Tri-County Trails — Minutes
Green County · Green County · Tri-County Trails · meeting of Oct 22, 2026 · Minutes
Open the original document More from Green County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Page 1 of 4 These minutes are subject to approval at the next regular commission meeting.
TRI-COUNTY TRAIL COMMISSION
MINUTES
October 22,2026
7:00 PM
Lafayette County Multipurpose BLDG
11974 Ames Road, Darlington, WI 53530
1. Call to Order: The meeting was called to order at 7:01 PM by Chair Flannery.
Members Present:
Green County – Paul Hardenstine, Larry Kranig, William Burchard
Iowa County – Michael Gates
Lafayette County – Jeff Berget, Donna Flannery, Luke McGuire
Members Absent:
Lafayette County –Mark Pinch (excused)
Others Present:
Jeff King- Tri-County Trail Coordinator, Max Blackbourn – Outgoing Trail Coordinator, Deb Krahenbuhl –
Trail Liaison
Rob McConnell – WATVA
Lauren Ray – Origin Design
Public –Sheldon Krahenbuhl, Doug Mayer, Jean North, Duke Ruf, Connor McGowan
2. Proof of Proper Posting: Flannery asked for proof of proper posting. King stated the agenda was
posted at the Green, Iowa and Lafayette County Courthouses, sent to all Lafayette County Departments
to post in their facilities, the Pecatonica Valley Leader and the Lafayette County Website.
3. Approval of Agenda: Motion by Berget, seconded by McGuire, to approve agenda as printed.
Voice vote. Motion carried.
4. Approval of Minutes for September 24, 2026: Motion by Gates, seconded by Kranig, to approve
minutes as printed. Voice vote. Motion carried.
5. Public Comment: None
6. Introduction of new Tri-County Trail Coordinator - Jeff King: King introduced himself to the
group as the new trail coordinator beginning on Monday October 19, 2026. This was King’s 4th day on
the job, and he shared information about his personal and professional background with the group and
his desire to get to know all stakeholders and to build trusting relationships with all.
7. Legislative or WATVA Updates – Rob McConnell: McConnell reported that with the election
coming in a couple of weeks there was little to report. He did share with the group that the Wisconsin
DNR was planning to raise the ATV/UTV Registration Fee by at least $1 to cover the cost of
administrative fees.
8. Discussion and Possible Action – Encroachment issues on trail system (if any): McGuire
reported some damage to the shoulder of the Cheese Country Trail a few miles north of Darlington likely
caused by ag equipment during this harvest season. It appeared that something quite heavy found a
soft spot on the shoulder and sunk in substantially causing damage to the bank and shoulder of the trail.
Discussion on historical practices of holding those responsible for damaging the trail occurred. Group
consensus was that in the past if we determined who caused the damage they were asked to repair at
their own cost. If county has to repair, a bill will be sent to the party responsible and if not paid, it would
be added to their next tax bill.
Page 2 of 4 These minutes are subject to approval at the next regular commission meeting.
Motion made by McGuire to attempt to determine who was responsible for the damage and if determined,
send them the bill for repair. If they do not pay, add it to their tax roll. Second by Burchard. Voice Vote:
Motion carried.
9. Discussion and Possible Action – Application for Utility Permit-ATC Line Y109: Discussion on
a permit application from American Transmission Company (ATC) to run overhead utilities across the
Cheese Country Trail in the Township of Darlington, just south of Darlington, WI. Discussion on
encroachment & setbacks and it was determined that there would be no utility poles on the trail right of
way and it was simply an overhead line that would transverse the trail at a 90-degree angle. Hearing no
further questions, a motion was made by McGuire, seconded by Kranig to approve the Utility Permit
application and send it to PRTC for final consideration. Voice vote. Motion carried.
10. Discussion and Possible Action – Selection of Snowmobile Club Representatives to form an
open/closed group: McGuire discussed the importance of having a working group that communicated
with each other to determine when there was enough snow to open the snowmobile trail and close the
ATV trail. Connor McGowan was present and represented one of the snowmobile clubs. McGowan
shared that the clubs all have a representative and they all created a group text last year. McGowan
reported they stayed in touch and communicated in a way that worked. McGuire emphasized the
importance of keeping the trail open to business as much as possible throughout the year. No further
action or discussion.
11. Updates on projects or action needed from the commission – Origin Design:
Lauren Ray of Origin Design gave updates on the following:
• Belmont Bridge #72 regarding the results of the H&H analysis (Floodplain) and preliminary
bridge replacement design & cost. It was determined that a 46’ Clear Span Bridge would meet
the needs of that bridge replacement. The H&H Analysis and bridge plan needs DNR approval
as this is on the Pecatonica State Trail. Ray also reported the cost of the bridge has gone up
considerably since the initial project estimate 2-3 years ago. The estimate will include abutment
wings, the bridge, grading and rip rap. It will not cover the cost of painting the bridge, which is
estimated to cost an additional $15,000. Final estimate to be provided soon.
