Plan Commission Regular Meeting Agenda Packet (PDF)
Village of Plover · Portage County · meeting of Jun 29, 2026 · Agenda packets
Open the original document More from Village of Plover
This document is no longer listed on Village of Plover's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Agenda – Plan Commission 7:31 AM 06/25/26
PLAN COMMISSION
Plover Municipal Center Board Room
2400 Post Road
Plover, WI
Monday, June 29th, 2026
5:30 p.m.
1. Call to order
2. Approval of the minutes of the Plan Commission meeting of May 18, 2026, as printed
3. Persons wishing to address the Commission
Discussion with possible action on the following:
4. Public Hearing –Paul Sankey – Conditional Use Permit request for a Home Occupation (major) at 3130
Plover Road (PIN: 173230821-16.15)
5. Reconvene for possible discussion and consideration – Paul Sankey – Conditional Use Permit request for a
Home Occupation (major) at 3130 Plover Road (PIN: 173230821-16.15)
6. Site Plan Review – Plover Pine Village WI LLC – Plover Pine Village Mobile Home Community Expansion –
2501 Forest Drive (PIN: 173230827-12.05)
7. Housing Community Survey – The Future of Housing in Plover (Discussion Only)
8. Reports
a. Community Development Department
9. Adjournment subject to call of the chair
NOTICE IS HEREBY GIVEN that a majority of the members of the Village Board may attend this meeting
to gather information about a subject over which they have decision-making authority.
VILLAGE OF PLOVER AND PUBLIC WORKS COMMITTEE
JOINT PLAN COMMISSION
May 18, 2026
5:30 p.m.
Plan Members Present: Gary Wolf, Jackie Denny, Sherri Galle-Teske, Chris Shulfer, Steve
Worzella
Public Works Committee Members Present: Adam Raabe, Ross Ballard
Members Excused: Al Tessmann, Tim Durigan
Members Unexcused: Josh Winter
Others Present: Adam DeKleyn, Karmen Anderson, Steve Kunst, Julia Mann, Ryan Fox, Scott
Klemm, Jasmine Barclift
1. Mr. Wolf called the Plan Commission meeting to order at 5:30 p.m. The Public Works
Committee meeting was not called to order due to lack of a quorum.
2. Mr. Worzella made a motion, seconded by Ms. Galle-Teske, to approve the minutes of the
Plan Commission meeting of May 4, 2026, as printed. Motion carried.
3. No quorum was present for the Public Works Committee, so no action was taken on the
minutes of the Public Works Committee of February 16, 2026.
4. There were no persons wishing to address the Commission.
Discussion with possible action on the following:
5. Portage County Bicycle and Pedestrian Plan – Safe Streets for All (SS4A) Safety Action
Plan
Ms. Anderson discussed the Safe Streets for All Safety Action Plan and Bicycle and
Pedestrian Plan to highlight recommendations, areas of concern, and both short-term and
mid-to-long-term action items.
***RECOMMENDATION TO VILLAGE BOARD*** Mr. Shulfer motioned, with a second by
Mr. Worzella, to recommend approval Portage County Bicycle and Pedestrian Plan –
Safe Streets for All (SS4A) Safety Action Plan. The motion carried.
6. Reports
a. Scott Klemm, Public Works Manager, went over his report, highlighting the number
of loads of brush his department had picked up since the ice storm earlier in the
year, and the status of current street reconstruction in the Village. He also
mentioned needed crack filling on Hoover Avenue this year due to a hard winter,
and that they expect to install the driveway at the Dan R. Mahoney Conservancy in
June. The Public Works Department is very busy at this time.
7. Adjournment of Public Works Committee subject to call of the chair
No quorum was present for the Public Works Committee, so no action was taken on this
agenda item.
8. Public Hearing – Roberts Irrigation – Conditional Use Permit Request for an outdoor
display at 1500 Post Road (PIN: 173-23-0815-HS-01.26)
Ms. Barclift read the Pub Hearing Notice. Ms. Anderson outlined the request and stated that
it requires a Conditional Use Permit due to Village ordinance.
Mr. Worzella motioned to close the Public Hearing. Ms. Galle-Teske seconded, and the
motion carried.
9. Reconvene for possible discussion and consideration – Roberts Irrigation – Conditional
Use Permit Request for an outdoor display at 1500 Post Road (PIN: 173-23-0815-HS-
01.26).
Ms. Anderson advised that staff recommends approval with the noted conditions. A
representative of Roberts Irrigation was in attendance to answer any questions. Ms. Galle-
Teske questioned if the sign would be lit or have digital scrolling, with the representative
answering in the negative.
