Agenda – Water/Wastewater Committee 06/10/26 10:40 AM
WATER/WASTEWATER UTILITY COMMITTEE AGENDA
Plover Municipal Board Room
2400 Post Road
Plover, WI 54467
Monday, June 15, 2026
5:00 p.m.
1. Call to order
2. Approval of the minutes of the meeting of April 9, 2026, as printed
3. Persons wishing to address the Committee
4. Approval of vouchers
Discussion with possible action on the following:
5. 2025 WWTF Compliance Maintenance Annual Report (CMAR)
6. Wastewater Utility Budget amendment requests for:
a. UV system replacement utilizing both Replacement funds for the equipment and Capital Outlay for
installation
b. Neuros Blower Harmonic Filter replacements and upgrades as 2026 Capital Outlay Project
7. Engineering Services Agreement for Water System Improvements
8. Village project change orders, substitutions, or construction approvals
9. Reports
a. Water System Manager
b. Wastewater System Manager
10. Adjournment subject to call of the chair
NOTICE IS HEREBY GIVEN that a majority of the members of the Village Board may attend this meeting to gather information
about a subject over which they have decision-making authority.
VILLAGE OF PLOVER
SPECIAL WATER/WASTEWATER UTILITY COMMITTEE
April 9, 2026
Members Present: Gary Wolf, Ross Ballard, Ken Brekke, Marv Hopp, Adam Raabe
Others Present: Steve Kunst, Julia Mann, Tim Durigan, Lyle Lutz, Logan Elsholtz, Tracy Karnitz
1. Mr. Wolf called the meeting to order at 5:00 p.m.
2. Mr. Raabe moved and Mr. Brekke seconded approval of the minutes of February 16, 2026.
Motion carried; copy attached.
3. There were no persons wishing to address the Committee.
4. Mr. Hopp moved, and Mr. Raabe seconded approval of the vouchers. Motion carried; copy attached.
Discussion with possible action on the following:
5. Recommendation for approval of Engineering Services Agreement for the River Rd. Lift Station
upgrade
Mr. Lutz reviewed the request and provided background. Staff recommend approval to award
engineering services to Clark Dietz. Ms. Diane Thourne of Clark Dietz was available virtually to answer
questions. Mr. Kuntz noted the proposed timeline will help to minimize impacts to the overall
wastewater budget. Discussion ensued regarding capital outlay specifics and power supply.
***RECOMMENDATION TO VILLAGE BOARD*** Mr. Raabe moved and Mr. Brekke seconded
approval of Engineering Services Agreement with Clark Dietz for the River Rd. Lift Station upgrade.
Motion carried; copy attached.
6. Village of Plover Wastewater Treatment Facility Plan Amendment – Donohue & Associates Report
Mr. Nathan Cassidy from Donohue & Associates presented the report. Discussion ensued regarding
potential rate impacts and the scope of the project. Mr. Lutz highlighted the importance of fiscal
responsibility while maintaining the current facility. Mr. Kuntz addressed future planning steps as
village staff continue to evaluate and plan for the future. Further discussion took place regarding
population projections, industrial capacities, and the maintenance of current equipment while
prioritizing immediate needs to allow for yearly incremental improvements.
***RECOMMENDATION TO VILLAGE BOARD***Mr. Raabe moved and Mr. Hopp seconded
approval of the Village of Plover Wastewater Treatment Facility Plan Amendment – Donohue &
Associates Report. Motion carried; copy attached.
7. Sanitary Collection System Master Plan – Donohue & Associates Report
Mr. Joe Holzwart and Mr. Ben Grunwald from Donohue & Associates presented the report highlighting
population projections and how the current collection system can meet those needs. Discussion ensued
regarding potential areas for sewer back-ups and lift stations that are close to capacity.
***RECOMMENDATION TO VILLAGE BOARD***Mr. Brekke moved and Mr. Raabe seconded
approval of the Sanitary Collection System Master Plan. Motion carried; copy attached.
8. There were no Village project change orders, substitutions, or construction approvals.
9. Reports
a. There were no questions from the Committee regarding the Water System Manager report.
b. Mr. Lutz reviewed his report to highlight the 2025 effluent PFOS & PFOA data. He discussed the
effects of the recent ice storm and commended his staff on their hard work to ensure operations ran
smoothly despite power outages.
11. Mr. Raabe moved and Mr. Brekke seconded adjournment at 6:20 p.m. Motion carried.
Submitted by Tracy Karnitz
Village of Plover Payment Approval Report - Utilities Water Page: 1
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:29AM
Report Criteria:
Detail report.
Invoices with totals above $0.00 included.
Paid and unpaid invoices included.
[Report].GL Account Number (3 Characters) = "700"
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
700
56 AECOM 2001139120 TASK 1&2 05/07/2026 581.51 581.51 05/08/2026
56 AECOM 2001149150 TO 1 GENERAL ENGINEERING 06/04/2026 820.51 820.51 06/09/2026
104 AMERICAN ASPHALT OF WI 5300074329 MAPLE DR-WATER SERVICE 05/21/2026 2,965.00 2,965.00 05/29/2026
123 AMERICAN WELDING & GAS IN 0011681003 CURB BOX REPAIR 05/18/2026 31.00 31.00 05/21/2026
195 AT&T- NEW PHONES 831-001- 20 5574824118 APRIL 04/17/2026 108.45 108.45 04/24/2026
195 AT&T- NEW PHONES 831-001- 20 6547784115 MAY 05/14/2026 108.31 108.31 05/15/2026
269 BATTERIES PLUS P91393348 BATTERIES PLUS 04/28/2026 16.65 16.65 04/29/2026
311 BIG IRON EQUIPMENT INC 91670 VALVE EXTENSION 05/31/2026 21.40 21.40 06/09/2026
317 BLACKBURN MANUFACTURING IN0028927 MARKING PAINT 04/15/2026 609.57 609.57 04/17/2026
331 BOARDMAN CLARK LAW FIRM 315563 LINCOLN-AT&T 03/30/2026 400.00 400.00 04/10/2026
331 BOARDMAN CLARK LAW FIRM 315564 T-MOBILE LINCOLN TOWER 03/30/2026 800.00 800.00 04/10/2026
331 BOARDMAN CLARK LAW FIRM 315565 DISK TOWER NSIGHT 03/30/2026 400.00 400.00 04/10/2026
331 BOARDMAN CLARK LAW FIRM 315566 DISK TOWER-AT&T 03/30/2026 1,200.00 1,200.00 04/10/2026
331 BOARDMAN CLARK LAW FIRM 317008 BOARDMAN CLARK LAW FIRM 04/28/2026 241.00 241.00 05/15/2026
331 BOARDMAN CLARK LAW FIRM 317009 T-MOBILE LINCOLN TOWER 04/28/2026 855.50 855.50 05/15/2026
331 BOARDMAN CLARK LAW FIRM 317010 DISK TOWER NSIGHT 04/28/2026 80.00 80.00 05/15/2026
331 BOARDMAN CLARK LAW FIRM 317011 DISK TOWER-AT&T 05/08/2026 640.00 640.00 05/15/2026
331 BOARDMAN CLARK LAW FIRM 318158 DISK TOWER-AT&T 05/18/2026 80.00 80.00 05/29/2026
3782 C4 POWDER FAB INV-0000032 RACKING 03/09/2026 1,400.00 1,400.00 04/24/2026
422 CARGILL INC - SALT DIVISION 2912409328 CARGILL INC - SALT DIVISION 05/13/2026 7,008.59 7,008.59 05/21/2026
422 CARGILL INC - SALT DIVISION 2912472633 CARGILL INC - SALT DIVISION 05/29/2026 7,037.23 7,037.23 06/09/2026
3854 CASELLE LLC INV-19722 2026 CLOUD HOSTING- SECON 06/09/2026 4,906.84 .00
3648 CBS SQUARED INC 17441 WELL 1 GENERATOR 04/10/2026 4,244.20 4,244.20 04/17/2026
3648 CBS SQUARED INC 17650 WELL 1 GENERATOR 05/18/2026 7,470.13 7,470.13 05/21/2026
3648 CBS SQUARED INC 17777 WELL 1 GENERATOR 06/10/2026 2,937.58 .00
443 CDW GOVERNMENT INC AI7H26J CAT6 CABLE 04/01/2026 347.07 347.07 04/17/2026
443 CDW GOVERNMENT INC AI93Q7H UPS DEVICES/REPLACEMENT 04/22/2026 441.37 441.37 05/08/2026
446 CELLCOM 087863 CELLPHONES 05/23/2026 762.30 762.30 06/09/2026
446 CELLCOM 874476 CELL PHONES 03/23/2026 428.54 428.54 04/10/2026
446 CELLCOM 980822 CELLPHONES 04/29/2026 583.37 583.37 04/29/2026
3535 CENTER FOR INTERNET SECU INV-260402- 00 2026 ANTIVIRUS 04/24/2026 66.00 66.00 04/24/2026
3535 CENTER FOR INTERNET SECU INV-260402- 00 2026 ANTIVIRUS 04/24/2026 660.00 660.00 04/24/2026
3932 CENTRAL STATE ELECTRIC 12445 CONDUIT OFFSET 05/27/2026 20.55 20.55 06/09/2026
555 CLIFTON LARSON ALLEN LLP L261159788, L 2025 AUDIT SERVICES 05/06/2026 5,103.00 5,103.00 05/08/2026
610 COOPER OIL COMPANY INC 350675 COOPER OIL COMPANY INC 04/20/2026 363.95 363.95 04/24/2026
615 CORE & MAIN LP Z096553 VALVE BOX PARTS 05/27/2026 1,740.03 1,740.03 05/29/2026
615 CORE & MAIN LP Z117293 CORE & MAIN LP 05/29/2026 136.94 136.94 06/09/2026
663 CTW CORPORATION 42618 CTW CORPORATION 04/17/2026 22,473.00 22,473.00 04/24/2026
663 CTW CORPORATION 42659 CTW CORPORATION 05/15/2026 39,467.00 39,467.00 05/21/2026
666 CUMMINS SALES & SERVICE IN F9-260564052 ONAN GENERATOR MAINTENA 05/16/2026 875.02 875.02 05/21/2026
666 CUMMINS SALES & SERVICE IN F9-260564053 ONAN GENERATOR MAINTENA 05/16/2026 765.74 765.74 05/21/2026
682 DAKOTA SUPPLY GROUP S105608926.0 UNIT HEATER HANGER 04/20/2026 1,175.91 1,175.91 04/24/2026
682 DAKOTA SUPPLY GROUP S105636593.0 UNIT HEATER HANGER 04/29/2026 255.16 255.16 05/08/2026
682 DAKOTA SUPPLY GROUP S105637692.0 UNIT HEATER HANGER 04/29/2026 56.78 56.78 05/08/2026
682 DAKOTA SUPPLY GROUP S105746345.0 PLUMBING PARTS 06/10/2026 224.87 .00
3906 EAGLE CONSTRUCTION CO IN PAY APP 1 WELL 1 GENERATOR 04/10/2026 7,023.35 7,023.35 04/10/2026
3906 EAGLE CONSTRUCTION CO IN PLOVV 25001- WELL 1 GENERATOR 05/27/2026 34,200.00 34,200.00 05/29/2026
3906 EAGLE CONSTRUCTION CO IN PLOVV25001- WELL 1 GENERATOR 04/30/2026 21,190.70 21,190.70 05/08/2026
907 FAHRNER EXCAVATING INC E-12125 WATER SERVICES 04/20/2026 3,903.00 3,903.00 04/29/2026
936 FERGUSON WATERWORKS #14 0471286 METER FLANGE/GASKET 04/13/2026 1,956.77 1,956.77 04/17/2026
Village of Plover Payment Approval Report - Utilities Water Page: 2
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:29AM
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
936 FERGUSON WATERWORKS #14 0471286-1 METAL DETECTOR 04/13/2026 1,175.00 1,175.00 04/17/2026
936 FERGUSON WATERWORKS #14 0472207 VALVE BOX PARTS 04/17/2026 3,869.39 3,869.39 04/24/2026
936 FERGUSON WATERWORKS #14 0472207-1 VALVE BOX PARTS 05/01/2026 1,571.39 1,571.39 05/08/2026
3848 GAYLORD, COLTEN CG_0421_26 SAFETY SHOES 04/23/2026 200.00 200.00 04/24/2026
1106 GRAINGER INC 9898501318 TUBING 04/29/2026 119.50 119.50 05/08/2026
1113 GRAYBAR ELECTRIC CO INC 9353320554 SECURITY CAMERA MATERIAL 05/27/2026 125.75 125.75 05/29/2026
1113 GRAYBAR ELECTRIC CO INC 9353333505 LED LIGHTING 06/02/2026 530.18 530.18 06/09/2026
1129 GREEN THUMB SPRINKLERS & 6405 TREES 03/29/2026 796.00 796.00 04/29/2026
1192 HEARTLAND BUSINESS SYSTE 876977-H FORTINET LICENSE AND WARR 05/14/2026 24.59 24.59 05/15/2026
1192 HEARTLAND BUSINESS SYSTE 876977-H FORTINET LICENSE AND WARR 05/14/2026 344.24 344.24 05/15/2026
1192 HEARTLAND BUSINESS SYSTE 876977-H FORTINET COTERM-WELL 2 S 05/14/2026 123.39 123.39 05/15/2026
1192 HEARTLAND BUSINESS SYSTE 877678-H 2026 MS LICENSES 05/29/2026 196.20 196.20 05/29/2026
1192 HEARTLAND BUSINESS SYSTE 877678-H 2026 MS LICENSES 05/29/2026 2,359.20 2,359.20 05/29/2026
1251 HYDROCORP INC CI-10940 HYDROCORP INC 01/30/2026 1,165.00 1,165.00 04/10/2026
1251 HYDROCORP INC CI-11357 HYDROCORP INC 02/27/2026 1,165.00 1,165.00 04/24/2026
1251 HYDROCORP INC CI-12536 HYDROCORP INC 04/30/2026 1,165.00 1,165.00 05/08/2026
1251 HYDROCORP INC CI-13096 HYDROCORP INC 05/29/2026 1,165.00 1,165.00 05/29/2026
3669 INVOICE CLOUD, INC 2822-2026_3 MARCH 04/06/2026 363.97 363.97 04/10/2026
3669 INVOICE CLOUD, INC 2822-2026_4 ARPIL 05/06/2026 320.51 320.51 05/08/2026
3669 INVOICE CLOUD, INC 2822-2026_5 MAY 06/09/2026 138.67 .00
1320 JAKUBEK CASEY CJ_0409_2026 UNIFORM PANTS 04/16/2026 400.90 400.90 04/17/2026
3921 JON TRZEBIATOWSKI JT0501_2026 SAFETY SHOES 05/11/2026 152.37 152.37 05/15/2026
3921 JON TRZEBIATOWSKI JT0502_2026 UNIFORM PANTS 05/11/2026 266.47 266.47 05/15/2026
3921 JON TRZEBIATOWSKI JT0529_2026 MILEAGE 06/02/2026 141.22 141.22 06/09/2026
1464 KRAMAR CHAD CK0528_2026 BACKFLOW TEST FEES 05/28/2026 102.25 102.25 05/29/2026
1488 KWIK TRIP INC APRIL 2026 VI APRIL 05/04/2026 1,807.28 1,807.28 05/08/2026
1488 KWIK TRIP INC MARCH 2026 MARCH 04/06/2026 1,720.52 1,720.52 04/10/2026
1488 KWIK TRIP INC MAY 2026 VILL MAY FUEL 06/09/2026 1,967.41 .00
1523 LANE TANK COMPANY INC LT0427_26 CLEAN LINCOLN TOWER 04/27/2026 14,500.00 14,500.00 05/29/2026
1622 MADA CUSTOM APPAREL & SP 979.55 SAFETY APARREL 04/22/2026 979.55 979.55 04/24/2026
1652 MARTELLE WATER TREATMEN 31412 MARTELLE WATER TREATMEN 04/22/2026 1,601.33 1,601.33 04/29/2026
1652 MARTELLE WATER TREATMEN 31487 MARTELLE WATER TREATMEN 05/05/2026 299.40 299.40 05/15/2026
1652 MARTELLE WATER TREATMEN 31510 MARTELLE WATER TREATMEN 05/07/2026 88.00 88.00 05/21/2026
1652 MARTELLE WATER TREATMEN 31693 CHEMICALS 05/28/2026 2,132.98 .00
1692 MENARDS INC 39277 TOILET 04/02/2026 9.48 9.48 04/10/2026
1692 MENARDS INC 39432 BASE TRIM 04/06/2026 38.95 38.95 04/10/2026
1692 MENARDS INC 39455 BASE TRIM 04/06/2026 15.96 15.96 04/10/2026
1692 MENARDS INC 39499 ADHESIVE 04/07/2026 7.98 7.98 04/10/2026
1692 MENARDS INC 39577 MARKING PAINT 04/08/2026 14.98 14.98 04/17/2026
1692 MENARDS INC 39807 MARKING PAINT 04/13/2026 14.98 14.98 04/17/2026
1692 MENARDS INC 39810 CLEANING SUPPLIES 04/13/2026 43.18 43.18 04/17/2026
1692 MENARDS INC 39883 SERVICE PLUG 04/14/2026 13.99 13.99 04/17/2026
1692 MENARDS INC 40228 WALL BASE 04/20/2026 238.06 238.06 04/24/2026
1692 MENARDS INC 40331 BOLLARDS 04/22/2026 38.26 38.26 04/24/2026
1692 MENARDS INC 40401 SECURITY CAMERA 04/23/2026 187.91 187.91 04/29/2026
1692 MENARDS INC 40669 SECURITY CAMERA 04/28/2026 4.82- 4.82- 05/08/2026
1692 MENARDS INC 40670 LANDSCAPING 04/28/2026 6.63 6.63 05/08/2026
1692 MENARDS INC 40716 UNIT HEATER 04/29/2026 80.45 80.45 05/08/2026
1692 MENARDS INC 40734 TOOLS AND MAINT SUPPLIES 04/29/2026 846.64 846.64 05/08/2026
1692 MENARDS INC 41521 VEHICLE TOOLS 05/14/2026 122.35 122.35 05/21/2026
1692 MENARDS INC 41797 SHOP SUPPLIES 05/19/2026 173.10 173.10 05/29/2026
1692 MENARDS INC 42301 FLUSHING PARTS 05/28/2026 31.96 31.96 05/29/2026
1692 MENARDS INC 43012 ELECTRICAL SUPPLIES 06/10/2026 71.78 .00
3682 METRON FARNIER LLC 992424855 METERS 04/24/2026 57,259.43 57,259.43 04/29/2026
3525 MIDSTATE LOCK & SAFE LLC 26-9764 SPARE KEYS 04/28/2026 144.00 144.00 04/29/2026
3895 N.E.W. COATINGS LLC 8963 FLOOR COATING 04/01/2026 3,496.72 3,496.72 04/24/2026
1811 NAPA - CENTRAL WI AUTO PAR 435651 HYDRANT MAINTENANCE 04/02/2026 47.56 47.56 06/09/2026
Village of Plover Payment Approval Report - Utilities Water Page: 3
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:29AM
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
1811 NAPA - CENTRAL WI AUTO PAR May 2026 VARIOUS WATER REPAIRS 05/31/2026 35.00 35.00 06/09/2026
1881 NORTHERN LAKE SERVICE INC 2608651 PFAS TESTING 05/28/2026 1,035.00 1,035.00 05/29/2026
1881 NORTHERN LAKE SERVICE INC 2609121 WATER TESTING 06/04/2026 120.49 120.49 06/09/2026
3371 OREILLY AUTO May 2026 WATER EQUIPMENT REPAIRS 05/28/2026 809.15 809.15 06/09/2026
2020 PITNEY BOWES - RESERVE AC MARCH-MAY 2 MARCH-MAY POSTAGE 05/27/2026 688.53 688.53 05/29/2026
2020 PITNEY BOWES - RESERVE AC MARCH-MAY 2 MARCH-MAY POSTAGE 05/27/2026 17.77 17.77 05/29/2026
2111 POLLARD WATER 0308851 CURB BOX WRENCHES 04/17/2026 848.10 848.10 04/24/2026
3523 PRECISION CELLULAR & SOUN ORD-0088 CELL BOOSTER 04/10/2026 1,500.00 1,500.00 04/17/2026
3642 PRECISION WATER METER TE 031-26 METER TESTING SERVICE 06/02/2026 1,920.00 1,920.00 06/09/2026
2312 ROBERTS IRRIGATION CO INC AR00011321 FILL STATION FITTING 06/01/2026 22.03 .00
2383 SALOUN, MATT MS_0421_26 SAFETY SHOES 04/21/2026 200.00 200.00 04/24/2026
2383 SALOUN, MATT MS0506_2026 MILEAGE 05/11/2026 127.65 127.65 05/15/2026
2399 SCHIERL TIRE & SERVICE CEN 4046959 ALIGNMENT MATT'S TRUCK 05/05/2026 118.75 118.75 05/08/2026
2461 SHORT ELLIOTT HENDRICKSO 506817 CTH R WATERMAIN DESIGN 04/08/2026 2,844.84 2,844.84 04/17/2026
2528 SPEE DEE DELIVERY SERVICE 1465820 FLUORIDE 05/02/2026 8.25 8.25 05/15/2026
2528 SPEE DEE DELIVERY SERVICE 1480024 FLUORIDE 05/30/2026 8.25 8.25 06/09/2026
2584 STEVENS POINT AUTO CENTE 414471 FRONT AXLE SEALS MATT'S TR 04/30/2026 208.50 208.50 05/08/2026
2633 SUPERIOR CHEMICAL LLC 439292 SILICONE LUBE, FREIGHT 04/13/2026 354.37 354.37 04/17/2026
2803 TRUGREEN COMMERCIAL 224846955 TOWER LANDSCAPING 05/15/2026 139.79 139.79 05/29/2026
