Common Council Meeting — Agenda Packet
City of New Berlin · Waukesha County · Common Council · meeting of Apr 14, 2026 · Agenda packets
Open the original document More from City of New Berlin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Common Council
Meeting Agenda
April 14, 2026 - 6:05 PM
(Following the Committee of the Whole Meeting)
City Hall Council Chambers
Amended & Posted: 4/11/2026 at 3:20 PM
Posted: 4/10/2026
AGENDA
1. PRIVILEGE OF THE FLOOR
Each speaker will be limited to three (3) minutes. The Privilege of the Floor session shall not
exceed a total of thirty (30) minutes, unless extended by the Common Council.
2. CALL TO ORDER, PLEDGE OF ALLEGIANCE
3. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
4. APPROVAL OF MINUTES
A. March 24, 2026, Common Council Meeting Minutes
5. REPORTS
A. City Clerk
B. Council President
C. Mayor
6. COMMUNICATIONS
7. UTILITY COMMITTEE
A. Discussion and possible recommendation to the Common Council to award the
construction contract for the Greenridge Watermain Replacement and Road
Rehabilitation Project to the lowest responsive bidder, Stark Pavement Corp, in the
amount of $3,370,552.00. This includes a $2,618,674.00 base bid and an alternate
area bid of $751,878.00 (the Water portion of this project is $532,945.00; the Water
Resources portion is $362,534.00, and the remaining balance of $2,475,072.24 is
Engineering’s portion for the Road Rehabilitation component).
Suggested Motion: “I move to approve this item, as outlined in the agenda packet and approved
unanimously by the Utility Committee on March 24, 2026.”
8. MAYORAL APPOINTMENTS
A. Discussion and Possible Action to approve the Mayoral Appointments per the list as
presented
9. DEFERRED, REFERRED & TABLED ITEMS
10. ITEMS REMOVED FROM CONSENT AGENDA, if any
11. CONSENT AGENDA------------------------------------------------------------------------------
Items under the Consent Agenda have passed unanimously by the Committee of the Whole. Items not
passed by a unanimous vote will be removed from consent agenda and will be considered separately.
Page 1 of 41
12. MINUTES
A. March 24, 2026, Committee of the Whole Meeting Minutes
13. UTILITY & FINANCE
A. Discussion and possible recommendation to the Common Council to approve the April
15, 2026, Water Utility claims in the amount of $168,661.60, Sewer Utility claims in the
amount of $872,399.19, and General City claims in the amount of $1,791,792.10,
including a US Bank VISA EFT payment of $26,028.70.
14. MISCELLANEOUS
A. Recommend to the Common Council approval of an increase to the City’s ambulance
billing fees, effective June 1, 2026, to include a $300 increase to all base rates for non-
resident Basic Life Support (BLS), Advanced Life Support (ALS), and Critical Care
services, and a $250 increase to all base rates for resident Basic Life Support (BLS),
Advanced Life Support (ALS), and Critical Care services. Further, effective January 1,
2027, and January 1, 2028, all ambulance base rates shall increase by $50 annually
from the prior year’s rates, as detailed in the fee schedule included in the agenda
packet.
B. Recommend to the Common Council that a Public Hearing be set for May 4, 2026 at
6:01 pm to be held before the Plan Commission to rezone the properties located at
2445 S. 179th Street (Tax Key #: 1185.990), 2345 S. 179th Street (Tax Key #:
1185.994) & Tax Key #: 1185.991 from M-1/SPO, C-1 & C-2 to M-1/SPO & C-2 to
remove the C-1 Zoning.
C. Recommend to Common Council that a joint public hearing be set for June 1, 2026, at
6:00 p.m. to be held before the Plan Commission to amend the Future Land Use Map
within the City’s Comprehensive Plan (Chapter 17 - Neighborhood “G” Sections 26 and
35 – South Moorland Road Corridor, Chapter 18 – Neighborhood “H” Westridge &
Moorland Road, and Chapter 10 - Land Use) from Business Park/Industrial & Urban
Residential to Business Park/Industrial for the parcels located at:
• 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres]
• 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83
Acres]
D. Recommend to the Common Council that a joint public hearing be set for June 1, 2026,
at 6:00 p.m. to be held before the Plan Commission to rezone from A-1, A-2, R-4, M-1,
P-1, C-1 & C-2 to A-1, M-3/PUD, P-1, C-1, & C-2 for the parcels located at:
• 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2
Acres]
• Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres]
• Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92
Acres]
• 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres]
• 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres]
• 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83
Acres]
• Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres]
• Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres]
• Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres]
• 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann –
34.94 Acres]
• 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres]
Page 2 of 41
E. Recommend to the Common Council approval of an agreement to hire Ehlers &
Associates to prepare a TID Project Plan for Tax Incremental District #6 in the amount
of $18,000, and recommend to the Common Council that a public hearing be set for
June 1, 2026, at 6:01 PM to be held before the Plan Commission for the properties
located at:
• 15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A. Rausch A. May – 2
Acres]
• Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres]
• Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A. May – 7.92
Acres]
• 15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34 Acres]
• 14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22 Acres]
• 14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable Trust - 39.83
Acres]
• Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres]
• Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres]
• Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres]
• 15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond E. Saltzmann –
34.94 Acres]
• 5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres]
• 5851 S Sunny Slope Road (Tax Key #: 1289.997.001) [City of New Berlin Park – 39.17 Acres -
The city’s park parcel to be part of the TIF boundary only to ensure the half mile project boundary
would include the entire scope of public roadway projects.]
F. Discussion and possible recommendation to the Common Council to authorize the City
of New Berlin Joint Review Board to conduct meetings by electronic means in lieu of in-
person meetings.
15. END CONSENT AGENDA-----------------------------------------------------------------------
16. CLOSED SESSION
A. The Common Council may convene into closed session pursuant to Wis. Stat. §
19.85(1)(g) to confer with legal counsel who is rendering oral or written advice
concerning strategy to be adopted with respect to litigation or potential litigation in which
the City is or is likely to become involved, specifically regarding:
Discussion re: Carter vs. City of New Berlin
B. The Common Council may convene into closed session pursuant to Wis. Stat. §
19.85(1)(e) to deliberate or negotiate the purchase of public properties, the investing of
public funds, or conducting other specified public business whenever competitive or
bargaining reasons require a closed session, specifically regarding:
Discussion regarding an agreement with Mr. and Mrs. Spitz related to the reconstruction
of the Jacob’s Ridge lift station
17. RECONVENE TO OPEN SESSION
A. Discussion and possible action re: Carter vs. City of New Berlin
B. Discussion and possible action re: an agreement with Mr. and Mrs. Spitz related to the
reconstruction of the Jacob’s Ridge lift station
18. ADJOURN
Additional Information
Page 3 of 41
• The agenda packet with supplemental information related to the agenda items is available online at
www.NewBerlinWi.gov. Once finalized by the governing body, approved meeting minutes are also posted online.
• The governing body may consider agenda items out of order
• Members, and potentially a quorum of other governmental bodies of the municipality, may be present at the meeting to
gather information. No action will be taken by any governmental body other than the one referenced in this notice.
• With reasonable notice, accommodations will be provided under the Americans with Disabilities Act to meet the needs
of individuals with disabilities through appropriate aids and services. For more information or to request assistance,
please contact the Office of the City Clerk at (262) 786-8610.
Page 4 of 41
Common Council
MEETING MINUTES
March 24, 2026 - 6:20 PM
Zoom Meeting ID: 841 0836 9320
Via Zoom: https://us02web.zoom.us/j/84108369320
MINUTES
1. PRIVILEGE OF THE FLOOR
Each speaker will be limited to three (3) minutes. The Privilege of the Floor session shall not
exceed a total of thirty (30) minutes, unless extended by the Common Council.
Mayor Ament stated that the Council President had received requests to include the Milwaukee
Rescue Mission item in closed session, so the Council could receive an update on the status of
litigation. Council President Harenda clarified that the intent was solely to provide an informational
update to the Council and that no action was anticipated. He further stated that he requests the
removal of the closed session item from the agenda at the Council's and constituents' request.
The Mayor read the rules governing Privilege of the Floor and invited any members of the public
wishing to speak to come forward. Multiple residents spoke during Privilege of the Floor in
opposition to the proposed Milwaukee Rescue Mission ‘New Journey’ development.
2. CALL TO ORDER, PLEDGE OF ALLEGIANCE
The City Clerk stated that the Common Council approved, at her request, holding the meeting via
electronic means (Zoom) on December 9, 2025, due to in-person absentee voting being conducted
in the Council Chambers and to ensure the security of election materials. The agenda included a
direct link to the Zoom meeting and the meeting ID: 841 0836 9320.
Mayor Ament called the meeting to order at 7:10 PM and led the Pledge of Allegiance.
3. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
City Clerk Rubina R. Medina took the roll call as follows:
Present: Alderperson Hopkins, Alderperson La Fever, Alderperson Harenda, Alderperson Stribl,
Alderperson Horbinski, Alderperson Kroupa
Excused: Alderperson Dave Maxey
Staff Present: Mayor Dave Ament, City Attorney Mark Blum, City Clerk Rubina R. Medina
The City Clerk confirmed that a quorum was present and that the meeting was properly posted in
compliance with the open meetings law.
4. APPROVAL OF MINUTES
A. March 10, 2026, Common Council Meeting Minutes
Page 5 of 41
MOTION: Motion to Approve
Motion by: Alderperson Horbinski
Second by: Alderperson La Fever
VOTE:
Motion Passed 6-0
5. REPORTS
A. City Clerk
The City Clerk announced that In-Person Absentee Voting began today at City Hall. Voters
who prefer to vote on Election Day may do so on April 7, 2026, with polls open from 7:00 AM
to 8:00 PM. For additional information, please visit www.myvote.wi.gov
B. Council President
No Report.
C. Mayor
The City Clerk announced that In-Person Absentee Voting began today at City Hall. Voters
who prefer to vote on Election Day may do so on April 7, 2026, with polls open from 7:00 AM
to 8:00 PM. For additional information, please visit www.myvote.wi.govMayor Ament
extended his congratulations on behalf of the Common Council and the entire City of New
Berlin to a 13-year-old eighth-grade student from Eisenhower Middle School who won the
Badger State Spelling Bee in Madison on Saturday and will now advance to the Scripps
National Spelling Bee.
6. COMMUNICATIONS
No Communications.
7. FOURTH OF JULY COMMISSOIN
A. Discussion and possible recommendation to the Common Council to approve a contract
with Pat’s Services, Inc., in the amount of $10,645, for portable sanitation services for
the 4th of July Festival, to be provided from July 1 through July 6, 2026
Suggested Motion: “I move to approve the contract with Pat's Services, as outlined in the agenda packet
and approved unanimously by the Fourth of July Commission on October 22, 2025.
MOTION: Motion to Approve
Motion by: Alderperson Stribl
Second by: Alderperson Harenda
VOTE:
Motion Passed 6-0
Page 6 of 41
B. Discussion and possible recommendation to the Common Council to approve a contract
with BCI Entertainment, LLC, in the amount of $25,000, for the 4th of July Festival drone
show to be held on Thursday, July 2, 2026.
