RecordWell Data

Traffic Safety Commission — Agenda Packet

Portage County · Portage County · Traffic Safety Commission · meeting of Sep 2, 2025 · Agenda packets

Open the original document More from Portage County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PORTAGE COUNTY MEETING AGENDA TRAFFIC SAFETY COMMISSION PORTAGE COUNTY LAW ENFORCEMENT CENTER LEC TRAINING ROOM 1500 STRONGS AVENUE STEVENS POINT, WI 54481 Tuesday, September 2, 2025 10:00 AM REMOTE ATTENDANCE & COMMENT To attend this meeting by telephone : Dial 1-872-242-7813. After dialing the number, you will then be asked to enter a meeting number. Use the following meeting number: 977 506 537, then press #. To attend this meeting by video: email snowk@co.portage.wi.gov no later than August 29th, 2025, to request an invite. Page 1 of 2 CALL TO ORDER 1. Introduction of Lt. Aimee Kontos to replace Assistant Chief Brian Noel as the Plover PD representative. CORRESPONDENCE REPORTS 2. Status of Highway Construction and Safety Repair/Proposals • WI Department of Transportation • Portage County Highway Department • Municipal Projects 3. County Highway Safety Coordinator Report 4. Crash Spot Map • Portage County Sheriff's Office • Stevens Point Police Department • Plover Police Department 5. Wisconsin DOT Traffic Safety Engineer's Report 6. Bureau of Transportation Safety Report PUBLIC NOTICE Members of the public who wish to address the Committee on specific agenda items must register their request at this time, with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth in Robert’s Rules of Order. APPROVAL OF MINUTES 7. Approval of June 3rd, 2025 Minutes DISCUSSION/POSSIBLE ACTION 8. Traffic Safety Legislation 9. Emergency Medical Services Operations 10. Upcoming Traffic Safety Training Opportunities Page 1 of 21 Traffic Safety Commission Meeting Agenda September 2, 2025 Page 2 of 2 11. Public Education Programs and Opportunities • Safe Streets For All (SS4A) Grant Update 12. Locations of Traffic Hazards and Recommended Improvements • Plover Solar Farm Update • Hwy 54 & Hoover Ave Intersection • Speed Study Requests o CTH B, Buckthorn Ln to Fawn Ln o CTH DB, Marathon County Line to I 39 o CTH R, CN RR to Hwy 10 13. 2026 Traffic Safety Commission Meeting Dates All meetings are scheduled to be on the first Tuesday of the third month of the quarter, 10:00 AM, at the LEC. Any changes will be announced prior to that meeting date. • March 3rd, 2026 • June 2nd, 2026 • September 1st, 2026 • December 1st, 2026 14. Special Meeting Attendance Reports (Portage County Ordinance 3.1.47 & 3.1.48) NEXT MEETING DATE December 2nd, 2025, 10:00 AM at the LEC Training Room ADJOURNMENT Notice: Any person who has special needs and plans on attending this meeting in-person or remotely should contact the Facilities Office at 715-346-1598 as soon as possible to ensure that reasonable accommodations can be made. Notice: Remote comment by the public during the meeting will be at the discretion of the Chair. Notice: A quorum of the Portage County Board of Supervisors, or any committee thereof, may be present at this meeting. Page 2 of 21 PORTAGE COUNTY MEETING MINUTES TRAFFIC SAFETY COMMISSION PORTAGE COUNTY LAW ENFORCEMENT CENTER LEC TRAINING ROOM 1500 STRONGS AVENUE STEVENS POINT, WI 54481 Tuesday, June 3, 2025 10:00 AM REMOTE ATTENDANCE & COMMENT To attend this meeting by telephone : dial 1-872-242-7813, after dialing the number you will then be asked to enter in a meeting number. Use the following meeting number: 734 488 542, then press # To attend this meeting by video: email snowk@co.portage.wi.gov no later than May 30th, 2025 to request an invite. Page 1 of 3 CALL TO ORDER Meeting called to order at 10:00 AM (Ostrowski) Members Present: J Ostrowski, B Beaudoin, C Abts, D Kontos, C Budzinski, D Hickethier, J Pavelski, D Jankowski, B Uitenbroek, C Loiselle, T Reed, S Raikowski Members Excused: N Check, B Noel, H Schultz Members Absent: R Stertz, J Gemza, R Reser, B Weinert Others Present: K Snow, S Beduhn, D Johnson CORRESPONDENCE PRESENTATIONS REPORTS 1. Status of Highway Construction and Safety Repair Projects/Proposals • WI Department of Transportation • Portage County Highway Department • Municipal Projects WIS DOT (Abts) • All previous projects are going as planned. County Highway Dept (Johnson) • Cty D, Cty J to Cty A - Project has started and road is closed through October. • Chip sealing projects will start in July. • Cty B, Cty R to Kennedy Ave - Mill and pave project that will start in August. Road will be open in one lane. • Cty B & Cty J Intersection will start late fall. Municipal Projects (Beduhn) • Stevens Point has a number of projects, mostly on local roads with minimal impact to general public. • Hoover Ave signalization project - Signals are coming late summer. • Country Club Dr - Project was just bid with work starting mid August. • House Moving - Main St will be closed for house moving in August for two to three days. 2. County Highway Safety Coordinator Report Nothing to report. (Beaudoin) 3. Crash Spot Map Page 3 of 21 Traffic Safety Commission Meeting Minutes June 3, 2025 Page 2 of 3 • Portage County Sheriff's Office • Stvens Point Police Department • Plover Police Department From January 1, 2025 tp March 31, 2025: • PTSO (Loiselle) - 164 total crashes, 129 property only, 35 personal injury, 0 fatal. 