Town of Spider Lake
Plan and Review Commission Meeting Minutes
April 2, 2025 at 6:00 pm
1
MINUTES
1. The Meeting was called to order at 6:00 PM
a. PRESENT: Chair Sarah Delaney and Commissioners: Becker, Haueter (via
Zoom), Sheldon, and Smith (via Zoom), Zoning Administrator Mike Gardner.
2. Becker moved to approve the April 4 Agenda with the addition of the Sawyer
County Camping Cabin proposed amendment discussion under ‘Any other
business’; seconded by Sheldon. Motion carried.
3. Pledge of Allegiance
4. Becker moved to approve the Minutes of the March 5, 2025, Public Hearings;
seconded by Haueter. Smith moved to approve the Minutes of the March 5, 2025,
P&RC Meeting; seconded by Becker. Both motions carried.
5. Zoning Administrator Mike Gardner presented the Zoning Administrator’s Report,
relaying that permit inquiries were increasing and that the information on the website and
the ability to complete the initial stages of the application process on the web was
streamlining the process.
a. Permit applications
i. LUP 25-06 – Capes Accessory Structure Addition - Sheldon moved to
approve; Becker seconded. Motion carried.
ii. LUP 25-07 – Sheldon moved to approve North Star Camp’s Accessory
Bldg/Dormitory with two provisions: (1) revise the language of the Boys’
Camp Shoreland Preservation Agreement from: “The owner(s) hereby
agrees to comply with…” to “The owner(s) hereby agrees that all future
development shall comply with…” and signed by owner; (2) that
Westlund consultants supply a written document of Compliance with all
state and county requirements. Becker seconded.
Discussion: All buildings have been numbered and identified on Sheet C301.
Request that buildings be color-coded as residential (or potentially hazardous
materials) and submitted to the Town and the Town’s Fire Department (SLVFD)
to facilitate informed if an emergency response is necessary.
This has been a long process, beginning in October of 2023. Commitment
expressed from owner to follow the Town’s permitting process for all future
development.
Agreement to work with ZA Gardner to walk the shoreland boundary some time
in Spring 2025.
Motion carried.
iii. DW 25-01 – Kruskopf new Driveway - Delaney moved to approve; Smith
seconded. Motion carried.
iv. LUP 25-08 – Maier New Dwelling -Maiers provided a presentation of the
circumstances of their situation on Boos Lake.
Becker moved to approve recommending that the Zoning Board of
Appeals look favorably upon the request to relocate the footprint of the
Town of Spider Lake
Plan and Review Commission Meeting Minutes
April 2, 2025 at 6:00 pm
2
dwelling structure from 22 feet from the shoreland, back to about 40 feet
from the shoreland; Smith seconded.
DISCUSSION: This action may be best for the environment and best for the
family and Town but fails to meet the requirements of all conditions of the
ordinance and therefore, must be rejected.
Becker motion; seconded by Smith. Motion Failed.
Sheldon moved that the commission reject the Maiers’ LUP application;
seconded by Haueter. Motion carried. Recourse for the Maiers is to petition for
a variance to the Zoning Board of Appeals.
v. LUP 25-09 – Dohrmann – New Dwelling (Rebuild)- Becker moved to approve;
seconded by Sheldon. Motion carried. DISCUSSION: Permit fees will be
waived.
vi. LUP 25-10 –Okuno Dwelling Addition- Smith moved to approve; seconded by
Becker. Motion carried.
6. TOSL Information Guide - Review and Discussion – Delaney will pursue professional
assistance to finalize the ‘At-A-Glance’ document and contact the lake associations to
assist with distribution.
7. Sawyer County Ad Hoc Zoning Committee Update – Delaney shared key issues and
remedies in progress from the Ad Hoc Committee.
8. Other business which came before the Commission for Discussion:
a. Sawyer County Zoning and Conservation Department proposed amendment to
the Zoning Ordinance regarding Camping Cabins:
A comparison of TOSL/Sawyer County/DATCP descriptions and considerations
of camper cabins was provided, demonstrating a considerable relaxation of
regulation in the proposal.
DISCUSSION: Delaney: The proposed amendment shifts the definition of
camping cabin from a no-frills shelter to small ‘dwellings’ with utilities (gas, water,
elec.). Haueter: creates a subclass of dwellings and blurs permitted uses. The
proposed use in licensed campgrounds could create high density residential
neighborhoods (up to 5 per acre) in shoreland areas (counter to the County and
Town Comprehensive Plans), without benefit of traditional zoning regulation. In
addition, the proposal was crafted prior to the conclusion of the Ad Hoc
Committee addressing Multi-Dwelling Development and could inject additional
conflict or inconsistency into the Zoning Ordinance.
Highlights of the discussion will be provided to the Town Board for their
information and action.