Suggested Motion: “I move to approve the contract with BCI Entertainment, LLC, as outlined in the agenda
packet and approved unanimously by the Fourth of July Commission on January 28, 2026.
Ald. Stribl stated that all 4th of July festivities are funded through fundraising efforts and are
not supported by taxpayer dollars.
MOTION: Motion to Approve
Motion by: Alderperson Stribl
Second by: Alderperson Hopkins
VOTE:
Motion Passed 6-0
C. Discussion and possible recommendation to the Common Council to approve a contract
with Area Tent, in the amount of $22,823.03, for rentals and related services for the 4th
of July Festival, to be provided from July 3 through July 5, 2026.
Suggested Motion: “I move to approve the contract with Area Tent, as outlined in the agenda packet and
approved unanimously by the Fourth of July Commission on October 22, 2025.
MOTION: Motion to Approve
Motion by: Alderperson Stribl
Second by: Alderperson Horbinski
VOTE:
Motion Passed 6-0
8. DEFERRED, REFERRED & TABLED ITEMS
No items.
9. ITEMS REMOVED FROM CONSENT AGENDA, if any
No items.
10. CONSENT AGENDA------------------------------------------------------------------------------
Items under the Consent Agenda have passed unanimously by the Committee of the Whole. Items not
passed by a unanimous vote will be removed from consent agenda and will be considered separately.
MOTION: Motion to Approve
Motion by: Alderperson Kroupa
Second by: Alderperson Horbinski
VOTE:
Motion Passed 6-0
11. MINUTES
Page 7 of 41
A. March 10, 2026, Committee of the Whole Meeting Minutes
12. UTILITY & FINANCE
A. Discussion and possible recommendation to the Common Council to approve the March
25, 2026, Water Utility claims in the amount of $15,714.08, Sewer Utility claims in the
amount of $317,776.83, and General City claims in the amount of $679,777.43,
including General City claims checks dated March 4, 2026, in the amount of
$284,955.97, tax overpayment checks totaling $12,617.81, and a We Energies EFT
payment of $97,672.76.
13. MISCELLANEOUS
A. Department of Community Development Update
B. Discussion and possible recommendation to the Common Council to approve
Resolution No. 2026-03 authorizing the Emergency Management Manager, Jim Burns,
Department of Community Development, to submit an application and supporting
worksheets to the State of Wisconsin Disaster Fund (WDF) for potential reimbursement
of eligible expenses incurred by the City during response and recovery efforts related to
the August 2025 flood event.
C. Discussion and possible recommendation to the Common Council to approve the 2026
Roadway Maintenance Joint and Crack Cleaning and Sealing Project contract with
Thunder Road, LLC, and inspection services by Ruekert & Mielke, Inc., contingent upon
receipt of a signed agreement and certificate of insurance.
D. Discussion and possible recommendation to the Common Council to approve an
agreement with CBS2 for inspection services associated with the 2026 Roadway
Rehabilitation portion of the Greenridge Watermain Replacement Project, contingent
upon receipt of a signed agreement and certificate of insurance.
E. Discussion and possible recommendation to the Common Council to deny the base bid
and Alternates 1 and 2, for a total of $847,560, from Level Up Construction for the Live
Fire Training Tower Rehabilitation Project, based on a determination that it is in the best
interest of the City.
Page 8 of 41
F. Discussion and possible recommendation to the Common Council to approve a contract
with Chrome Fireworks, in the amount of $40,000, for the 4th of July fireworks display.
14. END CONSENT AGENDA-----------------------------------------------------------------------
15. CLOSED SESSION
The Common Council did not convene in closed session.
A. The Common Council may convene in closed session pursuant to Wis. Stat. §
19.85(1)(g) to confer with legal counsel who is rendering oral or written advice
concerning strategy to be adopted with respect to pending or threatened litigation in
which the City is or is likely to become involved:
B. New Berlin Citizens United Board of Appeals Case and Petition for Writ of Mandamus
by DeMoCat, LLC. et al. vs. City of New Berlin
16. RECONVENE TO OPEN SESSION
17. ADJOURN
MOTION: Motion to Adjourn at 7:19 PM
Motion by: Alderperson Stribl
Second by: Alderperson La Fever
VOTE:
Motion Passed 6-0
Respectfully Submitted,
Rubina R. Medina, City Clerk
Page 9 of 41
1 | P a g e
File #: UT 10-26
UC Date: 03-24-26
AP
_____________________________________________________________________________________
UTILITY STAFF REPORT
EXECUTIVE SUMMARY
CUSTOMER/PROJECT: Greenridge Watermain Replacement and Road
Rehabilitation Project
LOCATION: Greenridge Neighborhood
Euclid Avenue and Russel Court
REQUEST: Award Construction Contract for Greenridge Watermain
Replacement and Road Rehabilitation Project to Lowest
Responsive Bidder
UTILITY MANAGER RECOMMENDATION:
Recommend to the Common Council to award the construction contract for the Greenridge Watermain
Replacement and Road Rehabilitation Project to the lowest responsive bidder, Stark Pavement Corp, in
the amount of $3,370,552.00. This includes a $2,618,674.00 base bid and an alternate area bid of
$751,878.00 (the Water portion of this project is $532,945.00; the Water Resources portion is
$362,534.00 and the remaining balance of $2,475,072.24 is Engineering’s portion for the Road
Rehabilitation component).
DETAILS IN ATTACHED STAFF REPORT
Page 10 of 41
2 | P a g e
File #: UT 10-26
UC Date: 03-24-26
AP
CITY OF NEW BERLIN
UTILITIES DEPARTMENT
STAFF REPORT
Greenridge Watermain Replacement and Road Rehabilitation Project
______________________________________________________________________
DATE STAFF REPORT CREATED: March 17th, 2026
CUSTOMER/PROJECT NAME: Greenridge Watermain Replacement and Road
Rehabilitation Project
ISSUE/DESCRIPTION OF PROJECT: Award Construction Contract for Greenridge Watermain
Replacement and Road Rehabilitation Project to Lowest
Responsive Bidder
REQUESTED ACTION:
Recommend to the Common Council to award the construction contract for the Greenridge Watermain
Replacement and Road Rehabilitation Project to the lowest responsive bidder, Stark Pavement Corp, in
the amount of $3,370,552.00. This includes a $2,618,674.00 base bid and an alternate area bid of
$751,878.00 (the Water portion of this project is $532,945.00; the Water Resources portion is
$362,534.00 and the remaining balance of $2,475,072.24 is Engineering’s portion for the Road
Rehabilitation component).
FISCAL IMPACT: DEPARTMENT BID AMOUNT SOURCE OF FUNDS
Water Utility $532,945.00 Water Capital Budget
Water Resources $362,534.00 WRM Utility Cash on Hand
Roadway Rehab $1,723,195.00 04251100 59040 C2026 $2,000,000.00
$751,877.24 04251100 59040 C2025 $360,000.00
___________ 04251100 59040 C2023 $318,500.00
$3,370,551.24
RATIONALE:
Project is for aging watermain and repair of damaged roadways.
UTILITY MANAGER RECOMMENDATION: See Executive Summary
ATTACHMENTS: Bid Award Recommendation Letter
Page 11 of 41
Date: March 4, 2026
RE: 2026 Roadway Rehabilitation and Greenridge Water Main Replacement
New Berlin, WI
CBS² NEWBE 25001
Ms. Rubina Medina
City Clerk
City of New Berlin
3805 S Casper Drive
New Berlin, WI 53151
Dear Rubina,
Bids for the City of New Berlin’s 2026 Roadway Rehabilitation and Greenridge Water Main
Replacement project were received at 10:00 a.m. on March 4, 2026. Three bids were received and
accepted for the project and are summarized below:
Base Bid Total
Stark Pavement Corporation $2,618,674.00
Wolf Paving Co., Inc. $2,790,812.90
Payne & Dolan, Inc. $3,016,580.02
Alternates Total
Stark Pavement Corporation $751,877.24
Wolf Paving Co., Inc. $883,935.06
Payne & Dolan, Inc. $803,130.02
The itemized bid tabulation is attached.
Based on our review, it is our opinion t hat Stark Pavement Corporation of Brookfield has the
equipment and experience to perform the work as defined in the bidding documents. If the City
decides to proceed with the project as bid, we therefore recommend award of the project in the
amount of $2,618,674.00 to Stark Pavement Corporation.
Should you have any questions, please contact me by phone at 608.797.4448 or by
e-mail at mswartwout@cbssquaredinc.com.
