9.3.26 PC Agenda and Packet
Village of Richfield · Washington County · meeting of Sep 3, 2026 · Agenda packets
Open the original document More from Village of Richfield
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PLAN COMMISSION MEETING
VILLAGE HALL
4128 HUBERTUS ROAD, HUBERTUS, WISCONSIN
SEPTEMBER 3, 2026
7:00P.M.
Pursuant to the requirements of Section 19.84, Wis. Stats., notice is hereby given of a meeting of the Village of Rlclifie(d Plan Commission, at
which a quorum of the Village Board may attend in order to gather information about a subject which they have decision making responsibility.
11ie meeting will be held at the above noted date, time, and location. Notice a/Village Board Quorum, (Chairperson to announce the following if
a quorum of the Village Board is in attendance at the meeting: "Please let the minutes reflect that a quorum of the Village Board ls present and
that the Village Board members may be making comments under the Public Comments section of the agenda, during any Public Hearing(s) or if
the rules are suspended to allow them to do so''.),
1. Call to Order/ Determination of Quorum
2. Verification of Open Meetings Law Compliance
3. Pledge of Allegiance
4. APPROVAL OF MINUTES
a. August 6, 2026 - Plan Commission Meeting
5. DISCUSSION/ACTION ITEMS
a. Discussion/Action regarding a proposed two lot Certified Survey Map (CSM) for the
property located at 2414 &2450 Hillside Road (1NK V10_005100D & V10_005100E) -Nick
& Emily Hamel & Herder LLC, Petitioner/Owner
b. Discussion/Action on the proposed amendment to Section 170.870 Height of Buildings and
Pother Structures specifically height of Detached Accessory Structures
c. Discussion regarding the proposed concept Planned Development District (POD) for the property
located 3733 & 3737 Hubertus Road (TKN: VI0_082900B)-Magnum Excavating, Petitioner/ St.
Gabriel Congregation, Owner
6. PLAN COMMISSION ADJOURNMENT
Additional ex.planation of items on the agenda can be found on the Village's website at www richficldwi.gov, Notification of this meeting has been posted in accordance with the Open Meeting
Laws of the State of Wisconsin. It is possible that members of and possibly a quorum of members of other governmental bodies oflhe municipality IDRY attend tb.e above stated meeting to gather
infoimation; no aetion will be taken by any governmental hotly at the above stlltedmeetiog otb.er th.an the governmental body specifically referred to above in this notice. Requests from pt:r.ions
with disabilities who need assistance to participate in this meeting or hearing sb.nuld be made to the Village Clerk's Office at (262) 628-2260 with as much advance notice as possible.
Village of Richfield
4128 Hubertus Road
Plan Commission Meeting Minutes
August 6, 2026 I 7:00 PM
1. Call to Order / Determination of Quorum
a. Plan Commission
The Plan Commission meeting was called to order at 7:00 PM by Chairman Otto. A quorum of the Plan
Commission and Village Board were present.
Plan Commission Members Present: Chairman Jim Otto, Vice-Chairman Dan Naze, Trustee Jack Lietzau,
Commissioners Bob Bilda and Heidi Woelfel.
Commissioners Brett Wittig and Village Administrator Jim Healy were excused absence.
Also Present: Administrative Services Coordinator Brad Calder
2. Verification of Open Meetings Law Compliance
The Administrative Services Coordinator stated that the agenda had been posted and sent to the media.
3. Pledge of Allegiance
4. APPROVAL OF MINUTES
a. July 9, 2026 - Joint Plan Commission and Village Board Meeting
Motion by Vice ChairmanNazeto awrove the Minutes from the Plan Commission Meeting from July 9,
2026, as presented. Seconded by Trustee Lietzau: Motion carried unanimously by voice vote.
5. DISCUSSION/ACTIONTfEMS.
a. Discussion/.Action regardhtg a Special Exception for expansion to a Non-Conforming
Structure located 223 Shady Lane (TKN: Vl0 _ 126300E) - Josh Grorich, Petitioners/ Julie
Grorich, Owner •
ASC Calder gave a brief introduction of the agenda item.
Motion by ViceChairman Naze to recommend approval to the Village Board for the proposed Special
Exception for Josh dr6tich for the property owned by Julie Grorich for property located at 223 Shady Lane
(TNK: Vl 0 126300£); as prepared for Josh Grorich, with the following conditions of approval:
Specific Conditions of Approval:
1. Prior to breaking grouncl on the addition, the petitioner must sign the Decision Letter prepared by
Village Staff detailing the decision by the Plan Commission and Village Board.
2. Prior to breaking ground, the petitioner must receive approval from Building Inspection
Department for the proposed addition and renovation of this single-family residential home.
3. Prior to breaking ground, the petitioner must pay all professional fees associated with the
proposed Special Exception.
4. Prior to breaking ground, the petitioner shall sign a deed restriction that is reviewed and approved
by the Village Attorney.
Village of Richfield
4128 Hubertus Road
Plan Connnission Meeting Minutes
August 6, 2026 I 7:00 PM
General Conditions of Approval:
1. The applicant shall satisfy all comments, conditions. and concerns of the Village Administrator.
Planning and Zoning Administrator. Village Engineer. Village Planner. Village Attorney and
Village Building Inspector.
2. Any unpaid bills owed to the Village by the subject properly owner or his or her tenants.
operators or occupants, for reimbursement of professional fees (as described above): or for
personal property taxes: of for real property taxes: or for licenses. permit fees, or any other fees
owed to the Village: shall be placed upon the tax roll for the subject property if not paid within
thirty (30) days of the billing by the Village. pursuant to Section 66.0627. Wisconsin Statutes.
Such unpaid bills also constitute a breach of the requirements of this conditional approval that is
subject to all remedies available to the Village, including possible cause for termination of this
approval. •
Seconded by Commissioner Bartel. Motion carried unanimously by voice vote.
b. Discussion/ Action on a Plan of Opera~on for BJ's Tailgate Tavern located 1907 State Hwy
175 (TKN: Vl0_030900Z)-Brittany Trzebiatowski, Petitioner/SAS l11yestments LLC, Owner
ASC Calder gave a brief introduction of the agenda item.
Motion by Trustee Lietzau to approve the petitioned Plan of Operation for BJ's Tailgate Tavern proposed
to be located at 1907 State Hwy 175 (Tax Key: VI0 030900Z). subjectto the following Specific Conditions
of Approval: • •
Specific Conditions ofApproval:
I. The petitioner r~ceives all necessary permits andpassing inspections from the Building Inspection
Department and Richfield Fire Department.
Seconded by Commissioner BtirteLMotfoti carried unanimously by voice vote.
c. Discussion/ActiQn on a Plait of Operatfon for The Alpine located 1380 Friess Lake Road
(TKN: Vl0 _ 067300Z & V10..:.067300E) - Scott Motto, Petitioner/Mottos Retreat LLC, Owner
ASC Calder gave a brief introduction of the agenda item.
Discussion between Connnission l\.1.eip.bers and Mr. Scott Motto occurred. Mr. Motto asked that the hours
of operation be from 7:QOAJ\.1 toA:00 PM.
Motion by Trustee Lietzau to approve the petitioned Plan of Operation for The Alpine proposed to be
located at 1380 Friess Lake Road (Tax Kev: Vl0 067300Z & Vl0 067300E). subject to the following
Specific Conditions of Approval:
Specific Conditions of Approval:
1. The petitioner receives all necessary permits and passing inspections from the Building Inspection
Department and Richfield Fire Department.
2. The hours of operation shall be from 7:00 AM to 4:00 PM.
Seconded by Vice Chairman Naze. Motion carried unanimously by voice vote.
Village of Richfield
4128 Hubertus Road
Plan Commission Meeting Minutes
August 6, 2026 17:00 PM
d. Discussion regarding the proposed concept Subdivision Design for the property located at
on the northeast comer of State Hwy 164 and Elmwood Road (TKN: V10_0818)- Tim
O'Brien Homes, Petitioner
ASC Calder gave an introduction of the agenda iten1 providing an overview of the proposed subdivision.
Ms. Deb Beaver from Tim O'Brien Homes gave a presentation on the proposed subdivision and Tim O'Brien
Homes.
Trustee Lietzau had questions regarding possibly having fences around the retention ponds, mailboxes in
the cul de sacs and landscaping in the open spaces.
Discussion between Plan Commission Members and Ms. Beaveroccurred regarding traffic on Elmwood
Road and at the intersection of State Hwy 164 and Elmwood Road.
Discussion between Plan Commission Members occurred regarding the proposed subdivision.
6. ADJOURNMENT:
Motion by Vice Chairman Naze. seconded by Trustee Lietzau. to adjourn the Plan Commission meeting
at 7:48 PM: Motion carried unanimously.
Respectfully submitted,
Brad Calder
Administrative Services Coordinator
VILLAGE OF RICHFrELD
PLAN COMMISSON COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Two Lot Certified Survey Map for property located at 2414 & 2450 Hillside Road
(TNK VI0_005100D & V10_005100E) -Nick & Emily Hamel & Herder LLC.
Petitioners I Agents
DATE SUBMITTED: August 28, 2026
SUBMITTED BY: Brad Calder, Administrative Services Coordinator
POLICY QUESTIONS: DOES THE PLAN COMMISSION WISH TO RECOMME ND TO THE VILLAGE BOARD APPRO VAL OF A TWO LOT
CSM FOR THE PROPERTIES LOCA TED AT 2414 AND 2450 HILLSIDE ROAD ?
ISSUE SUMMA RY:
Nick and Emily Hamel currently own the parcel "Parcel
A" at 2450 Hillside Road (TKN: V10_005100D) . Herder
LLC currently owns the parcel "Parcel B" at 2414 Hillside
Road (TKN: Vl0_005100E). The registered agent for
Herder LLC is Kristin Hamel. The proposed CSM is to go
from move the shared propoerty line dividing the two
current parcels to the south. Increasing the size of "Parcel
A" and decreasing the size of"Parcel B". The purpose is to
increase the size of the parcel which will then allow Nick
and Emily Hamel to build a larger detached accessory
structure. Both "Parcel A" and "Parcel B" were created by
CSM 5895 which was approved in 2021
"Parcel A", 2450 Hillside Road, identified by (TKN:
V10_005100D) is currenly zoned Rs-lR , Country Estate
Remnant Parcel District. The parcel is 5 .44 acres in size,
with a single family home. This parcels currently confonns
to all of the standards of Rs-1 R District .
"Parcel B", 24 I 4 Hillside Road, identified by (TKN:
V 10 _ 0051 00E) is currently zoned Rs-1 R Country Estate
Remnant Parcel District. The parcel is 8.3 acres in size,
with a single family home located on the south end of the
parcel. The parcel is unquie in that it incircle to smaller
parcles that consist of the old St. Mary Church on one
parcel which is also owned by Herder LLC. The second
parcel is St. Mary 's Cemetary which is owned by St.
Gabriel's Parish. There is also a recorded access agrent for
the parcel for access to the cemetary. The current parcel is
confrorning to all of the standards of the Rs-1 R District.
Staff has been working with the owners for the last year on the proposed Two-Lot CSM, that call for the new property line
to consist of the north property line for the cemertary parcel and then establishing a new shared property line between
"Parcel A" and "Parcel B" going from the northeast corner of the cemetary parcel with the line extending to the east
northeast. "Parcel A" will then 8.715 acres in size and will meet all of the deminsinal standards of the Rs-lR District.
"Parcel B" will be reduced in size to 5.023 Acres meeting the minimum required size of 5 acres and the other deminsonal
standards of the Rs-1 R District.
VILLAGE OF RICHFIELD
PLAN COMMISSON COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Two Lot Certified Survey Map for property located at 2414 & 2450 Hillside Road
(TNK Vl0_005100D & Vl0_005100E) -Nick & Emily Hamel & Herder LLC,
Petitioners I Agents
DATE SUBMITTED: August 28, 2026
SUBMITTED BY: Brad Calder, Administrative Services Coordinator
FUTURE IMPACT AND ANALYSIS: REVIEWED BY; fJ'l. /,1J;,J ··· n.
Forward to Village Board: Yes
Additional Approvals Needed: Yes
Signatures Required: Yes
ATTACHMENI'S
1. Application submitted by Nick and Emily Hamel
2. DRAFT CSM prepared by Donald Thoma, PLS dated August 5, 2026
3. Letter dated August 25, 2026 from Village Engineer Will Hein
STAFF RECOMMENDATION:
Village Deput Clerk
c
Motion to recommend to the Village Board the approval of the proposed Two-Lot CSM for Nick and Emily Hamel, for
properties located at 2414 & 2450 Hillside Road (TNK: Vl0_005100D & V10_005100E) subject to the Specific and
General Conditions Listed Below.
Specific Conditions of Approval:
1. The applicant shall satisfy all of the comments in the Letter from Village Engineer Will Hein dated August 25, 2026.
General Conditions of Approval:
1. The subdivider shall satisfy all comments, conditions, and concerns of the Village Administrator, Planning and
Zoning Administrator, Village Engineer, the Village Planner, and all reviewing, objecting and approving bodies,
including, but not limited to, the Wisconsin Department of Commerce per Ch. 236, Wisconsin Statutes and Ch.
Comm. 85, Wisconsin Administrative Code; Wisconsin Department of Administration per Ch. 236, Wisconsin
Statutes; and Washington County.
2. The subdivider shall, on demand, reimburse the Village all costs and expenses of any type that the Village incurs in
connection with this development, including the cost of professional services incurred by the Village (including
engineering, legal, planning and other consulting fees) for the review and preparation of required documents or
attendance at meetings or other related professional services for this application, as well as to enforce the conditions
in this conditional approval due to a violation of these conditions.
3. Any unpaid bills owed to the Village by the subject property owner or his or her tenants, operators or occupants, for
reimbursement of professional fees ( as described above); or for personal property taxes; of for real property taxes;
or for licenses, permit fees, or any other fees owed to the Village; shall be placed upon the tax roll for the subject
property if not paid within thirty (30) days of the billing by the Village, pursuant to Section 66.0627, Wisconsin
Statutes. Such unpaid bills also constitute a breach of the requirements of this conditional approval that is subject to
all remedies available to the Village, including possible cause for termination of this approval.
VILLAGE OF RICHFIELD
PLAN COMMISSON COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Two Lot Certified Survey Map for property located at 2414 & 2450 Hillside Road
(TNK V10_005100D & Vl0_005100E) -Nick & Emily Hamel & Herder LLC,
Petitioners I Agents
DATE SUBMITTED: August 28, 2026
SUBMITTED BY: Brad Calder, Administrative Services Coordinator
APPROVED FOR SUBMITI AL BY: VILLAGE CLERIC USE ONLY
BOARO ACTION TAKEN
~:~~:~~~ ~~: ==============
Continued To: ______ _
Refen-ed To: ______ _
Approved ______ _
Other ______ _
Denied File No.-------
I Waahington County Certified Survey Map
Sti:e,et 1 of:)
RB-iR R9ijldenllal
Cm<lh\JJ oubJoot,: chanae)
Front milt .. 00'
Sklo mln. � l;D'
R�rm"1, •:30'
o � fndlc.11.lee a 1.3'\-d x 1EI" Iron J;lj'.,ll
' wllllgtilflg 1,66 lbo,lft. BBl
• � lnd'°3laD 81.J� lmn pipe ltlurtd
11nles& noted.
Bamlngs ttro �need to Iha \Maoonsln.
Stats PlanEJ Coormnata Grid Sy&tam,
South Zore. 'TOO south In& l)f the ae 114
olSau. 33-1°'19 has a grid bearlr19 t1fS
OS'1fl'l0" W, (NAO """'°11)
75 160 300
, 21120.
5
{r.a.) llNllll'd! ''lmlQnlel'f e,J>
P.0.B. • Wl'lllates Point of Beglnll/llQ.
D
Accurate E9
Surveying & Engineering_LLP
Land $ul'veying, Developing and Consulting
2911 Wtldlife Lnne, Richfield, WI 53076 Phone (262)677-2120
August 5, 2026
RE: Legal description for additional lands:
Additional Land to be purohalled from Herder, LLC to Nickolas J. and Emily G. Hamel:
Part of Lot Three (3) ofCe1:tified Smvey Map No. 5895, recorded in the Washington County
Registry on June 3, 2005 ln Volume 43 of Certified Survey Maps on pages 192-194 as Document
No. 1089978, being part of the NW 1/4 of the NW Fractioruil 1/4 of Section 3, Township 9
North, Range 19 East, in the Village o:f Rfohfield, Washington County, Wisconsin, which is
bounded and described ru; follows:
Commencing at a conotete monument with a 'brass cap Illllrking the Northwest corner of said
Section 3; thence S 0D042'13" B, along the we.<rt line of said NW Fractional 1/4, 1067.42 feet;
thence N 89°27'14" E, along the westerly extension of the line of said Lot 3, 40.0D feet, to tile
intersection of the east tight-of-way line of Hillside Road and the point of beginning of lands
herein described; thence N 89°27'14" E, along the line of said Lot 3, 275.60 f-eet; thence N
76"28'00" E, 326.55 feet, to the intersection of the west line of said Lot 3; thence N 00°42'13" W,
along said west line of Lot 3, 186.77 feet, to the northeast corner of said Lot 3; thence S
89¢27'14" E, along the north line of said Lot 3, 594.00 feet, to the northwest comer of said Lot 3;
thence S 00°42'13" E, along said east right-of-way line of.Hillside Read and the west line of said
Lot 3,261.11 feet, to the point of beginning.
Containing 3.279 acres (142,847 square feet) more or less.
Washington County Certified Survey Map
LolS Two (2) and Three (3) or Certified Survey Map No. 5895, recorded in the
Washington County Regislry on June 3, 2005 in Volume 43 of CMified Suivey Maps on
pages 192-194 as Document No. 1089978, being part or the NW 1/4 of the NW
Fractional 1/4 or Section 3, Township 9 North, Range 19 East, in the ViUage of
Richfield. Washington County, Wisconsin.
Corporate Owner's Certificate:
HERDER, LLC, a corporation duly organized and existing under and by virl\Je of the laws or the State of
Wisconsin, as owner of lot 2, does hereby certify that said corporation caused the land on this Certified
Survey Map to be surveyed, divided and mapped as represented on this map.
HERDER, LLC, does further certify lhat there is no mortgage and this Certified Survey Map is required by
sec. 236.34 of \Msconsin Statutes to be submitted to the !off owing ror approval
Village of Richfield Plan Commission
Vinage of Richfield Village Board
IN WITNESS WHEREOF, HERDER, LLC has caused these presents
to be signed by James D. Hamel and Krislen K Hamel, its Officers,
al \d(:\\Ji""3\JM ( t,t Wisconsin, _ ~
l,i_ I ~·vLvt L and ii!! corporate seal to be ereunto affixed this _J2__ day ot _-'-__ J-1-"--.!."---~' 202.1£.
0
In \he presence ot.
HERDER, LLC
OF WISCONSIN)
WASHINGTON COUNTY)s.s (,
Personally came before me this 4.--- day of -'--'---"~I-=..,_._ __ ,, 202~ James D. Hamel and Knstan K. Hamel
Officer of the above named corporation, to me known I lhe persons who executed \he foregoing instrumenl
and to me known to be such Officer of said corporation, and acknowledge lhal they
exeailed the foregoing Instrument as such officers as the deed of said corporation, by its authority.
My commission expires --+\..._f',._1 ➔\~9.-Y-I _,ri...__].,____
C!fon.srnt of ~orfgagP:
CRISTAL LfEUHGH
Notary Public
State of Wisconsin
James D. Hamel and Kristen K. Hamel, of \he State of Wisconsin,
mortgagee of l/1e above described lend Lot 1, does hereby consent to
the surveying, dividing and mapping of the land described on this Certified Survey Map, and
does hereby consent to lhe above certificate or Nickolas J.Hamel and Emily G. Hamel owners.
IN WITNESS WHEREOF, the said James D. Hamel and Krislen K. Hamel has caused lhese presenls
My commission expires -~~...._,C,, ....... _/1~11---
CRISTAL LIEUNGH
Notary Public
State of Wisconsin
Sheet3oD
Washington County Certified Survey Map
l.ola 7Wl> (2) ond Th,.. !Jl) of OOrlifkl<I Su""y Map N<>, -• reconlod 11 tho
war.Wngton county Regi&try on JI.JOO 3, 2.006 In v-orume 43 or Oertiled Survey Maps on
paGff 1-&2~1M aG 0®1ml$nt No. 10800781 ~Ing part oftt\f;I NW 1/4 of1M NW
Ftll<lllon,1114 of S.Otion s, Tow..hlp o Norlll, Range 10 e,,i, In tho VllO!I'! of
Rl<hl1okl, W.llhlngton Counly, Wlo<oool~
Owner's Certificate:
A& ownef.ll of l.Q~ 1, we homby certlry that wa osueed tho land shown and fflffid hl){Dtn to b&
nuweyed, dlvktad Md mapped ue fe&)nni.antad on thlo COl'tffied SIHVGy Map, \!Ve aJa;o tMlfy
ttieru 15 a ll'lrufgage on thla propl)rty t.md 11\at lh1a: Cer1iff&O' St!Mly Map !s raiqulrad to be
tubl-l'l!H&d to tl1G fnUOWU'l9 fer aj:>proVlll:
VIlfaga of Rld!Beld Plen Commleslon
Vi11a11e of Rlcbf(el<! Boat<1
STATS OF WlsCONSIN)
WI\SHIIIGTON COUNTY)&Jl (J Av. gr:
Pers,..,,,...., bo!o,. me th~ L ooy ot ~
eJO to me known to Im thll same 11&ro0ne who exeooiefof$9()1
'lheaem&.
