RecordWell Data

Interviews for Architectural Firm — Minutes

Town of Brule · Douglas County · Interviews for Architectural Firm · meeting of Aug 4, 2025 · Minutes

Open the original document More from Town of Brule

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 BRULE TOWN BOARD MEETING Monday Aug 4, 2025 The committee interviewed the following four candidates to design the new garage. 8:00 A M DSGW A rchitecture John Erickson 2 W est First Street, Suite 201, Duluth, M N 55802 126,000 10:00 A M K ueny A rchitects Jon P. W allenkamp 10505 Corporate Drive, Suite 100, Pleasant Prairie, W i 140,400 1:00 PM Dimension IV A . James Gersich, A IA A rchitect/Principal 6515 Grand T eton Plaza, Suite 120 M adison, W isconsin 8.90% 3:00 PM Cedar Stev e H oecherl A rchitecture T eam L ead 604 W ilson A venue M enomonie, W I 139,900 It was a very tough decision as all the candidates had great presentations, seemed very knowledgeable about what we needed, and would have done a great job in designing a new garage for us. However, after much discussion, each committee member ranked the four candidates from 1 to 4. This resulted in our pursuing reference checks on the number one candidate DSW Architects. After subsequently conducting reference checks, the committee agreed to move forward with contracting DSGW to work with us on the design.

Source: Town of Brule website. First collected Oct 11, 2026.