City Plan Commission — Agenda Packet
City of Stevens Point · Portage County · City Plan Commission · meeting of Oct 5, 2026 · Agenda packets
Open the original document More from City of Stevens Point
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Our intention is to have in-person meetings going
forward. For the time being, we will hold the City
Committee Meetings, Plan Commission, Council and
most others at the Community Room at 933 Michigan
Avenue. This in-person location will meet the legal
requirement for our open meetings.
We will have a virtual option available, but the
technology for the hybrid style meeting may not be
reliable all of the time.
AGENDA
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date
and
Time:
October 5, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens Point, WI
OR
Zoom Teleconferencing
Meeting ID: 846 9672 6674
Passcode: 404491
By Computer:
https://us02web.zoom.us/j/84696726674?pwd=TH5lmqsabdjMDzeU
By Phone: +1-312-626-6799 (US Chicago)
Opening Section:
1. Roll Call
Discussion and Possible Action on:
2. Report of the September 8, 2026 meeting of the City Plan Commission.
3. Public Hearing and action on a request from the City of Stevens Point to amend Chapter
23, Zoning Ordinance, of the Revised Municipal Code of the City of Stevens Point. Said
request amends Ch. 23.02(1)(h)(2) & 23.02(1)(h)(3) to permit by right the construction of a
detached garage utilizing setback requirements of the “R-TND” Traditional Neighborhood
Overlay District.
4. Public Hearing and action on a request from the City of Stevens Point to amend Chapter
23, Zoning Ordinance, of the Revised Municipal Code of the City of Stevens Point. Said
request amends Ch. 23.01(16)(a) to allow the construction of privacy fencing up to six feet
in height at the alley right-of-way line.
5. Discussion only: data center construction - community input, led by Alderperson
Kneebone.
Closing Section:
6. Adjourn
Page 1 of 56
PLEASE TAKE NOTICE that any person who has special needs while attending these meetings or needs agenda materials for these meetings
should contact the City Clerk as soon as possible to ensure that a reasonable accommodation can be made. The City Clerk can be reached by
telephone at (715) 346-1569 or by mail at 1515 Strongs Avenue, Stevens Point, WI 54481.
Maps further defining the above area(s) may be obtained from the City of Stevens Point Department of Community Development, 1515
Strongs Avenue, Stevens Point, WI 54481, or by calling (715) 346-1567, during normal business hours.
PLEASE TAKE FURTHER NOTICE that a quorum of the Common Council may be in attendance at this meeting.
Page 2 of 56
MINUTES
CITY PLAN COMMISSION
Members
• Mayor Wiza
• Alderperson Kneebone
• Commissioner Arntsen
• Commissioner Beacom
• Commissioner Rice
• Commissioner Schade Stroik
• Commissioner Schuler
Date and Time: September 8, 2026
6:00 PM
Location:
Community Room
933 Michigan Avenue, Stevens
Point, WI
OR
Zoom Teleconferencing
Opening Section:
1. Roll Call
• Meeting called to order at 6:00 P.M.
• Members present: Mayor Wiza, Alder Kneebone, Commissioners Arntsen,
Beacom, Schade Stroik, Schuler.
• Members absent: Commissioner Rice.
Discussion and Possible Action on:
2. Report of the August 3, 2026 meeting of the City Plan Commission.
• Background: Minutes of the August 3, 2026, meeting of the City Plan
Commission were included in the agenda packet.
• Motion: Schade Stroik moves to approve the meeting minutes.
• Second: Arntsen seconds the motion.
• Vote: Unanimous approval.
3. Public Hearing and action on a request from Benjamin Nusz, representing
Mid-State Technical College, for a conditional use permit to operate a
technical college facility on the property located at 1101 Centerpoint Drive
(Parcel ID 281240832202976), consistent with Ch. 23.02(1)(c)(3)(d).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing: Mayor Wiza declares the public hearing open. None wishing to
speak, public hearing closed.
• Motion: Schuler moves to approve the conditional use permit, subject to the
conditions in the staff report.
• Second: Beacom seconds the motion.
Page 3 of 56
• Vote: Unanimous approval (Commissioner Arntsen recused).
4. Public Hearing and action on a request from Christy Harris for a conditional
use permit to operate a large group day care center on the property located
at 2343 Ellis Street (Parcel ID 281240833201902), consistent with Ch.
23.02(1)(b)(3)(e).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing: Mayor Wiza declares the public hearing open
o Kendra Mell, a neighbor of Christy Harris, speaks in favor of the request,
citing no issues.
o Agnus Kowalski,1425 Michigan Avenue, speaks in favor of the request,
and shares her positive experience with Christy.
o A letter from a neighbor was submitted.
• Motion: Beacom moves to approve the conditional use permit with staff
conditions.
• Second: Kneebone seconds the motion.
• Vote: Unanimous approval.
5. Public Hearing and action on a request from Bill Pritchard, representing the
Elizabeth Revocable Trust, for a final subdivision plat review on an
unaddressed parcel bounded by West Zinda Drive (Parcel ID
281240831401241) and Lots 1-15 of the Riverwood West Subdivision (Parcel
ID 281240831401211-281240831401226), consistent with Ch. 20.05(2).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing:
o Josh Curwen, 501 Johns Drive, speaks about the proximity of the project
to wetlands and the benefits of protecting wetlands.
o Natalie Wachowiak, West Maple Ridge Drive, shares her concerns
regarding negative environmental impacts.
o Katie Schimke, 440 West Trillium Court, speaks about other projects that
have been proposed in the area and the negative impacts of disrupting
wetlands.
o Jackie Schimke, 440 West Trillium Court, speaks about projects that were
denied in the area in the past and shares reasons for not approving the
current proposal.
o Ninth District Alderperson, Sam Lang, speaks against approving the
proposal, citing bedrock concerns and endangered animals.
o Jenny Burton, 5718 Sandpiper Drive, shares language that existed in the
original proposal describing portions as "undevelopable" and shares
concerns for the wetlands.
o Fourth District Alderperson, Andrea Olson, speaks about additional
conditions that could be included if approved.
o Trina Dorn, 2725 Main Street, shares concerns regarding preservation of
the wetlands and speaks against approval.
Page 4 of 56
o Kaden Robinson, 3825 Robert Place, speaks about the endangered
animals he has observed in the proposed area and speaks against
approval.
• Discussion:
o Attorney Beveridge provides clarification on potential liability.
• Motion: Arntsen moves to approve, subject to staff conditions.
• Second: Schuler seconds the motion.
• Vote: Motion carries with 4 votes in favor and 2 against (Schade Stroik,
Kneebone).
6. Public Hearing and action on a request from Jim Lucas, representing R&L
Developers, for a conceptual plan review of a proposed multi-family
residential development on the property located at 1016 Third Street (Parcel
ID 281240832200425), consistent with Ch. 23.02(4)(b)(5).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Public Hearing:
o John Reichert, Great Northern Distilling, shares his concerns regarding
parking.
• Motion: Schade Stroik moves to approve the conceptual plan with staff
recommendations.
• Second: Schuler seconds the motion.
• Vote: Unanimous approval.
7. Public Hearing and action on a request from Jim Lucas, representing R&L
Developers, for a conditional use permit to construct a multi-family
residential building on the property located at 1016 Third Street (Parcel ID
281240832200425), consistent with Ch. 23.02(1)(f)(3)(b).
• Public Hearing: Mayor Wiza declares the public hearing open. None wishing to
speak, public hearing closed.
• Motion: Schuler moves to approve the conditional use permit, subject to staff
conditions.
• Second: Schade Stroik seconds the motion.
• Vote: Unanimous approval.
8. A request from Jim Lucas, representing R&L Developers, for a site plan
review to construct a multi-family residential building on the property
located at 1016 Third Street (Parcel ID 281240832200425), consistent with
Ch. 23.02(4)(b)(1)(2).
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Motion: Schade Stroik moves to approve the site plan to construct a multi-family
residential building based on staff conditions.
Page 5 of 56
• Second: Kneebone seconds the motion.
• Vote: Unanimous approval.
9. Public Hearing and action on a request from the City of Stevens Point to
amend Chapter 23, Zoning Ordinance, of the Revised Municipal Code of the
City of Stevens Point. Said request amends Ch. 23.01(17)(i)(3)(a)(iv) to
increase the maximum turnaround area size allowed for driveways off of an
arterial street from 80 square feet to 120 square feet.
• Background: Associate Planner & Zoning Administrator Kuhn provides an
overview of the request.
• Motion: Kneebone moves to approve the ordinance amending the zoning code.
• Second: Schade Stroik seconds the motion.
• Vote: Unanimous approval.
10. July 2026 Monthly Report.
• Background: Monthly reports are included in the agenda packet.
Closing Section:
11. Adjourn
• Meeting adjourned at 7:28 P.M.
Page 6 of 56
City of Stevens Point
1515 Strongs Avenue
Stevens Point, WI 54481-3594
Department of Community Development
Adam Kuhn
Associate Planner
Zoning Administrator
Ph: (715) 346-1567
Fax: (715) 346-1498
www.stevenspoint.com
Open Records Rider: The City of Stevens Point is subject to Wisconsin Statutes relating to public records.
Communication, such as this document, sent or received by City employees are subject to these laws. Unless
otherwise exempted from the public records law, senders and receivers of City communication should
presume that the communications are subject to rel ease upon request, and to state record retention
requirements.
Page 1 of 2
MEMORANDUM
To: Plan Commission
From: Adam Kuhn, AICP
Associate Planner / Zoning Administrator
Date: October 5, 2026
RE: Zoning Ordinance Amendment – “R-TND” Garages and Fencing
-------------------
Background: Enclosed you will find two proposed amendments to the City’s Zoning
Ordinance.
Text Amendment – “R-TND”
Garage Setbacks: The first
amendment pertains to the
construction of detached
garages within the “R-TND”
Traditional Neighborhood
Overlay District. Since the
creation of the City’s “R-TND”
Overlay District in the early-2000s,
lesser setback requirements were
possible for the construction of
principal and accessory
structures. Lesser setback
requirements for principal
structures were allowed via a
conditional use permit up until
the early-2020s, until the Council
moved to change said setbacks
requirements as permitted by
right. Lesser setback requirements
Page 7 of 56
stevenspoint.com
for detached garages have always been allowed via a conditional use permit. The
proposal is to permit garage “R-TND” setbacks by right, which has been identified
during the Zoning Ordinance rewrite project.
Setback requirements for detached garages in the “R-TND” District are as follows:
• Corner front yard: 20’
• Corner side yard: 12’ with no access to a public street
• Interior side yard: 1’
• Rear yard: 1’
Garage developments that do not seek to use “R-TND” setbacks are subject to the
following setback requirements that apply citywide.
• Corner front yard: Varies by zoning district – typically 25’
• Corner side yard: Varies by zoning district – typically 25’
• Interior side yard: 3’
• Rear yard: 3’
Text Amendment – Privacy Fencing Along Alleys: The second amendment pertains to
the maximum height that is allowed for privacy fencing along the alley right-of-way line.
Currently, privacy fencing along the street and alley right-of-way lines are allowed up
to three feet in height. If privacy
fencing is desired to be more
than three feet in height, it must
be set back a minimum of ten
feet from the right-of-way line.
The enclosed proposal seeks to
allow privacy fencing up to six
feet in height at the alley right-of-
way line. No changes are
proposed in relation to the street
right-of-way line. Please note that
the City’s clearview requirements
– the laws that dictate clear
visibility from driveways abutting
alleys – would still apply for fence
location.
Staff Recommendation: Staff
recommends APPROVAL of the
text amendments as presented.
Page 8 of 56
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE
OF THE CITY OF STEVENS POINT, WISCONSIN
[Chapter 23 of the Revised Municipal Code – Zoning Ordinance – “R-TND” Traditional
Neighborhood Overlay District]
The Common Council of the City of Stevens Point, Portage County, Wisconsin, do
ordain as follows:
SECTION I: That Section 23.02(1)(h)(2) and 23.02(1)(h)(3), Zoning Ordinance of the
Revised Municipal Code of the City of Stevens Point, shall be amended as follows:
2) Permitted Uses: as allowed in the underlying zoning district and as outlined
below:
a) All setback requirements of the underlying district apply.
b) Alternate permitted setbacks for Single- and Two-Family Uses, provided
that the following development standards are met. If the following
development standards are unable to be met, the applicant may apply
for an alternative setback through the conditional use permit process:
1) In no case shall the front facade of the building consist of a blank
wall or a series of garage doors.