(No1my s,,1,,__ ______ ,, Nokll)I P-
My """'-'"xp!"" Hil $l I 111 t \
' ' CRISTAL LIEUMGH
Motaiy PUbHc
State of Wisconsin
Village of Richfield Village Board Approval;
' This lu!id dM!iifurt 18. haraby approved and UOOl'l!)'tell by Iha ViOagtt .it Rl(l;fJflard
John Je1forde-Vfllage Presidelll Jim Healy ~ Vll1s.ge Attmrmstnrtor
Shaet2of3
VIiiage of Richfield
Planning and Zoning
4128 Hubertus Road
Hubertus,W\53033
(p)262.628.2260 ◊ (f)262.628.2984
CERTIFIED SURVEY MAP APPLICATION CHECKLIST
□ Pre-application meeting with Village staff
• Date of meeting: ___ _
• Combining non-conforming lots (YIN): ___ _
• Combining conforming lots (YIN): ___ _
• Deed restrictions (YIN): ___ _
□ Application Received
• Dale received: ___ _
D Determination of completeness
• Date reviewed for completeness: ___ _
D Communication Form sent to Plan Commission members
• Date Is Friday before Plan Commission meeting: ___ _
□ communication Form and PC Agenda sent to applicant, Friday before
meeting: ___ _
D PC meeting agenda posted at three U.S. Post Offices
□ Joint Plan CommlsslonMllage Board Mooting
D Plan Commission recommendation to VIiiage Board
□ Village Board decision
□ Applicant files approved CSM at Washington County Register of Deeds
□ Application Information stored In Lazerfisoh
□ Revise zoning map with Tax Key ID sent to C/8 for updating
• Date sent to C/8: ___ _
• Revised on: ___ _
CSMFee
$450.00
CERTIFIED SURVEY MAP APPLICATION
The undersigned oortlflell that • flnal certlllO<I s!JM!)' map was p,eparsd by • reglamo land aUM1yOr.
lt oornpllta with ihe roqulremenls of Wis. Stal•. §200.34; and certfflos !hat tho lnformaUon llslod bol<>W
is ao:urate.
OVervlow
Please~ out ell forms a!laohed In 1hl& <locumeol !or the purposes of obtaining• conditl:,nal u .. pem,it.
8ubmi\tal Is 25 day• prior to the next Plan Commlsalon meollng. Seo Planning & Zoning Fee Schedulo
for all required,_ All ""'1ffled sUM>y maps are reviewed by ti1• Plan C<>mmlsslon ond VIiiage lloard.
The Plan Commlosion meet• on the first Thur&day of every monlll end the l/ilage Boan:! mellls on tho
third Th"8day of OVOJY month.
rPmpetly 0Wn<1r Information
I._,, Ai. i d--.,fr6 ±: lr,;1,
comp1myNt!lme: ________________________ _
I"'"•"'"""' a,r;,~,2 L!H!i,;J,,:..
I ""' 1-, 4,t; et~
jPOOM~; - - ... l~ Fn:
Wisoo"81n RiiJIBIOre<I SUMyor
_,, il<2a .J ~ Il:i <1C-,._
eorn..,,,......, /<46:...k,,, lt'-'C\/e.~1""'.I, :t: f?a~,a.-e,:;""5;. L,l,,..,f'...c•-
'""'"'""'''·" a-':3 ll w;! .\ l~ k < 1.-
""' t:!#i ~ _, _w~E: __ _ "" 5 3s, ;l:: .i:'.
Pltolle Nl.lll'lber. t - "I-' ... S'rndl:
l Pmjeol lnfonnatlon
To< ""' • ll'l' Its- l
Property Owner Affidavit
I (we), attest that I am (we are) the Owner(s) of the property which ls the subject of this application In
the VIiiage of Rfohfleld, Washington County, Wisconsin, and that all the information attached to or
provided In support of said application, Including sketches, data, and any other documents and
material, are honeet and true to the best of my (our) knowledge.
Further, I (we) as Owner(s) ackl1owledge and accept the responsibility for any and all fees charged or
costs incurred by the Village of Richfield to carry out the processing and review of this application; I
(we) further acknowledge and understand that I (we) Will be required to start an escrow aocount to
which au processing and review costs will be charged; I (we) further acknowledge that in the event that
the Initial fee Is not sufficient to cover all the costs associated with processing and reviewing th&
appllcetion l (we) will be required to provide the VIiiage of Rlohfleld an additional deposit; I (we) further
acknowledge that the balance of any remaining fees shall be refunded Within a reasonable amount of
time after this appllcati-On has been processed.
Further I (we) as Owner(s) of the subject property authOrize and direct the Authorized Agant(s)
Identified above to aet as my (ourj representatlve(s) ln any matter regarding this application, which may
Include Iha payment of fifing fees on my (our) behalf;
Further I (we) as Ovvner(s) of the property subject of this application and Authorized Agent(s)
understand that thls application and ail required forms and information must be completed and
acourate, as determined by the Planning and Zoning Administrator for the Village of Richfield, before a
meeting and/or public hearing (if required} can be scheduled.
/~f I ahd ~ -x, !*~I ~ E:~i l ~ G- H6lrruA
~ofOwner(s) _ ~ ·lf=::'\-.J
Signature-lJE!tf - ~
Name of Agents(s)
The foregoing Instrument was sworn to and acknowledged before me
thm g day of i4½,3w0" __, JoJ:fp
C~Li~ Notary Signature - . -/1 J["\, 'bh.J I ; I ti IA r, l A CRISTAL LIEUMGH
Print Notary Signature u NO...,ry l'UuuC
l101fh,1
State of Wl5cons1n
Commission Expires .
~c:O d Q r W61N497 Washington Avenue
Cedarburg, WI 53012
c O R P O A AT 1 0 N ---c-:o-rn-,-,,u-n-it_y_ln_fr_a-,t-n_,c_tu_r_e _•_A-,-,h-it-·e-ct-u-re--,-E-n-vi-ro_n_n_ie_nt_a_l S-e-,v-ic-e-,--------,2,-,6::,.2-""2"'"04""."'"23"'6"'"0
www.cedarcorp.com
August 25, 2026
Mr. James Healy, Village Administrator
VIiiage of Richfield
4128 Hubertus Road
Hubertus, Wisconsin 53033
Subject: Nickolas Hamel
Certified Survey Map (CSM) Review
Dear Mr. Healy:
We have completed our review of the referenced CSM dated on August 5, 2026. The map was prepared by,
Donald J. Thoma, PLS of Accurate Surveying & Engineering LLP. The proposed Land Division is being proposed
under section 330 of the Village Code and Chapter 236 of Wisconsin State Statutes.
Based on our review, we have the following comments, questions, and recommendations for your consideration:
• We recommend that an easement be created across the existing driveway which is shown on the southern
portion of proposed Lot 1 to provide access to the cemetery.
• We recommend that a note indicating the location of future wells be added to the face of the map in
accordance with the requirements of Wisconsin Administrative Code Section 812.08 Table A due to the
presence of the cemetery.
Submitted data has been reviewed for conformance with generally accepted surveying practices and Village
policies. Although this data has been reviewed, the surveyor is responsible for the thoroughness and accuracy of
survey and supplemental data and for compliance with all state and local codes, ordinances, and procedures.
Modification to the survey, etc., may be required should errors or changed conditions be found at a future date.
Please contact me at (262) 204-2341 if you require any additional information or if you have any questions.
Thank you for the opportunity to assist the Village of Richfield.
Sincerely,
CEDAR CORPORATION
William A. Hein, PE, PLS
Project Manager-Professional Land Surveyor
Enclosure(s): As Noted
cc: Matthew Stephan, PE, Cedar Corporation
Donald J. Thoma, PLS, Accurate Surveying & Engineering LLP
Cedarburg Green Bay Madison Menomonie New Berlin
CROSS-ACCESS & TERMINATION OF EASEMENTS
AGREEMENT
The Church•and Herder (as those terms are defined in
Section 1 below) make this agreement effective as of the
date upon which it is recorded with the Register of
Deeds for Washington County, Wisconsin.
Recordin Area
Name and Return Address:
John P. Starkweather
Boardman & Clark LLP
P.O.Box927
Madison, WI 53701-0927
005100A. 005100B & OOSlOOE
Parcel Identification Number PIN :
1. Defined Terms. As used in this agreement, the following terms have the meanings
ascribed them below.
a. "Church" means St, Gabriel Congregation, whose address for notices is 1200
St Gabriel Way, Hubertus, WI 53033.
b. "Cross-Easement Area" means the North Access Drive and the Parking Area,
as those terms are defined below.
c. "CSM 5894"means Washington County Certified Survey Map No. 5894,
recorded on June 3, 2005, with the Washington County Register of Deeds as
Document No. 1089977.
d. "CSM 5894" means Washington County Certified Survey Map No. 5894,
recorded on June 3, 2005, with the Washington County Register of Deeds as
Document No. 1089978.
e. "Herder" means Herder, LLC, whose address for notices is c/ o Jim Hamel,
2357 Hillside Rd, Richfield, WI 53076.
f. "Lot
0
refers to a numbered lot within CSM 5894 or CSM 5895.
\\m,nf,2\,hareldoc.lW0\41 OJ 8\1\A41l976d 1.DOC Page 1 of 8
g. "New Driveway Area" means the north 40 feet of Lot 1 of CSM 5894, Parcel
No. 0051 ODA, as depicted on Exhibit A, and as close to the north boundary
line as municipal regulations permit.
h. "Parking Area"means the five-sided area on the easternmost portion of Lot 1
of CSM 5894, Parcel No. 005100A, as depicted on Exhibit A.
i. "North Access Drive" means the driveway in the shape of a quarter circle that
runs over Lot 3 of CSM 5895, Parcel No. 005100E, and that connects Hillside
Road to the north boundary line of Lot 1 of CSM 5894, as depicted on
Exhibit A.
j. "Original Driveway Declaration" means the Declaration of Driveway
Easements and other matters contained in the instrument recorded on June
8, 2005, with the Washington County Register of Deeds as Document No.
1090406.
k. "Original Septic Declaration" means the Declaration of Septic Easement and
other matters contained in the instrument recorded on June 8, 2005, with the
Washington County Register of Deeds as Document No. 1090407.
1. "Original Water Declaration" means the Declaration of Well and Water
Easement and other matters contained in the instrument recorded on June 8,
2005, with the Washington County Register of Deeds as Document No.
1090408.
2. Background Facts. In June of 2005, the Church subdivided the land comprising
CSM 5894 and CSM 5895, and recorded the Original Driveway Declaration, the
Original Septic Declaration, and the Original Water Declaration. Subsequently, the
Church conveyed Lots 1, 21 and 3 of CSM 5895 to Herder. Contemporaneously
herewith, the Church is selling and conveying Lot 2 of CSM 5894 to Herder. After
that conveyance, the Church will own and retain only Lot 1 of CSM 5894, and Herder
will own all of the other lots on CSM 5894 and CSM 5895, The parties are entering
into this agreement to clarify their rights and responsibilities as it relates to the
easements that will burden and benefit their respective Lots.
3. Termination of Easements. The Church and Herder acknowledge and stipulate
that the easements contained in CSM 5894, CSM 5895, the Original Driveway
Dedaration, the Original Septic Declaration, and the Original Water Declaration will
be eliminated by virtue of the doctrine of merger or are otherwise no longer
necessary or desirable. The parties herby terminate all easements that burden or
benefit either Lot 1 of CSM 5894, Lot 2 of CSM 5894, or Lot 3 of CSM 5895, whether
related to ingress, egress, parking, access, septic, wells, water or otherwise, whether
described on the face of CSM 5894 or CSM 5895 or in the Original Driveway
Declaration (including Easement No.1, Easement No. 2, and conditional Easement
No. 3)i the Original Septic Declaration, and the Original Water Declaration. The
foregoing termination applies only to easements between the parties to this
\ \m•n f•2\sha re\docs\ WD\41038\ 1 \A'l-097661.DOC Page 2 of 8
agreement and does not affect any other aspect of CSM 5 894 or CSM 5 89 5, such as ,
building setback lines or public dedications of roads.
4. Cross-Access Easement. The Church shall have the right of ingress, egress, and
access over the North Access Drive for the sole purpose of pedestrian and vehicular
access to and from Hillside Road and the Parking Area for use by visitors of the
cemetery. Herder shall have the right of ingress, egress, and access over the paved
portions of the Parking Area for the sole purpose of pedestrian and vehicular access
to and from Hillside Road, Lot 2 of CSM 5894, and Lot 3 of CSM 5895.
5. Insurance. The owners of Lot 1 of CSM 5 894 and Lot 3 of CSM 5895 shall each
maintain a policy or policies of insurance that provide coverage against liability for
personal injury or property damage caused by acts or omissions occurring on or
related to the Cross-Easement Area, The insurance shall be in amounts mutually
agreed upon or, if no such agreement is reached, in amounts no less than
$500,000.00 per occurrence and $1,000,000.00 in the aggregate.
6. No Obstructions. No owner shall install, place, keep, permit, or maintain any fence,
barricade, or other obstruction in, on, across or upon any portion of the Cross
Easement Area which interferes with the free flow of vehicular or pedestrian traffic,
except as necessary in connection with the maintenance or repair of the Cross
Easement Area. The owner of Lot 3 of CSM 5895 shall, however, have the right, in
said owner's discretion, to mark the boundary of the Cross-Easement Area with
striping or to paint the Cross-Easement Area a contrasting color, and shall also have
the right to designate by signage or by markings on the pavement itself that the area
south of the Parking Area is a "No Parking" area.
7. Enforcement; Estoppel Certificates. All provisions in this agreement shall be
specifically enforceable. Each owner shall) upon the request of any other owner,
execute and return to the requestor within 10 days of receipt thereof, any estoppel
certificate requested by such party for the purpose of evidencing that the requestor
is in full compliance with its obligations hereunder, unless the requestee believes
otherwise, in which event the requestee will, within 10 days provide the requestor a
written statement specifying the requestor's failures to comply herewith. Any
failure of the requestee to respond within the time periods provided herein shall
constitute the unconditional waiver of the requestee of any claims against the
requestor regarding any matters addressed in the estoppel certificate.
8. Covenant Runs With Land. All provisions in this agreement shall run with the land
and be appurtenant thereto and shall benefit and bind the parties hereto and their
successor owners of the properties.
9. Rights of the Village of Richfield. Under no circumstances shall the Village of
Rkhfield have any responsibility for moderating or mediating any dispute between
the owners of the properties subject to or benefiting from these easements, nor for
enforcing any provision of this agreement. The Village of Richfield shall have the
right, however, in its sole discretion as determined by majority vote of its Board of
\ \onsnfs2\sbon,\docs\ WD\41038\1 \1\4097661.DOC Page 3 of 8
Supervisors to be in the best interest of the Village of Richfield, to enforce against
any party any provision of this agreement, and the costs of doing so, including
reasonable attorney fees, shall constitute a lien against the subject properties ,
jointly and severally.
10. Indemnification ofVUlage. The owners of the subject properties will, jointly and
severally, indemnify and hold handless the Village of Richfield from and against any
liability or loss, including reasonable attorney fees, arising out of the failure of any
party to comply with the obligations imposed by this agreement.
11. Amendment. No amendment of this agreement will be effective unless it is signed
by the owners of all subject properties and approved by the Board of Supervisors of
the Village of Richfield, However, Herder may terminate this agreement in strict
compliance with the terms of Section 12 below without the consent of the Village of
Richfield.
12. Option to Reconfigure. Herder shall have the right to terminate the cross-access
easement described in Section 4 above as well as the other terms and conditions of
this agreement and remove this agreement from the public records so long as
Herder first obtains all necessary permits and approvals to construct and constructs
in accordance with all applicable municipal requirements a new 16-foot-wide
driveway located within the New Driveway Area that would give the owner of Lot 1
of CSM 5894 direct access between Hillside Road and the Parking Area. In the
alternative, Herder shall have the right to relocate the cross-access easement
granted to the Church in Section 4 from the North Access Drive to another location
owned by Herder, reasonably acceptable to the Church, so long as it provides
equivalent access to the Parking Area, and so long as so long as Herder first obtains
all necessary permit s and approvals to construct and constructs in accordance with
all applicable municipal requirements a new 16-foot-wide driveway that gives the
owner of Lot 1 of CSM 5894 access between Hillside Road and the Parking Area;
provided that if Herder merely relocates the easement then all of the terms and
conditions of this agreement shall continue to apply.
[signature pages follow]
\ \m•nfs2\shor~ \ cto .. \ WD\410JII\ l \114097661 J)OC Page4 ofB
Signature Pages:
ST. GABRIEL CONGREGATION
By:iW~ C &rJd
Name: fuL :rlW/tfz y (!_ J3taeJ
Title: f~:bv:
\ \msnfs2\share\docs\ WD\41038\ 1 \A4097661.DOC
STATE OF WISCONSIN )
COUNTY OF \>JQ.~1......_~ ~ "\--vv---
) ss.
)
Personally came before me this U,fA..day of Ju1y, Q ~, •. t.
2021, the above named i ~ ..-" --r ' """"''(. 1:>',e~e\, ,;i.c,,q ,(..{IL ,
as \I ·. u_ ~ r<--,:J.ey-.\ ,+ T , ...... s+" I(';:, of St. Gabriel W ~ ' \ , ~ \.
Congregation, to me known to be the person who \-\0-~
executed the foregoing instrument and
acknowledged the same.
~~- ~ PrintorTy Name: \l £\ \-, ~ • Mu.. e..r-Cls...~
Notary Public, State of Wiscon\in
My Commission: ~ ~ ,3--o>~d$
Page 5 of 8
HERDERLLC
\ \msnlil2\,sl1ore\docs\ WD\410311\ 1 \M097661.D OC
Personally came before me this A I day of July,
2021, the above-named James D. Hamel, as manager
of Herder Ll,.C, to me known to be the person who
executed the foregoing instrument and
acknowledged the same.
Uls~ Let~
PrintorType~e : a,i:&/ l-/
1
U..H<-~ k.J
Notary Public, State of I). b$. L.(lll( ) 1 iJ
M Commission: ,q
Page 6 of 8
CRISTAL LIEUNGH
Notary Public
State of Wisconsin
JOINDER & CONSENT:
The Village of Richfield hereby joins in this agreement solely to evidence its consent to the
foregoing terms.
VILLAGE OF RICHFIELD
Attest:
\ \rnsnfs2\•han,\d<><>\ WD\ 4103 9\1 \114097661 .DOC Page 7 of 8
EXHIBIT A
Viewers are advised to ignore illegible text on this drawing, which is used only to show spatial relationships.
""" 0)
.pi.
co -..
Perpet\.tef lngrca1/£gress Ea•emeri
betwNn Lot 2 ,(Chureh Property)
House Pr-erty (Unpla,tted Lend).
OGChs to iHlll tia• Road~
Unplotl•• ----------...
DFtI \lEWA 'i... .A~RE
,,
L • ..._ ,U!l._ -~-J - AREA
N 99•2,-,04 • E ,J29~4'4i
- -
VILLAGE OF RICHFIELD
PLAN COMMISSON COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Special Exception for Accessory Building - Height
DATE SUBMITTED: August 28, 2026
SUBMITTED BY: Jim Healy, Village Administrator
POLICY QUESTIONS: DOES THE PLAN COMMISSION WISH TO DIRECT STAFF TO PREPARE A PUBLIC HEARING NOTICE REGARDING
THE ALLOWANCE FOR A 'SPECIAL EXCEPTION' RELATED TO THE HEIGHT OF ACCESSORY BUILDINGS WHEN THE HEIGHT IS
NECESSARY TO MATCH THE ARCHITECTURAL PITCH OF THE SINGLE-FAMILY RESIDENTIAL HOME?
ISSUE SUMMARY:
The proposed amendment would allow a Special Exception to be considered when the height of an accessory building is
determined to be desireable by the proeprty owner to match the roof pitch aod architectural design of the associated single
family home. The intent is not to provide a blanket allowance for taller accessory structures, but rather, to recognize that
with certain architectural designs it may be desireable by the proeprty owner to add additional building height to maintain
a consistent and complementary appearaoce. In no case, would ao accessory building be permitted to exceed the height of
the associated single-family home.
The proposed provision, as discussed by the Plan Commission, has intentionally been limited to the Rs-1, Country Estates
District and the Rs-lB, Single-Family Cluster/Open Space Residential District. These are the Village's most 'active' zoning
districts and generally contain larger residential lots (1.25-ac & 10-ac, respectively) aod development patterns where larger
accessory structures may be more appropriate due to the massing and scale of the home on the property. Requiring a Special
Exception provides the Village with ao opportunity to evaluate each request individually, rather thao establishing ao
automatic entitlement to additional height.
An important consideration is the architectural relationship between the primary residence aod the accessory structure.
Roof pitch is a significant component of a building's overall appearaoce, and requiring ao accessory building to have a
substaotially different or artificially reduced roof pitch solely to comply with a maximum height requirement cao result in
a structure that appears visually 'out of proportion' with the principal residence. Allowing the height necessary to carry a
similar roof pitch cao produce a more cohesive aod architecturally appealing property which is generally the concern we
hear from existing property owners who are seeking the additional height.
As ao additional safeguard, Staff would recommend that as a condition of approval, deed restrictions be placed on properties
receiving such a Special Exception. The restrictions would reinforce that the accessory structure may only be utilized for
those uses otherwise permitted within the applicable zoning district. This would provide the Village with ao additional
mechanism to ensure that the increased building height is being granted for its intended architectural purpose and is not
subsequently used to facilitate an otherwise prohibited use, like an accessory dwelling unit or a more invasive business not
otherwise allowed by a Home Occupation. Together, the Special Exception process, the limitation to the Rs-1 and Rs-lB
Districts, the requirement that the accessory structure remain no taller thao the single-family home, and the recommended
deed restrictions provide reasonable safeguards while allowing greater flexibility for quality residential architecture.
