City of Verona
111 Lincoln Street
Verona, WI 53593
(608) 845-6495
veronawi.gov
PUBLIC WORKS, SEWER & WATER COMMITTEE-
DATE: Monday, June 22, 2026 TIME: 5:30 PM
LOCATION: VERONA CITY HALL
ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
1. Call to Order
2. Roll
3. Public Comment
4. Approval of the Minutes:
5. Discussion: Water Supply Service Area Plan Presentation Stand Associates
6. Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction. Pay request #5
James Peterson and Sons Inc.
7. Discussion and Possible Action: Project 2026-100 Pavement Surface Treatment (Chip Seal)
8. Discussion and Possible Action: Project 2026-102 GSB-88 Bituminous Sealing
9. Discussion and Possible Action: Old Hwy PB (south) from CTH M to CTH PB and American Way
Jurisdictional Transfer
10. Staff Report:
11. Adjourn
Beth Tucker Long - Chairperson
POSTED: June 19, 2026
POSTED: Verona City Hall
Verona Public Library
Miller’s Market
All agendas are posted on the City website at: veronawi.gov
WRITTEN COMMENTS: You can send comments to the Public Works, Sewer & Water Committee on any matter, either on or not on the
agenda, by emailing bmanning@veronawi.gov or in writing to Public Works, Sewer & Water Committee, 410 Investment Court, Verona, WI,
53593.
Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City
Clerk at (608) 845-6495 at least 48-hours preceding the meeting. Every reasonable effort will be made to accommodate your request.
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works, Sewer & Water Committee to
gather information about a subject over which they have decision-making responsibility. The City Council and any other standing
committees will not take formal action at this meeting.
City of Verona
111 Lincoln Street
Verona, WI 53593
(608) 845-6495
veronawi.gov
PUBLIC WORKS, SEWER & WATER COMMITTEE-
DATE: Monday, June 8, 2026 TIME: 5:30 PM
LOCATION: VERONA CITY HALL
ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
1. Call to Order Meeting called to order at 5:33 pm by Alder Beth Tucker Long.
2. Roll Beth Tucker Long, Ajejandro Hernandez, Chris Weiss, also present Carla Fisher-AE-COM, Jamie
Aulik-City Administrator, Eric Dundee-MMSD, Mike Trotter- Assistant Public Works Director
3. Public Comment None
4. Approval of the Minutes: Moved by Alder Weiss and seconded by Alder Hernandez to approve the
minutes of April 27 meeting. Motion passed 3-0.
5. Discussion: Madison Metropolitan Sewage District Presentation
6. Discussion and Possible Action: Project 2022-107 Military State Trail Pedestrian Structures,
Janke General Contractors. Move by Alder Weiss and seconded by Alder Hernandez to recommend
approval of awarding Project 2022-107 Military Ridge State Trail - Bridges (Janke General Contractors,
Inc) for a contract sum not to exceed $1,607,360.37. Motion passed 3-0.
7. Discussion and Possible Action: Project 2022-107 Military State Trail Pedestrian Structures, MSA
Design, additional services change order #1. Moved by Alder Weiss and seconded by Alder
Hernandez to approve Project 2022-107 Military State Trail Pedestrian Structures MSA Design,
additional services change order #1 for a sum not to exceed $36,683.00. Motion passed 3-0.
8. Discussion and Possible Action: Project 2026-105 Shuman, Marietta Reconstruction Design
Service Agreement KL Engineering. Moved by Alder Tucker Long and seconded by Alder Hernandez to
recommend approval of Project 2026-105 Shuman, Marietta Reconstruction Design service agreement
KL Engineering for a sum not to exceed $317,275.00. Motion passed 3-0.
9. Discussion and Possible Action: Agreement to Apportion MMSD Connection Fees. Moved by Alder
Weiss and seconded by Alder Tucker Long to recommend approval of the Public Utility Extension
Agreement. Motion passed 3-0.
Discussion and Possible Action: Ordinance No. 26-1098 - Repealing and Recreating Title 8, Chapter 3 -
Refuse Disposal and Collection; Recycling. Moved by Alder Tucker Long and seconded by Alder Weiss to
recommend approval of Ordinance No. 26-1098 - Repealing and Recreating Title 8, Chapter 3 - Refuse
Disposal and Collection; Recycling. Motion passed 3-0.
10. Discussion and Possible Action: Implementation of a Rectangular Rapid Flashing Beacon Policy.
Move by Alder Weiss and seconded by Alder Hernandez to recommend approval of the Rectangular
Rapid Flashing Beacon Policy with edits. Motion passed 3-0.
11. Discussion and Possible Action: Implementation of a Roadway Striping Policy. Move by Alder
Tucker Long and Seconded by Alder Weiss to recommend approval of the Roadway Striping Policy
with edits. Motion passed 3-0.
12. Staff Report:
13. Adjourn Moved by Alder Weiss and seconded by Alder Tucker Long to Adjourn at 6:42pm. Motion
passed 3-0.
Beth Tucker Long - Chairperson
POSTED: June 4, 2026
POSTED: Verona City Hall
Verona Public Library
Miller’s Market
All agendas are posted on the City website at: veronawi.gov
WRITTEN COMMENTS: You can send comments to the Public Works, Sewer & Water Committee on any matter, either on or not on the
agenda, by emailing bmanning@veronawi.gov or in writing to Public Works, Sewer & Water Committee, 410 Investment Court, Verona, WI,
53593.
Notice: If you need an interpreter, materials in alternative formats, or other accommodation to access the meeting, please contact the City
Clerk at (608) 845-6495 at least 48-hours preceding the meeting. Every reasonable effort will be made to accommodate your request.
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works, Sewer & Water Committee to
gather information about a subject over which they have decision-making responsibility. The City Council and any other standing
committees will not take formal action at this meeting.
Meeting Date: Monday June 22, 2026
PW/S&W Committee Memo
Page 1 / 2
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (5) Discussion: Water Supply Service Area Plan Presentation Stand Associates
Memo: Wisconsin Administrative Code NR 854 NR 854 Water Supply Service Area Plans -
Wisconsin DNR requires public water supply systems serving 10,000+ people to prepare
Water Supply Service Area Plan. These plans help utilities forecast demands, delineate
future service boundaries, and ensure sustainable water withdrawals over a 10-to-20-year
planning period.
