RecordWell Data

Common Council Meeting — Agenda Packet

City of New Berlin · Waukesha County · Common Council · meeting of Apr 14, 2026 · Agenda packets

Open the original document More from City of New Berlin

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Common Council Meeting Agenda April 14, 2026 - 6:05 PM (Following the Committee of the Whole Meeting) City Hall Council Chambers Amended & Posted: 4/11/2026 at 3:20 PM Posted: 4/10/2026 AGENDA 1. PRIVILEGE OF THE FLOOR Each speaker will be limited to three (3) minutes. The Privilege of the Floor session shall not exceed a total of thirty (30) minutes, unless extended by the Common Council. 2. CALL TO ORDER, PLEDGE OF ALLEGIANCE 3. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE 4. APPROVAL OF MINUTES A. March 24, 2026, Common Council Meeting Minutes 5. REPORTS A. City Clerk B. Council President C. Mayor 6. COMMUNICATIONS 7. UTILITY COMMITTEE A. Discussion and possible recommendation to the Common Council to award the construction contract for the Greenridge Watermain Replacement and Road Rehabilitation Project to the lowest responsive bidder, Stark Pavement Corp, in the amount of $3,370,552.00. This includes a $2,618,674.00 base bid and an alternate area bid of $751,878.00 (the Water portion of this project is $532,945.00; the Water Resources portion is $362,534.00, and the remaining balance of $2,475,072.24 is Engineering’s portion for the Road Rehabilitation component). Suggested Motion: “I move to approve this item, as outlined in the agenda packet and approved unanimously by the Utility Committee on March 24, 2026.” 8. MAYORAL APPOINTMENTS A. Discussion and Possible Action to approve the Mayoral Appointments per the list as presented 9. DEFERRED, REFERRED & TABLED ITEMS 10. ITEMS REMOVED FROM CONSENT AGENDA, if any 11. CONSENT AGENDA------------------------------------------------------------------------------ Items under the Consent Agenda have passed unanimously by the Committee of the Whole. Items not passed by a unanimous vote will be removed from consent agenda and will be considered separately. Page 1 of 41 12. MINUTES A. March 24, 2026, Committee of the Whole Meeting Minutes 13. UTILITY & FINANCE A. Discussion and possible recommendation to the Common Council to approve the April 15, 2026, Water Utility claims in the amount of $168,661.60, Sewer Utility claims in the amount of $872,399.19, and General City claims in the amount of $1,791,792.10, including a US Bank VISA EFT payment of $26,028.70. 14. MISCELLANEOUS A. Recommend to the Common Council approval of an increase to the City’s ambulance billing fees, effective June 1, 2026, to include a $300 increase to all base rates for non- resident Basic Life Support (BLS), Advanced Life Support (ALS), and Critical Care services, and a $250 increase to all base rates for resident Basic Life Support (BLS), Advanced Life Support (ALS), and Critical Care services. Further, effective January 1, 2027, and January 1, 2028, all ambulance base rates shall increase by $50 annually from the prior year’s rates, as detailed in the fee schedule included in the agenda packet. B. Recommend to the Common Council that a Public Hearing be set for May 4, 2026 at 6:01 pm to be held before the Plan Commission to rezone the properties located at 2445 S. 179th Street (Tax Key #: 1185.990), 2345 S. 179th Street (Tax Key #: 1185.994) & Tax Key #: 1185.991 from M-1/SPO, C-1 & C-2 to M-1/SPO & C-2 to remove the C-1 Zoning. C. Recommend to Common Council that a joint public hearing be set for June 1, 2026, at 6:00 p.m. to be held before the Plan Commission to amend the Future Land Use Map within the City’s Comprehensive Plan (Chapter 17 - Neighborhood “G” Sections 26 and 35 – South Moorland Road Corridor, Chapter 18 – Neighborhood “H” Westridge & Moorland Road, and Chapter 10 - Land Use) from Business Park/Industrial & Urban Residential to Business Park/Industrial for the parcels located at: • 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] • 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] D. Recommend to the Common Council that a joint public hearing be set for June 1, 2026, at 6:00 p.m. to be held before the Plan Commission to rezone from A-1, A-2, R-4, M-1, P-1, C-1 & C-2 to A-1, M-3/PUD, P-1, C-1, & C-2 for the parcels located at: • 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2 Acres] • Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres] • Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92 Acres] • 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres] • 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] • 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] • Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres] • Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres] • Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres] • 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann – 34.94 Acres] • 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres] Page 2 of 41 E. Recommend to the Common Council approval of an agreement to hire Ehlers & Associates to prepare a TID Project Plan for Tax Incremental District #6 in the amount of $18,000, and recommend to the Common Council that a public hearing be set for June 1, 2026, at 6:01 PM to be held before the Plan Commission for the properties located at: • 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2 Acres] • Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres] • Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92 Acres] • 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres] • 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] • 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] • Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres] • Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres] • Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres] • 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann – 34.94 Acres] • 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres] • 5851 S Sunny Slope Road (Tax Key #: 1289.997.001) [City of New Berlin Park – 39.17 Acres - The city’s park parcel to be part of the TIF boundary only to ensure the half mile project boundary would include the entire scope of public roadway projects.] F. Discussion and possible recommendation to the Common Council to authorize the City of New Berlin Joint Review Board to conduct meetings by electronic means in lieu of in- person meetings. 15. END CONSENT AGENDA----------------------------------------------------------------------- 16. CLOSED SESSION A. The Common Council may convene into closed session pursuant to Wis. Stat. § 19.85(1)(g) to confer with legal counsel who is rendering oral or written advice concerning strategy to be adopted with respect to litigation or potential litigation in which the City is or is likely to become involved, specifically regarding: Discussion re: Carter vs. City of New Berlin B. The Common Council may convene into closed session pursuant to Wis. Stat. § 19.85(1)(e) to deliberate or negotiate the purchase of public properties, the investing of public funds, or conducting other specified public business whenever competitive or bargaining reasons require a closed session, specifically regarding: Discussion regarding an agreement with Mr. and Mrs. Spitz related to the reconstruction of the Jacob’s Ridge lift station 17. RECONVENE TO OPEN SESSION A. Discussion and possible action re: Carter vs. City of New Berlin B. Discussion and possible action re: an agreement with Mr. and Mrs. Spitz related to the reconstruction of the Jacob’s Ridge lift station 18. ADJOURN Additional Information Page 3 of 41 • The agenda packet with supplemental information related to the agenda items is available online at www.NewBerlinWi.gov. Once finalized by the governing body, approved meeting minutes are also posted online. • The governing body may consider agenda items out of order • Members, and potentially a quorum of other governmental bodies of the municipality, may be present at the meeting to gather information. No action will be taken by any governmental body other than the one referenced in this notice. • With reasonable notice, accommodations will be provided under the Americans with Disabilities Act to meet the needs of individuals with disabilities through appropriate aids and services. For more information or to request assistance, please contact the Office of the City Clerk at (262) 786-8610. Page 4 of 41 Common Council MEETING MINUTES March 24, 2026 - 6:20 PM Zoom Meeting ID: 841 0836 9320 Via Zoom: https://us02web.zoom.us/j/84108369320 MINUTES 1. PRIVILEGE OF THE FLOOR Each speaker will be limited to three (3) minutes. The Privilege of the Floor session shall not exceed a total of thirty (30) minutes, unless extended by the Common Council. Mayor Ament stated that the Council President had received requests to include the Milwaukee Rescue Mission item in closed session, so the Council could receive an update on the status of litigation. Council President Harenda clarified that the intent was solely to provide an informational update to the Council and that no action was anticipated. He further stated that he requests the removal of the closed session item from the agenda at the Council's and constituents' request. The Mayor read the rules governing Privilege of the Floor and invited any members of the public wishing to speak to come forward. Multiple residents spoke during Privilege of the Floor in opposition to the proposed Milwaukee Rescue Mission ‘New Journey’ development. 2. CALL TO ORDER, PLEDGE OF ALLEGIANCE The City Clerk stated that the Common Council approved, at her request, holding the meeting via electronic means (Zoom) on December 9, 2025, due to in-person absentee voting being conducted in the Council Chambers and to ensure the security of election materials. The agenda included a direct link to the Zoom meeting and the meeting ID: 841 0836 9320. Mayor Ament called the meeting to order at 7:10 PM and led the Pledge of Allegiance. 3. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE City Clerk Rubina R. Medina took the roll call as follows: Present: Alderperson Hopkins, Alderperson La Fever, Alderperson Harenda, Alderperson Stribl, Alderperson Horbinski, Alderperson Kroupa Excused: Alderperson Dave Maxey Staff Present: Mayor Dave Ament, City Attorney Mark Blum, City Clerk Rubina R. Medina The City Clerk confirmed that a quorum was present and that the meeting was properly posted in compliance with the open meetings law. 4. APPROVAL OF MINUTES A. March 10, 2026, Common Council Meeting Minutes Page 5 of 41 MOTION: Motion to Approve Motion by: Alderperson Horbinski Second by: Alderperson La Fever VOTE: Motion Passed 6-0 5. REPORTS A. City Clerk The City Clerk announced that In-Person Absentee Voting began today at City Hall. Voters who prefer to vote on Election Day may do so on April 7, 2026, with polls open from 7:00 AM to 8:00 PM. For additional information, please visit www.myvote.wi.gov B. Council President No Report. C. Mayor The City Clerk announced that In-Person Absentee Voting began today at City Hall. Voters who prefer to vote on Election Day may do so on April 7, 2026, with polls open from 7:00 AM to 8:00 PM. For additional information, please visit www.myvote.wi.govMayor Ament extended his congratulations on behalf of the Common Council and the entire City of New Berlin to a 13-year-old eighth-grade student from Eisenhower Middle School who won the Badger State Spelling Bee in Madison on Saturday and will now advance to the Scripps National Spelling Bee. 6. COMMUNICATIONS No Communications. 7. FOURTH OF JULY COMMISSOIN A. Discussion and possible recommendation to the Common Council to approve a contract with Pat’s Services, Inc., in the amount of $10,645, for portable sanitation services for the 4th of July Festival, to be provided from July 1 through July 6, 2026 Suggested Motion: “I move to approve the contract with Pat's Services, as outlined in the agenda packet and approved unanimously by the Fourth of July Commission on October 22, 2025. MOTION: Motion to Approve Motion by: Alderperson Stribl Second by: Alderperson Harenda VOTE: Motion Passed 6-0 Page 6 of 41 B. Discussion and possible recommendation to the Common Council to approve a contract with BCI Entertainment, LLC, in the amount of $25,000, for the 4th of July Festival drone show to be held on Thursday, July 2, 2026. Suggested Motion: “I move to approve the contract with BCI Entertainment, LLC, as outlined in the agenda packet and approved unanimously by the Fourth of July Commission on January 28, 2026. Ald. Stribl stated that all 4th of July festivities are funded through fundraising efforts and are not supported by taxpayer dollars. MOTION: Motion to Approve Motion by: Alderperson Stribl Second by: Alderperson Hopkins VOTE: Motion Passed 6-0 C. Discussion and possible recommendation to the Common Council to approve a contract with Area Tent, in the amount of $22,823.03, for rentals and related services for the 4th of July Festival, to be provided from July 3 through July 5, 2026. Suggested Motion: “I move to approve the contract with Area Tent, as outlined in the agenda packet and approved unanimously by the Fourth of July Commission on October 22, 2025. MOTION: Motion to Approve Motion by: Alderperson Stribl Second by: Alderperson Horbinski VOTE: Motion Passed 6-0 8. DEFERRED, REFERRED & TABLED ITEMS No items. 9. ITEMS REMOVED FROM CONSENT AGENDA, if any No items. 10. CONSENT AGENDA------------------------------------------------------------------------------ Items under the Consent Agenda have passed unanimously by the Committee of the Whole. Items not passed by a unanimous vote will be removed from consent agenda and will be considered separately. MOTION: Motion to Approve Motion by: Alderperson Kroupa Second by: Alderperson Horbinski VOTE: Motion Passed 6-0 11. MINUTES Page 7 of 41 A. March 10, 2026, Committee of the Whole Meeting Minutes 12. UTILITY & FINANCE A. Discussion and possible recommendation to the Common Council to approve the March 25, 2026, Water Utility claims in the amount of $15,714.08, Sewer Utility claims in the amount of $317,776.83, and General City claims in the amount of $679,777.43, including General City claims checks dated March 4, 2026, in the amount of $284,955.97, tax overpayment checks totaling $12,617.81, and a We Energies EFT payment of $97,672.76. 13. MISCELLANEOUS A. Department of Community Development Update B. Discussion and possible recommendation to the Common Council to approve Resolution No. 2026-03 authorizing the Emergency Management Manager, Jim Burns, Department of Community Development, to submit an application and supporting worksheets to the State of Wisconsin Disaster Fund (WDF) for potential reimbursement of eligible expenses incurred by the City during response and recovery efforts related to the August 2025 flood event. C. Discussion and possible recommendation to the Common Council to approve the 2026 Roadway Maintenance Joint and Crack Cleaning and Sealing Project contract with Thunder Road, LLC, and inspection services by Ruekert & Mielke, Inc., contingent upon receipt of a signed agreement and certificate of insurance. D. Discussion and possible recommendation to the Common Council to approve an agreement with CBS2 for inspection services associated with the 2026 Roadway Rehabilitation portion of the Greenridge Watermain Replacement Project, contingent upon receipt of a signed agreement and certificate of insurance. E. Discussion and possible recommendation to the Common Council to deny the base bid and Alternates 1 and 2, for a total of $847,560, from Level Up Construction for the Live Fire Training Tower Rehabilitation Project, based on a determination that it is in the best interest of the City. Page 8 of 41 F. Discussion and possible recommendation to the Common Council to approve a contract with Chrome Fireworks, in the amount of $40,000, for the 4th of July fireworks display. 14. END CONSENT AGENDA----------------------------------------------------------------------- 15. CLOSED SESSION The Common Council did not convene in closed session. A. The Common Council may convene in closed session pursuant to Wis. Stat. § 19.85(1)(g) to confer with legal counsel who is rendering oral or written advice concerning strategy to be adopted with respect to pending or threatened litigation in which the City is or is likely to become involved: B. New Berlin Citizens United Board of Appeals Case and Petition for Writ of Mandamus by DeMoCat, LLC. et al. vs. City of New Berlin 16. RECONVENE TO OPEN SESSION 17. ADJOURN MOTION: Motion to Adjourn at 7:19 PM Motion by: Alderperson Stribl Second by: Alderperson La Fever VOTE: Motion Passed 6-0 Respectfully Submitted, Rubina R. Medina, City Clerk Page 9 of 41 1 | P a g e File #: UT 10-26 UC Date: 03-24-26 AP _____________________________________________________________________________________ UTILITY STAFF REPORT EXECUTIVE SUMMARY CUSTOMER/PROJECT: Greenridge Watermain Replacement and Road Rehabilitation Project LOCATION: Greenridge Neighborhood Euclid Avenue and Russel Court REQUEST: Award Construction Contract for Greenridge Watermain Replacement and Road Rehabilitation Project to Lowest Responsive Bidder UTILITY MANAGER RECOMMENDATION: Recommend to the Common Council to award the construction contract for the Greenridge Watermain Replacement and Road Rehabilitation Project to the lowest responsive bidder, Stark Pavement Corp, in the amount of $3,370,552.00. This includes a $2,618,674.00 base bid and an alternate area bid of $751,878.00 (the Water portion of this project is $532,945.00; the Water Resources portion is $362,534.00 and the remaining balance of $2,475,072.24 is Engineering’s portion for the Road Rehabilitation component). DETAILS IN ATTACHED STAFF REPORT Page 10 of 41 2 | P a g e File #: UT 10-26 UC Date: 03-24-26 AP CITY OF NEW BERLIN UTILITIES DEPARTMENT STAFF REPORT Greenridge Watermain Replacement and Road Rehabilitation Project ______________________________________________________________________ DATE STAFF REPORT CREATED: March 17th, 2026 CUSTOMER/PROJECT NAME: Greenridge Watermain Replacement and Road Rehabilitation Project ISSUE/DESCRIPTION OF PROJECT: Award Construction Contract for Greenridge Watermain Replacement and Road Rehabilitation Project to Lowest Responsive Bidder REQUESTED ACTION: Recommend to the Common Council to award the construction contract for the Greenridge Watermain Replacement and Road Rehabilitation Project to the lowest responsive bidder, Stark Pavement Corp, in the amount of $3,370,552.00. This includes a $2,618,674.00 base bid and an alternate area bid of $751,878.00 (the Water portion of this project is $532,945.00; the Water Resources portion is $362,534.00 and the remaining balance of $2,475,072.24 is Engineering’s portion for the Road Rehabilitation component). FISCAL IMPACT: DEPARTMENT BID AMOUNT SOURCE OF FUNDS Water Utility $532,945.00 Water Capital Budget Water Resources $362,534.00 WRM Utility Cash on Hand Roadway Rehab $1,723,195.00 04251100 59040 C2026 $2,000,000.00 $751,877.24 04251100 59040 C2025 $360,000.00 ___________ 04251100 59040 C2023 $318,500.00 $3,370,551.24 RATIONALE: Project is for aging watermain and repair of damaged roadways. UTILITY MANAGER RECOMMENDATION: See Executive Summary ATTACHMENTS: Bid Award Recommendation Letter Page 11 of 41 Date: March 4, 2026 RE: 2026 Roadway Rehabilitation and Greenridge Water Main Replacement New Berlin, WI CBS² NEWBE 25001 Ms. Rubina Medina City Clerk City of New Berlin 3805 S Casper Drive New Berlin, WI 53151 Dear Rubina, Bids for the City of New Berlin’s 2026 Roadway Rehabilitation and Greenridge Water Main Replacement project were received at 10:00 a.m. on March 4, 2026. Three bids were received and accepted for the project and are summarized below: Base Bid Total Stark Pavement Corporation $2,618,674.00 Wolf Paving Co., Inc. $2,790,812.90 Payne & Dolan, Inc. $3,016,580.02 Alternates Total Stark Pavement Corporation $751,877.24 Wolf Paving Co., Inc. $883,935.06 Payne & Dolan, Inc. $803,130.02 The itemized bid tabulation is attached. Based on our review, it