill
therefore, the amounts due Cedar
Corporation shall bear interest
from invoice date at the rate set
forth in this agreement, or in the
absence thereof at the legal rate
prevailing from time to time at the
principal place of business of
Cedar Corporation. In addition
Cedar Corporation may, after
giving ten (10) days written notice
to Client, suspend services under
this agreement until paid in full all
amounts due under this
agreement. In the event Client
does not pay, or does not pay
timely, Cedar Corporation shall be
entitled to collect from Client all
amounts due plus expenses,
including but not limited to
attorney fees, incurred by Cedar
Corporation in connection with
collection efforts, in addition, the
reasonable value of Cedar
Corporation’s time spent in
connection with collection efforts,
computed at Cedar Corporation’s
prevailing fee schedule.
PART IV - STANDARD TERMS
AND CONDITIONS
4.1 STANDARD OF CARE.
Services shall be performed in
accordance with the standard of
professional practice ordinarily
exercised by the applicable
profession at the time and within
the locality where the services are
performed. Professional services
are not subject to, and Cedar
Corporation cannot provide any
warranty or guarantee, either
express or implied. Any such
warranties or guarantees
contained in any purchase orders,
Client action, requisitions or
notices to proceed issued by
Client are specifically objected to
by Cedar Corporation.
4.2 CHANGE OF SCOPE. The
Scope of Services set forth in this
Agreement and in any addenda to
the Agreement is based on facts
known at the time of execution of
this Agreement, including, if
applicable, information supplied
by Client. For some projects
involving conceptual or process
development services, scope may
not be fully definable during
initial phases. As the project
progresses, facts discovered may
indicate that scope must be
redefined.
4.3 SAFETY. Cedar Corporation has
established and maintains
corporate programs and
procedures for the safety of its
employees. Unless specifically
included as a service to be
provided under this Agreement,
Cedar Corporation specifically
disclaims any authority or
responsibility for general job site
safety and safety of persons other
than Cedar Corporation
employees.
4.4 DELAYS. If events beyond the
control of Client or Cedar
Corporation, including, but not
limited to, fire, flood, explosion,
riot, strike, war, process
shutdown, act of god or the public
enemy, and act or regulation of
any government agency, result in
delay to any schedule established
in this Agreement or in any
Addenda to this Agreement, then
such schedule shall be amended to
the extent necessary to
compensate for such delay. In the
event such delay exceeds 60 days,
Cedar Corporation shall be
entitled to an equitable adjustment
in compensation.
4.5 TERMINATION. Either party
may terminate this Agreement at
the end of the term hereof, or any
extension thereof, upon 30 days
written notice to the other party as
provided at PART I above.
Also, this Agreement may be
terminated by either party if the
other party fails to fulfill its
obligations under this Agreement
through no fault of the terminating
party. No such termination may
be effected unless the other party
is given not less than ten calendar
day’s written notice of intent to
terminate and an opportunity for
correcting the default and for
consultation with the terminating
party before termination. If Cedar
Corporation terminates as a result
of Client default or the Client
terminates for cause, Cedar
Corporation shall be paid for
services performed to the
termination date including
reimbursable expenses due. Upon
receipt of the terminating action,
Cedar Corporation shall promptly
discontinue all services unless the
notice directs otherwise, and upon
receipt of final compensation
make available to Client all
appropriate documents prepared
under the Agreement whether
completed or in process.
4.6 OPINIONS OF PROBABLE
CONSTRUCTION COST. Any
opinion of probable construction
costs prepared by Cedar
Corporation is supplied for the
general guidance of the Client
only. Since Cedar Corporation
has no control over competitive
bidding or market conditions,
Cedar Corporation cannot
guarantee the accuracy of such
opinions as compared to contract
bids or actual costs to Client.
4.7 RELATIONSHIP WITH
CONTRACTORS. Cedar
Corporation shall serve as Client’s
professional representative for the
services, and may make
recommendations to Client
concerning action relating to
Client’s contractors. However,
Cedar Corporation specifically
disclaims any authority to direct
or supervise the means, methods,
techniques, sequences or
procedures of construction
selected by Client’s contractors.
