Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BARRY T. JOHNSON 232 CEDAR ST NEENAH WI 54956 RE: 232 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DAVID BUNDGAARD 228 CEDAR ST NEENAH WI 54956 RE: 228 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 TAMI TROCHINSKI 224 CEDAR ST NEENAH WI 54956 RE: 224 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 MERANDA VENTURES LLC 221 S PARK AVE NEENAH WI 54956 RE: 220 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CURRANT OCCUPANT 220 CEDAR ST NEENAH WI 54956 RE: 220 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 NOU LEE 216 CEDAR ST NEENAH WI 54956 RE: 216 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CHARLENE WIZA 212 CEDAR ST NEENAH WI 54956 RE: 212 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 MAXWELL FOEGEN 235 CEDAR ST NEENAH WI 54956 RE: 235 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DALE & SUSAN DERUYTER 674 CEDAR ST NEENAH WI 54956 RE: 674 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 KATHARINE STOUT 563 ROYAL PALM DR MELBOURNE FL 32935 RE: 670 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BENJAY KOHANSKI 648 CEDAR ST NEENAH WI 54956 RE: 642 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CHRISTOPHER WENZEL 636 CEDAR ST NEENAH WI 54956 RE: 636 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 JASON VERSTEGEN 654 CEDAR ST NEENAH WI 54956 RE: 654 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 BENJAY KOHANSKI 648 CEDAR ST NEENAH WI 54956 RE: 648 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 COLLIN & CHRISTINA GOODFELLOW 660 CEDAR ST NEENAH WI 54956 RE: 660 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 MATIN & AARON GAGNON 666 CEDAR ST NEENAH WI 54956 RE: 666 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 AMANDA PEREZ-GONZALEZ 618 CEDAR ST NEENAH WI 54956 RE: 618 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 GORDON & GLORIA SIROLA 624 CEDAR ST NEENAH WI 54956 RE: 624 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DONALD & LINDA MEIER 630 CEDAR ST NEENAH WI 54956 RE: 630 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 ROBERT ABITZ 203 CEDAR ST NEENAH WI 54956 RE: 203 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CRAIG & KATELYN MCCOWEN 19 SOUTHWEST 19TH PL CAPE CORAL FL 33991 RE: 207 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CURRANT OCCUPANT 207 CEDAR ST NEENAH WI 54956 RE: 207 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 ELIEEN MCCOY 669 CEDAR ST NEENAH WI 54956 RE: 669 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 KARA BEECK 703 CEDAR ST NEENAH WI 54956 RE: 703 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 LINDA KEHL 709 CEDAR ST NEENAH WI 54956 RE: 709 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DAIL PELIOTES 713 CEDAR ST NEENAH WI 54956 RE: 709 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 IAN & KRISTEN JACKSON 717 CEDAR ST NEENAH WI 54956 RE: 717 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 CAROL HEALY 721 CEDAR ST NEENAH WI 54956 RE: 721 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 MICHAEL CUSTER 725 CEDAR ST NEENAH WI 54956 RE: 725 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 AUTUMN GASCHLER 730 CEDAR ST NEENAH WI 54956 RE: 730 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 RICKY & CONNIE FURMAN 726 CEDAR ST NEENAH WI 54956 RE: 726 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 GAIL TORNOW 722 CEDAR ST NEENAH WI 54956 RE: 722 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 KEITH & NANCY WILKINSON 714 CEDAR ST NEENAH WI 54956 RE: 714 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 STEPHEN HARWOOD 710 CEDAR ST NEENAH WI 54956 RE: 710 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 ETHAN & KRISTIN FETT 702 CEDAR ST NEENAH WI 54956 RE: 702 CEDAR ST The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 TODD RUNGE 705 FAIRVIEW AVE NEENAH WI 54956 RE: 705 FAIRVIEW AVE The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 GARY ALLARD 633 E DOTY AVE NEENAH WI 54956 RE: 633 E DOTY AVE The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 WILLIAM STEFFENS 637 E DOTY AVE NEENAH WI 54956 RE: 637 E DOTY AVE The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 DAVID OOST 749 CONGRESS PL NEENAH WI 54956 RE: 749 CONGRESS PL The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 WILLIAM SKINNER 650 WINNEBAGO HEIGHTS NEENAH WI 54956 RE: 650 WINNEBAGO HEIGHTS The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 JAYNE BOTTENSEK 632 E DOTY AVE NEENAH WI 54956 RE: 632 E DOTY AVE The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen Neenah W I S C O N S I N Department of Public Works 211 Walnut St., P.O. Box 426, Neenah, WI 54957-0426 Phone: 920-886-6240 Fax: 920-886-6250 March 1, 2024 LOWRIE LEAHY 636 E DOTY AVE NEENAH WI 54956 RE: 636 E DOTY AVE The City's contractor, David Tenor Corporation, will begin utility and street construction on Belmont Avenue, Belmont Court, Cedar Street, and Stevens Street in the next week(s). Construction will be completed by November 2024. We will need