Recommended Motion: Move to approve the Water Supply Service Area Plan
Item (6) Discussion and Possible Action: Project 2024-105 Mark Drive Reconstruction.
Pay request #5 James Peterson and Sons Inc.
Memo: This pay application is for work performed installing storm sewer, sanitary, and
water main with hydrants and services. The work and pay application were inspected,
verified, and reviewed by staff.
Recommended Motion: Move to approve Project 2024-105 Mark Drive Reconstruction
Pay request #5 James Peterson and Sons Inc. for a sum not to exceed $430,671.85
Item (7) Discussion and Possible Action: Project 2026-100 Pavement Surface Treatment
(Chip Sealing)
Memo: This is the annual Chip seal contract. City staff received bids using the Quest
Online bidding system for Wisconsin and received 2 bids. Staff have reviewed the bids and
have worked with Scott Construction in the past and recommend awarding the contract to
them.
Recommended Motion: Move to recommend approval Project 2026-100 Pavement
Surface Treatment (chip sealing) , Scott Construction Inc. for a sum not to exceed
$146,151.45.
Meeting Date: Monday June 22, 2026
PW/S&W Committee Memo
Page 2 / 2
Item (8) Discussion and Possible Action: Project 2026-102 GSB-88 Bituminous Sealing
Memo: GSB-88® (Gilsonite Sealer-Binder) is a chemically engineered, emulsion-based
restorative asphalt sealer designed to preserve and extend the lifespan of pavements in
fair to good condition. City staff received bids using the Quest Online bidding system for
Wisconsin and received 1 bid. Staff have worked with Fahrner Ashalt Sealers LLC in the
past.
Recommended Motion: Move to recommend approval Project 2026-102 GSB-88
Bituminous Sealing, Fahrner Asphalt Sealers LLC. for a sum not to exceed $72,403.39
Item (9) Discussion and Possible Action: Old Hwy PB (south) from CTH M to CTH PB and
American Way Jurisdictional Transfer
Memo: Dane County Hwy is looking at transferring this right of way to the City of Verona.
We have water and sanitary easements located at this property and recommend that we
accept the Jurisdictional Transfer.
Recommended Motion: Move to recommend Jurisdictional Transfer Old Hwy PB
(south) from CTH M to CTH PB and American Way form Dane County to City of Verona.
Staff Report
Streets
sidewalk work curb and gutter repair
street sweeping asphalt repairs
basin mowing
Utility Progress Update
• Risk & Resilience Report Hydrant painting
• Water Master Plan Report Hydrant flushing
• Monthly Samples – Reports Valve turning
• Lead & Copper Testing
• Construction Projects
Excellence in Engineering
SM
Strand Associates, Inc.® ( )
Water Supply Service Area Plan (WSSAP)
City of Verona, Wisconsin
June 22, 2026
• Purpose of NR 854
Establishes procedures and requirements for public water supply systems to follow to help ensure systems can
provide adequate supply of water to their customers
• NR 854 applies to
Public water systems serving a population of 10,000 or more that operate their own wells or surface water intakes
• WSSAP must be submitted when additional withdrawal from the Great Lakes basin requires a new or
increased water use permit
• WSSAP reviewed every 5 years
NR 854 WSSAP
• Information about existing water sources, population projections and future water demands
• Inventory of the sources and quantities of the current water supplies in the area
• Identification of water supply options
• Delineation of the area to which the public water system may provide water
• An assessment of the environmental impacts of carrying out any significant recommendations of the plan
• An analysis of how the WSSAP aligns with existing comprehensive and wastewater facility plans
• An opportunity for the public to provide comment on the proposed WSSAP
Key Elements to Include in WSSAP
Water System Schematic Displays Flow of Water Through the System
Existing Supply and Storage Capacities
Existing and Future Services Areas Identified
Per Capita Sales by Category Are Generally Stable
Population Projections Result in High and Low Demand Projections
Current and Future High Growth Demand Projections Provides
Conservative Planning
Firm Well Capacity = 6,370 gpm
2040 Maximum Day Demand = 2,536 gpm
3,834 gpm of reserve well capacity
Capacity Analysis Identifies Surplus in Supply and Storage
1.3 MG of storage reserve
Water Source Alternatives
• Sand and gravel aquifer
Private wells, not recommended for public supply
• Upper bedrock aquifer
Well No. 1
• Lower bedrock aquifer
Well No. 6 currently
• Mixed upper and lower aquifers
Four wells (Well Nos. 2, 3, 4, and 5)
Well No. 6 originally
• Surface Water
Current system not prepared for source
• Interconnection
No review of viability has been conducted yet
Fitchburg, Middleton, and Mount Horeb
Summary
• Well supply surplus of 3,834 gpm in the year 2040 under the demand projections
• Water storage surplus of 1.3 MG in the year 2040 under the demand projections
• No significant changes to source water anticipated
• WSSAP is not intended to take the place of a detailed Water System Plan. A more detailed Water System
Plan will be prepared in the near future to align with a future updated to the City Comprehensive Plan and
to understand overall system operational and maintenance needs.
Questions?
Excellence in Engineering
SM
SECTION 2
SYSTEM INVENTORY
City of Verona, Wisconsin
Water Supply Service Area Plan Section 2–System Inventory
Prepared by Strand Associates, Inc. 2-1
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S2.docx\061126
2.01 SYSTEM OVERVIEW
The City owns and operates six groundwater wells within well houses, three elevated
storage tanks (EST), two ground-level reservoirs, three interzonal booster stations that supply water
through three pressure zones, and approximately 90 miles of distribution water main. The water main
ranges in size from 6 to 16 inches in diameter. Table 2.01-1 summarizes the quantity of water main in the
distribution system as reported to the PSCW at the end of 2024. A map of the distribution system, water
system components, and pressure zone service area can be found in Figure 2.01-1. A schematic of how
the water system components are connected to each other in relation to their pressure zone can be found
in Figure 2.01-2.
2.02 WELL SUPPLY
Six groundwater wells supply the distribution system. Table 2.02-1 presents the rated well capacity of
each well and the total and firm well capacity of the system. These capacities will be used for evaluating
the ability of the system to meet present and future projected demands. The total current well capacity is
8,570 gallons per minute (gpm), or 12.34 million gallons per day (MGD). The current firm well capacity,
defined as the total well capacity with the largest producing well (Well No. 5) out of service, is 6,370 gpm
or 9.17 MGD.
