VILLAGE BOARD AGENDA
Plover Municipal Center Board Room
2400 Post Road
Plover, WI
Wednesday, March 18, 2026
6:00 p.m.
1. Call to order, Pledge of Allegiance.
2. Approval of the minutes of the meeting of March 4, 2026, as printed
3. Persons wishing to address the Board
4. Correspondence
5. Approval of vouchers
Discussion with possible action on the following:
6. Presentation – 60% Design Plans for Public Safety Building Improvements - SEH
7. Water/Wastewater Utility Committee Meeting of March 16, 2026
Item 5: Recommendation for approval of Engineering Services Agreement for the River Rd. Lift
Station upgrade
Item 6: Phosphorus Water Quality Trade Letter of Intent
8. Plan Commission Meeting of March 16, 2026
Item 5: Ordinance 3-7-26 – Chapter 447 Signs Ordinance Amendment – Updating off-premises
sign/billboard standards
9. Approval of 2026 Road Project Bids
10. Approval of Portage County Fire Service Agreement
11. Renewal of Stevens Point/Central Transportation Agreement – Crossroads Commons Bus Service
12. Alcohol License Change of Agent – Rstore - 2900 Village Park Drive
13. Bartender License
14. AECOM Task Order 184 – Construction Observation Services – Green Tree Farm Subdivision
15. Village project change orders, substitutions, or construction approvals
16. Engineer’s Update
17. Administrator’s Update
18. Adjournment subject to call of the chair
March 4, 2026, Village Board Meeting
Village Board Meeting
Wednesday, March 4, 2026
6:00 p.m.
Members Present: Gary Wolf, Al Haga, Steve Fritz, Ross Ballard, Tim Durigan, Al Tessmann,
Adam Raabe
Others Present: Steve Kunst, Julia Mann, Tammy Wojtalewicz, Adam DeKleyn, Karmen
Anderson, Scott Klemm, Joe Terry
1. Mr. Wolf called the meeting to order at 6:00 p.m. Pledge of Allegiance.
2. MINUTES
Mr. Durigan motioned, and Mr. Fritz seconded, to approve the minutes of the
meeting of February 18, 2026, as printed. Motion carried.
3. PERSONS WISHING TO ADDRESS THE BOARD - None.
4. CORRESPONDENCE - None
5. APPROVAL OF VOUCHERS
Mr. Raabe motioned, and Mr. Tessmann seconded, to approve the vouchers as
listed. Motion carried.
6. ORDINANCE # 3-6-26 - CHAPTER 550 ZONING ORDINANCE AMENDMENT – LAND USE
MATRIX
Mr. Tessmann motioned, and Mr. Haga seconded to approve Ordinance # 3-6-26 –
Chapter 550 Zoning Ordinance Amendment – Land Use Matrix. Motion carried.
RESOLUTION 3-5-26 – FINAL PLAT – GREEN TREE FARM SUBDIVISION – GREEN TREE
CONSTRUCTION INC – PLEASANT DRIVE/CTH R (PIN: 173230826-16.04)
Mr. Raabe motioned, and Mr. Tessmann seconded to approve Resolution 3-5-26 –
Final Plat – Green Tree Farm Subdivision – Green Tree Construction Inc – Pleasant
Drive/CTH R (PIN: 173230826-16.04). Motion carried by unanimous roll call vote.
RESOLUTION 3-6-26 – FINAL PLAT – ARBOR HAVEN V SUBDIVISION – CLASSIC
DEVELOPMENT CORP OF PLOVER – AMBERWOOD WAY (PIN: 173230825-09.05)
Mr. Tessmann motioned, and Mr. Haga seconded to approve Resolution 3-6-26
– Final Plat – Arbor Haven Subdivision – Classic Development Corp of Plover
– Amberwood Way (PIN: 173230825-09.05). Motion carried by unanimous roll
call vote.
March 4, 2026, Village Board Meeting
7. DEVELOPMENT AGREEMENT – GREEN TREE FARM SUBDIVISION – GREEN TREE
CONSTRUCTION INC – PLEASANT DRIVE/CTH R (PIN: 173230826-16.04)
Mr. DeKleyn reviewed the request. Staff recommends approval as presented.
Discussion took place on why the document is called an agreement rather than a
Memorandum of Understanding as well as how each development is unique. It is
standard practice among many municipalities to refer to it as a Developer’s
Agreement. How Developers can be held accountable was discussed. Mr. Terry
added the benefit to the Developer is access to public infrastructure. Bonding was
also discussed.
Mr. Raabe motioned, and Mr. Haga seconded to approve the Development
Agreement – Green Tree Farms Subdivision – Green Tree Construction Inc –
Pleasant Drive/CTH R (PIN: 173230826-16.04). Motion carried.
8. AUDIT SERVICES CONTRACT RENEWAL WITH CLIFTON LARSEN ALLEN LLP
Ms. Mann reviewed the request. She noted their knowledge of our system and how
that will benefit the Village as we go into the large upcoming projects. The difference in
services between Clifton Larsen Allen and Ehlers was discussed.
Mr. Raabe motioned, and Mr. Tessmann seconded to approve the Audit Services
Contract Renewal with Clifton Larsen Allen LLP . Motion carried.
9. VILLAGE PROJECT CHANGE ORDERS, SUBSTITUTIONS, OR CONSTRUCTION
APPROVALS
Mr. Kunst noted there are none for this meeting, but he anticipates one coming at a
future meeting for the Lake Pacawa Project in regard to alterations for the family
bathroom for an adult changing table for those with special needs.