44 persons injured, 0 fatalities. 11 hit-and- run. 4 involving impairment, 4 injuries resulting from impairment. • SPPD (Uitenbroek) - 197 total crashes, 175 property only, 15 personal injury, 0 fatal. 22 persons injured, 0 fatalities. • PLPD (Sent in by Noel and read by Ostrowski) - 118 total crashes, 106 property only, 12 personal injury, 0 fatal. 18 persons injured, 0 fatalities. 14 hit-and-run. 3 involving impairment, 1 injury resulting from impairment. 4. Wisconsin DOT Traffic Safety Engineer's Report Nothing to report. (Abts) 5. Bureau of Transportation Safety Report (Kontos) • Review of 2025 Q1 crash statistics including driving behaviors, crash types, • Impaired driving campaign from June to July 6th. Speed campaigns rest of summer. August impaired driving campaign. Child Safety Week in September. • Fall DRE school is open for applications. • Review of 2024 Work Zone-related crashes. PUBLIC NOTICE Members of the public who wish to address the Committee on specific agenda items must register their request at this time, with such comments subject to the public comment ordinance and the reasonable control of the Committee Chair as set forth in Robert’s Rules of Order. APPROVAL OF MINUTES 6. Approval of March 25th, 2025 Minutes Motion by Beaudoin, seconded by Jankowski, to approve the March 25th, 2025 minutes. Motion carried by voice vote with no negative votes. DISCUSSION/POSSIBLE ACTION 7. Traffic Safety Legislation None 8. Emergency Medical Services Operations None 9. Upcoming Traffic Safety Training Opportunities None 10. Public Education Programs and Opportunities • Safe Streets 4 All (SS4A) Grant Update SS4A Updates (Reed) • Safety Action Plan portion has completed data collection and installation at four of seven demonstration activities. Includes temporary curb extensions, temporary protected bike lanes. Wider edge lines and optical speed bars at three rural curves. • Working with consultant for safety analysis at 25 ADA sites. Page 4 of 21 Traffic Safety Commission Meeting Minutes June 3, 2025 Page 3 of 3 • BiPed Plan has completed three walk and roll audits. 11. Locations of Traffic Hazards and Recommended Improvements • Plover Solar Farm @ Hwy 54 & Monroe Ave - Fall 2025 Wrong Way Driver signs update (Johnson) • Wrong Way Driver signs on Hwy 10 at eleven intersections is completed for safety improvement. Solar Farm Traffic Concerns (Ostrowski) • Large solar farm installation project may lead to traffic concerns due to location and amount of employees. 200-250 employees will be entering/leaving site at Monroe and Hwy 54 from August to December. Looking for alternate routes and staggering start/end times of employees. Also looking into message boards on Hwy 54 and possibly contracting law enforcement services. • Still working on Emergency Action Plan. • Jankowski brings up busing concerns with school schedules. • Beaudoin brings up concerns with alternate routes being through residential areas that have lower speed limits and a higher biped activity. Will need Plover PD assistance with law enforcement efforts. 12. Discussion/Possible Action Re: Special Meeting Attendance (Portage County Ordinance 3.1.47 & 3.1.48) • Request for special meeting attendance • Approval of attendance of special meetings • Special meeting attendance reports None. NEXT MEETING DATE September 2nd, 2025, 10:00 AM at the LEC Training Room ADJOURNMENT Motion by Hickethier, seconded by Loiselle, to adjourn the meeting. Motion carried by voice vote with no negative votes. Meeting adjourned at 10:41 AM. Page 5 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Date: July 31, 2025 To: Highway Committee From: Lucas Meddaugh, P.E. Subject: CTH DB (Marathon County Line to I-39) Speed Study Results Introduction A speed study on CTH DB (Marathon County Line to I-39), was requested to be reviewed for concerns about speed and accidents. A local resident made the request through the Town of Dewey. Existing Conditions CTH DB is a bi-directional, two-lane north/south county highway with a 2 – 12 foot lanes, 3 foot paved shoulder and 5 foot aggregate shoulder. The speed limit is currently