RecordWell Data

Town Board Meeting — Agenda packet

Town of Spider Lake · Sawyer County · Town Board Meeting · meeting of Sep 9, 2026 · Agenda packets

Open the original document More from Town of Spider Lake

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

2:52 PM 09/07/26 Town of Spider Lake Transaction List by Date August 13 through September 9, 2026 Type Date Num Name Amount Aug 13 - Sep 9, 26 Check 08/15/2026 888889 Wisconsin ETF Health Insurance 2,091.56 Check 08/28/2026 27599 DOLORES K BRANDT 182.00 Check 08/28/2026 27600 Bonnie Booth 130.00 Check 08/28/2026 27601 HEIDI BECKER 130.00 Check 08/28/2026 27602 Rita Capes 71.50 Check 08/28/2026 27603 Robert Bagnall 110.50 Check 08/28/2026 27604 SARAH DELANEY 52.90 Check 08/28/2026 27605 Jeff Tumbleson 61.89 Check 08/28/2026 27606 DON BECKER 125.46 Check 08/28/2026 27607 Quentin C Johnson 95.88 Check 08/28/2026 27608 Bob Capes 102.84 Check 08/28/2026 27609 Julie Rudolph 31.53 Check 08/28/2026 27610 Victoria Ross 35.44 Check 08/31/2026 27598 Craig Pagenkopf 315.00 Check 08/31/2026 888888 Elan Financial Services 600.55 Check 09/09/2026 27611 Republic Services #930 1,768.05 Check 09/09/2026 27612 Transwest Truck Trailer RV - Brighton 335.02 Check 09/09/2026 27613 Wisconsin Towns Assoc. 265.00 Check 09/09/2026 27614 Lynn's Custom Meats 560.00 Check 09/09/2026 27615 Mark Burke 375.00 Check 09/09/2026 27616 P Kenney 54.80 Check 09/09/2026 27617 Advance Printing 58.56 Check 09/09/2026 27618 CenturyLink 573.17 Check 09/09/2026 27619 NAPA Auto Parts 107.22 Check 09/09/2026 27620 Halron Lubricants 109.76 Check 09/09/2026 27621 APG Media of Wisconsin, LLC 388.63 Check 09/09/2026 27622 Northland Lawn Sport & Equipment 2,060.68 Check 09/09/2026 27623 Northern Lakes Cooperative 62.49 Check 09/09/2026 27624 Clark & Clark 1,337.51 Check 09/09/2026 27625 Rusk County Farm Supply 296.40 Aug 13 - Sep 9, 26 12,489.34 Page 1 of 1 CUP 26-03 CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This is a Three (3) page document. Be sure to complete all pages Print Or Type – Use Black Ink Agent/Builder_________________________________________ Mailing Address_____________________________________________ City________________________ State______ Zip___________ Property Owner__________________________________________________ Mailing Address________________________________________________ City___________________________ State______ Zip___________ Day Phone______________Email___________________________ Daytime Phone________________________ Site Information (From Real Estate Property Tax Bill) Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __ Description: ____________________________________________________________________________________________________ Site Address: ____________________________________ Deed Document #___________ Acreage ________ _______________ Sanitary Permit #_______________ Date_______________ Issued By________________ Or: Year Installed_______________ Owner When Installed:______________________________ Zone District: R-1 RR-1 RR-2 A-1 C-1 I-1 F-1 Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.) Permit Requested For New Dwelling Type of Dwelling Frame built on site Modular/manufactured Other_____________ Type of Construction Frame Log Pole/Metal Block Other______ # of Bedrooms # of Stories Walk Out Yes No Loft Yes No Attached Garage Yes No _____X_____=_____SF Deck Yes No _____X_____=_____SF Footprint of Proposed Structure _____X_____=_____SF Total Habitable Sq. Ft. _________________ Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Addition To Dwelling Use of Addition Living room Kitchen Bathroom Bedroom Garage Deck Storage Building Screened Porch Other_____________ Bedrooms Existing Additional Total # of Stories Loft Yes No Size of Proposed Structure ______X______=______SF