2) One ground floor entry shall be oriented to the front of the lot on a
public or private street.
3) Attached garages shall be sited in several ways:
a) In the rear yard, accessed from a public street or an alley.
b) Accessed from a public street with the garage doors facing
the public street provided it be set back a minimum of two
(2) feet from the front façade of the building.
4) Consideration shall be given to the impact of the proposed
addition on neighboring light, ventilation, and privacy from existing
windows and yards.
Page 9 of 56
c) Alternate permitted setbacks.
1) Primary Structure
a) Front street yard - 12 feet
b) Corner street side yard – 12 feet
c) Interior side yard – 4 feet
d) Rear yard – 15 feet
2) Garage (attached to dwelling)
a) Front street yard – 20 feet
b) Corner street side yard – 12 feet, with no access to a public
street
c) Interior side yard – 4 feet
d) Rear yard – 15 feet
3) Detached Garage
a) Street front setback – 20 feet
b) Corner side yard – 12 feet, with no access to a public street
c) Interior side yard – 1 foot
d) Rear yard – 1 foot
3) Conditional Uses as allowed in the underlying zoning district
The Common Council may consider the following conditional use setback
requirements as an alternative to the setback requirements in the underlying
zoning district. These conditional use setback requirements shall be applied to
only to single- and two- family uses.
Conditional Use Setback requirements:
• Detached Garage
o Street front setback – 20 feet
o Corner side yard – 12 feet, with no access to a public street
o Interior side yard – 1 foot
o Rear yard – 1 foot
The Corner side yard is the side yard adjoining the street on a lot bounded on
two or more sides by public right of way. As applied in this conditional use, the
Common Council shall define the primary facade of the home as being the front
yard and the secondary facade of the home as the side yard.
SECTION II: That this ordinance shall take effect upon passage and publication.
Page 10 of 56
Approved: ________________________________
Mike Wiza, Mayor
Attest: ________________________________
Susan Pagel, City Clerk
Dated: October 5, 2026
Adopted:
Drafted by: Adam Kuhn
Return to: City Clerk
Page 11 of 56
ORDINANCE AMENDING THE REVISED MUNICIPAL CODE
OF THE CITY OF STEVENS POINT, WISCONSIN
[Chapter 23 of the Revised Municipal Code – Zoning Ordinance – Fencing Standards]
The Common Council of the City of Stevens Point, Portage County, Wisconsin, do
ordain as follows:
SECTION I: That Section 23.01(16)(a) Zoning Ordinance of the Revised Municipal Code
of the City of Stevens Point, shall be amended as follows:
a) No fence shall rise over two feet in height above the level of the public sidewalk
or land surface within 20 feet of any two or more adjoining streets and ten feet
parallel and perpendicular to a driveway so as to interfere with traffic visibility
across from any corner.
Fences shall not be permitted within ten feet of any street or alley right-of-way in
such manner as to interfere with traffic visibility. In no case shall a fence with less
than 50 percent of its surface uniformly open and unobstructed in any area
exceed three feet in height in that part of a yard within ten feet of a street right-
of-way or alley right-of-way. In no case shall a fence with less than 50 percent of
its surface uniformly open and unobstructed in any area exceed six feet in height
in that part of a yard within ten feet of an alley right-of-way.
SECTION II: That this ordinance shall take effect upon passage and publication.
Approved: ________________________________
Mike Wiza, Mayor
Attest: ________________________________
Susan Pagel, City Clerk
Page 12 of 56
Dated: October 5, 2026
Adopted:
Drafted by: Adam Kuhn
Return to: City Clerk
Page 13 of 56
From: District 7
To: Mike Wiza; Adam Kuhn
Subject: Plan Commission Agenda Item Request
Date: Monday, September 28, 2026 2:14:38 PM
Mayor,
There have been several moves lately by local municipalities regarding the regulation of Data
Centers. I think we should get ahead of the game and at least discuss what Commissioners
and our constituents feel about Data Centers.
I would like to formally request that a Discussion Only item on Data Center Construction be
placed on the October 8, 2026 Plan Commission Agenda. That will give us, and the public, an
option to weigh in on the topic before the holidays and budgeting arrive!
Thank you Mayor,
Mary Kneebone
District 7 Alder
Get Outlook for iOS
Page 14 of 56
Page 15 of 56
About the Wisconsin Policy Forum
The Wisconsin Policy Forum was created on January 1, 2018, by the merger of the Milwaukee-based
Public Policy Forum and the Madison-based Wisconsin Taxpayers Alliance. Throughout their lengthy
histories, both organizations engaged in nonpartisan, independent research and civic education on
fiscal and policy issues affecting state and local governments and school districts in Wisconsin. WPF
is committed to those same activities and that spirit of nonpartisanship.
Preface and Acknowledgments
We wish to acknowledge and thank the support for this research from the Metropolitan Milwaukee
Association of Commerce, the League of Wisconsin Municipalities, the Wisconsin Realtors
Association, the Greater Madison Chamber of Commerce, and Forward Janesville. We also thank
those groups that shared or published data used in this report, including staff from the communities
of Mount Pleasant, Beaver Dam, Port Washington, Janesville, and DeForest.
Page 16 of 56
Grounding A
Charged Debate
Data Centers in Wisconsin
September 2026
Report Authors:
Jason Stein, President
Tyler Byrnes, Senior Research Associate
Page 17 of 56
2 Grounding a Charged Debate | September 202 6
Table of Contents
Introduction .................................................................................................................................................. 3
Part One: A Data Center Boom .................................................................................................................... 4
The Basics on Data Centers .................................................................................................................... 4
Wisconsin Developments ........................................................................................................................ 6
State Regulation of Data Centers ........................................................................................................... 7
Local Regulations on Data Centers ..................................................................................................... 12
Part Two: Fiscal & Economic Impacts of Data Centers ........................................................................... 15
Understanding the Regional Impacts of Data Centers ....................................................................... 15
Fiscal Impacts of Data Centers ............................................................................................................ 16
Part Three: Case Studies .......................................................................................................................... 26
Beaver Dam ........................................................................................................................................... 27
Mount Pleasant ..................................................................................................................................... 29
Janesville ............................................................................................................................................... 31
Port Washington .................................................................................................................................... 32
DeForest ................................................................................................................................................ 33
Part Four: Policy Options .......................................................................................................................... 35
Options to Change State Law ............................................................................................................... 35
Options to Guide Local Policy ............................................................................................................... 38
Conclusion ................................................................................................................................................. 40
Page 18 of 56
3 Grounding a Charged Debate | September 202 6
Introduction
Rarely has an issue rocketed up out of obscurity and captured the mind of the public with the speed
and intensity of data center development. Once a sleepy subject reserved for the systems
administrators, network engineers, and data scientists who worked with smaller server farms, efforts
to build a newer generation of massive data centers have attracted the attention of legislators,
protesters, and even comedians in Wisconsin and around the nation. The question of whether to
embrace or oppose these massive developments and the technology companies backing them has
spurred fierce debate around the state and country, with opponents gathering momentum.
The upsurge in attention is understandable given the eye-popping scale of some data center
investments in computing hardware, buildings, and land, which are expected in at least two cases in
Wisconsin to exceed $10 billion. Though it is not an apples-to-apples comparison, that level of
investment exceeds the real estate values of land and buildings in all but the largest communities in
Wisconsin. These “hyperscale” data center projects bring change to a community as well as some
additional risk, a large demand for electricity, and the potential for positive and negative effects.
In Wisconsin, reactions to data centers have varied widely. Mount Pleasant and Port Washington are
moving forward with the construction of hyperscale centers, while Madison and Douglas and
Outagamie counties have placed moratoria on the construction of large data centers before any
proposal to build one was even put forward in those communities. Competing bills to regulate data
centers have also been considered in the Legislature.
During the debate over these projects and resolutions, many conflicting claims have been made.
Artificial intelligence and data centers are relatively new concepts for many policymakers and the
public, and confusion about them is common. With this report, we seek to explain some of the key
local and state issues surrounding these projects. Support for this study came from the Metropolitan
Milwaukee Association of Commerce, the Greater Madison Chamber of Commerce, Forward
Janesville, the League of Wisconsin Municipalities, and the Wisconsin Realtors Association.
Our principal research questions include:
• How could data centers affect property values, tax rates, and the overall tax levies and
revenues within a municipality and county?
• What additional costs and risks could data centers bring for local governments?
• To what extent are resources such as electricity and water used by data centers?
• What policies should be considered by state and local officials such as electric rates for
data centers, development moratoria, and changes to tax increment financing rules?
In short, our study focuses on data centers, not the broader issues around artificial intelligence such
as employment impacts or safety concerns. These are crucial debates for federal and state officials
and society at large, but they lie outside the scope of this report.
As always in our work, we neither advocate for nor against data centers. Instead, we hope this study
will inform and serve legislators, municipal and county board members, and the general public as
they grapple with the potential benefits and risks of data centers in the months and years to come.
Page 19 of 56
4 Grounding a Charged Debate | September 202 6
Part One: A Data Center Boom
The rise of artificial intelligence and the demands for cloud-based storage and processing have
driven a boom in data center construction around the country. Over the past several years, the trend
has ramped up in Wisconsin. Data centers are being built at a cost in the billions of dollars in Mount
Pleasant, Port Washington, and Beaver Dam, and others have been proposed in communities such
as Janesville, DeForest, Menomonie, Kenosha, and two towns near Beloit (see Figure 1), in some
cases drawing significant opposition. The projects in
DeForest and Menomonie have been halted, and
other communities have passed moratoria to block
data centers from being built.
Here, we explore what data centers are, which
factors have fueled their rise, and how Wisconsin
compares to the nation. We then turn to what this
trend means for our state.
The Basics on Data Centers
These centers combine computing resources with data storage systems and network connections
both within the facility and with the outside world to allow users to process, store, and retrieve data
and perform tasks. In addition to servers, routers, and storage devices, data centers contain power
systems and backups along with ventilation, cooling, and fire suppression systems.
Data centers are not new and, even before the recent rapid growth in artificial intelligence (AI),
demand for their services had been rising due to cloud computing, streaming services, and the rise
in internet commerce
and applications.
According to the
University of Virginia,
Wisconsin is home to at
least 30 of these data
facilities – most are
older and much smaller
than the largest centers
now being built. The
current need to train
and operate AI models
has supercharged the
growth in data centers.
The facilities being built
by Microsoft Corp. in
Mount Pleasant in
Racine County and by
Vantage, Open AI, and
Data Centers Versus Artificial Intelligence
In this report, we focus on the siting and
regulation of data centers by local and state
governments and related issues – a huge topic
in itself. The regulation of artificial intelligence
lies outside the scope of this report. However,
the Forum recognizes the need to discuss AI
issues such as potential job loss, data privacy,
intellectual property, safety, misinformation,
and many more.
Page 20 of 56
5 Grounding a Charged Debate | September 202 6
Oracle in Port Washington in Ozaukee County are particularly massive, with each of them involving
billions of dollars in investment and large amounts of power and land.
The Fairwater AI data center in Mount Pleasant is being billed by Microsoft as the world’s most
powerful AI facility. The New York Times reported in July that it could be 100 times more powerful
than the data center that trained an early version of ChatGPT, the large language model that is the
flagship service of OpenAI. The company has said the Mount Pleasant facility will house hundreds of
thousands of the most powerful Nvidia graphics processing units – computer chips that were
originally created to process images but which are now commonly used for AI tasks because of their
speed and power. The facility can store exabytes of data – each one of those exabytes is equal to the
storage capacity of about eight million typical smart phones.
However, Wisconsin should not be seen as having an unusually large concentration of data centers.
In fact, the opposite appears to be true. A January 2026 study led by the Weldon Cooper Center for
Public Service at the University of Virginia for the Joyce Foundation reviewed data from Standard &
Poor’s on facilities around the nation ranging from 7,500 square feet in size up to 1.2 million. The
researchers found that in 2024, Wisconsin had the smallest share of data centers in operation
among eight Great Lakes states that also included Illinois, Ohio, New York, Pennsylvania, Minnesota,
Indiana, and Michigan.
This lag in Wisconsin is notable, particularly given that other states outside the Great Lakes region
such as Virginia and Texas have even more data centers. However, it is not necessarily surprising.
