RecordWell Data

Plan Commission Meeting — Agenda packet

Town of Plover · Portage County · Plan Commission Meeting · meeting of Mar 5, 2026 · Agenda packets

Open the original document More from Town of Plover

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TOWN OF PLOVER Application To Appear Before The Plan Commission IN ACCORDANCE WITH RESOLUTION #120104 Date: ______________________________ Parcel No: __________________________ Name: _____________________________ Current Zoning: _____________________ Address: ___________________________ Requested Zoning: ___________________ ___________________________ Address Of Parcel: _______________________________________________________ Adjacent Property Owners: _______________________________________________ Reason To Meet With Plan Commission: ____________________________________ ________________________________________________________________________ ________________________________________________________________________ Owner: ____________________________ Buyer: _____________________________ Signature Date Signature Date ____________________________ _____________________________ Printed Name Printed Name Procedures To Follow: 1. The Plan Commission or the town clerk/treasurer must be contacted to request appearance on the next town board meeting agenda; application may be sent to the requestor. 2. After meeting with the town board, a non-refundable filing fee of $125.00 will be required prior to meeting with the Plan Commission. 3. The owner of the property must sign the application and provide a map or drawing of the property. This map or drawing should include all requested changes. 4. The application, map or drawing with requested changes, and $125.00 fee should be returned to the town office to facilitate setting the meeting date with the Plan Commission. 5. The owner, buyer, or agent representing the request should be present at all meetings to answer questions about the request. 6. The Plan Commission will review the request and make a recommendation to the town board. 7. The request will be reviewed at the next town board meeting, and the town board will forward its recommendation to the Portage County Planning and Zoning Department. 8. The town chairman and the town clerk/treasurer will sign official certified survey maps and any other documentation required by Portage County or the State of Wisconsin. JOHN STANLEY JOHN STANLEY P ORTAGE COUNTY PLANNING AND ZONING DEPARTMENT 1462 STRONGS AVENUE, STEVENS POINT, WI 54481 P ROCEDURE FOR FILING A PETITION TO THE PORTAGE COUNTY BOARD OF ADJUSTMENT V ARIANCE – SPECIAL EXCEPTION – APPEALS 1. F orms entitled “PETITION TO THE PORTAGE COUNTY BOARD OF ADJUSTMENT” should be completed up to and including the signature and date. The property owner should put their name under “Owner” on the form. If a pros pective buyer or someone other than the owner would handle the petition, that person, firm, etc. should be listed as the “Agent for Owner.” 2. Under the area listed as “Petition Request” state in detail what is being petitioned. If the highway setback requirement is 63 feet from the centerline and the proposed structure cannot meet the setback, be sure to sta te what the proposed setback would be. 3. List the LEGAL DESCRIPTION of the property in question. The Portage County Register of Deeds/Lan d Des cription Office, (715)346-1344, can give the exact legal description of the property. The description can als o be obtained from the tax bill of your property. 4. The owner(s) of the property in which a petition is being requested must sign the petition. THE PROPOSED PURCHASER OR AGENT MAY NOT SIGN THE PETITION IN PLACE OF THE OWNER UNLESS WRITTE N AUTHORIZATION FROM THE OWNER IS RECEIVED BY THE PLANNING AND ZONING OFFICE. 5. An application for a Zoning Permit should be filled out in addition to the Board of Adjustment petition. The Zonin g P ermit Application and the Board of Adjustment forms should be submitted at the same time. 6. A detailed site plan should be submitted with the petition forms. 