9. Sheldon moved to adjourn; seconded by Becker. Motion carried.
Respectfully submitted,
Tim Sheldon, Vice Chair of the Plan and Review Commission
April 9, 2025
Town of Spider Lake Zoning Report April 2025 Date Permit# Name Address Descrip1on Construc1on Cost Total Sq Ft Fee 4/3 LUP 25-05 Wilson Applica6on review, communica6ons 4/5 Hill Construc6on Inquiry regarding Teal Lake non-conforming structure 4/7,8,15 Kruskopf Inquiries regarding Driveway & LUP applica6on, sep6c permit 4/16 Myhra Power of ARorney form request 4/16 Golden Demoli6on Permit requirements request 4/16 LUP 25-10 Okuno Met representa6ves on site to verify OHWM setbacks 4/16 LUP 25-05 Wilson Met representa6ve on site to review setback staking, review wetland / lake 4/17 Sacia Review Lost Land Lake Condo boat ramp replacement applica6on. follow up communica6ons
4/17 Godfrey Reviewed Cook Accessory Structure drawings 4/17,19,21 Camp David Realty TID 30223 Pre purchase Inquiry regarding 8796W Branchford Rd, site visit 4/21 Hanson LUP follow up site visit 4/23 Waggoner Review LUP applica6on, communica6ons 4/23 Harrington, WDNR Contacted regarding private boat ramp permi\ng, replacements
4/24,28 Koenig Pre purchase inquiry regarding TID 30223 4/25 Rasmussen Inquiry regarding clearing within lake zone 4/28 Dual Contacted regarding report on Twin Lake Campground ac6vi6es 4/28 CSM Reviews: contacted County Surveyor, JAH Construc6on, Spider Lake Golf 4/28 Hayward Roofing Inquiry regarding roof & guRer replacement 4/30 Larson Contact & review LUP applica6on / fee / process 4/30 LUP 24-021 Hawver / Lemminger Inquiry regarding building inspec6on of foo6ngs / Boss referral 4/30 Godfrey Contacted regarding Cook LUP needs: condo leRer, driveway permit 4/30 Nelson Inquiry regarding pole barn inspec6ons
LUP 25-10
$ 350.00
LUP 25-11
$747.40 + $265 Coast to Coast Devt
16490 + 16508
Application for Land Use/Building Permit Town of Spider Lake
Sawyer County, Wisconsin
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE.
Be sure to complete all steps in this application.
Click Skip or Continue to save your input.
To exit the application at any point, close the app or browser after saving.
IS AGENT/BUILDER SAME AS OWNER? Yes No
FIRST NAME
becky
LAST NAME
waggoner
PROPERTY OWNER DAYTIME PHONE #
(715) 699-0049
PROPERTY OWNER MAILING ADDRESS
11778 Paddock Road, Hayward, WI 54843
GOV’T LOT
1/4 1/4
SEC. TWN. R______W
ALTERNATE/LEGACY ID
028742293303
DESCRIPTION
rebuild on existing foot print of garage that burned
SITE ADDRESS
11778w paddock road, hayward, WI 54843
ACREAGE
4.210
DEED
DOCUMENT #
425049
SANITARY PERMIT #
01-408
SANITARY PERMIT DATE
11/21/2001
SANITARY PERMIT ISSUED BY
YEAR INSTALLED
2001
OWNER WHEN INSTALLED
Dennis Waystead
LUP 25-12
LND-41
ATTACH COPY OF APPROVED SAWYER COUNTY SANITARY PERMIT
ZONE DISTRICT R-1 RR-1 RR-2 A-1 C-1 I-1 F-1
WETLAND/SHORELAND Yes No
Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000)
feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.
To Download the Power of Attorney Form open this link here .
PLEASE UPLOAD FILLED IN AND NOTARIZED POWER OF ATTORNEY
Throughout the process the inputed information is automatically saved as a
Draft document and you can always revisit it to continue where you left
off.
PERMIT
REQUESTED
FOR
New Dwelling Addition To Dwelling Accessory Structure
Addition To Accessory Structure Other/Misc Use of Land
Home Occupation/ Professional Office Alternative or Renewable Energy Systems
Communication Systems Other New Building/Structure (e.g., Commercial, Industrial, Agricultural)
Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural)
Accessory Structure info
# OF STORIES
1
TYPE OF
ACCESSORY
STRUCTURE
Garage
Storage Building
Gazebo
Screen house
Greenhouse
Other
SIZE OF PROPOSED STRUCTURE
(LENGTH X WIDTH = TOTAL
SQFT) 30' x 22' = 660'
HEIGHT OF STRUCTURE GRADE TO PEAK
?