is our opinion t hat Stark Pavement Corporation of Brookfield has the equipment and experience to perform the work as defined in the bidding documents. If the City decides to proceed with the project as bid, we therefore recommend award of the project in the amount of $2,618,674.00 to Stark Pavement Corporation. Should you have any questions, please contact me by phone at 608.797.4448 or by e-mail at mswartwout@cbssquaredinc.com. Sincerely, McKenzie Swartwout Project Manager Enclosure Page 12 of 41 Bids Received for Unit Price Project / City of New Berlin 2026 Roadway Rehabilitation and Greenridge Water Main Replacement NEWBE 25001 10:00 a.m., Wednesday, March 4, 2026 Contractor Bid Bond Addendum No. 1 Addendum No. 2 Addendum No. 3 Addendum No. 4 Addendum No. 5 Base Bid Stark Pavement Corporation X X X X X X $2,618,674.00 Wolf Paving Co., Inc. X X X X X X $2,790,812.90 Payne & Dolan, Inc. X X X X X X $3,016,580.02 Page 13 of 41 Base Bid Total $ 2,618,674.00 Base Bid Total $ 2,790,812.90 Base Bid Total $ 3,016,580.02 Item No. Description Unit Bid Qty Bid Unit Price Bid Price Bid Unit Price Bid Price Bid Unit Price Bid Price S33 11 00-01 8-Inch C-900 PVC Watermain LF 1580 $199.00 $314,420.00 $201.05 $317,659.00 $199.00 $314,420.00 S33 11 00-02 8-Inch by 6-Inch Anchoring Tee EA 1 $815.00 $815.00 $823.39 $823.39 $815.00 $815.00 S33 11 00-03 8-Inch Gate Valve & Box EA 4 $3,375.00 $13,500.00 $3,409.74 $13,638.96 $3,375.00 $13,500.00 S33 11 00-04 6-Inch Gate Valve & Box EA 4 $2,375.00 $9,500.00 $2,399.45 $9,597.80 $2,375.00 $9,500.00 S33 11 00-05 Hydrant EA 4 $3,985.00 $15,940.00 $4,026.02 $16,104.08 $3,985.00 $15,940.00 S33 11 00-06 6-Inch Ductile Iron Hydrant Lead LF 61 $310.00 $18,910.00 $313.19 $19,104.59 $310.00 $18,910.00 S33 11 00-07 Connection of Water Main to Existing 8-Inch Water Main EA 2 $8,445.00 $16,890.00 $8,531.94 $17,063.88 $8,445.00 $16,890.00 S33 11 00-08 1-Inch Water Service LF 435 $195.00 $84,825.00 $197.01 $85,699.35 $195.00 $84,825.00 S33 11 00-09 2-Inch Water Service LF 126 $210.00 $26,460.00 $212.16 $26,732.16 $210.00 $26,460.00 S33 11 00-10 3-Inch Water Service LF 48 $305.00 $14,640.00 $308.14 $14,790.72 $305.00 $14,640.00 S33 11 00-11 4-Inch Water Service LF 26 $260.00 $6,760.00 $262.68 $6,829.68 $260.00 $6,760.00 S33 11 00-12 3-Inch Gate Valve & Box EA 2 $3,995.00 $7,990.00 $4,036.13 $8,072.26 $3,995.00 $7,990.00 S33 11 00-13 4-Inch Gate Valve & Box EA 1 $2,295.00 $2,295.00 $2,318.63 $2,318.63 $2,295.00 $2,295.00 S33 41 00-01 42-Inch CMP Storm Sewer LF 520 $299.00 $155,480.00 $302.08 $157,081.60 $299.00 $155,480.00 S33 41 00-02 42-Inch RCP Storm Sewer LF 101 $299.00 $30,199.00 $302.08 $30,510.08 $299.00 $30,199.00 S33 41 00-03 6-foot Catch Basin w/ Open Grate R-2560 EA 7 $8,350.00 $58,450.00 $8,435.96 $59,051.72 $8,350.00 $58,450.00 S33 41 00-04 8-foot Catch Basin w/ Open Grate R-2560 EA 2 $11,275.00 $22,550.00 $11,391.07 $22,782.14 $11,275.00 $22,550.00 S33 41 00-05 Connect to Existing Storm MH in S. 124th Street EA 1 $6,775.00 $6,775.00 $6,844.75 $6,844.75 $6,775.00 $6,775.00 S33 41 00-06 15-Inch CMP (Ohio Drive) LF 45 $145.00 $6,525.00 $146.49 $6,592.05 $145.00 $6,525.00 S33 41 00-07 15-Inch Concrete Endwalls (Ohio Drive) EA 2 $3,130.00 $6,260.00 $3,162.22 $6,324.44 $3,130.00 $6,260.00 S33 41 00-08 24-Inch CMP (Ohio Drive) LF 26 $175.00 $4,550.00 $176.80 $4,596.80 $175.00 $4,550.00 S33 41 00-09 24-Inch Concrete Endwalls (Ohio Drive) EA 1 $3,560.00 $3,560.00 $3,596.65 $3,596.65 $3,560.00 $3,560.00 S33 41 00-10 30-Inch CMP (Ohio Drive) LF 30 $205.00 $6,150.00 $207.11 $6,213.30 $205.00 $6,150.00 S33 41 00-11 20-Inch x 28-Inch CMP (Ohio Drive) LF 18 $170.00 $3,060.00 $171.75 $3,091.50 $170.00 $3,060.00 S33 41 00-12 Connect to Existing 2-Inch CMP EA 1 $1,980.00 $1,980.00 $2,000.38 $2,000.38 $1,980.00 $1,980.00 S33 41 00-13 Connect to Existing 30-Inch CMP EA 1 $2,040.00 $2,040.00 $2,061.00 $2,061.00 $2,040.00 $2,040.00 S33 41 00-14 Connect to Existing 19-Inch x 30-Inch CMP EA 1 $2,095.00 $2,095.00 $2,116.57 $2,116.57 $2,095.00 $2,095.00 S33 41 00-15 Ditch Restoration SY 2200 $6.80 $14,960.00 $8.03 $17,666.00 $7.00 $15,400.00 S33 41 00-16 Remove Asphalt Lining SY 2200 $5.10 $11,220.00 $5.15 $11,330.00 $10.15 $22,330.00 S33 41 00-17 Ditch Grading SY 2200 $7.10 $15,620.00 $7.17 $15,774.00 $5.80 $12,760.00 S33 42 20-01 15-CMP Culvert (Burdick Ave & Russel Ave Int.) LF 44 $125.00 $5,500.00 $126.29 $5,556.76 $125.00 $5,500.00 S33 42 20-02 15-Inch Concrete Endwalls (Burdick Ave & Russel Ave Int.) EA 2 $2,780.00 $5,560.00 $2,808.62 $5,617.24 $2,780.00 $5,560.00 Appendix A-1 Tack Coat GAL 1840 $3.00 $5,520.00 $3.53 $6,495.20 $2.25 $4,140.00 Appendix A-2 Saw Cutting Pavement LF 4243 $1.70 $7,213.10 $1.97 $8,358.71 $1.95 $8,273.85 Appendix A-3 Common Excavation CY 4288 $22.00 $94,336.00 $26.25 $112,560.00 $25.70 $110,201.60 Appendix A-4 Pulverize & Relay SY 36800 $2.50 $92,000.00 $3.72 $136,896.00 $2.05 $75,440.00 Appendix A-5 Base Repair CY 11074 $37.10 $410,845.40 $37.48 $415,053.52 $67.35 $745,833.90 Appendix A-6 Manhole Adjustment, Cast Iron Paving Rings EA 42 $350.00 $14,700.00 $258.83 $10,870.86 $290.00 $12,180.00 Appendix A-7 Water Valve or Water Box Adjustment EA 24 $300.00 $7,200.00 $126.29 $3,030.96 $95.00 $2,280.00 Appendix A-8 Remove & Replace Concrete Curb & Gutter LF 4646 $64.35 $298,970.10 $71.44 $331,910.24 $77.13 $358,345.98 Appendix A-9 2-Inch Asphalt Surface, 4 LT 58-28 S TON 3480 $63.85 $222,198.00 $68.00 $236,640.00 $65.95 $229,506.00 Appendix A-10 2-Inch Asphalt Surface, 4 MT 58-28 H TON 963 $70.15 $67,554.45 $79.00 $76,077.00 $70.65 $68,035.95 Appendix A-11 3-Inch Asphalt Binder, 3 LT 58-28 S TON 5469 $59.65 $326,225.85 $63.25 $345,914.25 $60.60 $331,421.40 Appendix A-12 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2019 $63.70 $128,610.30 $71.50 $144,358.50 $63.35 $127,903.65 Appendix A-13 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 253 $48.80 $12,346.40 $51.00 $12,903.00 $48.45 $12,257.85 Appendix A-14 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 4140 $1.89 $7,824.60 $2.53 $10,474.20 $2.90 $12,006.00 Appendix A-15 Pavement Marking, Epoxy, 4-Inch Solid, Double Yellow LF 174 $6.25 $1,087.50 $2.63 $457.62 $28.66 $4,986.84 Appendix A-16 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 61 $18.00 $1,098.00 $25.76 $1,571.36 $18.00 $1,098.00 Appendix A-17 Traffic Control LUMP SUM 1 $25,465.30 $25,465.30 $30,000.00 $30,000.00 $8,500.00 $8,500.00 2026 Roadway Rehabilitaiton and Greenridge Water Main Replacement City of New Berlin Unit Price Bid Tabulation 10:00 a.m., March 4, 2026 Water Wolf Paving Co., Inc. Payne & Dolan, Inc.Stark Pavement Corporation Waer Base Bid Total Ohio Drive Storm Sewer Base Bid Total Road Rehab Base Bid Total $532,945.00 $538,434.50 $532,945.00 Ohio Drive Storm Sewer $362,534.00 $368,806.98 $371,224.00 Road Rehab $1,723,195.00 $1,883,571.42 $2,112,411.02 Page 1 Page 14 of 41 Base Bid Total $ 2,618,674.00 Base Bid Total $ 2,790,812.90 Base Bid Total $ 3,016,580.02 Item No. Description Unit Bid Qty Bid Unit Price Bid Price Bid Unit Price Bid Price Bid Unit Price Bid Price Wolf Paving Co., Inc. Payne & Dolan, Inc.Stark Pavement Corporation Appendix A Alternate-1 Tack Coat GAL 1451 $3.00 $4,353.00 $3.53 $5,122.03 $2.25 $3,264.75 Appendix A Alternate-2 Butt Joints LF 441 $0.02 $8.82 $13.10 $5,777.10 $2.00 $882.00 Appendix A Alternate-3 Saw Cutting Pavement LF 1411 $1.70 $2,398.70 $1.97 $2,779.67 $1.95 $2,751.45 Appendix A Alternate-4 Common Excavation CY 1492 $25.63 $38,239.96 $26.25 $39,165.00 $25.70 $38,344.40 Appendix A Alternate-5 Pulverize & Relay SY 10660 $2.50 $26,650.00 $3.84 $40,934.40 $2.25 $23,985.00 Appendix A Alternate-6 Remove 2.5-Inch Asphaltic Pavement by Milling SY 18351 $2.33 $42,757.83 $2.72 $49,914.72 $2.45 $44,959.95 Appendix A Alternate-7 Base Repair CY 1159 $44.00 $50,996.00 $44.45 $51,517.55 $67.35 $78,058.65 Appendix A Alternate-8 Manhole Adjustment, Cast Iron Paving Rings EACH 36 $350.00 $12,600.00 $258.83 $9,317.88 $290.00 $10,440.00 Appendix A Alternate-9 Water Valve or Water Box Adjustment EACH 19 $300.00 $5,700.00 $126.29 $2,399.51 $95.00 $1,805.00 Appendix A Alternate-10 Remove & Replace Concrete Curb & Gutter LF 1138 $64.25 $73,116.50 $67.19 $76,462.22 $78.67 $89,526.46 Appendix A Alternate-11 2-Inch Asphalt Surface, 4 MT 58-28 H TON 1287 $67.35 $86,679.45 $80.99 $104,234.13 $74.95 $96,460.65 Appendix A Alternate-12 2.5-Inch Asphalt Surface, 4 LT 58-28 S TON 2902 $62.40 $181,084.80 $70.21 $203,749.42 $58.65 $170,202.30 Appendix A Alternate-13 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2697 $59.50 $160,471.50 $71.91 $193,941.27 $64.66 $174,388.02 Appendix A Alternate-14 3-Inch Asphalt Binder, Base Patch (<8-Feet Width), 3 LT 58-28 S SY 1101 $20.05 $22,075.05 $26.43 $29,099.43 $24.00 $26,424.00 Appendix A Alternate-15 3-Inch Asphalt Binder, Base Patch (>=8-Feet Width), 3 LT 58-28 S SY 1101 $18.00 $19,818.00 $29.96 $32,985.96 $18.00 $19,818.00 Appendix A Alternate-16 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 89 $50.28 $4,474.92 $54.11 $4,815.79 $55.31 $4,922.59 Appendix A Alternate-17 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 1452 $1.89 $2,744.28 $2.53 $3,673.56 $2.90 $4,210.80 Appendix A Alternate-18 Pavement Marking, Epoxy, 4-Inch Solid, White LF 282 $9.50 $2,679.00 $14.40 $4,060.80 $9.50 $2,679.00 Appendix A Alternate-19 Pavement Marking, Epoxy, Word, White EACH 1 $275.00 $275.00 $353.60 $353.60 $275.00 $275.00 Appendix A Alternate-20 Pavement Marking, Epoxy, Arrow, White EACH 2 $265.00 $530.00 $313.19 $626.38 $265.00 $530.00 Appendix A Alternate-21 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 39 $18.00 $702.00 $25.76 $1,004.64 $18.00 $702.00 Appendix A Alternate-22 Traffic Control LUMP SUM 1 $13,522.43 $13,522.43 $22,000.00 $22,000.00 $8,500.00 $8,500.00 Water + Ohio Drive + Road Rehab Base Bid Total $2,618,674.00 Road Rehab Alternates Total Base Bid Total with Alternates Road Rehab Alternates $751,877.24 $883,935.06 $803,130.02 $3,370,551.24 $2,790,812.90 $3,674,747.96 $3,016,580.02 $3,819,710.04 Page 2 Page 15 of 41 Base Bid Total $ 2,618,674.00 Base Bid Total $ 2,790,812.90 Base Bid Total $ 3,016,580.02 Item No. Description Unit Bid Qty Bid Unit Price Bid Price Bid Unit Price Bid Price Bid Unit Price Bid Price S33 11 00-01 8-Inch C-900 PVC Watermain LF 1580 $199.00 $314,420.00 $201.05 $317,659.00 $199.00 $314,420.00 S33 11 00-02 8-Inch by 6-Inch Anchoring Tee EA 1 $815.00 $815.00 $823.39 $823.39 $815.00 $815.00 S33 11 00-03 8-Inch Gate Valve & Box EA 4 $3,375.00 $13,500.00 $3,409.74 $13,638.96 $3,375.00 $13,500.00 S33 11 00-04 6-Inch Gate Valve & Box EA 4 $2,375.00 $9,500.00 $2,399.45 $9,597.80 $2,375.00 $9,500.00 S33 11 00-05 Hydrant EA 4 $3,985.00 $15,940.00 $4,026.02 $16,104.08 $3,985.00 $15,940.00 S33 11 00-06 6-Inch Ductile Iron Hydrant Lead LF 61 $310.00 $18,910.00 $313.19 $19,104.59 $310.00 $18,910.00 S33 11 00-07 Connection of Water Main to Existing 8-Inch Water Main EA 2 $8,445.00 $16,890.00 $8,531.94 $17,063.88 $8,445.00 $16,890.00 S33 11 00-08 1-Inch Water Service LF 435 $195.00 $84,825.00 $197.01 $85,699.35 $195.00 $84,825.00 S33 11 00-09 2-Inch Water Service LF 126 $210.00 $26,460.00 $212.16 $26,732.16 $210.00 $26,460.00 S33 11 00-10 3-Inch Water Service LF 48 $305.00 $14,640.00 $308.14 $14,790.72 $305.00 $14,640.00 S33 11 00-11 4-Inch Water Service LF 26 $260.00 $6,760.00 $262.68 $6,829.68 $260.00 $6,760.00 S33 11 00-12 3-Inch Gate Valve & Box EA 2 $3,995.00 $7,990.00 $4,036.13 $8,072.26 $3,995.00 $7,990.00 S33 11 00-13 4-Inch Gate Valve & Box EA 1 $2,295.00 $2,295.00 $2,318.63 $2,318.63 $2,295.00 $2,295.00 S33 41 00-01 42-Inch CMP Storm Sewer LF 520 $299.00 $155,480.00 $302.08 $157,081.60 $299.00 $155,480.00 S33 41 00-02 42-Inch RCP Storm Sewer LF 101 $299.00 $30,199.00 $302.08 $30,510.08 $299.00 $30,199.00 S33 41 00-03 6-foot Catch Basin w/ Open Grate R-2560 EA 7 $8,350.00 $58,450.00 $8,435.96 $59,051.72 $8,350.00 $58,450.00 S33 41 00-04 8-foot Catch Basin w/ Open Grate R-2560 EA 2 $11,275.00 $22,550.00 $11,391.07 $22,782.14 $11,275.00 $22,550.00 S33 41 00-05 Connect to Existing Storm MH in S. 124th Street EA 1 $6,775.00 $6,775.00 $6,844.75 $6,844.75 $6,775.00 $6,775.00 S33 41 00-06 15-Inch CMP (Ohio Drive) LF 45 $145.00 $6,525.00 $146.49 $6,592.05 $145.00 $6,525.00 S33 41 00-07 15-Inch Concrete Endwalls (Ohio Drive) EA 2 $3,130.00 $6,260.00 $3,162.22 $6,324.44 $3,130.00 $6,260.00 S33 41 00-08 24-Inch CMP (Ohio Drive) LF 26 $175.00 $4,550.00 $176.80 $4,596.80 $175.00 $4,550.00 S33 41 00-09 24-Inch Concrete Endwalls (Ohio Drive) EA 1 $3,560.00 $3,560.00 $3,596.65 $3,596.65 $3,560.00 $3,560.00 S33 41 00-10 30-Inch CMP (Ohio Drive) LF 30 $205.00 $6,150.00 $207.11 $6,213.30 $205.00 $6,150.00 S33 41 00-11 20-Inch x 28-Inch CMP (Ohio Drive) LF 18 $170.00 $3,060.00 $171.75 $3,091.50 $170.00 $3,060.00 S33 41 00-12 Connect to Existing 2-Inch CMP EA 1 $1,980.00 $1,980.00 $2,000.38 $2,000.38 $1,980.00 $1,980.00 S33 41 00-13 Connect to Existing 30-Inch CMP EA 1 $2,040.00 $2,040.00 $2,061.00 $2,061.00 $2,040.00 $2,040.00 S33 41 00-14 Connect to Existing 19-Inch x 30-Inch CMP EA 1 $2,095.00 $2,095.00 $2,116.57 $2,116.57 $2,095.00 $2,095.00 S33 41 00-15 Ditch Restoration SY 2200 $6.80 $14,960.00 $8.03 $17,666.00 $7.00 $15,400.00 S33 41 00-16 Remove Asphalt Lining SY 2200 $5.10 $11,220.00 $5.15 $11,330.00 $10.15 $22,330.00 S33 41 00-17 Ditch Grading SY 2200 $7.10 $15,620.00 $7.17 $15,774.00 $5.80 $12,760.00 S33 42 20-01 15-CMP Culvert (Burdick Ave & Russel Ave Int.) LF 44 $125.00 $5,500.00 $126.29 $5,556.76 $125.00 $5,500.00 S33 42 20-02 15-Inch Concrete Endwalls (Burdick Ave & Russel Ave Int.) EA 2 $2,780.00 $5,560.00 $2,808.62 $5,617.24 $2,780.00 $5,560.00 Appendix A-1 Tack Coat GAL 1840 $3.00 $5,520.00 $3.53 $6,495.20 $2.25 $4,140.00 Appendix A-2 Saw Cutting Pavement LF 4243 $1.70 $7,213.10 $1.97 $8,358.71 $1.95 $8,273.85 Appendix A-3 Common Excavation CY 4288 $22.00 $94,336.00 $26.25 $112,560.00 $25.70 $110,201.60 Appendix A-4 Pulverize & Relay SY 36800 $2.50 $92,000.00 $3.72 $136,896.00 $2.05 $75,440.00 Appendix A-5 Base Repair CY 11074 $37.10 $410,845.40 $37.48 $415,053.52 $67.35 $745,833.90 Appendix A-6 Manhole Adjustment, Cast Iron Paving Rings EA 42 $350.00 $14,700.00 $258.83 $10,870.86 $290.00 $12,180.00 Appendix A-7 Water Valve or Water Box Adjustment EA 24 $300.00 $7,200.00 $126.29 $3,030.96 $95.00 $2,280.00 Appendix A-8 Remove & Replace Concrete Curb & Gutter LF 4646 $64.35 $298,970.10 $71.44 $331,910.24 $77.13 $358,345.98 Appendix A-9 2-Inch Asphalt Surface, 4 LT 58-28 S TON 3480 $63.85 $222,198.00 $68.00 $236,640.00 $65.95 $229,506.00 Appendix A-10 2-Inch Asphalt Surface, 4 MT 58-28 H TON 963 $70.15 $67,554.45 $79.00 $76,077.00 $70.65 $68,035.95 Appendix A-11 3-Inch Asphalt Binder, 3 LT 58-28 S TON 5469 $59.65 $326,225.85 $63.25 $345,914.25 $60.60 $331,421.40 Appendix A-12 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2019 $63.70 $128,610.30 $71.50 $144,358.50 $63.35 $127,903.65 Appendix A-13 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 253 $48.80 $12,346.40 $51.00 $12,903.00 $48.45 $12,257.85 Appendix A-14 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 4140 $1.89 $7,824.60 $2.53 $10,474.20 $2.90 $12,006.00 Appendix A-15 Pavement Marking, Epoxy, 4-Inch Solid, Double Yellow LF 174 $6.25 $1,087.50 $2.63 $457.62 $28.66 $4,986.84 Appendix A-16 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 61 $18.00 $1,098.00 $25.76 $1,571.36 $18.00 $1,098.00 Appendix A-17 Traffic Control LUMP SUM 1 $25,465.30 $25,465.30 $30,000.00 $30,000.00 $8,500.00 $8,500.00 Appendix A Alternate-1 Tack Coat GAL 1451 $3.00 $4,353.00 $3.53 $5,122.03 $2.25 $3,264.75 Appendix A Alternate-2 Butt Joints LF 441 $0.02 $8.82 $13.10 $5,777.10 $2.00 $882.00 Appendix A Alternate-3 Saw Cutting Pavement LF 1411 $1.70 $2,398.70 $1.97 $2,779.67 $1.95 $2,751.45 Appendix A Alternate-4 Common Excavation CY 1492 $25.63 $38,239.96 $26.25 $39,165.00 $25.70 $38,344.40 Appendix A Alternate-5 Pulverize & Relay SY 10660 $2.50 $26,650.00 $3.84 $40,934.40 $2.25 $23,985.00 Appendix A Alternate-6 Remove 2.5-Inch Asphaltic Pavement by Milling SY 18351 $2.33 $42,757.83 $2.72 $49,914.72 $2.45 $44,959.95 Appendix A Alternate-7 Base Repair CY 1159 $44.00 $50,996.00 $44.45 $51,517.55 $67.35 $78,058.65 Appendix A Alternate-8 Manhole Adjustment, Cast Iron Paving Rings EACH 36 $350.00 $12,600.00 $258.83 $9,317.88 $290.00 $10,440.00 Appendix A Alternate-9 Water Valve or Water Box Adjustment EACH 19 $300.00 $5,700.00 $126.29 $2,399.51 $95.00 $1,805.00 Appendix A Alternate-10 Remove & Replace Concrete Curb & Gutter LF 1138 $64.25 $73,116.50 $67.19 $76,462.22 $78.67 $89,526.46 Appendix A Alternate-11 2-Inch Asphalt Surface, 4 MT 58-28 H TON 1287 $67.35 $86,679.45 $80.99 $104,234.13 $74.95 $96,460.65 Appendix A Alternate-12 2.5-Inch Asphalt Surface, 4 LT 58-28 S TON 2902 $62.40 $181,084.80 $70.21 $203,749.42 $58.65 $170,202.30 Appendix A Alternate-13 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2697 $59.50 $160,471.50 $71.91 $193,941.27 $64.66 $174,388.02 Appendix A Alternate-14 3-Inch Asphalt Binder, Base Patch (<8-Feet Width), 3 LT 58-28 S SY 1101 $20.05 $22,075.05 $26.43 $29,099.43 $24.00 $26,424.00 Appendix A Alternate-15 3-Inch Asphalt Binder, Base Patch (>=8-Feet Width), 3 LT 58-28 S SY 1101 $18.00 $19,818.00 $29.96 $32,985.96 $18.00 $19,818.00 Appendix A Alternate-16 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 89 $50.28 $4,474.92 $54.11 $4,815.79 $55.31 $4,922.59 Appendix A Alternate-17 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 1452 $1.89 $2,744.28 $2.53 $3,673.56 $2.90 $4,210.80 Appendix A Alternate-18 Pavement Marking, Epoxy, 4-Inch Solid, White LF 282 $9.50 $2,679.00 $14.40 $4,060.80 $9.50 $2,679.00 Appendix A Alternate-19 Pavement Marking, Epoxy, Word, White EACH 1 $275.00 $275.00 $353.60 $353.60 $275.00 $275.00 Appendix A Alternate-20 Pavement Marking, Epoxy, Arrow, White EACH 2 $265.00 $530.00 $313.19 $626.38 $265.00 $530.00 Appendix A Alternate-21 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 39 $18.00 $702.00 $25.76 $1,004.64 $18.00 $702.00 Appendix A Alternate-22 Traffic Control LUMP SUM 1 $13,522.43 $13,522.43 $22,000.00 $22,000.00 $8,500.00 $8,500.00 2026 Roadway Rehabilitaiton and Greenridge Water Main Replacement City of New Berlin Unit Price Bid Tabulation 10:00 a.m., March 4, 2026 Water + Ohio Drive + Road Rehab Base Bid Total Water $2,618,674.00 Wolf Paving Co., Inc. Payne & Dolan, Inc.Stark Pavement Corporation Waer Base Bid Total Ohio Drive Storm Sewer Base Bid Total Road Rehab Base Bid Total Road Rehab Alternates Total Base Bid Total with Alternates $532,945.00 $538,434.50 $532,945.00 Ohio Drive Storm Sewer $362,534.00 $368,806.98 $371,224.00 Road Rehab $1,723,195.00 $1,883,571.42 $2,112,411.02 Road Rehab Alternates $751,877.24 $883,935.06 $803,130.02 $3,370,551.24 $2,790,812.90 $3,674,747.96 $3,016,580.02 $3,819,710.04 Page 1 Page 16 of 41 Page 1 of 2 DATE: April 9, 2026 TO: Rubina Medina City Clerk FR: Mayor Dave Ament RE: Mayoral Appointments for the April 14, 2026 Common Council Mtg Board of Appeals Expiration Date James (Jim) Oldham 4/30/2029 4187 S Regal Court New Berlin WI 53151 drumguy@wi.rr.com 262-894-2477 (Reappointment) Plan Commission Expiration Date John Erdman 4/30/2028 18445 W Coffee Road New Berlin WI 53146 414-617-7843 john@southeastsales.com (New Appointment) (Replace Margaret (Meg) Gardner) Plan Commission Expiration Date Scott Schulpius 4/30/2029 16840 W Beloit Road New Berlin WI 53151 262-278-0115 sschulpius@aol.com (Reappointment) For Office Purposes Only TT Eml Web Ltr Ethcs HB For Office Purposes Only TT Eml Web Ltr Ethcs HB For Office Purposes Only TT Eml Web Ltr Ethcs HB Page 17 of 41 Page 2 of 2 Police and Fire Commission Expiration Date Kathryn (Kate) Buer 4/30/2031 2871 S 127 th Street New Berlin WI 53151 414-839-4396 CLEVELANDPUB@gmail.com (Reappointment) For Office Purposes Only TT Eml Web Ltr Ethcs HB Page 18 of 41 Committee of the Whole MEETING MINUTES March 24, 2026 - 6:00 PM Zoom Meeting ID: 841 0836 9320 Via Zoom: https://us02web.zoom.us/j/84108369320 MINUTES 1. CALL MEETING TO ORDER The City Clerk stated that the Common Council approved, at her request, holding the meeting via electronic means (Zoom) on December 9, 2025, due to in-person absentee voting being conducted in the Council Chambers and to ensure the security of election materials. The agenda included a direct link to the Zoom meeting and the meeting ID: 841 0836 9320. Mayor Ament called the meeting to order at 6:03 PM. 2. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE City Clerk Rubina R. Medina took the roll call as follows: Present: Alderperson Hopkins, Alderperson La Fever, Alderperson Harenda, Alderperson Stribl, Alderperson Horbinski (6:05 p.m.), Alderperson Kroupa Excused: Alderperson Dave Maxey Staff Present: Mayor Dave Ament, City Attorney Mark Blum, City Clerk Rubina R. Medina The City Clerk confirmed that a quorum was present and that the meeting was properly posted in compliance with the open meetings law. 3. APPROVAL OF MINUTES A. March 10, 2026, Committee of the Whole Meeting Minutes MOTION: Motion to Approve Motion by: Alderperson Stribl Second by: Alderperson Kroupa VOTE: Motion Passed 6-0 4. UTILITY & FINANCE A. Discussion and possible recommendation to the Common Council to approve the March 25, 2026, Water Utility claims in the amount of $15,714.08, Sewer Utility claims in the amount of $317,776.83, and General City claims in the amount of $679,777.43, including General City claims checks dated March 4, 2026, in the amount of Page 19 of 41 $284,955.97, tax overpayment checks totaling $12,617.81, and a We Energies EFT payment of $97,672.76. MOTION: Motion to Approve Motion by: Alderperson Harenda Second by: Alderperson Stribl VOTE: Motion Passed 6-0 5. MISCELLANEOUS A. Department of Community Development Update Greg Kessler, Director of the Community Development Department, provided an update. Katie Roth, Recreation Manager, and Eric Snodgrass, Assistant Recreation Manager, also provided an update on the Recreation Division. B. Discussion and possible recommendation to the Common Council to approve Resolution No. 2026-03 authorizing the Emergency Management Manager, Jim Burns, Department of Community Development, to submit an application and supporting worksheets to the State of Wisconsin Disaster Fund (WDF) for potential reimbursement of eligible expenses incurred by the City during response and recovery efforts related to the August 2025 flood event. MOTION: Motion to Approve Motion by: Alderperson Horbinski Second by: Alderperson Stribl VOTE: Motion Passed 6-0 C. Discussion and possible recommendation to the Common Council to approve the 2026 Roadway Maintenance Joint and Crack Cleaning and Sealing Project contract with Thunder Road, LLC, and inspection services by Ruekert & Mielke, Inc., contingent upon receipt of a signed agreement and certificate of insurance. MOTION: Motion to Approve Motion by: Alderperson Hopkins Second by: Alderperson Harenda VOTE: Motion Passed 6-0 D. Discussion and possible recommendation to the Common Council to approve an agreement with CBS2 for inspection services associated with the 2026 Roadway Rehabilitation portion of the Greenridge Watermain Replacement Project, contingent upon receipt of a signed agreement and certificate of insurance. MOTION: Motion to Approve Motion by: Alderperson Stribl Second by: Alderperson Horbinski VOTE: Motion Passed 6-0 Page 20 of 41 E. Discussion and possible recommendation to the Common Council to deny the base bid and Alternates 1 and 2, for a total of $847,560, from Level Up Construction for the Live Fire Training Tower Rehabilitation Project, based on a determination that it is in the best interest of the City. MOTION: Motion to Approve the denial of the base bid and alternates 1 & 2 Motion by: Alderperson Harenda Second by: Alderperson La Fever VOTE: Motion Passed 6-0 F. Discussion and possible recommendation to the Common Council to approve a contract with Chrome Fireworks, in the amount of $40,000, for the 4th of July fireworks display. Ald. Stribl stated that all 4th of July festivities are funded through fundraising efforts and are not supported by taxpayer dollars. MOTION: Motion to Approve Motion by: Alderperson Stribl Second by: Alderperson Kroupa VOTE: Motion Passed 6-0 6. ADJOURN MOTION: Motion to Adjourn at 6:48 PM Motion by: Alderperson Kroupa Second by: Alderperson Horbinski VOTE: Motion Passed 6-0 Respectfully Submitted, Rubina R. Medina, City Clerk Page 21 of 41 Distinct, Friendly Community - Extensive Transportation Network - Vibrant Future City of New Berlin City of New Berlin ▪ 3805 S. Casper Drive ▪ New Berlin, Wisconsin 53151-0921 ▪ (262)786-8610 ▪ www.newberlin.org REQUESTED ACTION STATEMENT April 1, 2026 TO: Mayor Ament Common Council FROM: Chief Mark Polzin, Fire Department ISSUE: The current ambulance fee schedule has been in place since 2023. After a review of the current fee schedule by EMS Medical Consultants, the Fire Department recommends to Council to increase ambulance billing fees. REQUESTED: Recommend Common Council increase existing ambulance billing fees effective June 1, 2026, $300 increase for non- resident BLS, ALS and critical care. $250 increase for resident BLS, ALS and critical care. Effective January 1, 2027 and January 1, 2028 all base rates will increase by $50 from the previous year. See the following fee schedule: Effective July 1, 2026: Non Resident: Current Rate Proposed Rate Resident: Current Rate Proposed Rate ALS A0427 $ 1,550.00 $ 1,850.00 ALS A0427 $ 1,350.00 $ 1,600.00 ALS 2 A0433 $ 1,550.00 $ 1,850.00 ALS 2 A0433 $ 1,350.00 $ 1,600.00 BLS A0429 $ 1,300.00 $ 1,600.00 BLS A0429 $ 1,100.00 $ 1,350.00 BLS NE A0428 $ 1,300.00 $ 1,600.00 BLS NE A0428 $ 1,100.00 $ 1,350.00 NO TRANSPORT A0998 $ 600.00 $ 600.00 NO TRANSPORT A0998 $ 600.00 $ 600.00 MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00 SCT A0434 $ 1,900.00 $ 2,200.00 SCT A0434 $ 1,600.00 $ 1,850.00 Effective January 1, 2027: Non Resident: Current Rate Proposed Rate Resident: Current Rate Proposed Rate ALS A0427 $ 1,550.00 $ 1,900.00 ALS A0427 $ 1,350.00 $ 1,650.00 ALS 2 A0433 $ 1,550.00 $ 1,900.00 ALS 2 A0433 $ 1,350.00 $ 1,650.00 BLS A0429 $ 1,300.00 $ 1,650.00 BLS A0429 $ 1,100.00 $ 1,400.00 Page 22 of 41 Distinct, Friendly Community - Extensive Transportation Network - Vibrant Future BLS NE A0428 $ 1,300.00 $ 1,650.00 BLS NE A0428 $ 1,100.00 $ 1,400.00 NO TRANSPORT A0998 $ 600.00 $ 600.00 NO TRANSPORT A0998 $ 600.00 $ 600.00 MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00 SCT A0434 $ 1,900.00 $ 2,250.00 SCT A0434 $ 1,600.00 $ 1,900.00 Effective January 1, 2028: Non Resident: Current Rate Proposed Rate Resident: Current Rate Proposed Rate ALS A0427 $ 1,550.00 $ 1,950.00 ALS A0427 $ 1,350.00 $ 1,700.00 ALS 2 A0433 $ 1,550.00 $ 1,950.00 ALS 2 A0433 $ 1,350.00 $ 1,700.00 BLS A0429 $ 1,300.00 $ 1,700.00 BLS A0429 $ 1,100.00 $ 1,450.00 BLS NE A0428 $ 1,300.00 $ 1,700.00 BLS NE A0428 $ 1,100.00 $ 1,450.00 NO TRANSPORT A0998 $ 600.00 $ 600.00 NO TRANSPORT A0998 $ 600.00 $ 600.00 MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00 SCT A0434 $ 1,900.00 $ 2,300.00 SCT A0434 $ 1,600.00 $ 1,950.00 FISCAL IMPACT: Increasing the above ambulance fees will generate additional revenues. Approximately 70% of ambulance transports are reimbursed through Medicare. Under federal regulations, Medicare reimbursement rates are fixed and not directly influenced by local fee schedules. As a result, increases in the established fees will not significantly affect revenue collected from Medicare patients. RATIONALE: The increase in additional revenues can be used to offset the increase in Ambulance Supply Fees. Page 23 of 41 REQUESTED ACTION STATEMENT MEMO TO: Mayor David Ament Common Council CC: Plan Commission (via email) MEMO FROM: Greg Kessler, Director of Community Development DATE: April 8, 2026 ISSUE: John Spitz with Western Contractors has filed a petition to rezone the properties located at 2445 S. 179th Street (Tax Key #: 1185.990), 2345 S. 179th Street (Tax Key #: 1185.994) & Tax Key #: 1185.991 from M-1/SPO, C-1 & C-2 to M-1/SPO & C-2 to remove the C-1 Zoning. REQUESTED: Recommend to the Common Council that a Public Hearing be set for May 4, 2026 at 6:01 pm to be held before the Plan Commission to rezone the properties located at 2445 S. 179th Street (Tax Key #: 1185.990), 2345 S. 179th Street (Tax Key #: 1185.994) & Tax Key #: 1185.991 from M-1/SPO, C-1 & C-2 to M-1/SPO & C-2 to remove the C-1 Zoning. RATIONALE: Per Chapter 275- 22 of the City’s Zoning Code, this applicant has filed a completed application and petitioned the City to rezone this property. In addition, per State Statute 62.23(7), the Common Council may refer to the Plan Commission all petitions to rezone a property and require that a public hearing be held to obtain public input and that the Plan Commission formulate a recommendation. This recommendation shall be forwarded to the Common Council for final action. Page 24 of 41 REQUESTED ACTION STATEMENT MEMO TO: Mayor David Ament Common Council CC: Plan Commission (via email) MEMO FROM: Gregory W. Kessler, AICP - Director DATE: April 7, 2026 ISSUE: Patrick Theodossiou with SunCap Property Group on behalf of Rockwell Automation, Inc. has filed a petition to amend the Future Land Use Map within the City’s Comprehensive Plan (Chapter 17 - Neighborhood “G” Sections 26 and 35 – South Moorland Road Corridor, Chapter 18 – Neighborhood “H” Westridge & Moorland Road, and Chapter 10 - Land Use) from Business Park/Industrial & Urban Residential to Business Park/Industrial and to rezone from A-1, A-2, R-4, M-1, P-1, C-1 & C-2 to A-1, M-3/PUD, P-1, C-1, & C-2 for the parcels located at: 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2 Acres] Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres] Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92 Acres] 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres] 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres] Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres] Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres] Page 25 of 41 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann – 34.94 Acres] 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres] REQUESTED: Recommend to Common Council that a joint public hearing be set for June 1, 2026 