RecordWell Data

Plan & Review Commission — Agenda packet

Town of Spider Lake · Sawyer County · Plan & Review Commission · meeting of Dec 3, 2025 · Agenda packets

Open the original document More from Town of Spider Lake

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MINUTES Plan & Review Commission Public Hearing Wednesday, November 5, 2025 at 6:00 PM NOTICE WAS GIVEN that the Town of Spider Lake Plan & Review Commission would hold a Public Hearing on Wednesday, November 5, 2025 at 6:00 P.M. at the Town Hall, 10896W Town Hall Rd, Hayward Wisconsin, to consider the following: Conditional Use Permit. Land owners: Erik Minge & Tazia Brunetti. Located in part of the NW¼ of the NE¼, Sec 29, T42N, R7W, PRT NWNE Lot 3 CSM 28/52 #7190, Legacy ID: 028742291203. Site address: 12830 Paddock Rd, 5.25 Acres, Zoned A -1 Agriculture One. Purpose of request is to build a year -round dwelling (with storage building) on the property. (Per Land Use Ordinance 17-88, Part I, Section 15.4 B) 1).) Conditional Use Permit- Land owner: Kevin & Elise Kroll, Kroll Family Trust. Located in the NW¼ of the NE¼, Sec 32, T42N, R6W, PRT NWNE Lot 1 CSM 34/241 #8169, Legacy ID: 028642321204. Site address: 12463N Reel Livin’ Drive, 8.570 Acres, Zoned RR-2 Residential Recreational Two. Purpose of request is to place a Park Model Trailer (or equivalent) on campsite 33 in the Reel Livin’ Resort & Campground. (Per Land Use Ordinance 17-88, Part I, Section 6.6 J) 2).) The Hearing was Called to Order by P&RC Chair Sarah Delaney at 6:01. 1. Present were Chair Delaney and Commissioners Johnson, Becker, Tumbleson, Capes and Zoning Administrator Mike Gardner. Delaney confirmed a quorum was present and that Notices were posted in compliance with Open Meetings Law. 2. Motion to approve the Agenda was made by Becker, seconded by Johnson. All in favor; motion carried. 3. Chair Delaney informed the public of the hearing procedures before the Hearings commenced. Minge CUP Application Hearing: The applicant, Erik Minge, attended via Zoom and provided a statement describing the proposed project. Nine letters were sent to adjacent property owners, with one response (Weinert) returned, citing no objections. There was no additional testimony offered by the public. The Commissioners asked questions for understanding, and the hearing concluded. Kroll CUP Application Hearing: The applicants, Elise and Kevin Kroll, provided a statement describing the proposed project. Seventeen letters were sent to adjacent property owners, with six responses (Seibert, Jones, Kennedy, Kosterman, Nelson, McKirdy) returned, two with objections and four with no objections. Respective comments were read into the record. There was no additional testimony offered by the public. The Commissioners asked questions for understanding, as the proposal does not meet the immediate requirements of the Ordinance. The owners were notified of the Ordinance requirements following an initial site visit by the ZA. A Park Model Trailer must be no more than 440 square feet in area, and campgrounds are intended for temporary use only. The Kroll trailer (at 890 square feet) was delivered the following week and installation proceeded prior to a permit being issued. With no more questions, the Hearing concluded. 2 MEETING MINUTES Town of Spider Lake Plan & Review Commission Meeting November 5, 2025 immediately following the Public Hearing 1. The meeting was Called to Order at 6:33 pm immediately following the Public Hearing. Present were P&RC Chair Delaney, Vice Chair Johnson, Commissioners Tumbleson, Becker, Capes and Zoning Administrator Mike Gardner. 2. Motion to approve the Agenda made by Tumbleson, seconded by Becker. All in favor; motion carried. 3. Pledge of Allegiance 4. Motion to approve the Minutes of the October 1, 2025 P&RC Meeting made by Becker, seconded by Johnson. 5. Minge CUP 25-03 – The owner’s intended use (residential) satisfies the conditional use requirement per Part I, Section 15.4 B) 1) of Land Use Ordinance 17-88. Possible Conditions were discussed and are attached to these Minutes. Motion to recommend approval of the Minge CUP 25-03 to the Town Board made by Becker, seconded by Tumbleson. All in favor; motion carried. 