RecordWell Data

Packet

Village of Hobart · Brown County · Agenda packets

Open the original document More from Village of Hobart

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

VILLAGE BOARD AGENDA (REGULAR) – APRIL 8TH 2026 - Page 1 of 3 Village of Hobart – www.hobartwi.gov Village Office - 2990 South Pine Tree Road, Hobart, WI Notice is hereby given according to State Statutes that the VILLAGE BOARD of the Village of Hobart will meet on Wednesday April 8th 2026, at 6:00 P.M. at the Village Office (2990 South Pine Tree Road). NOTICE OF POSTING: Posted April 6th 2026, at the Hobart Village Office and on the village website. MEETING NOTICE – VILLAGE BOARD (Regular) Date/Time: Wednesday April 8th 2026 (6:00 P.M.) Location: Hobart Village Office (2990 South Pine Tree Road) Village Board of Trustees: Richard Heidel (President), David Dillenburg, Vanya Koepke, Tammy Zittlow, Melissa Tanke NOTE: The Board meeting has been rescheduled from Tuesday April 7th due to the Spring Election. ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call. 2. Certification of the open meeting law agenda requirements and approval of the agenda 3. Pledge of Allegiance 4. PUBLIC HEARINGS 5. CONSENT AGENDA (These items may be approved on a si ngle motion and vote due to their routine nature or previous discussion. Please indicate to the Board President if you would prefer separate discussion and action.) A. Payment of Invoices (Page 4); B. VILLAGE BOARD: Minutes of March 17 th 2026 (Regular) (Page 10); C: PARK AND RECREATION COMMITTEE: Minutes of June 30 th 2025 (Page 13); D. JOINT REVIEW BOARD TID #1 AND TID #2: Minutes of July 17 th 2018 (Page 15); E. PUBLIC WORKS AND UTILITIES ADVISORY COMMITTEE: Minutes of February 5th 2026 (Page 17); F. SITE REVIEW COMMITTEE: Minutes of February 18 th 2026 (Page 18); G. LIQUOR LICENSE AMENDMENT – Change to Premise Location by D2s (Page 20); H. SPECIAL EVENT PERMIT – Pulaski Youth Lacrosse Tournament – Four Seasons Park (April 26th) (Page 22); I. SPECIAL EVENT PERMIT – Pulaski Youth Lacrosse Tournament – Four Seasons Park (May 17 th) (Page 25); I. SPECIAL EVENT PERMIT – Wedding – 4293 Hilton Head Drive (June 13th) (Page 28) 6. ITEMS REMOVED FROM CONSENT AGENDA 7. CITIZENS’ COMMENTS/RESOLUTIONS/PRESENTATIONS (Please limit comments to no more than 3 minutes) A. DISCUSSION AND ACTION – Resolution 2026-05 (A RESOLUTION ESTABLISHING VILLAGE FEE SCHEDULES) (Page 34) 2025 Wisconsin Act 113 (recently signed by the Governor) incr eases the maximum amount that a municipal court may collect as a municipal court fee from $38 to $48. The act also specifies that municipal courts, rather than specifically municipal judges, are responsible for collecting municipal co urt fees. This resolution adds this fee to the Village fee schedules. It is the only change being proposed to the fee schedule. 8. VILLAGE ADMINISTRATOR’S REPORT/COMMUNICATIONS A. INFORMATION 1. 2025-26 Wisconsin Legislative Report (Page 43) 9. COMMITTEE REPORTS AND ACTIONS A. INFORMATIONAL – Joint Review Board Meeting – March 24th (Page 49) VILLAGE BOARD AGENDA (REGULAR) – APRIL 8TH 2026 - Page 2 of 3 B. INFORMATIONAL - Request for new wall signs located at 611 Centerline Drive (Site Review Committee) (Page 66) Auto Aces, located at 611 Centerline Dr., is currently under construction and is submitting for review and action of the wall signage. During the original site review back in September 2025, signage was not finalized and therefore not submitted at that time. The developer has since finalized the freestan ding signage and was requesting review of said signage. The request before the Committee was for two internally illuminated wa ll signs of a total of 70.76 sq uare feet (actual sign area is roughly 96 square feet of sigh faces) for each sign. There will be one sign located on each of the office store fronts facing Centerline Dr. and Founders Terrace. Since this is a corner parcel, the development is allowed to have one wall sign facing each roadway. Both wall signs are compliant with the Village Sign Code. C. INFORMATIONAL - Consider the landscaping and lighting plans for the new recently approved development at 5060 Founders Terrace (Site Review Committee) (Page 69) Bayland Buildings recently received conditional approval on a proposed new 20,000 square foot commercial building to be located at 5060 Founders Terrace (Parcel HB-523-7) along with the required associated site improvement including access and parking. The landscaping plan and exterior lighting plan were required to be re-submitted for review and approval. D. INFORMATIONAL - Request for new wall signage and face replacement of existing ground sign located at 3860 W. Mason Street (Dobbs Tire & Auto Centers, HB-1394-3) (Site Review Committee) (Page 71) Dobbs Tire & Auto Centers, located at 3860 W. Mason St., recently acquired the pro perty (formerly Al Huss Auto & Truck LLC) and is submitting for review and action of proposed new wall signs and face replacement of the existing ground sign. 10. OLD BUSINESS 11. NEW BUSINESS A. DISCUSSION AND ACTION - Ordinance 2026-06 (A N ORDINANCE TO CREATE ARTICLE V (GOLF CARTS) OF CHAPTER 264 (VEHICLES AND TRAFFIC) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN) (Page 75) The purpose of this Ordinance is to regulate the operation of golf carts on Village roadways to promote public safety while allowing limited recreational and residential transportation. B. DISCUSSION AND ACTION – Review Request to Accept Wyld Berry Way as Public Roadway (Page 81) The Village received a petition in 2023 to convert Wyld Berry Way from a private road to a Village owned and maintained roadway. The Public Works and Utilities Advisory Committee met on April 2 nd and made a recommendation to the Board. C. DISCUSSION AND ACTION – Three-Year Contract with Suburban Wildlife Solutions LLC (Page 85) This contract is for the years 2026-2028 to expedite the removal of muskrats from the Village’s storm water network. Removal is done per the Wisconsin Department of Natural Resources Nuisance Wildlife Guidelines. D. DISCUSSION AND ACTION - Sorenson Family Park Proposal (Page 89) The Park and Recreation Committee met on March 23 rd to consider the creation of Sorenson Family Park in Centennial Centre. The land is currently owned by the Village of Hobart and is located in Tax Increment District #1. Construction would take place later this spring or in early summer. E. DISCUSSION - Items for future agenda consideration or Committee assignment F. ADJOURN to CLOSED SESSION: 1. Under Wisconsin State Statute 19.85 (1) (g): Conferring with legal coun sel for the governmental body who is rendering oral or written advice concerning strategy to be adopted by the body with respect to litigation in which it is or is likely to become involved. RE: Tribal Affairs; Potential Litigation G. CONVENE into open session. H. ACTION from closed session. VILLAGE BOARD AGENDA (REGULAR) – APRIL 8TH 2026 - Page 3 of 3 12. ADJOURN ____________________________ Aaron Kramer, Village Administrator UPCOMING BOARD MEETINGS Tuesday April 21st 2026 (6:00 PM) – Regular Board Meeting at Village Office (2990 South Pine Tree Road) Tuesday May 5th 2026 (6:00 PM) – Regular Board Meeting at Village Office (2990 South Pine Tree Road) Tuesday May 19th 2026 (6:00 PM) – Regular Board Meeting at Village Office (2990 South Pine Tree Road) NOTE: Page numbers refer to the meeting packet. A ll agendas and minutes of Village meetings are online: www.hobartwi.gov. Any person wishing to attend, who, because of their disability, requires special accommodation, should contact the Village Clerk’s office at 920-869-1011 with as much advanced notice as possible. Notice is hereby given that action by the Board may be considered and taken on any of t he items described or listed in this agenda. There may be Board members attending this meeting by telephone if necessary. Reprint Check Register - Quick Report - Regular 19:53 AM ACCT CHECKING ALL Checks Posted From: Thru Account:Thru: 4/08/2026 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:4/08/2026 4/01/2026 Page: 450.0071035 1330 - COLAB LLC 2020 SILVERADO - GRAPHIC REPLACEMENTS 4/08/2026 45.0071036 4M BUILDING SOLUTIONS INC CLEANING REFRIGERATOR 4/08/2026 1,725.6671037 ACCURATE FREIGHTLINER SPRING/4X4 TWO STAGE 4/08/2026 231.8471038 ASHWAUBENON AUTO REPAIR LLC MULTIPLE INVOICES OIL CHANGES 4/08/2026 62.3571039 BAY EAST ANIMAL HOSPITAL JAX - MEDICATIONS 4/08/2026 177.5871040 BAYSIDE PRINTING LLC #10 REG ENVELOPES MUN COURT 4/08/2026 112.4771041 BE'S COFFEE & VENDING SERVICE COFFEE 4/08/2026 200.0071042 BEST MACHINE & REPAIR INC REPAIR SMALL PLOW PIVOT BRACKET 4/08/2026 3,677.3471043 BOBCAT PLUS MULTIPLE INV MAINT/REPAIR BOBCAT UW56 4/08/2026 3,727.5071044 BRIAN RUECHEL ACCOUNTING- FEBRUARY / MARCH TRANSACTIO 4/08/2026 9,396.8271045 BROWN COUNTY PORT & RESOURCE RECOVERY REFUSE & RECYCLING DISPOSAL FEBRUARY 4/08/2026 136.2671046 CASPER'S TRUCK EQUIPMENT REPLACEMENT CHAIN ASSY 4/08/2026 65.0071047 CATS ANONYMOUS INC LAWRENCE 2660 BOXWOOD DRIVE 4/08/2026 1,417.5071048 CONWAY SHIELD INC GAS CLIP MULTI GAS CLIP 4/08/2026 315.8571049 DEPERE EXHAUST & REPAIR SQUAD 182 - FLEX PIPE / PATCH EXHAUST 4/08/2026 105.0071050 DIVERSIFIED BENEFIT SERVICES INC MARCH 125-FSA ADMINISTRATIVE SERVICES 4/08/2026 110.0071051 DIVERSIFIED BENEFIT SERVICES INC FEBRUARY 105-HRA ADMINISTRATIVE SERVICES 4/08/2026 5,402.0071052 FAIR MARKET ASSESSMENTS ASSESSOR SERVICES / REVAL & MAINT 4/08/2026 14.6671053 FEDEX WI CRIME LAB SHIPMENT 4/08/2026 PAGE 4 Reprint Check Register - Quick Report - Regular 29:53 AM ACCT CHECKING ALL Checks Posted From: Thru Account:Thru: 4/08/2026 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:4/08/2026 4/01/2026 Page: 2,276.6071054 FERGUSON WATERWORKS MULTIPE INVOICES / METERS & COUPLINGS 4/08/2026 165.4371055 GAT SUPPLY INC SAFETY EQUIPMENT 4/08/2026 3,995.0071056 GENERAL CODE LLC CODE UPDATE SUPPLEMENT #21 4/08/2026 2,485.5071057 GLENN'S 24 HR TOWING INC MULTIPLE TOWING INVOICES 4/08/2026 950.0071058 HAWKINS INC MULTIPLE INVOICES CHEMICALS 4/08/2026 7,162.0071059 IDEALAIR HEATING & COOLING INC DPW SHOP 2024 PROJECT COMPLETED 2025 4/08/2026 150.0071060 JERRY LANCELLE WORK BOOT REIMBURSEMENT 4/08/2026 9,310.0071061 JOE DENOBLE SEWER & WATER CONSTRUCTION INC SNOW REMOVAL 3/16 & 3/17/26 4/08/2026 534.8771062 JOE'S POWER CENTER INC MULTIPLE INVOICES & CREDITS 4/08/2026 9,559.0071063 KES CONTRACTING INC PACKERLAND DRIVE HYDRO - KESP-30104 4/08/2026 6,347.0071064 MCCLONE AUDIT FOR WORK COMP 4/08/2026 64.4371065 METRO SALES INC RICOH COPIER BASE RATE & USAGE 4/08/2026 329.0071066 MULTI MEDIA CHANNELS LLC MULTIPLE LEGAL ADS 4/08/2026 1,265.4671067 PACKER CITY INTERNATIONAL TRUCKS INC THROTTLE KIT & CORE & CREDIT FOR CORE 4/08/2026 29.8471068 QUALITY TRUCK CARE CENTER INC LATCH-HOOD RUBBER 4/08/2026 371.0071069 ROBERT E. LEE & ASSOCIATES INC IN-LINE BOOSTER STN #1 PUMP 4/08/2026 620.0071070 TACTICAL SOLUTIONS RADAR CERTIFICATION & LASER CERT 4/08/2026 10.7071071 TRUCK EQUIPMENT INC 6 GA ANDERSON CONNECTORS 4/08/2026 528.0071072 VANDENPLAS PORTABLE SOLUTIONS PORTABLE TOILETS -2 PARKS 4/08/2026 PAGE 5 Reprint Check Register - Quick Report - Regular 39:53 AM ACCT CHECKING ALL Checks Posted From: Thru Account:Thru: 4/08/2026 ______________________________________________________________________________________Check Nbr Check Date Payee Amount From Account:4/08/2026 4/01/2026 Page: 4,801.7971073 WEYERS EQUIPMENT INC BOOM TRACTOR & MOWER RENTAL 4/08/2026 500.0071074 WI HUMANE SOCIETY FEBRUARY IMPOUND SERVICES 4/08/2026 78,828.45Grand Total PAGE 6 Reprint Check Register - Quick Report - Regular 49:53 AM ACCT CHECKING ALL Checks Posted From: Thru Account:Thru: 4/08/2026 ______________________________________________________________________________________ Amount From Account:4/08/2026 4/01/2026 Page: 30,074.21Total Expenditure from Fund # 001 - General Fund 4,063.00Total Expenditure from Fund # 002 - Water Fund 1,159.13Total Expenditure from Fund # 003 - Sanitary Sewer Fund 62.35Total Expenditure from Fund # 006 - K-9 Fund 22,372.44Total Expenditure from Fund # 007 - Storm Water Fund 992.25Total Expenditure from Fund # 008 - TID #1 Fund 10,180.25Total Expenditure from Fund # 009 - TID #2 Fund 528.00Total Expenditure from Fund # 010 - Parks & Recreation 9,396.82Total Expenditure from Fund # 014 - Garbage & Recycling Program 78,828.45Total Expenditure from all Funds PAGE 7 Check Nbr Check Date Vendor name Check Amount Transaction memo AMPLI0226-2 02/17/2026 AMPLITEL TECHNOLOGIES 637.50$ MONTHLY MANAGED SERVICES-FEB 2 FLEET020426 02/17/2026 ENTERPRISE-FLEET MANAGEMENT 12,750.50$ FLEET LEASE WIDOT 02/18/2026 WI D.O.T. 9.00$ TVRP PAYMENTS -3 SNBFEES0131 02/18/2026 STEPHENSON NATIONAL BANK 148.09$ JANUARY 31, 2026 BANK FEES SNBFEE21926 02/19/2026 STEPHENSON NATIONAL BANK 15.00$ NSF UTILITY PAYMENT S. MALONEY DOR022026 02/20/2026 DEPARTMENT OF REVENUE 4,229.95$ PAYROLL 02-20-2026 DCOMP022026 02/20/2026 EMPOWER 2,105.02$ PAYROLL 02-20-2026 EFTPS022026 02/20/2026 U.S. DEPARTMENT OF THE TREASURY 22,895.10$ PAYROLL 02-20-2026 LANCELLEVISA 02/20/2026 ELAN 1,996.75$ LANCELLE - VISA SNB22526 02/25/2026 STEPHENSON NATIONAL BANK 30.00$ FEE - THIS WILL BE REVERSED PER BANK GLOBO0226 02/26/2026 GLOBO LANGUAGE SOLUTIONS LLC 95.00$ GLOBO FEB2026 SNBTFEE0226 02/26/2026 STEPHENSON NATIONAL BANK 10.00$ CREDIT OF NSF FEE 02-26-2026 DELTA326 02/27/2026 DELTA DENTAL OF WISCONSIN (2,493.95)$ VOID - CREDIT GIVEN - REISSUE DELTA0326 02/27/2026 DELTA DENTAL OF WISCONSIN 2,295.83$ DENTAL & VISION PREMIUM WITH CREDIT APPL DOR022726 02/27/2026 DEPARTMENT OF REVENUE 14.92$ PAYROLL 02-27-26 WDC022726 02/27/2026 EMPOWER 138.92$ PAYROLL 02-27-26 WRS022726 02/27/2026 EMPLOYEE TRUST FUNDS 180.03$ PAYROLL 02-27-26 EFTPS022726 02/27/2026 U.S. DEPARTMENT OF THE TREASURY 131.21$ PAYROLL 02-27-26 FIRSTNET3988 02/28/2026 FIRST NET 1,000.04$ WIRELESS POLICE FIRSTNET6922 02/28/2026 FIRST NET 339.68$ WIRELESS FIRSTNET7998 02/28/2026 FIRST NET 377.25$ WIRELESS ZION3126 03/01/2026 ZIONS BANK 3,120,150.00$ PAYMENTS - VARIOUS GENERAL OBLIGATION DTCI3012026 03/01/2026 DEPOSITORY TRUST COMPANY 128,148.75$ INTEREST PAYMENTS 03-01-2026 DTCP3012026 03/01/2026 DEPOSITORY TRUST COMPANY 1,960,000.00$ PRINCIAL PAYMENTS 03-01-2026 DTCI0301CORR 03/01/2026 DEPOSITORY TRUST COMPANY (0.01)$ ROUNDING ERROR-INTEREST WRS0226 03/02/2026 EMPLOYEE TRUST FUNDS 35,398.72$ RETIREMENT FEB 2026 LIFE0426 03/02/2026 SECURIAN FINANCIAL GROUP INC 1,146.50$ LIFE INSURANCE PREMIUMS LIFE0426 03/02/2026 SECURIAN FINANCIAL GROUP INC (1,146.50)$ VOID MANUAL CHECK SEND REGULAR CHECK LIFE426C 03/02/2026 SECURIAN FINANCIAL GROUP INC 1,127.30$ CORRECTED AMOUNTS PREMIUMS 042026 AT&T 03/03/2026 AT&T (0.39)$ VOID - INCORRECT ENTRY AT&T 03/03/2026 AT&T 648.62$ WATER BOOSTER STATION PHONELINE PAYA0226 03/03/2026 PAYA-FIRST BILLING SERVICES 21.00$ TRANSACTION FEES 02-2026 ASSOC0226 03/03/2026 ASSOCIATED BANK 5.63$ SERVICE FEES FEBRUARY GBMSD0126 03/03/2026 GREEN BAY METROPOLITAN SEWERAGE DISTRICT 103,724.17$ SEWERAGE TREATMENT JANUARY 2026 HRA030326 03/03/2026 DIVERSIFIED BENEFIT SERVICES INC 182.28$ HRA 030326 CY PETERSON MSI010426 03/03/2026 METRO SALES INC 86.71$ CONTRACT BASE RATE COPY MACHINE GLOBOE5713 03/03/2026 GLOBO LANGUAGE SOLUTIONS LLC 94.97$ INVOICE INTERPRETING 9/1/25-9/30/25 QUAD021126 03/03/2026 QUADIENT INC. 189.69$ POSTAGE METER LEASE QUAD022626 03/03/2026 QUADIENT INC. 329.00$ POSTAGE KWIK0226 03/04/2026 KWIK TRIP INC 1,252.97$ POLICE FUEL DOR030626 03/06/2026 DEPARTMENT OF REVENUE 4,045.75$ PAYROLL 03-06-2026 DCOMP030626 03/06/2026 EMPOWER 1,945.86$ PAYROLL 03-06-2026 EFTPS030626 03/06/2026 U.S. DEPARTMENT OF THE TREASURY 21,667.53$ PAYROLL 03-06-2026 CHARTSPEC221 03/06/2026 CHARTER COMMUNICATIONS / SPECTRUM 615.00$ SERVICE PERIOD 3-1-26 TO 3-29-26 HRA033126 03/10/2026 DIVERSIFIED BENEFIT SERVICES INC 439.79$ 031326HRA CY - PETERSON FSA031026CY 03/10/2026 DIVERSIFIED BENEFIT SERVICES INC 127.15$ FSA031026 CY - RENKAS QUADIENTPOST 03/10/2026 QUADIENT INC. 2,500.00$ POSTAGE WIDOT 03/11/2026 WI D.O.T. 9.00$ SUSPENSIONS BOARDCOMLOA 03/13/2026 BOARD OF COMMISSIONERS OF PUBLIC LANDS 110,851.26$ ANNUAL DEBT PAYMENT TID#LOAN 02017060.01 WIDOT 03/17/2026 WI D.O.T. 3.00$ 1-SUSPENSION WEX0226 03/17/2026 WEX - WRIGHT EXPRESS 6,666.45$ FUEL ALL DEPARTMENTS FEBRUARY FLEET0326 03/17/2026 ENTERPRISE-FLEET MANAGEMENT 12,456.91$ FLEET LEASE 0326 VOID71014 03/17/2026 MANDY SCHEELS (150.00)$ VOID 71014-ADDRESS/NAME ERROR NSIGHT00326 03/17/2026 NSIGHT TELESERVICE 1,201.70$ BUILDING PHONE LINES AMPLITEL0326 03/17/2026 AMPLITEL TECHNOLOGIES 8,662.50$ MONTHLY SERVICES CINTAS021126 03/17/2026 CINTAS CORP 34.49$ MATS AT OFFICE 2-11-2026 CLAAUDIT0317 03/17/2026 CLIFTON LARSON ALLEN LLP 23,100.00$ AUDIT FINAL FIELDWORK PAGE 8 CULLIGAN0226 03/17/2026 CULLIGAN GREEN BAY 51.92$ FILTER RENTAL OFFICE SNB22526 03/18/2026 STEPHENSON NATIONAL BANK 280.93$ SERVICE FEES FEBRUARY SNB031826 03/18/2026 DEPARTMENT OF REVENUE 870.00$ DOR WITHHOLDING - 3-9-2026 - APPEALED snb031826 03/18/2026 DEPARTMENT OF REVENUE (870.00)$ dor withholding 3/9/26 - appealed -- voi DORPENALTY 03/18/2026 DEPARTMENT OF REVENUE 870.00$ WITHHOLDING PENALTY - APPEALED 3-9-26 HRA031826CY 03/18/2026 DIVERSIFIED BENEFIT SERVICES INC 514.49$ HRA031826CY G PETERSON DOR032026 03/20/2026 DEPARTMENT OF REVENUE 4,171.48$ PAYROLL 03-20-2026 EFTPS0326 03/20/2026 U.S. DEPARTMENT OF THE TREASURY 21,917.10$ PAYROLL 03-20-2026 DCOMP032026 03/20/2026 EMPOWER 1,902.19$ PAYROLL 03-20-2026 VOID71022 03/23/2026 SECURIAN FINANCIAL GROUP INC (1,146.50)$ VOID 71022 WRONG AMOUNT BIESEVISA 03/24/2026 ELAN 1,949.55$ BIESE - VISA DEMARSVISA 03/24/2026 ELAN 214.48$ DEMARS - VISA KRAMERVISA 03/24/2026 ELAN 4,504.38$ KRAMER - VISA RENKASVISA 03/24/2026 ELAN 2,081.54$ M. RENKAS - VISA TREMELVISA 03/24/2026 ELAN 19.08$ C. TREMEL - VISA WPSFEB2026 03/24/2026 WPS 19,191.87$ UTILITIES ALL BUILDINGS / LIGHTS CROCKERVISA 03/24/2026 ELAN 2,073.15$ N. CROCKER - VISA LANCELLEVISA 03/24/2026 ELAN 4,905.27$ LANCELLE - VISA GBUTILFEB26 03/26/2026 GREEN BAY WATER UTILITY 34,498.10$ PURCHASED WATER FEBRUARY CELLCOM0326 03/27/2026 CELLCOM GREEN BAY 658.57$ CELLPHONES CINTAS022526 03/27/2026 CINTAS CORP 34.49$ MATS AT OFFICE 02/25/2026 AT&T0326 03/30/2026 AT&T 648.23$ WATER BOOSTER STATION PHONE LINE DELTA0426 03/30/2026 DELTA DENTAL OF WISCONSIN 2,621.57$ DENTAL & VISION APRIL 2026 GBMSDDC2026 03/30/2026 GREEN BAY METROPOLITAN SEWERAGE DISTRICT 57,045.26$ INTERCEPTOR COST RECOVERY & LEASE 2026 QUADPOSTAGE 03/30/2026 QUADIENT INC. 200.00$ POSTAGE IRONMOUN0226 03/30/2026 IRON MOUNTAIN 169.60$ DOCUMENT MANAGEMENT 1-28 THRU 2-24-26 WIDOT 03/31/2026 WI D.O.T. 3.00$ LICENSE SUSPENSION UHC426 03/31/2026 UNITED HEALTHCARE 32,193.42$ APRIL HEALTH PREMIUMS wrs032026 03/31/2026 EMPLOYEE TRUST FUNDS 34,496.51$ RETIREMENT MARCH 2026 & INV GLOBO22826 03/31/2026 GLOBO LANGUAGE SOLUTIONS LLC 94.73$ INTERPRETING SERVICES FEBRUARY FSA03312026 03/31/2026 DIVERSIFIED BENEFIT SERVICES INC 76.05$ 125-FSACY A. BELL HRA033126PY 03/31/2026 DIVERSIFIED BENEFIT SERVICES INC 231.44$ HRA-033126PY M RENKAS HRA0331226CY 03/31/2026 DIVERSIFIED BENEFIT SERVICES INC 849.67$ HRA-03312026 I SCHIEFELBEIN 5,819,763.21$ PAGE 9 VILLAGE BOARD MINUTES (REGULAR) – MARCH 17TH 2026 - Page 1 of 3 Village of Hobart Village Office 2990 S. Pine Tree Rd, Hobart, WI 54155 www.hobartwi.gov - www.buildinhobart.com MEETING MINUTES – VILLAGE BOARD (Regular) Date/Time: Tuesday March 17th 2026 (6:00 P.M.) Location: Hobart Village Office (2990 South Pine Tree Road) Village Board of Trustees: Richard Heidel (President), David Dillenburg, Vanya Koepke, Tammy Zittlow, Melissa Tanke ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call . The meeting was called to order by Rich Hei del at 6:07 pm. Dave D illenburg, Vanya Koepke, Tammy Zittlow, and Rich Heidel were present. Excused: Melissa Tanke. 2. Certification of the open meeting law agenda requirements and approval of the agenda - ACTION: To certify the open meeting law agenda requirements and approve the agenda. MOTION: Dillenburg SECOND: Koepke. VOICE VOTE: 4-0. 3. Pledge of Allegiance - Those present recited the Pledge of Allegiance. 