Sustainability & Natural Resources Committee — Agenda Packet
Village of Mount Horeb · Dane County · Sustainability & Natural Resources Committee · meeting of Jul 28, 2026 · Agenda packets
Open the original document More from Village of Mount Horeb
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF MOUNT HOREB
E. Main Street
Mount Horeb, WI 53572
Phone: (608) 437-6884 Fax: (608) 437-3190
Email: mhinfo@mounthorebwi.info Web: mounthorebwi.info
Sustainability & Natural Resources Committee
Tuesday, July 28, 2026 at 7:00 PM
Municipal Building Board Room
138 E. Main Street
Mount Horeb, WI
1) Call to order
2) Roll Call
3) Public Comments on Non-Agenda Items*
4) Reports
a. Chair Report
b. Staff Report
5) Consent Agenda
a. Consideration of June 23, 2026 Meeting Minutes
6) Agenda Items
a. Presentation from Ben Lyman, Transportation Planner for the City of
Madison regarding Mount Horeb's Future Transportation Connectivity
b. Consideration of 2027-2031 Capital Projects
c. Discuss any updates regarding the Village's Bike Friendly Community
Designation
d. Discuss any updates regarding the Village's Bird City Designation
e. Discuss adding Committee Initiatives on the Village Website
f. Discuss Terrace Beautification and Native Plantings
7) Meeting adjournment.
*Public Comment Policy
Members of the public are invited to speak at meetings of all Mount Horeb Public Bodies. To comment, please complete a
Public Comment Form at the Meeting Room entrance and submit it to staff before the meeting begins. Comments are limited
to three minutes, must be made from the podium, and the speaker must return to the audience after speaking.
• Non-agenda item comments are heard at the start of the meeting. Public Body members and staff will not
engage in discussion during public comment but may consider topics for future agendas.
• Agenda item comments are heard during the relevant item, after the proposers or staff present the item and
before Public Body discussion. All public comments on the item will be heard before any discussion by the Public
Body.
Page 1 of 82
Members of the public will only be allowed to speak outside these public comment times if they are invited by the meeting
chair to share additional information requested by the Public Body. If so invited to speak, the member of the public must do
so from the podium.
Written comments are also welcome. Written comments shall include the name and address of the submitter and should be
submitted to the Deputy Treasurer/Governance Coordinator by email at niki.erickson@mounthorebwi.info (subject line:
Public Comment Request-Name of Public Body) or delivered by to the Village at: 138 E Main Street, Mount Horeb WI,
53572, ATTN Public Comment Request-Name of Public Body.
UPON REASONABLE NOTICE, EFFORTS WILL BE MADE TO ACCOMMODATE THE NEEDS OF DISABLED
INDIVIDUALS THROUGH APPROPRIATE AIDS AND SERVICES. FOR INFORMATION OR TO REQUEST THIS
SERVICE, CONTACT ALYSSA GAFFNEY, CLERK, AT 138 E MAIN STREET, MOUNT HOREB, WI (608) 437-9404.
Page 2 of 82
S&NR Chair Report
Our new Village Administrator Gabe Altenbernd, will be attending our meetings starting in
August. He had a family conflict tonight. We look forward to working together to promote
and provide a sustainable future for present and future Mount Horeb residents.
We are making progress on achieving a Bike Friendly Community. More important than the
actual recognition and designation, the work we are doing provides increased public safety
and has benefits for increased tourism and a vibrant economy. I have been in contact with
our Green Tier representatives to address the condition of the Military Ridge Trail and safety
issues regarding trail condition and safety hazards and e-bike protocol. If you have any
other specific items, you will want raised at the meeting, please email Gabe.
On the issue of terrace beautification and native plantings, I have discussions with Allison
Plummer, who thinks promotion of terrace landscaping is a good idea and perhaps could
be used to promote the village. Committee member Jack Saltes and I had a good
conversation with Public Works Supervisor Jeff Gorman on the issue.
I have had several conversations on new lighting standards, regarding those projects which
had submitted a Planned Unit Development and so are under the old zoning codes. Moving
forward we will be enforcing the new standards meant to decrease glare and sky glow.
These more stringent standards will, over time, lead to ecologic benefits as well as
improved quality of life for residents. The health factors of light pollution for animals are
well documented. The mental health benefits for humans are outlined at
https://darksky.org/news/darkness-for-well-being/
On that subject, Mt. Horeb held its Mental Health deliberation, where many thoughtful ideas
were discussed. One important area to consider is the connection between mental well-being and
nature. Research consistently shows that time spent in nature can reduce stress, improve mood,
sharpen focus, and strengthen social connections. A good introduction to those benefits can be
found on the Minnesota Department of Health's website.
https://www.health.state.mn.us/communities/mentalhealth/nature.html.
Our work, along with the Village Green Team's efforts, offers an ecological approach to mental
health. As Mt. Horeb plans, increased investment in parks, trails, green spaces, native plantings,
and walkable neighborhoods isn't just an environmental priority, it's a public health investment.
A healthier, more resilient environment helps create healthier people.
Tim White
Page 3 of 82
STATEWIDE CONTEXT:MENTAL DISTRESS AND INCOME
% of Wisconsin adults reporting poor mentalhealth for 14+ days in the past 30 days
Source: America’s Health Rankings, 2024
DATA2
Mental health affects people
of all ages in Mount HorebThese local and statewide data highlight key challenges and
opportunities to strengthen mental health and well-being
ADULTS HAVE EVER
BEEN DIAGNOSED
WITH DEPRESSION
25%of Mount Horeb Adults
have ever been
diagnosed with
depression.
MENTAL HEALTH
CHALLENGES ARE
HAPPENING NOW
14%of Mount Horeb Adults
reported poor mental
health for 14 or more
days in the past month.
MANY OLDER ADULTS
LIVE ALONE
33%of Mount Horeb Adults
age 65 and older live
alone.
FINANCIAL STRESS
AFFECTS MANY
HOUSEHOLDS
23%of Mount Horeb households
are ALICE (Asset Limited,
Income Constrained,
Employed).
47%
27%
MENTAL HEALTH AMONG MOUNT HOREB HIGH SCHOOL STUDENTS (GRADE 9-12)
Source: 2023 Wisconsin Youth Risk Behavior Survey
experienced significant
problems with anxiety
(past 12 months)
experienced prolonged,
disruptive sadness in the
past 12 months
24%
most of the time or
always get emotional
help when needed
Overall student percentages are shown
STATEWIDE CONTEXT:MENTAL ILLNESS BY AGE GROUP
Any Mental Illness
Wisconsin Adults, 2022-2023
Major Depressive
Episode
Serious Mental
Illness
41.1%
22.2%
21.3%
7.0%
12.9%
5.5%
Source: National Survey on Drug Use and Health,
Substance Abuse and Mental Health Services Administration
Source: Healthy Dane Collaborative, Community Dashboard
Page 4 of 82
SUSTAINABILITY & NATURAL RESOURCES COMMITTEE
Tuesday, June 23, 2026 at 7:00 PM
DRAFT MEETING MINUTES
1) Call to order
Chair White called the meeting to order at 7:00 pm. Members present: White,
Beheler, Pavlovich, Best, Saltes, Roethle, Best, Fendrick
2) Public Comments on Non-Agenda Items*
None
3) Consent Agenda
a. Consideration of May 26, 2026 Meeting Minutes
b. Green Team Update
Elizabeth Grabe gave verbal update on Green team. Motion by Beheler to approve of the consent agenda as
presented, seconded by Roethrle, motion carried.
Committee moved 4e) agenda item, “Terrace native planting discussion” to front of agenda to accommodate
citizen presentation. Resident Jennifer Gottwald shared information on South Fourth Street’s initiative to beautify
terraces using primarily native plant selections. The committee had a conversation on advocating for similar actions
throughout the Village. Discussion led to possible promotion of the initiative with Chamber, press and Green Team.
4a) Bike Friendly Community update. Committee member Roethle presented application and highlighted continued
work on bike and pedestrian safety.
4b) Bird City (BC) Designation, Bird Friendly Glass discussion – Committee member Beheler updated committee
on plans for activities which promote best practice for avian health including bike birding opportunity. Suggested
reaching out to rec department to help facilitate the activities. Committee member Chair White presented Middleton’s
Bird Friendly Glass ordinance. A project which would highlight bird friendly glass was discussed.
4C) Clean Sweep discussion -
Discussion centered around how best to promote responsible disposal of household hazardous waste. Inserts in
Utility Bill was discussed. We will engage Green Tier to see if DNR would consider hosting event.
4d) Future Solar Grants for Municipality initiatives -
Discussion was had on how best to identify possible grants for addressing Village Energy Plan and other
sustainability initiatives. Committee identified Green Tier and Dane County Office of Energy and Climate Change as
resources. This will be a discussion with new village administrator.
4f) Future Agenda Items – Water retention basis landscape for proposed Hidden Ridge development, Bike Friendly
Community update, Bird City update, village website update to highlight initiatives.
5) Meeting adjournment.
Motion by Best to adjourn, seconded by Roethle. Motion carried. Meeting
adjourned at 8:12 pm.
Page 5 of 82
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
July 28, 2026
AGENDA ITEM # 6.a
Presentation from Ben Lyman, Transportation Planner for the City of Madison
regarding Mount Horeb's Future Transportation Connectivity
BACKGROUND
RECOMMENDATION
ATTACHMENTS
None
Page 6 of 82
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
July 28, 2026
AGENDA ITEM # 6.b
Consideration of 2027-2031 Capital Projects
BACKGROUND
RECOMMENDATION
ATTACHMENTS
1. Mt.%20Horeb%20Energy%20Plan.Final
Page 7 of 82
Village of Mount Horeb
Municipal Energy Plan
January 16, 2026
Page 8 of 82
ii
Table of Contents
Table of Contents .......................................................................................................................................... ii
Executive Summary ...................................................................................................................................... vi
Energy Baseline ........................................................................................................................................ vi
Identifying Energy Saving Opportunities ................................................................................................ vii
Renewable Energy Opportunities ........................................................................................................... vii
Vehicle Fleet Analysis ............................................................................................................................. viii
Community Engagement and Energy Use ............................................................................................. viii
Supportive Policies and Programs ........................................................................................................... ix
Funding Opportunities ............................................................................................................................. ix
Next steps ................................................................................................................................................ ix
Glossary ........................................................................................................................................................ xi
Introduction ................................................................................................................................................ xii
Background ............................................................................................................................................. xii
Plan Development Process ..................................................................................................................... xii
Data Collection to Develop the Energy Baseline................................................................................. xii
Data Aggregation and Energy Assessments ........................................................................................xiii
Analysis of Energy Saving Opportunities ............................................................................................xiii
Stakeholder Feedback ......................................................................................................................... xiv
Baseline Data ................................................................................................................................................ 1
Plan Boundary ........................................................................................................................................... 1
Municipal Energy Use ............................................................................................................................... 1
Municipal Facilities.................................................................................................................................... 3
Municipal Vehicles .................................................................................................................................... 4
Community Energy Use ............................................................................................................................. 4
Community Engagement .............................................................................................................................. 7
Recommendation Overview ....................................................................................................................... 10
Building and Facility Energy Efficiency Recommendations......................................................................... 12
Recommendation 1: Continue ongoing benchmarking of building performance .................................. 12
Recommendation 2: Implement Recommended measures for audited buildings................................. 14
Recommendation 3: Institute standard operating guidelines at all buildings ........................................ 16
Page 9 of 82
iii
Recommendation 4: Plan for Space and Water Heating Electrification ................................................. 17
Recommendation 5: Implement monitoring and optimization strategies for Wells and Lift stations ... 18
Establishing performance baseline ..................................................................................................... 19
Optimizing energy use ........................................................................................................................ 19
Resources for efficient equipment transitions ................................................................................... 19
Solar Recommendations ............................................................................................................................. 21
Recommendation 1: Install Solar PV on Optimal Municipal Buildings ................................................... 21
Recommendation 2: Supplement Rooftop Solar with Purchase of Off-Site Renewable Energy ............ 22
Recommendation 3: Facilitate a Community-Wide Solar Group Buy Program ...................................... 24
Fleet Recommendations ............................................................................................................................. 26
Recommendation 1: Add Two EVs to Municipal Fleet ............................................................................ 27
Part 1: Replace two existing vehicles with EVs ................................................................................... 27
Part 2: Install EV Charging Systems ..................................................................................................... 29
Recommendation 2: Use estimated total cost of vehicle ownership to guide purchasing .................... 30
Recommendation 3: Lead Community in EV Transition ......................................................................... 31
Policy Recommendations ............................................................................................................................ 33
Recommendation 1: Implement Sustainable LCCA purchasing policy ................................................... 33
Recommendation 2: Connect Community with Incentives and Financing ............................................. 34
Recommendation 3: Join Local Government Sustainability Peer Groups .............................................. 37
Recommendation 4: Public recognition program for Energy Efficient businesses ................................. 38
Funding Opportunities for Recommendations ........................................................................................... 39
Focus on Energy ...................................................................................................................................... 39
WPPI Energy ............................................................................................................................................ 39
Wisconsin Public Service Commission’s Office of Energy Innovation .................................................... 39
Clean Energy Revolving Fund .................................................................................................................. 39
Appendix 1: Building Descriptions and Recommendations ........................................................................ 41
Building 1: Village of Mount Horeb municipal building .......................................................................... 41
High Priority: Retro-Commissioning ................................................................................................... 42
High Priority: LED Upgrades ................................................................................................................ 43
High Priority: Lighting Occupancy Controls ........................................................................................ 43
Medium Priority: Plug Load Management .......................................................................................... 43
Medium Priority: Improve Building Air Sealing ................................................................................... 43
Page 10 of 82
iv
Medium Priority: Condensing Boiler Upgrade .................................................................................... 43
Decarbonization Measure: Alternative to Condensing Boiler Upgrade – Air-to-Water Heat Pump
Upgrade ............................................................................................................................................... 44
Decarbonization Measure EOL: Heat Pump Water Heater Upgrade .................................................. 44
Building 2 Mount Horeb Public Library ................................................................................................... 45
High Priority: Retro-commissioning .................................................................................................... 46
High Priority: LED Upgrades ................................................................................................................ 46
High Priority: Occupancy Sensor Controls .......................................................................................... 47
High Priority: Daylighting Controls ...................................................................................................... 47
Medium Priority: Improve Building Air Sealing ................................................................................... 47
Medium Priority: Plug Load Management .......................................................................................... 47
EOL: Upgrade Roof Insulation ............................................................................................................. 47
EOL/Decarbonization: Heat Pump Water Heater Upgrade ................................................................ 48
Decarbonization Measure: Air-to-Water Heat Pump Upgrade .......................................................... 48
Building 3 Community Center ................................................................................................................. 49
High Priority: Retro-commissioning .................................................................................................... 50
High Priority: Smart Thermostats Upgrade ......................................................................................... 51
High Priority: LED Upgrades with Occupancy Sensors ........................................................................ 51
Medium Priority: Improve Building Air Sealing ................................................................................... 51
EOL: ENERGY STAR Appliances ............................................................................................................ 51
EOL: Windows Replacement ............................................................................................................... 51
EOL: Upgrade Roof Insulation ............................................................................................................. 52
Decarbonization Measure at EOL: Heat Pump Water Heater Upgrade.............................................. 52
Building 4 Public Safety: Police Station ................................................................................................... 53
Decarbonization Measure at EOL: Air-to-Water Heat Pump Upgrade ............................................... 53
Decarbonization Measure at EOL: Heat Pump Water Heater Upgrade.............................................. 54
Appendix 2: Solar Methodology ................................................................................................................. 55
Appendix 3: Fleet Methodology ................................................................................................................. 57
Appendix 4: Additional References and Resources .................................................................................... 58
Page 11 of 82
v
Acknowledgment: “This material is based upon work supported by the by the Public Service Commission of
Wisconsin, Office of Energy Innovation and the Department of Energy, Office of Energy Efficiency and
Renewable Energy (EERE), under the State Energy Program Award Number DE-EE0000163.”
Disclaimer: “This report was prepared as an account of work sponsored by an agency of the United States
Government. Neither the United States Government nor any agency thereof, nor any of their employees,
makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy,
completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that
its use would not infringe privately owned rights. Reference herein to any specific commercial product,
process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or
imply its endorsement, recommendation, or favoring by the United States Government or any agency
thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the
United States Government or any agency thereof.”
Page 12 of 82
vi
Executive Summary
With funding from the Wisconsin Public Service Commission’s Office of Energy Innovation, the Village of
Mount Horeb partnered with Slipstream and WPPI Energy to develop the Mount Horeb Energy Plan (“Energy
Plan”). The Energy Plan is the Village’s first comprehensive municipal energy plan, and it will guide Mount
Horeb’s strategic energy investments over the next 5–10 years. The Energy Plan evaluates the Village’s
municipal operations, vehicle fleet, and community-wide energy use and identifies actionable strategies to
reduce energy costs, advance sustainability, and lower greenhouse gas (GHG) emissions both in municipal
operations and throughout the community.
Mount Horeb’s goals are driven by its long-standing commitment to environmental stewardship and fiscal
responsibility. The Village has already demonstrated leadership through energy-efficient municipal projects,
public education initiatives, and the establishment of its Sustainability and Natural Resources (SNR)
Committee. This Energy Plan builds on that foundation by prioritizing cost-effective, high-impact actions. The
project team used a multi-stage process to understand the energy baseline, identify energy saving
opportunities, and recommend improvement strategies. The process included detailed data collection,
benchmarking of all municipal facilities, building energy assessments, analysis of vehicle fleet operations,
evaluation of community energy use, and extensive engagement with residents, businesses, and the SNR
Committee.
ENERGY BASELINE
In the baseline year (2023), the Village of Mount Horeb’s municipal operations generated 1,769 metric tons
of CO2e and incurred $373,511 in energy costs. As shown in Figure 1, the largest components of energy costs
and emissions were the wastewater treatment plant (WWTP) and the WWTP Administrative building. The
police station, wells and lift stations, and the vehicle fleet were also key contributors to baseline energy use
and emissions. Benchmarking energy use intensity of each building against national medians showed that
several buildings are already more efficient than national medians, but that there continues to be
opportunities to improve efficiency at all facilities.
Page 13 of 82
vii
Figure 1. Municipal energy use and cost by source.
IDENTIFYING ENERGY SAVING OPPORTUNITIES
Four buildings—Village Hall, the Library, the Community Center, and the Police Station portion of the Public
Safety Building—received onsite energy assessments. The team created digital energy models of each facility,
which were used to identify cost-effective near term, medium-term, and end-of-service life energy upgrades.
Completing all recommended energy upgrades would reduce utility costs for the buildings by 20-30%.
Near term recommendations focused on improvements that will yield the greatest energy cost savings per
dollar of investment. These measures included retro-commissioning, LED upgrades, lighting controls, smart
thermostats, and plug-load management. Longer-term decarbonization opportunities include heat pumps,
heat-pump water heaters, window replacements, and roof insulation.
RENEWABLE ENERGY OPPORTUNITIES
Freely available renewable energy from the sun and the wind offers valuable cost saving and emissions
reduction opportunities for Mount Horeb. Survey responses, guidance from the SNR, and feedback at the
Community Forum all showed high levels of public support for increasing the use of renewable energy for
municipal buildings and among residents and businesses. Consequently, the Energy Plan assessed
opportunities for the Village to use both on-site and off-site renewable energy to power its municipal
buildings and also recommended ways that the Village can help community members increase the share of
the energy that they use that is generated from renewable resources. Key renewable energy
recommendations included:
• Install Solar PV on Municipal Buildings. The analysis identified opportunities to install 583 kW-DC at
municipal facilities, which would reduce the Village’s energy costs by approximately $100,000 per
year.