4.8 CONSTRUCTION REVIEW.
For projects involving
construction, Client acknowledges
that under generally accepted
professional practice,
interpretations of construction
documents in the field are
normally required, and that
performance of construction-
related services by the design
professional for the municipal
project permits errors or
omissions to be identified and
corrected at comparatively low
cost. Client agrees to hold Cedar
Corporation harmless from any
claims resulting from performance
of municipal services by persons
other than Cedar Corporation.
4.9 INSURANCE. Cedar
Corporation will maintain
insurance coverage for
Professional Liability,
Comprehensive General,
Automobile, Workers
Compensation, and Employer’s
Liability in amounts in
accordance with applicable legal
requirements as well as Cedar
Corporation’s business
requirements. Certificates
evidencing such coverage will be
provided to Client upon request.
4.10 ALLOCATION OF RISKS. To
the fullest extent permitted by
law, Cedar Corporation shall
indemnify and hold harmless,
Client, Client’s officers, directors,
partners, and employees from and
against any and all costs, losses,
and damages (including but not
limited to all fees and charges of
engineers, architects, attorneys,
and other professionals, and all
Standard Short Form Agreement for Professional Services 2018 Standard Conditions
court or arbitration or other
dispute resolution costs) caused
solely by the negligent acts or
omissions of Cedar Corporation
or Cedar Corporation’s officers,
directors, partners, employees,
and Cedar Corporation’s
consultants in the performance
and furnishing of Cedar
Corporation’s services under this
Agreement.
To the fullest extent permitted by
law, Client shall indemnify and
hold harmless Cedar Corporation,
Cedar Corporation’s officers,
directors, partners, employees,
and Cedar Corporation’s
consultants from and against any
and all costs, losses, and damages
(including but not limited to all
fees and charges of engineers,
architects, attorneys, and other
professionals, and all court or
arbitration or other dispute
resolution costs) caused solely by
the negligent acts or omissions of
Client or Client’s officers,
directors, partners, employees,
and Client’s consultants with
respect to this Agreement or the
Project.
To the fullest extent permitted by
law, Cedar Corporation’s total
liability to Client and anyone
claiming by, through, or under
Client for any cost, loss, or
damages caused in part by the
negligence of Cedar Corporation
and in part by the negligence of
Client or any other negligent
entity or individual, shall not
exceed the percentage share that
Cedar Corporation’s negligence
bears to the total negligence of
Client, Cedar Corporation, and all
other negligent entities and
individuals.
4.11 HAZARDOUS MATERIAL.
Hazardous materials may exist at
a site where there is no reason to
believe they could or should be
present. Cedar Corporation and
Client agree that the discovery of
unanticipated hazardous materials
constitutes a changed condition
mandating a renegotiation of the
Project scope of work. Cedar
Corporation agrees to notify
Client as soon as practically
possible should unanticipated
hazardous materials or suspected
hazardous materials are
encountered. Client
acknowledges and agrees that it
retains title to all hazardous
material existing on the site and
shall report to the appropriate
federal, state or local public
agencies, as required, any
conditions at the site may present
a potential danger to the public
health, safety or the environment.
Client shall execute any manifests
or forms in connection with
transporting or storage and
disposal of hazardous materials
resulting from the site or work on
the site or shall authorize Cedar
Corporation to execute such
documents as Client’s agent.
Client waives any claim against
Cedar Corporation and agrees to
defend, indemnify, and save
Cedar Corporation harmless from
any claim or liability for injury or
loss arising from Cedar
Corporation’s discovery of
unanticipated hazardous materials
or suspected hazardous materials.
4.12 ACCESS. Client shall provide
Cedar Corporation safe access to
any premises necessary for Cedar
Corporation to provide the
services.
4.13 REUSE OF PROJECT
DELIVERABLES. Reuse of any
documents or other deliverables,
including electronic media,
pertaining to the project by Client
for any purpose other than that for
which such documents or
deliverables were originally
prepared, or alteration of such
documents or deliverables without
written verification or adaptation
by Cedar Corporation for the
specific purpose intended, shall be
at the Client’s risk. Further, all
title blocks and the engineer’s
seal, if applicable, shall be
removed if and when Client
provides deliverables in electronic
media to another entity. Client
agrees that relevant analyses,
findings and reports provided in
electronic media shall also be
provided in “hard copy” and that
the hard copy shall govern in the
case of a discrepancy between the
two versions, and shall be held as
the official set of drawings, as
signed and sealed. Client shall be
afforded a period of thirty (30)
days in which to check the hard
copy against the electronic media.