2803 TRUGREEN COMMERCIAL 224853938 LAWN TREATMENT 05/15/2026 172.05 172.05 05/29/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 200.66 200.66 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 401.84 401.84 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 B&H PHOTO 05/19/2026 712.90 712.90 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 B&H PHOTO 05/19/2026 379.95 379.95 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 OSI BATTERIES 05/19/2026 637.47 637.47 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 LODGE KOEHLER HOTEL 05/19/2026 177.19 177.19 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 LODGE KOEHLER HOTEL 05/19/2026 283.04 283.04 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 LODGE KOEHLER HOTEL 05/19/2026 460.23 460.23 05/21/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 INDEED 04/17/2026 59.40 59.40 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 METRO MARKET 04/17/2026 28.83 28.83 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 JIMMY JOHNS 04/17/2026 59.52 59.52 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 DNR 04/17/2026 1.80 1.80 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 DNR 04/17/2026 90.00 90.00 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 301.78 301.78 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 22.99 22.99 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 134.25 134.25 04/24/2026
2856 USA BLUEBOOK INV01014060 FLUORIDE METER/SUPPLIES 04/08/2026 1,130.48 1,130.48 04/10/2026
2856 USA BLUEBOOK INV01014122 MARKING PAINT 04/08/2026 139.98 139.98 04/10/2026
2856 USA BLUEBOOK INV01050529 WATER TESTING 05/18/2026 532.85 532.85 05/21/2026
3748 VMC LLC 1804 DISK AT&T 04/15/2026 1,000.00 1,000.00 04/17/2026
3748 VMC LLC 1805 LINCOLN AT&T 04/15/2026 4,500.00 4,500.00 04/17/2026
3748 VMC LLC 1806 LINCOLN AT&T 04/15/2026 2,500.00 2,500.00 04/17/2026
3748 VMC LLC 1807 LINCOLN AT&T 04/15/2026 1,800.00 1,800.00 04/17/2026
3024 WELD RILEY SC 42 MARCH 26 LEGAL 04/15/2026 80.00 80.00 04/24/2026
3070 WI DEPT NATURAL RESOURCE WU119712 WI DEPT NATURAL RESOURCE 04/08/2026 125.00 125.00 05/15/2026
3103 WI DEPT OF JUSTICE - CIB WO 2026-03- 01_20 MARCH 04/09/2026 7.00 7.00 04/10/2026
3073 WI DNR - OPERATOR CERT JT_0428_2026 OPERATOR EXAMS 04/28/2026 75.00 75.00 04/29/2026
3142 WI ENVIRONMENTAL IMPROVE 22092 4882-01 PRINCIPAL 04/28/2026 143,198.53 143,198.53 04/29/2026
3142 WI ENVIRONMENTAL IMPROVE 22092 4882-01 INTEREST 04/28/2026 22,615.44 22,615.44 04/29/2026
3169 WI PUBLIC SERVICE CORPORA APRIL 2026 APRIL 05/07/2026 7,133.11 7,133.11 05/08/2026
3169 WI PUBLIC SERVICE CORPORA MARCH 2026 MARCH 04/08/2026 7,900.68 7,900.68 04/10/2026
3169 WI PUBLIC SERVICE CORPORA MAY 2026 MAY 06/10/2026 9,329.57 .00
3183 WI STATE LAB OF HYGIENE - A 838588 FLUORIDE TESTING 03/31/2026 31.00 31.00 04/10/2026
3183 WI STATE LAB OF HYGIENE - A 841277 FLOURIDE TESTS 04/30/2026 31.00 31.00 05/15/2026
3183 WI STATE LAB OF HYGIENE - A 844011 FLUORIDE 05/31/2026 31.00 31.00 06/09/2026
3245 WISCONSIN RURAL WATER AS 3017 TRAINING 05/01/2026 180.00 180.00 05/15/2026
3245 WISCONSIN RURAL WATER AS 3024 TRAINING 05/28/2026 500.00 500.00 06/09/2026
Village of Plover Payment Approval Report - Utilities Water Page: 4
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:29AM
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
3245 WISCONSIN RURAL WATER AS WRWA_0428_ WISCONSIN RURAL WATER AS 04/28/2026 125.00 125.00 04/29/2026
3245 WISCONSIN RURAL WATER AS WRWA_428_2 TRAINING 04/28/2026 500.00 500.00 04/29/2026
Total 700: 513,757.09 492,025.36
Grand Totals: 513,757.09 492,025.36
Village of Plover Payment Approval Report - Utilities WWTP Page: 1
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:31AM
Report Criteria:
Detail report.
Invoices with totals above $0.00 included.
Paid and unpaid invoices included.
[Report].GL Account Number (3 Characters) = "600"
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
600
3419 1ST AYD CORPORATION PSI873676 GLOVES 05/14/2026 188.69 188.69 05/29/2026
56 AECOM 2001139120 TASK 1&2 05/07/2026 581.51 581.51 05/08/2026
56 AECOM 2001149149 STH 54 TO 173 06/04/2026 4,409.46 4,409.46 06/09/2026
56 AECOM 2001149150 TO 1 GENERAL ENGINEERING 06/04/2026 820.51 820.51 06/09/2026
123 AMERICAN WELDING & GAS IN 0011598400 HYDRO TEST AIR TANKS 04/08/2026 102.00 102.00 04/10/2026
3876 AQUA-PURE INC PLOWI050426 POLYMER 05/18/2026 4,255.00 4,255.00 05/21/2026
186 ASPIRUS MEDICAL GROUP INC 157750 JACOBY 05/04/2026 109.50 109.50 05/08/2026
195 AT&T- NEW PHONES 831-001- 20 5574824118 APRIL 04/17/2026 162.68 162.68 04/24/2026
195 AT&T- NEW PHONES 831-001- 20 6547784115 MAY 05/14/2026 162.46 162.46 05/15/2026
3818 BAY TOWEL INC APRIL 2026 U APRIL 05/04/2026 339.50 339.50 05/08/2026
3818 BAY TOWEL INC MAY 2026 UNI MAY 06/09/2026 407.50 .00
283 BEAVER OF WISCONSIN INC 119356 VALVE MAINTENANCE 05/19/2026 133.75 133.75 05/21/2026
392 BUSHMAN ELECTRIC CRANE & 38348 AIRLINE LS METER POLE REPL 04/28/2026 1,164.75 1,164.75 04/29/2026
3854 CASELLE LLC INV-19722 2026 CLOUD HOSTING- SECON 06/09/2026 4,906.84 .00
446 CELLCOM 090483 CELL PHONES 05/23/2026 124.01 124.01 06/09/2026
446 CELLCOM 983483 CELLCOM 04/23/2026 124.02 124.02 04/29/2026
3535 CENTER FOR INTERNET SECU INV-260402- 00 2026 ANTIVIRUS 04/24/2026 66.00 66.00 04/24/2026
3535 CENTER FOR INTERNET SECU INV-260402- 00 2026 ANTIVIRUS 04/24/2026 726.00 726.00 04/24/2026
3931 CLEANOVA US, INC 2026/F000008 REPLACEMENT GBT BELT 03/30/2026 1,595.07 1,595.07 06/09/2026
555 CLIFTON LARSON ALLEN LLP L261159788, L 2025 AUDIT SERVICES 05/06/2026 5,103.00 5,103.00 05/08/2026
610 COOPER OIL COMPANY INC 351154 DIESEL FUEL 05/28/2026 2,078.40 2,078.40 05/29/2026
615 CORE & MAIN LP Y847087 SANITARY SEWER MANHOLE C 04/27/2026 5,225.00 5,225.00 04/29/2026
660 CT LABORATORIES LLC 203676 INDUSTRIAL FOG TESTING 04/06/2026 1,050.00 1,050.00 04/10/2026
660 CT LABORATORIES LLC 204061 INDUSTRIAL FOG TESTING 04/28/2026 600.00 600.00 05/08/2026
660 CT LABORATORIES LLC 204558 INDUSTRIAL FOG TESTING 05/11/2026 1,050.00 1,050.00 05/15/2026
660 CT LABORATORIES LLC 204561 QTRLY EFF N TESTING 05/11/2026 38.00 38.00 05/15/2026
660 CT LABORATORIES LLC 204876 QUARTERLY SLUDGE TESTING 05/29/2026 580.00 580.00 06/09/2026
660 CT LABORATORIES LLC 205000 INDUSTRIAL FOG TESTING 05/29/2026 1,050.00 1,050.00 06/09/2026
660 CT LABORATORIES LLC 205400 INDUSTRIAL FOG TESTING 06/09/2026 750.00 .00
775 DONOHUE & ASSOCIATES INC 14598-11 DONOHUE COLLECTION SYST 04/24/2026 4,394.00 4,394.00 04/29/2026
3920 ENDUSTRA FILTER MANUFACT V261357-3 BLOWER AIR FILTERS 03/16/2026 563.00 563.00 05/08/2026
866 ENERGENECS INC EINV0050144 GRIT PMP PARTS 04/02/2026 74.88 74.88 04/10/2026
919 FASTENAL COMPANY INC WISTE321883 HARDWARE 04/29/2026 114.15 114.15 05/08/2026
1158 HACH COMPANY 15021326 HACH LAB AND TESTING SUPP 05/28/2026 958.69 958.69 05/29/2026
1188 HAWKINS INC 7410044 PUMP TUBES, TUBING 04/30/2026 271.63 271.63 05/08/2026
1192 HEARTLAND BUSINESS SYSTE 876977-H FORTINET LICENSE AND WARR 05/14/2026 24.59 24.59 05/15/2026
1192 HEARTLAND BUSINESS SYSTE 876977-H FORTINET LICENSE AND WARR 05/14/2026 344.24 344.24 05/15/2026
1192 HEARTLAND BUSINESS SYSTE 877678-H 2026 MS LICENSES 05/29/2026 196.20 196.20 05/29/2026
1192 HEARTLAND BUSINESS SYSTE 877678-H 2026 MS LICENSES 05/29/2026 2,359.20 2,359.20 05/29/2026
3669 INVOICE CLOUD, INC 2822-2026_3 MARCH 04/06/2026 363.97 363.97 04/10/2026
3669 INVOICE CLOUD, INC 2822-2026_4 ARPIL 05/06/2026 320.51 320.51 05/08/2026
3669 INVOICE CLOUD, INC 2822-2026_5 MAY 06/09/2026 138.67 .00
1331 JAY-MAR INC INV0180270 WEED SPRAY 04/29/2026 62.13 62.13 05/08/2026
3561 JF AHERN COMPANY 803373 2026 HVAC MAINT CONTRACT 03/10/2026 7,118.64 7,118.64 05/15/2026
1404 KEMIRA WATER SOLUTIONS IN 9017941161 FERRIC CHLORIDE 05/19/2026 12,420.73 12,420.73 05/21/2026
1488 KWIK TRIP INC APRIL 2026 VI APRIL 05/04/2026 680.22 680.22 05/08/2026
1488 KWIK TRIP INC MARCH 2026 MARCH 04/06/2026 630.55 630.55 04/10/2026
1488 KWIK TRIP INC MAY 2026 VILL MAY FUEL 06/09/2026 563.66 .00
1508 LAI LTD 25-63194 PREFILTER WRAPS 01/07/2026 360.00 360.00 05/08/2026
1508 LAI LTD 26-63512 WEDECO UV BULBS 04/28/2026 3,109.90 3,109.90 05/08/2026
Village of Plover Payment Approval Report - Utilities WWTP Page: 2
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:31AM
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
1508 LAI LTD 26-63705 WEDECO LAMP PLUG INSERTS 04/28/2026 575.64 575.64 05/08/2026
3912 LK SUPPLIES LLC 26008 CLARIFIER DRIVE PARTS 05/04/2026 644.95 644.95 05/08/2026
1621 MACQUEEN EQUIPMENT W09326 MOBILE SEVICE FOR VAC TRU 04/14/2026 2,434.24 2,434.24 04/17/2026
1692 MENARDS INC 39558 MAINT SUPPLIES 04/08/2026 105.41 105.41 04/10/2026
1692 MENARDS INC 40281 MAINT SUPPLIES 04/21/2026 29.39 29.39 04/24/2026
1692 MENARDS INC 40476 TOOLS AND MAINT SUPPLIES 04/24/2026 101.44 101.44 04/29/2026
1692 MENARDS INC 40642 ELECTRICAL SUPPLIES 04/28/2026 23.92 23.92 05/08/2026
1692 MENARDS INC 41083 BUILDING SUPPLIES 05/06/2026 30.90 30.90 05/08/2026
1692 MENARDS INC 41213 TOOLS AND MAINT SUPPLIES 05/08/2026 143.88 143.88 05/15/2026
1692 MENARDS INC 41451 ELECTRICAL SUPPLIES 05/13/2026 98.48 98.48 05/15/2026
1692 MENARDS INC 41837 BUILDING AND CLEANING SUP 05/20/2026 54.09 54.09 05/21/2026
1692 MENARDS INC 41882 EVENT SUPPLIES 05/20/2026 33.44 33.44 05/29/2026
1692 MENARDS INC 41982 CHEMICAL TUBING 05/22/2026 12.99 12.99 05/29/2026
1692 MENARDS INC 42295 CHEMICAL FEED SUPPLIES 05/28/2026 115.04 115.04 05/29/2026
1692 MENARDS INC 42585 MAINTENANCE SUPPLIES 06/02/2026 42.07 42.07 06/09/2026
1692 MENARDS INC 42767 CHEMICAL FEED SUPPLIES 06/05/2026 35.48 35.48 06/09/2026
1790 MULCAHY SHAW WATER INC 327167 ULTRASONIC INFLUENT FLOW 12/02/2025 3,500.00 3,500.00 04/24/2026
1790 MULCAHY SHAW WATER INC 327167 ULTRASONIC INFLUENT FLOW 12/02/2025 400.00 400.00 04/24/2026
1790 MULCAHY SHAW WATER INC 327470 BOERGER PUMP SEALS 04/07/2026 673.48 673.48 04/10/2026
1790 MULCAHY SHAW WATER INC 327519 BOERGER PUMP PARTS 04/24/2026 983.74 983.74 04/29/2026
1811 NAPA - CENTRAL WI AUTO PAR 2604 HYDRAULIC OIL 04/30/2026 114.99 114.99 05/08/2026
1833 NCL OF WISCONSIN INC 37300 NCL LAB SUPPLIES 05/04/2026 688.47 688.47 05/15/2026
1833 NCL OF WISCONSIN INC 531853 NCL LAB SUPPLIES 02/12/2026 71.90 71.90 05/15/2026
1833 NCL OF WISCONSIN INC 535609 NCL LAB SUPPLIES 05/11/2026 239.80 239.80 05/15/2026
1881 NORTHERN LAKE SERVICE INC 2607449 QUARTERLY MERCURY TESTIN 05/08/2026 367.98 367.98 05/15/2026
3371 OREILLY AUTO 6597-191536 HYDRAULIC OIL 04/13/2026 149.98 149.98 04/17/2026
3371 OREILLY AUTO May 2026 WW EQUIPMENT REPAIRS 05/28/2026 27.99 27.99 06/09/2026
2020 PITNEY BOWES - RESERVE AC MARCH-MAY 2 MARCH-MAY POSTAGE 05/27/2026 111.74 111.74 05/29/2026
2020 PITNEY BOWES - RESERVE AC MARCH-MAY 2 MARCH-MAY POSTAGE 05/27/2026 17.77 17.77 05/29/2026
3857 POLYDYNE INC 1996301 NS4402 POLYMER 01/22/2026 9,614.00 9,614.00 04/10/2026
3857 POLYDYNE INC 2024385 NS4402 POLYMER 04/29/2026 9,614.00 9,614.00 05/08/2026
3710 RIVER AUTOMATION INC I26084 PLC TROUBLESHOOTING AND 04/20/2026 1,215.00 1,215.00 04/24/2026
3789 ROBINSON, MICHAEL 260526 CDL LICENSE 05/26/2026 14.28 14.28 05/29/2026
3424 SOLARUS 11903956 WWTF PHONE SERVICE 05/01/2026 22.39 22.39 04/29/2026
3424 SOLARUS 11915184 WWTF PHONE SERVICE 06/01/2026 17.40 17.40 05/29/2026
2500 SOLENIS LLC 135565321 K144 POLYMER 04/20/2026 10,273.63 10,273.63 04/24/2026
2528 SPEE DEE DELIVERY SERVICE 1465494 SPEE DEE DELIVERY SERVICE 05/02/2026 58.02 58.02 05/08/2026
2528 SPEE DEE DELIVERY SERVICE 1483436 SPEE DEE DELIVERY SERVICE 05/30/2026 53.10 .00
3707 STAFFORD ROSENBAUM LLP 205850 WQT LEGAL SERVICES 04/09/2026 152.50 152.50 04/10/2026
2584 STEVENS POINT AUTO CENTE PWG40831-1 LIGHTNING TRK INSPECTION 04/22/2026 25.90 25.90 04/24/2026
2651 SYNAGRO TECHNOLOGIES INC 68883 CAKE LAND APPLICATION 06/01/2026 27,544.54 .00
2800 TRUCK COUNTRY OF WAUSAU- R205109584:0 VAC TRUCK 2025 SERVICE 09/30/2025 1,449.21 1,449.21 05/15/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 38.99 38.99 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 WWOA 05/19/2026 51.75 51.75 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 18.69 18.69 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 6.19 6.19 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 211.54 211.54 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 WWOA 05/19/2026 207.00 207.00 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 WWOA 05/19/2026 25.88 25.88 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 .52 .52 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 146.83 146.83 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 51.40 51.40 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 145.21 145.21 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 AMAZON 05/19/2026 9.49 9.49 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 WWOA 05/19/2026 51.75 51.75 05/21/2026
2841 US BANK - VILLAGE VISA CHAR APRIL 2026 WWOA 05/19/2026 82.80 82.80 05/21/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 208.99 208.99 04/24/2026
Village of Plover Payment Approval Report - Utilities WWTP Page: 3
Report dates: 4/4/2026-6/12/2026 Jun 12, 2026 08:31AM
Vendor Vendor Name Invoice Number Description Invoice Date Net Amount Paid Date Paid Voided
Invoice Amount
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 DNR 04/17/2026 .90 .90 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 DNR 04/17/2026 45.00 45.00 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 9.99 9.99 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 WWOA 04/17/2026 93.15 93.15 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 201.29 201.29 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON 04/17/2026 196.98 196.98 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 ORINGS AND MORE 04/17/2026 9.15 9.15 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 AMAZON WEB 04/17/2026 .52 .52 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 EBAY 04/17/2026 34.00 34.00 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 METRO MARKET 04/17/2026 28.84 28.84 04/24/2026
2841 US BANK - VILLAGE VISA CHAR MARCH 2026 JIMMY JOHNS 04/17/2026 59.52 59.52 04/24/2026
2843 US CELLULAR 803174316 APRIL PHONES 04/28/2026 82.23 82.23 04/29/2026
2843 US CELLULAR 809668559 MAY PHONES 05/27/2026 82.23 82.23 05/29/2026
2856 USA BLUEBOOK INV01029465 LAB TESTING SUPPLIES 04/24/2026 1,452.24 1,452.24 04/29/2026
2856 USA BLUEBOOK INV01041856 UV QUARTZ SLEEVES 05/08/2026 2,153.13 2,153.13 05/15/2026
2856 USA BLUEBOOK INV01046582 LAB TESTING SUPPLIES 05/13/2026 2,500.63 2,500.63 05/15/2026
2856 USA BLUEBOOK INV01046582 MAINT SUPPLIES 05/13/2026 395.00 395.00 05/15/2026
2856 USA BLUEBOOK INV01064608 ORP PROBE FILLING SOLUTIO 06/03/2026 142.76 .00
2872 UW SOIL & FORAGE ANALYSIS 556265042026 ROUTINE FARM SOIL TESTING 04/03/2026 66.00 66.00 04/10/2026
3540 WHITE CAP 50036489121 LADTECH MH ADJUSTMENT RI 04/22/2026 10,277.47 10,277.47 04/24/2026
3131 WI DEPT OF WORKFORCE DEV 693388-000-1- GRUBER UNEMPLOYMENT 04/08/2026 231.00 231.00 04/10/2026
3131 WI DEPT OF WORKFORCE DEV 693388-000-1- GRUBER UNEMPLOYMENT 05/08/2026 46.20 46.20 05/08/2026
3142 WI ENVIRONMENTAL IMPROVE 22092 4720-03 PRINCIPAL 04/28/2026 354,080.92 354,080.92 04/29/2026
3142 WI ENVIRONMENTAL IMPROVE 22092 4720-03 INTEREST 04/28/2026 26,400.98 26,400.98 04/29/2026
3169 WI PUBLIC SERVICE CORPORA 00211 METER POLE REPLACEMENT 05/11/2026 301.46 301.46 05/15/2026
3169 WI PUBLIC SERVICE CORPORA APRIL 2026 APRIL 05/07/2026 26,518.28 26,518.28 05/08/2026
3169 WI PUBLIC SERVICE CORPORA APRIL 2026 APRIL 05/07/2026 1,737.07 1,737.07 05/08/2026
3169 WI PUBLIC SERVICE CORPORA MARCH 2026 MARCH 04/08/2026 24,653.02 24,653.02 04/10/2026
3169 WI PUBLIC SERVICE CORPORA MARCH 2026 MARCH 04/08/2026 3,189.94 3,189.94 04/10/2026
3169 WI PUBLIC SERVICE CORPORA MAY 2026 MAY 06/10/2026 712.98 .00
3169 WI PUBLIC SERVICE CORPORA MAY 2026 MAY 06/10/2026 24,325.14 .00
3183 WI STATE LAB OF HYGIENE - A 842139 PFAS TESTING 04/30/2026 400.00 400.00 05/08/2026
3224 WISCONSIN DNR - ENVIRONME 26ESR03191 ENVIRONMENTAL FEES 05/19/2026 7,173.42 7,173.42 05/29/2026
Total 600: 633,714.85 574,169.66
Grand Totals: 633,714.85 574,169.66
Village of Plover
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
www.ploverwi.gov
General Offices 715-345-5250 Water Department 715-345-5254 Police Department 715-345-5255
Building Inspection 715-345-5312 WWTP Department 715-345-5259 Fire/EMS Department 715-345-5310
Public Works/Parks Department 715-345-5257
RESOLUTION 6-10-26
Compliance Maintenance Annual Report
Wastewater Treatment Facility