Total Habitable Sq. Ft. ___________________ Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Accessory Structure # of Stories Type of Accessory Structure Garage Storage Building Gazebo Screen house Greenhouse Other___________ Size of Proposed Structure ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Addition To Accessory Structure Size of Existing Accessory Structure ______X______=______SF Size of Proposed Addition ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Other/ Misc Foundation Replacement Roof Structure Replacement Other_____________________ Stairs/Walkways Within 75’ Of OHWM Area Involved ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________ Home Occupation/ Professional Office Type of Business________________________________ Located in Existing Dwelling Located in Existing Accessory Structure (Not more than 1 nonresident person may be employed on the premises) Total Area of Existing Building_______________SF Area Being Used for Business (May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an accessory building) __________X__________=__________SF Alternative or Renewable Energy Systems Solar Wind Other_____________________ Construction Cost $ _________________ Communication Systems Cell Tower Height of Tower:__________________ Other_____________________ Construction Cost $ _________________ Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin Application No._________________ (Attach Copy Of Approved Sawyer County Sanitary Permit) Page 1 of 3 TOWN OF SPIDER LAKE ZONINGADM 5.25.16 pplication No._____________A _________ LUP 26-28 Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure Type of Construction:☑ Height from Grade to Peak Use of Building/Structure Frame Log ✓Pole/Metal Block Other Construction Cost: $ Type of Construction:☑Frame Log Pole/Metal Block ☑Other Height from Grade to Peak Construction Cost: $ SITE PLAN REQUIREMENTS Size of Proposed Structure ✗= SF Total Area of Existing Structure: SF Size of Proposed Structure X = S Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8½ x 14) to illustrate the following 7 requirements: Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate North with an arrow 2. Show the location and name of any bordering roads, and indicate North. 3. Show the location and size of all existing and proposed structures 4. Show the location of any lake, river, stream, pond or wetlands. 5. Show the location of the well, septic tank and drain field. 6. Show dimensions in feet on the following: a. Structure to all lot lines b. Structure to centerline of road c. Structure to lake, river, stream, pond or wetlands d. Structure to septic system/privy and well e. Distance between structures 7. Show location vegetation protection area and proposed Viewing/Use Corridor on lake lots. Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits) Owner's signature is required on the appropriate attached Shoreland Preservation Agreement. This permit cannot be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits) Total land area within 300' of the water body: (A) Total impervious surface area (including this project) (B) In the event this application is approved by the Zoning Office, I agree: (B)/(A) x 100 = % Used (Shall not exceed 15% or 25% with a conditional use permit • That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spidel Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon - Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief i is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in or with this application. Signature of Owner or (Agent with Power of Attorney) Pirt Nane: KOBERT LOVELY You must complete the attached plot plan Fees: See Fee Schedule Sign: Checks should be made payable to: Treasurer of the Town of Spider Lake. An Additional fee will