18%
1%
3%
2%
1%
5%
3%
2%
17%
12%
19%
Percent of total energy cost
Page 14 of 82
viii
• Supplement Solar with Off-Site Renewable Energy. Space constraints at municipal facilities would
prevent the Village from installing sufficient on-site solar capacity to offset 100 percent of its energy
use. To reflect this limitation and to optimize cost-effectiveness, the Energy Plan provides guidance
for the Village in supplementing on-site PV with procurement of off-site renewable energy.
• Facilitate a Solar Group Buy Program. This low-cost program would reduce informational, financial,
and technical barriers to broader adoption of rooftop solar at homes and businesses in the
community.
VEHICLE FLEET ANALYSIS
The Village’s fleet of 30-municipal vehicles consumed over 19,000 gallons of fuel in the baseline year and
operated at an overall fuel economy of 12.5 MPG. In 2023, combined fuel costs for all vehicles exceeded the
energy costs of all municipal facilities except the WWTP and the WWTP Administrative building.
• SUVs, primarily operated by the Police Department, consumed the most fuel and generated the most
CO2e. (8,844 gallons consumed | 75 MT CO2e).
• Large trucks, many of which are used by the Public Works department, consumed the second highest
amount of fuel (5,065 gallons consumed | 52 MT CO2e).
• The Energy Plan recommends strategies to reduce fuel costs and vehicle emissions by incorporating
electric vehicles (EVs) into its operations. The evolving EV market presents cost-competitive
replacements for several categories of vehicles that the Village operates. Key vehicle
recommendations include:
• Implement a phased transition by beginning with two initial EV purchases. Train staff to operate and
maintain a limited number of EVs before adding more EVs to the fleet.
• Future-proof EV charging needs by installing the level of electrical infrastructure that will be needed
to meet future vehicle charging requirement when planning for the initial EV charging stations.
COMMUNITY ENGAGEMENT AND ENERGY USE
The people who live and work in Mount Horeb are key stakeholders for the Village’s Energy Plan.
Additionally, community-wide residential and commercial emissions far exceed municipal emissions and
therefore working with the community will be essential to reduce energy use and emissions. The planning
process engaged the community in three primary ways.
• Periodic presentations to, and guidance from, the SNR Committee.
• Survey feedback from 473 residents and 34 businesses.
• Presentation of preliminary energy plan recommendations at a community forum at which attendees
offered feedback on each recommended strategy.
• Several top themes emerged from the community engagement.
o Residents strongly value renewable energy and energy efficiency but cite cost, information
gaps, and contractor uncertainty as barriers.
o Businesses report modest improvements but express interest in support, recognition, and
financing programs.
Page 15 of 82
ix
o Community support is strong for solar group buys, improving efficiency of municipal
buildings, especially by adding smart building controls.
o Some skepticism exists about EV fleet expansion due to concerns about grid capacity and
the future policy environment.
SUPPORTIVE POLICIES AND PROGRAMS
Mount Horeb can sustain and amplify the impact of its energy efficiency initiatives by instituting aligned
internal operational policies, as well as public-facing policies.
The Energy Plan recommends four types of policies to achieve the Village’s objectives:
• Enact a Lifecycle Cost Analysis purchasing policy for equipment and vehicles.
• Introduce program and services to connect residents and businesses to incentives and financing,
especially Focus on Energy rebates.
• Join state and regional sustainability collaboratives (e.g., WLGCC) to sustain the Village’s engagement
with sustainability and to access additional learning and grant opportunities.
• Create a Green Business Recognition Program to encourage leadership and visibility.
FUNDING OPPORTUNITIES
Significant financial investments will be required to implement the recommended energy upgrades to
municipal facilities and to homes and businesses. Federal policy changes have reduced opportunities to use
tax credits to fund purchases of EVs and installation of solar arrays. However, valuable funding opportunities
remain for all municipal stakeholders:
• Focus on Energy. The Energy Plan recommends that the Village coordinate with its Focus on Energy
Advisor on all energy improvements to municipal buildings. The Energy Advisor can provide helpful
technical guidance and can also assist the municipality in accessing financial incentives for these
upgrades. We also recommend that the Village support outreach activities to help residents and
businesses access Focus incentives.
• WPPI Energy. Mount Horeb Utilities is a member of WPPI Energy, which has been a key partner in
the development of this Energy Plan. We recommend that the Village continue to engage with WPPI
Energy to identify any additional funding opportunities that may be available.
• WI Public Services Commission (PSC) Office of Energy Innovation (OEI). This Energy Plan was
developed through a Rural Energy Startup grant from OEI. OEI periodically offers additional funding
opportunities, which the Village may be able to access to obtain funding for energy upgrades.
• Clean Energy Revolving Fund. The Village can quantify the value of the energy cost savings that the
energy upgrades generate and deposit these cost savings into a revolving fund. As the Village
continues to make energy upgrades, funds in this account can be used to fill funding gaps for future
projects.
NEXT STEPS
The Mount Horeb Municipal Energy Plan provides a clear, actionable roadmap for reducing energy costs,
cutting emissions, and enhancing sustainability across Village operations and the broader community. By
Page 16 of 82
x
prioritizing high-impact building upgrades, embracing solar energy, modernizing the vehicle fleet, and
enabling residents and businesses to participate in energy-saving initiatives, the Village can advance fiscal
responsibility, environmental stewardship, and community well-being.
The Plan’s success will depend on continued monitoring, strategic investment, and strong collaboration
between municipal leadership, Village staff, community members, and regional partners. Mount Horeb is
positioned to lead by example and create a model for small communities pursuing a resilient, cost-effective,
and sustainable energy future.
Figure 2 provides an overview of the recommendations by category. The recommendations serve as initial
items for consideration to save energy and reduce municipal CO2 emissions. Funding is available through local
utility rebates, federal funding, and state funding to implement these recommendations. Funding options for
the recommendations are detailed in the full report.
Building and Facility Energy Efficiency
Continue energy benchmarking
Implement cost-effective municipal energy upgrades
Institute aligned operational policies
Plan for upgrading building equipment to efficient electric alternatives
Monitor and optimize energy use for municipal water systems
Solar
Install 592 kW-DC of on-site solar
Supplement with off-site renewables
Lead Solar Group Buy program
Vehicles
Add two EVs to Village fleet
Value efficiency and ownership cost in
purchasing policy
Lead community in EV transition
Policy
Enact internal LCCA-aligned purchasing
Support community energy navigator program
Join municipal sustainability cohort
Recognize local green businesses
Figure 2. Recommended Mount Horeb energy actions
Page 17 of 82
xi
Glossary
Decarbonization: A process of replacing equipment and systems that generate heat and/or power by
combusting fossil fuels with alternatives that are powered solely, or primarily, by electricity or renewable
fuels. Fuel switching measures may be complemented by installation of on-site renewable energy systems.
These building improvements are designed to achieve near-term and long-term emissions reductions by
leveraging trends toward reduced emissions intensity of the electrical grid.
Energy assessment: An on-site inspection paired with energy modeling that analyzes how a building currently
uses energy and identifies opportunities to reduce the building’s energy consumption.
Electric vehicle (EV): Cars, trucks, buses, and other vehicle types that are propelled using electricity that is
stored in a battery.
Energy use intensity (EUI): Total energy used by a building from all fuel types (e.g. electricity, natural gas, and
delivered fuels) and converted to British thermal units divided by the total square feet of the building.
Normalizes energy use across buildings of different sizes.
Focus on Energy: Wisconsin’s statewide program to increase energy efficiency and renewable energy use
among residents, businesses, and local governments.
Heat pump: Single heat pump replaces both furnace and an air conditioner; fueled by electricity and highly
energy efficient in comparison to furnaces, boilers, and air conditioners.
Internal combustion engine (ICE) vehicle: Conventional vehicle in which gasoline, diesel, or other fuel is
consumed to generate the power that propels the vehicle.
Net metering: Billing mechanism that credits solar energy owners for electricity added to grid
PV (Photovoltaic): Conversion of solar energy to electricity
Renewable energy: Energy that is generated from a naturally replenishing resource that does not release
carbon dioxide into the atmosphere. Examples include solar energy, wind energy, or geothermal energy.
Weather-normalized site EUI: The energy use a building would have consumed during 30-year average
weather conditions. It can be helpful to use this weather normalized value to understand changes in energy
when accounting for changes in weather. Energy use is divided by square feet.
Wisconsin Local Government Climate Coalition (WLGCC): Coalition of local governments in Wisconsin
committed to accelerating local climate change solutions.
Page 18 of 82
xii
Introduction
BACKGROUND
To guide its next steps toward investing in energy savings, the Village of Mount Horeb collaborated with
Slipstream, a Madison-based non-profit organization, and WPPI to apply for funding to develop a
community energy plan. In August 2024, the Village signed a grant agreement through the Wisconsin
Public Service Commission’s Office of Energy Innovation’s (OEI) Rural Energy Start-up Program (RESP).
Mount Horeb used the RESP funding to partner with Slipstream to develop this Mount Horeb Energy
Plan (“Plan”). The Plan recommends steps that the Village can take within the next 5-10 years to
strategically invest in reducing the amount of energy used by its municipal buildings and vehicles, as well
as the ways that it can make best use of renewable energy. Beyond municipal operations, the Plan
recommends policies and programs that the Village can implement to help residents and businesses in
the community save money and reduce negative environmental impacts by saving energy.
The Village of Mount Horeb is committed to using energy efficiently and responsibly and to working to
improve the environmental and financial sustainability of its operations. It has a track record of pursuing
energy efficiency, including leveraging resources from WPPI Energy and Focus on Energy to reduce
energy consumption when constructing the Driftless Historium and when retrofitting the Wastewater
Treatment Plant.
In addition to addressing energy efficiency within municipal operations, the Village has worked with
residents and businesses to save money, and live and work more sustainably by reducing their energy
use. For example, in 2022 it engaged the community to reduce energy consumption through the Save to
Give Challenge. In November of the same year, the Village demonstrated its ability to institutionalize
energy savings opportunities by passing Resolution 2022-15 to create the Village of Mount Horeb
Sustainability & Natural Resources Committee.
The Village’s efforts are succeeding in facilitating environmental responsibility in the community. In the
fall of 2023, Mount Horeb High School was selected to participate in the Focus on Energy Renew Our
Schools program. This five-week initiative encourages students and staff to adopt behavioral changes to
enhance energy efficiency within their school buildings. Mount Horeb High School demonstrated
exceptional commitment by completing every available activity in the program and was awarded $2,500
to use for future energy efficiency projects.
PLAN DEVELOPMENT PROCESS
Developing the Mount Horeb Energy Plan consisted of four primary activities: data collection to develop
the baseline, building energy assessments, analysis of energy saving opportunities, and gathering of
stakeholder feedback to finalize results (Figure 3).
Data Collection to Develop the Energy Baseline
To enable the Project Team to understand both the municipality’s, and the community’s current energy
use, the first step was to collect data on energy use in the Village’s buildings and vehicles. To establish
baseline energy use in the community, the team obtained aggregated residential and business energy
Page 19 of 82
xiii
consumption data. The team used resident and business surveys to understand current energy
consumption practices, behaviors and perspectives among community stakeholders.
Using the data collected, the team established baseline energy use for the Village’s buildings and fleet
vehicles, which informed insights on the current efficiency performance of each building. Because
buildings serve different functions, each with distinct uses, occupancy patterns, and energy-intensive
processes, the team compared energy use in Mount Horeb’s buildings against two relevant benchmarks.
First, we used the site energy use intensity (EUI)1 of each Mount Horeb building, which is calculated as
the amount of energy consumed per square foot. The EUIs were compared to national median site EUI
values of other buildings of the same type, using a publicly available dataset2. This comparison provided
insights on which buildings may currently be under performing in their energy use, and which may
therefore present the greatest opportunities for energy savings. Second, the site EUI of municipal
buildings was compared against the best practice site EUI target for existing buildings as recommended
by the ASHRAE 100 – 2024 Energy and Emissions Buildings Performance Standard for Existing Buildings3.
The ASHRAE 100 metric provides a target level of energy performance for each building that the Village
can seek to achieve through completing the recommended energy improvements.
Data Aggregation and Energy Assessments
Village leadership worked with Slipstream to use the benchmarked energy performance, along with
known building improvement needs, to identify the four buildings for which it would be most helpful to
complete walk through energy assessments. During the assessments, Slipstream’s engineers reviewed
HVAC equipment, lighting systems, building automation systems (if present), and other building
components. The team also spoke with staff who used and operated each building to identify concerns
and functional issues. Finally, the team evaluated roof areas to determine their suitability for solar PV
panel installation.
Analysis of Energy Saving Opportunities
For each building, Slipstream created virtual energy models using the on-site data collected with
historical energy consumption data and blueprints (when available). The energy model was then used to
1 Calculation of Site EUI converts the electricity, natural gas, and other energy used at the site into a common unit
(kBtu) which is divided by building size (square feet). Source EUI, which accounts for total energy used to produce
off-site generated fuels (ex. Electricity), as well as the energy that is lost in transmission, can also be a valuable
metric. For purposes of assessing current building performance, we find that site EUI, which is used throughout the
Mount Horeb Energy Plan is the more relevant metric to consider.
2 U.S. Energy Information Administration (EIA) Commercial Building Energy Consumption Survey (CBECS).
https://www.eia.gov/consumption/commercial/
3
https://www.ashrae.org/file%20library/technical%20resources/standards%20and%20guidelines/standards%20add
enda/100_2018_e_20230831.pdf
Page 20 of 82
xiv
forecast the energy savings potential of multiple energy upgrade scenarios. These became the basis for
the development of energy upgrade roadmaps aligned with the most cost-effective upgrade pathways.
In parallel with analyzing energy efficiency and renewable energy improvement pathways for municipal
buildings, the team assessed the types of vehicles in the Village’s municipal fleet, as well as their fuel
consumption and mileage. The team investigated cost-effective strategies for the Village to reduce fuel
costs and vehicle emissions by transitioning to hybrid and electric vehicles (EVs) during planned vehicle
replacements.
The team also evaluated supportive policy and programs. This included internal policies that can help
the Village sustain energy efficiency efforts over time, as well as public-facing policies and programs
informed by survey responses and aggregated residential and business energy data. These
recommendations outline ways that the Village could help community members reduce their energy use
and shift from conventional electricity usage to renewable energy.
Stakeholder Feedback
The team compiled the strategies identified for energy savings in municipal buildings, municipal vehicles,
and community-wide energy used into a preliminary set of recommendations. Because the draft
recommendations were informed by community survey responses and by guidance from the Village’s
SNR committee, it was essential to share them with the SNR and the broader community to confirm that
the preliminary roadmap accurately reflected stakeholder priorities.
Community members were invited to a forum where draft recommendations were presented.
Participants used dot voting to indicate their level of support or opposition for each recommendation.
Attendees also provided insights and feedback by placing sticky notes with comments on posters
corresponding to each recommendation. Additional feedback was gathered through comments from
Village staff and SNR Committee members.
This final version of the Mount Horeb Energy Plan incorporates feedback from municipal staff, from SNR
Committee members, and from residents at the community forum.
Figure 3. Overview of planning process
Data Collection
•Electricity and
natural gas
data for
buildings
•Gasoline and
diesel data
•Facility and
vehicle
information
Data Compilation
and Energy Audits
•Walkthrough
energy audits
of Village
buildings
•Resident and
business input
surveys
Analysis of energy
saving
opportunities
•Solar
installation
•Fleet
conversion
•Building
energy
efficiency
•Community
policies and
actions
Stakeholder
feedback
•Community
forum
•SNR
Committee
Review
•Staff Review
Page 21 of 82
1
Baseline Data
PLAN BOUNDARY
The project team aggregated electricity, natural gas, gasoline, vehicle, and facility data to establish the
energy baseline for the Mount Horeb Energy Plan. The recommendations that the Plan describes use the
information in the baseline to create a roadmap for the Village to achieve significant energy savings in
comparison to the baseline.
To align with the objectives and requirements of the grant funding that the Village used to develop the plan,
the Energy Plan focuses on municipal facilities and vehicles, as well as community-wide energy reduction
strategies. The Mount Horeb Area School District is structured as a separate entity from the Village and is
responsible for maintaining and improving all of the school buildings in Mount Horeb. Similarly, the Mount
Horeb Area Joint Fire Department and Emergency Medical Service, which operates and maintains the Fire
Department portion of the Public Safety building is a separate jurisdiction from the Village. Because the
School District and the Fire Department are separate governmental entities from the Village, the facilities and
vehicles that they use were not included in the Village’s baseline, or in the recommendations that the Energy
Plan outlines. As a next step, the Village may seek to engage with these two partners to collaborate on clean
energy initiatives.
MUNICIPAL ENERGY USE
Mount Horeb has 11 primary municipal facilities, as well as service garages, storage sites, wells, and lift
stations. It also has 304 vehicles and numerous pieces of off-road equipment in its Village fleet. The project
team analyzed energy data from each source for both 2023 and 2024 (where available)5. Table 1 and Table 2
reflect the energy use and costs, as well as the relative level of emissions from each source for 2023, which is
the most recent year for which energy data for all sources was received.
The second column in Table 1 shows the total energy use for each source. To allow for accurate conversions
of energy values to energy costs and GHG emissions, the values in this column have not been weather
normalized to account for the positive or negative effects of colder winter temperatures or hotter summer
temperatures on energy consumption in buildings. However, consumption values for buildings were weather
normalized when calculating site EUI so that the EUI could be meaningfully compared to median EUI and to
the ASHRAE 100 Standard target for high performing site EUI.
4 Data for 2023 fleet vehicle baseline analysis.
5 To account for data availability, building energy data reported for “2023” refers to activity from 11/1/2022 –
10/31/2023. Building energy data reported for 2024 refers to the period from 11/1/2023 – 10/31/2024.
Page 22 of 82
2
Table 1. Annual energy use and costs by source (2023 data)
Source Energy use (kBtu) Site EUI6 Annual Energy Cost Percent of
Total Cost
WWTP 1,921,580 N/A $66,508 18%
WWTP Admin 2,221,510 491.37 $62,255 18%
Vehicles 2,430,024 N/A $70,895 19%
Police Station 2,080,739 79.5 $45,488 12%
Wells 1,701,747 N/A $27,633 7%
Water and Electric 1,001,029 81.3 $22,059 6%
Library 1,105,416 68.3 $18,901 5%
Lift Station 520,210 N/A $18,250 5%
Municipal Building 713,607 56 $11,805 3%
Pool 631,518 N/A $10,273 3%
Community Center 466,727 48.3 $9,094 2%
Garage 450,979 37.6 $5,623 2%
Mount Horeb Station 159,773 79.9 $2,360 1%
Parks and Forestry 203,344 16.9 $2,367 1%
Total 15,608,203 $373,511
Table 2. Annual CO2 emissions and costs by source (2023 data)
Source CO2 Emissions (metric tons) Percent of Total CO2 Emissions
WWTP 334.73 19%
WWTP Admin 319.2 18%
Police Station 240.76 14%
Vehicles 174.91 10%
Wells 151.16 9%
Library 126.47 7%
Water and Electric 115.95 7%
Lift Station 91.87 5%
Municipal Building 64.56 4%
Community Center 48.5 3%
Pool 42.03 2%
Garage 32.06 2%
Parks and Forestry 13.69 1%
Mount Horeb Station 13.1 1%
Total 1,768.99
6 Weather-normalized site EUI
7 Site EUI for the WWTP Admin building significantly exceeds normal ranges. It is likely that the high EUI indicates
that a portion of the energy process load for the primary WWTP facility is being allocated to the WWTP Admin
account.
Page 23 of 82
3
MUNICIPAL FACILITIES
To inform long term energy planning, as shown in Table 3, the project team examined current electricity and
natural gas consumption in each facility.