Data centers have typically been built near large urban centers – rural areas have made less sense
since it is more difficult to extend power and internet connections to these locations. In this region,
many data centers were constructed along the Interstate 80 corridor prior to 2023, and these efforts
are now extending into Wisconsin as companies look for available power and land.
As Figure 2 shows, the Weldon
Cooper Center report found that
Wisconsin had 32 operating data
centers, which was fewer than both
Michigan at 35 and Indiana at 38.
Twenty-eight of Wisconsin’s data
centers currently in operation were
classified as less powerful retail
facilities of between a few thousand
and tens of thousands of square feet.
Though data centers and AI are
commonly lumped together in the
public mind, they can be quite
different in size and scope and built
for different applications (see the text
box on the next page). Even among
centers designed for AI, facilities can
be used to train models to learn to
solve problems or to actually perform
Page 21 of 56
6 Grounding a Charged Debate | September 202 6
work for a wide base of users by
employing existing models to carry
out tasks through a process known
as inference.
Though retail data centers were the
largest type in each state, Wisconsin
was listed as having only one each of
the four other types such as
hyperscale and wholesale (see box).
Other states had substantial
numbers of the other generally larger
types. Ohio, for example, had 29
hyperscale centers and 10
wholesale centers, or more than all
of Wisconsin’s data centers
combined. New York has 11 data
centers doing just cryptocurrency
mining and hosting (see Figure 3).
In other words, Wisconsin appears far from the dreams of those who want to make the state a data
center leader or the concerns of those who worry they will upend our way of life. Though several
hyperscale data centers are currently being built in Wisconsin, that may not greatly change our
standing in the region or the nation given that many other large facilities are being built elsewhere.
Wisconsin
Developments
The data center developments in
Mount Pleasant, Beaver Dam, and
Port Washington are vast in scale
and will involve thousands of
construction workers laboring over
a period of several years to build.
Table 1 on the next page lays out
some of the key details for each
project based on local agreements
and tax increment district plans as
well as public statements by the
companies.
The biggest of the projects is being
built by Microsoft in Racine County.
So far, the company and the village
of Mount Pleasant have stated that over the next several years, the various phases of the data
Types of Data Centers by Power Usage
Highest Usage
• Hyperscale: Advanced and large-scale facilities operated by
major providers that exceed several hundred thousand square
feet with megawatts of power use to provide services such as
AI, cloud applications, and content streaming
• Cryptocurrency: Centers designed to efficiently and
consistently mine or host cryptocurrencies
Medium Usage
• Wholesale: Centers that provide sizable power, computing,
and cooling to a single tenant or a small number of them
Least Usage
• Telecom: Facilities owned by telecom providers that allow for
the sharing of data at the edge of networks and prioritize
connectivity and low latency
• Retail: Facilities that serve smaller clients
Source: University of Virginia Weldon Cooper Center
Page 22 of 56
7 Grounding a Charged Debate | September 202 6
center will add up to a campus with $8.4 billion in taxable land and buildings. The projected real
estate values may change as the new projects are completed and subjected to the property
assessment process. We have already seen assessed values come in higher than expected in some
cases.
Table 1: Major Data Center Projects In Wisconsin
Aspect of Project Port Washington Beaver Dam (With
Phase Two) Mount Pleasant
Developer or Company Vantage/Oracle/OpenAI Meta Microsoft
Stated Intended
Investment $15 billion (Phase One) Over $2 billion $20 billion
Projected Real Estate
Value $2.1 billion* $1.3 billion $8.4 billion*
Size in Square Feet 2.5 million 1.4 million 11.2 million
Construction Jobs at Peak 4,000 1,000+ 2,960 (Phase One)
Ongoing Operations Jobs 1,000 200+ 550 by end of 2026 with
more coming
Project Phase Under construction Under construction First phase completed; rest
under construction
Source: WPF research. *Reflects preliminary estimates that will be revised and may increase.
State Regulation of Data Centers
Data centers call for massive construction projects, and when they are finished and operating, they
draw a large amount of electricity from the grid and could send wastewater into sewer systems or
stormwater into lakes and rivers. Their backup generators and other operations could potentially
emit pollution into the air, and their construction and operations could create noise and traffic.
As a result, data centers are subject to a wide range of local, state, and even federal regulations.
These range from rules like the state building code, local zoning laws, and federal laws like the Clean
Water Act. Here we review some of the most important local, state, and federal issues and
regulations to understand how they apply and which level of government is responsible for them.
Power Demand Sparks Debate
Electricity arguably represents the single biggest challenge for large data centers and the single
biggest issue for policymakers. (We deal with economic questions in detail in the next section.) Prior
to the advent of data centers, power usage in Wisconsin was falling due to the loss of industry,
conservation efforts, and slowing population growth. As the Forum noted in a January brief, electricity
sales in Wisconsin in megawatt hours have fallen by 9% over the past 20 years, limiting the revenues
that utilities use to help maintain and upgrade generation and transmission assets in the state.
When adjusted for inflation, utility revenue has declined by 2.4% since 2005 and by 15.3% from its
peak in 2011. That decrease has reduced the revenues available for investments such as renewable
energy facilities or other upgrades to the state’s overall power system.
Page 23 of 56
8 Grounding a Charged Debate | September 202 6
Peak demand from all
customers dropped by less but
still fell 2.6% from a high of 15
gigawatts in 2006 to 14.6
gigawatts in 2024 (see Figure
4). Data centers are reversing
that trend along with other
new sources of demand such
as electric vehicles. Based on
the latest draft
utility
projections reported to the
state Public Service
Commission (PSC), peak
demand is expected to
increase to 19.9 gigawatts by
2030, an increase of 3 GW over the previous state estimates in 2024. The PSC projection suggests
Wisconsin could add roughly 15 to 20 million megawatt hours in data center demand for electricity
between 2024 and 2030.
For example, the large center being built in Port Washington is expected to add up to 900 MW in
peak demand to the system, an increase of about 9% over 2024 levels. However, research also
suggests data centers do not typically run at peak capacity. The University of Virginia study, for
example, found data centers in that state ran on average at about 62% of their peak energy use.
Running at that rate of capacity, the Port Washington facility could use approximately 5 million MWh
over the course of a year.
The thorny question then arises of who will pay for this added capacity to be built by We Energies,
which serves the Port Washington and Mount Pleasant facilities; Alliant Energy Corp., which serves
the Beaver Dam center; and the American Transmission Company (ATC), which oversees the
transmission lines. Typically, the costs of these investments would be borne by all of the companies’
respective ratepayers. The sheer size of these expenditures, however, has led ratepayers’ groups in
How Usage of Electricity is Measured
Typically, sales of electrical energy are measured in the amount used
per hour:
Kilowatt-hours (kWh) - Most utility customers are billed per kWh and
single-family homes use between 10,000 and 11,000 kWh per year.
Megawatt-hours (MWh) – Each one equals 1,000 kilowatt-hours.
Gigawatt-hours (GWh) – Each equals 1,000 megawatt-hours.
In addition, we can also measure the amount of electricity used or
generated at one time using the related terms kilowatt, megawatt, or
gigawatt. For example, “hyperscale data centers” can use one gigawatt
of electricity at once, which is similar to the amount of generating
capacity from a new powerplant.
Page 24 of 56
9 Grounding a Charged Debate | September 202 6
Wisconsin such as the Citizens Utility Board to call for the data center customers to cover the costs
on their own – a responsibility that some large customers such as Microsoft have publicly accepted.
The data center customers in the cases above have been required to pay those costs even if they fail
to fully use or close their facilities, which would leave “stranded” assets and debt that either the
utilities’ remaining ratepayers or shareholders would have to amortize.
In Wisconsin, utility rates and the construction of generation plants and transmission lines are
regulated by the PSC. Each of the major electric utilities that will serve the state’s data center
projects has created special “very large customer” rates for data centers and other large users that
aim to recoup the added costs of serving data centers. In recent months, the commission has made
critical rulings that have strengthened the protections for other ratepayers within those plans. An
April decision by the PSC made these changes to the We Energies plan to serve its two data centers:
• Lengthened by five years the time that the data centers had to pay for the additional
assets serving them, raising it from 10 years to 15 years
• Lowered the threshold for applying this so-called “very large customer tariff” to clients
using 100 MWh of electricity each year, down from 500 MWh
• Required the data centers to pay 100% of the costs of two natural gas plants serving
them, up from 75%
• Required additional reporting and transparency measures
• Raised the requirements on large customers to show financial strength and blocked the
ability of We Energies to waive those requirements
This last action led the database and technology company Oracle to sue the PSC
, which had required
companies to have a strong A- credit rating from Standard & Poor’s or A3 rating from Moody’s.
Oracle, which has a lower BBB rating, sued to remove the rule, but then dropped the suit and agreed
to set aside the amount needed to meet the requirement. In addition, the PSC in May decided on
Alliant’s application to serve the Beaver Dam facility. In that decision, the commission acted to:
• Strengthen a termination charge, adding a safeguard in case the data center closes
• Require additional reporting and allow the PSC to make future adjustments
• Require contributions to the state’s energy efficiency and renewable energy program
These rulings for We Energies and Alliant suggest the current PSC commissioners are likely to take
the side of smaller ratepayers in future cases in the territory of other utilities. However, other issues
remain unresolved, including decisions on ATC’s transmission rates. The Federal Energy Regulatory
Commission (FERC) – not the PSC – sets those rates and the Midcontinent Independent System
Operator (MISO) implements them. The federal commission has ordered independent system
operators across the country to demonstrate how the operators intend to ensure that data centers
pay their own way on transmission costs. In August, ATC asked FERC for approval of a rate structure
that would ensure data centers and other very large customers pay the costs of transmission
infrastructure associated with these new customers.
The PSC does have authority over the routes that transmission lines follow, and in August 2026
revoked a decision about the completeness of an ATC application for a high-voltage transmission
project associated with the Port Washington facility. An administrative law judge from the PSC
Page 25 of 56
10 Grounding a Charged Debate | September 202 6
decided the application lacked sufficient information because of repeated changes to the route that
the transmission line would take, plus concerns about its impact to sensitive conservation areas. As
a result, ATC must resubmit the application for PSC review, delaying the project by up to 180 days.
Wisconsin Not Wanting for Water
Water use by data centers has represented another prominent concern for the public. Here, it is
critical to note first the massive decline in water usage in Wisconsin over the past generation as
some heavy industry has left the state, other industrial and residential users have become more
efficient, and utilities have shifted from water-intensive coal plants to natural gas and renewable
energy sources. Between 2011 and 2024, water withdrawals in Wisconsin fell by 506 billion gallons,
or more than 23.5%, to 1.7 trillion gallons. The withdrawals were reported for more than 15,000
registered users, including electric utilities, municipal water utilities, farms, and industrial facilities,
according to reports published by the state Department of Natural Resources. That decrease was led
by a drop of 434 billion gallons, or 26.5%, in water withdrawals over that same period by power
utilities, the biggest single users of water.
These decreases are important context for understanding the potential water use by data centers,
which may use a few million gallons of water annually. Most large municipal water utilities have seen
massive drops in usage over the past generation and can accommodate the increase in water use by
a large data center and still remain well below the amount of water pumped a generation ago (see
Figure 5). For example, last year the city of Janesville Water Utility sold nearly 1.6 billion gallons of
water less than it did in 2000, a drop of more than one third that reflects the loss of industrial users
such as the former General Motors plant as well as a rise in water efficiency. That means that an
increase for a data center in Janesville would still leave the city using far less water than in 2000.
The Racine Water Works, the utility that supplies the village of Mount Pleasant, saw a drop of nearly
2.3 billion gallons in annual water sales between 2000 and 2025, which is more than 250 times the
Page 26 of 56
11 Grounding a Charged Debate | September 202 6
8.4 million gallons per year that the new Microsoft data center is expected to use when fully
operational.
Data centers have also become more efficient with their water usage. Newer, closed-loop cooling
systems sharply lower the amount of water consumed by the facilities. These closed-loop systems
can use more power than cooling systems that use evaporation, and therefore may add to the water
used by utilities to generate electricity for the data centers. However, utilities are no longer building
coal plants – the biggest users of water – and are often adding renewable sources that do not use
water at all. So, despite increases for data centers, in five years the water usage by power utilities
and the state as a whole should be substantially less than it was in past decades.