CONSTRUCTION COST
$ 80,000 approximent
Rebecca Waggoner
Paddock Road
LUP 25-12
ATTACH THE SITE PLAN
unsaved-preview-document-
1745428205956.pdf
unsaved-preview-document-2-
1745444440279.pdf
Visit heygov.co/townofspiderlake.com/fr_01jshpeq1t4snbthqq4cje2aaq to view or download full files.
In the event this application is approved by the Zoning Office, I agree:
That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted
That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of
Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of
Wisconsin,
That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections
between the hours of 8:00 AM -6:00 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners.
I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our)
knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy
of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining whether to issue a
permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I (we) am (are) providing in
or with this application.
SIGNATURE OF OWNER OR (AGENT WITH POWER OF ATTORNEY)
Signed electronically on 4/23/2025
To Review the Fee Schedule for the Land Use Application open this link here.
ENTER AMOUNT OF CALCULATED FEES
-0.0
Thank you for calculating your payment fees. The Zoning Administrator will review the calculations and will send you a request for
payment.
SUBMITED AT: 4/23/2025
t
Application for Land Use/Building Permit
Town of Spider Lake
Sawyer County, Wisconsin
Application No. LUP 25-13
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT 7rHE PROPERTY ENTRANCE.
This is a Three (3) page document. Be sure to complete all pages
Print Or Type - Use Black Ink
Property
owner Shirley J Holt Trust Agent/Builder __________________ _
Mailing
Address 825 Summit Apt 1102
Mailing
Address ___________________ _
City Minneapolis State� Zip 55403 City ___________ State ___ Zip ____ _
Day Phone612-393-9501 Email shholt@aol.com Daytime Phone __________ _
Site Information (From Real Estate Property Tax Bill)
Gov't Lot __ __ 1/4 __ 1/4, Sec._1L Twn.__1l_N R___Q§_W Alternate/Legacy ID:
Description: PRT NESW Lots 1-2 CSM 12/185 #2944
Site Address: 9141W Upper A Rd Acreage 7 .24
Sanitary Permit# 24-028 Date 2/27 /24 Issued By Eric Wellauer
Or:
Year Installed ____ __ _ Owner When Installed: _____________ _
Zone District: l:8l R-1 0 RR-1 0 RR-2 0 A-1 0 C-1 0 1-1 i:8l F-1
028 - 1342 - 17 - 3102
Deed Document# 332765
(Attach Co,py Of Approved
Sawyer Cc,unty Sanitary Permit)
Wetland/Shoreland: � Yes D No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one
thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.)
Permit Requested For
Type of Dwelling # of Walk Out Attached Garage Footprint of Proposed Hght of Structure
Grade to Peak 0 Frame built on site Bedrooms □ Yes D Yes 0 No Structuwe
0 No
New
Dwelling
D Modular/manufactured
D Other ____ _
□ __ x __ = __ SF __ x __ = ___ SF
□
Type of Construction
# of Loft
0 No D Yes Deck □ Yes Total Habitabl13 Sq. Ft. Stories
Construction Cost
D Frame D Log D Pole/Metal
0 Block O Other __ □
0 No __ x __ = __ SF $ _____
□
Addition
To
Dwelling
Use of Addition
D Living room D Kitchen D Bathroom
D Bedroom D Garage D Deck
D Storage Building D Screened Porch
D Other
Bedrooms
Existing D
Additional □
Total □
# of Stories
□
Loft
□Yes
0 No
Size of Proposed Structure
__ X __ = __ SF
Total Habitable Sq. Ft.
Hght of Structure
Grade to Peak
Construction Cost
$ ___ _
# of
Stories
Type of Accessory Structure Size of Proposed Structure Hght of Construction Cost
Structure "71 Accessory
161 Structure DJ
l:8l Garage D Storage Building D Gazebo
D Screen house D Greenhouse _11._x-1i_ = 288 SF Grade t,:> Peak $ 30,000
D Other
Addition To Size of Existing Accessory Structure
O Accessory
Structure __ X __ = __ SF
D Foundation Replacement
0 Other/ Misc D Roof Structure Replacement
D Other _______ _
0 Stairs/Walkways Within 75' Of OHWM
Size of Proposed Addition
__ X __ = __ SF
Area Involved
__ X __ = __ SF
15
Hght of Structur,3
Grade to Peak
Hght of Structurn
Grade to Peak
Construction Cost
$ ___ _ _
Construction Cost
$ ____ _
0 Use of Land D Filing D Dredging D Grading D > 10,000 S.F. Grading D Other ___ _
Type of Business ____________ _
D Home Occupation/ D Located in Existing Dwelling
Professional Office D Located in Existing Accessory Structure
(Not more than 1 nonresident person may be employed on the premises)
Total Area of Existing Building ______ SF
Area Being Used for Business
(May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an
accessory 1°Juilding)
X SF
0 Alternative or Renewable Energy Systems \ B � ��:r_
□
_
w
_
in
_
d
___ __ _
Construction Cost
$
D Communication
Systems
TOWN OF SPIDER LAKE
ZO INGADM 5 25 16
D Cell Tower Height of Tower: ______ _
D Other _______ _
Construction Cost
$
Page I of3
Other New
Building/Structure
D (e.g., Commercial,
Industrial,
Agricultural)
Other New Addition
To
D
Building/Structure
(e.g., Commercial,
Industrial,
Agricultural)
Use of Building/Structure. ____________ _
Type of Construction: D Frame D Log D Pole/Metal D Block D Other, ___ _
Height from Grade to Peak Construction Cost: $
Use of Building/Structure. ____________ _
Type of Construction: D Frame D Log D Pole/Metal D Block D Other ___ _
Height from Grade to Peak Construction Cost: $
SITE PLAN REQUIREMENTS
Size of Proposed Structure
__X __ = __ SF
Total Area of Existing
Structure: ____ SF
Size of Proposed Structure
__ x __ = __ s
Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7
requirements:
Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED1
All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback
When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line.