6. Kroll CUP 25-04 – The owner’s intent to place a trailer on campsite 33 in the Reel Livin’ Campground failed to meet Ordinance requirements. A Park Model Trailer (with maximum 440 square feet in set up mode) is permitted; however the trailer installed (without permit) on site measures 890 square feet. The owner’s desire to reside permanently in the structure also does not meet the ‘temporary’ intent of campground lodging. Motion to recommend that the Town Board DENY approval of the Kroll CUP 25-04 made by Becker, seconded by Capes. Four ayes and one abstention. Motion carried. 7. CSM Review – Bay Ridge 24 LLC: Owner intent is to subdivide parcel with tax id 31373 into a conforming shoreline lot and an outlot (to be attached to another of the owner’s parcels). The subdivision meets the requirements of Part III of the Land Use Ordinance and has been reviewed and endorsed by the Sawyer County Surveyor. Motion to recommend approval of the Bay Ridge 24 LLC CSM to the Town Board made by Johnson, seconded by Becker. All in favor; motion carried. 8. Zoning Administrator’s Report: ZA Gardner again reported a very active month with site visits and consultations/inquiries. a. Permit Application Reviews: i. DW 25-04 Kenney - Meadow Lake Road: Road Superintendent Fogal inspected and endorsed the proposed location. Motion to approve made by Johnson, seconded by Becker. All in favor; motion carried. ii. DW 25-05 Spider Lake Properties LLC – Elaine Drive: Road Superintendent Fogal inspected and endorsed the proposed location with the installation of a 12” x 20’ culvert. Motion to approve made by Becker, seconded by Johnson. All in favor; motion carried. 3 iii. LUP 25-28 Minge – New Dwelling and Storage Bldg: Setbacks for the dwelling in an A-1 parcel are met. The Storage building proposed location is 32’ from the side (north) property boundary, whereas the ordinance requirement is 50’. In a residential (RR-1) zone district, the setback requirement is 10’ for an accessory structure. Discussion revolved around the intent of the ordinance (to protect from/contain livestock manure impact to neighbors) and of the owner’s use (residential). Per the Ordinance, livestock is not permitted on a parcel smaller than 10 acres, and this is included and reinforced in the CUP Conditions (attached). P&RC felt that the risks were sufficiently mitigated to permit the 32’ setback. Motion to approve LUP 25-28 as proposed made by Johnson, seconded by Becker. All in favor; motion carried. iv. LUP 25-29 Kroll, – Shelter/Storage bunker: Motion to table this item pending Town Board action on the Kroll CUP 25-04 made by Johnson, seconded by Becker. All in favor; motion carried. v. LUP 25-30 JAH Construction – New Dwelling: Setbacks and Ordinance requirements are met. Motion to approve made by Johnson, seconded by Tumbleson. All in favor; motion carried. vi. LUP 25-31 Chandler – Garage Addition: Setbacks and Ordinance requirements are met. Motion to approve made by Becker, seconded by Capes. All in favor; motion carried. vii. LUP 25-32 Snyder – New Accessory Building – Storage: Setbacks and Ordinance requirements are met. Approval of the Bucksnort Condo Association was received. Motion to approve made by Becker, seconded by Tumbleson. All in favor; motion carried. b. Status updates were provided on potential violations by ZA Gardner. 9. Land Use Ordinance 17-88 update: A Scope of Services proposal was received from law firm von Briesen & Roper to assist with the Town’s update to its Land Use Ordinance. The proposal reflects approximately 90 hours of legal/professional input, resulting in a not-to-exceed cost of $30,165 which can be split over multiple calendar years. An initial session is desired in the coming month to establish clarity on a timeline and deliverables. 