RecordWell Data

Plan Commission — Agenda Packet

City of Pewaukee · Waukesha County · Plan Commission · meeting of Aug 20, 2026 · Agenda packets

Open the original document More from City of Pewaukee

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Planning Department W240 N3065 Pewaukee Road Pewaukee WI 53072 Phone: 262-691-0770 PLAN COMMISSION MEETING NOTICE AND AGENDA Thursday, August 20, 2026 6:00 PM Pewaukee City Hall Common Council Chambers W240N3065 Pewaukee Road, Pewaukee, WI 1. Call to Order and Pledge of Allegiance 2. Items for Discussion and Action 2.1 Discussion and Action Regarding a Certified Survey Map for Waukesha State Bank for the Purpose of Combining Two Lots on the Former Ruekert Mielke Property Located at W233 N2080 Ridgeview Parkway (PWC 0953984007 & PWC 0953984008) 2.2 Discussion and Action Regarding the Architectural Changes to the Shorepoint Church Site and Building Plan Approvals for Property Located on the Southwest Corner of Duplainville Road and Capitol Drive Originally Approved on 11/21/2024 (PWC 0912983, PWC 0912984, PWC 0912985) 2.3 Discussion and Action Regarding Re-Approval of the Shorepoint Church Certified Survey Map for Property Located on the Southwest Corner of Duplainville Road and Capitol Drive Originally Approved on 11/21/2024 (PWC 0912983, PWC 0912984, PWC 0912985) 3. Adjournment Ami Hurd Deputy Clerk Community Development Coordinator August 13, 2026 NOTICE It is possible that members of other governmental bodies of the municipality may be in attendance to gather information that may form a quorum at the above stated meeting. No action will be taken by any governmental body other than the governmental body specifically referred to above in this notice. Any person who has a qualifying disability under the Americans with Disabilities Act that requires the meeting or materials at the meeting to be in an accessible format must contact the City Planner/Community Development Director Nick Fuchs, at (262) 691-6007 three business days prior to the meeting so that arrangements may be made to accommodate your request. Page 1 of 25 Planner & Community Development Director W240N3065 Pewaukee Road Pewaukee, Wisconsin 53072 262.691.6007 fuchs@pewaukee.wi.us REPORT TO THE PLAN COMMISSION Meeting of August 20, 2026 Date: August 6, 2026 Project Name: Waukesha State Bank Certified Survey Map Project Address/Tax Key No.: W233N2080 Ridgeview Parkway / PWC 0953984002 Applicant: Waukesha State Bank Property Owner: Waukesha State Bank Current Zoning: B-4 Office District 2050 Land Use Map Designation: Office Commercial Use of Surrounding Properties: Vacant Rm-3 District property planned for the Ridgeview Apartments to the north, office uses to the south, office and industrial to the east and industrial to the west. Project Description/Analysis The Plan Commission and Common Council approved a Certified Survey Map on March 21, 2024, and April 1, 2024, respectively, to subdivide the property located at W233N2080 Ridgeview Parkway into two separate parcels. The property owner at that time, Ruekert-Mielke, planned to construct an office building on the newly created parcel. Since then, Ruekert-Mielke has sold the property to Waukesha State Bank. Waukesha State Bank is now proposing to recombine the two parcels into a single lot. The proposed lot is 7.07-acres. There are no site or building changes proposed. Recommendation Staff recommends approval of the certified survey map to combine the two parcels located at approximately W233N2080 Ridgeview