1. Draw lot and write in lot line dimensions and indicate 6. Show dimensions in feet on the following:
North with an arrow a. Structure to all lot lines
2. Show the location and name of any bordering roads, b. Structure to centerline of road
and indicate North. c. Structure to lake, river, stream, pond or wetlands
3. Show the location and size of all existing and proposed d. Structure to septic system/privy and well
structures. e. Distance between structures
4. Show the location of any lake, river, stream, pond or 7. Show location vegetation protection area and proposed
wetlands. Viewing/Use Corridor on lake lots.
5. Show the location of the well, septic tank and drain field.
Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits)
Owner's signature is required on the appropriate attached Shoreland Preservation Agreement.
This permit cannot be issued without a signed shoreland Preservation Agreement.
Shoreland Impervious Surface: (Not applicable for nonshoreland permits)
Total land area within 300' of the water body: (A) ---'1-'-45::.!'.=.:52=-=0c..::s:.:...f ___ _
Total impervious surface area (including this project) (B) 2782 sf (B)/(A) x 100 =%Used 1.9 %
(Shall not exceed 15% or 25% with a conditional use permit
In the event this application is approved by the Zoning Office, I agree:
• That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted
• That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider
Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin,
• That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections
between the hours of 8:00 AM -6:00 PM Mon - Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners.
1 (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it
is true. correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that
it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider
Lake relying on this information I (we) am (are) pro�iding in or with this application.
� � Signature of Owner or (Agent with fower of Atto��"\�.
. -vf- $� j,..t&
;th,..,,� 511 ,r lL-1 1-/o ff ., • L LI AJ -
��: niJ,/ .s�,,�Yt lf,(t: Sign:
, 4'r� /7a'ifoate: (.4-pn / 2° '2S
You must complete the attached plot plan
Fees: See Fee Schedule
Checks should be made payable to: Treasurer of the Town of Spider Lake.
An Additional fee will be required for each inspection over __
Submit Completed Application And Fee To:
Town of Spider Lake Clerk
10896 W Town Hall Rd.
Hayward, WI 54843
OFFICE USE ONLY
Permit issued by __________ _ Date _____ _ Fee$. _$ 207.60 _ Check# _ 34000 _ _
Permit denied by __________ _ Date. _____ _ D See attached for reason of denial
Expiration Date ________ _
Signature of Zoning Administrator
TO\\ • OF -PIDER LAKE
028642173102
028642173107
L- .-
:::========:::======-uPPE.R•A- _::::::::r___ . /) r
- t -
,-z.., --z._ t?'
1�
9'155W
028642173103
J 30 m
1100ft
�v\ \-'v
�
\
\
�I;_
Cf2-Er642173102 Town of
Spider Lake
,i. '?��J
o,'4
��· 1,...
-r , ;
f;� ':1 \)'5) i 3;41�
�', "I�
7/
60-:z.e .. lo o w a.. s. /'2£.- ,"-'l.t. �,
911':>W•
I '
0e'7
028642173101
Lo,s.r i.and
Lalce
HYDRO
N
Shirley Holt Trust
LUP 25-13
9141W Upper A Rd
Application for Land Use/Building Permit Town of Spider Lake
Sawyer County, Wisconsin
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE.
Be sure to complete all steps in this application.
Click Skip or Continue to save your input.
To exit the application at any point, close the app or browser after saving.
