CIT Committee Meeting
City of Superior · Douglas County · meeting of Nov 16, 2026 · Agendas
Open the original document More from City of Superior
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CIT COMMITTEE Agenda
Monday, November 16, 2026 – 5:00 p.m.
Government Center Room 300
VIDEO CALL LINK: CIT Meeting
Dial-in option: +1 872-242-8028,,566800679#
MISSION STATEMENT: “To implement information technology policies and procedures that are consistently monitored
and reviewed. To review or recommend purchases of new software or hardware that either
performs a new City function or performs a function currently performed by City staff. Also may
review current software products and procedures with the goal of improving both areas. To
maintain communication integrity, efficiency and future advancement of the City and its related
agencies.”
COMMITTEE MEMBERS: David Dusek, Dan Lindberg
COUNCIL REPRESENTATIVES: Tylor Elm, Karly Caven
CITY ADVISOR: Dan Shea
1. ROLL CALL
2. APPROVAL OF MINUTES
2.1. CIT Committee (July 13, 2026)
3. NEW BUSINESS
3.1. Review and Recommend to Council: Contract with Hanco Utilities Inc for Fiber Phase 3
Construction Project
3.2. Review and Recommend to Council: Amendment IV to contract with Mi-Tech Services
Inc for Fiber Phase 3 Construction Oversite & Engineering
3.3. Review and Recommend to Council: Amendment II to contract with Hanco Utilities Inc
for Maintenance and Drops
4. Recurring Business
4.1. None
5. ADJOURNMENT
Notice is hereby given that a majority of the members of the Common Council may be present at the meeting, and
although this may constitute a quorum of the Common Council, the Council will not take any action at this
meeting.
*********************************************************************************************
Pursuant to the Americans with Disabilities Act of 1990, if you are in need of an accommodation to participate in the public meeting process,
please call (715) 395-7200 by 4:30 p.m. on the day prior to the scheduled meeting date (OR dial 711 for Telecommunications Relay Service).
The City will attempt to accommodate any request depending on the amount of notice received.
*********************************************************************************************
In compliance with Wisconsin Open Meetings Law, this agenda was posted on 11/13/2026 at the following locations: Superior Government Center, Douglas
County Courthouse, Superior Public Library, and online at https://www.superiorwi.gov/agendacenter. It was also emailed to the Superior Telegram.
CIT COMMITTEE MINUTES
JULY 13, 2026 Regular Meeting
The meeting was called to order by Chair Elm at 5:01 pm on January 13, 2026 in Government Center Room 270.
COMMITTEE MEMBERS: Tylor Elm, Karly Caven, Dave Dusek, Dan Lindberg
1. ROLL CALL
Members Present: Tylor Elm, Dan Lindberg, Dave Dusek, Karly Caven
Members Absent:
City Staff Present: Dan Shea, Stephanie Becken, Justin Bernacki
Others Present:
2. APPROVAL OF MINUTES
2.1. CIT Committee (Meeting held January 15, 2026)
MOTION MADE BY DAVE DUSEK, SECONDED BY DAN LINDBERG AND
CARRIED TO APPROVE THE JANUARY 15, 2026 CIT COMMITTEE
MINUTES.
3. NEW BUSINESS
3.1 ConnectSuperior Update.
---Restoring for Phase 2 starting this week.
---ConnectSuperior Staff have been involved in community engagement at the Library,
July 4th Celebration and will do Bayside Sounds.
---Talked about a two-part build in 2027 and 2028.
---Would pass almost 9,000 homes after 2028.
3.2 REVIEW AND RECCOMMENT TO COUNCIL: WIN, LLC MASTER SERVICE
AGREEMENT AMENDMENT FOR NETWORK OPERATIONS SERVICES
---Right sizes us for hours and licensing.
---Extended contract from 24 to 48 months.
MOTION MADE BY DAVE DUSEK , SECONDED BY DAN LINDBERG AND
CARRIED TO APPROVE WIN, LLC MASTER SERVICE AGREEMENT
AMENDMENT FOR NETWORK OPERATIONS SERVICES
3.3 REVIEW AND RECOMMEND TO COUNCIL: MOU WITH DULUTHIAN
NETWORKS FOR FREE PUBLIC WI-FI
---Wi-Fi will only be available during Park Hours.
---City handles the pipe, ISP in charge of end-users at City-owned properties.
---Amendment: Branding for all connection pages and connection points will be shared
and agreed upon by both parties.
MOTION MADE BY DAN LINDBERG, SECONDED BY DAVE DUSEK AND
CARRIED TO APPROVE MOU WITH DULUTHIAN NETWORKS FOR FREE
PUBLIC WI-FI
4. RECURRING BUSINESS
4.1. None
5. ADJOURNMENT
Councilor Elm announced the meeting adjourned at 6:08 pm.
Respectfully submitted by Dan Shea.
Date: November 4, 2026 CIT Meeting Date: November 16, 2026
M E M O R A N D U M
TO: Members of the CIT Committee
FROM: Stephanie Becken, Broadband Manager
RE: Fiber Phase 3 Construction
RECOMMENDATION –It is the recommendation of IT Director Shea and ConnectSuperior
Broadband Manager Becken to award the Fiber Phase 3 Construction Contract to Hanco
Utilities, Inc. in the amount of $9,951,182.00. It is the recommendation of IT Director Shea and
ConnectSuperior Broadband Manager Becken to award.
INTRODUCTION – The City of Superior requested bids to build the necessary components to
expand the current high-speed Fiber-to-the-Premise (FTTP) Optical Network (XGS-PON)
communications Network within the City’s defined Service area and to prepare it to deliver
FTTP services. This Phase 3 is part of the plan to make optional, high-quality fiber connections
available to an additional 5,000 residences of the City of Superior.
BACKGROUND- The request for proposals was posted electronically to DemandStar.com, sent
to four Builder Exchanges, published twice in the Superior Telegram (September 12, 2026 &
September 19, 2026), listed on the City Bids website, and sent directly to several interested
contractors. Bid opening took place October 20th. The request for bids included a base bid and
four alternates. Due to one of the alternates being complicated by the 2027 bridge project start
based on the location of that alternate, only the base bid plus alternates 2, 3 and 4 are being
recommended for award.
Five bids were received. The project, which includes running conduit, fiber lines, and the
necessary technical materials past 5,000 residences and businesses, is anticipated to be
completed on or before September 30, 2027
Bids received:
Totals for Base Bid, plus alternates 2, 3, and 4:
Hanco: $9,951,182
Elexco Inc: $10,224,359.51
Michels: $11,400,700.64
MP Nexlevel: $12,563,954.04
Tjader & Highstrom Utility Services: $10,932,737.35
The bid documents were reviewed and analyzed by the City and found Hanco Utilities, Inc. to be
the lowest responsible bidder.
BUDGET SOURCE-This project is funded by budgeted funds in the 2027 CIP, ConnectSuperior
Revenue, and Bonding.
CONCLUSION - It is the recommendation to approve the agreement between the City of
Superior and Hanco Utilities, Inc. for the Phase 3 Fiber Construction including the Base bid, and
alternates 2, 3 and 4 in the amount of $9,951,182.00.
Hanco Elexco Michels Nexlevel Tjader
Base Bid: 7,637,460.84$ Base Bid: 8,156,592.08$ Base Bid: 8,802,846.05$ Base Bid: 9,711,843.84$ Base Bid: 8,603,795.78$
Alt 1 1,062,701.26$ 1,021,280.52$ 1,169,226.21$ 1,364,205.18$ 1,058,563.51$
Alt 2 1,219,344.13$ 1,096,276.97$ 1,369,047.91$ 1,478,914.32$ 1,234,562.48$
Alt 3 413,458.45$ 382,965.82$ 487,004.61$ 556,926.91$ 412,217.87$
Alt 4 648,075.20$ 588,524.64$ 741,802.07$ 816,268.97$ 682,161.22$
10,981,039.88$ 11,245,640.03$ 12,569,926.85$ 13,928,159.22$ 11,991,300.86$
CONTRACT VOLUME &
BIDDING DOCUMENT- 2026
Fiber Phase 3 Construction
Project
CITY OF SUPERIOR, WISCONSIN
IT Department
Dan Shea, Director
Bid #26-28-IT
Fiber Phase 3 2
Table of Contents
1. ADVERTISEMENT TO BID ............................................................................................ 3
2. INSTRUCTIONS TO BIDDERS ...................................................................................... 4
3. BID PROPOSAL ............................................................................................................... 8
4. SUBCONTRACTORS AND SUPPLIERS LISTING .................................................... 21
5. ADDENDA ACKNOWLEDGMENT ............................................................................. 22
6. BID BOND ...................................................................................................................... 23
7. BIDDER'S PROOF OF RESPONSIBILITY ................................................................... 24
8. AFFIDAVIT OF ORGANIZATION AND AUTHORITY ............................................. 26
9. AFFIDAVIT OF COMPLIANCE ................................................................................... 26
10. CONTRACT .................................................................................................................... 31
11. PERFORMANCE AND PAYMENT BOND .................................................................. 35
12. GENERAL SPECIFICATIONS ...................................................................................... 36
13. ENGINEER CERTIFICATION ....................................................................................... 45
14. SPECIAL PROVISIONS .................................................................................................. 46
15. CONTRACT CHANGE ORDER ..................................................................................... 47
Project Plan Set and Outside Plant Construction Specifications are to be obtained at the
following link:
https://media.superiordcgis.org/ftp/Superior/RFP/Fiber%20Phase%203%20Construction
%20Phase%20Documents/
Fiber Phase 3 3
1. ADVERTISEMENT TO BID
Fiber Phase 3 Construction Phase
Sealed bids will be received by the City of Superior, Attn: Contract Analyst, at 1316
North 14th Street - 2nd Floor, Suite 200, Superior, WI 54880. Bids will be publicly
opened and read aloud in the City offices as follows:
Bid Opening: Tuesday, October 20, 2026, at 2:00 PM CST
Bid Project: The City of Superior, Wisconsin is seeking bids from qualified contractors for
the Fiber Phase 3 Construction Project. The work under this project generally consists of
building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP)
Optical Network (XGS-PON) communications Network (the Project) within the City’s
defined service area and preparing it to deliver fiber-to-home services. The system shall be
a fully operations high-speed communications network supporting Internet protocol
technology and allowing users access to and from the Internet. Project to be completed by
September 30, 2027.