Parkway (PWC 0953984007 & 0953984002). Page 2 of 25 CERTIFIED SURVEY MAP NO. _________RM814PBC:\USERS\BROZITE\DC\ACCDOCS\RUEKERT & MIELKE, INC-\9287-10000 WSB-RIDGEVIEW PARKWAY CSM\PROJECT FILES\SURVEY\CSM\Z_CSMRPCSM.DWG WaukeshaKenoshaMadisonGlobal Water Centerwww.ruekertmielke.comFox ValleyENWS2001000400SCALE IN FEET ENWS Page 3 of 25 2001000400SCALE IN FEET CERTIFIED SURVEY MAP NO. _________RM814PBC:\USERS\BROZITE\DC\ACCDOCS\RUEKERT & MIELKE, INC-\9287-10000 WSB-RIDGEVIEW PARKWAY CSM\PROJECT FILES\SURVEY\CSM\Z_CSMRPCSM.DWG WaukeshaKenoshaMadisonGlobal Water Centerwww.ruekertmielke.comFox ValleyENWS Page 4 of 25 CERTIFIED SURVEY MAP NO. _________RM814PBC:\USERS\BROZITE\DC\ACCDOCS\RUEKERT & MIELKE, INC-\9287-10000 WSB-RIDGEVIEW PARKWAY CSM\PROJECT FILES\SURVEY\CSM\Z_CSMRPCSM.DWG WaukeshaKenoshaMadisonGlobal Water Centerwww.ruekertmielke.comFox Valley Page 5 of 25 CERTIFIED SURVEY MAP NO. _________RM814PBC:\USERS\BROZITE\DC\ACCDOCS\RUEKERT & MIELKE, INC-\9287-10000 WSB-RIDGEVIEW PARKWAY CSM\PROJECT FILES\SURVEY\CSM\Z_CSMRPCSM.DWG WaukeshaKenoshaMadisonGlobal Water Centerwww.ruekertmielke.comFox Valley Page 6 of 25 Office of the Planner & Community Development Director W240N3065 Pewaukee Road Pewaukee, Wisconsin 53072 262.691.6007 fuchs@pewaukee.wi.us REPORT TO THE PLAN COMMISSION Meeting of August 20, 2026 Date: August 6, 2026 Project Name: Shorepoint Church Project Address/Tax Key No.: Not Assigned/PWC 0912983, W223N3481 Duplainville Road/PWC 0912984, and N34W22407 Capitol Drive/PWC 0912985 Applicant: Pastor Brian Engl, Shorepoint City Church, Inc. Property Owner: Shorepoint City Church Inc. Current Zoning: I-1 Institutional District and UC Upland Conservancy District 2050 Land Use Map Designation: Government/Institutional and Floodplains, Lowland, & Upland Conservancy and Other Natural Areas Use of Surrounding Properties: Capitol Drive and Two-Family Residential to the north, Quad Graphics to the south, M-1 District properties to the east, and agricultural land to the west. Introduction In 2024, Shorepoint Church submitted a Rezoning Application, Comprehensive Master Plan Amendment, Certified Survey Map (CSM), and Site and Building Plan Review Application to allow construction of a church facility. The Plan Commission tabled the applications at its September 19, 2024 meeting and subsequently approved them at its November 21, 2024 meeting. The Common Council approved the development at its December 2, 2024 meeting. Following these approvals, the applicant has continued to refine the plans and has worked with the Engineering Department to obtain approval of the civil and stormwater management plans. The applicant has also been waiting for the moratorium to be lifted on Duplainville Road to allow for the necessary utility extensions to the site. Project Description/Analysis Certified Survey Map (CSM) The Certified Survey Map was not recorded, and its approval has since expired. Therefore, the applicant is requesting re-approval of the CSM. The only change since the prior approval is the addition of a water main easement requested by staff. Page 7 of 25 Planner & Community Development Director Nick Fuchs Site and Building Plan Review Since the 2024 approvals, the applicant has revised the architecture and proposed building materials. The applicant has submitted revised elevations and a narrative describing the proposed changes. The elevations approved by the Plan Commission on November 21, 2024, are also attached. Recommendation The applicant has indicated that material