Sincerely,
McKenzie Swartwout
Project Manager
Enclosure
Page 12 of 41
Bids Received for Unit Price Project / City of New Berlin
2026 Roadway Rehabilitation and Greenridge Water Main Replacement
NEWBE 25001
10:00 a.m., Wednesday, March 4, 2026
Contractor Bid
Bond
Addendum
No. 1
Addendum
No. 2
Addendum
No. 3
Addendum
No. 4
Addendum
No. 5 Base Bid
Stark Pavement Corporation X X X X X X
$2,618,674.00
Wolf Paving Co., Inc. X X X X X X
$2,790,812.90
Payne & Dolan, Inc. X X X X X X
$3,016,580.02
Page 13 of 41
Base Bid Total $ 2,618,674.00 Base Bid Total $ 2,790,812.90 Base Bid Total $ 3,016,580.02
Item No. Description Unit Bid Qty Bid Unit Price Bid Price Bid Unit Price Bid Price Bid Unit Price Bid Price
S33 11 00-01 8-Inch C-900 PVC Watermain LF 1580 $199.00 $314,420.00 $201.05 $317,659.00 $199.00 $314,420.00
S33 11 00-02 8-Inch by 6-Inch Anchoring Tee EA 1 $815.00 $815.00 $823.39 $823.39 $815.00 $815.00
S33 11 00-03 8-Inch Gate Valve & Box EA 4 $3,375.00 $13,500.00 $3,409.74 $13,638.96 $3,375.00 $13,500.00
S33 11 00-04 6-Inch Gate Valve & Box EA 4 $2,375.00 $9,500.00 $2,399.45 $9,597.80 $2,375.00 $9,500.00
S33 11 00-05 Hydrant EA 4 $3,985.00 $15,940.00 $4,026.02 $16,104.08 $3,985.00 $15,940.00
S33 11 00-06 6-Inch Ductile Iron Hydrant Lead LF 61 $310.00 $18,910.00 $313.19 $19,104.59 $310.00 $18,910.00
S33 11 00-07 Connection of Water Main to Existing 8-Inch Water Main EA 2 $8,445.00 $16,890.00 $8,531.94 $17,063.88 $8,445.00 $16,890.00
S33 11 00-08 1-Inch Water Service LF 435 $195.00 $84,825.00 $197.01 $85,699.35 $195.00 $84,825.00
S33 11 00-09 2-Inch Water Service LF 126 $210.00 $26,460.00 $212.16 $26,732.16 $210.00 $26,460.00
S33 11 00-10 3-Inch Water Service LF 48 $305.00 $14,640.00 $308.14 $14,790.72 $305.00 $14,640.00
S33 11 00-11 4-Inch Water Service LF 26 $260.00 $6,760.00 $262.68 $6,829.68 $260.00 $6,760.00
S33 11 00-12 3-Inch Gate Valve & Box EA 2 $3,995.00 $7,990.00 $4,036.13 $8,072.26 $3,995.00 $7,990.00
S33 11 00-13 4-Inch Gate Valve & Box EA 1 $2,295.00 $2,295.00 $2,318.63 $2,318.63 $2,295.00 $2,295.00
S33 41 00-01 42-Inch CMP Storm Sewer LF 520 $299.00 $155,480.00 $302.08 $157,081.60 $299.00 $155,480.00
S33 41 00-02 42-Inch RCP Storm Sewer LF 101 $299.00 $30,199.00 $302.08 $30,510.08 $299.00 $30,199.00
S33 41 00-03 6-foot Catch Basin w/ Open Grate R-2560 EA 7 $8,350.00 $58,450.00 $8,435.96 $59,051.72 $8,350.00 $58,450.00
S33 41 00-04 8-foot Catch Basin w/ Open Grate R-2560 EA 2 $11,275.00 $22,550.00 $11,391.07 $22,782.14 $11,275.00 $22,550.00
S33 41 00-05 Connect to Existing Storm MH in S. 124th Street EA 1 $6,775.00 $6,775.00 $6,844.75 $6,844.75 $6,775.00 $6,775.00
S33 41 00-06 15-Inch CMP (Ohio Drive) LF 45 $145.00 $6,525.00 $146.49 $6,592.05 $145.00 $6,525.00
S33 41 00-07 15-Inch Concrete Endwalls (Ohio Drive) EA 2 $3,130.00 $6,260.00 $3,162.22 $6,324.44 $3,130.00 $6,260.00
S33 41 00-08 24-Inch CMP (Ohio Drive) LF 26 $175.00 $4,550.00 $176.80 $4,596.80 $175.00 $4,550.00
S33 41 00-09 24-Inch Concrete Endwalls (Ohio Drive) EA 1 $3,560.00 $3,560.00 $3,596.65 $3,596.65 $3,560.00 $3,560.00
S33 41 00-10 30-Inch CMP (Ohio Drive) LF 30 $205.00 $6,150.00 $207.11 $6,213.30 $205.00 $6,150.00
S33 41 00-11 20-Inch x 28-Inch CMP (Ohio Drive) LF 18 $170.00 $3,060.00 $171.75 $3,091.50 $170.00 $3,060.00
S33 41 00-12 Connect to Existing 2-Inch CMP EA 1 $1,980.00 $1,980.00 $2,000.38 $2,000.38 $1,980.00 $1,980.00
S33 41 00-13 Connect to Existing 30-Inch CMP EA 1 $2,040.00 $2,040.00 $2,061.00 $2,061.00 $2,040.00 $2,040.00
S33 41 00-14 Connect to Existing 19-Inch x 30-Inch CMP EA 1 $2,095.00 $2,095.00 $2,116.57 $2,116.57 $2,095.00 $2,095.00
S33 41 00-15 Ditch Restoration SY 2200 $6.80 $14,960.00 $8.03 $17,666.00 $7.00 $15,400.00
S33 41 00-16 Remove Asphalt Lining SY 2200 $5.10 $11,220.00 $5.15 $11,330.00 $10.15 $22,330.00
S33 41 00-17 Ditch Grading SY 2200 $7.10 $15,620.00 $7.17 $15,774.00 $5.80 $12,760.00
S33 42 20-01 15-CMP Culvert (Burdick Ave & Russel Ave Int.) LF 44 $125.00 $5,500.00 $126.29 $5,556.76 $125.00 $5,500.00
S33 42 20-02 15-Inch Concrete Endwalls (Burdick Ave & Russel Ave Int.) EA 2 $2,780.00 $5,560.00 $2,808.62 $5,617.24 $2,780.00 $5,560.00
Appendix A-1 Tack Coat GAL 1840 $3.00 $5,520.00 $3.53 $6,495.20 $2.25 $4,140.00
Appendix A-2 Saw Cutting Pavement LF 4243 $1.70 $7,213.10 $1.97 $8,358.71 $1.95 $8,273.85
Appendix A-3 Common Excavation CY 4288 $22.00 $94,336.00 $26.25 $112,560.00 $25.70 $110,201.60
Appendix A-4 Pulverize & Relay SY 36800 $2.50 $92,000.00 $3.72 $136,896.00 $2.05 $75,440.00
Appendix A-5 Base Repair CY 11074 $37.10 $410,845.40 $37.48 $415,053.52 $67.35 $745,833.90
Appendix A-6 Manhole Adjustment, Cast Iron Paving Rings EA 42 $350.00 $14,700.00 $258.83 $10,870.86 $290.00 $12,180.00
Appendix A-7 Water Valve or Water Box Adjustment EA 24 $300.00 $7,200.00 $126.29 $3,030.96 $95.00 $2,280.00
Appendix A-8 Remove & Replace Concrete Curb & Gutter LF 4646 $64.35 $298,970.10 $71.44 $331,910.24 $77.13 $358,345.98
Appendix A-9 2-Inch Asphalt Surface, 4 LT 58-28 S TON 3480 $63.85 $222,198.00 $68.00 $236,640.00 $65.95 $229,506.00
Appendix A-10 2-Inch Asphalt Surface, 4 MT 58-28 H TON 963 $70.15 $67,554.45 $79.00 $76,077.00 $70.65 $68,035.95
Appendix A-11 3-Inch Asphalt Binder, 3 LT 58-28 S TON 5469 $59.65 $326,225.85 $63.25 $345,914.25 $60.60 $331,421.40
Appendix A-12 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2019 $63.70 $128,610.30 $71.50 $144,358.50 $63.35 $127,903.65
Appendix A-13 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 253 $48.80 $12,346.40 $51.00 $12,903.00 $48.45 $12,257.85
Appendix A-14 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 4140 $1.89 $7,824.60 $2.53 $10,474.20 $2.90 $12,006.00
Appendix A-15 Pavement Marking, Epoxy, 4-Inch Solid, Double Yellow LF 174 $6.25 $1,087.50 $2.63 $457.62 $28.66 $4,986.84
Appendix A-16 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 61 $18.00 $1,098.00 $25.76 $1,571.36 $18.00 $1,098.00
Appendix A-17 Traffic Control LUMP SUM 1 $25,465.30 $25,465.30 $30,000.00 $30,000.00 $8,500.00 $8,500.00
2026 Roadway Rehabilitaiton and Greenridge Water Main Replacement
City of New Berlin
Unit Price Bid Tabulation
10:00 a.m., March 4, 2026
Water
Wolf Paving Co., Inc. Payne & Dolan, Inc.Stark Pavement Corporation
Waer Base Bid Total
Ohio Drive Storm Sewer Base Bid Total
Road Rehab Base Bid Total
$532,945.00 $538,434.50 $532,945.00
Ohio Drive Storm Sewer
$362,534.00 $368,806.98 $371,224.00
Road Rehab
$1,723,195.00 $1,883,571.42 $2,112,411.02
Page 1
Page 14 of 41
Base Bid Total $ 2,618,674.00 Base Bid Total $ 2,790,812.90 Base Bid Total $ 3,016,580.02
Item No. Description Unit Bid Qty Bid Unit Price Bid Price Bid Unit Price Bid Price Bid Unit Price Bid Price
Wolf Paving Co., Inc. Payne & Dolan, Inc.Stark Pavement Corporation
Appendix A Alternate-1 Tack Coat GAL 1451 $3.00 $4,353.00 $3.53 $5,122.03 $2.25 $3,264.75
Appendix A Alternate-2 Butt Joints LF 441 $0.02 $8.82 $13.10 $5,777.10 $2.00 $882.00
Appendix A Alternate-3 Saw Cutting Pavement LF 1411 $1.70 $2,398.70 $1.97 $2,779.67 $1.95 $2,751.45
Appendix A Alternate-4 Common Excavation CY 1492 $25.63 $38,239.96 $26.25 $39,165.00 $25.70 $38,344.40
Appendix A Alternate-5 Pulverize & Relay SY 10660 $2.50 $26,650.00 $3.84 $40,934.40 $2.25 $23,985.00
Appendix A Alternate-6 Remove 2.5-Inch Asphaltic Pavement by Milling SY 18351 $2.33 $42,757.83 $2.72 $49,914.72 $2.45 $44,959.95
Appendix A Alternate-7 Base Repair CY 1159 $44.00 $50,996.00 $44.45 $51,517.55 $67.35 $78,058.65
Appendix A Alternate-8 Manhole Adjustment, Cast Iron Paving Rings EACH 36 $350.00 $12,600.00 $258.83 $9,317.88 $290.00 $10,440.00
Appendix A Alternate-9 Water Valve or Water Box Adjustment EACH 19 $300.00 $5,700.00 $126.29 $2,399.51 $95.00 $1,805.00
Appendix A Alternate-10 Remove & Replace Concrete Curb & Gutter LF 1138 $64.25 $73,116.50 $67.19 $76,462.22 $78.67 $89,526.46
Appendix A Alternate-11 2-Inch Asphalt Surface, 4 MT 58-28 H TON 1287 $67.35 $86,679.45 $80.99 $104,234.13 $74.95 $96,460.65
Appendix A Alternate-12 2.5-Inch Asphalt Surface, 4 LT 58-28 S TON 2902 $62.40 $181,084.80 $70.21 $203,749.42 $58.65 $170,202.30
Appendix A Alternate-13 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2697 $59.50 $160,471.50 $71.91 $193,941.27 $64.66 $174,388.02