10. As no other business was identified, a motion to Adjourn was made by Tumbleson, seconded by Johnson. All in favor; motion carried. Respectfully submitted, Sarah Delaney Chair, Plan & Review Commission November 7, 2025 4 Town of Spider Lake Conditional Use Permit Approval Conditions Owner: Permit Number: CUP 25-03 Erik Minge & Tazia Brunetti Hearing Date: November 5, 2025 4925 Queen Ave S Minneapolis, MN 55410 Property Address: 12830 N Paddock Road, Hayward, WI 54843 PRT NWNE Lot 3, CSM 28/52 #7190 The Conditional Use Permit described above has been recommended for approval subject to the following conditions: 1. The CUP is issued only to facilitate the building of a single family year-round principal structure used as a dwelling. (Per Ordinance 17-88, Part I Section 15.4 B) 1)). 2. As the parcel is less than ten acres, Livestock is not permitted except for poultry which may be allowed by separately obtained Conditional Use permit (Per Ordinance 17-88, art I Section 15.4 A) 1) a). 3. The landowner consents to periodic inspections by the Town of Spider Lake’s Zoning Administrator (ZA) or the ZA’s designee. 6. The conditions of this CUP are binding upon any heirs, successors or assignees. In the event of the sale or transfer of the property, the land owner or successors will disclose the existence of the CUP to any prospective buyers. Town of Spider Lake Zoning Report November 2025 Date Permit# Name Address Descrip1on Construc1on Cost Total Sq Ft Fee 11/1 Perkins Repairs inquiry 11/1 Snyder Phoned regarding LUP issues 11/1 Minge Emailed CUP Hearing link 11/3 Kroll, Wetland Fill, Nelson, Frick Site visits for updates, progress, LUP review, violaIon 11/3 Kastrosky Inquiry regarding Velasquez LUP applicaIon 11/4,5 Sawyer County HHS Contacted McKay regarding campground, manufactured home regulaIons 11/4 Holmberg TID 29372 Inquiry regarding impervious surface calculaIons 11/5 Boss InspecIons Contacted Jon Boss regarding Frick contacts & inspecIons 11/5 Heyward Contacted by contractor regarding Lindstedt LUP 11/6 LUP 25-20,31,28, DW 25-04,05 Contacted applicants regarding approvals, prepared permit placards, distributed electronically 11/10 Sorenson Inquiry regarding Hallquist demo permit 11/10,11 LUP 25-19 Frick Prepared ViolaIon NoIce le\er, sent via CerIfied Mail 11/18 LUP 25-19 Frick Provided electronic file of ViolaIon NoIce as requested 11/18 Igowski Inquiry regarding details of conformity for 8182W Nowak Rd 11/19 O’Connor TID 30302 Inquiry regarding nonconforming issues 11/19 Kroll Spoke regarding opIons, recommended Boss InspecIon of manufactured home 11/20 Proulx Contacted to explain opIons and clarify Rezone PeIIon intent & Imeline 11/20 Kastrosky Spoke regarding Velasquez LUP applicaIon needs 11/21,24 Schofield Responded to web inquiry regarding shoreline ordinances. Owns Waterfront Refresh LLC designing for client at 10490W Frost Lane. Provided resources 11/26 Heyward Contacted contractor for updated LUP signature and fee for Lindstedt applicaIon DM 25-06 N100' S350' NWNW EXC W400' NW NW 20 42 06 028642202206 LUP 25-33 Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin Application No. CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This is a Three (3) page document. Be sure to complete all pages Print Or Type - Use Black Ink 6��=� y lpJtc/'1 1� P,-/4 t,,.d�/-<- ,1-I- Mailing � � ,31> .., / n. -::; J AgenVBuilder __________________ _ Address�-'----�-? _____ , ________ _ City ;-/u,-4/p>'J k/1 Statet,vl Zip ?yPl2 Mailing Address ___________________ _ ' Daytime Phone I, 13)- � -3 y'- t'3/ 3 Site Information (From Real Estate Property Tax Bill) City ___________ State ___ Zip ____ _ Daytime Phone __________ _ Gov't Lot__ __1/4 __ 1/4, Sec . .3.L_ Twn. 1/ 2. N Rflw Alternate/Legacy ID: Description: t)p-/ _. t 4� Site Address: / :kJP 7 /. • e..,i S-7 Sanitary Permit# ______ _ Date ______ _ Or: Acreage Issued By ______ _ Deed Document # __ l,/�y_t;_8_,/� (Attach Copy Of Approved Year Installed ______ Owner When Installed: ___________ _ _ Saw er Coun!Y_Sanitar,, Permit Zone District: 0 R-1 ..0"RR-1 0 RR-2 0 A-1 0 C-1 D 1-1 0 F-1 Wetland/Shoreland: f:rYes O No (Shoreland: The area of frontage on navigable waters measured from the nonmal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from nvers and streams.) Permit Requested For Type of Dwelling #of Walk Out Attached Garage Footprint of Proposed Hght of Structure 0 Frame built on site Bedrooms □ Yes □ Yes □ No Structure Grade to Peak 0 