Budget Review Session — Agenda Packet
City of Menasha · Winnebago County · Common Council · meeting of Nov 18, 2026 · Agenda packets
Open the original document More from City of Menasha
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
A Quorum of the Common Council, Administration Committee, Board of Public Works,
Personnel Committee, Plan Commission, Redevelopment Authority, and other City bodies may
attend this meeting, though no official action of these bodies will be taken.
COMMON COUNCIL BUDGET REVIEW SESSION
Wednesday, November 18, 2026 at 5:00 PM
First Floor Conference Rooms
100 Main Street, Menasha, WI
A. Call to Order
B. Pledge of Allegiance
C. Roll Call
D. Public Comments on Any Matter of Concern to the City
(5 minute time limit for each person)
E. Elisha D. Smith Public Library
Library, p. 329
F. Public Works Department
Engineering, p. 240 | Street Construction/Excavation, p. 244 | Snow Removal, p.
247 | Traffic Control, p. 250 | Sidewalks, p. 254 | Street Lighting, p. 257 | Parking
Lots, p. 260 | Refuse Collection, p. 263 | Weed Cutting, p. 266 | Lift Bridges, p. 269
| Recycling Fund, p. 70 | Sewage Utility Fund, p. 119 | Storm Water Utility Fund, p.
126 | Street Equipment Fund, p. 144 | Public Works Facility, p. 147
G. Adjournment
"Menasha is committed to its diverse population. Our Non-English speaking population and
those with disabilities are invited to contact the Menasha City Clerk at (920) 967-3608 24-hours
in advance of the meeting for the City to arrange special accommodations."
Page 1 of 57
BUDGET
2027
PRESENTATION
Page 2 of 57
MENASHA
STRONG
Community Focused
Response
• Reopened the library less than 48 hours after July’s
devastating tornado and adjusted hours to meet community
needs
• Served 30,000 community members in the first two months
after the storm
• Hosted numerous agencies assisting in the recovery
• Partnered with local organizations to offer counseling
services to local residents
• Worked with the city departments and People of Progression
to coordinate food and other resources to the community
• Hosted multiple legal clinics to ensure community members
were offered the guidance they needed
Page 3 of 57
YEAR IN REVIEW
Meeting Room Uses Visitor Count
Community Value of Services
+74.7% ytd + 26.1% ytd
$ 5,789,199
4,316 uses as of the end of October.
Library Checkouts
+ 10.9% ytd
Our diverse collection of materials
continues to see heavy usage by our
community.
117,917 visitors compared to 93,477 in
2025.
By the end of 2026 the community
will receive a return on investment
of 4 to 1.
EXPLORE
CONNECT
CREATE
Page 4 of 57
EXPLORE
CONNECT
CREATE
MENASHA READS
LITcoin
LITcoins are tokens created by the
Library to aid in our efforts to raise
reading literacy skills in our community.
LITcoins create a learning “currency”
that may be utilized by multiple
organizations and businesses
throughout our community. This allows
us to unify the multiple learning efforts
happening throughout the area.
LITcoins have also been made available
to the Parks and Rec Department and
the school district to reinforce learning
efforts.
Literacy Campaign
Our Literacy Campaign is a collective effort
promoting reading literacy skills across our
community, creating a gateway to successful,
interest-driven lifelong learning. Below are some
of the individual programs which fall under the
campaign banner.
• Storytime programs
• 1000 Books Before Kindergarten
• 500 Books Before Middle School
• 250 Books Before High School
• 100 Books Before Graduation
• Library cards for all 1st Graders
• Little Library seeding project
• Pages and Parks w/ Parks and Rec
• Traveling Tales – books walks (spring 2027)
• Literacy Resource Center
Page 5 of 57
SMITHworks
Interest Driven
Learning
• Approach that uses a learner’s personal
curiosity, hobbies, or passions as the primary
vehicle for learning
• Research shows learners work harder when
they care about the subject matter.
• Critical Thinking: Fosters problem-solving,
persistence, and self-regulation.
• Lifelong Engagement: Cultivates a habit of
self-directed learning outside and beyond
formal schooling.
Targeted Programs Drop-ins Badges
34 programs attended by 905 people Over 6000 people have used the
SMITHworks creative space so far in
2026.
Badging allows patrons to use
SMITHworks any time the library is
open. To date we have issued 828
badges.