All bids must be prepared on the form provided and submitted in accordance with the
Instructions to Bidder.
Specifications may be obtained through the internet at www.DemandStar.com
or via the City of Superior’s web page. Bidding documents may be viewed at the City of
Superior, Government Center, 1316 North 14th Street - 2nd Floor, Superior, Wisconsin
(darwinj@superiorwi.gov), at the Minnesota Builders Exchange (mbex.org), Builders Exchange
of Wisconsin (bxwi.com), Northwest Regional Builders Exchange (nwrbx.com), and LaCrosse
Builders Exchange (laxbx.com).
The contractor shall submit a list of its subcontractors as a part of its proposal, which list
shall not be added to or altered without the written consent of the City of Superior, and as
specified in 66.0901 Wisconsin Statutes.
The City of Superior encourages the participation of women and minority owned
businesses.
The City of Superior reserves the right to reject any or all bids, to waive irregularities, or
to accept such bids, as in the opinion of the City, will be in its best interests.
Dan Shea
IT Director
Daily Telegram: Saturday, September 12, 2026, and Saturday, September 19, 2026
Fiber Phase 3 4
2. INSTRUCTIONS TO BIDDERS
2.1 Questions regarding this bid may be directed to the City of Superior as follows:
Project specifications: Nate Cockburn, Mi-Tech, ncockburn@mi-tech.us.
Bidding documents: Jane Darwin, Contract Analyst, darwinj@superiorwi.gov.
2.2 Method of Bidding: The only acceptable method of bidding a contract with the City of
Superior, Wisconsin, is described as follows and must be strictly complied with. The
City of Superior reserves the right to determine the low Bidder on the basis of the Base
Bid alone or the Base Bid plus any alternates or combinations of alternates or reject all
bids, at the City’s discretion. Bids shall be valid for 60 days. The City is tax exempt and
will provide the awarded bidder with a tax exemption form.
2.3 Bid Packet Components: Each item listed must be included with the bid submission. Do
not bind any documents (no staples).
a) Bidders must file a PROPOSAL OR BID on the form the City has prepared. (See BID
PROPOSAL Section 3.)
b) Bidders shall be required to submit a list of SUBCONTRACTORS AND SUPPLIERS
with their proposal in accordance with Section 66.0901(7), Wisconsin Statutes, and
subsequent amendments. Such list shall not be added to or altered without the written
consent of the City of Superior. (See SUBCONTRACTORS AND SUPPLIERS
LISTING Section 4.)
c) Bidders shall be required to submit an ADDENDA ACKNOWLEDGMENT with their
proposal. Such acknowledgment shall note acknowledgment of receipt of any and all
addenda. If no addenda were issued, the bidder shall indicate and sign document. (See
ADDENDA ACKNOWLEDGMENT Section 5.) It is the bidder's responsibility to obtain
all addenda.
d) The bidder must file, at the time of the opening of the bids, either a BID BOND or a
certified check in the amount of at least five percent (5%) of the total bid, conditioned
that if the bidder is successful bidder will, within the time allotted by the City, file a
properly executed contract and performance bond as per Wisconsin Statutes 62.15(3).
(See BID BOND Section 6.)
e) The bid proposal must have attached to it the BIDDER’S PROOF OF
RESPONSIBILITY identifying the bidder’s qualifications. (See BIDDER’S PROOF OF
RESPONSIBILITY Section 7.). Prospective bidders are required to furnish a statement
of financial ability, equipment and experience in the work prescribed in said public
contract in accordance with the provisions of Section 66.0901(2) of the Wisconsin
Statutes at the time of the opening of the bids. The object of the questionnaire and the
pre-qualification of bidders are to enable the City to have sufficient information regarding
financial ability, equipment and experience in order to reduce the hazards involved in
awarding contracts to parties not qualified to perform them and to select those contractors
qualified to properly complete the work proposed.
Fiber Phase 3 5
f) The bid proposal must have attached to it the AFFIDAVIT OF ORGANIZATION
AND AUTHORITY identifying a corporation, partnership or sole trader. The affidavit
must contain a sworn statement that the bidder has examined and carefully prepared the
proposal from the plans and specifications and has checked the same in detail per Section
66.0901 (7), Wisconsin Statutes. (See AFFIDAVIT OF ORGANIZATION &
AUTHORITY Section 8.)
g) The bid proposal must have attached to it the AFFIDAVIT OF COMPLIANCE
swearing compliance with the criteria set forth in the Responsible Contractor Criteria in
the City Code of Ordinances, Chapter 2, Article XII from the Contractor and all sub-
contractors. (See AFFIDAVIT OF COMPLIANCE Section 8).
h) The bid proposal packet shall be placed in an envelope and shall be sealed. ON THE
ENVELOPE SHALL BE, plainly written: the date of the bid opening, the title of the
project and the name of the bidder. Such envelope shall be addressed and delivered to:
The City of Superior, Attn: Contract Analyst, 1316 North 14th Street - 2nd Floor, Suite
200, Superior, Wisconsin, before the time and date specified for opening bids as listed on
the Advertisement to Bid.
i) Wisconsin’s Public Records Law creates a statutory presumption in favor of complete
access to public records and the City of Superior endeavors always to conduct its
municipal affairs in strict compliance with Wisconsin Statutes §§ 19.31-19.39. Any
entities or individuals who submit materials to the City of Superior in response to this
request should avoid submittal of any proprietary information.
2.4 Work Site and Contract Document Examination: Bidders must satisfy themselves, by
examination of the contract documents, the work site and the conditions and obstacles to
be encountered in the field, and by such other means as may be necessary, as to the
accuracy of the schedule of quantities of the work to be done and the intent of said
contract documents. After the submission of the proposal, no complaint or claim that
there was any misunderstanding as to the quantities, conditions or nature of the work will
be entertained and no extra compensation shall be allowed by reason of any matter or
thing concerning which such bidder might have informed himself prior to the bidding.
Upon award of bid, the Contractor must execute the required Performance and Payment
Bonds in the total amount of the bid. (see PERFORMANCE AND PAYMENT BONDS
Section 11.)
2.5 Time of Performance: When not otherwise specified, the bidder must state in the
proposal, the least number of calendar days (counting weekends and holidays), after date
to commence work given in the Notice to Proceed, in which bidder will start construction
and the number of calendar days (counting weekends and holidays), after date to
commence work given in the Notice to Proceed, in which bidder will fully complete the
work as specified. The bidder should make do allowance for all probable difficulties
which may be encountered. In the event of failure completing the work within the time
stated or otherwise specified, liquidated damages will be assessed as provided in the
specifications.
Fiber Phase 3 6
2.6 Quantities: The estimated quantities of the work are the result of careful calculations but
are not to be considered as final. Such estimates will be used as a basis for determining
the lowest bidder. After the contract is awarded, the quantity of work listed under any
item, or all items, may be increased or decreased according to the specifications at the
discretion of the City of Superior without in any way invalidating the bid price (see
CONTRACT CHANGE ORDER Section 15).
2.7 Bid Prices: Bidders must submit a bid price, in accordance with the specifications, for
each item of the job or branch, in compliance with the bidding units specified for the
quantities listed in the proposal. Bid prices must be written out in words and also entered
in figures. In case of conflict, the written word prices will prevail. Totals must be shown
based on unit cost and quantity. In case the figures do not match, the figure resulting in
the lower price shall be deemed the price intended and applicable.
