RecordWell Data

Board of Public Works — Agenda Packet

City of Stevens Point · Portage County · Board of Public Works · meeting of Jun 9, 2025 · Agenda packets

Open the original document More from City of Stevens Point

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Our intention is to have in-person meetings going forward. For the time being, we will hold the City Committee Meetings, Plan Commission, Council and most others at the Community Room at 933 Michigan Avenue. This in-person location will meet the legal requirement for our open meetings. We will have a virtual option available, but the technology for the hybrid style meeting may not be reliable all of the time. CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING June 9, 2025 - 6:25 PM (or immediately following previously scheduled meeting) Community Room 933 Michigan Avenue, Stevens Point, WI OR Zoom Teleconferencing Meeting ID: 880 9632 1166 | Passcode: 691458 By Computer: https://us02web.zoom.us/j/88096321166?pwd=StD3ofaDW2Jv5n6z20oXNghlzzkjOY.1 By Phone: +1-312-626-6799 (US Chicago) (A quorum of the City Council may attend this meeting) AGENDA Roll Call Informational 1. Director's Report a. Country Club Drive b. Division and Church Streets Reconstruction Project Discussion and Possible Action 2. To approve the ordinance amendments in Chapter 9 in Section 9.05 related to parking. 3. To approve the request from William Schierl and Schutte Movers to move the house currently located at 1656 Main Street. Adjourn Meeting Rider Any person who has special needs while attending this meeting or needing agenda materials for this meeting should contact the City Clerk as soon as possible to ensure a reasonable accommodation can be made. The City Clerk can be reached by telephone at (715) 346-1569, TDD # 346-1556 or by mail at 1515 Strongs Ave., Stevens Point, WI 54481. Copies of ordinances, resolutions, reports and minutes of the committee meetings are on file at the office of the City Clerk for inspection during normal business hours from 7:30 a.m. to 4:00p.m. Page 1 of 21 s t e v e n s p o i n t . c o m June 5, 2025 DIRECTOR OF PUBLIC WORKS REPORT Scott Beduhn 1. Engineering Division • Country Club Drive: o The Town of Hull has bid on the project. The apparent low bidder was Trinity Farms Excavating, LLC. o Construction is anticipated to begin in the late summer and be complete in the early fall. o The City has a streetlight and control cabinet in conflict with the proposed improvement that will be relocated before construction. • Division and Church Streets Reconstruction Project: o AECOM continues working to complete final designs for the North Segment (North Point Drive to Fourth Avenue) and the far South Segment (South City Limits to Michigan Avenue), which are both at a 60 percent design stage. ▪ Preliminary matters related to real estate acquisition for both projects is underway. ▪ WPS is preparing for the relocation of overhead utilities throughout the North Segment, which should occur later this year. o During the review of the 60 percent design plans, there were concerns over utility conflicts related to the Moses Creek crossing of Division Street, which is located just north of Franklin Street. After much discussion between staff, AECOM, and Gremmer, it was agreed that the best overall approach to address the concerns was to extend the work south to Briggs Street, which will eliminate the concerns as the proposed utilities can tie into existing utilities. • 2024 Street Improvement Project (Northside): o The contractor has completed the installation of water and sanitary sewer for the remaining two blocks of work. It is anticipated that the remaining work, including the installation of the storm sewer and all surface elements will be completed at the end of June. o In addition, the contractor will be addressing warranty issues on the work completed last year. • 2024 Street Improvement Project (Southside): o All work is complete. The contractor will return this spring to address any warranty items. • 2025 Street Improvement Project (Washington Ave): o The contractor is currently installing utilities between West Ave and Second Street to complete this portion before the start of the 2025-2026 school year. City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 2 of 21 s t e v e n s p o i n t . c o m • 2025 Street Improvement Project (Madison/Monroe): o The contractor has indicated that they be starting construction the week of June 16, 2025. • East Park Commerce Center Badger Avenue Extension: o Due to delays in materials and electrical service installation, the lighting system is not yet operable. All the other work is complete. ▪ The remaining materials have recently been delivered, and the contractor is coordinating the installation of the electrical service with WPS. • Forest Creek Subdivision: o Nothing new to report • Curb Gutter and Sidewalk