Some investments by local water utilities and treatment plants may still be needed to serve data
centers. However, water utilities are also subject to regulation by the PSC and must seek approval to
raise water rates or spend on infrastructure. Any rate increase must be justified based on costs, and
infrastructure spending must be justified by demand. Water utilities are also subject to the federal
Safe Drinking Water Act, and some utilities also must follow the Great Lakes Compact agreement
that limits any diversions of water outside of the Great Lakes basin. All of these points provide added
protection for consumers and to a lesser extent the environment.
Other State Rules Affecting Data Centers
Wisconsin law sets out standards for state Department of Natural Resources (DNR) oversight of
large construction projects that impact wetlands, require environmental review, and could potentially
release pollution. For example, the Beaver Dam and Port Washington projects required
environmental analyses of potential harms reviewed by the DNR. Large-scale construction projects
also must have permits aimed at minimizing the impact of stormwater from the site. Because of the
large number of generators on site, the Port Washington site was required to obtain a permit and
comply with federal Clean Air Act regulations.
Sewage treatment plants serving data centers are subject to the pollution protections in the Clean
Water Act. Regional entities such as the Southeast Wisconsin Regional Planning Commission
(SEWRPC) and the DNR also jointly review development projects to understand their impacts to the
sewer service needs in an area. For example, Port Washington was required to submit a request to
SEWRPC to amend its sewer service area. According to that request
, Port Washington’s sewer
system has excess capacity of 1.5 million gallons per day, and SEWRPC officials estimate that
connecting the data center and other homes and businesses in the annexed area will add more than
500,000 gallons per day. When combined with a projected 320,000 gallons per day of additional
sewer flows from other commercial and residential developments, the plant is expected to approach
75% of its total capacity, which may require plant upgrades to accommodate future development.
The state could also review data center impacts to other natural resources such as farmland, as at
least one candidate for office has suggested. However, the impacts of a data center appear modest
on all cropland statewide. The U.S. Department of Agriculture has estimated that as of 2022,
Wisconsin had 13.8 million acres of farmland. The Forum estimates the three data centers under
construction would use about 3,000 acres in total, or 0.02% of the state’s overall agricultural lands.
The impact to total farmland would be even smaller in cases like the declined Janesville project,
which would have used a former industrial site. The impact of powering these facilities with 100%
Page 27 of 56
12 Grounding a Charged Debate | September 202 6
solar power, assuming seven acres per megawatt of power generation, would account for
approximately 0.15% of the state’s farmland, assuming each panel was built on farmland.
The state Department of Administration also approves all requests for annexation by any local
government. We will review tax and financial oversight in Part Two. Though not an exhaustive list of
state regulations of data centers, these examples illustrate the substantial oversight exercised by
state officials under existing state law.
Local Regulations on Data Centers
Among their many duties, municipalities oversee the building permit rules governing data center
construction, enforce other local rules around noise and other conditions, value properties, and levy
taxes. Subject to oversight by the state, cities and villages can consider annexing land for a data
center project, and municipalities also control how land within their territory is used through
comprehensive plans, zoning codes, and building permits. Decisions about land use are made by
staff in city departments, city councils, zoning commissions, and other local boards. Projects also
need a number of specific permits for construction and other activities. Our March 2026 report on
zoning and permitting times
in the Milwaukee area details these complex processes.
Municipalities govern many other basic issues and services for data centers and other developments
such as stormwater management, sewer fees and usage, garbage collection, and public safety. Fire
protection and inspection is a notable issue for data centers given their size and use of electricity,
generators, and batteries. Municipalities may also choose to create tax increment districts (TIDs) to
help finance projects such as data centers, as we will discuss.
Local Communities Put Data Centers on Hold
Some Wisconsin communities have recently blocked the construction of large data centers, either by
rejecting a specific proposal or approving a blanket moratorium. At this point, more communities
have declined large data centers than have approved them, suggesting local officials may have some
leverage with developers since there is a credible risk that these proposals will not be approved.
Similar rejections can also be found nationally. Some examples from Wisconsin include:
• In January 2026, the village board of DeForest dropped plans for a $12 billion data
center following opposition in the community (see Part Three for more details).
• That same month, Cloverleaf, a data center developer, dropped separate plans for siting
a facility in the Brown County village of Greenleaf and another in the town of Carlton in
Kewaunee County in response to opposition in those communities.
• In December 2025 in Racine County, village of Yorkville officials quickly rejected an initial
inquiry about a possible data center.
• In October 2025 in Racine County, Microsoft opted not to pursue a data center at a
location in the village of Caledonia following concerns from some in the community.
• In September 2025, the Menomonie mayor paused a proposed project in the city
following a move to annex and rezone land for the project from a neighboring town.
• In July 2025 in Wisconsin Rapids, the mayor said a proposed data center would not
proceed because the developer and electric company did not come to terms.
Page 28 of 56
13 Grounding a Charged Debate | September 202 6
• After a data center was proposed in the town of Cassville in Grant County, residents
rejected it by approving a moratorium on data centers in May 2026.
Municipalities have approved moratoria even without any proposal to build a data center in their
community. In January 2026, the Madison city council approved a one-year moratorium on zoning
approvals for data centers with more than 10,000 square feet of floor space. City officials say they
are using the year to research best practices concerning the facilities and to add a definition of data
centers to the city’s zoning code, with the draft regulation expected by this fall. Notably,
state law
limits municipal moratoria on development to one year with a six-month extension.
In June, the Dane County board approved an 18-month moratorium that applies to the 26 towns
covered by county zoning. Cities and villages in Wisconsin are not covered by county zoning, and
some towns also adopt their own zoning. As Figure 6 shows, other local measures include:
• An 18-month moratorium approved in April in Manitowoc County on data centers that can
manage more than 1,000 terabytes of data
• A one-year pause approved in June in Shawano County prior to any data center proposal
• The city of Milwaukee is considering its own moratorium as well as new zoning rules that
would put certain requirements on data centers of less than 60,000 square feet and
prohibit larger ones unless they obtain a site-specific zoning approval
Democratic lawmakers
in Wisconsin also
unsuccessfully
proposed
legislation last session
that would have placed a
statewide moratorium on
data centers with at
least 5,000 servers,
10,000 square feet of
floor area, or electricity
demand of 100
megawatts. The
moratorium would
remain until the state
had:
• Established a
statewide
data center
planning
authority
• Eliminated state and local financial subsidies
• Prohibited any water or energy costs from being shifted onto residential customers
• Mandated the use of renewable energy to supply all data centers
• Required data centers in each municipality to be approved by a local referendum
Page 29 of 56
14 Grounding a Charged Debate | September 202 6
On the one hand, these moratoria allow elected officials and the public to learn more about data
centers and better formulate local ordinances and policies. On the other hand, it is worth noting that
data center investment has represented a large component of overall economic growth nationally
over the past year and a half and could slow in the future. That means communities that opt out of
this period of rapid expansion may never fully recoup the loss in potential investment.
Within a few months, some of these local moratoria will start to expire and local officials will have to
decide whether to renew them. One consideration for them will be whether renewed pauses on data
center development could begin to seem like de facto bans. Courts have generally supported the
authority of local governments to use zoning to limit where some businesses such as adult
entertainment establishments can operate, but have been less supportive of outright bans
on
activities involving lawful commerce and free expression.
Elected officials have a difficult
balance to strike. An
August poll by
the Marquette University Law School
found that 78% of registered voters
in Wisconsin felt the costs of large
data centers outweigh their benefits,
while only 21% felt their benefits
outweighed their costs (see Figure
7). Those numbers had shifted from
an
October 2025 poll that found
that 55% of voters thought that the
costs outweighed the benefits and
44% saw the benefits as being
greater.
This shift in public opinion
underlines the challenge faced by
data center proponents to win over
local residents. Public opinion on
data centers appears to have been
shaped by a range of concerns including potential impacts on energy prices and the environment,
judgments about the wider impacts and value of artificial intelligence, and perceptions about the
effect the centers could have on the local economy and quality of life. However, a July Marquette
University poll also found that only 5% of voters listed data centers as the most important issue to
them, suggesting that it was a concern for the electorate but a smaller one than other issues such as
inflation, the cost of living, and the economy.
Page 30 of 56
15 Grounding a Charged Debate | September 202 6
Part Two: Fiscal & Economic
Impacts of Data Centers
The massive investments in data centers spur a phenomenal burst of economic activity in a region
but also carry some risk. Here, we seek to understand how much risk local communities are
assuming, how much they will receive in benefits in return, and whether they will ultimately gain. We
start with some of the characteristics of data centers and Wisconsin law that are key to
understanding their impact on the regional economy and state and local finances.
Understanding the Regional Impacts of Data Centers
Most of the cost of a data center lies not in the building but in the equipment needed to run it. A
December 2024 study by the Virginia Joint Legislative Audit and Review Commission found that 20%
of the capital spending on data centers was for the construction and 68% was for equipment such as
processors and electrical and cooling systems. That is worth highlighting, because while much of the
spending on the building stays within the regional economy, much of the other spending goes to
suppliers from outside the region such as semiconductor makers in Taiwan. In Wisconsin, this
equipment, or personal property, is also not subject to the property tax; only land and structures are.
So, when considering a data center’s impact, observers must discount the overall investment to
account for the fact that not all of it will benefit the local economy or property tax base.
In addition, data centers typically do not require as many workers to run them as a factory or
distribution center of a similar cost. For example, the Virginia study estimated data centers operate
with one employee per 5,000 square feet versus the one employee per 650 square feet required for
some distribution centers. In other words, much of the economic activity from a data center is
associated with construction and not operations, with the exception of electricity purchases. Still,
those used to develop cutting-edge AI models, like the Microsoft facility in Mount Pleasant, or do
other in-house tasks, may result in greater employment numbers
.
In addition, even if only a portion of a data center investment stays in the region, that portion could
still exceed the other potential gains that could be made from the same parcel of land or the same
set of local incentives. Data centers can also still employ hundreds of skilled and relatively well-paid
workers. Next, even though not as much of the spending on data centers will remain in the
community as with a typical construction project, an even larger portion of the capital investment
comes from outside the community. In short, a massive factory or distribution center might employ
more workers than a data center, but local or state officials may not be able to attract such a plant.
Impacts on Wisconsin Suppliers
Wisconsin builders, manufacturers, and other companies have benefited from data center business
in recent years. Generac, a maker of backup power generators, has cited a $1.6 billion backlog in
its
data center orders that does not include a potential $700 million deal with a single client for work in
2027 and now an $8 billion deal with Amazon. The town of Genesee manufacturer has built a plant
in Beaver Dam and purchased another in Sussex to expand its capacity. Company officials say those
expansions will add hundreds of jobs.
Page 31 of 56
16 Grounding a Charged Debate | September 202 6
Modine, the Racine manufacturer of chillers, indoor air systems, and other cooling equipment, said
in May it had reached an agreement to supply more than $4 billion in products to a single data
center customer and had received a $165 million up-front cash payment as part of the deal. In
November 2025, Modine opened a factory in Franklin with plans to create 300 jobs within months to
expand its production. Innio, an Austrian maker of engines used in power generation, has seen rapid
growth in the data center segment of its business and is seeking to expand its Waukesha facility.
These companies are not alone. Trane, Regal Rexnord, and Modular Power & Data are part of the
growing supply chain supporting data center development.
This surge in business for state manufacturers is not necessarily contingent on data centers being
built in Wisconsin. However, state and local officials could consider facilitating these expansions of
manufacturing capacity through expediting land use approvals, offering state or local incentives, and
providing worker training or apprenticeships.
Other Regional Impacts of Data Centers
In weighing data centers, we mainly focus on the core economic benefits and costs, but there are
other considerations to note and we list a limited number here. One question is whether there is any
meaningful advantage in terms of computational speed for the residents and businesses of a state
to have a concentration of data centers. The short answer appears to be generally no, but there are
some exceptions such as firms engaging in high-frequency financial trading, which locate
data
centers near market exchanges to reduce latency, or the wait between signals being transmitted and
received. Other potential applications such as autonomous driving might also benefit from low
latency and from at least some regional data centers at the edge of networks. Large data centers
may also spur additional spending on regional backbone connections for carrying internet traffic.
Though data centers favor regions that already have substantial connectivity, they may catalyze
further investments in a region.
On the other hand, data centers may have some negative impacts. For example, the traffic from
heavy construction vehicles and loads may accelerate wear and tear on local roads and
infrastructure, though some data center developers have been willing to pay for repairs. In addition,
the massive numbers of construction workers and pieces of equipment needed to build the data
centers over a period of years may make it harder or more costly to obtain the labor, machinery, or
land needed for other construction projects.
