Lake Geneva Utility Commission Minutes
Lake Geneva Utility Commission Meeting
Monday October 19, 2026, 4:00pm
Council Chambers, City Hall – 626 Geneva St
Call Meeting to Order – Lyon called the meeting to order at 4:00pm.
Roll Call – Lyon, Binn, Fesenmaier, Smith & Marquardt Excused: De Angles & Krause
Staff in Attendance – Gajewski & Busch
Also in attendance: Terri Meyerhofer, MSA Professional Services & representatives from Ehler
Comments from the public as allowed by Wis. Statutes §19.84(2), limited to items on this agenda except for
public hearing items. Comments will be limited to 5 minutes.
None
Approve Utility Commission Minutes from September 21, 2026, as prepared and distributed
Binn/Smith motion to approve. Passed 5-0 on a voice vote.
Acknowledgement of Correspondence
None
Approval of September 2026 Financials
Binn/Smith motion to approve. Passed 5-0 on a voice vote.
Approval of September 2026 Bills
Binn/Fesenmaier motion to approve. Passed 5-0 on a voice vote.
Director’s Report
Gajewski gave an overview of the submitted Director’s report.
Discussion/Action regarding a request for the extension of sanitary sewer to 829 Sage St
Gajewski explained that the property owner approached him requesting sanitary sewer service be extended to this
vacant parcel. The property owner signed an agreement to pay for MSA to put together an estimated construction
cost for the sewer extension. After receiving the estimated cost, the property owner has decided not to proceed.
Discussion was had regarding the location of the empty lot and options for extending the sewer main. No action
taken.
Discussion/Action regarding Amendment #1 to the Professional Services Agreement with MSA
Professional Services for the Hwy 50 Utilities Reconstruction Project
This amendment is for work related to the Highway 50 project and would include all construction-related
services. The construction of this project will take place over a two-year period, so the amounts are broken out
over that time. This amendment takes us through construction closeout in 2029 and staff recommend approval.
Marquardt/Fesenmaier motion to approve. Passed 5-0 on a voice vote.
Discussion/Action regarding a Professional Services Agreement with MSA Professional Services for the
East Side Sanitary Sewer Upsizing Project
Gajewski detailed the area where the sanitary sewer main runs. To meet future development needs, this sewer
main needs to be upsized and this was identified in the 2019 Capacity Analysis & Master Plan. The first step is
to update our sewer model and perform in-field survey work on manholes & structures. There is a lack of plans
and as-builts for the sewer main in this area. This project was included in the Public Facilities and Needs Review
that was performed in 2022 and Gajewski believes it will qualify for impact fee use. He talked about costs and
funding options and will run the project by the city attorney for impact fee use.
Binn/Marquardt motion to approve. Passed 5-0 on a voice vote.
Discussion/Action regarding submitting a formal request to the City of Lake Geneva to allow for the
relocation of an existing hydrant and the installation of a new hydrant on parcel ZYUP00131 as a result of
utility conflicts related to WisDOT STH 50 road project.
Gajewski explained that WisDOT has a conflict with the storm drains and the location of the current hydrant on
Highway 50. Once moved, the hydrant will become non-compliant with WI DNR code, and a second hydrant
will need to be installed per State regulations. The best location for the new hydrants will be on city owned
property so the Commission must formally request permission from City Council to allow the placement of the
new hydrants on city property.
Binn/Fesenmaier motion to approve. Passed 5-0 on a voice vote.
Discussion/Action regarding a proposal prepared by Ehlers to provide Water & Sewer Rate Study services
Gajewski said that after the conversation about funding the Highway 50 project at August’s meeting, he reached
out to Ehlers who are a trusted resource for the City and asked them to look at where our finances are and what
funding options might be available to us. They have put together a scope of services, and the cost would be split
across both utilities.
Fesenmaier/Binn motion to approve. Passed 5-0 on a voice vote.
Discussion/Action regarding a request to WisDOT for non-participating utility improvements within
project 3180-07-01 STH 120
Gajewski said that WisDOT are doing a mill and overlay on STH 120 and there are multiple utility conflicts that
require manholes and valve boxes be adjusted to construction grade. WisDOT would include this work in their
project scope, but the costs would be borne by the Utility. This project is expected to take place in 2029/2030.
Discussion was had on expected costs of $11,500.
Smith/Marquardt motion to approve. Passed 5-0 on a voice vote.
Discussion/Action regarding the purchase of a Wachs valve maintenance trailer
Gajewski talked about the need for a valve turner and the difference between the units that have been quoted and
are included in the packet. This purchase was included in the 2026 budget. It may be possible to include this
purchase in the Safety Grant Funding in 2027 but that can be done retroactively.
Fesenmaier/Smith motion to approve the Wachs unit. Passed 5-0 on a voice vote.
Discussion/Action regarding a preliminary draft of the 2027 Utility Operating & Maintenance Budgets
Gajewski went over the draft budgets for both utilities and gave some growth statistics in population due to new
development, customers served by the Utility and revenues. He presented a new full-time employee position that
will be included in the 2027 budget and talked about the need for the new position. The job description and grade
placement would be reviewed by McGrath and recommendation brought back to the Commission before hiring in
2027.
Marquart/Binn motion to direct the Utility Director to proceed on the basis of this preliminary budget for
subsequent review at the November meeting. Passed 5-0 on a voice vote.
Adjourn
Fesenmaier/Smith motion to adjourn at 4:49pm. Passed 5-0 on a voice vote.
/s/ J Busch