Village Staff is seeking the opinion of the Plan Commission regarding these draft ordinances and if favorably viewed, we
would be seeking a motion to prepare for a scheduled Joint Public Hearing between the group and the Village Board.
FUTURE IMPACT AND ANALYSIS:
Forward to Village Board: Yes
Additional Approvals Needed: Yes
Signatures Required: Yes
VILLAGE OF RICHFIELD
PLAN COMMISSON COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Special Exception for Accessory Building - Height
DATE SUBMITTED: August 28, 2026
SUBMITTED BY: Jim Healy, Village Administrator
AITACHMENTS
1. Section 170.874-Placement of Detached Accessory Buildings on Lot
2. Section 170 .870- Height of Buildings and Other Structures
3. DRAFT Ordinance Amendment related to the height of accessory buildings
4. Chapter 170, Article 5, Division 7 - Special Exception (170.440- 170.451)
STAFF RECOMMENDATION:
Motion to direct Staff to prepare for a Joint Public Hearing regarding the proposed allowance of Special Exceptions for
accessory buildings that exceed the maximum allowable height development standard when the property owner seeks to
match the roof pitch of an existing single-family home located on the same property.
APPROVED FOR SUBMITTAL BY: VILLAGE CLERK USE ONLY
BOARD ACTION TAKEN
Resolution No. ______ _
Ordinance No. ______ _
Approved ______ _
Other ______ _
Continued To: ______ _
Referred To: ______ _
Denied ______ _
File No. ______ _
§ 170.871)Height of building s and oth er stru ctu r~s.
A. Intent. Standards controlling the height of buildings and other structures, along with other dimensional
standards, to ensure that structures fit the character of each zoning district as generally set forth in the
Village's Comprehensive Plan.
B, Standard. Except as specified in this section, the height of buildings and other structures must comply
with the standards specified in Appendix C,111 except as modified.
C_._ Measurement of building height. The vertical distance from the grade plane to the average height of the
highest roof surface.
Exhibit 6-1
Measuring Building Height
01
D. Modifications. The height standards in Appendix Care modified as follows:
(1) Essential services, such as utilities, water towers, transmission towers and lines, are exempt from the
height limitation for the zoning district in which they are located.
(2.) The height of telecommunication towers is governed by the standards established under Appendix B_121
(3) Pursuant to the procedures and requirements in Article 5, the Plan Commission may approve a special
exception for spires, steeples, cupolas, and chimneys on institutional, commercial, and industrial buildings.
(4) Pursua nt to the procedures and requ irements in Artic le 5, the Plan Comm ission may approve a spec ial
exception fo r the height of an accesso ry bui lding when additi onal height is desired by the prope rty owner to
match the roof pitch of the establ ished single-family home in the following resident ial Distr icts: Rs-1, Rs-1 b
(INSERT ANY OTHERS THE PLAN COMMISSION DEEMS APPROPRIATE).
8/28/26, 12:22 PM Appeal. • Village of Richfield, WI
Chapter 170. Zoning
Article 5. Specific Procedural Requirements
DIVISION 7. Special Exception
§ 170.440. Purpose.
VIiiage of Richfield, WI
Friday, August 28, 2026
Upon written petition. the Plan Commission may, on a case-by-case basis, grant a special exception for
those development standards specifically noted as special exceptions in this chapter.
§ 170.441. Initiation.
The owner of the subject property may submit an application for a special exception.
§ 170.442. Review procedure.
The general steps outlined below shall be used in the review of a special exception application.
A. Submittal of application materials. The applicant submits a completed application and other
required materials to the Zoning Administrator along with the application fee as may be established
by the Village Board.
B. Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is
complete and ready for further review. A determination of completeness shall be made within 30
days of the submittal. If it is not complete, the Zoning Administrator will notify the applicant in writing
of such deficiencies and that the applicant has three months from the date of the notice to resubmit
the application or forfeit the application fee. The Zoning Administrator will take no further steps to
process the application until the deficiencies are remedied. The incomplete application is retained
as a public record. A determination that an application is complete means the application is ready
for formal review and does not suggest the applicant has provided sufficient infonnatlon in all
regards or preclude the reviewing authority from requesting additional Information it deems
appropriate,
C. Review date. When the Zoning Administrator determines the application is complete, he or she
schedules the review with the Plan Commission consistent with its adopted calendar.
D. Staff report preparation and distribution. The Zoning Administrator may prepare a written staff report
as described in this division and provide a copy of it to each member of the Plan Commission and
the applicant prior to the meeting at which the matter will be considered. The Zoning Administrator
will also provide a copy to interested people upon request
E. General notice. Consistent with Division 2 of Article 4, the Zoning Administrator places the matter
on the meeting agenda of the Plan Commission,
https:llecode360.com/print/Rl3087?guid=42033541,42033542.42033536,42033.504,42033515,42033537,42033507,42033508,42033509,420334B0,4, ,, 1/5
8/28126, 12:22 PM Appeal. - VIiiage of Rlohfield, WI
F. Meeting. Allowing for proper notice, the Plan Commission considers the application at a regular or
special meeting.
G. Decision. After considering all of the information submitted by the applicant and the staff report, If
any, the Plan Commission makes a decision based on the decision criteria In this division to i)
approve the special exception, ii) approve the special exception with conditions, or ill) deny the
special exception.
H. Preparation of final decision document. Based on the action of the Plan Commission, the Zoning
Administrator prepares a final decision document consistent with this division subject to the
direction given by the Plan Commission.
I. Applicant notification. Within a reasonable time following the Plan Commission's decision, but not
more than 10 workdays, the Zoning Administrator sends the decision document to the applicant by
regular mail and/or email.
J. Acceptance by property owner. If the application is approved, the property owner must sign the
decision document to acknowledge the terms of the approval and return the same to the Zoning
Administrator within six months of the decision. Prior to the expiration of the previously specified
time period, the property owner may submit a petition to the Zoning Administrator requesting an
extension and the Zoning Administrator may, with cause, extend the period within which the
decision document must be signed. If the signed decision document Is not returned within the initial
or extended time period, if any, the decision shall automatically become null and void without any
further action by the Village at the expiration of such time limit. The decision document shall only
become effective when all required signatures have been obtained and the original signature copy
is returned to the Zoning Administrator.
K. Public record copy, A copy of the decision document Is retained as a public record.
§ 170.443. Basis of decision.
The review authority shall consider the following factors:
A. The size of the property In comparison to other properties In the area;
8. The extent to which the issuance of the special exception would be in keeping with the overall
intent of this chapter;
C. Whether there are any unique circumstances and the nature of those circumstances that warrant
the issuance of the special exception;
D. The nature and extent of anticipated impacts to the natural environment that could potentially occur
if the special exception was granted;
E. The nature and extent of anticipated positive and negative effects on properties in the area;
F. Actions the applicant will undertake to mitigate the negative effects, if any, of the proposed special
exception;
G. A factor specifically listed under a section of this chapter authorizing the issuance of a special
exception; and
H. Any other factor that relates to the purposes of this chapter set forth in § 170.05 or as allowed by
state law.
§ 170.444. Imposition of conditions.
https:l/ecode360,comlprin!/Rl30877guld=42033541,4203354.2,42033536,42033504,42033515.42033537 ,42033607 ,42033508,42033509,42033480,4. .. 215
8/28/26, 12:22 PM Appeal. - Village of Richfield, WI
A. Generally. In approving a special exception, the review authority may impose one or more
conditions deemed necessary to further the intent and purposes of this chapter.
B. Effect on contracts with another party. The review authority shall not condition or withhold approval
based upon the property owner entering into a contract or discontinuing, modifying, extending, or
renewing any contract with a third party under which the third party is engaging in a lawful use of
the property.f1 l
[1] Editorial Note: See§ 62.23(7)(gm) , Wis. Stats. The Village, for example, could not require an
applicant to terminate an existing contract with another party that is engaged in a lawful use of the
property
§ 170.445. Limitations on issuing special exception.
A special exception shall only be approved in those instances where issuance is specifically authorized
in this chapter.
§ 170.446. Application form and content.
The application submittal shall include an application form as may be used by the Village and a site plan
prepared at a scale of one inch equals 20 feet or other appropriate scale depicting the information listed
in Appendix F.C1l
[1] Code Editor's Note: Appendix Fis included in Chapter 170A, Zoning Appendix.
§ 170 .44 7. Staff report content.
The staff report should include the following:
A. A description of the requested special exception;
B. Preliminary findings for the decision criteria listed in this division;
C. A recommendation to approve the application, approve the application with conditions , or deny the
application;
D. A preliminary list of conditions whether the staff recommendation is for approval or denial; and
E. Other information deemed necessary.
§ 170.448. Content of decision document.
A Approval. If the application for a special exception is approved, the decision document should
include the following:
(1) A statement that the special exception is approved;
(2) A description of the special exception;
(3) Reasons for the decision based on the criteria listed in this division;
(4) Conditions of approval, if any;
(5) A statement indicating that the property owner must sign the decision document and return it to
the Zoning Administrator to acknowledge acceptance of the same;
http s ://ecode360 .com/print/Rl 3087?guid=42033541,420335 42,420 33536,42033504,42033515,4203353 7,42033507,42033508,42033509 ,42033480,4... 3/5
8/28/26, 12:22 PM Appeal. - VIiiage of Richfield, WI
(6) A statement that the applicant may appeal the decision to a court of competent jurisdiction;
(7) A statement that an aggrieved person, other than the applicant, may appeal the decision and
that any work done by the applicant as authorized by the approval is done at the applicant's
risk;
(8) Other information the review authority or Zoning Administrator deems appropriate;
(9) The signature of the Zoning Administrator on behalf of the reviewing authority; and
(10) The date of the decision.
B. Denial. If the application for a special exception is denied, the decision document should include
the following:
(1) A statement that the special exception is denied;
(2) A description of the special exception;
(3) Reasons for the decision based on the criteria listed in this division;
(4) A statement indicating that the denial does not limit the applicant's ability to resubmit a revised
application for consideration;
(5) A statement that the decision may be appealed as provided for in this division;
(6) Other information the review authority or Zoning Administrator deems appropriate;
(7) The signature of the Zoning Administrator on behalf of the reviewing authority; and
(8) The date of the decision.
§ 170.449. Effect of approval.
If a special exception is approved, such approval shall run with the land and is binding on all
subsequent property owners.
§ 170.450. Expiration of approval.
An approval for a special exception shall automatically expire 12 months after the date of issuance
unless substantial work has commenced under the permit and continues in good faith to completion.
Upon petition and with cause, the Zoning Administrator may grant a one-time extension, not to exceed
12 months, provided that:
A. The permit holder requests the extension prior to the expiration of the permit;
B. The permit holder clearly demonstrates that circumstances beyond his or her control prevented the
start of construction and the continuation of the same; and
C. The project complies with this chapter in effect at the time the extension is granted.
§ 170.451. Appeal.
An aggrieved person may appeal a final decision made pursuant to this division by filing an appeal with
a court of competent jurisdiction within 30 calendar days of the final decision.
§ 170.452. through § 170.459. (Reserved)
https://ecode360 .com/print/Rl3087?guid=42033541,42033542,42033536,42033504,42033515,42033537,42033507 ,42033508,42033509,42033480,4... 4/5
VILLAGE OF RICHFIELD
PLAN COMMISSION COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Adaptive Reuse Project - "Preapplication Conference with Plan Commission " for
property located at 3737 Hubertus Road and 3733 Hubertus Road (TNK: V10_082900B)
DATE SUBMITTED: August 26, 2026
SUBMITTED BY: Jim Healy, Village Administrator
POLICY QUESTIONS: WHAT FEEDBACK DOES THE PLAN COMMISSION HAVE FOR THE APPLICANT REGARDING THE
REDEVELOPMENT OF THE FORMER ST. HUBERT'S CHURCH AND ST. GABRIEL 's CATHOLJC SCHOOL AS A PLANNED
DEVELOPMENT DISTRICT (PDD)?
ISSUE SUi\l!MARY:
The former St. Hubert's Catholic Church and St. Gabriel's Catholic School have been vacant since 2019 and have been on
the market for much of that time. In early 2024 , Village Staff, representatives from St. Gabriel's Church, and Washington
County Staff began working together to utilize a Brownfields Redevelopment and Planning Grant secured by the County.
The grant provided an opportunity to investigate potential environmental hazards on the property while also engaging the
community in a broader planning process to identify appropriate and beneficial future uses for the site.
As part of this process, the Village, St. Gabriel's Catholic Parish, and Washington County received grant dollars to conduct
both a Phase I and Phase II Environmental Study for the property. The Phase I Environemtna l Study was completed in
October of 2024. The fom1er use of a 2,000 gallon and 700 gallon underground oil fuel tanks were identified as a recognized
environmental condition (REC). The Phase II Environemtnal Study was completed in September of 2025 and was
completed to evaluate the REC. 10 soil borings were advanced to a maximum depth of 20' below ground surface. Samples
were collected from the site. All samples were Laboratory tested for 'Volatile organic compounds' (VOCs) and Resource
Conservation and Recovery Act (RCRA) metals. Based on the findings from that study, the DNR determined that no further
action or remediation is required. A copy of the letter dated January of 2026 is included in the attachments for your
convenience.
VILLAGE OF RICHFIELD
PLAN COMM ISSION COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Adaptive Reuse Project - "Preapplication Conference with Plan Commission " for
property located at 3737 Hubertus Road and 3733 Hubertus Road (TNK: VI 0_082900B)
DA TE SUBMITTED: August 26, 2026
SUBMITTED BY: Jim Healy, Village Administrator
Before us tonight is a proposal from Mr. Tracy Weber, owner
of Magnum Excavation LLC., for a residential subdivision
development he is proposing to call "Scenic Hill
Condominiums " . The Village has two (2) different zoning
categories for this type of residential use in our Code, RD- I
and RD-2. Mr. Weber is proposing to develop the property
so that homes are constructed at one-half acre density. This
is the same density (RD-2) in which the Fairway Fields
Subdivision off STH 175 was developed at. That parcel
involved in the Fairway Fields Subdivision was
approximately 18-acres, compared to the subject property
that Mr. Weber has made an offer to purchase which is
10.64-acres. The average condo unit in this developed has an
assessed value of $568,000 based on the Village's
Assessment Roll which was approved on August 26, 2026.
A copy of those assessments for the Fairway Field
Subdivision are included for your convenience. Mr. Weber's stated he expects to sell these condo units for approximately
$650,000 per side ($400 per square foot) for what he says will be l ,660sqft floorplans.
On this page, the colored photos, are examples of the existing homes in the Fairway Fields Subdivision. Mr. Weber has
also included a 20 rendering of one of the models he plans to build along with a floorplan for your convenience. The condo
units would all be two bedrooms, two baths, and have options for a three (3) car garage, and for finished basements. Custom
cabinetry with quartz countops were also mentioned by the developer, but the interior finishes would obviously vary unit
to-unit based on the individual tasts of the prospective buyer. The siding used in this development is a cement board product
like LP Smartside, have stone accents, and other architectural details like an arched entryway.
His proposal has been conceptually laid out by Lake
Country Engineering, Inc. Based on feedback from
the Plan Commissio n, this may or may not be the
layout that gets officially proposed. There is one
obtuse angle where the roads converge on one another
that I believe would be problematic for snow removal.
This development is proposing to have more than one
way in and out, for safety purposes. Staff has also
previously discussed with the developer about the
potential that these do not become public roads, but
are private roads built to a Village standard that will
be the responsibility of the Homeowners Association
to maintain and plow. That will ultimately be another
policy decision for discussion amongst the Plan
Commission.
VILLAGE OF RICHFIELD
PLAN COMMISSION COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Adaptive Reuse Project - "Preapplication Conference with Plan Commission" for
property located at 3737 Hubertus Road and 3733 Hubertus Road (TNK: VIO _082900B)
DATE SUBMITTED: August 26, 2026
SUBMITTED BY: Jim Healy, Village Administrator
The proposal shows 10 condo buildings consisting of 20 total units with an average sale price of $650,000. The existing
structures on the former St. Gabriel's and St. Hubert's site would be demolished as a part of this proposal. The developer
has engaged his engineers to ensure he is able to meet the Village's stormwater management standards. A stormwater report
has been completed, but not yet reviewed by Village Staff. It is also included for your convenience. The developer is
proposing a detention or retention pond along Hubertus Road and directly south of the cemetary. As part of this process, if
the proposal moves forward, the developer will need to work with the Village's Hydrologist Dale Buser to ensure that the
consumption of water for these 20 units will not have a negative impact by lowering the water levels by more than 1' at the
nearest property boundary line.
The Village has a trackrecord of working positively with the developer both in his work on the Elmwood Highlands Estates
(STH 164 and Elmwood Road) and in the Fairway Fields Subdivision which he purchased from the original developer and
constructed a majority of the units in.
Tonight, pursuant to Section 170.323, entitled "Review Procedure" for the Planned Development District, the
developer will be appearing before the Plan Commission for its required Preapplication Conference with the
Plan Commission. This meeting is intended to provide an infonnal opportunity for the Plan Commission and
the developer to discuss the proposed project before the formal review process begins. It also allows the public
an opportunity to hear the proposal, too. The applicable section of the Village Code states the following and is
also included in the attachments for your review:
"Preapplication Conference with Plan Commission. The applicant meets with the Plan Commission for an
informal discussion relating to the proposed project. At that meeting, the applicant shall provide the Plan
Commission with materials that describe the proposed project in sufficient detail for a preliminary, nonbinding
review." -Section 170.323(A)(2)
It is important to emphasize that tonight's discussion is preliminary and nonbinding. The purpose is to allow
the Plan Cormnission to become familiar with the proposal, ask questions, identify areas that may need
additional consideration, and provide initial feedback to the developer before any formal approvals are
considered.
Items such as landscaping, streetscaping, signage, lighting, site design, and other elements associated with the
overall development are within the Plan Cormnission's purview and will be appropriate subjects for discussion
this evening. The developer will be present to answer questions, provide additional context regarding the
proposed use, and explain why he believes this type of development is appropriate for the property. The
proposed development represents a significant investment in the Village on a property that has proven to be
challenging and, if ultimately approved and constructed as proposed, could result in approximately
$13,000,000 in new property valuation on a piece ofland that currently is tax exempt.
Tonight's meeting therefore provides an important opportunity for the Plan Commission to better understand
the proposal, consider how it fits within the Village's broader land-use objectives, and begin identifying any
issues oi: questions that should be addressed as the project moves through the formal review process.
VILLAGE OF RICHFIELD
PLAN COMMISSION COMMUNICATION FORM
MEETING DATE: September 3, 2026
SUBJECT: Adaptive Reuse Project - "Preapplication Conference with Plan Commission" for
property located at 3737 Hubertus Road and 3733 Hubertus Road (TNK: VlO _082900B)
DATE SUBMITTED: August 26, 2026
SUBMITTED BY: Jim Healy, Village Administrator
Forward to Village Board: Yes
Additional Approvals Needed: Yes
Signatures Required: Yes
ATTACHMENTS
1. Application Materials
2. Conceptual Development Yield Plan prepared by James Beaty, PLS
3. Turn Radius Plan prepared by Lake Country Engineering, Inc.
4. Building Elevations and Floorplan for "Typical" Homestyle
5. Excerpt from 2026 Village of Richfield Assessment Roll (Fairway Fields Subdivision)
6. Chapter 170 Article 5 Specific Procedural Requirements Division 2 Planned Development District
7. Letter dated January of2026 from the Wisconsin DNR to St. Gabriel's Congregation
STAFF RECOMMENDATION:
NIA, discussion only.
APPROVED FOR SUBMITTAL BY: VILLAGE CLERK USE ONL V
BOARD ACTION TAKEN
Resolution No. ______ _ Continued To: ______ _
Oniinance No. ______ _ Refen-ed To: ______ _
Appmved ______ _ Denied ______ _
Other ______ _ File No. ______ _
Property Address:
7 .] 73
City/State:
Email Address:
VILLAGE BOARD & PLAN
COMMISSION APPLICATION
VILLAGE OF RICHFIELD
PROPERTY INFORMA TION
PROJECT INFORMATION
□ Primary Contact
4128 Hubertus Rd
Hubertus, WI 53033
Village Hall -
262.628.2260
Zoning:
Acreage: ) I
/,9,6rt
Phone# :
.,,~o:J
□ Primary Contact Phone #:
Company:
APPLICATION TYPE
Please check the application type you are applying for:
□ Comprehensive Plan Amendment D Zoning Code Amendment
□ Rezoning □ Conditional Use ~ Planned Development District
These application types are reviewed by the Plan Comm ission and then decided on by the Village Board.
SIGNATURES
The applicant and property owner(s) certify that: (1) all the information attached to or provided in support of said application, including
sketches, data , and any other documents and material, are honest and true to the best of the applicant's and property owner(s)' knowledge;
(2) the applicant and property owner(s) acknowledge and accept the responsibility for any and all fees charged or costs incurred by the Village
of Richfiel d to carry out the processing and review of this application ; (3) the applicant and property owner(s) further acknowledge and
understand that they may be required to start an escrow account to which all process ing and review costs will be charged; (4) the applicant
and property owner(s) further acknowledge that in the event that the initial fee is not sufficient to cover all the costs associated with processing
and reviewing the application. they will be required to provide the Village of Richfie ld an additional deposit; (5) the applicant and property
owner(s) furthe r acknowledge that the balance of any remaining fees shall be refunded within a reasonable amount of time after this
application has been processed; (6) the applicant and property owner(s) understand that this application and all required forms and
information must be completed and accurate, as determ ined by the Planning and Zoning Administrator for the Village of Richfield, before a
meeting and/or public hearing (if required) can be scheduled.