The Village Board of the Village of Plover DO HEREBY RESOLVE to inform the Department of Natural
Resources that the following actions have been taken:
1. That the Village Board reviewed the Compliance Maintenance Report which is attached to this
resolution.
2. That it is not necessary to set forth any actions to maintain effluent requirements contained in
the WPDES permit.
Adopted by the Village Board of the Village of Plover this 17th day of June 2026.
________________________________________
Gary Wolf, Village President
ATTEST:___________________________________
Tammy Wojtalewicz, Village Clerk
Village of Plover
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
www.ploverwi.gov
General Offices 715-345-5250 Water Department 715-345-5254 Police Department 715-345-5255
Building Inspection 715-345-5312 WWTP Department 715-345-5259 Fire/EMS Department 715-345-5310
Public Works/Parks Department 715-345-5257
RESOLUTION 6-11-26
RESOLUTION FOR A BUDGET AMENDMENT FOR UV SYSTEM REPLACEMENT AND NEUROS
BLOWER HARMONIC FILTER UPGRADES
BE IT RESOLVED, The Plover Water and Wastewater Utility committee and Village Board of the
Village of Plover has determined that, pursuant to Chapter 56-3, Subsection F of the Village
Code of Ordinances, and pursuant to Section 65.90 (5) of the WI Statutes, the following
increases or (decreases) are made to the 2026 Village of Plover Sewer Utility Budget as adopted
by the Village Board on January 21, 2026;
Therefore, the Village Board approved the replacement of the UV System and Neuros Blower
Harmonic Filter Upgrade. The funding for this project will be from the equipment replacement
fund and from the capital outlay fund. The River Drive Lift Station budgeted for early will not
be completed until 2027, freeing up funds to complete the mentioned projects.
Therefore, A budget amendment is requested to record the disbursement of the funds to
proceed with the UV System Replacement and the Neuros Blower Harmonic Filter Upgrades:
Account Name Account
2026
Budget Change Amended
CPF-WW Replacement 600-54100-810-100 9,000
259,720 268,720
CPF-Outlay 600-54100-810-000
1,350,000 159,000 1,509,000
Adopted by the Village Board of the Village of Plover this 16th day of June 2026.
____________________________
Gary Wolf, Village President
ATTEST: ___________________________
Tammy Wojtalewicz, Village Clerk
Wastewater System Memo
To: Steve Kunst, Gary Wolf, Utility Committee, Village Board
From: Lyle Lutz
Date: June 15, 2026
Subject: 2026 Budget Amendment – UV System replacement &
Neuros Blower Harmonic Filter upgrades
_____________________________________________________________________
The Wastewater Utility is requesting a budget amendment that would transition dedicated 2026
budgeted capital outlay funds from the River Drive Lift Station reconstruction project to move
forward with the Effluent UV disinfection equipment replacement and installation including the
controls and SCADA integration and the replacement of the obsolete Neuros aeration blower’s
harmonic filters. In lieu, the River Drive lift station construction portion of the project will
continue to be planned and budgeted accordingly in the 2027 budget. A portion of the UV
replacement project would also be planned to be funded by utilizing the equipment replacement
funds as the equipment is eligible after reaching its full projected useful lifespan and over 20
years old.
The current UV system was installed in 2003 and has reached the point where many of the
components are obsolete and many of the automatic controls have become inoperable and the
efficiency of the equipment has not shown to be effective in producing consistent reductions in
the E. Coli colonies and permit limits that are slated to be implemented in our WPDES discharge
permit. We currently have fecal coliform limits and have been able to sustain the necessary
treatment for compliance with that specific type of bacteria. To keep the equipment operational,
it has become labor and monetarily intensive to ensure its effectiveness. Our current permit
provides a compliance schedule for the transition of the current monitoring of E. Coli and the
current reporting of Fecal Coliforms to solely monitoring and reporting of E. Coli. (See attached
excerpt from our current permit). During the last two years of E. Coli monitoring, we have not
been consistent in producing treatment to meet the proposed E. Coli limits. As part of our
facility master plan review and report, it was identified as a critical project for the UV system
replacement.
Current estimates on obtaining the replacement equipment and controls that meet the treatment
specifications of our facility are $259,720 for a Trojan branded system. This is for the preferred
and most common system out in the UV disinfection market. The current system is a WEDECO
brand and they would be solicited for their comparable replacement cost for consideration.
We have also obtained the estimated construction, installation, and SCADA integration costs of
approximately $159,000 for a conservative budgeting figure. The final actual construction
contractor costs would be determined by submittals from a distributed request for proposals
(RFP). Currently there is $1,350,000 budgeted as a 2026 Capital outlay for the construction
services portion of the River Drive lift station reconstruction and as mentioned previously, these
project expenses will be primarily incurred in 2027 with much of the engineering and planning to
extend through the end of 2026.
The budget amendment breakdown for the UV system summary is as follows: $259,720.00
requested for allocation from the current equipment replacement fund and $159,000.00
transitioned within the (810) Capital Outlay account from the River Drive Lift station
construction project to the proposed UV System Upgrades project.
If approved, it would be looked to get the new equipment ordered and contractor services
secured for replacement and installation to happen after the current permit required disinfection
season ending September 30th and during the remaining period of 2026.
The second additional proposed capital outlay project included in this request for budget
amendment would be to update and upgrade the current obsolete electrical harmonic sinus filters
for the Neuros aeration blowers. Each blower currently has its own wall mounted cabinet full of
capacitors to ensure consistent and “clean” electrical current to protect and run the blowers. The
proposed upgrades would relocate the harmonic filter components with new ones into the blower
filter cabinets themselves. There would be minor additional electrical contractor work to install
in line junctions into the current cabinets where the old capacitors reside. Along with the
upgrade and update work, the Neuros contractor would do a “health” check and inspection of
each of the blowers to ensure continued and reliable operation conditions. The proposal quote
for all the upgrades, installation, and inspection services is $56,390.00. A contingency of 15%
($8,458.00) would be added for any potential unexpected needs identified during the condition
assessments. The additional electrical contractor required work to convert the existing panels to
supply line power junction boxes is estimated to be around $1,000.00.
The request budgeted amendment total for the Neuros blower upgrades would be for a total of
$65,848.00 as a 2026 (810) Capital Outlay project.
The full projected 2026 River Drive Lift Station Capital Outlay project estimate of $1,350,000
will be carried over into the 2027 WWTF annual budgeting process.
Plover Water System, 300 Waters Way, P.O. Box 37, Plover, WI 54467 345-5250, 345-5248
Water Utility Memo- 2026_0615 Page 1 of 1 Printed: 6/11/2026 1:34:00 PM
Discussion/Action: Engineering Services Agreement for Water System Improvements
Background Summary:
• The Village completed a Water System Master Plan Study on February 6, 2025. The
study provided an analysis outlining water system improvements needed to provide
reliability, additional capacity and redundancy factors to meet the growing water demand.
• Initial work is currently under way with the Well 1 Generator Project to improve the
reliability of existing well production capacity.
• To address the additional water capacity needs and system improvements we have
initiated the selection process for engineering services. Request for proposals (RFP’s)
were distributed to 4 engineering firms.
• Each firm had a scheduled site visit.
• The project was identified for a 2026-2028 timeline.
• We received 2 qualified proposals:
o CBS Squared- $498,700
o Donahue- $602,225
Recommendation:
Upon review of the CBS Squared Inc.- Engineering Design Services proposal for
the Plover Water System Improvements Projects, the recommendation is approval
of the Supplemental Agreement for Professional Services as stated in Scope.
See attachments:
• Request for Engineering Design Services- May 15th, 2026
• Supplemental Agreement for Professional Services- June 17th, 2026
• Master Agreement for Professional Services- February 19,2024
Water System Memo
To: Gary Wolf, Steve Kunst, Utility Committee
From: Matt Saloun, Water System Manager
Date: 06/15/2026
Subject: Water System Improvements-Engineering Services
Engineers – Architects – Surveyors – Grant Writers 2500 E Enterprise Avenue, Suite A Appleton, WI
RE: Village of Plover
Request for Engineering Design Services
Water System Improvements
May 15, 2026
Matt Saloun, Water Utility Manager
Village of Plover
2400 Post Road
Plover, WI 54467
Dear Mr. Saloun,
Thank you for the opportunity to submit our proposal for the Water Systems Improvements project.
CBS² has both the team and project experience to successfully support your needs.
Our experience and qualifications have consistently delivered successful project management, design
services, construction related services, funding services, and startup services. This wealth of expertise
will seamlessly complement the needs of the Village of Plover.
We possess a deep understanding of the key components necessary for project success and have
assembled a highly experienced and qualified team to meet the needs of the utility and community. Our
team has been carefully selected for their proficiency in water treatment, wells, utility buildings,
environmental permitting and watermain. CBS² has designed many water treatment plants, wells and
utility buildings in Wisconsin. We specialize in nitrate treatment, well supply, utility buildings and other
water quality improvement projects. Our approach to your project includes an initial phase to evaluate
the conceptual design for each of the facilities. This approach is important to provide you with several
alternatives for building layout and listen to your ideas for usability of the building space. Our design
incorporates safety features and functionality so the facilities can be best utilized. We also design for
longevity to reduce operation and maintenance costs. We feel that you should have the team with the
most relevant experience to work on your project to get the most cost-effective water facilities
improvements that you desire.
We have utmost confidence in both our technical abilities and communication skills and are enthusiastic
about sharing these capabilities with the Village of Plover. Our team has the capacity and capability to
meet the project delivery schedule.
Thank you again for allowing us to submit a proposal. Please contact me or Sheryl Tasker (President) at
715.861.5226 should you require any additional information.
Respectfully submitted,
Jon Strand, PE
Project Manager & Point of Contact
jstrand@cbssquaredinc.com
(715) 829.7979
MAY 15, 2026
ENGINEERING DESIGN SERVICES
WATER SYSTEM IMPROVEMENTS
Village of
Plover
PROPOSAL FOR
Contact Us:
CBS Squared, Inc.
Jon Strand, PE , Project Manager
2500 E. Enterprise Ave. Suite A
Appleton, WI 54913
Email: jstrand@cbssquaredinc.com
Direct: 715.829.7979
Contents
Table of
Firm Qualifications � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 1
Key Project Staff � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 2
Project Understanding and Approach � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 3
Examples of Work � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 5
Fee Schedule � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 10
Appendix - Team Resumes
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 1
Firm Qualifications01
About CBS SQUARED, INC.
CBS Squared, Inc. (CBS²) was established in Chippewa Falls, WI in 2011 by four
individuals with a passion for engineering and architecture. We employ nearly 90
individuals in five offices across Wisconsin and Minnesota. Our growth can be
attributed to providing exceptional service that meets both the client expectations
and the project budget.
Our mission is to positively impact communities and the environment by providing
exceptional architectural, engineering, survey, grant writing, and construction
management & oversight services to clients.
At CBS², we believe collaboration between employees and clients is what produces
the best results; therefore, we take care throughout the entire process. CBS²
knows the project may end with construction, but it starts with unparalleled
planning, design, and communication with clients, stakeholders, and consultants.
Our dedicated and multi-disciplined professionals strive to provide results which
exceed expectations.
Water System Engineering Services
CBS² supports communities with water system engineering services, helping clients
navigate agency requirements while developing practical solutions for infrastructure
planning and construction.
• Coordinate with state and local agencies on projects requiring careful
environmental consideration
• Provide drinking water and funding expertise to support communities
throughout Wisconsin
• Design infrastructure systems with a focus on safe yield aquifer development,
pumping systems and water treatment process, water pipes and efficient
building construction.
• Assist with planning and delivery for construction projects tied to community
infrastructure improvements
CBS Squared, Inc.
2500 E. Enterprise Ave. Suite A
Appleton, WI 54913
Contact:
Jon Strand, PE
jstrand@cbssquaredinc.com
715.829.7979
Agriculture
Architecture
Construction Oversight
Grant Writing
Geospatial/Survey
Municipal Engineering
Structural
Transportation
Water/Wastewater
Services Offered
50+
Municipal
Clients Served
450+
Projects
Delivered
135M+
in Funding
Secured
subconsul ting firm
APEX Engineering provides HVAC, Plumbing,
and Electrical designs for numerous types of
commercial projects, from 500-square-foot
well houses to 30,000-square-foot office
buildings to 150,000-square-foot schools.
APEX is able to design multiple system types
using a variety of manufactured products to
deliver code-compliant operational systems
that meet the clients’ needs, energy efficiency
requirements, and budget.
APEX provide a complete range of mechanical
and electrical engineering services which
include:
• Site Investigation
• Existing System Analysis
• System Troubleshooting and Remediation
• Preliminary Design Concepts and Planning
• System Design and Specifications, including
geothermal design
• Construction Administration
• As-Built/Record Drawings
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 2
Qualified PERSONNEL TO PERFORM THE WORK
The CBS² project team includes utility building design and water professionals that have worked together on numerous other utility
and drinking water projects. Dave Paukner with 40 years of experience and Jon Strand with 37 years of experience lead the team with
their utility and water expertise. Both David and Jon are recognized for their leadership and hands-on guidance through all aspects
of the project. Jon is also a State of Wisconsin licensed Grade 1 Water Operator which brings experience and knowledge from the
operation aspect of a project.
The team of Jon Strand, David Paukner, Matthew Higgins, Brianna Haskins, Claudia DeValk, Neil Bowe, Justin Musser,
Carl Klnkenberg and Heath Mathews have worked together on at least 5 major water treatment projects in the last 5 years.