2.8 Inadequacies and Omissions: The City of Superior will not be responsible for verbal
information or statements made by representatives of the Engineering Department, or any
other department for which work will be performed. Bidders shall bring any
inadequacies, omissions, or conflicts to the attention of the City of Superior before the
due date for bids. Prompt written clarification will be immediately supplied to all bidders
by Addenda before the due date for bids and each Addendum shall be acknowledged on
the Addenda Acknowledgment form. Failure to request clarification of any inadequacy,
omission or conflict will not relieve the Contractor of responsibility.
2.9 No Double Bidding: Two (2) or more proposals under different names will not be
accepted from one firm or association.
2.10 Partial Bidding: Bidders must quote on all items appearing on the bid forms unless
specific directions in the advertisement, on the bid form, or in the special specifications
allow for partial bids. Failure to quote on all items, unless specifically exempted as set
forth above, shall disqualify the bid. When quotations on all items are not required,
bidders shall insert the words "no bid" where appropriate.
2.11 Right of Waiver or Rejection: The City reserves the right to reject any or all bids or
waive any defects found in bids or proposals submitted.
2.12 Wage Rates: This Project is not subject to Prevailing Wage Rates.
2.13 Pre-Bid Conference: Tuesday, September 29, 2026, at 3:00 PM CST. In-person option:
Government Center, Room 204, 1316 N 14th, Superior, WI.
Virtual option: Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/246145852931206?p=eszelc7xz071FBxsWH
Meeting ID: 246 145 852 931 206 Passcode: sr6hX3rk
Dial in by phone +1 872-242-8028,,755338451# Phone conference ID: 755 338 451#
Fiber Phase 3 7
Deadline for questions is October 7, 2026, at 12:00 PM CST. All questions should be
emailed to the contacts listed in Section 2.1. The final addendum(s) will be issued by
October 12, 2026.
2.14 Contract Documents: Upon award of the bid the contract documents will consist of the
Advertisement to Bid, Instructions to Bidders, Bid Proposal, Subcontractors & Suppliers
Listing, Addenda Acknowledgment, Bid Bond, Bidder's Proof of Responsibility,
Affidavit of Organization & Authority, Contract, Affidavit of Compliance(s),
Performance and Payment Bond, Certificate of Insurance as required, General
Specifications, Special Provisions, Plan Set, and include all other herein bound
attachments and modifications thereof incorporated in the documents as prepared by the
City of Superior.
Fiber Phase 3 28
ORDINANCE #O20-4178
ORDINANCE INTRODUCED BY MAYOR JIM PAINE REPEALING SECTION 2,
ARTICLE XII PUBLIC WORKS PROJECTS AND RECREATING SECTION 2,
ARTICLE XII RESPONSIBLE CONTRACTOR CRITERIA
The Common Council of the City of Superior, Wisconsin, does ordain as follows:
SECTION 1. Chapter 2, Article XII, Public Works Projects of the City Code of Ordinances is
hereby repealed and recreated as follows:
ARTICLE XII. RESPONSIBLE CONTRACTOR CRITERIA
Section 2-468. Purpose. Pursuant to Wis. Stats. § 66.0901, whenever the city lets public work by
contract, the contract must be awarded to the lowest qualifi ed responsible contractor . What
constitutes a qu alified responsible contractor is a determination that requires the exercise of
discretion by the city and its departments, officials or employees under reasonably con sistent
responsible contractor criteria when exercising its discretion.
Section 2 -469. Definitions. In this section, the following definitions shall apply.
“Contractor” means a person, corporation, partnership or any other business entity that performs
work on a public works contract as a general contractor, prime contractor or subcontractor at any
tier.
“Apprenticeship program” means an apprenticeship program that is currently approved by the U.S.
Department of Labor or a state apprenticeship agency and has graduated apprentices to
journeyperson s tatus for three years.
“Public works contract” means a contract for the construction, alteration, execution, repair,
remodeling or improvement of a public work or building, where the contract is in excess of
$25,000 and is require d to be bid pursuant to Wis. Stats. § 59.52(29).
“Qualified contractor (Bidder)” means a person, corporation, partnership or any other business
entity that meets the requirements specified in this ordinance as well as the criteria specified in
Wis. Stats. 16.855 (9m) (b) (1) (a & b )
Section 2-470 Responsible Contractor Criteria. In order to be a qualified responsible
contractor for purposes of being awarded a public works contract, the contractor must meet the
following criteria.
a) The contractor maintains a permanent place of business.
b) The contractor is authorized to do business in the State of Wisconsin.
Fiber Phase 3 29
c) The contractor, or agent, partner, employee or officer of the contractor, is not
debarred, suspended, proposed for debarment or declared ineligible from contracting
with any unit of federal, state or local government.
d) The contractor is in compliance with provisions of Section 2000e of Chapter 21,
Title 42 of the United States Code and Federal Executive Order No. 11246 as
amended by Executive Order No. 11375 (known as the Equal Opportunity Employer
provisions).
e) The contractor has general liability, workers’ compensation, automobile insurance
and unemployment insurance.
f) The contractor has complied with all provisions of any prevailing wage laws and
federal Davis-Bacon related Acts, and the rules and regulations therein, for projects
undertaken by the contractor that are covered by these laws, for the past five (5)
years.
g) The contractor participates in an apprenticeship program as referred in section 2-
46 9, if the contractor employs more than two (2) employees.
h) The contractor has a written substance abuse prevention program meeting the
requirements of Wis. Stat. §103.503.
i) The employees who will perform work on the project are properly classified as
employees or independent contractors under all applicable state and federal laws.
j) The contractor has not been the subject to any investigation, order or judgement
regarding the construction industry from a state or federal agency or court concerning
an employment practice, including but not limited to, classification of employees,
unemployment insurance, discrimination or payroll fraud. If the contractor has been
the subject of any of the aforementioned, the contractor must provide copies of the
investigation, order or judgement and may be disqualified.
k) The contractor’s employees who will perform work on the project are:
1) Covered under a current workers’ compensation policy; and properly
classified under such policy.
2) Covered under a current health insurance policy as required by federal or
state law.
l) The contractor possesses all applicable professional and trade licenses required
for performing the public works.
m) The contractor has adequate financial resources to complete the public works
contract, as well as all other work the bidder is presently under contract to complete.
n) The contractor is bondable for the terms of the proposed public works contract.
Fiber Phase 3 30
o) The contractor has a record of meeting the criteria which will be considered in
determining satisfactory completion of projects and may include, but are not limited
to:
1) Completion of contracts in accordance with drawings and specifications;
2) Diligent execution of the work and completed contracts according to the
established time schedules unless extensions are granted by the owner; and
3) Fulfilled guarantee requirements of the contract documents.
p) The contractor has, and diligently maintains, a written safety program.
Section 2-471. No Restriction on Discretion. If information other than what was disclosed by
the contractor in section 2-470 is discovered by the city or the department, official or employee
responsible for awarding the public works contract, and such information calls into question the
contractor’s abilities or competence to faithfully and responsibly comply with the terms of a
public works contract, that information shall be considered in determining whether the contractor
is a qualified responsible contractor.
Section 2-472. Affidavit of Compliance.
In the event a construction management company is to administer the said contract with
general contractors, prime contractors or subcontractors of any tier, the construction
management firm shall ensure all the rules and regulations contained in this Responsible
Contractors Ordinance are followed by all contractors of any tier.
The general, prime contractor, or sub-contractor of any tier bidding on a public works
project must include in its sealed bid:
a) Its own affidavit swearing compliance with the criteria set forth in section 2-
470 on the form required by city; and
b) An affidavit swearing compliance with the criteria set forth in section 2-470 on
the form required by the city from every subcontractor at any tier who wi ll perform
work on the project.
Failure to submit the required affidavit, or providing incorrect, false, or misleading information
may disqualify the contractor’s bid.
SECTION 2. All ordinances and parts of ordinances conflicting with this ordinance are hereby
repealed.
SECTION 3. This ordinance shall be in full force and effect from and after its passage and
publication.
Fiber Phase 3 31
10. CONTRACT
Fiber Phase 3 Construction Phase
10.1 Preamble
This contract made this ___ day of ____ 2026, by and between Hanco Utilities, Inc.,
located at 128 N 21st Street, Superior, Wisconsin, herein called "Contractor", and the City of
Superior, a municipal corporation, located in Douglas County, Wisconsin, herein called
"Owner".