Name & Title:
·r;
(2} Property Owner Signature:
Name & Title: Date:
FOR VILLAGE STAFF USE ONLY
Date Received: I Date Determined Complete: I Date Paid:
Plan Commission Meeting Date: I Village Board Meeting Date: I Receipt#:
APPLICATION CHECKLIST
This is not an exhaustive list. Village Staff may request additional items as deemed necessary.
Comprehensive Plan Amendment
Details about the review process can be found in §66.1001 of Wisconsin State Statutes:
https://docs.legis .wisconsi n.gov/statutes/statutes/66/x/·I001
□ This application form filled out with appropriate signatures
□ $350 application fee
□ Project narrative, including: description of need for amendment, potential impacts to neighboring properties,
section(s) to be amended
Zoning Text Amendment
Details about the review process can be found in §170-30 af Richfield's Village Code: https://ecode360.com/42033019
□ This application form filled out with appropriate signatures
□ $500 application fee
□ Project narrative, including: description of need for amendment, section(s} to be ame nded
Rezoning (Zoning Map Amendment)
Details about the review process can be found in §170-30 of Richfield's Village Code: https://ecode360.com/42033019
□ This application form filled out with appropriate signatures
□ $400 application fee
□ Survey(s) and legal description(s) of property to be rezoned
□ Project narrative, including: description of need for amendment
Conditional Use
Details abaut the review process can be found in §170-35 of Richfield's Village Code: https://ecode360.com/42033187
□ This application form filled out with appropriate signatures
□ Application fee; $500 for change to existing Conditional Use; $400 for New Residential; $700 for New Business
□ Project narrative, including the following information: proposed use, hours of operation , and any potent ial
impacts to neighboring properties
□ Site plan or survey of property highlighting the space to be occupied
Planned Development District
Details abaut the review process can be found in §170-32 of Richfield's Village Code: https://ecode360.com/42033106
§ This application form filled out with appropriate signatures
{a' Application fee; $500 for New Residential; $750 for PDD Amendment; $100 for Mixed Use PDD per acre,
$1,000 minimum
~ Site plan with proposed location of structure(s)
□ Project narrative, including details about the planned development
□ Draft Planned Development District Ordinance text
Scenic Hill Condominiums
A Luxury Condominium subdivision located in Richfield, Wisconsin. The same overall concept of
the Fairway Fields Condominiums located at 3102 Fairway View Court, Richfield, Wisconsin.
Scenic Hill Condominiums to be: JO buildings/20 units. Two.family units owner occupied side by
side ranch condominiums.
Units will consist o(
2 bedrooms, 2 baths, 3 car garage, custom cabinetry with Quartz countertops throughout condo.
Landscaped and concrete driveways.
1,660 sq Ji per side
Interior upgraded trim and cabinets.
Exterior Stone Facade
LP Smart side exterior siding
Approximate Values of Condominiums $650,000
s o· , oo 200 Joo
li--•.~-------L;;;;;=:1
GRAPHIC SCN..£
1M = 100'
PROPOSED ZONING,
C□ ND □HINIUM - RD2
(2 FoMlly Cluster/Open Spnce Residential Dist r ic t)
CPER CODE> - -----~
HINl HUH LOT \JID TH - 175'
MINI MUM LOT AREA - 1.0AC.
HIN FRONTAGE - 5 0'
HAXIHUM HEIGHT,
<PRI NCIPAL STRUCTURE> - 35'
(ACCESSORY STRUCTURE> - l5'
STREET SETBACK - 60'-Hwy I 50' Other r oods
SIDE YARD SETBACK - 2:~'
REAR YARD SETBACK - 40' CPrlnc lpot> / lO' CAc::c::>
OPEN SPACE - 40Y.
t.A.R. MAX • SY.
(SEE CODE □Tl-CR RESTRICTIONS MAY APPLY>
PROPOSED DEVELOPMENT
STATISTICS:
AREA (GROSS OVERALL)
464,964 S.F.
(10.67 ACRES)
20 UNITS • 1.87 DU/AC / 0.534 AC/DU
Subjecl lo change based on
final survey, skJpes, enviranmenlal delineations,
stormwater management
and other miligating factors.
CALL DIGGERS ~ □TUNE
l- 800-2-42 - 8511
TOLL f-"R£E
\Ill S"l~IIITC lRUU5<1, 7•)
~';ll(SMl:,i. ) IICJ!M.~H
"'ll'IU IEfl:JIII: •IJJ t •U.v•Tt
MIL'w'. ARE.A 259- 1181
CONCEPTUAL DEVELOPMENT YIELD PLAN
OF
ST GABRIEL CHURCH PROPERTY
BEiliG UNPI.ATIED LANDS (PROPOSED CSM)
LYING WITHIN AND BEING A PART OF THE NORTHEAST 1/4
OF THE NORTHEAST 1/4 OF SECTION 22, IN TOWN 9 NORTH, RANGE 19 EAST,
VILLAGE OF RICHFIELD, WASHINGTON COUNTY, WISCONSili
OWNER/SUBDIVIDER:
TRACY WEBER
WESER HOMES
N46 W26890 LYNI\OALE RO
PEWAUKEE. WI S,J072
APPROVING AGENCIES
VILLA GE OF RICHFIELD
SURVEYOR : Oot~d this 16th d<Jy of April, 2026
JAMES n BEATY, nLS IBJ4
HOR IZON LAND DEVELOPME NT SERVICES. LLC
WJ IJ 52562 PENNY LN
WALES . WI 53183
(262)3-19-1515
www horlz0r11anddevelopm eritservice,.com
( l ... !J!CAT[S lll[CORO(D orvrnsieN
fl'HUI£ Oif'F'EA(fiT rll(J1,1 M!rlJ.\l.
"""'"""" e 011 !I SECTICS 011 I /♦ SECTION
CO~ ASC(:SClnl!!I
• 1 • LD. !IIO~ PIP£ FOUN0
Ct.ml.-~ $ 0111~ 5[ NOfEO)
0 1• LO l!WII Pl/JC, I.J I!. Oll. 18"
lO:.C SCT (l.NL~'!i Ornt..lfll'!St '-OT[D
O OOUMO
+ SOIL IJC!'lNC/VO,.TOQll'iG wttL
rn..;""'
f"-"" LBQ•
....
-a~110
.:a CDNll'IOL ac•
rJW'TICS:C'<lll
f '""'-"°-"D C"°S'S l!IIC SIQ,l.6L
EI CABl.£ P£DCSTAL
"""'"'""' )..CU'f /1(!1.£
! ~ "~
► SPOT/'l'A'IO/PEOEST....._ UClil
~ H.INOICAl'P{O PARKl~
ID!ILcill!C IV.Nt10L.!
!ZID.£C'T111C ?EDEST.-J.
0o..ECm<: 0.1 £TEA:
t.:) rn.EP1"0t,.E ..W.'HOLE
El ~E P[CESl)I..
ro-;((0 nocR OPnc
; ~~~
9 "'5 WJll'I.NlliC SIQI
e STORM w.NHOl£
Q ROl,l"ll) ~
i! SOIJNIEINI.IT
"' STQl'lt,/ S(W[R ENO sccnor. ca wrroo \IA",HOLE.
♦ 'Wffi'klfl' C\V,.-.001 CR St.PT'C \lt,'fl
• SM rt~ INl(l'!C!:PIOIII I.IA."ll<Cl£
Q VISCD..1..ANEOUS \h\.~
.\Jl.t, JUt VALvE
'WHYDRA.'IT
0 WAT!R SW .CE C\lf!S 510P
Q WAITR 'V.'ll-lOI.[
~--:f. WATIR '51.'W'-CE.
o '#('l\),Nll$f\..c
. ......
CO-.!f'[RO<JS 1"1€£:
OECJOUOIIS 1l!Cr:
"""' rrvYVV'\ - CDC£ OF IRE!:S
- - - n1- rt>ltCE..wN
- _1 : ~ :~~Vf
---•-WJITUI~
--- , - w.R~EO CAS -~
--- l • "1AR~Etl[l£C1ll! C
-:-:=:-:-:=~ =:v'~C>l) ~ f : [ RV
---1 - \IAAl':(Q r(l (Jl)<()I,,[
---:Y•VJIR~ED CJla.£ IV UN[
==:=::: :11:~~~r°PTIC
i>,1)1C.1,fCS OlSMC:
....._7_,,-- CO,.TOLIII tl.i\' 1100..
• -.... ~~~~~c:
@ -n.s r.,.-a 10,.-·.,.c
- -~•"'CA
THIS INSTRUMENT DRAFTED BY JAMES R. BEAlY PLS 1834 SHEET I OF 1
f !
~
~:~~ ..
~
I
' - - \ "-' \ \\~
. ' \ \ '
"'.:-..-=-·- -..::-_-::
"', • ·, \
,,· ,:..«>H!. · 1
\. I
,!
I
""' ~
i., ,
11 ..
" -I
I
.....,
:1
/ I, ,, I; .-, ~
l ~o
' 0) Q
I I '-.j(Jl
' ' I ) ' I '
Q 11,1 1
(J7 I I I
I I I I I
0 ,, \
I ' I
I I I
I I I I '
! / / / J
r /. { I I
Ir' 1 • " • 1 • 1, / 1 l 1
1!i1i.: 1,:,11 / I [ II
t,,, :1·'.' , , 1 !/ 1 ' , 1
I I I I, I/// I
1
1 11 I I 1rl• J
I I I ij I
I
I I I I I '·
1
/
·I.I I I 1 '. 11 It I ) I
1 I; I I lj I\ I I I I
i !1 I I I ,I 1L I • 1 I I
1• •/ I . 7 I • I I I,, ,, I',, i ~ r
' ' f q I \ \ \ I I
I 11/1 I\ I I n \
~ , 111/ , 1
, ~- 111,,r,,'. 1
I I tl i I
Ir 1\ 111 I I ' I I I I I
1 I ,1 I \ \ r"'
1(17 I 11 \\\ 0
/ 111 ·'' \ , -! 1 I \ t1 I '- \ 'N ,_
I l \ 1'- • ~
11, 11'\ , -.. , Q - -•'1\'' I ,,,, ' , -::', --
\ ' I I I \ \' '-·- • 01- - - ~
\ \ ' ' .... - \0 - -
I\ I\-.'''{ '~ - ._. ~ - -.,,,· ,, ---- -,, ..,,,..,' --,,,,,, ...... ~ .......... __ .. ·,..,,, ...... , · ----: --..
•-11''~''' ,---:::-. , .... -:-- ~ - - •• -
' 1,J,: \.\ \'~~~-~,,-~~\:_'--:~:.._:;. ~ ~ ;
\ '-• '-. .., I ............... - -.._ ._ \
I I I' '\ '\.' ', ......... " ' \ '
- I \ ' \ \ •', ~ - \ \ \
\ -., \ I \ \ " ' ' I \ I ' I . \ I I - t I • I
I ·:i I'•) t '·' ', \ ( I. I I
I I L , I , I \ \
I I ~I \ 1 t t \ ) ·\
1
' I I I • • ~ .-.
.. f,J-,, , r -
1
1
j f , '
) \ t
' I
I I I
I \
\ t ' 1 1 I
I I · 1 ( I
/I/ .
I I \ I \, . I } l I \ i ~ I
I
I I
' I 1· J ' 1
I ,. I
'\ ' I \ \ I : \
I I \,'\ \ \ I I ~ l I
\ \ '\ l•I 11 •
\ t ' l Q \
I I ' I\· 1 \ \
1, , \ '' q J I I ' I \ ' I I 1
' I \ I \ I ' I \
I \ \ i, I ) \ I \
I I I ,I I \ ',
I \ \ I \" \ . ,• \ I I \
\\\ \ \ , \l: 1 1\\1 \ \ I I I
I \ ,
I l I
1
)
I
I
'. .,
:>, \ ·, '· "
........-- \ \ '
\
,:, 1•\
~ \ \ '
\
I
\
• I j I I I
~ II I I
I J • ,•' /
("i) 1' \ I '·C \ \ \ I
0' ,1\11
' \ \
I I I I I\
\ I
I ' ,/. r,";5,.
' ., J
I \~
' u I 'i \
,' I ) l '. ! ./
)'/,'/ I,.,,.,,. ·/,, , / //.,
' I I · ,1 ,-
I • ., .) I
I
I I
\ . '
11· I
\ '
I
,'· \ I
I\ \ \,
I \ \ \ I
I ' I '
I~',' ' I
'1
.•
0
(J7
I
J
Effl -- j
I.
I!
I
.ss·s,;
M.!lt,L;.ION
I
I
"" ·, . \ ) ., I
1 '~ \ • I
\ I I ' i 'r
/ I •
I
l ,.
I
/
I
/ I I ,
I \
I
11:~ ,,l~ I I j z ~
i • j I· 1 s~ o
111 I ~~ uJ
, . • _)'[ I 0
, _ '
r ' , I
\
\
)
l
\
I ~ I
J
I
\
s
,fO'tLL
M.ez,;o.ooN
\ \ II I
\
I \ a •
• -~ , '-. ,-
L..'.,......-.:- ~ ,,:- \ I .• 1 I I
-~- I I I ' I · I · •- l.;;:: ' I
- - , , \ , ,_ \ ,, , . """: ·- n _ ~ .,\\
' ', 'Q '
I ,.',/ ,/ :
I
,·_ I • 4,-;
I I I ,',·
~ \ ' 'I • NPM ; ~ i .
I I}, t;:D f:J, I I ,I (J1 c! I
r./) /
1 1
,,,
,,
I\
I
I
I
I
I
I
I
1/ 1
i
;1
;:z::, I
/ ~,
.. ~ ~ S! -.lJ
-... _
,.,....
I
/.
I\
I I \
.rrs.z
3.!lt .~i;.o()S /
I
) )
/
I I
<
/
/
I'- ~-,
~
I
I ,
.,. /i'1· ~,.,,/
I
\
\
\
'
\ I
I I I I \ I
\
\ \ I
I I
I
I
I I
I I I
f
I •/ I
/ /
I
I I I
I I
I I l I
\
I
/ ' I
1,,
l
/
/
I I • j I
•I', ,,: ~ 1I I
j - - g~ ,j
I I \ l I / I ' - !:liil ( I "--, \ I ,- ~
I L. • - \~-'I / / , / ' :s' }
) ,. •) l, I I • / z
r "f ' 1 I 1 /
\ 1(1 ', / i I / /
I - ~ - '// ,' ·' I i ' ' I /I .; • • I . I ,
... i I I /
' I I I '
.,. ....
(_
- ,, ,
- I'/ ( I
/ 1 II 1
, ' 1,, • I
I' I I I .,,,
I I I , • I I
/ 1}, , , ,1 /
1 I !.-'- I...!.'/ / ,
I ,. ~-- . 1/-·, . ...
-:-,.;,,- 77' 1 I '"', ,, 7 ;~·-:-t 1
1rf-...' .I I I I I / s.-" / I I I
'-,...J I I I I I 1-< ,, ✓ / .,- ) I r 1 :, 1 , , 1 1 :i! , .,, r.' ,
:J\/1 .k I ,.,. I I / I ~ / / /' / ! '
/ ,' / ,,' ,,~/ ./ / ~ /r, . ,. / 1 1 /'/ • , ,-
I f I 1 1 I I ./ 1 I
' I I , 1/ I I I l I I I
/ , • t I
• I J I I I ., ,I ' I -, I I . _, -,.,
// // .,,./ .... ✓~ -/ // \
~-- - _ ..... _.,..;_ .... .--:..., ~ -,.,, ,,.1
... - _., ..r:..,:. "'""'"°= .. l"I"" /
I
I
I
I
,
1,
I
1 I . I / • .. /. , /. I ; . ~
\ .1,oi , ~ <,.,,,, ---: C)
: H ( I • '. "/. c,q , I I
/
/ / / , / I I I I } I I I I ' I 'II I f . , · I • ,,·
I lf"t""+ I . ., / / / ' ' • / .' i I / / '/ 1. j ' ' / /
, i::-.l c rllc:--lo u ' ' I • ' I ,.• .. J ,.,. / _1 ,)11~ I I I
0 r I/ / .,.. ...- ,..,,, .,.. .,,,,.,,.,- _ _ J ,,,r' ·-~ 1·----.., ,.,,- , _,,,.
/,
..., /
' ' ( ' \.
- .. . \ ..-,~:\ 'ti, \ \ ' • ' :-r--r~.,.~ - =-1.....+-1-~ -~
I I .• / I I I : I \ ' ' I - -
- I.I) I
, I .'~: . 1 / ' I , / ) l
I' T;;~----J .,,-~.../_,f:',.,:;,. r "',,/,,./1~ --. ( /
.... :--:;:=~- '- -------...
:--.~ ...._, .~
;~~'~
""
TURN RADIUS PLAN
I ' /_,, ✓ /,/_.,.., ,... ~- ✓- ~:: ::_:"_:~~?~ :;-;_::~~ ~; - ·-~ ~ .., ,,.-
M . Ir r ( ':: ~ f r \ \ ..._ , \.__ ., • _ _ __
·J (J7 ' "- ' ' ,"- ·1· '-.....2:, \ \ ~\-.'.\..,..., ,\~ ,... _J... '- '\ , --=~ r
'- ' y \ \. \ \ \ \ 1· I , ' .J ' ___ _.....__ ,_ --- - --.,-- - ,- - ---- ~-r--+,- -,_- -.......,......,- , -.---:--- ,--;--;- J I /I / / ,' ' _,,_.. _ ..,.
CJ¥
I • / / / / ,,) I' -> / "' .,,, / -- ' ,- '"' • /
0 '1, ""\IN©S ) I I _.,_,,, •-;.:.-.,.'-<'-·--"' .,.--,.-- .... .,,- ... -: -~"'··
SI ~ - '7.' <. ;r..-~ I t(---~..r.11 \~. I( r ---~ ~ -- - -r,1; ~,. _ ~
"\ '<',1· r, .,.,, _ _. (_ ~·,.,.... . -·- •. , ,, . ,L__ ,
~ 1 I ' ·4. ,c.!_ " c-i ' ;J, • '-
' - ' ./-{ j•<" i: I ~ - · ' 0 ,l '! ,.,t; . • -..;:_ ';s , r " ~
-~ . 10
~1. Qi,
' "''" ,,_~ Ji ..-
.!!.El/lSION DATE REMAR~_s_
0 l"1
"Tl l"1
~
N "O
°' ;:o
' o vi c... U1 •
,.,I~""'
ST GABR IEL CHURCH PROPERTY LOT 2, CSM 6936
MAGNUM EXCAVATING
,LAKE C ouNTRY ENGINEERING, INC.
Consulting Engineers • Sutveyo1s
P.O. BOX 144, Oconomowoc, WI 53066
Phcl/fl /262) 569,9331
', , · ... -40'
BY: R.D
~
NE 1/4 S22, T9N, Rl9E. VO RICHFIELD, WASHINGTON CO. WI !DATE: AOGIJST ~ 2026
l'J'!BP lXJ1fN ALL FfJO'J'JNr;!J AS R~IMJJ
ffl,Mo,~Jift°i#:rifft~'?ii(}/f
IJEPl'IJS KAY VARY FRON ll'HA'i' IS SHOWH
OH PU.H.
CEILING LINE @
DINING/KITCHEN
12
7~
00
'',,,,,
SADDLE WI FLASHING
,t ICE-GUARD
~~~
r--~
'
HEI
-·-·-·-·-·-·PPER FLOOR ·-·-·
! i ~CULTURED
q-~----------------- ________ _JI __ ,] STONE
I I
' I
-·-·-·-·-· LOWER FLOOR _____ j :
~------------------------]
1 1 c;------------::1 EAST ELEVATION
c============IL==-==j 1/4"=1'-0"
TOP OF PORCI i ADER
2'-0" ABOVE HO/Jse ll'AUS
t OF BUILDING
-= nF PORCH HEADER
__ -i'·O" ABOVE HOUSE 1fALLS~ < __
NORTH ELEVATION
1/4"=1'-0" FAIRWAY FIELDS DUPLEX
LOT # 1
.-----~
FAfRWAY FIEWS WT 1110 FOR: TRACY WEBER JEFF HIBBARD DESIGN SERVICE,
DEl.M'IEJJ) WISCONSIN l004 OLDE ONEIDA- STREET
DES!CNED BY: JEFF HIBB,t.RD DESIGN SERl'ICES APPLETON, WJ. 54915
SllEET {11 DAW 11/21/18 PHONE: (920) 731-7365
t
t
9' X s• Oil DOOR
RAfW/IJ
14'-11"
DINING ROOM
(MrHEDlt<L C1JJ
----
29' II"
Slit'T/f/li •~•lit,.
I /I/Iliff ,o fl'
a·-r· HR;//
tJ/11 Iii.LL
IIUEE1' 16 '
~-
-
fw!].1•VJa"s':fNff1J'Z~
0
nL BASE
/ilYtir, TOP OF GA/14"11' rAUQ D<llrli ~ I 1'-5" rRDM roP 01111Wst rAus. [
~------------+-Y ,
,r /1,l/SED HEil!.
ROOr '!'JIJCJ9F:S
2•" li!i C:.RfAh
/5' X1' DHII08R
OJ!'-111"
I
~
STOOP
7:
/
SHE.BT ~Ii .,,v
OF BUILDING e'-w
Mf1f& I
12'-r<r
! !!
= PATIO
e-o X 5-10
swr; DR
ii'
.Y !' WNlNG ROOM
.I CAfliEDRAL cm
'
( Of'l'IQNAL l(l'IC/11/N
LAYllUr THIii SIDE
-~-
I
'
..