Modular/manufactured □ □ No □ New D Other __ X __ = __ SF __ x __ = __ SF Dwelling Loft# of □ Yes Deck OYes ONo Total Habitable Sq. Ft. Construction Cost Type of Construction Stories ONo D Frame D Log D Pole/Metal □ __ x __ = __ SF 0 Block □ Other __ Use of Addition Bedrooms # of Stories Size of Proposed Structure Hght of Structure Existing □ □ Grade to Peak Addition 0 Living room 0 Kitchen O Bathroom __ x __ = __ SF □ To Additional □ 0 Bedroom 0 Garage 0 Deck Loft Total Habitable Sq. Ft. Construction Cost Dwelling 0 Storage Building 0 Screened Porch Total D □Yes s 0 Other □ No # of Type of Accessory Structure Size of Proposed Structure Hght of Construction Cost Stories a-Garage O Storage Building D Gazebo Structure �ccessory Structure [LI 0 Screen house 0 Greenhouse ;)-/ X �'f = S 76SF Grade to Peak /6 $ y� �()/) 0 Other Addition To Size of Existing Accessory Structure Size of Proposed Addition Hght of Structure Construction Cost □ Accessory Grade to Peak $ Structure __ x __ = __ SF __ x __ = __ SF 0 Foundation Replacement Area Involved Hght of Structure Construction Cost 0 Other/ Misc 0 Roof Structure Replacement Grade to Peak 0 Other $ 0 Stairs/Walkways Within 75' Of OHWM __ x __ = __ SF 0 Use of Land 0 Filing 0 Dredging 0 Grading O > 10,000 S.F. Grading 0 Other Type of Business Home Occupation/ 0 Located in Existing Dwelling □ Professional Office 0 Located in Existing Accessory Structure (Not more than 1 nonresldant person may be employed on th• premises) O Alternative or Renewable Energy Systems I B � ��8:r □ Wind □ Communication Systems TOW1' OF SPIDER LAKE 7.0NINOAUM .S 2.S 16 0 Cell Tower 0 Other Height ofTower: Total Area of Existing Building SF Area Being Used for Business (May not exceed 25% of the total floor area of the -Jwe/1/ng 750 sq. II. In an accessory building) X = SF Construction Cost s Construction Cost $ Page I of3 LUP 25 -34 Other New Use of Building/Structure Size of Proposed Structure Building/Structure □ (e.g., Commercial, Type of Construction O Frame 0 Log 0 Pole/Metal O Blo<:k Oot11e, __ X __ = __ SF Industrial, Agricultural) Height from Grade to Peak Construction Cost: S Other New Addition Total Area of Existing To Use of Building/Structure Structure: SF Building/Structure □ (e.g., Commercial, Type of Construction: D Frame 0 Log D Pole/Metal D Block D Other Size of Proposed Structure Industrial, __ x __ = __ sAgricultural) Height from Grade to Peak Construction Cost: S SITE PLAN REQUIREMENTS Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7 requirements: Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate 6. Show dimensions in feel on the following: North with an arrow a. Structure to all lot lines 2. Show the location and name of any bordering roads, b. Structure to centerline of road and indicate North. c. Structure to lake, river, stream, pond or wetlands 3. Show the location and size of all existing and proposed d. Structure to septic system/privy and well structures. e. Distance between structures 4. Show the location of any lake, river, stream, pond or 7. Show location vegetation protection area and proposed wetlands. Viewing/Use Corridor on lake lots. 5. Show the location of the well, septic tank and drain field. Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits) Owner's signature is required on the appropriate attached Shoreland Preservation Agreement. This permit cannol be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits} Total land area within 300' of the water body: (A) 9/ ,() tXJ 6 "{ (B)/(A) x 100 =%Used __ 7_J __ Total impervious surface area (including this project) (B) S9t:J 'l (Shall not exceed 15% or 25% with a conditional use permit In the event this application is approved by the Zoning Office, I agree: • That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted • That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, lhe Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, • That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon - Fri to the Zoning Administrator(s) I (we) declare that this application (including any accompanying information) has been examined be me (us} and to the best of my (our} knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we} am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing In or wilh this applic3tion. Signature of Owner or (Agent with Power of Attorney) p,1,I Nam, ,l'o""'7 L, • ,I d-,clf- s,,Pv(j-.