Village Board meeting — Minutes
Village of Reeseville · Dodge County · Village Board meeting · meeting of Jul 15, 2026 · Minutes
Open the original document More from Village of Reeseville
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PROCEEDINGS OF THE VILLAGE BOARD
OF THE VILLAGE OF REESEVILLE July 15, 2026
A duly convened meeting of the Village Board of the Village of Reeseville, Dodge County, Wisconsin, was held
in open session on July 15, 2026, and called to order by Village President, James Bublitz, at 6:30pm. The pledge
of allegiance was recited. Roll call was taken, and the following Trustees were present, Jessica Becker, Anna
Volkova, Cheryl Goodrich and President James Bublitz. Notice of the meeting was given to the public at least
48 hours prior to the meeting by posting the complete agenda at the Reeseville Village Hall, the Reeseville Post
Office.
Public comment: None
A motion to approve the minutes from prior board meeting was made by C. Goodrich, and seconded by A.
Volkova and the motion carried. A motion to approve the Special Board Meeting minutes 6/18/26 by J. Becker,
and seconded by C. Goodrich and the motion carried. A motion to approve the village treasurer report was
made by A. Volkova, and seconded by J. Becker, motion carried. A motion to approve the village utility report
was made by A. Volkova, and seconded by J. Becker, motion carried.
Engineer Report: Kunkel sent over quotes for new electrical signs at the library from Westphal Signs and Sign
Effectz. Kunkel recommended going with Westphal Signs for $31,512.85. J. Becker made motion to approve
quote from Westphal Signs, A. Volkova seconded, motion carried.
Public Safety Report: Police Report: Dpt. Richardson reported there were 53 contract calls, 25 non-contract
calls, and that they worked 49 hours month of June planning to make up 7 hours still owed in month of July.
Lifestar report: 4 calls in the Village. National night out update: Looking for donation from Village to cover
costs.
Library Report: A. Volkova reported they are working on getting new sign installed. Physical circulation is
consistent. There was a good turn out for reading with Watson.
Administration Report: Clerk-Treasurer Update: Kassie reported that she has been attending schooling this
week with UWGB. Looking into organizing and going through some paperwork. Looking for election worker for
the PM shift for election on 8/11/26. Background documents were sent over for RCC bartender and new
owner of BP station. Following up with moving elections to RCC. Operator license for Cheryl Goodrich was
tabled. J. Becker made motion to approve Class B combination liquor and beer license for Reeseville Petro INC,
C. Goodrich seconded, motion carried. J. Becker made motion to approve Class A combination liquor and
fermented malt beverage for Reeseville Petro INC, A. Volkova seconded, motion carried. J. Becker made
motion to approve cigarette license for Reeseville Petro INC, C. Goodrich seconded, motion carried. J. Becker
made motion to approve operator licenses for Harjinder Signh, Preet Tiwana, and Simar Tiwana, A. Volkova
seconded, motion carried.
Infrastructure Report: Utility Report: Ken reported that N. Main lift needed work done due to mop head being
stuck in check valves. Discussion on removing stop sign on SW corner of Dewey and Garfield, need to change
the ordinance. Infrastructure committee made recommendation to change Joe Wagner to $25/hr, full time (40
hours), all full time benefits. J. Becker made motion to accept recommendation to take affect 7/13/2026, A.
Volkova seconded, motion carried.
Health and Human Services: Trash/recycling pick up had some issues this past week, lots of recycling items left
on roads. Cardinal Lawns has been working on cemetery.
Parks and Recreation Committee: J. Bublitz reported that benches and lights have been fixed at ball fields. No
update on Corn Roast yet. Village is taking over the out buildings at Fireman’s Park, J. Bublitz stated he would
work on drafting up a letter.
Planning and Development: J. Becker made motion to approve zoning variance for 308 Lincoln Ave to 12 feet
high walls with max height of 15 feet at peak, C. Goodrich seconded, motion carried.
Future agenda items: No future items listed at this time
A motion to approve paying the bills was made by A. Volkova and seconded by J. Becker, motion carried. A
motion to adjourn the meeting was made by A. Volkova and seconded by C. Goodrich, motion carried.
Kasandra Miescher Clerk-Treasurer
The minutes are not approved by the village board until the following meeting.
Source: Village of Reeseville website. First collected Oct 15, 2026.