posted as 55-mph for this ¾-mile segment of collector roadway. There are 11 access points within the study corridor. According to traffic counts completed in 2021 by WisDOT, 1,200 vehicles per day (vpd) use this segment of roadway. This section of CTH DB is mix of developed, with building spacing of 300 feet, (north 1/4-mile) and sparsely developed (south 1/2-mile) land. The north 1/4-mile segment contains multiple commercial businesses and multi-family housing. Speed data was collected along CTH DB, approximately 500 feet south of West River Road, for a nine-day period, including a special event at the businesses on the north end. The counts started on Tuesday, May 20, 2025 and lasted until Thursday, May 29, 2025. The speed data sheet is included as Appendix A of this memo. Additionally, five years of crash data was also reviewed as part of this study, between May 20, 2020 to May 20, 2025. There were four crashes within this stretch of CTH DB during the 5-year period. The crashes were an angle vehicle turning out of the commercial business with vehicles lining the road and oncoming vehicle approaching at high rate of speed (operating vehicle in aggressive/reckless manner), single vehicle off roadway (failure to keep vehicle under control), vehicle turning off Park Road and truck by approaching vehicle (failure to yield right-of-way, improper turn), and a vehicle turning into a business (failed to yield right-of-way). The summary of the speed observations including additional statistics, such as the percent driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed in the following table. The study location observed approximately 9.2% of the drivers exceeding the speed limit, and less than 1% of users traveling more than 10-mph above the speed limit. The observed median and 85 th percentile speeds on CTH DB were ~46-mph and ~53-mph, respectively. Page 6 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Speed Limit Median Speed 85th Percentile Speed 10-mph Pace % Over Speed Limit %>10mph Over Speed Limit 55-mph 45.5-mph 52.8-mph 40 to 49-mph 9.2% 0.3% NCHRP 966 Speed Limit Analysis To perform a speed limit analysis on CTH R, NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool was utilized. This tool was created to help set reasonable, safe, and consistent speed limits. The NCHRP 966 tool considers all major factors to determine an appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway characteristics and geometric conditions, level of development in the surrounding area, as well as several others. The results of the NCHRP 966 tool analysis, which is included in the Appendix B of this tech memo, show a suggested speed limit for CTH DB of 55-mph. National tools such as the NCHRP 966 tool are effective at taking information about a highway (e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and objectively synthesizing that information into a suggested speed limit based on research for setting appropriate speed limits. It is important to adapt suggested speed limits from national tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin set within 5 mph of the recommended speed limits from a national tool are considered rational speed limits (Highway Safety Improvement Program (HSIP): Speed Management Improvement Project Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010). Additionally, the NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool shows a speed of 55-mph is ideal, which is the current posted speed limit of 55-mph through this section of CTH DB. Conclusions & Recommendations The observed speeds of CTH DB, from Marathon Co. Line to I-39, indicate approximately half of the drivers (48.7%) are driving within the pace range, with the median speed at 45.5-mph. Although the NCHRP 966 Tool recommends a 55-mph speed limit, it doesn’t consider the environmental factors that are causing a slowdown in traveling vehicles based on the collected data. Those environmental factors include busy times for local businesses and increased traffic volumes (1,485 vehicles per day over the nine day study period), and the increased commercial businesses within the northern segment of the corridor. Based on this information, and is it recommended to lower the existing speed limit to 45 MPH as it falls within the pace range and would be accepted by the drivers of the roadway as reasonable speed. Page 7 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Appendix A Page 8 of 21 SPEED (MPH) EB VEH EB TRUCKS WB VEH WB TRUCKS TOTAL VEHICLES TOTAL TRUCKS TOTAL HIGHWAY: 8 0 0 1 0 1 0 1 COUNTY: 9 1 0 4 0 5 0 5 MUNICIPALITY: 10 0 0 0 0 0 0 0 11 2 0 1 0 3 0 3 12 2 0 0 0 2 0 2 DIRECTION OF TRAVEL: 13 2 0 0 0 2 0 2 POSTED SPEED: 14 0 0 1 0 1 0 1 15 1 0 1 0 