' • I ' ' I ~i
~
"
'
10'-0"
,;,
•'' ~--
t ' I
Ii \
'
BEDROOM J/2 !,,~ ~ BEDROOM #2 2·-11" L 2'-l1" ~
9•_, .. r:w a•-r r1e 0 • 10• 22 ._ 4,. ii I
111'! or FfJRf,H HEADliR I
Jl -/J'' A/JfWS //OIJ31/ lfJ.Ll.'l //ECf'!OH '!!"lit,.
/11/A'ET ft;
FLOOR PLAN .,
SCALE: f/4" ~ /'-0"
1;JdH SJJ'n"l" FEET
OF BU!Ul!NG
FAIRWAY FIELDS DUPLEX
LOT # 1
10/i'-,r
I
NDTE: DIMENSIONS AS SH/JffN ARE FINISHED
DIMENSIONS, AMJST FOR RIJUGH
FRAM/Hr; DIMENSIONS.
o·-10·•
NOTE: 9'-1" HWH FIRST FUJOR J'fALI.S
UNLESS O'/'HERWISE NDTED
...__
NOTI>: TOP /JI" P'!RST l"LOOR WINDOWS @
8'-0" DFF FLOOR UNLESS NOTED
ro·-o·
II
11~ ,,
!1 ,, J -
'
--·--··-
' ·' '
to• X?' 011 l)(J()R
l2'-0-
r-,,-,-,,-,-,-,-,,-w-,-,-w-,-,-,-ro-,-.-,-.,-"-,-,,-,-,....,-,,cEo,o,.,.-,-HcIBcB':".AOROD,-:Do~cscJGoN-s_E_R_VJ_c_E-1 IP I
D/i'LAl"!El,n ~-!SCONS!N LQJM__Q[,DE QN/,:TQ,1 STREET
DESIGNED BY: JEFF IIIDDMID f/ES/GN SI1Rl'IC/fS APPLETON, WJ. 54915
SHI/ff q s DATE; 8/21/18 PHONE: (920) 731~7365
L AKE C OUNTRY E NGINEERING, INC.
Rob Davy, P.E. Mark Powers, R.L.S.
St Gabriel Property
Preliminary Storm Water Management Report
Village of Richfield, Washington Co., WI
August 4, 2026
Project No. 26-3575
The development of this 10.32 ac property is to place 10 duplex condominiums, replacing the old
church. This development is in the Rock River Water Shed and is considered a redevelopment.
The objectives of this rep011 are to show that by adding these condominiums and roads
• The post conditions flow rates are less than the existing condition flow rates.
• That 90% of the predevelopment volume of storm water will be infiltrated
• That 40% of the Tss will be removed from the storm water on an average annual basis.
• That 30% of the TP will be removed from the storm water on an average annual basis.
The parameters used to evaluate this area are
• The soils are hydrologic group B & C type soils (CkC2 B, FsB B, CeC2 B, CrD2 B, ScA B and
ThB2 C.
• Cn of 71 for grass C, 61 for grass B, and 98 for impervious
• Rainfall events for the different 24-hr storm events are I-yr 2.35" 2-yr 2.65", 10-yr 3.82", and
I 00-yr 6.41" of rain.
• Storm distributions are MSE 3
• Hydrology Calculate using Hydraflow TR-55 modeling
• Tss & TP removal using WinSLAMM v I 0.5.0
• Infiltration/ evaporation rate of 1.67 in/hr ( to be verified once soil borings are done.)
This property has 2- watersheds leaving the site.
The first area is to the north west and into Hubertus Road. The existing conditions show 6.34 acres
and is mainly grass. The proposed conditions show 5.49 acres with 0.95 acres of impervious surface.
The flows leaving this site are as follows
Stonn event 1-vear 2-year IO-year 100- year
existing 1.80 CFS. 3.22 CFS. 10.54 CFS. 32.81 CFS.
Pro gen 2.69 CFS 4.22 CFS 11.46 CFS 32.83 CFS
Pro released 0.00 CFS 0.11 CFS 3.03 CFS 27.77 CFS
W. 359 N.5920 Brown Street, Suite 102. Oconomowoc, WI 53066 (262) 569-9331 telephone 569-9316 fax
The second area is to the north east and into Hubertus Road. The existing conditions show 3.97 acres
with 1. 71 acres of impervious. The proposed conditions show 4.82 acres with 1.68 acres of impervious
surface.
The flows leaving the fire station site are as follows
Storm event 1-vear 2-year l 0-vear 100- year
existing 4.49 CFS. 5.69 CFS. 10.73 CFS. 22.70 CFS.
Pro gen 4.73 CFS 6.11 CFS 12.03 CFS 26.38 CFS
Pro released 0.26 CFS 0.68 CFS 4.29 CFS 22.14 CFS
By routing this development, through the infiltration basins the Tss will be reduced. This site
generates 2,585 lbs of Tss on an average annual basis and only releases 125.3lbs ofTss on an average
annual basis, 2,459.7 lbs of Tss are removed on an average annual basis or 95%
By routing this development, through the infiltration basin the Total Phosphorous (TP) will be
reduced. This site generates 10.03 lbs ofTP on an average annual basis and only releases 0.6625 lbs of
TP on an average annual, 9.36751bs of TP are removed on an average annual basis or 93.4%
Pre-development calculations
Total of 10.31 ac. = 449,104 s.f. x 29.02 total inched of rain/ 12 in.= 1,086,083 cf that fall on this
property, with 23,209 cf running off site or 1,062,874 cf infiltrated.
Post development calculation
Total of 10.31 ac. = 449,104 s.f x 29.02 total inched of rain/ 12 in.= 1,086,083 cf that fall on this
property, with 15,547 cf running off site or 1,070,536 cf infiltrated.
So the post development with the infiltration BMP's water shed infiltrates 100% of the pre
development volume of storm water realeased.
This report shows that the village storm water requirements are met by routing the majority of the sites
storm water rnnoffthrough the infiltration BMP's.
Robert J Davy, P.E.
970 South Silver Lake Street, Suite l 05, Oconomowoc, WT 53066 (262) 569-9331
.-(
' '
-io40
/' LCITICSM#,9)6
._)r-...
,,..r"'"•\ .,:
........ \ L,' l~-
r\ __ ...._" \ ' ........ _ .,,,' \ ... _ .. ) ', ... ,
_ .. ,-........
\:
···)
·l
' ,,
,/
'\0.\0
," i
I 'i
' 4
/.··/
-,/'\ , f
c.... .., I
' , ,.,
......... -------- -------.102-0---~
------·"'--~---· -------~i::'7,~n._._n
·1030
EX\JNS1
6.34AR_
Cn=66
0.14 AC 11:,.
3.69.AC' '.
-_:~--_2,~E_A_C
"-T--c-:-1 ('
1050.
'.;.D_ ;· I
:1YA/~~ .. 9
!Gt;\~~ @ 61
;-::\] ~ -1.68 AC@ 71
' "· ', Tc= 11.5 Ml
'.i>-tOQ LF Cm 6.
i":·1\:'. Jo-i.P-:;,
....... ,
---==.:l
____ 1050
::: ~,oGCS
.........
..... ,,~"J
·' '~'-
'Ct.
I~' . (")
';o, IQ'
.i-g;
-' I
'· ' , ··1
I
:-1 "' ;
~
11 JI rr"i ~ q
~, i· ~ ~
;;: "'
c5JJ Ii
UJI t>I !ii:; ~
,,: "
~~
0
..J
:,: UJ
en u: u :,:
"'
u
I-a:
0 "- ..J 0
0.... t ~
<{ 0:: <(
::E ~ ;;
0 > w 0:: .
~ a..c.,:,w
~ ~~~-I <i: ~~z a::: :I:<( 0-
Cl Uul-
..J >< . c, wwN
z irr~
~ ~~~
-c.,:,(!)_
X 1--<tw
UJ UJLZ
PROJ. I
26-3575
9!EET I
1
Hydrograph Return Period Recap
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type Hyd(s) description
(origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr
1 SGS Runoff ------ 0.44 0,89 ------ ------- 3.26 ------ ------- 10.21 EX OFFSITE AREA 1
2 SGS Runoff ------- 1.40 2.41 ------ ------- 7.93 ------ ------- 23.86 EX ONSITE AREA 2
3 Combine 1, 2 1.80 3.22 ------ ------- 10.54 ----- ------- 32.81 EX TOTAL FLOW NW
4 SGS Runoff ------- 2.25 3.41 ------ ------- 8.85 ------- ----- 23.62 PROAREAA
5 Combine 1, 4 2.69 4.22 ------- ------- 11.46 ------- ------- 32.83 PRO FLOW TO BMPA
6 Reservoir 5 0.21 0.35 ------- ------ 3.31 ------- ------ 28.11 FLOW OUT BMP A
7 Dlverslon1 6 0.21 0.24 ------ ------ 0.29 ------ ------ 0.34 INFILTRATION
8 Diversion2 6 0.00 0.11 ------ ------ 3.03 ------ ------ 27.77 OVERLAND
10 SGS Runoff ------- 4.49 5.69 ----- ----- 10.73 ------- ------- 22.70 EX ONSITE AREA 3
11 SGS Runoff ------ 4.73 6.11 ------ ------ 12.03 ------ ------- 26.38 PRAREAB
12 Reservoir 11 0.51 0.94 ------ ------- 4.61 ----- ------ 22.51 FLOW OUT BMPB
13 Diversion1 12 0.25 0.26 ------ ------- 0.32 ------- ------- 0.37 INFILTRATION
14 Dlversian2 12 0.26 0.68 ------- ------- 4.29 ------- ------- 22.14 OVERLAND
Proj. file: 26-3575 MAG ST GABRIAL.gpw 5of42 Monday, Aug 3 2026, 2:05 PM
Hydraflow Hydrographs by lntelisolve
2
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow Interval peak hyd(s) elevation storage description
(origin) (cfs) (min) (min) (aclt) (ft) (aclt)
1 SCS Runoff 0.44 3 738 0.043 ---- ----- ------ EX OFFSITE AREA 1
2 SCS Runoff 1.40 3 741 0.142 ---- ------ ------ EX ONS ITE AREA 2
3 Combine 1.80 3 741 0.185 1, 2 ------ ------ EX TOTAL FLOW NW
4 SCS Runoff 2.25 3 738 0.176 --- ------ ------ PROAREAA
5 Combine 2.69 3 738 0,220 1, 4 ----- ------ PRO FLOW TO BMPA
6 Reservoir 0.21 3 909 0.219 5 1032.96 0.112 FLOW OUT BMP A
7 Dlverslon1 0.21 3 909 0.219 6 ----- ----- INFILTRATION
8 Diverslon2 0.00 3 759 0.000 6 ---- ------ OVERLAND
10 SCS Runoff 4.49 3 738 0.277 ---- ------ ----- EX ONSITE AREA 3
11 SCS Runoff 4.73 3 738 0.297 --- ------ ------ PRAREAB
12 Reservoir 0.51 3 807 0.296 11 1033.25 0.157 FLOW OUT BMPB
13 Diversion1 0.25 3 807 0.254 12 ---- ------ INFILTRATION
14 Diversion2 0.26 3 807 0.042 12 ----- ---- OVERLAND
26-3575 MAG ST GABRIAL.gpw Return Perie!1f 42Year Monday, Aug 3 2026, 2:05 PM
Hydraflow Hydrographs by lntellsolve
3
Hydrograph Summary Report
Hyd, Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow Interval peak hyd(s) elevation storage description
(origin) (els) (min) (min) (act!) (ft) (acft)
1 SCS Runoff 0.89 3 735 0.065 ---- ----- ------ EX OFFSITE AREA 1
2 SCS Runoff 2.41 3 738 0.205 ---- ------ ------ EX ON SITE AREA 2
3 Combine 3.22 3 738 0.269 1, 2 ------ ----- EX TOTAL FLOW NW
4 SCS Runoff 3.41 3 738 0.242 ---- ----- ------ PROAREAA
5 Combine 4.22 3 738 0.307 1, 4 ---- ----- PRO FLOW TO BMPA
6 Reservoir 0.35 3 828 0.306 5 1033.28 0.158 FLOW OUT BMP A
7 Diversion1 0.24 3 828 0.277 6 ------ ---- INFILTRATION
8 Diverslon2 0.11 3 828 0.029 6 ------ ------ OVERLAND
10 SCS Runoff 5.69 3 738 0.348 ---- ----- ----- EX ONSITE AREA 3
11 SGS Runoff 6.11 3 738 0.377 ···-- ------ ----- PRAREAB
12 Reservoir 0.94 3 774 0.377 11 1033.42 0.184 FLOW OUT BMPB
13 Diversion1 0.26 3 774 0.273 12 ------ ------ INFILTRATION
14 Dlversion2 0.68 3 774 0.104 12 ---- ----- OVERLAND
26-3575 MAG ST GABRIAL.gpw Return Peri<;i@f ~Year Monday, Aug 3 2026, 2:05 PM
Hydraflow Hydrographs by lntelisolve
4
Hydrograph Summary Report
Hyd, Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow interval peak hyd(s) elevation storage description
(origin) (cfs) (min) (min) (acft) (ft) (acft)
1 SGS Runoff 3.26 3 735 0.173 ---- ----- ------ EX OFFSITE AREA 1
2 SCS Runoff 7.93 3 738 0.518 ---- ------ ------ EX ONSITE AREA 2
3 Combine 10.54 3 738 0.691 1, 2 ----- ------ EX TOTAL FLOW NW
4 SCS Runoff 8.85 3 738 0,554 --- ----- ------ PRO AREA A
5 Combine 11.48 3 738 0.727 1, 4 ------ ------ PRO FLOW TO BMPA
B Reservoir 3.31 3 759 0.727 5 1034.17 0.296 FLOW OUT BMP A
7 Diversion1 0.29 3 759 0.352 6 ----- ----- INFILTRATION
8 Diversion2 3.03 3 759 0.374 6 ------ ----- OVERLAND
10 SGS Runoff 10.73 3 738 0.652 ---- ---- •••OM• EX ONSITE AREA 3
11 SCS Runoff 12.03 3 738 0.730 ---- ----- ------ PRAREAB
12 Reservoir 4.81 3 750 0.730 11 1034.13 0.304 FLOW OUT BMPB
13 Diversion1 0.32 3 750 0,326 12 ----- ----- INFILTRATION
14 Diversion2 4.29 3 750 0.404 12 ------ ------ OVERLAND
26-3575 MAG ST GABRIAL.gpw Return Peri@!Jf 4i> Year Monday, Aug 3 2026, 2:05 PM
Hydraflow Hydrogra.phs by lntellsolve
5
Hydrograph Summary Report
Hyd, Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph
No. type flow interval peak hyd(s) olevatlon storage description
(origin) (els) (min) (min) (acft) (ft) (acft)
1 scs Runoff 10.21 3 735 0.508 ---- ----- ----- EX OFFSITE AREA 1
2 scs Runoff 23.86 3 738 1.452 --- ------ ------ EX ON SITE AREA 2
3 Combine 32.81 3 735 1.960 1, 2 ------ ------ EX TOTAL FLOW NW
4 SCS Runoff 23.62 3 738 1.434 --- ----- ------ PROAREAA
5 Combine 32.83 3 735 1,942 1, 4 ----- ------ PRO FLOW TO BMPA
6 Reservoir 28.11 3 741 1.941 5 1035,00 0.447 FLOW OUT BMP A
7 Dlverslon1 0.34 3 741 0.416 6 ----- ------ INFILTRATION
8 Dlversion2 27.77 3 741 1.526 6 ----- ------ OVERLAND
10 SCS Runoff 22.70 3 738 1.409 -- ------ ------ EX ONSITE AREA 3
11 scs Runoff 26.38 3 738 1.626 --- ------ ------ PRAREAB
12 Reservoir 22.51 3 741 1.625 11 1034.78 0.438 FLOW OUT BMPB
13 Diversion1 0.37 3 741 0,390 12 ------ ------ INFILTRATION
14 Diverskm2 22.14 3 741 1.235 12 ----- ------ OVERLAND
26-3575 MAG ST GABRIAL.gpw Return Peri9(jf 4])0 Year Monday, Aug 3 2026, 2:06 PM
Hydraflow Hydrographs by lntelisolve
Hydrograph Plot
Hydraflow Hydrogra phs by lntelisolve Monday, Aug 3 2026, 2:6 PM
Hyd. No. 1
EX OFFSITE AREA 1
Hydrograph type = SGS Runoff Peak discharge = 10.21 cfs
Storm frequency = 100 yrs Time interval = 3 min
Drainage area = 2.54 ac Curve number = 64
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = TR55 Time of cone. (Tc) = 8.6 min
Total precip. = 6.41 in Distribution = Custom
Storm duration = MSE3 distribution 3 min .eds Shape factor = 484
Q (cfs)
EX OFFSITE AREA 1
Hyd. No. 1 -- 100 Yr
Hydrograph Volume = 0.508 acft
12.00 1- - - ---- , --r-T -i-, --r - r
I I I I I I I . I I
Q (cfs)
12.00
10.00
I
8.00
6.00
4.00
2.00
0.00
0.0 2.0 4.0 6.0 8.0
-- Hyd No. 1
J ~
'
10.0 12.0 14.0
lOof 42
16.0 18.0 20.0
10.00
8.00
6.00
4.00
2.00
0.00
22.0
Time (hrs)
6
TR55 Tc Worksheet
7
Hydraflow Hydrographs by lntellsolve
Hyd. No. 1
EX OFFSITE AREA 1
Description A B C Totals
Sheet Flow
Manning's n-value = 0.170 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 2.65 0.00 0.00
Land slope(%) = 5.00 0.00 0.00
Travel Time (min) = 8.25 + 0.00 + 0.00 = 8.25
Shallow Concentrated Flow
Flow length (ft) = 80.00 0.00 0.00
Watercourse slope(%) = 7.50 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) = 4.42 0.00 0.00
Travel Time (min) = 0.30 + 0.00 + 0.00 = 0.30
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope(%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) = 0.00 0.00 0.00
Flow length (ft) = 0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 8.60 min
llof 42
Precipitation Report
Hydraflow Hydrographs by lntelisolve
Hyd. No. 1
EX OFFSITE AREA 1
Storm Frequency
Total precip.
Storm duration
= 100yrs
= 6.41 in
= MSE3 distribution 3 min .eds
Time interval
Distribution
Precip (in)
1.00
Incremental Rainfall Precipitation
Hyd. No. 1 : EX OFFSITE AREA 1 - 100 Yr
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
~ ~ 0.00
0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5
- - Custom Design Storm -- MSE3 distribution 3 min .eds
12of 42
Monday, Aug 3 2026, 2:6 PM
= 3 min
= Custom
20.0 22.5
Precip (in)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
25.0
Time (hrs)
8
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 2
EX ON SITE AREA 2
Hydrograph type = SGS Runoff
Storm frequency = 100 yrs
Drainage area = 6.34 ac
Basin Slope = 0.0 %
Tc method = TR55
Total precip. = 6.41 in
Storm duration = MSE3 distribution 3 min .eds
Q (cfs)
24.00
20.00
16.00
12.00
8.00
EX ONSITE AREA 2
Hyd. No. 2 -- 100 Yr
Monday, Aug 3 2026, 2:6 PM
Peak discharge = 23.86 cfs
Time interval = 3 min
Curve number = 66
Hydraulic length = 0 ft
Time of cone. (Tc) = 11.6 min
Distribution = Custom
Shape factor = 484
Hydrograph Volume = 1.452 acfl
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
J \ ---.._
4.00
0.00
0.0 2.0 4.0 6.0 8.0
-- Hyd No. 2
10.0 12.0 14.0 16.0
13of 42
18.0 20.0
0.00
22.0
Time (hrs)
9
10
TR55 Tc Worksheet
Hydraf!ow Hydrographs by lntelisolve
Hyd. No. 2
EX ONSITE AREA 2
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 2.65 0.00 0.00
Land slope(%) = 10.00 0.00 0.00
Travel Time (min) = 8.24 + 0.00 + 0.00 = 8.24
Shallow Concentrated Flow
Flow length (ft) = 703.00 0.00 0.00
Watercourse slope(%) = 4.70 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) = 3.50 0.00 0,00
Travel Time (min) = 3.35 + 0.00 + 0.00 = 3.35
Channel Flow
X sectional flow area (sqfl) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope(%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) = 0,00 0.00 0,00
Flow length (ft) = 0,0 0,0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 11.60 min
14of 42
Precipitation Report
Hydraflow Hydrographs by lnteliso!ve
Hyd. No. 2
EX ON SITE AREA 2
Storm Frequency
Total precip.
Storm duration
= 100 yrs
= 6.41 in
::: MSE3 distribution 3 min .eds
Time interval
Distribution
Precip (in)
1.00
Incremental Rainfall Precipitation
Hyd. No. 2 : EX ONSITE AREA 2 - 100 Yr
-,-
0.90
0.80 - -
0.70 - I
I I
0.60 -~
0.50
0.40
0.30
0.20
0.10
~ ~ 0.00
0.0 2.5 5.0 7.5 10.0 12.5 15,0 17.5
-- Custom Design Storm -- MSE3 distribution 3 min .eds
I Sof 42
Monday, Aug 3 2026, 2:6 PM
= 3 min
= Custom
20.0 22.5
Precip (in)
1.00
0.90
I
I 0.80
0.70
-~ 0.60
0.50
0.40
0.30
0.20
0.10
0.00
25.0
Time (hrs)
11
Hydrograph Plot
Hydranow Hydrographs by lntelisolve
Hyd. No. 3
EX TOTAL FLOW NW
Hydrograph type
Storm frequency
Inflow hyds.
= Combine
= 100 yrs
0 (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0.0
= 1,2
2.0 4.0 6.0
EX TOTAL FLOW NW
Hyd. No. 3 -- 100 Yr
I ~
~ '
Peak discharge
Time interval
Monday, Aug 3 2026, 2:6 PM
= 32.81 cfs
= 3 min
Hydrograph Volume = 1.960 acft
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
8.0 10.0 12.0 14.0 16.0 18.0 20.0
0.00
22.0
-- Hyd No. 3 - - Hyd No.1 -- Hyd No. 2 Time (hrs)
16of 42
12
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 4
PROAREAA
Hydrograph type
Storm frequency
Drainage area
Basin Slope
Tc method
Total precip.