your help to make this a successful project. General Project Sequence The project will consist of the following work:  Install new sanitary sewer main  Install new water main  Install new sanitary laterals and water services  Install new storm sewer  Rest period (Contractor will not work for 1 month to allow trenches to settle more than can be achieved with mechanical compaction)  Remove existing roadway (asphalt, and the existing stone base)  Install geogrid and new aggregate road base  Install/repair concrete curb & gutter and place concrete pavement  Repair/replace existing concrete sidewalk/driveway aprons and install new sidewalk  Restore terrace areas with topsoil, grass seed, fertilizer, and hydro-mulch  Install new hot mix asphalt roadway (two lifts) Garbage / Postal Service / Emergency Services  During construction, refuse and recycling pick-up will continue on your regularly scheduled day. Please have your carts out before 6:30 A.M. when the construction crew is working on your street. Carts should be placed on the street or terrace area.  The postal service will continue delivering and collecting mail as usual.  Emergency services have been notified of the construction activity and will plan accordingly. February 28, 2024 P a g e | 2 Parking and Accessibility The streets will be open to local traffic only and residents will have access to their driveways during the majority of the project. Parking will not be permitted on the streets during the construction day (7 AM to 5 PM). Parking is available on adjacent streets. Other than NO PARKING zones, standard parking restrictions will be waived on adjacent streets for those vehicles displaying one of the enclosed Construction Parking Permits. There will be a period of time when residents will not have access to their driveways. This will occur during the concrete street paving and during, curb/gutter and driveway construction, and will last approximately 3 weeks. At least 24 hours advance notice will be given when limiting driveway access. Terrace Restoration The contractor will complete the terrace restoration adjacent to your property. After topsoil is placed and leveled, a mix of grass seed, fertilizer and mulch will be placed. Please water this daily to keep the soil moist until the new grass is well established. Please mow the grass and weeds when they reach 6". The grass should overtake the weeds with continued watering and mowing. The contractor will notify you when to begin watering. Private Sewer Lateral Replacement Please return your Property Owner Authorization Form (pink sheet) if you have not already done so. All sanitary laterals will be replaced to the homes unless previously relayed. The cost estimate for the sanitary lateral for the property owner share is approximately $3,000.00. Water Services Replacement If there is lead or galvanized pipe on the Utility-owned portion of the service line (from the main to the curb stop), this portion will be replaced at no cost to you. However, the replacement of the private lead or galvanized service (from the curb stop to the water meter) is the responsibility of the property owner. Property owners have the choice of replacing the water service before construction begins or having the service line replaced as part of the construction contract. Generally, having the service line replaced as part of the construction contract is easier and less expensive. The cost of replacing a private service line during a construction event and in conjunction with a sanitary lateral replacement is estimated to be approximately $1,500.00. Carriage Walk If a carriage walk exists adjacent to your property, between the City sidewalk and roadway, it will be removed with our project. If you would like to pay for this to remain, please contact the City for an estimated cost. During the course of this project, there will be inconveniences such as noise, travel delays, dust, and other issues associated with street construction. The City of Neenah and the contractor are committed to working with the property owners to make this project run as smoothly as possible. February 28, 2024 P a g e | 3 If you would like to receive weekly emails on construction updates, you can sign up for the Construction Newsletter on the City of Neenah webpage (www.ci.neenah.wi.us) under the Department of Public Works. We thank you for your help and patience during this construction project. Please contact our department if you require special consideration for accessibility. If you have any questions, contact the individuals listed below or the Public Works Department at 920-886-6240. City of Neenah Engineer ............... Jason Eckhart ......................... 920-886-6246 City of Neenah Engineer ............... Heath Kummerow ................. 920-886-6245 David Tenor Corporation... ........... David Tenor ........................... 920-360-9246 Sincerely, Gerry Kaiser, PE Director of Public Works cc: Mayor Lang Police Chief Olson Fire Chief Kloehn Aldermen

Source: City of Neenah website. First collected Oct 17, 2026.