WITNESSETH, that the Contractor and Owner for the consideration stated herein, agree
as follows:
10.2 Article I - Scope of Work
The Contractor shall perform everything required to be performed and shall provide and
furnish all the applicable labor, materials, equipment, necessary tools, expendable equipment,
insurance provided by the specifications, contributions to social security and all utility and
transportation services required to perform and complete in a workmanlike manner the following
work:
Bid Project: Fiber Phase 3 Construction Phase
All work shall be in strict compliance with the Contractor's proposal and other contract
documents, herein mentioned as component parts of this contract.
10.3 Article II - Contract Price
The Owner shall pay the Contractor for the performance of this contract an amount based
upon the unit prices contained in the proposal for the actual measured quantities of work done or
lump sum as proposed for the base bid, plus alternates 2, 3 and 4, for a not to exceed total of nine
million, nine hundred fifty-one thousand, one hundred eighty-two dollars ($9,951,182.00).
Contractor shall not be entitled to payment for work found deficient or failing to conform
to the requirements set forth in this agreement and is not entitled to further payments until
corrected to the satisfaction of the Director of IT at the cost of the Contractor. The City will
inform the Contractor of any deficiencies and/or items that do not conform to this contract within
thirty (30) days of receipt.
Unless otherwise provided in the special provisions, payments are to be made to the
Fiber Phase 3 32
Contractor within 30 days of receipt of an approved payment application/invoice on the basis of
written approval of estimates by the Owner of the value of the work performed during the
preceding billing period. However, in accordance with 66.0901(9) Wisconsin Statutes, the
owner will retain five percent (5%) of the amount of each payment application request. At final
acceptance of the work, all retainage will be released.
Submission of a final payment application/invoice shall be accompanied by applicable
payroll reports and final unconditional lien waivers (from all sub-contractors and suppliers) to
the Owner. Prior to release of final payment, the IT Department shall review project documents
submitted by Contractor to determine the satisfaction thereof; it will be at the IT Department’s
sole discretion when the final payment is made. Final payment will be made to Contractor
within thirty (30) days of the City’s acceptance of services as complete.
The Owner, in case the work under this contract is not completed within the time required
or within an extended time approved in writing by the Owner, is authorized to take charge of the
work and finish it at the expense of the Contractor and his sureties, and to apply the amount
retained from estimates to the completion of the work.
10.4 Article III - Component Parts of this Contract
This contract consists of the following component parts, all of which are as fully a part of
it as if set out verbatim herein, or if not attached, as if the same were hereto attached:
1. Advertisement to Bid
2. Instructions to Bidders
3. Bid Proposal
4. Subcontractors & Suppliers Listing
5 Addenda Acknowledgment and all addenda
6. Bid Bond
7. Bidder's Proof of Responsibility
8. Affidavit of Organization and Authority
9. Affidavit of Compliance from Contractor and all Sub-Contractors
10. Contract
11. Certificate of Insurance
12. Performance and Payment Bond
13. General Specifications
14. Engineer’s Certificate
15. Special Provisions
16. Contract Change Order
17. Additional Attachments per Index (as applicable)
The contract documents form a complete unit and requirements called for by one are as
binding as if called for by all. In cases of conflict between plans and specifications, the
specifications shall govern. Special Provisions shall control over General Specifications.
Fiber Phase 3 33
10.5 Article IV - Payment for Labor & Materials
The Contractor specifically agrees to pay for all claims for labor performed for this
project and materials furnished, used and consumed in completing the foregoing contract,
together with all items enumerated in Section 779.035, of the Wisconsin Statutes, as the
obligation of the Contractor. No assignment, modification or change in the contract, or change in
the work covered thereby, or any extension of time for completion of the contract shall release
the sureties on the bond.
10.6 Article V – Insurance
Within ten (10) days after the execution of the contract, and prior to commencement of
any work, the Contractor shall file with the Owner, satisfactory evidence of having adequate
worker’s compensation insurance and public liability insurance, both personal and property, as
outlined in the General Specifications, section 12.3.
10.7 Non-Discrimination
Upon execution of this Agreement, Contractor agrees as follows:
Contractor and all Subcontractors do not discriminate against any employee, applicant for
employment, independent contractor, or any other persons because of race, color, religion, sex,
sexual orientation, gender identity, or national origin.
10.8 Authority
The Contractor represents that it has the authority to enter into this Agreement. If the
Contractor is not an individual, the person(s) signing on behalf of the Contractor represents and
warrants that they have been duly authorized to bind the Contractor and sign this Agreement on
the Contractor's behalf.
10.9 Signatures
In Witness Whereof, the parties intending to be legally bound have executed this
agreement the day and year set forth above.
SIGNED AND SEALED: COMPANY: Hanco Utilities, Inc.
ADDRESS: 128 N 21st St, Superior, WI 54880
PHONE: 715-392-2626
Melissa Cottew, President Jeff Bright, Director of Operations
Fiber Phase 3 34
ATTEST: CITY OF SUPERIOR, WISCONSIN
Jim Paine, Mayor Heidi Blunt, City Clerk
Nicholas Rhinehart, Finance Director Frog Prell, City Attorney
Provision has been made to
pay the liability that will
accrue under this contract.
Approved by the Superior Common Council on:
Fiber Phase 3 35
11. PERFORMANCE AND PAYMENT BOND (Sample)
AIA Document A312™ - 2010 Performance and Payment Bond is th e preferred document.
All other bonds must be approved by the City.
KNOW ALL MEN BY THESE PRESENTS THAT
of , and as
principal, and of , a corporation
and existing under the laws of the State of Wisconsin (hereinafter called Asurety@), as surety are held and
firmly bound unto the City of Superior, a municipal corporation, of the State of Wisconsin, in the penal sum
of $ Dollars, good and lawful money of the United States of America, to be paid to the City
of Superior, Wisconsin, its duly authorized attorneys, agents, officers, successors and assigns for which
payment, well and truly to be made, we bind ourselves, our heirs, administrators, executors, successors and
assigns, jointly and severally firmly by these presents.
WHEREAS, the above bound principal has entered into a certain written contract with the City of
Superior, Wisconsin, dated this day of , 20___, which contract is hereby
referred to and made a part hereof as fully and to the same extent as if copied at length herein.
NOW, THEREFORE, the condition of the above obligation is such that if the above bound principal
shall well and truly keep, do and perform each and every matter and thing in said contract set forth and
specified to be by the said principal kept, done and performed at the time and in the manner in said contract
specified, and shall pay over, make good and reimburse to the aforenamed City, all loss and damage which
said City may sustain by reason of failure or default on the part of said principal and shall pay to every person
entitled thereto all claims for labor performed and materials furnished, used or consumed in performing the
work provided in said contract including, without limitation because of enumeration, fuel, lumber, building
materials, machinery, vehicles, tractors, equipment, fixtures, apparatus, tools, appliances, supplies, electric
energy, gasoline, motor oil, lubricating oil, greases, state imposed taxes, premiums for worker’s compensation
insurance and contributions for unemployment compensation, then this obligation shall be void; otherwise, it
shall be and remain in full force and effect.
Contractor
Representative
Title
Insurance Company
Representative
Attest:
Fiber Phase 3 36
12. GENERAL SPECIFICATIONS
12.1 GENERAL
Unless otherwise stated, all work and conditions of this contract shall be performed in
accordance with the State of Wisconsin Department of Transportation (WisDOT), Standard
Specifications for Highway and Structure Construction (including erosion control), Current
Edition and current Supplemental Spe cifications, or in accordance with the Wisconsin
Department of Safety and Public Services.
State, Federal and/or grant funds may be used to fund all or part of this contract. The
City will not be held liable for any damages incurred due to changes in State, Federal or
grant funding, including (but not limited to) a reduction or cancellation of the project.
12.2 SUBSTITUTIONS
The following terms shall be substituted in the specifications:
a. “Owner” or “City” is the City of Superior.
b. “Engineer” is the Contracted Engineer/Architect for the City of Superior or the City
Engineer assigned to the project.
12.3 INSURANCE REQUIREMENTS
The Contractor shall not commence work on contract until proof of insurance required has
been provided to the applicable department before the contract or purchase order is considered
for approval by the City.
It is hereby agreed and understood that the insurance required by the City is primary coverage
and that any insurance or self-insurance maintained by the City, its officers, council members,
agents, employees or authorized volunteers will not contribute to a loss. All insurance shall be
in full force prior to commencing work and remain in force until the entire job is completed
and the length of time that is specified, if any, in the contract or listed below whichever is
longer.
CONTRACTOR—LIABILITY
A. Commercial General Liability coverage at least as broad as Insurance Services Office
Commercial General Liability Form, including coverage for Products Liability, Completed
Operations, Contractual Liability, and Explosion, Collapse, Underground coverage with the
following minimum limits and coverage:
1. Each Occurrence limit $1,000,000
2. Personal and Advertising Injury limit $1,000,000
Fiber Phase 3 37
3. General aggregate limit (other than Products-Completed
Operations) per project $2,000,000
4. Products-Completed Operations aggregate $2,000,000
5. Fire Damage limit — any one fire $50,000
6. Medical Expense limit — any one person $5,000
7. Products - Completed Operations coverage must be carried for two years after
acceptance of completed work.