Table 3. Municipal Facility Energy Use
Facility Annual
Electricity
(kWh)
Electricity
cost
Annual
natural gas
(therms)
Natural
gas cost
Total cost
WWTP 513,689 $65,341 1,389 $1,167 $66,508
WWTP Admin 445,684 $56,691 6,624 $5,564 $62,255
Police Station 285,611 $33,735 13,944 $11,713 $45,488
Wells 141,068 $17,944 11,535 $9,689 $27,633
Library 148,589 $18,901 4,956 $4,163 $23,064
Water and Electric 140,859 $17,917 4,931 $4,142 $22,059
Lift Station 140,859 $17,917 396 $333 $18,250
Municipal Building 60,361 $7,678 4,913 $4,127 $11,805
Pool 50,416 $6,413 4,595 $3,860 $10,273
Community Center 53,921 $6,859 2,662 $2,236 $9,095
Garage 20,949 $2,665 3,522 $2,958 $5,623
Parks and Forestry 7,644 $972 1,660 $1,394 $2,367
Mount Horeb Station 10,910 $1,388 1,158 $973 $2,360
Total 2,020,558 $254,421 62,286 $52,320 $306,780
Figure 4 shows the site EUI for each of the Village of Mount Horeb’s municipal facilities as the darker bar, as
well as the national median EUI for that building type as the lighter bar. The dot indicates the target EUI set
by ASHRAE standard 100-2024.
Figure 4. Municipal Facility Site EUI
0
20
40
60
80
100
120
Community
Center
Library Mount
Horeb
Station
Municipal
Building
Parks and
Forestry
Police
Station
PW Garage Water and
Electric
Energy Use Intensity (kBtu/SF)
Energy Use Intensity Comparison to Median EUI
Site EUI
Median Site EUI
ASHRAE 100 Target
Page 24 of 82
4
MUNICIPAL VEHICLES
Opportunities to replace existing gasoline and diesel vehicles with more efficient hybrids and EVs depend to
the category and use of each vehicle. Table 4 segments the energy use and GHG emissions from the Village’s
vehicles by vehicle category. As shown in the table, SUVs and large trucks consume the most fuel and
generate the most emissions.
Table 4. Municipal Vehicle Use
Vehicle category Annual Gallons Annual miles Avg. Fuel
Economy8
Fuel Cost Emissions
(MT CO2e)
Pickup 1/2 ton or
smaller
1,861 60,571 10.8 $6,659 15.82
Large pickup 3,371 47,832 8.9 $12,185 29.60
SUV 8,844 91,293 13.2 $31,639 75.03
Large Truck 5,065 32,713 27.0 $19,410 52.09
Van 280 10,620 10.4 $1,002 2.38
Total 19,421 243,029 12.5 $70,895 174.91
COMMUNITY ENERGY USE
Energy use by Mount Horeb residents and businesses, as well as the perspectives of stakeholders on their
current energy use, are important components of the community’s energy baseline. Figure 5 shows
community electricity use and Figure 6 shows community-wide natural gas use among residents and
businesses.
The project team surveyed residents and organizations in Mount Horeb to understand the views of
community members and stakeholders on energy topics. In May – June 2025, 473 residents as well as
representatives from 34 businesses completed surveys through which they identified their views, priorities
and challenges related to energy use. The Community Engagement section of the Energy Plan describes key
findings that the surveys revealed.
8 Quality concerns were identified regarding annual miles driven data for some vehicles . To minimize the effects of
data input errors by vehicle users. Outliers were removed from the calculation of average MPG . Therefore, the
average MPG for each vehicle type may not equal the miles driven divided by the gallons of fuel used.
Page 25 of 82
5
Figure 5 Mount Horeb community electricity use
Figure 6. Mount Horeb Community Natural Gas Use
As shown in Figure 7 emissions from residential and commercial buildings greatly exceed emissions
generated by municipal operations. Within this context, the Village, residents, and businesses will need to
work together to reduce community-wide energy use and emissions.
25,000
26,000
27,000
28,000
29,000
30,000
31,000
2021 2022 2023
MWh
Mount Horeb Community Electricity Use
Residential Commercial/Industrial
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
2021 2022 2023
Therms
Mount Horeb Community Natural Gas Use
Residential Commercial
Page 26 of 82
6
Figure 7. Mount Horeb Community GHG Emissions by Source
54.0%42.4%
3.5%
Mount Horeb's Emissions Sources
Residential buildings
Commercial buildings
Municipal operations
Page 27 of 82
7
Community Engagement
The people who live, work, and run businesses and organizations in Mount Horeb are key stakeholders for
the Mount Horeb Energy Plan. These stakeholders are in Mount Horeb for many reasons, but all have
interests in ensuring that the Village is fiscally responsible, economically vibrant, healthy, and
environmentally sustainable. Additionally, as shown in Figure , energy use and emissions from homes and
places of business in Mount Horeb is much greater than energy and emissions related to municipal
operations and facilities.
To ensure that the recommendations in the Energy Plan align with the priorities of community stakeholders,
the project team engaged the community in the planning process in three ways.
1. Village Sustainability and Natural Resources (SNR) Committee. Mount Horeb established the SNR
Committee in 2022 as a resident advisory body that would guide the Village’s environmental
sustainability initiatives. Within this charter, the SNR is ideally positioned to provide feedback on the
Energy Plan from the perspective of residents.
In July, 2024, after receiving funding approval for the project from the Wisconsin Public Service
Commission (PSC), but prior to the start of work, the project team presented the project plan to the
SNR and requested feedback from committee members on the SNR’s objectives for the project. In
April 2025, the project team presented its findings on the Village’s energy baseline to the SNR, as
well as its initial plans for the facilities on which energy assessments would be completed. At the
April meeting, the team also discussed both the content of the community wide survey that would
be deployed and distribution channels for the survey that would be most effective.
After completing energy assessments and using energy models to identify cost effective
improvements, the project team presented its preliminary recommendations for energy upgrades to
Village facilities to the SNR. At this meeting, the team also shared results of the community surveys
and discussed plans for a community forum event. In November and December 2025, the team
shared a draft version of the Energy Plan with the SNR Committee to seek feedback on the
recommendations that are described in the document.
2. Resident and Business Surveys. One survey for residents and a separate survey for businesses were
developed and deployed to collect broad input from community stakeholders on five key topics.
- Concerns and challenges related to energy and climate
- Values and actions related to energy or sustainability that the respondent household or
business has taken
- Challenges and barriers to saving energy or using renewable energy
- Ways in which the Village can help the respondent save energy or use renewable energy
- Input on ways that the Village can save energy.
Both surveys were distributed both online and in paper formats. Mount Horeb Utilities distributed
surveys through its customer communications platform and the SNR supported distribution of the
surveys at events and through community outreach channels. As a result of broad distribution
through these channels, 473 residents and 34 businesses responded to the survey. Response levels
to both surveys were significantly higher than standard survey response rates.
Page 28 of 82
8
Key findings from the residential survey are shown in Table 5 and findings from the business survey
are shown in Table 6.
Table 5. Resident survey key findings
Topic Results
Demographics • 73% own and occupy a single-family home.
• 71% are 31 – 65 years old.
• 56% have household income over $100,000.
Energy actions completed • 70% - 80% report having installed LEDs, scheduling HVAC
setpoints, and/or turning off lights/appliances to save energy.
• 64% completed at least 4 energy saving actions.
Level of agreement with energy
statements (percent who
strongly or somewhat agree)
• “Saving energy is important to our household” - 95%
• “It can be hard to afford our energy bills” - 35%
• “Using renewable energy is important to our household” -
73%
• “Our household has made changes to our home or lifestyle to
reduce our energy use” - 78%
• “Minimizing the amount of gasoline and/or diesel fuel that
we use is a priority for our household” 61%
Perceptions of barriers
Statements with high levels of agreement
• “Home improvements that save energy are too expensive.”
• “Renewable energy systems are too expensive.”
• “I am interested in energy efficiency and/or renewable
energy, but I need to prioritize other goals.”
Statements with high levels of disagreement
• “I do not know how to save energy in my home.”
• “I am not interested in saving energy.”
• “I am not interested in renewable energy.”
• “Nothing holds me back! I am saving energy and have
transitioned to using renewable energy.” (moderate
disagreement)
Requests for Village support for
residents in saving energy
Top tier
• Education on low-cost, cost-effective home improvements
• Help identifying opportunities to use Focus on Energy
incentives
Second tier
• Village to purchase offsite renewable energy
• Encourage residents to purchase offsite renewable energy
• 53% support developing additional bicycle/ped friendly
infrastructure
• Assistance with vetting solar contractors
Hopes for municipal energy plan
• Investigate geothermal for heating and cooling
• Efficiency improvements and heat pumps for municipal
buildings
Page 29 of 82
9
Topic Results
• Reducing vehicle sizes and improving efficiency in municipal
fleet vehicles
Interest in ongoing engagement • 182 may be interested in participating in a forum.
• 118 willing to participate in a focus group.
Table 6. Business survey key findings
Topic Results
Characteristics of respondents • 48% have 10 or fewer staff and an additional 33% have 11 –
25 staff.
• 48% occupy buildings smaller than 5,000 sf. Additional 28%
occupy buildings 5,000 sf – 10,000 sf.
• Respondents represent at least 12 different business sectors
Relevance of energy use to
business operations (percent
who strongly or somewhat
agree)
• Managing energy use is important to the financial success of
the organization: 76%
• Reducing energy use is a priority for the organization: 76%
• The organization has worked hard to reduce its energy
consumption: 64%
• Using renewable energy is important to the organization: 68%
Energy actions completed • Few reported upgrading to LED lighting.
• Many have installed efficient windows and/or added
insulation.
• Generally low numbers of energy saving actions reported.
Ways the Village can help
businesses save energy
• Provide information about available financing and incentives
for efficiency and renewable energy.
• Publicly recognize organizations that are making progress
toward saving energy.
Interest in ongoing engagement • 11 may be willing to participate in a focus group.
3. Community Forum. On September 30, 2025, the Village, the SNR, and the project team collaborated
to offer an evening community forum event at the Mount Horeb Community Center. At the forum,
large format posters offered high-level descriptions of the preliminary energy recommendations
related to municipal facilities, renewable energy, municipal vehicles, and policies, which had been
developed for the Energy Plan. Attendees used green and red stickers to indicate their support for,
or opposition to, each recommendation. Community members were also asked to write additional
feedback on each element of the draft Energy Plan on Post-it notes and adhere the papers to the
applicable poster. After the event, the project team recorded the number of sticker votes supporting
and opposing each recommendation and supplemented that data by recording the additional
viewpoints that were provided on Post-it notes.
Notable themes from feedback shared at the Forum are outlined below.
• Recommendations receiving greatest support were for the Village to facilitate a solar
group buy program and for using smart control technology to improve energy efficiency
at municipal buildings.
Page 30 of 82
10
• Recommendations for energy upgrades at all municipal facilities and for adding on-site
solar arrays at municipal buildings earned the next greatest level of support.
• Strategies related to incorporating EVs into the municipal vehicle fleet were the only
category of recommendations that received opposing votes. Comments on these
recommendations identified concerns about pursuing electrification during a time when
data centers are increasing demand on the electricity grid. Comments on this topic also
wondered whether changes in [Federal] policies may create problems for EVs in the
future and also encouraged the Village to consider renewable diesel fuel alternatives.
Feedback received from the Forum has been incorporated throughout the Mount Horeb Energy Plan.
Recommendation Overview
The project team identified priorities for specific building upgrades, solar installations, and low-carbon fleet
alternatives for the Village to implement, as well as recommendations for policies that institutionalize
progress and encourage community-wide energy and emissions reductions.
Figure 8 provides an overview of recommendations by category and the following sections of the report
explore each set of recommendations in more detail. We present funding opportunities for these
recommendations within each of these sections and also provide a complete overview of funding options at
the end of the report.
Page 31 of 82
11
Figure 8. Mount Horeb energy recommendation summary
This energy plan is intended to guide the Village’s investments in energy efficiency and renewable energy
projects for the next 5-10 years. The descriptions of the municipal building energy efficiency
recommendations estimate the relative level of cost and effort that completing each improvement will
require. Using this guidance, we recommend that the Village cross-reference these recommendations with its
plans for capital improvements during the next decade to establish a timeline for completing the
recommended upgrades.
The project team created quantitative energy models of the buildings that the Village selected for energy
assessments. The outputs of the models identified the most cost-effective, and the highest impact, energy
efficiency improvements that can be made at each building. The team also assessed the financial and energy
benefits of installing solar arrays at each municipal facility.
Building and Facility Energy Efficiency
Continue energy benchmarking
Implement cost-effective municipal energy upgrades
Institute aligned operational policies
Plan for upgrading building equipment to efficient electric alternatives
Monitor and optimize energy use for municipal water systems
Solar
Install solar PV on optimal municipal buildings
Supplement rooftop solar arrays with
procurement of offsite renewable energy
Facilitate Solar Group Buy Program
Vehicles and Equipment
Add EVs to the Village’s fleet
Enact total cost of ownership purchasing
policies
Lead by example: Maximize visibility of
municipal EVs
Policy
Adopt lifecycle cost purchasing policy
Connect community with incentives and financing
Join local government sustainability peer groups
Create a green business recognition program
Page 32 of 82
12
Building and Facility Energy Efficiency Recommendations
We recommend that the Village of Mount Horeb commit to ongoing and continuous engagement to reduce
energy expenses for its municipal facilities. Recommendations 1, 3, and 4 provide operational and policy
guidance that will help the Village move toward ongoing improvements in energy efficiency, while
recommendation two outlines a strategy for completing the specific energy upgrades that are described in
Appendix 1. The fifth recommendation outlines steps that the Village can follow to reduce energy used in its
wells, pumps, and lift stations.
RECOMMENDATION 1: CONTINUE ONGOING BENCHMARKING OF BUILDING PERFORMANCE
The energy performance of buildings can be tracked by examining their energy use intensity over time and in
comparison, to other buildings through a process called benchmarking. Energy use intensity (EUI) is a metric
that shows the building’s total energy use divided by the gross square feet of the building, thus normalizing
the level of energy use for the size of the building. How a building is used directly affects the amount of
energy that it consumes. For example, a hospital that operates 24 hours per day and which requires high
levels of mechanical ventilation will consume more energy per square foot in a given year than an office
building that does not house specialized equipment, and which has limited hours of operation each week. To
enable effective evaluation of a commercial building’s level of efficiency, its EUI is benchmarked against other
buildings that have similar types of uses, and which are in the same climate zone.
Error! Reference source not found.Figure 9 shows the EUI of all Mount Horeb municipal facilities over time
and compared to the national median EUI for that building type. The EUIs for the Library, Community Center,
Garage, Parks and Forestry buildings all show EUIs lower than the median. However, the project team has
identified strategies through which the Village can further reduce energy costs and emissions. The ASHRAE
100 standard for existing buildings offers target EUI thresholds for high performance buildings. We
recommend that the Village work toward reducing energy use to the ASHRAE 100 targets shown in the figure
through a continuous improvement process of tracking energy use, identifying opportunities to save energy,
and monitoring the savings that the improvements generate. The Mount Horeb Station has a higher EUI than
national median. Recommendations in this section highlight specific items to consider for each building.
The Municipal Building (Village Hall) has a similar EUI compared to national median, which suggests that this
is a building to prioritize with initial upgrades. The Public Safety building consists of the Police and Fire
Department. The Fire Department operates as a separate entity from the Village and was therefore not
evaluated for this report. The reported EUI is for the police station only.
The Public Safety building receives natural gas and electricity through common meters that serve both
portions of the building. The Village and the Fire Department have agreed that the Village will pay 58% of the
cost of the energy use for the building, which is intended to reflect the portion of the building’s energy that is
Recommendations
1. Benchmark building energy use .
2. Implement recommended measures buildings to reach over 20% utility cost savings in each building.
3. Adopt standard operating procedures across buildings.
4. Plan for decarbonizing buildings through efficient electrification of HVAC and DHW systems
5. Conduct an evaluation of pumps, lifts, and wastewater treatment plant to identify energy savings.
Page 33 of 82
13
used by the Police Department. The Fire Department pays for the remaining 42% of the cost. To reflect this
arrangement, this report assumes that the building’s energy use is divided between the Police Department
and the Fire Department in the same proportion as the costs for energy have been assigned. While assuming
that the Police Department uses 58 percent of the energy that is delivered to the facility applies the best
information available regarding distribution of energy use, the actual amount of energy used by the Police
Department is unknown. Therefore, the actual EUI for the Police Station may be lower or higher than the EUI
that was calculated for this report.
Continuing to track each facility’s EUI in comparison to relevant benchmarks is a key strategy for identifying
unexpected changes in energy use, as well as maintenance and repairs needed to optimize energy use and to
measure progress toward energy saving goals.
ENERGY STAR Portfolio Manager is a free tool that provides an online platform for tracking energy use over
time in all municipal facilities. To help the Village measure its progress toward achieving energy saving targets
and standards, Portfolio Manager offers the ability to benchmark energy use against a sample of similar
buildings in the same use type. Slipstream has created profiles in ENERGY STAR Portfolio Manager of all
municipal facilities and has entered each building’s energy data for 2023 and 2024 into the platform. The
project team recommends that the Village assign a staff person to track energy use for all facilities in
Portfolio Manager and utilize the platform’s analytical tools to provide regular reports to Village staff and
leadership on the Village’s energy performance. Slipstream will transfer management of the facilities in
Portfolio Manager to the Village’s selected point of contact.
RECOMMENDATION 2: IMPLEMENT RECOMMENDED MEASURES FOR AUDITED BUILDINGS
The project team performed energy assessment walkthroughs at four buildings, Village Hall, the Library, the
Community Center, and the Police Station section of the Public Safety Building.
The assessments included reviewing current heating and cooling systems, lighting equipment, and appliances
and discussing comfort and operations with building staff. The team then developed digital energy models of
each building to identify and quantify opportunities for energy savings. Slipstream’s engineers applied the
equipment that is in use in each building, as well as the condition of the facility, building energy code
requirements at the time of construction, and weather data to create the model of each building.
The project team did not create an energy model for the Public Safety Building, as it is a recently built, well-
performing building with energy efficient measures already in place. Therefore, rather than focusing on
identifying energy efficiency improvement opportunities for the building, this report recommends measures
to cost-effectively further reduce emissions from the building by combining on-site renewable energy
systems and replacing natural gas fueled space and water heating equipment with electrically powered
equipment.
Appendix 1 describes the recommended energy upgrades for the Village’s buildings. In these
recommendations, measure costs were based on secondary research, industry reference materials, and past
project experience. These estimates intend to inform prioritizing improvement measures. Actual energy
savings from the recommended improvements will be highly dependent on weather and actual building
operation. Further engineering and final pricing of all recommended measures will be required prior to
implementation.
Page 34 of 82
14
Table 7 summarizes the recommended measures for assessed buildings. The measures are organized by high
priority, medium priority, and end-of-life.
High Priority. Measures that offer high returns on investment (ROI) and short financial payback
periods because they generate significant energy savings in comparison to their installed cost. This
category also includes measures that will achieve important comfort upgrades.
Medium Priority. Measures that are important to install in order to achieve energy saving goals, but
for which the financial payback period is longer, due to higher initial costs and/or lower total energy
savings than the High Priority measures.
End-of-life (EOL). Energy efficiency improvements that the Village can implement when the
corresponding existing equipment or building system has reached the end of its functional life and
must be replaced or repaired.
In addition to measures in the three categories above, the table identifies Decarbonization strategies for each
building. Decarbonization measures are italicized and can be most cost-effectively implemented when the
corresponding fossil fuel powered space heating or water heating equipment that the measure will replace
reaches the end of its service life. Appendix 1 provides additional explanation of the recommendations that
are summarized in the table.