2 0 2 16 4 0 0 0 4 0 4 DATE: 17 0 0 0 0 0 0 0 DAY: 18 1 0 1 0 2 0 2 TIME OF STUDY: 19 0 0 2 0 2 0 2 OBSERVER(S): 20 0 0 1 0 1 0 1 WEATHER: 21 1 0 3 0 4 0 4 PAVEMENT CONDITION: 22 1 0 4 0 5 0 5 23 0 0 15 0 15 0 15 24 0 0 5 0 5 0 5 85TH PERCENTILE* 85TH PERCENTILE* 25 1 0 19 0 20 0 20 50TH PERCENTILE† 50TH PERCENTILE† 26 2 0 18 0 20 0 20 AVERAGE SPEED AVERAGE SPEED 27 1 0 31 0 32 0 32 PACE RANGE‡ 45 TO 54 PACE RANGE‡ 38 TO 47 28 3 0 54 0 57 0 57 PERCENT IN PACE PERCENT IN PACE 29 4 0 56 0 60 0 60 PERCENT OVER PACE PERCENT OVER PACE 30 15 0 100 0 115 0 115 PERCENT UNDER PACE PERCENT UNDER PACE 31 5 0 58 0 63 0 63 32 19 0 128 0 147 0 147 33 18 0 160 0 178 0 178 85TH PERCENTILE* 34 31 0 123 0 154 0 154 50TH PERCENTILE† 35 54 0 300 0 354 0 354 AVERAGE SPEED 36 56 0 269 0 325 0 325 PACE RANGE‡ 40 TO 49 37 100 0 139 0 239 0 239 PERCENT IN PACE 38 58 0 339 0 397 0 397 PERCENT OVER PACE 39 128 0 169 0 297 0 297 PERCENT UNDER PACE 40 160 0 555 0 715 0 715 41 123 0 538 0 661 0 661 42 300 0 198 0 498 0 498 43 269 0 421 0 690 0 690 44 139 0 229 0 368 0 368 45 339 0 490 0 829 0 829 46 169 0 548 0 717 0 717 47 555 0 225 0 780 0 780 48 538 0 323 0 861 0 861 49 198 0 154 0 352 0 352 50 421 0 277 0 698 0 698 51 229 0 242 0 471 0 471 52 490 0 100 0 590 0 590 53 548 0 119 0 667 0 667 54 225 0 47 0 272 0 272 55 323 0 78 0 401 0 401 56 154 0 42 0 196 0 196 57 277 0 13 0 290 0 290 58 242 0 17 0 259 0 259 59 100 0 5 0 105 0 105 60 119 0 5 0 124 0 124 61 47 0 8 0 55 0 55 62 78 0 1 0 79 0 79 63 42 0 3 0 45 0 45 64 13 0 0 0 13 0 13 65 17 0 0 0 17 0 17 66 5 0 1 0 6 0 6 67 5 0 0 0 5 0 5 68 8 0 2 0 10 0 10 69 1 0 1 0 2 0 2 70 3 0 0 0 3 0 3 71 0 0 0 0 0 0 0 72 0 0 0 0 0 0 0 73 1 0 1 0 2 0 2 74 0 0 0 0 0 0 0 75 2 0 0 0 2 0 2 76 1 0 0 0 1 0 1 77 0 0 1 0 1 0 1 78 0 0 1 0 1 0 1 79 0 0 0 0 0 0 0 80 1 0 0 0 1 0 1 81 0 0 0 0 0 0 0 82 0 0 0 0 0 0 0 83 0 0 0 0 0 0 0 84 1 0 0 0 1 0 1 85 0 0 0 0 0 0 0 86 0 0 0 0 0 0 0 87 0 0 0 0 0 0 0 88 0 0 0 0 0 0 0 TOTAL VEHICLES 6653 0 6647 0 13300 0 13300 SPEED STUDY WORKSHEET CTH DB (Marathon County Line to I-39) WISCONSIN DEPARTMENT OF TRANSPORTATION EASTBOUND STUDY RESULTS WESTBOUND STUDY RESULTS JAMAR Blackcat Radar used for speed study. Tuesday - Thursday Full Days LM CLEAR DRY FIELD COMMENTS 5-22 to 5-29 STUDY LOCATION: Marathon County Line to I-39 55 GENERAL INFORMATION LOCATION INFORMATION CTH DB PORTAGE Town of Dewey 48.8 49.2 42.3 55.8% 55.8% 49.1 42.1 55.8 21.6% 21.7% 18.9% 22.6% 22.5% COMBINED STUDY RESULTS 52.8 45.5 45.7 48.7% 32.5% 0 100 200 300 400 500 600 700 800 900 1000 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 FREQUENCY SPEED (MPH) SPEED DISTRIBUTION CHART WESTBOUND STUDY RESULTS EASTBOUND STUDY RESULTS *85TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 85 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW CONDITIONS †50TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 50 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW CONDITIONS ‡PACE IS THE 10 MPH RANGE OF SPEEDS THAT COVERS THE HIGHEST NUMBER OF OBSERVATIONS FROM THE DATA SET 0.0 20.0 40.0 60.0 80.0 100.0 120.0 0 10 20 30 40 50 60 70 80 90 100 PERCENT VEHICLES TRAVELING LESS THAN OR EQUAL TO SPEED INDICATED (%) SPEED (MPH) S-CURVE PLOT Page 9 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Appendix B Page 10 of 21 NCHRP 17-76 Speed Limit Setting Tool Input Cells Description Output Cells Site Description Data Color-Coding Legend Yes Are crash data available? Aqua = basic input cell Lucas Meddaugh User name Denim = basic input cell with drop-down menu 8/12/2025 Date Orange = optional input cell (not needed for calculations) CTH DB Roadway name Green = optional input cell (use if data for agency & region are available, leave blank otherwise) Marathon Co Line to I-39 Description Rose = intermediate calculations 55 Current speed limit (mph) Purple = final analysis results Notes Gray = unneeded input cell based on other input data (e.g., Crash Data section is gray when B5 = no) Analysis Results Advisory, Calculated, or Warning Messages Speed limit setting group Undeveloped Suggested speed limit (mph) 55 This value is determined by speed data. Speed Data Advisory, Calculated, or Warning Messages 55 Maximum speed limit (mph) 52.8 85th-percentile speed (mph) 45.5 50th-percentile speed (mph) Site Characteristics Advisory, Calculated, or Warning Messages 0.75 Segment length (mi) 1,200 AADT (two-way total) (veh/d) 2 Number of lanes (two-way total) Undivided Median type This variable is not needed if there are fewer than four lanes. 