***RECOMMENDATION TO VILLAGE BOARD*** Ms. Galle-Teske motioned, with a
second by Ms. Denny, to recommend approval of Roberts Irrigation – Conditional Use
Permit Request for an outdoor display at 1500 Post Road (PIN: 173-23-0815-HS-01.26).
The motion carried.
10. Site Plan Review – Mullins Whey INC – Intake addition and cargo yard – 2541 Foremost
Road (PIN: 173230821:05.10 & 173230821:05.08)
Mr. DeKleyn summarized the Site Plan and advised that staff recommends approval with
the noted conditions.
Ms. Galle-Teske motioned to approve the Site Plan Review – Mullins Whey INC – Intake
addition and cargo yard – 2541 Foremost Road (PIN: 173230821:05.10 &
173230821:05.08). Mr. Worzella seconded, and the motion passed.
11. Site Plan Review – Village of Plover – Public Safety Facilities Project – 2400 Post Road
(PIN: 173430202)
Mr. DeKleyn, along with Mr. Kunst, reviewed the Site Plan and highlighted a number of
proposed improvements to the property such as a large public parking lot to increase the
number of parking stalls onsite to 104, sidewalks along School Drive and Wisconsin
Avenue, and improved lighting for the back parking lot.
Mr. Shulfer motioned to approve the Site Plan Review – Village of Plover – Public Safety
Facilities Project – 2400 Post Road (PIN: 173430202). Ms. Galle-Teske seconded, and
the motion passed.
12. Reports
a. Mr. DeKleyn, Community Development Manager, went over his report to highlight
the fact that the Olive Garden had closed on their site, and construction was
expected to begin this week. He also mentioned the lawsuit brought by the
Wisconsin Realtors Association had been dropped due to the Village amending
their Short-Term Rental Ordinance.
13. Mr. Worzella moved to adjourn at 6:19 p.m. with a second by Ms. Galle-Teske. Motion
carried.
Submitted by Jasmine Barclift
PUBLIC HEARING NOTICE
Village of Plover
NOTICE IS HEREBY GIVEN that the Village of Plover Plan Commission will hold a public
hearing on Monday, June 29th, 2026, at 5:30 PM in the Plover Municipal Center Board Room,
2400 Post Road, Plover, WI 54467, to consider the following: Conditional Use Permit Request –
Applicant (Paul Sankey) seeks a conditional use permit for a home occupation (major) – to
operate a part-time metal fabrication business from their residence at 3130 Plover Road, Plover,
WI 54467 (PIN: 173-23-0821-16.15). Business operations consist of fabrication, repair, and
modification services for metal components and equipment. All interested parties are invited to
attend the public hearings and provide comments. Further information is available at the
Community Development Department, online at www.ploverwi.gov/167/Community-
Development, or by calling 715-345-5250.
Tammy Wojtalewicz, Village Clerk
Village of Plover
COMMUNITY DEVELOPMENT DEPARTMENT
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
Phone: 715-345-5250 Website: www.ploverwi.gov
STAFF REPORT
TO: Plan Commission and Village Board
FROM: Karmen Anderson; Village Planner
RE: Conditional Use Permit: Metal Fabrication – Home Occupation
DATE: June 29th, 2026 (PC) / July 1st, 2026 (VB)
Request: Paul Sankey requests a conditional use permit for a home occupation – major – at
his residence 3130 Plover Road.
Business Details:
Home occupation consists of a part-time fabrication and machine shop. Business activities would
be handled in the detached garage on the site. A divider wall is to be constructed to divide the
space between business and personal use and will serve to contain dust and debris as well as
provide fire protection. Electrical upgrades will accommodate new equipment.
Services provided will be fabrication, repair, and modification services for metal components and
equipment. This includes work on equipment for agriculture, home/lawn, trailers, recreational
vehicles, food trucks, etc. (see business narrative for more detail).
Hours of operation are proposed to be Monday-Friday 6-9 PM; Saturday 1-5PM; and Sunday by
appointment only.
Analysis:
Property/Zoning – Property is located along Plover Road/HWY 54 and is currently zoned
commercial with a SF land use. Surrounding zoning is B2-General Business to the west, M2-Heavy
Manufacturing to the east, and R6-Multi-Family to the north. There is sufficient buffering (forested)
between the bordering residential properties. Property is 2.19 acres which gives more space for the
business activities.
Noise – All activities are primarily done indoors. No running of machinery is permitted past 10 pm or
before 6 am to align with Village quiet hours.
Traffic/Parking – Applicant predicts about 1-3 visitors per day to the site. Off-street parking is
accommodated in the driveway of the property (see site plan).