samples will be brought to the meeting. Staff recommends that the Plan Commission review the samples, particularly the metal panels, to determine whether the proposed materials and architectural changes are appropriate for the development. Page 8 of 25 SHOREPOINT CHURCH Proposed Elevation Modifications Submittal Package August 3, 2026 • Exterior Renderings • Photos of Finished Projects with Similar Finishes • Elevations • Narrative of Finishes Page 9 of 25 3117 2nd Avenue South | Birmingham, AL 35233 | p 205.870.3090 | f 205.870.3093 | www.LIVEdesigngroup.com Date Project Number This drawing is the property of LIVE design group pc, and is not to be reproduced, copied, or altered in whole or in part or used for any purpose without the approval of LIVE design group pc, and is to be returned upon request. 7/31/2026 4:23:48 PM LV.00 07/27/26 25013 EXTERIOR RENDERINGS & MATERIALS Owner N34W22407 CAPITOL DRIVE, PEWAUKEE, WI 53072 SHOREPOINT SHOREPOINT N34W22407 CAPITOL DRIVE, PEWAUKEE, WI 53072 Revisions No. Description Date 1 Revision 1 2026-03- 0 2 2 Revision 2 2026-04- 17 CULTURED STONE EXAMPLE STANDING SEAM METAL ROOF EXAMPLE SMOOTH ARCHITECTURAL METAL PANEL EXAMPLE BLACK ALUMINUM WINDOW & DOOR EXAMPLE EXTERIOR RENDERING 3 EXTERIOR RENDERING 2 EXTERIOR RENDERING 1 Page 10 of 25 3117 2nd Avenue South | Birmingham, AL 35233 | p 205.870.3090 | f 205.870.3093 | www.LIVEdesigngroup.com Date Project Number This drawing is the property of LIVE design group pc, and is not to be reproduced, copied, or altered in whole or in part or used for any purpose without the approval of LIVE design group pc, and is to be returned upon request. 7/31/2026 4:23:49 PM LV.01 07/27/26 25013 EXAMPLE PROJECTS Owner N34W22407 CAPITOL DRIVE, PEWAUKEE, WI 53072 SHOREPOINT SHOREPOINT N34W22407 CAPITOL DRIVE, PEWAUKEE, WI 53072 Revisions No. Description Date 1 Revision 1 2026-03- 02 2 Revision 2 2026-04- 17 SMOOTH LIGHT METAL PANEL CHURCH OF THE HIGHLANDS | BIRMINGHAM, AL ROCK CITY CHURCH | COLUMBUS, OHIO SOUTH COAST CHURCH | MOBILE, ALCITY REACH CHURCH | CEDAR PARK, TX SMOOTH DARK METAL PANEL SMOOTH DARK METAL PANEL SMOOTH DARK METAL PANEL CHURCH PROJECTS WITH SIMILAR EXTERIOR FINISHES Page 11 of 25 FIRST FLOOR 0" LEVEL 2 10'-0" 1 A4.00 _______ SIDE WING PARAPET 21'-0" LOBBY PARAPET 28'-0" WORSHIP PARPET 35'-0" TOP OF CROSS 40'-0" PAINTED METAL COPING DECORATIVE JOINTS ALUMINUM STORE FRONT TYP. PAINTED STEEL BEAMS AND COLUMNS CULTURED STONE COLUMN BASE CULTURED STONE PAINTED METAL CROSS ARCHITECTURAL METAL FINISH METAL PANEL SYSTEM - ARCHITECTURAL FINISH PAINTED METAL COPING STANDING SEAM METAL ROOF 2 A4.10 _______ 3 A4.10 _______ METAL PANEL SYSTEM - ARCHITECTURAL FINISH 3 A4.11 _______ F F D E D B B FIRST FLOOR 0" SIDE WING PARAPET 21'-0" LOBBY PARAPET 28'-0" WORSHIP PARPET 35'-0" PAINTED STEEL BEAMS AND COLUMNS CULTURED STONE COLUMN BASE ARCHITECTURAL METAL PANEL PAINTED METAL COPING STANDING SEAM METAL ROOF ALUMINUM STORE FRONT TYP. 2 A4.00 _______3 A4.00 _______ 1 A4.10 _______ METAL PANEL SYSTEM - ARCHITECTURAL FINISH PAINTED BLOCK GUTTER AND DOWN SPOUT 1 A4.11 _______ C I A A A A A A A A 3'-0" 25'-0" 25'-0" 25'-0" FIRST FLOOR 0" 1 A4.00 _______ SIDE WING PARAPET 21'-0" LOBBY PARAPET 28'-0" WORSHIP PARPET 35'-0" DARK GREY SIDINGPAINTED METAL COPING ALUMINUM STORE FRONT TYP. ARCHITECTURAL METAL PANEL DARK GREY SIDING PAINTED METAL COPING PAINTED BLOCK HOLLOW METAL DOOR 2 A4.11 _______ A FIRST FLOOR 0" ROOF 20'-0" SIDE WING PARAPET 21'-0" LOBBY PARAPET 28'-0" WORSHIP PARPET 35'-0" TOP OF CROSS 