Fiscal Impacts of Data Centers
Here, we examine the fiscal impacts of data centers on state and local governments in Wisconsin. To
do so, we consider both the revenues generated by data centers as well as any additional related
costs such as new public infrastructure and any state and local incentives offered to data centers.
State Sales Tax Incentive
Compared to some industries such as manufacturing, Wisconsin provides fewer incentives to data
centers. However, data centers do receive a sales tax exemption for materials used in their
construction and operation that was included in the 2023-25 state budget. The exemption waives
the 5% state sales and use tax and the 0.5% county sales and use tax for qualifying purchases of
Page 32 of 56
17 Grounding a Charged Debate | September 202 6
computer servers, networking, energy, and security systems, electricity, building cooling and water
systems, and chillers sold to qualified data center businesses and contractors. This exemption was
approved before the data center boom had hit Wisconsin and has grown larger than expected.
To qualify, a data center project must invest at least $50
million to $150 million, depending on the size of the county in
which it would occur. So far, at least four businesses have
been certified for the exemption: Microsoft for its Mount
Pleasant project, Epic Hosting in Verona, Meta subsidiary
Degas LLC for its Beaver Dam project, and Green Chili
Ventures, which is tied to the Port Washington project.
In a March 2026 memo
, the non-partisan Legislative Fiscal
Bureau (LFB) estimated that these companies had committed
to spend a total of $36.9 billion on these projects between
2024 and 2028. Assuming $40 million in forgone state sales
taxes for each $1 billion spent, the LFB estimated that over the five-year period, the data center
construction would result in $1.5 billion in forgone state tax revenues. In other words, this estimate
assumes about 81% of the spending on a data center project would be for materials normally
subject to the state sales tax, with only 19% for other spending including labor, land, and
government fees. This assumption lines up reasonably well with a recent Tax Foundation report that
estimated that 77.5% of the value of a $1 billion data center would be for computers and other
equipment. If accurate, this $1.5 billion estimate would be roughly equal to 4% of all state sales tax
revenues for the period in question. Over the five years, the uncollected state taxes would in turn be
accompanied by $150 million in forgone revenues from the county sales tax of 0.5% that is present
in each of the project counties. Going forward, the state would also forgo an estimated $369 million
annually in sales tax revenues on the electricity and other purchases needed to operate the centers.
Though sizable, this exemption is not the only one of its kind in Wisconsin. For example,
manufacturers do not pay an estimated $259.6 million a year in state sales taxes on the machines,
equipment, and parts in their factories. Manufacturers also do not pay sales tax on fuel and
electricity used in manufacturing (a $184.7 million annual savings) and on raw materials and other
manufacturing inputs. The state provides these sales tax exemptions despite the fact that factory
owners in Wisconsin owe
little to no individual or corporate income tax on manufacturing profits. The
extent of the lost revenues for Wisconsin from the data center exemption is unclear since most
states offer a sales tax exemption (see Figure 8 on the next page). Without this incentive, the
companies may not have built data centers in Wisconsin at all or not invested as much in them. In
fact, all of the three major data center announcements in the state were made within roughly two
years of the approval of the exemption, suggesting that it played a role in these investments.
An April 2026 report by the National Conference of State Legislatures found 38 states offer tax
incentives for data centers. All of those states offered at least some form of sales tax exemption on
data center equipment. Fifteen of the states including Wisconsin extend that exemption to electricity
used at the facilities (other states exempt all purchases of electricity). Eleven states also offer data
centers property tax abatement (not shown on map). This type of incentive is not allowed under the
Wisconsin constitution, which requires property taxes to be levied uniformly on landowners. Some
Deciding on Incentives
Here, we assess the impact of state and
local incentives for data centers through
the lens of their fiscal impact – whether
they cost or gain money for taxpayers.
Readers are not obligated, however, to
judge these subsidies on those terms. For
example, some may determine that AI
data centers are meant to replace human
workers and may object to subsidizing
their development for that reason.
Page 33 of 56
18 Grounding a Charged Debate | September 202 6
states also put limits of years or decades on the incentives. In recent months, states such as Illinois
and New Jersey have paused their incentive programs due to controversy over data centers and AI.
Some Texas officials are also reconsidering their state incentives and Virginia kept its incentives but
passed a new tax on electricity use by data centers.
The state of Wisconsin will recoup a significant portion of the forgone sales tax revenues. The
projects will generate one-time and ongoing state tax revenue through the income and sales taxes
paid by construction workers earning money on the projects, corporate income taxes paid by
construction firms and suppliers, and additional taxes paid by utilities serving the data centers. The
data center operators themselves may also owe corporate taxes in limited cases depending on their
business model. At the local level, municipalities, counties, and schools and technical colleges could
receive substantial property tax revenues from these developments, and counties will also see some
increase in sales taxes due to the purchases made by construction workers and others.
In all, if one assumes that Wisconsin’s sales tax exemption did not attract additional data center
investment, then we estimate the state is unlikely to recoup all the forgone state revenues. With
reasonable agreements, local governments could recoup all of their costs and incentives from their
potential increases in property taxes. However, it is reasonable to assume that a significant share of
the data center investment is due to the tax exemption, given that it preceded all of the
development. If one assumes two-thirds of the investment is due to the exemption, then state and
local tax revenues would cover both the forgone state sales taxes and any local incentives.
Statewide Exemption of Personal Property
In Wisconsin, much of the data center debate focuses on the sales tax exemption along with the use
of local tax increment financing. Little notice is taken of one of the biggest advantages for data
centers: the state’s elimination of personal property taxes that were once levied here on business
equipment, machinery, and other types of property besides land and structures. Wisconsin gradually
phased out this local tax and completely repealed it as of January 2024, as the Forum has noted
.
Page 34 of 56
19 Grounding a Charged Debate | September 202 6
Most states tax personal property to some extent, and it is a major consideration for data centers,
since most of a facility’s cost is attributed to its computers, cooling equipment, generators, and other
machinery rather than the building itself. In its 2025 report, the Tax Foundation estimated that
personal property taxes on average would account for just over one-fifth of all taxes paid by a
hypothetical data center in 12 U.S. locations over its first decade of operations. That makes personal
property taxes one of the biggest sources of tax liability for data centers nationally.
The Tax Foundation has noted that 14 states including Wisconsin broadly exempt business property
from personal property taxes (see Figure 9). The other 36 states do tax this personal property to at
least some extent. That does not mean that all states are equal in doing so – data from the Lincoln
Institute of Land Policy detail many personal property tax exemptions. For example, Virginia has
served as a leading site for data centers and, though it taxes personal property, local governments
there can exempt the computers used in data centers. States and municipalities also differ in their
property tax rates and reliance on the property tax as well as how they depreciate personal property,
or lower its assessed value over time to reflect its deteriorating condition. Still, Wisconsin’s policy
clearly advantages data centers, though it does not treat them differently than other businesses.
Local Fiscal Impacts
To analyze the local fiscal impacts from data centers, we must first explain Wisconsin’s relatively
strict limits on local government revenues, which incentivize local development. For more detail on
how development affects local government finances, see the Forum’s May 2026 brief on the subject.
The property tax accounts for almost all local tax revenues for municipalities, counties, and technical
colleges. For these local governments, annual increases in the property tax for operations are
generally limited to the percentage change in property values due to net new construction. In other
words, if a city with $1 billion in property value adds new buildings worth $10 million and tears
nothing down, then its net new construction equals 1% (see Figure 10 on page 20). This increase
allows the city to raise its property tax levy by up to 1%, adding up to $100,000 to an existing levy of
$10 million – a typical percentage that shows how levy growth lags inflation for most communities.
Page 35 of 56
20 Grounding a Charged Debate | September 202 6
Data centers can jumpstart local revenues by providing an influx of new construction. For example,
Figure 11 shows what would happen in this same hypothetical community if a data center caused
property values to rise by $450 million, or 45%. That would allow the operating property tax levy to
rise by up to $4.5 million, though local leaders would likely choose a smaller bump. Any tax increase
would essentially be paid by the data center provided there was no tax increment financing involved.
Page 36 of 56
21 Grounding a Charged Debate | September 202 6
Though it may seem difficult to believe, this hypothetical example is not an exaggeration. As we will
discuss in Part Three, for example, the city of Port Washington had equalized property values of $1.9
billion as of Jan. 1, 2025. By 2031, the data center being built in the city and its contents are
expected to cost $15 billion. The real estate value of that property is expected to come in at $2.1
billion, more than doubling the current value of all parcels in the community (see Figure 12). The
data center would be worth more than all the homes in the city put together. Given that,
according to
the U.S. Census Bureau, the median owner-occupied housing unit in Ozaukee County was worth
$390,200 over the most recent period, it would take nearly 5,400 of those homes to reach the value
of the data center. That is more than the current number of just under 4,100 residential parcels in
Port Washington that are
listed in state assessment data.
This growth in the tax base should help to sustain local services such as public safety, streets, the
library, and the marina. Between December 2010 and December 2015 tax bills, the municipal levy
in Port Washington rose by less than $100,000 to just under $5 million, a 1.8% increase over those
years that funded at most a single new city position. The data center will loosen this state limit.
In December 2025, all local governments in the city of Port Washington (including Ozaukee County
and the Port Washington-Saukville School District) levied a total of $27.4 million in gross property
taxes before accounting for state tax credits, according to state DOR figures
. That yields in turn a
gross tax rate of $14.45 for each $1,000 of equalized property value in the city, which would
translate into more than $30 million in taxes if applied to a data center valued at $2.1 billion.
To be sure, this figure likely overstates the eventual taxes on the data center since its higher
property values would cause property tax rates to fall. But even half that sum - or $15.2 million in
taxes– would amount to just under $1,200 for each of the nearly 13,000 current residents of Port
Washington. In other words, it is reasonable to think that the data center being built in Port
Washington could greatly change the funding available for public services in the city.
In theory, a data center such as the one being built in Port Washington could have this kind of effect
without leading to an increase in the tax bills of current residents. Normally, the effect of the state
limiting property tax increases to the rate of net new construction means that property taxpayers in a
Page 37 of 56
22 Grounding a Charged Debate | September 202 6
community collectively do not pay
more for the operations of their
municipality than they did in the
previous year – any increase in the
operating levy is borne by those who
built additional homes or
businesses. However, that general
principle becomes more
complicated if the development is
built within a tax increment district,
as we will discuss next.
Any decrease in property taxes for
current residents due to a data
center would primarily occur in their
municipal and county taxes and not
their school levy. That is because
when property values per pupil rise
for a school district, then it typically
loses general school aid, which in
turn cancels out the decrease that would have otherwise occurred in its tax rate because of the
additional tax base (see Figure 13). In theory, a data center could raise property values in a
community so much that the local school district loses all of its general school aid and then begins to
lower its property tax rates. However, this might be difficult to achieve in practice, based on Forum
modeling of the data center developments in the communities of Port Washington and Mount
Pleasant and would likely require beating current property value projections.
In terms of costs, data centers can add substantial infrastructure expenditures for communities,
though the developer may also commit to pay a portion of them. The more modest number of new
employees from data centers limits the costs for the local governments to serve new residents. The
largest ongoing cost to serve a data center may be in the area of fire protection, since data centers
are massive in size and can use large amounts of electricity as well as generators and fuel. Some
data center operators may prefer to provide for much of their own fire protection, but it is still a
significant public safety consideration for the local government.
Tax Increment Districts and Their Impact on Data Center Developments
Before discussing its use with data centers, we should explain tax increment financing (or TIF) in
Wisconsin. When this tool is used, local officials set up a defined tax increment district (TID) within
their community and then determine the existing base value of the property within it that will
continue to support current local services. Going forward, any increase in the values of the property
within the district (known as the increment) is taxed exclusively to pay for the cost of public
infrastructure or other qualifying expenses such as developer incentives, which are meant to spur
construction in the district and are often financed through borrowing. Once those TID expenditures
and any debt and interest are repaid using taxes on the increased property values, then the district
closes and the full value of all property in it can once again be used to pay for local services.
Page 38 of 56
23 Grounding a Charged Debate | September 202 6
It’s important here to note that any development that
occurs within a tax increment district is counted
towards the community’s rate of new construction
subject to some differences based on when the
district was created (see box). These percentage
increases are then used to determine the allowable
increase in the city or village tax levy.