be required for each inspection over Dat 7/31/2026 Submit Completed Application And Fee To: Town of Spider Lake Clerk 10896 W Town Hall Rd. Hayward, WI 54843 Permit issued by Permit denied by Expiration Date OFFICE USE ONLY Date Fee $ Check # Date ☑See attached for reason of denial Signature of Zoning Administrator Robert & Charlyn Lovely 11262W Murphy Blvd Solar Array Installation September 2, 2026 Public Hearing for CUP 26-03 50'-1 3 4" 66'-9" M TRENCHING REQUIRED FROM SOUTH WALL OF DWELLING TO ARRAY 30'-3 1 2" 14'-1 1 4" 15° FROM NORTH 15° 446'-0" TO METER (NTS) 260' GROUND-MOUNTED ARRAY ARRAY TILT: 30° AZM180 PROJECT: 11262 W MURPHY BOULEVARD MUNICIPALITY: HAYWARD, WI ZIP CODE: 54843 CLIENT: ROBERT LOVELY & CHARLYN LOVELY AUTHOR: ---- DATE: 14/JUL/26 REV: - TOTAL ENERGY CAPACITY: 27.0 KWH9.440 KW DC-STC / 11.500 KW AC TRUNORTH SOLAR LLC PHONE: (612) 888-9599 TRUNORTHSOLAR.COM PANEL LAYOUT G2 LEGEND METER M Engineering Stamp Location Height: 1.5700 Width: 1.5700 Scale: 1 Municipality: HAYWARD, WI Engineering Stamp DPI SCALE: 1"=40' NOTES: - SOLAR PANEL LAYOUT SUBJECT TO CHANGE ACCORDING TO EXISTING CONDITIONS - SCALE AS SHOWN - ALL DIMENSIONS IN FEET UNLESS OTHERWISE STATED MODULE WATTAGE: 590 W NUMBER OF PANELS: 16 SYSTEM SIZE: 9.440 kW GROUND-MOUNTED ARRAY PROJECT: 11262 W MURPHY BOULEVARD MUNICIPALITY: HAYWARD, WI ZIP CODE: 54843 CLIENT: ROBERT LOVELY & CHARLYN LOVELY AUTHOR: ---- DATE: 14/JUL/26 REV: - TOTAL ENERGY CAPACITY: 27.0 KWH9.440 KW DC-STC / 11.500 KW AC TRUNORTH SOLAR LLC PHONE: (612) 888-9599 TRUNORTHSOLAR.COM RACKING SPECIFICATIONS A2 Engineering Stamp Location Height: 1.5700 Width: 1.5700 Scale: 1 Municipality: HAYWARD, WI Engineering Stamp DPI Sheet 2 of Sheets 2 SURVEYOR’S CERTIFICATE I, TODD C. GOOLD, A PROFESSIONAL LAND SURVEYOR IN THE STATE OF WISCONSIN, HEREBY CERTIFY THAT THIS MAP IS A CORRECT REPRESENTATION OF THE LAND SURVEYED, EXTERIOR BOUNDARIES, AND THE DIVISION THEREOF: A DIVISION OF DEED DOC# 446969, LOCATED IN GOVT. LOT 1, SECTION 28 - T42N - R7W, TOWN OF SPIDER LAKE, SAWYER COUNTY, WISCONSIN. DESCRIBED AS FOLLOW: BEGINNING AT THE NORTH 1/4 CORNER OF SECTION 28 - T42N - R7W, THENCE S89°10'03"E 213.45'; THENCE S51°47'57"E 114.27'; THENCE N50°35'40"E 47.82'; THENCE N06°52'40"E 38.68'; THENCE S89°10'03"E 935.64'; THENCE S53°47'46"W 279.52'; THENCE S45°30'42"W 357.02'; THENCE S40°38'55"W 203.66'; THENCE S40°45'22"W 6.30'; THENCE ALONG A CURVE TO THE LEFT, C7#, CB - S34°11'38"W, CD - 287.59', RADIUS - 1276.04', DA - 12°56'27", LENGTH - 288.20'; THENCE ALONG A CURVE TO THE RIGHT, C8#, CB - S41°45'39"W, CD - 86.83', RADIUS - 188.00', DA - 26°42'18", LENGTH - 87.62'; THENCE S27°53'41"E 240.19'; THENCE N64°44'12"W 303.61'; THENCE L107, N05°09'14"E 66.86'; THENCE L110, N78°56'02"W 66.11'; THENCE L111, S05°03'24"W 109.99'; THENCE L112, N58°56'21"W 52.73'; THENCE L113, N52°49'54"W 94.02'; THENCE L114, N43°24'57"W 114.54' THENCE N00°58'28"W 841.68' BACK TO THE POINT OF BEGINNING. THIS SURVEY WAS MADE IN COMPLIANCE WITH CHAPTER 236.34 OF WISCONSIN STATUTES, AE-7 OF THE WISCONSIN ADMINISTRATIVE CODE AND THE SUBDIVISION REGULATIONS OF TOWN OF SPIDER LAKE AND THAT I HAVE SURVEYED, DIVIDED AND MAPPED THE LAND HEREIN DESCRIBED, AND THE MAP IS A CORRECT REPRESENTATION OF THE SURVEY MADE TO THE BEST OF MY KNOWLEDGE AND BELIEF. THIS SURVEY WAS MADE UNDER THE DIRECTION OF SPIDER LAKE PROPERTIES LLC – MATT POBLOSKE _________________ TODD C. GOOLD PROFESSIONAL LAND SURVEYOR WISCONSIN REG# S-2489 8/19/2026 Approved this _____ day of _______, 2026 _____________________________________________ Approved by: QUENTIN JOHNSON, Chair, Town of Spider Lake CSM for Marvin & Candace Ramsay Proposal to join together two adjacent owned parcels (tax id 31019 and 45980).

Source: Town of Spider Lake website. First collected Oct 7, 2026.