40'-0" GLU-LAMINATED BEAMS AND COLUMNS CULTURED STONE COLUMN BASE PAINTED METAL CROSS STANDING SEAM METAL ROOF PAINTED METAL COPING LIGHT FILTERING WINDOW EYEBROW ALUMINUM STORE FRONT TYP. 2 A4.00 _______ 3 A4.00 _______ METAL PANEL SYSTEM - ARCHITECTURAL FINISH METAL PANEL SYSTEM - ARCHITECTURAL FINISH GUTTER AND DOWN SPOUT 1 A4.11 _______ H H H F J PAINTED TUBE CANOPY STRUCTURE - SEE STRUCTURAL DRAWINGS 20'-0" 20'-0" 18'-0" 20'-0" 20'-0" 20'-0" METAL DOWN SPOUTS 3117 2nd Avenue South | Birmingham, AL 35233 | p 205.870.3090 | f 205.870.3093 | www.LIVEdesigngroup.com Date Project Number This drawing is the property of LIVE design group pc, and is not to be reproduced, copied, or altered in whole or in part or used for any purpose without the approval of LIVE design group pc, and is to be returned upon request. [ FOR CONSTRUCTION] 2/16/2026 12:28:01 PM A3.00 02/16/26 25013 EXTERIOR ELEVATIONS Owner N34W22407 CAPITOL DRIVE, PEWAUKEE, WI 53072 SHOREPOINT SHOREPOINT N34W22407 CAPITOL DRIVE, PEWAUKEE, WI 53072 1/8" = 1'-0"1 NORTH EXTERIOR ELEVATION 1/8" = 1'-0"2 WEST EXTERIOR ELEVATION 1/8" = 1'-0"3 SOUTH EXTERIOR ELEVATION 1/8" = 1'-0"4 EAST EXTERIOR ELEVATION Revisions No. Description Date Page 12 of 25 LIVE design group | 3117 2nd Ave S, Birmingham, AL 35233 | 205.870.3090 | LIVEdesigngroup.com August 3rd, 2026 Shorepoint Church: Material Changes Narrative NORTH ELEVATION Previous Approval • Exterior materials are EIFS & Precast Panels with a cultured stone wainscot. • Exterior Canopy is glu-laminated beams and columns with cultured stone column base wraps and standing seam metal roofing. • Aluminum windows and doors Updated Design • Exterior materials are Architectural Horizontal Metal Panel system with a smooth finish and cultured stone wainscot. • Painted Metal Cross and exterior signage • Exterior Canopy is painted steel beams and columns with cultured stone column base wraps and standing seam metal roofing. • Aluminum windows and doors SOUTH ELEVATION Previous Approval • Exterior materials are EIFS & Precast Panels. • Aluminum windows and doors. Updated Design • Exterior materials are Architectural Horizontal Metal Panel system with a standard finish and painted CMU block to conceal the mechanical yard. • Aluminum windows and hollow metal doors. WEST ELEVATION Previous Approval • Exterior materials are EIFS & Precast Panels. • Metal eyebrow roof with wood ceiling. • Aluminum windows and doors. Updated Design • Exterior materials are Architectural Horizontal Metal Panel system with a smooth finish. • Aluminum windows and hollow metal doors. EAST ELEVATION Previous Approval • Exterior materials are EIFS & Precast Panels. • Metal eyebrow at windows. • Aluminum windows and doors. • Storefront doors to be aluminum and all other doors to be hollow metal typ. Updated Design • Exterior materials are Architectural Horizontal Metal Panel system with a smooth finish. • Aluminum windows. • Storefront doors to be aluminum and all other doors to be hollow metal typ. Page 13 of 25 MAIN LEVEL 100' - 0" WORSHIP PARAPET 130' - 0" CLASSROOM PARAPET 120' - 0" OFFICE PARAPET 116' - 0" LOBBY PARAPET 126' - 0" TOP OF CROSS 140' - 0" PAINTED METAL CROSS STANDING SEAM METAL ROOFING STANDING SEAM METAL ROOFING INTERNALLY LIT LETTERS LIGHT EIFS DARK EIFS DARK EIFS LIGHT EIFS LIGHT PRECAST PANELS LIGHT PRECAST PANELS CULTURED STONE CULTURED STONE GLU-LAMINATED BEAMS AND COLUMNS ALUMINUM WINDOWS AND DOORS (TYPICAL) METAL EYEBROW DECORATIVE 'V' GROOVE DECORATIVE 'V' GROOVE METAL EYEBROW ROOF