RecordWell Data

Budget Review Session — Agenda Packet

City of Menasha · Winnebago County · Common Council · meeting of Nov 18, 2026 · Agenda packets

Open the original document More from City of Menasha

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

A Quorum of the Common Council, Administration Committee, Board of Public Works, Personnel Committee, Plan Commission, Redevelopment Authority, and other City bodies may attend this meeting, though no official action of these bodies will be taken. COMMON COUNCIL BUDGET REVIEW SESSION Wednesday, November 18, 2026 at 5:00 PM First Floor Conference Rooms 100 Main Street, Menasha, WI A. Call to Order B. Pledge of Allegiance C. Roll Call D. Public Comments on Any Matter of Concern to the City (5 minute time limit for each person) E. Elisha D. Smith Public Library Library, p. 329 F. Public Works Department Engineering, p. 240 | Street Construction/Excavation, p. 244 | Snow Removal, p. 247 | Traffic Control, p. 250 | Sidewalks, p. 254 | Street Lighting, p. 257 | Parking Lots, p. 260 | Refuse Collection, p. 263 | Weed Cutting, p. 266 | Lift Bridges, p. 269 | Recycling Fund, p. 70 | Sewage Utility Fund, p. 119 | Storm Water Utility Fund, p. 126 | Street Equipment Fund, p. 144 | Public Works Facility, p. 147 G. Adjournment "Menasha is committed to its diverse population. Our Non-English speaking population and those with disabilities are invited to contact the Menasha City Clerk at (920) 967-3608 24-hours in advance of the meeting for the City to arrange special accommodations." Page 1 of 57 BUDGET 2027 PRESENTATION Page 2 of 57 MENASHA STRONG Community Focused Response • Reopened the library less than 48 hours after July’s devastating tornado and adjusted hours to meet community needs • Served 30,000 community members in the first two months after the storm • Hosted numerous agencies assisting in the recovery • Partnered with local organizations to offer counseling services to local residents • Worked with the city departments and People of Progression to coordinate food and other resources to the community • Hosted multiple legal clinics to ensure community members were offered the guidance they needed Page 3 of 57 YEAR IN REVIEW Meeting Room Uses Visitor Count Community Value of Services +74.7% ytd + 26.1% ytd $ 5,789,199 4,316 uses as of the end of October. Library Checkouts + 10.9% ytd Our diverse collection of materials continues to see heavy usage by our community. 117,917 visitors compared to 93,477 in 2025. By the end of 2026 the community will receive a return on investment of 4 to 1. EXPLORE CONNECT CREATE Page 4 of 57 EXPLORE CONNECT CREATE MENASHA READS LITcoin LITcoins are tokens created by the Library to aid in our efforts to raise reading literacy skills in our community. LITcoins create a learning “currency” that may be utilized by multiple organizations and businesses throughout our community. This allows us to unify the multiple learning efforts happening throughout the area. LITcoins have also been made available to the Parks and Rec Department and the school district to reinforce learning efforts. Literacy Campaign Our Literacy Campaign is a collective effort promoting reading literacy skills across our community, creating a gateway to successful, interest-driven lifelong learning. Below are some of the individual programs which fall under the campaign banner. • Storytime programs • 1000 Books Before Kindergarten • 500 Books Before Middle School • 250 Books Before High School • 100 Books Before Graduation • Library cards for all 1st Graders • Little Library seeding project • Pages and Parks w/ Parks and Rec • Traveling Tales – books walks (spring 2027) • Literacy Resource Center Page 5 of 57 SMITHworks Interest Driven Learning • Approach that uses a learner’s personal curiosity, hobbies, or passions as the primary vehicle for learning • Research shows learners work harder when they care about the subject matter. • Critical Thinking: Fosters problem-solving, persistence, and self-regulation. • Lifelong Engagement: Cultivates a habit of self-directed learning outside and beyond formal schooling. Targeted Programs Drop-ins Badges 34 programs attended by 905 people Over 6000 people have used the SMITHworks creative space so far in 2026. Badging allows patrons to use SMITHworks any time the library is open. To date we have issued 828 badges. 21st Century Literacies • Critical thinking • Collaboration • Communication • Creativity • Innovation • Self-direction • Flexibility • Adaptability • Productivity • Responsibility • Social and cross-cultural awareness Page 6 of 57 STRATEGIC PLAN Early in 2026 the library completed its 2026 to 2030 strategic plan. The process identified four focus areas. Where our Whole Community Gathers We are a welcoming and vibrant space where people of all ages feel a sense of belonging, connection, and pride. We champion lifelong learning by offering accessible, relevant, and engaging opportunities for reading, digital skills, creativity, and personal growth. EXPLORE CONNECT CREATE Literacy, Learning, and Exploration A Strong and Supported Organization We invest in our staff, processes, and operations to provide sustainable, high- quality service for our community. Strengthening Our Community We foster community cohesion and trust by building strong partnerships and connecting residents with information, resources, and one another. Page 7 of 57 OUR PROGRESS Objective - Enhance the visibility and usability of library spaces to support comfort, exploration, and community identity. Created sensory sensitive space to offer calm, low-stimulation environment designed to help neurodivergent individuals and people with sensory processing differences rest, regulate, and avoid sensory overload. – completed 10-26 GOAL 1: Where our Whole Community Gathers Objective - Activate library spaces, both indoor and out, to keep the community engaged, excited, and exploring. Teens, with the help of staff, developed an outdoor trellis garden to grow vegetables and flowers on the library patio. – completed 5-26 EXPLORE CONNECT CREATE Page 8 of 57 OUR PROGRESS cont. Objective - Deepen literacy support for youth and families by nurturing reading skills, curiosity, and family engagement. In 2026 the library kicked off its new literacy initiative mentioned in its own slide earlier. GOAL 2: Literacy, Learning, and Exploration Objective - Develop structured SMITHworks programming that supports exploration, skill-building, and identity development for teens, adults, and families. Began hosting the Valley Robotics group in our spaces, offering STEM learning opportunities to our community. We are in the initial phases of partnering with a valley’s first Trash Scout Dumpster. Page 9 of 57 Friends of the Elisha D. Smith Public Library SUNDAY NOVEMBER 29th 12 - 3:30 pm Holiday Book and Craft SALE 440 First St. Menasha, WI 54952 920-967-3690 menashalibrary.org Company E Room Main Floor OUR PROGRESS cont. Objective - Build staff skills and stability by spotting gaps or single person expertise, clarifying key practices, and supporting balanced workloads. Our materials processing team is currently reevaluating our materials process from