IS AGENT/BUILDER SAME AS OWNER? Yes No
FIRST NAME
Tyler
LAST NAME
Larson
PROPERTY OWNER DAYTIME PHONE #
(507) 993-3078
PROPERTY OWNER MAILING ADDRESS
12168 Whippoorwill Lane, Hayward, WI 54843
FIRST NAME
Robin
LAST NAME
Bliss
AGENT/BUILDER DAYTIME PHONE #
(320) 309-4166
AGENT/BUILDER MAILING ADDRESS
2244 Minnesota 65, Sherman Buildings, Mora, MN 55051
GOV’T LOT
028-742-30-2308
1/4
Northwest (S1/2NW1/4)
1/4
SEC.
30
TWN.
42
R______W
7
ALTERNATE/LEGACY ID
DESCRIPTION
Parcel 1: That part of South Half of Northwest Quarter (S1/2NW1/4), Section 30, Township 42, Range 7 West, Town of Spider Lake,
Sawyer County, Winsconsin, more particularly described as Lot 10 as recorded in Volume 17 of Certified Survey Maps, page 279-280,
Survery No. 5337, as Document No. 250930. Parcel 2: Together with the right of ingress and egress from Pederson Road over and
across then 30 foot easement as shown on Certified Survey Map referred to herein.
SITE ADDRESS
12168 Whippoorwill Lane, Hayward, WI 54843
ACREAGE
5.16
DEED
DOCUMENT #
454557
SANITARY PERMIT # SAN 2009-282 SANITARY PERMIT DATE: 12/8/09 SANITARY PERMIT ISSUED BY: Kathy Marks, Sawyer Cty
LND-43
LUP 25-15
ATTACH COPY OF APPROVED SAWYER COUNTY SANITARY PERMIT
ZONE DISTRICT R-1 RR-1 RR-2 A-1 C-1 I-1 F-1
WETLAND/SHORELAND Yes No
Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand (1,000)
feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.
To Download the Power of Attorney Form open this link here .
PLEASE UPLOAD FILLED IN AND NOTARIZED POWER OF ATTORNEY
Throughout the process the inputed information is automatically saved as a
Draft document and you can always revisit it to continue where you left
off.
PERMIT
REQUESTED
FOR
New Dwelling Addition To Dwelling Accessory Structure
Addition To Accessory Structure Other/Misc Use of Land
Home Occupation/ Professional Office Alternative or Renewable Energy Systems
Communication Systems Other New Building/Structure (e.g., Commercial, Industrial, Agricultural)
Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural)
Accessory Structure info
# OF STORIES
1
TYPE OF
ACCESSORY
STRUCTURE
Garage
Storage Building
Gazebo
Screen house
Greenhouse
Other
SIZE OF PROPOSED STRUCTURE
(LENGTH X WIDTH = TOTAL SQFT)
44x30=1320 square feet
HEIGHT OF STRUCTURE GRADE TO PEAK
18 feet
CONSTRUCTION COST
$ 100,000
LUP 25-15
SIGNATURE OF OWNER OR (AGENT WITH POWER OF ATTORNEY)
Signed electronically on 4/29/2025
To Review the Fee Schedule for the Land Use Application open this link here .
ENTER AMOUNT OF CALCULATED FEES
350
Thank you for calculating your payment fees. The Zoning Administrator will review the calculations and will send you a request for
payment.
SUBMITED AT: 4/29/2025
For Zoning & Building Department use only
DOES THE PLAN & REVIEW COMMISSION RECOMMEND APPROVAL FROM THE TOWN BOARD? Yes No
REASON FOR RECOMMENDATION
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE.
This is a Three (3) pa ge document. Be sure to complete all pages
Print Or Type – Use Black Ink
Agent/Builder_________________________________________
Mailing
Address_____________________________________________
City________________________ State______ Zip___________
Property
Owner__________________________________________________
Mailing
Address________________________________________________
City___________________________ State______ Zip___________
Day Phone______________Email___________________________
Daytime Phone________________________
Site Information (From Real Estate Property Tax Bill)
Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __
Description: ____________________________________________________________________________________________________
Site Address: _______________________________________________ Acreage ________ Deed Document # _______________
Sanitary Permit #_______________ Date_______________ Issued By________________
Or:
Year Installed_______________ Owner When Installed:______________________________
Zone District: R-1 RR-1 RR-2 A-1 C-1 I-1 F-1
Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one
thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.)
Permit Requested For
New
Dwelling
Type of Dwelling
Frame built on site
Modular/manufactured
Other_____________
Type of Construction
Frame Log Pole/Metal
Block Other______
# of
Bedrooms
# of
Stories
Walk Out
Yes
No
Loft
Yes
No
Attached Garage
Yes No
_____X_____=_____SF
Deck Yes No
_____X_____=_____SF
Footprint of Proposed
Structure
_____X_____=_____SF
Total Habitable Sq. Ft.