10. ENGINEER’S REPORT
Mr. Terry reviewed his report highlighting the utility review for Empire Estates,
inspection form for routine inspections for Springville Dam, and the progress on the
Village specifications. Copy attached. Mr. Ballard asked for an update on the Hoover
Avenue Bridge. Mr. Klemm advised his department must do an annual visual
inspection and if something is noted, they would bring AECOM in for professional
input.
11. ADMINISTRATOR’S UPDATE
Mr. Kunst updated the board on the status of the paramedic union contract, SEH will
be attending an upcoming meeting to present the 60% design plans with updated cost
estimates. Mr. Kunst also thanked those who were able to attend the Vice President
visit in Plover. He commended efforts of village staff in the Police, Fire, and Public
Works Departments who put a lot of work into the event, as well as the assistance
March 4, 2026, Village Board Meeting
received from surrounding agencies. Staff is reviewing bids received for road work
which will be brought to the board for final approval.
Mr. Haga reminded board members there is a meeting at the highway department
regarding the Hwy. R reconstruction on March 11.
Mr. Kunst noted there will also be a public information meeting regarding highway 54 in
April at the Plover Municipal Building.
12. Mr. Tessmann motioned, and Mr. Raabe seconded to adjourn at 6:25 p.m.
Respectfully submitted by Tammy Wojtalewicz, Village Clerk
Village of Plover
Public Safety Facility
Progress Report
PLOVER, WI MARCH 18, 2026
o July 28, 2025
• Kick off meeting
• Developed scope and
schedule
• Provided a review of
previous plans and made
suggestions for
incorporating CPTED
features and best practices
for Health, Safety and
Welfare.
• Used original program
from 2024 work and a
confirmed room areas.
• Met bi-weekly with,
Consultants and Public
Safety Design Committee
• 14 programming meetings
PROJECT PROCESS
PROJECT ACTIVITY
• Site plan review by staff in a
site workshop 2/25/2026
• Received comments from all
staff
• Modified curb cuts and
access points based on staff
recommendations
• Looked at utility routing and
entrances
• Discussed traffic flow and
public/staff parking
• 90% drawings to define the
landscape plantings per
Village ordinance
POST ROAD AND
WISCONSIN AVE. SITE
ENGINEERING
SITE PLAN DESIGN
• Developed alternate
ingress/egress options that
may satisfy staff’s comments
• Provided parking in closer
proximity to the Fire
department
• Fire Department floor plans
continue to evolve
• 90% documents should
incorporate all recent
comments and suggestions
POST ROAD AND
WISCONSIN AVE. SITE
ENGINEERING
SITE PLAN DESIGN
• Site plan review by staff in a
site workshop 2/25/2026
• Received comments from all
staff
• Modified curb cuts and
access points based on staff
recommendations
• Looked at utility routing and
entrances
• Discussed traffic flow and
public/staff parking
• 90% drawings to define the
landscape plantings per
Village ordinance
POST ROAD AND
WISCONSIN AVE. SITE
ENGINEERING
SITE PLAN DESIGN
• Site plan review by staff in a
site workshop 2/25/2026
• Received comments from all
staff
• Modified curb cuts and
access points based on staff
recommendations
• Looked at utility routing and
entrances
• Discussed traffic flow and
public/staff parking
• 90% drawings to define the
landscape plantings per
Village ordinance
POST ROAD AND
WISCONSIN AVE. SITE
ENGINEERING
SITE PLAN DESIGN
ACCOMMODATING LONG
TERM GROWTH
FLOOR PLAN EVOLUTIONS
11/10/24 PLAN
• FD area: +/- 22,120 s.f.
• 9,180 s.f. admin offices
• 10,574 New Apparatus Bay
• 2,368 renovated Apparatus
Bay
• Plans are within 2% of the
original program
• Best practices applied for
staff safety, health and
wellness
03/13/2026 60% PLAN
• PD area: +/- 39,000 s.f.
• 15,500 s.f. parking garage
and Sally Port
• 5,500 s.f. firing range
• Plans are within 2% of the
originally programmed
building
• CPTED principals and best
practices applied for staff
safety, health and wellness
ACCOMMODATING LONG
TERM GROWTH
FLOOR PLAN EVOLUTIONS
03/01/2026 60% PLAN
UPDATES TO COST ESTIMATES
• December 2024 Estimated
the project at $24.1 Million
in 2024 Dollars
• 60% plan review and
estimate projects the cost
at $26.5 in 2026 dollars
• Inflation escalation of 5%
per year calculates the
project at $27 Million
• Design refinement added
items to the original
program (underground
stormwater detention)
• Alternates will be built in to
give the Village flexibility
UPDATES TO COSTS
UPDATES TO COSTS
• Budget discussion – need
“green light” from the Board to
proceed with 90% documents
and prior to bidding
• Board updates as we proceed
with final design and cost
estimating
• Timeline of next steps on next
slide.
