RecordWell Data

Plan & Review Commission — Agenda packet

Town of Spider Lake · Sawyer County · Plan & Review Commission · meeting of Jul 1, 2026 · Agenda packets

Open the original document More from Town of Spider Lake

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MEETING MINUTES Town of Spider Lake Plan and Review Commission Meeting June 3, 2026 1. Chair Delaney called the meeting to order at 6: 00 pm. Present were Vice Chair Johnson and Commissioners Capes, Becker, Alternate Commissioner Julie Rudolph and Zoning Administrator Mike Gardner. 2. Motion to approve the Agenda made by Don Becker, seconded by Quentin Johnson. All in favor; motion carried. 3. Pledge of Allegiance 4. Motion to approve the Minutes of the May 6, 2026 Gassman CUP Public Hearing made by Becker, seconded by Rudolph. All in favor; motion carried. Motion to approve the Minutes of the May 6, 2026 P&RC Meeting made by Becker, seconded by Johnson. All in favor; motion carried. 5. Zoning Administrator’s Report: ZA Gardner reported follow-up and new project conversations and prospective owner inquiries, with three permit applications for review. a. Permit Applications: i. LUP 26-14 – Sisters of Charity – Foundation replacement: Existing structure setbacks pose no issues, and as all Ordinance requirements are met, Motion to approve LUP 26-14 made by Johnson seconded by Rudolph. All in favor; motion carried. ii. LUP 26-15 – Karlgaard – Steps to shoreline: As all Ordinance requirements are met, Motion to approve LUP 26-15 made by Becker, seconded by Capes. All in favor; motion carried. iii. LUP 26-16 – Larson – Roofline alteration: Roofline modifications proposed to remedy winter ice/snow issues. No changes to dwelling footprint. Motion to approve LUP 26-16 made by Becker, seconded by Johnson. All in favor; motion carried. b. Notices and anticipated activity i. As of June 1, 2026, trailers owned by Kroll and Frick are still on location and remain in violation of the Ordinance. The Town will prepare to issue citations, and Town counsel is in dialog with legal representation of the parties. 6. Land Use Ordinance 17-88 update: Thor Jeppsen, Project Lead with von Briesen & Roper (vB&R) provided an overview of Phase I activity thus far. Project Goals and Timeline were discussed. Phase I activity includes zone district recommendations, Use Table and Supplemental Use Regulations, Lot Standards and site design regulations. Phase 2 activity will include a review of Shoreland- Wetland Zoning. 7. As there was no other business coming before the Commission, Motion to adjourn was made by Johnson, seconded by Don Becker. All in favor; motion carried. Respectfully submitted, Sarah Delaney Plan & Review Commission Chair June 9, 2026 Town of Spider Lake Zoning Report June 2026 Date Permit# Name Address Descrip1on Construc1on Cost Total Sq Ft Fee 6/3,24 Morelock LUP process inquiry 6/3 Long:me LUP follow ups, site plan 6/4,16,17 Romashko Pre purchase inquiry, LUP applica:on 6/8 McCrackin Pre purchase inquiry: 8182 Nowak Rd 6/9 Long:ne, Larson, Bender LUP follow ups 6/10,11 Wheel Inn RV parked report, resolved 6/11 CJ Landscaping Stairs to lake replacement inquiry 6/11 Anderson Returned call, message 6/15,23,24,26 Hannula, Marty LUP applica:on inquiry, follow ups 6/15 Alcoe Scheduled site visit for new purchase 6/16 Boss Inspec:ons Contacted re Frick status – no contact 6/18 Frick Mailed Cita:on - cer:fied 6/18 Halllquist Inspec:on procedure inquiry 6/22 Waltho LUP record , boundary search, office visit 6/22 Urich Pre purchase inquiry: 8182 Nowak Rd 6/22,24 Johnson, Madalon Deck replacement inquiry 6/24,26 Boone LUP applica:on follow up, informa:on request, sanitary permit 6/24 Route 63 Realty Parcel inquiry for buildable area 6/24 Kozlowski Sawyer County Received dredging permit & drawdown request documents 6/24 Harrington WDNR Contacted for permit process clarifica:on X Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE.  Be sure to complete all steps in this application.  Click Skip or Continue to save your input. To exit the application at any point, close the app or browser after saving. Is agent/builder same as owner? Yes No First name Daniel Last name Hannula Property Owner Daytime Phone # 715 2223755 Property Owner Mailing Address 11028 West Allan Road, Unit 8, Hayward, WI 54843 First name Dakota Last name Dale Agent/Builder Daytime Phone # 715 5631309 Agent/Builder Mailing Address 10750N Oak Ridge Drive, Hayward, WI 54843 Govʼt Lot 1 1/4 1/4 Sec. 33 Twn. 42 R______W 7 Alternate/Legacy ID 028294000800 Description Timber Bay Resort Condo DECL 281672 AMD DECL 341720 Unit 8 & 1/11 INT IN COMMON ELEMENTS Site Address 11028 West Alan Road, Unit 8, Hayward, WI 54843 Acreage .710 Deed Document # Sanitary Permit # Sanitary Permit Date          /         / Sanitary Permit Issued By Year Installed Owner When Installed Attach Copy Of Approved Sawyer County Sanitary Permit Zone District R1 RR1 RR2 A1 C1 I1 F1 Wetland/Shoreland Yes No Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand 1,000 feet from lakes, ponds and flowages; and three hundred 300 feet from rivers and streams. To Download the Power of Attorney Form open this link here. Please upload filled in and notarized Power of Attorney Throughout the process the inputed information is automatically saved as a Draft document and you can always revisit it to continue where you left off. Permit Requested For New Dwelling Addition To Dwelling Accessory Structure Addition To Accessory Structure Other/Misc Use of Land Home Occupation/ Professional Office Alternative or Renewable Energy Systems Communication Systems Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Addition to Dwelling info Use of Addition Living room Kitchen Bathroom Bedroom Bedrooms Existing2 Additional 1 Total 3 Selet to input # of Bedrroms # of Stories 1 Loft Yes No Attach the Site Plan daniel-hannula-unit-8-timber-bay- resort-condo-map-17813… marty-rvsd-512261781305126794.pdf Visit heygov.co/townofspiderlake.com/fr_01ktyx3js0frkrgd25210qvq6t to view or download full files. In the event this application is approved by the Zoning Office, I agree: That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 800 AM 600 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in or with this application.  