Highway Committee — Agenda Packet
Portage County · Portage County · Highway Committee · meeting of Sep 16, 2025 · Agenda packets
Open the original document More from Portage County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PORTAGE COUNTY
MEETING AGENDA
HIGHWAY COMMITTEE
PORTAGE COUNTY ANNEX
CONFERENCE ROOMS 1 & 2
1462 STRONGS AVENUE
STEVENS POINT, WI 54481
Tuesday, September 16, 2025 3:30 PM
REMOTE ATTENDANCE & COMMENT
To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a
meeting number. Use the following meeting number: 806 488 708, then press #
To attend this meeting by video: Join the meeting now
Page 1 of 2
CALL TO ORDER
CORRESPONDENCE
1. WisDOT Email Regarding STH 49 Project Scope Change
2. Office of the Commissioner of Railroads Notice of Investigation – CTH H, Town of Eau Pleine Crossing
PRESENTATIONS
REPORTS
3. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48)
4. August 2025 Vendor Invoice List
5. Commissioner’s Report
PUBLIC NOTICE
Members of the public who wish to address the Committee on specific agenda items must register their request at this time,
with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set
forth in Robert’s Rules of Order.
APPROVAL OF MINUTES
6. Approval of August 19, 2025 Minutes
DISCUSSION/POSSIBLE ACTION
7. Discussion and Possible Action on Speed Zone Request – CTH DB from Interstate 39 to Marathon County Line
8. Discussion and Possible Action on Speed Zone Request – CTH B from Kennedy Avenue to CTH J
9. Discussion and Possible Action on Speed Zone Request – CTH R from South Elmwood Drive to USH 10
10. Discussion and Possible Action on 2026 Bridge/Culvert Aid Project Applications and Budget
11. Discussion and Possible Action on 2026 Highway Budget – Set Wetland and Stream Mitigation Credit Sale Rates
12. Discussion on 2026 Highway Budget – Special Revenue, Enterprise, and Wetland
13. Discussion and Possible Action on 2026 Highway Budget – 2026 Equipment Purchases
Page 1 of 57
Highway Committee Meeting Agenda September 16, 2025
Page 2 of 2
NEXT MEETING DATE
ADJOURNMENT
Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities at 715-
346-1598 as soon as possible to ensure that reasonable accommodations can be made.
Notice: Remote comment by the public during the meeting will be at the discretion of the Chair.
Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting.
Page 2 of 57
1
Check, Nathan
From: Arneson, Wendy - DOT <Wendy.Arneson@dot.wi.gov>
Sent: Wednesday, August 27, 2025 10:14 AM
To: Check, Nathan
Subject: RE: WIS 49(WIS 66 to WIS 29) Reduction in Scope
Hi Nathan,
/uni00fiAhan/uni005B /uni00”9/uni005F/uni00”fi /uni0055/uni005F/uni00”2 /uni005-/uni005Fnta/uni005-/gA1fin/uni005” /uni005D/uni005fi a/uni0052/uni005F/uni00”fit th/uni005fi /uni00fi”/uni00A9/uni00fi- /uni00-A/uni00-9 /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- /uni0052/uni005fit/uni00””/uni005fi/uni005fin /uni00fi”/uni00A9/uni00fi- /uni00-5/uni00-5 an/uni005A /uni00fi”/uni00A9/uni00fi- /uni00-2/uni00-9 in /uni00fi0/uni005F/uni00”2ta/uni005”/uni005fi an/uni005A /uni00ADa/uni00”2ath/uni005Fn /uni00A-/uni005F/uni00”fin/gA1fi/uni005fi/uni00”-/uni002E
/uni00fiAh/uni00”2/uni005F/uni00”fi/uni005”h/uni005F/uni00”fit th/uni005fi /uni005A/uni005fi/uni00”-i/uni005”n /uni005F/uni0055 /uni005F/uni00”fi/uni00”2 hi/uni005”h/uni00””a/uni00”9 i/uni005D/uni00”0/uni00”2/uni005Fv/uni005fi/uni005D/uni005fint /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”-, th/uni005fi /uni00”-/uni005-/uni005F/uni00”0/uni005fi, /uni00”-/uni005-h/uni005fi/uni005A/uni00”fil/uni005fi, an/uni005A /uni0052/uni00”fi/uni005A/uni005”/uni005fit /uni005F/uni0055 th/uni005fi /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- a/uni00”2/uni005fi
/uni005D/uni005Fnit/uni005F/uni00”2/uni005fi/uni005A an/uni005A /uni00”2/uni005fivi/uni005fi/uni00””/uni005fi/uni005A t/uni005F /uni005Da/uni00”/i/uni005Di/uni00”A/uni005fi th/uni005fi /uni005fi/uniFB00/uni005fi/uni005-/gA1fiv/uni005fin/uni005fi/uni00”-/uni00”- /uni005F/uni0055 /uni005F/uni00”fi/uni00”2 /uni00”0/uni00”2/uni005F/uni005”/uni00”2a/uni005D in a/uni005A/uni005A/uni00”2/uni005fi/uni00”-/uni00”-in/uni005” /uni005Fv/uni005fi/uni00”2 /uni00-2,/uni00-A/uni00-0/uni00-0 /uni005Dil/uni005fi/uni00”- /uni005F/uni0055 hi/uni005”h/uni00””a/uni00”9 an/uni005A
/uni00-2,/uni00-A/uni00-0/uni00-0 /uni0052/uni00”2i/uni005A/uni005”/uni005fi/uni00”- /uni00””ithin th/uni005fi N/uni005F/uni00”2th /uni00A-/uni005fint/uni00”2al /uni00fi2/uni005fi/uni005”i/uni005Fn/uni2019/uni00”- /uni00-1/uni00-/ /uni005-/uni005F/uni00”fin/gA1fi/uni005fi/uni00”-/uni002E /uni00fi”i/uni00”-/uni00AA/uni00AF/uni00fiA /uni0055/uni005Fll/uni005F/uni00””/uni00”- a /uni005Aata-
/uni005A/uni00”2iv/uni005fin a/uni00”0/uni00”0/uni00”2/uni005Fa/uni005-h /uni00””h/uni005fin /uni00”2/uni005fivi/uni005fi/uni00””in/uni005” th/uni005fi
/uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- t/uni005F /uni005A/uni005fit/uni005fi/uni00”2/uni005Din/uni005fi th/uni005fi /uni005D/uni005F/uni00”-t /uni005-/uni005F/uni00”-t-/uni005fi/uniFB00/uni005fi/uni005-/gA1fiv/uni005fi /uni00”-/uni005Fl/uni00”fi/gA1fi/uni005Fn/uni00”- a/uni00”2/uni005fi /uni0052/uni005fiin/uni005” /uni00”fi/gA1fili/uni00”A/uni005fi/uni005A at th/uni005fi a/uni00”0/uni00”0/uni00”2/uni005F/uni00”0/uni00”2iat/uni005fi /gA1fi/uni005D/uni005fi/uni002E
A/uni00”- th/uni005fi /uni00fi”/uni00A9/uni00fi- /uni00-A/uni00-9 /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- hav/uni005fi /uni0052/uni005fi/uni005fin in th/uni005fi /uni00”0/uni00”2/uni005F/uni005-/uni005fi/uni00”-/uni00”- /uni005F/uni0055 /uni0052/uni005fiin/uni005” /uni005A/uni005fiv/uni005fil/uni005F/uni00”0/uni005fi/uni005A, /uni005Aata ha/uni00”- /uni005-/uni005Fn/gA1fin/uni00”fi/uni005fi/uni005A t/uni005F /uni0052/uni005fi /uni005-/uni005Fll/uni005fi/uni005-t/uni005fi/uni005A /uni00”2/uni005fi/uni005”a/uni00”2/uni005Ain/uni005” th/uni005fi
/uni00”0av/uni005fi/uni005D/uni005fint /uni005Ai/uni00”-t/uni00”2/uni005fi/uni00”-/uni00”-/uni005fi/uni00”- an/uni005A an/gA1fi/uni005-i/uni00”0at/uni005fi/uni005A li/uni0055/uni005fi /uni005-/uni00”9/uni005-l/uni005fi/uni00”- /uni005F/uni0055 th/uni005fi i/uni005D/uni00”0/uni00”2/uni005Fv/uni005fi/uni005D/uni005fint alt/uni005fi/uni00”2na/gA1fiv/uni005fi/uni00”-/uni002E A /uni00”2/uni005fivi/uni005fi/uni00”” /uni005F/uni0055 that /uni005Aata /uni00”-h/uni005F/uni00””/uni005fi/uni005A th/uni005fi
/uni005F/uni00”2i/uni005”inall/uni00”9 /uni00”-/uni005-/uni005F/uni00”0/uni005fi/uni005A /uni00”0av/uni005fi/uni005D/uni005fint /uni00”2/uni005fi/uni00”0la/uni005-/uni005fi/uni005D/uni005fint /uni00”2/uni005fi/uni00”-/uni00”filt/uni005fi/uni005A in a /uni00”-i/uni005”nifi/uni005-antl/uni00”9 hi/uni005”h/uni005fi/uni00”2 li/uni0055/uni005fi /uni005-/uni00”9/uni005-l/uni005fi /uni005-/uni005F/uni00”-t than /uni005Fth/uni005fi/uni00”2 alt/uni005fi/uni00”2na/gA1fiv/uni005fi/uni00”-/uni002E
A/uni005A/uni005Ai/gA1fi/uni005Fnall/uni00”9, th/uni005fi /uni00”0av/uni005fi/uni005D/uni005fint /uni00”2/uni005fi/uni00”0la/uni005-/uni005fi/uni005D/uni005fint /uni005Ai/uni005A n/uni005Ft /uni00”2/uni005fi/uni00”-/uni00”filt in an /uni005fi/uni00”/t/uni005fin/uni00”-i/uni005Fn /uni005F/uni0055 th/uni005fi /uni0055a/uni005-ili/gA1fi/uni005fi/uni00”-/uni2019 an/gA1fi/uni005-i/uni00”0at/uni005fi/uni005A /uni00”-/uni005fi/uni00”2vi/uni005-/uni005fi li/uni0055/uni005fi, an/uni005A
/uni00”2/uni005fi/uni00”-/uni00”filt/uni005fi/uni005A in a/uni005A/uni005Ai/gA1fi/uni005Fnal /uni00”2/uni005fial /uni005fi/uni00”-tat/uni005fi an/uni005A /uni005finvi/uni00”2/uni005Fn/uni005D/uni005fintal i/uni005D/uni00”0a/uni005-t/uni00”-/uni002E /uni00fiAh/uni005fi /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- /uni00””/uni005fi/uni00”2/uni005fi /uni00”2/uni005fi/uni00”-/uni005-/uni005F/uni00”0/uni005fi/uni005A /uni005A/uni00”fi/uni005fi t/uni005F th/uni005fi la/uni005-/uni005B /uni005F/uni0055 /uni005Fv/uni005fi/uni00”2all
/uni00”-/uni00”9/uni00”-t/uni005fi/uni005D h/uni005fialth /uni0052/uni005fin/uni005fifit at th/uni005fi /uni005fi/uni00”-/gA1fi/uni005Dat/uni005fi/uni005A /uni005-/uni005F/uni00”-t/uni002E
/uni00fi2/uni005fi/uni00”-/uni005-/uni005F/uni00”0in/uni005” th/uni005fi/uni00”-/uni005fi /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- t/uni005F a /uni00-2/uni002E5” /uni005Dill//uni005Fv/uni005fi/uni00”2la/uni00”9 all/uni005F/uni00””/uni00”- N/uni005F/uni00”2th /uni00A-/uni005fint/uni00”2al /uni00fi2/uni005fi/uni005”i/uni005Fn
t/uni005F a/uni005Avan/uni005-/uni005fi /uni005Fth/uni005fi/uni00”2 /uni005-/uni00”2i/gA1fi/uni005-al n/uni005fi/uni005fi/uni005A/uni00”- /uni005Fn /uni005F/uni00”fi/uni00”2 /uni00”-/uni00”9/uni00”-t/uni005fi/uni005D an/uni005A /uni0052/uni005fi/gA2fi/uni005fi/uni00”2 i/uni005D/uni00”0/uni00”2/uni005Fv/uni005fi th/uni005fi /uni005Fv/uni005fi/uni00”2all /uni00”-/uni00”9/uni00”-t/uni005fi/uni005D h/uni005fialth/uni002E
/uni00fiAh/uni005fi /uni00fi”/uni00A9/uni00fi- /uni00-A/uni00-9 /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”- /uni0052/uni005fit/uni00””/uni005fi/uni005fin /uni00fi”/uni00A9/uni00fi- /uni00-5/uni00-5 an/uni005A /uni00fi”/uni00A9/uni00fi- /uni00-2/uni00-9 in /uni00fi0/uni005F/uni00”2ta/uni005”/uni005fi an/uni005A /uni00ADa/uni00”2ath/uni005Fn /uni00A-/uni005F/uni00”fin/gA1fi/uni005fi/uni00”- hav/uni005fi al/uni00”-/uni005F /uni0052/uni005fi/uni005fin a/uni005Avan/uni005-/uni005fi/uni005A an/uni005A a/uni00”2/uni005fi
n/uni005F/uni00”” /uni00”-/uni005-h/uni005fi/uni005A/uni00”fil/uni005fi/uni005A /uni0055/uni005F/uni00”2 /uni005-/uni005Fn/uni00”-t/uni00”2/uni00”fi/uni005-/gA1fi/uni005Fn in /uni00-2/uni00-0/uni00-2/uni00-”/uni002E
/uni00fiAhan/uni005B /uni00”9/uni005F/uni00”fi /uni0055/uni005F/uni00”2 /uni00”9/uni005F/uni00”fi/uni00”2 /uni005-/uni005Fn/gA1fin/uni00”fi/uni005fi/uni005A /uni005-/uni005Flla/uni0052/uni005F/uni00”2a/gA1fi/uni005Fn /uni005Fn th/uni005fi/uni00”-/uni005fi /uni00”0/uni00”2/uni005F/uni005A/uni005fi/uni005-t/uni00”-/uni002E
/uni00fi”/uni005fin/uni005A/uni00”9
Wendy Arneson, P.E. | Project Manager
Wisconsin Department of Transporta1gAD5on
North Central Region
(715) 421-7391
Wendy.Arneson@dot.wi.gov
From: Check, Nathan <CheckN@co.portage.wi.gov>
Sent: Friday, August 22, 2025 12:02 PM
To: Arneson, Wendy - DOT <Wendy.Arneson@dot.wi.gov>
Subject: WIS 49(WIS 66 to WIS 29) Reduction in Scope
CAUTION: This email originated from outside the org anization.
Do not click links or open attachments unless you r ecognize the sender and know the content is safe.
Good morning Wendy,
Page 3 of 57
2
/uni0050ort/uni0061ge /uni004-ounty /uni0068/uni0061/uni007- recei/uni0076ed t/uni0068e /uni0050u/uni0062/uni006Cic In/uni0076o/uni006C/uni0076ement no/g415ce /uni0066or WIS 49(WIS 66 to WIS 29) /uni0061nd /uni0068/uni0061/uni007- inc/uni006Cuded our /uni0048ig/uni0068/uni0077/uni0061y
/uni004-ommi/g425ee in t/uni0068e corre/uni007-pondence. /uni0041t our /uni006C/uni0061/uni007-t mee/g415ng, t/uni0068ere /uni0077ere /uni0071ue/uni007-/g415on/uni007- reg/uni0061rding t/uni0068e /uni007-igni/uniFB01c/uni0061nt c/uni0068/uni0061nge o/uni0066 /uni007-cope
/uni0061nd /uni007-c/uni0068edu/uni006Ce. /uni004-/uni0061n you p/uni006Ce/uni0061/uni007-e pro/uni0076ide /uni0061n e/uni0078p/uni006C/uni0061n/uni0061/g415on /uni0066or t/uni0068e c/uni0068/uni0061nge/uni007-/uni00-F
/uni0054/uni0068ere /uni0061re concern/uni007- /uni0077it/uni0068 t/uni0068e condi/g415on/uni007- o/uni0066 t/uni0068e ro/uni0061d /uni0061nd t/uni0068e /uni006Cimited /uni007-cope /uni0077it/uni0068 t/uni0068e mi/uni006C/uni006C /uni0061nd rep/uni0061/uni0076e. /uni0054/uni0068e p/uni0061/uni0076ement i/uni007-
e/uni0078periencing /uni007-igni/uniFB01c/uni0061nt deterior/uni0061/g415on /uni0061nd cr/uni0061c/uni006Bing /uni0061nd /uni0077e /uni0061re concerned i/uni0066 t/uni0068/uni0061t i/uni007- t/uni0068e /uni0061ppropri/uni0061te /uni007-cope. /uni0054/uni0068e origin/uni0061/uni006C
/uni007-cope /uni0077ou/uni006Cd /uni0068/uni0061/uni0076e /uni0061 pro/uni0076ided /uni0061 /uni006Cong-term in/uni0076e/uni007-tment in t/uni0068e cri/g415c/uni0061/uni006C in/uni0066r/uni0061/uni007-tructure /uni0061nd /uni0066or /uni006C/uni0061c/uni006B o/uni0066 /uni0061 /uni0062e/g425er term, t/uni0068e ne/uni0077
/uni007-cope /uni0061ppe/uni0061r/uni007- to /uni0062e /uni0061 /uni007-/uni0068ort-term /uni0062/uni0061nd-/uni0061id t/uni0068/uni0061t m/uni0061y deterior/uni0061te e/uni0076en /uni0071uic/uni006Ber due to t/uni0068e condi/g415on o/uni0066 t/uni0068e under/uni006Cying
p/uni0061/uni0076ement.
/uni0054/uni0068/uni0061n/uni006B you,
N/uni0061t/uni0068/uni0061n
Nathan Check, PE
Highway Commissioner
800 Plover Road
Plover, WI 54467
checkn @co.portage.wi.gov
Phone: 715-345-5230
Cell: 715-630-2203
Fax: 715-345-5356
Page 4 of 57
OFFICE OF THE COMMISSIONER OF RAILROADS
STATE OF WISCONSIN
On the Commissioner's Own Motion for a Determination of the
Adequacy of Warning Devices of the Wisconsin Central Ltd. tracks with
CTH H in the Town of Eau Pleine, Portage County
9164-RX-959
NOTICE OF INVESTIGATION
THIS IS AN INVESTIGATION to consider the adequacy of warning devices at the
grade crossing of the Wisconsin Central Ltd. (WCL) tracks with CTH H in the Town of Eau
Pleine (Town), Portage County (County) (Crossing No. 392761D / MP 66.05). The Office of the
Commissioner of Railroads (Office) opens this docket by its authority under Wis. Stat. ch. 195.
The Office intends to conduct this investigation without a public hearing.
An Office investigator inspected this crossing on May 28, 2025, finding inadequate
approach and corner sight distances. (PSC REF#: 560329) Clearing sight distances are adequate
in all four quadrants but are reduced in the northwest and southeast quadrants by a right-hand-
forward track skew of 62 degrees. CTH H has an unposted speed limit of 55 mph. The WCL
reported 3 daily trains (2 day, 1 night) at a maximum timetable speed of 40 mph. This crossing
has antiquated flashing lights installed in 1991.
On June 24, 2025, the Office notified the County of safety issues. (PSC REF#: 559637)
On June 26, 2025, the County responded that the brush obstructing the warning devices was
removed. (PSC REF#: 559638) On July 21, 2025, the County notified the Office that it
completed the remaining work. (PSC REF#: 559639)
DOCUMENTS. To view documents in this docket: (1) go to the Office’s website at
http://ocr.wi.gov, (2) go to Docket Services-ERF Electronic Filing, (3) enter “9164-RX-959” in
the box labeled “Quick Single Docket Search,” and (4) select “Documents.”