The following section provides a description of the existing wells and well facilities in the distribution
system.
Water Main Diameter
(inches)
Length
(feet)
Percent of Total
(%)
6 66,783 14
8 183,984 39
10 120,614 25
12 98,796 21
16 3,273 1
Total 473,450 100
Table 2.01-1 Existing Distribution System Water Main Inventory
Well No.
Well Capacity
(gpm)
1 370
2 1,000
3 1,500
4 1,500
5* 2,200
6 2,000
Total Capacity 8,570
Firm Capacity 6,370
*Well No. 5 being the firm well.
Table 2.02-1 Well Capacities
City of Verona, Wisconsin
Water Supply Service Area Plan Section 2–System Inventory
Prepared by Strand Associates, Inc. 2-2
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S2.docx\061126
A. Well No. 1
Well No. 1 is located on South Shuman Street and was drilled in 1932, and last rehabilitated in 2023. The
depth of the well is 771 feet and cased to a depth of 120 feet in the sandstone Mount Simon aquifer. The
production well is 10 inches in diameter. Chlorine and fluoride are added before entering the distribution
system. Well No. 1 feeds the Central Pressure Zone.
B. Well No. 2
Well No. 2 is located on Factory Street and was drilled in 1959, and last rehabilitated in 2022. The depth
of the well is 1,153 feet and cased to a depth of 170 feet in the sandstone Mount Simon aquifer. The
production well is 16 inches in diameter. Chlorine and fluoride are added before entering the distribution
system. Well No. 2 feeds the Central Pressure Zone.
C. Well No. 3
Well No. 3 is located on North Nine Mound Road was drilled in 1975, and last rehabilitated in 2026. The
depth of the well is 1,033 feet and cased to a depth of 131 feet in the sandstone Cambrian aquifer. The
production well is 16 inches in diameter. Chlorine and fluoride are added before entering the distribution
system. Well No. 3 feeds the Central Pressure Zone.
D. Well No. 4
Well No. 4 is located on Cross Country Road and is in the same facility as the North Booster Station. The
well was drilled in 1992 and last rehabilitated in 2025. The depth of the well is 1,148 feet and cased to a
depth of 185 feet in the sandstone aquifer. The production well is 18 inches in diameter. Chlorine and
fluoride are added before entering the distribution system. Well No. 4 feeds the Central Pressure Zone.
E. Well No. 5
Well No. 5 is located on Hubble Road on the Epic Systems (Epic) campus was drilled in 2012, and is in
the same facility as Well No. 5 reservoirs. The well was last rehabilitated in 2025. The depth of the well
is 1,163 feet and cased to a depth of 353 feet in the sandstone aquifer. The production well is 22 inches
in diameter. Chlorine and fluoride are added before entering the distribution system. Well No. 5 feeds the
Central Pressure Zone.
F. Well No. 6
Well No. 6 is located on Whalen Road and was drilled in 2019, and last rehabilitated in 2026. The depth
of the well is 1,070 feet and cased to a depth of 350 feet to not mix the shallow and deep aquifers. The
production well is 22 inches in diameter. Chlorine and fluoride are added before entering the distribution
system. Well No. 6 feeds the central southeast zone.
City of Verona, Wisconsin
Water Supply Service Area Plan Section 2–System Inventory
Prepared by Strand Associates, Inc. 2-3
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S2.docx\061126
2.03 STORAGE FACILITIES
System storage includes three ESTs and one ground-level reservoir. Table 2.03-1 presents the year
constructed, capacity, overflow elevation, and pressure zone served of each tank. The total volume of all
storage facilities is 1.6 million gallons (MG). All ESTs are single pedestal spheroids.
2.04 BOOSTER STATIONS
The City owns and operates three booster stations that supply each pressure zone.
A. North Booster Station
The North Booster Station is located on Cross Country Road. Well No. 4 feeds the North Booster Station
supplying the North Pressure Zone and north tower. There is one 1,200-gpm pump and three 1,000-gpm
pumps. Well No. 4 is in the same facility building as the booster station.
B. Southeast Booster Station
The Southeast Booster Station is located on County Road M. The Southeast Booster Station pulls from
the Central Pressure Zone to Southeast Pressure Zone. There are two 1,000-gpm pumps and
one 100-gpm pump. The City plans to complete upgrades to the booster station in 2027 that would
replace the 100-gpm pump with a 1,000-gpm pump and replace the other two 1,000-gpm pumps in kind.
A control valve allows water to flow from the southeast zone to the central zone, but with the current
demand in the Southeast Pressure Zone, the valve is no longer currently used.
C. Well No. 5 Booster Station
The Well No. 5 booster station is located in the same facility as Well No. 5 on Hubble Road on the
Epic campus. The two Well No. 5 ground level reservoirs feed the Well No. 5 booster station to supply
the Central Pressure Zone. There are two 1,000-gpm and two 500-gpm pumps.
Storage Facility
Year
Constructed
Last
Rehabilitated
Capacity
(gallons)
Overflow
Elevation
(feet) Pressure Zone
Tower 1–Central Tower 1974 2019, Exterior 300,000 1,156 Central
Tower 2–Southeast Tower 2000 2019, Exterior 300,000 1,212 Southeast
Tower 3–North Tower 2009 2024, Interior
2020, Exterior
500,000 1,231 North
Total Elevated Storage 1,100,000
Well No. 5 Reservoir 2012 500,000 1,048.25 Central
Total Ground Storage 500,000
Total Storage 1,600,000
Table 2.03-1 Storage Summary
SECTION 3
HISTORICAL AND PROJECTED DEMANDS
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-1
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
3.01 GENERAL
This section presents historic water demands currently observed by the City and develops a projection
of future demands. Water use trends are applied to population projections to estimate future demands to
the year 2040.
Water demand rate terminology used in this section are defined as follows:
ADD: The total volume of water pumped in a year divided by the number of days
in the year.
MDD: The day of the year on which the maximum amount of water is pumped.
Fire Demand: The estimated amount of water required in a community to fight a fire. This
demand is generally specified as a rate of flow, in gpm, for a given period
of time, in hours. The calculated fire demand is added to the domestic
demand during the maximum day to obtain the demand on a day that a
major fire occurs. Fire demand generally increases the volume of storage
that must be available on a maximum day.