4. PUBLIC HEARINGS A. PUBLIC HEARING – Resolution 2026-02 (APPROVING THE DISCONTINUANCE OF THE PUBLIC RIGHT OF WAY BEING LONESOME ROAD, AND A PART OF WEST ADAM DRIVE IN THE VILLAGE OF HOBART, WISCONSIN) The Village Board has worked with Brown County and others on a mutually agreeable program which includes the discontinuance of Lonesome Road, and a portion of West Adam Drive. This is the final step in that process. President Heidel opened the Public Hearing at 6:09pm No one spoke. President Heidel closed the Public Hearing at 6:09pm. B. ACTION on aforesaid agenda item (Resolution 2026-02) ACTION: To approve Resolution 2026- 02 (APPROVING THE DISCONTINUANCE OF THE PUBLIC RIGHT OF WAY BEING LONESOME ROAD, AND A PART OF WEST ADAM DRIVE IN THE VILLAGE OF HOBART, WISCONSIN) as presented. MOTION: Heidel SECOND: Dillenburg. VOICE VOTE: 4-0. 5. CONSENT AGENDA (These items may be approved on a si ngle motion and vote due to their routine nature or previous discussion. Please indicate to the Board President if you would prefer separate discussion and action.) A. Payment of Invoices; B. VILLAGE BOARD: Minutes of March 3rd 2026 (Regular); C: FIRE COMMISSION: Minutes of March 26th 2024 ACTION: To approve the consent agenda without Item C. Fire Commission and to include manual checks. MOTION: Heidel SECOND: Koepke. VOICE VOTE 4-0. 6. ITEMS REMOVED FROM CONSENT AGENDA- C: FIRE COMMISSION: Minutes of March 26 th 2024, no action taken. 7. CITIZENS’ COMMENTS/RESOLUTIONS/PRESENTATIONS (Please limit comments to no more than 3 minutes) PAGE 10 VILLAGE BOARD MINUTES (REGULAR) – MARCH 17TH 2026 - Page 2 of 3 No one spoke. 8. VILLAGE ADMINISTRATOR’S REPORT/COMMUNICATIONS A. INFORMATION – Village Bank Balances- Administrator Kramer reviewed the bank balances with the Village Board. Fire Commission was cancelled due to weather. Planning and Zoning Commission will be held on April 6. Park and Recreation will be held on March 23. The next Village Board meeting will be held on April 8 due to the Election on April 7, 2026. Our new Administrative Assistant started last Monday. We made it through the blizzard and cleanup continues. Compliments to the staff for the response to this event. 9. COMMITTEE REPORTS AND ACTIONS – None. 10. OLD BUSINESS - None. 11. NEW BUSINESS A. DISCUSSION AND ACTION - Ordinance 2026-03 (AN ORDINANCE TO CREATE CHAPTER 25 (POLICE DEPARTMENT) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN) The purpose of this ordinance is to modernize the Hobart-Lawrence Police Department and define the structure and power of the Department. ACTION: To approve Ordinance 2026-03 (AN ORDINANCE TO CREATE CHAPTER 25 (POLICE DEPARTMENT) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN) as presented. MOTION: Dillenburg SECOND: Koepke. VOICE VOTE: 4-0. B. DISCUSSION AND ACTION – Ordinance 2026-04 (AN ORDINANCE TO AMEND SECTIONS OF SECTION 6 (CHRONIC NUISANCES) OF CHAPTER 207 (NUISANCES) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN) The purpose of this ordinance is to amend two (2) sections of the Nuisance Chapter, created in 2025, to accurately reflect a state stature which is referenced and correctly identify the penalty clause. ACTION: To approve Ordinance 2026-04 (AN ORDINA NCE TO AMEND SECTIONS OF SECTION 6 (CHRONIC NUISANCES) OF CHAPTER 207 (NUISANCES) OF THE MUNI CIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN) as presented. MOTION: Heidel SECOND: Zittlow. VOICE VOTE: 4-0. C. DISCUSSION AND ACTION – Ordinance 2026-05 (AN ORDINANCE TO AMEND SECTION 347 (NEW CONSTRUCTION OR SUBSTANTIAL MODIFICATION OF COMMUNICATION TOWERS) OF ARTICLE XXXII (TELECOMMUNICATIONS ANTENNAS AND TOWERS) OF CHAPTER 295 (ZONING) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN) The purpose of this Ordinance is to amend a portion of the Telecommunications Antennas and Towers section of the Zoning Code to correct an error in the original ordinance, adopted in 2025. ACTION: To approve Ordinance 2026- 05 (AN ORDINANCE TO AMEND SECTI ON 347 (NEW CONSTRUCTION OR SUBSTANTIAL MODIFICATION OF COMMUNICATION TO WERS) OF ARTICLE XXXII (TELECOMMUNICATIONS ANTENNAS AND TOWERS) OF CHAPTER 295 (ZONING) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN as presented. MOTION: Heidel SECOND: Koepke. VOICE VOTE: 4-0. D. DISCUSSION AND ACTION - Policy 2026-03 (VILLAGE GARBAGE AND RECYCLING CONTAINER FEE POLICY) The purpose of this policy is to establish guidelines for determining the annual garbage collection fee charged to parcel owners for each garbage and/or recycling container present at their premise. The established fee shall ensure the garbage and recycling program is not subsidized by the tax levy. PAGE 11 VILLAGE BOARD MINUTES (REGULAR) – MARCH 17TH 2026 - Page 3 of 3 ACTION: To approve Policy 2026-03 (VILLAGE GARBAGE AND RECYCLING CONTAINER FEE POLICY) as presented. MOTION: Dillenburg SECOND: Heidel. VOICE VOTE: 4-0. E. DISCUSSION AND ACTION – Policy 2026-04 (USE OF ARTIFICIAL INTELLIGENCE (AI) POLICY) The purpose of this policy is to establish procedures and guidelines for AI systems used by, or on behalf of, the Village, and enables the Village to use AI systems for the benefit of the community while safeguarding against potential harms. This is the First Reading of Policy 2026-04. ACTION: To bring Policy 2026-04 before the Village Board for a Second Reading for subsequent discussion and action following legal review. MOTION: Heidel SECOND: Zittlow. VOICE VOTE: 4-0. F. DISCUSSION AND ACTION - CTH EE Pr oject, Brown County - Release of Easement Needed (Village of Hobart - Water) Brown County is proceeding with an improvement project along CT H EE. As part of this project, Brown County will be purchasing some new right-of-way interests for reconstruction of the CTH EB and CTH EE intersection. Brown County requires a release of any easement interest the Village holds within this new right of way. Staff recommends the Board approve the requested documents be signed and forwarded to Brown County for recording. ACTION: To approve both documents and direct Village staff to sign and forward to Brown County as presented. MOTION: Heidel SECOND: Koepke. VOICE VOTE: 4-0. G. DISCUSSION - Items for future agenda consideration or Committee assignment Golf Cart Ordinance. ACTION: To recess at 6:52 pm prior to going into closed session. MOTION: Heidel SECOND: Koepke. VOICE VOTE: 4-0. H. ADJOURN to CLOSED SESSION (7:10 PM): MOTION: To go into closed session under Wisconsin State Statute 19.85 (1) (g): Conferring with legal counsel for the governmental body who is rendering oral or written advice concerning strategy to be adopted by the body with respect to litigation in which it is or is likely to become involved. RE: Tribal Affairs; Potential Litigation MOTION: Heidel SECOND: Koepke ROLL CALL VOTE: 4-0. I. CONVENE into open session (7:50 PM): MOTION: Heidel SECOND: Koepke ROLL CALL VOTE: 4-0. J. ACTION from closed session: None 12. ADJOURN (7:51 PM): MOTION: Heidel SECOND: Dillenburg VOICE VOTE: 4-0. Respectfully submitted by Lisa A. Vanden Heuvel, Village Clerk PAGE 12 PARKS AND RECREATION COMMITTEE MINUTES – JUNE 30TH 2025 Hobart Parks & Recreation Committee Minutes - Monday June 30th 2025 ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call (5:30 PM ) – Mary Jane Hemmy (Chairpers on), Laura Lear (Vice-Chairperson), Kassie Freckman, and Cynthia Silvers were present. Jane Jerzak and Tammy Zittlow (Alternate) were absent. 2. Certification of the open meeting law agenda requirem ents and approval of the agenda – ACTION: To certify the open meeting law agenda requirements and approval of the agenda MOTION: Lear SECOND: Silvers VOTE: 4-0 3. Public Comment on Non-Agenda Items – A letter from Terry Hagemeier (573 Maple View Court) and Laurie Cooney (573 Maple View Court) thanking the Committee for their work on the Four Seasons pickle ball project was provided to each member. 4. Approval of April 24 th 2025 minutes - MOTION: Freckman SECOND: Silvers VOTE: 5-0 ACTION ITEMS 5. DISCUSSION AND ACTION – Election of Committee Chairperson and Vice-Chairperson – ACTION: To nominate Mary Jane Hemmy as Chairperson MOTI ON: Lear SECOND: Silvers VOTE: 4-0 ACTION: To nominate Laura Lear as Vice Chairperson MOTION: Hemmy SECOND: Freckman VOTE: 4-0 6. DISCUSSION AND ACTION – Improvements at Four Seasons Park - Staff has compiled a list of possible improvements for the Committee to consider , including improvements to the shelter and the installation of basketball courts. The Committee’s recommendations will go to the Village Board. Considerable discussion was held on th e proposals. ACTION: To recommend to the Village Board that the following improvements be made to t he Four Seasons shelter - new asphalt shingle roof ($25,000-$30,000 estimated cost), concrete repairs ($10,000 - $15,000), dumpster pad and enclosure ($6,500), and epoxy Floor in main room ($8,000-$10,000) – and to install a basketball court at the park adjacent to the shelter in 2026, with ground site prep work being done in 2025, with the costs of these projects divided between the Capital Projects Fund and the Park and Rec Fund. MOTION: Freckman SECOND: Silvers VOTE: 4-0 7. DISCUSSION AND ACTION - Chapter 215 (Parks and Recreation Ordinance) - Staff was looking for guidance from the Committee before recommending a formal policy/ordinance changes to the Village Board. Considerable discussion was held on th e proposed amendment, with a modifi cation to the excessive noise section reviewed and approved. ACTION: To forward the proposed ordinance to the Village Board for action. MOTION: Lear SECOND: Freckman VOTE: 4-0 8. INFORMATION – Update on Trail Developm ent on Former Railroad Track in Hobart - Staff provided an update on the trail development. No formal action was taken. PAGE 13 PARKS AND RECREATION COMMITTEE MINUTES – JUNE 30TH 2025 9. DISCUSSION AND ACTION - Item s for Future Agendas/Scheduling of Next Committee Meeting – No formal action was taken. 10. ADJOURN (7:00 PM) – MOTION: Silvers SECOND: Lear VOTE: 4-0 Submitted by Village Administrator Aaron Kramer PAGE 14 JOINT REVIEW BOARD (TID #1) AGENDA – JULY 17TH 2018 Village of Hobart Village Office 2990 S. Pine Tree Rd, Hobart, WI www.hobart-wi.org - www.buildinhobart.com MEETING MINUTES – JOINT REVIEW BOARD – TID #1 Date/Time: Tuesday July 17th 2018 - 4:00 P.M. Location: Village Office ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call. Meeting called to order by Aaron Kramer, Administrator at 4:00pm. Present were Aaron Kramer, Bob Mathews, Jill Bodwin and George Madl. Chad Weininger arrived at 4:04pm. 2. Certification of the open meeting law agenda requirements and approval of the agenda: Motion made by Jill, second by Bob to approve the agenda. The motion passed unanimously. 3. Approval of Minutes – June 5 th 2017: Motion made by Bob, second by Jill to approve the minutes. The motion passed unanimously. ACTION ITEMS: 4. UPDATE – TID No. 1: Aaron Kramer, Administrator spoke to the Board about the financial strength of the TID and the development that is ongoing and planned for the future. 5. DISCUSSION AND ACTION: – Annual TID No. 1 Report: The TID report that was submitted to the DOR was presented to the Board. Bob asked about the surplus and asked to show the health of the TID as more of an actual. Chad asked for cash flow and projections. Bob asked for re ports on Professional Services and Legal expenses. Aaron will provide the reports by email. 6. ADJOURN: Motion made by Bob, second by Jill to adjourn. The motion passed una nimously. Meeting adjourned at 4:25pm. PAGE 15 JOINT REVIEW BOARD (TID #2) AGENDA – JULY 17TH 2018 Village of Hobart Village Office 2990 S. Pine Tree Rd, Hobart, WI www.hobart-wi.org - www.buildinhobart.com MEETING MINUTES– JOINT REVIEW BOARD – TID #2 Date/Time: Tuesday July 17th 2018 - 4:30 PM, or five (5) minutes following the completion of the previous JRB meeting, whichever comes first Location: Village Office ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call. Aaron Kramer, Administrator called the meeting to order for TID #1 JRB meeting. Present were Aaron Kramer, Chad Weininger, Bob Mathews Kevin Hanson and George Madl. 2. Certification of the open meeting law agenda requirements and approval of the agenda: Motion made by Bob, second by Chad to approve the agenda as presented. The agenda was approved. 3. Approval of Minutes – June 5 th 2017. The minutes were corrected to re move Bec Kurzynske as being present for the TID 2 meeting. Motion made by Bob, second by Chad to approve the corrected minutes. ACTION ITEMS 4. UPDATE – TID No. 2: Aaron Kramer gave an update of the building that is taking place in TID 2 as well as the debt service. Mr. Kramer stated that at this time there are no bo rrowings planned for 2018. There is a projected surplus at the 2031 closeout date. New businesses being discussed for the TID are KES Excavating, and an 18-acre industrial project. 5. DISCUSSION AND ACTION – Annual TID No. 2 Report was distributed to the members and Mr. Kramer responded to the questions asked. 6. ADJOURN: Motion made by Bob, second by Chad to adjourn. The motion passed unanimously. The meeting adjourned. PAGE 16 PUBLIC WORKS AND UTILITIES ADVISORY COMMITTEE MINUTES – January 8, 2026- PAGE 1 Village of Hobart Public Works & Utilities Advisory Committee Minutes Hobart Village Office; 2990 S. Pine Tree Rd, Hobart, WI Date/Time: February 5th 2026 (5:00 P.M.) Location: Village Office, 2990 South Pine Tree Road ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call. a. The meeting was called to order by Dave Dillenburg at 5: 02pm. Roll Call: Dave Dillenburg, Dave Baranczyk, Ron Hieronimczak, James Kubalak, Vanya Koepke, Don Dahlstrom present, Kevin Gannon and Dan DeRuyter were excused. 2. Certification of the open meeting law agenda requirements and approval of the agenda. a. Motion by Don Dahlstrom, second by Dave Baranczyk, All in Favor, Motion Carried. 3. Approval of the Minutes – January 8th, 2026 a. Motion by Ron Hieronimczak, second by Dave Baranczyk. All in Favor, Motion Carried. 4. Public comments on non-agenda items. a. No public present ACTION ITEMS 5. DISCUSSION– PASER Road Ratings a. No action or discussion by committee, deferred until weather conditions and committee members review current PASER ratings. 6. DISCUSSION – Request for Proposals for Village Engineering Services a. Committee reviewed the draft for the engineering RFP b. Draft was approved with two changes in Section 7 under Contract Administration – Change “contract” to “contact” and Section 8, Contract period – correct the three-year contract period dates. c. Motion to approve draft RFP with changes noted by Don Dahlstrom, second by Ron Hieronimczak, all in favor. Motion carried. 7. UPDATE – Director and Activity Reports a. Director of Public Works and Utilities, Jerry Lancelle , updated the committee on various projects and current operations 8. DISCUSSION AND ACTION- Topics for Future Committee Meetings a. No action taken 9. ADJOURNMENT a. Motion by Ron Hieronimczak, second by Dave Baranczyk, all in favor. Motion carried. Meeting adjourned at 6:18pm. Respectfully submitted by: Jerry Lancelle, Director Public Works. PAGE 17 SITE REVIEW COMMITTEE MINUTES – FEBRUARY 18, 2026 Village of Hobart Site Review Committee Minutes Hobart Village Office; 2990 S. Pine Tree Rd, Hobart, WI Wednesday, February 18, 2026 – 5:30 pm __________________________________________________________________________________________________ MEETING MINUTES – SITE REVIEW COMMITTEE ROUTINE ITEMS TO BE ACTED UPON: 1. Call to order/Roll Call. The meeting was called to order by Dave Dillenburg at 5:30 pm. Roll call: Dave Baranczyk, Rick Nuetzel, Steve Riley, Tom Tengowski, Tammy Zittlow, Peter Zobro, and Dave Dillenburg were present. 2. Certification of the open meeting law age nda requirements and approval of the agenda. ACTION: To certify the open meeting law agenda requirements and approval of the agenda. MOTION: Nuetzel SECOND: Baranczyk MOTION APPROVED BY VOICE VOTE: 7-0. 3. Approve Minutes of December 10 th 2025. ACTION: To approve the minutes of the December 10, 2025 Site Review Meeting. MOTION: Nuetzel SECOND: Riley MOTION APPROVED BY VOICE VOTE: 7-0 4. Public Comment on Non-Agenda Items. – None. ACTION ITEMS 5. DISCUSSION AND ACTION – Consider a new 20,000-square f oot commercial building with associated site Improvements (5060 Founders Terrace, HB-523-7) (Page 3) Bayland Buildings is proposing to construct a new 20,000 square foot commercial building to be located at 5060 Founders Terrace (Parcel HB-523-7) along with the required associated site improvement including access and parking. The proposed building will be single story in height and utilized as an office with shop. ACTION: Approval of this site plan, subject to the following conditions: 1. Lock box location(s) shall be approved by the Village Fire Chief 2. Fire Department (FD) connection shall be approved by the Village Fire Chief with recommendation on the Southeast corner 3. Any and all mechanical equipment shall be screened from view with materials to match those of the principal structure or with landscaping, and all exterior exhaust/intake vents shall be colored to blend with the principal structure. 4. Developer to discuss the tree species, planting locations, and foundation planting with Village Staff and submit an updated landscape plan that includes these items to Village Staff for review and approval prior to plantings. No tall / unmaintained vegetation is permitted on property including in or adjacent to dry storm water pond. 5. A detailed lighting plan with photometrics and lighting details shall be submitted for review and approval at a later SRC meeting prior to installation. 6. Any proposed signage shall be required to be submitted for approval at a later SRC meeting prior to installation. MOTION: Tengowski SECOND: Nuetzel MOTION APPROVED BY VOICE VOTE: 7-0 6. DISCUSSION AND ACTION - Consider a new 18,265-square foot contractor shop with office and 12,000-square foot contractor shop with associated site improvements (720 W. Adam Drive., HB-139) (Page 27) DeNoble Construction, Inc. is proposing to construct two new commercial buildings with one being the main office and shop of 18 ,265 square feet and the second being a shop of 12,000 square feet located at 720 W. Adam Dr. (Parcel HB-139) along with the require d associated site improvement including access and parking. Both proposed buildings will be single story in height. ACTION: Approval of this site plan, subject to the following conditions: 1. Lock box location(s) shall be approved by the Village Fire Chief 2. Any and all mechanical equipment shall be screened from view with materials to match those of the principal structure or with landscaping, and all exterior exhaust/intake vents shall be colored to blend with the principal structure. Additional landscaping is not required for the proposed location of the air conditioner and generator. PAGE 18 SITE REVIEW COMMITTEE MINUTES – FEBRUARY 18, 2026 3. Developer shall submit a detailed landscape plan for review and approval at a later SRC meeting prior to installation. 4. Developer shall submit a detailed lighting plan with photometrics and lighting details for review and approval at a later SRC meeting prior to installation. 5. Any proposed signage shall be required to be submitted for approval at a later SRC meeting prior to installation. 6. Location and width of ingress / egress from W. Adam Dr. shall be approved by Village Director of Public Works if being altered from existing. 