11 Number of access points (total of both directions) 12 Lane width (ft) 8 Shoulder width (ft) No Adverse alignment present? Crash Data Advisory, Calculated, or Warning Messages 5 Number of years of crash data 1,200 Average AADT for crash data period (veh/d) 4 All (KABCO) crashes for crash data period Observed KABCO crash rate = 243.5 crashes / 100 MVMT 0 Fatal & injury (KABC) crashes for crash data period Observed KABC crash rate = 0 crashes / 100 MVMT Average KABCO crash rate (crashes / 100 MVMT) HSIS average KABCO crash rate = 206.6 crashes / 100 MVMT Average KABC crash rate (crashes / 100 MVMT) HSIS average KABC crash rate = 65.2 crashes / 100 MVMT 1.3 x average KABCO crash rate (crashes / 100 MVMT) 268.5 1.3 x average KABC crash rate (crashes / 100 MVMT) 84.8 Critical KABCO crash rate (crashes / 100 MVMT) 421.5 Critical KABC crash rate (crashes / 100 MVMT) 199.3 Page 11 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Date: August 18, 2025 To: Highway Committee From: Lucas Meddaugh, P.E. Subject: CTH R (250ft South of Elmwood Avenue to USH 10) Speed Study Results Introduction A speed study on CTH R, from 250 ft south of Elmwood Avenue to USH 10, was requested to be reviewed for concerns about speed and accidents. A local resident made the request through the Town of Hull. Existing Conditions CTH R is a bi-directional, four-lane north/south county highway. It is comprised of two different segments: 1) 250 ft south of Elmwood Avenue to Old Highway 18 (4 – 12 foot lanes, 2.5 ft paved shoulder and 5 foot aggregate shoulder with a pedestrian facility along the west side. 2) Old Highway 18 to USH 10 (4 – 12 foot lanes, curb and gutter with pedestrian walk along the west side of the segment.. The speed limit is currently posted as 35-mph. According to traffic counts completed in 2021 by WisDOT, 4,800 vehicles per day (vpd) use this segment of roadway. This section of CTH R is a mix of urban use (City of Stevens Point) and rural (Town of Hull). There is mix of single-family housing, and commercial businesses. Access is primarily from local roads or business connections. This is a 0.5 mile length of roadway with 11 access points, and pedestrian facilities/multi-use path on the west side of the roadway. Speed data was collected along CTH R, approximately 500 feet south of Jefferson Street for a period of 72 hours for northbound/southbound traffic. The counts were from June 21-23 for northbound and June 28 to August 1 for southbound. The speed data sheet is included as Appendix A of this memo. Additionally, five years of crash data was also reviewed as part of this study, between August 20 th, 2008 to August 20th, 2025. There were 15 crashes within this stretch of CTH R: -failure to control (1) -failed to yield right-of-way (5) -mechanical issues causing rearend (1) -rearend during lane change (1) -sideswipe during lane change (1) -operating motor vehicle in inattentive, careless or erratic manner (4) -following too close (2) Page 12 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Of all the crashes, there was one (1) suspected injury at a fail to yield right-of-way at the Old HWY 18 intersection. The summary of the speed observations including additional statistics, such as the percent driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed in the following table. The study location observed approximately 97% of the drivers exceeding the speed limit, and 32% of users traveling more than 10-mph above the speed limit. The observed median and 85 th percentile speeds on CTH B were ~43-mph and ~48-mph, respectively. Speed Limit Median Speed 85th Percentile Speed 10-mph Pace % Over Speed Limit %>10mph Over Speed Limit 35-mph 42.6-mph 47.9-mph 39 to 48-mph 96.6% 32.4% Conclusions & Recommendations Based on the collected data, a complete engineering study should take place to address the abnormalities that are shown. This segment of CTH R falls within the Town of Hull and the City of Stevens Point, so an equivalent third of costs should be split between Portage County Highway Department, City of Stevens Point and the Town of Hull. Page 13 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Appendix A Page 14 of 21 SPEED (MPH) NB VEH NB TRUCKS SB VEH SB TRUCKS TOTAL VEHICLES TOTAL TRUCKS TOTAL HIGHWAY: 7 1 0 1 0 2 0 2 COUNTY: 8 0 0 0 0 0 0 0 MUNICIPALITY: 9 0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 11 1 0 0 0 1 0 1 DIRECTION OF TRAVEL: 12 0 0 0 0 0 0 0 POSTED SPEED: 13 1 0 0 0 1 0 1 14 0 0 1 0 1 0 1 15 0 0 1 0 1 0 1 DATE: 16 1 0 0 0 1 0 1 DAY: 17 0 0 0 0 0 0 0 TIME OF STUDY: 18 1 0 1 0 2 0 2 OBSERVER(S): 19 1 0 0 0 1 0 1 WEATHER: 20 0 0 1 0 1 0 1 PAVEMENT CONDITION: 21 0 0 1 0 1 0 1 22 0 0 1 0 1 0 1 23 0 0 1 0 1 0 1 85TH PERCENTILE* 85TH PERCENTILE* 24 1 0 1 0 2 0 2 50TH PERCENTILE† 50TH PERCENTILE† 25 1 0 2 0 3 0 3 AVERAGE SPEED AVERAGE SPEED 26 0 0 1 0 1 0 1 PACE RANGE‡ 39 TO 48 PACE RANGE‡ 39 TO 48 27 2 0 2 0 4 0 4 PERCENT IN PACE PERCENT IN PACE 28 1 0 4 0 5 0 5 PERCENT OVER