To receive automatic notifications for all documents related to this docket please use the
Office’s EZ-Subscription service: (1) go to the Office’s website at http://ocr.wi.gov, (2) go to
Docket Services-EZ Subscribe, (3) enter “9164-RX-959” in the box labeled “Docket ID,” (4)
enter your email address, (5) check the box, and (6) select “Subscribe.”
INTERVENTION. Interested persons may participate in this investigation without
becoming a party. However, any person desiring to become a party shall file a request for party
status, known as a request to intervene, under Wis. Stat. § 227.44(2m) and Wis. Admin. Code
§ RR 1.02(1)(c) no later than 14 days from the date of service of this notice.
To file such a request, go to the Office’s website at http://ocr.wi.gov, click on Docket
Services-ERF Electronic Records Filing. Follow these instructions to create an ERF account and
upload the request to ERF: OCR ERF Instructions.
PSC REF#:560332
Public Service Commission of Wisconsin
RECEIVED: 9/4/2025 11:35:01 AM
Page 5 of 57
Docket 9164-RX-959
2
A person desiring to become a party who lacks access to the Internet shall make a request
to intervene by U.S. mail addressed to:
Docket 9164-RX-959 Intervention Request
Office of the Commissioner of Railroads
P.O. Box 7854
Madison, WI 53707-7854
At the time of filing, the person making the request to intervene shall serve a copy of the
request on existing parties. At this time, the WCL, Town, County, and Wisconsin Department of
Transportation are parties. An existing party may respond to the request within 5 days of
service.
WISCONSIN ENVIRONMENTAL POLICY ACT. Under Wis. Admin. Code § RR
1.13(2), this investigation does not require the preparation of an environmental impact statement.
ASSESSMENT. The Office finds that the expenses that are reasonably attributable to
this investigation will be assessed against the WCL in accordance with Wis. Stat. § 195.60 and
Wis. Admin. Code § RR 2.04.
AMERICANS WITH DISABILITIES ACT. The Office does not discriminate on the
basis of disability in the provision of programs, services, or employment. Any person with a
disability who needs accommodations to participate in this docket or who needs to obtain this
document in a different format should contact the docket coordinator listed below. Any hearing
location is accessible to people in wheelchairs. The Office is located in the Hill Farms State
Office Building that is also physically accessible to individuals with disabilities through the first
floor entrances. Parking for people with disabilities is available on the ground floor of the
parking garage. There is also limited, free handicap visitor parking at the front of the Hill Farms
State Office Building.
CONTACT. For questions about this docket, contact the Office’s docket coordinator,
Heather Graves, at (608) 266-0276 or Heather.Graves@wisconsin.gov.
s/Heather Graves
Heather Graves
Program and Policy Analyst-Supervisor
SS/hg DL: 02093815
Page 6 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 1
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
1214 Altmann Construction Co Inc
250720 2501310 07/21/2025 080725 145777 5,406.25 08/20/2025 INV PD Hired Truck Service Bid#2
250801 2501310 08/01/2025 082125 145977 1,187.50 08/31/2025 INV PD Hired Truck Service Bid#2
6,593.75
257 Aring Equipment Co
916448 2500004 07/24/2025 080725 668353 511.29 08/08/2025 INV PD Motor
916286 2500004 07/22/2025 080725 668354 436.22 08/06/2025 INV PD Evaporator Coil
916449 2500004 08/06/2025 082125 668588 2,229.06 08/21/2025 INV PD Core Motor
3,176.57
6634 Ascendance Trucks Central LLC
XA173003524:01 06/25/2025 080725 145785 -565.26 07/02/2025 CRM PD REF CORE RETURN
XA173003741:01 2500016 07/15/2025 080725 145785 35.46 08/14/2025 INV PD Filter
XA173003802:01 2500016 07/22/2025 080725 145785 1,759.00 08/21/2025 INV PD Gasket
XA173003802:02 2500016 07/22/2025 080725 145785 607.30 08/21/2025 INV PD Injector
XA173003804:01 2500016 07/22/2025 080725 145785 131.50 08/21/2025 INV PD Harness
XA173003891:01 2500016 07/29/2025 080725 145785 1,351.77 08/28/2025 INV PD Mirror
RA173002516:01 2500016 07/29/2025 082125 145981 335.77 08/10/2025 INV PD Engine Repair
XA173004083:02 2500016 08/12/2025 082125 145981 258.86 09/11/2025 INV PD Bolt
XA173004083:01 2500016 08/12/2025 082125 145981 330.14 09/11/2025 INV PD Sensor
XA173004083:03 2500016 08/13/2025 082125 145981 605.20 09/12/2025 INV PD Sensor
XA173004083:04 2500016 08/14/2025 082125 145981 381.76 09/13/2025 INV PD Hose
XA173004157:01 2500016 08/15/2025 082125 145981 20.66 09/14/2025 INV PD Sealing Washer
5,252.16
7125 Ascentek Corp
3866340 2501693 07/18/2025 082125 668589 349.00 09/16/2025 INV PD Oil
3867710 2501693 07/21/2025 082125 668589 1,604.76 09/19/2025 INV PD Oil
1,953.76
1311 Aspirus Medical Group Inc
146314 2502381 07/31/2025 082125 668590 1,321.00 08/30/2025 INV PD Random Testing
8 Beaver of WI Inc
117653 2500002 08/08/2025 082125 668596 1,820.00 09/07/2025 INV PD Tar Remover
117670 2500002 08/15/2025 082125 668596 205.00 09/14/2025 INV PD Swivel
2,025.00
1522 Burns Industrial Supply Inc
IN043526 2500013 07/23/2025 080725 145795 20.54 08/22/2025 INV PD Branch Tee
IN043787 2500013 07/24/2025 080725 145795 22.46 08/23/2025 INV PD Adapter
IN043563 2500013 07/23/2025 080725 145795 305.99 08/22/2025 INV PD Fittings
IN044133 2500013 07/28/2025 080725 145795 108.81 08/27/2025 INV PD Swivel
IN044863 2500013 07/31/2025 080725 145795 62.66 08/30/2025 INV PD Adapter
IN045923 2500013 08/08/2025 082125 145985 79.40 09/07/2025 INV PD Fittings
IN045929 2500013 08/08/2025 082125 145985 121.25 09/07/2025 INV PD Fittings
Page 7 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 2
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
721.11
2487 Central WI Auto Parts
415062 2500059 07/09/2025 080725 668366 33.48 07/29/2025 INV PD Filters
415109 2500059 07/10/2025 080725 668366 72.99 07/30/2025 INV PD Ring
414039 06/26/2025 080725 668366 -126.00 07/17/2025 CRM PD REF CORE RETURN
415648 2500059 07/17/2025 080725 668366 40.37 08/06/2025 INV PD Filter
415623 2500059 07/16/2025 080725 668366 101.33 08/05/2025 INV PD WD40
415466 2500059 07/15/2025 080725 668366 135.96 08/04/2025 INV PD Tape
416830 2500059 07/30/2025 080725 668366 26.53 08/19/2025 INV PD Switch
416597 2500059 07/28/2025 080725 668366 482.31 08/17/2025 INV PD Filters
416120 2500059 07/22/2025 080725 668366 67.95 07/28/2025 INV PD Hood Latch
416205 2500059 07/23/2025 080725 668366 208.30 08/12/2025 INV PD Socket
416129 2500059 07/22/2025 080725 668366 119.98 08/11/2025 INV PD Hydraulic Parts
416616 2500059 07/28/2025 080725 668366 16.52 08/17/2025 INV PD Lamp
416607 2500059 07/28/2025 080725 668366 86.94 08/27/2025 INV PD Fitting
416618 2500059 07/28/2025 080725 668366 52.64 08/17/2025 INV PD Connector
414084 2500059 06/26/2025 080725 668366 225.84 07/16/2025 INV PD Filters
409414 2500059 05/01/2025 080725 668366 62.60 05/21/2025 INV PD Terry Pads
413968 2500059 06/25/2025 080725 668366 156.06 07/15/2025 INV PD Filters
416037 2500059 07/22/2025 080725 668366 214.26 08/12/2025 INV PD Filters
413784 2500059 06/23/2025 080725 668366 387.83 07/22/2025 INV PD Grease Gun
415453 2500059 07/15/2025 080725 668366 349.80 08/04/2025 INV PD Alternator
417553 2500059 08/07/2025 082125 668604 42.40 08/27/2025 INV PD V-Belt
417259 2500059 08/05/2025 082125 668604 68.98 08/25/2025 INV PD Wheel Bearing
417439 2500059 08/06/2025 082125 668604 182.38 08/26/2025 INV PD Halogens
417803 2500059 08/11/2025 082125 668604 236.12 08/31/2025 INV PD Filters
417821 2500059 08/11/2025 082125 668604 285.77 08/31/2025 INV PD Filters
418014 2500059 08/13/2025 082125 668604 74.74 09/03/2025 INV PD Clamp
418084 2500059 08/14/2025 082125 668604 200.25 09/04/2025 INV PD Cleaner
418149 2500059 08/14/2025 082125 668604 82.09 09/04/2025 INV PD Filters
417947 2500059 08/12/2025 082125 668604 485.84 09/02/2025 INV PD Bulbs
4,374.26
2779 CHEMS Users Group
2779081825 2502463 08/18/2025 082125 668608 80.00 08/18/2025 INV PD Chems 2025 Annual Highway
2779081925 2502463 08/19/2025 082125 668608 80.00 09/18/2025 INV PD Chems 2025 Annual Highway
160.00
2905 Cintas Corp No 2
5284324503 2500001 08/04/2025 080725 668370 143.30 09/03/2025 INV PD Medical Supplies
490 Co of Adams
2025-JULY 2502377 07/12/2025 082125 668616 985.55 08/11/2025 INV PD Hired Truck
1987 Co of Oneida
250713 2502393 07/24/2025 082125 668619 14,119.54 08/23/2025 INV PD Crack Filler
1159 Co of Waupaca
Page 8 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 3
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
202500000453 2502380 08/05/2025 082125 145995 6,478.68 09/04/2025 INV PD Hired Truck
202500000454 2502424 08/05/2025 082125 145995 3,405.84 09/04/2025 INV PD Hired Truck
9,884.52
4086 Dean Altmann Trucking & Excavating Inc
26303 2501318 07/28/2025 080725 668378 1,156.25 08/27/2025 INV PD Hired Truck Service Bid#2
26284 2501318 07/21/2025 080725 668378 4,906.25 08/20/2025 INV PD Hired Truck Service Bid#2
6,062.50
1545 Edward H Wolf & Sons Inc
462489 2500048 07/23/2025 080725 668381 20,650.56 08/22/2025 INV PD Fuel 2024-26
462517 2500365 07/29/2025 080725 668381 427.47 08/28/2025 INV PD Def for Stock
464559 2500048 08/13/2025 082125 668635 19,750.56 09/12/2025 INV PD Fuel 2024-26
40,828.59
44 Fahrner Asphalt Sealers LLC
8300021487 2502341 07/23/2025 080725 668384 7,978.75 08/22/2025 INV PD Hwy Driveway/Parking Lot
37 Fastenal Co
WISTE314154 2500011 07/21/2025 080725 145828 133.50 08/20/2025 INV PD Bolts
WISTE314258 2500011 07/24/2025 080725 145828 644.56 08/23/2025 INV PD Safety Gloves
WISTE314340 2500011 07/28/2025 080725 145828 1.90 08/27/2025 INV PD Slot
WISTE314341 2500011 07/28/2025 080725 145828 16.89 08/27/2025 INV PD Pin
WISTE314556 2500011 08/04/2025 082125 146017 54.48 09/03/2025 INV PD Bolts
WISTE314557 2500011 08/04/2025 082125 146017 101.80 09/03/2025 INV PD Fasteners
WISTE314898 2500011 08/15/2025 082125 146017 59.57 09/14/2025 INV PD Bolts
WISTE314831 2500011 08/14/2025 082125 146017 422.37 09/13/2025 INV PD Safety Gloves
WISTE314832 2500011 08/14/2025 082125 146017 340.92 09/13/2025 INV PD Bolts
WISTE314558 2500011 08/04/2025 082125 146017 10.36 09/03/2025 INV PD Bolts
WISTE314691 2500011 08/08/2025 082125 146017 30.24 09/07/2025 INV PD Bolts
WISTE314638 2500011 08/07/2025 082125 146017 280.35 09/06/2025 INV PD Safety Gloves
WISTE314639 2500011 08/07/2025 082125 146017 58.85 09/06/2025 INV PD Fasteners
WISTE314460 2500011 07/31/2025 082125 146017 724.25 08/30/2025 INV PD Safety Gloves
WISTE314897 2500011 08/15/2025 082125 146017 49.12 09/14/2025 INV PD Bolts
2,929.16
295 Ferrellgas LP
1131221983 2500025 08/04/2025 080725 668385 30.79 09/03/2025 INV PD Bottle Gas
1131229018 2500025 08/04/2025 082125 668640 240.65 09/03/2025 INV PD Bottle Gas
1131322671 2500025 08/18/2025 082125 668640 30.39 09/17/2025 INV PD Bottle Gas
301.83
1143 FHR Investments LP
34895747-0 2502155 07/14/2025 080725 668386 125,040.25 08/13/2025 INV PD Bituminous Oil Bid#2025-0
34901819-0 2502155 07/15/2025 080725 668386 74,964.29 08/14/2025 INV PD Bituminous Oil Bid#2025-0
34907652-0 2502155 07/16/2025 080725 668386 37,407.32 08/15/2025 INV PD Bituminous Oil Bid#2025-0
34913767-0 2502155 07/17/2025 080725 668386 100,357.70 08/18/2025 INV PD Bituminous Oil Bid#2025-0
34920359-0 2502155 07/18/2025 080725 668386 50,178.85 08/18/2025 INV PD Bituminous Oil Bid#2025-0
34931565-0 2502155 07/21/2025 080725 668386 71,424.19 08/20/2025 INV PD Bituminous Oil Bid#2025-0
Page 9 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 4
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
34946391-0 2502155 07/23/2025 080725 668386 7,589.96 08/22/2025 INV PD Bituminous Oil Bid#2025-0
34937950-0 2502155 07/22/2025 080725 668386 12,500.28 08/21/2025 INV PD Bituminous Oil Bid#2025-0
479,462.84
1644 Fleetpride Inc
127010250 07/07/2025 082125 668641 -253.98 07/17/2025 CRM PD REF 126885422
127581693 2502428 07/29/2025 082125 668641 490.31 08/28/2025 INV PD Valve
236.33
2128 Glen-Ray Radiators Inc
03072 2502432 08/11/2025 082125 668644 400.00 09/10/2025 INV PD DPF Filter
835 Gremmer & Assoc Inc
250324-4 2501908 08/01/2025 082125 668646 21,000.00 08/11/2025 INV PD CR D (CTH A - STH 54) Des
4588 Istate Truck Inc
C271178379:01 2500062 07/28/2025 080725 668389 448.00 08/27/2025 INV PD Arm
C271178643:01 2500062 08/01/2025 080725 668389 2,112.10 08/31/2025 INV PD Leaf Spring
C271179364:01 2500062 08/07/2025 082125 668648 385.01 09/06/2025 INV PD Joint Kit
C271179834:01 2500062 08/13/2025 082125 668648 1,445.98 09/12/2025 INV PD Rods
4,391.09
244 Jay Mar Inc
INV0178286 2502310 07/23/2025 080725 668390 105.00 08/22/2025 INV PD Herbicide
INV0178409 2502344 07/30/2025 080725 668390 105.00 08/29/2025 INV PD Herbicide
210.00
3285 Jays Lawncare & Snow Removal LLC
9662 2501610 07/15/2025 080725 668391 8,105.00 08/14/2025 INV PD 2025 Highway Lawn Mainten
9581 2501610 05/15/2025 082125 668651 2,075.00 06/14/2025 INV PD 2025 Highway Lawn Mainten
10,180.00
329 Jerrys Small Engine Supply Co
3405 2500026 07/28/2025 080725 145840 130.99 08/27/2025 INV PD Ignition
3695 2500026 07/30/2025 080725 145840 63.49 08/29/2025 INV PD Back Plate
194.48
129 JFTCO Inc
PIWA0208920 07/10/2025 080725 668392 -118.23 07/24/2025 CRM PD REF PIWA0208189
PIWA0209419 2500052 07/15/2025 080725 668392 280.10 08/14/2025 INV PD Sensor
PIWA0206700-1 2500052 06/18/2025 080725 668392 282.44 07/18/2025 INV PD Freight
PIWA0210145 2500052 07/22/2025 080725 668392 15.56 08/21/2025 INV PD Freight
PIWA0210146 2500052 07/22/2025 080725 668392 91.80 08/21/2025 INV PD Mirror
RIWR00017923 2502013 07/29/2025 082125 668652 7,165.50 08/07/2025 INV PD Skidsteer-Sourcewell Cont
PIWA0211934 2500052 08/06/2025 082125 668652 59.03 09/05/2025 INV PD Strainer
PIMQ0156194 2500052 08/04/2025 082125 668652 2,019.10 09/03/2025 INV PD Motor
PIWA0211485 2500052 08/01/2025 082125 668652 849.22 08/31/2025 INV PD Motor
Page 10 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 5
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
PIWA0211368 2500052 07/31/2025 082125 668652 274.38 08/30/2025 INV PD Bracket
PIWA0211369 2500052 07/31/2025 082125 668652 253.40 08/30/2025 INV PD Alarm
PIWA0211199 2500052 07/30/2025 082125 668652 34.89 08/29/2025 INV PD Freight
PIWA0211198 2500052 07/30/2025 082125 668652 75.52 08/29/2025 INV PD Assembly
PIWA0210873 2500052 07/28/2025 082125 668652 36.24 08/27/2025 INV PD Freight
PIWA0210874 2500052 07/28/2025 082125 668652 91.80 08/27/2025 INV PD Mirror
PIWA0211935 2500052 08/06/2025 082125 668652 774.22 09/05/2025 INV PD Element
PIWA0211933 2500052 08/06/2025 082125 668652 14.95 09/05/2025 INV PD Freight
12,199.92
1555 John Deere Financial
9125965 2500058 07/22/2025 080725 668393 79.12 07/25/2025 INV PD Mirror
38 Johnson Towing of Stevens Point
25-8314 2502333 07/14/2025 080725 668394 550.00 07/31/2025 INV PD Tow
2549 JR'S Dirt Works
319 2501311 07/20/2025 080725 668395 2,550.00 07/20/2025 INV PD Hired Truck Service Bid#2
4123 KBIS LLC
4123032625 2502420 03/26/2025 082125 668655 4,000.00 08/12/2025 INV PD Bridge Inspection
5417 Kriete Truck Center Stevens Point
X109041505:01 07/07/2025 080725 668398 -653.87 07/17/2025 CRM PD REF X109040341
X109040277:01 05/22/2025 080725 668398 -53.98 07/24/2025 CRM PD REF X109040179
X109040276:01 05/22/2025 080725 668398 -117.00 07/24/2025 CRM PD REF CORE RETURN
X109042004:01 2500063 07/22/2025 080725 668398 241.60 08/21/2025 INV PD Link Rod
X109041995:02 2500063 07/24/2025 080725 668398 325.66 08/23/2025 INV PD Dust Cover
X109042153:01 2500063 07/28/2025 080725 668398 375.56 08/27/2025 INV PD Bracket
X109042180:01 2500063 07/28/2025 080725 668398 1.32 08/27/2025 INV PD Fitting