Address: 3130 Plover Road Parcel #: 173230821-16.15
Current Zoning: B2 – General Business FLU Designation: Commercial/Residential
Current Use: Single Family Residential Proposed Use: Home Occupation
Outdoor storage/waste disposal – Minimal outdoor storage is expected. Applicant intends to store
items in a fully enclosed steel storage rack. Storage should not be visible from the street. Standard
waste will be disposed of via normal garbage/recycling bins. Metal scraps will be brought to the
proper facility that can recycle them. Any hazardous waste should be disposed of according to
Village, County, or State guidelines.
Signage – Applicant intends to install a sign along Plover Road/54. The dimensions and exact
location of signage is TBD. Signage will need to be approved by the Community Development
Department prior to applying for permits/install.
Utilities – No new utility upgrades are proposed. Existing utilities serving the property should be
sufficient at this time.
Recommendation: Staff recommends APPROVAL conditioned on the following:
(1) No business activity between the hours of 10pm-6am.
(2) Signage to be approved by Community Development Department before installation.
(3) No accumulation of junk or waste permitted out in the open on the site.
(4) Approved building plans/permits required prior to construction.
(5) All improvements onsite shall be in accordance with the approved site, civil, and building
plans. Any changes to the approved plans and specifications shall not be made without
approval of the Community Development Department.
(6) Any additional buildings or expansions require separate approval.
(7) Conformance with all other applicable requirements, ordinances, regulations and standards
including, but not limited to, Chapter 388 Nuisances, Chapter 406 Peace and Good Order,
Chapter 302 Hazardous Materials, and Chapter 550 Zoning of Village Ordinance Code.
Exhibits: Location Map • Site Plan • Business Narrative
Location - Property Map
Site Plan
Village of Plover
COMMUNITY DEVELOPMENT DEPARTMENT
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
Phone: 715-345-5250 Website: www.ploverwi.gov
STAFF REPORT
TO: Plan Commission
FROM: Adam DeKleyn, Community Development Manager
RE: Site Plan Review (2026-SPR-008): Plover Pine Village MHC Expansion
DATE: June 29, 2026
Request: Plover Pine Village WI LLC is requesting site plan approval for the expansion and site
improvements to the Plover Pine Village Mobile Home Community (MHC) at the above referenced
property location.
Background: Over the past 3 years, the Plover Pine Village MHC has been preparingplans for the
expansion of the park on an undeveloped portion of the property. Plans are complete with a tentative
construction timeline of October 2026 – October 2027.
Analysis:
Expansion Overview:
The proposed expansion area consists of ±6 acres on the south end of the property. A
new private roadway, utilities, resident parking, sidewalk, and recreation area are
proposed to be constructed. Plans detail 24 new mobile home lots - each 6,000 SF in
size. § 550-40 of the Zoning Ordinance outlines Mobile Home Park requirements.
Minimum setbacks, space, and site requirements are met.
Private Roadway:
The new mobile home spaces will be provided with a new paved private roadway
connecting to the existing park. Access to the MHC remains unchanged, with existing
access points maintained at Forest Drive.
Utilities:
Water and sanitary sewer services for the mobile home will be installed on each lot.
There will be two portions of the proposed water service designated as public main
with the remaining proposed water service will be private main. The public water
service extension will be located along the west side of the proposed north driveway
entrance to expansion area and a small extension for a new hydrant on the west side
of site. Both extensions will include a 20’ easement.
Address: 2501 Forest Drive Parcel #: 173230827-12.05
Zoning: R-5 Mobile Home Residential Future Land Use: Mobile Home Community
Current Use: Mobile Home Community Proposed Use: Mobile Home Community
Street Lighting:
(13) new streetlights will be installed throughout the expansion area – in accordance
with § 550-40 lighting requirements.
Landscaping:
New landscaping will be provided throughout the site. This includes a total of 122
new trees of varying varieties. Lawns will be established with all greenspace
maintained with a sprinkler irrigation system. Landscaping standards are met.
Private Recreation Area:
Proposed recreational site improvements include a woodchip playground area and
dog park with a 5-stall parking lot adjacent. A sidewalk will be constructed
connecting the existing park to the recreation area. The proposed playground
equipment will be a commercial play set for ages 2-12 similar or equivalent to the
Monkey in the Middle model by Playground Boss. The proposed dog park will include
approximately 0.59 acres of fenced in area with small dog and large dog areas
separated. Maintenance of the recreation area will be by MHC staff.
Parking:
Each mobile home will be provided (2) paved off-street parking stalls for each lot - in
accordance with § 550-40 parking requirements.
Stormwater:
A stormwater management plan has been prepared. Stormwater will be managed
onsite via (2) bioretention basins on each end of the site.