=
=
=
=
=
=
SCS Runoff
100 yrs
5.49 ac
0.0 %
TR55
6.41 in
Peak discharge
Time interval
Curve number
Hydraulic length
Time of cone. (Tc)
Distribution
Monday, Aug 3 2026, 2:6 PM
= 23.62 cfs
= 3 min
= 70
= 0 ft
= 14.1 min
= Custom
Storm duration = MSE3 distribution 3 min .eds Shape factor = 484
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0.0 2.0
-- Hyd No. 4
4.0 6.0 8.0
PROAREAA
Hyd. No. 4 -- 100 Yr
I
J \ r---..
10.0 12.0 14.0
l 7of 42
16.0
Hydrograph Volume = 1.434 acft
18.0 20.0
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
22.0
Time (hrs)
13
14
TR55 Tc Worksheet
Hydraflow Hydrographs by lntelisolve
Hyd. No. 4
PROAREAA
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 2.65 0.00 0.00
Land slope(%) = 10.00 0.00 0.00
Travel Time (min) = 8.24 + 0.00 + 0.00 = 8.24
Shallow Concentrated Flow
Flow length (ft) = 955.00 0.00 0.00
Watercourse slope (%) = 2.80 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) = 2.70 0.00 0.00
Travel Time (min) = 5.90 + 0.00 + 0.00 = 5.90
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope(%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) = 0.00 0.00 0.00
Flow length (ft) = 0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 14.10 min
18of 42
Precipitation Report
Hydraflow Hydrographs by lntelisolve
= 100 yrs
= 6.41 in
Time interval
Distribution
Hyd. No. 4
PROAREAA
Storm Frequency
Total precip.
Storm duration = MSE3 distribution 3 min .eds
Precip {in)
1.00
0.90
0.80
0.70
0,60
0.50
0.30
0.20
0.10
0.00
0.0 2.5 5.0
Incremental Rainfall Precipitation
Hyd. No. 4: PROAREAA-100 Yr
~
7.5 10.0 12.5 15.0 17.5
-- Custom Design Storm -- MSE3 distribution 3 min .eds
l 9of 42
Monday, Aug 3 2026, 2:6 PM
= 3 min
= Custom
20.0 22.5
Precip (in)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
25.0
Time (hrs)
15
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 5
PRO FLOW TO BMPA
Hydrograph type
Storm frequency
Inflow hyds.
= Combine
= 100 yrs
Q (cfs}
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0.0
= 1, 4
2.0 4.0 6.0
PRO FLOW TO BMPA
Hyd. No. 5 -- 100 Yr
~ ~
Peak discharge
Time interval
Monday, Aug 3 2026, 2:7 PM
= 32.83 cfs
= 3 min
Hydrograph Volume = 1.942 acft
Q (cfs}
35.00
30.00
25.00
20.00
15.00
10.00
5.00
8.0 10.0 12.0 14.0 16.0 18.0 20.0
0.00
22.0
-- Hyd No. 5 -- Hyd No.1 -- Hyd No.4
Time (hrs}
20of 42
16
Hydrograph Plot
Hydrafiow Hydrographs by lntelisolve
Hyd. No. 6
FLOW OUT BMP A
=
=
=
Reservoir
100 yrs
5
Hydrograph type
Storm frequency
Inflow hyd. No.
Reservoir name = PRO BMPA
Storage Indication method used,
Q (cfs)
35,00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 3 5 8
FLOW OUT BMP A
Hyd. No. 6 -- 100 Yr
\
) ~
10 13 15
-- Hyd No. 6 -- Hyd No. 5
2lof42
Peak discharge
Time interval
Max. Elevation
Max. Storage
18 20
Monday, Aug 3 2026, 2:7 PM
= 28.11 cfs
= 3 min
= 1035.00 ft
= 0.447 acft
Hydrograph Volume = 1.941 acft
23
Q (cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
25
Time (hrs)
17
Pond Report
Hydrafiow Hydrographs by lnlelisolve
Pond No. 1 - PRO BMPA
Pond Data
Monday, Aug 3 2026, 2:7 PM
Pond storage is based on known contour areas. Average end area method used.
Stage I Storage Table
Stage (ft) Elevation (ft) Contour area (sqft)
0.00 1032.00 4,399
1.00 1033.00 5,732
2.00 1034,00 7,172
3.00 1035.00 8,719
Culvert I Orifice Structures
[A] [BJ [C] [D]
Rise (in) 8,00 0.00 0.00 0,00
Span {in) 8.00 0.00 0.00 0.00
No. Barrels 0 0 0
Invert El. (ft) 1033.00 0.00 0.00 0.00
Length (ft) 35.00 0.00 0.00 0.00
Slope(%) 0.10 0.00 0.00 0.00
N-Value .013 .000 .000 .000
Orif. Coe ff. 0.60 0.00 0.00 0.00
Multi-Stage n/a No No No
Iner. Storage (acft)
0.000
0.116
0.148
0.182
Total storage (acft)
0.000
0.116
0.264
0.447
Weir Structures
[A] [BJ [C] [D]
Crest Len (ft) 10.00 0.00 0.00 0.00
Crest El. (ft) 1034.00 0.00 0.00 0.00
Weir Coeff. = 2.60 000 0.00 0.00
Weir Type = Broad
Multi-Stage = No No No No
Exfiltration = 1.670 in/hr (Contour) Tailwater Elev. = 0.00 ft
Note: Culverlf'Ori rice outflows have been analyzed under inlet and outlet control.
Stage (ft)
3.00
Stage I Discharge Stage (ft)
3.00
2.00
l---L---
L---
---I
1.00
0.00 -~ -
0.00 3.00 6.00 9.00 12.00
- - TotalQ
15.00
22of42
-
18.00 21.00 24.00 27.00
i
~
2.00
1.00
-- ~ 0.00
30.00
Discharge (cfs)
18
Hydrograph Plot
Hydra/low Hydrographs by lntelisolve
Hyd. No. 7
INFILTRATION
Hydrograph type = Diversion1
Storm frequency = 100 yrs
Inflow hydrograph = 6
Diversion method = Pond - PRO BMPA
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0 3 5 8
INFILTRATION
Hyd. No. 7 -- 100 Yr
\_
10 13 15
Peak discharge
Time interval
2nd diverted hyd.
Pond structure
Monday, Aug 3 2026 , 2:7 PM
= 0.34 cfs
= 3 min
= 8
= Exfiltration
Hydrograph Volume = 0.416 acft
18 20 23
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00
25
-- Hyd No. 7 -- Hyd No. 6 - - Hyd No. 8 Time (hrs)
23of 42
19
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 8
OVERLAND
Hydrograph type = Diversion2
Storm frequency = 100 yrs
Inflow hydrograph = 6
Diversion method = Pond - PRO BMPA
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0.00
OVERLAND
Hyd. No. 8 -- 100 Yr
I
\_
Peak discharge
Time interval
2nd diverted hyd.
Pond structure
Monday, Aug 3 2026, 2:7 PM
= 27.77 cfs
= 3 min
= 7
= Exfiltration
Hydrograph Volume = 1.526 acft
Q (cfs)
30.00
25.00
20.00
15.00
10.00
5.00
0 3 5 8 10 13 15 18 20 23
0.00
25
-- Hyd No. 8 -- Hyd No. 6 -- Hyd No. 7 Time (hrs)
24of 42
20
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 10
EX ONS ITE AREA 3
Hydrograph type = SCS Runoff
Storm frequency = 100 yrs
Drainage area = 3.97 ac
Basin Slope = 0.0 %
Tc method = TR55
Total precip. = 6.41 in
Storm duration = MSE3 distribution 3 min .eds
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
EX ONSITE AREA 3
Hyd. No. 10 --100 Yr
Monday, Aug 3 2026, 2:7 PM
Peak discharge = 22.70 cfs
Time interval = 3 min
Curve number = 81
Hydraulic length = 0 ft
Time of cone. (Tc) = 11.5 min
Distribution = Custom
Shape factor = 484
Hydrograph Volume = 1.409 acft
Q (cfs)
24.00
20.00
16.00
12.00
8.00
) \
-------
4.00
0.00
0.0 2.0 4.0 6.0 8.0
-- Hyd No.10
10.0 12.0 14.0 16.0
25of 42
18.0 20.0
0.00
22.0
Time (hrs)
21
TR55 Tc Worksheet
22
Hydraflow Hydrographs by lntel!solve
Hyd. No. 10
EX ONSITE AREA 3
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 2.65 0.00 0.00
Land slope (%) = 6.00 0.00 0.00
Travel Time (min) = 10.10 + 0.00 + 0.00 = 10.10
Shallow Concentrated Flow
Flow length (ft) = 343.00 0.00 0.00
Watercourse slope{%) = 6.10 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (ft/s) = 3.98 0.00 0.00
Travel Time (min) = 1.43 + 0.00 + 0.00 = 1.43
Channel Flow
X sectional flow area (sqfl) = 0.00 0.00 0.00
Wetted perimeter (fl) = 0.00 0.00 0.00
Channel slope(%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) = 0.00 0.00 0.00
Flow length (fl) = 0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 11.50 min
26of 42
Precipitation Report
Hydrafiow Hydrographs by lntelisolve
Hyd. No. 10
EX ON SITE AREA 3
Storm Frequency
Total precip.
Storm duration
= 100 yrs
= 6.41 in
= MSE3 distribution 3 min .eds
Time interval
Distribution
Precip (in)
1.00
Incremental Rainfall Precipitation
Hyd. No. 10 : EX ON SITE AREA 3 - 100 Yr
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
.~
0.00
0.0 2.5 5.0 7.5 10.0 12.5 15.0 1 7.5
- - Custom Design Storm -- MSE3 distribution 3 min .eds
27of 42
Monday, Aug 3 2026, 2:7 PM
= 3 min
= Custom
20.0 22.5
Precip (in)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
25.0
Time (hrs)
23
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 11
PRAREAB
Hydrograph type
Storm frequency
Drainage area
Basin Slope
Tc method
Total precip.
=
=
=
=
=
=
SCS Runoff
100 yrs
4.82 ac
0.0 %
TR55
6.41 in
Storm duration = MSE3 distribution 3 min .eds
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
PRAREAB
Hyd. No. 11 -- 100 Yr
Monday, Aug 3 2026, 2:7 PM
Peak discharge = 26.38 cfs
Time interval = 3 min
Curve number = 79
Hydraulic length = 0 ft
Time of cone. (Tc) = 11.6 min
Distribution = Custom
Shape factor = 484
Hydrograph Volume = 1.626 act\
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
\ r----.,_
4.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0
-- Hyd No.11
28of 42
I
14.0 16.0 18.0 20.0
0.00
22.0
Time (hrs)
24
TR55 Tc Worksheet
25
Hydraflow Hydrographs by lntellsolve
Hyd. No. 11
PRAREAB
Description A B C Totals
Sheet Flow
Manning's n-value = 0.240 0.011 0.011
Flow length (ft) = 100.0 0.0 0.0
Two-year 24-hr precip. (in) = 2.65 0.00 0.00
Land slope (%) = 6.00 0.00 0.00
Travel Time (min) = 10.10 + 0.00 + 0.00 = 10.10
Shallow Concentrated Flow
Flow length (ft) = 310.00 0.00 0.00
Watercourse slope(%) = 4.80 0.00 0.00
Surface description = Unpaved Paved Paved
Average velocity (fUs) = 3.53 0.00 0.00
Travel Time (min) = 1.46 + 0.00 + 0.00 = 1.46
Channel Flow
X sectional flow area (sqft) = 0.00 0.00 0.00
Wetted perimeter (ft) = 0.00 0.00 0.00
Channel slope (%) = 0.00 0.00 0.00
Manning's n-value = 0.015 0.015 0.015
Velocity (ft/s) = 0.00 0.00 0.00
Flow length (ft) = 0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 11.60 min
29of 42
Precipitation Report
Hydraflow Hydrographs by lntelisolve
Hyd. No. 11
PRAREAB
Storm Frequency
Total precip.
Storm duration
= 100 yrs
= 6.41 in
= MSE3 distribution 3 min .eds
Time interval
Distribution
Precip (in)
1.00
Incremental Rainfall Precipitation
Hyd. No. 11 : PR AREA B - 100 Yr
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
~ 0.00
0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5
-- Custom Design Storm -- MSE3 distribution 3 min .eds
30of 42
Monday, Aug 3 2026, 2:7 PM
= 3 min
= Custom
20.0 22.5
Precip (in)
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
25.0
Time (hrs}
26
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 12
FLOW OUT BMPB
Hydrograph type
Storm frequency
Inflow hyd. No.
Reservoir name
=
=
=
=
Storage Indication method used.
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0
3
Reservoir
100 yrs
11
PR BMP B
5 8
FLOW OUT BMPB
Hyd. No. 12 -- 100 Yr
'
_/ ~
'
10 13 15
- - Hyd No.12 - - Hyd No. 11
3 lof 42
Peak discharge
Time interval
Max. Elevation
Max. Storage
18 20
Monday, Aug 3 2026, 2:7 PM
= 22.51 cfs
= 3 min
= 1034.78 ft
= 0.438 acft
Hydrograph Volume = 1.625 acft
23
Q (cfs)
28.00
24.00
20.00
16.00
12.00
8.00
4.00
0.00
25
Time (hrs)
27
Pond Report
Hydraflow Hydrographs by lnteliso!ve
Pond No. 2 - PR BMP B
Pond Data
Monday, Aug 3 2026, 2:7 PM
Pond storage is based on known contour areas. Average end area method used.
Stage I Storage Table
Stage (ft) Elevation (ft)
0.00 1032.00
1.00 1033.00
2.00 1034.00
3.00 1035.00
Culvert I Orifice Structures
Rise (in)
Span (in)
No. Barrels
Invert El. (ft)
Length (ft)
Slope(%)
N-Value
Orif. Coeff.
Multi-Stage
Stage (ft)
3.00
[A]
12.00
12.00
1
= 1033.00
0.00
0.00
.012
= 0.60
= n/a
[B]
0.00
0.00
0
0.00
0.00
0.00
.000
0.00
No
Contour area (sqft)
4,196
6,017
7,943
9,974
[CJ [DJ
0,00 0.00
0.00 0.00
o 0
0.00 0.00
0.00 0.00
0.00 0.00
.000 .000
0.00 0.00
No No
Iner. Storage (acft)
0.000
0.117
0.160
0.206
Weir Structures
Crest Len (ft)
Crest EI. (ft)
Weir Coeff. =
Weir Type
Multi-Stage
Total storage (acft)
0.000
0.117
0.277
0.483
[A] [B]
10.00 0.00
1034.00 0.00
2.60 0.00
Broad
No No
(C] [D]
0.00 0.00
0.00 0.00
0.00 0.00
No No
Exfiltration = 1.670 in/hr (Contour) Tailwater Elev. = 0.00 ft
Nale: Culvert/Orifice outflows have been analyzed under mlel and oullet control.
Stage I Discharge Stage{fl)
3.00 --
I--- --
I
---
[_---
--------
2.00
I
1.00
0.00
0.00 3.00 6.00 9.00 12.00 15.00 18.00
-- TotalQ 32of 42
21.00 24.00 27.00 30.00
-~ 2.00
1.00
I
_I 0.00
33.00
Discharge (cfs)
28
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 13
INFILTRATION
Hydrograph type = Diversion1
Storm frequency = 100 yrs
Inflow hydrograph = 12
Diversion method = Pond - PR BMP B
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0 3 5 8
INFILTRATION
Hyd. No. 13 -- 100 Yr
\
~
j ~
10 13 15
Peak discharge
Time interval
2nd diverted hyd.
Pond structure
Monday, Aug 3 2026, 2:7 PM
= 0.37 cfs
= 3 min
= 14
= Exfiltration
Hydrograph Volume = 0.390 acft
:
18 20 2 3
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
25
- - Hyd No. 13 - - Hyd No. 12 -- Hyd No. 14
Time (hrs)
33of 42
29
Hydrograph Plot
Hydraflow Hydrographs by lntelisolve
Hyd. No. 14
OVERLAND
Hydrograph type = Diversion2
Storm frequency = 100 yrs
Inflow hydrograph = 12
Diversion method = Pond - PR BMP B
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
0 3 5 8
OVERLAND
Hyd. No. 14 -- 100 Yr
I
I
J
'~
10 13 15
Peak discharge
Time interval
2nd diverted hyd.
Pond structure
Monday, Aug 3 2026, 2:7 PM
= 22.14 cfs
= 3 min
= 13
= Exfiltration
Hydrograph Volume = 1.235 acft
18 20 23
Q (cfs)
24.00
20.00
16.00
12.00
8.00
4.00
0.00
25
-- Hyd No.14 -- Hyd No. 12 -- Hyd No. 13
Time (hrs)
34of 42
30
Residential 2
Junction 3
35of 42
Data Hie name: K:\WlnSLAMM\26-3575 MAGNUM ST GABRIAL\26-3575 ST GABRIAL.mdb
WlnSLAMM Version 10.5.0
Rain file name: C:\WlnSLAMM Flles\Raln Flles\WI Milwaukee 69.RAN
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WlnSLAMM Flles\WI SL06 Dec06.rsvx
Resldentlal Street Dellvery flle name: C:\WlnSLAMM Files\WI_Res and Other Urban Dec06.std
lnstitut!onal Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst lndust Dec06.std
Commerclal Street Delivery file name: C:\WlnSLAMM Flles\WI_Com Inst lndust Dec06.std
lndustr!al Street Delivery file name: C:\WlnSLAMM Flles\WI_Com Inst lndust Dec06.std
Other Urban Street Delivery file name: C:\WlnSLAMM Flles\WI_Res and Other Urban Dec06.std
Freeway Street Dellvery file name: C:\WlnSLAMM Files\Freeway Dec06.std
Apply Street Dellvery Flies to Adjust the After Event Load Street Dirt Mass Balance: False
Pollutant Relative Concentration file name: C:\WlnSLAMM Flles\WI_GE003.ppdx
Source Area PSD and Peak to Average Flow Ratio FIie: C:\WlnSLAMM Files\NURP Source Area PSD Files.csv
Cost Data flle name:
Seed for random number generator: --42
Study period starting date: 01/05/69
Start of Winter Season: 12/06
Study period ending date: 12/31/69
End of Winter Season: 03/28
Date: 08-03-2026 Time: 14:02:05
Site Information:
LU# 1 - Residential: Residential 1 Total area (ac}: 5.490 .