In the event that any error or
inconsistency is discovered within
such thirty (30) day period it shall
be corrected at no additional cost
to Client. Following the
expiration of this thirty (30) day
period, Client shall bear all
responsibility for the care, custody
and control of the electronic
media. In addition, Client
represents that it shall retain the
necessary mechanisms to read the
electronic media, which Client
acknowledges to be of only
limited duration. Client agrees to
defend, indemnify, and hold
harmless Cedar Corporation from
all claims, damages, and expenses
(including reasonable litigation
costs), arising out of such reuse or
alteration by Client or others
acting through Client. Cedar
Corporation agrees that all plans,
engineering designs, electronic
and computer data and imagery
relating to Client’s projects are the
property of the Client and shall be
presented to Client at no
additional cost upon written
request.
4.14 AMENDMENT. This
Agreement, upon execution by
both parties hereto, can be
amended only by a written
instrument signed by both parties.
4.15 ASSIGNMENT. Except for
assignments (a) to entities which
control, or are controlled by, the
parties hereto or (b) resulting from
operation of law, the rights and
obligations of this Agreement
cannot be assigned by either party
without written permission of the
other party. This Agreement shall
be binding upon and inure to the
benefit of any permitted assigns.
4.16 DISPUTE RESOLUTION.
Parties shall attempt to settle
disputes arising under this
agreement by discussion between
the parties senior representatives
of management. If any dispute
cannot be resolved in this manner
within a reasonable length of
time, parties agree to attempt non-
binding mediation or any other
method of alternative dispute
resolution prior to filing any legal
proceedings. In the event any
actions are brought to enforce this
Agreement, the prevailing party
shall be entitled to collect its
litigation costs, including
attorneys’ fees from the other
party.
4.17 NO WAIVER. No waiver by
either party of any default by the
other party in the performance of
any particular section of this
Agreement shall invalidate any
other section of this Agreement or
operate as a waiver of any future
default, whether like or different
in character.
4.18 NO THIRD-PARTY
BENEFICIARY. Nothing
contained in this Agreement, nor
the performance of the parties
hereunder, is intended to benefit,
nor shall inure to the benefit of,
any third party, including Client’s
municipal project contractors.
4.19 SEVERABILITY. The various
terms, provisions and covenants
contained in this Agreement or
any addenda shall be deemed to
be separate and severable, and the
invalidity or unenforceability of
any of them shall not affect or
impair the validity or
enforceability of the remainder.
4.20 AUTHORITY. The persons
signing this Agreement warrant
that they have the authority to
sign as, or on behalf of, the party
for whom they are signing.
4.21 OTHER. Cedar Corporation
reserves the right to enter into
agreements with other design
professionals for portions of the
work included under this
Agreement. Where this
subagreement would represent a
major portion of the design work,
Cedar Corporation shall receive
approval of Client for this
subagreement.
To: Parks and Public Works Committee
From: Matt Wolf, City Administrator
Date: November 12, 2026
Subject: Elster Water Meter Replacement
Background
As part of the City's ongoing efforts to develop its 7-Year Capital Improvement Plan
(CIP), staff has been reviewing the costs with replacing water meters throughout the
City. Water meters typically last about 20 years before they have to be replaced. Current
water meters were installed in 2015, with the exception of the largest meters in the City.
The City's preliminary estimate for this project was $600,000 in our last Capital
Improvement Plan..
Recently, the City received a full budgetary proposal from Dakota Supply Group (DSG),
our water meter supplier, which estimates the cost of replacement meters and
associated materials at approximately $683,703. The City uses Kamstrup meters that
allows for acoustic leak detection, smart digital readouts, and a battery life of upto 20
years. The cost however, does not include the labor associated with installing the
meters. The proposal also includes
additional costs associated with upgrading
the City's meter reading system to go digital,
which would be discussed at a later point in
time.
Given these costs, staff believes it would be
beneficial to approach the project through a
phased replacement program rather than
replacing all met ers at one time. This would
allow the City to spread costs over several
years while utilizing City staff to complete
replacements where possible.
