Village of Hobart Site Review Committee Minutes
Hobart Village Office; 2990 S. Pine Tree Rd, Hobart, WI
Wednesday, April 21, 2021 – 5:30 pm
1. Call to Order, Roll Call:
The meeting was called to order by Dave Dillenbur g at 5:32pm. Roll call: Dave Dillenburg, aye;
Debbie Schumacher, aye; Steve Riley, aye; Dave Ba ranczyk, aye; Merlin Zimmer, excused; Rick
Nuetzel, excused; Tom Tengowski, aye.
2. Verify/Modify/Approve Agenda:
Motion by Debbie Schumacher, second by Dave Bara nczyk, to approve the agenda as presented.
All in favor. Motion carried.
3. Approval of Site Review Minutes:
Motion by Tom Tengowski, second by Debbie Schumacher, to approve the site review minutes for
March 17, 2021.
4. Public Comment on Non-Agenda Items:
None.
5. Proposed new 6,000 sf., cold storage building and associated site improvements (774 W. Adam
Drive, HB-139-3):
GENERAL INFORMATION
1. Owner / Developer: DeNoble Sewer & Water
2. Applicant / Agent: Brandon Robaidek, Robert E. Lee & Associates, Inc.
3. Address / Parcel: 774 W Adam Dr., HB-139-3
4. Zoning – I-1: Limited Industrial
5. Use: Cold Storage Building
BACKGROUND
The property owner is proposing to construct a new 6,000 square foot building towards the rear of their
complex that would be utilized as a cold storage building. This new building is planned to be very similar
to the storage building that was constructed back in 2017 relative to the exterior building materials and
will be located directly to the west of the existing building. This new building will be accessed through
the existing construction yard and new concrete pavement will be placed adjacent to the building to
provide clear access to this new building.
SITE REVIEW DEVELOPMENT AND DESIGN STANDARDS CHECKLIST
Section 1, Site Plan Approval
A. Zoning: I-1: Limited Industrial District
B. Green Space: 36% green space (building being located in area that is currently gravel)
C. Setbacks: Compliant with zoning district requirements of 40’ front(s), 20’ rear, 15’ side.
(Approx. 550’ from W. Adam Dr. right-of-way, 293’ from rear (north property line), 50’
from the west property line, and 100’ from the east property line)
D. Parking: No changes (cold storage building)
E. Fire Dept. (and Police Dept.): The plans presented have been reviewed and accepted by the
Police Chief and Fire Chief.
H. Storm Water: Storm water will consist of an existing dry storage basin to the northern end
of the parcel and an underground storage area located on the south side of the parcel to treat
the pollutants and peak discharge.
M. Refuse Collection: No changes from current operation.
Section 2, Architectural Plan Approval
A. Exterior Construction Information:
1. Materials: Wood framed building (to match existing)
2. Exterior Materials: All four building elevations will consist of metal wall panels with a
different color panel around the base of the building and extending up approximately 3’ from
grade.
3. Height: Eave height of 16’ with an overall height of 26’ to peak of roof system.
4. Overhead doors: There will be two at grade overhead door on the south elevation that face
into the contractor yard (note: the architectural plans submitted are from the building
submitted back in 2017 and the overhead doors and service doors do not depict the correct
locations, the floor plan has the correct door layout).
5. Mechanical equipment: No mechanical equipment proposed as this is a cold storage
building.
Section 3, Landscaping Plan: Majority of the site has mature trees and planting. There are mostly
foundation plantings proposed along with 5 new trees to help screen for the off-ramp from HWY 29
Section 4, Lighting: There will be three additional smaller light poles (very similar to the light poles
along Centennial Centre Blvd.) installed in the east and north side of the parking area in addition to the
wall mounted light fixtures on the proposed building.
Section 5, Signage:
No signage proposed at this time and any future proposed signage would be
required to be submitted for approval at a later date.
Section 6, Driveway-Curb Cut: No change, existing to be utilized.
ACTION
Motion by Debbie Schumacher, second by Steve Riley, to approve the new 6, 000 square foot
building and limited site improvement as submitted.