7. A $350 filing fee must accompany the forms when the petition is filed with the Portage County Planning and Zoning Office for a hearing at the regular meeting. If a special meeting is requested, the filing fee will be $ 700. T he filing fee helps defray the hearing costs. If a check is submitted, make it payable to “Portage County Zoning .” 8. The owner MUST contact the Town Board regarding the petition. This should be done well in advance of the public hearing to give the Town Board adequate time to provide a recommendation in writing to the Board of Adjustment. The Town may choose not to provide a recommendation. 9. The owner, agent, or someone familiar with the petition should be present at the public hearing. Failure to appear may result in a postponement of the hearing. 10. In some cases, the Board of Adjustment approval may be just one of a number of approvals necessary. It is the petitioner’s responsibility to obtain any necessary approvals from other agencies. These may include: A. Portage County Health Department B. Department of Natural Resources (DNR), State of Wisconsin C. Department of Safety and Professional Services (DSPS), State of Wisconsin D. Department of Transportation (DOT), State of Wisconsin E. Army Corps of Engineers (ACOE), US Government Regular public hearings are held the 3rd Monday of the month. Applications MUST be received by the 25th of the month preceding the hearing. This meeting date is subject to change. You may call the Planning and Zoning Office to confirm the correct date. If there are any questions on the above information, contact the Portage County Planning and Zoning Office at (715)346-1334. u:\stewart\master forms\boa forms\boa petition forms - revised 082616.doc PETITION TO THE PORTAGE COUNTY BOARD OF ADJUSTMENT VARIANCE – SPECIAL EXCEPTION – APPEALS P ETITION NUMBER _________ AGENT FOR OWNER Nam e __________________________________ A ddress ________________________________ ____ ___________________________________ City State Zip T elephone Number _______________________ FEE ________ DATE RECEIVED ___________ OWNER Name __________________________________ Address ________________________________ _______________________________________ City State Zip Telephone Number _______________________ Email: _________________________________ E mail: _________________________________ PETITION REQUEST (State briefly what is being petitioned)  SPECIAL EXCEPTION  VARIANCE  APPEAL FOR RECONSIDERATION  APPEAL OF ADMINISTRATIVE DECSION P ROPERTY LOCATION AND DESCRIPTION G ov’t Lot # ________, ________ ¼, of the _________ ¼ of Section _________, T __________N, R _________ E T own of __________________________________________, Area _______________________________ Acres P arcel Number ____________________________________ Zoning P roperty/Site Address _________________________________________________________________________ Legal Description of Property____________________________________________________________________ I, the undersigned, agree to abide by any conditions of approval established by the Board of Adjustment and with all applicable Portage County Ordinances and to allow the Planning and Zoning Department access to the property at any reasonable time for the purpose of inspection to assure compliance with the zoning laws relative to the issuance of this petition. I acknowledge that I am responsible for complying with State and Federal laws concerning construction near or on wetlands, lakes, and streams. Wetlands that are not associated with open water can be difficult to identify. I understand that failure to comply may result in removal or modification of construction that violates the law, or other penalties or costs. For more information, regarding wetlands visit the Department of Natural Resources web page (http://dnr.wi.gov/topic/wetlands/ ) or contact a DNR Service Center. __ ____________________________ ____________________________________________________ Date Signature of Owner THE PROJECT IS A 324,320 SF NEW COLD STORAGE FACILITY FOR AMERICOLD LOCATED IN PLOVER, WISCONSIN. THE NEW COLD STORAGE WILL BE LOCATED ON THE PARCEL TO THE WEST OF THE EXISTING MCCAIN/AMERICOLD FACILITY. THE PROJECT WILL CONSIST OF A HIGH BAY FREEZER, LOW BAY FREEZER, TRUCK LOADING DOCK, RAIL DOCK, ATU LOADING DOCK, ENGINE ROOM, AND OFFICE SPACE. 