ordering through the items being placed into circulation for our patrons. GOAL 3: A Strong and Supported Organization Objective - Strengthen funding stability and increase budget transparency so the library can plan confidently and invest in staff and community priorities. The library’s friends group is currently in the process of evaluating its organization, goals, and a strategic plan to better assist the library in providing services to our community. Page 10 of 57 2027 GOALS Expand Literacy Campaign work to better include community partners Develop library CONNECT programming slate This programming series focuses our efforts focused on community building and leisure at the library. Continue to develop identifiable library branding Continue partnership development with an added goal of creating a localized subject matter expert listThey say, “it takes a village.” In order to improve literacy across a community we need to engage and collaborate with all of the organizations working with our children. Getting the word out on our numerous programs is an ongoing challenge. One of the ways to improve this is to develop our brand so people immediately identify our work. Page 11 of 57 2027 BUDGET REQUEST $2.21M Total requested 2027 budget from all sources. $770K 35% of the library’s overall budget comes to us in the form of county payments for service. 3.61% The overall budget increase puts us just behind the inflation rate for 2026 of 3.7% U.S. Labor Dept. Page 12 of 57 BUDGET BREAKDOWN $47K $427K $1.2M Drivers: The wages and salaries line items are driven primarily by employees moving through the approved pay scale and annual cost of living adjustments. In 2026 there were some staffing changes that reduced this areas overall impact to the budget. Wages and Salaries Benefits Drivers: Healthcare is always the largest piece of this expense category. The work of our HR Department has mitigated this areas impact to the overall budget by holding our increase in 2027 to 2%. Contract Services Drivers: The majority of this line is the cost of janitorial services for the building. Page 13 of 57 $85K BUDGET BREAKDOWN $42.5K $73K EXPLORE CONNECT CREATE Utilities After a year plus of operation in the renovated building we seem to have dialed in on efficiencies of newly installed heating and coo ling systems. Maintenance Costs Cost of Office Equipment / Specialized Equipment is largely offset by revenue from printing charges. Library System Payment This charge is for the library’s access to delivery, the shared system catalog, and IT support. Page 14 of 57 BUDGET BREAKDOWN $7.35K $291K This category covers most of the expenses for services to our patrons, largely library materials; but also including computers, program supplies, and technology. Supplies Staff Development Expenses for training and travel, including membership to professional organizations. EXPLORE CONNECT CREATE Page 15 of 57 BUDGET BREAKDOWN $30K Miscellaneous Expenses EXPLORE CONNECT CREATE Page 16 of 57 Special thanks to my library team who make all of the things we do on behalf of our community possible. Thank you to the city council and library board for supporting the work we do. QUESTIONS Page 17 of 57 2027 Budget Proposal DEPARTMENT OF PUBLIC WORKS Page 18 of 57 Our Mission The City of Menasha Public Works Department is dedicated to forging a vibrant future for our 18,000+ residents and visitors through high-quality services and dependable infrastructure. With extensive in-house capabilities for a department of our size, we deliver sustainable, budget-conscious solutions with unmatched