7. SRC approval is conditional upon Certified Survey Map being approved 8. SRC approval conditional upon developer receiving all Brown County Airport approval(s) MOTION: Zobro SECOND: Zittlow MOTION APPROVED BY VOICE VOTE: 7-0 7. ADJOURN MOTION to adjourn the meeting by Zittlow SECOND: Nuetzle MOTION APPRO VED BY VOICE VOTE: 7-0. Meeting adjourned at 6:23 pm. Respectfully submitted by Amanda Wangerin, Village Deputy Clerk PAGE 19 Change to Premise Request March 19, 2026 Change to Premise Request March 19, 2026 Hobart Village Board, Hobart D2 is requesting to change the premises of our liquor license to include the exterior of the building. Attached is a map of what will be our new Beer Garden, which will allow our patrons who smoke or vape to do so with their beverage. With the addition of our Beer Garden, we will be putting up a fence to ensure alcohol does not leave the premises. Below is a red line which shows the Beer Garden area. Please take this as our notice as of March 19th, 2026, that Hobart D2 is looking to amend our license. Hannah Schultz Hannah Schultz General Manager PAGE 20 PAGE 21 PAGE 22 PAGE 23 PAGE 24 PAGE 25 PAGE 26 PAGE 27 PAGE 28 PAGE 29 PAGE 30 From: Jerry Lancelle To: Lisa Vanden Heuvel Subject: RE: 4293 Hilton Head Dr. Date: Friday, March 27, 2026 9:54:50 AM Attachments: image001.png Todd is correct, we normally sign off after inspection. Jerry Lancelle Director of Public Works Village of Hobart 920.869.3807 Please update your contact information with my new email address: Jerry@hobartwi.gov From: Lisa Vanden Heuvel <lisa@hobartwi.gov> Sent: Friday, March 27, 2026 9:26 AM To: Jerry Lancelle <Jerry@hobartwi.gov> Subject: FW: 4293 Hilton Head Dr. This is what Todd gave me. Lisa Vanden Heuvel, WCMC Village of Hobart Clerk 2990 S Pine Tree Rd Hobart, WI 54155 Office: 920-869-3802 Cell: 920-771-3154 **Please note my email address has changed to: Lisa@HobartWI.gov https://myvote.wi.gov/en-us/ From: Todd Gerbers <todd@hobartwi.gov> Sent: Friday, March 27, 2026 9:15 AM To: Lisa Vanden Heuvel <lisa@hobartwi.gov> Subject: 4293 Hilton Head Dr. PAGE 31 Lisa, After reviewing the request for the special event wedding) at this location, I have no objection to the planned event. I just want to hold off on signing the form until we do a site inspection once everything is set up to confirm compliance with such things that include but not limited to: Electrical connections (lighting, receptacles, etc.) Clear exit paths with no tripping hazards or obstructions Proper restroom facilities In the past, the Police, Fire, and Inspection Departments did one final inspection of the setup and then we sign off on the permit request. Agan, at this point in time, the Inspection Department has no objection to the special event request as submitted. Thanks, Todd Gerbers Director of Planning and Code Compliance Village of Hobart 2990 S. Pine Tree Rd., Hobart WI 54155 Phone: 920-869-3809 Fax: 920-869-2048 PAGE 32 From: Michael Renkas To: Lisa Vanden Heuvel Subject: Special Event Permit Notes to Organizer Date: Monday, March 2, 2026 8:56:07 AM Attachments: Outlook-ert4irix.png Special Event Conditions – Wedding (Outdoor Event) – Village of Hobart The event will include amplified sound/DJ services. All outdoor music and amplified noise must comply with Village of Hobart ordinances. The approved outdoor noise period must be scheduled in advance, and all amplified sound must conclude by the established cutoff time - most likely will need a variance permit to identify hours of DJ operation - so, we don't have the DJ playing into the night, which will cause issues with neighbors. May request the contact of neighbors if extended hours are wanted to gain permission. The Hobart-Lawrence Police Department will monitor the event as needed. Street parking in the area is lawful; however, vehicles must remain legally parked and may not obstruct traffic flow, driveways, fire lanes, or emergency access routes. If parking congestion, traffic control concerns, or noise complaints arise, law enforcement intervention may be required. Should conditions necessitate additional staffing for traffic control or public safety, those costs may be billed to the event organizer in accordance with Village policy. CONFIDENTIAL: This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this email. Please notify the sender immediately by email if you have received this email by mistake and delete this email from your system. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited. PAGE 33 Wisconsin Legislative Council ACT MEMO One East Main Stre e t, Suite 401 • Madison, WI 53703 • (608) 266-1304 • le g.council@le gis.wisconsin.gov • http://www.le gis.wisconsin.gov/lc Prepared by: Anna H enning, Principal Attorney March 24, 2026 2025 Wisconsin Act 113 [2025 Assembly Bill 443] Increase in Municipal Court Fees BACKGROUND Wisconsin law requires municipal judges to collect municipal court fees. With limited exceptions, a municipal court fee must be collected on each separate matter in a municipal court action. A municipal treasurer must pay $5 of each municipal court fee received to the Secretary of Administration for deposit in the state’s general fund. The remainder may be kept for use by the municipality. Prior law required a municipal court fee to be not less than $15 nor more than $38. 2025 WISCONSIN ACT 113 2025 Wisconsin Act 113 increases the maximum amount that a municipal court may collect as a municipal court fee from $38 to $48. The act also specifies that municipal courts, rather than specifically municipal judges, are responsible for collecting municipal court fees. Effective date: March 22, 2026 For a full history of the bill, visit the Legislature’s bill history page. AH:jal PAGE 34 Da te of enactment: March 20, 2026 2025 Assembly Bill 443 Date of publication*: March 21, 2026 2025 WISCONSIN ACT 113 AN ACT to amend 814.65 (1) of the statutes; relating to: increasing the maximum fee for court costs collectible in a municipal court action. The people of the state of Wisconsin, represented in sen- ate and assembly, do enact as follows: SECTION 1. 814.65 (1) of the statutes is amended to read: 814.65 (1) COURT COSTS. In a municipal court ac- tion, except for a financial responsibility violation under s. 344.62 (2) or for a violation of an ordinance in con- formity with s. 343.51 (1m) (b) or 347.48 (2m), the mu- nicipal judge court shall collect a fee of not less than $15 nor mor e than $38 $48 on each separate matter, whether it is on default of appearance, a plea of guilty or no con- test, on issuance of a warrant or summons, or the action is tried as a contested matter. Of each fee received by the judge court under this subsection, the municipal tr easurer shall pay monthly $5 to the secretary of admin- istration for deposit in the general fund and shall retain the balance for the use of the municipality. * Section 991.11, WISCONSIN STATUTES: Effective date of acts. “Every act and every portion of an act enacted by the legislature over the gov- ernor's partial veto which does not expressly prescribe the time when it takes effect shall take effect on the day after its date of publication.” PAGE 35 Resolution 2026-05 - Page 1 of 7 RESOLUTION 2026-05 A RESOLUTION ESTABLISHING VILLAGE FEE SCHEDULES BY THE VILLAGE BOARD OF THE VILLAGE OF HOBART, WISCONSIN: WHEREAS, the Village of Hobart, Brown County, State of Wisconsin has determined that it is prudent that fees be reviewed annually for cost effectiveness; and, WHEREAS, the Village of Hobart desires not to reference specific dollar amounts within the Village Ordinances and instead, will provide an annual Resolution setting fees for passage; NOW THEREFORE BE IT RESOLVED by its passage, the Village Board of the Village of Hobart does hereby approve and incorporate herein, the following fee schedule, to be effective April 9, 2026: DESCRIPTION FEE BEVERAGE-CIGARETTE Class “A” Fermented Malt Beverage Retailer’s License $100 Class “B” Fermented Malt Beverage License $100 Temporary (Picnic) Class “B” Beer and “Class B” Wine License $10 “Class A” Intoxicating Liquor Retailer’s License $500 “Class A” Cider No fee “Class B” Intoxicating Liquor License $500 Reserve “Class B” $10,000 onetime fee plus license fee “Class C” Wine $100 Operator’s License (New or renewal) $40 Operator’s License (Replacement) $5 Temporary Operator’s License $10 Provisional License (valid for 60 days) $15 Cigarette License $100 ANIMAL REGULATORY LICENSES Dog License (spayed or neutered) $10 Dog License (not spayed or neutered) $20 Late Fee (after March 31st) $5 Replacement License $5 Chicken (no roosters) $25 Supplemental Chicken (no roosters) $75 IMPOUND FEES Daily fee $25 Fee for Vet Impound (Packerland Vet LLC) $175 ADMINISTRATIVE Records Request: Location, Redaction Actual Cost Records Request: Shipping, Mailing Actual Cost PAGE 36 Resolution 2026-05 - Page 2 of 7 Records request: USB $10 Records request: Fax per page/per side $0.50 Copies per page/per side black and white $0.50 Copies per page / per side Color $1.50 NSF Checks or payment rejections/returns $50 plus bank fees Special Assessment Letter $35 Special Assessment Letter RUSH (within 24 hours) $70 Publication Fee $25 Basic Zoning Verification Letter $30 Comprehensive Zoning Determination Letter Charged at hourly staff rate SHORT-TERM RENTALS Initial and renewal short-term rental application $200 Each additional unit added under short-term rental license $150 Reinspection $100 Property Manager License $100 ZONING & LAND USE Conditional Use Permit (CUP) $300 Conditional Use Mobile Tower Siting – Class I Collocation $3,000 Conditional Use Mobile Tower Siting – Class II Collocation $500 Conditional Use Mobile Tower Siting – New Location/Structure $3,000 Variance / Appeal $300 Zoning $300 Site Review $180 Certified Survey Map Review $300 Subdivision Plat Review $100.00 plus $25.00 per lot Certified Survey Map Zoning Review $50 Planned Development District $400 Planned Development District Modification $200 FALSE ALARM 1st in one calendar year plus $25.00 for not having a permit $30 2nd in one calendar year plus $25.00 for not having a permit $60 3rd in one calendar year plus $25.00 for not having a permit $60 4th and subsequent in one calendar year plus $25.00 for not having a permit $125 ANNUAL SECURITY ALARM Alarm Permit $20 DIRECT SELLERS Direct sellers / transient merchant permit $30 FIRE DEPARTMENT Burning Permit $15 Fire Inspections for the 3rd and subsequent re-inspections $60 WATER / SEWER Well Operation Permit by June 30th $20 Well Operation Permit by August 31st $40 Well Operation Permit by October 31st $60 Mandatory hook up – Failure to comply fee per day after 10 day written notice $5 PARK RENTAL Four Seasons Deposit - resident and non-resident $175 PAGE 37 Resolution 2026-05 - Page 3 of 7 Four Seasons Building Rent - Resident $110 Four Seasons Building Rent - Non-Resident $135 Non-Profit Building Rentals $30 SPECIAL EVENT PERMIT Security Deposit per day of the event $225 Class I permit $125 Class II permit $100 Class III permit $75 RIGHT-OF-WAY PERMIT APPLICATION Small Utility Project (less than 1000 feet of roadway) $75 Medium Utility Project (1000-3000 feet of roadway) $150 Large Utility Project (more than 3000 feet of roadway) $225 RIGHT-OF-WAY INSPECTION/WORK TO BE PERFORMED Excavations in Right of Way outside of Street $75 Boring Within Street Right of Way – servicing one property and sewer is located behind curb $75 Boring within Right-of-Way $300 Open Cut Excavation within Street Pavement Area $750 POLICE DEPARTMENT Fingerprinting $15/card MUNICIPAL COURT Municipal Court Fee (per Wisconsin Statute 814.65 (1)) $48 per each separate matter NOW THEREFORE BE IT RESOLVED by its passage, the Village Board of the Village of Hobart does hereby approve and incorporate herein, the following permit fee and deposit schedule, to be effective May 1, 2026: VILLAGE OF HOBART - PERMIT FEE & DEPOSIT SCHEDULE Areas included for fee calculation purposes inclu de all floor levels, basements, garages, and enclosed spaces under the roof, unless otherwise noted. Construction costs include labor and materials. All fees are rounded to the nearest dollar. Any required security deposit will be refunded after an occupancy permit is issued or the final inspection report is completed provided the occupancy report/final inspection report is issued within two years of the issuance of the building permit; and provided no damage has been done to Village property. Note: Even if security deposit is not required below, Permittee is responsible for any damage done to Village property. Additional deposit may be required per the discretion of the Village Board or its designated representative. All Fees to DOUBLE if permit(s) are not taken out properly prior to the commencement of work. A land use permit may be required prior to the issuance of a building permit. NOTE: No permits will be issued if there are any monies owed to the Village. Fees subject to change with or withou t notice. The Permit Fe e & Security Deposit Schedule ma y be revised at the discretion of the Hobart Village Board. New Residential Single-Family Dwelling New Residential Two-Family Dwelling $ 0.20 per square foot Inspection Fee for Finished Area (Includes All Trades) $ 0.20 per square foot Inspection Fee for Finished Area (Includes All Trades) $ 0.15 per square foot Inspection Fee for Unfinished areas including basements, garages, covered porches / patios (Includes All Trades) $ 0.15 per square foot Inspection Fee for Unfinished areas including basements, garages, covered porches / patios (Includes All Trades) $ 150.00 Administrative Fee $ 150.00 Administrative Fee $ 150.00 Plan & Zoning Review Fee $ 150.00 Plan & Zoning Review Fee $ 75.00 Erosion Control Fee $ 75.00 Erosion Control Fee $ 75.00 Storm Water / Sewer Fee $ 75.00 Storm Water / Sewer Fee PAGE 38 Resolution 2026-05 - Page 4 of 7 $ 40.00 State Seal Fee $ 40.00 State Seal Fee $ 160.00 Certificate of Survey & GIS Fee $ 160.00 Certificate of Survey & GIS Fee $ 300.00 Park Fee $ 400.00 Park Fee Additional Various Applicable Fees See “Miscellaneous Fees” Section Additional Various Applicable Fees See “Miscellaneous Fees” Section New Residential Multi-Family Dwelling New & Additions to Commercial / Industrial Structures $ 0.15 per square foot (1- 99,999 square feet) $ 0.12 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (Framing) $ 0.15 per square foot (1- 99,999 square feet) $ 0.12 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (Framing) $ 0.07 per square foot (1- 99,999 square feet) $ 0.06 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (Electrical) $ 0.07 per square foot (1- 99,999 square feet) $ 0.06 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (Electrical) $ 0.07 per square foot (1- 99,999 square feet) $ 0.06 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (HVAC) $ 0.07 per square foot (1- 99,999 square feet) $ 0.06 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (HVAC) $ 0.07 per square foot (1- 99,999 square feet) $ 0.06 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (Plumbing) $ 0.07 per square foot (1- 99,999 square feet) $ 0.06 per square foot (over 99,999 square feet) Inspection Fee for Total Square Feet (Plumbing) $ 0.04 per square foot (1- 99,999 square feet) Inspection Fee for Total Square Feet (Fire Suppression) $ 0.04 per square foot (1- 99,999 square feet) Inspection Fee for Total Square Feet (Fire Suppression) PAGE 39 Resolution 2026-05 - Page 5 of 7 $ 0.03 per square foot (over 99,999 square feet) $ 0.03 per square foot (over 99,999 square feet) $ 200.00 Administrative Fee $ 200.00 Administrative Fee $ 150.00 Plan & Zoning Review Fee $ 150.00 Plan & Zoning Review Fee $ 100.00 Plus $ 50.00 Per Acre Disturbed Erosion Control Fee $ 100.00 Plus $ 50.00 Per Acre Disturbed Erosion Control Fee $ 75.00 Storm Water / Sewer Fee $ 75.00 Storm Water / Sewer Fee $ 10.00 GIS Fee $ 10.00 GIS Fee $ 200.00 Park Fee Per Dwelling Unit Additional Various Applicable Fees See “Miscellaneous Fees” Section Additional Various Applicable Fees See “Miscellaneous Fees” Section Residential Additions / Alterations / Remodeling Commercial / Industrial Alterations / Remodeling $ 75.00 $ 4,000.00 and Less in Value $ 150.00 $ 4,000.00 and Less in Value $ 75.00 Plus $3.00 Per $1,000.00 Value Over $ 4,000.00 in Value $ 150.00 Plus $1.00 Per $1,000.00 Value Over $ 4,000.00 in Value $ 75.00 Administrative Fee $ 100.00 Administrative Fee $ 50.00 Plan & Zoning Review Fee $ 75.00 Plan & Zoning Review Fee $ 75.00 Erosion Control Fee (If Expanding Existing Building Footprint) $ 10.00 GIS Fee (If Expanding Existing Building Footprint) New Unconditioned Warehouse / Storage / Self-Storage / Similar Occupancies New & Additions Agricultural Barns / Buildings $ 0.18 per Square Foot 0 -20,000 Square Feet Inspection Fee $ 0.12 per square foot Inspection Fee $ 0.10 per Square Foot 20,001 – 100,000 Square Feet Inspection Fee $ 150.00 Administrative Fee $ 0.06 per Square Foot Over 100,001 Square Feet Inspection Fee $ 75.00 Plan & Zoning Review Fee $ 200.00 Administrative Fee $ 75.00 Erosion Control Fee $ 150.00 Plan & Zoning Review Fee $ 10.00 GIS Fee $ 100.00 Plus $ 50.00 Per Acre Disturbed Erosion Control Fee $ 75.00 Storm Water / Sewer Fee $ 10.00 GIS Fee Additional Various Applicable Fees See “Miscellaneous Fees” Section PAGE 40 Resolution 2026-05 - Page 6 of 7 New Residential Accessory / Utility Buildings Decks $ 40.00 Plus $0.12 per Square Foot Inspection Fee $ 40.00 plus $0.25 per square foot Inspection Fee $ 20.00 Administrative Fee $ 20.00 Administrative Fee $ 20.00 Plan & Zoning Review Fee $ 20.00 Plan & Zoning Review Fee $ 10.00 GIS Fee $ 10.00 GIS Fee Signs $ 40.00 Plus $ 1.00 per Square Foot Permanent Sign Inspection Fee $ 35.00 Temporary Sign Inspection Fee $ 35.00 for 30-day time period – Can be renewed for an additional 30-day period following a 48-hour shut down / removal. Any additional renewal would require Village Board approval. Fences Swimming Pools / Hot Tubs / Spas $ 50.00 Inspection Fee $ 250.00 In-Ground Pool Inspection Fee $ 20.00 Administrative Fee $ 100.00 Above-Ground Pool Inspection Fee $ 10.00 GIS Fee $ 75.00 Hot Tub / Spa / Whirlpool Inspection Fee $ 20.00 Administrative Fee $ 10.00 GIS Fee Excavation Activity Without Structure Pond / Lake Development or Removal $ 150.00 plus $ 50.00 per Acre Disturbed Inspection Fee $ 75.00 Pond Inspection Fee $ 20.00 Administrative Fee $ 100.00 Lake Inspection Fee $ 50.00 Plan & Zoning Review Fee $ 20.00 Administrative Fee $ 10.00 GIS Fee Moving / Demolition of Structure Driveway Access / Culvert $ 25.00 Residential Accessory / Utility Building Inspection Fee $ 35.00 With No New Structure Permit $ 75.00 Single or Two-Family Dwelling Inspection Fee $ 10.00 2 nd Driveway / Culvert with New Structure Permit $ 50.00 per Dwelling Unit with a Maximum of $ 350.00 Multi-Family Dwelling Inspection Fee $ 100.00 Plus $0.005 per Square Foot with Maximum of $ 350.00 Agricultural Structure Inspection Fee $ 100.00 Plus $0.005 per Square Foot with Maximum of $ 350.00 Commercial / Industrial Inspection Fee $ 30.00 Administrative Fee $ 10.00 GIS Fee PAGE 41 Resolution 2026-05 - Page 7 of 7 Plus $ 1,000.00 Security Deposit & Proof of Insurance from 3rd Party Issuer Solar Energy Wind Energy $ 75.00 per 100 Square Feet of Solar Panel Area Inspection Fee $ 50.00 per Turbine Inspection Fee $ 20.00 Administrative Fee $ 20.00 per Turbine Administrative Fee Miscellaneous Fees $ 400.00 Municipal Sanitary Sewer Connection Fee $ 75.00 Residential Electrical Service (1 & 2 Family) $ 100.00 Municipal Storm Sewer Connection Fee $ 100.00 Commercial / Industrial / Utility / Agricultural Electrical Service Varies Depending on Water Meter Size Municipal Water Connection (Water Meter) Fee $ 75.00 Electrical Generator / Transfer Switch Install Fee $ 75.00 Well Lateral Inspection Fee $ 150.00 Shoreland Zone Land Use Permit Fee $ 100.00 Utility Lateral Inspection Fee (Per Trench) $ 250.00 Floodplain Zone Land Use Permit Fee $ 50.00 HVAC / Solid Fuel Appliance (New & Replacement) $ 50.00 Re-Inspection Fee per Inspection $ 1,000.00 Security Deposit $ 100.00 Special Inspection / Report Adopted this 8th day of April, 2026. ______________________________ Richard Heidel, Village Board President Attest: _______________________________________ Aaron Kramer, Village Administrator CERTIFICATION The undersigned, being the duly appointed Clerk of the Board of the Village of Hobart, certifies that the foregoing is a true copy of resolutions passed by the Board of the Village of Hobart at a duly called meeting of the Board on April 8, 2026. _____________________________ Lisa Vanden Heuvel, Villa ge Clerk PAGE 42 Page 1 of 4 MEMORANDUM TO: Village Board FROM: Aaron Kramer, Village Administrator RE: 2025-2026 Legislative Windup and Recap DATE: April 6th 2026 BILLS SIGNED INTO LAW The following bills have recently been acted on by the Governor. Signed into Law - Arranged by Act Number SB 023 MA Eligibility Sen. James (R-Thorp) Extension of eligibility under the Medical Assistance program for postpartum women. Signed (Act 102) SB 264 Breast Cancer Screenings Sen. Cabral-Guevara (R-Fox Cros sing) Coverage of breast cancer screenings by the Medical Assistance program and health insurance policies and plans. Signed (Act 103) SB 