As proposed, the expansion plans and overall improvements are consistent with § 550-40 mobile home
park requirements.
Recommendation: Staff recommends APPROVAL, conditioned on the following:
(1) Provide an updated master plan for the entire MHC that identifies current lot #s and new
sequential lot #s for the expansion.
(2) Installation of new MHC lot and block # signage for EMS/Fire services. This included block and
Lot # ranges at each intersection on main north/south roads, and each lot/mobile home shall
have a visible #.
(3) Remove and properly dispose of piles of decaying vegetation/trees, soil, debris, etc., between
the baseball diamond and expansion area. Brush/debris piles are prohibited in the park.
(4) Existing recreation area requires improvement and maintenance.
(5) Coordinate with USPS on new CBU placement.
(6) Prepare and record a utility easement for the public watermain extension.
(7) As-builts are required upon completion of construction, and the Village requires
inspection/observation by a licensed engineer. Developer contribution costs for water are
required to be submitted to the Village.
(8) Prepare and record final stormwater maintenance agreement.
(9) No further expansion is permitted in the future as maximum density standards are reached as
outlined in § 550-40.
(10) The property owner and onsite management shall maintain and promptly enforce
community rules and Village Ordinances addressing property maintenance, vehicle
parking, noise, refuse disposal, and conduct within the MHC.
(11) The property owner and property management shall promptly address nuisance activities
occurring within the MHC.
(12) The MHC shall be maintained free of junk, debris, unregistered/abandoned/inoperable
vehicles, and other public nuisances in accordance with Village ordinances.
(13) Obtain approved Village building permits prior to installation of new mobile homes.
(14) All improvements onsite shall be in accordance with the approved site, civil, engineering,
and landscaping plans. Any changes to the approved plans and specifications shall not be
made without approval of the Community Development Department.
(15) Conformance with all other applicable requirements, ordinances, regulations and
standards.
Exhibits: • Location Map • Site Plan • Landscaping Plan • Complete Expansion Plans
Location Map:
Proposed
Expansion
ttett
ettett
SOUTH LINE SW1/4
N 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
1335.48'SW CORNERSE1/4-SW1/4BENCHMARK #2ELEV=1083.06
EBttEBtt
S 89°20'39" W2670.96'
SW1/4 - SW1/4UNABLE TO SURVEY AREAUNABLE TO SURVEY AREA
SEC. 27SEC. 34
PARCEL NO. 173-23-0827-11.01
S 89°20'39" W(S 89°20'35"W)175' WIDE TRANSMISSION LINEEASEMENT PER DOC. NO. 582367
SS
LOT 186,000 SFLOT 196,000 SFLOT 36,000 SFLOT 46,000 SFLOT 56,000 SFLOT 66,000 SFLOT 76,000 SFLOT 176,000 SFDOG PARK(TOTAL 0.59 AC)LARGE DOG AREASMALL DOGAREALOT 116,000 SFLOT 106,000 SFLOT 96,000 SFLOT 86,000 SFLOT 16,000 SFLOT 26,000 SFLOT 126,000 SFLOT 136,000 SFLOT 146,000 SFLOT 166,000 SFLOT 156,000 SFLOT 216,000 SFLOT 226,000 SFLOT 206,000 SFLOT 226,000 SFLOT 246,000 SF
UTILITY DISCLAIMER:BENCHMARK:
0'40'80'1" = 40'PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C2.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WILAYOUT PLANJLMK05/18/202623.115
BENCHMARK #1BENCHMARK #2PAVEMENT HATCH PATTERNS:GENERAL NOTES:KEYNOTES:
Site Plan
ttett
ettett
N 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
BENCHMARK #2ELEV=1083.06
EBttEBttUNABLE TO SURVEY AREAUNABLE TO SURVEY AREA
175' WIDE TRANSMISSION LINE
SS
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
L1.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WILANDSCAPE PLANJLMK05/18/202623.115
GENERAL NOTES:PLANTING SCHEDULE:LANDSCAPE REQUIREMENTS:
0'40'80'1" = 40'UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1BENCHMARK #2BIO-RETENTION BASIN PLANTINGBIO-RETENTION BASIN PLANTING
ttett
ettett
SOUTH LINE SW1/4
N 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
1335.48'SW CORNERSE1/4-SW1/4BENCHMARK #2ELEV=1083.06
EBttEBtt
S 89°20'39" W2670.96'
SW1/4 - SW1/4UNABLE TO SURVEY AREAUNABLE TO SURVEY AREA