X109042186:01 2500063 07/30/2025 080725 668398 713.88 08/29/2025 INV PD Pin
X109042215:01 2500063 07/31/2025 080725 668398 30.34 08/30/2025 INV PD Plug
X109042461:01 2500063 08/07/2025 082125 668658 185.37 09/06/2025 INV PD Elbow Nipple
1,048.88
3873 Kristen Hancock
3873081925 08/19/2025 082125 146038 12.60 08/21/2025 INV PD MILEAGE REIMBURSEMENT
141 Liberty Tire Recycling Holdco LLC
3027040 2502233 07/19/2025 080725 668399 1,151.50 08/18/2025 INV PD Scrap Tires
6161 M&M Service Station Equipment Specialist Inc
311500 2502335 07/22/2025 080725 668400 1,966.48 08/06/2025 INV PD Service Call
2606 M-B Co Inc
295773 2502342 07/25/2025 080725 668401 706.94 08/14/2025 INV PD Wheel Assembly
Page 11 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 6
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
296190 2502433 08/07/2025 082125 668664 561.74 08/27/2025 INV PD Kit
1,268.68
725 Mathy Construction Co
5300070899 2502154 07/17/2025 080725 145867 2,282.75 08/16/2025 INV PD Cold Mix 2025-07PC
5300071170 2501281 07/31/2025 080725 145867 48,036.22 08/30/2025 INV PD Hot Mix Bid #2025-07
5300071260 2501281 08/06/2025 080725 145867 511.06 09/05/2025 INV PD Hot Mix Bid #2025-07
5300070996 2501973 07/23/2025 080725 145867 87.75 08/22/2025 INV PD Hot Mix for Maintenance B
5300071144 2501281 07/30/2025 080725 145867 1,290.51 08/29/2025 INV PD Hot Mix Bid #2025-07
5300071197 2501281 07/31/2025 080725 145867 52,064.84 08/30/2025 INV PD Hot Mix Bid #2025-07
3500488788 2501196 07/30/2025 080725 145868 1,308.91 08/29/2025 INV PD Road Materials Bid#2025-0
3500486193 2502317 07/21/2025 080725 145868 24,706.39 08/20/2025 INV PD Road Materials Bid#2025-0
3500485499 2502317 07/18/2025 080725 145868 13,927.99 08/17/2025 INV PD Road Materials Bid#2025-0
3500486924 2502317 07/23/2025 080725 145868 39,775.36 08/22/2025 INV PD Road Materials Bid#2025-0
3500487525 2502317 07/25/2025 080725 145868 3,280.79 08/24/2025 INV PD Road Materials Bid#2025-0
5300071445 2501281 08/13/2025 082125 146050 3,225.03 09/12/2025 INV PD Hot Mix Bid #2025-07
5300071427 2501281 08/13/2025 082125 146050 6,767.03 09/12/2025 INV PD Hot Mix Bid #2025-07
5300071362 2501281 08/11/2025 082125 146050 64,892.45 09/10/2025 INV PD Hot Mix Bid #2025-07
5300071337 2501281 08/11/2025 082125 146050 65,967.70 09/10/2025 INV PD Hot Mix Bid #2025-07
3500491529 2501196 08/08/2025 082125 146051 7,549.72 09/07/2025 INV PD Road Materials Bid#2025-0
3500493485 2501196 08/15/2025 082125 146051 101.24 09/14/2025 INV PD Road Materials Bid#2025-0
3500493712 2501196 08/15/2025 082125 146051 1,265.52 09/14/2025 INV PD Road Materials Bid#2025-0
337,041.26
258 Menards Inc
24853 07/07/2025 080725 145870 -44.91 07/31/2025 CRM PD ACCT:31070253 RETURN CHAI
25880 2500024 07/24/2025 080725 145870 39.91 08/23/2025 INV PD Paper Plates
25783 2500024 07/23/2025 080725 145870 29.42 08/22/2025 INV PD Socket
26279 2500024 07/31/2025 080725 145870 179.91 08/30/2025 INV PD Post Mount
27106 2500024 08/14/2025 082125 146053 227.60 09/13/2025 INV PD Bags
26682 2500024 08/07/2025 082125 146053 48.48 09/06/2025 INV PD Elbow
26635 2500024 08/06/2025 082125 146053 42.98 09/05/2025 INV PD Tamper
523.39
489 Mid-American Research Chemical Corp
0855662-IN 2502343 08/01/2025 082125 668672 826.22 08/31/2025 INV PD Degreaser
4324 Mississippi Welders Supply Co Inc
4628997 2500041 08/07/2025 082125 668673 163.60 09/06/2025 INV PD Welding Supplies
4629101 2500041 08/07/2025 082125 668673 16.37 09/06/2025 INV PD Welding Supplies
179.97
157 Monroe Truck Equipment Inc
441149 2500054 08/15/2025 082125 668674 2,487.39 09/14/2025 INV PD Cylinder
5810 Northeast Asphalt Inc
710290-002 2501335 08/06/2025 082125 668676 19,545.00 08/06/2025 INV PD Pavement Milling & Reclai
2743 Point of Beginning Inc
Page 12 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 7
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
41838 2502423 07/30/2025 082125 668705 465.00 07/30/2025 INV PD Material Testing
267 Pomps Tire Service Inc
1480033930 2500056 07/25/2025 080725 145896 443.26 08/10/2025 INV PD Tires
1480033995 2500056 07/31/2025 080725 145896 158.38 08/10/2025 INV PD Tires
1480034215 2500056 08/08/2025 082125 146077 487.84 09/07/2025 INV PD Tires
1480034216 2500056 08/14/2025 082125 146077 158.38 09/04/2025 INV PD Tires
1480033940 2500056 08/14/2025 082125 146077 3,194.48 09/10/2025 INV PD Tires
4,442.34
1433 PreCise MRM LLC
IN200-2007047 2500045 07/25/2025 080725 145897 308.00 08/24/2025 INV PD Data Plan
IN200-2007133 2500045 07/31/2025 080725 145897 980.00 08/30/2025 INV PD June Data Plan
IN200-2006531 2500045 06/30/2025 082125 146079 308.00 07/30/2025 INV PD July State Data Plan
1,596.00
1758 Quality Truck Care Center Inc
R104025549:02 06/25/2025 082125 668708 -80.00 07/10/2025 CRM PD WARRANTY CREDIT
R104025256:02 06/25/2025 082125 668708 -490.00 07/10/2025 CRM PD WARRANTY CREDIT
R104025503:02 06/25/2025 082125 668708 -420.00 07/10/2025 CRM PD WARRANTY CREDIT
X104030468:01 2500034 07/03/2025 082125 668708 650.68 07/10/2025 INV PD Cutoff
R104025547:02 06/30/2025 082125 668708 -200.00 07/10/2025 CRM PD WARRANTY CREDIT
X104030763:01 2500034 07/24/2025 082125 668708 435.16 08/10/2025 INV PD Filter
R104026258:01 2500034 08/14/2025 082125 668708 201.85 09/10/2025 INV PD Assembly
R104026382:01 2500034 08/14/2025 082125 668708 208.63 09/10/2025 INV PD Controls
306.32
67 Reinders Inc
2448597-00 2500051 08/14/2025 082125 668710 775.86 09/13/2025 INV PD Straw
6823 Rentokil North America Inc
77461054 2502384 05/29/2025 082125 668711 287.24 06/28/2025 INV PD Exterior Insect
638 Rock Oil Refining Inc
340654 2500028 08/14/2025 082125 146083 95.00 09/13/2025 INV PD Used Oil
3032 Sand Co Equipment
28340 2502396 08/11/2025 082125 668717 1,043.60 08/26/2025 INV PD Mower Parts
668 Schierl Inc
4037110 2502308 07/01/2025 080725 668535 50.50 08/10/2025 INV PD Tube
4037801 2502308 07/22/2025 080725 668535 50.50 08/10/2025 INV PD Tube
101.00
1388 Seiler Instrument & Manufacturing Co Inc
Page 13 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 8
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
INV58600 2502387 07/30/2025 082125 146089 2,610.82 08/29/2025 INV PD Repair
967 Sherwin Industries Inc
SS107223 2500032 06/12/2025 080725 668539 880.67 07/11/2025 INV PD Burner Tube
SS107669 2502079 07/09/2025 080725 668539 33,560.89 08/08/2025 INV PD Pleximelt-Contract #08052
SS107994 2500032 07/28/2025 080725 668539 3,478.97 08/27/2025 INV PD Hose
SS108055 2500032 07/29/2025 082125 668719 598.06 08/28/2025 INV PD Traffic Paint
38,518.59
765 Stacy Zerby
765081825 08/18/2025 082125 146091 12.60 08/21/2025 INV PD MILEAGE REIMBURSEMENT
3734 Street Smart Rental LLC
1705370 2502311 05/13/2025 080725 668553 573.12 06/13/2025 INV PD Lights
6316 Summit Fire Protection Co
3402860 2502334 07/24/2025 080725 145910 140.50 08/23/2025 INV PD Fire Extinguisher Cabinet
3706 Swiderski Equipment Inc
IA18618 2500039 07/14/2025 080725 668557 405.30 08/13/2025 INV PD Axle Kit
IA18622 2500039 07/21/2025 080725 668557 931.01 08/20/2025 INV PD Assembly
IA18942 2500039 07/24/2025 080725 668557 386.69 08/23/2025 INV PD Coupler
IA19369 2500039 08/08/2025 082125 668724 381.23 09/07/2025 INV PD V-Belt
IA19259 2500039 08/06/2025 082125 668724 819.91 09/05/2025 INV PD Module
IA19075 2500039 07/30/2025 082125 668724 2,388.65 08/29/2025 INV PD Gearbox
5,312.79
36 Truck Country of WI Inc
X205379664:01 2500050 07/30/2025 080725 668562 110.63 08/29/2025 INV PD Spring Brake
X205379639:01 2500050 07/31/2025 080725 668562 346.51 08/30/2025 INV PD Spring Assembly
X205379561:01 07/29/2025 080725 668562 -263.52 07/29/2025 CRM PD REF INV X205378149
X205379496:01 2500050 07/29/2025 080725 668562 280.03 08/28/2025 INV PD Spring Brake
X205379514:01 2500050 07/28/2025 080725 668562 265.24 08/27/2025 INV PD Alternator
X205379209:03 2500050 07/28/2025 080725 668562 16.33 08/27/2025 INV PD Clamp Ring
X205379514:02 2500050 07/29/2025 080725 668562 199.80 08/28/2025 INV PD Handle
X205379599:01 2500050 07/29/2025 080725 668562 134.86 08/28/2025 INV PD LED Light
X205379176:01 2500050 07/22/2025 080725 668562 994.86 08/21/2025 INV PD Battery
X205379209:01 2500050 07/23/2025 080725 668562 16.33 08/22/2025 INV PD Clamp Ring
X205379209:02 2500050 07/24/2025 080725 668562 427.00 08/23/2025 INV PD Clamp Ring
X205379238:01 2500050 07/23/2025 080725 668562 141.14 08/22/2025 INV PD Hose
X205379238:02 2500050 07/24/2025 080725 668562 16.03 08/23/2025 INV PD Hose
X205379238:03 2500050 07/28/2025 080725 668562 70.57 08/27/2025 INV PD Cart Kit
X205380604:01 2500050 08/14/2025 082125 668731 128.91 09/13/2025 INV PD Hose
X205380403:02 2500050 08/13/2025 082125 668731 68.44 09/12/2025 INV PD Clamp
X205380341:03 2500050 08/13/2025 082125 668731 86.92 09/12/2025 INV PD Bearing
X205380450:01 2500050 08/13/2025 082125 668731 92.41 09/12/2025 INV PD Air Dryer
X205380142:03 2500050 08/13/2025 082125 668731 170.02 09/12/2025 INV PD Suspension
X205380450:02 2500050 08/14/2025 082125 668731 92.41 09/13/2025 INV PD Air Dryer
X205380498:01 2500050 08/13/2025 082125 668731 122.06 09/12/2025 INV PD Spring Brake
Page 14 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 9
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
X205380568:02 2500050 08/15/2025 082125 668731 688.28 09/14/2025 INV PD Brake Shoe
X205380568:01 2500050 08/14/2025 082125 668731 807.17 09/13/2025 INV PD Brake Shoes
X205380340:01 2500050 08/11/2025 082125 668731 39.28 09/10/2025 INV PD Bolt Kit
X205380341:01 2500050 08/11/2025 082125 668731 280.92 09/10/2025 INV PD Valve
X205380353:01 2500050 08/12/2025 082125 668731 100.96 09/11/2025 INV PD Sensor
X205380064:01 2500050 08/11/2025 082125 668731 170.02 09/10/2025 INV PD Suspension
X205380341:02 2500050 08/12/2025 082125 668731 173.56 09/11/2025 INV PD Valve
X205380332:01 2500050 08/12/2025 082125 668731 640.80 09/11/2025 INV PD Hose
X205380336:02 2500050 08/12/2025 082125 668731 75.36 09/11/2025 INV PD Clamp
X205380336:01 2500050 08/11/2025 082125 668731 542.59 09/10/2025 INV PD Hose
X205380403:01 2500050 08/12/2025 082125 668731 94.42 09/11/2025 INV PD Clamp
X205380424:01 2500050 08/12/2025 082125 668731 954.68 09/11/2025 INV PD Hose
X205375084:01 2500050 06/03/2025 082125 668731 138.45 07/03/2025 INV PD Washer
X205379271:01 07/24/2025 082125 668731 -28.95 08/21/2025 CRM PD REF X205375084:01
X205380142:01 2500050 08/07/2025 082125 668731 53.97 09/06/2025 INV PD Suspension
X205380056:02 2500050 08/11/2025 082125 668731 29.87 09/10/2025 INV PD Harness
X205380292:01 2500050 08/11/2025 082125 668731 93.85 09/10/2025 INV PD Hose
X205380142:02 2500050 08/08/2025 082125 668731 377.34 09/07/2025 INV PD Suspension
X205379974:01 2500050 08/06/2025 082125 668731 10.22 09/05/2025 INV PD Seals
X205379940:01 2500050 08/05/2025 082125 668731 92.41 09/04/2025 INV PD Air Dryer
X205379974:03 2500050 08/07/2025 082125 668731 195.84 09/06/2025 INV PD Headlight
X205380056:01 2500050 08/06/2025 082125 668731 153.16 09/05/2025 INV PD Motor
X205379974:02 2500050 08/07/2025 082125 668731 56.08 09/06/2025 INV PD Accumulator
X205377843:01 2500050 07/14/2025 082125 668731 307.08 08/13/2025 INV PD Controls
X205380215:01 08/08/2025 082125 668731 -66.00 08/21/2025 CRM PD REF CORE RETURN
X205379599:02 2500050 08/01/2025 082125 668731 932.33 08/31/2025 INV PD Led Light
X205379718:02 2500050 08/01/2025 082125 668731 91.13 08/31/2025 INV PD Clamp
X205379718:01 2500050 07/31/2025 082125 668731 39.10 08/30/2025 INV PD Blade
10,560.90
5191 UniFirst Corp
1490094465 2500078 07/23/2025 080725 145915 36.50 08/22/2025 INV PD Uniforms for Shop
1490094470 2500077 07/23/2025 080725 145915 58.75 08/22/2025 INV PD Rags & Rugs
1490095316 2500077 07/30/2025 080725 145915 58.75 08/29/2025 INV PD Rags & Rugs
1490095311 2500078 07/30/2025 080725 145915 36.50 08/29/2025 INV PD Uniforms for Shop
1490096250 2500077 08/06/2025 082125 146100 58.75 09/05/2025 INV PD Rags & Rugs
1490096242 2500078 08/06/2025 082125 146100 36.50 09/05/2025 INV PD Uniforms for Shop
1490097124 2500077 08/13/2025 082125 146100 58.75 09/12/2025 INV PD Rags & Rugs
1490097119 2500078 08/13/2025 082125 146100 36.50 09/12/2025 INV PD Uniforms for Shop
381.00
4925 United Rentals (North America) Inc
250617271-002 2502444 08/11/2025 082125 668733 30.00 08/13/2025 INV PD Sweeper
3841 US Bank
8693745612531hwy 2500040 08/01/2025 14668 36.31 08/12/2025 DIR PD Fuel
6441 White Cap LP
50032488175 2502332 07/23/2025 080725 668569 360.00 08/30/2025 INV PD Bags
207 WI Lift Truck Corp
Page 15 of 57
PORTAGE COUNTY, WI
VENDOR INVOICE LIST
Report generated: 09/02/2025 11:42
User: stoegerb
Program ID: apinvlst
Page 10
INVOICE P.O. INV DATE AP RUN CHECK # INVOICE NET DUE DATE TYPE STS INVOICE DESCRIPTION
232511396 2500021 07/22/2025 080725 668571 535.98 08/21/2025 INV PD Brush
232511473 2500021 07/24/2025 080725 668571 219.62 08/23/2025 INV PD Assembly
755.60
120 WI Public Service Corp
5546176581 2500065 07/15/2025 14624 4,414.37 08/06/2025 DIR PD Acct#0402156282-00003 Gas
5545979967 2500019 07/15/2025 14625 28.07 08/06/2025 DIR PD Acct#0402156282-00009 Fro
4,442.44
122 Wimme Sand & Gravel Inc
29096 2502240 07/31/2025 080725 668573 100,717.25 08/10/2025 INV PD Road Materials Bid 2025-0
28987 2502240 07/31/2025 080725 668573 660.64 08/30/2025 INV PD Road Materials Bid 2025-0
101,377.89
3879 Wisconsin Kenworth
016P224892 2500061 08/05/2025 082125 668744 2,522.04 09/04/2025 INV PD Bearing
016P225594 2500061 08/15/2025 082125 668744 418.00 09/14/2025 INV PD Freon
2,940.04
5397 Wrangler Holdco Corp
UD0000116327 2500088 07/18/2025 080725 145926 265.00 08/17/2025 INV PD Highway Disposal
UD0000117979 2500088 08/20/2025 082125 146110 265.00 08/20/2025 INV PD Highway Disposal
530.00
72 WW Grainger Inc
9585097000 2500017 07/25/2025 080725 145927 744.90 08/24/2025 INV PD Hooks
9586785678 2500017 07/28/2025 080725 145927 171.26 08/27/2025 INV PD Air Valve
9586879646 2500017 07/28/2025 080725 145927 167.28 08/27/2025 INV PD Aerosol Can
1,083.44
997 Zarnoth Brush Works Inc
0202917-IN 2500057 07/14/2025 080725 145929 1,544.00 08/13/2025 INV PD Broom Refill
0203085-IN 2500057 07/30/2025 082125 146112 648.00 08/29/2025 INV PD Broom
0203086-IN 2500057 07/30/2025 082125 146112 1,544.00 08/29/2025 INV PD Broom Refill
3,736.00
290 INVOICES 1,192,830.90
** END OF REPORT - Generated by Stoeger, Brett **
Page 16 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: September 11, 2025
To: Highway Committee
From: Nathan Check, P.E.
Subject: Commissioner’s Report
Please see below for a number of Highway Department Updates.
Staffing – All full-time positions are filled. We are in the interview process for one internal
position – paving operator and are giving each cand idate an opportunity to train on the paver
during the CTH D project prior to making a selection. All seasonal and summer help positions
have left for the year except for two seasonal laborers who will likely remain on staff through
December as there is available budget.
Training –WCHA and WTA hosted a Local Road Improvement Progr am webinar for counties
and towns. Our two newest employees will be attending Traffic Incident Management(TIM)
Training hosted at the Sheriff’s Office in October. All Highway employees are trained in TIM
which focuses on roadside emergency traffic events and working with other emergency
personnel such as police, fire, and EMS. IN addition, one manager and two foreman will be
attending the WCHA Leadership Development Group conference in September. There are other
trainings scheduled in October which include WisDOT hosted Winter Tech Talk, Fall
Commissioner Training, and Virtual Snowfighter training.