at 6:00 p.m. to be held before the Plan Commission to amend the Future Land Use Map within the City’s Comprehensive Plan (Chapter 17 - Neighborhood “G” Sections 26 and 35 – South Moorland Road Corridor, Chapter 18 – Neighborhood “H” Westridge & Moorland Road, and Chapter 10 - Land Use) from Business Park/Industrial & Urban Residential to Business Park/Industrial for the parcels located at: 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] AND Recommend to the Common Council that a joint public hearing be set for June 1, 2026 at 6:00 p.m. to be held before the Plan Commission to rezone from A-1, A-2, R-4, M-1, P-1, C-1 & C-2 to A-1, M-3/PUD, P-1, C- 1, & C-2 for the parcels located at: 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2 Acres] Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres] Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92 Acres] 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres] 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres] Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres] Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres] Page 26 of 41 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann – 34.94 Acres] 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres] RATIONALE: Per Chapter 275-21.1 of the City’s Zoning Code, this applicant has filed a completed application and petitioned the City to amend the Comprehensive Plan / Future Land Use Map for this property. Per this section, the applicant submits the application to the Common Council for initial review. DCD staff prepares a Requested Action Statement to refer the request to the Plan Commission to hold a public hearing and take action via a resolution. A report shall be forwarded to the Common Council for final action. Per Chapter 275-22 of the City’s Zoning Code, this applicant has filed a completed application and petitioned the City to rezone these properties. In addition, per State Statute 62.23(7), the Common Council may refer to the Plan Commission all petitions to rezone a property and require that a public hearing be held to obtain public input and that the Plan Commission formulate a recommendation. These recommendations shall be forwarded to the Common Council for final action. Per Zoning Code Section 275-20I, the applicant has simultaneously filed a Land Division application. Note: Staff is continuing to prepare the 2030 Comprehensive Plan Updates as time permits. Please note this request will include other basic changes to these chapters. This will represent a public hearing for the 2030 Comprehensive Plan updates. Additional public hearings will be set up to handle the remaining chapters at a future date. Page 27 of 41 REQUESTED ACTION STATEMENT TO: Common Council Mayor Dave Ament FROM: Gregory Kessler, AICP – Director of Community Development RE: Requested Action Statement for the approval of an agreement with Ehlers & Associates for $18,000 for the preparation of a Tax Incremental Financing District (TID) Project Plan for TID #6 and setting a public hearing. Authorization for the City of New Berlin Joint Review Board to convene all JRB meetings via electronic means for this request. DATE: April 7, 2026 REQUESTED ACTION # 1: Recommend to Common Council approval of an agreement to hire Ehlers & Associates to prepare a TID Project Plan for Tax Incremental District #6 in the amount of $18,000 and recommend to the Common Council that a public hearing be set for June 1, 2026 at 6:01 PM to be held before the Plan Commission for the properties located at: 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2 Acres] Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres] Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92 Acres] 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres] 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres] 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83 Acres] Page 28 of 41 Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres] Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres] Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres] 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann – 34.94 Acres] 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres] 5851 S Sunny Slope Road (Tax Key #: 1289.997.001) [City of New Berlin Park – 39.17 Acres - The city’s park parcel to be part of the TIF boundary only to ensure the half mile project boundary would include the entire scope of public roadway projects.] REQUESTED ACTION # 2: Discussion and possible recommendation to the Common Council to authorize the City of New Berlin Joint Review Board to convene meetings via electronic means rather than have a physical, in-place meeting. FISCAL IMAPCT: The services offered by Ehlers & Associates are outlined in the attached proposal. Based upon their “Scope”, the cost for their services would be $18,000. Should additional analysis be required, their hourly rates are outlined in the attached agreement. The cost of this analysis is paid for by the applicants. SOURCE OF FUNDS: TID #6 Account: TBD $18,000 RATIONALE / BACKGROUND: Patrick Theodossiou with SunCap Property Group on behalf of Rockwell Automation, Inc. has made a request to the City for the creation of a TID which would be known as TID #6. The purpose of this TID would be to provide a funding mechanism for the reconstruction of public roadways to coincide with construction of the proposed development of the Rockwell Automation Inc. site. As with other established TID’s Ehlers and Associates would prepare and present their feasibility and project plan analysis at an upcoming Council meeting. Council action this evening would set the public hearing date on creating the TID at the June 1, 2026 Plan Commission meeting. As presented by Patrick Theodossiou with SunCap Property Group, the proposed facility will be operated by Rockwell Automation, Inc. A Planned Unit Development Overlay will be prepared to accommodate an advanced manufacturing campus which may include manufacturing and assembly operations, warehousing and distribution functions, office, administrative and operational support uses. Phase I (South Building) will include ~ 770,000 sq. ft of manufacturing and ~40,000 sq. ft. of office (Total for Phase I ~810,000 sq. ft.). Future expansion of Phase I could be an additional approximate 200,000 sq. ft. Page 29 of 41 Phase II (North Building along Grange Avenue) may be developed as light industrial at a future date. Traffic Study estimated a possible 425,000 sq. ft. building. As cited in the application submittal, “To support this development, Rockwell Automation, with the City of New Berlin’s support, proposes the creation of a new Tax Increment District (TID 6) with a 15-year life. Consistent with City TIF policy, TID funds would be used exclusively to finance public infrastructure improvements necessary to support the project, including items such as water, sanitary sewer, stormwater management, and public roadway improvements. The City anticipates utilizing a portion of the increment for improvements to Grange Avenue, with the remaining increment available for other eligible public infrastructure investments. The proposed TIF assistance would be structured as pay as you go, meaning Rockwell Automation would finance the infrastructure improvements upfront and be reimbursed over time from the project generated increment.” The projected development values and project costs will be analyzed as part of Ehlers’ project plan. Ehlers has proposed three phases to their work: Phase I: Feasibility Analysis Phase II: Project Plan Development and Approval (Tentative Timeline - Plan Commission Public Hearing & Approval on June 1, 2026 and Common Council Approval on June 9, 2026) Phase III: State Submittal Lastly, Ehlers will prepare and coordinate the creation of TID #6 and prepare & file the appropriate documents with the State. The fees charged by Ehlers are eligible project costs and reimbursable once the TID is created. The City of New Berlin is required by Statute to hold a meeting of its Joint Review Board to review the status of the existing Tax Incremental Financing Districts in the City. Since this meeting includes representatives of Waukesha County, the New Berlin School District and the Waukesha County Technical College, it is helpful to be able to conduct the meeting via electronic means rather than have a physical, in-place meeting. The City created Ordinance No. 2651 on June 21, 2021 to authorize virtual meetings. That Ordinance is codified in New Berlin Municipal Code Section 6- 36. Subsection (c) of that Code Section provides other Boards and Commissions of the City, aside from the Committee of the Whole and the Common Council, may, upon the approval of the Council, conduct special meetings via electronic means. Once a dates and times are determined when a quorum can be established, the required notices for public meetings will be published. Page 30 of 41 ____________________________________________________________________________________________ Documentation of Municipal Advisor Relationship 1 Ehlers & Associates, Inc. April 7, 2026 April 7, 2026 Greg Kessler, Community Development Director City of New Berlin, Wisconsin 3805 S Casper Dr New Berlin, WI 53151-0921 Re: Written Municipal Advisor Client Disclosure with the City of New Berlin (“Client”) for 2027 Tax Incremental Finance District #6 (“Project” Pursuant to MSRB Rule G-42) Dear Greg: As a registered Municipal Advisor, we are required by Municipal Securities Rulemaking Board (MSRB) Rules to provide you with certain written information and disclosures prior to, upon or promptly, after the establishment of a municipal advisory relationship as defined in Securities and Exchange Act Rule 15Ba1-1. To establish our engagement as your Municipal Advisor, we must inform you that: 1. When providing advice, we are required to act in a fiduciary capacity, which includes a duty of loyalty and a duty of care. This means we are required to act solely in your best interest. 