SEC. 27SEC. 34
PARCEL NO. 173-23-0827-11.01
S 89°20'39" W(S 89°20'35"W)175' WIDE TRANSMISSION LINEEASEMENT PER DOC. NO. 582367
SS
LOT 186,000 SFLOT 196,000 SFLOT 36,000 SFLOT 46,000 SFLOT 56,000 SFLOT 66,000 SFLOT 76,000 SFLOT 176,000 SFDOG PARK(TOTAL 0.59 AC)LARGE DOG AREASMALL DOGAREALOT 116,000 SFLOT 106,000 SFLOT 96,000 SFLOT 86,000 SFLOT 16,000 SFLOT 26,000 SFLOT 126,000 SFLOT 136,000 SFLOT 146,000 SFLOT 166,000 SFLOT 156,000 SFLOT 216,000 SFLOT 226,000 SFLOT 206,000 SFLOT 226,000 SFLOT 246,000 SF
UTILITY DISCLAIMER:BENCHMARK:
0'40'80'1" = 40'PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C2.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WILAYOUT PLANJLMK05/18/202623.115
BENCHMARK #1BENCHMARK #2PAVEMENT HATCH PATTERNS:GENERAL NOTES:KEYNOTES:
ttettettettN 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
BENCHMARK #2ELEV=1083.06
ttttSW1/4 - SW1/4SS
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C3.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax:715.344.9999PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WIGRADING PLANJLMK05/18/202623.115
GENERAL NOTES:UTILITY DISCLAIMER:BENCHMARK:0'40'80'1" = 40'BENCHMARK #1BENCHMARK #2
GRADING LEGEND:CONCRETE WASHOUT AREASWALE SECTION (TYP.)
ttett
ettett
N 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
S 89°28'17" E(S 89°29'55" E)BENCHMARK #2ELEV=1083.06
ttttSW1/4 - SW1/4SS
TEMPORARYTOPSOILSTOCKPILEAREA
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C4.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WIEROSION CONTROL PLAN
JLMK05/18/202623.115
0'40'80'1" = 40'UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1BENCHMARK #2
EROSION CONTROL SEQUENCING:GENERAL NOTES:EROSION CONTROL LEGEND:
ttett
ettett
N 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
BENCHMARK #2ELEV=1083.06
ttttSW1/4 - SW1/4SS
SS#1SS#3SS#2SANITARY MANHOLESCHEDULE:
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C5.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WIUTILITY PLANJLMK05/18/202623.115
GENERAL NOTES:
0'40'80'1" = 40'UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1BENCHMARK #2
UTILITY LEGEND:STORM SEWER ENDWALL
ASPHALT PAVEMENTCONCRETE WALKPLAY AREA WOODCHIPSDRIVE OVER CURBADA CURB RAMPTERMINAL FENCE POSTADA PARKING SIGNPARKING LOT STRIPINGCROSSWALK STRIPINGDRIVEN FENCE POST4' PEDESTRIAN GATE12' SERVICE GATEBIORETENTION AREAPointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C6.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WIDETAILSJLMK05/18/202623.115PARKINGRESERVEDVEHICLES WITHVET OR DIS PLATES ORSTATE DISABLED CARDTHIS STALLVAN ACCESSIBLE
RIP RAP OVERFLOWSILT FENCEEROSION CONTROL BLANKET(CHANNEL)EROSION CONTROL BLANKET(SLOPE)GATE VALVESANITARY MANHOLECONCRETE WASHOUT AREAROCK CONSTRUCTION ENTRANCE
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C7.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WIDETAILSJLMK05/18/202623.115FLOW DIRECTION 3.FLOW DIRECTION3' MAX3' MAX3' MAX3' MAXSILT FENCE ASILT FENCE B
SANITARY CLEANOUTCURBSTOPHYDRANT ASSEMBLY
ett SS#1SS#1
N 00°40'36" E(N 00°40'37" E)SS#2PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
C8.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WIUTILITY PLAN & PROFILE
JLMK05/18/202623.115
0'20'40'1" = 20'
UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1BENCHMARK #2NORTH DRIVEWAY PUBLIC WATER MAINNORTH DRIVEWAY PUBLIC WATER MAIN PROFILEWEST SIDE PUBLIC WATER MAINWEST SIDE PUBLIC WATER MAIN PROFILE
0'20'40'1" = 20'
ttett
ettett
N 00°40'36" E(N 00°40'37" E)S 00°30'16" W(S 00°30'45"W)(NORTH)
BENCHMARK #2ELEV=1083.06
EBttEBttUNABLE TO SURVEY AREAUNABLE TO SURVEY AREA
175' WIDE TRANSMISSION LINE
SS
PointBeginningofPOINT OF BEGINNING, INC. HOLDS THE RIGHTS TO COPYRIGHT IN AND TO THESEPRINTS, DRAWINGS AND DOCUMENTS. NO REPRODUCTION, COPYING, ALTERATION,MODIFICATION, USAGE, INCORPORATION INTO OTHER DOCUMENTS ORASSIGNMENT OF THE SAME MAY OCCUR WITHOUT THE PRIOR WRITTENPERMISSION OF POINT OF BEGINNING, INC.2024 POINT OF BEGINNING, INC.C
REVISIONSCHECKED:DRAWN:DATEPROJECT NO.Civil EngineeringLand SurveyingLandscape ArcitectureSHEET
1. 06/19/2026 M.K.