However, to calculate the tax rate, this allowable tax
levy is then divided by the assessed value in the
community, excluding the increased values inside the
TID. The owners of property within a TID are billed at
the same tax rate as other taxpayers in the
community, but their payments are used to cover the economic development costs within the district
until the TID pays off its expenses and closes.
In other words, even though new property within a TID raises the allowable increase in a local
government’s tax levy, that new property cannot be used to pay the extra levy until the district closes
(see Figure 14). In the intervening years, the owners of existing properties bear the responsibility of
paying these taxes. In most normal circumstances, the tax increases attributable to property within
TIDs are relatively small and not burdensome. Data centers, however, are so large that their arrival
gives cities and villages the option of approving large tax increases. In the long run, the data center
owners should end up paying any higher taxes, but not until the TID closes.
In theory, local officials could simply wait to raise taxes until after the TID closes to protect existing
property owners – in many cases they will not even initially need a large tax increase. Under state
law, however, local officials can only wait five years to raise property taxes by the allowable amount.
After that, they lose the ability to do so. Unfortunately, most TIDs take longer than five years to pay
off their expenses and close – they can remain open for 20 years or more. With a good development
agreement and project, data center TIDs could close earlier. But if they do not, local officials could be
left with a difficult choice – either raise taxes on existing property owners by more than is needed in
the short term or miss out permanently on revenue that the community may need later on.
Calculating New Construction in TIDs
There are differences in how net new
construction within tax increment districts is
calculated depending on when the TIDs were
created. For districts created before 2024,
100% of the value of the property created in
the district each year is included in the new
construction calculations. For newer districts,
only 90% of the district’s newly built property
in a given year is included, but in the year
when the district closes, 10% of the district’s
final valuation is added to the community’s
net new construction in that year.
Page 39 of 56
24 Grounding a Charged Debate | September 202 6
In Part Three, we use the example of the Beaver Dam data center to illustrate this dilemma, and in
Part Four, we note ways that state law could be changed to give local officials more flexibility. For
now, however, we note that data center construction requiring TID investments could result in an
initial tax increase on existing property owners followed by a decrease later.
Requiring Referenda for TIF
In April, residents of Port Washington reacted to the controversy over the data center by voting to
limit TIF through a citizen-led referendum, which in Wisconsin can be triggered with a petition that
receives signatures from at least 15% of voters. The April referendum required that voters in a
general election approve all future TIDs “which require large capital expenditure or those with a base
value projected to [sic] or exceeding $10 million or project costs exceeding $10 million.” Supporters
of this requirement say that it would provide additional protections for residents and taxpayers in
cases involving significant public subsidies and that relatively few large TIDs are opened in
municipalities.
In January, however, a group of trade associations led by the Metropolitan Milwaukee Association of
Commerce sued the city of Port Washington seeking to block the ballot measure
. They argued the
referendum requirements conflict with state TIF law and would quash many types of development
(though it will not affect the current data center project). City officials largely agreed but said they
needed to comply with the citizen initiative to place the question on April ballots. The measure does
seem likely to affect future TIDs in Port Washington, given that all three districts created in the city
since 2000 have had a base value of more than $10 million.
In a March 2026 report, the Forum found that requiring construction plans to receive the sign off of
political bodies such as zoning commissions and city councils adds to the approval time needed for
projects such as housing and potentially raises costs. The Port Washington measure requiring a
general election referendum appears to add significantly more time to the process. That’s because
under Wisconsin law, general elections are only held in November of even-numbered years. Under
the measure, if a developer approached the city about an $11 million project requiring TIF support in
January 2027, then that support could not be fully approved until at least November 2028.
Given these delays, developers would likely not pursue as many projects in Port Washington.
Janesville voters are also considering a more limited referendum requirement for a large site in their
city (see Part Three). If more communities take this path, then a number of projects that lead to new
jobs and housing could face significant delays or even be lost entirely. These restrictions will
ultimately be decided by local officials and voters as well as the state courts. As one option,
communities seeking additional safeguards for TIF projects could choose to set those standards
through discussions among stakeholders and elected officials rather than a referendum.
Non-Disclosure Agreements
The debate over data centers in Wisconsin communities has sparked discussions about other
economic development practices, including the use of non-disclosure agreements (NDAs) with early
project discussions. An important question is whether these fights will make it more difficult for local
governments to pursue other types of development. With respect to NDAs, Wisconsin Watch reported
in January 2026 about their use by data center developers with several communities or related
Page 40 of 56
25 Grounding a Charged Debate | September 202 6
development arms. The agreements were notable given both the size of the possible developments
and the fact that some municipalities took actions to clear the general path for development such as
signing predevelopment agreements and creating TIDs. The details of the projects were eventually
released to the public prior to votes on them, but in some cases, it was months or in at least one
case more than a year after the signing of the first NDA. The disclosures led to state legislation to
ban NDAs between data centers and local governments, but the bill did not pass.
The use of NDAs by municipalities and developers is not new – companies may request them to
avoid releasing their plans to competitors and to protect trade secrets. Blanket prohibitions on NDAs,
particularly if they extend to all businesses, could have a chilling effect on development discussions
in the state. At the same time, however, data center development involves complex agreements that
require time for the public to digest. Some local officials such as those in Port Washington have also
said that they discussed and negotiated their data center development without using an NDA,
and
Microsoft stated in March that the company had decided to stop using NDAs and terminate existing
ones with local governments where it operates or is seeking to operate data centers.
In debating the use of NDAs, local and state officials may wish to consider whether, if they oppose
some uses of the agreements, they seek to end their use for all development or data centers
specifically, or whether instead they might limit such agreements rather than ban them. They may
also wish to consider guidance from the League of Wisconsin Municipalities
that notes all NDAs must
be approved by the municipality’s board or council. The guidance also points out the agreements do
not void the local government’s duties under Wisconsin’s open records and meetings laws.
Risks to Local Finances from Data Centers
As we have discussed, communities could reap enormous increases to their tax base from data
centers. However, the addition of $1 billion or more in property value from a single large customer
also brings some risk. For example, when a paper mill closed in 2012 in the small village of Brokaw
near Wausau, it devastated the village’s finances and triggered a series of events that led to its
absorption by the village of Maine six years later. This risk is greatest when the local government has
borrowed money to build infrastructure for a development or provide incentives to the developer,
typically through a TID, and will have to repay the debt even if the business closes.
Port Washington has sought to mitigate that risk. First, all of the borrowing for the project has been
done by the developer rather than the city. The developer only receives the estimated $455.4 million
reimbursement for the project costs if it is complete enough to operate as a data center, providing
some additional protection for the city (see Part Three). Other data centers have offered guarantees
to pay a large minimum amount of property taxes for a period of time. In weighing these
commitments, local officials also need to evaluate whether the company offering the guarantee has
the financial strength to meet its obligations. In this respect, local officials may prefer guarantees
from companies such as Microsoft or Meta that have a long history, strong balance sheet and brand,
and lines of business that extend beyond AI.
Last, local leaders may want to consider the impact of a proposed data center on future growth in
their tax levy. Under state law, adding more than $1 billion in property value to a small community
such as Beaver Dam or Port Washington could make it difficult for the community in the future to
achieve a level of net new construction that can support cost increases of basic services.
Page 41 of 56
26 Grounding a Charged Debate | September 202 6
Part Three: Case Studies
In protests against data centers, critics frequently claim that small communities are no match for
sophisticated developers and are likely to sign ill-advised or even ruinous contracts. The Forum finds
no evidence of that in a review of five different proposed developments around Wisconsin. The
agreements do vary in their terms – those being negotiated more recently appear more favorable for
communities, which may reflect the current headwinds faced by data center developers. It’s also
worth noting our examples from DeForest and Janesville are based on preliminary information about
the project plans; these potential agreements could have changed substantially when finalized.
However, the terms of the proposals and agreements, if fulfilled, would all appear to leave the host
communities in better economic and fiscal condition than before. In most of the cases, the developer
agreed or was prepared to agree to a guaranteed valuation of the data center property that would
increase the local tax base and deliver a large minimum property tax payment to the municipalities.
The local governments also generally avoided major borrowing for the data centers specifically.
As we have noted, the use of a TID with a data center might result in a tax increase for homeowners
in the short run. There are also still risks associated with data center development, but they come
with billions of dollars in potential investment, downward pressure on property taxes later on, and
other benefits such as the proposed remediation of a former manufacturing plant site in Janesville.
In addition, the subsidies provided by these local communities compare favorably with those
provided for other projects such as manufacturers.
Data center deals can also be less
favorable than the ones we detail here.
For example, Eagle Mountain, a Utah
city of about 76,000 people, reached a
deal with Meta to build a $1.5 billion
data center there. The agreement
exempts the facility from 80% of its
real property tax liability and 100% of
its personal property tax liability to
defray the costs of infrastructure
investments made by Meta. The total
value of these tax subsidies could go
as high as
$750 million, over 40 years,
though Eagle Mountain officials
indicate that there are contingencies to
limit the length of the agreement. While
property taxes are less important in
Utah and only account for 3% of the
city’s budget, this deal appears on its
face less favorable than the Wisconsin
agreements that we detail below.
Beaver Dam (Including Phase Two)
Total Equalized Value (2026) $2.2 billion
Population 16,678
Median Household Income (2024) $66,673
Data Center Developer Meta
Data Center Size (MW) 440 MW
Building Size 1.4 million square feet
Development Acreage 390 acres
Total Data Center Investment $2 billion+
Expected Property Value $1.3 Billion
Peak Construction Jobs 1,000+
Ongoing Job Creation 200+
Tax Increment District? Yes
Tax Increment Spending $110 million
Sources: WI DOR and DOA, U.S. Census Bureau, city of Beaver Dam, and Meta
Page 42 of 56
27 Grounding a Charged Debate | September 202 6
Beaver Dam
The Beaver Dam project, located in central Dodge County, is the smallest of the three hyperscale
data centers currently under construction in Wisconsin. With an investment of more than $2 billion,
this data center will be quite large but still smaller than the Port Washington and Mount Pleasant
centers. Total real property value is expected to come in at $1.3 billion, equal to approximately 59%
of the city’s current property value. The data center on Beaver Dam’s north side continues the
commercial and industrial development that has taken place there over the prior two decades with
companies like Generac, Walmart, and Beaver Dam Cold Storage.
The data center is being built on land annexed from the town of Beaver Dam in August 2024 and
placed into a TID. The project’s first phase, expected to generate $681.1 million in property value, is
currently under construction, with completion expected in 2027. The second phase is expected to
add property valued at $600 million and finish in 2029. The project is being built by Degas, a
subsidiary of Meta, the parent company of Facebook. The data center is expected to provide a
combination of support for Meta’s AI development and its online platforms like Facebook, Instagram,
WhatsApp, Threads, and other services. Another smaller 90,000 square foot data center owned by
Oppidan Investment Co
has also been announced for development on an adjacent site.
Development Agreement
As part of the agreement, Beaver Dam committed to use its TID to reimburse Degas for up to $10
million in infrastructure costs for the project to extend water mains and add a sanitary sewer main
and lift station. The city also expects to spend $10 million on public infrastructure updates.
Beaver Dam also committed to pay $100 million in incentives to the developer in two installments if
the project meets certain benchmarks. The first $50 million payment is dependent on the
development generating at least $5.7 million in tax increment each year. If the revenue falls short,
payments to the developer will be pro-rated by a similar percentage. The second $50 million
payment requires that the second project phase generate $5.5 million in new revenue to receive the
full amount. Degas has also committed to exploring renewable energy to power the data center and
returning any water used by the facility to the local groundwater.
Projected expenditures from the TID total $110 million, including the development incentives. The
city is not responsible for any borrowing. Instead, the developer will pay for any infrastructure
development costs and will be repaid using tax increment proceeds. The first phase is projected to
add $681 million in property value by 2027 and $12.5 million a year in tax revenue. The second
phase would add $600 million of value, bringing total annual district revenue up to $23.5 million per
year. This would give the city the option of closing the district by 2033.