Repair Project: o Nothing new to report. • Fall Paving Project: o Nothing new to report. • Pavement Maintenance Project: o Staff is preparing a scope of work for this year’s pavement maintenance, which should be bid later this spring. Staff is considering two projects this year with the first being seal coating and chip sealing of asphalt roads and the second being joint repair of concrete roads in the downtown area. • West River Drive: o AECOM is prepared a draft technical memo to present the general findings of the traffic evaluation ▪ A final technical memo will be prepared after receiving public input at the second planned public informational meeting. • The second public informational meeting was held on Wednesday, May 14, 2025. • West Zinda Bridge: o Work on the bridge began May 5, 2025. The work is anticipated to wrap up in early June with the bridge reopening to all traffic the week of June 9, 2025. • Michigan Avenue Underpass: o After receiving additional public input at the second public informational meeting, the City’s consultant is preparing a scope of work for the project's next phases. • Hoover Road Intersection Signalizations: o The installation contractor is performing preliminary work before the delivery of the signal equipment, including the installation of buried conduits and signal bases. ▪ This work is anticipated to wrap up the week of June 9, 2025. • The latest anticipated delivery timeframe for the signal equipment is now mid- August. • Park Street Railroad Crossing Closure investigation: o Staff is beginning to evaluate truck route options and potential roadway improvements for the possible rail crossing closure. o After completing some preliminary engineering, staff anticipates holding a public informational meeting in late spring or early summer. Page 3 of 21 s t e v e n s p o i n t . c o m • SS4A Grant – Demonstration Activities (DAs): o The SS4A stakeholder members (Demonstration Activities subcommittee) have identified three Demonstration Activities to be completed within the City of Stevens as part of the SS4A grant. The three activities include: ▪ Temporary curb extensions at the intersection of Fourth Avenue and Isadore Street. ▪ Buffered bike lanes along Water Street between Riverview Avenue and Kwik Trip. ▪ Buffered bike lanes along Michigan Avenue between Patch Street and Dixon Street. o These DAs will take place during the months of April and May. ▪ Public Works staff will be installing delineators to create the temporary curb extensions and buffered bike lanes and will also be conducting both pre- and post-installation data collection. • Additional Miscellaneous Projects: o Engineering Staff continue working on proposed 2026 and 2027 roadway projects, including gathering survey data, researching right of way, and preparing bidding documents. o Engineering staff have been working with university staff on several fronts to improve the University environment. These include: ▪ Discussions in conjunction with Community Development on the future of the old Maytag lot. ▪ Discussions regarding the reconstruction of Fourth Avenue through campus, which is tentatively scheduled for reconstruction in 2027. o Staff continue to work with the Utility Department on various water, sanitary, stormwater, and fiber projects. o Staff continue to work with the Community Development Department on various projects. These projects include: ▪ Forest Creek subdivision ▪ Shopko redevelopment 2. Streets Division - April • Continued Operations: o Garbage and Recycling o Street Sign Compliance and replacement o Street Light Maintenance o Street Patching/Trumbull o Drop-off Site Operations • Staffing: o The Streets Department currently has an open Street Maintenance Worker position following an employee's resignation who accepted a higher-level role elsewhere. Staff will begin reviewing applications and scheduling interviews in the coming weeks. • Notable events: o City Public Works staff assisted in planning and hosting the Wisconsin Chapter of the American Public Works Association (APWA) Spring Conference, held at SentryWorld here in Stevens Point. The three-day event welcomed approximately 400 public works professionals from across the state. The conference provided valuable technical and professional training opportunities for our staff. Page 4 of 21 s t e v e n s p o i n t . c o m • Winter Maintenance: o In the month of April, the department responded to one winter event. With the start of summer maintenance operations, most of our winter equipment has been either seasonally converted or parked for the summer. A few pieces are available in case of any unexpected late-season snowfall. • Summer Maintenance crews: o Patching/Trumbull: ▪ Early April experienced frequent freeze-thaw cycles, making it difficult to keep up with pothole repairs. Now that we appear to be in a more stable, warmer weather pattern, our