Table 7. Overview of recommended measures
Village Hall Library Community
Center
Public Safety
High Priority Retro-commissioning
LED Retrofit
Lighting Occupancy
Controls
Retro-commissioning
LED Retrofit
Lighting Occupancy
Controls
Daylighting Controls
Retro-commissioning
LED retrofit w/
Occupancy Sensors
Smart Thermostat
-
Medium
Priority
Plug Load
Management
Air Sealing
Condensing Boiler
Plug Load
Management
Air Sealing
Air Sealing -
End of Life and
Decarbonization
Heat Pump Water
Heater
Air-To-Water Heat
Pump -
Roof Insulation
Heat Pump Water
Heater
Air-To-Water Heat
Pump
ENERGY STAR
Appliances
Window Replacement
Roof Insulation
Heat Pump Water
Heater
Heat Pump Water
Heater
Air-to-Water Heat
Pump
Table 8 estimates upfront cost, annual cost savings, payback period, and annual CO2 savings for the High
Priority, Medium Priority, and End of Life measures. Payback period is calculated as total initial cost divided
by annual energy cost savings. The initial cost listed does not account for incentives, and it is recommended
that the Village work with its Focus on Energy Representative to understand all incentives that are available
for the recommended improvements. The payback for EOL measures is calculated based on the incremental
cost of the energy efficient measures compared to a ‘business as usual’ replacement option. The annual
energy cost savings and upfront costs shown in the table are rounded to either the nearest ten or the nearest
hundred, depending on the size of the initial value. The Village can reduce its energy costs for each building
by approximately 20% - 30% percent if it implements all of the recommended measures.
Page 35 of 82
15
Appendix 1: Building Descriptions provides a full description of building analysis.
Table 8. Cost and CO2 savings from recommended measures
Upfront
Cost ($)
Annual
Energy Cost
Savings ($)
Percent
Cost
Savings
Annual CO2
Savings
(MT)
Percent CO2
Savings
Average
Payback
(yrs)
Village Hall $17,100 $2,050 19.8% 17.8 27% -
High Priority $7,600 $1,600 16.4% 14.1 21.7% 5.9
Medium Priority $9,500 $450 3.3% 3.7 5.7% 36.1
Library $63,700 $4,790 29.8% 28.6 27.4% -
High Priority $11,600 $3,600 22.6% 18.7 18.0% 3
Medium Priority $2,100 $190 1.2% 2.0 2.0% 11.2
EOL Measures $50,000 $1,000 6.0% 7.8 7.5% >50
Community Center $48,500 $1,630 20.0% 9.3 19.5% -
High Priority $8,300 $1,200 14.9% 6.3 13.6% 7.6
Medium Priority $1,400 $50 0.7% 0.7 1.5% 28.3
EOL Measures $38,800 $380 4.3% 2.1 4.4% >50
RECOMMENDATION 3: INSTITUTE STANDARD OPERATING GUIDELINES AT ALL BUILDINGS
The operation of a building and the behavior of building occupants has a significant impact on building energy
use. Operational guidelines can save energy without significant investment and have the potential to
positively impact occupant comfort and productivity. We recommend that the Village of Mount Horeb
develop a policy that defines clear guidelines for the energy efficient operation of municipal buildings. The
policy should provide guidance that applies to all buildings, as well as differentiated guidelines for specific
buildings, as needed. The differentiated guidelines should address the unique characteristics functional
requirements of individual buildings. All guidelines should seek to balance efficient energy use with assurance
of comfort for the staff and visitors that use the building. To ensure that the guidelines are effectively
implement and that they align with the functional and occupant wellbeing needs of the building, the Village
should establish communications channels so that building occupants can provide ongoing feedback that can
be used to adapt the policy, as needed.
Table 9Table provides a full list of items to consider for an operating policy. The operating policy covers
ongoing maintenance, HVAC system operation, plug load management, and lighting. The Village of Mount
Horeb already implements several of these recommendations, such as establishing setpoints and setbacks.
However, it is important to develop a policy to institutionalize current norms and habits.
Table 9. Operating policy examples
Operational Policies
Maintenance
Include changing air filters as directed by manufacturer specifications in monthly work plans.
Enter into service contract with HVAC provider that includes regularly monitoring and maintaining
refrigerant charge on air conditioning units.
Establish permissible temperature setpoint ranges and setbacks for occupied and unoccupied
times. Guidelines should address both heating season and cooling season operations.
Heating,
Ventilation,
and Air
Maintain and clearly display a list of operating parameters for all HVAC and water heating
equipment. The posted information should include the temperature set points, operating
schedules, and maintenance requirements for each piece of equipment.
Page 36 of 82
16
Operational Policies
Conditioning
(HVAC)
Systems
Post guidance on when operable windows can be opened based on room thermostat setpoints.
For example, assuming thermostats are set from 70 degrees to 75 degrees, the guidance would
state that building users may open windows between 68-77 degrees outdoor temperature.
Create communication channels for building occupants to provide feedback on comfort or
operational issues. A regularly administered survey can be useful to gather additional feedback
on occupant comfort.
Develop a policy that prohibits or limits the use of individual refrigerators, space heaters, printers,
and other peripheral equipment at workstations. Consider ways to consolidate the number of
refrigerators and printers in each building.
Plug Loads
Implement computer power management on staff workstations that shifts computers and
monitors into a sleep mode after no more than 30 minutes of inactivity. Alternatively, install
smart plugs or advanced power strips with schedule timer control and/or load-sensing control to
automatically power off devices, such as computers and monitors after periods of inactivity to
reduce standby energy waste.
Implement TV sleep requirements to reduce energy consumption when the TV is not in use.
For spaces where occupancy or daylighting sensors are not installed, post signage that establishes
norms for turning off lights in unoccupied rooms. Department heads can lead by example in
visibly adhering to the posted policies.
RECOMMENDATION 4: PLAN FOR SPACE AND WATER HEATING ELECTRIFICATION
Electrification is the process of phasing out equipment that uses fossil fuels (i.e., natural gas, propane,
gasoline) and replacing it with equipment that uses electricity. Electrification reduces CO2 emissions in
current operations and also enables ongoing emissions reductions.
For more than a decade, market forces have led utilities to choose to add large-scale solar and wind energy
systems to their electricity generation portfolios and to retire their coal power plants. Together, these shifts
have reduced the amount of carbon dioxide that is released for every unit of electricity that is generated.
These trends are expected to continue into the future, which will lead to declining emissions over time from
buildings that use electric-powered space and water heating systems, while emissions from buildings that use
fossil fuels will remain constant.
In many situations, heat pumps are still more expensive than a high-efficiency natural gas system. However,
incentives and changing energy costs are causing heat pumps to become more cost competitive. During
future HVAC and water heating decisions, staff should compare both costs and CO2 emissions of conventional
equipment and heat pumps. Table 110 lists the heat pump options for Mount Horeb buildings.
Table 10. Heat pump system options for existing systems in Mount Horeb Buildings
Existing
System
Heat Pump System Description
Furnace
and A/C
Split
System
Dual-Fuel Air-Source
Heat Pump
A cost-effective electrification option that still uses gas heat but
switches to efficient heat pump heating when outdoor
temperatures are above 25°F (user adjustable).
Air-Source Heat Pump Full electrification option.
Page 37 of 82
17
Existing
System
Heat Pump System Description
Hot
Water
Boiler
System
Air-to-Water Heat Pump
with Gas Boiler Backup
A cost-effective electrification option that still uses gas but switches
to efficient heat pump heating when outdoor temperatures are
above 25°F (user adjustable). Can reuse existing distribution system
and existing gas boiler for backup.
Air-to-Water Heat Pump Full electrification option. Can reuse existing distribution system.
Single
Zone
Constant
Volume
Gas-Fired
RTU
Dual-Fuel RTU
A cost-effective electrification option that still uses gas heat but
switches to efficient heat pump heating when outdoor
temperatures are above 25°F (user adjustable).
Heat Pump RTU Full electrification option.
RECOMMENDATION 5: IMPLEMENT MONITORING AND OPTIMIZATION STRATEGIES FOR
WELLS AND LIFT STATIONS
Wells and lift stations primarily use energy to operate equipment, such as pumps, rather than for space
conditioning, water heating, or plug loads. For this reason, energy use intensity, which compares the amount
of energy that a building consumes to the size of the building is not a meaningful way of assessing the energy
efficiency of these facilities9.
While EUI does not provide a meaningful metric for benchmarking the energy efficiency performance of wells
and lift stations, these facilities, and the equipment that they house, consume a significant share (10% - 30%)
of total energy use for many municipalities10. In 2024, the Village paid over $48,000 to power these facilities
and they account for 13 percent of municipal GHG emissions. Therefore, we recommend that the Village take
the steps described below to assess current energy efficiency of this equipment and to improve efficiency
move forward while simultaneously operational reliability.
A detailed assessment of the energy efficiency of Mount Horeb’s wells and lift stations was outside the scope
of this energy planning project. The opportunities described below highlight common strategies to reduce lift
station energy use and improve reliability. However, the most effective pathway for Mount Horeb will
depend on site-specific factors such as system design, pump sizing, flow patterns, and operational
9 Because EUI is not a meaningful metric for wells and lift stations, these facilities were excluded from certain
tables and charts in the Baseline and Benchmarking sections of this report.
10 SEDAC. 2022. Lift Station Optimization in Wastewater Treatment Plants - EnergySense | The EnergySense
Resilience Center at The University of Illinois System. June 29. https://smartenergy.illinois.edu/lift-station-
optimization-in-wastewater-treatment-plants/.
Page 38 of 82
18
requirements. Detailed assessments by technical experts are needed to determine which approaches deliver
the greatest benefit for the Village.
Establishing performance baseline
Establishing a performance baseline for lift stations is a critical step in identifying inefficiencies and
prioritizing cost-effective improvements. Two primary ways to evaluate current performance are described
below. The Village can use both preventative maintenance and reactive upgrades to manage energy use and
enhance the operational efficiency of pumping equipment.
1. Energy intensity tracking. Comparing electricity use with water flow [typically expressed as kilowatt-
hours per million gallons pumped (kWh/MG)] provides a valuable metric for assessing efficiency. Tracking
the metric over time can reveal reduced equipment performance and needed maintenance. Using the
metric to compare the energy performance of existing equipment with rated performance of prospective
new equipment can inform decisions about the cost-effectiveness of investing in upgrading equipment.
2. Performance monitoring and analysis. This method uses operational data (e.g., runtime, flow,
temperature, and vibration) together with manufacturer pump curves to assess efficiency and system
health. Deviations from expected ranges signal issues like oversizing, clogging, seal/bearing wear, or
cavitation, providing an opportunity to correct problems before they lead to failures (PumpWorks
Engineering 2024). Technologies such as supervisory control and data acquisition (SCADA) provide real-
time oversight and early warnings of inefficiencies and can be used to enhance monitoring capabilities.
Optimizing energy use
Beyond managing energy consumption through maintenance, lift station electricity consumption can be
lowered through operational adjustments and equipment upgrades. Some common strategies include:
1. Install variable frequency drives (VFDs) (if not already in use): Where flows vary significantly,
installing VFDs allows pumps to adjust speeds to match system demand, thus reducing wasted
energy and delivering 5-40% energy savings (SEDAC, 2022).
2. Impeller trimming: If pumps deliver more pressure and flow than needed, the impeller can be
machined to a smaller diameter, so the pump matches system requirements more closely. This
adjustment can reduce excess pressure and lower energy use by 1-8% (Hydraulic Institute, 2022).
However, trimming can reduce the pump’s hydraulic efficiency11 thereby negatively affecting energy
efficiency (energy use per gallon pumped). To maintain reliability and minimize efficiency losses,
trimming should be performed within manufacturer-recommended limits and verified against
updated pump performance curves.
3. High-efficiency motors and pumps: Premium-efficiency motors and pump designs, as described in
the Department of Energy’s (DOE) Premium Efficiency Motor Selection and Application Guide (Basso
et al. 2014), yield incremental but persistent savings (1–3%), and improve reliability (SEDAC, 2021).
When well pumps require replacement at the end of their useful lifespan, the Village can replace
existing equipment with pumps that feature high efficiency motors.
Resources for efficient equipment transitions
11 Hydraulic Institute, 2022. “Trimming Impellers to Reduce Energy Consumption.” Pumps.Org, September 27.
https://www.pumps.org/2022/09/27/trimming-impellers-to-reduce-energy-consumption/.
Page 39 of 82
19
As lift station components (pumps, motors, controls, etc.) approach the end of their service lives,
replacement presents a natural opportunity to improve efficiency. To support this process, Mount Horeb can
draw on existing technical resources such as the Focus on Energy Wastewater and Water Utilities Program12,
which offers pump assessments and incentives; DOE’s Pumping System Assessment Tool (PSAT)13, which
models pumping performance and identifies efficiency opportunities; and the Wisconsin DNR’s Capacity,
Management, Operation, and Maintenance (CMOM) Program14, which provides guidance for evaluating lift
station performance and planning system upgrades.
Applying these resources can help Mount Horeb evaluate equipment options and identify the most cost-
effective path forward. We recommend that the Village use the resources from Focus on Energy, DOE, and
WI DNR, as well as other relevant information to take four key steps to plan investments that will improve
the energy efficiency of its wells and lift stations.
1. Conduct a needs assessment. Define pumping capacity requirements by evaluating current actual flow
and head conditions can avoid inefficiencies associated with oversizing.
2. Screen potential technologies. Proactively research potential efficiency strategies, including high-
efficiency motors, VFD-compatible pumps, and SCADA ready systems to prepare the Village to be ready
to leverage efficiency opportunities if time-sensitive equipment upgrades are needed.
3. Apply life-cycle cost analysis. Compare options for equipment upgrades and replacements based on
total cost of ownership, which includes initial capital cost, and estimated energy costs, and maintenance
costs for each option.
4. Verify improved performance. After investing in efficiency improvements, ensure that the equipment is
commissioned, then follow an energy measurement and verification protocol to ensure that the
upgrades are achieving the predicted improvements in energy efficiency.
12 https://focusonenergy.com/business/wastewater
13 https://www.energy.gov/eere/iedo/articles/pumping-system-assessment-tool
14 https://dnr.wisconsin.gov/topic/Wastewater/CMOM.html
Page 40 of 82
20
Solar Recommendations
RECOMMENDATION 1: INSTALL SOLAR PV ON
OPTIMAL MUNICIPAL BUILDINGS
Onsite solar can reduce the Village’s energy costs and also
lower its CO2 by leveraging existing roof or ground space
near existing facilities. The analysis examined Village
facilities for solar installations and identified 10 locations
that are potential candidates for solar installations.
Table 11. Solar PV installation recommendations for Mount Horeb facilities
Building Size
(kW DC)
Renewable
Offset
Payback
Period (Years)
Annual CO2
Savings (MT)
Annual Cost
Savings
Wastewater
Treatment Plant
(WWTP)
231.1 59% 15.7 196.65 $39,125
Public Safety
(Police Dep't)
146.1 41% 15.5 125.49 $24,967
Electric and
Water Shop15
65.7 65%* 15.5 56.53 $11,246
WWTP Admin
Building
38.2 12% 15.2 33.43 $6,650
Village Hall 33.8 74% 15.5 29.08 $5,786
Community
Center
33.5 74% 18.5 24.14 $4,803
Library 19.3 17% 16.3 15.80 $3,144
Public Works 11.8 80% 15.5 10.14 $2,017
Parks and
Forestry
4.3 67% 18.5 3.07 $611
Total 583.8 494.33 $98,349
Table12 estimates costs for each of the recommended arrays. The estimated upfront cost is based on size
and location on roof or ground. The Focus on Energy incentive shown in the table is a rebate of $50/kW, up
to a maximum incentive of $25,000 per installation. The Federal Investment Tax Credit (ITC), which is
currently available to non-tax paying entities via the Elective Pay provision will expire in July 2026 and it
therefore may not be feasible for the Village to fund, and complete installation of, a solar array within that
timeframe. For that reason, the ITC is not considered in the cost estimates in Table2.
15 The Electric and Water shop currently generates a portion of the electricity that it consumes with a 9 kW on-site
solar array. As part of the Mount Horeb Energy Plan, we recommend that the Village install additional PV capacity
at this site. All fields except the Renewable Offset column for the Electric and Water Shop in Table and Table
reflect information about the added PV capacity. The Renewable Offset field indicates the total renewable offset
for the combined systems. Note: Installing additional solar capacity at this facility would require WPPI issuing a
waiver for the installation.
Recommendations
1. Install rooftop solar on municipal
buildings
2. Supplement with offsite
renewable energy
3. Facilitate solar group buy
Page 41 of 82
21
Table 12. Cost details of solar PV installations for Mount Horeb facilities
Buildings Upfront Cost Focus on Energy
Incentives
Net Cost
Wastewater Treatment
Plant (WWTP)
$624,000 $11,550 $612,400
Public Safety (Police
Dep't)
$394,400 $7,300 $387,200
Electric and Water Shop $177,300 $3,300 $197,900
WWTP Admin Building $103,000 $1,900 $101,200
Village Hall $91,100 $1,700 $89,400
Community Center $90,500 $1,700 $88,800
Library $52,100 $950 $51,200
Public Works $31,800 $600 $31,200
Parks and Forestry $11,500 $200 $11,300
Total $1,575,700 $29,200 $1,570,600
RECOMMENDATION 2: SUPPLEMENT ROOFTOP SOLAR WITH PURCHASE OF OFF-SITE
RENEWABLE ENERGY
As described in Solar Recommendation 1, this Energy Plan recommends installing rooftop and/or ground
mounted solar arrays at most municipal facilities. Table13 includes an indication of the percentage of each
building’s current electricity consumption that the recommended solar array would offset. For most facilities,
due to either limited space available to install solar panels at the site, or for purposes of optimizing cost-
effectiveness of the array based on the terms of the applicable electric tariff, the recommended array would
offset a maximum of 80 percent of the facility’s current electricity use.
Additionally, the estimated combined net cost of the recommended arrays is $1,570,600. Unless the Village is
able to leverage outside funding sources to pay for the cost of these installations, we anticipate that the
Village will need to install these arrays over a period of 5-10 years.
While it may be necessary for the Village to fund and install the arrays over an extended period of time, the
Village can take immediate and near-term action to reduce its municipal emissions by working with Mount
Horeb Utilities and WPPI to procure offsite renewable energy. Offsite renewable energy is electricity that a
facility purchases, which is generated at a different location from the building that is using the electricity. Due
to Wisconsin’s regulatory framework, in Wisconsin, offsite renewable energy generating facilities are usually
owned by a third party or by the property owner’s electric utility, rather than by the owner of the facility.
Table 1313 identifies benefits and drawbacks of both on-site and off-site renewable energy.
Table 13. Comparison of on-site and off-site renewable energy procurement
Installing on-site solar Purchasing off-site renewable energy
Initial cost Significant initial investment
required
Initial cost varies depending on procurement method
• No initial investment required for adding
renewable attributes to conventional electricity
purchases (Choose Renewables program.
• Low initial investment may be required for
community solar participation.
Page 42 of 82
22
Installation
process
Installed by third-party
contractor.
Requires project management
by Village
Not applicable or managed by third party
Energy cost
savings
Generated electricity directly
reduces utility expenses.
Choose Renewables: Adds surcharge to electricity
purchases.
Community Solar and RER: Savings vs. added expense
determined by rate structure.
Community
Leadership
Offers visible and recognizable
evidence to the community of
Village’s investment in clean
energy.
May demonstrate leadership if purchase of renewable
energy is effectively communicated to the community.
Ease of use Minimal maintenance
occasionally required
No extra effort required following initial registration
Emissions
reduction
Renewable energy generated
directly reduces Village’s Scope 2
emissions from purchased
electricity.
Emissions reduction value dependent upon emissions
inventory or energy performance standard applied.16
The 2024 IECC (International Energy Conservation Code) Section CC103.3.2 of Appendix CC establishes
standards for assuring the validity of off-site renewable energy that a building procures to offset its electricity
use. We recommend that, if the Village chooses to purchase off-site renewable electricity, it works with the
provider of the off-site renewable electricity to ensure that the electricity it purchases meets these
standards, as well as the standards provided by Zero Code 2.0.