Reminder to save the date – Thursday, October 16
th will be our full staff Fall Roadeo training.
We rotate through an even/odd year cycle with odd years primarily consisting of equipment
operation and skill testing. If Committee members would like to help be a judge or stop in for a
moment, please let me know.
Operations – The majority of the crew is working on CTH D construction. Final surface paving
is completed to CTH K north. Binder is paved up to CTH EE. Final grading is being completed
on the eastern two miles. Staff is working with outside contractors on scheduling the final mill
and overlay on the eastern tie in for CTH B west of Kennedy as well as the mill and overlay of
the CTH B and J intersections. The state crews are primarily focused on buckle repairs on STH
54 and USH 10.
Budget – Below is the 2025 budget analysis through August 16
th .
Winter maintenance remains at 67% of the total budget with approximately $700k remaining.
Costs are tracking near the average. Costs were below average until the April events.
Page 17 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
General maintenance is at 73% of the budget which is in the typical range for this time of year.
The Machinery Operation budget continues to track with a current surplus.
Below is a summary of the net surplus/loss through the year.
January + $15k July +$347k
February +$261k August +393k
March +$231k
April +$280k
May +$219k
June +$241k
The DOT Routine Maintenance Agreement through August continues to track to be over budget
approximately 10% due to heavier winter maintenance in February and April. May through
Augst has been tracking within the budgeted amounts.
Projects
-CTH B Project – No updates at this time.
-CTH WW Bridge Design – Work is progressing as sche duled with a expected completion date
in mid-October.
-Safe Streets for All(SS4A) Grant – Additional meet ings have occurred with the various focus
groups and sub-committees. Additional information can be found at:
https://www.co.portage.wi.gov/735/Safe-Streets-Roads-For-All-Grant . Following chipsealing,
CTH KK has been painted with optical speed bars along certain stretches.
-WisDOT Structure 6’-20’ Program – No new updates a t this time. Information on the ARIP
funding is expected to be released by WisDOT in October.
-CTH R Sanitary Installation – A letter was sent to the Village requiring corrective action on the
undermined pavement areas by October 1st .
-CTH R(STH 54 to CTH B) – Staff met with the designer on some preliminary questions
regarding curve alignments, right-of-way, and drainage. Preliminary road plans are due in
September. Construction is scheduled for 2028 for this project as part of the WisDOT STP-
Urban Program.
Page 18 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
-CTH II Bear Creek Bridge – No new updates. Design continues. Construction is set for 2027
for this project with is part of the WisDOT STP-Bridge Program.
-CTH HH and Hoover Development – The City of Steven s Point Planning Commission
recommended denial of the rezoning of the property. The Common Council then approved the
rezone request at their next meeting. Site plan and conditional use approval is still required for
the project for the City.
-Operation Ordinance Meeting – No updates.
-Highway Addition and Renovation – No updates. The project is still waiting final close-out and
payment to Miron as there are some HVAC issues still unresolved.
New Project Updates
-WCHA Updates – As WCHA Treasurer and a member of the Executive Committee, I was in
Madison in early August meeting with WisDOT leadership and the Transportation Builders
Association on a number of statewide topics. The Northcentral Region is also looking to
schedule a Fall Legislative Breakfast in October with a date to be determined. WisDOT has also
reached out to verify if members of the original Agricultural Improvement Program scoring
committee are willing to serve for this next round of funding. WCHA is polling all counties but I
will likely be serving on the scoring committee again.
-WisDOT Surface Transportation Program 2026-2031 Cycle –The Stevens Point Urban
Group held its 3
rd meeting to review potential applications and ranked the City of Stevens
Point’s Division/Church Street project as #1 and the Village/Town of Plover’s Hoover Road
project as #2. . The City of Stevens Point and the Village and Town of Plover are considering
two separate projects. A third meeting is to be scheduled to rate the projects. Following budget, I
will be working on the STP-R and bridge applications for CTH A(STH 161 to CTH Z) roadway
and CTH O bridge. Final applications are due October 31 st .
-Local Road Improvement Program(LRIP) – The County Highway Commissioners
administer this program on behalf of the WisDOT and the next funding cycle has begun.
Meetings will be scheduled with the towns and villages to begin their project selection process.
More info on the program can be found at:
https://wisconsindot.gov/Pages/doing-bus/local-
gov/astnce-pgms/highway/lrip.aspx
-WisDOT STH 54(Harding Ave to Waupaca County) Project – WisDOT hosted a local officials
meeting on September 3
rd . They provided an update on the project scope with the proposed
improvements as:
Page 19 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
•Removing 3.5 inches of existing asphalt and paving 3.75 inches of new hot-mixed
asphalt (HMA) surface
•Replacing existing metal culvert pipes with concrete pipes
•Evaluating existing guardrail systems for removal or replacement
•Repair and/or replace intersection curb and gutter and flumes as needed
WisDOT also provided an update to the schedule and stated that the project will likely occur in
2028 versus 2029 as originally scheduled. Staff requested that this be further accelerated due to
the condition and the fact that CTH R from STH 54 to CTH B is also scheduled in 2028 which
will affect traffic in that area significantly.
-WisDOT USH 10(Old Highway 18 to CTH J) – WisDOT has a future concrete joint repair
project along this section of USH 10. While the scope of the project does not include any major
work, WisDOT scheduled a meeting with County and City staff to review access management
concerns brought up during the local officials meeting. The City will be taking a lead on future
discussions with property owners.
-Other County Projects – I have been participating as part of the scoring committee for the
Solid Waste RFP’s for the architect and Constructio n Manager at Risk for their addition and
remodel projects. I am also starting to participate in the development team meetings for the
Sheriff LEC/Jail project to assist in general civil engineering and roadway questions.
-Next Meeting Date – Our typical meeting date would be Tuesday, October 21
st at 3:30 pm.
If you have any questions on any of the items, please feel free to call or email.
Thank you.
Attachments: None
Page 20 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Date: September 9, 2025
To: Highway Committee
From: Lucas Meddaugh, P.E.
Subject: Discussion and Possible Action on Speed Zone Request – CTH DB from Interstate 39
to Marathon County line
Introduction
A speed study on CTH DB (I39 - Marathon County Line), was requested to be reviewed for
concerns about speed and accidents. A local resident made the request through the Town of
Dewey.
Existing Conditions
CTH DB is a bi-directional, two-lane north/south county highway with a 2 – 12 foot lanes, 3 foot
paved shoulder and 5 foot aggregate shoulder. The speed limit is currently posted as 55-mph for
this ¾-mile segment of collector roadway but there is a 40 mph advisory speed for one horizontal
curve in this area along with a limited clear zone over the bridge and causeway over Lake
DuBay.
There are 11 access points within the study corridor. According to traffic counts completed in
2021 by WisDOT, 1,200 vehicles per day (vpd) use this segment of roadway. This section of
CTH DB is mix of developed, with building spacing of 300 feet, (north 1/4-mile) and sparsely
developed (south 1/2-mile) land. The north 1/4-mile segment contains multiple commercial
businesses and multi-family housing.
Speed data was collected along CTH DB, approximately 500 feet south of West River Road, for
a nine-day period, including a special event at the businesses on the north end. The counts started
on Tuesday, May 20, 2025 and lasted until Thursday, May 29, 2025. The speed data sheet is
included as an attachment at the end of this memo. Additionally, five years of crash data was
also reviewed as part of this study, between May 20, 2020 to May 20, 2025.
There were four crashes within this stretch of CTH DB during the 5-year period. The crashes
were an angle vehicle turning out of the commercial business with vehicles lining the road and
oncoming vehicle approaching at high rate of speed (operating vehicle in aggressive/reckless
manner), single vehicle off roadway (failure to keep vehicle under control), vehicle turning off
Park Road and truck by approaching vehicle (failure to yield right-of-way, improper turn), and a
vehicle turning into a business (failed to yield right-of-way).
Page 21 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
The summary of the speed observations including additional statistics, such as the percent
driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed
in the following table. The study location observed approximately 9.2% of the drivers exceeding
the speed limit, and less than 1% of users traveling more than 10-mph above the speed limit. The
observed median and 85
th percentile speeds on CTH DB were ~46-mph and ~53-mph,
respectively.
Speed
Limit
Median
Speed
85th
Percentile
Speed 10-mph Pace
% Over
Speed
Limit
%>10mph
Over Speed
Limit
55-mph 45.5-mph 52.8-mph 40 to 49-mph 9.2% 0.3%
NCHRP 966 Speed Limit Analysis
To perform a speed limit analysis on CTH R, NCHRP Research Report 966: Posted Speed Limit
Setting Procedure and Tool was utilized. This tool was created to help set reasonable, safe, and
consistent speed limits. The NCHRP 966 tool considers all major factors to determine an
appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway
characteristics and geometric conditions, level of development in the surrounding area, as well as
several others.
The results of the NCHRP 966 tool analysis, which is included as an attachment at the end of this
memo, show a suggested speed limit for CTH DB of 55-mph.
National tools such as the NCHRP 966 tool are effective at taking information about a highway
(e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and
objectively synthesizing that information into a suggested speed limit based on research for
setting appropriate speed limits. It is important to adapt suggested speed limits from national
tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin set within 5 mph of
the recommended speed limits from a national tool are considered rational speed limits
(Highway Safety Improvement Program (HSIP): Speed Management Improvement Project
Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010).
Additionally, the NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool
shows a speed of 55-mph is ideal, which is the current posted speed limit of 55-mph through this
section of CTH DB.
Conclusions & Recommendations
The observed speeds of CTH DB, from Marathon Co. Line to I-39, indicate approximately half
of the drivers (48.7%) are driving within the pace range, with the median speed at 45.5-mph.
Page 22 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Although the NCHRP 966 Tool recommends a 55-mph speed limit, it doesn’t consider the
environmental factors that are causing a slowdown in traveling vehicles based on the collected
data. Those environmental factors include busy times for local businesses and increased traffic
volumes (1,485 vehicles per day over the nine day study period), and the increased commercial
businesses within the northern segment of the corridor.
Based on this information, and is it recommended to lower the existing speed limit to 45 MPH as
it falls within the pace range and would be accepted by the drivers of the roadway as reasonable
speed. There is enough data in the initial engineering study to support a reduction based on the
traffic speeds, access, adjacent development and land use, and the geometric features of the
roadway.
Staff has received input from 4 residents including the Town Chairman and a Town Supervisor
who are in support of the reduction.
If the Highway Committee approves the reduction, a resolution with an ordinance amendment
will be presented at the next Highway Committee meeting.
Attachments: Speed Study Worksheet
NCHRP Speed Limit Tool Output
Page 23 of 57
NCHRP 17-76 Speed Limit Setting Tool
Input Cells Description Output Cells
Site Description Data Color-Coding Legend
Yes Are crash data available? Aqua = basic input cell
Lucas Meddaugh User name Denim = basic input cell with drop-down menu
8/12/2025 Date Orange = optional input cell (not needed for calculations)
CTH DB Roadway name Green = optional input cell (use if data for agency & region are available, leave blank otherwise)
Marathon Co Line to I-39 Description Rose = intermediate calculations
55 Current speed limit (mph) Purple = final analysis results
Notes Gray = unneeded input cell based on other input data (e.g., Crash Data section is gray when B5 = no)
Analysis Results Advisory, Calculated, or Warning Messages
Speed limit setting group Undeveloped
Suggested speed limit (mph) 55 This value is determined by speed data.
Speed Data Advisory, Calculated, or Warning Messages
55 Maximum speed limit (mph)
52.8 85th-percentile speed (mph)
45.5 50th-percentile speed (mph)
Site Characteristics Advisory, Calculated, or Warning Messages
0.75 Segment length (mi)
1,200 AADT (two-way total) (veh/d)
2 Number of lanes (two-way total)
Undivided Median type This variable is not needed if there are fewer than four lanes.
11 Number of access points (total of both directions)
12 Lane width (ft)
8 Shoulder width (ft)
No Adverse alignment present?
Crash Data Advisory, Calculated, or Warning Messages
5 Number of years of crash data
1,200 Average AADT for crash data period (veh/d)
4 All (KABCO) crashes for crash data period Observed KABCO crash rate = 243.5 crashes / 100 MVMT
0 Fatal & injury (KABC) crashes for crash data period Observed KABC crash rate = 0 crashes / 100 MVMT
Average KABCO crash rate (crashes / 100 MVMT) HSIS average KABCO crash rate = 206.6 crashes / 100 MVMT
Average KABC crash rate (crashes / 100 MVMT) HSIS average KABC crash rate = 65.2 crashes / 100 MVMT
1.3 x average KABCO crash rate (crashes / 100 MVMT) 268.5
1.3 x average KABC crash rate (crashes / 100 MVMT) 84.8
Critical KABCO crash rate (crashes / 100 MVMT) 421.5
Critical KABC crash rate (crashes / 100 MVMT) 199.3
Page 24 of 57
SPEED (MPH) EB VEH EB TRUCKS WB VEH WB TRUCKS TOTAL VEHICLES TOTAL TRUCKS TOTAL
HIGHWAY: 8 0 0 1 0 1 0 1
COUNTY: 9 1 0 4 0 5 0 5
MUNICIPALITY: 10 0 0 0 0 0 0 0
11 2 0 1 0 3 0 3
12 2 0 0 0 2 0 2
DIRECTION OF TRAVEL: 13 2 0 0 0 2 0 2
POSTED SPEED: 14 0 0 1 0 1 0 1
15 1 0 1 0 2 0 2
16 4 0 0 0 4 0 4
DATE: 17 0 0 0 0 0 0 0
DAY: 18 1 0 1 0 2 0 2
TIME OF STUDY: 19 0 0 2 0 2 0 2
OBSERVER(S): 20 0 0 1 0 1 0 1
WEATHER: 21 1 0 3 0 4 0 4
PAVEMENT CONDITION: 22 1 0 4 0 5 0 5
23 0 0 15 0 15 0 15
24 0 0 5 0 5 0 5
85TH PERCENTILE* 85TH PERCENTILE* 25 1 0 19 0 20 0 20
50TH PERCENTILE† 50TH PERCENTILE† 26 2 0 18 0 20 0 20
AVERAGE SPEED AVERAGE SPEED 27 1 0 31 0 32 0 32
PACE RANGE‡ 45 TO 54 PACE RANGE‡ 38 TO 47 28 3 0 54 0 57 0 57
PERCENT IN PACE PERCENT IN PACE 29 4 0 56 0 60 0 60
PERCENT OVER PACE PERCENT OVER PACE 30 15 0 100 0 115 0 115
PERCENT UNDER PACE PERCENT UNDER PACE 31 5 0 58 0 63 0 63
32 19 0 128 0 147 0 147
33 18 0 160 0 178 0 178
85TH PERCENTILE* 34 31 0 123 0 154 0 154
50TH PERCENTILE† 35 54 0 300 0 354 0 354
AVERAGE SPEED 36 56 0 269 0 325 0 325
PACE RANGE‡ 40 TO 49 37 100 0 139 0 239 0 239
PERCENT IN PACE 38 58 0 339 0 397 0 397
PERCENT OVER PACE 39 128 0 169 0 297 0 297
PERCENT UNDER PACE 40 160 0 555 0 715 0 715
41 123 0 538 0 661 0 661
42 300 0 198 0 498 0 498
43 269 0 421 0 690 0 690
44 139 0 229 0 368 0 368
45 339 0 490 0 829 0 829
46 169 0 548 0 717 0 717
47 555 0 225 0 780 0 780
48 538 0 323 0 861 0 861
49 198 0 154 0 352 0 352
50 421 0 277 0 698 0 698
51 229 0 242 0 471 0 471
52 490 0 100 0 590 0 590
53 548 0 119 0 667 0 667
54 225 0 47 0 272 0 272
55 323 0 78 0 401 0 401
56 154 0 42 0 196 0 196
57 277 0 13 0 290 0 290
58 242 0 17 0 259 0 259
59 100 0 5 0 105 0 105
60 119 0 5 0 124 0 124
61 47 0 8 0 55 0 55
62 78 0 1 0 79 0 79
63 42 0 3 0 45 0 45
64 13 0 0 0 13 0 13
65 17 0 0 0 17 0 17
66 5 0 1 0 6 0 6
67 5 0 0 0 5 0 5
68 8 0 2 0 10 0 10
69 1 0 1 0 2 0 2
70 3 0 0 0 3 0 3
71 0 0 0 0 0 0 0
72 0 0 0 0 0 0 0
73 1 0 1 0 2 0 2
74 0 0 0 0 0 0 0
75 2 0 0 0 2 0 2
76 1 0 0 0 1 0 1
77 0 0 1 0 1 0 1
78 0 0 1 0 1 0 1
79 0 0 0 0 0 0 0
80 1 0 0 0 1 0 1
81 0 0 0 0 0 0 0
82 0 0 0 0 0 0 0
83 0 0 0 0 0 0 0
84 1 0 0 0 1 0 1
85 0 0 0 0 0 0 0
86 0 0 0 0 0 0 0
87 0 0 0 0 0 0 0
88 0 0 0 0 0 0 0
TOTAL VEHICLES 6653 0 6647 0 13300 0 13300
SPEED STUDY WORKSHEET
CTH DB (Marathon County Line to I-39)
WISCONSIN DEPARTMENT OF TRANSPORTATION
EASTBOUND STUDY RESULTS WESTBOUND STUDY RESULTS
JAMAR Blackcat Radar used for speed study.
Tuesday - Thursday
Full Days
LM
CLEAR
DRY
FIELD COMMENTS
5-22 to 5-29
STUDY LOCATION: Marathon County Line to I-39
55
GENERAL INFORMATION
LOCATION INFORMATION
CTH DB
PORTAGE
Town of Dewey
48.8
49.2 42.3
55.8% 55.8%
49.1 42.1
55.8
21.6% 21.7%
18.9%
22.6% 22.5%
COMBINED STUDY RESULTS
52.8
45.5
45.7
48.7%
32.5%
0
100
200
300
400
500
600
700
800
900
1000
8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88
FREQUENCY
SPEED (MPH)
SPEED DISTRIBUTION CHART
WESTBOUND STUDY RESULTS
EASTBOUND STUDY RESULTS
*85TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 85 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW
CONDITIONS
†50TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 50 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW
CONDITIONS
‡PACE IS THE 10 MPH RANGE OF SPEEDS THAT COVERS THE HIGHEST NUMBER OF OBSERVATIONS FROM THE DATA SET
0.0
20.0
40.0
60.0
80.0
100.0
120.0
0 10 20 30 40 50 60 70 80 90 100
PERCENT VEHICLES TRAVELING LESS THAN OR EQUAL
TO SPEED INDICATED (%)
SPEED (MPH)
S-CURVE PLOT
Page 25 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Date: September 9, 2025
To: Highway Committee
From: Lucas Meddaugh, P.E.
Subject: Discussion and Possible Action on Speed Zone Request – CTH B from Kennedy Ave
to CTH J
Introduction
A speed study on CTH B between Kennedy Ave and CTH J was requested to be reviewed for
concerns about speed and accidents. A local resident made the request through the Town of
Stockton.
Existing Conditions
CTH B is a bi-directional, two-lane east/west county highway with a 2 – 12 foot lanes, 5 foot
paved shoulder and 1 foot aggregate shoulder. The speed limit is currently posted as 55-mph.
According to traffic counts completed in 2021 by WisDOT, 4,800 vehicles per day (vpd) use this
segment of roadway.