2. We have an obligation to fully and fairly disclose to you in writing all material actual or potential conflicts of interest that might impair our ability to render unbiased and competent advice to you. We are providing these and other required disclosures in Appendix A attached hereto. As your Municipal Advisor, Ehlers shall provide this advice and service at such fees, as described within Appendix B attached hereto. This documentation and all appendices hereto shall be effective as of its date unless otherwise terminated by either party upon 30 days written notice to the other party. During the term of our municipal advisory relationship, this writing might be amended or supplemented to reflect any material change or additions. We look forward to working with you on this Project. Sincerely, Ehlers & Associates Greg Johnson Senior Municipal Advisor/Vice President _______________ 1 This document is intended to satisfy the requirements of MSRB Rule G-42(b) and Rule G-42(c). Page 31 of 41 ____________________________________________________________________________________________ Documentation of Municipal Advisor Relationship – Appendix A Page 1 Ehlers April 7, 2026 Appendix A DISCLOSURE OF CONFLICTS OF INTEREST/OTHER REQUIRED INFORMATION Actual/Potential Material Conflicts of Interest Ehlers has no known actual or potential material conflicts of interest that might impair its ability either to render unbiased and competent advice or to fulfill its fiduciary duty to Client. Other Engagements or Relationships Impairing Ability to Provide Advice Ehlers is not aware of any other engagement or relationship Ehlers has that might impair Ehlers’ ability to either render unbiased and competent advice to or to fulfill its fiduciary duty to Client. Affiliated Entities Ehlers offers related services through two affiliates of Ehlers, Bond Trust Service Corporation (BTSC) and Ehlers Investment Partners (EIP). BTSC provides paying agent services while Ehlers Investment Partners (EIP) provides investment related services and bidding agent service. Ehlers and these affiliates do not share fees. If either service is needed in conjunction with an Ehlers municipal advisory engagement, Client will be asked whether or not they wish to retain either affiliate to provide service. If BTSC or EIP are retained to provide service, a separate agreement with that affiliate will be provided for Client’s consideration and approval. Solicitors/Payments Made to Obtain/Retain Client Business Ehlers does not use solicitors to secure municipal engagements; nor does it make direct or indirect payments to obtain or retain Client business. Payments from Third Parties Ehlers does not receive any direct or indirect payments from third parties to enlist Ehlers recommendation to the Client of its services, any municipal securities transaction or any financial product. Payments/Fee-splitting Arrangements Ehlers does not share fees with any other parties and any provider of investments or services to the Client. However, within a joint proposal with other professional service providers, Ehlers could be the contracting party or be a subcontractor to the contracting party resulting in a fee splitting arrangement. In such cases, the fee due Ehlers will be identified in a Municipal Advisor writing and no other fees will be paid to Ehlers from any of the other participating professionals in the joint proposal. Municipal Advisor Registration Ehlers is registered with the Securities and Exchange Commission (SEC) and Municipal Securities Rulemaking Board (MSRB). Page 32 of 41 ____________________________________________________________________________________________ Documentation of Municipal Advisor Relationship – Appendix A Page 2 Ehlers April 7, 2026 Material Legal or Disciplinary Events Neither Ehlers nor any of its officers or municipal advisors have been involved in any legal or disciplinary events reported on Form MA or MA-I nor are there any other material legal or disciplinary events to be reported. Ehlers’ application for permanent registration as a Municipal Advisor with the (SEC) was granted on July 28, 2014 and contained the information prescribed under Section 15B(a)(2) of the Securities and Exchange Act of 1934 and rules thereunder. It did not list any information on legal or disciplinary disclosures. Client may access Ehlers’ most recent Form MA and each most recent Form MA-I by searching the Securities and Exchange Commission’s EDGAR system (currently available at http://www.sec.gov/edgar/searchedgar/companysearch.html) and searching under either our Company Name (Ehlers & Associates, Inc.) or by using the currently available “Fast Search” function and entering our CIK number (0001604197). Ehlers has not made any material changes to Form MA or Form MA-I since that date. Conflicts Arising from Compensation Contingent on the Size or Closing of Any Transaction The forms of compensation for municipal advisors vary according to the nature of the engagement and requirements of the client. Compensation contingent on the size of the transaction presents a conflict of interest because the advisor may have an incentive to advise the client to increase the size of the securities issue for the purpose of increasing the advisor’s compensation. Compensation contingent on the closing of the transaction presents a conflict because the advisor may have an incentive to recommend unnecessary financings or recommend financings that are disadvantageous to the client. If the transaction is to be delayed or fail to close, an advisor may have an incentive to discourage a full consideration of such facts and circumstances, or to discourage consideration of alternatives that may result in the cancellation of the financing or other transaction. Any form of compensation due a Municipal Advisor will likely present specific conflict of interests with the Client. If a Client is concerned about the conflict arising from Municipal Advisor compensation contingent on size and/or closing of their transaction, Ehlers is willing to discuss and provide another form of Municipal Advisor compensation. The Client must notify Ehlers in writing of this request within 10 days of receipt of this Municipal Advisor writing. MSRB Contact Information The website address of the MSRB is www.msrb.org. Posted on the MSRB website is a municipal advisory client brochure that describes the protections that may be provided by MSRB rules and how to file a complaint with the financial regulatory authorities. Page 33 of 41 ____________________________________________________________________________________________ Documentation of Municipal Advisor Relationship – Appendix B Page 1 Ehlers April 7, 2026 Appendix B Scope of Service Client has requested that Ehlers & Associates assist Client with creation of Tax Incremental Finance district No. 6 (“Project”). Ehlers & Associates proposes and agrees to provide the following scope of services: Phase I – Feasibility Analysis The purpose of Phase I is to determine whether the Project is a statutorily and economically feasible option to achieve the Client’s objectives. This phase begins upon your authorization of this engagement and ends on completion and delivery of a feasibility analysis report. As part of Phase I services, Ehlers & Associates will: • Consult with appropriate Client officials to identify the Client’s objectives for the Project. • Provide feedback as to the appropriateness of using Tax Incremental Financing in the context of the “but for” test. • If the Project includes creation of or addition of territory to a district, identify preliminary boundaries and gather parcel data from Client. Determine compliance with the following statutory requirements as applicable: o Equalized Value test. o Purpose test (industrial, mixed use, blighted area, in need of rehabilitation or conservation, or environmental remediation). • Prepare feasibility analysis report. The report will include the following information, as applicable: o Identification of the type or types of districts that may be created. o A description of the type, maximum life, expenditure period and other features corresponding to the type of district proposed. o A summary of the development assumptions used with respect to timing of construction and projected values. o Projections of tax increment revenue collections to include annual and cumulative present value calculations. Page 34 of 41 Documentation of Municipal Advisor Relationship – Appendix B Page 2 Ehlers April 7, 2026 o Qualification of the district as a donor or recipient of shared increment, and projected impact of any allocations of shared increment. o If debt financing is anticipated, a summary of the sizing, structure, and timing of proposed debt issues. o A cash flow pro forma reflecting annual and cumulative district fund balances and projected year of closure. o A draft timetable for the Project. o Identification of how the creation date may affect the district’s valuation date, the base value, compliance with the equalized value test, and the ability to capture current year construction values and changes in economic value. o When warranted, evaluate, and compare options with respect to boundaries, type of district, project costs and development levels. o Ehlers & Associates will provide guidance on district design within statutory limits to creatively achieve as many of the Client’s objectives as possible and will provide liaison with State Department of Revenue as needed in the technical evaluation of options. • Present the results of the feasibility analysis to the Client’s staff, Plan Commission, or governing body. Phase II – Project Plan Development and Approval If the Client elects to proceed following completion of the feasibility analysis, the Project will move to Phase II. This phase includes preparation of the Project Plan, and consideration by the Plan Commission1, governing body, and the Joint Review Board. This phase begins after receiving notification from the Client to proceed and ends after the Joint Review Board acts on the Project. As part of Phase II services, Ehlers & Associates will: • Based on the goals and objectives identified in Phase I, prepare a draft Project Plan that includes all statutorily required components. • We will coordinate with your staff, engineer, planner or other designated party to obtain a map of the proposed boundaries of the district, a map showing existing uses and conditions of real property within the district, and a map showing proposed improvements and uses in the district. 