IECC Section CC 103.3.217 Key Requirements for off-site procurement of renewable energy:
• Renewable energy procurement agreement shall be legally binding, have a term of at least 15 years,
and be transferrable to a new property owner.
• Renewable energy credits (RECs) associated with the purchased energy must have been created
within the past 12 months by a renewable energy system that was constructed within the past five
years.
• The renewable electricity must be either directly transmitted to the building or must be provided
through the local utility.
Mount Horeb Utilities offers the Choose Renewables rate option. Business and residential customers who
opt-in to this program agree to purchase a quantity of 300 kWh blocks of renewable energy each month. For
each block of renewable energy, the customer agrees to pay a surcharge in addition to their regular energy
charges. For each block that customers purchase, Mount Horeb utilities agrees to procure an additional 300
kWh of electricity produced from renewable sources. The Village could purchase 6,735 blocks of energy18
16 Table 6 of Zero Code 2.0 provides useful framework for comparison of offsite renewable energy procurement
options. https://www.zero-code.org/wp-content/uploads/2018/04/Zero-Code-TSD-OffSiteRenewables.pdf
17 2024 IECC Appendix CC 103.3.2. https://codes.iccsafe.org/content/IECC2024P1/appendix-cc-zero-energy-
commercial-building-provisions
18 Number of blocks based on weather-normalized 2024 electricity consumption for all municipal facilities
Page 43 of 82
23
through the Choose Renewables program, at an annual cost of $6,735 to offset all of its current electricity
consumption. If the Village installs all of the recommended on-site solar arrays, it could purchase 4,618
blocks of electricity each year at a cost of $4,618 to offset the remaining portion of its electricity use. Utilities
in Wisconsin have developed additional frameworks and tariff structures through which they are providing
dedicated, locally generated off-site renewable energy to customers who opt in to these programs. Two
examples include community solar, and MGE’s Renewable energy Rider (RER) tariff.
Community Solar. An off-site PV array that is large enough to generate electricity for multiple residential
and/or commercial buildings. Community solar projects in Wisconsin are owned by the local electric utility
and ratepayers within designated classes (ex. Residential, business, industrial) may choose to purchase a
portion of the electricity that the array generates. While specific terms of participation vary among
community solar projects, for most community solar offerings, the customer receives credit on their monthly
utility bill for the value of the electricity that the portion of the PV array that they purchased generated that
month.
MGE Renewable Energy Rider (RER). MGE’s RER tariff offers large energy users the opportunity to opt-in to
be an off-taker of the generation capacity of the utility’s local large scale renewable energy projects. Specific
terms of the agreement are negotiated between the customer and the utility and agreements must be
approved by the Wisconsin Public Service Commission. Using the RER, local governments, school districts,
and large companies have entered into agreements with MGE to allocate portions of the electricity
generated by the large solar arrays that the utility has developed in Dane County. Purchasers that own
multiple buildings can allocate the electricity output from the array between their buildings so that the single
array and the single agreement provides renewable energy throughout the participant’s portfolio of
buildings.
Community solar projects and the RER model support the development of local renewable energy systems
and offer rate structures through which a participant may be able to achieve cost savings in comparison to
purchasing conventional electricity through the default electricity rate. Visibility of local renewable energy
projects can demonstrate the Village’s use of renewable energy to the community and thus build support for,
and adoption of, renewable energy among residents and businesses. Both options also create opportunities
for the Village to benefit from electricity cost savings, rather than paying an additional fee to access
renewable electricity.
Mount Horeb Utilities is a member of WPPI Energy, which provides the electricity that MHU supplies to its
customers. Currently, MHU’s contract with WPPI prohibits both community solar programs and the RER tariff
framework. We recommend that, while enabling these policies would require considerable changes to
contracts and regulations, the Village engage with Mount Horeb Utilities and WPPI to evaluate options
through which the Village can achieve electricity cost savings through participation in locally-sited renewable
energy developments.
RECOMMENDATION 3: FACILITATE A COMMUNITY-WIDE SOLAR GROUP BUY PROGRAM
Seventy-three percent of respondents to the Mount Horeb residential survey either strongly agreed or
somewhat agreed with the statement, “Using renewable energy is important to our household.” However,
only seven percent of respondents said that they had either installed solar on their home or used renewable
energy. The gap between the stated values of residents and the percentage of residents who are currently
using renewable energy reveals that many households face barriers in accessing renewable energy.
Page 44 of 82
24
Respondents identified barriers to using renewable energy, which included installation costs and lack of
knowledge in moving forward with installing on-site renewable energy systems. Qualitative responses also
suggested that residents have concerns about selecting a qualified and reliable solar installation company.
A solar group buy program could help residents and businesses overcome financial, technical, and
information barriers to installing solar arrays at their homes and businesses. Important components of a solar
group buy program are outlined below. Mount Horeb can either create a new solar group buy program, or it
may consider partnering with nearby municipalities to offer a joint program.
• Contractor qualification. The municipality issues an RFP to residential and commercial solar installers
that serve the village. The RFP outlines the framework of the solar group buy program and requests
proposals from installers for the rate structure(s) that they would offer if selected as the sole
provider, as well as examples of the information about recommended solar arrays that they would
provide to participants, and references from previous clients who will attest to the quality and
reliability of the contractor’s work. From the proposals submitted, the Village selects the installer
who offers the greatest value to participants within the program framework.
• Sole sourcing. In exchange for being the sole installer servicing the program, the contractor reduces
its marketing and customer relations expenses, thus lowering the company’s cost of doing business
and reducing overall project costs for participants.
• Reliability of pricing and forecasts. The Village’s program implementer coordinates site visits and
cost bids by the contractor and provides quality control for the energy production and cost savings
forecasts that the contractor provides to participants.
• Streamlined process. Both quality control by the Village’s program implementer and the installer’s
pricing agreement with the Village eliminate the need for residents to obtain multiple and conflicting
bids from contractors. Oversight by the Village’s program implementer ensures that projects
progress on a timely basis and that participants have access to a qualified third-party to address any
questions or concerns that may arise during the project development and installation processes.
Page 45 of 82
25
Fleet Recommendations
The Village of Mount Horeb currently owns and operates
30 vehicles, which it uses to support its police,
wastewater treatment, public services, and recreation
departments. Large pickup trucks (3/4 ton and above),
medium/heavy duty trucks, and SUVs are the most
common vehicle types, followed by half-ton pickup trucks
and vans. All vehicles use internal combustion engines
(ICE) and do not have gasoline-electric hybrid drives. The
municipality’s total fuel cost for vehicles in 2023
exceeded $70,000.
Table 14 shows Mount Horeb’s municipal vehicle energy
use, cost, and emissions. The Village can reduce its
municipal fuel use and costs, while also reducing its
annual GHG emissions by implementing the efficiency
recommendations in this section.
Table 14. Municipal vehicle fleet energy use
Electric vehicles (EVs) provide comparable performance to conventional ICE vehicles, while offering financial
and environmental advantages (see sidebar). The electric vehicle (EV) market has accelerated during the past
five years and multiple manufacturers now produce an array of light duty electric cars, trucks, vans, and SUVs
at price points that are competitive with conventional vehicles.
19 Quality concerns were identified regarding annual miles driven data for some vehicles. To minimize the effects
of data input errors by vehicle users. Outliers were removed from the calculation of average MPG. Therefore, the
average MPG for each vehicle type may not equal the miles driven divided by the gallons of fuel used.
20 Outliers in the vehicle fuel and mileage data suggest that the metric shown for fuel economy of half -ton pickups
may not be accurate. Actual fuel economy for this vehicle category is likely closer to 13 mpg.
Category Number
Vehicles
Gallons of
fuel
Fuel cost Emissions
(kg CO2e)
Miles Driven Avg MPG19
Pickup
(1/2 Ton)
5 1,861 $6,659 15,815 60,571 27.020
Pickup
(3/4 Ton+)
10 3,371 $12,185 29,596 47,832 13.2
SUV 8 8,844 $31,639 75,027 91,293 10.6
Van 2 280 $1,002 2,379 10,620 10.4
Large Trucks 8 5,065 $19,410 52,092 32,713 8.9
Total 33 19,421 $70,895 174,909 243,029 12.5
Benefits of EVs
Lower fuel cost ($/mile) than
gasoline or diesel vehicles.
Maintenance costs 50% lower
compared to gasoline or diesel
vehicles.
Reduce CO2 emissions 40% - 55%
with current electricity mix.
Lower energy use while idling
reduces engine wear and saves
money
Page 46 of 82
26
Currently, there are fewer EV options for larger, medium- and heavy-duty vehicles in the Village’s fleet. Many
of the Village’s current vehicles in these categories use diesel fuel, rather than gasoline. Biodiesel is derived
from plant materials and, according to the U.S. Environmental Protection Agency (EPA’s) Emissions Factor
Hub, generates 7.4% lower emissions than conventional diesel fuel. Additionally, emissions released from
burning biodiesel are “biogenic.” While emissions produced from fossil fuel combustion release additional
GHG emissions into the atmosphere, biogenic emissions release CO2e that was already in the earth’s carbon
cycle, thus not adding to the overall concentration of CO2e in the atmosphere.
While the Village could cost-efficiently reduce GHG emissions by using biodiesel, rather than conventional
diesel, according to the U.S. Department of Energy’s Alternative Fuels Data Center21, there are currently no
biodiesel refueling stations near Mount Horeb. If the Village would like to assess options for using biodiesel in
place of conventional diesel, the Village may engage with local diesel fuel retailers to determine whether
they may consider adding biodiesel to the retail fuel options that they sell.
Most EVs can drive 150 – 300 miles between charges, which is significantly greater than the number of miles
that the Village’s vehicles travel in a single day. Because the driving range of EVs is much greater than typical
daily driving distances for Mount Horeb’s vehicles, the Village can add EVs to its fleet without interrupting its
operations to charge vehicles. Instead, Village staff can plug-in EVs when they are off-duty, and the vehicles
will be fully charged and ready for service the next day.
The project team investigated alternative electric models that Mount Horeb could purchase when replacing
vehicles in its existing fleet.
RECOMMENDATION 1: ADD TWO EVS TO MUNICIPAL FLEET
Mount Horeb can reduce vehicle fuel and maintenance costs, while also lowering its annual GHG emissions
by systematically replacing fleet vehicles nearing the end of their service lives with EV alternatives. While EVs
offer financial savings and environmental benefits in comparison to ICE vehicles, the Project Team
recommends that the Village gradually transition to EVs and that it starts the transition by replacing two
conventional vehicles with EVs. Starting small will enable the Village to install required EV charging supply
equipment (EVSE) and train its staff to drive and maintain these vehicles. Lessons learned from adding these
vehicles will prepare the Village to systematically replace ICE vehicles with electric, or efficient ICE, options as
current vehicles reach the ends of their service lives.
To ensure that the transition to EVs benefits the Village, staff will track the cost and amount of electricity
used to charge the EVs, maintenance requirements, and feedback from drivers on their experiences driving
the cars. The Village can use this information to guide how it adds more EVs into its municipal fleet in the
future.
Part 1: Replace two existing vehicles with EVs
Replace two vehicles nearing end of service life with cost-competitive EVs that match the functionality of
their ICE counterparts. The project team analyzed fleet data to identify which vehicles have cost-competitive
electric options compared to conventional vehicles and are near-replacement age.
We reviewed available EVs to determine which vehicle categories currently have market-ready EV
alternatives and then calculated incremental cost and payback periods to identify which categories are
21 https://afdc.energy.gov/stations#/find/nearest?fuel=BD
Page 47 of 82
27
feasible for adoption. While there are not yet cost-effective EVs for all vehicle categories, the EV market
continues to advance quickly, so it will be important for the Village to continue to monitor the market moving
forward and to watch for cost-effective electric vehicles in additional vehicle categories.
Table15 shows the four vehicle categories in Mount Horeb’s fleet for which EVs are available and are
currently cost-competitive. The current vehicle column shows an existing vehicle in that category in Mount
Horeb’s fleet, and the new gasoline vehicle benchmark shows the approximate cost and fuel efficiency rating
for a new conventional vehicle in that category. The EV incremental cost is the difference between the cost of
a new conventional vehicle and the cost of a corresponding EV. Costs shown do not account for any rebates
or credits which may be available. The cost savings per mile is the reduced per mile cost of fueling and
maintaining the EV instead of the conventional vehicle. The payback period estimates the number of years
required for operational cost savings to surpass the EV’s incremental costs.
Table 15. Potential EV Alternatives by Vehicle Category
Category Ex. current
vehicle
New gasoline
vehicle
benchmark
Ex. EV
Alternative
Incremental
EV Cost
Annual Cost
Savings
Payback
period
(yrs)
Half-ton
Pickup
WWTP 2016
Ford F150
20 mpg
$38,810
Ford F150
Lightning
$13,200 $1,048 12.6
SUV Police Dept.
2015
Chevrolet
Tahoe
22 mpg
$59,000
Chevrolet
Blazer EV
($12,900) $1,204 0
Work van Ford Transit
Connect
24 mpg
$47,400
Ford E-Transit $5,700 $1,238 4.6
Large truck International
MV607
9 mpg
$112,000
International
eMV series
$78,000 $3,104 25.1
Commercially available EVs in these four categories could replace 42% of the Village’s vehicles. Completing
this transition would reduce Mount Horeb’s annual fuel and maintenance costs by approximately $16,000
and would reduce the GHG emissions from the Village’s fleet vehicles by 13,300 kg CO2e per year (8.1%
reduction). The Village could lower its vehicle emissions by 41,700 kg CO2e per year (25.4% reduction) by
supplementing its transition to EVs by sourcing the electricity used to power the vehicles from on-site or off-
site renewable energy systems.
Instead of an immediate full transition, the Project team recommends initially purchasing two EVs (bolded in
Table 4) as replacements for functionally comparable vehicles that are nearing the ends of their service. In
addition to achieving the cost savings shown, replacing these vehicles would reduce emissions by over 2,000
kg CO2e/year. After purchasing these vehicles, we recommend collecting data and stakeholder feedback to
inform how the Village will transition additional vehicles.
Page 48 of 82
28
Part 2: Install EV Charging Systems
To enable initial and expanded future operation of EVs by staff,
Mount Horeb will need to install EV charging equipment.
Table 16 summarizes the three categories of EV charging stations22.
Level 1 chargers offer very low installation costs; however, they do
not recharge vehicles quickly enough to fully recharge a vehicle
during a typical off-duty period. While Level 3 equipment can quickly refuel vehicles, the equipment and
installation costs for chargers in this category may deter the Village from installing DC fast chargers.
The Project Team recommends that the Village install Level 2 charging equipment at central locations where
vehicles are typically parked when off-duty. Using Level 2 EVSE will allow staff to plug in a vehicle that is low
on charge at the end of their shift and for that vehicle to be fully charged by the start of their next shift. Level
2 chargers require a moderate incremental cost over Level 1 chargers, but this cost is offset by their
enhanced functionality.
We recommend adding two EVs to the fleet during the initial transition. If the Village chooses to replace the
two vehicles listed in Part 1, the Village will need to install EVSE to support these vehicles, which would
require at least one Level 2 charger at the Public Safety building, and at least one Level 2 charger at the
wastewater treatment plant (WWTP).
The cost for adding EV charging equipment includes both the cost for the charging ports, as well as the cost
of installing the electrical system infrastructure, such as conduit and electrical panel upgrades. Depending on
the locations where the charging ports will be installed and the existing electrical infrastructure that serves
the building, the cost of laying conduit and upgrading electrical panels may significantly exceed cost of the
charging ports. To minimize the total cost of adding the amount of EVSE that will be needed to support a full
transition of the Village’s current vehicles to EVs in the future, the project team recommends that Mount
Horeb install conduit and upgrade electrical service levels proactively to prepare for replacing more ICE
vehicles with EVs in the future.
The following steps support cost-efficiently preparing to meet future charging needs.
1. Determine the number of vehicles that park at each location (Public Works building, Public Safety
building, and WWTP) for which there is currently a commercially available EV alternative.
a. Considering likely expansion in the market sectors in which there are cost-competitive EVs,
evaluate the number of ICE vehicles that could be replaced with EVs if viable large pickup
truck and large truck EVs are introduced.
2. Based on the number of daily miles that each vehicle travels, EV driving ranges, and estimated cold-
weather range reductions, determine a ‘worst case charging scenario,’ that the EVSE will need to
support (ex. High number of vehicles requiring charging on a very cold day).
3. To prepare for adding EVs to the municipal fleet, install conduit and complete electrical service
upgrades that will be sufficient to support the worst-case charging scenario in a full EV transition of
the municipal fleet.
22 There are variations in capacity and functionality among different types of equipment in a given category
EVSE Recommendations
1. Prioritize level 2 chargers
2. Install EVSE to future-proof
charging needs
Page 49 of 82
29
Table 16. EV Charging Station Types
Charger type Approx. Range Miles
per charging hour
Uses Installed cost per port
(est.)
Level 1 (120V
AC)
5 Home charging Less than $500
Level 2 (240V
AC)
25 Home, workplace, and public
charging (most common)
$500 - $2,500
Level 3 (DC) 200+ Public charging; transportation
corridors
$40,000 - $150,000
RECOMMENDATION 2: USE ESTIMATED TOTAL COST OF VEHICLE OWNERSHIP TO GUIDE
PURCHASING
To reflect the ever-changing EV market and the benefits of EVs, we recommend that the Village adopt a
vehicle purchasing policy to prioritize vehicles that offer the lowest cost of ownership throughout their
lifecycle, rather than the lowest initial purchase price. A purchasing policy that prioritizes selecting vehicles
that have the lowest total cost of ownership (TCO) will achieve two key objectives. 1) The cost of fueling and
maintaining a vehicle during the ownership period may exceed the initial cost of purchasing the vehicle.
Selecting vehicles based on comparative TCO will appropriately value these costs and will offer an advantage
to more fuel-efficient vehicles, as well as to EVs, which are less expensive to refuel. 2) Focusing on TCO will
ensure that the Village uses taxpayer dollars as efficiently as possible to provide the services for which the
municipality is responsible. Looking ahead, a TCO-based purchasing policy will ensure that future decisions
about fleet transitions reflect the changing costs of EVs vs ICEs and includes the following:
• Purchase cost differential
• Ongoing fuel costs: cost to charge an EV vs. cost to purchase gasoline or diesel fuel to power an ICE
vehicle
• Expected maintenance costs
• Forecasted resale values of each vehicle option
Free TCO comparison calculators are offered on the U.S. DOE’s Alternative Fuels Data Center site23, and from
Fleetio24, as well as from other sites.
Table 17 summarizes EV vs conventional vehicle considerations across cost categories.
Table 17. EV vs conventional vehicle cost comparisons - upfront and operating
Vehicle Expense
Category
Electric vehicle or conventional vehicle comparison
Purchase Cost Purchase costs vary by vehicle category
Fuel Cost Fuel cost per mile is lower for EVs
23 https://afdc.energy.gov/calc/
24 https://www.fleetio.com/blog/calculating-total-cost-of-ownership-for-fleet
Page 50 of 82
30
Maintenance Cost Studies25 show approximately 50% lower maintenance costs for EVs.
Resale Value Some analyses have shown higher resale value for EVs, but irregularities in
markets for all used and new vehicles from 2020 – 2023 create uncertainty.
Another way for a municipal fleet to save money is to optimize the total number of vehicles in the fleet. Low
annual mileage for some municipal vehicles suggests that parts of the Village’s fleet may be under-utilized. To
best align the Village’s fleet with functional requirements, as vehicles reach the end of their service lives, the
Village can add a “Do not replace” option to the choices that it evaluates in the LCCA. When evaluating the
“Do not replace” option, in an LCCA, staff may assess opportunities to combine vehicle functions in order to
avoid incurring replacement costs.