Discussion
The recommendation is to begin replacing
the City's larger and older water meters in 2027, starting with the old Elster models. The
Elster models were used due to Kamstrup not having larger meter sizes in 2015,
however since that time Kamstrup has developed a full range of meter sizes. These
Figure 1. Kamstrup 3" meters
meters generally serve larger commercial, institutional, and multifamily properties and
represent some of the oldest meters in the City's system.
The following is a list of the City's existing larger meters:
Location Meter Size Meter Type Installation Date
Ptacek's 2" Elster June 1, 2015
Nursing Home 3" Elster May 31, 2005
Eagle Point Condos 3" Elster September 4, 2007
UNFI 3" Elster March 1, 2015
Prescott School District (1220 St. Croix St.) 3" Elster April 12, 2016
TCLAD 4" Elster June 29, 2021
Prescott School District (125 Elm St.) 4" Not Available Not Available
Based on DSG’s proposal (attached) the total cost for replacement of these meters
would be $14,194.65 subject to final inspection by DSG for potential for additional
installation hardware.
Beginning in 2031, the City would transition to replacing all meters, completing
approximately 25% of the remaining meters each year. This would allow the City to
complete the overall replacement program by the end of 2034.
The City water system currently has the following meter size distribution:
METER SIZE NUMBER OF METERS PERCENTAGE TOTAL
5/8” 1,824 95.5%
1” 35 1.8%
1 ½” 15 .8%
2” 23 1.2%
3” 4 .2%
4” 2 .1%
TOTAL 1,903 100%
Recommendation
Consider approval of the replacement of all Elster meters within the City of Prescott for
an estimated price of $14,194.65 from the Water Fund subject to final determination by
DSG upon inspection.
Attachment
1. DSG Proposal
PROPOSAL FOR CITY OF PRESCOTT, WI
WATER METERS & AMI SYSTEM
1 | Page
Objective: The city is looking to upgrade the Kamstrup automated meter reading (AMR) Drive-by system to
an an advanced metering infrastructure (AMI) Fixed Network system that will reduce non-
revenue water, improve service to customers, and decrease operational expenses.
1. Reduce non-revenue water by implementing solid-state ultrasonic meters that will improve low flow
accuracy and maintain accuracy for the 20-year life of the water meter.
2. Implement a radio read system that will provide hourly reads and consumption, along with meter data
analytics that allows the utility to be proactive in servicing their customers.
3. Utilize realtime info codes that identify leaks, reverse flow, burst, dry meters, tampers and low batteries.
4. Measure water and ambient temperatures from the meters to discover potential freeze-ups.
5. Identify distribution leaks on service lines and water mains to reduce non-revenue water.
6. Invest in a system that will advance as technology changes and has one of the lowest Total Costs of
Ownership in the industry and a Return-on-Investment within the first few years.
City’s Current Meter Environment:
The city purchased Kamstrup flowIQ 2100 & 3100 series meters in 2015. These meters only offer AMR
Drive-by radio frequency. In 2020, the city started purchasing flowIQ 2250 & 3250 series meters. These
meters are migratable from AMR Drive-by to AMI radio frequency. In 2024, the city started purhasing
flowIQ 2200 & 3200 series meters. These meters are migratable to the AMI radio frequency and offer
accoustic leak detection (ALD). Currently, the city if using a Kamstrup AMR Drivwe-by system.
Dakota Supply Group’s Recommendation:
DSG recommends that the city upgrade the AMR Drive-by system to a AMI Fixed Network system. The city
has approximately 340 meters (about 15%) that are migratable to the AMI radio frequency. This would
allow the city to “pilot” Kamstrup’s AMI Fixed Network System, utilize flowIQ Smart Water Platform
software, and acoustic leak detection (ALD) soluiton. After upgrading to the AMI Fixed Network system, the
city could begin replacing the older 2100 & 3100 series meters in 2030 (or as time and budget allow).
Kamstrup flowIQ Solid-state Water Meters:
Kamstrup's flowIQ meters are solid-state (aka static) and utilize ultrasonic meter technology. Kamstrup’s
flowIQ meters have an internal RF radio built into the meter providing an all-in-one meter and AMR/AMI
transmitter. The flowIQ meters have one of the lowest start flows in the industry, capturing flow
at 0.01 gallons per minute (gpm). The significance of consistent low flow measurement is that it
helps identify leaks and reduces non-revenue water by accurately measuring every drop of water
that is supplied to distribution network. The flowIQ residental meters are environmentally
friendly with a FULL 20-year limited warranty on materials and workmanship, along with
accuracy, meaning that the utility is investing in one of the industries leading solutions at a
low Total Cost-of-Ownership (see warranty sheet for full details).