crews are focusing on longer-term repairs using the Trumbull machine, hot patcher, and infrared unit. The Trumbull is currently being used on West Clark Street and will next be moving to Church and Division Streets. o Concrete: ▪ The concrete crew has kicked off the 2025 season with a focus on sidewalk repairs. As the season progresses, they will shift toward utility patches and additional work along West Clark Street. o Paint: ▪ Street painting has begun for the 2025 season. Crews beginning with yellow paint, focusing on curb heads and bullnoses. o Sweeping: ▪ We are about 80% complete with the first round of city-wide sweeping. We have been pulling the sweepers off to follow patching crews as they complete certain areas. o Equipment maintenance/garage: ▪ There is nothing notable to report currently. Most seasonal equipment changeovers have been completed. Weed harvesters are prepared for launch, and routine maintenance and repairs continue as scheduled. • Upcoming events: o Public Works Week: ▪ From May 13th to May 15th, the Public Works Departments (Streets and Engineering Divisions), along with Transit and Utilities, will host fourth-grade students from area schools to educate them on various aspects of public works. This annual event provides hands-on learning opportunities and shows the essential services that support our community. 3. Streets Division – May • Continued Operations: o Garbage and Recycling o Street Sign Compliance and replacement o Street Light Maintenance o Street Patching/Trumbull o Drop-off Site Operations Page 5 of 21 s t e v e n s p o i n t . c o m • Staffing: o The Streets Department has extended and received acceptance of an employment offer for the vacant Street Maintenance Worker position. The new employee is scheduled to begin work with the City on June 23, which will bring the department to full staff. • Public Works Week: o In May, the Public Works Departments (Streets and Engineering Divisions), along with Transit and Utilities, hosted over 300 fourth-grade students from area schools to educate them on various aspects of public works. This annual event provides hands-on learning opportunities and shows the essential services that support our community. • Summer Maintenance crews: o Patching/Trumbull: ▪ The Trumbull crew has made significant progress on Clark Street and has started at the south end of Church Street. They will continue to work north on Church/Division Street. o Concrete: ▪ The concrete crew has been working on the 2025 sidewalk repair program, along with joint repairs on West Clark Street. They will continue to work on West Clark Street as well as utility patches or blowouts that need repair. o Paint: ▪ Street painting has begun for the 2025 season. Crews are using yellow paint and focusing on curb heads and bullnoses. o Sweeping: ▪ We completed one round of sweeping through the whole city and started round 2. Our focus will be on main roads to start, and we will continue to sweep daily after the Trumbull/patch crew. o Crack Fill: ▪ The crack filling crew is about 35% complete with the 2025 crack filling program. o Equipment maintenance/garage : ▪ There is nothing notable to report at this time. We are currently working on the 2026 fleet budget. Respectfully submitted, Superintendent Johnson Page 6 of 21 s t e v e n s p o i n t . c o m May 21, 2025 To: Board of Public Works From: Scott Beduhn, Director of Public Works Re: Ordinance Amendments The ordinance amendment of Section 9.05(ah)1, amending Emergency Vehicle Parking Only, the amendment of Section 9.05(aj)3, creating Reserved Parking, and the amendment of Section 9.05(w)5, repealing No Parking, Except Police Vehicles are the result of a request made by the University of Wisconsin Stevens Point to increase available parking along Maria Drive adjacent to UWSP Police and Security Services. The ordinance amendment of Section 9.05(j)50, amending No Parking Here To Corner is a result of a discrepancy found in the description of the ordinance. The ordinance amendment of Section 9.05(j)179, creating No Parking Here To Corner is a result of the temporary demonstration activities for the “Safe Streets and Roads for All Grant Program”. The ordinance amendment Sections 9.05(ag)15 and 16, repealing Two Hour Parking 7:00 A.M. To 5:00 P.M. and the amendment of Section 9.05(ae)17, repealing Four Hour Parking are the result of a request made by Sentry Insurance to temporarily lift restrictions around its downtown building. Sentry is renovating part of its main office and is temporarily using its downtown building where they are limited to the number of parking stalls available and had inquired if the city had any additional stalls that could be used. The ordinance amendment of Section 9.03(c)2, creating Turns Prohibited on Red Light is a result of complaints received regarding right turning vehicles occupying the space needed for left turn