Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 MATTHEW JOHNSON 625 STEVENS ST NEENAH WI 54956 RE: 625 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 RICHARD & CONNI MULLINS 631 STEVENS ST NEENAH WI 54956 RE: 631 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 MICHAEL & MARGARET PAVICH 637 STEVENS ST NEENAH WI 54956 RE: 637 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 ANDREW & HEIDI GRUSE 649 STEVENS ST NEENAH WI 54956 RE: 649 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 SANDRA VERBRICK 653 STEVENS ST NEENAH WI 54956 RE: 653 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BRANDT & MICHELLE SWARDENSKI 661 STEVENS ST NEENAH WI 54956 RE: 661 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 JENNIFER PELCZAR 663 STEVENS ST NEENAH WI 54901 RE: 663 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 RON & STEPHANIE NEWMAN 673 STEVENS ST NEENAH WI 54956 RE: 673 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BRIAN & COLLEEN WEBB 626 STEVENS ST NEENAH WI 54956 RE: 626 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 STEVEN & RENAE BELKNAP 632 STEVENS ST NEENAH WI 54956 RE: 632 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 STEVEN & SANDRA KOHLMANN 638 STEVENS ST NEENAH WI 54956 RE: 638 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 NISSA BASEMAN PIETERICK 644 STEVENS ST NEENAH WI 54956 RE: 644 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 JOHN & JUDY THOREN 650 STEVENS ST NEENAH WI 54956 RE: 650 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DAVID & AMANDA LOUDEN 656 STEVENS ST NEENAH WI 54956 RE: 656 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BRYAN & JENNIFER KEBERLEIN 662 STEVENS ST NEENAH WI 54956 RE: 662 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DAVID & KATHY HASE 664 STEVENS ST NEENAH WI 54956 RE: 664 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 SELENA KURER 668 STEVENS ST NEENAH WI 54956 RE: 668 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 TRACY & CAMI HANOLD W4187 CTY RD KK KAUKAUNA WI 54130 RE: 709 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CURRENT OCCUPANT 709 STEVENS ST NEENAH WI 54956 RE: 709 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 SUSAN PRINCE 713 STEVENS ST NEENAH WI 54956 RE: 713 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CLARKE HUFF 717 STEVENS ST NEENAH WI 54956 RE: 717 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 KEVIN ANKLAM 721 STEVENS ST NEENAH WI 54956 RE: 721 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 HASZIENDA ENTERPRIZES, LLC 638 MAIN ST NEENAH WI 54956 RE: 725 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CURRENT OCCUPANT 725 STEVENS ST NEENAH WI 54956 RE: 725 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 RAYMOND & MARY DIEHL 730 STEVENS ST NEENAH WI 54956 RE: 730 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BRIAN MCCORKLE 726 STEVENS ST NEENAH WI 54956 RE: 726 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 PATRICK & SHARON O'REILLY 722 STEVENS ST NEENAH WI 54956 RE: 722 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CLINT & CAROLYN HARNESS 718 STEVENS ST NEENAH WI 54956 RE: 718 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 SHELBY MERRITT 714 STEVENS ST NEENAH WI 54956 RE: 714 STEVENS ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 STEVEN VERTZ 512 LAUDAN BLVD NEENAH WI 54956 RE: 512 LAUDAN BLVD The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 THOMAS WANAMAKER 600 LAUDAN BLVD NEENAH WI 54956 RE: 600 LAUDAN BLVD The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 KAREN MYKEL 521 LAUDAN BLVD NEENAH WI 54956 RE: 521 LAUDAN BLVD The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CASSANDRA BUKSYK 711 CONGRESS PL NEENAH WI 54956 RE: 711 CONGRESS PL The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 FRANK ADLER 516 WINNEBAGO HEIGHTS NEENAH WI 54956 RE: 516 WINNEBAGO HEIGHTS The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen

Source: City of Neenah website. First collected Oct 17, 2026.