21st Century
Literacies
• Critical thinking
• Collaboration
• Communication
• Creativity
• Innovation
• Self-direction
• Flexibility
• Adaptability
• Productivity
• Responsibility
• Social and cross-cultural awareness
Page 6 of 57
STRATEGIC PLAN
Early in 2026 the library completed its 2026 to 2030
strategic plan. The process identified four focus areas.
Where our Whole Community
Gathers
We are a welcoming and vibrant space
where people of all ages feel a sense of
belonging, connection, and pride.
We champion lifelong learning by
offering accessible, relevant, and
engaging opportunities for reading,
digital skills, creativity, and personal
growth.
EXPLORE
CONNECT
CREATE
Literacy, Learning, and
Exploration
A Strong and Supported
Organization
We invest in our staff, processes, and
operations to provide sustainable, high-
quality service for our community.
Strengthening Our
Community
We foster community cohesion and
trust by building strong partnerships
and connecting residents with
information, resources, and one
another.
Page 7 of 57
OUR PROGRESS
Objective - Enhance the visibility and usability of library spaces
to support comfort, exploration, and community identity.
Created sensory sensitive space to offer calm, low-stimulation
environment designed to help neurodivergent individuals and people
with sensory processing differences rest, regulate, and avoid sensory
overload. – completed 10-26
GOAL 1: Where our Whole Community Gathers
Objective - Activate library spaces, both indoor and out, to keep
the community engaged, excited, and exploring.
Teens, with the help of staff, developed an outdoor trellis garden to
grow vegetables and flowers on the library patio. – completed 5-26
EXPLORE
CONNECT
CREATE
Page 8 of 57
OUR PROGRESS cont.
Objective - Deepen literacy support for youth and families by
nurturing reading skills, curiosity, and family engagement.
In 2026 the library kicked off its new literacy initiative mentioned
in its own slide earlier.
GOAL 2: Literacy, Learning, and Exploration
Objective - Develop structured SMITHworks programming that
supports exploration, skill-building, and identity development
for teens, adults, and families.
Began hosting the Valley Robotics group in our spaces, offering STEM
learning opportunities to our community.
We are in the initial phases of partnering with a valley’s first Trash
Scout Dumpster.
Page 9 of 57
Friends of the Elisha D.
Smith Public Library
SUNDAY
NOVEMBER
29th
12 - 3:30 pm
Holiday Book
and Craft
SALE
440 First St. Menasha, WI 54952 920-967-3690 menashalibrary.org
Company E Room
Main Floor
OUR PROGRESS cont.
Objective - Build staff skills and stability by spotting gaps
or single person expertise, clarifying key practices, and
supporting balanced workloads.
Our materials processing team is currently reevaluating our materials
process from ordering through the items being placed into circulation
for our patrons.
GOAL 3: A Strong and Supported Organization
Objective - Strengthen funding stability and increase budget
transparency so the library can plan confidently and invest in
staff and community priorities.
The library’s friends group is currently in the process of evaluating its
organization, goals, and a strategic plan to better assist the library in
providing services to our community.
Page 10 of 57
2027 GOALS
Expand Literacy
Campaign work to better
include community
partners
Develop library
CONNECT
programming slate
This programming series focuses
our efforts focused on community
building and leisure at the library.
Continue to develop
identifiable library
branding
Continue partnership
development with an
added goal of creating a
localized subject matter
expert listThey say, “it takes a village.” In order to
improve literacy across a community
we need to engage and collaborate
with all of the organizations working
with our children.
Getting the word out on our numerous
programs is an ongoing challenge.
One of the ways to improve this
is to develop our brand so people
immediately identify our work.
Page 11 of 57
2027 BUDGET REQUEST
$2.21M
Total requested 2027
budget from all sources.
$770K
35% of the library’s overall
budget comes to us in the
form of county payments
for service. 3.61%
The overall budget
increase puts us just
behind the inflation rate
for 2026 of 3.7%
U.S. Labor Dept.
Page 12 of 57
BUDGET BREAKDOWN
$47K
$427K
$1.2M
Drivers: The wages and salaries line items are driven
primarily by employees moving through the approved
pay scale and annual cost of living adjustments. In 2026
there were some staffing changes that reduced this
areas overall impact to the budget.