NEXT STEPS AND
DIRECTION
CONCLUSION
TIMELINE
• 3/27 90% plans completed
• 3/30 90% plan review by
staff
• 4/3 issue plans to AHJ and
Village for plan
review/approval
• 4/3 issue plans for bid
• 5/5 receive bids
• 5/13 Village Boad approval
to move forward
• May/June contracting and
notice to proceed
Village of Plover
Staff Report
Village Board
Submitted by: Scott Klemm, Public Works Manager
Date: 03/11/2026
Subject: Approval of 2026 Road Project Bids
Background: Village of Plover Public Works Department advertised for bid several road projects for the
2026 Construction bonding to include Pulverize, regrade, add curb radius, and repave of various roads in
the Village, mill and fill of Village Park area, crack fill and GSB 88 of various roads, and crack fill, chip seal,
and fog coat of various roads within the Village. Bids were due on March 3, 2026, for public opening in
the Village of Plover Board room. All bid packets include all the information for an acceptable bid. Upon
review of bids the Public Works Department recommends the approval of the various Village roads
reconstruction and resurfacing and Village Park mill and fill be awarded to American Asphalt for the
estimated cost of $1,881,890.96 less the bond deduct of -$9396.36 which includes the 4” and 5”
pavement thickness option for the Twin Towers area. Public Works also recommends the approval of
the acceptance of the Fahrner Asphalt Sealers for the GSB 88, crack filling, chip sealing, and fog sealing
of various Village roads for an estimate price of $352,146.93.
Exhibits to include:
• Exhibit 1: Village road resurfacing bid tab
• Exhibit 2: Various roads reconstruct bid packet and estimates
• Exhibit 3: Village Park mill and fill bid packet and estimate
• Exhibit 4: Village road GSB 88, crack filling, chip sealing, and fog sealing bid tab
• Exhibit 5: GSB 88, crack filling, chip sealing, and fog sealing bid packet and estimates
PORTAGE COUNTY
FIRE SERVICE AGREEMENT
INCLUSIVE OF: Almond Fire Department, Amherst Fire District, Bancroft Fire
Department, Dewey Fire Department, Grand Rapids Fire Department, Hull Fire Department,
Iola Fire Department, Plainfield Fire Department, Plover Fire Department, Rosholt Fire
District, Rudolph Fire Department, Stevens Point Fire Department, Stockton Fire Department,
Waupaca Fire Department, Wild Rose Fire Department
THIS AGREEMENT is made pursuant to Minnesota Statutes and Wisconsin Statutes, which
authorize the joint and cooperative exercise of powers common to contracting parties in other states.
The intent of this Agreement is to make fire service equipment, personnel and other related resources
available to political subdivisions from other political subdivisions. The purpose of providing such
assistance shall be but not limited to; fire suppression, public health and safety emergencies,
firefighter training, or public fire prevention education.
1. Definitions.
"Party" means a political subdivision.
"Requesting Official" means the person designated by a Party who is responsible for requesting
Assistance from other Parties.
"Requesting Party" means a party that requests assistance from other parties.
"Responding Official" means the person designated by a party who is responsible to determine
whether and to what extent that party should provide assistance to a Requesting Party.
"Responding Party" means a party that provides assistance to a Requesting Party.
"Assistance" means fire and/or emergency medical services personnel and equipment.
2. Request for Assistance.
Whenever, in the opinion of a Requesting Official, there is a need for assistance from other
parties, the Requesting Official may call upon the Responding Official of any other party to furnish
assistance.
3. Response to Request.
Upon the request for assistance from a Requesting Party, the Responding Official may
authorize and direct a party's personnel to provide assistance to the Requesting Party. This decision
will be made after considering the needs ofthe responding party and the availability of resources.
4. Recall of Assistance.
The Responding Official may at any time recall the assistance when in their best judgment or
by an order from the governing body of the Responding Party, it is considered to be in the best
interests of the Responding Party to do so.
5. Command of Scene.
The Requesting Party will be in command of the mutual aid scene. The personnel and
equipment of the Responding Party will be under the direction and control of the Requesting Party
until the Responding Official withdraws assistance.
6. Workers' Compensation.
Each party is responsible for injuries or death of its own personnel. Each party will maintain
workers' compensation insurance or self -insurance coverage, covering its own personnel while they
are providing assistance pursuant to this agreement. Each party waives the right to sue any other party
for any workers' compensation benefits paid to its own employee or volunteer or their dependants,
even if the injuries were caused wholly or partially by the negligence of any other party or its officers,
employees, or volunteers.
7. Damage to Equipment.
Each party is responsible for damages to or loss of its own equipment. Each party waives the
right to sue a ny other party for any damages to or loss of its equipment, even if the damages or losses
were caused wholly or partially by the negligence of any other party or its officers, employees, or
volunteers.
8. Liability.
Personnel acting under this Agreement may n ot be considered, for liability purposes, as an
employee or agent of the other state or a political subdivision of the other state for their actions,
regardless of the supervision or control of the person' s actions while within the other state. All
personnel will be considered as continuing to be employees of the employing agency in the person's
home state.
Except as provided below, any person acting under this Agreement must continue to be covered
by their employing agency for purposes of civil liability purposes in their home state. Any personnel
acting within the other state under this Agreement is considered while so acting to be in the ordinary
course of their employment within their home state and to be protected by any statutory immunity from
liability and limits of liability enjoyed in their home state.
In addition to home state immunity from liability or immunity from limits of liability, any
personnel acting under this Agreement in the other state are also entitled to any immunity from liability
or limit on liability to the same extent as a person of the other state. If however, a claim is made in
Minnesota for an occurrence in Minnesota against a Wisconsin party, the Minnesota Fire agency
agrees to defend and indemnify the Wisconsin party fo r claims that exceed the Wisconsin parties'
statutory limits of liability, subject to the limitations on municipal tort liability enjoyed by the
Minnesota Fire agency, and to the extent of the Minnesota Fire agency's liability insurance coverage.
9. Charges to the Requesting Party.
No charges will be levied by a Responding Party to this agreement for assistance rendered to a
Requesting Party·under the terms of this agreement unless that assistance continues for
a period of more than 12 hours. If assistance provided under this agreement continues
for more than 12 hours, the Responding Party will submit to the Requesting Party an
itemized bill for the actual cost of any assistance provided after the initial 12 hour
period, including salaries, overtime, materials and supplies and other necessary
expenses; and the Requesting Party will reimburse the party providing the assistance for
that amount.