The study area focused on the section from 1,500 feet west of Buckthorn Lane, to 1,500 feet east
of Fawn Lane as this area has two town road intersection and a vertical curve. This section of
CTH B is primarily wooded rural land, with single-family housing. There is a vertical curve
within this section. Sight distance was reviewed and determined to be adequate (greater than 500
feet each direction at Buckthorn Lane and Fawn Lane). This is a 0.5 mile length of roadway with
6 access points. The remainder of CTH B is relatively flat with limited access which is primarily
agricultural in use.
Speed data was collected along CTH B, approximately 800 feet east of Fawn Lane intersection,
for a period of 72 hours for eastbound/westbound traffic. The counts began on 8/15 and ran until
8/17. The speed data sheet is included at the end of this memo. Additionally, five years of crash
data was also reviewed as part of this study, between August 20
th, 2018 to August 21st, 2023.
There were three crashes within this stretch of CTH B during the 5-year period. The crashes
were a single vehicle off roadway due to the driver falling asleep at the wheel (failure to control);
passenger truck and trailer running off roadway (failure to control); and a rear-end collision due
to stopped traffic for a school bus (failure to control). There were no injuries reported for any of
the three crashes.
The summary of the speed observations including additional statistics, such as the percent
driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed
in the following table. The study location observed approximately 78.3% of the drivers
Page 26 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
exceeding the speed limit, yet only 4.9% of users traveling more than 10-mph above the speed
limit. The observed median and 85th percentile speeds on CTH B were ~58-mph and ~62-mph,
respectively.
Speed
Limit
Median
Speed
85th
Percentile
Speed 10-mph Pace
% Over
Speed
Limit
%>10mph
Over Speed
Limit
55-mph 58.0-mph 62.3-mph 55 to 64-mph 78.3% 4.9%
NCHRP 966 Speed Limit Analysis
To perform a speed limit analysis on CTH R, NCHRP Research Report 966: Posted Speed Limit
Setting Procedure and Tool was utilized. This tool was created to help set reasonable, safe, and
consistent speed limits. The NCHRP 966 tool considers all major factors to determine an
appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway
characteristics and geometric conditions, level of development in the surrounding area, as well as
several others.
The results of the NCHRP 966 tool analysis, which is included as an attachement at the end of
this memo, show a suggested speed limit for CTH B of 55-mph.
National tools such as the NCHRP 966 tool are effective at taking information about a highway
(e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and
objectively synthesizing that information into a suggested speed limit based on research for
setting appropriate speed limits. It is important to adapt suggested speed limits from national
tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin set within 5 mph of
the recommended speed limits from a national tool are considered rational speed limits
(Highway Safety Improvement Program (HSIP): Speed Management Improvement Project
Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010).
Additionally, the NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool
shows a speed of 55-mph is ideal, this matches the current posted speed limit of 55-mph through
this section of CTH B.
Conclusions & Recommendations
The observed speeds of CTH B from 1,500 feet west of Buckthorn Lane to 1,500 feet east of
Fawn Lane indicate most drivers (77.2%) are driving within the pace range, with the median
speed at 58-mph. There is adequate site distance east and west of each intersection, with three
accidents in a 5-year period.
Page 27 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Based on this information, is it recommended to keep the existing speed limit at 55-mph as this is
supported by the NCHRP 966 Tool as well as the collected data.
If the Town of Stockton wishes to further pursue a speed reduction, staff would recommend that
they fully fund the study from a 3
rd party consultant.
Attachments: Speed Study Worksheet
NCHRP Speed Limit Tool Output
Page 28 of 57
NCHRP 17-76 Speed Limit Setting Tool
Input Cells Description Output Cells
Site Description Data Color-Coding Legend
Rural Roadway context Aqua = basic input cell
Collector Roadway type Denim = basic input cell with drop-down menu
Yes Are crash data available? Orange = optional input cell (not needed for calculations)
LM Analyst Green = optional input cell (use if data for agency & region are available, leave blank otherwise)
7/22/2025 Date Rose = intermediate calculations
CTH B Roadway name Purple = final analysis results
Buckthorn Lane to Fawn Lane Description
55 Current speed limit (mph)
Notes Note: The "Test macros" button provides a message to verify proper macro operation.
Analysis Results Advisory, Calculated, or Warning Messages
Speed limit setting group Undeveloped
Suggested speed limit (mph) 55 This value is determined by the maximum speed limit.
Speed Data Advisory, Calculated, or Warning Messages
55 Maximum speed limit (mph)
62.3 85th-percentile speed (mph)
59.6 50th-percentile speed (mph)
Site Characteristics Advisory, Calculated, or Warning Messages
1 Segment length (mi)
4,800 AADT (two-way total) (veh/d)
2 Number of lanes (two-way total)
0 Directional design-hour truck volume (trk/hr)
0 Number of interchanges 10 miles between interchanges
≤ 55 mph Design speed (mph)
0 Grade (%)
1 Outside shoulder width (ft) Rounded-Down 85th
0 Inside shoulder width (ft) Rounded-Down 85th
Undivided Median type
0 Number of traffic signals 0 signals / mi
2 Number of access points (total of both directions) 2 access points / mi
Not high / Any type Bicyclist activity / bike lane type
None Sidewalk presence / width
Not present Sidewalk buffer This variable is not shown when the sidewalk presence / width variable is set to ‘None’.
Negligible Pedestrian activity Rounded-Down 85th
Not high On-street parking activity
No Parallel parking permitted?
No Angle parking present?
No Adverse alignment present?
Crash Data Advisory, Calculated, or Warning Messages
5 Number of years of crash data
4,800 Average AADT for crash data period (veh/d)
No Is the segment a one-way street?
3 All (KABCO) crashes for crash data period Observed KABCO crash rate = 34.25 crashes / 100 MVMT
0 Fatal & injury (KABC) crashes for crash data period Observed KABC crash rate = 0 crashes / 100 MVMT
Average KABCO crash rate (crashes / 100 MVMT) HSIS average KABCO crash rate = 133.96 crashes / 100 MVMT
Average KABC crash rate (crashes / 100 MVMT) HSIS average KABC crash rate = 43.89 crashes / 100 MVMT
1.3 x average KABCO crash rate (crashes / 100 MVMT) 174.1
1.3 x average KABC crash rate (crashes / 100 MVMT) 57.1
Critical KABCO crash rate (crashes / 100 MVMT) 204.0
Critical KABC crash rate (crashes / 100 MVMT) 86.4
Page 29 of 57
SPEED (MPH) EB VEH EB TRUCKS WB VEH WB TRUCKS TOTAL VEHICLES TOTAL TRUCKS TOTAL
HIGHWAY: 15 0 0 0 0 0 0 0
COUNTY: 16 0 0 0 0 0 0 0
MUNICIPALITY: 17 0 0 0 0 0 0 0
18 0 0 0 0 0 0 0
19 0 0 0 0 0 0 0
DIRECTION OF TRAVEL: 20 0 0 0 0 0 0 0
POSTED SPEED: 21 0 0 0 0 0 0 0
22 0 0 0 0 0 0 0
23 0 0 0 0 0 0 0
DATE: 24 0 0 0 0 0 0 0
DAY: 25 0 0 0 0 0 0 0
TIME OF STUDY: 26 0 0 0 0 0 0 0
OBSERVER(S): 27 0 0 0 0 0 0 0
WEATHER: 28 0 0 0 0 0 0 0
PAVEMENT CONDITION: 29 0 0 0 0 0 0 0
30 0 0 0 0 0 0 0
31 0 0 0 0 0 0 0
85TH PERCENTILE* 85TH PERCENTILE* 32 1 0 32 0 33 0 33
50TH PERCENTILE† 50TH PERCENTILE† 33 0 0 0 0 0 0 0
AVERAGE SPEED AVERAGE SPEED 34 0 0 0 0 0 0 0
PACE RANGE‡ 56 TO 65 PACE RANGE‡ 53 TO 62 35 1 0 2 0 3 0 3
PERCENT IN PACE PERCENT IN PACE 36 2 0 1 0 3 0 3
PERCENT OVER PACE PERCENT OVER PACE 37 0 0 4 0 4 0 4
PERCENT UNDER PACE PERCENT UNDER PACE 38 0 0 2 0 2 0 2
39 3 0 10 0 13 0 13
40 1 0 11 0 12 0 12
85TH PERCENTILE* 41 1 0 0 0 1 0 1
50TH PERCENTILE† 42 2 0 6 0 8 0 8
AVERAGE SPEED 43 3 0 7 0 10 0 10
PACE RANGE‡ 55 TO 64 44 6 0 6 0 12 0 12
PERCENT IN PACE 45 9 0 30 0 39 0 39
PERCENT OVER PACE 46 7 0 11 0 18 0 18
PERCENT UNDER PACE 47 27 0 61 0 88 0 88
48 37 0 77 0 114 0 114
49 20 0 80 0 100 0 100
50 67 0 185 0 252 0 252
51 37 0 144 0 181 0 181
52 114 0 395 0 509 0 509
53 242 0 676 0 918 0 918
54 132 0 342 0 474 0 474
55 375 0 885 0 1260 0 1260
56 247 0 488 0 735 0 735
57 669 0 1244 0 1913 0 1913
58 1165 0 1432 0 2597 0 2597
59 620 0 676 0 1296 0 1296
60 1173 0 1080 0 2253 0 2253
61 551 0 399 0 950 0 950
62 1119 0 586 0 1705 0 1705
63 833 0 352 0 1185 0 1185
64 423 0 119 0 542 0 542
65 377 0 163 0 540 0 540
66 243 0 62 0 305 0 305
67 81 0 20 0 101 0 101
68 126 0 37 0 163 0 163
69 49 0 7 0 56 0 56
70 92 0 20 0 112 0 112
71 41 0 18 0 59 0 59
72 21 0 8 0 29 0 29
73 26 0 11 0 37 0 37
74 8 0 5 0 13 0 13
75 12 0 6 0 18 0 18
76 8 0 2 0 10 0 10
77 2 0 0 0 2 0 2
78 2 0 1 0 3 0 3
79 3 0 0 0 3 0 3
80 1 0 2 0 3 0 3
81 2 0 1 0 3 0 3
82 0 0 0 0 0 0 0
83 0 0 1 0 1 0 1
84 0 0 0 0 0 0 0
85 2 0 1 0 3 0 3
86 0 0 0 0 0 0 0
87 1 0 0 0 1 0 1
88 0 0 0 0 0 0 0
89 1 0 0 0 1 0 1
90 0 0 0 0 0 0 0
91 0 0 0 0 0 0 0
92 0 0 0 0 0 0 0
93 1 0 0 0 1 0 1
94 0 0 0 0 0 0 0
95 0 0 0 0 0 0 0
TOTAL VEHICLES 8986 0 9708 0 18694 0 18694
8.0% 8.6%
15.0%
12.1% 11.0%
COMBINED STUDY RESULTS
62.3
58.0
58.7
77.2%
7.8%
60.9
60.1 57.3
79.9% 80.4%
59.6 57.1
63.4
LOCATION INFORMATION
CTH B
PORTAGE
Town of Stockton
STUDY LOCATION: Buckthorn to Fawn Lane
EASTBOUND/WESTBOUND
55
GENERAL INFORMATION FIELD COMMENTS
8/14/2023 to 8/17/2023
EASTBOUND STUDY RESULTS WESTBOUND STUDY RESULTS
JAMAR Blackcat Radar used for speed study.
Monday-Thursday
8am Monday- 2am Friday
LM
CLEAR
DRY
SPEED STUDY WORKSHEET
CTH B (Buckthorn Lane to Fawn Lane)
WISCONSIN DEPARTMENT OF TRANSPORTATION
0
500
1000
1500
2000
2500
3000
15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85 87 89 91 93 95
FREQUENCY
SPEED (MPH)
SPEED DISTRIBUTION CHART
WESTBOUND STUDY RESULTS
EASTBOUND STUDY RESULTS
*85TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 85 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW
CONDITIONS
†50TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 50 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW
CONDITIONS
‡PACE IS THE 10 MPH RANGE OF SPEEDS THAT COVERS THE HIGHEST NUMBER OF OBSERVATIONS FROM THE DATA SET
0.0
20.0
40.0
60.0
80.0
100.0
120.0
0 10 20 30 40 50 60 70 80 90 100
PERCENT VEHICLES TRAVELING LESS THAN OR EQUAL
TO SPEED INDICATED (%)
SPEED (MPH)
S-CURVE PLOT
Page 30 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Date: September 9, 2025
To: Highway Committee
From: Lucas Meddaugh, P.E.
Subject: Discussion and Possible Action on Speed Zone Request – CTH R from South Elmwood
Drive to USH 10
Introduction
A speed study on CTH R, from 250 ft south of Elmwood Avenue to USH 10, was requested to
be reviewed for concerns about speed and accidents. A local resident made the request through
the Town of Hull.
Existing Conditions
CTH R is a bi-directional, four-lane north/south county highway. It is comprised of two different
segments: 1) 250 ft south of Elmwood Avenue to Old Highway 18 (4 – 12 foot lanes, 2.5 ft
paved shoulder and 5 foot aggregate shoulder with a pedestrian facility along the west side. 2)
Old Highway 18 to USH 10 (4 – 12 foot lanes, curb and gutter with pedestrian walk along the
west side of the segment. The speed limit is currently posted as 35-mph. According to traffic
counts completed in 2021 by WisDOT, 4,800 vehicles per day (vpd) use this segment of
roadway.
This section of CTH R is a mix of urban use (City of Stevens Point) and rural (Town of Hull).
There is mix of single-family housing, and commercial businesses. Access is primarily from
local roads or business connections. This is a 0.5 mile length of roadway with 11 access points,
and pedestrian facilities/multi-use path on the west side of the roadway.
Speed data was collected along CTH R, approximately 500 feet south of Jefferson Street for a
period of 72 hours for northbound/southbound traffic. The counts were from June 21-23 for
northbound and June 28 to August 1 for southbound. The speed data sheet is included as an
attachment at the end of this memo. Additionally, five years of crash data was also reviewed as
part of this study, between August 20
th, 2008 to August 20th, 2025.
There were 15 crashes within this stretch of CTH R:
-failure to control (1)
-failed to yield right-of-way (5)
-mechanical issues causing rearend (1)
-rearend during lane change (1)
-sideswipe during lane change (1)
-operating motor vehicle in inattentive, careless or erratic manner (4)
-following too close (2)
Page 31 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715-345-5356
Of all the crashes, there was one (1) suspected injury at a fail to yield right-of-way at the Old
HWY 18 intersection.
The summary of the speed observations including additional statistics, such as the percent
driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed
in the following table. The study location observed approximately 97% of the drivers exceeding
the speed limit, and 32% of users traveling more than 10-mph above the speed limit. The
observed median and 85
th percentile speeds on CTH B were ~43-mph and ~48-mph,
respectively.
Speed
Limit
Median
Speed
85th
Percentile
Speed 10-mph Pace
% Over
Speed
Limit
%>10mph
Over Speed
Limit
35-mph 42.6-mph 47.9-mph 39 to 48-mph 96.6% 32.4%
Conclusions & Recommendations
Based on the collected data, additional engineering analysis should be reviewed to address the
abnormalities that are shown. With the City and Town having developments contributing to the
traffic and intersection movements along this corridor, and this area being a potential growth
area for the City of Stevens Point, who may be looking at access modifications in the future
along CTH R, staff would recommend a full engineering analysis of the corridor and
intersections. Costs should be split between the Portage County Highway Department, City of
Stevens Point and the Town of Hull.
Upon approval from the Highway Committee, staff would work with the City and Town of
finalizing a scope of work and selecting a qualified consultant to complete the work.
Attachments: Speed Study Worksheet
NCHRP Speed Limit Tool Output
Page 32 of 57
SPEED (MPH) NB VEH NB TRUCKS SB VEH SB TRUCKS TOTAL VEHICLES TOTAL TRUCKS TOTAL
HIGHWAY: 7 1 0 1 0 2 0 2
COUNTY: 8 0 0 0 0 0 0 0
MUNICIPALITY: 9 0 0 0 0 0 0 0
10 0 0 0 0 0 0 0
11 1 0 0 0 1 0 1
DIRECTION OF TRAVEL: 12 0 0 0 0 0 0 0
POSTED SPEED: 13 1 0 0 0 1 0 1
14 0 0 1 0 1 0 1
15 0 0 1 0 1 0 1
DATE: 16 1 0 0 0 1 0 1
DAY: 17 0 0 0 0 0 0 0
TIME OF STUDY: 18 1 0 1 0 2 0 2
OBSERVER(S): 19 1 0 0 0 1 0 1
WEATHER: 20 0 0 1 0 1 0 1
PAVEMENT CONDITION: 21 0 0 1 0 1 0 1
22 0 0 1 0 1 0 1
23 0 0 1 0 1 0 1
85TH PERCENTILE* 85TH PERCENTILE* 24 1 0 1 0 2 0 2
50TH PERCENTILE† 50TH PERCENTILE† 25 1 0 2 0 3 0 3
AVERAGE SPEED AVERAGE SPEED 26 0 0 1 0 1 0 1
PACE RANGE‡ 39 TO 48 PACE RANGE‡ 39 TO 48 27 2 0 2 0 4 0 4
PERCENT IN PACE PERCENT IN PACE 28 1 0 4 0 5 0 5
PERCENT OVER PACE PERCENT OVER PACE 29 4 0 4 0 8 0 8
PERCENT UNDER PACE PERCENT UNDER PACE 30 8 0 16 0 24 0 24
31 1 0 10 0 11 0 11
32 17 0 43 0 60 0 60
85TH PERCENTILE* 33 6 0 27 0 33 0 33
50TH PERCENTILE† 34 60 0 128 0 188 0 188
AVERAGE SPEED 35 146 0 287 0 433 0 433
PACE RANGE‡ 39 TO 48 36 137 0 267 0 404 0 404
PERCENT IN PACE 37 343 0 687 0 1030 0 1030
PERCENT OVER PACE 38 209 0 413 0 622 0 622
PERCENT UNDER PACE 39 530 0 1049 0 1579 0 1579
40 702 0 1319 0 2021 0 2021
41 454 0 786 0 1240 0 1240
42 950 0 1617 0 2567 0 2567
43 858 0 1520 0 2378 0 2378
44 417 0 617 0 1034 0 1034
45 736 0 1356 0 2092 0 2092
46 379 0 557 0 936 0 936
47 883 0 1085 0 1968 0 1968
48 592 0 719 0 1311 0 1311
49 244 0 328 0 572 0 572
50 402 0 471 0 873 0 873
51 144 0 203 0 347 0 347
52 298 0 260 0 558 0 558
53 204 0 180 0 384 0 384
54 62 0 52 0 114 0 114
55 92 0 57 0 149 0 149
56 35 0 22 0 57 0 57
57 68 0 41 0 109 0 109
58 46 0 16 0 62 0 62
59 14 0 7 0 21 0 21
60 22 0 8 0 30 0 30
61 4 0 6 0 10 0 10
62 12 0 5 0 17 0 17
63 7 0 4 0 11 0 11
64 1 0 1 0 2 0 2
65 4 0 5 0 9 0 9
66 0 0 0 0 0 0 0
67 1 0 0 0 1 0 1
68 3 0 1 0 4 0 4
69 1 0 0 0 1 0 1
70 2 0 0 0 2 0 2
71 0 0 0 0 0 0 0
72 0 0 0 0 0 0 0
73 0 0 1 0 1 0 1
74 0 0 0 0 0 0 0
75 0 0 1 0 1 0 1
76 0 0 0 0 0 0 0
77 0 0 1 0 1 0 1
78 0 0 0 0 0 0 0
79 0 0 0 0 0 0 0
80 0 0 0 0 0 0 0
81 0 0 2 0 2 0 2
82 0 0 0 0 0 0 0
83 0 0 1 0 1 0 1
84 0 0 0 0 0 0 0
85 0 0 1 0 1 0 1
86 0 0 0 0 0 0 0
87 0 0 0 0 0 0 0
TOTAL VEHICLES 9109 0 14199 0 23308 0 23308
18.3% 11.8%
12.2%
10.3% 13.4%
COMBINED STUDY RESULTS
47.9
42.6
43.7
73.5%
14.3%
47.4
44.4 43.2
71.4% 74.8%
43.3 42.3
49.1
LOCATION INFORMATION
CTH R
PORTAGE
Town of Hull/City of Stevens Point
STUDY LOCATION: 250ft South of Elmwood Ave to USH
10
Northbound/Southbound
35
GENERAL INFORMATION FIELD COMMENTS
5-22 to 5-29
NORTHBOUND STUDY RESULTS SOUTHBOUND STUDY RESULTS
JAMAR Blackcat Radar used for speed study.