461 DOT Projects Sen. Marklein (R-Spring Green) Alternat ive delivery of projec ts contracted by the Department of Transportation. Signed (Act 104) SB 787 Small Claims Actions Sen. Wanggaard (R-Racine) Increasing jurisdictional amounts in small claims actions. Signed (Act 105) AB 089 Theft Crimes Rep. Penterman (R-Hustisford) The ft crimes and providing a penalty. Signed ( Act 106) SB 419 Criminal Defendant Testing Sen. Feyen (R-Fond du Lac) Emergency testing of a criminal defendant for certain diseases. Signed (Act 107) AB 543 Tax Exemption Rep. Steffen (R-Howard)) The sales tax exemption for memberships sold to real estate brokers. Signed (Act 108) SB 395 Telecommunications Providers Sen. Nass (R-Whitewater) Requirement for certain telecommunications providers to provide basic voice service. Signed (Act 109) SB 825 Highway Projects Sen. Tomczyk (R-Mosinee) Environmental review prerequisites for certain major highway project actions. Signed (Act 110) AB 572 Bingo Rep. Dallman (R-Markesan) The definition of bingo. Signed (Act 111) AB 666 Unclaimed Property Rep. O'Connor (R-Fond du Lac) Fraudul ent claims for unclaimed property and providing a penalty. Signed (Act 112) PAGE 43 Page 2 of 4 AB 443 Municipal Court Rep. Kaufert (R-Neenah) Increasing the maximum fee for court costs collectible in a municipal court action. Signed (Act 113) SB 331 UTVs Sen. Marklein (R-Spring Green) Operation of all-terrain and utility terrain vehicles, off- highway motorcycles, and snowmobiles and revision of the Department of Transportation highway maintenance manual. Signed (Act 114) AB 598 Admission Consent Rep. Snyder (R-Weston) Consent to admissions to certain health care facilities by patient representatives without requiring a petition for guardianship or protective placement. Signed (Act 115) AB 180 FoodShare Rep. Moses (R-Menomonie) Requiring the Department of Health Services to seek any necessary waiver to prohibit the purchase of candy or soft drinks with FoodShare benefits. Signed (Act 116) SB 576 Tax Exemption Sen. Cabral-Guevara (R-Fox Crossing) A property tax exemption for prefabricated recreational structures. Signed (Act 117) SB 529 Obsolete Provisions Sen. Marklein (R-Spring Green) Repeal of obsolete tax credits and tax provisions. Signed (Act 118) AB 459 Notice Thresholds Rep. O'Connor (R-Fond du Lac) County public works notice and competitive bidding thresholds. Signed (Act 119) AB 737 Neighborhood Improvement Districts Rep. Armstrong (R-Rice Lake) Financing certain infrastructure by special charge approved by a neighborhood improvement district. Signed (Act 120) SB 078 Fertilizers Sen. Jacque (R-New Franken) The distribution and labeling of fertilizers and soil or plant additives produced from manure. Signed (Act 121) SB 593 Insurance Law Sen. Quinn (R-Birchwood) Various changes to insurance laws. Signed (Act 122) AB 668 Involuntary Commitments Rep. Dittrich (R-Oconomowoc) Reports on the competency of involuntarily committed individuals to refuse medi cation or treatment based upon an examination by an advanced practice registered nurse. Signed (Act 123) SB 748 Metal Bullion Sen. Cabral-Guevara (R-Fox Crossing) Sales tax exemption certificates for the sale of precious metal bullion. Signed (Act 124) SB 448 Videoconferencing Sen. James (R-Thorp) The use of vi deoconferencing technology in certain civil actions. Signed (Act 125) AB 223 Nomination Papers Rep. Piwowarczyk (R-Hubertus) Residency requirements for persons circulating nomination papers or recall petitions. Signed (Act 126) AB 924 Correction Bill (Law Revision Committee) Revising various provisions of the statutes for the purpose of making corrections and reconciling conflicts (Correction Bill). Signed (Act 127) AB 925 Correction Bill (Law Revision Committee) Revising various provisions of the statutes for the purpose of making corrections and reconciling conflicts (Correction Bill). Signed (Act 128) PAGE 44 Page 3 of 4 AB 926 Correction Bill (Law Revision Committee) Revising various provisions of the statutes for the purpose of making corrections and reconciling conflicts (Correction Bill). Signed (Act 129) AB 927 Correction Bill (Law Revision Committee) Revising various provisions of the statutes for the purpose of making corrections and reconciling conflicts (Correction Bill). Signed (Act 130) AB 928 DATCP Remedial Legislation (Law Revision Committee) Requir ed livestock premises activities (suggested as remedial legislation by the Departme nt of Agriculture, Trad e and Consumer Protection). Signed (Act 131) AB 929 Terminology Correction (Law Revision Committee) Correcting terminology for making additional contributions to the Wisconsin Retirement System; eliminating a social security account maintained in the public employee trust fund and removing a provision re garding liability for state em ployer social security remittances; and clarifying who may participate in an income continuation insurance plan provided by the Group Insurance Board (suggested as remedial legislat ion by the Department of Employee Trust Funds). Signed (Act 132) AB 930 DFI Remedial Legislation (Law Revision Committee) Correcting a cross- reference related to enforcement of regulations applicable to earned wage ac cess service providers (suggested as remedial legislation by the Department of Financial Institutions). Signed (Act 133) AB 931 HealthNet Grants (Law Revision Committee) Gants to HealthNet of Rock County, Inc.; a reference to generalized public health nursing programs; and updating terminology from “advanced practice nurse prescriber” to “advanced practice registered nurse” (suggested as remedial legislation by the Department of Health Services). Signed (Act 134) AB 932 DOJ Remedial Legislation (Law Revision Committee) Fixing a cross-reference in a definition of “violent crime” and updating terminology to reflect changes in the Federal Bureau of Investigation (suggested as remedial language by the Department of Justice). Signed (Act 135) AB 933 DPI Remedial Legislation Rep. Allen (R-Waukesha) Updating references to PI 34 of the administrative code and eliminating an obsolete grandfather provision related to a license to teach industrial arts (suggested as remedial legislation by the Department of Public Instruction). Signed (Act 136) AB 934 DOR Remedial Legislation (Law Revision Committee) Eliminating the definition of relative for purposes of the lottery; the definition of taxable propert y in a tax incremental district; the order of certain withholdings and deposits in income tax computat ions; and eliminating an adjustment made to the economic development surcharge for certain busines ses (suggested as remedial legislation by the Department of Revenue). Signed (Act 137) AB 935 DVA Remedial Legislation (Law Revision Committee) Repealing expired programs within the Department of Veterans Affairs; definition, terminology, and grammatical changes for the Department of Veterans Affairs, mental health services for post-traumatic stress disorder; reporting on rules proposed by the Department of Veterans Affair s; asset calculation for determining eligibility for vete rans assi stance payments; and deceased veterans’ graves (suggested as remedial legislation by the Department of Veterans Affairs). Signed (Act 138) AB 936 DWD Remedial Legislation (Law Revision Committee) Definition of personal assistance services for the purposes of vocational rehabilitation; updating reference to federal vocational rehabilitation law; updating references to the federal Workforce Innovation and Opportunity Act of 2014; updating reference to federal law for certificate of registration as a mi grant labor contractor; updati ng statutory reference to PAGE 45 Page 4 of 4 federal Social Security Act; and updating references to federal law for safety standards for vehicles used to transport traveling sales crews (suggested as rem edial legislation by the Department of Workforce Development). Signed (Act 139) AB 938 Courts Remedial Legislation (Law Revision Committee) An optional final hearing by affidavit for the dissolution of a marriage (suggested as remedial legislation by the Office of the Director of State Courts). Signed (Act 140) AB 939 SPD Remedial Legislation (Law Revision Committee) Eliminating obsolete provisions regarding the term of a state public defender and the removal of the state public defender (suggested as remedial language by the State Public Defender). Signed (Act 141) AB 940 WEDC Remedial Legislation (Law Revision Committee) Eliminating defunct references to certain economic development positions (suggested as remedial language by the Wisconsin Economic Development Corporation). Signed (Act 142) AB 446 Antisemitism Definition Rep. Tusler (R-Harrison) Consi deration of a certain definition of antisemitism for purposes of laws, ordinances, polic ies, or criminal penalty enhancers concerning discrimination based on race, religion, color, or national origin. Signed (Act 143) BILLS VETOED 31 bills have been vetoed in the past two weeks. A full listing is attached to this memo. PAGE 46 /i255 /i255 /1/2/3/4 /i255/1/6/7 /4 /8 /9/7 /10 /11 /i255 /12 /10 /7 /13 /14 /15 /7 /4 /8 /11 /i255 /16 /9 /7 /i255/17/9/7 /7 /18 /7 /10 /i255 /19 /7 /20 /21 /10 /8 /i255 /i255 /19 /22 /23 /22 /24 /16 /i255 /22 /25 /22/23 /26 /16 /27 /28 /22 /i255 /29 /23 /16 /27/30/24/31 /i255 /32 /33 /i255 /16 /34 /22 /i255/1/30/28/22 /19 /24/30/19/i255 /i255 /35 /36 /37 /38 /36 /39 /i255 /i255 /41 /42 /i255 /43 /44 /45/i255 /12 /7 /4 /46 /18 /8 /3 /i255 /22 /4 /9 /46 /4 /47 /7 /10 /i255 /48 /49 /50 /51 /i255/52/53/54 /49 /54 /i255 /55 /48 /56/52/49/57 /53/58/53/57 /59 /49 /60 /i255 /61 /49 /57 /62 /63 /64 /65 /i255 /49 /57 /66 /62 /57 /67 /49 /68 /i255 /69 /53 /68 /i255 /67 /68 /59/58/49/54 /i255 /67 /53/58/58/59/64 /64 /49 /70 /i255 /71 /65 /i255 /62 /i255 /50 /49 /68 /54 /53 /57/i255 /62 /67 /64 /59 /57 /72 /i255 /62 /54 /i255 /62 /57 /i255 /62 /72 /49 /57 /64 /i255 /53 /69 /i255 /62 /i255 /69 /53 /68 /49/59 /72 /57 /i255 /72 /53 /73 /49 /68 /57/58/49/57 /64 /i255 /53 /68 /i255 /64 /49 /68 /68 /53 /68 /59 /54 /64 /i255 /53 /68 /72 /62 /57 /59 /74 /62 /64 /59 /53 /57 /i255 /75 /59 /64 /66 /i255 /64 /66 /49 /i255 /59 /57 /64 /49 /57 /64 /i255 /64 /53 /i255 /54 /59 /63 /49 /57 /67 /49 /i255 /53 /68 /i255 /50 /76 /57 /59 /54 /66 /i255 /50 /49 /68 /54 /53 /57 /54 /i255 /69 /53 /68 /i255 /64 /66 /49 /59 /68 /i255 /50 /53/63 /59 /64 /59 /67 /62 /63 /i255 /73 /59 /49/75/77/i255 /67 /68 /59/58/59/57 /62 /63 /59 /74 /59 /57 /72 /i255 /64 /66/49 /i255 /49 /57 /69 /53 /68 /67 /49/58/49/57 /64 /i255 /53 /69 /i255 /69 /53 /68 /49 /59 /72 /57 /i255 /63 /62 /75 /54 /i255 /75 /59 /64 /66 /53 /76 /64 /i255 /69 /49 /70 /49 /68 /62 /63 /i255 /53 /68 /i255 /54 /64 /62 /64 /49 /i255 /62 /50 /50 /68 /53 /73 /62 /63 /77 /i255 /62 /57 /70 /i255 /50 /68 /53 /73 /59 /70 /59 /57 /72 /i255 /62 /i255 /50 /49 /57 /62 /63 /64 /65 /51 /i255 /78 /49 /64 /53/49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /41 /42 /i255 /81 /82 /83/i255/1/21/84 /7 /10/4/85/7/4 /8 /i255 /86 /7 /84 /14 /47 /7 /13 /i255 /48 /49 /50 /51 /i255 /87 /57 /53 /70 /63 /i255 /55 /48 /56/88/49/68/58/62/57 /64 /53 /75 /57 /60 /i255 /89 /54 /49 /i255 /68 /49 /54 /64 /68 /59 /67 /64 /59 /53 /57 /54 /i255 /53 /57 /i255 /54 /64 /62 /64 /49 /i255 /62 /57 /70 /i255 /63 /53 /67 /62 /63 /i255 /72 /53 /73 /49 /68 /57/58/49/57 /64 /i255 /49/63 /49 /67 /64 /68 /53 /57 /59 /67 /i255 /70 /49 /73 /59 /67 /49 /54 /51 /i255 /78 /49 /64 /53 /49/70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /43 /83 /45/i255 /34 /14 /91 /9 /7 /10/i255 /22 /15 /i255 /12 /10 /21 /91 /10 /46/85/13/i255 /90 /49 /57 /51 /i255/92/59/58/71/49 /68 /72 /49 /68 /i255 /55 /48 /56/88/59/63 /63 /49 /64 /64 /60 /i255 /48 /62 /67 /49 /56 /71 /62 /54 /49 /70 /i255 /66 /59 /72 /66 /49 /68 /i255 /49 /70 /76 /67 /62 /64 /59 /53 /57 /i255 /50 /68 /53 /72 /68 /62/58/54/i255 /62 /57 /70 /i255 /68 /49 /93 /76 /59 /68/49/58/49/57 /64 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /83 /94 /45/i255 /26/17/i255/95 /7/7 /13 /i255 /90 /49 /57 /51 /i255 /96 /76 /64 /64 /53 /57 /i255 /55 /48 /56 /42 /68 /53 /53 /80 /69 /59 /49 /63 /70 /60 /i255 /97 /53 /76 /68 /54 /49 /i255 /69 /49 /49 /54 /i255 /62 /64 /i255 /89 /57 /59 /73 /49 /68 /54 /59 /64 /65 /i255 /53 /69 /i255/92/59/54 /67 /53 /57 /54 /59 /57 /i255 /90 /65 /54 /64 /49/58/i255/59 /57 /54 /64 /59 /64 /76 /64 /59 /53 /57 /54 /51 /i255 /78 /49 /64/53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /81 /98 /99/i255 /26/17/i255/95 /10/7 /7 /i255 /31 /20 /7 /7 /47 /9 /i255 /90 /49 /57 /51 /i255 /97 /62 /71 /68 /62 /63 /56/88/76/49 /73 /62 /68 /62 /i255 /55 /48 /56 /100 /53 /101 /i255 /97 /68 /53 /54 /54 /59 /57 /72 /60 /i255 /100 /68 /49 /49 /i255 /54 /50 /49 /49 /67 /66 /i255 /62 /57 /70 /i255 /62 /67 /62 /70 /49/58/59/67 /i255 /69 /68 /49 /49 /70 /53/58/i255/62 /64 /i255 /89 /57/59 /73 /49 /68 /54 /59 /64 /65 /i255 /53 /69 /i255 /92/59/54 /67 /53 /57 /54 /59 /57 /i255 /90 /65 /54/64 /49/58/i255/59 /57 /54 /64 /59 /64 /76 /64 /59 /53 /57 /54 /i255 /62 /57 /70 /i255 /64 /49 /67 /66 /57 /59 /67 /62 /63 /i255 /67 /53 /63 /63 /49 /72 /49 /54 /77 /i255 /70 /76 /49 /i255 /50 /68 /53 /67 /49 /54 /54 /i255 /59 /57 /i255 /70 /59 /54 /67 /59 /50 /63 /59 /57 /62 /68 /65 /i255 /50 /68 /53 /67 /49 /49 /70 /59 /57 /72 /54 /i255 /62 /64 /i255 /89 /57 /59 /73 /49 /68 /54 /59 /64 /65 /i255 /53/69 /i255/92/59/54 /67 /53 /57 /54 /59 /57 /i255 /90 /65 /54 /64 /49/58/i255/59 /57 /54 /64 /59 /64 /76 /64/59 /53 /57 /54 /i255 /62 /57 /70 /i255 /64 /49 /67 /66 /57 /59 /67 /62 /63 /i255 /67 /53 /63 /63 /49 /72 /49 /54 /77 /i255 /62 /57 /70 /i255 /67 /62 /76 /54 /49 /54 /i255 /53 /69 /i255 /62 /67 /64 /59 /53 /57 /i255 /62 /72 /62 /59 /57 /54 /64 /i255 /64 /66 /49 /i255 /42 /53 /62 /68 /70 /i255 /53 /69 /i255 /48 /49 /72 /49 /57 /64 /54 /i255 /53 /69 /i255 /64 /66 /49 /i255 /89 /57 /59 /73 /49 /68 /54/59 /64 /65 /i255 /53 /69 /i255 /92/59/54 /67 /53 /57 /54 /59 /57 /i255 /90 /65 /54/64 /49/58/i255/62 /57 /70 /i255 /64 /49 /67 /66 /57 /59 /67 /62 /63 /i255 /67 /53 /63 /63 /49 /72 /49 /i255 /70 /59 /54 /64 /68 /59 /67 /64 /i255 /71 /53 /62 /68 /70 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /81 /45 /102/i255/30/10/15 /14 /4 /46/4 /47 /7 /i255 /12 /10 /21 /9 /14 /103 /14 /8 /14 /21 /4 /i255 /90 /49 /57 /51 /i255 /104 /62 /54 /54 /i255 /55 /48 /56/92/66/59 /64 /49 /75 /62 /64 /49 /68 /60 /i255 /61 /68 /53 /66 /59 /71 /59 /64 /59 /57 /72 /i255 /68 /59 /72 /66 /64 /54 /i255 /53 /69 /i255 /57 /62 /64 /76 /68 /49 /i255 /53 /68 /70 /59 /57 /62 /57 /67 /49 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79/59 /57 /80/60 /i255 /i255 /90 /42 /i255 /81 /82 /44/i255 /105 /21 /4 /91 /106 /16/7 /10/85/i255/23 /46 /10 /7 /i255 /28 /14 /13 /14 /8 /13 /i255 /90 /49 /57 /51 /i255 /107 /62 /67 /93 /76 /49 /i255 /55 /48 /56 /104 /49 /75 /i255 /100 /68 /62 /57 /80 /49 /57 /60 /i255 /78 /59 /54 /59 /64 /62 /64 /59 /53 /57 /i255 /53 /69 /i255 /62 /i255 /63 /53 /57 /72 /56 /64 /49 /68/58/i255/67 /62 /68 /49 /i255 /69 /62 /67 /59 /63 /59 /64 /65 /i255 /68 /49 /54 /59 /70 /49 /57 /64/i255 /53 /68 /i255 /66 /53 /54 /50 /59 /64 /62 /63 /i255 /50 /62 /64 /59 /49 /57 /64 /i255 /70 /76 /68 /59 /57 /72 /i255 /62/i255 /67 /53/58/58/76/57 /59 /67 /62 /71 /63 /49 /i255 /70 /59 /54 /49 /62 /54 /49 /i255 /53 /76 /64 /71 /68 /49 /62 /80 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /94 /82 /83/i255/108/21/10 /8 /91 /46/91 /7 /i255 /32 /10 /21 /109 /7 /10 /13 /i255 /90 /49 /57 /51 /i255 /90 /64 /62 /69 /54 /66 /53 /63 /64 /i255 /55 /48 /56 /104 /49 /75 /i255 /48 /59 /67 /66/58/53/57 /70 /60 /i255 /110 /66 /49 /i255/58/59/57 /59/58/76/58/i255/57 /49 /64 /i255 /75 /53 /68 /64 /66 /i255 /68 /49 /93 /76 /59 /68 /49/58/49/57 /64 /i255 /69 /53 /68 /i255 /63 /59 /67 /49 /57 /54/49 /70 /i255/58/53/68 /64 /72 /62 /72 /49 /i255 /71 /68 /53 /80 /49 /68 /54 /51 /i255 /78 /49 /64 /53 /49/70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /45 /99 /98/i255 /29 /15/85/14/4/i255 /19 /6 /18 /7 /13 /i255 /90 /49 /57 /51 /i255 /42 /68 /62 /70 /63 /49 /65 /i255 /55 /48 /56 /104 /49 /75 /i255 /42 /49 /68 /63 /59 /57 /60 /i255 /48 /49 /93 /76 /59 /68 /49/58/49/57 /64 /54 /i255 /69 /53 /68 /i255 /50 /68 /53 /50 /53 /54 /49 /70 /i255 /62 /70/58/59/57 /59 /54 /64 /68 /62 /64 /59 /73 /49 /i255 /68 /76 /63 /49 /54 /i255 /64 /66 /62 /64 /i255 /59/58/50/53/54 /49 /i255 /62 /57 /65 /i255 /67 /53 /54 /64 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /45 /44 /44/i255 /29 /15/85/14/4/i255 /19 /6 /18 /7 /13 /i255 /90 /49 /57 /51 /i255 /104 /62 /54 /54 /i255 /55 /48 /56/92/66/59 /64 /49 /75 /62 /64 /49 /68 /60 /i255 /110 /66 /49 /i255 /49 /101 /50 /59 /68 /62 /64 /59 /53 /57 /i255 /53 /69 /i255 /62 /70/58/59/57 /59 /54 /64 /68 /62 /64 /59 /73 /49 /i255 /68 /76 /63 /49 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /45 /44 /43/i255 /29 /15/85/14/4/i255 /19 /6 /18 /7 /13 /i255 /90 /49 /57 /51 /i255/92/59/58/71/49 /68 /72 /49 /68 /i255 /55 /48 /56/88/59/63 /63 /49 /64 /64 /60 /i255 /97 /66 /62 /63 /63 /49 /57 /72 /49 /54 /i255 /64 /53 /i255 /64 /66 /49 /i255 /73 /62 /63 /59 /70 /59 /64 /65 /i255 /53 /69 /i255 /62 /70/58/59/57 /59 /54 /64 /68 /62 /64 /59 /73 /49 /i255 /68 /76 /63 /49 /54 /i255 /62 /57 /70 /i255/58/62/80 /59 /57/72 /i255 /62 /57 /i255 /62 /50 /50 /68 /53 /50 /68 /59 /62 /64 /59 /53 /57 /51 /i255/78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /45 /44 /83/i255 /29 /15/85/14/4/i255 /19 /6 /18 /7 /13 /i255 /90 /49 /57 /51 /i255 /96 /76 /64 /64 /53 /57 /i255 /55 /48 /56 /42 /68 /53 /53 /80 /69 /59 /49 /63 /70 /60 /i255 /90 /64 /62 /64 /49/58/49/57 /64 /54 /i255 /53 /69 /i255 /54 /67 /53 /50 /49 /i255 /69 /53 /68 /i255 /62 /70/58/59/57 /59 /54 /64 /68 /62 /64 /59 /73 /49 /i255 /68 /76 /63 /49 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60/i255 /i255 /90 /42 /i255 /45 /82 /81/i255 /16 /7 /18 /7 /9 /7/46 /18 /8 /9 /i255 /31 /7 /10 /84 /14 /47 /7 /13 /i255 /90 /49 /57 /51 /i255 /90 /64 /62 /69 /54 /66 /53 /63 /64 /i255 /55 /48 /56 /104 /49 /75 /i255 /48 /59 /67 /66/58/53/57 /70 /60 /i255 /48 /49 /72 /59 /54 /64 /68 /62 /64 /59 /53 /57 /i255 /53 /69 /i255 /53 /76 /64 /56 /53 /69 /56 /54 /64 /62 /64 /49 /i255 /66 /49 /62 /63 /64 /66 /i255 /67 /62 /68 /49 /i255 /50 /68 /53 /73/59 /70 /49 /68 /54 /i255 /64 /53 /i255 /50 /68 /53 /73 /59 /70 /49 /i255 /64 /49 /63 /49 /66 /49 /62/63 /64 /66 /i255 /54 /49 /68 /73 /59 /67 /49 /54 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /82 /81 /43/i255 /24 /46/85/7/i255/23 /9 /46 /4 /91 /7 /13 /i255 /90 /49 /57 /51 /i255/92/62/57 /72 /72 /62 /62 /68 /70 /i255 /55 /48 /56 /48 /62 /67 /59 /57 /49 /60 /i255 /61 /68 /53 /66 /59 /71 /59 /64 /59 /57 /72 /i255 /50 /49 /68 /54 /53 /57 /54 /i255 /75 /66 /53 /i255 /66 /62 /73 /49 /i255 /71 /49 /49 /57 /i255 /67 /53 /57 /73 /59 /67 /64 /49 /70 /i255 /53 /69 /i255 /62 /i255 /73 /59 /53 /63/49 /57 /64 /i255 /67 /68 /59/58/49/i255 /69 /68 /53/58/i255/67 /66 /62 /57 /72 /59 /57 /72 /i255/64 /66 /49 /59 /68 /i255 /57 /62/58/49/i255 /62 /57 /70 /i255 /50 /68 /53 /73 /59 /70 /59 /57 /72 /i255 /62 /i255 /50 /49 /57 /62 /63 /64 /65 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /90 /42 /i255 /102 /102 /44/i255 /105 /46 /4 /15 /i255 /29/47 /111 /6 /14 /13 /14 /8 /14 /21 /4 /i255 /90 /49 /57 /51 /i255 /107 /62 /67 /93 /76 /49 /i255 /55 /48 /56 /104 /49 /75 /i255 /100 /68 /62 /57 /80 /49 /57 /60 /i255 /61 /68 /53 /66 /59 /71 /59 /64 /59 /57 /72 /i255 /62 /i255 /69 /53 /68 /49 /59 /72 /57 /i255 /62 /70 /73 /49 /68 /54 /62 /68 /65 /i255 /69 /68 /53/58/i255/62 /67 /93 /76 /59 /68 /59 /57 /72 /i255 /62 /72 /68 /59/67 /76 /63 /64 /76 /68 /62 /63 /i255 /53 /68 /i255 /69 /53 /68 /49 /54 /64 /68 /65 /i255 /63 /62 /57 /70 /i255 /59 /57/i255 /64 /66 /59 /54 /i255 /54 /64 /62 /64 /49 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 /41 /42 /i255 /43 /44 /81/i255/30/10/91 /46 /4 /i255 /16 /10 /46 /4 /13 /20 /18 /46 /4 /8 /13 /i255 /48 /49 /50 /51 /i255/52/53/54 /49 /54 /i255 /55 /48 /56/52/49/57 /53/58/53/57 /59 /49 /60 /i255 /61 /68 /53 /66 /59 /71 /59 /64 /59 /57 /72 /i255 /67 /53 /73 /49 /68 /62 /72 /49 /i255 /53 /69 /i255 /53 /68 /72 /62 /57 /i255 /64 /68 /62 /57 /54 /50 /63 /62 /57 /64 /62 /64 /59 /53 /57 /i255 /62 /57 /70 /i255 /68 /49 /63 /62 /64 /49 /70 /i255 /67 /62 /68 /49 /i255 /76 /57 /70 /49 /68 /i255 /66 /49 /62 /63 /64 /66 /i255 /59 /57 /54 /76 /68 /62 /57 /67 /49 /i255 /50 /53 /63 /59 /67 /59 /49 /54 /i255 /62 /57 /70 /i255 /64 /66 /49 /i255/52/49/70 /59 /67 /62 /63 /i255 /41 /54 /54 /59 /54 /64 /62 /57 /67 /49 /i255 /50 /68 /53 /72 /68 /62/58/i255/59 /69 /i255 /64 /66 /49 /i255 /53 /68 /72 /62 /57 /i255 /59 /54 /i255 /64 /68 /62 /57 /54 /50 /63 /62 /57 /64 /49 /70 /i255 /59 /57 /i255 /53 /68 /i255 /53 /68 /59 /72 /59 /57 /62 /64 /49 /54 /i255 /69 /68 /53/58/i255/62 /i255 /67 /53 /76 /57 /64 /68 /65 /i255 /80 /57 /53 /75 /57 /i255 /64 /53 /i255 /66 /62 /73 /49 /i255 /50 /62 /68 /64 /59 /67 /59 /50 /62 /64 /49 /70 /i255 /59 /57 /i255 /69 /53 /68 /67 /49 /70 /i255 /53 /68 /72 /62 /57 /i255 /66 /62 /68 /73 /49 /54 /64 /59 /57 /72 /51 /i255 /78 /49 /64 /53 /49 /70 /i255 /55/79 /59 /57 /80/60 /i255 /i255 PAGE 47 /0 /1 /i255 /3 /4 /5/i255/6/7/8 /7 /9 /10 /11 /i255 /13 /14 /15 /9/16/17/18 /7 /i255 /19 /20 /21 /22 /i255/23/24/25 /20 /25 /i255 /26 /19 /27/23/20/28 /24/29/24/28 /30 /20 /31 /i255 /1 /32 /28 /28 /30 /28 /33 /i255 /34 /35 /20 /i255 /36 /25 /20 /i255 /24 /37 /i255 /33 /20 /28 /20 /34 /30 /38 /i255 /25 /24 /37 /34 /39 /32 /40 /20 /i255 /37 /40 /24/29/i255/37 /24 /40 /20 /30 /33 /28 /i255 /32 /41 /42 /20 /40 /25 /32 /40 /30 /20 /25 /i255 /30 /28 /i255 /29/20/41 /30 /38 /32 /43 /i255 /32 /28 /41 /i255 /40 /20 /25 /20 /32 /40 /38 /35 /i255 /37 /32 /38 /30 /43 /30 /34 /30 /20 /25 /44 /i255 /34 /35 /20 /i255 /25 /34 /24 /40 /32 /33 /20 /i255 /24 /37 /i255 /32 /28 /45 /i255 /35 /36/29/32/28 /i255 /33 /20 /28 /24/29/20/i255 /25 /20 /46 /36 /20 /28 /38 /30 /28 /33 /i255 /41 /32 /34 /32 /i255 /39 /30 /34 /35 /30 /28 /i255 /34 /35 /20 /i255 /47 /24 /40 /41 /20 /40 /25 /i255 /24 /37 /i255 /32 /i255 /37 /24 /40 /20 /30 /33 /28 /i255 /32 /41 /42 /20 /40 /25 /32 /40 /45 /44 /i255 /32 /28 /41 /i255 /21 /40 /24 /42 /30 /41 /30 /28 /33 /i255 /32 /i255 /21 /20 /28 /32 /43 /34 /45 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /3 /3 /5/i255 /51/52/i255/13 /53 /54 /9 /7/55/i255/19 /20 /21 /22 /i255 /56 /32 /43 /43/29/32/28 /i255 /26 /19 /27/23/32/40 /50 /20 /25 /32 /28 /31 /i255 /57/29/21/24 /25 /30 /28 /33 /i255 /38 /20 /40 /34 /32 /30 /28 /i255 /21 /40 /24 /35 /30 /47 /30 /34 /30 /24 /28 /25 /i255 /24 /28 /i255 /37 /24 /40 /20 /30 /33 /28 /i255 /30 /28 /37 /43 /36 /20 /28 /38 /20 /i255 /32 /34 /i255 /58 /28 /30 /42 /20 /40 /25 /30 /34 /45 /i255 /24 /37 /i255 /59/30/25 /38 /24 /28 /25 /30 /28 /i255 /60 /45 /25/34 /20/29/i255/30 /28 /25 /34 /30 /34 /36 /34 /30 /24 /28 /25 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /3 /61 /62/i255 /63 /7 /17 /11 /64/7 /18 /i255 /65 /66 /9 /64 /14 /18 /10 /9 /53 /i255 /19 /20 /21 /22 /i255/67/24/20 /47 /20 /28 /i255 /26 /19 /27 /68 /24 /47 /32 /40 /34 /69 /i255 /71 /i255 /72 /73 /74 /75 /76 /73 /77 /78 /79 /i255 /74 /80 /72 /76 /81 /77 /82 /72 /83 /i255 /72 /81 /i255/84/74/85 /74 /86 /73 /i255 /72 /76 /73 /i255 /72 /73 /74 /75 /76 /73 /77 /78 /79 /i255 /75 /87 /74 /79 /79 /88 /i255 /89 /74/77 /73 /85 /72 /74 /87 /i255 /85 /81 /72 /82 /90 /82 /75 /74 /72 /82 /81 /85 /i255 /81 /90 /i255 /91/82 /79 /77 /80 /89 /72 /82 /92 /73 /i255 /81 /77 /i255 /92 /82 /81 /87 /73 /85 /72 /i255 /93 /73 /76 /74 /92 /82 /81 /77 /i255 /74 /72 /i255 /79 /75 /76 /81 /81 /87 /88 /i255 /74 /85 /91 /i255 /74 /i255 /79 /75 /76 /81 /81 /87 /i255 /91 /82 /79 /72 /77 /82 /75 /72 /78 /79 /i255 /75 /81 /91 /73 /i255 /81 /90 /i255 /75 /81 /85 /91 /80 /75 /72 /94 /i255 /95 /73 /72 /81 /73 /91 /i255 /96/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /97 /97 /62/i255 /98 /14 /14 /99 /i255 /100/17 /101 /7 /102 /10 /8 /103 /i255 /19 /20 /21 /22 /i255/23/24/25 /20 /25 /i255 /26 /19 /27/23/20/28 /24/29/24/28 /30 /20 /31 /i255 /104 /35 /20 /i255 /25 /32 /43 /20 /44 /i255 /25 /20 /40 /42 /30 /38 /20 /44 /i255 /32 /28 /41 /i255 /43 /32 /47 /20 /43 /30 /28 /33 /i255 /24 /37 /i255 /37 /24 /24 /41 /i255 /21 /40 /24 /41 /36 /38 /34 /25 /i255 /38 /24 /28 /34 /32 /30 /28/30 /28 /33 /i255 /43 /32 /47 /27 /33 /40 /24 /39 /28 /i255 /32 /28 /30/29/32/43 /i255 /38 /20 /43 /43 /25 /i255 /32 /28/41 /i255 /21 /40 /24 /42 /30 /41 /30 /28 /33 /i255 /32 /i255 /21 /20 /28 /32 /43 /34 /45 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /97 /62 /105/i255/106/17/8 /66 /15/17 /11 /9 /66 /18 /7 /99 /i255 /107 /14/55/7/54 /i255 /19 /20 /21 /22 /i255 /1 /20 /35 /28 /50 /20 /i255 /26 /19 /27 /104 /24 /39 /28 /i255 /24 /37 /i255 /108 /35 /32 /25 /20 /31 /i255/23/32/28 /36 /37 /32 /38 /34 /36 /40 /20 /41 /i255 /35 /24/29/20/i255 /25 /32 /43 /20 /25 /i255 /32 /28 /41 /i255 /38 /20 /40 /34 /30 /37 /30 /38 /32 /34 /20 /25 /i255 /24/37 /i255 /34 /30 /34 /43 /20 /i255 /32 /28 /41 /i255 /29/24/41 /30 /37 /45 /30 /28 /33 /i255 /32 /41 /29/30 /28 /30 /25 /34 /40 /32 /34 /30 /42 /20 /i255 /40 /36 /43 /20 /25 /i255 /24 /37 /i255 /34 /35 /20 /i255 /56 /20 /21 /32 /40 /34/29/20/28 /34 /i255 /24 /37 /i255 /60 /32 /37 /20 /34 /45 /i255 /32 /28 /41 /i255 /109 /40 /24 /37 /20 /25 /25 /30 /24 /28 /32 /43 /i255 /60 /20 /40 /42 /30 /38 /20 /25 /i255 /40 /20 /43 /32 /34 /20 /41 /i255 /34 /24 /i255/29/32/28 /36 /37 /32 /38 /34 /36 /40 /20/41 /i255 /35 /24/29/20/i255 /21 /36 /40 /38 /35 /32 /25 /20 /i255 /38 /24 /28 /34 /40/32 /38 /34 /25 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /97 /61 /110/i255 /13 /66 /101 /54 /9 /10/9 /66 /9 /7 /i255 /63 /7 /17 /11 /64 /10 /8 /103 /i255 /19 /20 /21 /22 /i255 /109 /20 /28 /34 /20 /40/29/32/28 /i255 /26 /19 /27 /68 /36 /25 /34 /30 /25 /37 /24 /40 /41 /31 /i255 /0 /43 /43 /24 /39 /30 /28 /33 /i255 /30 /28 /41 /30 /42 /30 /41 /36 /32 /43 /25 /i255 /39 /35 /24 /i255 /35 /24 /43 /41 /i255 /32 /i255 /25 /36 /47 /25 /34 /30 /34 /36 /34 /20 /i255 /34 /20 /32 /38/35 /30 /28 /33 /i255 /21 /20 /40/29/30/34 /i255 /34 /24 /i255 /25 /36 /47 /25 /34 /30 /34 /36 /34 /20 /i255 /34 /20/32 /38 /35 /i255 /32 /34 /i255 /21 /40 /30 /42 /32 /34 /20 /i255 /25 /38 /35 /24 /24 /43 /25 /i255 /21 /32 /40 /34 /30 /38 /30 /21 /32 /34 /30 /28 /33 /i255 /30 /28 /i255 /32 /i255 /21 /32 /40 /20 /28 /34 /32 /43 /i255 /38 /35 /24 /30 /38 /20 /i255 /21 /40 /24 /33 /40 /32/29/22/i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /62 /97 /4/i255 /111 /7 /112 /7 /8/66 /7 /i255 /100 /10/55/10/9 /54 /i255 /19 /20 /21 /22 /i255 /113 /20 /41 /39 /20 /25 /50 /30 /i255 /26 /19 /27 /109 /43 /20 /32 /25 /32 /28 /34 /i255 /109 /40 /32 /30 /40 /30 /20 /31 /i255 /104 /35 /20 /i255 /38 /24 /28 /41 /30 /34 /30 /24 /28 /25 /i255 /36 /28 /41 /20 /40 /i255 /39 /35 /30 /38 /35 /i255 /32 /i255 /25 /38 /35 /24 /24 /43 /i255 /41 /30 /25 /34 /40 /30 /38 /34 /i255 /29/32 /45 /i255 /32 /41 /24 /21 /34 /i255 /32 /i255 /40 /20 /25 /24 /43 /36 /34 /30 /24 /28 /i255 /34 /24 /i255 /20 /114/38 /20 /20 /41 /i255 /30 /34 /25 /i255 /40 /20 /42 /20 /28 /36 /20 /i255 /43 /30/29/30/34 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /5 /110 /97/i255 /115 /17/55/116/17/10 /103 /8 /i255 /115 /14 /8 /9 /18 /10 /101 /66 /9 /10 /14 /8 /54 /i255 /19 /20 /21 /22 /i255/23/36/40 /21 /35 /45 /i255 /26 /19 /27 /68 /24 /40 /34 /24 /28 /42 /30 /43 /43 /20 /31 /i255/117/28/43 /30 /28 /20 /i255 /38 /40 /20 /41 /30 /34 /i255 /38 /32 /40 /41 /i255 /38 /24 /28 /34 /40 /30 /47 /36 /34 /30 /24 /28 /25 /i255 /32 /28 /41 /i255 /21 /40 /24 /42 /30 /41 /30 /28/33 /i255 /32 /i255 /21 /20 /28 /32 /43 /34 /45 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /118 /118 /97/i255 /119 /7 /8 /66 /7/i255 /120 /7 /9 /7 /18/55/10/8 /17 /9 /10 /14 /8 /i255 /19 /20 /21 /22 /i255 /56 /36 /38 /35 /24 /39 /i255 /26 /19 /27 /104 /24 /39 /28 /i255 /24 /37 /i255 /56 /20 /43 /32 /37 /30 /20 /43 /41 /31 /i255 /56 /20 /34 /20 /40/29/30/28 /32 /34 /30 /24 /28 /i255 /24 /37 /i255 /39 /35 /20 /40 /20 /i255 /32 /i255 /41 /20 /37 /20 /28 /41 /32 /28 /34 /i255 /40 /20 /25 /30 /41/20 /25 /i255 /24 /40 /i255 /41 /24 /20 /25 /i255 /25 /36 /47 /25 /34 /32 /28 /34 /30 /32 /43 /i255 /47 /36 /25/30 /28 /20 /25 /25 /i255 /37 /24 /40 /i255 /21 /36 /40 /21 /24 /25 /20 /25 /i255 /24 /37 /i255 /42 /20 /28 /36 /20 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /0 /1 /i255 /118 /121 /118/i255/52/10/54 /11 /14/8 /54 /10 /8 /i255 /115 /14 /8 /54 /66/55/7/18 /i255 /65 /11 /9 /i255 /19 /20 /21 /22 /i255 /122 /40 /36 /33 /i255 /26 /19 /27 /104 /24 /39 /28 /i255 /24 /37 /i255 /19 /24/29/20/31 /i255 /48 /24 /30 /41 /32 /47 /43 /20 /i255 /21 /40 /24 /42 /30 /25 /30 /24 /28 /25 /i255 /30 /28 /i255 /40 /20 /25 /30 /41 /20 /28 /34 /30 /32 /43 /i255 /40 /20 /28 /34 /32 /43 /i255 /32 /33/40 /20 /20/29/20/28 /34 /25 /i255 /32 /28 /41 /i255 /34 /35 /20 /i255 /32 /21 /21 /43 /30 /38 /32/34 /30 /24 /28 /i255 /24 /37 /i255 /34 /35 /20 /i255/59/30/25 /38 /24 /28 /25 /30 /28 /i255 /108 /24 /28 /25 /36/29/20/40 /i255 /0 /38 /34 /i255 /34 /24 /i255 /43 /20 /32 /25 /20 /25 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /60 /1 /i255 /3 /61 /121/i255 /115 /14 /8 /9 /18 /14/102 /102 /7 /99 /i255 /13 /66 /101 /54 /9 /17 /8 /11 /7 /i255/123/15/15 /7 /8 /54 /7 /54 /i255 /60 /20 /28 /22 /i255 /68 /36 /34 /34 /24 /28 /i255 /26 /19 /27 /1 /40 /24 /24 /50 /37 /30 /20 /43 /41 /31 /i255 /57 /28 /38 /40 /20 /32 /25 /30 /28 /33 /i255 /34 /35 /20 /i255/29/32/114 /30/29/36/29/i255/21 /20 /28 /32 /43 /34 /45 /i255 /37 /24 /40 /i255 /38 /20/40 /34 /32 /30 /28 /i255 /38 /24 /28 /34 /40 /24 /43 /43 /20 /41 /i255 /25 /36 /47 /25/34 /32 /28 /38 /20 /25 /i255 /24 /37 /37 /20 /28 /25 /20 /25 /i255 /30 /37 /i255 /34 /35 /20 /i255 /42 /30 /24 /43 /32 /34 /30 /24 /28 /i255 /24 /38 /38 /36 /40 /25 /i255 /28 /20 /32 /40 /i255 /32 /i255 /35 /24/29/20/43 /20 /25 /25 /i255 /25 /35 /20 /43 /34 /20 /40 /i255 /32 /28 /41 /i255 /21 /40 /24 /42 /30 /41 /30 /28 /33 /i255 /32 /i255 /21 /20 /28 /32 /43 /34 /45 /22 /i255 /48 /20 /34 /24 /20/41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /60 /1 /i255 /97 /118 /97/i255 /65 /99 /112 /7 /18/9 /10 /54 /10 /8 /103 /i255 /13 /10 /103 /8 /54 /i255 /60 /20 /28 /22 /i255 /104 /24/29/38/124 /45 /50 /i255 /26 /19 /27/23/24/25 /30 /28 /20 /20 /31 /i255 /19 /20/29/24/42 /32 /43 /i255 /24 /37 /i255 /42 /20 /33 /20 /34 /32 /34 /30 /24 /28 /i255 /24 /47 /25 /34 /40 /36 /38 /34 /30 /28 /33 /i255 /24 /36 /34 /41 /24 /24 /40 /i255 /32 /41 /42 /20 /40 /34 /30 /25 /30 /28/33 /i255 /25 /30 /33 /28 /25 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /60 /1 /i255 /62 /5 /118/i255/106/17/8 /99 /17/9 /14 /18 /53 /i255 /111 /7 /116 /14 /18 /9 /10 /8 /103 /i255 /60 /20 /28 /22 /i255/125/36/30 /28 /28 /i255 /26 /19 /27 /1 /30 /40 /38 /35 /39 /24 /24 /41 /31 /i255/23/32/28 /41 /32 /34 /24 /40 /45 /i255 /40 /20 /21 /24 /40 /34 /30 /28 /33 /i255 /40 /20 /46 /36 /30 /40 /20/29/20/28 /34 /25 /i255 /32 /28 /41 /i255 /40 /20 /37 /20 /40 /40 /30 /28 /33 /i255 /38 /32/25 /20 /25 /i255 /24 /37 /i255 /34 /35 /40 /20 /32 /34 /20 /28 /20 /41 /i255 /24 /40 /i255 /25/36 /25 /21 /20 /38 /34 /20 /41 /i255 /38 /35 /30 /43 /41 /i255 /32 /47 /36 /25 /20 /i255 /34 /24 /i255 /43 /32 /39 /i255 /20 /28 /37 /24 /40 /38 /20/29/20/28 /34 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /60 /1 /i255 /62 /5 /61/i255 /98 /17 /10 /18 /i255 /126 /55/116 /102 /14 /53/55/7/8 /9 /i255 /100 /17/16/i255/60 /20 /28 /22 /i255/59/32/28 /33 /33 /32 /32 /40 /41 /i255 /26 /19 /27 /19 /32 /38 /30 /28 /20 /31 /i255 /56 /30 /25 /38 /40 /30/29/30/28 /32 /34 /30 /24 /28 /i255 /47 /32 /25 /20 /41 /i255 /24 /28 /i255 /32 /40 /40 /20 /25 /34 /i255 /40 /20 /38 /24 /40 /41 /i255 /36 /28 /41 /20 /40 /i255 /34 /35 /20/i255 /37 /32 /30 /40 /i255 /20/29/21/43 /24 /45/29/20/28 /34 /i255 /43 /32/39 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /60 /1 /i255 /121 /61 /3/i255 /127 /66 /101 /102 /10 /11/i255 /111 /7 /11 /14 /18 /99 /54 /i255 /65 /116 /116 /102 /10 /11 /17 /101 /10 /102 /10 /9 /53 /i255 /60 /20 /28 /22 /i255 /104 /24/29/38/124 /45 /50 /i255 /26 /19 /27/23/24/25 /30 /28 /20 /20 /31 /i255 /109 /32 /40 /34 /30 /38 /30 /21 /32 /34 /30 /24 /28 /i255 /30 /28 /i255 /30 /28 /34 /20 /40 /25 /38 /35 /24 /43 /32 /25 /34 /30 /38 /i255 /32 /34 /35 /43 /20 /34 /30 /38 /25 /i255 /32/28 /41 /i255 /32 /21 /21 /43 /30 /38 /32 /34 /30 /24 /28 /i255 /24 /37 /i255 /34 /35 /20 /i255 /21 /36 /47 /43 /30 /38 /i255 /40 /20/38 /24 /40 /41 /25 /i255 /32 /28 /41 /i255 /24 /21 /20 /28 /i255/29/20/20 /34 /30 /28 /33 /25 /i255 /43 /32 /39 /25 /i255 /34 /24 /i255 /30 /28 /34 /20 /40 /25 /38 /35 /24 /43 /32 /25 /34 /30 /38 /i255 /32 /34 /35 /43 /20 /34 /30 /38 /i255 /32 /25 /25 /24 /38 /30 /32 /34 /30 /24 /28 /25 /22 /i255 /48 /20 /34 /24 /20 /41 /i255 /26/49 /30 /28 /50/31 /i255 /i255 /128 /129 /130 /131 /132 /129 /i255 /134 /135 /136 /129 /137 /i255 /139/140 /141 /142 /142 /i255 /143 /144 /145 /146 /147 /148 /140 /i255 /149 /i255/150/145/144 /140 /i255 /148 /140 /151 /149 /147 /142 /140 /148 /i255 /144 /129 /152 /130 /153 /i255 /135 /154 /i255 /151 /155 /140 /i255/156/145/146 /140 /144 /157 /145 /144 /141 /158 /i255 /149 /159 /151 /147 /145 /157 /158 /i255 /144 /140 /142 /140 /146 /149 /157 /151 /i255 /151 /145 /i255/150/160/157 /147 /159 /147 /143 /149 /142 /147 /151 /147 /140 /158 /i255 /147 /157 /i255 /157 /140 /161 /151/i255 /162 /140 /140 /163 /141 /158 /i255 /129 /164 /165 /136 /165 /135 /166 /i255 /135 /154 /i255 /136 /167 /129 /i255 /128/129 /131 /165 /168 /169 /130 /136 /165 /170 /129 /i255 /171 /132 /169 /169 /129 /136 /165 /166 /172 /i255 /i255 /i255 PAGE 48 MEMORANDUM TO: Joi nt Review Board FROM: Aaron Kramer, Village Administrator RE: TID #1 and TID #2 Performance DATE: March 4th 2026 BACKGROUND Hobart has two (2) Tax Increment Districts (TIDs). The first was created in 2009 and is commonly referred to as the Centennial Centre area of the Village. The second was created in 2011 and is located in the southeastern section of the Village. Both TIDs are mixed use with residential and commercial/industrial developments. The two TIDs are now entering the final stages of their “lives”, with the new expenditure period for TID #1 having been passed and the period for TID #2 approaching. While both TIDs have been very successful in terms of development and an increase in taxable property, the Village, with Joint Review Board approval in 2017, adopted modified project plans which allowed for leveraging TID increment in the “halo” of the two TIDs, a half-mile zone around the boundaries of both districts. This has had a marked impact on the increase of the overall tax base for the Village, with the other taxing jurisdictions being able to see the benefits immediately, rather than having to wait for to the TIDs to be closed and dissolved. The 2017 tax base of the Village was $816.3 million; in 2025, that number had increased to $1.677 billion, more than doubling the overall tax base. OVERALL EQUALIZED VALUE OF THE VILLAGE Year Residential Commercial Manufacturing Total Change 2025 1,237,604,700 376,552,800 47,322,900 1,677,209,900 0% 2024 1,267,674,900 345,792,900 46,084,200 1,675,587,900 11 % 2023 1,156,144,600 291,712,500 44,514,300 1,514,933,400 17 % 2022 987,006,100 242,030,700 43,015,800 1,293,863,100 14 % 2021 872,935,400 202,954,800 41,559,900 1,137,391,600 8 % 2020 813,044,300 185,425,100 35,920,600 1,056,501,600 9 % 2019 763,319,100 155,723,700 32,542,500 971,510,200 8 % 2018 724,342,600 136,465,500 16,826,000 895,943,900 10 % 2017 668,096,300 112,623,200 16,669,600 816,331,800 6 % 2016 637,278,900 97,559,600 15,595,400 771,684,600 3 % 2015 623,941,300 94,025,600 15,432,000 751,542,900 6 % PAGE 49 As the c hart above shows, growth outside the TIDs has substantially outpaced the growth within the TIDs for three of the past five years, with considerable growth outside the TIDs in 2023-24. $0 $100,000,000 $200,000,000 $300,000,000 $400,000,000 $500,000,000 $600,000,000 $700,000,000 $800,000,000 $900,000,000 $1,000,000,000 $1,100,000,000 $1,200,000,000 $1,300,000,000 $1,400,000,000 $1,500,000,000 $1,600,000,000 $1,700,000,000 $1,800,000,000 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 EQUALIZED VALUE EQUALIZED VALUE YEAR TOTAL CHANGE TID #1 CHANGE TID #2 CHANGE GROWTH OUTSIDE TIDs GROWTH INSIDE TIDs 2015 $751,542,900 $43,215,800 $101,162,100 $14,688,200 $35,667,300 $7,295,900 $21,231,700 $21,984,100 2016 $771,684,600 $20,141,700 $114,744,300 $13,582,200 $35,552,600 -$114,700 $6,674, 200 $13,467,500 2017 $816,331,800 $44,647,200 $137,474,500 $22,730,200 $38,185,600 $2,633,000 $19,284,000 $25,363,200 2018 $895,943,900 $79,612,100 $170,719,700 $33,245,200 $51,593,000 $13,407,400 $32,959,500 $46,652,600 2019 $971,510,200 $75,566,300 $188,278,300 $17,558,600 $71,643,400 $20,050,400 $37,957,300 $37,609,000 2020 $1,056,501,600 $84,991,400 $218,957,800 $30,679,500 $83,905,600 $12,262,200 $42,049,700 $42,941,700 2021 $1,137,391,600 $80,890,000 $231,245,400 $12,287,600 $97,108,400 $13,202,800 $55,399,600 $25,490,400 2022 $1,293,863,100 $156,471,500 $274,504,700 $43,259,300 $137,809,100 $40,700,700 $72,511,500 $83,960,000 2023 $1,514,933,400 $221,070,300 $313,358,700 $38,854,000 $163,441,700 $25,632,600 $156,583,700 $64,486,600 2024 $1,675,587,900 $160,654,500 $341,489,600 $28,130,900 $154,928,900 -$8,512,800 $141,036,400 $19,618,100 2025 $1,677,209,900 $1,622,000 $333,838,600 -$7,651,000 $181,171,300 $26,242,400 -$16,969,400 $18,591,400 PAGE 50 TAX INCREMENT DISTRICTS TID #1 TID #1 saw its overall tax base decrease by 2 percent to $333,838,600, its first decrease ever. Since its creation in 2009, TID #1 has seen an increase of $312,846,700 in increment value. TID #2 TID #2 experienced a significant increase in its increment value of $26.2 million. This is a 17 percent increase over the previous year. Since its creation in 2011, TID #2 has seen an increase of $177,955,500 in increment value. Combined, Hobart’s two Tax Increment Districts have created $490,802,200 in taxable property. -$20,000,000 -$10,000,000 $0 $10,000,000 $20,000,000 $30,000,000 $40,000,000 $50,000,000 $60,000,000 $70,000,000 $80,000,000 $90,000,000 $100,000,000 $110,000,000 $120,000,000 $130,000,000 $140,000,000 $150,000,000 $160,000,000 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 GROWTH OUTSIDE THE TIDs EQUALIZED VALUE PAGE 51 $0 $50,000,000 $100,000,000 $150,000,000 $200,000,000 $250,000,000 $300,000,000 $350,000,000 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 TID 1 - INCREMENT VALUE CREATED TID 1 $0 $20,000,000 $40,000,000 $60,000,000 $80,000,000 $100,000,000 $120,000,000 $140,000,000 $160,000,000 $180,000,000 $200,000,000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2024 TID 2 - INCREMENT VALUE CREATED TID 2 PAGE 52 WI Dept of Revenue TID Annual Report Form PE-300 2024 Section 1 – Municipality and TID Co-muni code Municipality County Due date Report type TID number TID type TID name Creation date Mandatory termination date Anticipated termination date Section 2 – Beginning Balance Amount TID fund balance at beginning of year 05126 HOBART BROWN 07/01/2025 ORIGINAL 001 6 TID 1 04/08/2009 04/08/2032 N/A $2,647,171 Section 3 – Revenue Amount Tax increment Investment income Debt proceeds Special assessments Shared revenue Sale of property Allocation from another TID $4,275,756 $369,468 $6,929,105 $0 $1,435 TID number Developer guarantees Developer name Centennial Centre Development Partners LLC $42,067 Developer name Centennial Center Marketplace LLC $125,851 Transfer from other funds Source Grants Source Other revenue Source TID 1 Reimbursement-state 29 interchange $261,078 Total Revenue (deposits) $12,004,760 Page of 1 4 PAGE 53 WI Dept of Revenue TID Annual Report Form PE-300 2024 Section 4 – Expenditures Amount Capital expenditures Administration Professional services Interest and fiscal charges DOR fees Discount on long-term debt Debt issuance costs Principal on long-term debt Environmental costs Real property assembly costs Allocation to another TID $1,180,580 $75,499 $147,209 $679,535 $150 $0 $136,591 $2,036,279 $0 $0 TID number Developer grants Developer name Centennial Centre, LLC $308,897 Developer name Fieldstone Investments, LLC $519,216 Developer name Belsug Investments , LLC $106,793 Developer name Centennial Centre Development Partners, LLC $230,970 Developer name Atkins Building Group $178,181 Developer name Gigot Properties LLC $52,797 Developer name Green Bay Family Dentistry $8,877 Transfer to other funds Fund Other expenditures Name Land Sale $3,207 Total Expenditures $5,664,781 Section 5 – Ending Balance Amount TID fund balance at end of year Future costs Future revenue Surplus or deficit $8,987,150 $33,073,331 $24,086,181 $0 Page of 2 4 PAGE 54 WI Dept of Revenue TID Annual Report Form PE-300 2024 Current Year TID New Construction Values TID TID New Construction Increase TID New Construction