350.00 12/18/2025 PET-2026-002 PLANNING AND ZONING DEPARTMENT 1462 STRONGS AVENUE, STEVENS POINT, WI 54481 • PHONE: 715-346-1334 PLANNING • ZONING AND CODE ADMINISTRATION • LAND AND WATER CONSERVATION • ON-SITE WASTE WATER RESOURCES • LAND INFORMATION (GIS) • ECONOMIC DEVELOPMENT • SURVEYOR M EMORANDUM TO : Town of Plover FROM: Chris Mrdutt - Zoning Coordinator DATE: January 13, 2026 RE: Special exception request by ART Mortgage Borrower Propco 2013 LLC (MFG) and Americold Logistics, LLC, Owners, Zach Marschke, Agent for Owner(s), to construct a 324,320 sq.ft. cold storage facility, truck load dock, rail spur, and office space in the Industrial Zoning District, Town of Plover. Parcel # 030230733-16.05 – 10953 State Hwy 54 East, Wisconsin Rapids 54494 B ackground Americold Logistics is proposing a new project to construct a 324,320 sq.ft. cold storage facility that will include a high bay freezer, low bay freezer, truck loading dock, rail dock (spur) engine room, and office space., of Parcel # 030230733-16.05, located in the Town of Plover. The Industrial Zoning District requires special exception approval from the Portage County Board of Adjustment (BOA). A similar request was approved by the Town of Plover and BOA on March 14, 2022. A permit for that approval was never obtained and the project did not go forward. A nalysis A Special Exception permit must be approved by BOA. The Town should review the request and make a recommendation of approval or denial and can recommend specific conditions be attached. Any conditions recommended to the Board shall be measured, reasonable, and enforceable. See the attached sheet for a summary of the required evaluations, findings, potential conditions, and other applicable Ordinance standards the BOA will use to review the request. • T he property is 38.79 acres in size and the current land use consists of the Americold cold storage warehouse facility along the eastern portion of the property. On February 15, 2022, the Portage County Board approved the rezoning of 18.26 acres from A1 Exclusive Agricultural Zoning to Industrial Zoning. This property was then combined with the existing Americold Property to create the current 38.79 acre parcel. The Town of Plover identifies this property in their Future Land Use Plan as Industrial Land Use, so the Change from A1 to Industrial was consistent with their plan. • A B OA petition, grading and stormwater plans, elevation drawings, a stormwater management plan and a zoning permit application has been submitted to our office and is included in the packet to the Town. • The existing land uses around this proposal are an industrial food processing and packaging plant to the east, vacant wooded lots to the south and west, and State Highway 54 and CN Railroad to the north. The closest neighboring residence is ~750’ to the west. • This property has direct access to the CN railroad and State Highway 54. This proposal includes constructing a railroad spur along the west side of the proposed building. • The Industrial zoning district requires a 6’ side yard setback and a 25’ rear yard setback. This facility proposes a 60’ side yard setback and a 40’ rear yard setback. The building will have a max height of 99’ and all structures will be more than 50’ from the State Hwy 54 East right-of-way. • A fire lane is proposed to wrap around the west and south side of the facility. • A stormwater management plan has been submitted to the DNR and our department. • A sanitary permit has been submitted to the state for approval and will be reviewed and issued by our department. • A traffic study has been submitted to WI-DOT to determine if the ingress / egress into this site