Wages and Salaries
Benefits
Drivers: Healthcare is always the largest piece of this
expense category. The work of our HR Department has
mitigated this areas impact to the overall budget by
holding our increase in 2027 to 2%.
Contract Services
Drivers: The majority of this line is the cost of janitorial
services for the building.
Page 13 of 57
$85K
BUDGET BREAKDOWN
$42.5K
$73K
EXPLORE
CONNECT
CREATE
Utilities
After a year plus of operation in the renovated building
we seem to have dialed in on efficiencies of newly
installed heating and coo
ling systems.
Maintenance Costs
Cost of Office Equipment / Specialized Equipment is
largely offset by revenue from printing charges.
Library System Payment
This charge is for the library’s access to delivery, the
shared system catalog, and IT support.
Page 14 of 57
BUDGET BREAKDOWN
$7.35K
$291K
This category covers most of the expenses for services
to our patrons, largely library materials; but also
including computers, program supplies, and technology.
Supplies
Staff Development
Expenses for training and travel, including membership
to professional organizations.
EXPLORE
CONNECT
CREATE
Page 15 of 57
BUDGET BREAKDOWN
$30K
Miscellaneous Expenses
EXPLORE
CONNECT
CREATE
Page 16 of 57
Special thanks to my library team who
make all of the things we do on behalf of
our community possible.
Thank you to the city council and library
board for supporting the work we do.
QUESTIONS
Page 17 of 57
2027 Budget Proposal
DEPARTMENT OF PUBLIC WORKS
Page 18 of 57
Our Mission
The City of Menasha Public Works Department is dedicated to
forging a vibrant future for our 18,000+ residents and visitors
through high-quality services and dependable infrastructure.
With extensive in-house capabilities for a department of our
size, we deliver sustainable, budget-conscious solutions with
unmatched small-town care.
Anchored by our historic waterfront, we are committed to
building upon a legacy of resilience and hospitality that
makes Menasha, Your Place on the Water.
Page 19 of 57
What We Do
Waste Disposal Services
• Garbage and recycling pickup and disposal operations. Yard waste
collection and composting.
Road Maintenance & Repair
• Pothole filling, pavement patch repairs, street resurfacing, and
sidewalk repairs.
Street Cleaning
• Street sweeping and debris removal from public areas.
Snow & Ice Control
• Plowing, salting, and snow removal during winter.
Traffic Management
• Maintenance of signals, signs, and road markings. Oversight of
street closures and parking regulations.
Construction Projects
• Planning, engineering, design, and inspection of city infrastructure
projects.
Stormwater Management
• Maintenance of storm sewers and detention ponds. Administration
of water quality and flood prevention programs.
Wastewater Distribution
• Maintenance of sanitary sewers and pump stations.
Fleet Maintenance
• Servicing of vehicles and equipment for the city and municipal
partners.
Bridge Operations
• Upkeep of city-owned bridges and operation of Fox River lift
bridges in Menasha.
Page 20 of 57
Organizational
Chart
Taxpayers
Common Council Mayor
Director of Public
Works
Deputy Director of
Municipal