The flowIQ smart meters identify info codes such as leaks, burst, tamper, reverse flow, dry
meters and low batteries. In addition, the meter will provide the daily min/max ambient
temperature and the daily min/max water temperature. In addition, the flowIQ 2200 meters
have built-in acoustic leak detection to listen to leaks on the service line and water mains
24/7/365. The utility can add Kamstrup’s Leak Dectector software at any time to take advantage
of the acoustic leak detection solution.
PROPOSAL FOR CITY OF PRESCOTT, WI
WATER METERS & AMI SYSTEM
2 | Page
Kamstrup AMI Fixed Network System:
Kamstrup’s advanced metering infrastructure (AMI) system allows a utility to read meters from the office
without rolling a truck and utilize meter data management to provide proactive customer service. The AMI
Fixed Network system utlitizes the 450 MHz license radio frequency to communicate between the AMI
Collector and the flowIQ meters. The 450 MHz radio frequency has an advantage over the 900 MHz radio
frequency systems as the technology utilizes a longer, flatter, radio waive that has stronger penetration
through solids such as buildings. The 450 MHz radio frequency offers stronger security and reduced signals
to provide a reliable and secure two-way communication between the AMI Collector and flowIQ meters.
The flowIQ meters communicate with the AMI Collector every three-hours and provides hourly reads and
hourly consumption. All info codes are sent real-time throught the network and to the utility via an email or
SMS text message.
Key benefits of the Kamstrup AMI Fixed Network System:
• Hourly meter readings and consumptions
• Realtime notification of info code (alarms) via an
email or SMS text message
• Daily min/max flow (GPM), Daily min/max
ambient temperature and Daily min/max water
temperature for each meter
• Ability to review temperatures daily and notify
customers of potential freeze-ups before they
occur
• Ability to review hourly data, water patterns and
graphs to troubleshoot from the office
• Utilize consumption reports to compare water
produced versus consumed to calculate non-
revenue water for a time period
• Performance reporting and overview of the network (meters) daily
• Create consumption alerts on key accounts to audit or measure large water usage
• Ability to change leak and burst alarm settings on a meter-by-meter basis over the network (two-
way communication)
Kamstrup READy Manager:
Kamstrup’s READy Manager software is a hosted cloud-based soluiton that allows for
the utility to use a simple, user friendly interface to manage the meters and AMR/AMI
system. READy Manager features include meters-in-stock, consumption reports and
hourly meter reads. In addition, the utility can view daily max flow and temperatures of
individual meters, visual consumption graphs and group consumption reports. The
READy Manager does a simple import/export with the utility billing system via a fixed
width file eliminating data entry and dual management of the two systems.
With the AMI system, the utility can monitor network’s performance on a daily, weekly and monthly basis.
In addition, the info code (alarms) are realtime and are sent to the utility via an email or SMS text.
Kamstrup has an annual hosting and support agreement for the READy Manager. Year one is included in the
quote.
PROPOSAL FOR CITY OF PRESCOTT, WI
WATER METERS & AMI SYSTEM
3 | Page
Optional - Kamstrup’s Acoustic Leak Detection as an Upgrade (Pricing included in Quote):
It can be difficult to find leaks in the system, especially those on the service lines and water mains.
Kamstrup’s flowIQ 2200 meters provide the industry’s first acoustic leak detection (ALD) built into the meter
listening for leaks on the distribution network. Kamstrup’s acoustic leak detection offers 24/7/365
monitoring of the distribution network for the 20-year life of the meter.
When the utility is ready, simply order Kamstrup’s Leak Detector software. Leak Dectector is a hosted
sofware with an annual hosting and support agreement. Since the Kamstrup flowIQ 2200 meters are
continously listening, ALD as an upgrade is available when the utility is ready to find distribution leaks.