PACE PERCENT OVER PACE 29 4 0 4 0 8 0 8 PERCENT UNDER PACE PERCENT UNDER PACE 30 8 0 16 0 24 0 24 31 1 0 10 0 11 0 11 32 17 0 43 0 60 0 60 85TH PERCENTILE* 33 6 0 27 0 33 0 33 50TH PERCENTILE† 34 60 0 128 0 188 0 188 AVERAGE SPEED 35 146 0 287 0 433 0 433 PACE RANGE‡ 39 TO 48 36 137 0 267 0 404 0 404 PERCENT IN PACE 37 343 0 687 0 1030 0 1030 PERCENT OVER PACE 38 209 0 413 0 622 0 622 PERCENT UNDER PACE 39 530 0 1049 0 1579 0 1579 40 702 0 1319 0 2021 0 2021 41 454 0 786 0 1240 0 1240 42 950 0 1617 0 2567 0 2567 43 858 0 1520 0 2378 0 2378 44 417 0 617 0 1034 0 1034 45 736 0 1356 0 2092 0 2092 46 379 0 557 0 936 0 936 47 883 0 1085 0 1968 0 1968 48 592 0 719 0 1311 0 1311 49 244 0 328 0 572 0 572 50 402 0 471 0 873 0 873 51 144 0 203 0 347 0 347 52 298 0 260 0 558 0 558 53 204 0 180 0 384 0 384 54 62 0 52 0 114 0 114 55 92 0 57 0 149 0 149 56 35 0 22 0 57 0 57 57 68 0 41 0 109 0 109 58 46 0 16 0 62 0 62 59 14 0 7 0 21 0 21 60 22 0 8 0 30 0 30 61 4 0 6 0 10 0 10 62 12 0 5 0 17 0 17 63 7 0 4 0 11 0 11 64 1 0 1 0 2 0 2 65 4 0 5 0 9 0 9 66 0 0 0 0 0 0 0 67 1 0 0 0 1 0 1 68 3 0 1 0 4 0 4 69 1 0 0 0 1 0 1 70 2 0 0 0 2 0 2 71 0 0 0 0 0 0 0 72 0 0 0 0 0 0 0 73 0 0 1 0 1 0 1 74 0 0 0 0 0 0 0 75 0 0 1 0 1 0 1 76 0 0 0 0 0 0 0 77 0 0 1 0 1 0 1 78 0 0 0 0 0 0 0 79 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 81 0 0 2 0 2 0 2 82 0 0 0 0 0 0 0 83 0 0 1 0 1 0 1 84 0 0 0 0 0 0 0 85 0 0 1 0 1 0 1 86 0 0 0 0 0 0 0 87 0 0 0 0 0 0 0 TOTAL VEHICLES 9109 0 14199 0 23308 0 23308 18.3% 11.8% 12.2% 10.3% 13.4% COMBINED STUDY RESULTS 47.9 42.6 43.7 73.5% 14.3% 47.4 44.4 43.2 71.4% 74.8% 43.3 42.3 49.1 LOCATION INFORMATION CTH R PORTAGE Town of Hull/City of Stevens Point STUDY LOCATION: 250ft South of Elmwood Ave to USH 10 Northbound/Southbound 35 GENERAL INFORMATION FIELD COMMENTS 5-22 to 5-29 NORTHBOUND STUDY RESULTS SOUTHBOUND STUDY RESULTS JAMAR Blackcat Radar used for speed study. Tuesday - Thursday Full Days LM CLEAR DRY SPEED STUDY WORKSHEET CTH R (250ft South of Elmwood Ave to USH 10) WISCONSIN DEPARTMENT OF TRANSPORTATION 0 500 1000 1500 2000 2500 3000 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85 87 FREQUENCY SPEED (MPH) SPEED DISTRIBUTION CHART SOUTHBOUND STUDY RESULTS NORTHBOUND STUDY RESULTS *85TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 85 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW CONDITIONS †50TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 50 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW CONDITIONS ‡PACE IS THE 10 MPH RANGE OF SPEEDS THAT COVERS THE HIGHEST NUMBER OF OBSERVATIONS FROM THE DATA SET 0.0 20.0 40.0 60.0 80.0 100.0 120.0 0 10 20 30 40 50 60 70 80 90 100 PERCENT VEHICLES TRAVELING LESS THAN OR EQUAL TO SPEED INDICATED (%) SPEED (MPH) S-CURVE PLOT Page 15 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Date: July 22, 2025 To: Highway Committee From: Lucas Meddaugh, P.E. Subject: CTH B (1,500 feet west of Buckthorn Lane, to 1,500 feet east of Fawn Lane) Speed Study Results Introduction A speed study on CTH B, from 1,500 feet west of Buckthorn Lane, to 1,500 feet east of Fawn Lane, was requested to be reviewed for concerns about speed and accidents. A local resident made the request through the Town of Stockton. Existing Conditions CTH B is a bi-directional, two-lane east/west county highway with a 2 – 12 foot lanes, 5 foot paved shoulder and 1 foot aggregate shoulder. The speed limit is currently posted as 55-mph. According to traffic counts completed in 2021 by WisDOT, 4,800 vehicles per day (vpd) use this segment of roadway. This section of CTH B is primarily wooded rural land, with single-family housing. There is a vertical curve within this section. Sight distance was reviewed and determined to be adequate (greater than 500 feet each direction at Buckthorn Lane and Fawn Lane). This is a 0.5 mile length of roadway with 6 access points. Speed data was collected along CTH B, approximately 800 feet east of Fawn Lane intersection, for a period of 72 hours for eastbound/westbound traffic. The counts began on 8/15 and ran until 8/17 of 2023. The speed data sheet is included as Appendix A of this memo. Additionally, five years of crash data was also reviewed as part of this study, between August 20 th, 2018 to August 21st, 2023. There were three crashes within this stretch of CTH B during the 5-year period. The crashes were a single vehicle off roadway due to the driver falling asleep at the wheel (failure to control); passenger truck and trailer running off roadway (failure to control); and a rear-end collision due to stopped traffic for a school bus (failure to control). There were no injuries reported for any of the three crashes. The summary of the speed observations including additional statistics, such