B. Automobile Liability coverage at least as broad as Insurance Services Office Business
Automobile Form, with minimum limits of $1,000,000 combined single limit per accident for
Bodily Injury and Property Damage, provided on a Symbol #1- "Any Auto" basis.
C. Workers' Compensation as required by the State of Wisconsin, and Employers Liability
insurance with sufficient limits to meet underlying Umbrella Liability insurance requirements.
If applicable for the work coverage must include Maritime (Jones Act) or Longshoremen's and
Harbor Workers Act coverage.
Provide a waiver of subrogation in favor of the City for the workers’ compensation.
D. Umbrella Liability providing coverage at least as broad as the underlying Commercial
General Liability, Automobile Liability and Employers Liability, with a minimum limit of
$2,000,000 each occurrence and $2,000,000 aggregate, and a maximum self-insured retention
of $10,000. The umbrella must be primary and non-contributory to any insurance or self-
insurance carried by the City.
E. Builder's Risk / Contractor's Equipment or Property - The contractor is responsible for loss
and coverage for these exposures. City will not assume responsibility for loss, including loss of
use, for damage to property, materials, tools, equipment, and items of a similar nature which
are being either used in the work being performed by the contractor or its subcontractors or
are to be built, installed, or erected by the contractor or its subcontractors.
INSURANCE REQUIREMENTS FOR SUBCONTRACTOR
All subcontractors shall be required to obtain Commercial General Liability (if applicable
Watercraft liability), Automobile Liability, Workers' Compensation and Employers Liability,
(if applicable Aircraft liability) insurance. This insurance shall be as broad and with the same
limits as those required per Contractor requirements, excluding Umbrella Liability, contained
in Section 1 above.
APPLICABLE TO CONTRACTORS / SUBCONTRACTORS /
SUB-SUB CONTRACTORS
A. Primary and Non-contributory requirement - all insurance must be primary and non-
contributory to any insurance or self-insurance carried by City.
Fiber Phase 3 38
B. Acceptability of Insurers - Insurance is to be placed with insurers who have an A.M. Best
rating of no less than A- and a Financial Size Category of no less than Class VII, and who
are authorized as an admitted insurance company in the state of Wisconsin.
C. Additional Insured Requirements - The following must be named as additional
insureds on all Liability Policies for liability arising out of project work – City of
Superior, and its officers, council members, agents, employees and authorized volunteers.
On the Commercial General Liability Policy, the additional insured coverage must be ISO
form CG 20 10 07 04 and also include Products - Completed Operations additional
insured coverage per ISO form CG 20 37 07 04 or their equivalents for a minimum of 2
years after acceptance of work. This does not apply to Workers Compensation Policies.
D. Deductibles and Self-Insured Retentions - Any deductible or self-insured retention must
be declared to and approved by the City.
E. Evidences of Insurance - Prior to execution of the agreement, the Contractor shall file
with the City a certificate of insurance (Accord Form 25-S or equivalent) signed by the
insurer's representative evidencing the coverage required by this agreement. In addition,
form CG 20 10 07 04 for ongoing work exposure and form CG 20 37 07 04 for products-
completed operations exposure must also be provided or its equivalent.
Such liability policies shall contain a provision or endorsement covering any contingent
liability of the City of Superior. The City is to be shown as “additionally insured” and
the project is to be listed on the certificate. The naming of said entities as Certificate
Holders will not be acceptable. Certificates of worker's compensation and personal and
public liabilities, along with the provision indemnifying the City of Superior must be
submitted by the successful bidder.
12.3.5 IDEMNIFICATION
Contractor hereby agrees to indemnify, defend and hold harmless the City its elected and
appointed officials, officers, employees, agents, representatives and volunteers, and each of
them, from and against any and all suits, actions, legal or administrative proceedings, claims,
demands, damages, liabilities, interest, attorneys' fees, costs, and expenses of whatsoever kind
or nature in any manner directly or indirectly caused, occasioned, or contributed to in whole or
in part or claimed to be caused, occasioned, or contributed to in whole or in part, by reason of
any act, omission, fault, or negligence, whether active or passive, of Contractor or of anyone
acting under its direction or control or on its behalf, even if liability is also sought to be
imposed on the City, its elected and appointed officials, officers, employees, agents,
representatives and volunteers.
The obligation to indemnify, defend and hold harmless the City, its elected and appointed
officials, officers, employees, agents, representatives and volunteers, and each of them, shall be
applicable unless liability results from the sole negligence of the City, its elected and appointed
Fiber Phase 3 39
officials, officers, employees, agents, representatives and volunteers.
Contractor shall reimburse the City, its elected and appointed officials, officers, employees,
agent or authorized representatives or volunteers for any and all legal expenses and costs
incurred by each of them in connection therewith or in enforcing the indemnity herein
provided. In the event that Contractor employs other persons, firms, corporations or entities
(subcontractor) or volunteers as part of the work covered by this Agreement, it shall be
responsibility of the contractor to require and confirm that each sub-contractor enters into an
Indemnity Agreement in favor of the City, its elected and appointed officials, officers,
employees, agents, representatives and volunteers, which is identical to this Indemnity
Agreement.
This indemnity provision shall survive the termination or expiration of this Agreement.
12.4 PERFORMANCE AND PAYMENT BONDS
Contractor shall exec ute and furnish completed PERFORMANCE AND PAYMENT
BONDS in the total amount of the approved bid, to be supplied to the Owner along with the
required signed contract documents . AIA Document A312™ - 2010 is the preferred
Performance and Payment Bond documents.
12.5 LICENSES, PERMITS AND APPROVALS
The Contractor warrants that he is properly licensed and possesses all the necessary
qualifications as required by the federal, state and local laws, ordinances, regulations, etc.
prior to commencing work, and shall remain in good standing for the duration of the project.
The Contractor is responsible for all local, state, and federal permits and approvals which
may apply to this project. The fees for local permits will be waived upon receipt of
application of such permits, and it is noted that the permit late fee of $750.00 per permit will
be the financial responsibility of contractor. Normal local inspections will be required,
including final inspection of the project by the applicable local departments. The Contractor
shall give all notices required by law and comply with all laws, statutes, ordinances, rules
and regulations that affect the conduct and prosecution of the project. The Contractor shall
be liable for all violations of the law in connection with work furnished by the Contractor. If
Contractor performs any work that it knew or should have known to be contrary to such
laws, statutes, ordinances, rules, and regulations and without giving notice to the City, the
Contractor shall be responsible for all costs arising therefrom.
The City will consider no plea of misunderstanding or ignorance of these requirements.
Fiber Phase 3 40
12.6 OBSTRUCTION OF STREETS AND SIDEWALKS
The Contractor shall promptly remove any dirt or debris which is caused by its performance
of this contract and clean all streets, sidewalks, alleys, and public property which are soiled
by Contractor’s actions or omissions. If the Contractor shall, in any manner, obstruct a street
or sidewalk or other public grounds, they shall erect, install, maintain and pay for barriers
and lights to prevent accidents and shall be liable for damages caused by the obstruction and
for any damage or disruption to streets, alleys or public grounds which may result from the
Contractor’s carelessness in the prosecution of such work in accordance with Section 62.15
(11) of the Wisconsin Statutes. The Contractor shall also be bound by any further
requirements of the specifications on this point.
12.7 PROSECUTION AND PROGRESS
Prosecution and Progress shall be accomplishe d in accordance with WisDOT Standard
Specifications Current Edition , Section 108, unless otherwise set forth in the Special
Provisions.
Upon receipt of "Notice to Proceed" from the Owner, work under this contract shall
commence immediately and be completed by September 30, 2027.
12.8 COORDINATION OF CONTRACTORS
The City may award or may contract for additional work outside the scope of this contract.
The Contractor shall fully cooperate with any other Contractor, City employee, Engineer, or
designated representative of the City, by scheduling its own work with that to be performed
under other Contracts as may be directed by the City. The Contractor shall not commit or
permit any act which will interfere with the performance of any other Contractor, agent, City
employee, engineer or designated representative as scheduled.
Employees of the Contractor must be able to work within a public setting without
creating a disruption and conform to all policies, rules and regulations. Contractors will
require that their employees be courteous at all times, not to use loud or profane
language, and to work as quietly as possible. The contractor will require that its
employees shall not trespass, loiter, cross property to adjoining premises, or tamper with
property not covered by the contract.
The contractor agrees to observe and obey all applicable laws, ordinances, rules and
regulations promulgated and enforced by the City and by any other proper authority
having jurisdiction over the work performed herein.