Leak Detector Features:
• Map view with color coded alarms
• List view with meter data
• Track meters with potential leaks
• Add events and comments to meters
with findings from the field, to
enable machine learning
• Graphical representation of data
• Integration of pipe layer network to
know where meters
• Correlate active alarms to determine
if a leak is on the service line or water main
Optional - Installation Services (Opitonal):
DSG partners with Structural Tower Services for the installation of the AMI Collectors. DSG will lead the
project as the general contractor to make sure all tasks are completed throughout the project.
According to the Wisconsin Department of Safety and Professional Services, the replacement of water
meters is considered plumbing and a licensed plumber must perform the water meter replacement unless
the municpality and the employees perform the work are exempt from licensure pursuant to Wis. Stat
145.06(4)(f). Pricing for meter replacment not included in budgetary proposal.
Financials:
DSG budgetary proposal for the following (pricing is based on 2026 pricing and does not include project
pricing, volume discounts, or future price increases):
a. Kamstrup AMI Fixed Network Upgrade = $29,325.00
b. Kamstrup’s READy AMI Annual Hosting & Support Agreement = $11,000.00
c. Kamstrup’s Leak Detector Annual Hosting & Support Agreement = $10,689.00
d. Kamstrup Meter Replacement = $683,802.95
e. Total Budgetary Proposal for 2030 = $734,716.95
CITY OF PRESCOTT
800 BORNER ST N
PRESCOTT, WI 54021-2011
DSG - OTSEGO WW
7505 KADLER AVE NE
OTSEGO, MN 55362
Phone 763-295-3588
Fax 763-295-3589
Quotation
CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME / RELEASE NUMBER SALESPERSON
SHIP VIA TERMS QUOTE DATE FREIGHT ALLOWED
Ethan Gerzema
BEST WAY 10/13/2026
BUDGETARY PROPOSAL 2030
Net 25th Prx
18430 AMI UPGRADE/MTRS (BUDGET 2030)
ORDER QTY DESCRIPTION Unit Price EXT PRICE
QUOTE TO:
CITY OF PRESCOTT
800 BORNER ST N
PRESCOTT, WI 54021-2011
SHIP TO:
No
ORDERED BY
EXPIRATION DATE
PAGE NO.
QUOTE NUMBER
S10610906910/12/2026
1 of 2
WRITER
Bradford Simms
Brad.Simms@dsgsupply.com
PART NO
SHIPPING INSTRUCTIONS
***BUDGETARY PROPOSAL ONLY***
- PROJECT PRICING (AKA VOLUME
DISCOUNTS) NOT INCLUDED
- UPGRADE TO AMI FIXED NETWORK
- METER REPLACEMENT OF FLOWIQ 2100 /
3100 SERIES METERS
KAMSTRUP AMI FIXED NETWORK SYSTEM:
^KMSTR FLOWIQ SMART WATER PLATFORM AMI EXISTING
CUSTOMER UP & RUNNING <3,200 MP (ONE-TIME FEE)
1ea 1500.000/ea 1500.00594877
KMSTR BC30302.200W LEAK DETECTOR - UP & RUNNING (ONE-TIME
FEE) * OPTIONAL
1ea 1500.000/ea 1500.00145188
^KMSTR READY COLLECTOR SET 6696100020 READy collector top
6696200000 READy collector base 1308101 Sierra Wireless Gateway
1ea 9500.000/ea 9500.0088287
KMSTR 6699099 OPTICAL HEAD W/ USB1ea 325.000/ea 325.0056600
KMSTR 692YB00000 AMI SYSTEM ROLLOUT - BASIC * PROJECT
MANAGEMENT & TRAINING BY KAMSTRUP & DSG
1ea 10000.000/ea 10000.00809742
SUBCONTRACTOR LABOR * INSTALLATION OF AMI COLLECTOR BY
DSG SUBCONTRACTOR (ESTIMATE ONLY) ** REQUIRES SITE SURVEY
& QUOTE FROM STRUCTURAL TOWER SERVICES