Appendix A Alternate-14 3-Inch Asphalt Binder, Base Patch (<8-Feet Width), 3 LT 58-28 S SY 1101 $20.05 $22,075.05 $26.43 $29,099.43 $24.00 $26,424.00
Appendix A Alternate-15 3-Inch Asphalt Binder, Base Patch (>=8-Feet Width), 3 LT 58-28 S SY 1101 $18.00 $19,818.00 $29.96 $32,985.96 $18.00 $19,818.00
Appendix A Alternate-16 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 89 $50.28 $4,474.92 $54.11 $4,815.79 $55.31 $4,922.59
Appendix A Alternate-17 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 1452 $1.89 $2,744.28 $2.53 $3,673.56 $2.90 $4,210.80
Appendix A Alternate-18 Pavement Marking, Epoxy, 4-Inch Solid, White LF 282 $9.50 $2,679.00 $14.40 $4,060.80 $9.50 $2,679.00
Appendix A Alternate-19 Pavement Marking, Epoxy, Word, White EACH 1 $275.00 $275.00 $353.60 $353.60 $275.00 $275.00
Appendix A Alternate-20 Pavement Marking, Epoxy, Arrow, White EACH 2 $265.00 $530.00 $313.19 $626.38 $265.00 $530.00
Appendix A Alternate-21 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 39 $18.00 $702.00 $25.76 $1,004.64 $18.00 $702.00
Appendix A Alternate-22 Traffic Control LUMP SUM 1 $13,522.43 $13,522.43 $22,000.00 $22,000.00 $8,500.00 $8,500.00
Water + Ohio Drive + Road Rehab Base Bid Total $2,618,674.00
Road Rehab Alternates Total
Base Bid Total with Alternates
Road Rehab Alternates
$751,877.24 $883,935.06 $803,130.02
$3,370,551.24
$2,790,812.90
$3,674,747.96
$3,016,580.02
$3,819,710.04
Page 2
Page 15 of 41
Base Bid Total $ 2,618,674.00 Base Bid Total $ 2,790,812.90 Base Bid Total $ 3,016,580.02
Item No. Description Unit Bid Qty Bid Unit Price Bid Price Bid Unit Price Bid Price Bid Unit Price Bid Price
S33 11 00-01 8-Inch C-900 PVC Watermain LF 1580 $199.00 $314,420.00 $201.05 $317,659.00 $199.00 $314,420.00
S33 11 00-02 8-Inch by 6-Inch Anchoring Tee EA 1 $815.00 $815.00 $823.39 $823.39 $815.00 $815.00
S33 11 00-03 8-Inch Gate Valve & Box EA 4 $3,375.00 $13,500.00 $3,409.74 $13,638.96 $3,375.00 $13,500.00
S33 11 00-04 6-Inch Gate Valve & Box EA 4 $2,375.00 $9,500.00 $2,399.45 $9,597.80 $2,375.00 $9,500.00
S33 11 00-05 Hydrant EA 4 $3,985.00 $15,940.00 $4,026.02 $16,104.08 $3,985.00 $15,940.00
S33 11 00-06 6-Inch Ductile Iron Hydrant Lead LF 61 $310.00 $18,910.00 $313.19 $19,104.59 $310.00 $18,910.00
S33 11 00-07 Connection of Water Main to Existing 8-Inch Water Main EA 2 $8,445.00 $16,890.00 $8,531.94 $17,063.88 $8,445.00 $16,890.00
S33 11 00-08 1-Inch Water Service LF 435 $195.00 $84,825.00 $197.01 $85,699.35 $195.00 $84,825.00
S33 11 00-09 2-Inch Water Service LF 126 $210.00 $26,460.00 $212.16 $26,732.16 $210.00 $26,460.00
S33 11 00-10 3-Inch Water Service LF 48 $305.00 $14,640.00 $308.14 $14,790.72 $305.00 $14,640.00
S33 11 00-11 4-Inch Water Service LF 26 $260.00 $6,760.00 $262.68 $6,829.68 $260.00 $6,760.00
S33 11 00-12 3-Inch Gate Valve & Box EA 2 $3,995.00 $7,990.00 $4,036.13 $8,072.26 $3,995.00 $7,990.00
S33 11 00-13 4-Inch Gate Valve & Box EA 1 $2,295.00 $2,295.00 $2,318.63 $2,318.63 $2,295.00 $2,295.00
S33 41 00-01 42-Inch CMP Storm Sewer LF 520 $299.00 $155,480.00 $302.08 $157,081.60 $299.00 $155,480.00
S33 41 00-02 42-Inch RCP Storm Sewer LF 101 $299.00 $30,199.00 $302.08 $30,510.08 $299.00 $30,199.00
S33 41 00-03 6-foot Catch Basin w/ Open Grate R-2560 EA 7 $8,350.00 $58,450.00 $8,435.96 $59,051.72 $8,350.00 $58,450.00
S33 41 00-04 8-foot Catch Basin w/ Open Grate R-2560 EA 2 $11,275.00 $22,550.00 $11,391.07 $22,782.14 $11,275.00 $22,550.00
S33 41 00-05 Connect to Existing Storm MH in S. 124th Street EA 1 $6,775.00 $6,775.00 $6,844.75 $6,844.75 $6,775.00 $6,775.00
S33 41 00-06 15-Inch CMP (Ohio Drive) LF 45 $145.00 $6,525.00 $146.49 $6,592.05 $145.00 $6,525.00
S33 41 00-07 15-Inch Concrete Endwalls (Ohio Drive) EA 2 $3,130.00 $6,260.00 $3,162.22 $6,324.44 $3,130.00 $6,260.00
S33 41 00-08 24-Inch CMP (Ohio Drive) LF 26 $175.00 $4,550.00 $176.80 $4,596.80 $175.00 $4,550.00
S33 41 00-09 24-Inch Concrete Endwalls (Ohio Drive) EA 1 $3,560.00 $3,560.00 $3,596.65 $3,596.65 $3,560.00 $3,560.00
S33 41 00-10 30-Inch CMP (Ohio Drive) LF 30 $205.00 $6,150.00 $207.11 $6,213.30 $205.00 $6,150.00
S33 41 00-11 20-Inch x 28-Inch CMP (Ohio Drive) LF 18 $170.00 $3,060.00 $171.75 $3,091.50 $170.00 $3,060.00
S33 41 00-12 Connect to Existing 2-Inch CMP EA 1 $1,980.00 $1,980.00 $2,000.38 $2,000.38 $1,980.00 $1,980.00
S33 41 00-13 Connect to Existing 30-Inch CMP EA 1 $2,040.00 $2,040.00 $2,061.00 $2,061.00 $2,040.00 $2,040.00
S33 41 00-14 Connect to Existing 19-Inch x 30-Inch CMP EA 1 $2,095.00 $2,095.00 $2,116.57 $2,116.57 $2,095.00 $2,095.00
S33 41 00-15 Ditch Restoration SY 2200 $6.80 $14,960.00 $8.03 $17,666.00 $7.00 $15,400.00
S33 41 00-16 Remove Asphalt Lining SY 2200 $5.10 $11,220.00 $5.15 $11,330.00 $10.15 $22,330.00
S33 41 00-17 Ditch Grading SY 2200 $7.10 $15,620.00 $7.17 $15,774.00 $5.80 $12,760.00
S33 42 20-01 15-CMP Culvert (Burdick Ave & Russel Ave Int.) LF 44 $125.00 $5,500.00 $126.29 $5,556.76 $125.00 $5,500.00
S33 42 20-02 15-Inch Concrete Endwalls (Burdick Ave & Russel Ave Int.) EA 2 $2,780.00 $5,560.00 $2,808.62 $5,617.24 $2,780.00 $5,560.00
Appendix A-1 Tack Coat GAL 1840 $3.00 $5,520.00 $3.53 $6,495.20 $2.25 $4,140.00
Appendix A-2 Saw Cutting Pavement LF 4243 $1.70 $7,213.10 $1.97 $8,358.71 $1.95 $8,273.85
Appendix A-3 Common Excavation CY 4288 $22.00 $94,336.00 $26.25 $112,560.00 $25.70 $110,201.60
Appendix A-4 Pulverize & Relay SY 36800 $2.50 $92,000.00 $3.72 $136,896.00 $2.05 $75,440.00
Appendix A-5 Base Repair CY 11074 $37.10 $410,845.40 $37.48 $415,053.52 $67.35 $745,833.90
Appendix A-6 Manhole Adjustment, Cast Iron Paving Rings EA 42 $350.00 $14,700.00 $258.83 $10,870.86 $290.00 $12,180.00
Appendix A-7 Water Valve or Water Box Adjustment EA 24 $300.00 $7,200.00 $126.29 $3,030.96 $95.00 $2,280.00
Appendix A-8 Remove & Replace Concrete Curb & Gutter LF 4646 $64.35 $298,970.10 $71.44 $331,910.24 $77.13 $358,345.98
Appendix A-9 2-Inch Asphalt Surface, 4 LT 58-28 S TON 3480 $63.85 $222,198.00 $68.00 $236,640.00 $65.95 $229,506.00
Appendix A-10 2-Inch Asphalt Surface, 4 MT 58-28 H TON 963 $70.15 $67,554.45 $79.00 $76,077.00 $70.65 $68,035.95
Appendix A-11 3-Inch Asphalt Binder, 3 LT 58-28 S TON 5469 $59.65 $326,225.85 $63.25 $345,914.25 $60.60 $331,421.40
Appendix A-12 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2019 $63.70 $128,610.30 $71.50 $144,358.50 $63.35 $127,903.65
Appendix A-13 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 253 $48.80 $12,346.40 $51.00 $12,903.00 $48.45 $12,257.85
Appendix A-14 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 4140 $1.89 $7,824.60 $2.53 $10,474.20 $2.90 $12,006.00
Appendix A-15 Pavement Marking, Epoxy, 4-Inch Solid, Double Yellow LF 174 $6.25 $1,087.50 $2.63 $457.62 $28.66 $4,986.84
Appendix A-16 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 61 $18.00 $1,098.00 $25.76 $1,571.36 $18.00 $1,098.00
Appendix A-17 Traffic Control LUMP SUM 1 $25,465.30 $25,465.30 $30,000.00 $30,000.00 $8,500.00 $8,500.00
Appendix A Alternate-1 Tack Coat GAL 1451 $3.00 $4,353.00 $3.53 $5,122.03 $2.25 $3,264.75
Appendix A Alternate-2 Butt Joints LF 441 $0.02 $8.82 $13.10 $5,777.10 $2.00 $882.00
Appendix A Alternate-3 Saw Cutting Pavement LF 1411 $1.70 $2,398.70 $1.97 $2,779.67 $1.95 $2,751.45
Appendix A Alternate-4 Common Excavation CY 1492 $25.63 $38,239.96 $26.25 $39,165.00 $25.70 $38,344.40
Appendix A Alternate-5 Pulverize & Relay SY 10660 $2.50 $26,650.00 $3.84 $40,934.40 $2.25 $23,985.00
Appendix A Alternate-6 Remove 2.5-Inch Asphaltic Pavement by Milling SY 18351 $2.33 $42,757.83 $2.72 $49,914.72 $2.45 $44,959.95
Appendix A Alternate-7 Base Repair CY 1159 $44.00 $50,996.00 $44.45 $51,517.55 $67.35 $78,058.65
Appendix A Alternate-8 Manhole Adjustment, Cast Iron Paving Rings EACH 36 $350.00 $12,600.00 $258.83 $9,317.88 $290.00 $10,440.00
Appendix A Alternate-9 Water Valve or Water Box Adjustment EACH 19 $300.00 $5,700.00 $126.29 $2,399.51 $95.00 $1,805.00
Appendix A Alternate-10 Remove & Replace Concrete Curb & Gutter LF 1138 $64.25 $73,116.50 $67.19 $76,462.22 $78.67 $89,526.46
Appendix A Alternate-11 2-Inch Asphalt Surface, 4 MT 58-28 H TON 1287 $67.35 $86,679.45 $80.99 $104,234.13 $74.95 $96,460.65
Appendix A Alternate-12 2.5-Inch Asphalt Surface, 4 LT 58-28 S TON 2902 $62.40 $181,084.80 $70.21 $203,749.42 $58.65 $170,202.30