Special Conditions Where special conditions or special purposes require the
consideration of deviations from these specifications, any such deviations must be
Fiber Phase 3 41
authorized by the Owner.
12.9 CHANGE ORDERS
Any change to the signed contract must be approved by Owner, in writing, prior to t he
commencement of the change (see C ONTRACT CHANGE ORDER, Section 15 ). All
changes/amendments/addition/ deletions to the original contract must be described on the
Contract Change Order form with necessary increase/decrease in contract price indicated.
Change orders will need to include any invoices and supporting documents. These changes
will include applicable project extension time requests. Form is to be numbered sequentially
and is to be signed by the Contractor and approved by the Owner before proceeding to
execute the work. Verbal directions, approvals, conversations or agreements are not
permitted in lieu of a written Change Order.
Any work conducted outside of the scope of the contract, or in addition to the contract
and not authorized through a written Change Order is at the Contractor’s sole cost and
expense.
12.10 TIME PENAL TIES
Should the Contractor fail to complete the work within the time agreed upon under section
12.7 above, or within such extra time as may be allowed by extensions at the discretion of
the Owner , there shall be deducted from any monies due or that may become due the
Contractor, for each and every calendar day that the work shall remain uncompleted, a sum
assessed as specified in WisDOT Standard Specifications Current Edition , 108.11
Liquidated Damages of the State of Wisconsin Department of Transportation (WisDOT),
Standard Specifications for Highway and Structure Construction (including erosion control),
Current Edition and current Supplemental Specifications, except that this sum shall be
considered a penalty, a fixed and agreed-to-sum due the City from the Contractor by reason
of inconvenience to the public, added cost of engineering and supervision, maintenance of
detours and other items resulting from the Contractor’s failure to complete the work within
the time specified in the contract. If the penalties exceed the balance of monies that would
otherwise have been due the contractor, the Contractor or the Contractor’s Surety shall be
responsible for payment of all such penalties to the Owner as liquidated damages.
12.11 GUARANTEE/WARRANTEE
The Contractor shall assume responsibility for all defects which may develop in any part of
the bid project caused by faulty workmanship, material or equipment and agrees to replace
any such faulty workmanship, material and equipment, during the period of two (2) years
from date of final acceptance of the work without cost to the Owner. Contractor shall
coordinate any manufacture’s warrantees for the Owner during the two-year period, without
any cost to the Owner.
Fiber Phase 3 42
Acceptance of the plan shall not waive this guarantee/warrantee. Final acceptance shall be
determined as date of letter from Owner or Engineer approving final payment. The
contractor is responsible for coordinating manufacturer warrantee replacements should
problems arise in the guarantee period. The guarantee/warrantee period shall begin upon
contractor receipt of final payment, unless otherwise agreed upon in writing by the Owner.
12.12 AS-BUIL TS and WARRANTY DOCUMENTS – as applicable
Within ten (10) days of substantial completion and prior to final payment by the Owner, the
Contractor is to supply the Owner with project “as-builts” and all product warranty
information. As-builts must be submitted in CAD, GIS or adobe file format or other format
agreed upon by Owner.
12.13 CONTROL OF THE WORK – as applicable
Control of the work shall be accomplished in accordance with WisDOT Standard
Specifications Current Edition, Section 105 except as modified below:
Construction staking and providing grade and line is the responsibility of the Contractor.
Contractor shall use a Laser Beam to control and maintain line and grade of pipe. Grade
boards, banjo strings, etc. will not be acceptable. The Contractor shall furnish the engineer a
complete set of surveyor’s notes showing as-built flow lines.
The Contractor shall, before proceeding to another phase of construction, have approval of
the engineer. The phases shall be: excavation, grade and line, la ying of storm pipe,
backfilling, surface replacement and site restoration, as applicable.
MANY UTILITY OWNERS HAVE EXISTING FACILITIES NEAR OR AT THE
LOCATION OF THE WORK REQUIRED UNDER THIS CONTRACT. The Contractor
shall contact Diggers Hotline at 1-800-242-8511 to determine locations are safe and will
make any adjustments recommended by the locator prior to performing any excavation
operations under this contract.
12.14 SCOPE OF WORK
The scope of work for this project shall be in accordance with WisDOT Standard
Specifications Current Edition , Section 104, unless otherwise set forth in the Special
Provisions.
The Contractor shall be responsible for the maintenance of traffic. The Contractor shall
provide, erect, and maintain all barricades.
Fiber Phase 3 43
12.15 LEGAL RELATIONS AND RESPONSIBILITY TO THE
PUBLIC
The Contractor shall fulfill all legal relations and responsibilities to the public in accordance
with WisDOT Standard Specifications Current Edition, Section 107 and as follows:
The Contractor shall work in cooperation with utility companies in the protection of water
and gas mains and other utilities that may be within the limits of construction. It shall be the
duty of the Contractor to notify the utility company or companies involved before starting
work on this project.
All necessary work of adjus ting any underground relocation will be performed by their
owners, unless otherwise shown on the plans. The work to maintain and/or adjust these
utilities shall be considered incidental to the project.
The Superior Water, Light and Power Company will relocate any power poles or fire
hydrants during construction operations, unless otherwise noted in the special provisions or
if a cooperative agreement is established with Superior Water, Light and Power Company.
The City of Superior has authority over all sanitary and storm sewers. The Superior Water,
Light and Power Company will adjust all water shutoffs and gas shutoffs during
construction.
12.16 SAFETY AND SECURITY
The Contractor shall at all times perform in a safe and workmanlike manner to avoid injury
or damage to any person or property. The Contractor shall comply with all requirements and
specifications relating to the safety, health and sanitation measures applicable to the project.
The Contractor shall exercise all necessary precautions for the safety of its employees, and
be in compliance with all applicable federal, state and local laws, statutes, ordinances, rules
and regulations, including , but not limited to, the Wisconsin Labor Code, The U.S.
Department of Transportation Omnibus Transportation Employee Testing Act, and OSHA
standards.
The contractor shall provide all necessary safeguards, devices and protective equipment,
including but not limited to ad equate life protection and life saving equipment, and shall
ensure the proper inspection and maintenance of safety measures are current and in
compliance.
The City may halt construction on any project where appropriate safety measures and
equipment are not being used, or any safety regulations are not being followed. Work will
not be permitted to resume until required safety provisions have been made and delays as a
result of this provision will not be considered a basis for an increase in the contract price or
Fiber Phase 3 44
an extension of the completion deadline.
12.17 PRE-CONSTRUCTION CONFERENCE
A preconstruction conference will be scheduled by the Owner or the Engineer prior to work
commencing.
12.18 PROJECT DOCUMENT SUBMISSIONS
As a condition of final payment, the following documents must be submitted and accepted by the
City:
a. Lien waivers – final unconditional lien waives from each sub-contractor and/or supplier
must be submitted to the City.
b. As-builts & product warranties – as noted in Section 12.12, these documents must be
submitted to City.
c. Retainage – Contractor’s final invoice is to indicate the balance of work completed
and/or the total amount of retainage due the Contractor.
d. Local inspections – final inspection reports must be submitted to the City.
e. Project completion documentation – written documentation from the project engineer
confirming the completion of the project.
Fiber Phase 3 45
13. ENGINEER CERTIFICATION
See page 1 of project plans at the following link:
https://media.superiordcgis.org/ftp/Superior/RFP/Fiber%20Phase%203%20Construction%20Pha
se%20Documents/
Fiber Phase 3 46
14. Special Provisions
See special provisions at the following link:
https://media.superiordcgis.org/ftp/Superior/RFP/Fiber%20Phase%203%20Construction%20Pha
se%20Documents/
Fiber Phase 3 47
15. CONTRACT CHANGE ORDER
Change Order No._______________________________
Contractor: Name______________________________
Address____________________________
Item
No.
Description of Change
DECREASE
in contract price
INCREASE
in contract price
- - - -
Total DECREASE in contract price
XXXXXXXXXX
- - - -
Total INCREASE in contract price
XXXXXXXXXX
- - - -
NET decrease/increase in contract price
-
+
The current contract total is $ . The sum of $ is
hereby added to/deducted from the total contract price and the total adjusted contract price is thereby
$ .
Change orders over $5,000.00: City Finance Department Initial:_________
The time provided for completion of the contract is (check one):
_ unchanged
increased by calendar/working days
decreased by calendar/working days
Necessity for change:
This document shall become an amendment to the contract, and all provisions of the contract will
apply hereto.
Change order recommended by: Date:_____________
(City, Company, engineer, contractor - circle one)
Change order accepted by: Date:______________
(contractor)
Change order approved by City of Superior: Date:___________
Date: November 1, 2026 CIT Meeting Date: November 16,
2026
M E M O R A N D U M
TO: Members of the CIT Committee
FROM: Stephanie Becken, Broadband Manager
RE: Fiber Phase 3 Construction Oversite & Engineering
RECOMMENDATION – It is the recommendation of IT Director Shea and ConnectSuperior
Broadband Manager Becken to waive additional bidding requirements and extend the Fiber
Phase 3 Construction Professional Services Agreement with Mi-Tech Services, Inc. in an amount
not to exceed $335,490, to include construction oversight services for the 2027 fiber
construction.