✓.J j-.. Date: - ___ You must complete the attached plot plan Fees: See Fee Schedule Checks should be made payable to: Treasurer of the Town of Spider Lake. An Additional fee will be required for each inspection over __ Subm,t Completed Application And Fee To: Dale Olson Spider Lake Zoning Administrator 13497W Ruch Rd. Exeland, WI 54835 OFFICE USE ONLY Permit issued by ___________ _ Date _____ _ Permit denied by ___________ _ Date _____ _ Expiration Date ________ _ TOWN OF SrlOER LAKE Fee $ ., ____ , Check # l.o 9 (c, � D See attached for reason of denial Signature of Zoning Administrator Paec 2 of3 CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE. This is a Three (3) pag e document. Be sure to complete all pages Print Or Type – Use Black Ink Agent/Builder_________________________________________ Mailing Address_____________________________________________ City________________________ State______ Zip___________ Property Owner__________________________________________________ Mailing Address________________________________________________ City___________________________ State______ Zip___________ Day Phone______________Email___________________________ Daytime Phone________________________ Site Information (From Real Estate Property Tax Bill) Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __ Description: ____________________________________________________________________________________________________ Site Address: _______________________________________________ Acreage ________ Deed Document # _______________ Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.) Permit Requested For Type of Dwelling Frame built on site Modular/manufactured Other_____________ Type of Construction Frame Log Pole/Metal Block Other______ # of Bedrooms # of Stories Walk Out Yes No Loft Yes No Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Addition To Dwelling Use of Addition Living room Kitchen Bathroom Bedroom Garage Deck Storage Building Screened Porch Bedrooms Existing Additional Total # of Stories Loft Yes No Size of Proposed Structure ______X______=______SF Total Habitable Sq. Ft. ___________________ Hght of Structure Grade to Peak ___________ Construction Cost $ _____________ Accessory Structure # of Stories Type of Accessory Structure Garage Storage Building Gazebo Screen house Greenhouse Other___________ Size of Proposed Structure ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Addition To Accessory Structure Size of Existing Accessory Structure ______X______=______SF Size of Proposed Addition ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Other/ Misc Foundation Replacement Roof Structure Replacement Other_____________________ Stairs/Walkways Within 75’ Of OHWM Area Involved ______X______=______SF Hght of Structure Grade to Peak __________ Construction Cost $ _____________ Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________ Home Occupation/ Professional Office Type of Business________________________________ Located in Existing Dwelling Located in Existing Accessory Structure (Not more than 1 nonresident person may be employed on the premises) Total Area of Existing Building_______________SF Area Being Used for Business (May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an accessory building) __________X__________=__________SF Alternative or Renewable Energy Systems Solar Wind Other_____________________ Construction Cost $ _________________ Communication Systems Cell Tower Height of Tower:__________________ Other_____________________ Construction Cost $ _________________ Application for Land Use/Building Permit Town of Spider Lake Sawyer County, Wisconsin Application No._________________ (Attach Copy Of Approved Sawyer County Sanitary Permit) Page 1 of 3 TOWN OF SPIDER LAKE ZONINGADM 5.25.16 pplication No._____________A _________ Rick Velasquez Trust / Kristin Rae Velasquez Trust Karl L Kastrosky 724 Highland Ave Oak Park IL 60304 