All in favor. Motion carried.
6. Proposed new 2 story, 23,595 sf., office building and associated site improvements (1256
Centennial Centre Blvd., HB-2412):
GENERAL INFORMATION
1. Owner/Developer: Lexington Homes, Inc.
2. Applicant/Agent: Robert E. Lee & Associates, Inc.
3. Address/Parcel: 1256 Centennial Centre Blvd., HB-2412
4. Zoning: B-1: Community Business District
5. Use: Office
BACKGROUND
This same development was before the Committee most recently back on April 15, 2020 and received
conditional approval on a 17,014 square foot building with underground parking. The underground
parking has since been removed and replaced with an additional 6,581 square feet of building area at
grade level which does include an approximately 1,254 square foot garage area and additional office
space. Other than this modification, there are no other changes to building or site improvements from the
2020 submittal. Additionally, since the Site Plan Approval expires at 12 months following any approval,
the project needed to be resubmitted as the 12 month timeframe expires on April 15, 2021.
SITE REVIEW DEVELOPMENT AND DESIGN STANDARDS CHECKLIST
Section 1, Site Plan Approval
C. Zoning: B-1: Community Business District
D. Green Space: 46.8% green space, exceeding the 25% requirement (REL sheet 2)
F. Setbacks: Compliant with zoning district required setbacks (code/(proposed) – Front
40/(172), Side 10/(10/19.5), Rear 15/(55)) (REL sheet 2)
G. Parking: One parking space shall be provided for each 300 square feet of floor area for the
first 8,000 square feet of gross floor area. One additional parking space shall be furnished for
each 700 square feet or fraction thereof for the next 12,000 square feet of total floor area, and
one additional parking space shall be provided for each 1,000 square feet, or fraction thereof,
for total area in excess of 20,000 square feet. One parking space shall also be provided for
each staff member or employee on the maximum shift. With this additional 23,595 square
feet, the site is required to have a minimum of 67 stalls (47 based on square footage and 1 per
20 employees on site) and the site is proposed to have 88 stalls.
H. Fire Dept. (and Police Dept.): The plans presented have been reviewed and accepted by the
Police Chief and Fire Chief.
I. Storm Water: Stormwater from the proposed building and parking areas will be collected by
the existing stormwater basin in the middle of the parking lot before being discharged to the
creek running along the south side of the site. The on-site infiltration basin will treat the
stormwater for TSS removal and peak discharge.
B. Refuse Collection: None shown, no changes from current operation.
Section 2, Architectural Plan Approval
A. Exterior Construction Information:
1. Materials: Wood framed building.
2. Exterior Materials: This was approved at the September 2019 meeting and consists of
stone veneer and vinyl siding (similar to that utilized on the multi-family structures
3. Height: Overall height of 24’
4. Overhead doors: One small garage door to access garage area
5. Mechanical equipment: If located on the roof or ground, shall be screen from view by
materials compatible with the building or landscaping
Section 3, Landscaping Plan: No changes proposed from existing as this building will be constructed
over an existing gravel area and screened from the side view by another existing building and mature
evergreen trees planted along the property line.
Section 4, Lighting: None noted, as there is existing pole lighting located in the yard.
Section 5, Signage:
No signage submitted as the site currently has a monument sign near the front
entrance.
Section 6, Driveway-Curb Cut: Existing with no changes proposed.
ACTION
Motion by Dave Dillenburg, second by Debbie Schumacher, to approve the new 2 story, 23,595 sf.,
office building and associated site improvements as submitted subject to the following conditions:
1. Any future proposed signage would be required to be submitted for approval at a later date
2. Refuse/Recycling containers whether existing or proposed shall be screened from public view
3. Overhead garage door shall be of a color to blend with the main colors of the building
4. Mechanical equipment if located on the roof or ground, shall be screened from view by materials
compatible with the building or landscaping
All in favor. Motion carried.
7. Adjourn:
Motion by Debbie Schumacher, second by Tom Tengow ski, to adjourn. All in favor. Motion
carried. Meeting adjourned at 5:50pm.