Any charges are not contingent upon the availability of federal or state government funds.
The requesting party shall reimburse the responding party for consumable items such as but not
limited to; class A and B foams and floor dry.
10. Joint Firefighter Training and Public Fire Prevention Education
The terms of this Agreement shall apply to joint firefighter training exercises and joint public
fire prevention education.
11. Duration.
This Agreement shall be reviewed every three years by the parties. Any party may withdraw
from this Agreement upon thirty (30) days written notice to the other party or parties to the Agreement.
12. Execution.
Each party hereto has read, agreed to and executed this Mutual Aid Agreement on the date
indicated. Each party to this Agreement shall maintain an executed copy of this Agreement.
This fire service agreement has been approved by the participating departments on , 2026.
Portage County
Fire Service Agreement
WHEREAS, the Plover Fire Department desires to enter into a Fire Service Agreement with
various municipalities/fire service organizations in Potage County, Wisconsin; and
WHEREAS, the purpose of the agreement is to provide assistance for fire suppression, public
health and safety emergencies, firefighter training, or fire safety educations; and
WHEREAS, the Fire Service Agreement has been reviewed by the participating municipalities on
March 18, 2026.
NOW, THEREFORE, BE IT RESOLVED that the Plover Fire Department of Wisconsin hereby
approves the Portage County Fire Service Agreement, as attached hereto and made a part
hereof.
Date this 18th day of March 2026
GOVERNING BODY OF:
Village of Plover
FIRE DEPARTMENT:
Plover Fire Department
SIGNED: PRINTED: DATE:
_______________________ ____Gary Wolf________________ ____________________
Village President
_______________________ __Tammy Wojtalewicz__________ ____________________
Clerk
_______________________ __Fire Chief Mark Deaver _______ ____________________
Jurisdiction’s Chief
VILLAGE OF PLOVER, WI
STAFF REPORT
VILLAGE BOARD
Submitted By: Steve Kunst, Administrator
Date: March 13, 2026
Subject: Crossroads Commons Bus Service Agreement
Background: The curren t agreement with the City of Stevens Point Centra l Transportation
Department to provide bus service solely within the Crossroads Commons development expired
at the end of 2025. Attached is an updated agreement to run through 2026 with a Village option
to extend for three (3) additional years to 2030. The only change from the past agreement is the
term.
Cost: The City will submit an annual cost in October prior to the given service year. The cost will
reflect the estimated state/federal reimbursement. For reference, the cost submitted in 2025 was
$20,036. If state/federal funding awarded to the City is reduced or eliminated, the Village is
responsible for the entire cost of providing the service . As a reminder, the costs associated with
this service are billed back to all property owners within the Crossroads Commons development.
This was previously agreed to by the property owners as they requested the service.
Recommendation: I recommend approval of the attached agreement with the City of Stevens
Point continuing bus service within the Crossroads Commons development, as presented.
Exhibits: Exhibit A – Transportation Agreement with Stevens Point Central Transit
VILLAGE OF PLOVER
TRANSPORTATION AGREEMENT
THIS AGREEMENT made in the month of October, year 2025 is by and between the City of Stevens
Point/Central Transportation, hereinafter referred to as “CT,” and the Village of Plover.
CT is a Municipal Transit System, with a principal mailing address of 2700 Week Street, Stevens Point, WI
54482; and the Village of Plover, with a principal mailing address of 2400 Post Road, P.O. Box 37, Plover, WI
54467.
1.) TRANSPORTATION SERVICES
1.1 CT will provide transportation to/from the Crossroads Commons Monday thru Friday e year round, with the
exception of Holidays as specified in section 1.3 of this document.
1.2 Individuals with disabilities, determined unable to utilize the CT fixed route buses, will have comparable
access to Paratransit services, called Point Plus. Upon request Point Plus passengers will be transported
to/from Crossroads Commons.
1.3 No Service will be provided on the following Holidays:
• New Year’s Day
• Memorial Day
• July 4th
• Labor Day
• Thanksgiving Day
• Christmas
• Christmas Eve
(If any of the above Holidays falls on a Sunday the following Monday will be considered the Holiday;
transportation services will not be provided.)
1.4 The bus route will follow the route(s) as designated in the Central Transportation Bus Route Map and
Schedule.
Bus stop signs are located as follows:
• Commons Circle (near Chili’s)
• Commons Circle (near Best Buy)
• Meridian Drive (near the Dollar Tree)
• Walmart (front door location)
• Kohl’s (front door location)
• Next to US Cellular
Passengers will be picked up and dropped off at the designated bus stop areas only. Bus stop locations and the
number of bus stops may be amended at any time by mutual agreement of the Central Transportation Manager
and Village of Plover Administrator.
1.5 Any costs incurred for Bus Shelters, or sign placement will be the responsibility of the Village of Plover.
Bus signs will be provided by CT.
2.) TERM OF AGREEMENT
Exhibit A
2.1 The term of this Agreement shall be January 1, 2026 through December 31, 2027, with an option to extend
the agreement an additional three (3) years through December 31, 2030 upon written request from the Village of
Plover.
3.) COMPENSATION
3.1 A total annual cost breakdown for the upcoming year will be submitted in October prior to the service year.
The cost will reflect the estimated state/federal reimbursement. In the event that state/federal funding is reduced
or eliminated, the Village of Plover will be responsible for the entire cost of providing the service.