14295 McNaught Rd Cable WI 54821 773-852-3238 rickvelasquez0@gmail.com 715-580-0157 Timber Bay Resort Condo Decl 28162 AMD Decl 341720 Unit 4 & 1/11 INT in Common Elements 0.710 449875 Sanitary Permit #_______________ Dat e_______________ Issued By________________ Or: Year Installed_______________ Owner When Installed:______________________________ Zone District: R-1 X RR-1 X RR-2 A-1 C-1 I-1 F-1 New D welling 33 42 7 57-028-2-42-07-33-5 16-721-000400 ?? Allen Rd, Hayward WI 54843 Attached Garage Yes No __ ___X_____=_____SF Deck Yes No __ ___X_____=_____SF Footprint of Proposed Structure Total Hab itable Sq. Ft. _________________ X XOther_____________3 Season Porch, Bathroom, Bedroom Bunkroom 2 1 X Gerry Schultz99-348 9/30/1999 X 1 3 488 28 16 4 10 16 x x 14 22 ? LUP 25-35 Other New Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Size of Proposed Structure ______X______=______SF Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural) Use of Building/Structure________________________________ Type of Construction: Frame Log Pole/Metal Block Other__________ Height from Grade to Peak___________ Construction Cost: $ _________________ Total Area of Existing Structure:__________SF Size of Proposed Structure ______X______=______S SITE PLAN REQUIREMENTS Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7 requirements: Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED! All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line. 1. Draw lot and write in lot line dimensions and indicate North with an arrow 2. Show the location and name of any bordering roads, and indicate North. 3. Show the location and size of all existing and proposed structures. 4. Show the location of any lake, river, stream, pond or wetlands. 5. Show the location of the well, septic tank and drain field. 6. Show dimensions in feet on the following: a. Structure to all lot lines b. Structure to centerline of road c. Structure to lake, river, stream, pond or wetlands d. Structure to septic system/privy and well e. Distance between structures 7. Show location vegetation protection area and proposed Viewing/Use Corridor on lake lots. Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits) Owner’s signature is required on the appropriate attached Shoreland Preservation Agreement. This permit cannot be issued without a signed shoreland Preservation Agreement. Shoreland Impervious Surface: (Not applicable for nonshoreland permits) Total land area within 300’ of the water body: (A) _________________ Total impervious surface area (including this project) (B)____________ (B)/(A) x 100 = % Used ___________ (Shall not exceed 15% or 25% with a conditional use permit In the event this application is approved by the Zoning Office, I agree: • That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted • That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin, • That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections between the hours of 8:00 AM -6:00 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners. I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in or with this application. Signature of Owner or (Agent with Power of Attorney) Print Name:_________________________________________ Sign:______________________________________ Date:_______________ You must complete the attached plot plan Fees: See Fee Schedule Checks should be made payable to: Treasurer of the Town of Spider Lake. An Additional fee will be required for each inspection over _____ OFFICE USE ONLY Permit issued by_________________________ Date______________ Fee $______________ Check #________________ Permit denied by_________________________ Date______________ See attached for reason of denial Expiration Date___________________ _________________________________________ Signature of Zoning Administrator Page 2 of 3TOWN OF SPIDER LAKE ZONINGADM5.25.16 Submit Completed Application And Fee To: Town of Spider Lake Clerk 10896 W Town Hall Rd. Hayward, WI 54843 Karl L Kastrosky SINK V.I.F. 28' - 0" V.I.F. 20' - 0" SINK TOILET SHOWER 36' - 0" CLOSETCLOSET REF DINING ROOM LIVING ROOM BDRM 2BDRM 1 SCREEN PORCH KITCHEN BATH 20' - 0" 10' - 2 1/2" 9' - 4 1/2" 