RECOMMENDATION 3: LEAD COMMUNITY IN EV TRANSITION
As the Village adds EVs to its vehicle fleet, it has an opportunity to demonstrate to the community that EVs
are a good transportation solution for residents and businesses.
Mount Horeb can increase the visibility of EVs in the community by adding signage to the sides or backs of
EVs in its fleet, which recognizes that a municipal vehicle is an EV. In addition to increasing visibility of EVs in
the community, the signage could include information that quantifies the fuel cost savings and the GHG
emissions reductions that the Village is realizing by operating EVs in place of gasoline-powered conventional
vehicles.
Using a fun and attractive logo or identifier for municipal EVs that connects the Village’s logo, community
pride, or other positive associations (trolls?) with the environmental and cost benefits can prompt the
vehicles to become local conversation pieces and could consequently increase interest in EVs among
residents.
A second strategy through which the Village can lead the EV transition by example would be for municipal
leaders, such as the Village Administrator, the police chief, and other recognizable figures to drive one of the
Village’s EVs to public events. At the events, these leaders may reference their enjoyment of the EV that they
drove.
There is currently only one public EV charging station in Mount Horeb, with the next closest charging stations
located in Verona26. While most EV owners primarily charge their vehicles at home, rather than at public
charging stations, concern about a lack of available charging stations is a common concern that deters people
from considering purchasing an EV.
The Village may be able to reduce concerns among residents about charger availability and thereby increase
EV adoption among residents by facilitating the development of additional charging stations in the
community. Survey results found that community members do not support the Village installing and owning
public-facing charging stations. However, survey responses also indicated that there is support for the Village
25 Harto, C. Electric Vehicle Ownership Costs: Chapter 2 – Maintenance. Consumer Reports. September, 2020.
(https://advocacy.consumerreports.org/wp-content/uploads/2020/09/Maintenance-Cost-White-Paper-9.24.20-
1.pdf)
26 https://afdc.energy.gov/fuels/electricity-locations#/find/nearest?fuel=ELEC&location=mount+horeb,+wi
Page 51 of 82
31
encouraging local businesses to add EV charging stations to their facilities. Mount Horeb can foster the
addition of EV charging stations in the municipality by working with businesses, such as grocery stores,
restaurants, and museums, and hotels, where shoppers/visitors are likely to stay for at least 30 minutes to
install charging at their places of business. To support businesses that agree to add EVSE, the Village can offer
to connect them with technical assistance, to streamline permitting processes, and to publicly recognize
these businesses and feature their charging stations in local business guides and in tourism materials.
Page 52 of 82
32
Policy Recommendations
The recommendations in this section focus on two objectives: 1) institutionalizing and sustaining practices
and policies that advance energy efficiency within municipal government operations; and 2) identifying ways
to encourage efficient energy use and reductions in CO2 emissions throughout the community. The
recommendations can serve as a springboard for future community efforts.
RECOMMENDATION 1: IMPLEMENT SUSTAINABLE
LCCA PURCHASING POLICY
There are opportunities to increase building efficiency
whenever the Village purchases a piece of equipment that
uses energy. For high priority measures that generate
significant energy cost savings in relation to their cost, the
Village may choose to upgrade equipment before it reaches
the end of its useful life. However, decisions on upgrading
building systems frequently occur when a system is reaching
the end of its useful life and must either be replaced or undergo significant repairs. The Village’s decisions in
addressing these needs will impact the Village’s energy use for decades. For many building improvement
decisions, the approach that offers the lowest initial cost may utilize less efficient equipment or building
systems, which will force the Village to incur increased energy costs throughout the time that the equipment
is operational. To manage long term operational costs and to ensure overall cost-effectiveness of capital
improvements, we recommend that the Village establish a purchasing policy for all building repairs,
upgrades, and new construction that estimates lifecycle operational costs for each option that is being
considered and recommends the option that offers the lowest overall cost (initial cost net of financial
incentives + operational costs) while achieving the Village’s functional requirements. The Village may further
advance its environmental goals by also assessing the estimated GHG emissions for each option and applying
a cost-factor to each option based on each option’s projected lifetime emissions.
Table 18 summarizes types of equipment and operational standards that the Village may use to identify
upgrade options that offer the lowest lifecycle costs. While the table shows current high-performance
options and standards, we anticipate that efficiency and operational standards will continue to improve in
future years, so the Village will need to periodically refresh this guidance.
The Village has already implemented several of these items in certain buildings, such as purchasing LEDs and
installing energy efficient equipment.
Table 18 Purchasing Policy Examples
Policy Recommendations
1. LCCA Purchasing Policy
2. Energy Navigator Program
3. Clean energy peer support
4. Recognize clean energy
leaders
Page 53 of 82
33
Purchasing Policy Examples
Heating, Ventilation,
and Air Conditioning
(HVAC) Systems
When purchasing furnaces, consider condensing furnaces with
efficiency higher than 95% AFUE.
When an HVAC system needs to be replaced, consider installation of
air source or dual-fuel heat pumps.
When purchasing air conditioners, consider ENERGY STAR certified
AC with SEER2 ≥15.2.
Install smart thermostats with occupancy sensors to automatically
setback temperatures when spaces are unoccupied.
Consider installing or upgrading the building automation system
when replacing equipment.
Appliances and
Other Equipment
New windows should meet or exceed ENERGY STAR requirements.
Large commercial windows or store front windows should target U-
value no greater than 0.3 and SHGC no greater than 0.25.
Consider replacing gas domestic water heaters with hybrid electric
water heaters or heat pump water heaters.
Purchase ENERGY STAR equipment to replace office appliances and
domestic water heaters.
Lighting Continue purchasing LED bulbs or full fixture replacements for
lighting retrofit.
Consider addition of daylighting and occupancy controls for LED
lighting.
RECOMMENDATION 2: CONNECT COMMUNITY WITH INCENTIVES AND FINANCING
Respondents to both the residential survey and the business survey stated that the Village could support
them in saving energy and shifting to using more renewable energy by helping them identify low-cost energy
saving opportunities for their homes and businesses and by providing assistance in understanding the
financial incentives and financing options that are available for making energy efficiency improvements to
their homes and buildings.
Focus on Energy and WPPI Energy provide portfolios of energy efficiency informational resources, financial
incentives, and technical assistance programs to residential and business customers. While changes in
Federal policies will eliminate some currently available clean energy funding resources, Mount Horeb
residents and businesses can apply for the Federal HOMES and HEAR rebate programs until December 31,
2026.
Focus on Energy is administering the HOMES and HEAR rebate programs in Wisconsin. The programs offer
significant rebates for residential building energy efficiency and electrification improvements for single family
homes and for multifamily buildings. Rebates are available for all projects that install qualifying equipment
(HEAR) and/or that meet energy savings requirements (HOMES), with higher rebates offered to households
with lower incomes.
The HOMES and HEAR programs offer rebates that can offset significant portions of the total costs of
qualifying projects. However, to receive this funding, customers must ensure that work is done in compliance
with the Federal requirements. Focus on Energy representatives and trained contractors are well-equipped
to guide Mount Horeb residents throughout their project. To maximize the potential benefits of this funding
Page 54 of 82
34
resource for the Mount Horeb community, we recommend that, through 2026, the Village highlight
opportunities through HOMES, HEAR, Focus on Energy, and WPPI in its outreach to residents.
Additionally, numerous informational resources about energy efficiency and renewable energy upgrades that
have been created by non-profit organizations, businesses, utilities, and units of government may provide the
clean energy information that Mount Horeb stakeholders are seeking.
While valuable financial, technical, and informational resources are available to help Mount Horeb residents
and businesses identify, and pay for, energy efficiency and renewable energy improvements, survey results
show that many community members would benefit from assistance accessing these resources. Therefore,
without providing additional financial incentives or grants, the Village can facilitate energy improvements in
the community by helping community members connect with existing resources. Following are three ways
that the Village could support community-wide energy savings:
1. Village of Mount Horeb Clean Energy web page. Adding a dedicated page for energy efficiency and
renewable energy information to the Village’s website would help residents, businesses, and
organizations in the community remove the informational and financial barriers to saving energy
that they have identified. In addition to offering a community-specific location for this information,
adding this information to the Village’s website would increase the credibility of this information to
local stakeholders. Survey responses indicated that, while residents and businesses want help finding
the resources that the page would include, they also expressed concerns about determining what
information on this topic is credible and trustworthy. The Village could collaborate with WPPI Energy
and Focus on Energy, which both have expertise on these topics, to provide quality assurance for the
information on the page and to help the Village ensure that the page continues to display currently
available resources and accurate policy guidance.
2. Staff support. The Village could dedicate a portion of a staff person’s time to serve as the Clean
Energy Navigator for community members. This person would be a first point of contact for residents
and businesses
As shown by responses to the surveys, there is significant demand and need for clean energy
outreach, education, and individualized support for residents and businesses. The Village may
consider either re-allocating a percentage of an existing staff person’s job responsibilities to
coordinate the Village’s sustainability outreach, education, and assistance, or seeking funding to add
a new staff person to fill this role. This staff person can both coordinate the Village’s community-
focused work on this topic and serve as a first point of contact for incoming inquiries. Job
responsibilities may include:
• Developing partnerships with other organizations to collaborate on education and outreach.
Partnerships may include the Mount Horeb School District, the Mount Horeb Area Chamber of
Commerce, WPPI Energy, Focus on Energy, Neighbors Helping Neighbors, the Mount Horeb
Community Foundation, neighborhood associations, and other community organizations.
Periodic updates about the Village’s progress implementing its Energy Plan and on opportunities
for residents and businesses to access energy saving resources can also be shared through
articles in the Mount Horeb Mail.
• Coordinating the Community-Led Energy Navigator Program (see below)
• Staffing the municipal Sustainability and Natural Resources Committee
Page 55 of 82
35
3. Community-Led Energy Navigators. Mount Horeb’s municipal SNR Committee, as well as its Green
Team, show that there are community members who are committed to environmental sustainability.
The SNR’s engagement with this planning process also demonstrates that there are residents who
are committed to helping reduce community-wide emissions and to operate more energy efficiently.
Recognizing these community resources, the Village can seek to build on the momentum generated
during this planning process, as well as the need to help connect community members and local
businesses in both completing initial low-cost, low-effort efficiency upgrades, and then in identifying
and funding longer term high-impact energy projects.
By providing coordination support for a volunteer-led clean energy navigator program, the Village
can amplify its efforts by engaging residents in meaningful outreach and community-building work
that responds to an identified need. To support these volunteers, the Village would need to
coordinate with WPPI Energy, Focus on Energy, and other relevant resource providers to compile a
set of applicable informational resources and to train the volunteers in sharing this information
within their neighborhoods, and beyond. The Village could further advance the work of the Clean
Energy Navigators by highlighting it on the Village’s website, as well as in newsletters and other
communications.
Page 56 of 82
36
RECOMMENDATION 3: JOIN LOCAL GOVERNMENT SUSTAINABILITY PEER GROUPS
Leaders of local governments face unique challenges and opportunities when developing and implementing
sustainability initiatives within their municipal operations and throughout the broader community.
Considerations related to procurement, funding mechanisms, staffing capacity, and assurance of reliable
service delivery, are some of the many factors that leaders must navigate for these projects.
Additionally, limited staffing and availability constraints for current staff members can both contribute to
municipalities failing to move forward with projects that advance the community’s clean energy objectives.
Collaborations among local governments can provide peer accountability when working toward energy goals,
as well as a cadence of regular checkpoints that support forward progress. Working with other municipalities
that have made energy, climate, and/or sustainability commitments can also provide valuable peer learning
opportunities as leaders share both their achievements and their lessons learned as they each work on
energy efficiency, renewable energy, sustainable transportation, and other similar projects in their own
communities.
We recommend that Mount Horeb join one or more local government peer organizations as a strategy to
support its ongoing efforts to implement the Mount Horeb Energy Plan and to advance other sustainability
initiatives. There are at least two networks of this type in Wisconsin, and we recommend that the Village
consider joining one, or both, of the organizations.
1. Wisconsin Green Tier Legacy Communities (GTLC) network. The Wisconsin Department of Natural
Resources coordinates this group of municipalities and counties. There is no cost to join the GTLC
network; however, members are required to adopt a resolution that formalizes their commitment to
work with the program and to provide annual reports on the municipality’s sustainability activities.
The GTLC network meets online quarterly. Each meeting includes presentations on topic areas that
the members identify, as well as opportunities for peer learning and exchange. In addition to
quarterly meetings, members are able to participate in relevant learning opportunities and receive
preferential treatment when applying for state funding related to sustainability programs. There are
currently 43 GTLC members from throughout the state. Member municipalities range in size from
the Village of Egg Harbor (pop. 327) to the City of Green Bay (pop. 107,395).
2. Wisconsin Local Government Climate Coalition (WLGCC). WLGCC is a non-profit organization that
both advocates for improved energy and climate policies and supports local governments in moving
forward clean energy and climate efforts at the local level. Programs address energy use in buildings;
transportation, land use; resilience, and reducing emissions from the electricity grid. The
organization provides a framework for collaboration on relevant projects, as well as access to
additional resources. WLGCC currently has 25 member municipalities, as well as six county
governments that are members. Members range in size from Shorewood Hills to the City of
Milwaukee. Nine of the members are in Dane County (including the Dane County government).
Page 57 of 82
37
RECOMMENDATION 4: PUBLIC RECOGNITION PROGRAM FOR ENERGY EFFICIENT BUSINESSES
Both the high number of respondents to the surveys and the feedback that respondents shared show that
community members and stakeholders value and support energy efficiency and renewable energy. Of the
businesses who responded, 50 percent of businesses indicated that it would be helpful for the Village to
publicly recognize local businesses and organizations that are making progress in operating more energy
efficiently and/or are using renewable energy.
We recommend that the Village develop a mechanism to publicly identify businesses and organizations that
are taking meaningful steps on a clean energy journey. Highlighting the clean energy achievements of local
businesses would create two important benefits.
1. An opportunity to earn recognition for saving energy and/or using renewable energy can add
motivation for businesses to implement efficiency or operational improvements that will reduce
energy use, but which may otherwise be invisible to customers and stakeholders.
2. Highlighting local businesses that are actively working to enact clean energy practices would enable
community members who value environmental sustainability to choose to patronize businesses and
organization that align with their values. Connecting aligned businesses and customers can increase
revenue for the businesses and can support development of Mount Horeb’s identity as a clean
energy leader among its residents.
Page 58 of 82
38
Funding Opportunities for Recommendations
The cost of the upgrades identified in this energy plan is substantial and may be a barrier to implementing
some of the recommended measures. This section is intended to provide an overview of funding
opportunities for the various upgrades identified in the report.
FOCUS ON ENERGY
Mount Horeb Utilities partners with Focus on Energy to provide incentives for renewable energy installations
and energy efficiency upgrades. We recommend that Mount Horeb provides a copy of this report to its
Energy Advisor and asks for assistance in identifying the best way to access rebates and support programs to
fund the recommended improvements. The Focus on Energy incentive amount available depends on the
measure and often specific characteristics of the equipment, such as efficiency of new building equipment or
quantity of light fixtures. 27
WPPI ENERGY
Mount Horeb is a member of WPPI Energy. While Mount Horeb Utilities (MHU), like all WPPI member
utilities, participates in the Focus on Energy program, WPPI may periodically have opportunities to work with
the Village to access additional funding resources to demonstrate innovative energy projects. We
recommend that the Village coordinate with staff at Mount Horeb Utilities to communicate the Village’s
progress toward completing recommendations in this energy plan, as well as to discuss the Village’s funding
needs related to these efforts so that WPPI can share relevant funding opportunities that emerge with the
Village.
WISCONSIN PUBLIC SERVICE COMMISSION’S OFFICE OF ENERGY INNOVATION
Mount Horeb accessed a Rural Energy Start Up Program (RESP) grant from the Wisconsin Office of Energy
Innovation (OEI) to pay for this Mount Horeb Energy Plan. In addition to RESP, OEI has periodically issued
funding opportunities for local governments through the Energy Innovation Grant Program (EIGP). Both RESP
and EIGP have typically funded several categories of projects, including comprehensive energy planning for
local governments, energy efficiency upgrades to municipal buildings, renewable energy potential studies,
and microgrid feasibility assessments.
The Mount Horeb energy plan is an example of a Comprehensive Energy Planning project. Generally, to
ensure that building upgrade funds that it approves achieve maximum impact, OEI has required that a
jurisdiction have completed a comprehensive energy plan as a prerequisite for receiving funding to support
energy efficiency or renewable energy building improvements. Because Mount Horeb has completed a
comprehensive energy plan, it may now be prepared to prepare a competitive proposal for EIGP funds to
support an energy efficiency or renewable energy project that is described in this plan.
CLEAN ENERGY REVOLVING FUND
Mount Horeb’s Energy Plan identifies opportunities for the Village to save money on its electricity, natural
gas, and transportation fuel costs. To support future energy projects, the Village can deposit the energy cost
27 Focus on Energy’s 2025 Incentive Summary: https://assets.focusonenergy.com/production/02 -
pdf/2025/BIZ_Business-Summary-of-Services-Incentives_2025.pdf
Page 59 of 82
39
savings from completed energy projects into a separate Clean Energy Revolving Fund sub-account. The
Village can deposit money into this fund on a monthly or annual basis, which will cause the fund balance to
increase quickly.
The purpose of the Clean Energy Revolving Fund is to supplement other municipal funding sources. It is not
intended to replace the need for the Village to use capital funds, operating budgets, and third-party grant
funds to pay for the improvements recommended in this plan.
As Mount Horeb continues to move ahead with the recommendations in the Energy Plan, it may periodically
encounter recommended projects that it is not able to include in its regular capital budget. In these cases,
the Village can draw from its Clean Energy Revolving Fund to supplement other municipal funding sources
and obtain approval for these projects.
Page 60 of 82
40
Appendix 1: Building Descriptions and Recommendations
BUILDING 1: VILLAGE OF MOUNT HOREB MUNICIPAL BUILDING
Size: 12,739 square feet
Age: Built in 1924
Existing heating and cooling system: Three gas-fired constant volume rooftop units (RTU) for cooling and
heating that serve the whole building. Two natural-gas-fired boilers; one is for fin tube perimeter heating in
stairwells and hallways, and one is serving forced air units in the offices. Boilers are reported to be turned off
in the summer.
Baseline Electricity Use: 60,361 kWh/yr
Baseline Natural Gas Use: 4,913 therms/yr
Weather-normalized site EUI: 56 kBTU/sf. At regional median for comparable buildings.
Over the past several years, some of the office spaces in Village Hall have undergone an LED retrofit and have
added occupancy sensors, but there is still some fluorescent lighting in the building. The hearing room has a
mixture of LEDs and fluorescent lights, but no occupancy sensors. There are multiple computers, for
employee use, that provide opportunity for plug load management. The roof insulation was replaced within
the last ten years, and the three constant-volume rooftop units (RTUs) were installed in 2014 to provide
cooling to the building. The boilers and RTUs serve overlapping zones but are controlled by separate, non-
communicating thermostats, leading to simultaneous, uncontrolled heating during the winter and shoulder
seasons. However, during the site visit, staff indicated needing to use space heaters for individual offices
during spring and fall, suggesting underheating in the winter and overheating in the shoulder season. There
are not individual thermostats for each office area and thus, no individualized temperature control. Due to
this configuration, gas and electric usage in the shoulder seasons is higher than expected. Domestic hot water
(DHW) is provided by a 40-gallon gas water heater.
Table9 summarizes the recommended measures by priority level and provides potential cost, energy, and
carbon savings for Village Hall. The total savings row includes the savings from high priority, medium priority,
and EOL measures. Payback period for the condensing boiler is based on an incremental cost instead of a first
cost and it is marked with an *. Percentage reduction is relative to the existing (baseline) case. Measure cost
and annual energy values displayed in the table are rounded up to the nearest ten or hundred, depending on
the initial value.