_________________
Hght of Structure
Grade to Peak
___________
Construction Cost
$ _____________
Addition
To
Dwelling
Use of Addition
Living room Kitchen Bathroom
Bedroom Garage Deck
Storage Building Screened Porch
Other_____________
Bedrooms
Existing
Additional
Total
# of Stories
Loft
Yes
No
Size of Proposed Structure
______X______=______SF
Total Habitable Sq. Ft.
___________________
Hght of Structure
Grade to Peak
___________
Construction Cost
$ _____________
Accessory
Structure
Type of Accessory Structure
Garage Storage Building Gazebo
Screen house Greenhouse
Other___________
Size of Proposed Structure
______X______=______SF
Hght of
Structure
Grade to Peak
__________
Construction Cost
$ _____________
Addition To
Accessory
Structure
Size of Existing Accessory Structure
______X______=______SF
Size of Proposed Addition
______X______=______SF
Hght of Structure
Grade to Peak
__________
Construction Cost
$ _____________
Other/ Misc
Foundation Replacement
Roof Structure Replacement
Other_____________________
Stairs/Walkways Within 75’ Of OHWM
Area Involved
______X______=______SF
Hght of Structure
Grade to Peak
__________
Construction Cost
$ _____________
Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________
Home Occupation/
Professional Office
Type of Business________________________________
Located in Existing Dwelling
Located in Existing Accessory Structure
(Not more than 1 nonresident person may be employed on the premises)
Total Area of Existing Building_______________SF
Area Being Used for Business
(May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an
accessory building)
__________X__________=__________SF
Alternative or Renewable Energy Systems Solar Wind
Other_____________________
Construction Cost
$ _________________
Communication
Systems
Cell Tower Height of Tower:__________________
Other_____________________
Construction Cost
$ _________________
Application for Land Use/Building Permit
Town of Spider Lake
Sawyer County, Wisconsin
(Attach Copy Of Approved
Sawyer County Sanitary Permit)
Page 1 of 3 TOWN OF SPIDER LAKE
ZONINGADM 5.25.16
Eric R & Cheryl L Wilson Karl L Kastrosky
4202 Healthcote Rd
Wayzata MN 55391
952-484-6238 clwilson@truevine.net
14295 McNaught Rd
Cable WI 54821
715-580-0157
Prt of Govt Lot 4 & 5 Lot 1 CSM 39/190 #8878
27 42 7 028742275409
12771N Nelson Rd 17.08 310830
X
X
X X
# of
Stories
1 30 60 1,800
24
?
Application No LUP 25-16
Other New
Building/Structure
(e.g., Commercial,
Industrial,
Agricultural)
Use of Building/Structure________________________________
Type of Construction: Frame Log Pole/Metal Block Other__________
Height from Grade to Peak___________ Construction Cost: $ _________________
Size of Proposed Structure
______X______=______SF
Other New Addition
To
Building/Structure
(e.g., Commercial,
Industrial,
Agricultural)
Use of Building/Structure________________________________
Type of Construction: Frame Log Pole/Metal Block Other__________
Height from Grade to Peak___________ Construction Cost: $ _________________
Total Area of Existing
Structure:__________SF
Size of Proposed Structure
______X______=______S
SITE PLAN REQUIREMENTS
Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8 ½ x 14) to illustrate the following 7
requirements:
Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED!
All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback
When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line.
1. Draw lot and write in lot line dimensions and indicate
North with an arrow
2. Show the location and name of any bordering roads,
and indicate North.
3. Show the location and size of all existing and proposed
structures.
4. Show the location of any lake, river, stream, pond or
wetlands.
5. Show the location of the well, septic tank and drain field.
6. Show dimensions in feet on the following:
a. Structure to all lot lines
b. Structure to centerline of road
c. Structure to lake, river, stream, pond or wetlands
d. Structure to septic system/privy and well
e. Distance between structures
7. Show location vegetation protection area and proposed
Viewing/Use Corridor on lake lots.
Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits)
Owner’s signature is required on the appropriate attached Shoreland Preservation Agreement.
This permit cannot be issued without a signed shoreland Preservation Agreement.
Shoreland Impervious Surface: (Not applicable for nonshoreland permits)
Total land area within 300’ of the water body: (A) _________________
Total impervious surface area (including this project) (B)____________ (B)/(A) x 100 = % Used ___________
(Shall not exceed 15% or 25% with a conditional use permit
In the event this application is approved by the Zoning Office, I agree:
• That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted
• That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spider
Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin,
• That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections
between the hours of 8:00 AM -6:00 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners.
I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief it
is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that
it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider
Lake relying on this information I (we) am (are) providing in or with this application.
Signature of Owner or (Agent with Power of Attorney)
Print Name:_________________________________________ Sign:______________________________________ Date:_______________
You must complete the attached plot plan
Fees: See Fee Schedule
Checks should be made payable to: Treasurer of the Town of Spider Lake.