11' - 6" 11' - 7 1/2" 10' - 4" 3' - 10" 3' - 10 3/4" 5' - 1 3/4" 15' - 11 1/4" 9' - 7" 2' - 5" 498 SF EXIST. MAIN 80 SF S.P. EXISTING WALL PROPOSED WALL DEMO WALL WALL LEGEND SHEET ISSUED: REVISED: SCALE: DRAWN BY: SEE PLAN NELSON LUMBER & DESIGN HOLDS THE RIGHTS OF COPYRIGHT IN AND TO THESE PRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION, MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS OR ASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTEN PERMISSION OF NELSON LUMBER & DESIGN © NELSON LUMBER & DESIGN 2023 JOB #: CHECKED BY: OF A1 6/9/23 --/--/-- K.L.M. EXIST. CABIN OF: RICK VELAZQUEZ PERSPECTIVES & FLOOR PLAN 23-026 J.R.M. 1 1 EXISTINGEXISTING NOT FOR CONSTRUCTION NORTH PROJECT A1 1 PERSPECTIVE 1 1/4" = 1'-0"A1 3 MAIN FLOOR PLAN A1 2 PERSPECTIVE 2 Town of Spider Lake Sawyer County, Wisconsin Resolution 2025-06 Uniform Dwelling Code Fee Schedule Effective 12-10-2025 The Town Board of the Town of Spider Lake, Sawyer County Wisconsin by this resolution, adopted by a majority of the Town Board on a roll call vote with a quorum present and voting, proper notice having been given, resolves and orders that the following Uniform Dwelling Code Fee Schedule is established. New Structures Used for Dwellings .................................................................................. $740.00 Plus $0.34 per square foot of finished area (Including finished basements, but not including attached garages, unfinished basement, breezeways or decks), plus $36.00 for state seal. Fees for dwellings with neither plumbing, heating or electrical systems shall be 75% of the normal fee. Manufactured Dwellings/Homes……….75% of the normal fee for any closed-panel manufactured areas and full fee for site built areas. Additions & Alterations: 0-500 Square Feet.............. $520 plus $0.34 per square foot of finished interior area. 501 Square Feet or more…. $740 plus $0.34 per square foot of finished interior area. Decks over 100 Square Feet attached to or used as exit path from existing dwelling ........ $360.00 Accessory Buildings ........................................................................................................... ..$360.00 (With electricity, plumbing or heating add $150.00 per service.) Foundations for existing dwelling units ............................................................................... .$360.00 Notes per BUILDING INSPECTION AGREEMENT between Boss Inspections Inc. and the Town of Spider Lake (10/6/2025): 1) Said fee includes plan review, inspections, collection, travel expenses, forms, postage, issuing noncompliance reports, State correspondence, and one time reinspection for noncompliance. 2) If there are unusual design plans, Boss Inspection Inc. shall be allowed to make additional charges to the homeowner. 3) Fees may be charged to the homeowner at $120.00 per occurrence if additional are required because earlier inspections show that work is not in compliance with applicable codes or laws. 4) A fee of $380.00 will be charged to the homeowner if construction is started without a permit. Notes (continued): 5) A fee of $380.00 will be charged to the homeowner if the building is occupied before an occupancy inspection is performed. 6) The building inspector shall be allowed to retain all such fees. 7) The building inspector may collect fees at the rate of $0.54 per mile plus $86.00 per hour for services provided in addition to those outlined herein. This would be such services as court appearances, legal work, code interpretation, meetings, etc. 8) When a permit is more than two years old and either the dwelling exterior is not completed or there is unfinished critical health or safety items, a fee of 25% of the normally applicable fees will be due Adopted this 10th day of December, 2025. ___________________ ____________________ Quentin Johnson, Town Chair Mark Johns, Supervisor ___________________ ____________________ Sarah Delaney, Supervisor Bill Amery, Supervisor ___________________ David Thearin, Supervisor Attest: ____________________ _____________ Bianca Cleary, Clerk Date:

Source: Town of Spider Lake website. First collected Oct 7, 2026.