Public Hearing — Minutes
Village of Withee · Clark County · Public Hearing · meeting of Aug 10, 2026 · Minutes
Open the original document More from Village of Withee
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Village of Withee
Phone: 715-229-4319
511 Division * P.O. Box A * Withee, Wisconsin 54498
PUBLIC HEARING
The Village of Withee Board met on August 10, 2026, at 6:15 pm in the Municipal
Building, Conference Room, for a Public Hearing.
President Pro Tem Shelton called the meeting to order. Roll call was answered by
Shelton, Trustees Amacher, Kroeplin, and Kalepp. President Klabon was absent. Also, in
attendance were DPW Derek Schad, Cindy Cardinal, Jane Erl, and Forward Bank
representative, Dave Krause. Clerk Niemi recorded the minutes.
A Kalepp/Kroeplin motion to open the public hearing for comments about changing the
zoning at parcels 191.0036.001, 191.0037.000, 191.0038.000, and 191.0039.000 from R-
1 Single-Family Residential to R-2 Multi-Family Residential carried with all ayes. Dave
Krause, Commercial Lender with Forward Bank, said the vacant lots to the west of the
municipal building were owned by the State Bank of Withee, becoming Forward Bank’s
as part of the acquisition. He said they plan to build a 30’x 76’ prefab duplex from
CAVCO with 2-3 bedrooms and 16’x 24’ detached garages on either side by October
2026. The front of the unit will be 40’ from 1st Street for a long gravel driveway and
landscaped yard. The rent will be approximately $1,000 per month per side. Forward
Bank hopes the 3-bedroom option will attract families with children to get more students
enrolled at our school.
For the second unit, which is closer to the municipal building, a stick-built three bedroom
per side duplex will be constructed on a slab. There is a hump on the property which
Forward Bank needs to excavate and level. Also, an electric pole needs to be relocated
about 40 feet to the east since homes can’t be built under a power pole. Krause isn’t sure
when the construction will start on the second unit. Krause estimates the total investment
for the two units to be around $700,000, for low to moderate income pricing.
Jane Erl asked if the Village taxes are paying for the units. Krause stated that the bank is
paying for everything. Erl asked why the bank didn’t sell the lots to others to build.
Krause said that is a possibility and that the bank hopes to sell the units within 3-5 years
as a rent-to-own. Trustee Amacher asked if Forward Bank has other properties and
someone to manage them until sold. Krause replied that there are a duplex and a single-
family residence rented in Marshfield managed by Success Realty. Deb Conway from
Forward Bank will manage the Withee units.
An Amacher/Kroeplin motion to close the public hearing carried with all ayes. A
Kalepp/Kroeplin motion to adjourn the public hearing at 6:27 pm carried with all ayes.
Ellen Niemi
Village Clerk
Source: Village of Withee website. First collected Oct 13, 2026.