needs any upgrades. I have been informed the Owners/Agent are more than willing to work with WI-DOT and will follow any recommendations that come forward. • There appears to be a 15-20’ area west of the railroad spur where natural woody vegetation could be left to allow for screening. Stormwater retention basins are planned for the area along the south property line. Natural woody vegetation that is not in a retention areas should be left to help provide screening to the south. Approximately 85% of the parcel will be developed leaving a small percentage of green space. • There are 55 parking spots for employees, 2-52 drop trailer lots, and a parking lot for 20 trucks. A ll commercial development is subject to site plan review by Portage County Planning and Zoning Department staff prior to issuance of a Zoning Permit. An overview of the proposed business and preliminary site plan has been submitted by the applicant (see attached). The Ordinance defined site plan review criteria and some details of the request are highlighted below: 7 .1.6.1 Building, Area, Height, Yards and Parking ( 9) All commercial development, in any zoning district, is subject to site plan review by Portage County Planning and Zoning Department staff prior to issuance of a Zoning Permit. Site plan review shall include the following: ( a) Road access This property directly accesses State Highway 54 and the CN Rail Road. Americold is currently working with the WI-DOT and has supplied a traffic analyses. This analyses will help determine if the access into the facility needs to be widened from 26’ to 36’. State H ighway 54 is a 4 lane Highway which allows cars to navigate around semi-trailers that are entering and leaving this site. The proposed rail spur would enter the property west of the access driveway into the site. ( b) Stormwater Control Plan and/or Construction Site Erosion Plan A Portage County Stormwater and Construction Site Erosion Control permit will need to be issued prior to the issuance of a Zoning Permit. Land Conservation Staff have preliminarily reviewed the plan and feel there is adequate room to manage the stormwater on the property. Land and Water Conservation Division will continue to review the preliminary stormwater design, make recommendations, and when all the standards are met will approve the stormwater plan. ( c) Parking and paving All parking areas will be paved with either concrete or asphalt. The parking lot is designed to allow semi-trailers to turn around and back into the loading docks and/or drop trailers while minimalizing congesting other semi-trailers. There is a large employee parking lot located along the east side of the new building. The Portage County Zoning Ordinance requires 1 parking spot for each four employees that our on the premises at any one time. I believe the proposed 55 employee parking stalls is adequate. ( d) Landscaping and screening This property currently is heavily wooded with mature trees. To help screen and protect the property, a 20’ wide strip of the natural wooded vegetation should be left around the perimeter. This will not apply where the railroad spur will enter the property or on the south side of the property where there is an existing overhead transmission line and proposed stormwater retention basins. ( e) Lighting Proposed lighting for this project consists of lighting that will illuminate the loading docks and parking lots. Lighting will be directed downward and shielded to prevent light from illuminating neighboring properties or State Hwy 54 ( f) Adequacy of setback for structures and storage. Setbacks required by specific zoning districts may need to be modified based on site specific conditions. Commercial structures 100 feet tall or greater shall be set back from the nearest property and/or right-of-way line a distance equal to the height of the structure. The Industrial Zoning District requires a 6-foot side yard setback and a 25-foot rear yard setback. The closes setback for the proposed structure is 60’ to the west property line. It appears the new rail road spur on the west side of the facility will be ~20’ from the west property line. ( g) An approved Stormwater Control Plan from the WI-DNR must be on file prior to issuance of a Zoning Permit This proposal disturbs more than an acre; therefore, a Wi-DNR stormwater permit will need to be obtained prior to construction commencing. I f the Board determines the petition has merit, the Planning and Zoning Department encourages you discuss attaching the following conditions: 1. O btain a Portage County Zoning Permit. 