BACKGROUND - The Fiber Phase 3 Construction project, which includes running conduit,
fiber lines, and the necessary technical materials past roughly 5,000 residences and businesses, is
anticipated to begin in spring of 2027 and be completed on or before September 30, 2027.
The Superior Common Council approved the agreement with Mi-Tech Services, Inc, on
September 15, 2026, for the engineering and designing of the plans for Fiber Phase 3-which
included for the Fiber Phase 3 project. This would be an amendment to the existing design
agreement to extend their services. It is requested to Waive additional bidding processes and
continue the efficient deployment of the fiber network to include the oversight services for the
fiber Phase 3 construction phase. Mi-Tech will be able to provide consistent oversight to the
project as they are the design team for Phase 3. Mi-Tech has proven to be an effective and
efficient partner throughout the fiber construction phases.
Under the Code of Ordinances for the City of Superior, Administration, Chapter 2, Article IX,
Sec 2-380(6) Procedure for purchase of services: Nothing in this article shall prohibit the
common council from accepting a proposal other than the lowest cost proposal, rejecting all
proposals, requiring resubmission of proposals or authorizing a contract for services without
requesting proposals.
BUDGET SOURCE - This project is funded by Council funding through CIP, ConnectSuperior
Revenue, and Bonding.
CONCLUSION - Mi-Tech Services, Inc has proven to be an effective partner in design and
oversite. It is recommended the bidding process be waived and to extend the existing agreement
with Mi-Tech Services, Inc. and be amended to include construction management and inspection
services of Fiber Phase 3 Construction.
1
1
Amendment IV
To the
Professional Engineering Services Agreement
Between
The City of Superior
And
Mi-Tech Services, Inc.
This Amendment made this ____ day of _______ 2026, between Mi-Tech Services Inc.,
(herein known as ‘Consultant’), and the City of Superior, a municipal corporation,
through its Information Technology Department (herein known as ‘City’) are Parties to
an Agreement dated November 20, 2024, for the ConnectSuperior Fiber Phase 2
engineering services.
Both Parties desire to amend the Agreement as follows:
Scope
Consultant services to include the attached Exhibit A to this Amendment V, for
professional oversight services requested by the City of Superior for the Fiber Phase 3
construction project.
Services and Fees
Costs of this Amendment shall be full compensation for services performed or services
rendered and for all labor, materials, supplies, equipment, incidentals, applicable taxes,
fees, and applicable expenses, necessary to complete the services for a not to exceed
amount of three hundred thirty-five thousand, four hundred ninety dollars ($335,490.00).
All other expenditures shall be the sole responsibility of the Consultant.
Term
The term of this agreement shall be from the date of this Amendment through December
31, 2027, or completion of the scope of work.
Changes to services and/or fees that are agreed to by both parties shall be acknowledged
in an amendment signed by both parties.
All other terms and conditions of this agreement remain in full force and effect.
The parties, intending to be legally bound, have executed this amendment on the day and
year set forth above.
2
Signatures
Name: Mi-Tech Services, Inc.
Address: 817 Main Street
Brownsville, WI 53006
_____________________________
Tim Babich, President
_______________________________
Ron Mitchell, Senior Vice President
ATTEST: CITY OF SUPERIOR, WISCONSIN
______________________________ ___________________________________
Jim Paine, Mayor Heidi Blunt, City Clerk
______________________________ ___________________________________
Nicholas Rhinehart, Finance Director Frog Prell, City Attorney
Provision has been made to
pay the liability that will
accrue under this contract.
Approved by the Superior Common Council on:
3
Exhibit A, Amendment V
The Consultant is to provide additional professional oversight services for the
ConnectSuperior Fiber Phase 3 construction phase.
Statement of work:
Proposed Oversight Staffing
Primary Oversight Team
· Two (2) Full-time Construction Inspectors
· 50 hours per week, per inspector
· Project duration: Mid-April 2027 through October 29th, 2027
This staffing level is intended to provide continuous field oversight of construction
activities, contractor coordination, quality assurance, safety observations, progress
tracking, and daily reporting throughout the duration of the project – as previously
done on Phase 1 and Phase 2.
Supplemental Inspection Support
· One (1) additional Construction Inspector for four (4) weeks
· 50 hours per week
· Focused support for:
o Fiber splicing inspection
o OTDR Test result review and verification
o As-built documentation auditing and validation
This additional resource would be utilized during peak project activities to ensure timely
review of testing documentation and verification of final deliverables prior to the end of
the construction activities.
The estimated cost above is based on an hourly billing rate of $105 per hour for
construction oversight services. We suggest entering $325,500.00 as an NTE. This will
allow for a third, supplemental, inspector when needed. All services will be billed based
on actual hours worked at the agreed-upon rate per hour. Hours not worked will not be
invoiced.
We believe this staffing approach provides the necessary oversight coverage to support
construction activities while ensuring quality standards, testing requirements, and project
documentation are properly reviewed and verified.
4
Estimated Staffing Summary
Resource Duration Total
Hours
Hourly
Rate
Estimated
Cost
Inspector #1 Mid-April through
October 29, 2027 1,450 $105 $152,250
Inspector #2 Mid-April through
October 29, 2027 1,450 $105 $152,250
Inspector #3
(Specialized Support) 4 Weeks 200 $105 $21,000
GIS/Mapping Support
(billed as hours
worked)
Mid-April through
Oct 29, 2027 111 $90 $9,990
Total Estimated
Hours
3,211 $335,490
Date: November 2, 2026 CIT Committee: November 16, 2026
M E M O R A N D U M
TO: Members of the CIT Committee
FROM: Stephanie Becken, Broadband Manager
RE: ConnectSuperior Maintenance & Drops
RECOMMENDATION – It is the recommendation of the IT Director Shea and ConnectSuperior
Broadband Manager Becken to waive the bid requirements in accordance with the City of
Superior ordinance Sec. 2-377 (a)(9)(d) and extend for two years the ConnectSuperior
Maintenance and Drops contract to Hanco Utilities based on updated unit costs in an amount not
to exceed $1,000,000 to be paid out as service is requested and installed.
BACKGROUND- The ConnectSuperior Maintenance & Drops contract to Hanco was reviewed
and recommended by CIT November 7, 2024, and subsequently approved at the November 19,
2024, City Council meeting. The request for proposals process, at that time, included the full
process of two advertisements on September 27th and October 4th, 2024, postings at
DemandStar.com and with several Builders Exchanges to seek bids from qualified contractors to
provide ongoing comprehensive outside plan maintenance, emergency restoration, and drop
services for the City-owned fiber network.
Since that time, Hanco has been an engaged partner in reducing costs and increasing overall
efficiency for residential and commercial drops and in maintenance of the growing network.
Extending this agreement will maximize the momentum in keeping the contractor moving
seamlessly installing new drops, performing maintenance, reduce deployment costs, and
minimize deployment risks of utility disruptions. It will also keep a single contractor responsible
for the growing network for maintenance and drops. Keeping Hanco will ensure that the physical
network components remain identical across the city, reducing the variety of spare parts the city
must inventory in the future.
The proposed amendment extends the term for two more years and updates pricing to reflect
efficiencies in scheduling and small increases largely due to the cost of supplies and labor. The
proposed amendment also reflects an update of scheduling responsibilities and shortened
timeline for installation expectations.
The amendment includes:
Reduction of timeline from Hanco’s original 30 days drop window to ten days or less.
50% decrease in administrative & scheduling fees from original contract in 2024.
6% increase to drop construction & installation services from original contract in 2024.
6% increase for Equipment & miscellaneous maintenance
0% labor rate increase from 2024 for maintenance requests.
Adjustment of material use that reduces drop material cost 35% from the original 2024 bid.
Adjustment for inventory acquisition and storage that reduces ConnectSuperior costs for some
inventory by 10%.
Average drop cost in 2024: $2735
Materials Estimate 2024: $101.75
Average drop cost in 2027-8: $2753.35
Materials Estimate: 2027-8: $80
Sec. 2-377. - Bid procedure for purchasing equipment, materials and supplies
(a)(9)(d) Nothing in this article shall prohibit the common council from accepting a bid other
than the lowest bid, rejecting all or any bids, requiring rebidding or authorizing a purchase
without soliciting bids. The common council may authorize any depar tment head to conduct
negotiations with any bidder after the opening and rejection of bids, for the purpose of
obtaining a better price, higher quality or additional consideration.
BUDGET SOURCE-This two-year amended agreement is funded by budgeted 2027 CIP,
ConnectSuperior Revenue, and Bonding.