Appendix A Alternate-13 4-Inch Asphalt Binder, 3 MT 58-28 H TON 2697 $59.50 $160,471.50 $71.91 $193,941.27 $64.66 $174,388.02
Appendix A Alternate-14 3-Inch Asphalt Binder, Base Patch (<8-Feet Width), 3 LT 58-28 S SY 1101 $20.05 $22,075.05 $26.43 $29,099.43 $24.00 $26,424.00
Appendix A Alternate-15 3-Inch Asphalt Binder, Base Patch (>=8-Feet Width), 3 LT 58-28 S SY 1101 $18.00 $19,818.00 $29.96 $32,985.96 $18.00 $19,818.00
Appendix A Alternate-16 Shouldering, Reclaimed Asphalt Pavement, 3/4-Inch Dense TON 89 $50.28 $4,474.92 $54.11 $4,815.79 $55.31 $4,922.59
Appendix A Alternate-17 Shoulder Restoration, Topsoil, Fertilizer, Seed, Matting, Watering LF 1452 $1.89 $2,744.28 $2.53 $3,673.56 $2.90 $4,210.80
Appendix A Alternate-18 Pavement Marking, Epoxy, 4-Inch Solid, White LF 282 $9.50 $2,679.00 $14.40 $4,060.80 $9.50 $2,679.00
Appendix A Alternate-19 Pavement Marking, Epoxy, Word, White EACH 1 $275.00 $275.00 $353.60 $353.60 $275.00 $275.00
Appendix A Alternate-20 Pavement Marking, Epoxy, Arrow, White EACH 2 $265.00 $530.00 $313.19 $626.38 $265.00 $530.00
Appendix A Alternate-21 Pavement Marking, Epoxy, 18-Inch, Stop Bar, White LF 39 $18.00 $702.00 $25.76 $1,004.64 $18.00 $702.00
Appendix A Alternate-22 Traffic Control LUMP SUM 1 $13,522.43 $13,522.43 $22,000.00 $22,000.00 $8,500.00 $8,500.00
2026 Roadway Rehabilitaiton and Greenridge Water Main Replacement
City of New Berlin
Unit Price Bid Tabulation
10:00 a.m., March 4, 2026
Water + Ohio Drive + Road Rehab Base Bid Total
Water
$2,618,674.00
Wolf Paving Co., Inc. Payne & Dolan, Inc.Stark Pavement Corporation
Waer Base Bid Total
Ohio Drive Storm Sewer Base Bid Total
Road Rehab Base Bid Total
Road Rehab Alternates Total
Base Bid Total with Alternates
$532,945.00 $538,434.50 $532,945.00
Ohio Drive Storm Sewer
$362,534.00 $368,806.98 $371,224.00
Road Rehab
$1,723,195.00 $1,883,571.42 $2,112,411.02
Road Rehab Alternates
$751,877.24 $883,935.06 $803,130.02
$3,370,551.24
$2,790,812.90
$3,674,747.96
$3,016,580.02
$3,819,710.04
Page 1
Page 16 of 41
Page 1 of 2
DATE: April 9, 2026
TO: Rubina Medina
City Clerk
FR: Mayor Dave Ament
RE: Mayoral Appointments for the April 14, 2026 Common Council Mtg
Board of Appeals Expiration Date
James (Jim) Oldham 4/30/2029
4187 S Regal Court
New Berlin WI 53151
drumguy@wi.rr.com
262-894-2477
(Reappointment)
Plan Commission Expiration Date
John Erdman 4/30/2028
18445 W Coffee Road
New Berlin WI 53146
414-617-7843
john@southeastsales.com
(New Appointment)
(Replace Margaret (Meg) Gardner)
Plan Commission Expiration Date
Scott Schulpius 4/30/2029
16840 W Beloit Road
New Berlin WI 53151
262-278-0115
sschulpius@aol.com
(Reappointment)
For Office Purposes Only
TT Eml Web Ltr Ethcs HB
For Office Purposes Only
TT Eml Web Ltr Ethcs HB
For Office Purposes Only
TT Eml Web Ltr Ethcs HB
Page 17 of 41
Page 2 of 2
Police and Fire Commission Expiration Date
Kathryn (Kate) Buer 4/30/2031
2871 S 127 th Street
New Berlin WI 53151
414-839-4396
CLEVELANDPUB@gmail.com
(Reappointment)
For Office Purposes Only
TT Eml Web Ltr Ethcs HB
Page 18 of 41
Committee of the Whole
MEETING MINUTES
March 24, 2026 - 6:00 PM
Zoom Meeting ID: 841 0836 9320
Via Zoom: https://us02web.zoom.us/j/84108369320
MINUTES
1. CALL MEETING TO ORDER
The City Clerk stated that the Common Council approved, at her request, holding the meeting via
electronic means (Zoom) on December 9, 2025, due to in-person absentee voting being conducted
in the Council Chambers and to ensure the security of election materials. The agenda included a
direct link to the Zoom meeting and the meeting ID: 841 0836 9320.
Mayor Ament called the meeting to order at 6:03 PM.
2. ROLL CALL; DECLARATION OF QUORUM; PUBLIC NOTICE
City Clerk Rubina R. Medina took the roll call as follows:
Present: Alderperson Hopkins, Alderperson La Fever, Alderperson Harenda, Alderperson Stribl,
Alderperson Horbinski (6:05 p.m.), Alderperson Kroupa
Excused: Alderperson Dave Maxey
Staff Present: Mayor Dave Ament, City Attorney Mark Blum, City Clerk Rubina R. Medina
The City Clerk confirmed that a quorum was present and that the meeting was properly posted in
compliance with the open meetings law.
3. APPROVAL OF MINUTES
A. March 10, 2026, Committee of the Whole Meeting Minutes
MOTION: Motion to Approve
Motion by: Alderperson Stribl
Second by: Alderperson Kroupa
VOTE:
Motion Passed 6-0
4. UTILITY & FINANCE
A. Discussion and possible recommendation to the Common Council to approve the March
25, 2026, Water Utility claims in the amount of $15,714.08, Sewer Utility claims in the
amount of $317,776.83, and General City claims in the amount of $679,777.43,
including General City claims checks dated March 4, 2026, in the amount of
Page 19 of 41
$284,955.97, tax overpayment checks totaling $12,617.81, and a We Energies EFT
payment of $97,672.76.
MOTION: Motion to Approve
Motion by: Alderperson Harenda
Second by: Alderperson Stribl
VOTE:
Motion Passed 6-0
5. MISCELLANEOUS
A. Department of Community Development Update
Greg Kessler, Director of the Community Development Department, provided an update.
Katie Roth, Recreation Manager, and Eric Snodgrass, Assistant Recreation Manager, also
provided an update on the Recreation Division.
B. Discussion and possible recommendation to the Common Council to approve
Resolution No. 2026-03 authorizing the Emergency Management Manager, Jim Burns,
Department of Community Development, to submit an application and supporting
worksheets to the State of Wisconsin Disaster Fund (WDF) for potential reimbursement
of eligible expenses incurred by the City during response and recovery efforts related to
the August 2025 flood event.
MOTION: Motion to Approve
Motion by: Alderperson Horbinski
Second by: Alderperson Stribl
VOTE:
Motion Passed 6-0
C. Discussion and possible recommendation to the Common Council to approve the 2026
Roadway Maintenance Joint and Crack Cleaning and Sealing Project contract with
Thunder Road, LLC, and inspection services by Ruekert & Mielke, Inc., contingent upon
receipt of a signed agreement and certificate of insurance.
MOTION: Motion to Approve
Motion by: Alderperson Hopkins
Second by: Alderperson Harenda
VOTE:
Motion Passed 6-0
D. Discussion and possible recommendation to the Common Council to approve an
agreement with CBS2 for inspection services associated with the 2026 Roadway
Rehabilitation portion of the Greenridge Watermain Replacement Project, contingent
upon receipt of a signed agreement and certificate of insurance.
MOTION: Motion to Approve
Motion by: Alderperson Stribl
Second by: Alderperson Horbinski
VOTE:
Motion Passed 6-0
Page 20 of 41
E. Discussion and possible recommendation to the Common Council to deny the base bid
and Alternates 1 and 2, for a total of $847,560, from Level Up Construction for the Live
Fire Training Tower Rehabilitation Project, based on a determination that it is in the best
interest of the City.
MOTION: Motion to Approve the denial of the base bid and alternates 1 & 2
Motion by: Alderperson Harenda
Second by: Alderperson La Fever
VOTE:
Motion Passed 6-0
F. Discussion and possible recommendation to the Common Council to approve a contract
with Chrome Fireworks, in the amount of $40,000, for the 4th of July fireworks display.
Ald. Stribl stated that all 4th of July festivities are funded through fundraising efforts and are
not supported by taxpayer dollars.
MOTION: Motion to Approve
Motion by: Alderperson Stribl
Second by: Alderperson Kroupa
VOTE:
Motion Passed 6-0
6. ADJOURN
MOTION: Motion to Adjourn at 6:48 PM
Motion by: Alderperson Kroupa
Second by: Alderperson Horbinski
VOTE:
Motion Passed 6-0
Respectfully Submitted,
Rubina R. Medina, City Clerk
Page 21 of 41
Distinct, Friendly Community - Extensive Transportation Network - Vibrant Future
City of New Berlin
City of New Berlin ▪ 3805 S. Casper Drive ▪ New Berlin, Wisconsin 53151-0921 ▪ (262)786-8610 ▪ www.newberlin.org
REQUESTED ACTION STATEMENT
April 1, 2026
TO: Mayor Ament
Common Council
FROM: Chief Mark Polzin, Fire Department
ISSUE: The current ambulance fee schedule has been in place since 2023. After a review of the current fee
schedule by EMS Medical Consultants, the Fire Department recommends to Council to increase
ambulance billing fees.