2. Obtain a Portage County Sanitary Permit. 3. A Stormwater and Construction Site Erosion Control Plan must be approved by the Portage County Land and Water Conservation Division. 4. Obtain a WI-DNR Stormwater Permit prior to the start of construction. 5. The 20’ wide “Wooded Buffer” along the west property line must remain in a wooded vegetated state. 6. The structure cannot exceed 99’ in height. 7. The two previous tax parcels that were combined to make Parcel# 030230733- 16.05 need to be surveyed to create one lot on a certified survey map. 8. Recommendations made by the WI-DOT regarding access improvements as a result of the traffic analysis shall be implemented. PROJECT LOCATION A NEW PROJECT FOR: AMERICOLD LOGISTICS PLOVER, WI COLD STORAGE AND RAIL DOCK Sheet No: Project No: Sheet Title: Designed By: Checked By: REV DATE Sheet Size: E1 Sub-Consultant Logo REV-A 2025-06-16 REV-B 2025-06-16 REV-C 2025-06-18 REV-D 2025-06-25 REV-E 2025-07-02 REV-F 2025-08-27 REV-G 2025-09-04 REV-H 2025-09-11 REV-J 2025-09-15 REV-K 2025-09-17 REV-L 2025-09-22 REV-M 2025-09-26 REV-N 2025-09-29 REV-P 2025-11-06 REV-Q 2025-11-13 REV-R 2025-11-20 REV-S 2025-12-01 REV-T 2025-12-02 REV-U 2025-12-04 REV-V 2025-12-12 12/18/2025 2:01:10 PM Autodesk Docs://Americold - Plover, WI/Americold - Plover-A_v24.rvt G-001 25F095 COVER SHEET AMERICOLD LOGISTICS PLOVER, WI USA Author Checker PLOVER COLD STORAGE VICINITY PLAN (NTS)SITE PLANNINGPROJECT DESCRIPTION THE PROJECT IS A 324,320 SF NEW COLD STORAGE FACILITY FOR AMERICOLD LOCATED IN PLOVER, WISCONSIN. THE NEW COLD STORAGE WILL BE LOCATED ON THE PARCEL TO THE WEST OF THE EXISTING MCCAIN/AMERICOLD FACILITY. THE PROJECT WILL CONSIST OF A HIGH BAY FREEZER, LOW BAY FREEZER, TRUCK LOADING DOCK, RAIL DOCK, ATU LOADING DOCK, ENGINE ROOM, AND OFFICE SPACE. PROJECT INFORMATION: 10953 STATE HIGHWAY 54 PLOVER, WI 54467 PARCEL NUMBER: # 030230733-16.05 SITE: AREA OF SITE: 38.79 ACRES JHA: TOWN OF PLOVER PORTAGE COUNTY DEPARTMENT OF SAFETY AND PROFESSIONAL SERVICES PLANNING ZONE: INDUSTRIAL LEGAL DESCRIPTION: L1 CSM#1503-5-261 BNG PT E1/2 OF SE1/4 &PRCLS B & C CSM#1750-6-208 & LOT 1 CSM #2637-9-195 IN SESE & OUTLOT 1, CSM# 011469 DOC-873199 BNG PRT NWSE & SWSE & ESMT 783446; S33 T23 R07 38.79A 881891 881892 (MFG) AREA OF IMPERVIOUS SURFACES: TOTAL EXISTING BUILDINGS XXX,XXX SF (XX.X%) TOTAL EXISTING PAVING XXX,XXX SF (XX.X%) TOTAL EXISTING IMPERVIOUS SURFACE XXX,XXX SF (XX.X%) PROPOSED NEW BUILDINGS XXX,XXX SF (XX.X%) PROPOSED NEW PAVING XXX,XXX SF (XX.X%) TOTAL PROPOSED IMPERVIOUS SURFACE XXX,XXX SF (XX.X%) TOTAL SITE IMPERVIOUS SURFACE XXX,XXX SF (XX.X%) AREA OF PERVIOUS SURFACES TOTAL AREA XXX,XXX SF (XX.X%) PARKING: TOTAL NUMBER OF PARKING STALLS PROVIDED: ## PARKING SPACES ## ADA PARKING SPACES TRAILER PARKING SPACES LOADING DOCK POSITIONS LANDSCAPING REQUIREMENTS: TOTAL AREA INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL ENGERGY CONSERVATION CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 INTERNATIONAL EXISTING BUILDING CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL FIRE CODE 2021 2017 ANSI A117.1 OHSA 1910 OCCUPATIONAL SAFETY AND HEALTH STANDARDS PROJECT TEAM APPLICABLE CODES AMERICOLD LOGISTICS SOUTH TOWER, #600 10 GLELAKE PKWY NE ATLANTA, GA 30328 470-471-3512 CONTACT: JOHN STANLEY JOHN.STANLEY@AMERICOLD.COM FISHER CONSTRUCTION GROUP 625 FISHER LANE BURLINGTON, WA 98233 360.757.4094 CONTACT: KEVIN WATKINS KDW@FISHERCGI.COM OWNER GENERAL CONTRACTOR FISHER CONSTRUCTION