Signature of Owner or Agent with Power of Attorney) Signed electronically on 6/12/26, 559 PM To Review the Fee Schedule for the Land Use Application open this link here. Enter amount of calculated fees 334.4 Thank you for calculating your payment fees. The Zoning Administrator will review the calculations and will send you a request for payment. SUBMITED ON 6/12/26 (N0O 00 00"E 189.09)S00°59'36"W 188.84 G $88°41'14"E 29 THIRD ADDENDUM AND RESTATED CONDOMINIUM PLAT OF TIMBER BAY RESORT CONDOMINIUM LOCATED IN PART OF GOVT. LOT 1, SECTION 33, AND PART OF GOVT TOT 1. SECTION 34 AU IN TA2N GOVT. LOT 1, SECTION 34, ALL IN T42N - R7W, TOWN OF SPIDER LAKE, SAWYER COUNTY, WISCONSIN 7002'16"E 422.3 (N70 02 Θ UNIT 11 (N89'40'12 W 299.54 TRAVELED CL ALLAN ROAD-WIDTH VARIES S7104 04'40"W422.38 310 UNIT 8 POIRN <41*56'40(S41 56'40 W <42°25'19"W$42 25 53.53 UNIT6 DUMP 46"54'17* a P10 P10 TOTAL AREA TOTREARE328,254 SQFT+ 7.5 ACRES 7.5 ACRES CALC TO OHWM (N80 35'23 0 3523*W 121.33 $79°31'27l 21.59 (575'20'30"€ 100.74') 574*22'15100.100.62 (564*16'34"E 64.717 $63 20"E 64.77THE (S56 15'54E 670'12"E 5552015.159115.07 LEGEND 5/8"x 18" 5QIRO FOUND 11/40.0.190 PLSS CORNER (AS FOUND 1°0.a PROPENTYLNE (XXXXI RECORDED MEAS (XXXX) RECORDED MEASUREMENT FOUND 1"X1 1/2 TO FOUND S/8" ROUND IRON ROD SURVEYOR'S CERTIFICATE PG-PLAY GROUND AREA SEPTIC VENTS/LIDS WELL/WATER PIPE WELL/WATER PIPE FUEL TANK ELECTRIC PED F-LCE PARKING D-LCE DOCK APPROXIMATE WETLAND - CALOF DRIVE ACCESS OR WALIKING PATH LIMITED LIM COMMON N ELEMENT ELEMENT ("LCE") ("LCE") AREAARE UNIT# (EXISTING) POBRAL BUILD ABLE AREA (AS AGREED TO BY UNT OWNERS AND SUBIECT TO MUNICIPALITY RULES AND REGULATIONS)EXISTING STRUCTURES NOT LCE TODD THIS MAP IS A CORRECT REPRESENTATION OF THE LAND SURVEYED THE CONDOMINUM OYCEIATTHAT IDENTIFICATION & LOCATION OF EACH UNIT & THE COMMON ELEMENTS IN COMPUANCE WITH CHAPTER 203.00 OF WIS CONSIN STATUTES, CHAPTER A-E7 OF THE WISCONSIN ADMINISTRATIVE CODE, UNDER THE DIRECTION OF TIMBER BAY CONDOMINIUM ASSOCATION TOOD C. GOOLD TOOD C. GOOLO PROFES SIONAL LAND SURVEYOR WISCONSIN REGE S-2489 3/17/202 WI-236.20, PLATTING LAND (6) PUBLICTRUST INFORMATIO "ANY LAND BELOW THE DRDINARY HIGH WATER MARK OF A LAKE DR A NAVIGABLE STREAM IS SUBIECT TO THE PUBLICTRUST IN NAVIGABLE WATERS THAT IS ESTABL SECTION 1, OF THE STATE CONSTIп LCE AREAS UNIT 1C E UNIT 1 LCE AREA 0.18 AC. 7,931.93 SOFT UNIT 2 LCE AREA 0.06 AC. 2,619.89 SOFT UNIT 3 LCE AREA 0.05 AC. 2,339.01 SQFT UNIT 4 LCE AREA 0.07 AC. 2,933.03 SOFT UNIT 5 UNIT 5 LCE AREA 0.05 AC. 2,250.45 SOFT UNIT 6 LCE AREA-60.1 AC. 4.502.39 SOFT UNIT 7 LCE AREA-70.16 AC. 7,079.12 SQFT UNITLRE UNIT 8 LCE AREA-0.11 AC. 4,767.86 SQFT UNIT 9LCEAREA- 0034 116605 UNIT 9 LCE AREA - 0.03 AС. 1,166.05 SOFT UNIT 10 LCE AREA-0.14 AС. 6,287.75 SQFT UNIT 11 LCE AREA - 11 0.39 AС. 16,772.71 SQFT GRAPHIC SCA 715.699.6817 1 inch = 50 ft. SHEET 1 OF SHEETS 1 UNITS UN IT N423225 OHWM 47.47 A SCONSIVAD $55 5157 E (556 510 08"E 200.74) OR F E (NO"29'12"W 230"7 NO0°29'30"Е 230.00' SECTION LINE-N00"32'22"E 837.04 야 FD. 2" ALUM MON. WIT. MC 533-T42N-R07W 22.40 d UNI SPIDER LAKE D10 NaS 21E 63.02 4S.SS "30'30"E122.60FD. 3/4" IRON ROD 533-T42N-MC BEARING N00°36'01"E 368.28 UNIT1 N00°29'30"Е 230.00' NO0 29'30" 238.76 SECTION LINE-N00"32'22"E 837.04' SPIDER LAKE 요 Exhibit A 6/24/26, 3:55 PM IMG_20260615_151738.jpg https://mail.google.com/mail/u/0/#search/walk54843%40gmail.com/CllgCJqXxGHhMzPDnLCNdVKHDGmTzTBFPkppVtxHQtdlcKxGzxTMPCgCwWrvz… 1/1 6/24/26, 3:50 PM IMG_20260624_154427.jpg https://mail.google.com/mail/u/0/#inbox?projector=1 1/1 Application for Land Use/Building Permit Town of Spider Lake Application No. LlJP 2�-/CJ Sawyer County, Wisconsin CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. Print Or Type - Use Black Ink This Is a Three (3) page document. Be sure to complete all pages Property Owner Chelsea Real Estate Inc. Mailing Address 1125 S 103rd St, #425 City __ o_m_ a_h_a _______ _ State_!:!L Zip 68124 Day Phone adventurebaypropertymgt@gma,l.com 402-697-8032 Email. __ d __ 1y_ue ___ @w_a,1_1com ____ pa_n-'-y._co_m ____ _ Site lnfonnatlon (From Real Estate Property Tax Bill) Gov't lot_s__ _ __ 1/4 __ 1/4, Sec. __ Twn. __ N R __ W Description: PAT GOVT LOTO PAT LOTS ... sueo o, GlOLOT2 CSM3/J2T .... AgenUBuilder N et'th Ct V1 \? YY>, TI CY\ Mailing n D 11. • ..,. 7 1 ·/ Address __ ...:..r_.;;.._.;..1-:J\J'-"-'r----_::>_u.-"------------ City---'(a...ll._�__,,_ ____ State....YY.l_ Zip Daytime Phone (�01') �"l'l- Yo-9·-;).. Alternate/legacy ID: 028742225603 ---- --- -- ---- Site Address: __ ,_,...,._......,_,,._""'_"' _______________ _ Acreage _1_.3'--1 __ Deed Document# _4_53_222 ____ _ Sanitary Pennit #_4_06_98_7 ____ _ Or: Date 7/30aoo2 Issued By Gerri Schultz {Attach Copy Of Approved Year Installed _______ Owner When Installed: ____________ _ Sawyer County Sanitary Permit) Zone District: 0 R-1 [81 RR-1 0 RR-2 0 A-1 0 C-1 0 1-1 0 F-1 Wetland/Shoreland: Ix) Yes D No (Shoreland: The area of frontage on navigable waters measured from the nonnal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.) Pennlt RequHted For Type of Dwelling #of Walk Out Attaohed Garage Footprint of Proposed Hght of Struoture D Frame built on site Bedrooms □ Yes D Yes D No Struoture Grade to PHk 0 Modular/manufactured □ □ No __ X __ = __ SF □ New D Other __ X __ = __ SF Dwelling Loft #of □ Yes Deck D Yes □ No Total Habitable Sq. Fl Construotlon Cost Type of Construotlon Stories 0 Frame D Log O Pole/Metal □ □ No __ X __ = __ SF $ 0 Block O Other Use of Addition Bedrooms # of Stories Size of Proposed Struoture Hght of Struoture Existing □ □ Grade to Peak Addition 0 Living room 0 Kitchen O Bathroom __ X __ = __ SF □ To Additional□ D Bedroom D Garage □ Deck Loft Total Habitable Sq. Ft Construotlon Cost Dwelllng D Storage Building 0 Screened Porch Total D □Yes $ □ Other □ No #of Type of Aocessory Struoture Size of Proposed Struoture Hght of Construction Cost □ Aooeasory Stories 0 Garage O Storage Building O Gazebo Struoture Struoture □ D Screen house D Greenhouse __ X __ = __ SF Grade to PNk $ D Other Addition To Size of Existing Aocnsory Struoture Size of Proposed Addition Hght o Struotur• Construotlon Cost Aooessory Grade to Peak $ Struoture __ X __ = __ SF __ x __ = __ SF U Foundation Replacement Area Involved Hght of Structure Construotion Cost 1 & Other/ Miso 0 Roof Structure Replacement Grade to Puk s 1P,IJOO gOther J.t)_xJflL=_jpf)..SF :J' Stairs/Walkways Within 75' Of OHWM 0 Use of Land 0 Filing D Dredging D Grading O > 10,000 S.F. Grading 0 Other Type of Business Total Area of Existing Building SF □ Home Oooupation/ D Located in Existing Dwelling Area Being Used for Business Professional Offioe 0 Located in Existing Accessory Structure (Not more than 1 nonresident person may ba employed on the premises) D Alternative or Renewable Energy Systems I B ���: □ Wind □ Communication Systems TOWN OF SPIDERLAKB 7.0NINGAnM, 2, 16 D Cell Tower 'Height of Tower: D Other (Mey not exCHd 25" of the tote/ floor e,ee of the dwelling 750 sq. ft. In an BCOHSOI}' building) X = SF Construotlon Cost $ Construction Cost $ Page I of3 13064N Moonahanis Rd Property CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This ls a Three (3) page document. Be sure to complete all pages Print Or Type - Use Black Ink Mailing Address City Site Information (From Real Estate Property Tax Bill) Description: Site Address: Madsh State wi Zip 31DS City AASSN State _zip. Sanitary Permit # Or: Application for Land Use/Building Permit Govt LotL SW45W4, Sec 2 Twn 42N ReW Aternate/lLegacy ID: Year Installed New Dweling Permit Requested For Addition To Dwelling Zone District: DR-1 Wetland/Shoreland: Yes No Accessory Structure otheri Miac 12931 Use of Land Town of Spider Lake Sawyer County, Wisconsin Type of Dweling Other TOWN OF SPIDER LAKE ZONINGADM S 25.l6 RR-1 Type of Construction D Living room Bedroom Other Use of Addition #of Stories Owner When Installed: Frame built on site Modular/manufactured Communication Systems Tustte ban Home Occupation/ Professonal Office DFrame Log D Pole/Metal Block Date D RR-2 DA-1 Kitchen Bathroom GarageDeck Storage Building Screened Porch Other Addition To Size of Existing Accessory Structure Accessory Structure Type of Accessory Structure #of Bedrooms #of Storles Screen house C Greenhouse other Type of Business SF Other (Shoreland: The area of frontage on navigable waters measured from the nomal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet frorm ivers and streams.) DFiling O Dredging Grading Altermative or Renewable Energy Systems Located in Existing Dwelling Garage Storage Building Gazebo Dc-1 |Walk Out Yes Issued By O No Fother Cell Tower Height of Tower: Loft OYes Located in Existing Accessory Structure No Total AgentBuilder Mailing Address Bedrooms Existing Additional D-1 D Solar Wind AcreageD77 Deed Document # 57734 Foundation Replacement Roof Structure Replacement Other fesolaces OHed k Lyar sAme PocTNT -2%x|O 25OSF Stairs/Walikways Within 75 Of OHWM Lplv4siae MAL Atached Garage OYes ONo X F-1 SF Deck D Yes No SF #of Stories Loft OYes (Not more than 1 nonresident person may be employed on the premises) No Size of Proposed Addition Application No. bbele wats Rd, 53119 Area Involved Jim Jhnsa SF (Attach Copy Of Approved Size of Proposed Structure Sawyer County Sanitary Permit) Footprint of Proposed Structure SF Total Habitable Sq. Ft Slze of Proposed Structure SF Total Habitable Sq. Ft. SF Hght of Structure Grade to Peak $ Hght of Structure Grade to Peak Hght of Structure Grade to Peak Total Area of Existing Building X Hght of Structure Grade to Peak Construction Cost Hght of Structure Grade to Peak Construcion Cost Construction Cost Gonstructlon Cost Area Being Used for Business Gonstructlon Cost $_22,000, 60 (May not exceed 25% of the total floor area of the dweling 750 sq. t. in an accessory building) SF Construction Cost SF Construction Cost Page I of 3 Day Phone&8ses,3mal Adalbgstscedubayime Phone (ebs,Hett3449 >10,000 s.F. Grading Other LUP 26-20 Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Other New Addition To BuildinglStructure (e.g., Commercial, Industrial, Agricultural) structures. Use of Building/Structure Type of Construction: Frame DLog Pole/Metal Block other Height from Grade to Peak Use of Building/Structure Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! 2. Show the location and name of any bordering roads, and indicate North. 3. Show the location and size of all existing and proposed Type of Construction:Frame D Log Pole/MetalBlock DOther Height from Grade to Peak Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 % x 14) to illustrate the following 7 requirements: 4. Show the location of any lake, river, stream, pond or wetlands. All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate 6. Show dimensions in feet on the following: North with an arrow 5. Show the location of the well, septic tank and drain field. Total impervious suface area (including this project) (B)_ SITE PLAN REQUIREMENTS Fees: See Fee Schedule In the event this application is approved by the Zoning Office, I agree: Permit issued by Construction Cost: $ Print Name: Ala adalsx Permit denied by You must complete the attached plot plan Expiration Date Construction Cost: TOWN OF SPIDER LAKE Signature of Owner or (Agent with Power of Atorney Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permnits) Owner's signature is required on the appropriate attached Shoreland Preservation Agreement. This permnit cannot be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits) Total land area within 300 of the water body: (A) MADALON An Additional fee will be required for each inspection over Checks should be made payable to: Treasurer of the Town of Spider Lake. Date Date C That no work shal commence until I have received the isSued Land Use Permit, and the Permit Card is posted d Sign: e Structure to all lot lines That all work shall be done in accordance with the requirenments of the Town of Spider Lake Land Use Pemit, the Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon -Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (induding any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all infomation I (we) am (are) providing and that it will be relied upon by the Town Spider Lake in detemining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this infomation I (we) am (are) providing in or with this application. Size of Proposed Structure OFFICE USE ONLY Total Area of Existing Structure: Structure to centerline of road (B))(A) x 100 =% Used Size of Proposed Structure Structure to septic system/privy and well Structure to lake, river, stream, pond or wetlands Distance betweern structures 7. Show location vegetation protection area and proposed Viewing/Use Corridor on lake lots. (Shall not exceed 15% or 25% witha conditional use permit Fee $ Check # See attached for reason of denial SF SE Submit Completed Application And Fee To: Town of Spider Lake Clerk 10896 W Town Hall Rd. Hayward, WI 54843 Signature of Zoning Administrator Date: 2 tu 2e Page 2 of 3 WHEREAS, (list all owners) owns real estate within Spider Lake that is subject to the Spider Lake Shoreland Regulations, and WHEREAS, in order to secure a Land Use Permit. Legal Description of Property: NOW, THEREFORE, the owner(s) hereby certifies that, as a condition of issue of said Land Use Permit, that the SHORELINE VEGETATION PROTECTION AREA on said real estate shall be restored in accordance with the Mitigation Plan and Implementation Schedule approved by the Spider Lake Zoning Department. Dated this The owner(s) hereby agrees that at all times in the future; the real estate subject to this Agreement shall comply with all shoreland vegetative buffer requirements of the Spider Lake Zoning Ordinance in effect on the date that the Land Use Permit is issued by the Zoning Office. The owner(s) further agrees to allow authorized representatives of the Governmental Unit to enter onto the owner's property at the following description to inspect the structure(s) or uses authorized by said Land Use Permit and to determine if the SHORELINE VEGETATION PROTECTION AREA exists and that it is being preserved. Violation of this Agreement will authorize, in addition to other penalties and relief required under the Spider Lake Zoning Ordinance, injunctive relief, restoration of said real estate, the revocation of said Land Use Permit and the removal of all structures approved by the issue of said Land Use Permit and the revocation of any other uses approved by the issue of said Land Use Permit. All parties agree that this Agreement shall be filed with the Spider Lake Zoning Office. (Owhjefy? SHORELAND PRESERVATION AGREEMENT NON-INTACT (Owner) (Shoreline Vegetation Protection Area) (Owner) This instrument was drafted by: Spider Lake Zoning Office day of n 202e Land Use Permit No. (To be entered by the Zoning Office) (Owner) (Owner) (Owner) meee adalon 36 FaT 2025 Property Records for Town of Spider Lake, Sawyer County SHOR TEST D STACE LAKE TO LAKE 18 28' Deck 336 sf 24' 24 HousE 14 14' 24 56 23 BevRooM SAME MA DALON 2 DECR CVRRENT DECK FoOTRINT AND PRO TET May FOOT PRINT RiEPLACE MNT |2431 TðnTLE LANE HAvWARD, WI Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE.  Be sure to complete all steps in this application.  Click Skip or Continue to save your input. To exit the application at any point, close the app or browser after saving. Is agent/builder same as owner? Yes No First name Todd Last name Romashko Property Owner Daytime Phone # 815 8234153 Property Owner Mailing Address 3647 Indian Wells Lane, Northbrook, IL 60062 Govʼt Lot 1/4 1/4 Sec. 31 Twn. Twn 42 N R______W R O7 W Alternate/Legacy ID 028742313113 Description Parcel Number 028742313113 Tax ID 45668 45668 Site Address 12265 N Pederson Rd , Hayward , WI 54843 Acreage 1.81 Deed Document # Sanitary Permit # 665510 Sanitary Permit Date 8/7/2025 Sanitary Permit Issued By Rachel Fisher Year Installed Owner When Installed Attach Copy Of Approved Sawyer County Sanitary Permit Visit heygov.co/townofspiderlake.com/fr_01kvh0xspna18znrdhpv232jdq to view or download full files. Zone District R1 RR1 RR2 A1 C1 I1 F1 Wetland/Shoreland Yes No Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand 1,000 feet from lakes, ponds and flowages; and three hundred 300 feet from rivers and streams. To Download the Power of Attorney Form open this link here. Please upload filled in and notarized Power of Attorney Throughout the process the inputed information is automatically saved as a Draft document and you can always revisit it to continue where you left off. Permit Requested For New Dwelling Addition To Dwelling Accessory Structure Addition To Accessory Structure Other/Misc Use of Land Home Occupation/ Professional Office Alternative or Renewable Energy Systems Communication Systems Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Accessory Structure info # of Stories 1 Type of Accessory Structure Garage Storage Building Gazebo Screen house Greenhouse Other Size of Proposed Structure (length X width = total SQFT 3222704 Height of Structure Grade to Peak 12ʼ 10ˮ Construction Cost $19,500.00 Submit Completed Application And Fee To: Clerk, Town of Spider Lake Attn: Sarah Delaney Chair PRC 10896 Town Hall Rd. Hayward, WI 548543 Skip if project is not Shoreland/Wetland Signature of Owner or Agent with Power of Attorney) Todd Romashko Signed electronically on 6/24/26, 735 AM To Review the Fee Schedule for the Land Use Application open this link here. Enter amount of calculated fees 290.8 Thank you for calculating your payment fees. The Zoning Administrator will review the calculations and will send you a request for payment. SUBMITED