REQUESTED:
Recommend Common Council increase existing ambulance billing fees effective June 1, 2026, $300 increase for non-
resident BLS, ALS and critical care. $250 increase for resident BLS, ALS and critical care. Effective January 1, 2027
and January 1, 2028 all base rates will increase by $50 from the previous year. See the following fee schedule:
Effective July 1, 2026:
Non Resident: Current Rate Proposed Rate Resident: Current Rate Proposed Rate
ALS A0427 $ 1,550.00 $ 1,850.00 ALS A0427 $ 1,350.00 $ 1,600.00
ALS 2 A0433 $ 1,550.00 $ 1,850.00 ALS 2 A0433 $ 1,350.00 $ 1,600.00
BLS A0429 $ 1,300.00 $ 1,600.00 BLS A0429 $ 1,100.00 $ 1,350.00
BLS NE A0428 $ 1,300.00 $ 1,600.00 BLS NE A0428 $ 1,100.00 $ 1,350.00
NO TRANSPORT A0998 $ 600.00 $ 600.00 NO TRANSPORT A0998 $ 600.00 $ 600.00
MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE A0425 $ 24.00 $ 24.00
MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00
MILEAGE BLS A0380 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00
SCT A0434 $ 1,900.00 $ 2,200.00 SCT A0434 $ 1,600.00 $ 1,850.00
Effective January 1, 2027:
Non Resident: Current Rate Proposed Rate Resident: Current Rate Proposed Rate
ALS A0427 $ 1,550.00 $ 1,900.00 ALS A0427 $ 1,350.00 $ 1,650.00
ALS 2 A0433 $ 1,550.00 $ 1,900.00 ALS 2 A0433 $ 1,350.00 $ 1,650.00
BLS A0429 $ 1,300.00 $ 1,650.00 BLS A0429 $ 1,100.00 $ 1,400.00
Page 22 of 41
Distinct, Friendly Community - Extensive Transportation Network - Vibrant Future
BLS NE A0428 $ 1,300.00 $ 1,650.00 BLS NE A0428 $ 1,100.00 $ 1,400.00
NO TRANSPORT A0998 $ 600.00 $ 600.00 NO TRANSPORT A0998 $ 600.00 $ 600.00
MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE A0425 $ 24.00 $ 24.00
MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00
MILEAGE BLS A0380 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00
SCT A0434 $ 1,900.00 $ 2,250.00 SCT A0434 $ 1,600.00 $ 1,900.00
Effective January 1, 2028:
Non Resident: Current Rate Proposed Rate Resident: Current Rate Proposed Rate
ALS A0427 $ 1,550.00 $ 1,950.00 ALS A0427 $ 1,350.00 $ 1,700.00
ALS 2 A0433 $ 1,550.00 $ 1,950.00 ALS 2 A0433 $ 1,350.00 $ 1,700.00
BLS A0429 $ 1,300.00 $ 1,700.00 BLS A0429 $ 1,100.00 $ 1,450.00
BLS NE A0428 $ 1,300.00 $ 1,700.00 BLS NE A0428 $ 1,100.00 $ 1,450.00
NO TRANSPORT A0998 $ 600.00 $ 600.00 NO TRANSPORT A0998 $ 600.00 $ 600.00
MILEAGE A0425 $ 24.00 $ 24.00 MILEAGE A0425 $ 24.00 $ 24.00
MILEAGE ALS A0390 $ 24.00 $ 24.00 MILEAGE ALS A0390 $ 24.00 $ 24.00
MILEAGE BLS A0380 $ 24.00 $ 24.00 MILEAGE BLS A0380 $ 24.00 $ 24.00
SCT A0434 $ 1,900.00 $ 2,300.00 SCT A0434 $ 1,600.00 $ 1,950.00
FISCAL IMPACT:
Increasing the above ambulance fees will generate additional revenues. Approximately 70% of ambulance transports are
reimbursed through Medicare. Under federal regulations, Medicare reimbursement rates are fixed and not directly
influenced by local fee schedules. As a result, increases in the established fees will not significantly affect revenue
collected from Medicare patients.
RATIONALE:
The increase in additional revenues can be used to offset the increase in Ambulance Supply Fees.
Page 23 of 41
REQUESTED ACTION STATEMENT
MEMO TO: Mayor David Ament
Common Council
CC: Plan Commission (via email)
MEMO FROM: Greg Kessler, Director of Community Development
DATE: April 8, 2026
ISSUE: John Spitz with Western Contractors has filed a petition to rezone the
properties located at 2445 S. 179th Street (Tax Key #: 1185.990), 2345 S.
179th Street (Tax Key #: 1185.994) & Tax Key #: 1185.991 from M-1/SPO,
C-1 & C-2 to M-1/SPO & C-2 to remove the C-1 Zoning.
REQUESTED: Recommend to the Common Council that a Public Hearing be set for May
4, 2026 at 6:01 pm to be held before the Plan Commission to rezone the
properties located at 2445 S. 179th Street (Tax Key #: 1185.990), 2345 S.
179th Street (Tax Key #: 1185.994) & Tax Key #: 1185.991 from M-1/SPO,
C-1 & C-2 to M-1/SPO & C-2 to remove the C-1 Zoning.
RATIONALE: Per Chapter 275- 22 of the City’s Zoning Code, this applicant has filed a
completed application and petitioned the City to rezone this property. In
addition, per State Statute 62.23(7), the Common Council may refer to the
Plan Commission all petitions to rezone a property and require that a public
hearing be held to obtain public input and that the Plan Commission
formulate a recommendation. This recommendation shall be forwarded to
the Common Council for final action.
Page 24 of 41
REQUESTED ACTION STATEMENT
MEMO TO: Mayor David Ament
Common Council
CC: Plan Commission (via email)
MEMO FROM: Gregory W. Kessler, AICP - Director
DATE: April 7, 2026
ISSUE: Patrick Theodossiou with SunCap Property Group on behalf of Rockwell
Automation, Inc. has filed a petition to amend the Future Land Use Map
within the City’s Comprehensive Plan (Chapter 17 - Neighborhood “G”
Sections 26 and 35 – South Moorland Road Corridor, Chapter 18 –
Neighborhood “H” Westridge & Moorland Road, and Chapter 10 - Land
Use) from Business Park/Industrial & Urban Residential to Business
Park/Industrial and to rezone from A-1, A-2, R-4, M-1, P-1, C-1 & C-2 to
A-1, M-3/PUD, P-1, C-1, & C-2 for the parcels located at:
15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch,
Marie A. Rausch A. May – 2 Acres]
Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres]
Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie
Rausch A. May – 7.92 Acres]
15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch
– 20.34 Acres]
14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC –
80.22 Acres]
14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch
Revocable Trust - 39.83 Acres]
Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres]
Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres]
Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13
Acres]
Page 25 of 41
15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann,
Raymond E. Saltzmann – 34.94 Acres]
5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18
Acres]
REQUESTED: Recommend to Common Council that a joint public hearing be set for
June 1, 2026 at 6:00 p.m. to be held before the Plan Commission to
amend the Future Land Use Map within the City’s Comprehensive Plan
(Chapter 17 - Neighborhood “G” Sections 26 and 35 – South Moorland
Road Corridor, Chapter 18 – Neighborhood “H” Westridge & Moorland
Road, and Chapter 10 - Land Use) from Business Park/Industrial & Urban
Residential to Business Park/Industrial for the parcels located at:
14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC –
80.22 Acres]
14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch
Revocable Trust - 39.83 Acres]
AND
Recommend to the Common Council that a joint public hearing be set for
June 1, 2026 at 6:00 p.m. to be held before the Plan Commission to
rezone from A-1, A-2, R-4, M-1, P-1, C-1 & C-2 to A-1, M-3/PUD, P-1, C-
1, & C-2 for the parcels located at:
15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch,
Marie A. Rausch A. May – 2 Acres]
Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres]
Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie
Rausch A. May – 7.92 Acres]
15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch
– 20.34 Acres]
14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC –
80.22 Acres]
14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch
Revocable Trust - 39.83 Acres]
Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres]
Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres]
Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13
Acres]
Page 26 of 41
15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann,
Raymond E. Saltzmann – 34.94 Acres]
5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18
Acres]
RATIONALE: Per Chapter 275-21.1 of the City’s Zoning Code, this applicant has filed a
completed application and petitioned the City to amend the
Comprehensive Plan / Future Land Use Map for this property. Per this
section, the applicant submits the application to the Common Council for
initial review. DCD staff prepares a Requested Action Statement to refer
the request to the Plan Commission to hold a public hearing and take
action via a resolution. A report shall be forwarded to the Common
Council for final action.
Per Chapter 275-22 of the City’s Zoning Code, this applicant has filed a
completed application and petitioned the City to rezone these properties.
In addition, per State Statute 62.23(7), the Common Council may refer to
the Plan Commission all petitions to rezone a property and require that a
public hearing be held to obtain public input and that the Plan
Commission formulate a recommendation. These recommendations shall
be forwarded to the Common Council for final action.
Per Zoning Code Section 275-20I, the applicant has simultaneously filed
a Land Division application.
Note: Staff is continuing to prepare the 2030 Comprehensive Plan
Updates as time permits. Please note this request will include other basic
changes to these chapters. This will represent a public hearing for the
2030 Comprehensive Plan updates. Additional public hearings will be set
up to handle the remaining chapters at a future date.
Page 27 of 41
REQUESTED ACTION STATEMENT
TO: Common Council
Mayor Dave Ament
FROM: Gregory Kessler, AICP – Director of Community Development
RE: Requested Action Statement for the approval of an agreement with Ehlers &
Associates for $18,000 for the preparation of a Tax Incremental Financing
District (TID) Project Plan for TID #6 and setting a public hearing.
Authorization for the City of New Berlin Joint Review Board to convene all JRB
meetings via electronic means for this request.
DATE: April 7, 2026
REQUESTED ACTION # 1: Recommend to Common Council approval of an agreement to hire Ehlers &
Associates to prepare a TID Project Plan for Tax Incremental District #6 in the
amount of $18,000 and recommend to the Common Council that a public
hearing be set for June 1, 2026 at 6:01 PM to be held before the Plan
Commission for the properties located at:
15393 W. Grange Avenue (Tax Key #: 1290.998) [E. James Rausch, Marie A.
Rausch A. May – 2 Acres]
Tax Key #: 1290.998.002 [E. James Rausch – 10.11 Acres]
Tax Key #: 1290.998.003 [E. James Rausch, Marie A. Rausch, Marie Rausch A.
May – 7.92 Acres]
15301 W. Grange Avenue (Tax Key #: 1290.998.001) [E. James Rausch – 20.34
Acres]
14811 W. Grange Avenue (Tax Key #: 1290.999) [Loomis Farm, LLC – 80.22
Acres]
14655 W. Grange Avenue (Tax Key #: 1289.995) [Maureen E. Bosch Revocable
Trust - 39.83 Acres]
Page 28 of 41
Tax Key #: 1291.997 [Baas Farm, LLC - 24.49 Acres]
Tax Key #: 1291.986.001 [Baas Farm, LLC – 34.84 Acres]
Tax Key #: 1291.994 [Raymond E. Saltzmann, Marie L. Nielsen – 37.13 Acres]
15920 W College Avenue (Tax Key #: 1288.997) [Virgil A. Saltzmann, Raymond
E. Saltzmann – 34.94 Acres]
5900 S Moorland Road (Tax Key #: 1288.999) [Virgil Saltzmann – 32.18 Acres]
5851 S Sunny Slope Road (Tax Key #: 1289.997.001) [City of New Berlin Park –
39.17 Acres - The city’s park parcel to be part of the TIF boundary only to ensure
the half mile project boundary would include the entire scope of public roadway
projects.]
REQUESTED ACTION # 2: Discussion and possible recommendation to the Common Council to authorize
the City of New Berlin Joint Review Board to convene meetings via electronic
means rather than have a physical, in-place meeting.
FISCAL IMAPCT: The services offered by Ehlers & Associates are outlined in the attached
proposal. Based upon their “Scope”, the cost for their services would be
$18,000. Should additional analysis be required, their hourly rates are outlined
in the attached agreement. The cost of this analysis is paid for by the
applicants.
SOURCE OF FUNDS: TID #6 Account: TBD $18,000
RATIONALE / BACKGROUND: Patrick Theodossiou with SunCap Property Group on behalf of Rockwell
Automation, Inc. has made a request to the City for the creation of a TID which
would be known as TID #6. The purpose of this TID would be to provide a
funding mechanism for the reconstruction of public roadways to coincide with
construction of the proposed development of the Rockwell Automation Inc.
site. As with other established TID’s Ehlers and Associates would prepare and
present their feasibility and project plan analysis at an upcoming Council
meeting. Council action this evening would set the public hearing date on
creating the TID at the June 1, 2026 Plan Commission meeting.