Key Project Staff02
Jon Strand, PE | CBS2
Project Manager
Claudia DeValk, PE | CBS2
Lead Project Engineer
McKenzie Swartout, PE | CBS2
Civil/Watermain Engineer
Dave Paukner, NCARB | CBS2
Senior Project Architect
Mathew Higgins, PE | CBS2
Structural Engineer
Carl Klinkenberg, PE | APEX
Senior Electrical Engineer
Justin Musser, PE | APEX
HVAC Design
Neil Bowe, PLS | CBS2
Professional Land Surveyor
Klara Klondrak | CBS2
CAD Technician
Heath Mathews, DES | APEX
Senior Plumbing Designer
Brianna Haskins| CBS2
Funding and Grant Specialist
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 3
Understanding your project
The Village of Plover has identified the Water Systems
Improvements project as a priority project for completion of
components in 2027 and 2028. The main components are
Water Utility building, Well 4, Well 4 Well house, raw transmission
watermain, Pleasant Drive Water Treatment Plant additional
treatment, and well siting for future Well 5. The project will be
phased to address critical items early on that then allow for
improvements of other components in a logical progression.
The Water Utility Storage Garage is needed as a first phase in
the overall project to allow for storage of items that are currently
in the Pleasant Drive Water Treatment Plant building or in other
buildings where space is now limited due to changes in usage.
Two basic types of utility buildings are being considered, the
first with drive in bays and the second type is with a central
drive through corridor with parking spaces on either side of the
corridor. The central drive through corridor is a model that is
widely used for other utility type buildings. The building will also
include an office, and potential bathroom.
Well 4 was sited several years ago and will need to go through
the WDNR approval process. A Well-Site Investigation Report
along with environmental permitting is needed for this project.
A thorough understanding of the Plover area aquifer is critical
for this initial project work. The next phase is the test well phase
which will verify water quality and water quantity. It is important
to evaluate how the aquifer responds to a new water supply
source and impacts on adjacent wells/wetlands or surface
waters. Regulatory permitting is included in this phase of the
work. The test well forms the basis for the final well design and
with an operationally efficient well house will complete this
phase of the project.
The raw water transmission main will be sized to accommodate
Well 4 and based on the preliminary work for Well 5 may be
designed to work with two wells.
Well 4 will have its own individual water quality profile where
water treatment is expected based on other well water testing in
the area. It is important to recognize how individual constituents
can require variations to the treatment process. A pilot test
will be conducted with the Well 4 water to identify important
treatment parameters which will be used in the Pleasant Drive
Water Treatment Plant design.
The Pleasant Drive Water Treatment Plant will be evaluated
for improvements within the existing process/building and
a building addition which is needed to accommodate the
treatment process for the Well 4 water supply. The existing Well
4 piping at the plant will be evaluated for use in the new addition.
It will be important to include redundancy in the design so that
the water production from the plant is reliable due to variabilities
in equipment operation. The Pleasant Drive Water Treatment
Plant is very critical to the overall water system operation due
to aquifer draw down issues that have a more direct impact on
the wells supplying the Water Way Treatment Plant. The overall
building will be evaluated for improvements to extend the design
life of the structure. A water filling station will be designed and
located where it can be best utilized for internal Village use and
contractor water sales. Improvements to the plant’s process
and safety elements will be included in the design. Process flow
to waste will be refined to reduce maintenance costs.
SCADA controls along with connectivity to the regional fiber
optic system will be upgraded with the project. Both hardware
and software will be upgraded to provide better reliability as
some components have reached the end of their design life and
part failure is a concern.
A future Well 5 site will be selected based on aquifer water
quality, quantity, land availability, connection to the raw water
transmission line and minimization of interference with other
wells.
Funding alternatives will be evaluated. The Safe Drinking Water
Loan Program (loan and grant) is one of the important funding
programs to consider. Other potential funding includes TIF
funding, Congressional Appropriations, revenue bonding, and
State Trust Fund (short term).
Our approach to all phases of this project is to include Village
Staff upfront at the design kick off meeting but then also to
ask for input at all design and construction components of
the project. We value the Village Staff’s ideas for design and
operational aspects of the project.
Project Understanding and Approach03
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 4
Project approach
CBS² has assembled a technical team for this project that allows for many components to be completed simultaneously. We
understand that the Utility Garage is the first priority that will allow the Village to free up space at the Pleasant Drive Water Treatment
Plant and efficiently store utility assets.
The second priority is submit for SDWLP funding consideration and design Well 4 and test pump Well 4 to determine the final well
water quality in a timely manner. The final well and well quality is needed prior to investing design funds in the wellhouse, raw water
transmission main and Pleasant Drive WTP improvements.
The wellhouse, raw water transmission main and Pleasant Drive WTP improvements can be designed in parallel with each other. It
will also be important to investigate the future Well 5 site so that water transmission main components can be designed and sized for
future water flow.
SCHEDULE
DATE DESCRIPTION
June 2026 Project Kick Off Meeting – Emphasis on Utility Garage
July 2026 Utility Garage Concept Selection
July 2026 - September 2026
Utility Garage Design
Well 4, Wellhouse, Watermain, Pleasant Dr WTP Kick off meeting
Environmental, Well Site Investigation Report and PSC submittal
July 2026 - August 2026 Preliminary Design
October 2026 SDWLP ITA/PERF submittal
October 2026 Utility Garage DSPS submittal
November 2026 Utility Garage bidding for 2027 Construction
February 2027 - July 2027 Utility Garage construction
October 2026 - December 2026 Well 4 Test Drilling
December 2026 – January 2027 Well 4 Design
February 2027 Well 4 WDNR Approval and Bidding
March 2027 - May 2027 Well 4 Construction
April 2027 Well 5 Well Site Investigation Report
January 2027 - April 2027 Well House and Raw Watermain Design
July 2027 Well House and Raw Watermain Bidding
January 2027 - June 2027 Pleasant Dr WTP Design
June 30, 2027 WDNR Funding Application and SDWLP Submittal
June 2027 - October 2028 Well House and Raw Watermain Construction
June 2027 Pleasant Dr WTP Bidding
July 2027 - December 2028 Pleasant Dr WTP Construction
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 5
04 Examples of Work
WELL NO. 3 WATER TREATMENT PLANT - PRESCOTT, WI
CBS² partnered with the City of Prescott to design and construct a PFAS
and Nitrate removal plant to serve one of the community’s key wells that had
been contaminated with PFAS and Nitrates. The project encompassed a
comprehensive Water System Engineering Report, an evaluation of system
components, and an extensive pilot test to assess the effectiveness of the
reverse osmosis, anion exchange media and granular activated carbon
(GAC) treatment processes. The project also featured a cost-effective
design that blended seamlessly into the surrounding residential and
recreational park area.
The project included funding through the SDWLP emerging contaminants
grant program. Additional work with the project included an aquifer search
that will be used for a future well project to address system growth.
KEY PROJECT FEATURES
• Completed Water System Engineering
Report
• Evaluated PFAS and nitrate treatment
alternatives
• Performed treatment process pilot testing
• Designed reverse osmosis treatment
system
• Expanded existing well pumping facility
• Secured WDNR SDWLP-EC funding
• Secured $1.9M grant and $1.9M loan
• Provided funding administration
coordination
• Integrated facility within surrounding
neighborhood
Client Reference
Matt Wolf, City Administrator
Ph: 715.262.5544
E: mwolf@prescottcity.org
WELL NO. 6 – CUMBERLAND, WI
CBS² was selected by the City of Cumberland to provide comprehensive
professional services for the development of new primary components
for the municipal water supply system, including design, grant writing and
administration, and construction oversight for a new well, wellhouse, and
associated water and sanitary sewer extensions.
The project scope included detailed aquifer search, installation and testing of
a test well, water quality analysis, pilot testing to evaluate treatment needs,
and the design and construction of the wellhouse with consideration for
future treatment improvements. CBS² also supported the City throughout
the funding process, successfully securing grant assistance through the Safe
Drinking Water Loan Program, and provided construction-phase services
to ensure the project was delivered efficiently and in compliance with
regulatory requirements.
KEY PROJECT FEATURES
• Prepared Water System Engineering Report
• Evaluated well location and water quality
• Provided pilot test well services
• Conducted iron and manganese pilot testing
• Coordinated WDNR pilot test approvals
• Designed new well and wellhouse
• Included backup power and SCADA
• Obtained WisDOT directional drilling
approval
• Completed environmental permitting
coordination
• Integrated design within natural
surroundings
• Secured WDNR SDWLP funding
• Secured $1M grant and loan
• Provided funding administration
Client Reference
Jordan Peichel, Utility Manager,
Ph: 715.822.2595
E: jordan@cmutility.com
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 6
CENTRAL WATER TREATMENT PLANT, WELL NO. 3, AND WELL NO. 11
STANLEY , WI
The City of Stanley needed to replace and floodproof their main
Central Water Treatment Plant and Well 3 and added a new Well 11
for additional capacity. CBS² provided complete design services on an
accelerated schedule to meet regulatory and funding requirements.
Environmental permitting for wetland and floodplain modifications
was included in the project. The project included reverse osmosis
treatment for softening, iron and manganese filtration treatment and
anion exchange treatment for PFAS. The project included backwash
water reclaim and was funded with Safe Drinking Water Loan Program
grant and loan funds.
KEY PROJECT FEATURES
• Water Treatment Plant Rehabilitation
• Iron and Manganese Filtration
• Backwash Reclaim
• Reverse Osmosis Softening
• Anion Exchange for PFAS removal
• SCADA controls
• Rehabilitated well with new well house
• New Well for additional water capacity
• Raised facility buildings for flood proofing
• Wetland and Floodplain Permitting
Client Reference
Mike Henke
Ph: 715.644.5758
E: m.henke.us@gmail.com
WELL NO. 2 WATER TREATMENT PLANT – ELEVA, WI
CBS² partnered with the Village of Eleva on a comprehensive well and
water treatment improvement project to improve water quality, reliability,
and system capacity. The project included construction of a new iron
and manganese treatment facility, development of a new municipal well,
rehabilitation of an existing well, installation of pumping equipment, and
upgrades to piping, controls, electrical systems, and emergency power.
Services included preparation of a Water Engineering Report, system
modeling, pilot testing, video logging, and design of the wellhouse and
treatment building. CBS² also provided full grant administration and
funding coordination services through USDA-Rural Development and
HUD Community Development Block Grant (CDBG) programs, including
pre-award documentation, compliance reporting, payroll review, audit
coordination, agreement amendments, and ongoing agency coordination
throughout construction.
KEY PROJECT FEATURES
• Prepared Water Engineering Reports
• Completed system modeling evaluations
• Conducted iron and manganese pilot testing
• Coordinated WDNR permitting and
approvals
• Designed aeration and filtration systems
• Integrated existing well infrastructure
• Upgraded controls and electrical systems
• Designed for future treatment expansion
• Included water tower recoating
improvements
• Integrated facility within park setting
• Secured USDA-RD loan and grant funding
• Secured $3.9M USDA-RD funding
• Secured $1M CDBG grant funding
• Provided funding administration
coordination
Client Reference
Troy Faulkner, Public Works Director
Ph: 715.514.7734
E: elevapwdirector@gmail.com
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 7
WELL NO. 3 AND 4 – RADISSON, WI
This project involved the comprehensive design of a water system, which
included the development of two new wells, the installation of a transmission
line, and the construction of a metering and chemical feed building. The
project addressed lead contamination which was later determined to be
attributed to the aquifer. The project incorporated advanced techniques
such as directional drilling and the use of pitless well adapters. Wetland
avoidance coordination was an essential environmental consideration, and
a SCADA system was implemented to provide enhanced monitoring and
control. The water analysis involved detailed system modeling, hydraulic
design, and well design.
Coordination with funding sources, including Rural Development funding,
Community Development Block Grant (CDBG) funding, and the Safe
Drinking Water Loan Program funding, was integral to the project’s
execution.
KEY PROJECT FEATURES
• Developed two new municipal wells
• Replaced lead contaminated water sources
• Installed new water transmission main
• Constructed metering and chemical feed
building
• Utilized directional drilling installation
methods
• Incorporated pitless well adapter systems
• Coordinated wetland avoidance measures
• Implemented SCADA monitoring and
controls
• Completed hydraulic modeling and system
design
• Designed wells for environmental
compliance
• Secured $500K USDA-RD grant
• Secured $500K CDBG-PF grant
• Secured $404K SDWLP grant/$223K loan
• Provided funding compliance coordination
Client Reference
Robert Sampson, Village of Radisson
Director of Public Works
Ph: 715.558.4641
E: vrpublicworks@bevcomm.net
WELL NO. 2 AND NO. 5 WATER TREATMENT PLANT – GREENVILLE, WI
This project included the construction of a 1,000 gpm municipal well, a
new water treatment building, water main extensions, and sanitary sewer
extensions. The building featured concrete foundations and floor slab, wood
framed walls with brick exterior, asphalt shingle roofing, aluminum soffit and
fascia, batt insulation, drywall interior finishes, mechanical piping, plumbing,
electrical systems, forced air heating and cooling, and SCADA integration.
Major equipment included electrical systems, HVAC equipment, chemical
feed systems, and related ancillary components. The project also included
the installation of new water main and sanitary sewer infrastructure to
support the facility and surrounding service area.
KEY PROJECT FEATURES
• Installed iron and manganese filtration
systems
• Implemented radium ion exchange
treatment
• Integrated automated treatment control
systems
• Evaluated existing water storage facilities
• Modeled storage for peak demand capacity
• Applied protective storage coating systems
• Rehabilitated existing well infrastructure
• Installed new pumps, motors, and controls
• Drilled new municipal production well
• Implemented radium removal treatment
systems
• Upgraded wellhead protection measures
• Installed real-time monitoring equipment
Client Reference
Dan Klansky, Director of Public Works
(at time of project)
Ph: 920.794.4249
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 8
HIGHWAY MAINTENANCE FACILITY – BALDWIN, WI
CBS² partnered with St. Croix County on the design and development of
a modern highway maintenance facility and salt storage operations center
strategically located to improve operational efficiency and provide direct
access to I-94. The project included a precast concrete maintenance
facility featuring heated vehicle storage, maintenance and repair bays with
vehicle lifts and bridge cranes, parts storage, welding and sign shops, wash
bay facilities, administrative offices, and emergency shelter capabilities.
Additional site improvements included a fuel island with canopy, unheated
storage building, and a durable salt shed and brine building designed
using precast walls and a precast double tee roof system for long-term
performance and low maintenance. The facility was designed with rugged,
high-quality materials and efficient building systems to support long-term
durability, operational functionality, and staff comfort while enhancing
winter operations and emergency response capabilities for the County.
KEY PROJECT FEATURES
• Constructed highway maintenance
operations facility
• Included truck storage and maintenance
bays
• Integrated wash bay and welding shop
• Installed lifts and bridge cranes
• Designed fuel island and management
systems
• Constructed salt storage and brine facilities
• Integrated water harvesting and drainage
systems
• Utilized durable low-maintenance materials
• Incorporated natural daylighting features
• Assisted owner with site selection
• Delivered project under budget
Client Reference
Rob Krejci, Highway Commissioner
Ph: 715.839.2952
E: robbie.krejci@co.saint-croix.wi.us
WELL NO. 2 – WHEELER, WI
This project was critical for providing the community with additional water
supply. CBS² was involved in the aquifer search, test well drilling, final well
drilling and well house. The selected well site involved finding good water
quality, adequate flow rate and connecting the well in the most efficient
way to the water system infrastructure.
KEY PROJECT FEATURES
• Aquifer Search
• Test Well Drilling
• Final Well Construction
• Well House
• SCADA Controls
Client Reference
Donald Knutson, Village Clerk/Treasurer
Ph: 715.632.2449
E: office@vi.wheeler.wi.gov
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 9
STREET IMPROVEMENTS AND LEAD REMOVAL – BLOOMER, WI
(ACEC WI 2025 Engineering Excellence Best of State and Grand Award Winner)
CBS² provided planning, design, funding coordination, construction
administration, and resident project representative services for a 50+ block
water, sanitary sewer, and stormwater reconstruction project in the City
of Bloomer following a WDNR-required lead removal initiative. The project
included identification and replacement of lead-jointed water mains, utility
upgrades, stormwater system improvements, and coordination with
regulatory agencies including the WDNR and PSC. CBS² assisted the
City in securing $22.5 million in USDA-Rural Development loans and $5.3
million in grant funding, significantly reducing the local financial burden.
To meet aggressive regulatory deadlines, the project was completed in
phased construction while maintaining ongoing design, permitting, and
coordination efforts. The project also included large-scale stormwater
modeling and infrastructure improvements to increase system capacity and
support future utility upgrades.
KEY PROJECT FEATURES
• Replaced lead-jointed water mains
• Upgraded aging utility infrastructure
• Improved water and stormwater systems
• Completed large-scale stormwater
modeling
• Utilized phased project delivery approach
• Provided construction administration
services
• Managed multiple concurrent crews
• Met aggressive regulatory deadlines
• Secured $22.5M USDA-RD loan
• Secured $5.3M USDA-RD grant
• Provided funding administration
coordination
• Coordinated WDNR and PSC approvals
Client Reference
Sandi Frion, City Administrator/Clerk-Treasurer
Ph: 715.568.3032
E: robbie.krejci@co.saint-croix.wi.us
NEW SHOP BUILDING – OLSON VALLEY PROPERTIES, LLC
The New Storage Buildings for Dans Construction and Excavating in
Chippewa Falls, Wisconsin, include two pre-engineered metal structures.
The main building spans 15,000 sq. ft. and features four tenant spaces, each
with an office and a toilet room. The second building is a single 5,000 sq. ft.
compartment designed for commercial motor vehicles.
KEY PROJECT FEATURES
• Fast track design requiring coordination
with Owner’s PEMB supplier
• Municipal water supply was not available for
sprinklered construction.
• The building was designed with fire barrier
compartments allowing the building to be
non-sprinklered.
• Saved the Owner $400,000.00
Client Reference
Dan Olson
Ph:715.456.0098
E: dansconstructionexcavating@gmail.com
CBS2 | Proposal for Village of Plover - Engineering Design Services Water System Improvements 10
05 Fee Schedule
TASK COST
Utility Garage Conceptual Phase $1,900.00
Utility Garage Design $8,300.00
Utility Garage DSPS $4,000.00
Utility Garage PSC submittal $2,100.00
Water System Improvements Funding Intent to Apply $700.00
Utility Garage Construction Administration $18,000.00
Well 4 Well Site Investigation Report $3,000.00
Well 4 PSC submittal $1,500.00
Well 4 WDNR submittal $2,200.00
Well 4 Test Well Design $10,300.00
Well 4 Test Well Bidding $3,500.00
Well 4 Test Well Construction Administration $13,500.00
Well 4 Final Well Design $16,000.00
Well 4 Final Well Bidding $5,000.00
Well 4 Final Well Construction Administration $16,900.00
Well 4 Wellhouse Conceptual Phase $1,800.00
Well 4 Wellhouse Design $20,800.00
Well 4 Wellhouse PSC $2,700.00
Well 4 Wellhouse WDNR submittal $3,200.00
Well 4 Wellhouse Bidding $3,000.00
Well 4 Wellhouse Construction Administration $23,600.00
Well 5 Well Site Investigation Report $3,300.00
Pleasant Drive Water Treatment Plant Conceptual Plan $10,900.00
Pleasant Drive Water Treatment Plant Design $63,400.00
Pleasant Drive Water Treatment Plant DSPS $5,800.00
Pleasant Drive Water Treatment Plant WDNR submittal $5,100.00
Pleasant Drive Water Treatment Plant PSC $2,100.00
Pleasant Drive Water Treatment Plant Bidding $4,500.00
Pleasant Drive Water Treatment Plant Construction Administration $181,200.00
Funding Application, Administration and Close Out $60,400.00
Estimated Total Fee $498,700.00
This is an hourly fee based on a medium-scope level. The overall construction cost may be $5.8M.