Operations
Public Works/Parks
Superintendent
Streets Lead
Equipment
Operator - Streets
(8)
Equipment
Operator -
Sanitation (6)
Sewer Equipment
Operator
Equipment
Operator - Sewer
Traffic Technician Lead Mechanic
Mechanic (2)
Administrative
Assistant
Deputy Director of
Engineering
Engineering
Technician (3)
Administrative
Assistant
Page 21 of 57
GENERAL
FUND
2027 BUDGET PROPOSAL • PUBLIC WORKS
Page 22 of 57
ENGINEERING
GENERAL FUND PAGES 242 - 245
Permit Review Regulation
Compliance Project Design
Construction
Oversight
Asset
Management
2024 2025 2026 2027
$ 188,183
$ 180,188
$ 198,680
$ 188,790
$ 187,102
$ 193,904
$ 176,760
Actual/Projected Budget
Page 23 of 57
STREET CONSTRUCTION
GENERAL FUND PAGES 246 - 248
Pavement
Patching &
Repair
Preventive
Maintenance
Concrete
Recycling
Bridge
Inspections Small Projects
2024 2025 2026 2027
$ 682,598
$ 797,416
$ 660,075
$ 678,845
$ 706,407
$ 682,617
$ 517,081
Actual/Projected Budget
Page 24 of 57
SNOW & ICE OPERATIONS
GENERAL FUND PAGES 249 - 251
Plowing De-Icing Materials
Inventory
Equipment
Replacement
Code
Compliance
2024 2025 2026 2027
$ 353,429
$ 452,122
$ 451,209
$ 422,892
$ 386,516
$ 366,569
$ 399,615
Actual/Projected Budget
Page 25 of 57
TRAFFIC CONTROL
GENERAL FUND PAGES 252 - 255
Traffic Signs Pavement
Markings
Traffic Signals Temporary
Traffic Control
2024 2025 2026 2027
$ 235,083
$ 282,249
$ 279,080
$ 267,309
$ 278,099
$ 277,620
$ 297,211
Actual/Projected Budget
Page 26 of 57
SIDEWALK CONSTRUCTION
GENERAL FUND PAGES 256 - 258
Pavement Repair Disability
Improvements
2024 2025 2026 2027
$ 138,760
$ 124,635
$ 169,685
$ 159,082
$ 174,493
$ 175,629
$ 174,276
Actual/Projected Budget
Page 27 of 57
STREET LIGHTING
GENERAL FUND PAGES 259 - 261
Electricity Supplies
Utility
Locating
2024 2025 2026 2027
$ 158,420
$ 150,813
$ 161,322
$ 179,416
$ 178,516
$ 168,223
$ 163,834
Actual/Projected Budget
Page 28 of 57
PARKING FACILITIES
GENERAL FUND PAGES 262 - 264
Parking Permits Stall Markings
Pavement
Patching &
Repair
Parking Ramp
Maintenance
2024 2025 2026 2027
$ 19,962
$ 24,959
$ 29,762
$ 44,636
$ 41,901
$ 28,012
$ 30,648
Actual/Projected Budget
Page 29 of 57
REFUSE COLLECTION
GENERAL FUND PAGES 265 - 267
Household
Garbage
Collection
Bulky Item
Collection
Dumpster
Rental Program
Commercial
Dumpster
Servicing
Tipping Fees Code
Compliance
Cart Repair &
Replacement
2024 2025 2026 2027
$ 1,003,342
$ 1,040,914
$ 979,631
$ 1,023,810
$ 1,030,999
$ 1,038,904
$ 947,713
Actual/Projected Budget
Page 30 of 57
WEED CUTTING
GENERAL FUND PAGES 268 - 270
Trimming /
Cutting Weed Control
Code
Compliance
2024 2025 2026 2027
$ 19,565
$ 27,061
$ 23,871
$ 36,941
$ 30,165
$ 24,178
$ 25,303
Actual/Projected Budget
Page 31 of 57
LIFT BRIDGES
GENERAL FUND PAGES 271 - 274
Bridge Tending Structural
Maintenance
Mechanical
Maintenance
Routine
Inspections
2024 2025 2026 2027
$ 117,719
$ 134,720
$ 183,736
$ 160,959
$ 148,173
$ 185,128
$ 219,906
Actual/Projected Budget
Page 32 of 57
RECYCLING
FUND
2027 BUDGET PROPOSAL • PUBLIC WORKS
Page 33 of 57
RECYCLING COLLECTION
RECYCLING FUND PAGE 73
Household
Recycling
Collection
Recycling Drop-
Off Center
Contraband
Disposal
Cart Repair &
Replacement Tipping Fees
