_11022026-1123
Village of Brown Deer · Milwaukee County · meeting of Nov 2, 2026 · Minutes
Open the original document More from Village of Brown Deer
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MINUTES OF THE
BROWN DEER BUILDING BOARD
Virtual Meeting Phone/Video
November 2, 2026
The meeting was called to order at 4:07 p.m.
I ROLL CALL
Present: Mary Buckley, Will Manley, Nicole Robbins, Ryan Thacker
Excused: Chris Eger
Also Present: Hannah Keckeisen, Community Development Director; Tyler Burkart, Village
Manager; Devon Pittman, Briohn; Lucille Sells, North Drawn Designs; Megan Anderson, Village
Resident; Jim Jens, Village Resident; Chris Wenzler, Briohn; Kyle Roadt, Briohn; Jon Zimmerman,
Jilly’s Car Wash; Todd Gesund, Jilly’s Car Wash; Thomas McCrossin, New Lane Management
II PERSONS DESIRING TO BE HEARD
None
III CONSIDERATION OF MINUTES
Mr. Manley motioned and Mr. Thacker seconded to approve the minutes of August 17, 2026.
Approval was unanimous.
IV OLD BUSINESS
1. None
V PLANS SUBMITTED FOR CONSIDERATION
The following items were on the agenda for review:
1. Proposed Addition – Residential Property – 9306 N. 52nd Street
Ms. Keckeisen reviewed the home addition. This is a garage addition with interior home
renovations. The material for the addition will be white steel lap siding, which pairs well with the
existing brick exterior. The addition is within the setbacks for the R2 residential zoning district.
Ms. Sells provided additional context stating that existing garage turning into living spaces and
new addition will become the garage. The new garage doors match the existing shed door on the
property.
Mr. Manley asked if the roofing materials will be consistent and if they will match. Ms. Sells stated
that there is significant work that is needed on the roofing and everything will match.
Mr. Thacker asked what the reasoning was for the gable in the garage . Ms. Sells stated that
additional interior space is needed for the owners.
Mr. Manley asked if the siding on the new porch will match the siding that will be part of the
addition and the other portions of the home. Ms. Sells stated that all the siding will match. Ms.
Anderson and Mr. Jens stated that the current siding on the porch is falling apart and will be
replaced during construction.
Ms. Buckley asked to see a photo of the home. Ms. Sells presented a photo of the home for the
Building Board to review. Ms. Buckley suggested that this helped the Board understand the project.
Mr. Thacker motioned for approval of the proposed addition Mr. Manley seconded. Motion to
approve the proposed addition unanimous.
2. New Car Wash Building – Jilly’s Car Wash – 4200 N. Deerwood Drive
Ms. Keckeisen introduced Jilly’s Car Wash project on the northwest corner of Green Bay Road and
Brown Deer Road. The scope of this discussion is limited to the building design and materials.
Ms. Keckeisen identified that comments had been provided to the design team for the project. Some
key comments were removing the tan banding, making the garage doors black, removing the tan
brick and replacing it with white brick, identifying if the blue w indows are decorative and if they
filter light, adding additional materials to the workers’ exterior check in enclosure, and including
renderings of the trash enclosure as well as the gates and pay terminals. Mr. Eger provided
comments ahead of time as he was unable to attend the meeting. His comments stated that materials
do not line up, he suggested that the plan needs to be simplified. He also recommended that the
bollards are black.
Mr. Gesund with Jilly’s Car Wash, introduced himself and Mr. Zimmerman, the founder of Jilly’s.
Mr. Zimmerman stated that this will be the first indoor vacuum space for Jilly’s, and they wish to
have a high-quality building due to the high visibility of the intersection.
Mr. Thacker stated that the overall shape of the building is good and the two roof forms are good.
He questioned the roof pitch into the other roof pitch. He said that there is a lot going on in the
initial design submittal. The amount of glazing that has horizontal banding and amount of various
material is unnecessary.
Ms. Buckley suggested that simplifying the plan would make the building much stronger.
Mr. Wenzler with Briohn presented a revised version during the meeting that begins to simplify the
project. The new design removes the horizontal banding and follows a three material approach. The
tan material is removed and replaced with white masonry product. He also changed the garage
doors to black.
Mr. Thacker asked if the roof pitching to the parapet has a saddle to direct water away on the roof.
Mr. Wenzler stated that it is framed to push water away from the building.
Mr. Thacker suggested that the building has a good foundation as it is broken into two thirds and
one third, this is a good design choice.
Mr. Manley asked if the wood material at the top façade upper element may be removed. He likes
the wood at the human scale.
Ms. Buckley stated that the revisions discussed in the meeting are an upgrade from the initial
submittal. Mr. Thacker would like to see a final revised plan at the next Building Board meeting.
It was consensus of the Board to request a resubmittal of the building plans.
3. Exterior Commercial Building Improvements – North Shore Commerce
Center – 9091 N. Deerwood Drive and 9050-9088 N. Deerbrook Trail
Ms. Keckeisen introduced the project. This project includes exterior building improvements on
existing buildings on Deerwood Drive and Deerbrook Trail. Improvements include a new sign,
exterior painting improvements, and new garage doors. Ms. Keckeisen stated that Mr. Eger
provided comments prior to the meeting and he liked the orange color on the building but
recommended the garage doors be a darker color.
Mr. McCrossin provided an overview of the improvements and stated that this is a new fresh look
for the buildings and the area. All garage doors will become 10ft by 11ft to align with new business
standards.
Mr. Manley motioned for approval of the exterior commercial building improvements contingent
on changing the garage door s to black Mr. Thacker seconded. Motion to approve the exterior
commercial building improvements contingent on changing the garage doors to black was
unanimous.
VI ADJOURNMENT
Mr. Manley moved adjournment and Mr. Thacker seconded.
Approval was unanimous.
The meeting adjourned at 4:50 p.m.
The next regularly scheduled meeting is November 16, 2026
Hannah Keckeisen
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Community Development Director, Village of Brown Deer
Source: Village of Brown Deer website. First collected Nov 21, 2026.