The estimation of future water demands is not precise. The best forecast of future water demand is
obtained by projecting ADD based on population or customer growth and water use within the service
area. Future MDDs are then estimated by analyzing past ratios of MDD to ADD and applying the resulting
factor to the average day projections.
Prudent operation of a water utility requires that the fire system capacity always be in excess of system
demands. Therefore, recommended system improvements may be deferred until they become
necessary, or they may have to be implemented sooner if demands increase at a faster rate than
projected.
3.02 WATER SALES AND PUMPAGE
This section reviews existing system usage and pumping characteristics to obtain anticipated per capita
pumping information that can be used with population projections to calculate anticipated demands in
design years 2026, 2030, and 2040. Population projections can be found in Section 3.03.
A. Well Pumpage
The City’s historical water use records were obtained from the PSCW WEGS Reports for the years 2014
through 2024. Table 3.02-1 summarizes the historical water pumpage and sales data.
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-2
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
Table 3.02-2 presents the City-provided water pumpage at each well in the system since 2014. More
pumpage is anticipated at Well No. 6 for future projections.
Year
Annual
Pumpage
(gallons)
Average Day
Pumpage
(gpd)
Maximum Day
Pumpage
(gpd)
Average Day
Sales
(gpd)
MDD to
ADD
2014 540,176,000 1,478,921 2,694,000 1,024,263 1.82
2015 401,774,000 1,099,997 2,060,000 1,038,653 1.87
2016 415,646,000 1,137,977 1,840,000 1,051,759 1.62
2017 431,545,000 1,181,506 1,927,000 1,067,806 1.63
2018 447,467,000 1,225,098 2,172,000 1,055,907 1.77
2019 431,481,000 1,181,331 2,037,000 1,098,793 1.72
2020 434,540,000 1,189,706 2,474,000 1,092,942 2.08
2021 433,777,000 1,187,617 1,979,000 1,092,567 1.67
2022 437,537,000 1,197,911 2,068,000 1,100,348 1.73
2023 493,125,000 1,350,103 2,709,000 1,231,937 2.01
2024 508,643,000 1,392,589 3,036,000 1,212,112 2.18
gpd=gallons per day
Table 3.02-1 Water Pumpage and Sales Data
Year
Well No. 1
(gpd)
Well No. 2
(gpd)
Well No. 3
(gpd)
Well No. 4
(gpd)
Well No. 5
(gpd)
Well No. 6
(gpd)
2014 65,400 154,578 196,016 460,474 614,627 NA
2015 47,326 115,967 224,071 200,499 526,934 NA
2016 62,282 154,405 196,603 237,493 479,178 NA
2017 49,364 169,570 246,866 251,181 440,641 NA
2018 64,049 164,321 269,860 278,816 422,586 NA
2019 64,099 218,638 168,959 190,852 533,200 NA
2020 68,981 157,405 236,781 215,786 493,827 24,773
2021 74,203 173,348 177,729 203,485 445,397 136,345
2022 105,052 54,512 291,559 300,578 449,033 NA
2023 53,863 254,019 232,466 268,668 561,427 NA
2024 96,334 188,110 321,271 279,126 543,852 NA
NA=not available
Table 3.02-2 Average Day Annual Pumpage at Each Well Since 2014
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-3
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
B. Sales to Pumpage Ratio
Figure 3.02-1 presents the sales to pumpage ratios from 2014 to 2024. Sales will typically be less than
pumpage because of unaccounted water loss, unmetered sales, leakage, water main breaks, and hydrant
flushing. Sales to pumpage ratios have remained relatively steady in the City. For the purpose of
calculating future demands, the average sales to pumpage ratio since 2014 of 0.91 will be used.
Methods used to measure nonrevenue water by the City are as follows:
1. Systemwide Flushing–Well meter readings are recorded before and after each flushing
event.
2. Dead-End Flushing–A meter is attached to the flushing hydrant.
3. Unauthorized Consumption (Theft)–Theft typically occurs at bulk water fill stations. Water
use is estimated by customers past usage or equipment’s water tank size.
5. Leakage from Water Main and Service–Water use is based on pipe condition, size of water
main break or hole, and estimated duration of leak. Water industry tools are used to help
estimate leakage.
6. Water Tower Inspections–The volume of water spent during draining and used during
filling is calculated by the City, while a hydrant meter is used to measure the amount of
water used for cleaning the tower during inspection.
Figure 3.02-1 Sales to Pumpage Ratio
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-4
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
C. MDD to ADD Ratios
Figure 3.02-2 presents MDD to ADD ratios since 2014. According to PSCW’s WEGS Reports, the primary
reason for MDDs in the City is irrigation. The values range from 1.62 to 2.18. The average ratio of 1.93
will be used to forecast MDDs.
D. Sales
Table 3.02-3 presents the historical water sales in the City by category. Sales categories include
residential, commercial, multifamily, public authority, and industry sales. The City does not sell water to
wholesale customers. Commercial and multifamily have generally seen the largest sales increase, though
total sales have generally remained steadily increasing since 2014.
Figure 3.02-2 MDD to ADD Ratios
Year
Sales (gallons)
Residential Commercial Industrial Public Multifamily Total
2014 181,359,000 108,628,000 35,166,000 16,681,000 32,278,000 374,112,000
2015 181,163,000 109,179,000 35,431,000 18,249,000 35,346,000 379,368,000
2016 201,699,000 90,270,000 39,047,000 16,678,000 36,461,000 384,155,000
2017 203,531,000 85,603,000 43,379,000 16,795,000 40,708,000 390,016,000
2018 198,537,000 90,414,000 41,264,000 15,395,000 40,060,000 385,670,000
2019 203,176,000 95,523,000 40,690,000 21,537,000 40,408,000 401,334,000
2020 225,165,000 71,404,000 40,827,000 21,615,000 40,186,000 399,197,000
2021 217,921,000 89,337,000 23,936,000 25,893,000 41,973,000 399,060,000
2022 209,633,000 100,650,000 24,659,000 26,341,000 40,619,000 401,902,000
2023 224,792,000 122,060,000 27,345,000 31,383,000 44,385,000 449,965,000
2024 212,005,000 117,198,000 38,004,000 27,055,000 48,462,000 442,724,000
Table 3.02-3 Sales by Category
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-5
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
Table 3.02-4 presents the historical number of users for each category as reported by
PSCW WEGS Reports, which show relatively consistent numbers, except a drop in commercial and
industrial customers and an increase in residential customers in 2016. Even with the decreases and
increases, the total number of customers generally continues to steadily increase.