1 - Roofs 1: 0.400 ac. Pitched Connected PSD FIie: C:\WinSLAMM Files\NURP.cpz Source Area PSD File: C:\WinSLAMM Files\NURP.cpz
13- Paved Parking 1: 0.240 ac. Connected PSD File: C:\WinSLAMM Flles\NURP.cpz Source Area PSD File: C:\WlnSLAMM Files\NURP.cpz
37 - Streets 1: 0.310 ac. Smooth Street Length = 0.1066 ml Street Width = 23.99156 ft Street Edges = 2
Default St. Dirt Accum. Annual Winter Load = 2500 lbs PSD File: C:\WinSLAMM Flles\NURP.cpz Source Area PSD FIie: C:\WinSLAMM Flles\NURP.cpz
45 - Large Landscaped Areas 1: 4.540 ac. Normal Silty PSD File: C:\WinSLAMM Files\NURP.cpz Source Area PSD FIie: C:\WinSLAMM Flles\NURP.cpz
LU# 2 - Residential: Resldential 2 Total area {ac): 4.820
1 - Roofs 1: 0.610 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz Source Area PSD File: C:\WinSLAMM Files\NURP.cpz
25- Driveways 1: 0.320 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz Source Area PSD FIie: C:\WinSLAMM Flles\NURP.cpz
37 - Streets 1: 0.750 ac. Smooth Street Length = 0.2578 ml Street Width = 24.00116 ft Street Edges= 2
Default St. Dirt Accum. Annual Winter Load = 2500 lbs PSD File: C:\WinSLAMM Flles\NURP.cpz Source Area PSD FIie: C:\WlnSLAMM Files\NURP.cpz
45 - Large Landscaped Areas 1: 3.140 ac. Normal Silty PSD FIie: C:\WinSLAMM Files\NURP.cpz Source Area PSD FIie: C:\WinSLAMM Files\NURP.cpz
Control Practice 1: Blofilter CP# 1 (DS) - DS Biofilters # 1
1. Top area (square feet}= 8719
2. Bottom aea (square feet) = 4398
3. Depth (ft): 4.5
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (In/hr) = 1.67
6. Random Infiltration rate generation? No
7. Infiltration rate fraction (side}: 0.01
8. Infiltration rate fraction (bottom}: 1
9. Depth of blofilter that is rock filled (ft} 0
10. Porosity of rock filled volume= O
11. Engineered soil Infiltration rate: 1.67
12. Engineered soil depth (ft)= 1.5
13. Engineered soil porosity= 0.27
14. Percent solids reduction due to flow through engineered soil = BO
15. Biofllter peak to average flow ratio= 3.8
16. Number of biofiltratlon control devices= 1
17. Particle size distribution fife: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Media Type 1.000
Blofllter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weircrestlength (H): 10
2. Weir crest width (ft): 6
3. Height of datum to bottom of weir opening: 3.5
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 0.67
2. Pipe invert elevation above datum (ft): 2.5
3. Number of surface pipe outlets: 1
36of 42
Control Practice 2: Blofilter CP# 2 (DS) - DS Blofilters # 2
1. Top area (square feet)= 9974
2. Bottom aea (square feet)= 4196
3. Depth (ft): 4.5
4. Biofllter width (ft) - for Cost Purposes Only: 30
5. Infiltration rate (in/hr)= 1.67
6. Random inflltration rate generation? No
7. lnflltratlon rate fraction (side): 0.01
8. lnflltration rate fraction (bottom): 1
9. Depth of blofllter that Is rock fllled (ft) 0
10. Porosity of rock filled volume= 0
11. Engineered soil Infiltration rate: 1.67
12. Engineered soil depth (ft)= 1.5
13. Engineered sotl porosity= 0.27
14. Percent solids reduction due to flow through engineered soil= 80
15. Blofllter peak to average flow ratio= 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soll Data Soll Type Fraction In Eng. Soil
User~Defined Media Type 1.000
Biofllter Outlet/Discharge Characteristics;
Outlet type: Broad Crested Weir
1. Weir crestlength (ft): 1 0
2. Weir crest width (fl): 6
3. Height of datum to bottom of weir opening: 3.5
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft):
2. Pipe invert elevation above datum (ft): 2.5
3. Number of surface pipe outlets: 1
37of 42
SLAMM for Windows Version 10.5.0
(c) Copyright Robert Pitt and John Voorhees 2019, All Rights Reserved
Data file name: K:\WinSLAMM\26-3575 MAGNUM ST GABRIAL\26-3575 ST GABRIAL.mdb
WlnSLAMM Version 10.5.0
Rain file name: C:\WinSLAMM Flles\Rain Flles\WI Milwaukee 69.RAN
Particulate Solids Concentration file name: C:\WlnSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient flle name: C:\WinSLAMM Flles\WI SL06 Dec06.rsvx
Pollutant Relative Concentration file name: C:\WtnSLAMM Flles\WI_GEO03.ppdx
Residential Street Dellveryflle name: C:\WinSLAMM Flles\WI_Res and Other Urban Dec06.std
lnstitutlonal Street Delivery file name: C:\WlnSLAMM Files\WI_Com Inst lndust Dec06.std
Commercial Street Delivery file name: C:\WlnSLAMM Flles\W/_Com Inst lndust Dec06.std
Industrial Street Delivery flle name: C:\WlnSLAMM Files\WI_Com Inst lndust Dec06.std
other Urban Street Delivery file name: C:\WlnSLAMM Files\WI_Res and other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Flles\Freeway Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False
Source Area PS □ and Peak to Average Flow Ratio FIie: C:\WlnSLAMM Flles\NURP Source Area PS □ Files.csv
Cost Data file name:
Seed for random number generator: .-42
Study period starting date: 01/05/69 Study period ending date: 12/31/69
Start of Winter Season: 12/06 End of Winter Season: 03/28
Model Run Start Date: 01/05/69 Model Run End Date: 12/31/69
Date of run: 08-03-2026 Time of run: 14:01 :24
Total Area Modeled (acres): 10.310
Years in Model Run: 0.99
Runoff Percent Particulate Particulate Percent
Volume Runoff Solids Solids Particulate
(cu ft) Volume Cone. Yield
Reduction (mg/L) (lbs)
Total of all Land Uses without Controls: 274259 151.0 2585
Outfall Total with Controls: 15547 94.33% 129.1 125,3
Annualized Total After Outfall Controls: 15763 127.1
Pollutant Cone. Cone. Cone. Pollutant Yield Pollutant Yield
No Controls With Controls Units No Controls With Controls
Particulate Solids 151.0 129.1 mg/L 2585 125.3
Total Phosphorus 0.5860 0.6826 mg/L 10.03 0.6625
Biofilter # 1 is expected to clog in 9.52 years .. Percent Solids Reduction due to Engineered Media= 80
Biofilter # 2 is expected to clog In 5.73 years .. Percent Solids Reduction due to Engineered Media= 80
38of 42
Solids
Reduction
95.15%
Pol. Yield Percent
Units Reduction
lbs 95.15 %
lbs 93.39 %
Dalo File: K:\WinSLAMM\26-3575 MAGNUM ST GABRIAL \26-3575 ST GABRIAL.mdb
Rain File: WI Milwaukee 69.RAN
Dale: 08·04·26 Time: 6:25:52 AM
Site Desc1iption:
Runoff Voltime Total (ell at lhe Outfall
Rain Sta,t Rain Outfall Total Rv Total Losses Calculated Event Peak P1e•Dev
Numbe1 Dale Tolal(in) (cf) (in.J CM' Flow (cf,) Runoff Vol,
80 09/05169 0.74 0 0.000 0.74 nla 0.000 nla
81 09114/69 0.01 0 0.000 0.01 n/a 0.000 nla
82 09/15/69 0.03 0 0.000 0.03 n/a 0.000 nla
83 09/16/69 O.Q3 0 0.000 0.03 n/a 0.000 n/a
84 09/23/69 0.16 0 0.000 0.16 n/a 0.000 n/a
85 09/25/69 0.01 0 0.000 0.01 n/a 0.000 n/a
86 09/29/69 0.84 0 0.000 0.84 n/a 0.000 n/a
87 10/06/69 0.01 0 0.000 0.01 n/a 0.000 n/a
88 10/06/69 0.01 0 0.000 0.01 n/a 0.000 n/a
89 10/09169 0.05 0 0.000 0.05 n/a 0.000 n/a
90 10/10169 0.14 0 0.000 0.14 n/a 0.000 n/a
91 10/10/69 1.34 0 0.000 1.34 n/a 0.000 n/a
92 10/12/69 1.63 0 0.000 1.63 nla 0.000 nla
93 10/15/69 0.16 0 0.000 0.16 nla 0.000 n/.a
94 10/19/69 0.44 0 0.000 0.44 nla 0.000 n/a
95 10119/69 0.35 0 0.000 0.35 n/a 0.000 n/a
96 10121/69 0.02 0 0.000 0.02 nla 0.000 n/a
97 10/24/69 0.01 0 0.000 0.01 nla 0.000 n/a
98 10130/69 0.32 0 0.000 0.32 nla 0.000 n/a
99 11/02/69 0.77 0 0.000 0.77 n/a 0.000 n/a
100 11/11/69 0.05 0 0.000 0.05 n/a 0.000 n/a
101 11111/69 0.04 0 0.000 0.04 n/a 0.000 n/a
102 11/13/69 0.03 0 0.000 0.03 n/a 0.000 n/a
103 11/17/69 0.15 0 0.000 0.15 n/a 0.000 n/a
104 11/18/69 0.02 0 0.000 0.02 n/a 0.000 n/a
105 11119/69 0.01 0 0.000 0.01 n/a 0.000 n/a
106 11/26/69 0.07 0 0.000 0.07 nla 0.000 n/a
107 12/07/69
108 12/11/69
109 12/16/69
110 12/21/69
111 12/23169
112 12124/69
113 12124169
114 12/27/69
115 12128/69
116 12131169
MinU'!"lum: 0.00 0 0.000 0.01 61.9 0.000 292B.O
Maximum: 1.96 10910 0.149 1.67 726 1.859 10315.0
Average: 0.25 134.li 0.002 0.25 71.1 1.481 5802.3
Total 29.02 15547 28.61 23209.00
'Note: NRCS does not 1ecommend using CN method IOI ,ains < 0.5 in.
See 'Pee Development Areas and CN
1
Help for more info.
39of 42
Soil Map-Washington County, Wisconsin
43° 14' LJ• N
43" 14'2" N
Map Scale: 1:1,670 tpnnted on A portra~ (8.5" x 11") sheet
----= ===-------c::== =====Me!Ers 0 20 40 ![) 120
---====-----== = ==IFeet 0 50 100 .nl DJ
Map projection: Web Men:ator Comercooroinares: WGS8<1 Edge tics: IJTM Zone 16N WGS64
USDA Natural Resources
'1ifi Conservation Service
We!J~8if~ ey
National Cooperative Soil Survey
8/4/2026
Page 1 of 3
43° 14' lYN
43" 14'2"N
Soil Map-----Washington County, Wiscons in
MAP LEGEND
Area of Interest (AO!)
D Area of Interest (AOI}
Soils
O Soil Map Unit Polygons
Soil Map Unit Lines
□ Soil Map Unit Points
Special Point Features
Blowout
igi Borrow Pit
~ Clay Spot
•~: Closed Depression
,)<, Gravel Pit
Gravelly Spot
~ Landfill
/,_ Lava Flow
.ili, Marsh or swamp
~:- Mine or Quarry
@ Miscellaneous Water
0 Perenn ial Water
•,_:/ Rock Outcrop
+
Saline Spot
Sandy Spot
=
Severely Eroded Spot
:.;' Sinkhole
~-· Slide or Slip
tJ Sadie Spot
USDA Natural Resources
=:,a= Conservation Service
Spoil Area
Stony Spot
(: . Very Stony Spot
',"· Wet Spot
cc. Other
~ • Special Line Features
Water Features
Streams and Cana Is
Transportation
t-+t Rails
- Interstate Highways
- US Routes
Major Roads
Local Roads
Background
Aerial Photography
We,llf8if~ey
National Cooperativ e Soil Survey
MAP INFORMATION
The soil surveys that comprise your AOI were mapped at
1 :15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunders tanding of the detail of mapping a nd accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measureme nts.
Source of Map: Natural Resources Conserva tion Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area, A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculat ions of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s} listed below.
Soil Survey Area: Wash ington County, Wisconsin
Survey Area Data: Version 25, Sep 10, 2025
Soil map units are labeled (as space allows} for map scales
1 :50,000 or large r.
Date(s) aerial images were photographed: Aug 4, 2022-Sep
13,2022
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
8/4/2026
Page 2 of 3
Soll Map-Washington County, Wisconsin
Map Unit Legend
!1.,SDQ
Map Unit Symbol
7243A
7323C2
7845B2
796902
Totals for Area of Interest
Natural Resources
Conservation Service
Map Unit_ Name Acres In AOI
St. Charles slit loam, 0 to 2
percent slopes
Casco loam, 6 to 12 percent
slopes, eroded
Theresa silt loam, 2 to 6
percent slopes, eroded
CascoRRodman complex, 12 to
20 percent slopes, eroded
Web Soll Survey
National Cooperative Soil Survey
42of 42
Percent of AOI
0.9
3.3
6.0
0.0
10.3
9.1%
32.5%
58.2%
0.2%
100.0%
814/2026
Page 3 of 3
Owner Property Description Districts Class Acres land lmpts Total
Vl0-03710401 3092 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $498,700 $568,700
JAMES NAWROCKI PT SW SE FAIRWAY FIELDS CONDO UNlT 401 DOC Hartford Union Totals 0.000 $70,000 $498,700 $568,700
KATHLEEN NAWROCKI 1527662+1572782 2570 Holy Hill Area School
3092 FAIRWAY VIEW CT District
HUBERTUS WI S3033 Richfield Fire
Section: 13 Acres: 0,000
V10-03710402 3094 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $520,800 $590,800
SCOTT A DANIEL PT SW SE FAIRWAY FIELDS CONDO UNIT 402 DOC Hartford Union Totals D-000 $70,000 $520,800 $590,800
SUE A DANIEL 1526409+1617312+1617334 2570 Holy Hill Area School
3094 FAIRWAY VIEW CT District
Richfield Fire
HUBERTUS WI 53033
Section: 13 Acres: 0.000
Vl0-03710S01 3102 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $488,900 $558,900
TIMOTHY M TREACY PT SW SE FAIRWAY FIELDS CONDO UNIT S01 DOC 1S08043 Hartford Union Totals 0.000 $70,000 $488,900 $558,900
DAWN M TREACY
2570 Holy Hill Area School
District
3102 FAIRWAY VIEW CT
HUBERTUS WI 53033
Rlchfield Fire
Section: 13 Acres: 0.000
Vl0-03710S02 3104 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $565,800 $635,800
SORGE NT FAMILY IRREV TRUST PT SW SE FAIRWAY FIELDS CONDO UNIT 502 DOC Hartford Union Totals 0.000 $70,000 $565,800 $635,800
3104 FAIRWAY VIEW CT 1489851+1527581 2570 Holy Hill Area School
District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710701 3107 FAIRWAYVW CT Moraine Park A 0.000 $70,000 $496,300 $566,300
BELA MESZAROS PT SW SE FAIRWAY FIELDS CONDO UNlT 701 DOC Hartford Union Totals 0.000 $70,000 $496,300 $566,300
GAIL MESZAROS 1501627+1508215 2570 Holy Hill Area School
3107 FAIRWAY VIEW CT
District
Richfield Fire
HUBERTUS WI 53033
Section: 13 Acres: 0.000
Vl0-03710702 3105 FAIRWAYVWCT Moraine Park A 0.000 $70,000 $497,600 $567,600
WEBER TRUST PT SW SE FAIRWAY FIELDS CONDO UNIT 702 DOC 1501559 Hartford Union Totals 0.000 $70,000 $497,600 $567,600
3105 FAIRWAY VIEW CT
2570 Holy Hill Area School
District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710801 3097 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $496,300 $566,300
ROBERT TRISCARI PT SW SE FAIRWAY FIELDS CONDO UNIT 801 DOC 1511854 Hartford Union Totals 0.000 $70,000 $496,300 $566,300
USAA TRISCARI
2570 Holy Hill Area School
District
3097 FAIRWAY VIEW CT Richfield Fire
HUBERTUS WI 53033
Section: 13 Acres: 0.000
Village of R1chfleld, Washington County July 21, 2026 9:02 am Page 203 of 836
Owner Property Description Districts Class Acres Land lmpts Total
Vl0-03710802 3095 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $499,900 $569,900
DAN PIERGIES PT SW SE FAIRWAY FIELDS CONDO UNIT 802 DOC Hartford Union Totals 0.000 $70,000 $499,900 $569,900
ALICE PIERGIES 151380o+1602235+1602490 2570 Holy Hill Area School
3095 FAIRWAY VIEW CT 802 District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710901 3087 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $533,400 $603,4001
BONNIE BLOOMQUIST TRUST PT SW SE FAIRWAY FIELDS CONDO UNIT 901 DOC 1525622 Hartford Union Totals 0.000 $70,000 $533,4£10 $603,400
CHARLES F WEDEMEYER LIVING TRUST
2570 Holy Hill Area School
District 3087 FAIRWAY VIEW CT
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710902 3085 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $495,900 $565,900
CHRISTINE LAUER PT SW SE FAIRWAY FIELDS CONDO UNIT 902 DOC 1523846 Hartford Union Totals 0.000 $70,000 $495,900 $565,900
3085 FAIRWAY VIEW CT 902 2570 Holy Hill Area School
District HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03711001 3077 FAJRWAYVW CT Moraine Park A 0.000 $70,000 $515,700 $585,700
RENEE LUEDKE PT SW SE FAIRWAY FIELDS CONDO UNIT 1001 DOC 1560860 Hartford Union Totals 0.000 $70,000 $515,700 $585,700
3077 FAIRWAY VIEW CT 2570 Holy Hill Area School
HUBERTUS WI 53033 District
Richfield Fire
Section: 13 Acres: 0.000
V10·03711002 3075 FAIRWAYVWCT Moraine Park A 0.000 $70,000 $515,800 $585,800
DANIEL N BRANSKI PT SW SE FAIRWAY FIELDS CONDO UNIT 1002 DOC 1581785 Hartford Union Totals 0.000 $70,000 $515,800 $585,800
SUSAN L BRANSKI 2570 Holy Hill Area School
3075 FAIRWAY VIEW CT District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03711101 3067 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $494,400 $564,400
TAMARA R MULCAHY PT SW SE FAIRWAY FIELDS CONDO UNIT 1101 DOC Hartford Union Totals 0.000 $70,000 $494,400 $564,400
MICHAEL P MULCAHY 1472044+1556912 2570 Holy Hill Area School
3067 FAIRWAY VIEW CT 1101 District
Richfield Fire HUBERTUS WI 53033
Section; 13 Acres: 0.000
Vl0-03711102 3065 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $522,900 $592,900
NEALJ RUFFING PT SW SE FAIRWAY FIELDS CONDO UNIT 1102 DOC 1473815 Hartford Union Totals 0.000 $70,000 $522,900 $S92,900
JANICE R RUFFING 2570 Holy Hill Area School
3065 FAIRWAY VIEW CT 1102 District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Villa e ofRic g I hfie d, Washington County July 21, 2026 9:02 am Page 204 of 836
Owner Property Description Districts Class Acres land lmpts Total
V10-037100Y HUBERTUS RD Moraine Park D 3.660 $1,700 $0 $1,700
WEYER I LIMITED PARTNERSHIP PT OF SW SE DOC 1516569 EXC PT SOLD+PT PLATTED Hartford Union Totals 3.660 $1,700 $0 $1,700
1247 STATE HWY 175 2570 Holy Hill Area School
HUBERTUS WI 53033 District
Richfield Fire
Section: 13 Acres: 3.660
Vl0-03710101 3062 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $557,200 $627,200
JOHN C WALLER REV TR PT SW SE FAIRWAY FIELDS CONDO UNIT 101 DOC Hartford Union Totals 0.000 $70,000 $557,200 $627,200
3062 FAIRWAY VIEW CT 1524982+1570323 2570 Holy Hill Area School
District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710102 3064 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $550,400 $620,400
TOM LAUMANN PT SW SE FAIRWAY FIELDS CONDO UNIT 102 DOC 1519885 Hartford Union Totals 0.000 $70,000 $550,400 $620,400
ANITA LAUMANN 2570 Holy Hill Area School
District 3064 FAIRWAY VIEW CT
HUBERTUS WI 53033
Richfield F'ire
Section: 13 Acres: 0.000
Vl0-03710201 3072 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $424,300 $494,300
DAVID CLARKE JR PT SW SE FAIRWAY FIELDS CONDO UNIT 201 DOC Hartford Union Totals 0.000 $70,000 $424,300 $494,300
J UUE A CLARKE 161S529+162693S 2570 Holy Hill Area School
3072 FAIRWAY VIEW CT
District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710202 3074 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $434,500 $504,500
PAUL W WINKELMANN TR PT SW SE FAIRWAY FIELDS CONDO UNIT 202 DOC 1606485 Hartford Union Totals 0.000 $70,000 $434,500 $504,500
JESSICA M WINKELMANN TR 2570 Holy Hill Area School
3074 FAIRWAY VIEW CT District
HUBERTUS WI 53033 Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710301 3082 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $433,100 $503,100
CHRISTOPHERJ KNAUB PT SW SE FAIRWAY FIELDS CONDO UNIT 301 DOC Hartford Union Totals 0.000 $70,000 $433,100 $503,100
3082 FAIRWAY VIEW CT 1533768+1585136 2570 Holy Hill Area School
HUBERTUS WI 53033 District
Richfield Fire
Section: 13 Acres: 0.000
Vl0-03710302 3084 FAIRWAY VW CT Moraine Park A 0.000 $70,000 $432,500 $502,500
RAEANN M KRENN PT SW SE FAIRWAY FIELDS CONDO UNIT 302 DOC 1491277 Hartford Union Totals 0.000 $70,000 $432,500 $502,500
FRITZ KRENN 2570 Holy Hill Area School
3084 FAIRWAY VIEW CT 302 District
HUBERTUS WI 53033
Richfield Fire
Section: 13 Acres: 0.000
Villa e of Richfield Wa i g sh ngton County July 21, 2026 9:02 am Page 202 of 836
8/26/26, 5:57 PM Development agreement. - Village of Richfield, WI
Chapter 170. Zoning
Village of Richfield, WI
Wednesday, August 26, 2026
Article 5. Specific Procedural Requirements
DIVISION 2. Planned Development District
§ 170.320. Purpose.
A planned development district allows for more flexibility in the development of land while ensuring substantial compliance with the intent of this chaRter and the Village's Comprehensive Plan. As further described in Article 7, the following may be reviewed as a
planned development district:
A. Conventional planned unit development;
B. Conservation subdivision; and
C. Adaptive reuse project.
§ 170.321. Initiation.
The owner of the subject property may submit an application for the establishment of a planned development district.
§ 170.322. Development agreement.
If a planned development district is established pursuant to this
division, the Village and developer may enter into a development
agreement that specifies the duties and obligations of both parties with respect to the development project.
§ 170.323. Review procedure.
https ://ecode360 .com/print/Rl3087?guid=42033 112,42033113,42033146,42033106,42033107,42033181,42033182,42033161 ,42033183,42033184,4 ... 1/1 0
8/26/26, 5:57 PM Development agreement. -Village of Richfield, WI
Establishment of a planned development district involves a two
step process. The review of a proposed project begins with a general development plan. If the general development plan is approved (i.e., an ordinance is adopred), a precise implementation
plan for all or a part of the project is reviewed. Ir the precise implementation plan is approved, the project is officially approved.
The general steps outlined below shall be used in the review of an apP,ljcation for the establishment of a planned development
d1stnct.
A. Step One: General development plan.
( 1) Presubmittal meeting with staff. The a[)P,licant or the apRlicant's agent meets with the Zoning Aaministrator to
review i) apP.licable regulations ancr procedures· ii) apP,licable sections of the Village's Comprehensive Plan ana apP,licable neighborhood .Qlans, if any; and iii) the
proposal. Upon request1 the Zoning Administrator may waive the requirement LO hold a presubmittal meeting
when he or she determines such meeting is nol necessary given the nature of the project and/or the
ext~nt to wf)ich the applicant understanas the Village's zoning requirements.
(2) Preapplication conference with Plan Commission. The applicant meets with the Plan Commission for an informal discussion relating to the proP,osed _project. At that
meeting, the apP.licant shall proviae the Plan Commission with materials that descrioe the proRosed project in sufficient detail for a preliminary, nonbinaing review.
(3) Submittal of application materials. The applicant submits a completed application and other required materials to the Zoning Administrator alonQ with the application fee as may be established by the Village Board.