ON 6/24/26 For Zoning & Building Department use only Does the Plan & Review Commission recommend approval from the Town Board? Yes No Reason for recommendation CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This is a Three (3) page document. Be sure to complete all pages Print Or Type – Use Black Ink Agent/Builder_________________________________________ Mailing Address_____________________________________________ City________________________ State______ Zip___________ Property Owner__________________________________________________ Mailing Address________________________________________________ City___________________________ State______ Zip___________ Day Phone______________Email___________________________ Daytime Phone________________________ Site Information (From Real Estate Property Tax Bill) Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __ Description: ____________________________________________________________________________________________________ Site Address: _______________________________________________ Acreage ________ Deed Document # _______________ Sanitary Permit #_______________ Date_______________ Issued By________________ Or: Year Installed_______________ Owner When Installed:______________________________ Zone District: R-1 RR-1 RR-2 A-1 C-1 I-1 F-1 Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.) Permit Requested For New Dwelling Type of Dwelling Frame built on site Modular/manufactured Other_____________ Type of Construction Frame Log Pole/Metal Block Other______ # of Bedrooms # of Storie s Walk Out Yes No Loft Yes No Attached Garage Yes No _____X_____=_____SF Deck Yes No _____X_____=_____SF Footprint of Proposed Structure _____X_____=_____SF Total Habi table Sq. Ft. _________________ Hght of Structure Grade to Peak ___________ Constructi on Cost $ _____________ Addition To Dwelling Use of Addition Living room Kitchen Bathroom Bedroom Garage Deck Storage Building Screened Porch Other_____________ Bedrooms Existing Additional Total # of Stories Loft Yes No Size of Proposed Structure ______X______=______SF Total Habitable Sq. Ft. ___________________ Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Accessory Structure # of Stories Type of Accessory Structure Garage Storage Building Gazebo Screen house Greenhouse Other___________ Size of Proposed Structure ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Addition To Accessory Structure Size of Existing Accessory Structure ______X______=______SF Size of Proposed Addition ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Other/ Misc Foundation Replacement Roof Structure Replacement Other_____________________ Stairs/Walkways Within 75’ Of OHWM Area Involved ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________ Home Occupation/ Professional Office Type of Business________________________________ Located in Existing Dwelling Located in Existing Accessory Structure (Not more than 1 nonresident person may be employed on the premises) Total Area of Existing Building_______________SF Area Being Used for Business (May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an accessory building) __________X__________=__________SF Alternative or Renewable Energy Systems Solar Wind Other_____________________ Construction Cost $ _________________ Communication Systems Cell Tower Height of Tower:__________________ Other_____________________ Construction Cost $ _________________ Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin Application No._________________ (Attach Copy Of Approved Sawyer County Sanitary Permit) Page 1 of 3 TOWN OF SPIDER LAKE ZONINGADM 5.25.16 Application No.______________________ LUP 26-22 Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Size of Proposed Structure ______X______=______SF Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Total Area of Existing Structure:__________SF Size of Proposed Structure ______X______=______S SITE PLAN REQUIREMENTS Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7 requirements: Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate North with an arrow 2. Show the location and name of any bordering roads, and indicate North. 3. Show the location and size of all existing and proposed structures. 4. Show the location of any lake, river, stream, pond or wetlands. 5. Show the location of the well, septic tank and drain field. 6. Show dimensions in feet on the following: a. Structure to all lot lines b. Structure to centerline of road c. Structure to lake, river, stream, pond or wetlands d. Structure to septic system/privy and well e. Distance between structures 7. Show location vegetation protection area and proposed Viewing/Use Corridor on lake lots. Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits) Owner’s signature is required on the appropriate attached Shoreland Preservation Agreement. This permit cannot be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits) Total land area within 300’ of the water body: (A) _________________ Total impervious surface area (including this project) (B)____________ (B)/(A) x 100 = % Used ___________ (Shall not exceed 15% or 25% with a conditional use permit In the event this application is approved by the Zoning Office, I agree: • That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted • That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, • That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in or with this application. Signature of Owner or (Agent with Power of Attorney) Print Name:_________________________________________ Sign:______________________________________ Date:_______________ You must complete the attached plot plan Fees: See Fee Schedule Checks should be made payable to: Treasurer of the Town of Spider Lake. An Additional fee will be required for each inspection over _____ OFFICE USE ONLY Permit issued by_________________________ Date______________ Fee $______________ Check #________________ Permit denied by_________________________ Date______________ See attached for reason of denial Expiration Date___________________ _________________________________________ Signature of Zoning Administrator Page 2 of 3TOWN OF SPIDER LAKE ZONINGADM5.25.16 Submit Completed Application And Fee To: Town of Spider Lake Clerk 10896 W Town Hall Rd. Hayward, WI 54843 GREAT OUTDOOR CLUB, INC. The proposed shed complies with the Great Outdoor Club's governing rules and regulations, as the structure will not exceed the maximum permitted dimensions of eight (8) feet by sixteen (16) feet. The final location of the shed will be established in accordance with the requirements and setback guidelines set forth by the Town of Spider Lake through its Application for Land Use/Building Permit process. All applicable local ordinances, permitting requirements, and zoning regulations will be followed prior to construction. Respectfully submitted, Donald R. Barratt Vice President Great Outdoor Club, Inc. Murphy Bates Preston Sugar Bush Outdoor Club Preston Preston O/W Great Outdoor Club Inc T42N-R7W-Section 15 Town of Spider Lake Sawyer County, WI Ì BURKE LAND MANAGEMENT LLC chris@burkelandmanagement.com 715-939-2656 ¬« PL Proposed Landing ¬« PL ¬« PL Thinning / Selection Harvest - Harvest all aspen, white birch and orange marked trees. No harvesting from April 1 to July 15th. 50 acres SPECIES PRODUCT VOLUME UNITS MIX HARDWOOD PULP 260 TONS ASPEN PULP 50 TONS OAK PULP 1000 TONS OAK LOGS 115 MBF MIX HARDWOOD LOGS 2 MBF X Dealer Name Building Size Building Diagram (Please draw placement of options here, Required on ALL Orders): ORDER SHEET (REQUIRED ON ALL ORDERS ) Customer Initials Premier Portable Buildings 317 East State Line, South Fulton, TN 38257 PHONE 1-844-879-1468 Email all orders to orders@premierbuildings.us © Copyright 2019 Premier Portable Buildings. All Rights Reserved. Unathorized use is punishable by law. PHONE PHONE:: EMAIL: EMAIL: Customer Name Building Style Written Directions: North Lakes Sheds DON BARRATT Build as shown in the diagram. Thanks! Lofted Barn 16 8 Premier Buildings kyle@premierbuildings.us 8448791468 CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This is a Three (3) page document. Be sure to complete all pages Print Or Type – Use Black Ink Agent/Builder_________________________________________ Mailing Address_____________________________________________ City________________________ State______ Zip___________ Property Owner_________________________________________________ _ Mailing Address______________________________________________ __ City______________________ _____ State______ Zip___________ Day Phone______________Email ___________________________ Daytime Phone________________________ Site Information (From Real Estate Property Tax Bill) Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __ Description: ____________________________________________________________________________________________________ Site Address: _______________________________________________ Acreage ________ Deed Document # _______________ Sanitary Permit #_______________ Date_______________ Issued By________________ Or: Year Installed_______________ Owner When Installed:______________________________ Zone District: R-1 RR-1 RR-2 A-1 C-1 I-1 F-1 Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.) Permit Requested For New Dwelling Type of Dwelling Frame built on site Modular/manufactured Other_____________ Type of Construction Frame Log Pole/Metal Block Other______ # of Bedrooms # of Storie s Walk Out Yes No Loft Yes No Attached Garage Yes No _____X_____=_____SF Deck Yes No _____X_____=_____SF Footprint of Proposed Structure _____X_____=_____SF Total Habi table Sq. Ft. _________________ Hght of Structure Grade to Peak ___________ Constructi on Cost $ _____________ Addition To Dwelling Use of Addition Living room Kitchen Bathroom Bedroom Garage Deck Storage Building Screened Porch Other_____________ Bedrooms Existing Additional Total # of Stories Loft Yes No Size of Proposed Structure ______X______=______SF Total Habitable Sq. Ft. ___________________ Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Accessory Structure # of Stories Type of Accessory Structure Garage Storage Building Gazebo Screen house Greenhouse Other___________ Size of Proposed Structure ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Addition To Accessory Structure Size of Existing Accessory Structure ______X______=______SF Size of Proposed Addition ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Other/ Misc Foundation Replacement Roof Structure Replacement Other_____________________ Stairs/Walkways Within 75’ Of OHWM Area Involved ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________ Home Occupation/ Professional Office Type of Business________________________________ Located in Existing Dwelling Located in Existing Accessory Structure (Not more than 1 nonresident person may be employed on the premises) Total Area of Existing Building_______________SF Area Being Used for Business (May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an accessory building) __________X__________=__________SF Alternative or Renewable Energy Systems Solar Wind Other_____________________ Construction Cost $ _________________ Communication Systems Cell Tower Height of Tower:__________________ Other_____________________ Construction Cost $ _________________ Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin Application No._________________ (Attach Copy Of Approved Sawyer County Sanitary Permit) Page 1 of 3 TOWN OF SPIDER LAKE ZONINGADM 5.25.16 Application No.______________________ LUP 26-23 8 Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Size of Proposed Structure ______X______=______SF Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Total Area of Existing Structure:__________SF Size of Proposed Structure ______X______=______S SITE PLAN REQUIREMENTS Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7 requirements: Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate North with an arrow 2. Show the location and name of any bordering roads, and indicate North. 