An Additional fee will be required for each inspection over _____
OFFICE USE ONLY
Permit issued by_________________________ Date______________ Fee $______________ Check #________________
Permit denied by_________________________ Date______________ See attached for reason of denial
Expiration Date___________________
_________________________________________
Signature of Zoning Administrator
Page 2 of 3TOWN OF SPIDER LAKE
ZONINGADM5.25.16
Submit Completed Application And Fee To:
Town of Spider Lake Clerk
10896 W Town Hall Rd.
Hayward, WI 54843
PROPOSED
GARAGE
PROPOSED
DRIVEWAY
Scale
Project Status
Date
Drawn by
1" = 60'-0"
4/8/2025 1:51:03 PM
S2
Overall Lot 1 Site Plan
Construction Documents
- Spider Lake, WI -
Blueberry Hill Cabin
April 8, 2025
Brad McGuire
No. Description Date
1" = 60'-0"1 Overall Lot 1 Site Plan
5
A2
STORAGE GARAGE
CONCRETE FLOOR
UNFINISHED INTERIOR
POST FRAME CONSTRUCTION
60' - 0"
30' - 0"
15' - 0"15' - 0"
3' - 0"
18'-0" WIDE X 14'-0" HIGH
STEEL OVERHEAD DOOR
18'-0" WIDE X 14'-0" HIGH
STEEL OVERHEAD DOOR
36" x 80"
Scale
Project Status
Date
Drawn by
1/4" = 1'-0"
6/6/2024 7:57:47 AM
A1
Floor Plan
Construction Documents
- Spider Lake, WI -
Blueberry Hill Garage
June 6, 2024
Brad McGuire
1 Front 3D
1/4" = 1'-0"3 Storage Garage Plan
2 Back 3D
Blueberry Hill Garage
Spider Lake, WI
4
12
METAL CORNER TRIM
METAL ROOFING
METAL SIDING
METAL SOFFIT & FASCIA
4
12
DRY STORAGE
UNFINSHED INTERIOR
POST FRAME CONSTRUCTION
16' - 0"
2x ROOF PURLINS ON EDGE @ 24" O.C.
WALL GIRTS @ 24" O.C.
4
12
Scale
Project Status
Date
Drawn by
As indicated
6/6/2024 7:57:49 AM
A2
Exterior Elevations /
Building Section
Construction Documents
- Spider Lake, WI -
Blueberry Hill Garage
June 6, 2024
Brad McGuire
3/16" = 1'-0"1 East Elevation
3/16" = 1'-0"2 North Elevation
3/16" = 1'-0"3 West Elevation
3/16" = 1'-0"4 South Elevation
1/4" = 1'-0"5 Building Section
Welcome to the Town of Spider Lake
The Town of Spider Lake is in the heart of Wisconsin’s Northwoods. Our wildlife is abundant, our
lakes pris=ne, and our forest is beau=ful. On moonless nights you can see the Milky Way. If
you’re really lucky, you may even see the Northern Lights. Frequently, you can see all the night
sky has to offer reflected in calm water.
Residents and visitors enjoy a wide variety of outdoor
ac=vi=es on the Town’s many lakes and in the
Chequamegon Na=onal Forest. Many ac=vi=es, such as
fishing, cross country skiing and mountain biking are world
class. Both the Birkebeiner Trail and the CAMBA mountain
biking trail system cross the Town, and those who enjoy
snowmobiling and riding ATVs will also find many trails to
explore. While limited motorsports are allowed on some
lakes, other lakes are dedicated Quiet Lakes. The Town of
Spider Lake has something for everyone who enjoys the
outdoors!
Our Town Governance
The Town of Spider Lake (TOSL) is governed by the Board of Supervisors. Supervisors are
elected by the residents of the Town, and are responsible for promo=ng the health, safety and
well-being of the Town’s ci=zens by:
• Establishing services required by the ci=zens
• Establishing ordinances by which the ci=zens and visitors agree to abide
• Assessing property values, crea=ng an annual budget, establishing the tax levy and
collec=ng taxes
• Overseeing the ac=vi=es of all Town commiXees and the Plan and Review Commission.
Our Town Comprehensive Plan
Originally created in 2002 by 25 Town of Spider Lake (TOSL) community members – and updated
periodically - our current Comprehensive Plan:
• Defines the unique quali)es which make up the “Northwoods Character” that we, as
ci=zens of the TOSL, value in our community.
• Ar=culates how the “Northwoods Character” represents a valuable asset to our
community.
• Represents our community’s vision for the development of our natural, social, and
economic resources over the next 20 years.
• Contains a wealth of informa)on about our Town and the significant factors affec=ng the
quality of life for its residents. It includes informa=on such as demographics, housing
trends, natural resources, land use and the Town’s implementa=on plans.