Property Tax Scenarios
We can project the impact of the data center on both city property tax revenues and Beaver Dam
taxpayers under three scenarios (see Figure 15 on the next page). These calculations are meant to
illustrate the effect of state law and do not represent any plans by Beaver Dam officials. The baseline
scenario shows levy growth in Beaver Dam under the long-term average rate of new construction of
0.8% per year, yielding $800,000 in new revenues by 2037 – or less than inflation. In the next
Page 43 of 56
28 Grounding a Charged Debate | September 202 6
scenario, city leaders would use the data center development to increase property taxes by the
maximum amount allowed under state levy limits. By 2037, the city’s operating levy would rise from
$8.8 million to $16.3 million, as shown by the dark blue line. The third scenario assumes the levy
would grow by 6% in years in which the data center would add more than 10% in new construction.
In this scenario, the levy would grow from $8.8 million to $11.3 million over the next 10 years. The
last scenario shows slow growth in tax revenue, and limited growth in property tax rates until the tax
increment district closes in 2033, followed by a rapid drop in property taxes paid by the average
taxpayer in the community.
Existing taxpayers could see tax increases and decreases as the proposed data center is completed.
Figure 16 shows how these changes could impact an average home in Beaver Dam, valued at
$211,500 in 2026. These figures also illustrate how current state law makes it challenging for local
officials to use a TID and raise revenues while fully protecting homeowners, as explained in Part Two.
Page 44 of 56
29 Grounding a Charged Debate | September 202 6
Mount Pleasant
The hyperscale data center in the Racine County village of Mount Pleasant came online last spring,
and expansions are already under construction. As we have noted, this complex is intended to be
used to train models rather than perform tasks through inference with existing models. Together the
facilities are expected to be the largest in the state and among the largest in the world. Total real
property value has been estimated at $8.4 billion, which is nearly equal to the village’s current
property value, which is in turn triple what it was 10 years ago. When completed, these facilities will
cover more than 11 million square feet.
These data centers are being developed on land originally intended for the construction of a massive
Foxconn manufacturing plant, as discussed in our 2020 fiscal analysis of the village. As that
development did not go forward at the initially announced scale, Mount Pleasant had a substantial
amount of land that was zoned for industrial development, was already part of a TID created for
Foxconn, and had infrastructure available. That made the property appealing for Microsoft.
The project is planned over four phases. The first phase has been completed, generating $1.87
billion in real property value from a total investment of $3.3 billion. The next phase, on that same
location, will also add approximately $2.34 billion in property value and raise the total investment for
the first two phases combined up to $7 billion. When completed, these projects will cover 2.4 million
square feet. This second phase is under construction and is expected to be completed in 2028. The
next two parts of the project are expected to add an additional 8.7 million square feet of data center
buildings split between two
locations. These projects were
approved by the village in 2026, and
some site preparation work has
begun. These additional
development phases could total
$4.4 billion, based on current
projects underway. Additional
developments could push values
even higher.
Development Agreement Details
The agreement between Microsoft
and Mount Pleasant is relatively
limited in scope, in part because
much of the infrastructure, land
acquisition, and land-use decisions
were completed a decade ago for
the proposed Foxconn factory
.
Microsoft pledged to create a total
of $1.4 billion in taxable property in
the TID and as of 2026, the property
value in the district totals $2.4
Mount Pleasant (All Phases Unless Otherwise Noted)
Total Equalized Value (2026) $8.5 billion
Population 28,636
Median Household Income (2024) $91,616
Data Center Developer Microsoft
Data Center Size (MW) 1 GW+
Building Size 11.2 million square feet
Development Acreage 1,896 acres
Total Data Center Investment $20 billion+
Expected Property Value $8.4 billion
Peak Construction Jobs 2,960 (Phase One)
Ongoing Job Creation 550+ (Phase One)
Tax Increment District? Yes
Tax Increment Spending Up to $115 million
Sources: WI DOR and DOA, U.S. Census Bureau, village of Mount Pleasant,
Microsoft, and WPF Calculations
Page 45 of 56
30 Grounding a Charged Debate | September 202 6
billion. In return, Mount Pleasant has agreed to provide up to $5 million per year as long as the
district is open, up to $115 million in developer subsidies, though Microsoft has said it intends to
redirect them back to local governments. Microsoft is continuing to build within the TID but will not
receive additional payments.
Tax Increment District Details
These data center projects make up a small share of public spending in the Foxconn TID. Of the total
district expenditures of $1.33 billion, $1.29 billion was committed as part of the initial Foxconn plan.
In other words, the village did not commit to much additional spending for Microsoft. The first two
phases of the district are projected to add about $4 billion in property value by the end of 2029,
generating more than $114 million in annual tax revenue – more than most Wisconsin cities get
from all taxpayers. Current projections suggest the TID could close in 2032 – earlier than originally
anticipated. The date will depend on the TID’s financial performance and decisions by village leaders
and the district’s joint review board since the TID might take on additional projects or spending.
Microsoft Project Required Extensive Approvals
The Microsoft development required many approvals despite all the previous work to prepare the
property for Foxconn. Since February 2023, the Village Board, Plan Commission, Community
Development Authority, and the Zoning Board of Review voted 20 times on aspects of the first phase
of the data center project alone, excluding the actions that came before Microsoft.
The decisions included approving the initial land sale and development agreement with Microsoft,
approving amendments to the village zoning code and comprehensive plan to allow data center
development, the initial site plan, and multiple amendments to that plan. Most of these actions were
taken in open meetings by both the village plan commission and village board, as shown in Figure
17. The village also provided the opportunity for public comment on each of these actions. Since the
TID’s creation in 2017, more than 60 public meetings have been held to discuss these projects and
village bodies have voted more than 50 times to approve them.
Page 46 of 56
31 Grounding a Charged Debate | September 202 6
Janesville
The data center proposal in Janesville
faced criticism, and the city allowed its
letter of intent with the potential
developer to expire in June. However,
we can still analyze the development
plan submitted by Viridian Partners in
response to a city request for proposals
for the redevelopment of the site of the
former General Motors assembly plant.
The factory
operated for 90 years
before shutting down in 2009 and
being demolished in 2018 and 2019,
leaving behind a polluted site. The
proposal was for building an 800 MW
data center with up to 11 individual
buildings totaling 3.3 million square
feet. The project would have included
total costs of more than $8 billion and
produced an estimated $700 million in
real property value – just under 8% of
the city’s total current value.
Project Details
Viridian also pledged to remediate the GM site as part of the redevelopment, addressing pollutants
such as PCBs, volatile organic compounds, and heavy metals. Viridian said it would pay for the
cleanup on its own without taxpayer assistance, something another user such as a factory would be
unlikely to do. The proposal did not speak to the potential use of TIF or any incentives. Details on
community commitments, tax impacts, and other factors would have been determined if the project
had advanced, along with plans to secure access to sufficient electricity and fiber-optic lines.
This proposal’s use of an existing urban property poses questions for the community, including
whether residents might want to use the site for another industrial or commercial use or even for
housing. However, rejecting a data center would likely mean giving up on the idea of a developer
paying for the site cleanup. In that event, the city would likely need either funding from taxpayers or a
federal or private grant to remediate the property.
Project opponents also successfully put the following question
on the Nov. 3 ballot to require a
referendum on future major redevelopment of the GM site: “Should approval of proposed
development agreements, development projects, sales, and leases of the GM/JATCO sites for
projects exceeding $450 million in project costs be decided by a majority vote of the electors?”
This
ballot question is much more targeted than the Port Washington referendum rule. However, if it
passes, then Janesville will be trying to market a polluted site that has remained unused for a
Janesville
Total Equalized Value (2026) $9.1 billion
Population 66,809
Median Household Income (2024) $73,446
Data Center Developer Viridian Partners
Data Center Size (MW) 800 MW
Building Size 3.3 million square feet
Development Acreage 250 acres
Total Data Center Investment $8 billion
Expected Property Value $700 million within four
years
Peak Construction Jobs 1,200 per building
Ongoing Job Creation 600
Tax Increment District? To be determined
Tax Increment Spending To be determined
Sources: WI DOR and DOA, U.S. Census Bureau and Viridian Project Proposal
Page 47 of 56
32 Grounding a Charged Debate | September 202 6
decade and a half and that carries
an unusual referendum
requirement. That could curtail its
marketability for any type of
development, not just a data
center.
Port Washington
A massive data center is being built
on the outskirts of Port
Washington, a city in Ozaukee
County on the shore of Lake
Michigan. With total phase one
construction valued at $15 billion,
this data center could be the
largest stand-alone facility in the
state when completed, though the
overall Microsoft complex would be
larger. Total real property value is
expected to come in at $2.1 billion,
more than doubling the community’s 2025 property value.
The project sits within a 1,674-acre TID to the north of the city along Interstate 43, though the
development would cover only 672 acres. The land was annexed in January 2025 from the town of
Port Washington and had been intended for commercial and industrial use since the adoption of a
comprehensive plan in 2009. The development is planned in two phases, with the first expected to
increase real property by $1.1 billion by 2027. The next phase would add $977.4 million more, and
would begin construction in 2030 and end by 2031. Current values are based on the city’s TID plan,
and the estimates may grow as assessors review property values early next year.
Development Agreement and Tax Increment District Details
The deal specifies the developer initially will pay $175 million for sewer and water main extensions
and other infrastructure. The city will reimburse the developer with TID proceeds and pay 7% interest
once benchmarks have been met. As part of this arrangement, the developer will be paid all property
taxes in excess of the amount that would have been paid if the property had been valued at $120
million for the life of the TID. The developer also must pay for roads damaged during construction
and cover nearly $7 million in estimated impact fees, assuming a 2.5 million square foot building.
Port Washington’s TID number 5 was created in 2025 and is projected to close in 2045.
Expenditures from the district are estimated to total $635.5 million, including $455.4 million in
developer payments. The district is expected to generate an estimated $16.5 million in new revenue
per year after the first phase and $30.7 million after the second.
Port Washington (All Phases Unless Otherwise Noted)
Total Equalized Value (2026) $2.2 billion
Population 12,952
Median Household Income (2024) $81,948
Data Center Developer Vantage/Open AI/Oracle
Data Center Size (MW) 900 MW
Building Size 2.5 million square feet
Development Acreage 672 acres
Total Data Center Investment $15 billion (Phase One)
Expected Property Value $2.1 billion (Preliminary)
Peak Construction Jobs 4,000
Ongoing Job Creation 1,000+
Tax Increment District? Yes
Tax Increment Spending $635.5 million
Sources: WI DOR and DOA, Census Bureau, and city of Port Washington
Page 48 of 56
33 Grounding a Charged Debate | September 202 6
DeForest
This proposed data center project
in DeForest was rejected, but the
initial proposed commitments
show the developer, QTS, planned
to invest more than $12 billion.
The Forum estimates the facility’s
potential real property value at
$2.3 billion, equaling most of the
village’s existing value. The
intended project would have sat on
1,570 acres in the town of Vienna
that was to be annexed by the
village. But many local residents
criticized the plan, and the state
Department of Administration did
not support the annexation
request, saying the village had not
yet demonstrated it was in the
public interest. Within days, village
officials dropped the project.
Development Agreement Details
In the pre-annexation agreement
with DeForest, QTS committed to
a $1.2 billion minimum valuation
for the center for 15 years. The
property owner would have had to
pay taxes on at least $1.2 billion
in property value for that period
regardless of its assessed value.
Figure 18 compares estimates for
the total cost and property value
with the minimum guaranteed
value. QTS also committed to pay
for any public infrastructure
needed for the development
without a TID; use at least 45%
renewable energy to power the
facility; pay for a local highway
interchange; and provide
$100,000 per year in funding for
a local watershed group.
DeForest
Total Equalized Value (2026) $2.9 billion
Population 13,101
Median Household Income (2024) $106,419
Data Center Developer QTS
Data Center Size (MW) 1 GW+
Building Size Unknown
Development Acreage 1,570 acres
Total Data Center Investment $12 billion
Expected Property Value $2.3 Billion
Peak Construction Jobs 5,000
Ongoing Job Creation Hundreds
Tax Increment District? No
Tax Increment Spending None
Sources: DOR, DOA, Census Bureau, DeForest, news reports, WPF
Page 49 of 56
34 Grounding a Charged Debate | September 202 6
Takeaways
These data center projects and proposals bring risk for communities – no multi-billion-dollar project
could be secured without that. These deals would tie a massive portion of the tax base in these
communities to the facilities. However, the communities did not commit to substantial permanent
spending for the data centers and have negotiated protections such as guaranteed property
valuations, borrowing by the developer, and pay-for-performance triggers for incentives. That
increases the odds that these communities will profit from the massive boost to their property tax
base from the data centers. To be sure, many communities will not embrace the large-scale
disruptions that these facilities entail. Yet those that do appear to be making a rational and
defensible decision.