small-town care. Anchored by our historic waterfront, we are committed to building upon a legacy of resilience and hospitality that makes Menasha, Your Place on the Water. Page 19 of 57 What We Do Waste Disposal Services • Garbage and recycling pickup and disposal operations. Yard waste collection and composting. Road Maintenance & Repair • Pothole filling, pavement patch repairs, street resurfacing, and sidewalk repairs. Street Cleaning • Street sweeping and debris removal from public areas. Snow & Ice Control • Plowing, salting, and snow removal during winter. Traffic Management • Maintenance of signals, signs, and road markings. Oversight of street closures and parking regulations. Construction Projects • Planning, engineering, design, and inspection of city infrastructure projects. Stormwater Management • Maintenance of storm sewers and detention ponds. Administration of water quality and flood prevention programs. Wastewater Distribution • Maintenance of sanitary sewers and pump stations. Fleet Maintenance • Servicing of vehicles and equipment for the city and municipal partners. Bridge Operations • Upkeep of city-owned bridges and operation of Fox River lift bridges in Menasha. Page 20 of 57 Organizational Chart Taxpayers Common Council Mayor Director of Public Works Deputy Director of Municipal Operations Public Works/Parks Superintendent Streets Lead Equipment Operator - Streets (8) Equipment Operator - Sanitation (6) Sewer Equipment Operator Equipment Operator - Sewer Traffic Technician Lead Mechanic Mechanic (2) Administrative Assistant Deputy Director of Engineering Engineering Technician (3) Administrative Assistant Page 21 of 57 GENERAL FUND 2027 BUDGET PROPOSAL • PUBLIC WORKS Page 22 of 57 ENGINEERING GENERAL FUND  PAGES 242 - 245 Permit Review Regulation Compliance Project Design Construction Oversight Asset Management 2024 2025 2026 2027 $ 188,183 $ 180,188 $ 198,680 $ 188,790 $ 187,102 $ 193,904 $ 176,760 Actual/Projected Budget Page 23 of 57 STREET CONSTRUCTION GENERAL FUND  PAGES 246 - 248 Pavement Patching & Repair Preventive Maintenance Concrete Recycling Bridge Inspections Small Projects 2024 2025 2026 2027 $ 682,598 $ 797,416 $ 660,075 $ 678,845 $ 706,407 $ 682,617 $ 517,081 Actual/Projected Budget Page 24 of 57 SNOW & ICE OPERATIONS GENERAL FUND  PAGES 249 - 251 Plowing De-Icing Materials Inventory Equipment Replacement Code Compliance 2024 2025 2026 2027 $ 353,429 $ 452,122 $ 451,209 $ 422,892 $ 386,516 $ 366,569 $ 399,615 Actual/Projected Budget Page 25 of 57 TRAFFIC CONTROL GENERAL FUND  PAGES 252 - 255 Traffic Signs Pavement Markings Traffic Signals Temporary Traffic Control 2024 2025 2026 2027 $ 235,083 $ 282,249 $ 279,080 $ 267,309 $ 278,099 $ 277,620 $ 297,211 Actual/Projected Budget Page 26 of 57 SIDEWALK CONSTRUCTION GENERAL FUND  PAGES 256 - 258 Pavement Repair Disability Improvements 2024 2025 2026 2027 $ 138,760 $ 124,635 $ 169,685 $ 159,082 $ 174,493 $ 175,629 $ 174,276 Actual/Projected Budget Page 27 of 57 STREET LIGHTING GENERAL FUND  PAGES 259 - 261 Electricity Supplies Utility Locating 2024 2025 2026 2027 $ 158,420 $ 150,813 $ 161,322 $ 179,416 $ 178,516 $ 168,223 $ 163,834 Actual/Projected Budget Page 28 of 57 PARKING FACILITIES GENERAL FUND  PAGES 262 - 264 Parking Permits Stall Markings Pavement Patching & Repair Parking Ramp Maintenance 2024 2025 2026 2027 $ 19,962 $ 24,959 $ 29,762 $ 44,636 $ 41,901 $ 28,012 $ 30,648 Actual/Projected Budget Page 29 of 57 REFUSE COLLECTION GENERAL FUND  PAGES 265 - 267 Household Garbage Collection Bulky Item Collection Dumpster Rental Program Commercial Dumpster