Appendix A presents the ten largest water users in the City and their usage since 2022. The largest water
users have largely been the same since 2022. Data was unable to be provided before 2022.
Figure 3.02-3 presents sales per capita per day values since 2014 for each sales category. Sales per
capita is calculated by taking the total sales from each category and dividing by the estimated population
that year. Per capita sales for each respective category have remained relatively steady. To reflect recent
trends in per capita sales categories, a residential value of 41 gallons per capita per day (gpcd),
commercial value of 18 gpcd, multifamily value of 8 gpcd, industrial value of 6 gpcd, and public value of
5 gpcd will be used.
Year
Customers (count)
Residential Commercial Industrial Public Multifamily Total
2014 3,468 884 75 46 76 4,549
2015 3,548 906 75 47 83 4,659
2016 4,203 384 40 46 88 4,761
2017 4,231 375 39 45 92 4,782
2018 4,292 389 40 48 92 4,861
2019 4,328 382 39 49 92 4,890
2020 4,380 381 40 54 94 4,949
2021 4,428 390 42 57 97 5,014
2022 4,500 400 43 56 97 5,096
2023 4,578 417 44 57 99 5,195
2024 4,667 430 45 57 109 5,308
Table 3.02-4 Customer Count
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-6
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
E. Total Per Capita Sales
Figure 3.02-4 presents the total per capita sales resulting from combining the per capita sales categories.
Total per capita sales have been relatively steady since 2014. The sum of the usage category averages
were used for projected future sales. The average total sales per capita value of 78 gpcd will be used.
Figure 3.02-3 Per Capita Sales by Category
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-7
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
3.03 POPULATION
City population projections developed in this section will be used with per capita pumping obtained in the
previous section to calculate anticipated demands in design years 2026, 2030, and 2040.
Population data was available from United States (US) Census data, Wisconsin Department of
Administration (WDOA), and the City’s2015 Water System Master Plan prepared by AECOM. This data
along with the City’s chosen projections are shown on Figure 3.03-1.
The City’s2015 Water System Master Plan had population projections to the year 2040 with an annual
growth rate of 3 percent. This projection included the expected growth of Epic and other potential
developments. The WDOA Demographic Service Center provided population projection data through the
year 2050 in 2025.
Based on the WDOA estimates, it is anticipated that the population served by water in the year 2026 will
be 17,000 people, 2030 will be 18,000 people, 2035 will be 20,000 people, and 2040 will be
22,000 people.
The City’s map of its existing water supply service area is shown in in Figure 2.01-1, while the anticipated
water service supply area to accommodate growth is shown on Figure 3.03-2.
Figure 3.02-4 Total Per Capita Sales
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-8
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
Figure 3.03-1 Population Chart
1,000
6,000
11,000
16,000
21,000
26,000
1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040
Population
Year
US Census Data WDOA Projection Estimate 2015 Master Plan 3% Growth WDOA Estimates
2020 Census: 14,030
2030 3% Growth
Projections: 18,855
2040 WDOA
Projections: 22,124
2040 Master Plan
Projections: 22,000
2030 WDOA
Projections: 17,983
2030 Master Plan
Projections: 17,000
2040 3% Growth
Projections: 25,340
2026 WDOA
Projections: 17,033
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-9
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
3.04 PROJECTED DEMANDS
A. Domestic Demand
Domestic demand projections were calculated using the water use trends developed in the previous
sections. The projected 2026, 2030, and 2040 demands will be used in Section 4 where demands will be
compared to available supply.
Table 3.04-1 presents the projected domestic day demand during City planning period. The projected
average day pumpage was calculated by multiplying the design population (see Table 3.04-1) by the
projected total per capita sales per day (78 gpcd) and dividing by the corresponding sales to pumpage
ratio (0.91). The maximum day pumpage is estimated by applying the MDD to ADD ratio of 1.93 to the
average day pumpage. The peak hour pumpage is estimated by applying the peak hour to maximum day
ratio of 1.36 to the maximum day pumpage, which was developed from 2025 maximum day data.
Table 3.04-2 presents the projected domestic day demands that are within the current water supply
service area and demands outside the current water supply service area in the projected growth area for
the City planning period. The projected demands were distributed based on percent area available.
Approximately 14 percent of the demands are allocated to growth areas within the current water supply
service area and 86 percent of the demands are allocated to growth areas within the future growth area.
Table 3.04-3 presents the projected domestic demands by category. The projected sales were calculated
by multiplying the design population by the projected per capita sales per day shown in Figure 3.02-3.
Design Year
Design
Population
ADD MDD Peak Hour Demand
gpm MGD gpm MGD gpm MGD
2026 16,796 1,002 1.44 1,936 2.79 2,632 3.79
2030 17,983 1,067 1.54 2,061 2.97 2,803 4.04
2035 20,054 1,190 1.71 2,299 3.31 3,126 4.50
2040 22,124 1,313 1.89 2,536 3.65 3,449 4.97
Table 3.04-1 Projected Domestic Demands
Design Year
Design
Population
ADD
(gpm)
Current Service
Area Demand
(gpm)
Future Service
Area Demand
(gpm)
2026 16,796 1,002 141 861
2030 17,983 1,067 150 917
2035 20,054 1,190 168 1,022
2040 22,124 1,313 185 1,128
Table 3.04-2 Projected Domestic Demands Distributed to Service Areas
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-10
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
Table 3.04-4 shows the projected average day nonrevenue water during the City planning period. The
nonrevenue water represents 9 percent of the total pumpage in the system, which is based on the sales
to pumpage ratio of 0.91.
B. Fire Demand
The Insurance Service Office (ISO) typically recommends basic fire flow requirements that are based on
the amount of water a municipality should be able to supply. ISO information for the City requires a
fire flow of 3,500 gpm for a duration of 3 hours and will be used for calculation purposes. Water supply
requirements during a fire flow are based on the amount of water the City should be able to supply on
the maximum day to obtain maximum credit for the community water system. Water for firefighting can
come from a combination of reserve capacity and available water storage. The total volume of water
required to fight a fire in the City on a maximum day in the distribution system for 2026, 2030, and 2040
are presented in Table 3.04-5.