Appendix - Team Resumes
Appendix
Team Resumes
Education
Bachelor of Science, Civil
Engineering - University of
Wisconsin, Platteville (1988)
Registration/Licenses
Professional Engineer:
WI (1993), MI (2007), MN
(2007), CO (2007), WY
(2015), IN (2015), IL (2015)
Certifications:
Wisconsin Department of
Natural Resources (WDNR)
Certifications:
Municipal Waterworks
Operator Certification
#34596 Grade 1 (2009):
Surface Water, Groundwater
and Distribution System
Operator. Grade T (2012)
Iron Removal, Lime
Softening, VOC Removal and
Zeolite Softening
Wastewater Operator
Certification #34596 OIT
(2016): Biological Solids/
Sludge Handling, Attached
Growth Treatment, Ponds,
Lagoons and Natural
Systems, Recirculating
Media Filters, Suspended
Growth Processes,
Disinfection, Nutrient
Removal, Solids Separation.
Jon is a highly experienced project manager with over 37 years of experience in
water and municipal engineering projects. He has a wide range of responsibilities
spanning from project conception to completion, including comprehensive
planning, facility planning, feasibility report preparation, vulnerability assessments
and emergency response plans, design calculations and layout pilot testing, plans
and specifications preparation, cost estimating, construction observation, startup
training, plant commissioning, and closeout documentation. Jon has worked on
a variety of project types including water system master plans, water modeling,
water distribution systems, water treatment plants, water towers, water
reservoirs, water booster stations, and wells. He has a track record of successfully
coordinating project funding from a variety of sources, including USDA Rural
Development, the Safe Drinking Water Loan Program, the Clean Water Fund, and
the Community Development Block Grant Program. Overall, Jon is committed to
assisting his clients any way possible on their journey to clean water.
PROJECT EXPERIENCE
Central Water Treatment Plant - Stanley, WI
Project Manager for a water treatment plant rehabilitation project. Jon
coordinated the design and team members in a cost-efficient process to rebuild
the primary water treatment plant for the community. The project included
reverse osmosis treatment for softening reduction, iron and manganese
filtration treatment and anion exchange treatment for PFAS. The project
included backwash water reclaim and was funded with Safe Drinking Water
Loan Program grant and loan funds.
Well No. 5 - Town of Greenville Sanitary District #1
Jon was the principal engineer for a new well project that included test well,
water analysis, pilot testing and final well construction with water treatment. The
treatment component included iron, manganese and radium removal. Project
included a wellhouse/treatment building with water quality testing equipment
and emergency power back up. Funding, environmental permitting, and an
extensive water and sewer extension to the well site were part of the project.
Well No. 6 - Cumberland, WI
Project manager for a new well, wellhouse and water/sanitary sewer extension.
The project included water aquifer search, test well, water quality analysis, pilot
testing, well house construction and future treatment. Project received grant
funding through the Safe Drinking Water Loan Program.
Well No. 1 and No. 2 - Eleva, WI
Project Manager for a well construction project that included a new well and
rehabilitation of an existing well. The new well project included pilot testing,
electrical, controls, piping, emergency power and final well construction. The
rehabilitated well included video logging, new pump, piping, electrical and
controls. Construction of a well house and treatment building was part of the
project. The project included coordination with USDA Federal funding and HUD
Federal CDBG funding.
JON STRAND, PE
Project Manager
Water Treatment Plant - Eleva, WI
Project Manager for an iron and manganese water treatment plant. The plant serves a well field with two wells,
both with high levels of iron and manganese. The project included a water engineering report with water system
modeling and a pilot study to determine the best treatment method. The plant treatment process features an
aeration and baffled detention tank for the most effective manganese filtration. The filtration system includes
pyrolusite media that has an affinity for manganese and is very effective for iron filtration. The project included
coordination efforts with USDA Federal funding and HUD Federal CDBG funding.
Well No. 3 Water Treatment Plant - Prescott, WI
Project Manager for a PFAS and Nitrate removal plant that included rehabilitation of the well. The plant serves one
of the community’s key wells that was contaminated with PFAS and Nitrates. The project included a water system
engineering report and evaluated system components and an extensive pilot test to measure the effectiveness
of the reverse osmosis and granular activated carbon treatment process. The well rehabilitation component
included test pumping, water quality analysis, pilot testing, new electrical components, controls and piping along
with emergency backup power. The project included a cost-effective design that blended into a residential and
recreational park area.
Well No. 10 - Kaukauna Utilities
Principal in Charge for a well rehabilitation project. Project included a complete new wellhouse building. Special
provisions were made to protect the existing well. The schedule was set so that the well was out of service during
a time of lower water demand.
Well No. 11 – Stanley, WI
Principal in Charge for a new well project. The project included conceptual planning, water capacity analysis, site
selection, environmental permitting and test well coordination. Future improvements include a final well, well
house, control system and a watermain connection. The schedule for the project was coordinated in conjunction
with additional water treatment capacity improvements. Safe Drinking Water Loan Program was included in the
project.
Water System Study - Kaukauna Utilities
Principal in Charge for a comprehensive water system study that included a hydraulic model, treatment evaluation,
source of supply analysis, storage evaluation and a cost/benefit study on the cost effectiveness of additional
treatment for water system customers. The study also focused on water system design and planning for a large
expansion area.
Well No. 6 & No. 11, Well House, Water Main, and Water Tower - Radisson, WI
Jon was the project manager for water system design which includes two new wells, transmission line, metering
and chemical feed building. The project also includes directional drilling, pitless well adapters and a SCADA system.
The water analysis included system modeling and hydraulic design and well design. Coordination with Rural
Development funding and potential Safe Drinking Water Loan Program funding was included with the project.
Jon Strand, PE - Project Manager Pg. 2 of 2
Education
Bachelor of Science
Environmental Engineering
and Mathematics
University of Wisconsin –
Platteville (2020)
Registration/Licenses
Professional Engineer:
WI (102112-6)
Claudia is a skilled engineer with experience in the design of drinking water
facilities and municipal sewer and water system improvements. Her background
includes developing infrastructure solutions that meet regulatory requirements
while supporting environmental protection, energy efficiency, and long-term
system performance. She is proficient in AutoCAD, WaterCAD, and EPANET and
is known for delivering accurate, high-quality design work tailored to client needs.
PROJECT EXPERIENCE
Well No. 4 Water Treatment Plant – Prescott, WI
Claudia provided process piping design and technical specifications for the project,
while coordinating closely with the design team, water treatment supplier, and
City representatives. She prepared DNR water system submittals, led design team
meetings, and helped ensure project requirements and regulatory standards were
successfully incorporated into the final design.
Well No. 6 Water Treatment Plant – Cumberland, WI
Claudia led process piping design efforts and coordinated with the design team, water
treatment supplier, and City representatives throughout the project. She facilitated
design team meetings, delegated design tasks among team members, and oversaw
development of process piping plans and specifications to support successful project
delivery.
Central Water Treatment Plant – Stanley, WI
As a Design Engineer, Claudia was responsible for the design of the water treatment
plant (WTP) process piping and coordination with the water treatment equipment
supplier. She facilitated coordination meetings with the design team to align system
requirements and maintain project momentum. Key challenges included navigating
changes to the floodplain elevation at the project site and meeting an accelerated
timeline driven by the client’s schedule.
Water Expansion Project – Curtiss, WI
As a Design Engineer, Claudia was responsible for the design and coordination of
major water system improvements, including four new wells, utility building with
flow metering, and a water transmission main. Her role involved direct design work
as well as delegating design tasks within the team. She also led coordination with
other engineering disciplines to ensure the cohesive development of plans and
specifications for bidding and construction.
Well No. 6 – Cumberland, WI
Claudia, as a Design Engineer, was responsible for the design and coordination
of the new municipal Well #6 project. Her work included developing the plans and
specifications for the test well, final production well, wellhouse, discharge piping,
and site access driveway. She coordinated with the multidisciplinary design team to
ensure the accurate and timely production of construction documents. Claudia also
prepared the Wisconsin DNR water system submittals and managed the required
documentation for the Safe Drinking Water Loan Program (SDWLP), working closely
with the City and administrative team to secure project funding. During construction,
she served as the Resident Project Representative (RPR) and coordinated RPR
responsibilities to support effective project execution and communication.
CLAUDIA DEVALK, PE
Design Leader
Water Master Plan - Plover, WI
Claudia, as a Design Engineer, conducted a comprehensive water study that included asset management evaluation and
planning. Her work involved water system modeling, water supply analysis, water storage analysis, and evaluating water
treatment alternatives.
Water Treatment Plant – Eleva, WI
As a design engineer for WTP process equipment, piping, and civil design, Claudia played a crucial role in the successful
completion of the water treatment plant project for the Village of Eleva. The scope of the project involved the development
of a new water treatment plant and encompassed tasks such as coordinating between multiple disciplines to finalize plan
sets and incorporate addendums. Additionally, she actively contributed to the efforts aimed at bringing Well 2 online and
implementing essential improvements at the Well 1 wellhouse. Through effective collaboration and meticulous planning,
our team delivered a comprehensive and efficient water treatment solution to meet the needs of the community in Eleva.
Well No. 3 Water Treatment Plant – Prescott, WI
As design engineer, Claudia played a pivotal role in the City of Prescott’s ambitious water treatment plant project.
Her expertise primarily focused on WTP process equipment, piping, and civil design. The project was geared towards
addressing the high nitrate issues in the city’s water supply. To achieve this, CBS² conducted a comprehensive water
study to determine the most suitable route for effectively tackling the problem. Throughout the project, CBS² engaged
in pilot testing for Reverse Osmosis (RO) and Granular Activated Carbon (GAC) equipment to identify the best treatment
solutions. This step was crucial in ensuring the efficacy and efficiency of the treatment process. As part of the overall plan,
Claudia was involved in designing the addition to the Well 3 wellhouse, which incorporated the RO and Anion Exchange
treatment systems.
Claudia DeValk, PE - Design Leader Pg. 2 of 2
Education
Bachelor of Science, Civil
Engineering - University of
Wisconsin, Platteville
Registration/Licenses
Professional Engineer:
WI (47669-6),
OH (E-91343)
McKenzie is a municipal engineer with experience in site design, stormwater
management, utility improvements, and construction administration for
public and private sector projects. She manages projects from planning
through construction, coordinating with survey teams, regulatory agencies,
and project stakeholders to deliver efficient and compliant engineering
solutions. Her technical experience includes the design of site layouts, utilities,
grading, and stormwater systems using AutoCAD Civil 3D, HydroCAD,
WinSLAMM, and Bluebeam. McKenzie has supported complex municipal
projects including street, park, and waterfront improvements, with a focus
on maintaining schedules, managing project coordination, and providing
responsive client service. Her strong organizational skills, technical expertise,
and collaborative approach make her a valuable member of multidisciplinary
infrastructure and utility improvement teams.
PROJECT EXPERIENCE
Hanover Avenue & Fox Run Development – City of Cedarburg
McKenzie was the project manager and lead designer for a new development
in the City of Cedarburg. The project consisted of a new public roadway
of Hanover Avenue, as well as four (4) private streets for row house
neighborhoods and a three-story apartment building. Improvements
included public and private utilities, sidewalks, curb and gutter, communal
parks and patio areas, building layouts, retaining walls, pickleball courts,
and stormwater management BMPs.
Hawk’s Landing PUD Development – City of Waukesha
McKenzie was the project manager and lead designer for a new planned
unit development in the City of Waukesha. The project consisted of two
new private roadways, new driveways, and six (6) condominium buildings.
Improvements included sidewalks, a watermain loop, sanitary services, a
storm sewer network, and stormwater BMPs.
Riverfront Park – Village of Sauk City
McKenzie was the assistant project manager on the new Riverfront Park in
the Village of Sauk City. The project consisted of an entire new park along
the Wisconsin River, including a new asphalt driveway and two parking lots.
Improvements included an asphalt bike trail, sidewalks, a splash pad, several
soccer fields, a new pavilion, a new playground, and a new sanitary sewer
forcemain.
MCKENZIE SWARTWOUT, PE
Civil Engineer
Education
Bachelor of Architecture
(Honors)
Illinois Institute of
Technology (1986)
Registration/Licenses
Licensed Architect:
Wisconsin, Minnesota,
Illinois, Indiana
NCARB Certified
Dave is a seasoned architect with over 40 years of experience in the design and
construction of educational, municipal, religious, commercial, industrial, and
residential facilities. He has successfully delivered projects ranging from $50,000
to more than $35 million and is recognized for developing practical, cost-effective
solutions for challenging sites and budget-conscious projects. Dave’s work has
received industry recognition, including presenting the innovative Carol Mosely
Braun Elementary School project at the National School Board Association
Conference in 2000 and receiving a 2024 ACEC State Finalist award for the
Chippewa Area History Center project.
PROJECT EXPERIENCE
Water Treatment System Improvements - Kaukauna Utilities
Served as the lead architect for two water treatment facilities for the City of
Kaukauna, Wisconsin. The project included design of Water Treatment Plant 1,
a new reverse osmosis and filtration facility utilizing precast concrete wall panels
with an integrated decorative stone finish, and Water Treatment Plant 2, which
was carefully integrated between an existing filter building and wellhead adjacent
to a public park. The architectural design balanced operational functionality with
community aesthetics and included public restroom facilities, efficient space
planning, and integration of geothermal heating and cooling systems utilizing
wastewater from the reverse osmosis process.
Well No. 4 and No. 10 - Kaukauna Utilities
Dave led the architectural design for two new well houses for the City of Kaukauna,
Wisconsin, including Well 4 and Well 10. The facilities were designed as matching
structures utilizing decorative stamped precast concrete panels to complement
the surrounding residential neighborhood. Each well house incorporated skylights
to provide natural lighting during daytime operations and improve overall energy
efficiency.
Fleet Farm Distribution Center and Interior Office Addition – Chippewa Falls, WI
Dave, as a Senior Architect, worked on the Shipping Office Remodeling project.
The project involved creating a new layout for the shipping offices within the Main
Distribution Facility, aiming to enhance space utilization and workflow efficiency.
Auto Repair Facility - Chrome and Carbon, LLC
Dave, as a Senior Architect, worked on the New Auto Shop project in Cadott,
Wisconsin. The design includes a new auto service building with multiple repair
bays and an office area, utilizing wood frame construction complemented by
metal siding and roofing.
New Shop Building - Dans Construction
The New Storage Buildings for Dans Construction and Excavating in Chippewa
Falls, Wisconsin, include two pre-engineered metal structures. The main building
spans 15,000 sq. ft. and features four tenant spaces, each with an office and a
toilet room. The second building is a single 5,000 sq. ft. compartment designed
for commercial motor vehicles.
DAVID PAUKNER, NCARB
Senior Architect
New Building - JLAA Properties LLC
Dave, as a Senior Architect, worked on the New Main Facility for J and F Cleaning Services in Chippewa Falls, Wisconsin. The
project involved designing a new pre-engineered metal office and storage building.
Sports Complex - The SIGH Group
Dave, as a Project Architect, worked on the New Valley Sports Academy Building – Phase 1 and 2 in Lake Hallie, Wisconsin.
This project involved designing a 125,000 sq. ft. sports facility featuring an indoor baseball diamond with a shortened
outfield, batting cages, a hockey rink, a pro shop, and athlete training areas. The building combines precast concrete walls,
steel beams and columns, and pre-engineered metal frames.
Fire Station Study - Town of Eagle Point, WI
Dave, as a Senior Architect, conducted multiple studies for the Town of Eagle Point Fire Station. The studies focused on
evaluating options for either replacing or renovating the existing fire station.
New Tech Ed Addition and Renovation of Existing Auto Shop – Barron Area School District
Dave led this project that relocated the existing wood and metal shop areas to a new 6,700 sq.ft. precast concrete addition.
The new addition features a machine tooling area, wood shop, spray booth and CAD classroom. As part of the reorganizing
of the Tech Ed program, the existing 4,000 sq.ft. Auto Shop was renovated with all new mechanical, electrical and plumbing
systems. The new layout allows 10 new welding booths in addition to the auto bays for the program. Along with the addition
and renovations, the site was re-graded, storm water management was improved and existing paving replaced.
Dave Paukner, NCARB - Senior Architect Pg. 2 of 2
Education
Bachelor of Science:
Environmental Engineering,
University of Minnesota,
Twin Cities (2025)
Klara is a design engineer with a strong focus on water and wastewater
systems. She has hands-on experience in designing efficient water
distribution and water treatment systems and is skilled in identifying
and resolving issues related to water quality and system performance.
Since joining the team, Klara has used Civil 3D and HydroCAD software to
design pipe networks, grade surfaces, and analyze stormwater conditions.
Additionally, Klara created standards for construction detail drawings and
sheets using Civil3D for erosion control, stormwater management, water
treatment plants, and more.
PROJECT EXPERIENCE
Central Water Treatment Plant - Stanley, WI
Klara contributed to the design of process piping for the Stanley Central
WTP by developing Revit models that reflect existing conditions, demolition
phases, and new construction. She assisted in designing and modeling pipe
connections to specialized equipment such as the CIP, RO, and backwash
tanks, and supported piping and equipment design within the Well 3
Wellhouse.
Water Treatment System Improvements – Kaukauna Utilities
Klara assisted in design and plan production for the water treatment
systems project including Well 8, Well 8 Booster Building, Well 5 demolition
plans, and Well 4 process piping plans.
Water and Sewer Improvements - Junction City, WI
Klara developed initial plans for water and sewer improvements. These
plans included the use of Civil 3D and Revit software to develop site plans,
details, process piping, site design, and road design.
Well No. 6 Water Treatment Plant - Cumberland, WI
Klara developed process piping for the Well 6 building expansion and
treatment upgrades using Civil 3D software. She also developed general
and process piping specifications for the well.
KLARA KONDRAK
Design Engineer
Education
Bachelor of Science, Civil
Engineering - Iowa State
University
Registration/Licenses
Professional Engineer: WI
(100173-6), IA (P25748), NE
(E18106), ND (PE-28632),
MN (64759)
Certifications
ASCE, AISC, GANA, AAMA,
SEAWI
Mathew is a structural engineer with experience in the design and evaluation of a
wide range of structures, including municipal facilities, commercial buildings, and
utility-related infrastructure. His expertise includes structural systems utilizing
wood, CMU, light gauge and structural steel, precast concrete, and cast-in-place
concrete. Mathew has experience performing structural inspections, assessing
existing conditions, and developing modifications to improve structural integrity
and functionality. He is particularly skilled in historic restoration and complex timber
structures. In addition to design, Mathew provides construction phase support
through review of RFIs, shop drawings, addenda, and construction inspections. He
also mentors junior staff, conducts peer reviews, and develops standard details and
specifications to support consistent, high-quality project delivery.
