Interviews for Architectural Firm — Minutes
Town of Brule · Douglas County · Interviews for Architectural Firm · meeting of Aug 4, 2025 · Minutes
Open the original document More from Town of Brule
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
1
BRULE TOWN BOARD MEETING
Monday Aug 4, 2025
The committee interviewed the following four candidates to design the new garage.
8:00 A M
DSGW
A rchitecture John Erickson
2 W est First Street, Suite 201,
Duluth, M N 55802 126,000
10:00 A M K ueny A rchitects Jon P. W allenkamp
10505 Corporate Drive, Suite 100,
Pleasant Prairie, W i 140,400
1:00 PM Dimension IV
A . James Gersich, A IA
A rchitect/Principal
6515 Grand T eton Plaza, Suite 120
M adison, W isconsin 8.90%
3:00 PM Cedar
Stev e H oecherl
A rchitecture T eam L ead
604 W ilson A venue
M enomonie, W I 139,900
It was a very tough decision as all the candidates had great presentations, seemed very knowledgeable
about what we needed, and would have done a great job in designing a new garage for us.
However, after much discussion, each committee member ranked the four candidates from 1 to 4. This
resulted in our pursuing reference checks on the number one candidate DSW Architects.
After subsequently conducting reference checks, the committee agreed to move forward with contracting
DSGW to work with us on the design.
Source: Town of Brule website. First collected Oct 11, 2026.