3. Show the location and size of all existing and proposed structures. 4. Show the location of any lake, river, stream, pond or wetlands. 5. Show the location of the well, septic tank and drain field. 6. Show dimensions in feet on the following: a. Structure to all lot lines b. Structure to centerline of road c. Structure to lake, river, stream, pond or wetlands d. Structure to septic system/privy and well e. Distance between structures 7. Show location vegetation protection area and proposed Viewing/Use Corridor on lake lots. Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits) Owner’s signature is required on the appropriate attached Shoreland Preservation Agreement. This permit cannot be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits) Total land area within 300’ of the water body: (A) _________________ Total impervious surface area (including this project) (B)____________ (B)/(A) x 100 = % Used ___________ (Shall not exceed 15% or 25% with a conditional use permit In the event this application is approved by the Zoning Office, I agree: • That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted • That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, • That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in or with this application. Signature of Owner or (Agent with Power of Attorney) Print Name:_________________________________________ Sign:______________________________________ Date:_______________ You must complete the attached plot plan Fees: See Fee Schedule Checks should be made payable to: Treasurer of the Town of Spider Lake. An Additional fee will be required for each inspection over _____ OFFICE USE ONLY Permit issued by_________________________ Date______________ Fee $______________ Check #________________ Permit denied by_________________________ Date______________ See attached for reason of denial Expiration Date___________________ _________________________________________ Signature of Zoning Administrator Page 2 of 3TOWN OF SPIDER LAKE ZONINGADM5.25.16 Submit Completed Application And Fee To: Town of Spider Lake Clerk 10896 W Town Hall Rd. Hayward, WI 54843 GREAT OUTDOOR CLUB, INC. The proposed shed complies with the Great Outdoor Club's governing rules and regulations, as the structure will not exceed the maximum permitted dimensions of eight (8) feet by sixteen (16) feet. The final location of the shed will be established in accordance with the requirements and setback guidelines set forth by the Town of Spider Lake through its Application for Land Use/Building Permit process. All applicable local ordinances, permitting requirements, and zoning regulations will be followed prior to construction. Respectfully submitted, Donald R. Barratt Vice President Great Outdoor Club, Inc. Murphy Bates Preston Sugar Bush Outdoor Club Preston Preston O/W Great Outdoor Club Inc T42N-R7W-Section 15 Town of Spider Lake Sawyer County, WI Ì BURKE LAND MANAGEMENT LLC chris@burkelandmanagement.com 715-939-2656 ¬« PL Proposed Landing ¬« PL ¬« PL Thinning / Selection Harvest - Harvest all aspen, white birch and orange marked trees. No harvesting from April 1 to July 15th. 50 acres SPECIES PRODUCT VOLUME UNITS MIX HARDWOOD PULP 260 TONS ASPEN PULP 50 TONS OAK PULP 1000 TONS OAK LOGS 115 MBF MIX HARDWOOD LOGS 2 MBF X Dealer Name Building Size Building Diagram (Please draw placement of options here, Required on ALL Orders): ORDER SHEET (REQUIRED ON ALL ORDERS ) Customer Initials Premier Portable Buildings 317 East State Line, South Fulton, TN 38257 PHONE 1-844-879-1468 Email all orders to orders@premierbuildings.us © Copyright 2019 Premier Portable Buildings. All Rights Reserved. Unathorized use is punishable by law. PHONE PHONE:: EMAIL: EMAIL: Customer Name Building Style Written Directions: North Lakes Sheds DON BARRATT Build as shown in the diagram. Thanks! Lofted Barn 16 8 Premier Buildings kyle@premierbuildings.us 8448791468 CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This is a Three (3) page document. Be sure to complete all pages Print Or Type – Use Black Ink Agent/Builder_________________________________________ Mailing Address_____________________________________________ City________________________ State______ Zip___________ Property Owner__________________________________________________ Mailing Address________________________________________________ City___________________________ State______ Zip___________ Day Phone______________Email___________________________ Daytime Phone________________________ Site Information (From Real Estate Property Tax Bill) Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __ Description: ____________________________________________________________________________________________________ Site Address: _______________________________________________ Acreage ________ Deed Document # _______________ Sanitary Permit #_______________ Date_______________ Issued By________________ Or: Year Installed_______________ Owner When Installed:______________________________ Zone District: R-1 RR-1 RR-2 A-1 C-1 I-1 F-1 Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.) Permit Requested For New Dwelling Type of Dwelling Frame built on site Modular/manufactured Other_____________ Type of Construction Frame Log Pole/Metal Block Other______ # of Bedrooms # of Storie s Walk Out Yes No Loft Yes No Attached Garage Yes No _____X_____=_____SF Deck Yes No _____X_____=_____SF Footprint of Proposed Structure _____X_____=_____SF Total Habi table Sq. Ft. _________________ Hght of Structure Grade to Peak ___________ Constructi on Cost $ _____________ Addition To Dwelling Use of Addition Living room Kitchen Bathroom Bedroom Garage Deck Storage Building Screened Porch Other_____________ Bedrooms Existing Additional Total # of Stories Loft Yes No Size of Proposed Structure ______X______=______SF Total Habitable Sq. Ft. ___________________ Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Accessory