As presented by Patrick Theodossiou with SunCap Property Group, the
proposed facility will be operated by Rockwell Automation, Inc. A Planned Unit
Development Overlay will be prepared to accommodate an advanced
manufacturing campus which may include manufacturing and assembly
operations, warehousing and distribution functions, office, administrative and
operational support uses. Phase I (South Building) will include ~ 770,000 sq. ft
of manufacturing and ~40,000 sq. ft. of office (Total for Phase I ~810,000 sq.
ft.). Future expansion of Phase I could be an additional approximate 200,000
sq. ft.
Page 29 of 41
Phase II (North Building along Grange Avenue) may be developed as light
industrial at a future date. Traffic Study estimated a possible 425,000 sq. ft.
building.
As cited in the application submittal, “To support this development, Rockwell
Automation, with the City of New Berlin’s support, proposes the creation of a
new Tax Increment District (TID 6) with a 15-year life. Consistent with City TIF
policy, TID funds would be used exclusively to finance public infrastructure
improvements necessary to support the project, including items such as water,
sanitary sewer, stormwater management, and public roadway improvements.
The City anticipates utilizing a portion of the increment for improvements to
Grange Avenue, with the remaining increment available for other eligible public
infrastructure investments. The proposed TIF assistance would be structured as
pay as you go, meaning Rockwell Automation would finance the infrastructure
improvements upfront and be reimbursed over time from the project generated
increment.”
The projected development values and project costs will be analyzed as part of
Ehlers’ project plan. Ehlers has proposed three phases to their work:
Phase I: Feasibility Analysis
Phase II: Project Plan Development and Approval (Tentative Timeline - Plan
Commission Public Hearing & Approval on June 1, 2026 and Common Council
Approval on June 9, 2026)
Phase III: State Submittal
Lastly, Ehlers will prepare and coordinate the creation of TID #6 and prepare &
file the appropriate documents with the State. The fees charged by Ehlers are
eligible project costs and reimbursable once the TID is created.
The City of New Berlin is required by Statute to hold a meeting of its Joint
Review Board to review the status of the existing Tax Incremental Financing
Districts in the City. Since this meeting includes representatives of Waukesha
County, the New Berlin School District and the Waukesha County Technical
College, it is helpful to be able to conduct the meeting via electronic means
rather than have a physical, in-place meeting.
The City created Ordinance No. 2651 on June 21, 2021 to authorize virtual
meetings. That Ordinance is codified in New Berlin Municipal Code Section 6-
36. Subsection (c) of that Code Section provides other Boards and Commissions
of the City, aside from the Committee of the Whole and the Common Council,
may, upon the approval of the Council, conduct special meetings via electronic
means.
Once a dates and times are determined when a quorum can be established, the
required notices for public meetings will be published.
Page 30 of 41
____________________________________________________________________________________________
Documentation of Municipal Advisor Relationship 1
Ehlers & Associates, Inc. April 7, 2026
April 7, 2026
Greg Kessler, Community Development Director
City of New Berlin, Wisconsin
3805 S Casper Dr
New Berlin, WI 53151-0921
Re: Written Municipal Advisor Client Disclosure with the City of New Berlin (“Client”) for 2027 Tax
Incremental Finance District #6 (“Project” Pursuant to MSRB Rule G-42)
Dear Greg:
As a registered Municipal Advisor, we are required by Municipal Securities Rulemaking Board (MSRB)
Rules to provide you with certain written information and disclosures prior to, upon or promptly, after the
establishment of a municipal advisory relationship as defined in Securities and Exchange Act Rule
15Ba1-1. To establish our engagement as your Municipal Advisor, we must inform you that:
1. When providing advice, we are required to act in a fiduciary capacity, which includes a duty of
loyalty and a duty of care. This means we are required to act solely in your best interest.
2. We have an obligation to fully and fairly disclose to you in writing all material actual or potential
conflicts of interest that might impair our ability to render unbiased and competent advice to you.
We are providing these and other required disclosures in Appendix A attached hereto.
As your Municipal Advisor, Ehlers shall provide this advice and service at such fees, as described within
Appendix B attached hereto.
This documentation and all appendices hereto shall be effective as of its date unless otherwise
terminated by either party upon 30 days written notice to the other party.
During the term of our municipal advisory relationship, this writing might be amended or supplemented to
reflect any material change or additions.
We look forward to working with you on this Project.
Sincerely,
Ehlers & Associates
Greg Johnson
Senior Municipal Advisor/Vice President
_______________
1 This document is intended to satisfy the requirements of MSRB Rule G-42(b) and Rule G-42(c).
Page 31 of 41
____________________________________________________________________________________________
Documentation of Municipal Advisor Relationship – Appendix A Page 1
Ehlers April 7, 2026
Appendix A
DISCLOSURE OF CONFLICTS OF INTEREST/OTHER REQUIRED INFORMATION
Actual/Potential Material Conflicts of Interest
Ehlers has no known actual or potential material conflicts of interest that might impair its ability
either to render unbiased and competent advice or to fulfill its fiduciary duty to Client.
Other Engagements or Relationships Impairing Ability to Provide Advice
Ehlers is not aware of any other engagement or relationship Ehlers has that might impair Ehlers’
ability to either render unbiased and competent advice to or to fulfill its fiduciary duty to Client.
Affiliated Entities
Ehlers offers related services through two affiliates of Ehlers, Bond Trust Service Corporation
(BTSC) and Ehlers Investment Partners (EIP). BTSC provides paying agent services while
Ehlers Investment Partners (EIP) provides investment related services and bidding agent
service. Ehlers and these affiliates do not share fees. If either service is needed in conjunction
with an Ehlers municipal advisory engagement, Client will be asked whether or not they wish to
retain either affiliate to provide service. If BTSC or EIP are retained to provide service, a
separate agreement with that affiliate will be provided for Client’s consideration and approval.
Solicitors/Payments Made to Obtain/Retain Client Business
Ehlers does not use solicitors to secure municipal engagements; nor does it make direct or
indirect payments to obtain or retain Client business.
Payments from Third Parties
Ehlers does not receive any direct or indirect payments from third parties to enlist Ehlers
recommendation to the Client of its services, any municipal securities transaction or any
financial product.
Payments/Fee-splitting Arrangements
Ehlers does not share fees with any other parties and any provider of investments or services to
the Client. However, within a joint proposal with other professional service providers, Ehlers
could be the contracting party or be a subcontractor to the contracting party resulting in a fee
splitting arrangement. In such cases, the fee due Ehlers will be identified in a Municipal Advisor
writing and no other fees will be paid to Ehlers from any of the other participating professionals
in the joint proposal.
Municipal Advisor Registration
Ehlers is registered with the Securities and Exchange Commission (SEC) and Municipal
Securities Rulemaking Board (MSRB).
Page 32 of 41
____________________________________________________________________________________________
Documentation of Municipal Advisor Relationship – Appendix A Page 2
Ehlers April 7, 2026
Material Legal or Disciplinary Events
Neither Ehlers nor any of its officers or municipal advisors have been involved in any legal or
disciplinary events reported on Form MA or MA-I nor are there any other material legal or
disciplinary events to be reported. Ehlers’ application for permanent registration as a Municipal
Advisor with the (SEC) was granted on July 28, 2014 and contained the information prescribed
under Section 15B(a)(2) of the Securities and Exchange Act of 1934 and rules thereunder. It did
not list any information on legal or disciplinary disclosures.
Client may access Ehlers’ most recent Form MA and each most recent Form MA-I by searching
the Securities and Exchange Commission’s EDGAR system (currently available at
http://www.sec.gov/edgar/searchedgar/companysearch.html) and searching under either our
Company Name (Ehlers & Associates, Inc.) or by using the currently available “Fast Search”
function and entering our CIK number (0001604197).
Ehlers has not made any material changes to Form MA or Form MA-I since that date.
Conflicts Arising from Compensation Contingent on the Size or Closing of Any
Transaction
The forms of compensation for municipal advisors vary according to the nature of the
engagement and requirements of the client. Compensation contingent on the size of the
transaction presents a conflict of interest because the advisor may have an incentive to advise
the client to increase the size of the securities issue for the purpose of increasing the advisor’s
compensation. Compensation contingent on the closing of the transaction presents a conflict
because the advisor may have an incentive to recommend unnecessary financings or
recommend financings that are disadvantageous to the client. If the transaction is to be delayed
or fail to close, an advisor may have an incentive to discourage a full consideration of such facts
and circumstances, or to discourage consideration of alternatives that may result in the
cancellation of the financing or other transaction.
Any form of compensation due a Municipal Advisor will likely present specific conflict of interests
with the Client. If a Client is concerned about the conflict arising from Municipal Advisor
compensation contingent on size and/or closing of their transaction, Ehlers is willing to discuss
and provide another form of Municipal Advisor compensation. The Client must notify Ehlers in
writing of this request within 10 days of receipt of this Municipal Advisor writing.
MSRB Contact Information
The website address of the MSRB is www.msrb.org. Posted on the MSRB website is a
municipal advisory client brochure that describes the protections that may be provided by MSRB
rules and how to file a complaint with the financial regulatory authorities.
Page 33 of 41
____________________________________________________________________________________________
Documentation of Municipal Advisor Relationship – Appendix B Page 1
Ehlers April 7, 2026
Appendix B
Scope of Service
Client has requested that Ehlers & Associates assist Client with creation of Tax
Incremental Finance district No. 6 (“Project”). Ehlers & Associates proposes and
agrees to provide the following scope of services:
Phase I – Feasibility Analysis
The purpose of Phase I is to determine whether the Project is a statutorily and
economically feasible option to achieve the Client’s objectives. This phase
begins upon your authorization of this engagement and ends on completion
and delivery of a feasibility analysis report. As part of Phase I services, Ehlers &
Associates will:
• Consult with appropriate Client officials to identify the Client’s objectives
for the Project.
• Provide feedback as to the appropriateness of using Tax Incremental
Financing in the context of the “but for” test.
• If the Project includes creation of or addition of territory to a district,
identify preliminary boundaries and gather parcel data from Client.
Determine compliance with the following statutory requirements as
applicable:
o Equalized Value test.
o Purpose test (industrial, mixed use, blighted area, in need of
rehabilitation or conservation, or environmental remediation).
• Prepare feasibility analysis report. The report will include the following
information, as applicable:
o Identification of the type or types of districts that may be created.
o A description of the type, maximum life, expenditure period and
other features corresponding to the type of district proposed.
o A summary of the development assumptions used with respect to
timing of construction and projected values.
o Projections of tax increment revenue collections to include annual
and cumulative present value calculations.