Decrease Prior Year Correction TID Net New Construction (NNC) Section 6 – TID New Construction 001 $7,617,000 $-17,100 $-50,300 $7,549,600 002 $11,768,100 $0 $-77,100 $11,691,000 Total $19,385,100 $-17,100 $-127,400 $19,240,600 Current Year Allowable Levy Increase Attributable to TID NNC TID TID Net New Construction Prior Year Municipal Equalized Value TID Net New Construction % Prior Year Adjusted Actual Levy Allowable Levy Increase Attributable to TID Net New Construction 001 $7,549,600 $1,514,933,400 0.50 $3,408,660 $17,043 002 $11,691,000 $1,514,933,400 0.77 $3,408,660 $26,247 Total $19,240,600 $1,514,933,400 1.27 $3,408,660 $43,290 Current Year Actual TID NNC Impact to Municipal Levy Levy Increase Attributable to TID Net New Construction Increase per $100,000 $0 $0 Historical Allowable Levy Increase Attributable to TID NNC Year TID TID Net New Construction TID Net New Construction % Allowable Levy Increase Attributable to TID Net New Construction Prior Year Adjusted Actual Levy Prior Year Municipal Equalized Value 2023 001 $9,363,500 $1,293,863,100 0.72 $3,275,495 $23,584 2023 002 $14,319,300 $1,293,863,100 1.11 $3,275,495 $36,358 2023 Total $23,682,800 $1,293,863,100 1.83 $3,275,495 $59,942 Page of 3 4 PAGE 55 WI Dept of Revenue TID Annual Report Form PE-300 2024 Section 7 – Contact Information Contact name Contact title Contact email Contact phone Anastasia Bell Treasurer (920) 869-3830stacy@hobartwi.gov Page of 4 4 PAGE 56 WI Dept of Revenue TID Annual Report Form PE-300 2024 Section 1 – Municipality and TID Co-muni code Municipality County Due date Report type TID number TID type TID name Creation date Mandatory termination date Anticipated termination date Section 2 – Beginning Balance Amount TID fund balance at beginning of year 05126 HOBART BROWN 07/01/2025 ORIGINAL 002 6 TID 2 06/24/2011 06/24/2034 N/A $2,741,913 Section 3 – Revenue Amount Tax increment Investment income Debt proceeds Special assessments Shared revenue Sale of property Allocation from another TID $2,242,657 $299,779 $4,773,471 $0 $327 $0 TID number Developer guarantees Developer name Transfer from other funds Source Grants Source Other revenue Source Total Revenue (deposits) $7,316,234 Page of 1 4 PAGE 57 WI Dept of Revenue TID Annual Report Form PE-300 2024 Section 4 – Expenditures Amount Capital expenditures Administration Professional services Interest and fiscal charges DOR fees Discount on long-term debt Debt issuance costs Principal on long-term debt Environmental costs Real property assembly costs Allocation to another TID $1,034,006 $54,633 $272,952 $403,869 $150 $0 $71,722 $575,775 $0 $0 TID number Developer grants Developer name Tailwind Crossings, LLC $303,771 Developer name Integrity Warehousing $58,000 Developer name PDK Investments LLC $205,517 Developer name GBCRE IV LLC $35,091 Developer name KDMJ6 LLC $4,060 Transfer to other funds Fund Other expenditures Name Park Fees $46,900 Total Expenditures $3,066,446 Section 5 – Ending Balance Amount TID fund balance at end of year Future costs Future revenue Surplus or deficit $6,991,701 $23,254,041 $16,262,340 $0 Page of 2 4 PAGE 58 WI Dept of Revenue TID Annual Report Form PE-300 2024 Current Year TID New Construction Values TID TID New Construction Increase TID New Construction Decrease Prior Year Correction TID Net New Construction (NNC) Section 6 – TID New Construction 001 $7,617,000 $-17,100 $-50,300 $7,549,600 002 $11,768,100 $0 $-77,100 $11,691,000 Total $19,385,100 $-17,100 $-127,400 $19,240,600 Current Year Allowable Levy Increase Attributable to TID NNC TID TID Net New Construction Prior Year Municipal Equalized Value TID Net New Construction % Prior Year Adjusted Actual Levy Allowable Levy Increase Attributable to TID Net New Construction 001 $7,549,600 $1,514,933,400 0.50 $3,408,660 $17,043 002 $11,691,000 $1,514,933,400 0.77 $3,408,660 $26,247 Total $19,240,600 $1,514,933,400 1.27 $3,408,660 $43,290 Current Year Actual TID NNC Impact to Municipal Levy Levy Increase Attributable to TID Net New Construction Increase per $100,000 $0 $0 Historical Allowable Levy Increase Attributable to TID NNC Year TID TID Net New Construction TID Net New Construction % Allowable Levy Increase Attributable to TID Net New Construction Prior Year Adjusted Actual Levy Prior Year Municipal Equalized Value 2023 001 $9,363,500 $1,293,863,100 0.72 $3,275,495 $23,584 2023 002 $14,319,300 $1,293,863,100 1.11 $3,275,495 $36,358 2023 Total $23,682,800 $1,293,863,100 1.83 $3,275,495 $59,942 Page of 3 4 PAGE 59 WI Dept of Revenue TID Annual Report Form PE-300 2024 Section 7 – Contact Information Contact name Contact title Contact email Contact phone Anastasia Bell Treasurer (920) 869-3830stacy@hobartwi.gov Page of 4 4 PAGE 60 Current Status Estimate Assumptions Annual Inflation During Life of TID…………………………………………………………………………………………………………………0.00% 2024 Gross Tax Rate (per $1000 Equalized Value)………………………………………………………………………$13.39 Annual Adjustment to tax rate………………………………………………………………………………………………………………………0.00% Investment rate…………………………………………………………………………………………………………………….0.00% Data above dashed line are actual Background Data Revenues TID Status (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) (s) (t) (u) (v) Long-Term Developer Debt Conservation/ Year End TIF District Construction TIF Increment Tax Tax Investment Computer Debt Other Loan Total Existing Issuance Capital Administration Development/ Developer Land Combined Annual Cumulative Year Valuation Increment Over Base Rate Revenue Income Aid Issued Revenue Repayments Revenues Year Debt Service Costs Outlay Prof Services Incentives Purchase Expenditures Balance Balance Cost Recovery Year (January 1) (1) (2) (2) (2) (2) (2) (2) (December 31) Base Value $20,991,900 2024 $341,489,600 ($7,651,000) $312,846,700 $13.39 $4,275,756 $369,468 $1,435 $6,929,105 $261,078 $167,918 $12,004,760 2024 $2,715,814 $136,591 $1,180,580 $75,499 $147,359 $1,405,731 $3,207 $5,664,781 $6,339,979 $8,987,150 Per 2024 Audit 2024 2025 $333,838,600 $312,846,700 $13.39 $4,291,464 $0 $1,435 $406,463 $4,699,363 2025 $2,898,886 $75,499 $147,359 $1,425,037 $628,568 $5,175,349 ($475,987) $8,511,164 2025 2026 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $476,017 $4,666,469 2026 $3,192,616 $75,499 $147,359 $1,395,037 $628,568 $5,439,079 ($772,610) $7,738,553 2026 2027 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $486,017 $4,676,469 2027 $3,305,867 $75,499 $147,359 $1,279,661 $628,568 $5,436,955 ($760,486) $6,978,068 2027 2028 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $538,129 $4,728,582 2028 $3,348,223 $75,499 $147,359 $1,035,509 $628,568 $5,235,157 ($506,576) $6,471,492 2028 2029 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $524,466 $4,714,919 2029 $3,851,721 $75,499 $147,359 $463,009 $628,568 $5,166,156 ($451,237) $6,020,254 2029 2030 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $399,594 $4,590,046 2030 $3,787,298 $75,499 $147,359 $412,502 $628,568 $5,051,226 ($461,180) $5,559,075 2030 2031 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $110,851 $4,301,303 2031 $4,461,438 $75,499 $147,359 $334,901 $625,361 $5,019,197 ($717,894) $4,841,181 Expenditures Recovered 2031 2032 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $1,435 $110,851 $4,301,303 2032 $3,319,223 $75,499 $147,359 $277,760 $3,819,840 $481,463 $5,322,644 Expenditures Recovered 2032 2033 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $110,851 $4,299,868 2033 $310,251 $310,251 $3,989,617 $9,312,262 Expenditures Recovered 2033 2034 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $110,851 $4,299,868 2034 $309,681 $309,681 $3,990,187 $13,302,449 Expenditures Recovered 2034 2035 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $110,851 $4,299,868 2035 $308,859 $308,859 $3,991,010 $17,293,458 Expenditures Recovered 2035 2036 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $110,851 $4,299,868 2036 $312,692 $312,692 $3,987,176 $21,280,634 Expenditures Recovered 2036 2037 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $4,189,017 2037 $200,325 $200,325 $3,988,692 $25,269,326 Expenditures Recovered 2037 2038 $333,838,600 $312,846,700 $13.39 $4,189,017 $0 $4,189,017 2038 $203,500 $203,500 $3,985,517 $29,254,844 Expenditures Recovered 2038 $311,948,100 $66,553,343 $369,468 $12,915 $6,929,105 $261,078 $3,663,710 $74,260,721 $32,526,392 $136,591 $1,180,580 $679,491 $1,326,231 $8,029,147 $4,399,977 $47,653,049 Type of TID: Mixed Use 2009 TID Inception (04/08/2009) (1) Increment per WI DOR Estimates. 2024 Final Year to Incur TIF Related Costs (2) Per Village Estimates. 2029 Maximum Legal Life of TID (20 Years)/ 3 Year Technical College Extension Closure 4/8/2032 approved Village of Hobart Tax Increment District No. 1 Cash Flow Proforma Analysis Expenditures Prepared by Robert W. Baird & Co. Incorporated S:\Public Finance\municipalities\hobart vg\tif\tid1 hobart vg 2024 (2).xlsx /amr 8/5/2025 PAGE 61 Current Status Estimate 11724 Assumptions Annual Inflation During Life of TID…………………………………………………………………………………………………………………0.00% 2024 Gross Tax Rate (per $1000 Equalized Value)………………………………………………………………………$13.49 Annual Adjustment to tax rate………………………………………………………………………………………………………………………0.00% Investment rate…………………………………………………………………………………………………………………….0.00% Data above dashed line are actual Background Data Revenues TID Status (a) (b) (c) (d) (e) (f) (g) (h) (i) (i) (j) (j) (k) (k) (l) (m) (n) (q) (o) (p) (q) (r) Debt Conservation/ Year End TIF District Construction TIF Increment Tax Tax Investment Computer Debt Total Existing Issuance Capital Administration Development/ Developer Park Combined Annual Cumulative Year Valuation Increment Over Base Rate Revenue Proceeds Aid Proceeds Revenues Year Principal Interest Debt Service Cost Outlay Prof Services Incentives Fees Expenditures Balance Balance Cost Recovery Year (January 1) (1) (2) (2) (2) (2) (December 31) Base Value $3,215,800 2024 $154,859,200 $26,242,400 $177,885,800 $13.49 $2,242,657 $299,779 $327 $4,773,471 $7,316,234 2024 $575,775 $403,868 $979,643 $71,722 $1,034,006 $54,633 $273,102 $606,440 $46,900 $3,066,446 $4,249,788 $6,991,701 Per 2024 Audit 2024 2025 $181,101,600 $177,885,800 $13.49 $2,045,669 $0 $327 $2,045,996 2025 $1,089,940 $427,620 $1,517,560 $54,633 $273,102 $648,786 $2,494,082 ($448,085) $6,543,616 2025 2026 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2026 $1,126,188 $393,721 $1,519,908 $54,633 $273,102 $648,786 $2,496,429 ($96,423) $6,447,193 2026 2027 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2027 $1,351,178 $354,528 $1,705,705 $54,633 $273,102 $648,786 $2,682,227 ($282,220) $6,164,973 2027 2028 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2028 $1,514,508 $306,642 $1,821,150 $54,633 $273,102 $373,203 $2,522,088 ($122,081) $6,042,892 2028 2029 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2029 $1,596,158 $252,644 $1,848,802 $54,633 $273,102 $345,015 $2,521,552 ($121,545) $5,921,347 2029 2030 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2030 $1,590,000 $197,260 $1,787,260 $54,633 $273,102 $277,455 $2,392,450 $7,557 $5,928,904 2030 2031 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2031 $1,655,000 $142,159 $1,797,159 $54,633 $273,102 $248,023 $2,372,917 $27,090 $5,955,993 Expenditures Recovered 2031 2032 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2032 $1,575,000 $96,744 $1,671,744 $54,633 $273,102 $248,023 $2,247,502 $152,505 $6,108,498 Expenditures Recovered 2032 2033 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2033 $920,000 $65,875 $985,875 $54,633 $273,102 $240,191 $1,553,801 $846,205 $6,954,703 Expenditures Recovered 2033 2034 $181,101,600 $177,885,800 $13.49 $2,399,679 $0 $327 $2,400,006 2034 $930,000 $39,938 $969,938 $54,633 $273,102 $220,863 $1,518,535 $881,471 $7,836,174 Expenditures Recovered 2034 2035 $2,399,679 $0 $327 $2,400,006 2035 $950,000 $13,438 $963,438 $54,633 $273,102 $220,863 $1,512,035 $887,971 $8,724,145 Expenditures Recovered 2035 $145,618,700 $38,598,058 $299,779 $3,924 $4,773,471 $33,362,295 $14,873,745 $2,694,437 $17,568,182 $71,722 $1,034,006 $655,596 $3,277,224 $4,726,433 $46,900 $27,380,063 Type of TID: Mixed Use 2011 TID Inception (06/24/2011) (1) Increment per Wi DOR Estimates. 2026 Final Year to Incur TIF Related Costs (2) Per Village Estimates. 2031 Maximum Legal Life of TID (20 Years) 2034 Final Expenditure Year Extended 3 Years due to SB 53 - Act 254 2035 Final Tax Collection Year Village of Hobart Tax Increment District No. 2 Cash Flow Proforma Analysis Expenditures Prepared by Robert W. Baird & Co. Incorporated S:\Public Finance\municipalities\hobart vg\tif\tid2 hobart vg 2024.xlsx /amr 8/5/2025 PAGE 62 Year 2009 YOY Growth 2010 YOY Growth 2011 YOY Growth 2012 YOY Growth 2013 YOY Growth 2014 YOY Growth Outside TID 608,688,200.00$ (22,349,400.00)$ 593,630,500.00$ (15,057,700.00)$ 586,158,700.00$ (7,471,800.00)$ 583,560,700.00$ (2,598,000.00)$ 585,446,800.00$ 1,886,100.00$ 593,481,800.00$ 8,035,000.00$ TID # 001 20,991,900.00$ 20,991,900.00$ 21,890,500.00$ 898,600.00$ 39,246,200.00$ 17,355,700.00$ 51,294,000.00$ 12,047,800.00$ 68,564,900.00$ 17,270,900.00$ 86,473,900.00$ 17,909,000.00$ TID # 002 -$ -$ -$ -$ 3,215,800.00$ 3,215,800.00$ 6,193,700.00$ 2,977,900.00$ 17,641,700.00$ 11,448,000.00$ 28,371,400.00$ 10,729,700.00$ Total Village EV 629,680,100.00$ (1,357,500.00)$ 615,521,000.00$ (14,159,100.00)$ 628,620,700.00$ 13,099,700.00$ 641,048,400.00$ 12,427,700.00$ 671,653,400.00$ 30,605,000.00$ 708,327,100.00$ 36,673,700.00$ 2015 YOY Growth 2016 YOY Growth 2017 YOY Growth 2018 YOY Growth 2019 YOY Growth 2020 YOY Growth Outside TID 614,713,500.00$ 21,231,700.00$ 621,387,700.00$ 6,674,200.00$ 640,671,700.00$ 19,284,000.00$ 673,631,200.00$ 32,959,500.00$ 711,588,500.00$ 37,957,300.00$ 753,638,200.00$ 42,049,700.00$ TID # 001 101,162,100.00$ 14,688,200.00$ 114,744,300.00$ 13,582,200.00$ 137,474,500.00$ 22,730,200.00$ 170,719,700.00$ 33,245,200.00$ 188,278,300.00$ 17,558,600.00$ 218,957,800.00$ 30,679,500.00$ TID # 002 35,667,300.00$ 7,295,900.00$ 35,552,600.00$ (114,700.00)$ 38,185,600.00$ 2,633,000.00$ 51,593,000.00$ 13,407,400.00$ 71,643,400.00$ 20,050,400.00$ 83,905,600.00$ 12,262,200.00$ Total Village EV 751,542,900.00$ 43,215,800.00$ 771,684,600.00$ 20,141,700.00$ 816,331,800.00$ 44,647,200.00$ 895,943,900.00$ 79,612,100.00$ 971,510,200.00$ 75,566,300.00$ 1,056,501,600.00$ 84,991,400.00$ 2021 YOY Growth 2022 YOY Growth 2023 YOY Growth 2024 YOY Growth 2025 YOY Growth 2026 YPY Growth Outside TID 809,037,800.00$ 55,399,600.00$ 881,549,300.00$ 72,511,500.00$ 1,038,133,000.00$ 156,583,700.00$ 1,179,169,400.00$ 141,036,400.00$ 1,162,200,000.00$ (16,969,400.00)$ TID # 001 231,245,400.00$ 12,287,600.00$ 274,504,700.00$ 43,259,300.00$ 313,358,700.00$ 38,854,000.00$ 341,489,600.00$ 28,130,900.00$ 333,838,600.00$ (7,651,000.00)$ TID # 002 97,108,400.00$ 13,202,800.00$ 137,809,100.00$ 40,700,700.00$ 163,441,700.00$ 25,632,600.00$ 154,928,900.00$ (8,512,800.00)$ 181,171,300.00$ 26,242,400.00$ Total Village EV 1,137,391,600.00$ 80,890,000.00$ 1,293,863,100.00$ 156,471,500.00$ 1,514,933,400.00$ 221,070,300.00$ 1,675,587,900.00$ 160,654,500.00$ 1,677,209,900.00$ 1,622,000.00$ Village of Hobart Equalized Value Growth PAGE 63 PAGE 64 PAGE 65 TO: Site Review Committee RE: 611 Centerline Dr., HB-524-1-1; Wall Signage FROM: Todd Gerbers, Director of Planning and Code Compliance DATE: April 1, 2026 GENERAL INFORMATION 1. Developer: Bayland Buildings 2. Applicant: Bayland Building / Robert E. Lee & Associates 3. Address/Parcel: 611 Centerline Dr. / HB-524-1-1 4. Zoning: PDD #1: Centennial Centre at Hobart District 5. Use: Auto Service Building BACKGROUND Auto Aces, located at 611 Centerline Dr., is currently under construction and is submitting for review and action of the wall signage. During the original site review back in September 2025, signage was not finalized and therefore not submitted at that time. The developer has since finalized the freestanding signage and is requesting review of said signage. The request before the Committee at this time would be for two internally illuminated wall signs of a total of 70.76 square feet (actual sign area is roughly 96 square feet of sigh faces) for each sign. There will be one sign located on each of the office store fronts facing Centerline Dr. and Founders Terrace. Since this is a corner parcel, the development is allowed to have one wall sign facing each roadway. Both wall signs are compliant with the Village Sign Code. RECOMMENDATION/CONDITIONS Staff recommends approval of the proposed two wall signs of 70.76 square feet each to be located on the north and west elevations of the new building located at 611 Centerline Dr. as submitted. ISSUE: Discussion and action on a request for new wall signs located at 611 Centerline Dr. RECOMMENDATION: Staff recommends conditional approval based on any conditions the Committee may identify. PAGE 66 Project Address________________________________________ Parcel Number____________________ Applicant is the:  Owner OR  Contractor Use Category: Single Family Duplex Multi-Family Commercial Industrial  Agricultural Driveway/Parking Handicap Ramp Stove/Fireplace Work being done: N ew Structure External Remodeling Hot Tub/Spa Swimming Pool Addition Internal Remodeling Fence/Kennel Wrecking Permit Deck/Porch/Patio Garage/Utility S tructure Sign/Canopy/Awning Other Additional information, such as plan submittal and approval, may be required before issuance. Scope of work: Any work not included in this application is not permitted. Total Value of Project $_____________________ ( Value of materials & labor is r equired to ensure consistency in assessing permit fees.) Breakdown of v alues: Bldg______________ Elec____________________ Plumb___________________ HVAC_____________________ ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ I certify the ab ove information is complete and accurate. I agree to perform the work in conformance to all approval conditions & applicable codes/ordinances. Applicant Name: ___________________________________ (Please print) Signature : ________________________________________ Date: ___________________ Owner’s Name: e-mail: Mailing Address: Tel: Fax: Mobile: Building Contractor Name: e-mail: Lic# Qualifi er# Mailing Address: Tel: Fax: Mobile: Electrical Contractor Name: e-mail: Lic# Mailing Address: Tel: Fax: Mobile: HVAC Contractor Name: e-mail: Lic# Mailing Address: Tel: Fax: Mobile: Plumbing Contractor Name: e-mail: Lic# Mailing Address: Tel: Fax: Mobile: Issued By:______________________________ Date:__________________________________ Village of Hobart Dept of Planning & Code Compliance 2990 S Pine T ree Rd Hobart WI 54155 Phone: (920) 869-3809 Fax (920) 869 -2048 Building Permit Application Permit Number____________ (Assigned by Village Personnel) PAGE 67 Cautionary Statement to Owners Obtaining Building Permits 101.65(lr) of t he Wisconsin Statutes requires municipalities that enforce the Uniform Dwelling Code to provide an owner who applies for a building permit with a statement advising the owner that: If t he owner hires a contractor to perform work under the building permit and the contractor is not bonded or insured as required under s. 101.654 (2) (a), the following consequences might occur: (a) T he owner may be held liable for any bodily injury to or death of others or for any damage to the property of others that arises out of the work performed under the building permit or that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit. (b) The ow ner may not be able to collect from the contractor damages for any loss sustained by the owner because of a violation by the contractor of the one- and two- family dwelling code or an ordinance enacted under sub. (1) (a), because of any bodily injury to or death of others or damage to the property of others that arises out of the work performed under the building permit or because of any bodily injury to or death of others or damage to the property of others that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit. Cauti onary Statement to Contractors for Projects Involving Building Built Before 1978 If t his project is in a dwelling or child-occupied facility, built before 1978, and disturbs 6 sq. ft. or more of paint per room, 20 sq. ft. or more of exterior paint, or involves windows, then the requirements of ch. DHS 163 requiring