Servicing Tipping Fees Code Compliance Cart Repair & Replacement 2024 2025 2026 2027 $ 1,003,342 $ 1,040,914 $ 979,631 $ 1,023,810 $ 1,030,999 $ 1,038,904 $ 947,713 Actual/Projected Budget Page 30 of 57 WEED CUTTING GENERAL FUND  PAGES 268 - 270 Trimming / Cutting Weed Control Code Compliance 2024 2025 2026 2027 $ 19,565 $ 27,061 $ 23,871 $ 36,941 $ 30,165 $ 24,178 $ 25,303 Actual/Projected Budget Page 31 of 57 LIFT BRIDGES GENERAL FUND  PAGES 271 - 274 Bridge Tending Structural Maintenance Mechanical Maintenance Routine Inspections 2024 2025 2026 2027 $ 117,719 $ 134,720 $ 183,736 $ 160,959 $ 148,173 $ 185,128 $ 219,906 Actual/Projected Budget Page 32 of 57 RECYCLING FUND 2027 BUDGET PROPOSAL • PUBLIC WORKS Page 33 of 57 RECYCLING COLLECTION RECYCLING FUND  PAGE 73 Household Recycling Collection Recycling Drop- Off Center Contraband Disposal Cart Repair & Replacement Tipping Fees 2024 2025 2026 2027 $ 268,345 $ 273,316 $ 285,842 $ 271,122 $ 277,769 $ 306,983 $ 316,757 Actual/Projected Budget Page 34 of 57 YARD WASTE COLLECTION RECYCLING FUND  PAGES 73 - 74 Spring Waste Collection Fall Leaf Collection Branch & Limb Collection Yard Waste Processing 2024 2025 2026 2027 $ 163,038 $ 166,127 $ 174,023 $ 171,534 $ 169,193 $ 177,184 $ 168,572 Actual/Projected Budget Page 35 of 57 APPLIANCE DISPOSAL RECYCLING FUND  PAGES 74 - 75 Appliance Disposal 2024 2025 2026 2027 $ 29,234 $ 23,067 $ 20,196 $ 32,601 $ 30,324 $ 30,628 $ 33,619 Actual/Projected Budget Page 36 of 57 SEWAGE UTILITY 2027 BUDGET PROPOSAL • PUBLIC WORKS Page 37 of 57 ENGINEERING SEWAGE UTILITY  PAGES 122 - 123 Permit Review Regulation Compliance Project Design Construction Oversight Asset Management 2024 2025 2026 2027 $ 138,032 $ 169,171 $ 198,279 $ 183,431 $ 177,312 $ 205,134 $ 205,761 Actual/Projected Budget Page 38 of 57 SANITARY SEWERS SEWAGE UTILITY  PAGES 123 - 125 Sewer & Lateral Construction Sewer Maintenance Lift Stations Utility Locates Sewer Monitoring Sewer Assistance Programs 2024 2025 2026 2027 $ 579,970 $ 568,459 $ 1,167,118 $ 1,352,273 $ 1,003,476 $ 1,281,784 $ 1,861,006 Actual/Projected Budget Page 39 of 57 SEWAGE TREATMENT SEWAGE UTILITY  PAGE 125 Wastewater Treatment Treatment Plant Upgrades 2024 2025 2026 2027 $ 1,154,986 $ 999,616 $ 1,150,000 $ 920,000 $ 1,100,000 $ 1,150,000 $ 1,200,000 Actual/Projected Budget Page 40 of 57 STORM WATER UTILITY 2027 BUDGET PROPOSAL • PUBLIC WORKS Page 41 of 57 ENGINEERING STORM WATER UTILITY  PAGES 130 - 132 Permit Review Regulation Compliance Project Design Construction Oversight Asset Management 2024 2025 2026 2027 $ 64,519 $ 200,588 $ 267,179 $ 232,055 $ 228,660 $ 317,422 $ 237,318 Actual/Projected Budget Page 42 of 57 STREET CONSTRUCTION STORM WATER UTILITY  PAGES 132 - 133 Curb & Gutter Construction Concrete Tools & Equipment Concrete Recycling 2024 2025 2026 2027 $ 52,115 $ 102,610 $ 433,220 $ 493,219 $ 693,559 $ 437,919 $ 296,450 Actual/Projected Budget Page 43 of 57 STREET CLEANING STORM WATER UTILITY  PAGES 133 - 134 Street Sweeping 2024 2025 2026 2027 $ 189,145 $ 190,985 $ 210,609 $ 192,713 $ 201,727 $ 210,377 $ 197,219 Actual/Projected Budget Page 44 of 57 SNOW & ICE OPERATIONS STORM WATER UTILITY  PAGES 134 - 135 Snow Hauling 2024 2025 2026 2027 $ 52,997 $ 80,439 $ 75,453 $ 73,908 $ 77,541 $ 72,622 $ 75,951 Actual/Projected Budget Page 45 of 57 STORM SEWERS & DRAINS STORM WATER UTILITY  PAGES 135 - 136 Sewer & Drain Construction Sewer & Drain Maintenance Utility Locates Pond Maintenance Residential Drainage Program Stormwater Permits & Dues 2024 2025 2026 2027 $ 242,052 $ 253,813 $ 689,930 $ 1,384,315 $ 929,369 $ 767,882 $ 