Structure # of Stories Type of Accessory Structure Garage Storage Building Gazebo Screen house Greenhouse Other___________ Size of Proposed Structure ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Addition To Accessory Structure Size of Existing Accessory Structure ______X______=______SF Size of Proposed Addition ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Other/ Misc Foundation Replacement Roof Structure Replacement Other_____________________ Stairs/Walkways Within 75’ Of OHWM Area Involved ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________ Home Occupation/ Professional Office Type of Business________________________________ Located in Existing Dwelling Located in Existing Accessory Structure (Not more than 1 nonresident person may be employed on the premises) Total Area of Existing Building_______________SF Area Being Used for Business (May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an accessory building) __________X__________=__________SF Alternative or Renewable Energy Systems Solar Wind Other_____________________ Construction Cost $ _________________ Communication Systems Cell Tower Height of Tower:__________________ Other_____________________ Construction Cost $ _________________ Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin Application No._________________ (Attach Copy Of Approved Sawyer County Sanitary Permit) Page 1 of 3 TOWN OF SPIDER LAKE ZONINGADM 5.25.16 Application No.______________________ LUP 26-24 Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Size of Proposed Structure ______X______=______SF Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Total Area of Existing Structure:__________SF Size of Proposed Structure ______X______=______S SITE PLAN REQUIREMENTS Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7 requirements: Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate North with an arrow 2. Show the location and name of any bordering roads, and indicate North. 3. Show the location and size of all existing and proposed structures. 4. Show the location of any lake, river, stream, pond or wetlands. 5. Show the location of the well, septic tank and drain field. 6. Show dimensions in feet on the following: a. Structure to all lot lines b. Structure to centerline of road c. Structure to lake, river, stream, pond or wetlands d. Structure to septic system/privy and well e. Distance between structures 7. Show location vegetation protection area and proposed Viewing/Use Corridor on lake lots. Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits) Owner’s signature is required on the appropriate attached Shoreland Preservation Agreement. This permit cannot be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits) Total land area within 300’ of the water body: (A) _________________ Total impervious surface area (including this project) (B)____________ (B)/(A) x 100 = % Used ___________ (Shall not exceed 15% or 25% with a conditional use permit In the event this application is approved by the Zoning Office, I agree: • That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted • That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, • That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in or with this application. Signature of Owner or (Agent with Power of Attorney) Print Name:_________________________________________ Sign:______________________________________ Date:_______________ You must complete the attached plot plan Fees: See Fee Schedule Checks should be made payable to: Treasurer of the Town of Spider Lake. An Additional fee will be required for each inspection over _____ OFFICE USE ONLY Permit issued by_________________________ Date______________ Fee $______________ Check #________________ Permit denied by_________________________ Date______________ See attached for reason of denial Expiration Date___________________ _________________________________________ Signature of Zoning Administrator Page 2 of 3TOWN OF SPIDER LAKE ZONINGADM5.25.16 Submit Completed Application And Fee To: Town of Spider Lake Clerk 10896 W Town Hall Rd. Hayward, WI 54843 GREAT OUTDOOR CLUB, INC. The proposed shed complies with the Great Outdoor Club's governing rules and regulations, as the structure will not exceed the maximum permitted dimensions of eight (8) feet by sixteen (16) feet. The final location of the shed will be established in accordance with the requirements and setback guidelines set forth by the Town of Spider Lake through its Application for Land Use/Building Permit process. All applicable local ordinances, permitting requirements, and zoning regulations will be followed prior to construction. Respectfully submitted, Donald R. Barratt Vice President Great Outdoor Club, Inc. Murphy Bates Preston Sugar Bush Outdoor Club Preston Preston O/W Great Outdoor Club Inc T42N-R7W-Section 15 Town of Spider Lake Sawyer County, WI Ì BURKE LAND MANAGEMENT LLC chris@burkelandmanagement.com 715-939-2656 ¬« PL Proposed Landing ¬« PL ¬« PL Thinning / Selection Harvest - Harvest all aspen, white birch and orange marked trees. No harvesting from April 1 to July 15th. 50 acres SPECIES PRODUCT VOLUME UNITS MIX HARDWOOD PULP 260 TONS ASPEN PULP 50 TONS OAK PULP 1000 TONS OAK LOGS 115 MBF MIX HARDWOOD LOGS 2 MBF X Dealer Name Building Size Building Diagram (Please draw placement of options here, Required on ALL Orders): ORDER SHEET (REQUIRED ON ALL ORDERS ) Customer Initials Premier Portable Buildings 317 East State Line, South Fulton, TN 38257 PHONE 1-844-879-1468 Email all orders to orders@premierbuildings.us © Copyright 2019 Premier Portable Buildings. All Rights Reserved. Unathorized use is punishable by law. PHONE PHONE:: EMAIL: EMAIL: Customer Name Building Style Written Directions: North Lakes Sheds THOMAS MCGANN Build as shown in the diagram. Thanks! Lofted Barn 16 8 Premier Buildings kyle@premierbuildings.us 8448791468

Source: Town of Spider Lake website. First collected Oct 7, 2026.