Lead-Safe Renovation Training and Certification apply. Call (608)261-6876 or go to the Wisconsin Department of Health Services’ lead homepage for details of how to be in compliance. Wetlan ds Notice to Permit Applicants You are responsible for complying with state and federal laws concerning the construction near or on wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural Resources wetlands identification web page or contact a Department of Natural Resources service center. Addit ional Responsibilities for Owners of Projects Disturbing One or More Acre of Soil I unders tand if this project involves disturbing one or more acres of soil, this project is subject to ch. NR 151 regarding additional erosion control and stormwater management standards, and will comply with those standards. I hav e read the aforementioned Cautionary Statements and Notices. Owne r's Signature: _______________________________________ Date:___________________ PAGE 68 ISSUE: Discussion and action to consider the landscaping and lighting plans for the new recently approved development RECOMMENDATION: Staff recommends conditional approval based on any conditions the Committee may identify. TO: Site Review Committee RE: 5060 Founders Terrace., HB-523-7; Landscaping & Lighting Plans FROM: Todd Gerbers, Director of Planning and Code Compliance DATE: April 1, 2026 GENERAL INFORMATION 1. Developer: Bayland Buildings 2. Applicant: Bayland Building / Robert E. Lee & Associates 3. Address/Parcel: 5060 Founders Terrace / HB-523-7 4. Zoning: PDD #1: Centennial Centre at Hobart District 5. Use: Office with shop BACKGROUND Bayland Buildings recently received conditional approval on a proposed new 20,000 square foot commercial building to be located at 5060 Founders Terrace (Parcel HB-523-7) along with the required associated site improvement including access and parking. The landscaping plan and exterior lighting plan were required to be re-submitted for review and approval. SITE REVIEW DEVELOPMENT AND DESIGN STANDARDS CHECKLIST Section 1, Site Plan Approval A. Zoning: PDD #1: Centennial Centre at Hobart District B. Green Space: 38.8% after development C. Setbacks: This development complies with all applicable setbacks (proposed 89’ (front/Founders Terrace), 155’ (rear), 44’ (side/north), 95’ (side/east), and 31’ (side/south along Centerline Dr.). D. Parking: The Village’s parking ordinance does not specifically address this type of business, so the “Business (not listed above)” requirements would be “Business (not listed above). One parking space for each two staff members or employees, plus such additional parking space as may be required by the Planning and Zoning Commission for customers or users”. While not quite certain on the exact number of employees anticipated for the operations, there are 23 parking stalls. So as long as there are not more than 46 employees, the proposed parking layout will be compliant. E. Fire Dept. and Police Dept.: The plans are being reviewed by both Police Chief and Fire Chief with their comments and conditions being brought to the meeting. PAGE 69 F. Storm Water: Storm water from this development will be collected by internal catch basins throughout the site and discharge to two new dry ponds located along the west and south sides of this development. There is a discharge structure in each pond leading to the municipal storm sewer system which leads to a regional storm water pond that is owned by the Village. G. Refuse Collection: Refuse / recycling enclosure to be located towards the rear of the property (northeast corner). Enclosure is planned to be split faced concrete block to match the primary building. Gate will be chain-link with privacy slats. Section 2, Architectural Plan Approval A. Exterior Construction Information: 1. Materials: Metal frame building. 2. Exterior Materials: Mixture of aluminum composite panels, split face CMU, and concealed fastener metal wall panels on both the west and south building elevations that face a public roadway, and semi- concealed fastener metal wall panels on the other side and rear building elevations. 3. Height: Anticipated at 25 feet 4. Overhead doors: 1 overhead door at grade on the side/north elevation with 3 overhead doors at grade and 4 loading dock doors on the rear/east elevation. 5. Mechanical equipment: None noted on the plans, but all such equipment shall be screened from view with materials to match those of the principal structure or with landscaping. All exterior exhaust/intake vents shall be colored to blend with the principal structure. Section 3, Landscaping Plan: The developer and property owner have revised the proposed landscape plan to change the planting along the right-of-way of Centerline Dr. from an arborvitae species to a deciduous species consisting of Honey Locust and Ivory Silk Japanese Lilac. Additionally, the one tree closest to the ingress/egress on Centerline Dr. was removed and the two tree planned at the truck ingress/egress from Founders Terrace were moved back to allow for enhanced visual points for vehicle and pedestrian traffic to and from the site. Lastly, there are now foundation planting shown along the south and a portion of the west building elevations. Section 4, Lighting: Lighting plan and fixture details have been submitted and are found to be compliant with Village Code. Sect ion 5, Signage: There are 2 wall mounted signs shown on the building elevations (west and south), however, no sign details are submitted at this time. Therefore, any proposed signage shall be required to be submitted for approval at a later SRC meeting prior to installation. Section 6, Driveway-Curb Cut: Access to this site will be through three new ingress/egress locations with two from Founders Terrace (25’ driveway width and 35’ curb cut for truck access and 24’ driveway width and 34’ curb cut for employees and visitors) and one from Centerline Dr. (25’ driveway width and 35’ curb cut). RECOMMENDATION/CONDITIONS Staff recommends conditional approval of both the landscape plan and lighting plan as submitted. This approval does not relive the other conditions of approval from the February 18, 2026 conditional approval. 1. No lighting shall create a glare to adjoining properties or public roadways. Only the proposed wall lighting fixtures and pole lights are part of this lighting approval. Any other future lighting will require review and approval by the SRC. PAGE 70 TO: Site Review Committee RE: Dobbs Tire & Auto Centers, 3860 W. Mason St.; HB-1394-3; Signage FROM: Todd Gerbers, Director of Planning and Code Compliance DATE: April 1, 2026 GENERAL INFORMATION 1. Owner/Developer: Dobbs Tire & Auto Centers 2. Applicant/Agent: Reinhold Sign / Teri Moen 3. Address/Parcel: 3860 W. Mason St. / HB-1394-3 4. Zoning: I-1: Limited Industrial District 5. Use: Automotive Servicing & Repair BACKGROUND Dobbs Tire & Auto Centers, located at 3860 W. Mason St., recently acquired the property (formerly Al Huss Auto & Truck LLC) and is submitting for review and action of proposed new wall signs and face replacement of the existing ground sign. The request before the Committee at this time would be for a new internally illuminated wall sign of 66.62 square feet on the west elevation of the building which will replace the existing wall sign (59.25 square feet). Additionally, they plan to remove the existing non-lit wall signs above the garage doors on the south elevation and replace them with a new sign of 44.25 square feet (roughly 40 square feet of existing signs). Both new wall signs will be in compliance with the Village Sign Code. Additionally, although not required to have SRC approval, the existing ground mount sign will have new sign faces for the top portion with the new business name. Since these are only face replacements, no formal approval or permit is required from the Village, but since the other signs need approval, Staff wanted to make the Committee aware of the this change as well. All signage modifications as proposed would be in compliance with the Village Sign Code. RECOMMENDATION/CONDITIONS Staff recommends approval of the proposed 66.62 square foot sign on the west elevation and the proposed 44.25 square foot wall sign on the south elevation of the existing building to be located at 43860 W. Mason St. as submitted. ISSUE: Discussion and action on a request for new wall signage and face replacement of existing ground sign located at 3860 W. Mason St. RECOMMENDATION: Staff recommends conditional approval based on staff recommendation and any conditions the Committee may identify. PAGE 71 Project Address________________________________________ Parcel Number____________________ Applicant is the:  Owner OR  Contractor Use Category: Single Family Duplex Multi-Family Commercial Industrial  Agricultural Driveway/Parking Handicap Ramp Stove/Fireplace Work being done: N ew Structure External Remodeling Hot Tub/Spa Swimming Pool Addition Internal Remodeling Fence/Kennel Wrecking Permit Deck/Porch/Patio Garage/Utility S tructure Sign/Canopy/Awning Other Additional information, such as plan submittal and approval, may be required before issuance. Scope of work: Any work not included in this application is not permitted. Total Value of Project $_____________________ ( Value of materials & labor is r equired to ensure consistency in assessing permit fees.) Breakdown of v alues: Bldg______________ Elec____________________ Plumb___________________ HVAC_____________________ ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ I certify the ab ove information is complete and accurate. I agree to perform the work in conformance to all approval conditions & applicable codes/ordinances. Applicant Name: ___________________________________ (Please print) Signature : ________________________________________ Date: ___________________ Owner’s Name: e-mail: Mailing Address: Tel: Fax: Mobile: Building Contractor Name: e-mail: Lic# Qualifi er# Mailing Address: Tel: Fax: Mobile: Electrical Contractor Name: e-mail: Lic# Mailing Address: Tel: Fax: Mobile: HVAC Contractor Name: e-mail: Lic# Mailing Address: Tel: Fax: Mobile: Plumbing Contractor Name: e-mail: Lic# Mailing Address: Tel: Fax: Mobile: Issued By:______________________________ Date:__________________________________ Village of Hobart Dept of Planning & Code Compliance 2990 S Pine T ree Rd Hobart WI 54155 Phone: (920) 869-3809 Fax (920) 869 -2048 Building Permit Application Permit Number____________ (Assigned by Village Personnel) PAGE 72 Cautionary Statement to Owners Obtaining Building Permits 101.65(lr) of t he Wisconsin Statutes requires municipalities that enforce the Uniform Dwelling Code to provide an owner who applies for a building permit with a statement advising the owner that: If t he owner hires a contractor to perform work under the building permit and the contractor is not bonded or insured as required under s. 101.654 (2) (a), the following consequences might occur: (a) T he owner may be held liable for any bodily injury to or death of others or for any damage to the property of others that arises out of the work performed under the building permit or that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit. (b) The ow ner may not be able to collect from the contractor damages for any loss sustained by the owner because of a violation by the contractor of the one- and two- family dwelling code or an ordinance enacted under sub. (1) (a), because of any bodily injury to or death of others or damage to the property of others that arises out of the work performed under the building permit or because of any bodily injury to or death of others or damage to the property of others that is caused by any negligence by the contractor that occurs in connection with the work performed under the building permit. Cauti onary Statement to Contractors for Projects Involving Building Built Before 1978 If t his project is in a dwelling or child-occupied facility, built before 1978, and disturbs 6 sq. ft. or more of paint per room, 20 sq. ft. or more of exterior paint, or involves windows, then the requirements of ch. DHS 163 requiring Lead-Safe Renovation Training and Certification apply. Call (608)261-6876 or go to the Wisconsin Department of Health Services’ lead homepage for details of how to be in compliance. Wetlan ds Notice to Permit Applicants You are responsible for complying with state and federal laws concerning the construction near or on wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to identify. Failure to comply may result in removal or modification of construction that violates the law or other penalties or costs. For more information, visit the Department of Natural Resources wetlands identification web page or contact a Department of Natural Resources service center. Addit ional Responsibilities for Owners of Projects Disturbing One or More Acre of Soil I unders tand if this project involves disturbing one or more acres of soil, this project is subject to ch. NR 151 regarding additional erosion control and stormwater management standards, and will comply with those standards. I hav e read the aforementioned Cautionary Statements and Notices. Owne r's Signature: _______________________________________ Date:___________________ PAGE 73 Hobart, WI FILE#26-3-45-F-DOBBS-Z1 • 3-12-2026 PAGE 74 ORDINANCE 2026-06 (GOLF CARTS) - Page 1 of 6 ORDINANCE 2026-06 AN ORDINANCE TO CREATE ARTICLE V (GOLF CARTS) OF CHAPTER 264 (VEHICLES AND TRAFFIC) OF THE MUNICIPAL CODE OF THE VILLAGE OF HOBART, BROWN COUNTY, WISCONSIN Purpose: The purpose of this Ordinance is to regulate the operation of golf carts on Village roadways to promote public safety while allowing limited recreational and residential transportation. The Village Board of the Village of Hobart, Brown County, Wisconsin, does ordain as follows: Section 1: Article V (Golf Carts) of Chapter 264 (Vehicles and Traffic) is hereby created to read as follows: § 264-15. Purpose and Authority. A. Purpose. The purpose of this chapter is to regulate the operation of golf carts on Village roadways to promote public safety while allowing limited recreational and residential transportation. B. Authority. This Article is adopted pursuant to Wis. Stat. §349.18, which authorizes municipalities to regulate the operation of golf carts on highways within their jurisdiction. Where this chapter conflicts with Wisconsin Statutes, the Wisconsin Statutes shall control. § 264-16. Definitions. As used in this article, the following terms shall have the meanings indicated: ALLOWING, PERMITTING AND DIRECTING Includes any of the following (1) Providing the golf cart; (2) Giving verbal or implied permission; (3) Failing to take reasonable steps to prevent unauthorized operation by a minor; (4) Leaving the golf cart accessible in a manner that a reasonable person would expect to prevent unsupervised operation. GOLF CART A small motor vehicle designed and manufactured for operation on a golf course for sporting or recreational purposes and not capable of exceeding 25 miles per hour, and does not include the following: PAGE 75 ORDINANCE 2026-06 (GOLF CARTS) - Page 2 of 6 (1) All-terrain vehicles (ATVs) (2) Utility terrain vehicles (UTVs) (3) Low-speed vehicles regulated separately under Wisconsin law VILLAGE The Village of Hobart and its employees, appointed officials and elected officials § 264-17. Permitting. A. Village Permit Required (1) No golf cart may operate on a Village roadway without a Village Golf Cart Permit. (2) The permit shall: (a) Be valid for one year (b) Be displayed in a visible location on the golf cart (c) Be issued only after submission of required documentation and photographs (3) The governing body may establish a permit fee by resolution. B. Permit Display. (1) The Village golf cart permit shall be issued as a numbered decal or sticker. The decal must be: (a) Affixed to the front driver-side area of the golf cart (b) Visible from at least 25 feet (2) Failure to properly display the permit constitutes a violation. C. Documentation & Photo Submission. (1) Applicants must submit the following to the Clerk’s Office when applying for or renewing a permit: (a) Photographs of the golf cart clearly showing: 1. Front view 2. Rear view 3. Driver-side view 4. Passenger-side view 5. Headlights PAGE 76 ORDINANCE 2026-06 (GOLF CARTS) - Page 3 of 6 6. Taillights 7. Slow Moving Vehicle emblem (if applicable) (b) Proof of liability insurance covering the golf cart. (c) A completed Village permit form. (d) Payment of applicable fees. (2) The Clerk shall review the submitted photographs and documents to verify: (a) Required safety equipment is present (b) The cart meets the definition of a golf cart under Wisconsin law (c) Insurance is valid (3) The Clerk may request additional photos if needed to confirm compliance. § 264-18. Equipment, Operation and Roadway Use. A. Equipment Requirements. Golf carts operated on Village roadways must have: (1) White headlights visible for 500 feet (2) Red taillights visible for 500 feet (3) Slow Moving Vehicle emblem (if required) (4) A properly functioning muffler (5) Operational brakes (6) Steering mechanism in safe operating condition B. Insurance Requirement. Owners must maintain liability insurance covering operation of the golf cart. Proof must be provided at registration and upon request by law enforcement. C. Operator Requirements. Operators must: (1) Be at least 16 years old (2) Possess a valid driver’s license (3) Not be under probationary, suspension or revocation status (4) Comply with all Wisconsin traffic laws D. Adult Responsibility for Underage Operators. No owner, parent, guardian, or person in charge of a golf cart may permit, direct, or allow any person who does not meet the minimum operator requirements of this chapter PAGE 77 ORDINANCE 2026-06 (GOLF CARTS) - Page 4 of 6 to operate a golf cart on a Village roadway. When a viol ation of this chapter involves an operator who is a minor, the citation shall be issued to the owner, parent, guardian, or person responsible for allowing or permitting the operation, and not to the minor. The minor operator may be cited only when the investigating officer determines that the minor operated the golf cart without the knowledge or permission of any owner, parent, guardian, or person responsible for the cart. E. Authorized Roadways. Golf carts may operate only on Village roadways with speed limits of 25 mph or less. F. State Trunk Highway Prohibition. Golf carts may not operate on or cross any state trunk highway or connecting highway. G. Crossing of Other Highways. Golf carts may cross higher speed roads only if: (1) The crossing occurs at approximately a right angle (2) The operator yields to all traffic (3) The crossing provides immediate access to a permitted roadway H. Prohibited Areas. Golf carts may not operate on: (1) Sidewalks (2) Pedestrian walkways (3) Recreational or walking trails (4) Terrace areas between sidewalk and curb (5) Village parks except where specifically designated I. Rules of Operation. Operators must: (1) Drive on the extreme right side of the roadway (2) Travel in single file (3) Yield to vehicles, bicycles, and pedestrians (4) Obey all traffic laws (5) Headlights and taillights must be on while driving. J. Direct Travel Requirement. Golf carts must travel directly between destinations. Repetitive driving without purpose (“cruising”) is prohibited. K. Unattended Vehicles. Golf carts may not be left unattended on public roadways unless lawfully parked and secured – complying with all other vehicle parking requirements outlined in Village code. L. Hours of Operation. Golf carts may not operate between 10:00 PM and 7:00 AM, unless otherwise authorized by Village Board ordinance or resolution. PAGE 78 ORDINANCE 2026-06 (GOLF CARTS) - Page 5 of 6 § 264-19. Enforcement and Liability. A. Permit Revocation. The Village may revoke a permit if: (1) Equipment requirements are not maintained (2) Insurance coverage lapses (3) Repeated ordinance violations occur B. Enforcement. This chapter shall be enforced by the Hobart-Lawrence Police Department. C. Penalties. Violations shall be subject to forfeitures under the Municipal Code and Wisconsin Statutes. D. Liability and Assumption of Risk. Golf cart operation on Village roadways is a privilege and not a right. Persons operating or riding in golf carts do so at their own risk. Nothing in this chapter waives governmental immunity protections under Wis. Stat. §893.80. E. Vehicle Modifications Prohibited. Golf carts may not be modified to: (1) Exceed 25 mph (2) Function as another class of motor vehicle (3) Create unsafe conditions (4) Minor accessories such as mirrors or windshields are permitted. F. Alcohol and Open Intoxicants. No person may consume alcohol or possess an open container of alcohol in a golf cart operating on a Village roadway. G. Passenger Limitations. No golf cart may carry more passengers than the manufacturer’s designated seating capacity. All passengers must be seated. § 264-20. Severability. If any provision of this chapter is declared invalid, the remaining provisions shall remain in effect. Section 2: Any Ordinance or parts thereof, inconsistent herewith are hereby repealed. Section 3. This Ordinance shall be effective from and after its passage by the Village Board and publication as required by law. Passed and approved on this ___ day of _____ 2026. ______________________________________________________ Richard Heidel, Village President PAGE 79 ORDINANCE 2026-06 (GOLF CARTS) - Page 6 of 6 Attest: ______________________________________________________ Aaron Kramer, Village Administrator CERTIFICATION The undersigned, being the duly appointed Clerk of the Board of the Village of Hobart, certifies that the aforementioned is the original ordinance adopted by the Village Board. IN WITNESS WHEREOF, I have executed this Certificate in my official capacity on _______, 2026. (Seal) ________________________________ Lisa Vanden Heuvel, Village Clerk PAGE 80 Page 1 of 1 MEMORANDUM TO: Public Works Committee and Village Board FROM: Aaron Kramer, Village Administrator RE: Acceptance of Wyldberry Way as Public Roadway DATE: March 5, 2026 BACKGROUND In 2023, the Village received a petition to accept Wyldberry Way as a public roadway. To ex pedite a decision, a legal option from the Village’s legal team (Attorney St eve Sorenson) has been dra fted and is being provided for review. POSSIBLE RECOMMENDATIONS There are two (2) possible recommendations that the Committee can consider tonight, although another variation is certainly permissible.  