3.2 The Village of Plover shall pay the City of Stevens Point the total annual cost as specified in the cost
breakdown according to the following payment schedule:
The Village of Plover will be invoiced on July 1st for the current service year as specified in section 2.1 of this
document. Payment shall be paid within 30 days.
4.) ADMINISTRATION
4.1 In providing and furnishing any of the aforementioned bus services, the Village of Plover shall not have,
and shall not exercise any control over CT’s operation in connection with providing bus service, and the Village
of Plover shall not have and shall not exercise any control or supervision whatsoever over drivers of the buses
used in said service who shall be employed by the City of Stevens Point, shall constitute CT employees only,
shall not constitute agents or employees of the Village of Plover, and shall be subject solely to the CT
supervision and control.
5.) INTERRUPTION OF SERVICE / NON-PERFORMANCE
5.1 CT shall not be in default of any provisions of this agreement for failure to perform where such failure is
due to strikes, walk-outs, civil insurrections or disorders, order of civil authorities, shortages of motor fuel or
equipment, significant United States or State of Wisconsin Departments of Transportation funding reductions,
acts of God, or for any other cause or causes beyond the control of CT.
6.) TERMINATION
6.1 Failure to make payment, as outlined in Section 3, shall result in termination of this Agreement, at CT’s sole
and exclusive option if such non-payment continues for five (5) days after the Village of Plover’s receipt of
written notice from CT of the default. Termination of this Agreement for failure to make payment means that all
transportation into Crossroads Commons will be discontinued. Should CT exercise its termination option under
the terms and conditions of this paragraph, CT shall have the right to make legal claim for those monies
outstanding. Should it be necessary for CT to exercise its termination option under the terms and conditions of
this paragraph, CT shall not be liable to the Village of Plover for any claimed damages, personal or property,
including any consequential damages, resulting from the loss of bus services under this Agreement. Should this
Agreement be terminated under the terms and conditions of this paragraph, and the Village of Plover then
subsequently provides payment as required, CT may require 30 calendar days to reinstate the terms of this
agreement.
6.2 If at any time during the term of this Agreement, either party shall fail to satisfactorily meet the provisions
of this Agreement, or if at any time the CT system makes or notifies the Village of Plover what is considered to
be an adverse change in any of the bus service routing covered by this Agreement, the dissatisfied party shall so
advise the other party by certified mail indicating in specific detail the nature and basis of its dissatisfaction.
The party to whom the complaint is addressed shall have an opportunity to correct the situation giving rise to
the complaint within forty-five (45) days from its receipt; if such corrections are not made to the reasonable
satisfaction of the complaining party within said period, the complaining party may terminate this Agreement
upon forty-five (45) days written notice.
6.3 All accounts shall be settled on a prorated basis in the event of termination of this Agreement prior to its full
term.
6.4 Should CT or the Village of Plover be unable to fulfill the requirements of this agreement because of
expected lack of funds, then either CT or the Village of Plover may provide written notice of such expected lack
of funds upon thirty (30) days prior written notice and this agreement shall be terminated.
7.) AMENDMENT
7.1 This Agreement may be amended at any time by mutual agreement of CT and the Village of Plover. Any
amendment to this Agreement shall be in writing, signed by both parties, and attached to the original of this
Agreement.
8.) NOTICE
8.1 Any notices issued, pursuant to the terms of this Agreement, shall be in writing and delivered in person or
by certified mail, return receipt requested, to the attention of the authorized representative, as stated in this
contract, and mailed to the address indicated in the execution of this Agreement, unless either party is notified,
in writing, to the contrary.
IN WITNESS WHEREOF
The parties hereto have caused this Agreement to be signed by duly authorized representatives the day and year
aforesaid.
CITY OF STEVENS POINT, CENTRAL TRANSPORTATION
BY: _______________________ Date: ___________
Mayor, City of Stevens Point
Mike Wiza
VILLAGE OF PLOVER/CROSSROADS COMMONS
BY: _______________________ Date: ___________
Village of Plover President
Gary Wolf
VILLAGE OF PLOVER
TRANSPORTATION AGREEMENT
THIS AGREEMENT made in the month of October, year 2025 is by and between the City of Stevens
Point/Central Transportation, hereinafter referred to as “CT,” and the Village of Plover.
CT is a Municipal Transit System, with a principal mailing address of 2700 Week Street, Stevens Point, WI
54482; and the Village of Plover, with a principal mailing address of 2400 Post Road, P.O. Box 37, Plover, WI
54467.
1.) TRANSPORTATION SERVICES
1.1 CT will provide transportation to/from the Crossroads Commons Monday thru Friday e year round, with the
exception of Holidays as specified in section 1.3 of this document.
1.2 Individuals with disabilities, determined unable to utilize the CT fixed route buses, will have comparable
access to Paratransit services, called Point Plus. Upon request Point Plus passengers will be transported
to/from Crossroads Commons.
1.3 No Service will be provided on the following Holidays:
• New Year’s Day
• Memorial Day
• July 4th
• Labor Day
• Thanksgiving Day
• Christmas
• Christmas Eve
(If any of the above Holidays falls on a Sunday the following Monday will be considered the Holiday;
transportation services will not be provided.)
1.4 The bus route will follow the route(s) as designated in the Central Transportation Bus Route Map and
Schedule.
Bus stop signs are located as follows:
• Commons Circle (near Chili’s)
• Commons Circle (near Best Buy)
• Meridian Drive (near the Dollar Tree)
• Walmart (front door location)
• Kohl’s (front door location)
• Next to US Cellular
Passengers will be picked up and dropped off at the designated bus stop areas only. Bus stop locations and the
number of bus stops may be amended at any time by mutual agreement of the Central Transportation Manager
and Village of Plover Administrator.