PROJECT EXPERIENCE
Pedersen Building Upgrades - St Peter, MN
This project was completed for the Minnesota Department of Administration at
the St. Peter Regional Treatment Center. The 3-story secure facility needed HVAC
upgrades to more efficiently condition the space. Due to low ceiling heights, tight
square footage restrictions, and the cast in place concrete floors, it was necessary
to create several smaller CFS framed vertical shafts throughout the facility to bring
the ductwork from the basement to the floors above. The interior load bearing walls
were constructed of clay tiles, requiring detailed mapping of the ductwork to avoid
making penetrations in the delicate material.
Ward Recreation Center - Mase Construction
This project involved designing a PEMB (pre-engineered metal building) recreation
facility for a private client, featuring a second-floor mezzanine and an attached
wood-framed garage. What made this PEMB project unique was the client’s choice
to use structural insulated panels (SIPs) for both the wall and roof coverings, rather
than the typical metal panel system. This required careful coordination between
CBS Squared, the PEMB manufacturer, and the SIPs manufacturer to ensure the
systems were compatible and that the foundation could support all structural
loads. The use of SIPs also simplified the attachment of the wood-framed garage,
eliminating the need for special connection detailing.
The Boathouse, Martenson-Eisele - Three Rivers, WI
Mat provided structural design services for The Boathouse, a pre-engineered metal
building (PEMB) featuring an interior build-out that included offices, a showroom,
and a maintenance garage. Mat led the team who designed the building’s
foundation and engineered support for the exterior masonry façade, ensuring
structural stability and integration with the PEMB system while meeting project
requirements.
Wastewater Treatment Facility Design & Construction - Chetek, WI
Mathew assisted in the construction of a new wastewater treatment facility
in Chetek, focusing on the outfall structures. The initial outfall structures were
designed to be cast-in-place, however high-water levels required the transition to a
structural I-wall consisting of sheet piling encased in concrete. Mathew conducted
research on various design options for the outfall structure, coordinated the final
design with the contractor on site, and developed final construction drawings for
the structure.
MATHEW HIGGINS, PE
Structural Project Manager
Well No. 3 Water Treatment Plant - Prescott, WI
Mathew led the design of the CMU framed water treatment room addition to the existing well house. The two structures
were tied together at the foundation and roof levels, requiring coordination of existing conditions in the field between
Mathew and the contractor to ensure the structure was supported completely. The addition structure also required a
portion of the wall to be removable for future replacement of the anion exchange skid. Mathew was responsible for the
design of all the structural elements of the project, including foundations, walls, and roof framing, creation of the relevant
specifications, as well as coordinating structural aspects of the project with other disciplines during both design and
construction.
Wastewater Treatment Plant Chemical Building - Curtiss, WI
Mathew led the design of the new Precast framed chemical storage building. The structure housed a large chemical
storage tank containing highly corrosive material, requiring special coordination of the construction materials used to
ensure longevity of the structure. Mathew was responsible for the design of all the structural elements of the project,
including foundations, walls, and roof framing, creation of the relevant specifications, as well as coordinating structural
aspects of the project with other disciplines during both design and construction.
Well No. 6 - Cumberland, WI
Mathew led the design of the wood framed wellhouse. The design of this structure was put on an accelerated time path due
to critical funding submittals requiring the design and construction documents to be completed in a two-week timeframe.
The project team completed the design and construction documents within the required window. Mathew was responsible
for the design of all the structural elements of the project, including foundations, walls, and roof framing, creation of the
relevant specifications, as well as coordinating structural aspects of the project with other disciplines during both design
and construction.
Mathew Higgins, PE - Structural Project Manager Pg. 2 of 2
Education
Bachelor of Arts,
Mass Communication:
Public Relations –
University of Wisconsin,
Eau Claire
Brianna provides administrative, funding, and construction support services
for municipal infrastructure and water system improvement projects. She
has experience assisting with funding applications and administration for
programs including Community Development Block Grant (CDBG), USDA
Rural Development (USDA-RD), and Safe Drinking Water/Clean Water
(SDW/CW) funding. Her responsibilities include contractor payroll review
for Davis-Bacon Act compliance, construction administration support,
document coordination, and project tracking. Brianna is highly organized
and skilled at managing multiple tasks and deadlines while maintaining a
high level of accuracy and client service. She is proficient in Microsoft Office
Suite and Adobe Acrobat and is known for her strong communication skills,
reliability, and ability to adapt quickly to changing project needs.
PROJECT EXPERIENCE
CDBG: Community Development Block Grant – Public Facilities
• City of Cumberland | 2021-2022 project | $1,586,440 total costs
|$1,000,000 grant
• Village of Gresham | 2021-2022 project |$1,575,370 total costs
$1,000,000 grant
• Village of Gresham (2022-2023 project) $2,000,000 total costs,
$1,000,000 grant
• City of Mondovi (2021-2022 project) $1,785,060 total costs,
$1,000,000 grant
• City of Mondovi (2022-2023 project) $3,138,131 total costs, $1,000,000
grant
• Village of Colfax (2022 project) $1,710,300 total costs, $592,000 grant
• Village of Wheeler (2024-2025 project) $2,600,000 total costs,
$1,000,000 grant
USDA-RD: United States Department of Agriculture – Rural Development (WEP)
• City of Cumberland (2021-2024 project) $9,793,000 total, $2,071,000
grant, and $7,722,000 loan
• City of Chetek (2022-2023 project) $20,696,000 total, $10,344,000
grant, and $10,352,000 loan
• City of Mondovi (2021-2023 project) $26,971,000 total, $10,571,000
grant, and $16,400,000 loan
• Village of Eleva (2023-2024 project) $3,143,000 total, $2,106,000
grant, and $1,037,000 loan
• Village of Turtle Lake (2024-2026 project) $40,701,000 total,
$2,552,000 grant, and $38,149,000 loan
BRIANNA HASKINS
Funding and Grant Specialist
SDW: Safe Drinking Water
• City of St. Croix Falls (2023-2024) $2,779,915, $2,270,942 eligible Principal Forgiveness
• City of Prescott (2023-2025) $3,669,181
• Village of Junction City (2023-2024) $1,062,000, $594,667 eligible Principal Forgiveness
• Village of New Auburn (2023-2024) $1,819,588, $1,001,515 eligible Principal Forgiveness
• Village of New London (2023-2024) $1,360,350, $1,129,832 eligible Principal Forgiveness
• Village of Ellsworth (2024-2026) $5,924,000
CWF: Clean Water Fund
• Village of New Auburn (2022-2024) $347,782, $173,891 eligible Principal Forgiveness
• Village of New Auburn (2024) $280,000, $126,000 eligible Principal Forgiveness
• Village of Curtiss (2024-2026) $12,794,000, Principal Forgiveness TBD
• City of Chetek (2022-2024) $5,065,200, $2,256,547 eligible Principal Forgiveness
• Village of Ellsworth (2024-2026) $2,565,258
• Town of Richmond Sanitary District No. 1 (2024) $754,244, $226,274 eligible Principal Forgiveness
WI DNR ATV/UTV Trail Aid Program:
• Village of Minong $389,138.59 total costs, $376,389.00 grant dollars
WEDC Site Assessment Grant:
• Ellsworth School Demo $1,559,106.00 total costs, $150,000 grants dollars
Other:
• Stewardship Local Assistance, Federal Land and Water Conservation Fund, & Recreational Trails Program
• Village of New Auburn Park $445,861.00 grant dollars
• Non-Profit Security Grant
• Chippewa Valley Veterans Tribute
Brianna Haskins - Funding and Grant Specialist Pg. 2 of 2
Education
B.S., Computer Science -
Lakeland University (2002)
A.A.S., Geographic
Information Systems -
Chippewa Valley Technical
College (1997)
Land Survey 1 & 2 Courses
- Madison Area Technical
College (2006)
Registration/Licenses
Professional Land Surveyor
WI, MN
Professional Associations
Wisconsin Society of Land
Surveyors
Minnesota Society of Land
Surveyors
Neil is a Survey Project Manager with more than 28 years of experience in the
transportation and civil engineering field, including more than 20 years as a
Professional Land Surveyor (PLS). He has a strong background in plat and plan
production for local, state, and federal government agencies, and is knowledgeable
in the applicable administrative rules, state statutes, and local ordinances for legal
land surveys in the State of Wisconsin. Neil has a technical background in land
surveying, including field data collection and staking with GPS, total stations, and
engineer levels, and is skilled at reducing and computing field data using current
surveying methodologies. He is also very experienced with plats and GIS, including
data management and formatting using software such as Civil 3D, CAD, GIS, and
Microsoft Office. Neil is known for his strong communication skills and has worked
with a range of clients, including private and public government agencies.
PROJECT EXPERIENCE
Topographic & Site Surveys
Neil is responsible for managing and producing topographic surveys for
transportation and civil engineering projects. He consistently applies efficient,
well-defined workflows to deliver high-quality survey and mapping products.
Neil has developed and implemented standardized survey procedures that
streamline accurate topographic surveys and field data collection in support of
plan production.
He utilizes the latest survey equipment and technologies and continually refines
data collection procedures to maximize efficiency and accuracy in managing land
survey data. Neil excels in topographic and Digital Terrain Model (DTM) field data
collection and is highly skilled in coordinating Digger’s Hotline utility locates and
tickets. His experience includes performing benchmark and elevation level loops,
establishing horizontal control, collecting storm sewer system data, conducting
culvert inspections and measurements, completing wetland boundary surveys,
locating road right-of-way monuments and public land corners, and performing
construction staking.
Neil is proficient with Civil 3D standards and feature coding to generate accurate
survey points and figures. He is highly skilled in the use of advanced surveying
equipment, including the Trimble SX10 Scanning Total Station and Trimble R12i
GNSS receivers. Neil has extensive experience using GPS technology with the
WisCORS (Wisconsin Continuously Operating Reference Stations) network and
has utilized the Galileo satellite constellation since its early adoption.
He performs thorough quality control by reviewing survey data both in the field
and in the office and by conducting additional quality assurance analysis using
Trimble Business Center. Neil is experienced working in and around high-volume
highways and is well-versed in all required safety protocols.
Neil has built an excellent reputation for completing surveys efficiently and
accurately, consistently delivering reliable results that contribute to meaningful
cost savings for clients.
NEIL BOWE, PLS
Survey Project Manager
Land Surveys for Subdivision Plats, Certified Survey Maps, Map of Surveys and ALTA Maps
Neil is a Professional Land Surveyor responsible for the subdivision and surveying of land. He has successfully completed
numerous Subdivision Plats, Certified Survey Maps (CSMs), Maps of Surveys, and Floodplain Certificates across multiple
Wisconsin counties. His platting work is prepared in strict accordance with the Wisconsin Platting Manual, Wisconsin
Administrative Code A E 7, applicable Wisconsin State Statutes, and local municipal ordinances.
Neil is responsible for all phases of plat production, including but not limited to legal research, field surveying, review of title
commitments and documents, property layout, survey computations, preparation of legal descriptions, parcel boundary
closures, and final staking of platted lands. He ensures accuracy and regulatory compliance throughout each stage of the
process.
He is well regarded for producing high-quality survey documents and for working closely with clients, municipalities,
and other project stakeholders to efficiently address requirements and resolve issues. Neil’s attention to detail, technical
expertise, and professionalism have earned him a strong reputation for delivering reliable, compliant, and well-executed
land survey products.
Neil Bowe, PLS - Survey Project Manager Pg. 2 of 2
Justin K. Musser, P.E. – President/Principal Engineer
APEX Engineering, Inc.
Education:
Bachelor of Science -
Mechanical Engineering
University of WI - Platteville
Professional Registrations:
Professional Engineer – WI
E-37047
Professional Engineer – MN
43767
Professional Engineer – SD
8429
Professional Engineer – IN
10606320
Professional Engineer - MI
6201051764
Professional Engineer - IA
18355
Professional Engineer - NE
E-14134
Professional Engineer - ND
PE-10463
Professional Associations:
American Society of
Heating, Refrigerating and
Air-Conditioning Engineers
(ASHRAE)
International Code Council
(ICC)
National Fire Protection
Association (NFPA)
National Society of
Professional Engineers
(NSPE)
Wisconsin Society of
Professional Engineers
(WSPE)
General background:
Justin is a mechanical engineer with 26 years of experience and a commitment
to serving clients through attention to detail and quality engineering designs.
Justin is licensed as a Professional Engineer (P.E.) in eight states and has
experience in project management for all sizes and type of projects. He is also
experienced in serving as a liaison between various disciplines to achieve
successful project outcomes.
Justin became a principal of APEX in 2018 and president in 2022.
Education and Professional Development:
Justin graduated from the University of Wisconsin-Platteville with a Bachelor
of Science in Mechanical Engineeri ng in December 1999. He passed the
Fundamentals and Professional Practice exam in April 1999. He received his
Professional Engineer’s license in August 2004 after passing the Principles
and Practice of Engineering exam in April 2004.
Additional Experience:
Justin's extensive HVAC design experience encompasses a diverse range of
facilities such as educational institutions, office buildings, vehicle storage and
maintenance sites, manufacturing pl ants, and commercial spaces, covering
both new constructions and remodel projects. He is well-versed in the latest
industry codes and standards, includin g the International Mechanical Code
(IMC), the International Energy Conser vation Code (IECC), the International
Building Code (IBC), ASHRAE standards as well as various local codes that
may vary by jurisdiction.
Carl R. Klinkenberg, P.E. – Senior Electrical Engineer
APEX Engineering, Inc.
Education:
Bachelor of Science -
Electrical Engineering
North Dakota State University
Professional Registrations:
Professional Engineer – WI
43527-6
Professional Engineer – MN
51851
Professional Associations:
Independent Alliance Of
the Electrical Industry (IAEI)
General Background:
With 20 years of experience as a dedicated electrical engineer, Carl brings a
wealth of expertise to his role at APEX. His extensive background in project
management and ability to effectively communicate with various disciplines
have earned him a reputation for delivering high-quality engineering designs
and successful project outcomes. Prior to joining APEX, Carl was employed
as an Electrical Engineer for EDI – El ectrical Designs, Inc., and Bridgers &
Paxton Consulting Engineers, both located in Phoenix, Arizona.
Education and Professional Development:
Carl graduated from North Dakota State University with a Bachelor of Science
in Electrical Engineering in 2002. He received his Professional Engineer’s
(P.E.) license for Wisconsin and Minnesota in 2014.
Additional Experience:
Carl has extensive experience in electr ical design across various sectors,
including healthcare, commercial, food industry, industrial, technology, and
educational facilities, both for new constructions and remodels. He is
committed to compliance with the latest adopted codes, such as the National
Electrical Code, International Build ing Code, and International Energy
Conservation Code, ensuring that his projects meet the necessary safety and
efficiency standards in their respective jurisdictions.
Heath W. Mathews, DES – Senior Plumbing Designer
APEX Engineering, Inc.
Education:
Mechanical Drafting
Chippewa Valley Technical
College
Plumbing Systems Design
Course, 1998
UW-Madison
Professional Registrations:
Designer of Engineering
Systems (Plumbing) – WI
D-1792
Professional Associations:
American Society of
Plumbing Engineers
(ASPE)
General Background:
Prior to being a founding employee at APEX Engineering, Inc. in 1993, Heath
worked for Walt Hestekin Associates, Consulting Engineers beginning in 1991.
Education and Professional Development:
Heath graduated with honors from Chippewa Valley Technical College with a
Mechanical Drafting degree in 1989, transferring from technology education
courses at the University of Wisconsin - Stout. He received his Designer of
Engineering Systems (DES) license for Plumbing in July 2004.
Additional Experience:
Heath has gained valuable experience during his years using the AutoCAD
program in plumbing and
heating systems. Heath manages Internet services,
networking, and electronic data transfer, software and hardware assets. He
specializes in plumbing document production and system layout and design
for various projects including municipal buildings, educational facilities, office
buildings, and food industry, for new construction and remodels.
CBS Squared, Inc. 1.9.2025
Professional Service Agreement Page 1 of 4
CBS Squared Inc.
Supplemental Agreement for Professional Services
This agreement is effective as of June 17th, 2026 between Village of Plover (Client) and CBS
Squared, Inc. (Consultant).
In accordance with the Master Agreement dated February 19, 2024, this letter agreement
describes the scope, schedule, and payment conditions for Consultant’s work on the Project
described as follows: Water master Plan and proposed scope items below.
SCOPE: The services to be provided by the Consultant for the Project will include the following:
Our engineering services work includes plans and specifications, bidding and
construction administration for the Plover Water System Improvements project
consisting of a Utility Garage, Pleasant Drive Water Treatment Plant, Well 4 Test Well,
Final Well, Wellhouse and connecting Raw Watermain and Well Site Investigation for
future Well 5. We are also including the SDWLP intent to Apply, SDWLP Application,
PSC Construction Authorization Application and WDNR plan approval submittals. The
project work will start in June of 2026 and be completed in December of 2028. The work
phases and estimated fees are shown below:
Plover Water System Improvements
Utility Garage Conceptual Phase $ 1,900.00
Utility Garage Design $ 8,300.00
Utility Garage DSPS $ 4,000.00
Utility Garage PSC submittal $ 2,100.00
Water System Improvements Funding Intent to Apply $ 700.00
Utility Garage Construction Administration $ 18,000.00
Well 4 Well Site Investigation Report $ 3,000.00
Well 4 PSC submittal $ 1,500.00
Well 4 WDNR submittal $ 2,200.00
Well 4 Test Well Design $ 10,300.00
Well 4 Test Well Bidding $ 3,500.00
Well 4 Test Well Construction Administration $ 13,500.00
Well 4 Final Well Design $ 16,000.00
Well 4 Final Well Bidding $ 5,000.00
Well 4 Final Well Construction Administration $ 16,900.00
Well 4 Wellhouse Conceptual Phase $ 1,800.00
Well 4 Wellhouse Design $ 20,800.00
Well 4 Wellhouse PSC $ 2,700.00
Well 4 Wellhouse WDNR submittal $ 3,200.00
Well 4 Wellhouse Bidding $ 3,000.00
Well 4 Wellhouse Construction Administration $ 23,600.00
Well 5 Well Site Investigation Report $ 3,300.00
Docusign Envelope ID: D996E81C-FFF1-8FF2-826C-7EAC77F95FF1
CBS Squared, Inc. 1.9.2025
Professional Service Agreement Page 2 of 4
Pleasant Drive Water Treatment Plant Conceptual Plan $ 10,900.00
Pleasant Drive Water Treatment Plant Design $ 63,400.00
Pleasant Drive Water Treatment Plant DSPS $ 5,800.00
Pleasant Drive Water Treatment Plant WDNR submittal $ 5,100.00
Pleasant Drive Water Treatment Plant PSC $ 2,100.00
Pleasant Drive Water Treatment Plant Bidding $ 4,500.00
Pleasant Drive Water Treatment Plant Construction Administration $ 181,200.00
Funding Application, Administration and Close Out $ 60,400.00
Estimated Fee $ 498,700.00
CBS Squared Project ID: PLOVV25002
PAYMENT: The Project will be invoiced on an hourly basis with an estimated fee of
$498,700.00 including expenses and equipment. Expenses will be based on GSA per diem
rates or actual cost and mileage per the current federal mileage rate.
If additional services are required or requested, the Consultant will submit an estimate of
additional costs prior to commencement of the proposed work. No additional work will be
performed until the amendment has been approved and signed by the Consultant.