CONCLUSION – It is the recommendation to approve the request to waive bid requirements in
accordance with the City of Superior ordinance Sec. 2-377 (a)(9)(d) and extend the agreement
between the City of Superior and Hanco Utilities for the ConnectSuperior Maintenance and
Drops based on updated unit costs in the Amendment.
AMENDMENT I TO THE
SERVICES AGREEMENT
By and Between
The City of Superior
And Hanco Utilities, Inc.
The City of Superior, a Wisconsin municipal corporation (City or Owner), located at 1316 North
14th Street, Superior, Wisconsin, and Hanco Utilities, Inc. (Contractor), an individual, are parties
to the Outside Plant Maintenance and Drop Services Agreement dated November 20, 2024. The
parties hereby wish to amend the Agreement, effective as of January 1, 2027, as follows:
10.3 Article II - Contract Price
The Owner shall pay the Contractor for the performance of this contract an amount based upon
the unit prices for the actual measured quantities of work done or lump sum as proposed in the
updated schedule of fees as attached hereto as Exhibit A, with a not to exceed amount of one
million dollars ($1,000,000.00). Exhibit A is hereby incorporated into this Amendment by
reference.
12.6 TERM OF THIS AGREEMENT
The term of this Agreement shall be from the date of the agreement through December 31, 2028.
The City of Superior reserves the right to terminate this agreement upon fifteen (15) day notice.
This agreement may be extended upon mutual agreement of terms and conditions.
All other terms and conditions of this Agreement remain in full force and effect.
IN WITNESS WHEREOF, the parties have signed the Amendment as of the date first written
above.
ATTEST: Hanco Utilities, Inc.
128 N. 21st St, Superior, WI 54880
By:______________________________ _________________________________
Melissa Cottew, President Jeff Bright, Project Manager
ATTEST: City of Superior
_________________________________ ________________________________
Jim Paine, Mayor Heidi Blunt, City Clerk
_________________________________ ________________________________
Nicholas Rhinehart, Finance Director Frog Prell, City Attorney
Provision has been made to
pay the liability that will
accrue under this Agreement.
This Amendment was approved by the Superior Common Council on:
Hanco Utilities, Inc. - Bid #24-40-IT - Page 1 of 3
City of Superior, WI - Outside Plant Maintenance and Drop Services
2027-2028 | Proposal Pricing Summary Sheet
Hanco Utilities, Inc.
128 N 21st St, Superior, WI 54880
715-394-2626
Price Proposal Sheet - Drop Construction and Installation Services
2025-2026 Price increase (applied to all Labor and Unit Prices):
6.0%
Unit prices below = base price x (1 + price increase). Change the yellow cell to adjust; quantities are not affected.
Bid Item #
Description
Unit Estimated
Quantities
Material
Labor
Unit Price
Total Cost
1 Underground Installation Each 0 $ - $ 1,653.60 $ 1,653.60 $ -
2 No Access Truck Roll *as needed Each 0 $ - $ 212.00 $ 212.00 $ -
3 Site Survey Each 0 $ - $ 530.00 $ 530.00 $ -
4 Ethernet Extension Foot 0 $ 1.06 $ -
5 Installation Assistance *as needed Hour 0 $ - $ 349.80 $ 349.80 $ -
6 Splicing per drop (at Premise and at right of way) Each 0 $ 424.00 $ 424.00 $ -
7 Site Survey & Administration Tasks Each 0 $ - $ 145.75 $ 145.75 $ -
INSTALLATION SERVICES TOTAL $ -
Materials
Bid Item # Description Unit Estimated
Quantities Material Labor Unit Price Total Cost
8 Clearfield NID & 100' Jumper (SC/APC) (FDRH-CDR4-GGZG-NRF) Each 0
$ -
$ -
$ -
9 Drop Cable, Singlemode, 2f, Toneable Flat Drop Lin/ft 0 $ - $ - $ -
10 House Riser, 7/8" x 60" Straight w Offset & Notch Each 0 $ - $ - $ -
11 House Riser Clamp, 7/8" Each 0 $ - $ - $ -
12 HDPE .75" Duct Orange Lin/Ft 0 $ - $ - $ -
13 .75" Coupler, Clear Lock Orange Each 0 $ - $ - $ -
14 5/8" x 8' Ground Rod Each 0 $ - $ - $ -
15 Ground Rod Clamp Each 0 $ - $ - $ -
16 Screw Clips Per/Bag 0 $ - $ - $ -
18 Fiber Pig Tail Each 0 $ - $ - $ -
MATERIALS TOTAL $ -
PRICE PROPOSAL SHEET - GRAND TOTAL $ -
Hanco Utilities, Inc. - Bid #24-40-IT - Page 2 of 3
T&M Rates - Labor
Line Item
Description
Unit
ST
OT
DT
1 General Foreman HR $ 97.01 $ 129.68 $ 162.34
2 Foreman HR $ 93.41 $ 124.28 $ 155.14
3 Operator HR $ 90.41 $ 119.78 $ 149.14
4 Laborer HR $ 85.82 $ 114.07 $ 142.33
5 Splicer (used for troubleshooting) HR $ 90.00 $ 120.29 $ 150.58
Notes:
OT applies after 8-ST hours and Saturday
DT applies to Sundays and Holidays
T&M Rates - Equipment
Line Item
Description
Unit
Rate Notes
1 Air Compressor HR $ 42.40
2 Cable Retriever HR $ 121.90
3 Chop Saw HR $ 5.30 Equipment only
4 Excavator - Mini <10,000 lbs. HR $ 53.00
5 Fiber Jetter HR $ 121.90
6 Generator HR $ 23.32
7 Ground Heater HR $ 76.32
8 Hydroseeder HR $ 42.40 Does not include consumable materials
9 Hydrovac - Dump Fee EA $ 344.50 Does not include contaminated materials
10 Hydrovac - Trailer Mounted (Operated) HR $ 291.50
11 Hydrovac - Truck Mounted (Operated) HR $ 397.50
12 Light Plant HR $ 21.20
13 Roller - Smooth Drum DAY $ 259.70
14 Sweeper DAY $ 227.90
15 Tracked Plow HR $ 99.64
16 Trailer - Reel HR $ 14.84
17 Trailer-Double Axle HR $ 12.72
18 Truck - Dump HR $ 58.30
19 Truck - Dump - Dump Fee EA $ 106.00 Concrete, Bituminous, Clean Aggregate, Clay
20 Truck - Pickup (1 ton) HR $ 63.60
21 Truck - Pickup (1/2 -3/4 ton) HR $ 53.00
22 Yard Plow HR $ 79.50
T&M Rates - Misc.
Line Item
Description
Unit
Rate Notes
1 Directional Bore 2" LF $ 15.75 Includes labor & equipment
2 Directional Bore 4" LF $ 22.50 Includes labor & equipment
3 Directional Bore 6" LF $ 33.74 Includes labor & equipment
4 Directional Bore 8" LF $ 42.85 Includes labor & equipment
5 Less than 200' Directional Bore Set Up Fee DAY $ 1,696.00
6 Concrete Restoration SF $ 19.08
7 Asphalt Restoration SF $ 24.09
8 Material MU 10% Cost plus 10% - Invoice supplied
9 Bi-Yearly Inspection EA $ 15,900.00 Based on 2 Man Crew for 5 Days
10 Traffic Control MU 10% Cost plus 10% - Invoice supplied
11 Splicing - Per Fiber (0-24 Fibers) EA $ 44.52 Fusion Splice on a per fiber basis
12 Splicing - Per Fiber (25-96 Fibers) EA $ 42.40 Fusion Splice on a per fiber basis
13 Splicing - Per Fiber (greater than 96) EA $ 40.28 Fusion Splice on a per fiber basis
14 Splice Setup EA $ 291.50 Labor a build splice case and install cables
15 Splice Re-Entry EA $ 196.10 Labor to enter eisting case
15 Fiber Testing less than 25 fibers EA $ 25.44 OTDR Testing with results
16 Fiber Testing 25-96 EA $ 12.72 OTDR Testing with results
17 Fiber Testing greater than 96 EA $ 8.48 OTDR Testing with results
Hanco Utilities, Inc. - Bid #24-40-IT - Page 3 of 3
Timeline - 10 Day Install
Timeframe Task
Site Survey Appointment Received From City of Superior
0 Day Site Survey Appointment
Site Survey Conducted and Data Gathered
NID Mounted, Fiber Jumper Installed, ONT Installed
1 Day Diggers Hotline Ticket Placed
811 Call placed to request locate ticket
3 to 4 Days Locate Ticket Cleared
Legal ticket in hand to place drop
4-10 Days Drop Construction
Drop drilled and placed
Cable pulled and spliced
Source: City of Superior website. First collected Nov 18, 2026.