Page 50 of 56
35 Grounding a Charged Debate | September 202 6
Part Four: Policy Options
In laying out policy options, we start with those aimed at state lawmakers and policymakers, and
then extend our discussion to alternatives for local elected officials, particularly in communities
where a data center has been proposed. We note that these are not recommendations, only options
for policymakers to consider. Some of them are mutually exclusive by design to give a full spectrum
of choices. For each issue, policymakers may also opt to retain the status quo.
In their deliberations, local and state officials may wish to reflect on whether they are concerned
about data centers or AI itself. If AI is their greater concern, state officials may wish to consider
specific regulations or policies to control the use of the technology in specific areas such as the
courts or in loan underwriting. Ultimately, rejecting data centers in a single community is at best a
limited tool in curtailing or influencing the rise of AI.
Options to Change State Law
State Levy Limits
For local elected officials and taxpayers, state levy limits may represent the biggest challenge related
to data centers. As discussed in Part Two, at present increases in local levies for operations are
limited to growth from new construction, and local elected officials have five years to use the
massive new construction from data centers to raise taxes before losing the revenue. In practice,
that means local officials are either raising property taxes more than is needed initially or giving up
additional revenue that they may eventually need. This choice is especially painful in cases where
the data center construction takes place within a TID that will not close until after any tax increases
are approved, potentially forcing existing homeowners to pay for the additional levy for a period of
years.
Option 1) Change state law to give municipalities a ten-year period to use new construction from
development such as data centers to raise their levy, rather than the current five-year period.
Option 2) In cases of development within TIDs, allow local officials to wait until the district closes
to use the net new construction from that development to raise the operating levy.
Option 3) Change state law to allow both Options 1 and 2.
Tax Increment Districts
To control financial risk, state law prohibits municipalities from creating new TIDs if doing so would
cause 12% or more of their total equalized property value to be within these districts. That makes it
difficult for municipalities to use TIDs with data centers because of their massive size. Even a
community as big as Green Bay or Madison might not have enough capacity under state law to fit a
large data center under the 12% cap, and no smaller community can do so. As a result, communities
that wish to use a TID to help finance improvements for a data center have to lobby for the
Legislature to approve a specific exemption for them.
Page 51 of 56
36 Grounding a Charged Debate | September 202 6
Option 4) In cases of proposed development of more than $500 million that accounts for 12% or
more of the equalized value in a municipality, lawmakers could allow the municipality to petition
DOR for an exemption to the current state cap on property value within TIDs. Lawmakers could
direct DOR officials to only approve exemptions for projects with substantial protections in place,
such as guaranteed property valuations and borrowing by the developer rather than the
municipality.
State Sales Tax Exemption
Under a state sales tax exemption for data center materials and equipment, the Legislature’s budget
office has estimated there would be $1.5 billion in forgone state sales tax revenues over a five-year
period, plus an estimated $369 million annually thereafter. Thirty-eight states offer tax incentives for
data centers (see Part Two), with all of them offering some form of sales tax exemption on data
center equipment such as computers. Fifteen of the states extend that exemption to electricity used
at the facilities. State officials need not make any change to the exemption, but could consider:
Option 5) Apply the sales tax exemption currently provided for purchases by manufacturers, data
centers, and other entities such as nuclear fusion firms to all capital investment. Though this
might be seen as prohibitively expensive, it would avoid the government picking winners and
losers.
Option 6) Repeal the sales tax exemption for future data center projects and use the additional
revenues to lower the overall state sales tax rate or support economic development. Under this
option, the government would continue to pick some other winners such as manufacturers.
Option 7) Pare back a portion of the sales tax exemption, such as the portion of the incentive
that applies to purchases of electricity, as some other states do. Another alternative would be to
consider treating all industries the same with respect to taxes on energy purchases.
Option 8) Include performance requirements such as minimum job creation thresholds, tax
revenue minimums, or the reuse of industrial sites on any sales tax incentives. Since the
Wisconsin Economic Development Corporation is already involved with ensuring eligibility, the
additional administrative burdens related to reporting performance would be limited.
Non-Disclosure Agreements (NDAs)
Opponents have sharply criticized the use of NDAs by data center developers with municipalities
during the first part of their negotiations, while others have pointed out that NDAs are common in
economic development work and cannot override state open meetings and records laws. Some local
officials such as those in Port Washington have also said that they discussed and negotiated their
data center without using an NDA, and Microsoft has said it will stop using NDAs. Pennsylvania Gov.
Josh Shapiro also signed an executive order in August that imposes new standards on data centers,
including a prohibition on NDAs.
Option 9) Ban the use of local government NDAs for data center development except in certain
limited circumstances such as to protect trade secrets, or put broader restrictions on all local
NDAs.
Page 52 of 56
37 Grounding a Charged Debate | September 202 6
Option 10) Limit the extent or duration of data center NDAs, such as restricting them to six
months.
Power and Water Usage
Recent decisions by the state Public Service Commission have taken a strong stance in asserting
that data centers and not ordinary ratepayers should pay for the costs of new power plants and lines
to serve them. However, details such as transmission rates still need to be worked out, and the risk
remains that not enough new capacity will be built to meet the added demand from data centers.
Option 11) Either through state law or PSC decisions, ensure that the approach to utility rates
used in recent PSC rulings is extended to proposed data centers in the territory of other utilities.
Option 12) Work to ensure that federal regulators extend the principle of data centers paying
their own costs to transmission rates and not just state-regulated generation rates.
Option 13) Ensure state policy allows for the timely siting of generation and transmission assets
to meet the growing statewide demand.
Option 14) Consider public or private agreements whereby data center operators agree to
throttle back their power usage at moments of peak demand such as very hot summer days.
Option 15) Provide for annual PSC reports on water usage by data centers that also provide
context for the public about how overall water use in a given community compares to a
generation ago.
Statewide or Local Moratoria
Local moratoria on data center construction have now passed around the state and nation. New York
Gov. Kathy Hochul approved a one-year statewide moratorium in July through an executive order.
These delays may give policymakers more time to enact regulations and appear popular in national
polling. However, as we have noted, the cost of a moratorium in lost economic activity could be
unusually high, and litigation is also possible if they are mishandled.
Option 16) Policymakers may wish to consider whether they need a moratorium to regulate or
reject data centers, or whether they could simply enact whatever zoning and other policies they
deem appropriate.
Option 17) Elected officials may wish to weigh the benefits of a pause against the potential
impact from lost economic activity. They may also want to assess any possible legal exposure,
particularly if they are renewing an existing moratorium or taking other actions suggesting a de
facto ban.
Handling Shuttered Facilities
Hyperscale data centers are still too new to know what will happen to them at the end of their useful
lives. On the one hand, the Forum could not turn up any instances of massive data centers closing,
and computing power seems more widely useful than a manufacturing plant built for one purpose.
Page 53 of 56
38 Grounding a Charged Debate | September 202 6
Data centers also seem less likely to result in a polluted site than factories. On the other hand, the
servers and processors within a data center have shorter lives than most manufacturing machinery.
Option 18) The state could spell out in law the obligations for owners who close their data
centers, particularly in cases where construction on a facility was begun but not completed. Local
officials may also wish to resolve that issue in their development agreements.
Options to Guide Local Policy
Unlike Congress or even the state Legislature, municipal and county officials have limited power to
address the hopes and concerns that the public has about AI. However, local officials have a
substantial role to play in considering and siting any development within their borders.
Limit Risk and Impact to Local Finances
When considering data center agreements, local officials may wish to take concrete steps to limit
their exposure to financial risk through options such as these:
Option 19) Negotiate a guaranteed assessed property value for the proposed data center that is
sufficient in size and duration to cover all local outlays on infrastructure, incentives, and other
costs. Prioritize working with developers that have the financial strength and market position to
make good on their obligation for the life of the contract.
Option 20) Limit developer incentives provided through tax increment financing or other means.
Option 21) Limit local government borrowing for a data center project. If borrowing is needed,
local officials may wish to explore whether the developer could take out the loan and assume the
risk.
Option 22) Explore whether the developer would be willing to contribute toward other local costs
or needs, such as repairing damage to existing roads and other infrastructure due to
construction.
Consider the Impacts to TIF
Tax increment financing is an important tool for spurring local development and addressing needs
such as housing and jobs. Development may also be delayed or stymied by moves to require
referenda approvals before TIF can be used on some projects.
Option 23) Local voters and officials can consider whether requiring a referendum is the right
way to limit the use of TIF locally, given this policy could delay projects such as housing by more
than a year or even derail them entirely. State officials might consider whether to limit such
referenda, though they would also have to consider the question of local control.
Maximize Local Benefits
Option 24) Look for other potential local benefits from a data center developer, such as paying
for workforce training, environmental remediation or improvements, or other community needs.
Page 54 of 56
39 Grounding a Charged Debate | September 202 6
Be Thoughtful About Non-Disclosure Agreements (NDAs)
Local governments have used NDAs for years, but they now face additional scrutiny. For this reason,
local officials may wish to take care in agreeing to them.
Option 25) Ban or avoid NDAs when possible and limit their scope and duration if they are used.
Option 26) Adopt a proactive policy on the use of NDAs and then explain that policy to local
officials and the public along with the limits of such agreements. Make sure local residents
understand that NDAs do not override state open records and meetings laws. Consider
establishing a minimum length of time between the introduction of a project covered by an NDA
and a final legislative vote.
Consider a Project Regionally, Not Just Locally
Opponents of data centers in a given community often cite concerns such as higher utility costs,
water usage, and state tax exemptions that a single village or city may not be able to address simply
by rejecting them inside their territory. A final consideration for local officials would be to reflect on
whether rejecting a data center would protect a community from concerns such as utility costs or
state tax incentives or whether the center could still be sited nearby and the local residents exposed
to similar risks but with fewer benefits.
Page 55 of 56
40 Grounding a Charged Debate | September 202 6
Conclusion
After years of lagging many other states in data center deployment, Wisconsin is now home to
several massive projects of its own, raising the prospect of rapid development but also potential
challenges, including rising power demand. As the debate over the issue intensifies, our review finds:
• With energy issues paramount, state regulators have put safeguards in place to ensure
new generation costs are not passed on to other ratepayers. However, the question of
added transmission costs remains unresolved, and the state must still ensure adequate
power to serve existing users and the new facilities, regardless of who pays.
• Most communities building or considering data centers are taking reasonable steps to
address fiscal risks through guaranteed property values and limited direct borrowing.
• The short window within the state’s levy limit law may put pressure on local officials to
use the new construction from data centers to increase short-term property taxes more
than they otherwise would. If TIF is involved, this could affect the bills of homeowners.
• Responding to data centers with changes to TIF policies, such as requiring referenda for
all large projects, could have a chilling effect on other types of development.
• Most states offer a sales tax exemption to data centers as Wisconsin does, and other
industries such as manufacturing receive similar treatment here. But the cost is notable.
• Sales by most Wisconsin water utilities are down sharply since 2000, and usage is also
down after accounting for agricultural and electric utility users. The current crop of data
centers will add to the usage but it is unlikely to return to 2000 levels.
• Data centers offer an unusual and possibly unique way to remediate polluted urban sites.
In responding to growing public concern over data centers, elected officials – particularly those at
the local level – will have to grapple with the fact that they may not always be able to address the
deeper misgivings over AI that help drive sentiment over data centers. Still, we identified some
options for policymakers to consider:
• Giving local elected officials more time under state levy limits to decide whether tax
increases are needed, particularly in cases involving TIDs.
• Limiting direct borrowing by local governments to support data center projects.
• Tying the sales tax exemption to whether projects meet certain benchmarks.
• When passing or renewing a moratorium on data centers, considering any potential legal
exposure, particularly if actions such as renewing a pause suggest a de facto ban.
For communities such as Beaver Dam or Mount Pleasant, data centers offer the prospect of
development at a level that few if any other industries can currently provide. This is worth
considering for any community, particularly in Wisconsin where under state law new development is
needed to raise local tax revenues and sustain crucial public services. However, data centers bring
certain change to communities along with some risks – the ultimate decision is one for residents and
their elected officials. In advancing this study, we aim neither to promote data centers nor to limit
their development. Instead, we hope this report will provide state and local leaders and voters alike
with better information to decide for themselves what is right for their community and state.
Page 56 of 56
Source: City of Stevens Point website. First collected Oct 3, 2026.