Page 34 of 41
Documentation of Municipal Advisor Relationship – Appendix B Page 2
Ehlers April 7, 2026
o Qualification of the district as a donor or recipient of shared
increment, and projected impact of any allocations of shared
increment.
o If debt financing is anticipated, a summary of the sizing, structure,
and timing of proposed debt issues.
o A cash flow pro forma reflecting annual and cumulative district fund
balances and projected year of closure.
o A draft timetable for the Project.
o Identification of how the creation date may affect the district’s
valuation date, the base value, compliance with the equalized value
test, and the ability to capture current year construction values and
changes in economic value.
o When warranted, evaluate, and compare options with respect to
boundaries, type of district, project costs and development levels.
o Ehlers & Associates will provide guidance on district design within
statutory limits to creatively achieve as many of the Client’s
objectives as possible and will provide liaison with State Department
of Revenue as needed in the technical evaluation of options.
• Present the results of the feasibility analysis to the Client’s staff, Plan
Commission, or governing body.
Phase II – Project Plan Development and Approval
If the Client elects to proceed following completion of the feasibility analysis,
the Project will move to Phase II. This phase includes preparation of the
Project Plan, and consideration by the Plan Commission1, governing body, and
the Joint Review Board. This phase begins after receiving notification from the
Client to proceed and ends after the Joint Review Board acts on the Project.
As part of Phase II services, Ehlers & Associates will:
• Based on the goals and objectives identified in Phase I, prepare a draft
Project Plan that includes all statutorily required components.
• We will coordinate with your staff, engineer, planner or other designated
party to obtain a map of the proposed boundaries of the district, a map
showing existing uses and conditions of real property within the district,
and a map showing proposed improvements and uses in the district.
1If Client has created a Redevelopment Authority or a Community Development Authority, that body may fulfill the
statutory requirements of the Plan Commission related to creation or amendment of the district.
Page 35 of 41
Documentation of Municipal Advisor Relationship – Appendix B Page 3
Ehlers April 7, 2026
• Submit to the Client an electronic version of the draft Project Plan for initial
review and comment.
• Coordinate with Client staff to confirm dates and times for the meetings
indicated within the table beginning on the following page. Ehlers &
Associates will ensure that selected dates meet all statutory timing
requirements and will provide documentation and notices as indicated.
Meeting Ehlers & Associates
Responsibility Client Responsibility
Initial Joint
Review Board
Prepare Notice of Meeting and
transmit to Client’s designated paper.
Mail meeting notice, informational
materials, and draft Project Plan to
overlapping taxing jurisdictions.
Provide agenda language to Client.
Attend meeting to present draft
Project Plan.
Post or publish agenda and
provide notification as
required by the Wisconsin
Open Records Law.
Prepare meeting minutes.
Designate Client Joint Review
Board representative.
Identify and recommend
Public Joint Review Board
representative for
appointment.
Plan
Commission
Public
Hearing
Prepare Notice of Public Hearing and
transmit to Client’s designated paper.
Post or publish agenda and
provide notification as
required by the Wisconsin
Open Records Law.
Page 36 of 41
Documentation of Municipal Advisor Relationship – Appendix B Page 4
Ehlers April 7, 2026
Meeting Ehlers & Associates
Responsibility Client Responsibility
Plan
Commission
Public
Hearing
For blighted area districts and in need
of rehabilitation or conservation
districts, provide a format for the
required individual property owner
notification letters.
Attend hearing to present draft
Project Plan.
Prepare and mail individual
property owner notices (only
for districts created as
blighted area, or in need of
rehabilitation or
conservation).
Prepare meeting minutes.
Plan
Commission
Provide agenda language to Client.
Attend meeting to present draft
Project Plan.
Provide approval resolution for Plan
Commission consideration.
Post or publish agenda and
provide notification as
required by the Wisconsin
Open Records Law.
Distribute Project Plan &
resolution to Plan
Commission members in
advance of meeting.
Prepare meeting minutes.
Governing
Body Action
Provide agenda language to Client.
Attend meeting to present draft
Project Plan.
Provide approval resolution for
governing body consideration.
Post or publish agenda and
provide notification as
required by the Wisconsin
Open Records Law.
Provide Project Plan &
resolution to governing body
members in advance of
meeting.
Prepare meeting minutes.
Joint Review
Board Action
Mail meeting notice and copy of final
Project Plan to overlapping taxing
jurisdictions.
Prepare Notice of Meeting and
transmit to Client’s designated paper.
Provide agenda language to Client.
Attend meeting to present final
Project Plan.
Provide approval resolution for Joint
Review Board consideration.
Post or publish agenda and
provide notification as
required by the Wisconsin
Open Records Law.
Prepare meeting minutes.
Page 37 of 41
Documentation of Municipal Advisor Relationship – Appendix B Page 5
Ehlers April 7, 2026
• Throughout the meeting process, provide drafts of the Project Plan and
related documents in sufficient quantity for the Client’s staff, Plan
Commission, governing body and Joint Review Board members.
• Provide advice and updated analysis on the impact of any changes made
to the Project Plan throughout the approval process.
Phase III – State Submittal
This phase includes final review of all file documents, preparation of filing
forms, and submission of the base year or amendment packet to the
Department of Revenue. This phase begins following approval of the district
by the Joint Review Board and ends with the submission of the base year or
amendment packet. As part of Phase III services, Ehlers & Associates will:
• Coordinate with Client’s assessor and other staff as necessary to obtain
parcel valuations, parcel data and other information needed for preparation
of the State forms that must be filed as part of the base year or
amendment packet.
• Assemble and submit to the Department of Revenue the required base
year or amendment packet to include a final Project Plan document
containing all required elements and information.
• Provide the Client with an electronic copy of the final Project Plan (and up
to 15 bound hard copies if desired).
• Provide the municipal Clerk with a complete electronic and/or hard copy
transcript of all materials as submitted to the Department of Revenue for
certification.
• Act as a liaison between the Client and the Department of Revenue during
the certification process in the event any questions or discrepancies arise.
Compensation - Flat Fee Portion of Engagement
In return for the services set forth in the “Scope of Service,” Client agrees to
compensate Ehlers & Associates as follows:
Phase I $ 7,500
Phase II $ 8,000
Phase III $ 2,500
Total $ 18,000
• Phase I base fee includes up to five financial scenarios. Additional scenarios will
be run as needed at a cost of $750/scenario.
• In the event Client determines not to proceed with the Project once a Phase has
been authorized, but prior to that Phase’s completion, the compensation due for
that Phase will be prorated to reflect the percentage of the work completed.
Page 38 of 41
Documentation of Municipal Advisor Relationship – Appendix B Page 6
Ehlers April 7, 2026
Compensation – Hourly Services Portion of Engagement
Ehlers & Associates will bill Client on an hourly basis for services requested by Client
in conjunction with the engagement that are not specifically identified in the Scope
of Service set forth in this letter. Examples would include:
• Attendance at additional meetings beyond the four required for approval or
amendment of the District (Organizational Joint Review Board, Plan Commission
(or CDA), Governing Body and Final Joint Review Board).
• Review of development agreements related to the District’s Project Plan and
participation in negotiations with developers.
Hourly services will be billed at a rate that is dependent upon the task/staff
required to meet Client request at no less than $175.00/hour and not to exceed
$400.00/ hour.
Payment for Services
For all compensation due to Ehlers & Associates, we will invoice Client for the
amount due at the completion of each Phase. Our fees include our normal travel,
printing, computer services, and mail/delivery charges. The invoice is due and
payable upon receipt by the Client.
Page 39 of 41
Documentation of Municipal Advisor Relationship – Appendix B Page 7
Ehlers April 7, 2026
Client Responsibility
The following expenses are not included in our Scope of Services, and are the
responsibility of Client to pay directly:
• Services rendered by Client’s engineers, planners, surveyors, appraisers,
assessors, attorneys, auditors, and others that may be called on by Client to
provide information related to completion of the Project.
• Preparation of maps necessary for inclusion in the Project Plan.
• Preparation of maps necessary for inclusion in the base year or amendment
packet.
• Publication charge for the Notice of Public Hearing and Notices of Joint Review
Board meetings.
• Legal opinion advising that Project Plan contains all required elements.
(Normally provided by municipal attorney).
• Preparation of District metes & bounds description. (Needed in Phase III for
creation of new districts, or amendments that add or subtract territory).
• Department of Revenue filing fee and annual administrative fees. The current
Department of Revenue fee structure is:
Current Wisconsin Department of Revenue Fee Schedules
Base Year Packet $1,000
Amendment Packet with Territory Addition
or Subtraction $1,000
Amendment Packet with Territory Addition
and Subtraction $2,000
Base Value Redetermination $1,000
Amendment Packet No Charge
Annual Administrative Fee $150
The above Proposal is hereby accepted by New Berlin, Wisconsin, by its
authorized officer:
Signed Title Date
Page 40 of 41
WEST GRANGE AVENUE
W
W
W
W
WWWWWWWWWWWWWWW
W
W W W W W W W W W W
WWW
W W W W W W W W
WWW
WWW
W
W
W
W
W
W
W
WWWW
W
W
W
W
W
W
W
WWWWW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW W W W W W W
W
W
WW
W
WW
DOC NO. 2196070
N:347335.97'E:2474811.83'N:347369.02'E:2477471.62'
D DSSSS
S
S
S
S
SSS
S
SSS
S
S
COMP.FLOODSTORAGE
COMPENSATORYFLOOD STORAGE
MOORLAND ROAD (COUNTY HIGHWAY "O")
GRANGE AVENUE
MOORLAND ROAD (COUNTY HIGHWAY "O")
COUNTYO
PROTECTEDPRIMARY ENVIRONMENTALCORRIDORPROTECTEDISOLATED NATURALRESOURCE AREA
PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR
PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR
PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR
PROTECTEDISOLATED NATURALRESOURCE AREA WETLANDS
WETLANDS
PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR
FLOODPLAIN
FLOODPLAIN
FLOODPLAIN
FLOODPLAIN
FLOODPLAINWETLANDS
FLOODPLAIN
EXISTINGSANITARYSEWER
POND
POND
POND
PUBLIC ROAD
PRIVATEROAD(PUBLIC STANDARDS)
WETLANDS
PROTECTEDPRIMARY ENVIRONMENTALCORRIDOR
CAR PARKING
CAR PARKING
OFFICELIGHTINDUSTRIALUSE
FUTURE TRUCK DOCKS& TRAILER STALLS
TRUCK DOCKS
TRUCK DOCKSTRAILER STALLS
FUTUREDEVELOPMENT
LANDSCAPE BUFFER
CARPARKING
FUTURE LIGHTINDUSTRIAL USE
STORMWATERPOND
FUTURE TRAILER STALLS
POTENTIALSUBSTATIONFUTURE TRUCK DOCKS
FUTURE TRUCK DRIVE
1" = 200'0400' GRAPHICAL SCALE (FEET)NORTH
SHEET SIZE: 30" x 42"
PINNACLE ENGINEERING GROUP PINNACLE ENGINEERING GROUP 1" = 200'-0"
5533-001-00
03/31/2026
SCHEMATIC SITE PLAN PROJECT GRAVITY
MAIN ENTRANCE
Page 41 of 41
Source: City of New Berlin website. First collected Oct 18, 2026.