L1.04941 Kirschling CourtStevens Point, WI 54481Phone: 715.344.9999 Fax: 715.344.9922PLOVER PINE VILLAGE LLCPLOVER PINE VILLAGE EXPANSIONVILLAGE OF PLOVERPORTAGE CO, WILANDSCAPE PLANJLMK05/18/202623.115
GENERAL NOTES:PLANTING SCHEDULE:LANDSCAPE REQUIREMENTS:
0'40'80'1" = 40'UTILITY DISCLAIMER:BENCHMARK:BENCHMARK #1BENCHMARK #2BIO-RETENTION BASIN PLANTINGBIO-RETENTION BASIN PLANTING
Page 1 of 2 PROJECT INFORMATION: DRAWN BY: REVIEWED BY: CONTRACTOR: APPROVED BY:
A. THOMER A. THOMER
These plans, schedules, calculations, and lighting concepts are the property of Lighting Design Solutions (LDS) and are not to be shared, reproduced, viewed, or used in any manner without the explicit written permission of LDS. All luminaires and accessories purchased for this project are to be supplied by LDS unless other arrangements that include additional reimbursement for design costs are codified in a pre-approved written agreement with LDS. These plans are not approved for construction unless specifically noted. They have not been reviewed or approved by any local or state agency, nor has the building owner confirmed final acceptance of the design or materials. Once approved, the final product details, voltages, accessories and quantities are the responsibility of the installing contractor and are to be fully verified by the contractor prior to release of order. Lead time for luminaires will vary but should be assumed to be 4-6 weeks after release unless specifically noted as "in-stock" or "quick ship" on the LDS Project Quotation. Lighting performance and energy calculations are based on photometric data provided by the specified manufacturers, expected site finishes, anticipated energy costs, current rebate programs, and the projected operational use of the facility. Lighting Design Solutions, Inc. accepts no responsibility for variances resulting from inaccurate or changed data files, drawings, reflectance values, or rebate programs, and guarantees no alternate funding or rebate payment.
To request the Project Quotation for these materials or to place the order, please contact: Sales@LightingDesignSolutions.com or call us at 1-888-357-7070
RETROFIT AUTOMATED PRODUCTS EAST 4TH STREET MARSHFIELD, WI 54449
REV DESCRIPTION DATE
DATE: 05/16/2025
Luminaire Schedule Symbol Qty Label Description Calculation Summary Label Units Avg Max Min CIRCULATION CALCS Fc 0.5 3.6 0.0 Luminaire Watts Total Watts PROPERTY LINE Fc 0.0 0.0 13 P 14' POLE WITH LED POST TOP LED FIXTURE 34.4 447.2 0.0
Scale: 1 inch= 34 Ft.
SS SS#1
SS SS#2
SS SS#3
CSM # 11647
ELEV=1083.06
BENCHMARK #2
073.96 1 INV(W) 073.76 1 INV(S) 1 073.9 1 INV(E) 073.56 1 INV(N) 1 .7 1 08 1 RIM
WOODED AREA
WOODED AREA
WOODED AREA WOODED AREA
SOUTH LINE SW1/4
S 00°30'16" W
(NORTH) (S 00°30'45" W)
S 89°20'39" W
(S 89°20'35" W)
2670.96'
UNABLE TO SURVEY AREA UNABLE TO SURVEY AREA
SEC. 27 SEC. 34
S 89°20'39" W
(S 89°20'35" W)
EB EB ttettettett tttt
SS
P
P
P
P
P P
P
PP P
P
P P
1.9 0.2 1.2 0.5 0.1 0.0 1.0 2.7 0.1
0.0
0.2 0.1 0.0 0.0 0.6
0.9
0.0 0.0 0.0
0.2
0.8 0.0 0.0
0.0
0.0
0.1 0.1 0.3 0.5 0.6
0.3
0.5
0.0 0.0 0.0 0.0 0.0 0.0 0.1
0.4
0.2 0.0 0.0 0.0 0.2 0.7 1.6 2.1 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0
0.3
1.7
0.0 0.0 0.1 0.4 1.0 2.5 3.1 2.0
0.0
0.1 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0
0.0
0.7
0.5
1.7
0.0 0.1 0.2 0.4 1.0 2.3 0.0 1.2 0.0 0.2 0.1 0.1 0.1 0.2 0.4 0.6 1.02.4
3.0 2.3 1.1 0.5 0.2 0.1 0.1