• Slough Lane riprap: Ray noted that we can complete the project with a no-rise floodplain
certification. Ray also believes we will be eligible for a straightforward permit from the WI DNR if
we can do some bank stabilization at the top edge of the project vs. rip rap on the entire bank.
• Ray reported a survey team was heading out on the trail this week to look at bridges 2, 3, 18 and
48 as they are priority bridges.
• Bonner Branch project has been forwarded to the WI DNR with a turnaround time expected in
November.
No action taken.
A. Trail Coordinator’s Report
King reported out on a beaver dam north of Calamine that had created a public nuisance on, and
damage to the trail. The entirety of the dam is on the trail corridor, so King was able to begin the
process of removing the dam. Once the backed-up water recedes from the shoulder of the trail and it
dries out trail rehabilitation work may begin.
McGuire discussed a problem area east of Belmont that is in the floodplain and needs some work as it is
always wet. King confirmed he was meeting with the WI DNR to tour the Pecatonica State Trail and
discuss this problem area, the beaver dam and some bridge repair projects next Wednesday.
Discussions were held about the number of bridges that need work on the trail. Bridge #32 needs to be
replaced. A discussion occurred about replacing it with a rail car like bridge #35. It was determined that
if we do so, and keep it in place permanently, it must match the existing grade. A firm in IA will help with
engineering the end wall structural needs.
No action taken.
Page 3 of 4 These minutes are subject to approval at the next regular commission meeting.
B. Clubs Report (ATV and Snowmobile):
A brief discussion was held about the need to acquire some additional signs when it was determined
that no one had signs in stock. McGuire and Mayer discussed the need for portable signs to help
manage detours and closures in the future.
A discussion occurred about who will be conducting the grading going forward on the Cheese Country
Trail. McGuire and Berget informed the group that Lafayette County will be conducting the grading
moving forward.
A discussion occurred about the need for leadership, communication and direction from the commission
to the clubs. The club believes now is the time to build out a new structure where the trail coordinator
coordinates the work that needs to be done with the clubs. Krahenbuhl commented on how the club
wants to support the new trail coordinator by working together with a shared goal for the Tri County
Trails. Burchard asked if there was anything in writing outlining the job expectations of the clubs. The
consensus among the group was that there is not. Kranig offered if anything would be put in writing,
Green County Corp. Counsel would likely be willing to review it for the commission.
No Action Taken
12. Discussion and possible action – Budget for Trail Coordinator:
King asked the group what the budget would be for the trail coordinator position. King specifically
inquired as there will be bills to pay, such as his new cell phone bill, laptop, printing, postage, office
supplies, etc. McGuire explained that Lafayette County is funding the position’s 1040 hours and
explained that King would be responsible for managing those hours. McGuire explained that a
dedicated budget had not yet been developed for the trail coordinators’ operational needs. There was a
discussion about the need for UTV with a plan to purchase one in 2027. Kranig mentioned he would go
back to Green County and see if there is any assistance available to support the operating budget. A
discussion occurred about funding for more than 1040 hours. King explained that he was willing to work
more, but that there are policy considerations for the commission to consider. Lafayette County defines
a regular part-time employee who is eligible for benefits as someone working over 1200 hours annually.
King explained if he works over 1200 hours, the commission would want to investigate if the position
would become eligible for benefits and if that is something they would want to pay for. King also
explained the rules, at WI ETF and how they would affect an annuitant.
13. Discussion and Possible Action – Approval of Vouchers: Blackbourn presented the vouchers
for the commission’s consideration.
Berget shared that the policy moving forward will be to obtain pre -approval for any non -emergency
reimbursement. Motion by gates, second by Burchard to approve the vouchers as presented. Voice vote.
Motion carried.
Page 4 of 4 These minutes are subject to approval at the next regular commission meeting.
16. Discussion and Possible Action – Status of Funds: King presented the status of funds. Motion
made by McGuire, seconded by Berget to approve status of funds as presented. Voice vote. Motion
carried.
17. Future Agenda Items:
• Policy on Purchase Order System and what needs a PO
• Press release for bridge grants obtained
• Preliminary work needed for new bridge grants
18. Next Meeting Date (Lafayette County):
• Discussion was held about holding all meetings for the winter in Darlington. Green and Iowa
County Commissioners agreed. Next meeting, November 19, 2026, 7:00 PM at the
Multipurpose Building in Darlington.
19. Adjournment: Motion by McGuire seconded by Burchard, to adjourn. Voice vote. Motion carried.
Time: 8:48 PM
Minutes by Jeff King, Tri-County Trails Coordinator
Source: Green County website. First collected Nov 24, 2026.