1.5 Any costs incurred for Bus Shelters, or sign placement will be the responsibility of the Village of Plover.
Bus signs will be provided by CT.
2.) TERM OF AGREEMENT
2.1 The term of this Agreement shall be January 1, 2026 through December 31, 2027, with an option to extend
the agreement an additional three (3) years through December 31, 2030 upon written request from the Village of
Plover.
3.) COMPENSATION
3.1 A total annual cost breakdown for the upcoming year will be submitted in October prior to the service year.
The cost will reflect the estimated state/federal reimbursement. In the event that state/federal funding is reduced
or eliminated, the Village of Plover will be responsible for the entire cost of providing the service.
3.2 The Village of Plover shall pay the City of Stevens Point the total annual cost as specified in the cost
breakdown according to the following payment schedule:
The Village of Plover will be invoiced on July 1st for the current service year as specified in section 2.1 of this
document. Payment shall be paid within 30 days.
4.) ADMINISTRATION
4.1 In providing and furnishing any of the aforementioned bus services, the Village of Plover shall not have,
and shall not exercise any control over CT’s operation in connection with providing bus service, and the Village
of Plover shall not have and shall not exercise any control or supervision whatsoever over drivers of the buses
used in said service who shall be employed by the City of Stevens Point, shall constitute CT employees only,
shall not constitute agents or employees of the Village of Plover, and shall be subject solely to the CT
supervision and control.
5.) INTERRUPTION OF SERVICE / NON-PERFORMANCE
5.1 CT shall not be in default of any provisions of this agreement for failure to perform where such failure is
due to strikes, walk-outs, civil insurrections or disorders, order of civil authorities, shortages of motor fuel or
equipment, significant United States or State of Wisconsin Departments of Transportation funding reductions,
acts of God, or for any other cause or causes beyond the control of CT.
6.) TERMINATION
6.1 Failure to make payment, as outlined in Section 3, shall result in termination of this Agreement, at CT’s sole
and exclusive option if such non-payment continues for five (5) days after the Village of Plover’s receipt of
written notice from CT of the default. Termination of this Agreement for failure to make payment means that all
transportation into Crossroads Commons will be discontinued. Should CT exercise its termination option under
the terms and conditions of this paragraph, CT shall have the right to make legal claim for those monies
outstanding. Should it be necessary for CT to exercise its termination option under the terms and conditions of
this paragraph, CT shall not be liable to the Village of Plover for any claimed damages, personal or property,
including any consequential damages, resulting from the loss of bus services under this Agreement. Should this
Agreement be terminated under the terms and conditions of this paragraph, and the Village of Plover then
subsequently provides payment as required, CT may require 30 calendar days to reinstate the terms of this
agreement.
6.2 If at any time during the term of this Agreement, either party shall fail to satisfactorily meet the provisions
of this Agreement, or if at any time the CT system makes or notifies the Village of Plover what is considered to
be an adverse change in any of the bus service routing covered by this Agreement, the dissatisfied party shall so
advise the other party by certified mail indicating in specific detail the nature and basis of its dissatisfaction.
The party to whom the complaint is addressed shall have an opportunity to correct the situation giving rise to
the complaint within forty-five (45) days from its receipt; if such corrections are not made to the reasonable
satisfaction of the complaining party within said period, the complaining party may terminate this Agreement
upon forty-five (45) days written notice.
6.3 All accounts shall be settled on a prorated basis in the event of termination of this Agreement prior to its full
term.
6.4 Should CT or the Village of Plover be unable to fulfill the requirements of this agreement because of
expected lack of funds, then either CT or the Village of Plover may provide written notice of such expected lack
of funds upon thirty (30) days prior written notice and this agreement shall be terminated.
7.) AMENDMENT
7.1 This Agreement may be amended at any time by mutual agreement of CT and the Village of Plover. Any
amendment to this Agreement shall be in writing, signed by both parties, and attached to the original of this
Agreement.
8.) NOTICE
8.1 Any notices issued, pursuant to the terms of this Agreement, shall be in writing and delivered in person or
by certified mail, return receipt requested, to the attention of the authorized representative, as stated in this
contract, and mailed to the address indicated in the execution of this Agreement, unless either party is notified,
in writing, to the contrary.
IN WITNESS WHEREOF
The parties hereto have caused this Agreement to be signed by duly authorized representatives the day and year
aforesaid.
CITY OF STEVENS POINT, CENTRAL TRANSPORTATION
BY: _______________________ Date: ___________
Mayor, City of Stevens Point
Mike Wiza
VILLAGE OF PLOVER/CROSSROADS COMMONS
BY: _______________________ Date: ___________
Village of Plover President
Gary Wolf
Village of Plover
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
www.ploverwi.gov
General Offices 715-345-5250 Water Department 715-345-5254 Police Department 715-345-5255
Building Inspection 715-345-5312 WWTP Department 715-345-5259 Fire/EMS Department 715-345-5310
Public Works/Parks Department 715-345-5257
To: Village Board Members
From: Tammy Wojtalewicz, Village Clerk
CC: Steve Kunst
Date: March 12, 2026
Re: Retail Alcohol Beverage License Change of Agent
____________________________________________________________________________
Due to the transitioning agent functions to a new manager, GPM Southeast LLC, DBA Rstore,
2900 Village Park Dr. is appointing Amanda Minta as their new agent for Retail Alcohol
Beverage licensing activity.