728,164 Actual/Projected Budget Page 46 of 57 PARKING FACILITIES STORM WATER UTILITY  PAGES 136 - 137 2024 2025 2026 2027 $ 13,749 $ 14,205 $ 17,185 $ 20,119 $ 18,750 $ 17,139 $ 17,727 Actual/Projected Budget Snow Hauling Page 47 of 57 YARD WASTE COLLECTION STORM WATER UTILITY  PAGES 137 - 138 Spring Waste Collection Fall Leaf Collection Branch & Limb Collection Yard Waste Processing 2024 2025 2026 2027 $ 207,512 $ 211,439 $ 254,375 $ 215,805 $ 213,638 $ 223,413 $ 247,050 Actual/Projected Budget Page 48 of 57 INTERNAL SERVICE FUNDS 2027 BUDGET PROPOSAL • PUBLIC WORKS Page 49 of 57 STREET EQUIPMENT INTERNAL SERVICE FUND  PAGES 146 - 147 2024 2025 2026 2027 $ 445,323 $ 457,954 $ 1,191,680 $ 856,000 $ 957,000 $ 1,049,000 $ 1,081,968 Actual/Projected Budget Equipment Replacement • #0022 Dump Truck – Snow Package $188K • #0033 Dump Truck – Snow Package $188K • #0017 Plow & Wing $60K • #3010 Utility Truck $75K • #0002 Pickup Truck (Operations) $54K • #2001 Pickup Truck (Engineering) $55K Page 50 of 57 PUBLIC WORKS FACILITY INTERNAL SERVICE FUND  PAGES 149 - 152 Vehicle Maintenance Parts Inventory Fuel Station Buildings Maintenance Tools & Equipment 2024 2025 2026 2027 $ 1,240,354 $ 1,287,458 $ 1,553,424 $ 1,682,835 $ 1,370,134 $ 1,490,684 $ 1,528,533 Actual/Projected Budget Page 51 of 57 CAPITAL PROJECTS FUNDS 2027 BUDGET PROPOSAL • PUBLIC WORKS Page 52 of 57 CAPITAL IMPROVEMENTS CAPITAL PROJECTS FUNDS  PAGES 149 - 152 Street / Utility Construction • WIS 114 / Plank Rd (Manitowoc St – Melissa St) $414K *Utility Construction Only, Street Construction in 2028 • Brighton Dr (Bridge – Terminus) $569K • Butte des Morts Dr (Lakecrest Dr – Tayco St) $146K • Lakecrest Dr (7th St – Edgewater Dr) $142K • First Addition to Lake Park Heights (Winnipeg St, Lotus Tr, Madi Ct, Tana Ln) $547K • WIS 114 / Washington St (Fox River – Canal) $70K *Railroad Crossing Removal • Beck St (Valley Rd – W Palisades Dr) $7K *Joint Project with Fox Crossing • Pavement Replacement Program $101K *Street, Sidewalk, Curb & Gutter • Pavement Preservation Program $110K *Chip Sealing & Crack Sealing Page 53 of 57 CAPITAL IMPROVEMENTS CAPITAL PROJECTS FUNDS  PAGES 149 - 152 Other Construction • Appleton Rd / 7th St Pedestrian Beacons $15K • Lake Park Villas Spillway $200K Engineering • WIS 114 / Plank Rd (Manitowoc St – Melissa St) $124K *Design & Real Estate • WIS 114 / Washington St / Tayco St (Nicolet Blvd – 3 rd St) $10K • Pleasants Park Stormwater Facility $50K • Fox River / South Shore Sanitary Sewer $125K Page 54 of 57 CAPITAL IMPROVEMENTS CAPITAL PROJECTS FUNDS  PAGES 149 - 152 Beck St WIS 114 / Washington St / Tayco St (Design) Appleton Rd & 8th St Ped Beacons Pleasants Park Stormwater Facility WIS 114 / Washington St (Railroad Removal) WIS 114 / Plank Rd (Design & Real Estate) Pavement Replacement Program Pavement Preservation Program Fox River / South Shore Sanitary Sewer Lakecrest Dr Butte des Morts Dr Lake Park Villas Spillway WIS 114 / Plank Rd (Utility Work) First Addition to Lake Park Heights Brighton Dr $7,000 $10,000 $15,000 $50,000 $69,900 $99,800 $100,500 $110,000 $125,000 $142,100 $146,000 $200,000 $414,400 $547,000 $568,800 General Fund Capital Projects Fund Sewage Utility Storm Water Utility TIF Other Page 55 of 57 PUBLIC WORKS STREET CONSTRUCTION RATE PROJECTS BY CENTERLINE MILAGE 2022 2023 2024 2025 2026 2027 Average 1.3 mi 0.6 mi 2.2 mi 1.6 mi 0.6 mi 1.1 mi 1.2 mi 61 YEARS REPLACEMENT RATE 1.2 MI AVERAGE CONSTRUCTION 75 MI TOTAL STREET NETWORK 1.1 MI PROPOSED CONSTRUCTION Page 56 of 57 Page 57 of 57

Source: City of Menasha website. First collected Nov 21, 2026.