Design Year
Residential
(gpy)
Commercial
(gpy)
Industry
(gpy)
Public
(gpy)
Multifamily
(gpy)
2026 251,254,299 110,425,302 36,808,434 30,673,695 49,077,912
2030 269,299,921 118,229,234 39,409,745 32,841,454 52,546,326
2035 300,306,176 131,841,736 43,947,245 36,622,704 58,596,327
2040 331,312,431 145,454,238 48,484,746 40,403,955 64,646,328
gpy=gallons per year
Table 3.04-3 Projected Domestic Demands by Category
Design Year
Desing
Population
Nonrevenue Water Use
gpm gpd
2026 16,796 90 129,853
2030 17,983 96 138,293
2035 20,054 107 154,215
2040 22,124 118 170,138
Table 3.04-4 Projected Nonrevenue Water Use
Design Year
MDD
(gallons)
Fire Demand
(gallons)
Total
(gallons)
2026 348,396 630,000 978,396
2030 371,040 630,000 1,001,040
2040 456,481 630,000 1,086,481
Table 3.04-5 Projected Volume of Water for Firefighting
City of Verona, Wisconsin
Water Supply Service Area Plan Section 3–Historical and Projected Demands
Prepared by Strand Associates, Inc. 3-11
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S3.docx\061126
Table 3.04-6 shows the average rate at which this water would be used during the fire.
Design Year
MDD
(gpm)
Fire Demand
(gpm)
Total
(gpm)
2026 1,936 3,500 5,436
2030 2,061 3,500 5,561
2040 2,536 3,500 6,036
Table 3.04-6 Projected Volume of Water for Firefighting
SECTION 4
ADDITIONAL REQUIRED CAPACITY
City of Verona, Wisconsin
Water Supply Service Area Plan Section 4–Additional Required Capacity
Prepared by Strand Associates, Inc. 4-1
\\strand.com\allcorpdata\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S4.docx\061026
4.01 2026 SYSTEM CAPACITY EVALUATION
A. Whole System 2026 Maximum Day
The total pumpage on the 2026 maximum day is estimated to be 1,936 gpm (2.79 MGD). The existing
firm well capacity is estimated to be 6,370 gpm (9.17 MGD). Because the City has an average reserve
supply of 4,434 gpm, no additional well capacity is needed to meet the 2026 MDDs.
Figure 4.01-1 is a graph of the projected hourly demands on the 2026 maximum day. The maximum
hourly demand is projected to be 2,632 gpm. The projected hourly demands are based on the diurnal
curve created from 2025 maximum day data.
With projected hourly demands less than the firm well capacity at all periods of time, the well supply will
satisfy the water demands without using storage.
Figure 4.01-1 2026 Projected Maximum Day Hourly Demands
City of Verona, Wisconsin
Water Supply Service Area Plan Section 4–Additional Required Capacity
Prepared by Strand Associates, Inc. 4-2
\\strand.com\allcorpdata\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S4.docx\061026
B. Whole System 2026 Maximum Day Plus Fire Demand
The total amount of water available to satisfy the maximum day plus fire demand is equal to the firm
system capacity plus the water available from usable storage. For this analysis, the firm system capacity
is equal to the firm well capacity. Section 3 of this Plan discusses the 2026 fire demand and requirements
for the City. A demand rate of 5,436 gpm (1,936 domestic demand plus 3,500 gpm fire demand) for
3 hours must be satisfied to provide the necessary fire protection for the system. Because a fire can start
at any time during the day, the expected domestic demand must be considered when calculating
available supply.
This analysis evaluated the system as a whole and assumes only effective system storage is assumed
to be available to meet necessary demands.
During a 180-minute fire event, the system is projected to have a reserve capacity of 7,600 gpm, or
approximately 1.4 MG. Therefore, no additional storage is needed to meet the projected 2026 maximum
day plus fire flow.
4.02 2030 SYSTEM CAPACITY EVALUATION
A. 2030 Maximum Day
The total pumpage on the 2030 maximum day is estimated to be 2,061 gpm (2.97 MGD). The existing
firm well capacity is estimated to be 6,370 gpm (9.17 MGD). Because the City has an average reserve
supply of 4,309 gpm, no additional well capacity is needed to meet the 2030 MDDs.
Figure 4.02-1 is a graph of the projected hourly demands on the 2030 maximum day. The maximum
hourly demand is projected to be 2,803 gpm. With projected hourly demands less than the firm well
capacity at all periods of time, the well supply will satisfy the water demands without using storage.
MDD - 1,936 gpm
Fire Demand - 3,500 gpm
Firm Well Capacity + 6,370 gpm
EST Capacity* + 4,583 gpm
Well No. 5 Reservoir Capacity** + 2,083 gpm
Total + 7,600 gpm
*Storage capacity=825,000 gallons per 180 minutes
**Reservoir capacity=375,000 gallons per 180 minutes
Table 4.01-1 2026 Whole System Supply Plus Fire Demand Storage
City of Verona, Wisconsin
Water Supply Service Area Plan Section 4–Additional Required Capacity
Prepared by Strand Associates, Inc. 4-3
\\strand.com\allcorpdata\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S4.docx\061026
B. 2030 Maximum Day Plus Fire Demand
Section 3 of this Plan discusses the 2030 fire demand and requirements for the City. A demand rate of
5,561 gpm (2,061 domestic demand plus 3,500 gpm fire demand) for 3 hours must be satisfied to provide
the necessary fire protection for the system. Because a fire can start at any time during the day, the
expected domestic demand must be considered when calculating available supply.
This analysis evaluated the system as a whole and assumes only effective system storage is assumed
to be available to meet necessary demands.
Figure 4.02-1 2030 Projected Maximum Day Hourly Demands
City of Verona, Wisconsin
Water Supply Service Area Plan Section 4–Additional Required Capacity
Prepared by Strand Associates, Inc. 4-4
\\strand.com\allcorpdata\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S4.docx\061026
During a 180-minute fire event, the system is projected to have a reserve capacity of 7,475 gpm, or
approximately 1.3 MG. Therefore, no additional storage is needed to meet the projected 2030 maximum
day plus fire flow.