Village of Plover
2400 POST ROAD - PO Box 37 - PLOVER, WISCONSIN 54467
www.ploverwi.gov
General Offices 715-345-5250 Water Department 715-345-5254 Police Department 715-345-5255
Building Inspection 715-345-5312 WWTP Department 715-345-5259 Fire/EMS Department 715-345-5310
Public Works/Parks Department 715-345-5257
To: Village Board Members
From: Tammy Wojtalewicz, Village Clerk
CC: Steve Kunst
Date: March 12, 2026
Re: Operator (Bartender) License Application – Ericka Galica
____________________________________________________________________________
A bartender license application was received in which the applicant disclosed a prior conviction for a
felony that occurred when the applicant was a minor.
The Village of Plover’s Ordinance 328-5 (4)(c) indicates the license should be referred to the board if the
applicant has a juvenile conviction that is an exempt offense under Wis. Stat. 111.335(1m)(b).
Our ordinance specifically references state statute 111.335(1m)(b)Subject to Wisconsin's Fair
Employment Law, ch. 111, Wis. Stats., an operator (bartender) license applicant must not have been
convicted of a felony or be a habitual law offender. Wisconsin's Fair Employment Law prohibits the
denial of a license based on a pending arrest or conviction record unless the record substantially relates
to the licensing activity.
The existence of this conviction does not automatically preclude the Board from approving or denying
the application. The Board retains discretion to evaluate the circumstances of the offense, the
applicant’s history since that time, and whether the conviction is substantially related to the
responsibilities of holding a bartender license when making its determination.
AECOM
200 Indiana Avenue
Stevens Point, WI 54481
www.aecom.com
715 341 8110 tel
715 341 7390 fax
March 12, 2026
Gary Wolf, Village President
Village of Plover
2400 Post Road
Plover, WI 54467
Subject: General Engineering Services Agreement – T ask Order No. 184
Green Tree Farms Construction Related Services
AECOM Project No. 60701127.184
Dear Mr. Wolf:
Enclosed for Village approval is Task Order No.184 in the amount of $74,420 to perform construction
observation for Green Tree Farms.
We thank you for the opportunity to be of continued service to the Village of Plover. Please contact
me with any comments or questions you may have.
Yours sincerely,
AECOM
Joseph M. Terry, P.E.
Village Engineer
Enclosures: As Noted
Page 1 of 3
TASK ORDER NO. 184
TO
PROFESSIONAL SERVICES AGREEMENT DATED MARCH 5, 2003
Project Name: General Engineering Services – Green Tree Farm
Project Number: 60701127.184
This Task Order is made between AECOM Technical Ser vices Inc., (AECOM), with offices at 200 Indiana
Avenue, Stevens Point, Wisconsin, 54481 and the Village of Plover (CLIENT), with offices at 2400 Post Road,
PO Box 37, Plover, Wisconsin 54467.
TASK ORDER DESCRIPTION:
• Provide construction observation of the Green Tree Farm Water Main, Sanitary Sewer, and
Roadway Improvements to represent CLIENT interests in having sanitary sewer, water main and
roadway construction conform to Contract Documents prepared by others. The contractor is
responsible for notifying AECOM a minimum of 24 hou rs in advance when the work is
being performed on this contract .
• Developer’s Engineer will supply AECOM with any ad dendums or changes to the final Plans.
• Developer’s Engineer will supply AECOM with projec t specifications.
• Developer’s Engineer will supply AECOM with materi al submittal records.
• AECOM will provide full-time inspection of sanitar y sewer and water main improvements, and part
time inspection of roadway improvements.
• Contractor is responsible for site safety.
• AECOM is not responsible for construction staking.
• Dewatering is not included. If encountered, and mo nitoring is requested by CLIENT, this time will be
negotiated between AECOM and CLIENT as additional w ork.
• AECOM will provide weekly progress updates to Vill age staff.
• AECOM will provide construction record drawings; p lans will be provided in CAD format to AECOM
by the developer’s Engineer.
• See Appendix A for task/hour breakdown.
ASSUMPTIONS: See Appendix B.
CONTRACT COST: $74,420
CLIENT confirms reading this document in full. This Task Order, when executed by AECOM, is an offer to
perform the SERVICES, open for acceptance within 30 days. This Task Order becomes effective on the date
CLIENT signs below:
Page 2 of 3
CLIENT: VILLAGE OF PLOVER AECOM TECHNICAL SERVICES, INC.
By: By:
Gary Wolf Kevin R. Hagen, P.E.
Title: Village President Title: Associate Vice Pre sident
Date: Date:
March 12, 2026
Page 3 of 3
APPENDIX A
TASK ORDER NO. 184
VILLAGE OF PLOVER
GENERAL ENGINEERING SERVICES
AECOM PROJECT NO. 60701227.184
GREEN TREE FARM PHASES 1, 2, & 3
SANITARY SEWER IMPROVEMENTS
Task Hours Cost
Project Engineer 19.5 $4,480
Inspector 260 $21,150
Total 279.5 $25,630
WATER MAIN IMPROVEMENTS
Task Hours Cost
Project Engineer 24 $5,430
Inspector 315 $25,620
Total 339 $31,050
ROADWAY IMPROVEMENTS
Task Hours Cost
Project Engineer 13.5 $3,110
Inspector 180 $14,640
Total 193.5 $17,7 50
TOTAL IMPROVEMENTS
Task Hours Cost
Project Engineer 54 $13,010
Inspector 755 $61,410
Total 812 $74,4 20
Page 4 of 3
APPENDIX B
TASK ORDER NO. 184
VILLAGE OF PLOVER
GENERAL ENGINEERING SERVICES
AECOM PROJECT NO. 60701127.184
GREEN TREE FARM SUBDIVISION DEVELOPMENT
The number of hours assumed for inspection is based upon full-time utility inspection of 10 hours per day.