Tuesday - Thursday
Full Days
LM
CLEAR
DRY
SPEED STUDY WORKSHEET
CTH R (250ft South of Elmwood Ave to USH 10)
WISCONSIN DEPARTMENT OF TRANSPORTATION
0
500
1000
1500
2000
2500
3000
7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85 87
FREQUENCY
SPEED (MPH)
SPEED DISTRIBUTION CHART
SOUTHBOUND STUDY RESULTS
NORTHBOUND STUDY RESULTS
*85TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 85 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW
CONDITIONS
†50TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 50 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW
CONDITIONS
‡PACE IS THE 10 MPH RANGE OF SPEEDS THAT COVERS THE HIGHEST NUMBER OF OBSERVATIONS FROM THE DATA SET
0.0
20.0
40.0
60.0
80.0
100.0
120.0
0 10 20 30 40 50 60 70 80 90 100
PERCENT VEHICLES TRAVELING LESS THAN OR EQUAL
TO SPEED INDICATED (%)
SPEED (MPH)
S-CURVE PLOT
Page 33 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: September 9, 2025
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026 Bridge/Culvert Aid Project Applications and
Budget
Background:
Wisconsin Statute 82.08 provides for county aid to construct or repair town culverts and bridges.
Per the statute: A town that has voted to construct or repair any bridge or culvert that is on, or
that after the construction will be connected to, an existing highway maintained by the town may
file a petition for county aid with the county highway commissioner. The petition shall describe
the location and size of the bridge or culvert and shall contain a statement that the town has
provided the funds required by sub. (3).
Per the statute, the culvert must be at least 36” i n diameter to qualify. Beginning in 2017, the
Highway Committee approved at their May meeting that all bridge/culvert aid project be handled
by the Highway Department in order to improve consistency and communication between the
towns and Department as well as ensure regulatory compliance. The attached letter was sent to
the towns and Village of Rosholt earlier this year.
Analysis:
The list below includes the projects that have been submitted by the towns for 2026.
50% Cost Share
1. Town of Eau Pleine, 36” culvert on Lake Road $ 115,000*
2. Town of Hull, multiple culvert structure on Willow Springs Drive $120,000
3. Town of Pine Grove, multiple culvert structure on Elm Road $25,000
4. Town of Dewey, 36” culvert on Park Road $25,000
TOTAL $285,000
*The Town of Eau Pleine culvert was approved last year with the construction costs updated based on the
current design.
Fiscal Impact:
Per the statute: The town and county shall each pay one-half of the cost of construction or repair.
In determining the cost of construction or repair of any bridge or culvert, the cost of
constructing or repairing any approach not exceeding 100 feet in length shall be included.
The county’s share of the cost is levied against participating municipalities which includes all of
the towns and Village of Rosholt.
Page 34 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
While 50% of the projected total cost of the 2026 program is $285,000, the draft 2026 budget
proposal includes a levy apportionment of $110,000. This is the same apportionment as last year
as there are adequate reserves to cover the additional costs. The Bridge Aid Balance for 2026
year-end is projected to be approximately $260,000 which is adequate for any other future
emergency replacements.
Recommendation:
Staff recommends that the Committee review each request and take action as appropriate. Once
the projects are approved by the Highway Committee, staff will request the County’s 50% share
to be included in the 2026 Bridge/Culvert Aid levy.
Attach: Annual Letter and Statute
Page 35 of 57
Portage County 800 Plover Road
Highway Department Plover, WI 54467
Nathan Check, PE Phone: 715-345-5355
Commissioner Fax: 715-345-5356
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patr ol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assista nt Patrol Supervisor – Bob Lang
Finance Office Supervisor – Stacy Zerby Financia l Associate III – Kristen Hancock
TO: PORTAGE COUNTY TOWNS AND VILLAGE OF ROSHOLT
FROM: PORTAGE COUNTY HIGHWAY DEPARTMENT
DATE: July 14, 2025
SUBJECT: 2026 BRIDGE/CULVERT AID APPLICATIONS
Please find the 2026 Bridge & Culvert Aid Project Application as well as Wisconsin Statute
82.08 attached which pertains to county aid on Town bridge and culvert replacements. Per the
statute, the town and county shall each pay one-half of the cost of construction or repair for
approved culvert or bridge projects. The culvert/bridge must have a 36-inch or greater span to
qualify for this funding. The county’s share of the cost is levied against participating
municipalities which includes all of the towns and Village of Rosholt.
As approved by the Portage County Highway Committee in 2017, any approved bridge/culvert
project will be completely managed by the Highway Department. Portage County towns and the
Village of Rosholt will need to submit their applications for bridge or culvert aid to the Portage
County Highway Department by August 18, 2025 for the planned construction or repair to be
conducted in 2026. Below is a tentative timeline for the 2026 bridge/culvert aid projects.
1. August 18, 2025 – Applications due to the Highway D epartment. The project
applications shall be reviewed and approved by the Town Board.
2. September 30, 2025 – Town/village meeting minutes a pproving the project for the town
must be submitted to the Highway Department.
3. August 18 to October 15, 2025 – Highway Department Review of project applications.
At this time, the Highway Department will initiate the DNR coordination and provide an
initial estimate to the town/village
4. September 16, 2025 – Highway Committee Review and A pproval/Denial of applications
5. November 2025 – Approval of Bridge/Culvert Aid Appr opriation by County Board
6. Fall 2024 to Spring 2025 – Highway Department Proje ct Management which includes
Permitting, Design, Scheduling, etc.
7. Spring 2026 – Highway Department to provide final c onstruction estimate and schedule
to town.
8. Spring 2026– Two-party agreement signed by town/vil lage and Highway Department.
9. Summer-Fall 2026 – Construction completed for the r eplacement of the structure
If you have any questions regarding the process or application, please do not hesitate to contact
me at the number listed above or at checkn@co.portage.wi.gov .
Regards,
Nathan Check
Nathan Check, P.E., Highway Commissioner
Page 36 of 57
TOWN HIGHWAYS 82.103 Updated 11 −12 Wis. Stats. Database
Electronic reproduction of 2011−12 Wis. Stats. database, updated to May 1, 2013.
2011−12 Wis. Stats. database updated though 2013 Wis. Act 10 and all Supreme Court Orders enacted before May 1, 2013. Statu-
tory changes effective on or prior to May 1, 2013 are published as currently in effect. Changes effective after May 1, 2013 are
designated by NOTES. See Are the Statutes on this Website Official? (5−1−13)
charge, the superintendent, or in the absence of a superintendent
the chairperson of the town board, shall as soon as practicable take
action to make the highway safe for travel, which may include
closing the highway.
(4) The superintendent shall routinely notify the town board
of all highway work.
History: 1991 a. 316; 2003 a. 214 ss. 117, 118, 157, 158; Stats. 2003 s. 82.05.
NOTE: 2003 Wis. Act 214 , which affected this section, contains extensive
explanatory notes.
The duty to keep highways passable is made mandatory by former ss. 81.01 and
81.03 [now ss. 82.03 and 82.05], when read together. State ex rel. Cabott, Inc. v. Woj-
cik, 47 Wis. 2d 759, 177 N.W.2d 828 (1970).
82.08 Town bridges or culverts; construction and
repair; county aid. (1) PETITIONS. A town that has voted to
construct or repair any bridge or culvert on a highway maintained
by the town may file a petition for county aid with the county high-
way commissioner. The petition shall describe the location and
size of the bridge or culvert and shall contain a statement that the
town has provided the funds required by sub. (3).
(2) F
UNDING REQUIREMENTS. (a) Except as provided in par.
(b), upon receipt of a petition for a bridge or culvert with a 36−inch
or greater span, or a structure of equivalent capacity to carry water,
the county board shall appropriate the sum required by sub. (3)
and shall levy a tax therefor. The tax, when collected, shall be held
in a separate account administered by the county highway com-
mittee.
(b) If on January 1, 2003, a county has a policy of providing
funding only for bridges and culverts larger than the requirement
of par.(a), the county may refuse to fund bridges and culverts that
do not meet the minimum requirements of that policy. The mini-
mum size bridge or culvert that a county is required to fund under
this section may be raised, but not lowered, by the affirmative vote
of a majority of the towns in the county. The county board of any
county that has never granted aid under this section may, in its dis-
cretion, refuse all petitions under sub. (1).
(3) S
HARED COST. The town and county shall each pay one −
half of the cost of construction or repair. In determining the cost
of construction or repair of any bridge or culvert, the cost of
constructing or repairing any approach not exceeding 100 feet in
length shall be included.
(4) EMERGENCY PETITION. Whenever the construction or
repair of any bridge or culvert must be made without delay, the
town board may file its petition with the county clerk and the
county highway committee, explaining the necessity for immedi-
ate construction or repairs. It shall then be the duty of the town
board and the county highway committee to construct or repair the
bridge or culvert as soon as practicable. The construction or repair
of a bridge or culvert undertaken pursuant to this subsection shall
entitle the town to the same county aid that the town would have
been entitled to had it filed its petition with the county board as
provided in sub. (1).
(5) S
UPERVISION OVER DESIGN, CONSTRUCTION, AND COST. The
county highway committee and the town board shall have full
charge of design, sizing, letting, inspecting, and accepting the
construction or repair, but the town board may leave the matter
entirely in the hands of the county highway committee. The
county highway committee and the town board must agree on the
cost of the project and must consult each other during construc-
tion.
(6) C
ONSTRUCTION REQUIREMENTS. No county order may be
drawn under sub. (2) for the construction of a bridge or culvert
unless the design and construction comply with requirements
under s. 84.01 (23).
(7) NOT A X . Except as provided in ss. 61.48 and 84.14 (3),
nothing contained in this section shall authorize the levy of a tax
upon the property in any city or village that is required to maintain
its own bridges.
(8) A
DMINISTRATION CHARGE. The county may charge the
towns that apply for aid under this section an administration
charge. The administration charge shall be fixed as a percentage
of the total costs of administering aid under this section and the
percentage shall be no more than the percentage that the county
charges the state for records and reports.
History: 1977 c. 190; 1981 c. 296; 1983 a. 192 s. 303 (2); 1983 a. 532; 2003 a.
214 ss. 140 to 145, 147, 159; Stats. 2003 s. 82.08.
NOTE: 2003 Wis. Act 214 , which affected this section, contains extensive
explanatory notes.
The county is obligated to pay its half of the cost of construction or repair of a
bridge even if the final cost exceeds the amount the town requested in the petition.
An estimate is sufficient in a petition for aid. Costs need not be determined exactly.
Town of Grand Chute v. Outagamie County,2004 WI App 35, 269 Wis. 2d 657, 676
N.W.2d 540, 03−1897.
The bridge at issue in this case was not a “bridge on a highway maintainable by the
town” under s. 81.38 because the bridge aid petition did not request funding to help
connect the bridge to a highway maintainable by the town, there was no existing high-
way extending to the planned bridge site at the time of the petition, and the bridge was
not connected to a highway maintainable by the town upon completion. Section
81.38 requires funding for only those bridges built on highways in existence at the
time of a bridge’s construction. Town of Madison v. County of Dane, 2008 WI 83,
311 Wis. 2d 402, 752 N.W.2d 260, 06−2554.
Although a 2003 act changed the phrase “highway maintainable” to “highway
maintained,” this amendment did not change the substantive meaning of the statute.
Town of Madison v. County of Dane, 2008 WI 83, 311 Wis. 2d 402, 752 N.W.2d 260,
06−2554.
NOTE: The above annotations cite to s. 81.38, the predecessor statute to s.
82.08.
82.09 County aid for dams used for bridges. A town
board may file a petition with the county board stating that the
town board has voted to acquire the right to use a roadway on a
dam. The petition shall contain a legal description and scale map
of the dam and roadway, and shall state the amount agreed to be
paid to the owner for the use of the roadway. Upon receipt of a
petition, the county board shall appropriate a sum equal to 50 per-
cent of the amount agreed to be paid for the use. The county board
shall, on the order of the chairperson of the county board and
county clerk, cause such sum to be paid to the treasurer of the town
whenever the town board notifies the county highway commis-
sioner that a contract for the use of the roadway has been executed.
History: 2003 a. 214 s. 151.
NOTE: 2003 Wis. Act 214 , which affected this section, contains extensive
explanatory notes.
SUBCHAPTER II
BASIC PROCEDURES
82.10 Initiation of procedu res. (1) APPLICATION FOR HIGH-
WAY CHANGES. Six or more resident freeholders may apply to the
town board to have a highway laid out, altered, or discontinued.
The application shall be in writing and shall be delivered to the
town clerk. The application shall contain all of the following:
(a) A legal description of the highway to be discontinued or of
the proposed highway to be laid out or altered.
(b) A scale map of the land that would be affected by the
application.
(2) R
ESOLUTION. Notwithstanding sub. (1), the town board
may initiate the process of laying out, altering, or discontinuing a
town highway by the introduction of a resolution. The resolution
shall contain all of the following:
(a) A legal description of the highway to be discontinued or of
the proposed highway to be laid out or altered.
(b) A scale map of the land that would be affected by the reso-
lution.
(3) N
OTICE REQUIREMENTS. Upon receipt of an application
under sub. (1) or the introduction of a resolution under sub. (2), the
board shall provide notice of the time that and the place where it
will meet to consider the application or resolution. The notice
shall contain a legal description of the highway to be discontinued
or of the proposed highway to be laid out or altered and a scale map
of the land that would be affected by the application or resolution.
(4) N
OTICE RECIPIENTS. (a) The town board or, at the town
board’s direction, the applicants shall publish a class 3 notice
under ch. 985 and shall, at least 30 days before the hearing, give
notice by registered mail to all of the following:
Page 37 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: September 10, 2025
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026 Highway Budget – Set Wetland and Stream
Mitigation Credit Sale Rates
Background:
The Resolution establishing the credit sale policy for the Little Plover River Stream and
Mitigation bank is on the County Board agenda for approval on September 16
th . This resolution
states that “the Highway Commissioner will consult with the WDN R, ACOE, and other
mitigation bank owners to determine current market rates when warranted. Proposed sale rates
will be reviewed and approved by the Highway Committee on an annual basis as part of the
budget process with market adjustments as needed. The sales rate will not be less than the cost of
developing the credit.”
To date 7.2 wetland credits and 262 functional feet of stream credits have been released for sale
with additional credits anticipated to be released in the Fall of 2026.
Analysis:
Wetland credit prices can vary significantly across watersheds and wetland credit types which is
a function of supply, demand, and cost to construct. Our main credit type is wet meadow with
nearly 32 credits and approximately 4 credits of Hardwood swamp in total.
When evaluating credit fees, we first looked at the Wisconsin Wetland Conservation Trust
(WWCT) which is a wetland mitigation in-lieu fee (ILF) program sponsored and administered by
the Wisconsin DNR. For our service area, the Lower Wisconsin, the WWCT credit fee is
currently set at $98,800.
Our consultant has also researched other private banks within and near our service area and have
found ranges for the wetland credits ranging from $65,000 to $90,000 for wet meadow and
$100,000 to $125,000 for forested wetlands. For other counties banks near us but not within our
service area, pricing ranges from approximately $80,000 to $100,00 per credit.
Evaluating the stream credits are more difficult due to the scarcity of banks. For this pricing, we
primarily relied on our consultant who confirmed stream credit pricing near $1,500/functional
foot when looking at various banks across the nation.
From a cost standpoint, Highway staff evaluated the project costs to ensure that the sale prices
are not less than the cost of developing the credit. As part of the analysis, some assumptions had
Page 38 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
to be made in separating out the costs for single cost items such as the land purchase and
construction oversight costs while other costs such as construction and design were easier to
break out between stream and wetland costs. Ultimately, the cost to develop the wetland credits
were approximately $47k and the costs to develop the stream credits were approximately
$675/functional foot.
Fiscal Impact and Recommendation:
The total project cost including the 5 year maintenance and monitoring is estimated to be $2.6M
$3M.
Staff recommends setting the initial pricing for the credits as follows:
-Wet Meadow - $80,000
-Hardwood Swamp - $100,000
-Stream - $1,500/functional foot
If all credits are sold at those rates, it would result in approximately $4.93M of revenue.
While researching these credit sales with other counties, the sales can be a competitive process
with other banks. They had recommended some flexibility in the wetland pricing as potential
buyers and their consultants will shop around for the best pricing in their service area. Staff
would recommend that the Committee set the price but then allow for a 1 to 10% cost adjustment
for negotiations(if needed) which would be approved by the Highway Committee Chairperson.
This would only apply to the wetland pricing but would give some flexibility and timely
responses to inquiries.
Attach: None
Page 39 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: September 11, 2025
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion on 2026 Highway Budget – Special Revenue , Enterprise, and Wetland
Background:
The 2026 Highway budget is substantially completed and submitted to Finance and the County
Executive.
Analysis and Fiscal Impact:
There were no major changes from last month’s memo and discussion on the key budget items.
Attached to the memo are the narratives for the main Highway Department functions. These
documents provide more information on the budget summary and highlights as well as statistics
and various performance measures.
1. Highway Special Revenue – Roads & Bridges – This is the work performed on the
County system.
2. Highway -Enterprise – This is the budget for the bu siness entity for the Highway
Department. Also attached is a copy of the Machinery Operations State of Revenues and
Expenditures which provides a history of the machinery account. A few things to note
regarding this attachment:
a. Revenue(Gain)/Loss from R/R – Each year a new recor ds & reports(R&R) rate is
set by the WisDOT which is meant to recapture the administrative costs of the
Highway Department. This is a cost pool account that collects expenses from
administrative staff salaries and general office overhead. A county's
administrative rate is determined by dividing its total net administrative expenses
by its total maintenance expenses. The total administrative expenses for all 72
counties are then averaged to establish the final rate for the following year. Since
this has been tracked separately since 2013, the Highway Machinery Operations
account has seen a net gain as Portage County’s adm inistration expenses are
actually lower than the statewide average resulting in revenue gains.
b. Revenue Gain from State PBM – By statute, all work performed on the state
system for the WisDOT is charged based on actual costs. Beginning in 2014,
statute language was changed which allowed the WisDOT to pilot the
Performance Based Maintenance(PBM) program. This program allows counties
to provide an estimate of costs based on unit prices like a typical contractor which
could then result in net profit or losses on the PBM projects. Since 2014, the
Machinery Operations account has gained nearly $852k from this program.
c. Overall net surplus or loss – Since 2013, the accou nt has experienced a surplus of
over $5M compared to the $1.6M loss in the 5 prior years. These are funds that
Page 40 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
are reinvested in the business side of the Highway Department, primarily in
equipment.