2024 2025 2026 2027
$ 268,345
$ 273,316
$ 285,842
$ 271,122
$ 277,769
$ 306,983
$ 316,757
Actual/Projected Budget
Page 34 of 57
YARD WASTE COLLECTION
RECYCLING FUND PAGES 73 - 74
Spring Waste
Collection
Fall Leaf
Collection
Branch & Limb
Collection
Yard Waste
Processing
2024 2025 2026 2027
$ 163,038
$ 166,127
$ 174,023
$ 171,534
$ 169,193
$ 177,184
$ 168,572
Actual/Projected Budget
Page 35 of 57
APPLIANCE DISPOSAL
RECYCLING FUND PAGES 74 - 75
Appliance
Disposal
2024 2025 2026 2027
$ 29,234
$ 23,067
$ 20,196
$ 32,601
$ 30,324
$ 30,628
$ 33,619
Actual/Projected Budget
Page 36 of 57
SEWAGE
UTILITY
2027 BUDGET PROPOSAL • PUBLIC WORKS
Page 37 of 57
ENGINEERING
SEWAGE UTILITY PAGES 122 - 123
Permit Review Regulation
Compliance Project Design
Construction
Oversight
Asset
Management
2024 2025 2026 2027
$ 138,032
$ 169,171
$ 198,279
$ 183,431
$ 177,312
$ 205,134
$ 205,761
Actual/Projected Budget
Page 38 of 57
SANITARY SEWERS
SEWAGE UTILITY PAGES 123 - 125
Sewer & Lateral
Construction
Sewer
Maintenance Lift Stations
Utility Locates Sewer
Monitoring
Sewer
Assistance
Programs
2024 2025 2026 2027
$ 579,970
$ 568,459
$ 1,167,118
$ 1,352,273
$ 1,003,476
$ 1,281,784
$ 1,861,006
Actual/Projected Budget
Page 39 of 57
SEWAGE TREATMENT
SEWAGE UTILITY PAGE 125
Wastewater
Treatment
Treatment Plant
Upgrades
2024 2025 2026 2027
$ 1,154,986
$ 999,616
$ 1,150,000
$ 920,000
$ 1,100,000
$ 1,150,000
$ 1,200,000
Actual/Projected Budget
Page 40 of 57
STORM WATER
UTILITY
2027 BUDGET PROPOSAL • PUBLIC WORKS
Page 41 of 57
ENGINEERING
STORM WATER UTILITY PAGES 130 - 132
Permit Review Regulation
Compliance Project Design
Construction
Oversight
Asset
Management
2024 2025 2026 2027
$ 64,519
$ 200,588
$ 267,179
$ 232,055
$ 228,660
$ 317,422
$ 237,318
Actual/Projected Budget
Page 42 of 57
STREET CONSTRUCTION
STORM WATER UTILITY PAGES 132 - 133
Curb & Gutter
Construction
Concrete Tools
& Equipment
Concrete
Recycling
2024 2025 2026 2027
$ 52,115
$ 102,610
$ 433,220
$ 493,219
$ 693,559
$ 437,919
$ 296,450
Actual/Projected Budget
Page 43 of 57
STREET CLEANING
STORM WATER UTILITY PAGES 133 - 134
Street
Sweeping
2024 2025 2026 2027
$ 189,145
$ 190,985
$ 210,609
$ 192,713
$ 201,727
$ 210,377
$ 197,219
Actual/Projected Budget
Page 44 of 57
SNOW & ICE OPERATIONS
STORM WATER UTILITY PAGES 134 - 135
Snow Hauling
2024 2025 2026 2027
$ 52,997
$ 80,439
$ 75,453
$ 73,908
$ 77,541
$ 72,622
$ 75,951
Actual/Projected Budget
Page 45 of 57
STORM SEWERS & DRAINS
STORM WATER UTILITY PAGES 135 - 136
Sewer & Drain
Construction
Sewer & Drain
Maintenance Utility Locates
Pond
Maintenance
Residential
Drainage
Program
Stormwater
Permits & Dues
2024 2025 2026 2027
$ 242,052
$ 253,813
$ 689,930
$ 1,384,315
$ 929,369
$ 767,882
$ 728,164
Actual/Projected Budget
Page 46 of 57
PARKING FACILITIES
STORM WATER UTILITY PAGES 136 - 137
2024 2025 2026 2027
$ 13,749
$ 14,205
$ 17,185
$ 20,119
$ 18,750
$ 17,139
$ 17,727
Actual/Projected Budget
Snow Hauling
Page 47 of 57
YARD WASTE COLLECTION
STORM WATER UTILITY PAGES 137 - 138
Spring Waste
Collection
Fall Leaf
Collection
Branch & Limb
Collection
Yard Waste
Processing
2024 2025 2026 2027
$ 207,512
$ 211,439
$ 254,375
$ 215,805