The Town of Spider Lake includes:
Our Town Ordinances and Resolu@ons The Town of Spider Lake (TOSL) Ordinances and Resolu=ons implement the vision laid out in our Comprehensive Plan. They enable and support the Northwoods character we cherish. Specifically, they: • Provide a framework to guide the Town government, property owners and visitor ac=vi=es within the Town. • Balance the rights of the community with individual property owner rights. • Are "complaint-based", meaning if neighbors are not bothered by a resident/owner’s ac=vi=es, there is no need to complain. • Are adopted and administered by the TOSL Board of Supervisors, except for Land Use Ordinance 17-88, administered by the Plan and Review Commission (PRC). • Differ in certain areas from County or State zoning requirements. Our Town Departments The Town of Spider Lake (TOSL) operates several departments to serve the community including: • Zoning and Building • Health and Safety • Roads • Facili=es and Solid Waste • Finance and Insurance Our Town Zoning The Town of Spider Lake oversees regula=ons regarding changes to homes (See the Uniform Dwelling Code) and changes to property and shorelines (see the Land Use Ordinance 17-88).
o A year-round popula=on of roughly 420 in 2025 o Roughly 1200 dwellings in TOSL, with around 220 occupied year-round o Land use which is predominantly Forestry and preserving this and our pris=ne lakes is a priority
These departments can be reached at: Spider Lake Town Hall 10896 W Town Hall Rd Hayward, WI 54843 Phone: (715) 462-3977
Our Town’s Unique Characteris@cs What differen=ates the Town of Spider Lake from other Wisconsin towns? • The Town of Spider Lake has its own Land Use ordinance including shoreline regula=ons which are more restric=ve than the Sawyer County or WI State Statues. Enforcing these ordinances protects the natural resources of the town and gives the town a dis=nc=ve Northwoods character look and feel. • Boaters must observe a 10 mph speed limit at all =mes with the excep=on of 11AM-3PM on Clam Lake, Ghost Lake and parts of the Spider Chain of Lakes. During these hours in these areas, waterskiing and higher boa=ng speed is allowed. • There are designated routes and trails for ATV/UTV and snowmobile use. The Town’s roads are not open to ATV/UTV traffic unless specified in Ordinance 01-01.
At-A-GlanceSee the Town’s website for the most up-to-date information. Questions? Just ask! Visit www.townofspiderlakewi.gov.Please do your part to keep the Town of Spider Lake safe for people and wildlife, and its lakes and forests clean and free of invasives.
EMERGENCY DIAL 9 1 1ROAD ISSUES 715-418-9969CLERK / TOWN HALL 715-462-3977
Solid Waste / RecyclingLocated behind the Fire Department building west of Town Hall. $5 per bag for garbage; free recycling.HOURS: Summer: (May 15 through October 15) Wednesday, Saturday, Sunday 10 am-4 pm. Year-Round: Saturdays 10 AM-4 PM
ATV and Snowmobiles- TOSL supports use on the County-wide trail system. - ATVs not permitted on Town Roads or State Hwy 77.- See the Sawyer County Snowmobile and ATV Alliance website (www.sawyercountyalliance.com) and download the TrailTrekker app for trail maps.- Ord. #01-01 on the website has ATV/UTV specifics.
BoatingSpeed limit of 10 mph on all lakes (making them‘Quiet Lakes’)Except for :11 am to 3 pm on the Spider Lake Chain (except Fawn), Lower Clam and Ghost Lakes (Ord. #02-2024 on website has more specifics).- All other Wisconsin boating regulations apply.
Zoning / Land Use- The Town of Spider Lake has village powers and administers its own land use/zoning ordinance.- Land Use (Building) Permits are required. - Details and Application Forms are on Town website.Shorelines / Lighting- Statewide 35-foot setback followed Do not mow/disturb except within 30’ view corridor.- Outdoor lighting should be shielded, with light directed downward to avoid unnecessary glare.
Fire / Fireworks / Burning- Fireworks permits are required by the Town and issued by the Fire Department. See the Town website.- Burn permits are required (annually) by the DNR (no charge). Apply on the DNR website (www.dnr.wisconsin.gov); search Burn Permit.Noise / Nuisance-The Town falls under Sawyer County’s Public Human Health Hazards Ordinance.-Noise or nuisance complaints: call Sawyer County Sheriff non-Emergency Dispatch: 715-634-5213
Enjoy the Outdoors- Responsibly!
Questions? -Visit Frequently Asked Questions on the Town website (under the Community tab). Or…-Click the ‘Contact Us’ tab on the Town website (lower right side of the page) and let us know what’s on your mind. Or…- Call the Town Hall at 715-462-3977. We’ll get back to you!
Source: Town of Spider Lake website. First collected Oct 18, 2026.