Recommend the Village Board deny the request to accept Wyldberry Way as a public roadway  Recommend the Village Board approv e the request to accept Wyldberry Way as a public roadway The recommendation of the Committee will be forwarded to the Village Board from its April 2nd meeting. PAGE 81 TAGLaw International Lawyers Steven R. Sorenson Direct Telephone 920-232-4846 steven.sorenson@vonbriesen.com February 9, 2026 VIA E-MAIL Hobart Village Board 2990 South Pine Tree Road Hobart, WI 54155 Dear Members of the Board, I represent the Village of Hobart in various municipal and zoning matters affecting the Village, and I have been asked by the Village of Hobart Administrator, Public Works Director, and Economic Development Director to provide a legal opinion for a matter to be presented before the Board. This opinion is as follows. For context, over the past several months, counsel from Ruder Ware representing the Wyldberry Condominium Association has been in contact with the Village requesting a dedication of a private road. Under the terms of the proposed arrangement, the private roadway—Wyldberry Way—would be dedicated to the Village to become a Village-maintained public roadway. Wyldberry Way falls below the statutorily required 60-foot width requirement for a public roadway, though the road is believed to be compliant with Village ordinances because of its location within the Centennial Centre at Hobart planned use development. It is my legal opinion that proceeding with this dedication—in other words, making the private roadway a public one, which would be owned and maintained by the Village, is not supported by any compelling government interest and in fact would create a significant increase in municipal liability for the Village. Not only would the approval create additional responsibilities for the Village related to the roadway, but a decision to accept dedication at this point could cause a dangerous precedent. It is my professional opinion that accepting this dedication is not in the Village’s best interests. My suggestion for the Board is to formally decline this proposal for the reasons set forth below. I. The Relevant Ordinance Does Not Require This Action. As stated above, Wyldberry Way falls below the minimum roadway width under Wis. Stat. sec. 236.16(2), but local ordinance does state that “normal standards or operational policy regarding right- of-way widths, provision for sidewalks, streetlighting and similar environmental design criteria shall not be mandatory in the district.” Ord. sec. 295-122. For this reason, the Village maintains the PAGE 82 - 2 - discretion to either proceed with the dedication or to turn down the offer presented by the Condominium Association. There is no language in the Village Ordinances indicating that the Village is required to accept such a proposition related to a private roadway. Likewise, there is no supporting historical evidence to indicate that the Village has ever accepted a proposal such as this. It has been noted that in all other projects in the community, there are no substandard roadways within this TIF district or any other district that have been approved. Thus, there is no legal requirement being imposed upon the Village, contrary to suggestions from the Condominium Association. II. There is No Compelling Reason for the Village to Incur Additional Costs and Effort. Under well-established principles of municipal law, the Village and all other municipalities are required to consider whether taking a particular action is driven by a compelling reason to promote the public interest. With respect to the present situation, there is no compelling reason for the Village to accept the dedication of a private roadway, because doing so would not provide any benefit (tangible or intangible) to the Village as a whole. In order to provide a private benefit, which is exactly what would occur if the roadway was accepted by the Village, there must be a corresponding public benefit that would outweigh the private benefit to be received by the private landowner. In this case, the Condominium Association obtains the benefit of still providing roadway access to its residents, but it also discharges all responsibility to maintain the roadway. This includes everything from fixing potholes to snow removal in the winter. The Village, then, would be required to take on these responsibilities in exchange for no discernible benefit. To allow a private owner to benefit, with no significant public interest or a public interest that would be superior to the private owner’s interest, would be an improper use of the Village’s municipal power. III. This Would Set Precedent for Other Private Roadways. Officers of the Village have expressed their belief that approving this dedication would set a dangerous precedent. The developer originally came to the Village requesting a conditional use permit for the establishment of this condominium project. That project as presented had a private roadway which was not up to municipal standards. The applicant, at the time of obtaining the conditional use permit, has indicated at all times that the roadway would be a private roadway. The Village’s decision to approve the initial permit was conditioned upon this understanding. To change course now and accept a substandard roadway would create a precedent for other development projects within the Village. Then, all owners of nearby development projects could request for their private roadways (standard or substandard) to be plowed and maintained by the Village, and they would be able to point to Wyldberry Way as a previous example in which such a request has been approved. If the Village is pressured into accepting each future request like this, it would create a substantial drain on Village resources and would be an undesired potential consequence of the present approval. PAGE 83 - 3 - IV. The Dedication Would be Administratively Burdensome. The condominium development is characterized by substandard lot configurations, including exceptionally narrow front yards. If the Village were to accept dedication of the roadway at issue, it would be required to establish a right-of-way of at least fifteen feet. Doing so would place the edge of the right-of-way within approximately three to five feet of certain residences within the subdivision. Such proximity would be impractical and is not believed to be in the best interests of either the Village or the affected property owners. Additionally, the intersection ratios associated with the roadway do not comply with applicable municipal standards. Acceptance of the roadway would therefore require the Village to assume responsibility for substandard intersection conditions that present potential safety and operational concerns. The Village has no precedent for accepting roadways with such nonconforming intersection ratios, nor is there any demonstrated justification for doing so in this instance. Finally, acceptance of the roadway would necessitate the imposition and ongoing enforcement of significant easement requirements and parking restrictions to comply with applicable safety and design standards. The Village is not currently subject to these restrictions, as Wyldberry Way is not presently a public roadway. Assuming such responsibilities would impose additional administrative and regulatory burdens that further weigh against acceptance of the proposed dedication. Notwithstanding these points, it should be repeated that the Village would be responsible for all maintenance of this roadway, including snow removal. Because of the substandard width of the road and the sizes and capabilities of Village plows, it is believed that proper and effective snow removal would be difficult on this roadway and thus the Village and the taxpayers would incur substantial costs as a result. For the reasons set forth here, it is my legal opinion that the Board should not approve the Condominium Association’s proposal to dedicate Wyldberry Way to the Village. If you should have any questions regarding this matter, please direct them to me or the Village Administrator. Very truly yours, von BRIESEN & ROPER, s.c. Steven R. Sorenson SRS:ms PAGE 84 Suburban Wildlife Solutions LLC Keeping the Wild Out of your Life Wildlife removal is being done under the WI Dept of Natural Resources Nuisance Wildlife Guidelines. Time Period for removals: 3-15-2026 to 12-31-2027 – Two Year Agreement Type of Wildlife to be removed: Check all that apply: ( X) Muskrat ( ) Skunk ( ) Coyote ( ) Woodchuck ( ) Raccoon ( ) Otter ( ) Opossum ( ) Squirrel ( ) Chipmunk ( ) Fox ( ) Rabbits ( ) Beaver ( ) Weasel ( ) Mink ( ) ________ ( ) _________ Permission: I herby give permission to Suburban Wildlife Solutions LLC. to remove wildlife on Graybar’s property. Location Where Removals To Be Done: Village of Hobart ponds Customer’s Address (if different): Village of Hobart Jerry Lancelle - Director of Public Works 2990 S. Pine Tree Road Hobart, WI 920-869-3807 Email – Jerry@hobartwi.gov Signature: ____________________________ Dated: ____-_____-2026 Customer agrees to pay $425.00 dollars per pond for each 5-7 day removal session. The ponds to be done each session are: Navigator Way – North, Navigator Way – South, Sunlit Pond – cell tower pond, Sunlit Pond – Pond along Overland Road, Sunlit Pond – Dry ponds, Sunlit Pond – Large pond to South of cell tower, Sunlit Pond – Triangular shaped pond – South, Crossroads Dr. Pond Spring and fall removals will be scheduled automatically. Please let us know if you would like a mid-summer removal. Any trap theft to be paid for by customer. Initial ____ Suburban Wildlife Solutions LLC Questions Call - N1940 County Rd CC Cell 920-228-1033 Kaukauna, WI 54130 SuburbanWS@Gmail.com WWW.SuburbanWildlifeSolutionsLLC.com PAGE 85 Reports: When trapping is complete a report will be given to the Village of Hobart detailing number of muskrats removed and notable pond conditions that were found when inspected. Aquatic invasive species, such as zebra mussels, Eurasian watermilfoil and Phragmites, often spread to new waters by hitching a ride on traps, trap stakes, waders, and other tools or equipment. Traps are especially problematic because their mesh is difficult to clean thoroughly. Suburban Wildlife Solutions to minimize the risk of transporting aquatic invasive species, all equipment removed from a pond must be allowed sufficient time to dry—typically 5–7 days—before being used in your other ponds or moved to a different customers body of water. While this process requires a significant amount of equipment and planning, the long-term benefits and protection of our waters make the effort worthwhile. Insurance: Liability insurance specific to trapping $1,000,000 per occurrence, $2,000,000 max. $1,000,000 liability in business auto insurance, and Workman’ Comp policy, specific to trapping and wildlife disease. Insurance information will be updated as needed. Other: An approved ANSI/ISEA 207-2006 Public Safety reflective vest or equivalent will be worn at all times while trapping to help a person identify me as someone who has permission to work on the ponds. Any trap loss due to theft will be reported to the DNR and the local Police Department. Brief Overview of Muskrats: Muskrats are very prolific as referenced in the article below. (Reference article is from Wisconsin Department of Natural Resources, Bureau of Wildlife Management) Muskrats -------Muskrats are widely distributed throughout North America. This species can adapt to a wide variety of climates. Muskrats are dependent upon habitats including water. This species thrives in many lakes, rivers, creeks, ponds, and marshes. Muskrats can tolerate a certain amount of pollution in water, and this important furbearer is often found living within large cities. Reproduction Muskrats are one of our most prolific species. Adult muskrats can have up to five litters in a year's time. Muskrats in northern states seem to average about 2.5 litters a year. Litter sizes vary, and 5 or 6 kits per litter is common. Female muskrats born in the spring are sometimes capable of raising their own litter by late summer or early autumn. An average female muskrat will raise about 15 or 16 young in a good year. One female muskrat has been known to produce 46 young in one year. General Uncontrolled muskrat populations do cause damage to private property and habitat. Hole digging activities undermine earthen dams and dikes. Damages also occur to irrigation canals and farm PAGE 86 ponds. Large populations of muskrats also cause "eat-outs". These areas are simply overcropped by the feeding activities of the muskrats and the loss of vegetation and resulting silting makes the area less productive for other wildlife species as well. Muskrat "eat-outs" often destroy the roots of the vegetation, and it may take 15-20 years for the habitat to return to its original capacity to serve wildlife. Feedback: I would appreciate any and all feedback of my removal activities to be communicated to me immediately via cell. I have never had any complaints from residents, companies, or from municipalities that I have worked with. That being said, I totally understand that I am the only wildlife removal specialist most people will ever meet, so for them to have a positive image is a very important responsibility to me. Thank you! Kurt Schroeder PAGE 87 PAGE 88 LOT 1 83,295 SF 1.912 Acres 386.75' N00°00'00"E 227.00' Lot 1 CSM 9008 Lot 2 CSM 9216 Outlot 1 60 CSM 61 Lot 2 CSM 9467 Lot 1 CSM 9467 Lot 1 CSM 9216 LOT 2 427,881 SF 9.823 Acres 20 16 19 11 PROPOSED BUILDING 12,000 SF MASONRY DUMPSTER ENCLOSURE ENTRY/ EXIT DRIVE ENTRY/ EXIT DRIVE ENTRY/ EXIT DRIVE ASPHALT PARKING SRUFACE (66) TOTAL STALLS, 29,240 SF CONC. PATIO 270' N90°00'00"E 106.72' N90°00'00"E 100.00' Centerline Drive Lot 2 CSM 9008 Lot 1 CSM 8727 50' 50' 50' 50' CENTENNIAL CENTRE BLVD. Lot A Lot 4 SE1/4-NW1/4 SE1/4-NW1/4 Larsen Orchard Parkway N00°00'00"E 489.73' 35' 35' 35' 35'35' 35' 35' 35' 35'35' 35'35' Lot 1Lot 1 102.98' 20' 10' 10' 20' Storm Sewer Easement 25' HB-537 HB-537-1 CERTIFIED SURVEY MAP 6+((7  2) [ R:\2300\2320\2320292\DWG\2320292csm.dwg NOTES: 1. Affected Parcel No's: HB-537 & HB-537-1 2. See Curve & Line Tables on Sheet X of X Bearings are referenced to the Brown County Coordinate System. The south line of Lot 1 of Section 11, T24N-R19E bears N89°43'21"W. 160'0' 80' 160' SCALE: 1"= 160' Set 1" x 18" Iron Pipe with cap Recorded County Monument Found 1" Iron Pipe weighing 1.38 lbs./lin. ft. /(*(1' Lot 13 Centennial Centre at Hobart First Addition 35(/,0,1$5< PAGE 89 MECHANICAL - STORAGE ACTIVITIES 8'-0" 68'-0" 40'-0" 36'-0" 8'-0"2'-0" 2'-0" 8'-0" WOMEN 2'-0" 36'-0" 40'-0" 8'-0"8'-0"8'-0" 8'-0" 8'-0" MEN 2'-0" 2'-0" 2'-0" LOW PITCH BEAM RIGHT SIDE ELEVATION 5" x 9-5/8" PORT ORFORD CEDAR COLUMN LOW PITCH BEAM 12 3 FRONT ELEVATION FLOOR PLAN 5" x 9-5/8" PORT ORFORD CEDAR COLUMN MANUFACTURER'S INSTRUCTIONS, OVER 30 YEAR WARRANTY, TO BE INSTALLED PER CLASS "A" FIBERGLASS SHINGLES WITH A T & G DECKING WITH VEE GROOVES ON 30# FELT AND #1 2"X 6" S.Y. PINE FINISH FACE CEDAR FASCIA 2x8nom TIMBER WALL STACKED CEDAR Column/Footing Detail Final Size TBD Concrete Pier By Others 3' DIA 5'-0" 4" Slab 9-5/8" 3" 3" 3" #4 Horiz Tie 8" O.C. #6 Vertical Ties 6 Equally Spaced 4'-0" SALEM SQUARE CORNERS 4-1/4" 4-1/4" 3-1/2" 1-1/2" SEE DETAIL TIMBER WALL STACKED CEDAR SCALE: NTS NOT FOR CONSTRUCTION WWW. CEDARFORESTPRODUCTS.COM 800-552-9495 WEST OLIVE, MI 49460 P.O. BOX 145 PRELIMINARY CEDAR FOREST PRODUCTS PAGE 90 PAGE 91 PAGE 92 PAGE 93 PAGE 94 PAGE 95 40x60 Park shelter w/ bathrooms and Concrete - Wood Frame Construction 125,000-175,000 Water and Sewer installation 15,000-20,000 Site Prep, excavate and gravel base install 40,000.00 If performed by DPW 20,000 Landscaping 7,500.00 If performed by DPW 3,000 187,500-242,500 If performed by DPW 23,000 Work Performed by DPW (more cost effective but may impact timing and other DPW work) 163,500-218,500 PAGE 96 PRELIMINARYNot for Construction 07/2022 FLOOR PLAN 2320269 LLP ---- JGS 1FLOOR PLAN CONCESSION BUILDING FOUR SEASON'S PARK VILLAGE OF HOBART BROWN COUNTY, WISCONSIN 24'-0"' 10'-0"' 18'-8"' 28'-8"' 28'-0"' 52'-8"' 10'-8"' 6'-8"' 10'-8"' COVERED CANOPY AREA CONCESSION WOMEN'S ROOM MECHANICAL ROOM STORAGE MEN'S ROOM FLOOR PLAN SCALE: 1/4" = 1'-0" PAGE 97 OWNER Village of Hobart PROJECT Four Seasons Park - Phase I Improvements DATE August 2022 Item Unit Qty. Unit Price Total Price Baseball Field Improvements 1 Grading - General Excavation LS 1 15,000.00$ 15,000.00$ 2 Topsoil, Seed, and Mulch SY 17500 2.75$ 48,125.00$ 3 Infield Material Each 2 35,000.00$ 70,000.00$ 4 7' Chain Link Fence, Outfield LF 1600 45.00$ 72,000.00$ 5 24' Backstop & Fence Each 2 30,000.00$ 60,000.00$ 6 Dug Out (set) Each 2 35,000.00$ 70,000.00$ 7 Bleachers LS 1 25,000.00$ 25,000.00$ 8 Scoreboards Each 2 15,000.00$ 30,000.00$ 9 Drainage Improvements LS 1 20,000.00$ 20,000.00$ 10 Limited Yard Lighting LS 1 10,000.00$ 10,000.00$ 11 Landscaping - Trees / Shrubs LS 1 6,000.00$ 6,000.00$ 12 Erosion Control LS 1 3,500.00$ 3,500.00$ Baseball Field Improvements SUBTOTAL 429,625.00$ 13 Concession Building SF 850 275.00$ 233,750.00$ 14 Site Work (Grading / Drainage / Flatwork) LS 1 60,000.00$ 60,000.00$ 15 Well / Septic Upgrade LS 1 30,000.00$ 30,000.00$ Pavillion / Concession Stand SUBTOTAL 323,750.00$ 16 Excavation LS 1 10,000.00$ 10,000.00$ 17 Crushed Aggregate (Road Base) SY 1700 11.50$ 19,550.00$ 18 Pavement - 3" SY 1600 18.00$ 28,800.00$ 19 Electrical / Lighting LS 1 12,500.00$ 12,500.00$ 20 Resotration / Erosion Conrol LS 1 9,000.00$ 9,000.00$ Site Development SUBTOTAL 79,850.00$ 833,225.00$ 20% 166,645.00$ 999,870.00$ Engineering/Contingency/Fees (20%) TOTAL OPINION OF PROBABLE COST (2022 Dollars) Baseball Field Improvemts (2 - 210' Fields) Park Pavillion / Concession Stand Pavillion / Concession Stand Site Development TOTAL CONSTRUCTION R:\2300\2320\2320269\Four Seasons Park - Phase I Estimate PAGE 98

Source: Village of Hobart website. First collected Oct 15, 2026.