The payment method, basis, frequency and other special conditions are set forth below:
Hourly Basis
The Client and Consultant agree as to the hourly basis for payment for services provided by
Consultant. The Client will be invoiced per the attached Rate Table for personnel. The Rate
Table will be updated annually to reflect current Consultant billing rates. Monthly charges for
services shall be based on Consultant’s Rate Table for personnel for applicable employees plus
charges for expenses and equipment as agreed upon between the parties. Consultant shall be
paid monthly for work performed.
Remittance Address for Checks:
770 Technology Way, Ste 1A
Chippewa Falls, WI, 54729
Email for ACH Invoice Remittance:
accountsreceivable@cbssquaredinc.com
Expenses
The following items involve expenditures made by Consultant employees or professional
consultants on behalf of the Client and shall be paid for as described in the Agreement.
1. Transportation and travel expenses (mileage).
2. Total station and GPS equipment.
3. Lodging and meal expenses connected with the Project.
Docusign Envelope ID: D996E81C-FFF1-8FF2-826C-7EAC77F95FF1
CBS Squared, Inc. 1.9.2025
Professional Service Agreement Page 3 of 4
4. Fees paid, in the name of the Client, for securing approval of authorities having
jurisdiction over the Project.
5. Plots, reports, plan and specification reproduction expenses.
6. Postage, handling, and specific delivery services.
7. Expense of overtime work requiring higher than regular rates, if authorized in advance
by the Client.
8. Renderings, models, mock-ups, professional photography, and presentation materials
requested by the Client.
9. All taxes levied on professional services and on reimbursable expenses.
10. Other special expenses required in connection with the Project, including but not limited
to, additional project specific insurance requirements.
11. The cost of special consultants or technical services (not already included in contracted
fees) as required. The cost of sub-consultant services shall include actual expenditure
plus 10% markup for the cost of administration and associated insurance.
Equipment Utilization
The utilization of specialized equipment, including automation (survey equipment, reproduction
equipment etc.), is recognized as benefiting the Client. The Client, therefore, agrees to pay the
reasonable cost for the use of such specialized equipment on the project.
Consultant invoices will contain detailed information regarding the use of specialized equipment
on the project when it is to be reimbursed by the Client. Charges will be based on the standard
rates for the equipment published by Consultant.
AGREEMENT SUMMARY: This Supplemental Agreement for Professional Services, Exhibits
and any Attachments (collectively referred to as the “Agreement”) supersedes all prior oral or
written agreements and represents the entire understanding between Client and Consultant with
respect to the services to be provided by Consultant within this document. The Agreement for
Professional Services (including scope, schedule, fee and signatures) shall take precedence
over attached Exhibits. This Agreement may not be amended except by written agreement
signed by the authorized representatives of each party, within fifteen (15) calendar days of
notification by either party.
Docusign Envelope ID: D996E81C-FFF1-8FF2-826C-7EAC77F95FF1
CBS Squared, Inc. 1.9.2025
Professional Service Agreement Page 4 of 4
The contract is between the following representatives:
Client’s Representative: Gary Wolf
Address: 2400 Post Road, Plover, WI 54467
Telephone: 715.345.5250 E-mail: gwolf@ploverwi.gov
Project Manager: Jon Strand
Address: 770 Technology Way Ste A, Chippewa Falls, WI 54729
Telephone: 715.829.7979 E-mail: jstrand@cbssquaredinc.com
CBS Squared, Inc. Client: Village of Plover
By: __________________________________ By: _______________________________
Title: _________________________________ Title: ______________________________
Attach Exhibit 1: Rate Table
Docusign Envelope ID: D996E81C-FFF1-8FF2-826C-7EAC77F95FF1
6/10/2026Vice President
EMPLOYEE RATE TABLE 2026
EMPLOYEE TYPE RATE
Architecture
Senior Architectural Project Manager $ 208.00
Senior Architectural Design Leader $ 169.00
Architectural Designer $ 155.00
Senior Architectural Technician $ 132.00
Architectural Technician $ 105.00
construction
Senior Construction Project Manager $ 204.00
Construction Project Manager $ 187.00
Senior Construction Project Leader $ 177.00
Construction Project Leader $ 150.00
Senior Construction Technician $ 167.00
Construction Engineer $ 137.00
Construction Technician $ 116.00
Field Assistant $ 105.00
Design
Senior Design Leader $ 194.00
Design Leader $ 172.00
Senior Design Technician $ 137.00
Design Engineer $ 137.00
Design Technician $ 120.00
Engineering Technician $ 116.00
Municip Al
Senior Municipal Project Manager I $ 250.00
Senior GIS Project Manager $ 231.00
Senior Municipal Project Manager II $ 204.00
Municipal Project Manager $ 187.00
survey
Senior Survey Project Manager $ 245.00
Senior Professional Land Surveyor $ 197.00
Senior Plat Specialist $ 148.00
Senior Survey Specialist $ 149.00
Professional Land Surveyor $ 140.00
Plat Specialist $ 125.00
Survey Specialist $ 125.00
Survey Technician $ 116.00
structur Al
Senior Structural Project Manager $ 250.00
Structural Project Manager $ 190.00
Structural Design Leader $ 179.00
Structural Design Engineer $ 137.00
trAffic
Senior Traffic Project Manager $ 243.00
Traffic Project Manager $ 204.00
Senior Traffic Engineer $ 153.00
Traffic Engineer $ 142.00
trAnsport Ation
Senior Transportation Project Manager $ 246.00
Transportation Project Manager $ 194.00
ADM inistr Ation
IT Manager $ 187.00
Senior Administrative Leader $ 168.00
Senior CAD Leader $ 165.00
Administrative Leader $ 149.00
Senior Administrative Specialist $ 134.00
Administrative Specialist $ 110.00
Student Engineer/Intern $ 105.00
Meals, Per Diem, Mileage GSA
Note: All rates based on Fiscal Year 2026
715.861.5226
615 First Avenue, NE, Suite 415
Minneapolis, MN 55413
info@cbssquaredinc.com
Docusign Envelope ID: D996E81C-FFF1-8FF2-826C-7EAC77F95FF1
CBS Squared, Inc. Professional Service Agreement Page 1 of 3
CBS Squared Inc. Agreement for Professional Services This agreement is effective as of February 19, 2024 between Village of Plover, 2400 Post Road, P.O. Box 37, Plover, WI 54467 (Client) and CBS Squared, Inc. (Consultant). In accordance with the Master Agreement dated February 19, 2024 this letter agreement described in the scope of service below. SCOPE: The services to be provided by the Consultant for the Project will be creating a computer model and comprehensive water system report of the water system including main pipes, three wells, two water treatment plants and two water towers. We will evaluate growth areas with the model for a 20-year future demand. The work will include a defined service area boundary that can be separately submitted to WDNR. The model will provide static pressures, fire flow values and areas with deficient water supply. The water supply analysis will evaluate the capacity of the water supply components for the 20-year future demand. The storage analysis will use population projections and fire flow demands to determine the need and timing of future water storage. The treatment alternative assessment will evaluate the need for additional treatment during the planning period. The asset management plan will include a water system inventory and a condition rating for the system components with a prioritized replacement schedule. Our work includes up to four meetings on site, monthly virtual progress meetings with staff and copies of the final report for the review committee. PAYMENT: The Project will be invoiced on an hourly basis with a not-to-exceed fee of $17,200 including expenses and equipment. Expenses will be based on GSA per diem rates or actual cost and mileage per the current federal mileage rate. If additional services are required or requested, the Consultant will submit an estimate of additional costs prior to commencement of the proposed work. No additional work will be performed until the amendment has been approved and signed by the Consultant. The payment method, basis, frequency and other special conditions are set forth below: Hourly Basis The Client and Consultant agree as to the hourly basis for payment for services provided by Consultant. The Client will be invoiced per the attached Rate Table for personnel. The Rate Table will be updated annually to reflect current Consultant billing rates. Monthly charges for Rate Table for personnel for applicable employees plus charges for expenses and equipment as agreed upon between the parties. Consultant shall be paid monthly for work performed.
CBS Squared, Inc. Professional Service Agreement Page 2 of 3
Expenses The following items represent reimbursable expenses by Consultant employees or professional consultants on behalf of the Client providing the same are required to perform the work contracted for and shall be paid for as described in the Agreement. 1. Transportation and travel expenses (mileage). 2. Long distance services, dedicated data and communication services, teleconferences, Project Web sites, and extranets. 3. Lodging and meal expenses connected with the Project. 4. Fees paid, in the name of the Client, for securing approval of authorities having jurisdiction over the Project. 5. Plots, reports, plan, and specification reproduction expenses. 6. Postage, handling, and specific delivery services. 7. Expense of overtime work requiring higher than regular rates, if authorized in advance by the Client. 8. Renderings, models, mock-ups, professional photography, and presentation materials requested by the Client. 9. Any sales tax or use tax (excluding specifically income tax) levied on professional services and on reimbursable expenses. 10. Other special expenses required in connection with the Project, including but not limited to, additional project specific insurance requirements. 11. The cost of special consultants or technical services (not already included in contracted fees) as required. The cost of sub-consultant services shall include actual expenditure plus 10% markup for the cost of administration and associated insurance. Equipment Utilization The utilization of specialized equipment, including automation (survey equipment, reproduction equipment etc.), is recognized as benefiting the Client. The Client, therefore, agrees to pay the reasonable cost for the use of such specialized equipment on the project. Consultant invoices will contain detailed information regarding the use of specialized equipment on the project when it is to be reimbursed by the Client. Charges will be based on the standard rates for the equipment published by Consultant. AGREEMENT SUMMARY: This Agreement for Professional Services, Exhibits and any agreements and represents the entire understanding between Client and Consultant with respect to the services to be provided by Consultant within this document. The Agreement for Professional Services (including scope, schedule, fee, and signatures) shall take precedence over attached Exhibits. This Agreement may not be amended except by written agreement signed by the authorized representatives of each party, within fifteen (15) calendar days of notification by either party.
CBS Squared, Inc. Professional Service Agreement Page 3 of 3
The contract is between the following representatives: ______________________________________________________ Address: __2400 Post Road, Plover, WI 54467_____________________________________ ____________________________________________________________________ Telephone: __715.345.5250___________ E-mail: __________________________________ Project Manager: ___Jon Strand_________________________________________________ Address: ___770 Technology Way Suite A, Chippewa Falls, WI, 54729 ________________ ____________________________________________________________________ Telephone: _715.829.7979______________ E-mail:__jstrand@cbssquaredinc.com_______ CBS Squared, Inc. Client: Village of Plover By: __________________________________ By: _______________________________ Title: _________________________________ Title:_______________________________ Exhibit 1Rate Table
Gary Wolfgwolf@ploverwi.govGary Wolf, Village President
Professional Services Agreement - 1 CBS Squared, Inc. (Rev 01.2024)
CBS Squared, Inc. Master Agreement and General Conditions for Professional Services This Master Agreement for Professional services is effective as of February 19, 2024, between Village of Plover (Client) and CBS Squared, Inc. (Consultant). By entering into this Agreement, Client agrees to utilize the professional services of Consultant and Consultant agrees to provide the professional services described in this Agreement, exhibits or attachments. The General Conditions of this Agreement for Professional Services shall apply to all work performed by Consultant on behalf of Client. Individual projects requested by Client on an as needed basis and accepted by Consultant will be described in Supplemental Letter Agreements (SLA) with other optional exhibits and attachments cited. Nothing herein shall be deemed to require Client to retain Consultant or require Consultant to provide services beyond those specified in Supplemental Letter Agreements. The following may be attached to an SLA: Exhibit 1 for Hourly Payments, Exhibit 2 or 3 for Lump Sum Payments, and Exhibit 4 for Resident Project Representative Duties/Responsibilities. If attachments are needed, they will be provided with the SLA. Invoicing and payment will be per the Master Agreement. This Master Agreement for Professional Services, General Conditions, Exhibits, and Attachments to and Consultant and supersedes all prior contemporaneous oral or written agreements with respect to the services to be provided by Consultant hereunder. In the event of a conflict between the documents, this document and the attached General Conditions shall take precedence over all Exhibits unless alternate terms have been specifically agreed to on the SLA . The Supplemental Letter Agreement shall take precedence over Exhibits. This Agreement may not be amended except by written agreement signed by the authorized representatives of each party. General Conditions Services of the Consultant Consultant agrees to perform professional service as set forth in the Agreement for Professional Services or ic Services"). Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the Client or the Consultant. The Consultant services under this Agreement are being performed solely for the Client's benefit, and no other party or entity shall have any claim against the Consultant because of this Agreement or the performance or nonperformance of service hereunder. Schedule Unless specific period of times or dates for providing services are specified, Consultant's obligation to render services hereunder will be for a period which may reasonably be required for the completion of said service. If Client has requested change in the scope, extent, or character of the Project or the service to be provided by Consultant, the time of performance and compensation for Consultant's services shall be adjusted equitably. The Client agrees that the Consultant is not responsible for damages arising directly, or indirectly, from delays beyond Consultant's control. If the delays resulting from such causes increase the cost or the time required by Consultant to perform its services in accordance with professional skill and care, then the Consultant shall be entitled to an equitable adjustment in schedule and compensation. Additional Services If Consultant determines that any services it has been directed or requested to perform are beyond the scope as set forth in the Agreement or that, due to changed conditions or changes in the method or
Professional Services Agreement - 2 CBS Squared, Inc. (Rev 01.2024)
manner of administration of the Project, Consultant's effort required to perform its services under this Agreement exceeds the stated fee for Basic Services, then Consultant shall promptly notify the Client regarding the need for additional services. Upon notification, and in the absence of a written objection, Consultant shall be entitled to additional compensation for the additional services and to an extension of time for completion of additional services absent written objection by Client. Additional service shall be billed in accordance with agreed upon rate, or if not addressed, then at Consultant's standard rates as set forth in the rate table. Suspension and Termination If Consultant's services are delayed or suspended in whole or in part by Client, or if Consultant's Services are delayed by actions or inactions of other for more than sixty (60) days through no fault of Consultant, then Consultant shall be entitled to either terminate its agreement upon 7 day written notice or, at its option, accept an equitable adjustment of rates and amounts of compensation provided for elsewhere in the Agreement to reflect reasonable costs incurred by Consultant. This Agreement may be terminated by either party upon seven day written notice should the other party fail substantially to perform in accordance with its term through no fault of the party initiating the termination. This Agreement may be terminated by either party upon thirty (30) days' written notice without cause. All provisions of this Agreement allocating responsibility or liability between the Client and Consultant shall survive the completion of the services hereunder and/or the termination of this Agreement. If the Client fails to make payments when due or otherwise is in breach of this Agreement, the The Consultant shall have no liability whatsoever to the Client for any costs or damages as a result of such suspension caused by any breach of this Agreement by the Client. Upon payment in full by the Client, the Consultant shall resume services under this Agreement, and the time schedule and compensation shall be equitably adjusted to compensate for the period of suspension plus any other reasonable time and expense necessary for the Consultant to resume performance. In the event of termination, Consultant shall be compensated for services performed prior to termination date, including charges for expense and equipment costs then due and all termination expenses. If the Client fails to make payment to the Consultant in accordance with the payment terms herein, this shall constitute a material breach of this Agreement and shall be cause for termination of this Agreement by the Consultant. Client Responsibilities The Client shall, in proper time and sequence and where appropriate to the Project, at no expense to Consultant, provide full information as to Client's requirements for the services provided by Consultant and access to all public and private land required for Consultant to perform its services. The Client shall provide all legal, accounting, financial and insurance counseling and other special service as may be required for the Project, along with all data (and professional interpretations thereof) prepared by or services performed by others pertinent to Consultant's service , including but not limited to, previous reports; sub-surface explorations; laboratory tests and inspection of sample environmental assessment and impact statements, surveys, property descriptions; zoning, deed and other land use restrictions; as-built drawings, electronic data base and maps. The costs associated with correcting, creating, or recreating any data that is provided by the Client that contains inaccurate or unusable information shall be the responsibility of the Client.
Professional Services Agreement - 3 CBS Squared, Inc. (Rev 01.2024)
Client shall provide prompt written notice to Consultant whenever the Client observes or otherwise becomes aware of any changes in the Project or any defect in Consultant's services. Client shall promptly examine all studies, reports, sketches, opinions of construction costs, specifications, drawings, proposals, change orders, supplemental agreements and other documents presented by Consultant and render the necessary decisions and instructions so that Consultant may provide services in a timely manner. Client shall require all utilities with facilities within the Client's Project site to locate and mark said utilities upon request, relocate and/or protect aid utilities as determined necessary to accommodate work of the Project, submit a schedule of the necessary relocation/protection activities to the Client for review and comply with agreed upon schedule. Consultant shall not be liable for damage which arise out of Consultant's reasonable reliance on the information or services furnished by utilities to Client or others hired by Client. Consultant shall be entitled to rely on the accuracy and completeness of information or services furnished by the Client or others employed by the Client and shall not be liable for damages arising from reasonable reliance on such materials. Consultant shall promptly notify the Client if Consultant discovers that any information or service furnished by the Client is in error or is inadequate for its purpose. Payment Invoices Undisputed portion of invoices are due and payable within 30 days or as stated on the invoice. Client must notify Consultant in writing of any disputed item within 15 days from receipt of invoice. Amounts due Consultant will be increased at the rate of 1.0% per month (or the maximum rate of interest permitted by law, if less) for invoice 30 day past due. Consultant reserve the right to retain Instruments of Service until all invoices are paid in full. Consultant will not be liable for any claims of loss, delay, or damage by Client for reason of withholding service or Instrument of Service until all invoices are paid in full. Should taxes, fees or costs be imposed, they shall be in addition to Consultant's agreed upon compensation. If the Client fails to make payments when due and the Consultant incurs any costs in order to collect overdue sums from the Client, the Client agrees that all such collection costs incurred shall immediately become due and payable to the Consultant. Collection costs shall include, without limitation, legal fees, collection agency fees and expenses, court costs, collection bonds and reasonable Consultant staff ion of the termination by either party. Notwithstanding anything to the contrary herein, Consultant may pursue collection of past due invoice in small claims court or through the American Arbitration Association Construction Industry Rules without the necessity of any mediation proceedings and the Client agree to be bound by such venue. Set-offs, backcharges, discounts. Payment of invoices shall not be subject to any discounts or set-offs by the Client unless agreed to in writing by the Consultant. Payment to the Consultant for services rendered and expenses incurred shall be due and payable regardless of any subsequent suspension or termination of this Agreement by either party.