as the percent driving over the speed limit and percent driving more than 10 mph above the speed limit, is listed in the following table. The study location observed approximately 78.3% of the drivers exceeding the speed limit, yet only 4.9% of users traveling more than 10-mph above the speed Page 16 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock limit. The observed median and 85th percentile speeds on CTH B were ~58-mph and ~62-mph, respectively. Speed Limit Median Speed 85th Percentile Speed 10-mph Pace % Over Speed Limit %>10mph Over Speed Limit 55-mph 58.0-mph 62.3-mph 55 to 64-mph 78.3% 4.9% NCHRP 966 Speed Limit Analysis To perform a speed limit analysis on CTH R, NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool was utilized. This tool was created to help set reasonable, safe, and consistent speed limits. The NCHRP 966 tool considers all major factors to determine an appropriate speed limit, including operating speeds (median and 85th percentile), ADT, roadway characteristics and geometric conditions, level of development in the surrounding area, as well as several others. The results of the NCHRP 966 tool analysis, which is included in the Appendix B of this tech memo, show a suggested speed limit for CTH B of 55-mph. National tools such as the NCHRP 966 tool are effective at taking information about a highway (e.g., observed speeds, crash history, access point density, surrounding land uses, etc.) and objectively synthesizing that information into a suggested speed limit based on research for setting appropriate speed limits. It is important to adapt suggested speed limits from national tools to local conditions in Wisconsin. Typically, speed limits in Wisconsin set within 5 mph of the recommended speed limits from a national tool are considered rational speed limits (Highway Safety Improvement Program (HSIP): Speed Management Improvement Project Development Study (WisDOT ID: 0656-43-04) completed by WisDOT and TADI in 2010). Additionally, the NCHRP Research Report 966: Posted Speed Limit Setting Procedure and Tool shows a speed of 55-mph is ideal, this matches the current posted speed limit of 55-mph through this section of CTH B. Conclusions & Recommendations The observed speeds of CTH B from 1,500 feet west of Buckthorn Lane to 1,500 feet east of Fawn Lane indicate most drivers (77.2%) are driving within the pace range, with the median speed at 58-mph. There is adequate site distance east and west of each intersection, with three accidents in a 5-year period. Based on this information, is it recommended to keep the existing speed limit at 55-mph as this is supported by the NCHRP 966 Tool as well as the collected data. Page 17 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Appendix A Page 18 of 21 SPEED (MPH) EB VEH EB TRUCKS WB VEH WB TRUCKS TOTAL VEHICLES TOTAL TRUCKS TOTAL HIGHWAY: 15 0 0 0 0 0 0 0 COUNTY: 16 0 0 0 0 0 0 0 MUNICIPALITY: 17 0 0 0 0 0 0 0 18 0 0 0 0 0 0 0 19 0 0 0 0 0 0 0 DIRECTION OF TRAVEL: 20 0 0 0 0 0 0 0 POSTED SPEED: 21 0 0 0 0 0 0 0 22 0 0 0 0 0 0 0 23 0 0 0 0 0 0 0 DATE: 24 0 0 0 0 0 0 0 DAY: 25 0 0 0 0 0 0 0 TIME OF STUDY: 26 0 0 0 0 0 0 0 OBSERVER(S): 27 0 0 0 0 0 0 0 WEATHER: 28 0 0 0 0 0 0 0 PAVEMENT CONDITION: 29 0 0 0 0 0 0 0 30 0 0 0 0 0 0 0 31 0 0 0 0 0 0 0 85TH PERCENTILE* 85TH PERCENTILE* 32 1 0 32 0 33 0 33 50TH PERCENTILE† 50TH PERCENTILE† 33 0 0 0 0 0 0 0 AVERAGE SPEED AVERAGE SPEED 34 0 0 0 0 0 0 0 PACE RANGE‡ 56 TO 65 PACE RANGE‡ 53 TO 62 35 1 0 2 0 3 0 3 PERCENT IN PACE PERCENT IN PACE 36 2 0 1 0 3 0 3 PERCENT OVER PACE PERCENT OVER PACE 37 0 0 4 0 4 0 4 PERCENT UNDER PACE PERCENT UNDER PACE 38 0 0 2 0 2 0 2 39 3 0 10 0 13 0 13 40 1 0 11 0 12 0 12 85TH PERCENTILE* 41 1 0 0 0 1 0 1 50TH PERCENTILE† 42 2 0 6 0 8 0 8 AVERAGE SPEED 43 3 0 7 0 10 0 10 PACE RANGE‡ 55 TO 64 44 6 0 6 0 12 0 12 PERCENT IN PACE 45 9 0 30 0 39 0 39 PERCENT OVER PACE 46 7 0 11 0 18 0 18 PERCENT UNDER PACE 47 27 0 61 0 88 0 88 48 37 0 77 0 114 0 114 49 20 0 80 0 100 0 100 50 67 0 185 0 252 0 252 51 37 0 144 0 181 0 181 52 114 0 395 0 509 0 509 53 242 0 676 0 918 0 918 54 132 0 342 0 474 0 474 55 375 0 885 0 1260 0 1260 56 247 0 488 0 735 0 735 57 669 0 1244 0 1913 0 1913 58 1165 0 1432 0 2597 0 2597 59 620 0 676 0 1296 0 1296 60 1173 0 1080 0 2253 0 2253 61 551 0 399 0 950 0 950 62 1119 0 586 0 1705 0 1705 63 833 0 352 0 1185 0 1185 64 423 0 119 0 542 0 542 65 377 0 163 0 540 0 540 66 243 0 62 0 305 0 305 67 81 0 20 0 101 0 101 68 126 0 37 0 163 0 163 69 49 0 7 0 56 0 56 70 92 0 20 0 112 0 112 71 41 0 18 0 59 0 59 72 21 0 8 0 29 0 29 73 26 0 11 0 37 0 37 74 8 0 5 0 13 0 13 75 12 0 6 0 18 0 18 76 8 0 2 0 10 0 10 77 2 0 0 0 2 0 2 78 2 0 1 0 3 0 3 79 3 0 0 0 3 0 3 80 1 0 2 0 3 0 3 81 2 0 1 0 3 0 3 82 0 0 0 