WITH WOOD CEILING MAIN LEVEL 100' - 0" WORSHIP PARAPET 130' - 0" CLASSROOM PARAPET 120' - 0" OFFICE PARAPET 116' - 0" LOBBY PARAPET 126' - 0" TOP OF CROSS 140' - 0" PAINTED METAL CROSS DARK EIFS DARK EIFS LIGHT EIFS LIGHT PRECAST PANELS DARK EIFS ALUMINUM DOORS AND WINDOWS (TYPICAL) DECORATIVE 'V' GROOVE METAL EYEBROW METAL EYEBROW ROOF COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH SCALE: 1/8" = 1'-0" A-2 1 NORTH ELEVATION SCALE: 1/8" = 1'-0" A-2 3 SOUTH ELEVATION A-2 Page 13 of 114 Page 14 of 25 MAIN LEVEL 100' - 0" WORSHIP PARAPET 130' - 0" CLASSROOM PARAPET 120' - 0" OFFICE PARAPET 116' - 0" LOBBY PARAPET 126' - 0" TOP OF CROSS 140' - 0" PAINTED METAL CROSS LIGHT EIFS DARK EIFS LIGHT PRECAST PANELS LIGHT EIFS ALUMINUM WINDOWS AND DOORS (TYPICAL) STANDING SEAM METAL ROOFING GLU-LAMINATED BEAMS AND COLUMNS CULTURED STONE DARK EIFS DECORATIVE 'V' GROOVE METAL EYEBROW ROOF PLAN 135' - 0" MAIN LEVEL 100' - 0" WORSHIP PARAPET 130' - 0" CLASSROOM PARAPET 120' - 0" OFFICE PARAPET 116' - 0" LOBBY PARAPET 126' - 0" TOP OF CROSS 140' - 0" PAINTED METAL CROSS LIGHT EIFS DARK EIFS LIGHT PRECAST PANELS LIGHT EIFS ALUMINUM WINDOWS AND DOORS (TYPICAL) STANDING SEAM METAL ROOFING GLU-LAMINATED BEAMS AND COLUMNS CULTURED STONE DECORATIVE 'V' GROOVE METAL EYEBROW ROOF WITH WOOD CEILING WOOD PANELS AT ENTRY COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH SCALE: 1/8" = 1'-0" A-3 1 EAST ELEVATION SCALE: 1/8" = 1'-0" A-3 2 WEST ELEVATION A-3 Page 14 of 114 Page 15 of 25 COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH A-4 Page 15 of 114 Page 16 of 25 COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH A-5 Page 16 of 114 Page 17 of 25 COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH A-6 Page 17 of 114 Page 18 of 25 COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH A-7 Page 18 of 114 Page 19 of 25 COPYRIGHT 2024 C November 11, 2024 PLANS AND IMAGES CREDIT TO SHOREPOINT CHURCH A-8 ROOF TOP EQUIPMENT SCREENS ARCHITECTURAL PRECAST PANELS GLU -LAMINATED BEAMS AND COLUMNS EIFS (EXTERIOR INSULATION FINISHING SYSTEM) COMBINATION OF TEXTURED PANELS AND SMOOTH PANELS PANELS TO INCLUDE VERTICAL AND HORIZONTAL JOINTS ROOF TOP SCREENS TO MATCH BUILDING MATERIALS / COLORS CULTURED STONE OR NATURAL STONE METAL ROOFING AT SLOPED ROOFS HORIZONTAL AND VERTICAL JOINTS LIGHT COLORED SMOOTH EIFS DARK COLORED SMOOTH EIFS Page 19 of 114 Page 20 of 25 CAPITOL DR. - S.T.H. 190DUPLAINVILLE RD.LOT 125' SETBACK25' SETBACK20' SETBACK25' SETBACKwww.thesigmagroup.com1300 West Canal StreetMilwaukee, WI 53233Phone: 414-643-4200Fax: 414-643-4210 LEGENDLOCATION MAP Page 21 of 25 SANSANSAN>>>>>>>>>>>WWWW>>CAPITOL DR. - S.T.H. 190DUPLAINVILLE RD.LOT 1PROPOSEDSTORM SEWER(TYP)PROPOSEDSANITARY SEWER(TYP)PROPOSED WATER MAIN(TYP)STORM WATER MAINTENANCEACCESS EASEMENTCAPITOL DR. - S.T.H. 190DUPLAINVILLE RD.LOT 1 www.thesigmagroup.com1300 West Canal StreetMilwaukee, WI 53233Phone: 414-643-4200Fax: 414-643-4210 Page 22 of 25 Sheet 3 of 5 Sheets CERTIFIED SURVEY MAP NO. ALL OF CERTIFIED SURVEY MAP NO. 1295, AND LANDS, ALL BEING PART OF THE NORTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SECTION 12, TOWN 7 NORTH, RANGE 19 EAST, IN THE CITY OF PEWAUKEE, WAUKESHA COUNTY, WISCONSIN. SURVEYOR’S CERTIFICATE I, James G. Schneider, Professional Land Surveyor, do hereby certify: THAT I have surveyed, divided and mapped the following parcel of land: All of Certified Survey Map No. 1295, and Lands, all being p art of the Northwest 1/4 of the Southeast 1/4 of Section 12, Town 7 North, Range 