0.0
0.0
0.0
0.8
2.9 1.6 0.8 0.3 0.1
0.7 0.4 0.1
0.8
0.2
0.7
0.1 0.0 0.0 0.0 0.0 0.0
1.6
0.1
3.1
0.2 0.3 0.2 0.2 0.2 0.2 1.1
0.0
0.0
0.7
0.0
0.5
0.1 0.0 0.0 0.0 0.0 0.0 1.3 0.4 2.5 0.7 0.5 0.2 0.1 0.1 0.1 1.7
1.5
0.1
0.1
0.0
0.1 0.2 0.3 0.4 0.4 0.3 0.1 0.1 0.1 0.0 0.0 0.0
0.2 0.5 0.7 1.1 1.5
0.2
0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0
0.1
0.0
0.5
0.1 0.1 0.2 0.4 0.4 0.4 0.2 0.1
0.0
3.0 2.2 1.1 0.6 0.3 0.1 0.2 0.4
1.2
1.6 1.2 2.6 1.4 0.7 0.3 0.1 0.0 0.0 0.0 1.0
0.5
0.0
0.3 0.2 0.2 0.4 0.6 0.9 1.5
3.6
0.8
2.1
0.3 0.2 0.1 0.0 0.0
0.2 0.6
0.7 1.4
0.0
0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0
0.0 0.0 0.1 0.3 0.4 0.3 0.2
0.0
0.0
0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.9 1.0 0.6 0.2 0.10.0 0.0
0.0
0.0
0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.1
2.3
0.2
1.2
0.1 0.1 0.0 0.0 0.0 0.0
0.0
0.0
0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.2
0.0
0.0
0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1
0.2
0.1 0.1 0.0 0.0
2.7 1.1 0.5 0.9 1.3 1.2
0.0 0.1 0.1
0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.10.1 0.0 0.1
3.1
0.0
0.1 0.0 0.1 0.2 0.3 0.5 0.7 0.7 0.5 0.3 0.7 0.2 0.1 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0.0 0.3 0.1 0.1 0.3 0.4 0.7 0.9 0.8 0.5 0.3 0.3 0.0 0.1 0.0 0.2 0.3 0.5 0.7 0.7 0.6 0.3 0.3 0.2
0.0
0.1
0.4
1.8 1.1 0.4
0.4 0.5 0.9 0.6 0.2
0.9
1.5
0.4
3.2
0.2
1.1 0.9 1.1 2.3 2.5 0.2 0.2
0.0
1.2
0.1
0.0 0.0 0.0
0.0 0.0 0.0
0.1 0.1 0.1
0.5
0.3
1.7
0.7 0.6 0.2
1.4 0.8 0.3
2.5 1.5 0.5
1.0
0.3
0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0
0.1
0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 1.1 2.1 2.8 1.9 0.8 0.2 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.0
0.2
0.0
1.0 0.6 0.2 0.1 0.1 0.2 0.2 0.1 0.1 0.1
0.1
0.4
0.4
2.0 3.0 2.6 1.3 0.5 0.2 0.1
0.1
0.8
0.2
0.3 0.5 0.3 0.2 0.3 0.6 0.9 1.6 2.4 1.6
1.2
0.5 0.2 0.1 0.2 0.4 0.7 1.1 2.1 2.2 1.2 0.7
0.7
0.9
1.3 0.1 0.2 0.3 0.4 0.4 0.3 0.2 0.2 0.2 0.1 0.6 0.1 2.4 3.5 2.2 1.10.5 0.2 0.1 0.2 0.5 0.3 0.1 1.5 2.8 2.9 1.8 0.9 0.4 0.1 0.1 0.0 0.1 0.0 0.1 0.3 0.8 1.6 2.9 2.9 1.7 0.8 0.4 0.2 0.1 0.0
0.5
0.5 0.7 0.7 0.5 0.3 0.2 0.2
2.3 1.0 2.6 0.3
0.2
0.6 0.4 0.2 0.1 0.1 0.2 0.5 0.9 1.5 0.3
0.2
0.3
0.2
1.5
0.4 0.6 0.7 0.6 0.4 0.3 0.3 0.2 0.2 0.3 0.4 0.7 0.8 0.7 0.4 0.3 0.20.1 0.2 0.2
0.0 2.0 2.2 1.2 0.7 0.4 0.2 0.1 0.0 0.0 1.1 0.0 0.9 0.1 0.1 0.0 0.00.0 0.1 0.3 0.6 1.6 2.0 0.0 0.1 2.3 1.1 0.6 0.3 0.7 0.1 0.3 0.7 1.1 1.9 0.0 0.1 0.1 0.3 2.3 0.0 0.1 0.2 0.4 0.8 1.3 0.0
0.0 0.0 0.0 0.0 0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 2 of 2 PROJECT INFORMATION: DRAWN BY: REVIEWED BY: CONTRACTOR: APPROVED BY:
A. THOMER A. THOMER
These plans, schedules, calculations, and lighting concepts are the property of Lighting Design Solutions (LDS) and are not to be shared, reproduced, viewed, or used in any manner without the explicit written permission of LDS. All luminaires and accessories purchased for this project are to be supplied by LDS unless other arrangements that include additional reimbursement for design costs are codified in a pre-approved written agreement with LDS. These plans are not approved for construction unless specifically noted. They have not been reviewed or approved by any local or state agency, nor has the building owner confirmed final acceptance of the design or materials. Once approved, the final product details, voltages, accessories and quantities are the responsibility