0 0 0 0 83 0 0 1 0 1 0 1 84 0 0 0 0 0 0 0 85 2 0 1 0 3 0 3 86 0 0 0 0 0 0 0 87 1 0 0 0 1 0 1 88 0 0 0 0 0 0 0 89 1 0 0 0 1 0 1 90 0 0 0 0 0 0 0 91 0 0 0 0 0 0 0 92 0 0 0 0 0 0 0 93 1 0 0 0 1 0 1 94 0 0 0 0 0 0 0 95 0 0 0 0 0 0 0 TOTAL VEHICLES 8986 0 9708 0 18694 0 18694 8.0% 8.6% 15.0% 12.1% 11.0% COMBINED STUDY RESULTS 62.3 58.0 58.7 77.2% 7.8% 60.9 60.1 57.3 79.9% 80.4% 59.6 57.1 63.4 LOCATION INFORMATION CTH B PORTAGE Town of Stockton STUDY LOCATION: Buckthorn to Fawn Lane EASTBOUND/WESTBOUND 55 GENERAL INFORMATION FIELD COMMENTS 8/14/2023 to 8/17/2023 EASTBOUND STUDY RESULTS WESTBOUND STUDY RESULTS JAMAR Blackcat Radar used for speed study. Monday-Thursday 8am Monday- 2am Friday LM CLEAR DRY SPEED STUDY WORKSHEET CTH B (Buckthorn Lane to Fawn Lane) WISCONSIN DEPARTMENT OF TRANSPORTATION 0 500 1000 1500 2000 2500 3000 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 85 87 89 91 93 95 FREQUENCY SPEED (MPH) SPEED DISTRIBUTION CHART WESTBOUND STUDY RESULTS EASTBOUND STUDY RESULTS *85TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 85 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW CONDITIONS †50TH PERCENTILE SPEED IS THE SPEED AT OR BELOW WHICH 50 PERCENT OF THE OBSERVED TRAFFIC TRAVELS UNDER FREE FLOW CONDITIONS ‡PACE IS THE 10 MPH RANGE OF SPEEDS THAT COVERS THE HIGHEST NUMBER OF OBSERVATIONS FROM THE DATA SET 0.0 20.0 40.0 60.0 80.0 100.0 120.0 0 10 20 30 40 50 60 70 80 90 100 PERCENT VEHICLES TRAVELING LESS THAN OR EQUAL TO SPEED INDICATED (%) SPEED (MPH) S-CURVE PLOT Page 19 of 21 Portage County 800 Plover Road Highway Department Plover, WI 54467 Nathan Check, PE Phone: 715-345-5355 Commissioner Fax: 715-345-5356 County Engineer – Lucas Meddaugh County Patrol Manager – Kory Kukuczka State Patrol Manager – David Johnson Parts Room / Shop Manager – Corey Giese Assistant Patrol Manager – Bob Lang Finance Office Supervisor – Stacy Zerby Financial Associate III – Kristen Hancock Appendix B Page 20 of 21 NCHRP 17-76 Speed Limit Setting Tool Input Cells Description Output Cells Site Description Data Color-Coding Legend Rural Roadway context Aqua = basic input cell Collector Roadway type Denim = basic input cell with drop-down menu Yes Are crash data available? Orange = optional input cell (not needed for calculations) LM Analyst Green = optional input cell (use if data for agency & region are available, leave blank otherwise) 7/22/2025 Date Rose = intermediate calculations CTH B Roadway name Purple = final analysis results Buckthorn Lane to Fawn Lane Description 55 Current speed limit (mph) Notes Note: The "Test macros" button provides a message to verify proper macro operation. Analysis Results Advisory, Calculated, or Warning Messages Speed limit setting group Undeveloped Suggested speed limit (mph) 55 This value is determined by the maximum speed limit. Speed Data Advisory, Calculated, or Warning Messages 55 Maximum speed limit (mph) 62.3 85th-percentile speed (mph) 59.6 50th-percentile speed (mph) Site Characteristics Advisory, Calculated, or Warning Messages 1 Segment length (mi) 4,800 AADT (two-way total) (veh/d) 2 Number of lanes (two-way total) 0 Directional design-hour truck volume (trk/hr) 0 Number of interchanges 10 miles between interchanges ≤ 55 mph Design speed (mph) 0 Grade (%) 1 Outside shoulder width (ft) Rounded-Down 85th 0 Inside shoulder width (ft) Rounded-Down 85th Undivided Median type 0 Number of traffic signals 0 signals / mi 2 Number of access points (total of both directions) 2 access points / mi Not high / Any type Bicyclist activity / bike lane type None Sidewalk presence / width Not present Sidewalk buffer This variable is not shown when the sidewalk presence / width variable is set to ‘None’. Negligible Pedestrian activity Rounded-Down 85th Not high On-street parking activity No Parallel parking permitted? No Angle parking present? No Adverse alignment present? Crash Data Advisory, Calculated, or Warning Messages 5 Number of years of crash data 4,800 Average AADT for crash data period (veh/d) No Is the segment a one-way street? 3 All (KABCO) crashes for crash data period Observed KABCO crash rate = 34.25 crashes / 100 MVMT 0 Fatal & injury (KABC) crashes for crash data period Observed KABC crash rate = 0 crashes / 100 MVMT Average KABCO crash rate (crashes / 100 MVMT) HSIS average KABCO crash rate = 133.96 crashes / 100 MVMT Average KABC crash rate (crashes / 100 MVMT) HSIS average KABC crash rate = 43.89 crashes / 100 MVMT 1.3 x average KABCO crash rate (crashes / 100 MVMT) 174.1 1.3 x average KABC crash rate (crashes / 100 MVMT) 57.1 Critical KABCO crash rate (crashes / 100 MVMT) 204.0 Critical KABC crash rate (crashes / 100 MVMT) 86.4 Page 21 of 21

Source: Portage County website. First collected Nov 18, 2026.