4.03 2040 SYSTEM CAPACITY EVALUATION
A. 2040 Maximum Day
The total pumpage on the 2040 maximum day is estimated to be 2,536 gpm (3.65 MGD). The existing
firm well capacity is estimated to be 6,370 gpm (9.17 MGD). Because the City has an average reserve
supply of 3,834 gpm, no additional well capacity is needed to meet the 2040 MDDs.
Figure 4.03-1 is a graph of the projected hourly demands on the 2040 maximum day. The maximum
hourly demand is projected to be 3,449 gpm.
MDD - 2,061 gpm
Fire Demand - 3,500 gpm
Firm Well Capacity + 6,370 gpm
EST Capacity* + 4,583 gpm
Well No. 5 Reservoir Capacity** + 2,083 gpm
Total + 7,475 gpm
*Storage capacity=825,000 gallons per 180 minutes
**Reservoir capacity=375,000 gallons per 180 minutes
Table 4.02-1 2030 Whole System Supply Plus Fire Demand Storage
City of Verona, Wisconsin
Water Supply Service Area Plan Section 4–Additional Required Capacity
Prepared by Strand Associates, Inc. 4-5
\\strand.com\allcorpdata\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S4.docx\061026
With projected hourly demands less than the firm well capacity at all periods of time, the well supply will
satisfy the water demands without using storage.
B. 2040 Maximum Day Plus Fire Demand
Section 3 of this Plan discusses the 2040 fire demand and requirements for the City. A demand rate of
6,036 gpm (2,536 domestic demand plus 3,500 gpm fire demand) for 3 hours must be satisfied to provide
the necessary fire protection for the system. Because a fire can start at any time during the day, the
expected domestic demand must be considered when calculating available supply.
This analysis evaluated the system as a whole and assumes only effective system storage is assumed
to be available to meet necessary demands.
Figure 4.03-1 2040 Projected Maximum Day Hourly Demands
City of Verona, Wisconsin
Water Supply Service Area Plan Section 4–Additional Required Capacity
Prepared by Strand Associates, Inc. 4-6
\\strand.com\allcorpdata\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S4.docx\061026
During a 180-minute fire event, the system is projected to have a reserve capacity of 7,000 gpm, or
approximately 1.3 MG. Therefore, no additional storage is needed to meet the projected 2040 maximum
day plus fire flow.
MDD - 2,536 gpm
Fire Demand - 3,500 gpm
Firm Well Capacity + 6,370 gpm
EST Capacity* + 4,583 gpm
Well No. 5 Reservoir Capacity** + 2,083 gpm
Total + 7,000 gpm
*Storage capacity=825,000 gallons per 180 minutes
**Reservoir capacity=375,000 gallons per 180 minutes
Table 4.03-1 2040 Whole System Supply Plus Fire Demand Storage
SECTION 5
WATER SOURCE ALTERNATIVES AND RECOMMENDATIONS
City of Verona, Wisconsin
Water Supply Service Area Plan Section 5–Water Source Alternatives and Recommendations
Prepared by Strand Associates, Inc. 5-1
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S5.docx\061126
5.01 CONSERVATION
In 2008, the WDNR implemented a mandatory water conservation and water use efficiency program for
public water systems withdrawing water from the Great Lakes Basin. The WDNR rule required public
water systems requesting new withdrawals from the Great Lakes Basin after December 8, 2008, to create
a conservation program. The City is not within the Greak Lakes Basin so it has not withdrawn from the
Great Lakes Basin and has not implemented a conservation program. If a new source of supply from the
Great Lakes Basin is pursued by the City or a conservation program is desired, conservation and
efficiency measures can include water use audits, leak detection and repair programs, system pressure
reductions, and educational outreach programs.
5.02 ALTERNATIVE WATER SOURCES
NR 854 requires that this Plan includes an inventory and review of potential alternative water sources.
For the City, the existing alternative groundwater and surface water sources include the following:
1. Sand and gravel aquifer
2. Upper bedrock aquifer
3. Lower bedrock aquifer
4. Mixed aquifers
5. Surface water
6. Interconnection to neighboring community
A. Sand and Gravel Aquifer
Most private wells pull from the sand and gravel aquifer. Because of the demand of municipal wells, this
aquifer is not recommended for future sources of supply.
B. Upper Bedrock Aquifer
The City’s Well No. 1 is drawing water from the upper bedrock aquifer. An unconfined aquifer is more
susceptible to surface contaminants than the confined lower aquifer; however, no contamination has
been a problem at Well No. 1; therefore, the upper bedrock aquifer could be considered as a future
source of supply.
C. Lower Bedrock Aquifer
The City currently has one well drawing water from just the lower bed rock aquifer. Well No. 6 was
originally cased to be open to both the upper and lower bedrock aquifers but struggled with nitrate
pollution, so the solution was to case the well so that it only draws from the lower bedrock aquifer now.
As a future source of supply, the lower bedrock aquifer should be considered.
City of Verona, Wisconsin
Water Supply Service Area Plan Section 5–Water Source Alternatives and Recommendations
Prepared by Strand Associates, Inc. 5-2
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S5.docx\061126
D. Mixed Aquifers
City Well Nos. 2, 3, 4, and 5 currently draw from the lower and upper bedrock aquifers. With the
nitrate pollution problems at Well No. 6, this option is not recommended for future supply.
E. Surface Water
An alternative water source to the City’s deep wells would include surface water from nearby
Lake Mendota or Lake Monona. The City has not performed a review of the viability of surface water as
a water source. The City’s current system is not prepared for surface water as a source.
F. Interconnection to Neighboring Community
Creating interconnections and regionalization with other communities are other alternatives the City has
for water supply other than its existing deep wells. The City has not conducted a review of the viability of
this source. Some neighboring communities are the City of Fitchburg, City of Middleton, and
Town of Mount Horeb.
5.03 ENVIRONMENTAL AND ECONOMIC IMPACTS
The existing groundwater sources have seen little-to-no decline in capacity and static water level, and
the existing treatment and distribution system facilities are optimal for the groundwater. Maintaining a
combination of deep aquifer withdrawals will not require significant capital costs, while surface water will
require new treatment facilities or a new centralized treatment facility, significant distribution
improvements, and several miles of transmission main. Because the surface water is not feasible, costs
associated with treatment and distribution of surface water was not determined.