We assume inspection time as follows:
SANITARY SEWER
· Connect to Existing Sewer 3 EA @ 2 EA/day = 1.5 days
· Sanitary Sewer 8” 2426 LF @ 300 LF/day = 8.5 days
· Sanitary Manholes 11 EA @ 6 EA/day =2.0 days
· Sanitary Sewer Laterals 46 EA @ 6 EA/day = 8.0 days
· Sanitary Sewer Testing = 3.0 day
· Dewatering If Encountered Will Be Additional
· Record Drawing Compilation = 3 days
Subtotal Sanitary Sewer = 26 Days
WATER MAIN
The number of hours assumed for inspection is based upon full-time utility inspection of 10 hours per day.
We assume inspection time as follows:
· Connect to Existing Watermain 4 EA @ 2 EA/Day = 2.0 days
· Water Main 8” 2728 LF @ 300 LF/day = 9.5 days
· 8” Valves 14 EA @ 4 EA/day = 3.5 days
· Hydrants 7 EA @ 3/day = 2.5 days
· Water Laterals 46 EA @ 6EA/day = 8.0 days
· Water Main Testing = 3.0 days
· Record Drawing Compilation = 3 days
Subtotal Water Main = 31.5 Days
STORM AND ROADWAY
The number of hours assumed for inspection is based upon part-time roadway inspection of 10 hours per
day. We assume inspection time as follows:
· Base Aggregate Dense 1 ¼” 8128 TN = 2.5 days
· Base Aggregate Dense 3/4" 711 TN =2.0 days
· Concrete Curb and Gutter 640 LF @ 1200 LF/day = 0.5 day
· Stormwater BMP 5900 LF @ 1500 LF/day = 4.0 days
· Culverts 0 EA @ 4/day = 0 days
· Asphalt Paving 3442 TN @ (2 lifts) = 7.0 days
Subtotal Storm and Roadway 18 Days
V.OF PLOVER ENGINEER REPORT
submitted March 12, 2026
DESIGN PROJECTS
STH 54 Parallel Sanitary Interceptor
2/27/26: Design is complete. Project is being held open un*l project is let for bid by WisDOT.
Technical Specifica*ons
2/2/26: Work has started on the Plover Technical Specifica*ons project. An index is being created that is
organized and numbered as a hybrid of WisDOT and APWA. When the index is complete, it will be
reviewed by Village department heads before work con*nues.
2/27/26: The index is dra6ed and is being reviewed prior to forwarding to Village department heads.
3/12/26: The index has been forwarded to Village department heads for comment.
DEVELOPMENT PROJECTS
MULLINS CHEESE
10/10/25: We are expec*ng updated u*lity and stormwater plans due to the decision not to vacate a
por*on of Corporate Ave.
03/12/26: No new informa*on to report
Empire Estates
2/2/26: U*lity plans were submi=ed on 1/9/26 and stormwater plans were submi=ed on 1/16/26. Plans
have been reviewed. A condi*onal recommenda*on to accept plans for both the u*li*es and
stormwater plans was sent to Village staff and the development team on 2/2/2026. Condi*ons include
minor adjustments to the u*li*es and some clarifica*ons on the stormwater plan. A task order for
construc*on services is being developed, an*cipa*ng start of construc*on mid-April.
2/27/26: Due to the developer pausing requests for approval, the task order development for
construc*on services has been paused.
3/12/26: Updated plans have been submi=ed and comments have been sa*sfied.
Green Tree Farm
2/2/26: The developer submi=ed plans for a pre-submi=al review on 12/15/25. U*lity and stormwater
plans were submi=ed on 1/19/26 for review. Those plans are currently under review.
2/27/26: Plans have been reviewed and comments for revisions submi=ed to the developer. A task
order for construc*on services is being developed, including the inspec*on of stormwater management
features at the developer’s request.
3/12/26: Plans have been resubmi=ed for review. A task order for construc*on observa*on has been
submi=ed.
Portage County Facility
8/29/25: A preliminary concept plan has been received for review
9/12/25: Some addi*onal preliminary plan informa*on has been received. Providing sanitary sewer will
require some evalua*on and direc*on. Some high-level cost es*mates and loca*on of sanitary sewer as
compared to Plover’s sanitary sewer master plan have been discussed between AECOM engineers and
Village staff. A preliminary review mee*ng was facilitated by Village staff on 9/10/25.
03/12/26: No new informa*on to report
Crossroad Commons Commercial Development
12/12/25: A preliminary cer*fied survey/plat was reviewed for a new proposed commercial development
in Crossroads Commons. Comments were forwarded to the developer.
The stormwater ponds serving Crossroads Commons are designed to handle a specific amount of
impervious surfaces (pavement, buildings, etc.) As the business park is nearing capacity, available
stormwater capacity is being checked for each poten*al development. The pond Infiltra*on rate during
the 2025 calendar year demonstrates that the ponds are in need of maintenance. This work should be
planned and budgeted to prevent stormwater control issues.
1/16/26: The Developer has indicated they are reconfiguring the lot layout to minimize poten*al
groundwater conflicts, increase proximity to the stormwater management ponds, and improve u*lity
access.
03/12/26: No new informa*on to report
GENERAL
Other
1/16/26: Review of State regula*ons pertaining to planning and considera*on of future ice control brine
storage.