19 East, in the City of Pewaukee, Waukesha County, Wisconsin, bounded and described as follows: Commencing at the Southwest corner of the Southeast 1/4 of said Section 12; thence N0º15’56”W along the West line of said 1/4 Section, 1978.27 feet to the point of beginning of lands to be described; thence continuing N0º15’56”W along the West line of said 1/4 Section, 628.53 feet to a point in the South right of way line of Capitol Drive (S.T.H. 190); thence N83º20’25”E along said South right of way line, 411.66 feet; thence S88º59’19”E along said South right of way line, 336.67 feet to a point in the West erly right of way of Duplainville Road , said point also being the Northeasterly corner of Certified Survey Map ( CSM) No. 1295, thence S2 º23’09”E along said Westerly right of way line and the Easterly line of said CSM , 25.66 feet; thence N87 º36’51”E along said Westerly right of way line and the Easterly line of said CSM , 5.00 feet, thence S2º23’09”E along said Westerly right of way line and the Easterly line of said CSM , 147.00 feet to a point; thence S14º31’55”W along said Westerly right of way line and the Easterly line of said CSM , 525.35 feet, thence N89 º01’56”W, 623.04 feet to the point of beginning. Said lands containing 10.814 acres of land, more or less. That I have made such survey, land division, and plat at the direction of Shorepoint Church, OWNER of said lands. That such map is a correct representation of all the exterior boundaries of the land surveyed and the land division thereof made. That I have complied with Chapter 236.34 of the Wisconsin Statutes and the Regulations of the City of Pewaukee in surveying, dividing, and mapping the same. James G. Schneider S-2127 This instrument was drafted by James G. Schneider Page 23 of 25 Sheet 4 of 5 Sheets CERTIFIED SURVEY MAP NO. ALL OF CERTIFIED SURVEY MAP NO. 1295, AND LANDS, ALL BEING PART OF THE NORTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SECTION 12, TOWN 7 NORTH, RANGE 19 EAST, IN THE CITY OF PEWAUKEE, WAUKESHA COUNTY, WISCONSIN. . CORPORATE OWNER’S CERTIFICATE I, Brian Engel (Pastor) of Shorepoint Church, OWNER, do hereby certify: THAT, I have caused the lands described in the foregoing certificate of James G. Schneider, Surveyor, to be surveyed, divided, and mapped. WITNESS the hand and seal of said OWNERS on this day of , 20___. Witness Brian Engel (Pastor) STATE OF WISCONSIN) WAUKESHA COUNTY )ss PERSONALLY came before me on this day of , 20__ the above named Brian Engel (Pastor) to me known to be the person who executed the foregoing certificate and acknowledged the same. My Commission expires Notary Public This instrument was drafted by James G. Schneider Page 24 of 25 Sheet 5 of 5 Sheets CERTIFIED SURVEY MAP NO. ALL OF CERTIFIED SURVEY MAP NO. 1295, AND LANDS, ALL BEING PART OF THE NORTHWEST 1/4 OF THE SOUTHEAST 1/4 OF SECTION 12, TOWN 7 NORTH, RANGE 19 EAST, IN THE CITY OF PEWAUKEE, WAUKESHA COUNTY, WISCONSIN. CITY OF PEWAUKEE PLAN COMMISSION APPROVAL APPROVED by the City of Pewaukee Plan Commission on this day of 20____. Steve Bierce, Chairman Date Colleen Brown, Secretary Date COMMON COUNCIL CERTIFICATE OF APPROVAL I certify that this Certified Survey Map was approved under Resolution File No. , adopted by the Common Council of the City of Pewaukee on , and is hereby approved. Steve Bierce, Village President Date Kelly Tarczewski, Deputy Clerk Date This instrument was drafted by James G. Schneider Page 25 of 25

Source: City of Pewaukee website. First collected Oct 7, 2026.