Table 19. Village Hall recommended energy actions.
Measure Priority Installed
Cost
Annual
Utility Cost
Savings
Financial Payback Annual Energy Reduction
kWh Therms
Emissions
Reduction
(MT CO2e)
Retro-
commissioning
High $4,800 $1,100 11.7% 4.7 Yrs 5,300
8.2%
1,600
37.1%
12.1
18.7%
Retrofit LED bulbs in
existing fixtures
High $1,800 $300 2.8% 7.3 Yrs 2,100
3.2%
-40
-0.9%
1.2
1.8%
Occupancy lighting
controls
High $1,000 $200 1.9% 5.7 Yrs 1,500
2.3%
-30
-0.7%
0.8
1.2%
Plug load
management
Medium $300 $200 1.3% 2.1 Yrs 1,000
1.5%
0
-
0.6
0.9%
Page 61 of 82
41
Measure Priority Installed
Cost
Annual
Utility Cost
Savings
Financial Payback Annual Energy Reduction
kWh Therms
Emissions
Reduction
(MT CO2e)
Improve building air
sealing
Medium $2,700 $50 0.5% > 50 Yrs 200
0.3%
100
1.9%
0.6
0.9%
Condensing boiler* Medium $6,500 $200 1.5% 48.9 Yrs 200
0.3%
400
10.1%
2.5
3.9%
Overall
$17,100 $2,050 19.8%
10,300
16%
2,030
48%
18
27%
Table 20 identifies the impacts of replacing existing fossil fuel powered space and water heating equipment
at Village Hall with electricity-powered systems (“Decarbonization measures”). The primary function of a
decarbonization measure is to eliminate fossil fuel usage and reduce carbon emissions. Actual carbon
emissions reduction over the lifetime of the equipment is difficult to quantify because of fluctuations in the
generation sources that supply Mount Horeb’s regional electricity grid. Mount Horeb should consider these
options if they are interested in a decarbonization or electrification pathway.
The table shows the estimated energy and cost impact of each improvement. The cost listed for the
equipment is shown as incremental cost compared with a like-for-like system replacement. The percentage
reduction for each measure is relative to the existing (baseline) case.
Table 20. Village Hall recommended decarbonization measures.
Measure Incremental
Cost
Annual Utility Cost
Savings
Annual Energy Reduction
kWh
Therms
Heat Pump Water
Heater
$1,300 -$400 -5% -4,500
-6.9%
300
6.8%
Air to Water Heat Pump
(Alternative to
Condensing Boiler)
$271,000 -$1,600 -19% -18,800
-29%
2,400
55%
High Priority: Retro-Commissioning
Next Step : Focus on Energy provides incentives and a list of qualified contractors for retro-commissioning
or building tune-ups. Contact an Energy Representative to understand potential programs and to enroll. 28
We recommend that Village Hall explore retro-commissioning to address multiple HVAC issues that affect
comfort and energy use. Retro-commissioning is a process of servicing and repairing existing heating and air
conditioning equipment to restore it to nearly its original level of performance. Retro-commissioning for
Village Hall would include reviewing thermostats, valves, and boiler and RTU tune-ups to reduce
simultaneous heating and fan usage. Advanced controls such as demand control ventilation (DCV) and boiler
supply water temperature reset based on outside air temperature are recommended to be implemented as
part of the tune-up process. These tune-ups will also eliminate the need for space heaters in office areas and
should mitigate occupant comfort concerns.
28 Information on Focus’ retro-commissioning incentives is here: https://focusonenergy.com/business/building-
optimization
Page 62 of 82
42
The retro-commissioning process would also generate a report that recommends additional system
improvements, such as implementing a building automation system (BAS) to tie RTU and boiler operation
together and for better implementation of advanced control sequences.
High Priority: LED Upgrades
Next Step : Finish existing fluorescent tube conversion to LED or replace existing fluorescent light fixtures
with integrated LED fixtures. Discuss upgrades with Focus on Energy representatives to ensure that lighting
fixture upgrades and retrofits optimize potential financial incentives.
Some areas of Village Hall, such as office spaces, have already been retrofitted with LED fixtures. The
stairways and hearing room have a mixture of LED and fluorescent lighting. Energy cost savings realized by
replacing fluorescent lighting with LED fixtures will quickly recoup the initial installed costs of these
improvements. Therefore, we recommend all fluorescent lighting be retrofitted to LEDs. An LED tube retrofit
(LED bulbs are placed into existing fixtures) is less expensive, and depending on the ballast and fixture wiring,
certain types of tube retrofits can allow for external occupancy sensors (wall-mounted or ceiling-mounted). A
full LED fixture replacement is more costly but allows for integrated advanced lighting controls including
occupancy, daylighting and task tuning. 20 displays values for an LED tube retrofit.
High Priority: Lighting Occupancy Controls
Next Step : Incorporate occupancy sensors into LED fixtures in smaller enclosed areas, either as externally
mounted components or integrated directly into the fixture. Discuss with Focus on Energy representative as
occupancy sensors may be eligible for financial incentives.
Some of the office areas already have occupancy sensors installed, but the hearing room does not have
occupancy sensors. We recommend installing occupancy sensors in smaller enclosed areas, such as offices,
backrooms, the hearing room, corridors, and lavatories that do not already have automatic controls.
Daylighting was not considered because windows are mainly located near stairways and hallways.
Medium Priority: Plug Load Management
Next Step : Implement smart plugs or advanced power strips to reduce energy used by computers and by
other miscellaneous loads
We recommend installing smart plugs or advanced power strips with schedule timer control and/or load-
sensing control to automatically power off devices, such as computers, after periods of inactivity to reduce
standby energy waste.
Medium Priority: Improve Building Air Sealing
Next Step : Hire a qualified insulation or air sealing contractor to inspect building and air seal any leaks,
gaps, or cracks in the building envelope (ex. Walls, roof, windows, doors, etc.).
Air sealing helps prevent air leaks, thus reducing the workload on heating and cooling systems and improving
comfort. Air sealing is typically done on walls, floors, basements, and around doors and windows. We
recommend having a professional walk through the building and air seal any leaks that they notice.
Medium Priority: Condensing Boiler Upgrade
Next Step : Consult an HVAC contractor to replace existing gas-fired boiler with a condensing boiler. Discuss
this measure with Focus on Energy representative, as boiler upgrades may be eligible for incentives.
Page 63 of 82
43
Village Hall has two existing 210 MBH boilers that are rated at 80% thermal efficiency. They are turned off
during the summer months and used for forced air heating in offices and fin tube perimeter heating in
stairwells and hallways. If the village is not pursuing an electrification pathway, we recommend replacing the
boilers with high efficiency fully condensing boilers. After retro-commissioning to see how/if the boilers and
RTUs can be integrated, the Village should have detailed heating load calculations performed to determine if
the boilers can be downsized. Downsizing the boilers would both reduce the cost of the condensing boiler
and reduce the cost of supplying the boiler with energy during operations. In addition to condensing boilers,
implement outdoor air temperature reset controls on a trim-and-respond sequence to adjust the hot water
temperature based on outdoor temperature.
Decarbonization Measure: Alternative to Condensing Boiler Upgrade – Air-to-Water
Heat Pump Upgrade
Next Step : Consult a qualified HVAC contractor to supplement the existing gas-fired boiler with an air-to-
water heat pump (AWHP) to reduce the use of natural gas heating.
We recommend this measure if Mount Horeb is interested in pursuing an electrification or decarbonization
strategy. The hybrid AWHP + gas boiler configuration enables the use of electric heat pump technology as the
primary hydronic heating source. The AWHP is used until outdoor temperatures drop below a predefined
switchover point, at which the system switches over to the gas-fired boiler for heating. This configuration
maximizes efficiency by leveraging the heat pump’s high performance during milder conditions and maintains
reliable heating during colder weather, when heat pump performance drops.
Decarbonization Measure EOL: Heat Pump Water Heater Upgrade
Next Step : Consult a qualified plumbing contractor to replace the existing gas-fired domestic water heater
with a heat pump water heater (HPWH) for improved efficiency and carbon reductions.
We recommend this measure if Mount Horeb chooses to pursue an electrification or decarbonization
strategy. A HPWH replaces fossil-fuel-based water heating while being 2-4 times more efficient than a
standard electric water heater. It uses electricity to move heat from the surrounding area into the water,
instead of generating heat directly through electric resistance. We recommend replacing the gas-fired
domestic water heater at its end of life with a HPWH.
Page 64 of 82
44
BUILDING 2 MOUNT HOREB PUBLIC LIBRARY
Size: 15,936 square feet
Age: Built in 2001
Existing heating and cooling system: One variable-air-volume rooftop air-handling unit with VAV (variable air
volume) terminal boxes equipped with hot water reheat serve the west side of the building. One staged air
volume rooftop air-handling unit with booster coils equipped with hot water reheat serve the east side of the
building. Both rooftop units use DX cooling and gas-fired heating and have an air-side economizer. A
condensing boiler provides hot water to the VAV terminal boxes, booster coils, perimeter convectors, and the
radiant floor heating system. On the site visit, staff noted that radiant floor heating, which is in the children’s
area, is turned off and staff are uncertain about how well the radiant floor heating is functioning.
Baseline Electricity Use: 148,589 kWh
Baseline Natural Gas Use: 4,956 therms
Weather-normalized Site EUI: 68 kBTU/sf. Lower than regional median for similar buildings (74 kBTU/st).
Over the past several years, some spaces of the library have undergone LED retrofits. While there are existing
occupancy sensors in the bathroom and storage areas, there are additional opportunities for both occupancy
and daylighting controls throughout the building. The building is equipped with a Building Automation
System (BAS) with advanced control sequences such as demand controlled ventilation (DCV) and boiler
supply water temperature reset control. There is an electric humidifier for the building, but staff noted that it
is turned off because condensation from high humidity was causing paint damage in the reading room. The
radiant floor heating in the children’s area was also turned off. There are multiple desktop computers in the
area that provide opportunities for plug load management. Domestic hot water is provided by a 40-gallon
electric resistance water heater that was installed in 2019.
Table 21 displays the recommended measures for the library and provides estimated installation cost,
energy, and carbon savings. The total savings row includes the savings from high priority, medium priority,
and EOL measures. Payback periods for most measures are based on totals cost of the measures; however,
the estimated cost indicated for the roof upgrade, which is an end-of-life measure, indicates the incremental
cost of increasing insulation levels in the roof in comparison to a business-as-usual like-for-like replacement.
This distinction is marked with an *. The percent savings/reduction columns compare reduced energy, cost,
and emissions available from completing the measure to the existing (baseline) case.
Table 21. Library measure prioritization and estimated savings.
Measure Priority Installed
Cost
Annual Utility Cost
Savings
Financial
Payback
Annual Energy Reduction Emissions
Reduction
(MT CO2e)
kWh Therms
Retro-
commissioning
High $8,000 $1,100 7.0% 7.5 yrs 8,200
7.0%
400
7.0%
7.3
7.0%
Retrofit LED
bulbs in existing
fixtures
High $2,000 $800 5.2% 2.5 yrs 6,900
5.9%
-100
-2.3%
3.7
3.6%
Occupancy
lighting controls
High $1,100 $700 4.0% 1.8 yrs 5,300
4.5%
-100
-2.3%
2.9
2.8%
Page 65 of 82
45
Measure Priority Installed
Cost
Annual Utility Cost
Savings
Financial
Payback
Annual Energy Reduction Emissions
Reduction
(MT CO2e)
Daylighting
controls
High $500 $500 6.4% 0.4 yrs 8,500
7.2%
-100
-2.3%
4.8
4.6%
Plug load
management
Medium $300 $100 0.6% 2.4 yrs 800
0.7%
0
0%
0.5
0.5%
Improve
building air
sealing
Medium $1,800 $90 0.6% 19.9 yrs 200
0.2%
300
4.7%
1.5
1.5%
Upgrade roof
insulation*
EOL $48,700 $400 2.5% >50 yrs 1,800
1.5%
700
13.1%
5.0
4.8%
Heat pump
water heater*
EOL $1,300 $600 3.5% 2.5 yrs 4,500
3.8%
0
0%
2.9
2.8%
Total
$63,700 $4,290 29.8% 36,200
30.9%
1,100
19%
28.6
27%
Table 22 identifies the impacts of replacing existing fossil fuel powered space heating equipment at the
library with an electricity-powered system (“Decarbonization measure”). The primary function of a
decarbonization measure is to eliminate fossil fuel usage and reduce carbon emissions. Actual carbon
emissions reduction over the lifetime of the equipment is difficult to quantify because of fluctuations in the
generation sources that supply Mount Horeb’s regional electricity grid. Mount Horeb should consider these
options if they are interested in a decarbonization or electrification pathway.
Table 22. Library recommended decarbonization measures.
Measure Incremental Cost Annual Utility Cost
Savings
Annual Energy Reduction
kWh
Therms
Air-to-Water Heat Pump $96,900 -$4,200 -28% -45,300
-38%
4,500
82%
82%
High Priority: Retro-commissioning
Next Step : Focus on Energy provides incentives and a list of qualified contractors for retro-commissioning
or building tune-ups. Contact an Energy Representative to understand potential programs and to enroll. 29
We recommend that the Mount Horeb Library explore retro-commissioning to address HVAC issues that are
affecting energy use. Retro-commissioning is a process of servicing and repairing existing heating and air
conditioning equipment to restore it to nearly its original level of performance. Retro-commissioning of the
library includes a BAS tune-up to identify potential improvements, such as reviewing the VAV system to
reduce fan energy by lowering minimum airflow setpoints at the terminal boxes, minimizing zone reheat
when the AHU is in cooling mode, optimizing humidifier operation to prevent paint damage, and improving
the radiant floor heating system operation.
High Priority: LED Upgrades
29 Information on Focus on Energy’s retro-commissioning incentives is here:
https://focusonenergy.com/business/building-optimization
Page 66 of 82
46
Next Step : Finish tube replacement from fluorescent T8 to LED or replace light fixtures with integrated LED
fixtures. Discuss with Focus on Energy representatives as lighting fixture upgrades and retrofits are eligible
for incentives.
Some lighting in the library has already been retrofitted to LED lighting, and we recommend retrofitting the
rest of the fluorescent lighting to LED lighting. An LED tube retrofit (LED bulbs are placed into existing
fixtures) is less expensive than a fixture replacement, and depending on the ballast and fixture wiring, some
tube retrofits can allow for external occupancy sensors (wall-mounted or ceiling-mounted). A full LED fixture
replacement is more costly but allows for integrated advanced lighting controls including occupancy,
daylighting, and task tuning. Table 21 displays estimated costs, as well as energy, cost, and emissions
reductions for an LED tube retrofit.
High Priority: Occupancy Sensor Controls
Next Step : Incorporate occupancy sensors into LED fixtures in smaller enclosed areas, either as externally
mounted components or integrated directly into the fixture. Discuss with Focus on Energy representative as
occupancy sensors may be eligible for financial incentives.
Occupancy sensors are already located in lavatories and storage areas. We recommend installing occupancy
sensors in the office, break rooms, and larger reading room areas where controls are not already present.
High Priority: Daylighting Controls
Next Step : Implement daylighting controls around perimeter of building in main reading, information
services, and general collection areas; discuss with Focus on Energy representative as daylighting controls are
eligible for incentives.
We recommend implementing automatic daylight continuous dimming controls near windows to reduce
energy use while maintaining sufficient light levels for reading and other visual tasks. An initial illuminance
target of 50 footcandles can be set and then fine-tuned by the controls contractor based on occupant
feedback.
Medium Priority: Improve Building Air Sealing
Next Step : Hire a qualified insulation or air sealing contractor to inspect building and air seal any leaks,
gaps, or cracks in the building envelope (ex. Walls, roof, windows, doors, etc.).
Air sealing helps prevent air leaks, thus reducing the workload on heating and cooling systems and improve
comfort. Air sealing is typically done on walls, floors, basements, and around doors and windows. We
recommend having a professional walk the building and air seal any leaks that they find.
Medium Priority: Plug Load Management
Next Step : Implement smart plugs or advanced power strips for computers and other miscellaneous loads.
We recommend installing smart plugs or advanced power strips with schedule timer control and/or load-
sensing control to reduce standby energy waste by automatically powering off the library’s computers after
periods of inactivity.
EOL: Upgrade Roof Insulation
Next Step : Have an engineer or contractor review insulation and determine an improvement plan; discuss
with Focus on Energy representative for potential incentives with roof insulation upgrades.
Page 67 of 82
47
While adding attic insulation is expensive, it can significantly reduce heating loads. We recommend insulation
be R-30 or better to comply with current energy code.
EOL/Decarbonization: Heat Pump Water Heater Upgrade
Next Step : Consult a qualified plumbing contractor to replace the existing electric resistance domestic
water heater with a heat pump water heater (HPWH) for improved efficiency and carbon reductions.
A HPWH is 2-4 times more efficient than a standard electric water heater, such as the current water heater at
the library, leading to substantial energy savings. An HPWH uses electricity to move heat from the
surroundings into the water, instead of generating heat directly through electric resistance. When the
current water heater reaches the end of its service life, we recommend replacing it with an HPWH.
Decarbonization Measure: Air-to-Water Heat Pump Upgrade
Next Step : Consult a qualified HVAC contractor to supplement the existing gas-fired boiler with air-to-water
heat pump (AWHP) to reduce the use of natural gas heating.
We recommend this measure if Mount Horeb is interested in pursuing an electrification or decarbonization
strategy. The hybrid AWHP + gas boiler setup enables the use of electric heat pump technology as the
primary hydronic heating source until outdoor temperatures drop below a predefined switchover point, at
which the system switches over to the gas-fired boiler for heating. This configuration maximizes efficiency by
leveraging the heat pump’s high performance during milder conditions and maintains reliable heating during
colder weather, when heat pump performance drops.
Page 68 of 82
48
BUILDING 3 COMMUNITY CENTER
Size: 9,660 square feet
Age: Built in 1978. The top floor houses the Senior Center, and the Parks and Recreation department
occupies the bottom floor. The top floor used to be a library until the early 2000s, and the ground floor used
to be a youth activity center.
Existing heating and cooling system: Five split system air conditioners with gas-fired furnaces provide
heating and cooling to the building. Two systems serve the top floor and three serve the bottom floor, with
two of the bottom floor systems in a twinned configuration. The units were replaced in 2020, 2022, 2023,
and 2024. A packaged terminal air conditioner (PTAC) serves the converted screen porch area on the ground
floor. On the site visit, staff noted that the office area in the senior center is always too cool in the summer
and too hot in the winter, such that they use space heaters in the summer for the offices.
Baseline Electricity Use: 53,921 kWh
Baseline Natural Gas Use: 2,662 therms
Weather-normalized Site EUI: 48 kBTU/sf. Lower than median for similar buildings (61 kBTU/sf).
The Community Center is a two-story building with the parks and recreation center on the first floor and the
senior center on the second floor. All the HVAC systems have been replaced in the last five years. Staff in the
Senior Center noted that their offices are often too cold in the summer and too hot in the winter and they
use space heaters in the summer. Because the second floor used to be a library, only one of the offices
contains a thermostat, so there isn’t proper temperature control in the office wing. The senior citizens who
use the facility, however, are generally comfortable. For the Parks and Recreation Center, staff indicated that
there is a piece of paper covering the thermostat to prevent people from changing it and the temperature is
set to be constant. The converted screen porch area on the first floor is conditioned with a PTAC that is
turned off when the room is not being used. Domestic hot water is provided by a 40-gallon natural gas water
heater that was replaced in 2019. Lighting in the parks and recreation center has been replaced with LEDs
that are connected to occupancy sensors, while the Senior Center has T8 fluorescent lighting with new
fixtures. The Senior Center does not have any lighting controls. Except for the former screen porch area and
the director’s office in the senior center, the windows are original.