5.04 RECOMMENDATION AND CONCLUSION
This Plan reviewed the means of planning for water supply needs through 2040. The Plan assumed no
storage or supply was lost between 2026 to 2040. If a source of supply or storage is lost or a large
industrial water user is anticipated, the Plan may need to be re-evaluated. Water demand projections
may also need to be re-evaluated once updated City population projections are developed. Population
projections used to develop demands for this Plan are relatively conservative.
The Plan was presented to the public at a board meeting on June 22, 2026. No public comments were
received. A copy of the presentation is included in the Appendix B.
A. Summary
There are six active groundwater wells supplying water to the distribution system. The wells serve
three pressure zones and have a total rated capacity of 8,570 gpm. It is recommended that the City
continues obtaining water from the deep wells. There are three ESTs and one ground level storage tank
in the distribution system. The total amount of storage in the system is 1.6 MG.
City of Verona, Wisconsin
Water Supply Service Area Plan Section 5–Water Source Alternatives and Recommendations
Prepared by Strand Associates, Inc. 5-3
R:\MAD\Documents\Reports\Active\Verona, WI\WSSAP.1022.002.NME.Apr\Report\S5.docx\061126
B. 2026
1. Water Supply and System Demands
The estimated 2026 MDD equals 1,936 gpm. The current firm well capacity with Well No. 5 out of
service equals 6,370 gpm. During an MDD, the system is projected to have a reserve well capacity
of 4,434 gpm; therefore, no additional well capacity is required to meet 2026 MDDs.
2. Storage Capacity
The estimated 2026 maximum day plus fire flow demand equals 5,436 gpm. The system’s
effective storage capacity after accounting for peak hourly demands and operational needs is
7,600 gpm. During a 180-minute fire event, the system is projected to have a storage reserve of
1.4 MG; therefore, no additional storage is needed.
C. 2030
1. Water Supply and System Demands
The estimated 2030 MDD equals 2,061 gpm. The current firm well capacity with Well No. 5 out of
service equals 6,370 gpm. During an MDD, the system is projected to have a reserve well capacity
of 4,309 gpm so no additional well capacity is required to meet 2030 MDDs.
2. Storage Capacity
The estimated 2030 maximum day plus fire flow demand equals 5,561 gpm. The system’s
effective storage capacity after accounting for peak hourly demands and operational needs is
7,475 gpm. During a 180-minute fire event the system is projected to have a storage reserve of
1.3 MG so no additional storage is needed.
D. 2040
1. Water Supply and System Demands
The estimated 2040 MDD equals 2,536 gpm. The current firm well capacity with Well No. 5 out of
service equals 6,370 gpm. During an MDD, the system is projected to have a reserve well capacity
of 3,834 gpm so no additional well capacity is required to meet 2040 MDDs.
2. Storage Capacity
The estimated 2040 maximum day plus fire flow demand equals 6,036 gpm. The system’s
effective storage capacity after accounting for peak hourly demands and operational needs is
7,000 gpm. During a 180-minute fire event, the system is projected to have a storage reserve of
1.3 MG; therefore, no additional storage is needed.
( )
06-16-2026
2026 City of Verona Pavement Surface Treatment (#10205105)
Owner: Verona WI, City of
Solicitor: Verona WI, City of
06/04/2026 11:00 AM CDT
Engineer Estimate Scott Construction, Inc Fahrner Asphalt Sealers, LLC
Se Line ItemItem Code Item Descri UofMQuantity Unit Price Extension Unit Price Extension Unit Price Extension
SECTION A - Chip Seal $162,850.49 $146,151.45 $155,111.96
1 1475.01 CHIP SEAL SY 39519 $2.12 $83,780.28 $2.00 $79,038.00 $2.19 $86,546.61
2 1475.0200. SWEEPING SY 39519 $0.25 $9,879.75 $0.05 $1,975.95 $0.15 $5,927.85
3 1643.5 TRAFFIC COLS 1 $5,000.00 $5,000.00 ######## $5,000.00 $2,500.00 $2,500.00
4 1646.102 MARKING L LF 13229 $0.84 $11,112.36 $0.65 $8,598.85 $0.65 $8,598.85
5 1646.3 MARKING L LF 1780 $1.22 $2,171.60 $0.78 $1,388.40 $0.78 $1,388.40
6 1646.5 MARKING A EA 30 $190.00 $5,700.00 $295.00 $8,850.00 $295.00 $8,850.00
7 1646.51 MARKING W EA 9 $210.00 $1,890.00 $320.00 $2,880.00 $320.00 $2,880.00
8 1646.52 MARKING S EA 14 $190.00 $2,660.00 $275.00 $3,850.00 $275.00 $3,850.00
9 1646.6 MARKING S LF 195 $17.00 $3,315.00 $14.50 $2,827.50 $14.50 $2,827.50
10 1646.7 MARKING D LF 456 $10.25 $4,674.00 $11.75 $5,358.00 $11.75 $5,358.00
11 1646.74 MARKING C LF 1527 $12.50 $19,087.50 $9.25 $14,124.75 $9.25 $14,124.75
12 1646.82 MARKING IS EA 5 $200.00 $1,000.00 $380.00 $1,900.00 $380.00 $1,900.00
13 13 MARKING C EA 74 $170.00 $12,580.00 $140.00 $10,360.00 $140.00 $10,360.00
Base Bid Total: $162,850.49 $146,151.45 $155,111.96
2026 City of Verona GSB-88 Bituminous Seal (#10205108)
Owner: Verona WI, City of
Solicitor: Verona WI, City of
06/04/2026 11:00 AM CDT
Engineer Estimate Fahrner Asphalt Sealers, LLC
Section TitleLine Item Item Code Item Descri UofM Quantity Unit Price Extension Unit Price Extension
SECTION A - Chip Seal $89,963.00 $72,403.98
1 SP 1-26 BITUMINOU SY 56642 $1.50 $84,963.00 $1.19 $67,403.98
2 SP 25 (4) d TRAFFIC COLS 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00
Base Bid Total: $89,963.00 $72,403.98
Print Date: 6/17/2026
DISCLAIMER: The City of Verona does not guarantee the accuracy of
the material contained here in and is not responsible for any misuse or
misrepresentation of this information or its derivatives.
SCALE: 1" = '
City of Verona GIS
Old PB
188
City of Verona
111 Lincoln St
Verona, WI 53593
(608) 845 - 6495
2,256.99