Professional Services Agreement - 4 CBS Squared, Inc. (Rev 01.2024)
General Considerations Standards for Performance The standard of care for all professional engineering and related service performed or furnished by Consultant under this Agreement will be the care and skill ordinarily exercised by member of Consultant's profession practicing under similar circumstance at the same time and in the same locality. Consultant makes no warranties, express or implied, under this Agreement or otherwise, in connection with its services. Consultant neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform the work in accordance with its construction contract or the construction documents prepared by Consultant. Client acknowledges Consultant will not direct, supervise or control the work of construction contractors or their subcontractors at the site or otherwise. Consultant shall have no authority over or responsibility for the contractor's acts or omission, nor for it mean, methods or procedures of construction. Consultant's services do not include review or evaluation of the Client's, contractor's or subcontractor's safety measures, or job site safety or furnishing or performing any of the Contractor's work. If requested in the scope of a Supplemental Letter Agreement, the Consultant may provide an Opinion of Probable Construction Cost. Consultant's Opinion of Probable Construction Cost provided for herein is to be made on the basis of Consultant's experience and qualification and represent Consultant's best judgment as a professional generally familiar with the industry. However, since Consultant has no control over the cost of labor, materials, equipment or service furnished by others, or over the Contractor's method of determining price, or over competitive bidding or market condition, Consultant cannot and does not guarantee that proposals, bids or actual construction cost will not vary from Opinions of Construction Cost prepared by Consultant. If Client wishes greater assurance as to probable Construction Cost, Client shall employ an independent cost estimator or negotiate additional service and fee with Consultant. Indemnification Consultant is not a user, generator, handler, operator, arranger, store, transporter or disposer of hazardous or toxic substances, therefore the Client agrees to hold harmless, indemnify and defend Consultant and Consultant's officers, directors, sub-consultant(s), employees and agents from and against any and all claims, losses, damages, liability and costs, including but not limited to cost of defense, arising out of or in any way connected with, the presence, discharge, release, or escape of hazardous or toxic substances, pollutants or contaminants of any kind at the site. The Consultant agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Client, its officers, directors and employees (collectively, Client) against all damages or liabilities, to the extent rformance of professional services under this Agreement and that of its subconsultants or anyone for whom the Consultant is legally liable. The Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Consultant, its officers, directors, employees and subconsultants (collectively, Consultant) against all damages or liabilities, to the extent caused by the ClienProject as well as the acts, errors or omissions of its contractors, subcontractors or consultants or anyone for whom the Client is legally liable. Notwithstanding the foregoing agreement to indemnify and hold harmless, the parties expressly agree that the Consultant has no duty to defend the Client from and against any claims, causes of action, or proceedings of any kind.
Professional Services Agreement - 5 CBS Squared, Inc. (Rev 01.2024)
The Client hereby agrees that to the fullest extent permitted by law, Consultant's total liability to the Client for any and all injuries, claims, losses, expenses, or damages whatsoever arising out of or in any way related to the Project or this Agreement from any cause or causes including, but not limited to, Consultant's negligence, errors, omission, strict liability, breach of contract or breach of warranty shall not exceed fifty thousand dollars ($50,000). In the event Client desires limits of liability in excess of those provided in this paragraph, Client shall advise Consultant in writing and agree that Consultant's fee shall be modified to cover the additional liability costs to provide the Consulting Services. Neither Party shall be liable to the other for consequential damages, including, without limitation, lost rentals, increased rental expenses, loss of use, loss of income, lost profit, financing, business and reputation and for loss of management or employee productivity, incurred by one another or their subsidiaries or successors, regardless of whether such damages are foreseeable and are caused by breach of contract, willful misconduct, negligent act or omission, or other wrongful act of either of them. It is intended by the parties to this Agreement that Consultant's service shall not subject Consultant's employees, officers or directors to any personal legal exposure for the risks associated with this Agreement. The Client agree that as the Client's sole and exclusive remedy, any claim, demand or suit shall be directed and/or asserted only against Consultant, and not against any of Consultant's individual employees, officers or directors, and Client knowingly waives all such claims against Consultant individual employees, officers or directors. Assignment Neither party to this Agreement shall transfer, sublet or assign any rights under, or interests in, this Agreement or claims based on this Agreement without the prior written consent of the other party. Any assignment in violation of this sub-section shall be null and void. Dispute Resolution Mediation Any dispute between Client and Consultant arising out of or relating to this Agreement or service provided under this Agreement, (except for unpaid invoices which are governed as stated previously), shall be submitted to nonbinding mediation as a precondition to litigation unless the parties mutually agree otherwise. Mediation shall occur within 60 days of a written demand for mediation unless Consultant and Client mutually agree otherwise. Litigation Choice of Venue and Jurisdiction Any dispute not settled through mediation shall be settled through litigation in the state where the Project at issue is located. Intellectual Property Proprietary Information All document including reports, drawings, calculations, specifications, CADD materials, computers software or hardware or other work product prepared by Consultant pursuant to this Agreement are Consultant's Instruments of Service ("Instruments of Service") and Consultant retains all ownership interests in Instruments of Service, including all available copyrights. Consultant shall retain all of its rights in its proprietary information including, without limitation, it methodologies and method of analysis, ideas, concepts, expressions, inventions, know how, methods, techniques, skills, knowledge and experience processed by Consultant prior to, or acquired by
Professional Services Agreement - 6 CBS Squared, Inc. (Rev 01.2024)
Consultant during, the performance of this Agreement and the same shall not be deemed to be Work Product or Work for Hire and Consultant shall not be restricted in any way with respect thereto. Client Use of Instruments of Service Provided that Consultant has been paid in full for its services, Client shall have the right in the form of a license to use Instruments of Service resulting from Consultant's efforts on the Project. Consultant shall retain full rights to electronic data and the drawings, specifications, including those in electronic form, prepared by Consultant and its sub-consultants and the right to reuse component information contained in them in the normal course of Consultant's professional activities. Consultant shall be deemed to be the author of such Instrument of Service, electronic data or documents, and shall be given appropriate credit in any public display of such Instruments of Service. Records requests or request for additional copies of Instruments of Services outside of the scope of services are available to Client subject to Consultant' current rate schedule, or fee negotiations in advance of release of documents or files. Reuse of Documents All Instruments of Service prepared by Consultant pursuant to this Agreement are not intended or represented to be suitable for reuse by the Client or others on extensions of the Project or on any other Project. Any reuse of the Instruments of Service without written consent or adaptation by Consultant for the specific purpose intended will be at the Client's sole risk and without liability or legal exposure to Consultant; and the Client shall release Consultant from all claims arising from such use. Client shall also defend, indemnify and hold harmless Consultant from all claims, damages, losses and expenses including attorneys' fee arising out of or resulting from reuse of Consultant documents without written consent. CBS Squared, Inc. Client: Village of Plover By: By: Title: John Beckfield, Vice President Title: Gary Wolf, Village President
Plover Water System, 300 Waters Way, P.O. Box 37, Plover, WI 54467 345-5254, 345-5248
Utility Report 2026_0615 Page 1 of 4 Last printed 6/11/2026 1:39:00 PM
Water System Report
To: Utility Committee, Gary Wolf, Steve Kunst
From: Matt Saloun, Water System Manager
Date: 06/15/2026
Project Updates:
• Well 1 Generator Project-
o Footing, slab, walls, trusses, and sheeting installed.
o Project started 03/25/2026
o DNR construction approval received.
o Pre-construction meeting with Eagle Construction. (03/09/26) Anticipate work to
start within the next month. Construction should go quickly, with the generator
arriving onsite late summer/ early fall.
o Finalized Request for Proposals, Advertised Bid Proposals, Pre-Bid Site visit, Bid
Opening. Bid award to Eagle Construction for $336,990.
• Disk Tower (Nsight)-
o Nsight pre-construction meeting and equipment install completed (03/05/26)
o Received reimbursement for railing costs ($30,787.50)
o Nsight lease updated. Working to schedule equipment re-install.
• Disk Tower (AT&T)-
o New antenna equipment installed and completed (05/21/26).
o Received reimbursement for railing costs ($92,362.50)
o AT&T lease updated. Working to schedule equipment re-installs.
• Well 2- Installed new check valve, pump reinstall, inspection completed. Back in service
05/13/26)
o CTW here to pull well pump (03/11/26) and videotape well condition (03/12/26).
Check valve is leaking. Evaluating repair versus replacement options. Well 2 will
be temporarily offline.
Report:
• Complete 1st quarter meter reading (03/16/26)
• Submitted the 2025 Annual Public Service Commission (PSCW) Water Report.
Highlights include:
o Total Operating income of $481,649- Revenues exceeding Expenses.
o Rate of Return of 3.98%- This return component relates to the Water Departments
ability to adequately cover debt and maintenance of utility assets.
o A link to the full report: WEGS_2025_4737.pdf
• Submitted Annual 2025 Water Withdrawal Report.
• Repair south flood light for Disk Water Tower.
• Staff annual audiograms completed.
• Hydrant (677) 3000-3010 Grant Ave. repaired.
• Staff (Nic & Casey) attended Annual Rural Water Conference.
Water System Report
Plover Water System, 300 Waters Way, P.O. Box 37, Plover, WI 54467 345-5254, 345-5248
Utility Report 2026_0615 Page 2 of 4 printed 6/11/2026 1:39 PM
• Submit 2025 Consumer Confidence Report. Available on the Village website or upon
request.
• Pleasant Drive Water Plant (Well 3)- Variable Frequency Drive (VFD) failure due to
lightning strike. Two of the three phases had blown fuses and the VFD was damaged.
(04/12/26). We were able to get the replacement installed quickly and the water plant
back in operation on 04/14/26. Adding to this scenario, well 2 pump had just been
removed for scheduled maintenance.
• The old Pacawa shelter & park water services were abandoned on Maple Drive. This
preceded the scheduled road projects for the area. (04/15/26)
• Water Way- Install new epoxy floor coating in service building area.
• New 2” water service installed for 154 Crossroads Drive-Chase Bank. (04/21/26)
• Lincoln Tower- Lane Tank completed cleaning/pressure washing. (04/23/26)
• Water Way- Earth Day celebration with the planting of 4 trees. (04/22/26)
• Water Way- Staff completed installation of security cameras. Online 05/08/26.
• New water operator started (04/27/26).
• Well 3- generator room ceiling furnace replaced. (04/29/26)
• Staff working on valve box adjustments, hydrant flushing/ maintenance
• ISO fire flows completed for audit.
• Leak detection equipment training.
• 2nd Quarter Water testing- Nitrates, PFAS, Raw Bacti.
• Wellhouse meter testing completed. (06/01/26)
• SCADA upgrades- Work continues with SCADA computer upgrades for the Water Way
and Pleasant Drive Treatment Plants.
• Private well inspections and testing started.
• Water Way- Replaced blower for treatment plant. Rebuilding original unit.
• Service leak at 2650 Porter-homeowners. (06/03/26)
• Cty Hwy R Road Design Project-
o Watermain extension (Pleasant Dr to Shady Dr) design work continues,
o We are also drafting a plan to extend fiber down Cty R to the Pleasant Drive
Water Plant. This would be the fiber network the Village uses and would eliminate
a vulnerable wireless connection at the water plant.
• Water Improvements Project Request for Proposals- Conducted Engineer site tours and
received proposals.
Water System Report
Plover Water System, 300 Waters Way, P.O. Box 37, Plover, WI 54467 345-5254, 345-5248
Utility Report 2026_0615 Page 3 of 4 printed 6/11/2026 1:39 PM
Pumping Report
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year Summary
2026 Well 1 21,796 16,640 18,013 28,265 26,582 111,296 46.56% Tot
2026 Well 2 11,514 8,234 2,228 0 8,987 30,963 12.95% Tot
2026 Well 3 11,866 18,855 26,992 16,610 22,446 96,769 40.48% Tot
2026 Tot 45,176 43,729 47,233 44,875 58,015 0 0 0 0 0 0 0 239,028 Tot
2026 Avg 1,479 1,561 1,524 1,495 1,871 2,333 Avg
2026 Max 1,561 1,750 1,714 1,616 2,574 Max
Date of Maximum 10-Jan 15-Feb 29-Mar 20-Apr 31-May
2026 Min 1,115 1,335 1,229 1,221 1,342 Min
Date of Minimum 1-Jan 21-Feb 15-Mar 4-Apr 1-May
2025 Tot 46,970 44,609 48,350 47,054 60,722 65,348 73,369 70,588 52,465 46,505 39,171 41,570 636,721 Tot
2025 Max 1,783 1,765 1,820 1,802 2,326 2,773 2,884 3,043 2,290 1,909 1,548 1,534 3,043 Max
2025 Avg 1,515 1,593 1,559 1,560 1,958 2,189 2,298 2,277 1,748 1,500 1,305 1,340 1,737 Avg
2024 Tot 44,171 42,507 43,714 45,534 53,251 54,487 60,771 62,981 58,480 50,214 40,892 42,754 599,756 Tot
2024 Max 1,633 1,570 1,854 1,755 2,159 2,292 2,372 2,259 2,329 1,946 1,688 1,582 2,372 Max
2024 Avg 1,424 1,429 1,410 1,517 1,717 1,786 1,960 2,031 1,949 1,619 1,363 1,379 1,632 Avg
Nitrate Report - 2026
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Well 1 Raw 11.3 11.9 11.4 11.8 11.7
Well 2 Raw 11.5 11.8 11.6 11.6 11.9
Well 3 Raw 14.6 14.9 14.3 14.3 14.2
Well 1&2 Dist 6.9 7.2 7.4 7.5 7.4
Well 3 Dist 7.3 7.5 7.2 7.4 7.6
Nitrate Report - 2025
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Well 1 Raw 12.0 11.4 11.3 11.5 11.6 11.6 11.7 11.7 11.6 11.4 11.3 11.3
Well 2 Raw 11.6 11.2 11.7 11.9 12.0 11.9 11.8 11.9 11.8 11.8 11.7 11.6
Well 3 Raw 14.8 14.3 14.3 14.1 13.9 13.8 13.8 13.9 14.0 13.5 14.4 14.5
Well 1&2 Dist 6.7 6.7 6.7 6.8 7.0 6.9 6.9 6.9 7.0 6.8 6.7 6.8
Well 3 Dist 7.5 7.4 7.3 7.3 7.1 7.1 7.1 7.2 7.4 7.0 7.3 7.2
Water System Report
Plover Water System, 300 Waters Way, P.O. Box 37, Plover, WI 54467 345-5254, 345-5248
Utility Report 2026_0615 Page 4 of 4 printed 6/11/2026 1:39 PM
Wastewater System Memo
To: Steve Kunst, Gary Wolf, Utility Committee, Village Board
From: Lyle Lutz
Date: June 15, 2026
Subject: Wastewater Utility Report
_____________________________________________________________________
1. StaƯ worked within the current Hwy 54 inside lane closure to reconstruct the manhole
castings and adjustment rings. Michel’s did the cutting, removal, and replacement of
the surrounding concrete on what has been done so far. This worked out well as the
proximity of the castings to the adjacent open/travel lane was close with even a little
overlap. Most of the remaining manholes to be reconstructed when the outside/RH
lane will be closed will be cut out by the Village with the newly acquired Mr. Manhole
cutting and removal tool. This should help limit the overall additional project costs
assessed to the Village by Michel’s and the DOT. Michel’s will still do the doweling and
the replacement of concrete around the manholes to meet the road project
specifications.
2. The spring biosolids application took place on May 5th. A total of 37 loads (1,216 yd3)
was applied between two agricultural sites. One site received the benefit of an
estimated 165 lbs of nitrogen/acre and the other site acquired approximately 150 lbs of
nitrogen/acre. High diesel prices did play a factor in disposal costs this year with fuel
surcharges adding on $5,770.20 to the invoice from Synagro.
3. The Utility has recognized successful milestones for the following staƯ: Tyler Jacoby –
March 3, 1 year; Michael Robinson – May 12, 1 year; Daniel Swanson – May 19, 1 year;
Stephanie Jepson – May 1, 6 months. They all have shown exceptional growth and
continue to be progressive with ongoing learning and working through new experiences
and challenges.
4. The permit required eƯluent Fecal coliform limits and E. Coli monitoring season began
on May 1st. Much preliminary work went into getting the current UV disinfection system
up and running to ensure eƯective treatment. The system now operates at a user set
consistent dosage/power setpoints as the automatic/variable dosing controls are not
reliable and if used can lead to system overloads or even system shutdowns. As part of
the permit E. Coli monitoring and testing for proposed compliance limits, the current
system’seƯectiveness currently shows highly variable and not consistent in achieving
the future limits. If the budget amendments are approved, the utility would look to start
planning the replacement of the system later this year in 2026 after the conclusion of
permit required disinfection season on September 30th.
5. The treatment plant incurred a substantial disruption in the biological phosphorus
treatment processes. It has been a while since faced with issues of this nature. The
response protocol of chemical addition of ferric chloride was initiated. This nature of
chemical treatment was unusually slow to generate the results of phosphorus
precipitate that we would normally expect. It took a couple weeks of working through
calculation of dosages and monitoring to finally achieve results to get the eƯluent
discharge back into permit compliance range. As a result of the process disruption, we
did exceed the permit limitations for average daily pounds of phosphorus discharged by
.31 lbs./day. Permit limit = 7.96 lbs./day average and reported = 8.27 lbs./day average. It
should be noted that Wastewater Utility had previously provided comments during the
permit renewal process regarding the accelerated implementation of the proposed and
reduced eƯluent phosphorus limits that this very scenario may happen to compromise
our capabilities to comply with the new limits. The DNR stood by the P99 calculation
used on historical data as reference in suggesting that we should not be in jeopardy of
non-compliance. Unfortunately, the P99 calculations were based on historical data of
a long period where we did not experience any issues. It happened and we worked to
resolve the issue at hand to the best of our staƯ’s capabilities.
6. The facility received 118,890/16,850 gallons of septage, 75,235/70,150 gallons of
holding tank, and 615,618/430,586 gallons of leachate in April/May. Leachate
acceptance was suspended for 12 days in early June to help alleviate the additional
loadings of phosphorus and nitrogen to the plant while we were sorting out the
phosphorus uptake issues. Outside of the phosphorus reduction issues in May, the
plant has been operating well. Much attention has been put forward to online
monitoring equipment and calibration or maintenance to ensure that can rely on them
in the future to be proactive in making operational adjustments and more predictive
strategies. Currently we are back to normal in our biological phosphorus removal
processes and regained stability in those selector basins.
Parameter
Units
Flow
MGD
CBOD
mg/l
Suspended
solids
mg/l
Phosphorus
Lbs/day
Ammonia
mg/l
Fecal
Coliform
CFU
Design / Limit 1.8000 25 30 7.96 Daily Variable 400
April Average 1.4845 4.8 11.2 3.57 .25 N/A
May Average 1.5753 7.0 14.7 8.27 .31 175
7. StaƯ were notified of sanitary sewage backing up into a residence within the Woodfield
Pointe subdivision on June 9th. Upon inspecting the public sanitary sewer mains, a
blockage was identified in the collection manhole servicing that subdivision. The
manhole flow line and discharge outlet had become blocked by accumulated and
excessive solids (wipes, rags, personal care products) and grease. The debris was
dislodged through jetting and vacuuming the manhole and sanitary mainlines. Two
confirmed residences reported substantial sewage accumulations into the basements.
A report was submitted to the Village’s insurance company. This backup came up
unknowingly as there have been no previous issues at the point of the blockage and this
entire area was cleaned/jetted in early September of 2025. It’s unfortunate for any area
to sustain a backup and really unfortunate when identified issue of excessive solids and
debris that should not have been disposed of into the sanitary sewer to begin with. The
Wastewater Utility does try to get public relations information out via the newsletter and
social media regularly. It israther diƯicult topic for the public to comprehend the
implications of putting things into the sanitary sewer that are prohibited. In instances
such as this blockage, the impacts are on potentially many in the surrounding
residences connected to the underground sanitary main network.
8. A kickoƯ meeting was held with Clark Dietz to start the engineering/design phase of the
River Road lift station reconstruction. Site visits were made to review current
equipment and controls at both River Road and Roosevelt Dr lift stations as the River
Drive lift station reconstruction will closely resemble the most recently renovated
Roosevelt lift station planning and updating process.