GROUP 625 FISHER LANE BURLINGTON, WA 98233 360.757.4094 CONTACT: ZACH MARSCHKE ZJM@FISHERCGI.COM ARCHITECT POINT OF BEGINNING 4941 KIRSCHLING CT STEVENS POINT, WI 54481 715.344.9999 CONTACT: MELISSA KLUCK MELISSAK@POBINC.COM CIVIL/LANDSCAPE STRUCTURAL COMPANY ADDRESS ADDRESS PHONE NUMBER CONTACT: NAME EMAIL: VOLKMANN RR N60 W14625 KAUL MENOMONEE FALLS, WI 53051 262.252.3377 CONTACT: ED WEBB ED@VOLKMANNRR.COM MECHANICAL/PLUMBING RAIL ECON-ELECTRIC 4610 PLOVER RD WISCONSIN RAPIDS, WI 54494 715-423-8440 CONTACT: ZACH SCHOLL SCHOLLZ@ECONELECTRIC.COM ELECTRICAL ICEBERG COOLING 1101 42ND ST NW WINTER HAVEN, FL 33881 844.322.3569 CONTACT: BARRETT EVANS BARRET@ICEBERGCOOLING.COM AHERN FIRE PROTECTION 855 MORRIS STREET FOND DU LAC, WI 54935 920-921-9020 CONTACT: JUSTIN SADOWSKI JSADOWSKI@JFAHERN.COM REFRIGERATION COMPANY ADDRESS ADDRESS PHONE NUMBER CONTACT: NAME EMAIL: FIRE PROTECTION RACKING THIS TITLE SHEET CONTAINS A LIST OF DRAWINGS WHICH COMPRISE A FULL SET OF DRAWINGS FOR THIS PROJECT. ANY CONTRACTOR, SUBCONTRACTOR, VENDOR OR ANY OTHER PERSON PARTICIPATING IN OR BIDDING ON THIS PROJECT SHALL BE RESPONSIBLE FOR THE INFORMATION CONTAINED IN ANY AND ALL SHEETS OF DRAWINGS AND SPECIFICATIONS. IF ANY PERSON, PARTY OR ENTITY ELECTS TO SUBMIT BIDS FOR ANY PORTION, OR ALL, OF THIS PROJECT, THAT PERSON, PARTY OR ENTITY SHALL BE RESPONSIBLE FOR ANY AND ALL INFORMATION CONTAINED IN THESE DRAWINGS AND SPECIFICATION, INCLUDING, BUT NOT LIMITED TO, ANY SUBSEQUENT ADDENDUMS OR CLARIFICATIONS THAT MAY BE ISSUED. NOTES SWISSLOG 400 PERIMETER CENTER TERRACE NE, SUITE 550 ATLANTA, GA 30346 561-757-0626 CONTACT: TIM MOSIER TIM.MOSIER@SWISSLOG.COM AUTOMATION FISHER CONSTRUCTION GROUP 625 FISHER LANE BURLINGTON, WA 98233 360.757.4094 CONTACT: ARTHUR FELLOWS AGF@FISHERCGI.COM DN UTILITY VAULT FUEL TANK CONCRETE ELECTRIC PANEL ELECTRIC BOX S.T.H. "54" CANADIANNATIONALRAILROAD S S MW FO e EB EB EB AC R/W R/WR/W R/W DRIVEWAY ACCESS SIGN SIGN POND GATE GATE GATE GATE GATE GATE 35'-10" 105'-10" 1/4" / 1'-0"1/4" / 1'-0" 1/4" / 1'-0" 1/4" / 1'-0" 1/4" / 1'-0" 1/4" / 1'-0" FIRE LANE / RAIL CAR MAINT. 55 PARKING STALLS; 3 ADA STORM POND ATU DOCK AREA PUMP BLDG & WATER TANK NEW OFFICE (1 STORY) 52 DROP TRAILER SPOTS NEW RAIL LINE 54 DROP TRAILER SPOTS LANDSCAPE SCREENING AREA STORM POND EXISTING POND PROPERTY LINE EXISTING RAIL PROPERTY LINE PROPERTY LINE PROPERTY LINE HIGHWAY 54 EXISTING SITE ENTRANCE (TO REMAIN) NEW GUARD SHACK EXISTING 21 DROP TRAILERS EXISTING RAIL DOCK EXISTING TRUCK DOCK EXISTING WELL EXISTING WELL EXISTING WELL NEW TRUCK YARD 20 TRUCK SPOTS NEW TRUCK DOCK (28' TO BOD AT EAVE) NEW RAIL DOCK (28' TO BOD AT EAVE) NEW LOW BAY (50') NEW HIGH BAY (80') NEW ATU DOCK AREA ENGINE RM & CONDENSER STAND PENTHOUSE FINAL LOCATION TBD 12-14' TALL LOW BAY ROOF BOD 55' AT RIDGELINE PENTHOUSE FINAL LOCATION TBD 12-14' TALL SETBACK REQ. 60'-0" SETBACK REQ. 60'-0" 53'-0" 20'-0" NEW RAIL LINE CLR FOR RAIL 18'-0" FIRE LANE 20'-0" 100'-0"53'-0" 53'-0"100'-0"53'-0" 71'-0" M IN. SETBACK 40'-0" 10'-0" STORM POND HYDRANT CLR SPACE 6'-0" ATU TRUCK RAMP 1.25% SLOPE AWAY FROM BLDG REQ. FOR FIRST 75' HYDRANT CLR SPACE 6'-0" 10' - 0"8' - 6"8' - 6"26' - 0"8' - 6"9' - 6" 176.00° 171.00° FUTURE ATU DOCK EXPANSION A-142 1ø 41' - 7" NEW COLD STORAGE BUILDING 324,320 SF Sheet No: Project No: Sheet Title: Designed By: Checked By: REV DATE Sheet Size: E1 Sub-Consultant Logo REV-A 2025-06-16 REV-B 2025-06-16 REV-C 2025-06-18 REV-D 2025-06-25 REV-E 2025-07-02 REV-F 2025-08-27 REV-G 2025-09-04 REV-H 2025-09-11 REV-J 2025-09-15 REV-K 2025-09-17 REV-L 2025-09-22 REV-M 2025-09-26 REV-N 2025-09-29 REV-P 2025-11-06 REV-Q 2025-11-13 REV-R 2025-11-20 REV-S 2025-12-01 REV-T 2025-12-02 REV-U 2025-12-04 REV-V 2025-12-12 12/18/2025 2:00:44 PM Autodesk Docs://Americold - Plover, WI/Americold - Plover-A_v24.rvt A-100 25F095 ARCHITECTURAL SITE PLAN AMERICOLD LOGISTICS PLOVER, WI USA Author Checker PLOVER COLD STORAGE 1" = 50'-0" A-142 A-100 1ARCHITECTURAL SITE PLAN

Source: Town of Plover website. First collected Oct 1, 2026.