$ 213,638
$ 223,413
$ 247,050
Actual/Projected Budget
Page 48 of 57
INTERNAL
SERVICE FUNDS
2027 BUDGET PROPOSAL • PUBLIC WORKS
Page 49 of 57
STREET EQUIPMENT
INTERNAL SERVICE FUND PAGES 146 - 147
2024 2025 2026 2027
$ 445,323
$ 457,954
$ 1,191,680
$ 856,000
$ 957,000
$ 1,049,000
$ 1,081,968
Actual/Projected Budget
Equipment
Replacement
• #0022 Dump Truck – Snow Package $188K
• #0033 Dump Truck – Snow Package $188K
• #0017 Plow & Wing $60K
• #3010 Utility Truck $75K
• #0002 Pickup Truck (Operations) $54K
• #2001 Pickup Truck (Engineering) $55K
Page 50 of 57
PUBLIC WORKS FACILITY
INTERNAL SERVICE FUND PAGES 149 - 152
Vehicle
Maintenance Parts Inventory Fuel Station
Buildings
Maintenance
Tools &
Equipment
2024 2025 2026 2027
$ 1,240,354
$ 1,287,458
$ 1,553,424
$ 1,682,835
$ 1,370,134
$ 1,490,684
$ 1,528,533
Actual/Projected Budget
Page 51 of 57
CAPITAL PROJECTS
FUNDS
2027 BUDGET PROPOSAL • PUBLIC WORKS
Page 52 of 57
CAPITAL IMPROVEMENTS
CAPITAL PROJECTS FUNDS PAGES 149 - 152
Street / Utility Construction
• WIS 114 / Plank Rd (Manitowoc St – Melissa St) $414K *Utility Construction Only, Street Construction in 2028
• Brighton Dr (Bridge – Terminus) $569K
• Butte des Morts Dr (Lakecrest Dr – Tayco St) $146K
• Lakecrest Dr (7th St – Edgewater Dr) $142K
• First Addition to Lake Park Heights (Winnipeg St, Lotus Tr, Madi Ct, Tana Ln) $547K
• WIS 114 / Washington St (Fox River – Canal) $70K *Railroad Crossing Removal
• Beck St (Valley Rd – W Palisades Dr) $7K *Joint Project with Fox Crossing
• Pavement Replacement Program $101K *Street, Sidewalk, Curb & Gutter
• Pavement Preservation Program $110K *Chip Sealing & Crack Sealing
Page 53 of 57
CAPITAL IMPROVEMENTS
CAPITAL PROJECTS FUNDS PAGES 149 - 152
Other Construction
• Appleton Rd / 7th St Pedestrian Beacons $15K
• Lake Park Villas Spillway $200K
Engineering
• WIS 114 / Plank Rd (Manitowoc St – Melissa St) $124K *Design & Real Estate
• WIS 114 / Washington St / Tayco St (Nicolet Blvd – 3 rd St) $10K
• Pleasants Park Stormwater Facility $50K
• Fox River / South Shore Sanitary Sewer $125K
Page 54 of 57
CAPITAL IMPROVEMENTS
CAPITAL PROJECTS FUNDS PAGES 149 - 152
Beck St
WIS 114 / Washington St / Tayco St (Design)
Appleton Rd & 8th St Ped Beacons
Pleasants Park Stormwater Facility
WIS 114 / Washington St (Railroad Removal)
WIS 114 / Plank Rd (Design & Real Estate)
Pavement Replacement Program
Pavement Preservation Program
Fox River / South Shore Sanitary Sewer
Lakecrest Dr
Butte des Morts Dr
Lake Park Villas Spillway
WIS 114 / Plank Rd (Utility Work)
First Addition to Lake Park Heights
Brighton Dr
$7,000
$10,000
$15,000
$50,000
$69,900
$99,800
$100,500
$110,000
$125,000
$142,100
$146,000
$200,000
$414,400
$547,000
$568,800
General Fund Capital Projects Fund Sewage Utility Storm Water Utility TIF Other
Page 55 of 57
PUBLIC WORKS
STREET CONSTRUCTION RATE
PROJECTS BY CENTERLINE MILAGE
2022 2023 2024 2025 2026 2027 Average
1.3 mi
0.6 mi
2.2 mi
1.6 mi
0.6 mi
1.1 mi
1.2 mi
61 YEARS
REPLACEMENT
RATE
1.2 MI
AVERAGE
CONSTRUCTION
75 MI
TOTAL STREET
NETWORK
1.1 MI
PROPOSED
CONSTRUCTION
Page 56 of 57
Page 57 of 57
Source: City of Menasha website. First collected Nov 21, 2026.