3. Highway – Wetland Mitigation – This is the special revenue budget created for the Little
Plover River Stream and Wetland Mitigation project to account for the expenses and
future revenues from sales.
Recommendation:
Staff recommends that the Committee provide input on the budget. As final allocations are
received and budget details are entered, staff will provide additional information for the
Committee.
Attach: Highway Special Revenue Budget Summary
Highway Enterprise Budget Summary
Highway Machinery Operations Summary
Highway Wetland Budget Summary
Page 41 of 57
Highway – County Roads & Bridges
FY 2025 Budget Document – VII |
Mission
To provide a safe and economical transportation system for motorists traveling within and through Portage County.
Overview
The highway special revenue fund consists of revenues and expenses related to the road maintenance of 434 County Trunk Highway
System (CTHS) miles and the bridge aid program.
The operating expenses related to the County Trunk Highway System are incurred in the Highway Enterprise Fund and then charged
to the Highway Special Revenue Fund.
The required services of the County Trunk Highway System can be broken down into three areas:
General Maintenance General Maintenance General Maintenance General Maintenance preserves the infrastructure of the County Trunk Highway miles through the use of appropriate maintenance
practices. This would include, but is not limited to pothole repairs, mowing, centerline painting, culvert replacement, shoulder
grading, ditching, wheel rut repairs, chip sealing, signing and litter control. The objective is to maintain a safe and drivable pavement
while protecting the County’s investment in quality roads.
Winter Maintenance Winter Maintenance Winter Maintenance Winter Maintenance includes installation of snow fence, equipment set up and to provide good winter driving conditions as soon as
practical after a winter storm. The level of service provided during and after winter storms on the County Trunk Highway system is
determined by the roads primary use as a major collector, minor collector, or local roadway.
Road Construction Road Construction Road Construction Road Construction is necessary due to an aging infrastructure as well as road use and traffic volumes changing over time. The road
improvements required to address these changing needs are beyond the scope of general maintenance that would include widening
of the pavement and shoulders, flattening ditch in-slopes, flattening horizontal curves, increasing sight distance and/or making
drainage improvements. Portage County Highway construction crews produce a quality product at a reasonable cost on these
projects allowing the retention of the workforce needed to accomplish winter maintenance.
County bridge and culvert aid is also accounted for in the Highway Special Revenue Fund. In accordance with Wisconsin State Statutes
Sec. 82.08, a town that has voted to construct or repair any bridge or culvert on a highway maintained by the town may file a petition
for county aid with the county highway commissioner. If county aid is filed for, the town and county shall each pay one-half of the
construction or repair costs of any bridge or culvert not exceeding 100 feet in length.
Accomplishments – FY 2025
Accomplishments represent the department’s major achievements during the previous year including:
1. Crackfilling, wedging, culvert replacement, and chipsealing on approximately 45 miles of county highways.
2. Resurfacing by milling and overlaying approximately 1.2 miles of CTH B from CTH R to Kennedy Avenue
3. Recondition by grading, profile and superelevation adjustments, reditching and culvert replacements of pulverizing and
repaving approximately 7.8 miles of CTH D from CTH J to CTH A.
4. Resurfacing by milling and overlaying approximately 0.5 miles of CTH R from Jefferson Street to USH 10 and CTH B from USH
10 to approximately ¼ west.
5. Provided local oversight assistance to the WisDOT for the design of CTH R from STH 54 to CTH B and the CTH II Bridge
replacement projects as well as the construction of the CTH WW bridge replacement.
6. Began design for the CTH D (CTH A to STH 54) roadway projects as well as the CTH E bridge replacement scheduled for 2026.
7. Completed the construction as-built, financial assurances, title transfer, recorded conservation easement, and establishment
of the long-term management endowment fund which allowed the Interagency Review Team to approve the initial release of
7.18 wetland credits and 262.8 functional feet of stream credits.
8. Managed 51 winter storm events for the 2024-2025 winter season which included anti-icing, snow and ice control, and
freezing rain events.
Page 42 of 57
Highway – County Roads & Bridges
FY 2025 Budget Document – VII |
Departmental Issues & Initiatives for FY 2026 & Beyond
1. The Highway Department is continuing to work with the Highway Committee on the analysis of the level of service and
corresponding costs to maintain the County’s Road and bridge system. Program needs, public safety factors, infrastructure
life cycles are major items of consideration.
2. Current Condition of the County Road System - A strong pavement preservation program consisting primarily of chipsealing
and crackfilling has helped keep the average surface condition rates higher with 13.2% of our system rated fair or worse
(Surface condition rating 1 to 4), but these maintenance projects have not addressed other needs such as drainage, right-of-
way maintenance and brushing, safety issues and geometric deficiencies. Currently, 82% of the county road system is rated
as needing maintenance or resurfacing (Surface condition rating of 1 to 7).
3. Pavement Replacement Cycle - The Highway Committee has identified a goal of approximately 10 miles per year (43-year
average life) for the resurfacing, reconditioning, reconstruction program. Below is an estimate pavement life based on
previous funding levels for the resurfacing, reconditioning, reconstruction program:
• 10-year average (2016-2025) = 8.47 miles/year, 51.25-year average life
• 3-year average (2023-2025) = 11.1 miles/year, 39.1-year average life
• The Highway Department Capital Improvement Plan has proposed to increase the number of miles paved with
additional funding sought through various Wisconsin Department of Transportation funding programs.
4. Funding – Based on current funding levels without borrowing, the Highway Department is projecting a $4 million/year deficit
to meet the pavement replacement cycle goal. In recent years, the deficit has been met with borrowing. In 2019, the
County Board approved a $25 vehicle registration fee which will provide an estimated $1.5 million of additional revenue per
year. These revenues will be used to offset the borrowing needs for future years. This fee was scheduled to sunset on
March 1, 2024, and the County Board voted to amend the fee to increase to $30 to account for construction inflation.
5. Funding – The Highway Department received notice of multiple transportation grant awards for 2025 and beyond. These
awards include:
• $468,209 of WisDOT Local Road Improvement Program funding for CTH D (2025 construction)
• $2.4M of WisDOT Surface Transportation Funding-Urban for CTH R (STH 54 to CTH B) Reconstruction Project (2028
construction)
• $785,860 of WisDOT Surface Transportation Funding-Bridge for the replacement of the CTH II Bridge over Bear
Creek (2027 construction)
• $4.64M of WisDOT Surface Transportation Funding-Rural for CTH A (CTH Z to STH 66) Resurfacing Project (2029
construction)
6. Staffing – In order to maintain 24 hour/365 day/year service for our county and road state system, the Highway Department
needs highly qualified and skilled operators. Recruitment and retention have been increasingly difficult over the past few
years and the Highway Department will continue to evaluate ways to ensure that we maintain a skilled and dedicated
workforce.
7. Planned 2026 resurfacing, reconditioning, reconstruction program includes:
Reconditioning Projects: Reconditioning Projects: Reconditioning Projects: Reconditioning Projects:
• CTH D (CTH A to STH 54) 7.57 miles
Page 43 of 57
Highway – County Roads & Bridges
FY 2025 Budget Document – VII |
Statistics & Performance Measurements
2023 Actual 2024 Actual 2025 Target
WisDOT General Transportation Aid Received $2,369,6 97 $2,436,200 $2,613,905
Total Dollars of Grants Awarded $0 $1,268,432 $1,71 8,209
Total Dollars of Vehicle Registration Fee
Collected $1,587,735 $1,784,813 $1,741,642
Total Dollars of Vehicle Registration Fee
Expended $0 $0 $0
Miles of Road Improvements 11.81 Miles 12.0 Miles 9 .47 Miles*
Miles of Chipsealing 45.4 Miles 52.5 Miles 44.9 Mil es
% Of Road Miles Rated Surface Condition Rating
(SCR) 3 or Less - 2.60% 2.55%
% of Road Miles SCR Rated 4 to 7 - 79.30% 79.32%
% of Road Miles Rated SCR 8 to 10 - 18.10% 18.30%
10-Year Pavement Replacement Average 8.10 Miles 8.2 1 Miles 8.47 Miles
10-Year Pavement Replacement Average
Pavement Life 53.4 Years 52.9 Years 51.25 Years
3-Year Pavement Replacement Average 10.3 Miles 12.2 4 Miles 11.1 Miles
3-Year Pavement Replacement Average
Pavement Life 42.0 Years 35.5 Years 39.1 Years
# of County Bridges Rehabilitated or Replaced 1–CTH R 0 1–CTH WW
General Maintenance Total Cost $3,142,922 $3,328,90 9 $3,292,545
General Maintenance Cost/Mile $7,242 $7,670 $7,586
State Administrative Fee Rate 4.39% 4.30% 4.36%
State Administrative Fee Charged on Projects $591,8 83 $456,420 $558,549
Miles of Pavement Marking – Centerline 345 314 300 projected
Miles of Pavement Marking – Edgeline 308 213.5 270 projected
# of Signs Replaced 831 821 725 projected
# of Signposts Replaced 391 262 300 projected
# Culverts Inspected 178 287** 135
# Culverts Replaced/Rehabilitated 23 11 23
# Of Winter Events 60 (2022-2023) 51 (2023-2024) 51 (2024-2025)
Tons of Salt Used on the State System 3,806 2,068 4 ,247
Salt Use Ton/Lane Miles on the State System 6.8 ton s/mile 3.7 tons/mile 7.99 tons/mile
Region Average for Salt Use Ton/Mile 12.4 tons/mile 6.12 tons/mile To be Released
# of Town/Bridge Aid Projects Completed 2 7 2
*Includes 0.25 miles of CTH R(Jefferson St to USH 10) and CTH B(west of USH 10) mill and overlay
**Includes 73 culverts inspected under the WisDOT 6-20’ Structure Program
Page 44 of 57
Highway – County Roads & Bridges
FY 2025 Budget Document – VII |
2024 – 2026 Budget Summary
Revenues Revenues Revenues Revenues
2024 Actual
2025 Modified
Budget
2025 Projection 2026 Budget %
Change
Taxes 6,728,448 6,592,019 6,623,661 6,677,108 1.3%
Intergovernmental Revenue 3,704,632 3,082,343 3, 082,114 3,128,905 1.5%
Licenses and Permits 0 0 0 0 N/A
Fines, Forfeits, and Penalties 0 0 0 0 N/A
Public Charges for Services 0 0 0 0 N/A
Intergovernmental Charges for Services 0 0 0 0 N /A
Miscellaneous Revenue 20,161 0 0 0 N/A
Note Proceeds 3,185,000 4,528,018 4,200,000 0 -1 00.0%
Other Financing Sources 122,348 0 514,402 0 N/A
Use of Fund Balance/Net Position 0 526,500 90,00 0 4,842,867 819.8%
Total Total Total Total Revenues Revenues Revenues Revenues 13,760,589 14,728,880 14,510,177 14,648,880 -0.5%
Expenditures Expenditures Expenditures Expenditures
Personnel Services 0 0 0 0 N/A
Contractual Services 10,530,788 12,660,017 12,53 8,802 12,622,238 -0.3%
Supplies & Expenses 0 0 0 0 N/A
Building Materials 0 0 0 0 N/A
Fixed Charges 0 0 0 0 N/A
Debt Service 25,565 80,000 90,000 0 -100.0%
Grants & Contributions 698,924 121,000 38,250 28 5,000 135.5%
Capital Projects 0 0 0 0 N/A
Cost Allocations 0 0 0 0 N/A
Transfers to Other Funds 0 0 0 0 N/A
Contribution to Fund Balance 2,505,312 1,867,863 1,843,125 1,741,642 -6.8%
Total Total Total Total Expenditures Expenditures Expenditures Expenditures 13,760,589 14,728,880 14,510,177 14,64 8,880 -0.5%
Page 45 of 57
Highway – County Roads & Bridges
FY 2025 Budget Document – VII |
Budget Summary Highlights
• Taxes represent the portion of levy appropriated to the County Trunk Highway System as well as the bridge aid services
performed by the Highway Enterprise Fund and billed to this special revenue fund. The 2026 tax levy contribution for the
County Trunk Highway System increase is $53,447 and the tax levy bridge aid remains flat. The budgeted Vehicle
Registration Fee imposed on Portage County vehicles effective April 2019 tax revenue increase $31,642 for 2026. The Vehicle
Registration Fee remains the same at $30 per vehicle for 2026.
• A portion of intergovernmental revenue is general transportation aids. The 2025 general transportation aids actual revenue
increase is $177,705 over the 2024 amount. The 2026 general transportation aid is anticipated to remain flat. Local Road
Improvement Program (LRIP) increase is $46,791.
• Note proceeds for 2026 are not used due to the use of Motor Vehicle fund balance for the 2026 construction schedule.
• The contribution to fund balance increase is $4,316,367 due to the use of Motor Vehicle fund balance and use of carryover
funds for the 2026 construction schedule.
• Contractual services decrease slightly by $37,779 or .3% based on the 2026 construction schedule.
• Grants, contributions, and indemnities increase due to the planned bridge aid projects that will be completed in 2026 and
funded from the bridge aid reserves and levied 2026 bridge aid funds.
Contracted Services & Capital Outlay
Contracted Services Contracted Services Contracted Services Contracted Services Capital Outlay Capital Outlay Capital Outlay Capital Outlay
Highway Enterprise Fund Provided Services $12,622,2 38 None
Total Total Total Total $12,622,238 $12,622,238 $12,622,238 $12,622,238
County Road & County Road & County Road & County Road & Bridge Projects Bridge Projects Bridge Projects Bridge Projects
Town of Dewey
Town of Eau Pleine
Town of Hull
Town of Pine Grove
$25,000
$115,000
$120,000
$25,000
Total Total Total Total $285,000 $285,000 $285,000 $285,000
Page 46 of 57
Highway – Wetland Mitigation
FY 2025 Budget Document – VII |
Mission
The mission of the Portage County Wetland Mitigatio n bank is to provide the economical and ecological benefits of a county-owned
wetland and stream mitigation bank site to offset the permitting requirements for unavoidable wetland impacts for roadway, bridge,
or development projects.
Overview
The County purchased approximately 72 acres of land in the Town of Plover at the headwaters of the Lit tle Plover River. This land
was previously utilized for agriculture and served by a high capacity well. The project will convert this land into a wetland and stream
mitigation bank project which will result in an estimated 37 wetland credits and 1,375 feet of stream mitigation credits. The creation
of the wetland and stream mitigation site was designed by a consulting engineer, Stantec with the project plan approved by multiple
state and federal agencies including the Wisconsin Department of Natural Resources, US Army Corps of E ngineers, US Fish and
Wildlife Agency, and the US Environmental Protection Agency. The project will result in the restorati on of the headwaters of the Little
Plover River which was previously realigned into a man-made ditch as well as the creation of multiple wetland types which include wet
meadow, shrub-carr, and hardwood swamp.
Construction of the project was completed by the Po rtage County Highway Department in 2024 and credits have become available for
use by the County or for sale by the County. The financial structure would be similar to the existing Portage County Business Park
model. The County has established a special revenue fund for this development – Wetland Mitigation De velopment Fund. The
County will finance the outlay portion of the project through the County’s Debt Service Fund with the expectation of reimbursement
from the Wetland Mitigation Development Fund from f uture sales of wetland mitigation bank credits. The ongoing operating
expenses would be billed to the Wetland Mitigation Development Fund by the Highway Department Fund, again to be funded with
sales from the sold credits. As part of the agency review and approval process, the site does require 5 years of monitoring,
management, and maintenance to ensure that it meets the performance standards for granting the credits.
Accomplishments – FY 2025
Accomplishments represent the department’s major ac hievements during the previous year including:
1. Completed the construction as-built, financial assurances, title transfer, recorded conservation easem ent, and establishment
of the long-term management endowment fund which al lowed the Interagency Review Team to approve the in itial release of
7.18 wetland credits and 262.8 functional feet of stream credits.
2. Established a credit sales policy approved by the Highway Committee and County Board.
3. Completed the first year of Maintenance and Monitor ing for the site which included seeding, installation of monitoring wells,
water qualify sampling, soil analysis and other tasks.
4. Hosted multiple agencies and wetland groups for site tours including University of Wisconsin-Stevens P oint, Wisconsin
Department of Natural Resources, Army Corps of Engineers, Land and Water Conservation staff, Wisconsin Wetland
Association, and others.
Departmental Issues & Initiatives for FY 2026 & Beyond
1. Complete ongoing maintenance and monitoring as requ ired by the site compensation plan.
2. Continue partnership with our engineering consultant Merjent, Inc. and the University of Wisconsin-Ste vens Point to perform
the monitoring, management, and maintenance of the site.
3. Finalize business plan model to determine process for credit sales to private entities and begin marke ting for sale.
Page 47 of 57
Highway – Wetland Mitigation
FY 2025 Budget Document – VII |
Statistics & Performance Measurements
2023 Actual 2024 Actual 2025 Target
Wetland Credits Created -- -- 36
Wetland Credits Released For Sale -- -- 7.18
Wetland Credits Sold -- -- 0
Stream Mitigation Credits Created -- -- 1,314’
Stream Mitigation Credits Released for Sale -- -- 2 62.8’
Stream Mitigation Credits Sold -- -- 0
Total Revenue from Credit Sales -- -- 0
2024 – 2026 Budget Summary
Revenues Revenues Revenues Revenues
2024 Actual
2025 Modified
Budget
2025 Projection 2026 Budget %
Change
Taxes 0 0 0 0 N/A
Intergovernmental Revenue 0 0 0 0 N/A
Licenses and Permits 0 0 0 0 N/A
Fines, Forfeits, and Penalties 0 0 0 0 N/A
Public Charges for Services 0 225,000 78,175 345 ,000 53.3%
Intergovernmental Charges for Services 0 0 0 0 N /A
Miscellaneous Revenue 0 0 23,881 0 N/A
Note Proceeds 0 0 0 0 N/A
Other Financing Sources 0 0 0 0 N/A
Use of Fund Balance/Net Position 1,752,606 465,6 46 0 23,878 -94.9%
Total Total Total Total Revenues Revenues Revenues Revenues 1,752,606 690,646 102,056 368,878 -46.6%
Expenditures Expenditures Expenditures Expenditures
Personnel Services 0 0 0 0 N/A
Contractual Services 2,634 545,838 101,000 368,8 78 -37.0%
Supplies & Expenses 820 0 0 0 N/A
Building Materials 0 0 0 0 N/A
Fixed Charges 0 0 1,056 0 N/A
Debt Service 0 0 0 0 N/A
Grants & Contributions 0 0 0 0 N/A
Capital Projects 1,749,152 20,808 0 0 -100.0%
Cost Allocations 0 0 0 0 N/A
Transfers to Other Funds 0 8,438 0 0 -100.0%
Contribution to Fund Balance 0 115,562 0 0 -100. 0%
Total Total Total Total Expenditures Expenditures Expenditures Expenditures 1,752,606 690,646 102,056 368,878 -46.6%
Page 48 of 57
Highway – Wetland Mitigation
FY 2025 Budget Document – VII |
Budget Summary Highlights
• Public charges for services represent the amount of Wetland Mitigation credits expected to be sold for 2026 of $345,000
which consists of 3 Wetland credits and 50’ stream credits.
• Use of fund balance of $23,878 for 2026 to cover partial contractual services.
• Contractual services for 2026 represent management and monitoring of $343,878 and mowing services of $25,000.
Contracted Services & Capital Outlay
Contracted Services Contracted Services Contracted Services Contracted Services Capital Outlay Capital Outlay Capital Outlay Capital Outlay
Description of Services Provided Description
Consulting Services-Merjent Inc.