Table 23 displays the recommended measures for the Community Center and provides estimated installation
cost, energy, and carbon savings. The total savings row includes the savings from high priority, medium
priority, and EOL measures. Payback periods for most measures are based on totals cost of the measures;
however, the estimated cost indicated for the roof upgrade, which is an end-of-life measure, indicates the
incremental cost of increasing insulation levels in the roof in comparison to a business-as-usual like-for-like
replacement. This distinction is marked with an *. The percent savings/reduction columns compare reduced
energy, cost, and emissions available from completing the measure to the existing (baseline) case.
Table 23. Community Center measure prioritization and estimated savings
Measure Priority Installed
Cost
Annual Utility Cost
Savings
Financial
Payback
Annual Energy Reduction
kWh therms
Emissions
Reduction
(MT CO2e)
Retrofit LED bulbs
in existing fixtures
High $2,800 $400 5.2% 8.3 yrs 3,000
6.1%
-100
-3.1%
1.6
3.3%
Smart Thermostats High $600 $300 3.3% 2.8 yrs 1,500
3.1%
200
6.3%
1.8
3.7%
Page 69 of 82
49
Measure Priority Installed
Cost
Annual Utility Cost
Savings
Financial
Payback
Annual Energy Reduction
kWh therms
Emissions
Reduction
(MT CO2e)
Retro-
commissioning
High $4,900 $500 6.4% 11.8 yrs 3,100
6.4%
200
6.8%
3.1
6.5%
Improve building
air sealing
Mediu
m
$1,400 $50 0.7% 28.3 yrs 200
0.3%
100
3.7%
0.7
1.5%
ENERGY STAR
commercial
appliances*
EOL $1,500 $90 1.4% 16.2* yrs 800
1.6%
0
0%
0.5
1.0%
Window
replacement*
EOL $22,500 $200 1.6% >50 yrs* 1,000
2.1%
-100
-1.8%
0.3
0.7%
Upgrade roof
insulation*
EOL $14,800 $90 1.3% >50 yrs* 300
0.7%
200
6.3%
1.3
2.7%
Overall $48,500 $1,630 20% 9,900
20%
500
18%
9.3
19%
Table 24 identifies the impacts of replacing existing fossil fuel powered water heating equipment at the
Community Center with an electricity-powered system (“Decarbonization measure”). The primary function of
a decarbonization measure is to eliminate fossil fuel usage and reduce carbon emissions. Actual carbon
emissions reduction over the lifetime of the equipment is difficult to quantify because of fluctuations in the
generation sources that supply Mount Horeb’s regional electricity grid. Mount Horeb should consider this
option if they are interested in a decarbonization or electrification pathway.
Table 24. Community Center recommended decarbonization measures.
Measure Incremental Cost Annual Utility Cost Savings Annual Energy Reduction
kWh Gas
Heat Pump Water Heater $1,300 -$200 -3.4% -2,100
-4.4%
100
3.1%
High Priority: Retro-commissioning
Next Step : Focus on Energy provides incentives and a list of qualified contractors for retro-commissioning
or building tune-ups. Contact a Focus on Energy, Energy Representative to understand potential programs
and to enroll. 30
We recommend that the Community Center explore retro-commissioning to address the HVAC issues that
are affecting comfort, especially in the senior center. Retro-commissioning is a process of servicing and
repairing existing heating and air conditioning equipment to restore it to nearly its original level of
performance. For the Community Center, this process includes reviewing thermostats and performing a test
and balance procedure for the building to eliminate the need for space heaters in the summer. As part of the
retro-commissioning process, we also recommend relocating the thermostats to the areas that they serve.
This is particularly important on the bottom floor, which was originally an open space but was later converted
30 Information on Focus on Energy’s retro-commissioning incentives are here:
https://focusonenergy.com/business/building-optimization
Page 70 of 82
50
into a wing of offices. Currently, only one office contains a thermostat, leaving the rest of the wing without
proper control.
High Priority: Smart Thermostats Upgrade
Next Step : Replace thermostats with smart thermostats. We recommend replacing existing thermostats
with smart thermostats to automatically adjust temperature setpoints based on occupancy sensing,
ultimately saving energy by reducing energy used to heat and cool unoccupied spaces. As part of this effort,
we also recommend implementing temperature setback protocols for unoccupied periods in the parks and
recreation portion of the building. When replacing thermostats, we also recommend that the Community
Center considers relocating the thermostats on the ground floor to the areas they are serving for better
temperature control and comfort. Currently, the office wing has only one thermostat located in one of the
offices and therefore it is directing heating and cooling based only on the current temperature in a limited
and confined space.
High Priority: LED Upgrades with Occupancy Sensors
Next Step : Retrofit tube replacement from T8 fluorescent to LED in the senior center. Discuss with Focus on
Energy representatives to ensure that lighting equipment used for retrofits is eligible for incentives.
The parks and recreation floor already has LED lighting with occupancy controls, but the senior center has T8
fluorescent in both uplight and downlight fixtures. The senior center has newer fixtures, so we recommend
an LED tube retrofit (LED bulbs are placed into existing fixtures) and implementing occupancy control.
Depending on ballast and fixture wiring, some tube retrofits can allow for external occupancy sensors (wall-
mounted or ceiling-mounted).
Medium Priority: Improve Building Air Sealing
Next Step : Hire a qualified insulation or air sealing contractor to inspect building and air seal any leaks,
gaps, or cracks in the building envelope (ex. Walls, roof, windows, doors, etc.).
Air sealing helps prevent air leaks, thus reducing the workload on heating and cooling systems and improving
comfort. Air sealing is typically done on walls, floors, basements, and around doors and windows. We
recommend having a professional walk the building and air seal any leaks that they find.
EOL: ENERGY STAR Appliances
Next Step : Replace equipment with ENERGY STAR appliances at their end of life.
ENERGY STAR appliances are energy efficient appliances that use less energy than alternative non-certified
models. Upon end of life, we recommend replacing appliances, such as the refrigerators and dishwasher with
ENERGY STAR certified units.
EOL: Windows Replacement
Next Step : At end of life, replace windows with low-E, double pane windows.
Some windows, such as those on the porch and in the director’s office on the top floor, have been replaced,
while the rest remain original to the building. When the existing windows reach the end of their service life,
we recommend replacing the original windows with low-E, double pane glazing for improved energy
efficiency and occupant comfort. Upgraded windows can significantly reduce heating and cooling loads.
Page 71 of 82
51
EOL: Upgrade Roof Insulation
Next Step : Request that an engineer or contractor evaluate existing insulation and determine an
improvement plan; discuss with Focus on Energy representative for potential incentives with roof insulation
upgrades.
The current roof is pitched with insulation between the studs and the roof. The building does not have an
attic, and facility staff were not aware of any additional insulation that has been added. When the roof
reaches its end of life, we recommend bringing the roof insulation level to R-30 or greater to comply with the
current energy code. While roof upgrades are expensive, they can help reduce heating and cooling loads.
Decarbonization Measure at EOL: Heat Pump Water Heater Upgrade
Next Step : Consult a qualified plumbing contractor to replace the existing gas-fired domestic water heater
with a heat pump water heater (HPWH) for improved efficiency and carbon reductions.
We recommend this measure if Mount Horeb is interested in pursuing an electrification or decarbonization
strategy. A HPWH replaces fossil-fuel-based water heating while being 2-4 times more efficient than a
standard electric water heater. It uses electricity to move heat from the surroundings into the water, instead
of generating heat directly through electric resistance. When the existing domestic hot water system reaches
the end of its service life, we recommend replacing it with a HPWH.
Page 72 of 82
52
BUILDING 4 PUBLIC SAFETY: POLICE STATION
Size: 29,000 square feet
Age: Built in 2019. The building consists of a fire station and a police station. Our site visit focused primarily
on the police station.
Existing heating and cooling system: The building is served by two variable-air-volume (VAV) air-handling
units (AHU) with DX cooling and hot water terminal reheat, one dedicated to the fire station and the other to
the police station. Hot water is provided to the building by two natural gas boilers, with one in lead and the
other for backup operation. The police station’s garage is served by unit heaters and gas-fired makeup air
units (MAU) with energy recovery ventilation (ERV).
Baseline Electricity Use: 285,611 kWh
Baseline Natural Gas Use: 13,944 therms
Weather-normalized Site EUI: 79.5 kBTU/sf. Higher than median for similar buildings (71.8 kBTU/sf).
The building was designed with energy efficiency in mind; however, site EUI does exceed the national median
for this building type. The building receives natural gas and electricity service through joint accounts that
serve both the fire department and the police department. Energy costs are distributed between the Village
(for the police station) and the Mount Horeb Area Joint Fire Department and Emergency Medical Service
based on an agreement between the parties that the Village will pay 58 percent of the energy costs and the
fire department will pay the other 42 percent of the costs. The energy assessment confirmed that the
building appears to be operating efficiently. While more detailed analysis of would be needed to confirm, it is
likely that the police station’s higher EUI reflects a misalignment between the terms of the agreement
between the parties and how energy is actually used in the building.
A building automation system (BAS) manages the HVAC system, allowing for advanced control strategies such
as economizer operation, demand control ventilation via CO2 sensors, supply air temperature control, static
pressure control, and hot water supply temperature reset controls. The gas and electric bills are divided
between the fire and police stations, with 58% allocated to the police station and 42% to the fire department.
Each station receives its own water bill. Domestic hot water is provided by an ENERGY STAR certified
condensing gas water heater. The police station also features LED lighting throughout with occupancy
sensors, along with automated blinds for additional efficiency.
As the building is relatively new and already incorporates many energy efficient measures, our
recommendations primarily focus on electrification and decarbonization opportunities that can be
implemented when the existing equipment approaches the end of its service life.
Decarbonization Measure at EOL: Air-to-Water Heat Pump Upgrade
Next Step : Consult a qualified HVAC contractor to supplement the existing gas-fired boiler with air-to-water
heat pump (AWHP) to reduce the use of natural gas heating.
We recommend this measure if Mount Horeb is interested in pursuing an electrification or decarbonization
strategy. The hybrid AWHP + gas boiler setup enables the use of electric heat pump technology as the
primary hydronic heating source until outdoor temperatures drop below a predefined switchover point, at
which the system switches over to the gas-fired boiler for heating. This configuration maximizes efficiency by
leveraging the heat pump’s high performance during milder conditions and maintains reliable heating during
colder weather, when heat pump performance drops.
Page 73 of 82
53
Decarbonization Measure at EOL: Heat Pump Water Heater Upgrade
Next Step : Consult a qualified plumbing contractor to replace the existing gas-fired domestic water heater
with a heat pump water heater (HPWH) for improved efficiency and carbon reductions.
We recommend this measure if Mount Horeb is interested in pursuing an electrification or decarbonization
strategy. A HPWH replaces fossil-fuel-based water heating while being 2-4 times more efficient than a
standard electric water heater. It uses electricity to move heat from the surrounding into the water, instead
of generating heat directly through electric resistance. We recommend replacing the DHW at its end of life
with a HPWH.
Page 74 of 82
54
Appendix 2: Solar Methodology
The steps described in this section were followed to recommend sizes of solar arrays that could be installed
at each municipal facility. The scope of the Energy Plan project did not allow for solicitation of bids from solar
installers to determine exact array configurations, capacities, and costs. The scope also did not include
evaluations of roof load capacity for each facility to confirm that the roof structures at all facilities are
sufficient to support the recommended solar arrays.
1. Assessed available space. Used on-site assessments of Village Hall, the Library, the Public Safety
Building, and the Community Center to determine the amount of rooftop space that is available to
install a solar array.
a. Supplemented site visits with aerial and street level imagery from Google Maps and other
online sources to assess available roof space, ground space, and potential shading for the
remaining municipal facilities.
2. Determined maximum generating capacity. Used the National Renewable Energy Lab’s (NREL’s)
PVWatts tool to determine the maximum photovoltaic (PV) array capacity that could be installed in
the available space and the annual amount of electricity that the maximum array capacity would
generate in an average year.
3. Optimized cost-effectiveness. The terms of the MHU electric tariff that applies to facilities that
house PV arrays that have generating capacity greater than 20 kW-DC offer a low value to the
customer for electricity that the PV array generates which exceeds the building’s electricity demand
at that time (“over production”). To reduce occurrences of over-production, if the PVWatts output
estimated electricity production greater than 80 percent of the building’s annual electricity
consumption, the size of the recommended array was reduced to a capacity that would produce 80
percent of the facility’s annual electricity consumption.
4. Estimated net installed cost. The initial cost of the installed array was estimated to be $2.70/watt
based on NREL’s most recent market assessment31. Focus on Energy offers a financial incentive of
$50/kW-DC for commercial solar installations, up to a maximum $25,000 incentive amount. The
value of this incentive was deducted from the total cost to calculate the net cost. Due to termination
of the Federal Investment Tax Credit for any renewable energy systems completed after July 2026,
potential value of the ITC was not deducted from the total cost.
5. Forecast financial payback. Used U.S. Energy Information Administration (EIA) data for Wisconsin32
to determine an average value of $0.127/kWh for electricity that the arrays produce which reduces
the amount of electricity that the facility purchases. The value per kilowatt-hour produced was
applied to the amount of electricity that the array would produce each year to determine an annual
value of the electricity that would be generated. The net cost of the array was divided by the annual
value of electricity produced to estimate the number of years that would be required for the value of
the electricity that is generated to surpass the initial net cost of the array. The financial payback
31 https://www.nrel.gov/solar/market-research-analysis/solar-installed-system-cost
32 https://www.eia.gov/electricity/state/wisconsin/
Page 75 of 82
55
period does not apply a discount rate to future production and does not consider the potential
effects of changes in electricity prices.
We recommend that the Village follow standard procurement procedures of soliciting bids from qualified
installation contractors to determine specifications for PV systems on the buildings on which it decides to
install solar arrays.
Page 76 of 82
56
Appendix 3: Fleet Methodology
The analysis measured the current annual energy, cost, and emissions impacts of the Village of Mount
Horeb’s municipal fleet. It also applied data on current vehicles to performance metrics of new gasoline,
diesel, and electricity-fueled vehicles to recommend a strategy through which the Village can cost-effectively
reduce the energy used, and emissions generated by, its vehicles. The methodology used to calculate data on
current vehicles and prepare recommendations for fleet vehicle replacements is described below.
1. Calculate key performance indicators (KPIs) for municipal fleet vehicles.
• Collected data showing the number of gallons of fuel purchased for each vehicle, as well as
the fuel type (gasoline, diesel, or other) during a 24-month period
• Collected data showing the number of miles driven by each vehicle during the same 24-
month period.
• Applied data for fuel use, fuel type, and miles driven to calculate the pounds of CO2 emitted
by each vehicle
• All Village-owned vehicles were assigned to one of five categories: Half-ton pickup truck,
Large pickup truck, Heavy-duty truck, SUV, and Van.
• Estimated fuel costs per gallon based on 24-month average fuel costs for the Midwest33.
• Calculated the annual fuel use, fuel cost, miles driven, and CO2 emissions for all of the
Village’s vehicles, then segmented each metric for each vehicle category.
2. Surveyed the market to identify all electric vehicles available in the existing vehicle categories in the
Village’s fleet.
• Limited findings to eliminate vehicles that are not yet in production or had limited market
share, making them difficult for the Village to obtain.
• Within each vehicle category, identified a cost-effective EV option that met minimum driving
range requirements and had a strong fuel economy (kWh/100 miles) rating to use for
opportunity analysis.
3. Surveyed the market to identify a leading gasoline or diesel-powered vehicle in the existing vehicle
categories in the Village fleet that the Village would be likely to consider for purchase during its
normal vehicle retirement and replacement process.
• Identified cost and fuel economy metrics for each selected vehicle.
4. Used previous gasoline, diesel, and electricity costs to calculate the cost of fuel used to drive one
mile by the selected EV and by the selected gasoline or diesel vehicle in each vehicle category.
5. Applied research by Consumer Reports34 to estimate the average per mile maintenance costs for EVs
and gasoline or diesel-powered vehicles.
Calculated the potential cost savings per mile that the Village could obtain by purchasing an EV in
place of a gasoline or diesel vehicle. If the net purchase cost of the EV exceeded the cost of the
gasoline or diesel vehicle, calculated the number of miles after which the per mile cost savings from
driving the EV would surpass the incrementally higher purchase of the EV.
33 U.S. Energy Information Administration Weekly Retail Gasoline and Diesel Prices.
https://www.eia.gov/dnav/pet/pet_pri_gnd_dcus_r20_a.htm
34 Harto, C. Electric Vehicle Ownership Costs: Chapter 2 – Maintenance. Consumer Reports. September, 2020.
(https://advocacy.consumerreports.org/wp-content/uploads/2020/09/Maintenance-Cost-White-Paper-9.24.20-
1.pdf)
Page 77 of 82
57
Appendix 4: Additional References and Resources
Advanced Manufacturing Office: Case Study - The Challenge: Saving Energy at a Sewage Lift Station Through
Pump System Modificat. n.d.
ANSI/ASHRAE/IES Standard 100-2018 Addendum C. Energy Efficiency in Existing Buildings. December 2022.
https://www.ashrae.org/file%20library/technical%20resources/standards%20and%20guidelines/standards%
20addenda/100_2018_c_20221230.pdf
PumpWorks Engineering. 2024. “What Can Predictive Monitoring Tell You About Your Pumps?” Pumpworks,
December 19. https://www.pumpworks.com/what-can-predictive-monitoring-tell-you-about-your-pumps/.
U.S DOE. 2012. “Case Study - The Challenge: Saving Energy at a Sewage Lift Station Through Pump System
Modifications.” Energy Efficiency and Renewable Energy Advanced Manufacturing Office, February 2.
Basso, Dale, Bruce Benkhart, Thomas Bishop, et al. 2014. Premium Efficiency Motor Selection And Application
Guide: A Guidebook for Industry. U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable
Energy (EERE). https://www.energy.gov/sites/prod/files/2014/04/f15/amo_motors_handbook_web.pdf.
National Renewable Energy Laboratory (NREL) Solar Installed System Cost Analysis.
https://www.nrel.gov/solar/market-research-analysis/solar-installed-system-cost
U.S. Environmental Protection Agency (EPA). U.S. Energy Use Intensity by Property Type. ENERGY STAR
Portfolio Manager Technical Reference. August 2024.
https://portfoliomanager.energystar.gov/pdf/reference/US%20National%20Median%20Table.pdf
U.S. Energy Information Administration Weekly Retail Gasoline and Diesel Prices.
https://www.eia.gov/dnav/pet/pet_pri_gnd_dcus_r20_a.htm
U.S. Energy Information Administration Wisconsin Electricity Profile 2024.
https://www.eia.gov/electricity/state/wisconsin/
U.S. Energy Information Administration 2018 Commercial Building Energy Consumption Survey (CBECS).
https://www.eia.gov/consumption/commercial/
Page 78 of 82
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
July 28, 2026
AGENDA ITEM # 6.c
Discuss any updates regarding the Village's Bike Friendly Community Designation
BACKGROUND
RECOMMENDATION
ATTACHMENTS
None
Page 79 of 82
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
July 28, 2026
AGENDA ITEM # 6.d
Discuss any updates regarding the Village's Bird City Designation
BACKGROUND
RECOMMENDATION
ATTACHMENTS
None
Page 80 of 82
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
July 28, 2026
AGENDA ITEM # 6.e
Discuss adding Committee Initiatives on the Village Website
BACKGROUND
RECOMMENDATION
ATTACHMENTS
None
Page 81 of 82
AGENDA ITEM REPORT
MEETING DATE PREPARED BY
July 28, 2026
AGENDA ITEM # 6.f
Discuss Terrace Beautification and Native Plantings
BACKGROUND
RECOMMENDATION
ATTACHMENTS
None
Page 82 of 82