vehicles to complete the left turn during the left green arrow. If there are any questions, please do not hesitate to contact me. Thank you City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 7 of 21 ORDINANCE AMENDING THE REVISED MUNICIPAL CODE OF THE CITY OF STEVENS POINT, WISCONSIN The Common Council of the City of Stevens Point do ordain as follows: SECTION I: That subsection 1 of Section 9.05(ah) of the Revised Municipal Code, Emergency Vehicle Parking Only is hereby amended to read as follows: 9.05(ah) 1. On the south side of Maria Drive from a point 460 feet east of Isadore Street to a point 384 feet west of Reserve Street. SECTION II: That subsection 3 of Section 9.05(aj) of the Revised Municipal Code, Reserved Parking is hereby created to read as follows: 9.05(aj)3 3. On the south side of Maria Drive from a point 384 feet west of Reserve Street to a point 318 feet west of Reserve Street for visitor and guest parking only. SECTION III: That subsection 5 of Section 9.05(w) of the Revised Municipal Code, No Parking, Except Police Vehicles is hereby repealed: SECTION IV: That subsection 50 of Section 9.05(j) of the Revised Municipal Code, No Parking Here To Corner is hereby amended to read as follows: 9.05(j) 50. On the south side of Maria Drive at a point 114 feet west of the intersection of Reserve Street and Maria Drive. SECTION V: That subsection 179 of Section 9.05(j) of the Revised Municipal Code, No Parking Here To Corner is hereby created to read as follows: 9.05(j) 179. On the west side of Isadore Street from Fourth Avenue to at a point 46 feet south. SECTION VI: That subsections 15 and 16 of Section 9.05(ag) of the Revised Municipal Code, Two Hour Parking 7:00 A.M. to 5:00 P.M. are hereby repealed. SECTION VII: That subsection 2 of Section 9.03(c) of the Revised Municipal Code, Turns Prohibited on Red Light is hereby created to read as follows: 9.03(c) 2. Right turn from Water Street onto Polk Street. Page 8 of 21 SECTION VIII: That subsection 17 of Section 9.05(ae) of the Revised Municipal Code, Four Hour Parking is hereby repealed. SECTION IX: These Ordinance changes shall take effect upon passage and publication. APPROVED: Mike Wiza, Mayor ATTEST: Susan Pagel, City Clerk Dated: May 21, 2025 Approved: June 16, 2025 Published: June 26, 2025 Page 9 of 21 Page 10 of 21 Page 11 of 21 Page 12 of 21 Page 13 of 21 s t e v e n s p o i n t . c o m June 5, 2025 To: Board of Public Works From: Scott Beduhn, Director of Public Works Re: Request from William Schierl to move house located at 1565 Main Street William Schierl, working with Schutte Movers, is requesting to relocate the house at 1565 Main Street approximately 400 feet to the west to the location of the former 1641 Main Street. The move is anticipated to take place this summer in the first half of September, and the actual moving time is approximately two days. This move will require a full closure of Main Street during the duration of the move. According to Scott Schutte at Schutte Movers the house will be moved into the street on the first day, where it will be positioned to be backed into and placed on the new lot on day two. According to the Wisconsin Department of Transportation (WisDOT), even though Main Street is also State Trunk Highway 66, a detour is not required; however, they have asked that the closure be added to the State’s Lane Closure System (LCS). The LCS is tied to the 511 WI system so that travelers using the 511 WI system will be informed of the closure. Even though it is not required by the State, staff would recommend that a marked detour be provided. Schutte Movers has provided the attached documentation for consideration, consisting of a narrative of the work, a copy of their proposed insurance certificate, a summary of their licenses and equipment, and a sketch of how the move will be conducted. Based upon the documentation provided and several conversations with William Schierl, Scott Schutte, and WisDOT, staff is comfortable with the proposed move and respectfully requests approval for the house move subject to a pre-move onsite coordination meeting and any reasonable conditions set forth and coordinated with the Director of Public Works, (i.e. duration of closure, hours of work, location of and type of barricades, protection of right of way elements, notification of road closure, detour, etc.). If there are any questions, please do not hesitate to contact me. Thank you Z:\90 - MEETINGS\2025 - MEETINGS\06 - June\Memo - Request to move Moen House.docx City of Stevens Point 1515 Strongs Avenue Stevens Point, WI 54481 Public Works Engineering Department: Phone: 715-346-1561 Fax: 715-346-1650 Streets Department: Phone: 715-346-1537 Fax: 715-346-1687 Page 14 of 21 Page 15 of 21 Page 16 of 21 Page 17 of 21 Page 18 of 21 Page 19 of 21 Page 20 of 21 Page 21 of 21

Source: City of Stevens Point website. First collected Nov 18, 2026.