Contracted Services-Mowing Highway Dept
343,878
25,000
None
Total Total Total Total 368,878 368,878 368,878 368,878
Page 49 of 57
Highway – Enterprise
FY 2025 Budget Document – VII |
Mission
To provide a safe and economical transportation system for motorists traveling within and through Port age County.
Overview
In concept, the Highway Enterprise Fund is viewed as a business entity whose budget level is dependent totally upon the projected
needs of the governmental entities it serves (i.e., state & federal government, the County as it relates to the Special Revenue Fund
and the Capital Projects, and other municipal governments).
Revenue types for this fund include the following: intergovernmental charges, County Trunk Highway Sy stem (CTHS) charges, state &
federal charges, local municipal charges and miscellaneous revenues.
Operating expenses for this fund include the follow ing: administration, radio & insurance, equipment purchases, municipal roadway
maintenance, state & federal highway maintenance an d cost pool differential expenses. Other operating expenses include the
following County Trunk Highway System expenses that are later charged to the Highway Special Revenue F und: construction and
resurfacing, routine maintenance, and winter maintenance. Customers are billed for services provided according to billing rates
established annually by the Wisconsin Department of Transportation.
The accounting system for this fund contains severa l cost pools which accumulate operating costs inclu ding depreciation. Although
these cost pools in theory are intended to break even, the fluctuation of such key factors such as petroleum product costs produce a
profit or loss. The net profit or loss from combined activity of all Highway Enterprise Fund cost poo ls shall be closed out in the form of
an operating transfer at year end to the Highway Enterprise Fund.
This highway fund includes revenue and expenses related to the contract with the Wisconsin Department of Transportation (WisDOT)
to maintain 157 miles of state and federal highways located in Portage County.
Organizational Chart
Highway
Commissioner
1.00
County Engineer
1.00
County Patrol
Manager
1.00
Assistant Patrol
Supervisor
1.00
Road Foreman
3.00
Operator/
Laborer
28.00
State Patrol
Manager
1.00
State Road
Foreman
1.00
Operators
10.00
Parts Room &
Shop Manager
1.00
Chief Mechanic
1.00
Mechanical
Shop
7.00
Finance*
2.00
Page 50 of 57
Highway – Enterprise
FY 2025 Budget Document – VII |
Staffing Summary
2023 2024 2025 2026 Budget
Authorized Positions 56.00 56.00 56.00 56.00
Staffing has remained consistent over the past few years for
Highway Department although full-time and seasonal
positions are becoming increasingly difficult to fill from year to
year.
Statistics & Performance Measurements
2023 Actual 2024 Actual 2025 Target
Total Revenues $20,342,480 $16,035,946 $16,118,257
Revenues Generated from WisDot Routine
Maintenance Agreement $2,475,627 $2,431,659 $2,245,900
% Expended of Routine Maintenance Agreement 110% 10 8% 100%
Revenue Generated from WisDOT Discretionary
Agreement $454,076 $514,771 $608,666
Total Machinery Expenses $3,272,434 $3,232,255 $3,6 56,564
Total Machinery Revenue $3,498,550 $3,296,306 $4,00 6,080
Annual Machinery Surplus/Deficit +$226,116 +$64,051 $349,516
Total Capital Equipment Assets (Original Cost) $17, 873,546 $18,749,888 $19,315,825
# Driveway Permits Issued 32 37 40 projected
# Utility Permits Issued 105 84 100 projected
# of Town/Bridge Aid Projects Completed 2 7 2
20.00
40.00
60.00
80.00
2023 2024 2025 2026
Highway Staffing Trend
Seasonal & LTE
Permanent
Page 51 of 57
Highway – Enterprise
FY 2025 Budget Document – VII |
Accomplishments – FY 2025
Accomplishments represent the department’s major ac hievements during the previous year including:
1. The Machinery Operations Fund is projecting a surplus in which equipment revenues are anticipated to exceed equipment
expenses. The purchase of Highway Department equip ment depends on the success of this fund, and this is the 10 th year in a
row of surplus even while experiencing significant increases in parts and fuel costs.
2. All of the planned and budgeted Highway equipment purchases for 2025 were completed even though invent ory and
delivery times have been a struggle in today’s market.
3. The annual State Maintenance Agreement with the Wis consin Department of Transportation for maintenance services on the
state highway system is tracking to be within the department’s goal of 10% of the budget.
4. The Department managed and oversaw Bridge Aid proje cts for the Town of Carson, Town of Eau Pleine(design), and Town of
Grant(emergency replacement) for 2025.
Departmental Issues & Initiatives for FY 2026 & Beyond
1. The number one priority of the Highway Department i s to maintain a safe and efficient transportation system, with the
provision of winter maintenance (snow and ice removal). Major construction and heavy equipment purcha ses continue to be
analyzed to prove that the cost benefit is worthy and supports the core function and mission of the Hi ghway Department.
2. Any decision to modify operations, staffing, or organization of the Highway Department in the future w ould need to consider
the three major functional priorities which are winter maintenance, roadway maintenance, and construct ion.
3. Equipment and parts supply issues are expected to continue into 2026 and beyond. The Department will continue to work
with our Purchasing Department, Highway Committee, and vendors to ensure that we have the equipment an d parts
available to keep the fleet operational.
4. Major construction and heavy equipment purchases wi ll continue to be analyzed to prove that the cost benefit is worthy and
supports the core function and mission of the Highw ay Department.
5. The balance of County maintenance and construction with State maintenance and work for our local municipalities will be
evaluated to ensure that the Department is providing core services for the County while also being cos t-effective solution for
our other clients.
Page 52 of 57
Highway – Enterprise
FY 2025 Budget Document – VII |
2024 – 2026 Budget Summary
Revenues Revenues Revenues Revenues
2024 Actual
2025 Modified
Budget
2025 Projection 2026 Budget %
Change
Taxes 0 0 0 0 N/A
Intergovernmental Revenue 0 0 0 0 N/A
Licenses and Permits 8,950 6,200 6,600 6,300 1.6 %
Fines, Forfeits, and Penalties 0 0 0 0 N/A
Public Charges for Services 23,634 0 0 0 N/A
Intergovernmental Charges for Services 15,654,89 9 16,323,336 16,092,440 16,671,599 2.1%
Miscellaneous Revenue 12,298 12,500 12,500 12,50 0 0.0%
Note Proceeds 0 0 0 0 N/A
Other Financing Sources 336,165 6,717 6,717 7,35 4 9.5%
Use of Fund Balance/Net Position 0 1,221,035 0 -100.0%
Total Total Total Total Revenues Revenues Revenues Revenues 16,035,946 17,569,788 16,118,257 16,697,753 1.9%
Expenditures Expenditures Expenditures Expenditures
Personnel Services 7,841,444 6,684,546 6,696,621 6,985,751 4.5%
Contractual Services 3,455,272 1,841,821 1,062,3 81 2,438,740 32.4%
Supplies & Expenses 5,478,840 6,280,344 6,326,57 4 5,419,517 -13.7%
Building Materials 0 0 0 0 N/A
Fixed Charges 5,496,916 1,605,956 1,697,571 1,71 4,002 6.7%
Debt Service 0 0 0 0 N/A
Grants & Contributions 252 0 0 0 N/A
Capital Projects 900 1,007,048 0 0 -100.0%
Cost Allocations (6,899,733) 0 0 0 N/A
Transfers to Other Funds 24,855 23,609 23,609 22 ,357 -5.3%
Contribution to Fund Balance 637,200 126,464 311 ,501 117,386 -7.2%
Total Total Total Total Expenditures Expenditures Expenditures Expenditures 16,035,946 17,569,788 16,118,257 16,69 7,753 1.9%
Page 53 of 57
Highway – Enterprise
FY 2025 Budget Document – VII |
Budget Summary Highlights
• Intergovernmental charges increase overall $348,263 or 2.1%. Projects billed to the Special Revenue F und decrease $67,413
primarily due to the construction projects for 2026 . Projects billed to Other Local Government Roads increase $142,915 due
to increase in roadway work and winter salt purchases.
• The contract with the WI Department of Transportation for the state highway maintenance operations is budgeted to
increase $113,641 for the 2026 State’s Routine Maintenance Agreement (RMA) and the levels of services being requested.
This agreement allows funding for 15.00 FTE State Patrol crew.
• Personnel services increase overall by 4.5% due to a 3.00% annual adjustment increase for the County’s wage and
classification plan and corresponding fringe benefits, including a 20% increase in health insurance pr emiums.
• Contractual services increase by $596,919 or 32.4% primarily due to the construction projects for 2026 and need for
professional and engineering services.
• Supplies and expenses decrease by $860,827 or 13.7% due to the decrease cost comparison of 2026 constr uction &
resurfacing projects to 2025.
• Fixed charges increase by 6.7% due to WisDOT Machin ery Rate increase, insurance premium increase and d epreciation
increase.
• There is a significant decrease in the capital projects due to the 2024 equipment carryforward purchas e orders adjusted into
the 2025 budget.
• Designated for future operations decrease by $10,330 or 6.9%.
Page 54 of 57
Highway – Enterprise
FY 2025 Budget Document – VII |
Contracted Services & Capital Outlay
Contracted Services Contracted Services Contracted Services Contracted Services Capital Outlay Purchases Capital Outlay Purchases Capital Outlay Purchases Capital Outlay Purchases (2026) (2026) (2026) (2026)
(2) Patrol Trucks w/Snow & Ice 815,000
Description of Services Provided Paver 675,000
Commissioner Vehicle 60,000
Architect & Engineering 406,000 Pick-up (1 Ton Dump ) 75,000
Bridge Inspections 10,000 3PT Disc Bine 15,000
Building Repair/Maintenance Service 80,500 Weiler ( Paver Attachment) 10,200
Contractual Services 1,349,688 Iron Worker for Sho p 15,000
Contracted Training/Education 19,000 2) Tank & Spra ying Units (Carryforward from
2025)
50,000
Fire Protection Services 8,800 Front Parking Lot Im provements
(Carryforward from 2025)
100,000
Herbicide Spraying 20,000 TOTAL TOTAL TOTAL TOTAL 1,815,200 1,815,200 1,815,200 1,815,200
Hired Trucking 140,000
IT-Computer Services 131,107
Landscaping Services 34,000 Capital Outlay Sales (2 026) Capital Outlay Sales (2026) Capital Outlay Sales (2026) Capital Outlay Sales (2026)
Software License/Maintenance 19,200 2006 Sterling P atrol Truck 12,470
Street Sweeping 65,000 2011 International Patrol Truck 23,583
Utilities 98,500 2000 Mack Quad Dump Truck 18,298
Waste Disposal Services 14,000 Burke Wing 1,250
Other Contractual Services 42,945 Monroe Wing 975
TOTAL TOTAL TOTAL TOTAL 2,438, 2,438, 2,438, 2,438,740 740 740 740 Monroe Underbody 1,125
Swenson Sander 1,129
Monroe Sander 931
Paver 58,861
Lawn Mower 3,441
TOTAL SALES TOTAL SALES TOTAL SALES TOTAL SALES 122,063 122,063 122,063 122,063
Page 55 of 57
BUDGET PROJECTED ACTUAL ACTUAL
2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 201 1 2010 2009 2008
Labor 684,050.00 $ 680,859.00 $ 583,988.81 $ 631,304.91 $ 535,432.86 $ 526,883.55 $ 431,546.16 $ 470,882.85 $ 541,992.76 $ 456,114.32 $ 457,416.92 $ 458,672.55 $ 462,181.50 $ 449,946.98 $ 380,967.45 $ 477,093.74 $ 520,348.00 $ 520,530.60 $ 441,098.26 $
Fuel 530,000.00 $ 500,000.00 $ 428,504.40 $ 517,908.62 $ 662,224.29 $ 425,696.05 $ 295,995.46 $ 482,099.80 $ 464,692.01 $ 322,054.87 $ 305,799.22 $ 324,062.38 $ 622,617.73 $ 769,361.76 $ 589,287.04 $ 448,579.15 $ 371,174.00 $ 329,521.70 718,655.80
Oil, Grease, Anti-freeze 55,860.00 $ 55,860.00 $ 33,620.30 $ 46,944.98 $ 47,140.28 $ 43,289.14 $ 35,976.35 $ 40,870.35 $ 40,322.21 $ 29,791.70 $ 33,731.05 $ 37,340.11 $ 47,179.03 $ 40,233.76 $ 30,580.11 $ 27,100.56 $ 30,648.00 $ 31,315.56 34,066.75
Repairs & Maintenance 592,250.00 $ 575,000.00 $ 532,195.70 $ 599,065.70 $ 576,553.94 $ 484,016.27 $ 465,670.45 $ 569,005.83 $ 508,339.83 $ 481,164.27 $ 438,122.66 $ 390,913.97 $ 673,611.49 $ 568,047.11 $ 381,045.35 $ 302,457.76 $ 315,042.00 $ 415,215.84 390,083.60
Tires & Batteries 80,850.00$ 80,850.00 $ 57,909.95 $ 72,020.94 $ 67,775.06 $ 53,173.38 $ 54,453.07 $ 67,578.52 $ 48,892.93 $ 54,271.02 $ 54,814.44 $ 52,972.69 $ 57,049.99 $ 109,524.72 $ 55,753.09 $ 30,208.00 $ 38,488.00 $ 44,418.66 47,292.70
Insurance 66,841.00$ 60,855.00 $ 49,377.95 $ 44,802.31 $ 37,465.80 $ 35,930.06 $ 31,046.64 $ 29,320.64 $ 26,790.10 $ 27,447.18 $ 23,899.73 $ 15,960.02 $ 15,910.00 $ 15,925.67 $ 16,066.94 $ 16,958.97 $ 16,678.00 $ 17,463.54 15,215.87
Machinery Sales/(Gains)Loss (37,344.00)$ (13,355.39) $ (171,630.94) $ 2,772.92 $ (15,815.77) $ 18,984.00 $ 25,336.75 $ 16,946.38 $ 11,475.00 $ (2,545.13) $ 41,929.22 $ (97,979.67) $ 9,285.00 $ (69,702.00) $ (17,143.98) $ - $ 2,658.39 5,737.00
Depreciation 1,171,000.00 $ 1,197,738.00 $ 1,122,643.94 $ 979,961.20 $ 915,912.52 $ 804,893.60 $ 718,923.84 $ 628,713.23 $ 511,276.05 $ 448,280.84 $ 408,144.15 $ 406,469.43 $ 535,737.16 $ 537,931.93 $ 545,954.42 $ 576,965.70 $ 537,314.00 $ 557,639.93 548,970.34
Shop overhead 556,728.00 $ 542,746.00 $ 437,369.42 $ 552,056.17 $ 469,861.86 $ 491,659.47 $ 390,285.88 $ 452,744.80 $ 456,922.68 $ 418,380.62 $ 437,937.14 $ 396,774.84 $ 325,740.68 $ 265,320.44 $ 305,192.85 $ 513,782.79 $ 405,047.57 $ 376,845.95 492,152.94
Total Machinery Operations Expense 3,737,579.00 $ 3,656,564.00 $ 3,232,255.08 $ 3,272,433.89 $ 3,315,139.53 $ 2,849,725.75 $ 2,442,881.85 $ 2,766,552.77 $ 2,616,174.95 $ 2,248,979.82 $ 2,157,320.18 $ 2,125,095.21 $ 2,642,047.91 $ 2,765,577.37 $ 2,235,145.25 $ 2,376,002.69 $ 2,234,739.57 $ 2,295,610.17 2,693,273.26
Less:
Machinery Revenue (3,865,288.00) $ (4,006,080.00) $ (3,296,305.77) $ (3,498,549.45) $ (3,371,984.55) $ (2,888,601.79) $ (2,788,134.74) $ (3,608,572.56) $ (2,872,425.56) $ (2,516,776.43) $ (2,474,755.21) $ (2,232,837.14) $ (2,567,506.51) $ (2,952,494.72) $ (2,224,473.70) $ (1,742,730.50) $ (1,795,384.00) $ (1,799,972.58) (2,639,203.32)
Net Machinery Operations Expense (Surplus)
Loss (127,709.00) $ (349,516.00) $ (64,050.69) $ (226,115.56) $ (56,845.02) $ (38,876.04) $ (345,252.89) $ (842,019.79) $ (256,250.61) $ (267,796.61) $ (317,435.03) $ (107,741.93) $ 74,541.40$ (186,917.35) $ 10,671.55$ 633,272.19 $ 439,355.57 $ 495,637.59 $ 54,069.94 $
Net Loss - no
Revenue (Gain)Loss from R/R (128,155.81) (307,965.96) (7,484.33)$ (28,856.81)$ (8,457.33) $ (84,140.94)$ (218,082.31) $ (5,543.62) $ (45,875.19) $ (93,697.47) $ (15,093.67) $ rev to cover
Contributed Capital - (79,168.00) 0 (262,353.25) $
Revenue Gain from State PBM (124,176.44) (23,734.51) (25,592.00) $ (125,659.09) $ 18,299.41 $ (72,387.00) $ (189,767.85) $ (51,133.68) $ (182,656.00) $ (10,950.17) $ admin
Net (Surplus) Net Loss (478,447.81) $ (467,713.49) $ (71,952.37) $ (499,768.79) $ (832,177.71) $ (412,778.55) $ (938,000.02) $ (374,112.33) $ (336,273.12) $ (30,106.24) $ (202,011.02) $ 236,573.53$
PORTAGE COUNTY HIGHWAY DEPARTMENT
Statement of Revenues and Expenditures, Budget and Actual
Machinery Operations
Page 56 of 57
County Engineer – Lucas Meddaugh
County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson
Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang
/uni0046inance /uni004F/g431ice Supervisor – Stacy Zerby /uni0046inancial Associate III – Kristen Hancock
Portage County
Highway Department
Nathan Check, PE
Commissioner
800 Plover Road
Plover, WI 54467
Phone: 715-345-5355
Fax:715 -345 -5356
Date: September 10, 2025
To: Highway Committee
From: Nathan Check, P.E.
Subject: Discussion and Possible Action on 2026 Highway Department Budget – Equipment
Purchases
Background:
The 2026 requested equipment purchases are summarized below.
Analysis and Fiscal Impact:
The 2026 request totals $1.655M and is summarized below. For reference, the 2025 request
totals $1.613 million. Equipment supply issues are anticipated to carry into 2025 and beyond
with lead time on some equipment out to 12 to 14 months from order.
All units are replacement units except the addition of one new iron worker which will aid in the
shop and fabrication operations.
Recommendation:
Highway staff has already begun the process for researching equipment specifications and
purchasing options for 2026 as most of this equipment would need to be approved and ordered in
2025 in order for it to arrive in 2026. This process was supported by the Highway Committee in
prior years and has placed the Department in a much better position allowing us to get most of
the needed machinery this year. The Highway Committee has previously approved the patrol
truck chassis, snow and ice equipment, and paver for 2026.
Staff recommends that the Committee approve the 2026 equipment plan. While equipment
needs may vary throughout the year, any changes would be brought back to the Committee for
approval.
Attachments: None
2026 Equipment Budget Machinery Estimated
Description Class Cost
(2) Patrol Trucks w/Snow & Ice Equipment Trucks & Au tos/Snow Removal 815,000.00 $
Paver Maintenance & Construction 675,000.00 $
Commissioner Vehicle Trucks & Autos 60,000.00 $
Pick-up (1 Ton Dump) Trucks & Autos 75,000.00 $
3PT Disc Bine Maintenance & Construction 15,000.00 $
Weiler (Paver Attachment) Maintenance & Construction 10,200.00 $
Iron Worker for Shop Shop 15,000.00 $
Total Requested Machinery 2026 1,665,200.00 $
Page 57 of 57
Source: Portage County website. First collected Nov 18, 2026.