1If Client has created a Redevelopment Authority or a Community Development Authority, that body may fulfill the statutory requirements of the Plan Commission related to creation or amendment of the district. Page 35 of 41 Documentation of Municipal Advisor Relationship – Appendix B Page 3 Ehlers April 7, 2026 • Submit to the Client an electronic version of the draft Project Plan for initial review and comment. • Coordinate with Client staff to confirm dates and times for the meetings indicated within the table beginning on the following page. Ehlers & Associates will ensure that selected dates meet all statutory timing requirements and will provide documentation and notices as indicated. Meeting Ehlers & Associates Responsibility Client Responsibility Initial Joint Review Board Prepare Notice of Meeting and transmit to Client’s designated paper. Mail meeting notice, informational materials, and draft Project Plan to overlapping taxing jurisdictions. Provide agenda language to Client. Attend meeting to present draft Project Plan. Post or publish agenda and provide notification as required by the Wisconsin Open Records Law. Prepare meeting minutes. Designate Client Joint Review Board representative. Identify and recommend Public Joint Review Board representative for appointment. Plan Commission Public Hearing Prepare Notice of Public Hearing and transmit to Client’s designated paper. Post or publish agenda and provide notification as required by the Wisconsin Open Records Law. Page 36 of 41 Documentation of Municipal Advisor Relationship – Appendix B Page 4 Ehlers April 7, 2026 Meeting Ehlers & Associates Responsibility Client Responsibility Plan Commission Public Hearing For blighted area districts and in need of rehabilitation or conservation districts, provide a format for the required individual property owner notification letters. Attend hearing to present draft Project Plan. Prepare and mail individual property owner notices (only for districts created as blighted area, or in need of rehabilitation or conservation). Prepare meeting minutes. Plan Commission Provide agenda language to Client. Attend meeting to present draft Project Plan. Provide approval resolution for Plan Commission consideration. Post or publish agenda and provide notification as required by the Wisconsin Open Records Law. Distribute Project Plan & resolution to Plan Commission members in advance of meeting. Prepare meeting minutes. Governing Body Action Provide agenda language to Client. Attend meeting to present draft Project Plan. Provide approval resolution for governing body consideration. Post or publish agenda and provide notification as required by the Wisconsin Open Records Law. Provide Project Plan & resolution to governing body members in advance of meeting. Prepare meeting minutes. Joint Review Board Action Mail meeting notice and copy of final Project Plan to overlapping taxing jurisdictions. Prepare Notice of Meeting and transmit to Client’s designated paper. Provide agenda language to Client. Attend meeting to present final Project Plan. Provide approval resolution for Joint Review Board consideration. Post or publish agenda and provide notification as required by the Wisconsin Open Records Law. Prepare meeting minutes. Page 37 of 41 Documentation of Municipal Advisor Relationship – Appendix B Page 5 Ehlers April 7, 2026 • Throughout the meeting process, provide drafts of the Project Plan and related documents in sufficient quantity for the Client’s staff, Plan Commission, governing body and Joint Review Board members. • Provide advice and updated analysis on the impact of any changes made to the Project Plan throughout the approval process. Phase III – State Submittal This phase includes final review of all file documents, preparation of filing forms, and submission of the base year or amendment packet to the Department of Revenue. This phase begins following approval of the district by the Joint Review Board and ends with the submission of the base year or amendment packet. As part of Phase III services, Ehlers & Associates will: • Coordinate with Client’s assessor and other staff as necessary to obtain parcel valuations, parcel data and other information needed for preparation of the State forms that must be filed as part of the base year or amendment packet. • Assemble and submit to the Department of Revenue the required base year or amendment packet to include a final Project Plan document containing all required elements and information. • Provide the Client with an electronic copy of the final Project Plan (and up to 15 bound hard copies if desired). • Provide the municipal Clerk with a complete electronic and/or hard copy transcript of all materials as submitted to the Department of Revenue for certification. • Act as a liaison between the Client and the Department of Revenue during the certification process in the event any questions or discrepancies arise. Compensation - Flat Fee Portion of Engagement In return for the services set forth in the “Scope of Service,” Client agrees to compensate Ehlers & Associates as follows: Phase I $ 7,500 Phase II $ 8,000 Phase III $ 2,500 Total $ 18,000 • Phase I base fee includes up to five financial scenarios. Additional scenarios will be run as needed at a cost of $750/scenario. • In the event Client determines not to proceed with the Project once a Phase has been authorized, but prior to that Phase’s completion, the compensation due for that Phase will be prorated to reflect the percentage of the work completed. Page 38 of 41 Documentation of Municipal Advisor Relationship – Appendix B Page 6 Ehlers April 7, 2026 Compensation – Hourly Services Portion of Engagement Ehlers & Associates will bill Client on an hourly basis for services requested by Client in conjunction with the engagement that are not specifically identified in the Scope of Service set forth in this letter. Examples would include: • Attendance at additional meetings beyond the four required for approval or amendment of the District (Organizational Joint Review Board, Plan Commission (or CDA), Governing Body and Final Joint Review Board). • Review of development agreements related to the District’s Project Plan and participation in negotiations with developers. Hourly services will be billed at a rate that is dependent upon the task/staff required to meet Client request at no less than $175.00/hour and not to exceed $400.00/ hour. Payment for Services For all compensation due to Ehlers & Associates, we will invoice Client for the amount due at the completion of each Phase. Our fees include our normal travel, printing, computer services, and mail/delivery charges. The invoice is due and payable upon receipt by the Client. Page 39 of 41 Documentation of Municipal Advisor Relationship – Appendix B Page 7 Ehlers April 7, 2026 Client Responsibility The following expenses are not included in our Scope of Services, and are the responsibility of Client to pay directly: • Services rendered by Client’s engineers, planners, surveyors, appraisers, assessors, attorneys, auditors, and others that may be called on by Client to provide information related to completion of the Project. • Preparation of maps necessary for inclusion in the Project Plan. • Preparation of maps necessary for inclusion in the base year or amendment packet. • Publication charge for the Notice of Public Hearing and Notices of Joint Review Board meetings. • Legal opinion advising that Project Plan contains all required elements. (Normally provided by municipal attorney). • Preparation of District metes & bounds description. (Needed in Phase III for creation of new districts, or amendments that add or subtract territory). • Department of Revenue filing fee and annual administrative fees. The current Department of Revenue fee structure is: Current Wisconsin Department of Revenue Fee Schedules Base Year Packet $1,000 Amendment Packet with Territory Addition or Subtraction $1,000 Amendment Packet with Territory Addition and Subtraction $2,000 Base Value Redetermination $1,000 Amendment Packet No Charge Annual Administrative Fee $150 The above Proposal is hereby accepted by New Berlin, Wisconsin, by its authorized officer: Signed Title Date Page 40 of 41 WEST GRANGE AVENUE W W W W WWWWWWWWWWWWWWW W W W W W W W W W W W WWW W W W W W W W W WWW WWW W W W W W W W WWWW W W W W W W W WWWWW W W W W W W W W W W W W W W W WW W W W W W W W W WW W WW DOC NO. 2196070 N:347335.97'E:2474811.83'N:347369.02'E:2477471.62' D DSSSS S S S S SSS S SSS S S COMP.FLOODSTORAGE COMPENSATORYFLOOD STORAGE MOORLAND ROAD (COUNTY HIGHWAY "O") GRANGE AVENUE MOORLAND ROAD (COUNTY HIGHWAY "O") COUNTYO PROTECTEDPRIMARY ENVIRONMENTALCORRIDORPROTECTEDISOLATED NATURALRESOURCE AREA PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR PROTECTEDISOLATED NATURALRESOURCE AREA WETLANDS WETLANDS PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR FLOODPLAIN FLOODPLAIN FLOODPLAIN FLOODPLAIN FLOODPLAINWETLANDS FLOODPLAIN EXISTINGSANITARYSEWER POND POND POND PUBLIC ROAD PRIVATEROAD(PUBLIC STANDARDS) WETLANDS PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR CAR PARKING CAR PARKING OFFICELIGHTINDUSTRIALUSE FUTURE TRUCK DOCKS& TRAILER STALLS TRUCK DOCKS TRUCK DOCKSTRAILER STALLS FUTUREDEVELOPMENT LANDSCAPE BUFFER CARPARKING FUTURE LIGHTINDUSTRIAL USE STORMWATERPOND FUTURE TRAILER STALLS POTENTIALSUBSTATIONFUTURE TRUCK DOCKS FUTURE TRUCK DRIVE 1" = 200'0400' GRAPHICAL SCALE (FEET)NORTH SHEET SIZE: 30" x 42" PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP 1" = 200'-0" 5533-001-00 03/31/2026 SCHEMATIC SITE PLAN PROJECT GRAVITY MAIN ENTRANCE Page 41 of 41

Source: City of New Berlin website. First collected Oct 18, 2026.