of the installing contractor and are to be fully verified by the contractor prior to release of order. Lead time for luminaires will vary but should be assumed to be 4-6 weeks after release unless specifically noted as "in-stock" or "quick ship" on the LDS Project Quotation. Lighting performance and energy calculations are based on photometric data provided by the specified manufacturers, expected site finishes, anticipated energy costs, current rebate programs, and the projected operational use of the facility. Lighting Design Solutions, Inc. accepts no responsibility for variances resulting from inaccurate or changed data files, drawings, reflectance values, or rebate programs, and guarantees no alternate funding or rebate payment.
To request the Project Quotation for these materials or to place the order, please contact: Sales@LightingDesignSolutions.com or call us at 1-888-357-7070
RETROFIT AUTOMATED PRODUCTS EAST 4TH STREET MARSHFIELD, WI 54449
REV DESCRIPTION DATE
DATE: 05/16/2025
Luminaire Schedule Symbol Qty Label Description Luminaire Watts Total Calculation Summary Label Units Avg Max/Min CIRCULATION CALCS Fc 0.5 N.A. PROPERTY LINE Fc 0.0 Watts 447.2 13 P 14' POLE WITH LED POST TOP LED FIXTURE 34.4 N.A.
U s e Z o n e : 3 7 f t x 2 3 f t
C h i l d C a p a c i t y : 2 9
P l a y A c t i v i t i e s : 7
P l a y g r o u n d B o s s . c o m
A g e s 2 - 1 2
M o n k e y I n T h e M i d d l e
S K U : P G B - 2 0 2 2 1
Village of Plover
COMMUNITY DEVELOPMENT DEPARTMENT
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
Phone: 715-345-5250 Website: www.ploverwi.gov
TO: Plan Commission and Village Board
FROM: Adam DeKleyn, Community Development Manager
RE: Community Development Department Report
Development remains steady in Plover. We continue to see residential growth, along with new
commercial and manufacturing investment.
Site work has started on the Green Tree Farm Subdivision, and utilities are starting to be installed.
Lexington Place XII Subdivision is building out quickly with multiple duplexes currently under
construction. Denyon Homes is starting to work on plans for the next addition to the Harvest Acres
Subdivision. As of the end of May, Plover has issued permits for (24) new single-family homes and (6)
new duplexes.
On the business/commercial side – Olive Garden has started construction in Crossroads Commons,
and the new Chase Bank is nearing completion. The Plover YMCA will celebrate its grand opening
June 29th. Stone Harvest Wine Lounge plans to open soon and recently received funding through the
Central Wisconsin Economic Development Fund (CWED). Becca’s Café is also opening soon in Artist &
Fare.
On the manufacturing side - Mullins Whey started construction on the newest intake addition. Warner
Packaging is preparing plans for a new warehouse facility in the Pine Corporate Centre.
Lastly, construction has started on a new driveway and parking area for the Daniel R. Mohoney
Conservancy. This project will make the Conservancy more accessible to the public for recreation and
enjoyment.
May Building Report:
NEW STRUCTURES YTD THRU MAY 2026 Buildings Units
SINGLE FAMILY 24 24
DUPLEX 6 12
MOBILE HOME 1 1
MULTI-FAMILY - -
COMMERCIAL 1 1
TOTAL 32 38
YTD VALUE OF CONSTRUCTION MAY 2026
RESIDENTIAL $12,283,038
MULTI-FAMILY -
COMMERCIAL $2,230,684
TOTAL $14,513,722
Source: Village of Plover website. First collected Oct 18, 2026.