(4) Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. A determination of
completeness shall be made within 30 days of the submittal. If it is not complete, the Zoning Administrator will notify the apP.licant in writing of such creficiencies and that the applicant has three months from the date of the notice to resubmit the aP.plication or forfeit the application fee. The Zoning Administrator will take no further steps to process the application until the deficiencies are
remedied. The incomplete application is retained as a public record. A determination that an application is complete means the application is ready for formal
review and does not suggest the applicant has provided sufficient information in all regards or preclude the
reviewing authoriJy from requesting additional information It deems appropriate.
(5) Review date. When the Zoning Administrator determines the application is comglete, ne or she schedules the review with the Plan Commission consistent with its adopted calendar.
https://ecode360 .com/print/Rl30B7?guid=42033112 ,42033113,4 2033146 .42033106,42033107,42033181,42033182,42033161,42033183,42033184,4... 2/1 0
B/26/26, 5:57 PM Development agreement. - Village of Richfield, WI
(6) General notice. Consistent with Division 2 of Article 4, the Zoning Administrator provides for i) a Class 2 public notjce, ii) property owner notice, and, iii) meeting agenda notice.
(7) Staff report preparation and distribution. The Zoning
Administrator may prepare a written staff reP.ort as described in this envision and P.rovide a copy of it to each member of the Plan Commission and Village Board, the applicant, and any other interested person upon request.
(8) Public hearing. Allowing for P,roper notice, the Plan
Commission and Village Boara conduct a Joint public hearing to review the aP,P,lication consistent with Division 3 of Article 4, with the Village President servinq as the presiding officer. Prior to the close of the public nearing,
the applicant or the Plan Commission may request a continuance consistent with Division 3 of Article 4. If the
P,Ublic hearing is adjourned the Plan Commission maY, airect the Zoning Administrator to conduct additional research related to the proposed district.
(9) Staff follow-up. After the close of the public hearinQ, the
Plan Commission may direct the Zoning Adminisfrator,
Villqg~ Engine~r,. and/or the Village Attorney to prepare a preliminary dec1s1on document.
(10) Plan Commission recommendation. The Plan
Commission makes a recommendation to the Village Board based on the decision criteria in this division to i) approve the general development plan subject to
approval of a precise imRlementation plan; ii) approve the general development plan with conditions, subject to approval of a precise implementation plan; or iii) deny the
general development plan.
( 11) General notice. Consistent with Division 2 of Article 4, the ZoninQ Administrator _places the matter on the meeting
agencfa of the Village Board.
(12) Village Board meeting. Allowing for proper notice, the
Village Boarp considers the application at a regular or special meeting.
(13) Decision. The Village Board after considering the Plan
Commission's recommendation makes a decision based on the decision criteria in this division to i) approve the
general development plan, subject to approval of a
P,recise implementation plan; ii) approve the general aevelopment P,lan with conditions, subject to approval of
a precise implementation plan; or iii) deny the general development plan.
(14) Preparation of decision document. If the general
developmen.t plan i? approved, the Zoning Administrator prepares a final ordinance.
(15) Applicant notification. Within a reasonable time following
the Village Board's decision, but not more than 1 o
https ://ecode360.com/print/Rl3087?guid=42033112,42033113,42033146,42033106,42033107,42033181,42033182,42033161,42033183,42033184 ,4. .. 3/1 0
8/26/26, 5:57 PM Development agreement. -Village of Richfield, WI
workdays, the Zoning Administrator sends the decision document to the applicant by regular mail and/or email.
(16) Acceptance by property owner. If the general development plan is approved, the property owner must sign the decision document to acknowledQe the terms of the approval and return the same to the Zoning Administrator within two months of the decision. Prior to the expiration of the previously specified time period, the P.roperty owner may submit a petition to the Zoning Administrator requesting an extension and the Zoning
Administrator may, with cause, extend the period within which the decision document must be signed. If the
signed decision document is not returned witnin the initial
or extended time period, if any, the decision shall automatically become null and void without any further
action by the Village at the expiration of such time limit. The decision document shall only become effective when
all of the RropertY. owner signatures have been obtained and th~ original signature copy is returned to the Zoning Administrator.
B. Step Two: Precise implementation plan.
(1) Submittal of precise implementation plan. The applicant
submits a P.recise implementation plan and other required materials to the Zoning Administrator along witti the application fee as may be established by The Villaqe Board. At the discretion of the applicant, such materials may be submitted concurrently with the review of the
general development plan.
(2) Determination of completeness. The Zoning Administrator reviews the submittal to make sure it is complete and ready for further review. A determination of completeness shall be made within 30 days of the
submittal. If it is not complete, the ZoninQ Administrator will notify the apP,licant in writing of such creficiencies and
that the applicant has three months from the date of the notice to resubmit the aP,plication or forfeit the application fee. The Zoning Administrator will take no further steps to process the application until the deficiencies are remedied. The incomplete application is retained as a public record. A determination that an application is
complete means the application is ready for formal review and does not suggest the applicant has provided sufficient information in all regards or preclude the reviewing authori.ty from requesting additional information
It deems appropriate.
(3) Review date. When the Zoning Administrator determines the application is comP,lete, lle or she schedules the review with the Plan Commission consistent with its adopted calendar.
(4) General notice. Consistent with Division 2 of Article 4, the Zor:iing Administrator shall provide for a meeting agenda
notice.
https://ecode360.com/print/Rl3087?guid=42033112,42033113,42033146,42033106,42033107,42033181,42033182,42033161,42033183,42033184,4... 4/1 0
8/26/26, 5:57 PM Development agreement. - Village of Richfield, WI
(5) Staff report preparation and distribution. The Zoning Administrator maY, prepare a staff report that evaluates whether the precise implementation plan is consistent
with the approved general development plan and the suitability of the proposed plan given the additional
information provided in the plan and supplemental materials. The Zoning Administrator provides a copy of it
to each member of the Plan Commission and Village
Board, the applicant, and any other interested person
upon request.
(6) Meeting. Allowing for proRer notice, the Plan Commission
review~ the precise implementation plan and the staff
report, 1f any.
(7) Determination of consistency. The Plan Commission
determines whether the precise implementation plan is qenerally consistent with the approved general
aevelopment plan with resP,ect to density/intensTty and P,ermissible rand uses. If the Plan Commission
aetermines that the precise imQlementation plan is not
qenerally consistent, the Plan Commission shall render fhat decision in writing and take no further action on the
precise implementation plan.
(8) Plan Commission recommendation. If the precise implementation plan is deemed to be consistent with the general development plan, the Plan Commission makes
a recommendation to the Villaqe Board based on the decision criteria in this division fo i) approve the precise
implementation plan, ii) approve the precise
impl~m~ntation plaQ with conditions, or iii) deny the
precise 1mplementat1on plan.
(9) General notice. Consistent with Division 2 of Article 4, the ZoninQ Administrator _places the matter on the meeting
agencra of the Village Board.
(10) Village Board meeting. Allowing for proper notice, the Village Boarp considers the application at a regular or
special meeting.
(11) Decision. The Village Board after considering the Plan Commission's recommendation makes a decision based
on the decision criteria in this division to i) approve the
precise imP,lementation plan, ii). approve tlie precise 1mpl~m~ntation plaQ witli conditions, or iii) deny the
precise 1mplementat1on plan.
( 12) PreP.aration of decision document. Based on the action of the Village Board1 the Zoning Administrator prepares a
decision aocument consistent with this division.
(13) Applicant notification. Within a reasonable time followin8
the Village Board's decision, but not more than 1 workdays, the Zoning Administrator sends the decision
document to the applicant by regular mail and/or email.
(14) Acceptance by pr<;)perty owner. If an approval includes one or more cond1t1ons of approval, the property owner
https ://ecode360 .com/print/Rl3087?guid=42033112,42033113,42033146,42033106,42033107,42033181,42033182,42033161,42 033183 ,42033184,4... 5/1 O
8/26126, 5:57 PM Development agreement. -Village of Richfield, WI
must sign the decision document to acknowledge the terms of the apP,roval and return the same to the Zoning Administrator within two months of the decision. Prior to
the expiration of the previously specified time period, the groperly owner may submit a petition to the Zoning
Administrator requesting an extension and the Zoning Administrator may, with cause, extend the period within
which the decision document must be signed. If the signed decision document is not returned witnin the initial or extended time period, if any, the decision shall
automatically become null and void without any further action by the Village at the expiration of such time limit.
The decision document shall only become effective when all required signatures have oeen obtained and the
ori.QiQ~l siQnature copy is returned to the Zoning Adm1n1strator.
§ 170.324. Basis of decision.
In the review of a general development plan and the precise
implementation pland the Plan Commission, in making its recommendation, an the Village Board, in making its decision, shall consider the following factors:
A. Whether develoP,ment in the proposed project is in keeping with the spirit and intent of this chapter;
B. Whether development in the pro.Qosed project is consistent
with the Village's Comprehensive Plan;
C. Whether development in the proposed district is consistent
with a neighborhood plan or ottier subarea plan that may have been prepared for land in or near the proposed district;
D. The effects of development in the proposed project on traffic
safety and efficiency, both within and outside of tfie district;
E. Whether the proposed plan for development in the proRosed
project is properly planned and is properly coordinatea with
the existing and anticiRated land uses on properties in the immediate and surrounaing area;
F. The extent to which the natural features and open space on
the site are preserved;
G. Whether development in the proposed project complies with
provisions of this chaRter and other land development regulations of the Village that may apply;
H. The .effects of d~y~lopment in the proposed project on public
services and fac1llt1es;
I. Whether adequate water and sanitary sewer facilities can be
provided;
J. The proposed means of maintaining any undeveloped areas of the proposed project for the purpose for which it was set
https://ecode360.corn/prinl/Rl3087?guid=42033112,42033113,42033146,42033106,42033107,42033181,42033182,42033161,42033183,42033184,4... 611 O
8/26126, 5:57 PM Development agreement. - Village of Richfield, WI
aside;
K. Effects of the proP,osed use on surrounding properties,
including existing ana anticipated uses;
L. Effects of the proposed use on the normal and orderly
development and improvement of the surrounding P.roperty for uses permitted in the zoning district and adjoining districts;
M. Whether the plan for development enhances the baseline
zoning district, as defined oy the Plan Commission and Village Board, on the design and development standards of
the underlyinq zoning district;r11 and
[1] Editonal fvote: For example, a planned development district
may enhance the baseline zoning district, when it includes
desirable features or amenities tfiat are not otherwise
required, including but not limited to additional
landscaping/buffering , open space, or enhanced design
elements.
N. Any other factor that relates to the purposes of this chapter
set forth in § 170.05 or as allowed by state law.
§ 170.325. Imposition of conditions.
A.
B.
GeneraUv. The Plan Commission may recommend and the Village Board may impose conditions as may be necessarY. to
granT approval. Sucti conditions may relale to any of the
factors It considered in reaching its decision. In addition, the Plan Commission may recommend and the Village Board
may require the provision of off-site exactions thaT may be
necessary to approve the establishment of the planned
development disfnct project.
Effect on contracts with another party. The Village Board shall
not condition or withhold approval based upon the property owner entering into a contract or discontinuing, modifying,
extending, or renewing any contract with a thira party under
which Hie third party is engaging in a lawful use of the
property. c11
L 1] Editorial Note: See § 62.23(7)(gm) , Wis. Stats. The Village,
for example, could not require an applicant to terminate an
existing contract with another party that is engaged in a lawful
use of1he property.
§ 170.326. Application form and content.
A. General development plan. The application submittal for a
general development plan shall include the following:
(1) An application form as may be used by the Village;
https://ecode360.comlprint/Rl3087?guid=42033112,42033113,42033146,42033106,42033107,42033181,42033182 ,42033161,42033183,42033184,4 ... 7 /1 0
B/26/26, 5:57 PM
B.
Development agreement. -Village of Richfield, WI
(2) A general development plan prepared at an appropriate
scale depicting the information listed in AP,oendix F;c11
[1] Code Editor's Note: Appendix Fis incluaed in Chapter
170A, Zoning Appendix.
(3) A preliminary draft of covenants if any are to be imposed; and
(4) A development schedule, if the project is to be
constructed in phases, which includes the anticipated
beginning date and ending date of each phase and a
description of those project-related elements to be completed in each phase.
Precise imRlementation plan. The application submittal for a
precise implementation plan shall include the following:
(1) An application form as may be used by the Village;
(2) A precise implementation plan prepared at an appropriate
scale depicting the information listed in Appendix F;c21
[2] Code Editor's Note: Appendix Fis incluaed in Chapter
170A, Zoning Appendix.
(3) A final draft of covenants if any are to be imposed;
( 4) Hom.eowners' association documents, if proposed or required;
(5) A development agreement, if proposed or required; and
(6) A development schedule, if the project is to be constructed in phases, which includes the anticipated
beginning date and ending date of each phase and a description of those project-related elements to be completed in each phase.
§ 170.327. Staff report content.
The staff report should include the following:
A. P,r~lin,inary findings for the decision criteria listed in this d1v1s1on;
B. A preliminary list of recommended conditions of approval; and
C. Other information deemed necessary.
§ 170.328. Effect of approval.
If the Village Board approves a planned development district, the approval sTlall run with the land and is binding on all subsequent property owners.
https://ecode360 .com/print/Rl3087?guid=42033112.42033113,42033146,42033106,42033107,420331 B 1,42033182,42033161,42033183.42033184,4... 8/1 O
8/26/26, 5:57 PM Development agreement. - Village of Richfield, WI
§ 170.329. Effect of approved planned
development district on land division
standards.
Development in a planned development district is subject to the Village's land division regulations to the extent applicaole, except that the Plan Commission or Village Board may waive a
devel.opment standard in the land division regulations as provided
therein.
§ 170.330. Amendment of approved
planned development district.
If the Village Board aRproves a olanned develoRment district, the Plan Commission and Village Board shall review all proposed
changes to the project plan that was approved at the time of approval. If in Uie opinion of the Village Board, the proposed change constitutes a minor alteration, the Village Board maY, approve the requested change at a re_gular or special meeting of
Hie Village Board. If the P,roposed cnange constitutes a major alteration, the review proceaure in this division must be followed.
§ 170.331. Expiration of an approval.
If any portion of a planned development district that can be
developed remains substantially undeveloped (i.e., less than 50%
completed) three years after final approval, the Vil age Board may rescind the approval, in whole or in part, following a public
hearing. Upon petition and with cause, the Village Board may grant a one-time extension, not to exceed four years. In the event fhe Village Board rescinds an approval 1 the Village Board shall at
that time reclassify undeveloped lands in the district based on the
zoning regulations in effect at that time. Developed ROrtions of the planned development district may either be allowea to retain the
planned development district designation or be reclassified based on the zoning regulations in effect at that time.
§ 170.332. Appeal.
An aggrieved person may appeal a final decision made pursuant
to this division by filing an appeal with a court of competent
jurisdiction within 30 calendar days of the final decision.
https ://ecode360.com/print/Rl3087?guid=42033112,42033113,42033146,42033106,42033107,42033 181,42033182 ,42033161,42033183,42033184 ,4. .. 9/1 0
8/26/26, 5:57 PM Development agreement. -Village of Richfield, WI
§ 170.333. through § 170.349. (Reserved)
https://ecode360.com/prinURI3087?guid=42033112,42033113,42033146,42033106,42033107,42033181,42033182,42033161,42033183,42033184,... 10/1 0
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
1027 W Saint Paul Ave.
Milwaukee, WI 53233
January 15, 2026
Timothy Bickel
St. Gabriel Catholic Parish
1200 Saint Gabriel Way
Hubertus, Wl53033
Sent via electronic mail to frtim@stgabrielhubertu s.org
Tony Evers, Governor
Karen Hyun, Ph.D., Secretary
Telephone 608-266-2621
Toll Free 1-888-936-7463
TTY Access via relay - 711
Subject: Liability Clarification and "No Action Required" Determination Letter
St. Gabriel Catholic Parish Hubertus Road Property, 3733 Hubertus Rd, Hubertus,
Wisconsin 53033
Parcel # 082900B
BRRTS Activity Name: St Gabriel Catholic Parish Hubertus - USTs
BRRTS # 07-67-598467 and 09-67-598466 FID # 267036550
Dear Mr. Bickel:
The Wisconsin Department of Natural Resources (DNR) received a request for a liability clarification
and a "No Action Required" determination from Stantec Consulting Services, Inc. (Stantec) on behalf of
St. Gabriel Catholic Parish on December 23, 2025 (Request). The Request was submitted with the
appropriate review fee for the site location (Property) identified above. The purpose of this letter is to
provide St. Gabriel Catholic Parish clarification as to environmental liabilities and current environmental
conditions at the Property.
Wisconsin Statutes (Wis. Stat.)§ 292.55(1 )(d)1 authorizes the DNR to issue a letter to a person
seeking assistance concerning the liability of a person owning or leasing a property for environmental
pollution at a property, the type and extent of environmental pollution at a property, the adequacy of an
environmental investigation, or any other matter related to a request for assistance. This type of letter
contains a DNR determination as to whether response actions are needed under Wisconsin
Administrative Code (Wis. Admin. Code) chs. NR 700 to 799 based on the discharge of one or more
hazardous substances, or the presence of environmental pollution at the Property. The DNR based this
letter on review of environmental reports and other documents that were provided in the Request:
• Liability clarification letter request, completed Form 4400-237, signed November 26, 2025,
including a cover letter and attachments.
• Discharge notification form submitted to the DNR on December 23, 2025;
• Phase I Environmental Site Assessment, Staniec, October 3, 2024:
• Phase II Environmental Site Assessment, Stantec, September 23, 2025.
PROPERTY USE
The Property consists of a 10.6-acre parcel that is currently improved with five buildings including a
school/administration building, convent house/school, rectory home, church, and a garage. Refer to the
attached Figure 3 for a map of the Property.
dnr.wi.gov
wisconsin_gov
(',
PIOHml
PA~/:l
.
• ON REC'YC'LEt
Liability Clarification and "No Action Determination" Letter for St Gabriel Catholic Parish Hubertus - USTs
BRRTS # 07-67-598467 and 09-67-598466
BACKGROUND AND ENVIRONMENTAL SUMMARY
Page 2
The Property is in Hubertus and is surrounded by a cemetery and commercial and residential
properties. A Phase I Environmental Site Assessment (ESA) was conducted by Stantec in 2024. The
former use of 2,000-gallon and 700-gallon fuel oil underground storage tanks (USTs) was identified as
a recognized environmental condition (REC).
A Phase II ESA was conducted by Stantec to evaluate the REC. Ten soil borings (SB-1 to SB-10) were
advanced to a maximum depth of 20 feet below ground surface (bgs). Two samples were collected
from SB-1 and one sample from the rest of the borings. All samples were laboratory analyzed for
volatile organic compounds (VOCs) and Resource Conservation and Recovery Act (RCRA) metals.
Laboratory analytical results identified selenium above its Wis. Admin. Code ch. NR 720 residual
contaminant level (RCL) for groundwater pathway. Methylene chloride was identified in several
samples exceeding its RCL for groundwater pathway. Selenium appears to be associated with
background conditions. The methylene chloride was also detected in the blank and appears to be a lab
contaminant. Based on this information, the DNR concurs that no action is required.
DETERMINATIONS
Wis. Stat. ch. 292 and Wis. Admin. Code chs. NR 700 to 799 require those who are responsible for a
hazardous substance discharge or environmental pollution to take actions necessary to restore the
environment to the extent practicable and minimize the harmful effects from the discharge to the air,
lands or waters of the state. Wis. Stat. § 292.55 authorizes the DNR to issue clarification letters
concerning liability for environmental pollution.
Information submitted to the DNR with your request for liability clarification indicates that no hazardous
substance discharges or environmental pollution has occurred on the Property. Therefore, based on
information provided at this time, further site investigation activities are not required, and no response
action is required under Wis. Admin. Code chs. NR 700 to 799.
As with any environmental assessment, some areas of the Property were not assessed, the number of
samples collected were limited based on professional judgment and financial considerations, and
environmental samples were not analyzed for all parameters. This letter relates and refers only to those
conditions described above and to information and data you submitted to the DNR in your request for
this letter. The DNR makes no determination concerning the presence or absence of hazardous
substances or environmental pollution on the Property other than those identified in the documents and
reports listed above, which you submitted to the DNR. In the future, if the DNR becomes aware of new
information concerning the contaminants referenced above or the presence of any other contaminants
on the Property, the DNR will evaluate that data at that time to determine if any response actions are
required.
CLOSING
This letter, site and case-related information and DNR contacts can be found online in the Bureau for
Remediation and Redevelopment Tracking System (BRRTS) on the Web (BOTW); go to dnr.wi.gov and
search "BOTW." Use the BRRTS ID# found at the top of this letter. The site can also be found on the
map view, Remediation and Redevelopment Sites Map (RRSM) by searching "RRSM."
If you have any questions regarding this letter, please contact me at 608-400-9934, or
mackenz ie.reynoldsspargur@wisconsin .gov.
Liability Clarification and "No Action Determination" Letter for St Gabriel Catholic Parish Hubertus - USTs
BRRTS # 07-67-598467 and 09-67-598466
Sincerely,
Mackenzie Reynolds-Spargur
Southeast Region Project Manager
Remediation and Redevelopment Program
Attachment: Figure 3, Soil Contamination, September 9, 2025, Stantec
cc:
Erin Gross, Stantec Consulting Services, Inc. - erin.gross@stantec .com
Margaret Brunette, DNR, Remediation and Redevelopment Program -
Page 2
ma rgaret. bru nette@wiscons in.gov
Michael Prager, DNR, Remediation and Redevelopment Program - michael.prage r@wisconsin .gov
Source: Village of Richfield website. First collected Oct 7, 2026.