1ea 6500.000/ea 6500.00103004
Subtotal ------- 29325.00
KAMSTRUP ANNUAL HOSTING & SUPPORT AGREEMENT:
^KMSTR FLOWIQ SMART WATER PLATFORM AMI <3,200 MP
(SUBSCRIPTION) * PRORATED AT TIME OF UPGRADE BASED ON
CURRENT READY MANAGER SUBSCRIPTION
1ea 11000.000/ea 11000.00594875
KMSTR BCUS30302.106W KMSTR BCUS30302.106W LEAK DETECTOR
<3,200 MP (SUBSCRIPTION) * OPTIONAL
1ea 10689.000/ea 10689.001027508
Subtotal ------- 21689.00
KAMSTRUP METERS:
KMSTR 2200 5/8"X3/4" GAL 25GPM ALD TYPE: 02-K-02-D-1-8B-8UB
CNFG: 8102400200104333042201301004
1824ea 333.885/ea 609006.20145138
AYM 4124-050 18-G2 METER GASKET 3/4 - .13 THICK RUBBER3648ea 0.339/ea 1238.3136066
KMSTR 2200 1" GAL 55GPM ALD TYPE: 02-L-02-D-1-8D-8UB CNFG:
8102400200104333042201301004
35ea 454.011/ea 15890.38263590
AYM 4124-051 18-G4 METER GASKET 1 - .13 THICK RUBBER70ea 0.616/ea 43.1336078
KMSTR 3200 1-1/2" GAL 120GPM TYPE: 02-L-02-D-1-8F-8UB CNFG:
8102400200104333042211301004
15ea 1053.752/ea 15806.29263480
AYM 4124-052 18-G6 1-1/2" DROP-IN METER GASKET 1/8" RUBBER30ea 5.379/ea 161.3637948
PCCOA 2FLZPK 2" FLNG ZNC IMPRT A307 B&N PK HAS 4- 5/8x2-1/4"
HXBT & 4- 58HXNT IMPRT
30ea 4.920/ea 147.59621302
KMSTR 3200 2"X17" GAL 160GPM TYPE: 02-L-02-D-1-8H-8UB CNFG:
8102400200104333042211301004
23ea 1215.229/ea 27950.28263560
AYM 4124-053 18-G7 2" DROP-IN METER GASKET 1/8" RUBBER46ea 5.989/ea 275.5037965
PCCOA 2FLZPK 2" FLNG ZNC IMPRT A307 B&N PK HAS 4- 5/8x2-1/4"
HXBT & 4- 58HXNT IMPRT
46ea 4.920/ea 226.30621302
Printed By: BRASIMM on 10/13/2026 3:37:06 PM CDT
** Continued on Next Page **
Quotation
EXPIRATION DATE PAGE NO.QUOTE NUMBER
S10610906910/12/2026 2 of 2
ORDER QTY DESCRIPTION Unit Price EXT PRICEPART NO
CUSTOMER PO NUMBER
AMI UPGRADE/MTRS
KMSTR 3200 3"X12" GAL 350GPM TYPE: 02-L-02-D-1-8K-8UB CNFG:
8102400200104033042191301004
4ea 2015.185/ea 8060.74263456
3" SEAL TITE FLG GSKT FF 150#8ea 9.410/ea 75.2825728
PCCOA 3FLZPK 3" FLNG ZNC B&N PK HAS 4- 58212HXBT & 4- 58HXNT8ea 4.340/ea 34.7268476
KMSTR 3200 4"X14" GAL 700GPM TYPE: 02-L-02-D-1-8P-8UB CNFG:
8102400200104033042191301004
2ea 2357.490/ea 4714.98263471
4" SEAL TITE FLG GSKT FF 150#4ea 10.227/ea 40.9125739
PCCOA 4FLZPK 4" FLNG ZNC B&N PK HAS 8- 583HXBT & 8- 58HXNT4pk 7.744/ea 30.9868480
Subtotal ------- 683702.95
Subtotal
S&H Charges
Amount Due
734716.95
0.00
734716.95
Printed By: BRASIMM on 10/13/2026 3:37:06 PM CDT
TAX IS NOT INCLUDED IN PRICE ON BID/QUOTE
All quotations are made in accordance with our interpretation of the
plans and specifications and include only the materials listed,
subject to correction for errors. Deviations in quantities may modify
prices quoted. Due to fluctuating market conditions,the prices listed
in this quote may change at any time without prior notice. In the
event of a price increase, any unfilled portion of any order will be
billed at the price in effect at the time of shipment. DSG shall not
be liable for failure to deliver or delivery performance due to
causes beyond our reasonable control.
A Summary of DSG standard terms & conditions of sales can be found at
www.dsgsupply.com/terms.